   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "Nexus Hubbard Campus",
   "locality": "Hubbard",
   "state": "Ohio",
   "capacity_gw": 7.2,
   "builder": "Nexus",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Nexus Hubbard Campus](https://datacenterindex.ai/projects/manual-12) \u2014 7.2 GW, Hubbard, OH, United States (Nexus) \u00b7 under construction"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Nexus Hubbard Campus](https://datacenterindex.ai/projects/manual-12) \u2014 7.2 GW, Hubbard, OH, United States (Nexus) \u00b7 under construction"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Nexus Hubbard Campus](https://datacenterindex.ai/projects/manual-12) \u2014 7.2 GW, Hubbard, OH, United States (Nexus) \u00b7 under construction"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Nexus Hubbard Campus](https://datacenterindex.ai/projects/manual-12) \u2014 7.2 GW, Hubbard, OH, United States (Nexus) \u00b7 under construction"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Nexus Hubbard Campus](https://datacenterindex.ai/projects/manual-12) \u2014 7.2 GW, Hubbard, OH, United States (Nexus) \u00b7 under construction"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Nexus Hubbard Campus](https://datacenterindex.ai/projects/manual-12) \u2014 7.2 GW, Hubbard, OH, United States (Nexus) \u00b7 under construction"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "Hyperion AI DC (Louisiana)",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Hyperion AI DC (Louisiana)](https://datacenterindex.ai/projects/manual-72) \u2014 5.0 GW, Richland Parish, LA, United States (Meta) \u00b7 under construction"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Hyperion AI DC (Louisiana)](https://datacenterindex.ai/projects/manual-72) \u2014 5.0 GW, Richland Parish, LA, United States (Meta) \u00b7 under construction"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Hyperion AI DC (Louisiana)](https://datacenterindex.ai/projects/manual-72) \u2014 5.0 GW, Richland Parish, LA, United States (Meta) \u00b7 under construction"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Hyperion AI DC (Louisiana)](https://datacenterindex.ai/projects/manual-72) \u2014 5.0 GW, Richland Parish, LA, United States (Meta) \u00b7 under construction"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Hyperion AI DC (Louisiana)](https://datacenterindex.ai/projects/manual-72) \u2014 5.0 GW, Richland Parish, LA, United States (Meta) \u00b7 under construction"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Hyperion AI DC (Louisiana)](https://datacenterindex.ai/projects/manual-72) \u2014 5.0 GW, Richland Parish, LA, United States (Meta) \u00b7 under construction"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "Microsoft Fairwater Wisconsin",
   "locality": "Mount Pleasant",
   "state": "Wisconsin",
   "capacity_gw": 3.3,
   "builder": "Microsoft",
   "ai_customer": null,
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Microsoft Fairwater Wisconsin](https://datacenterindex.ai/projects/microsoft-fairwater-wisconsin) \u2014 3.3 GW, Mount Pleasant, WI, United States (Microsoft) \u00b7 operational"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Microsoft Fairwater Wisconsin](https://datacenterindex.ai/projects/microsoft-fairwater-wisconsin) \u2014 3.3 GW, Mount Pleasant, WI, United States (Microsoft) \u00b7 operational"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Microsoft Fairwater Wisconsin](https://datacenterindex.ai/projects/microsoft-fairwater-wisconsin) \u2014 3.3 GW, Mount Pleasant, WI, United States (Microsoft) \u00b7 operational"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Microsoft Fairwater Wisconsin](https://datacenterindex.ai/projects/microsoft-fairwater-wisconsin) \u2014 3.3 GW, Mount Pleasant, WI, United States (Microsoft) \u00b7 operational"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Microsoft Fairwater Wisconsin](https://datacenterindex.ai/projects/microsoft-fairwater-wisconsin) \u2014 3.3 GW, Mount Pleasant, WI, United States (Microsoft) \u00b7 operational"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Microsoft Fairwater Wisconsin](https://datacenterindex.ai/projects/microsoft-fairwater-wisconsin) \u2014 3.3 GW, Mount Pleasant, WI, United States (Microsoft) \u00b7 operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "Nebraska Mega-Campus",
   "locality": "Lincoln",
   "state": "Nebraska",
   "capacity_gw": 2.7,
   "builder": "Google",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Nebraska Mega-Campus](https://datacenterindex.ai/projects/manual-64) \u2014 2.7 GW, Lincoln, NE, United States (Google) \u00b7 announced"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Nebraska Mega-Campus](https://datacenterindex.ai/projects/manual-64) \u2014 2.7 GW, Lincoln, NE, United States (Google) \u00b7 announced"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Nebraska Mega-Campus](https://datacenterindex.ai/projects/manual-64) \u2014 2.7 GW, Lincoln, NE, United States (Google) \u00b7 announced"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Nebraska Mega-Campus](https://datacenterindex.ai/projects/manual-64) \u2014 2.7 GW, Lincoln, NE, United States (Google) \u00b7 announced"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Nebraska Mega-Campus](https://datacenterindex.ai/projects/manual-64) \u2014 2.7 GW, Lincoln, NE, United States (Google) \u00b7 announced"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Nebraska Mega-Campus](https://datacenterindex.ai/projects/manual-64) \u2014 2.7 GW, Lincoln, NE, United States (Google) \u00b7 announced"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "AWS Project Rainier (New Carlisle, Indiana)",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.4,
   "builder": "Amazon Web Services",
   "ai_customer": null,
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS Project Rainier (New Carlisle, Indiana)](https://datacenterindex.ai/projects/aws-project-rainier-ai-campus-indiana) \u2014 2.4 GW, New Carlisle, IN, United States (Amazon Web Services) \u00b7 operational"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS Project Rainier (New Carlisle, Indiana)](https://datacenterindex.ai/projects/aws-project-rainier-ai-campus-indiana) \u2014 2.4 GW, New Carlisle, IN, United States (Amazon Web Services) \u00b7 operational"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS Project Rainier (New Carlisle, Indiana)](https://datacenterindex.ai/projects/aws-project-rainier-ai-campus-indiana) \u2014 2.4 GW, New Carlisle, IN, United States (Amazon Web Services) \u00b7 operational"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS Project Rainier (New Carlisle, Indiana)](https://datacenterindex.ai/projects/aws-project-rainier-ai-campus-indiana) \u2014 2.4 GW, New Carlisle, IN, United States (Amazon Web Services) \u00b7 operational"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS Project Rainier (New Carlisle, Indiana)](https://datacenterindex.ai/projects/aws-project-rainier-ai-campus-indiana) \u2014 2.4 GW, New Carlisle, IN, United States (Amazon Web Services) \u00b7 operational"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS Project Rainier (New Carlisle, Indiana)](https://datacenterindex.ai/projects/aws-project-rainier-ai-campus-indiana) \u2014 2.4 GW, New Carlisle, IN, United States (Amazon Web Services) \u00b7 operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "Meta Hyperion",
   "locality": "Holly Ridge",
   "state": "Louisiana",
   "capacity_gw": 2.3,
   "builder": "Meta",
   "ai_customer": null,
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Meta Hyperion](https://datacenterindex.ai/projects/meta-hyperion) \u2014 2.3 GW, Holly Ridge, LA, United States (Meta) \u00b7 operational"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Meta Hyperion](https://datacenterindex.ai/projects/meta-hyperion) \u2014 2.3 GW, Holly Ridge, LA, United States (Meta) \u00b7 operational"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Meta Hyperion](https://datacenterindex.ai/projects/meta-hyperion) \u2014 2.3 GW, Holly Ridge, LA, United States (Meta) \u00b7 operational"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Meta Hyperion](https://datacenterindex.ai/projects/meta-hyperion) \u2014 2.3 GW, Holly Ridge, LA, United States (Meta) \u00b7 operational"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Meta Hyperion](https://datacenterindex.ai/projects/meta-hyperion) \u2014 2.3 GW, Holly Ridge, LA, United States (Meta) \u00b7 operational"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Meta Hyperion](https://datacenterindex.ai/projects/meta-hyperion) \u2014 2.3 GW, Holly Ridge, LA, United States (Meta) \u00b7 operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "Diablo Canyon AI Integration Project",
   "locality": "Avila Beach",
   "state": null,
   "capacity_gw": 2.3,
   "builder": "Pacific Gas and Electric Company (PG&E)",
   "ai_customer": null,
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Diablo Canyon AI Integration Project](https://datacenterindex.ai/projects/diablo-canyon-ai-integration-project) \u2014 2.3 GW, Avila Beach, United States (Pacific Gas and Electric Company (PG&E)) \u00b7 operational"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Diablo Canyon AI Integration Project](https://datacenterindex.ai/projects/diablo-canyon-ai-integration-project) \u2014 2.3 GW, Avila Beach, United States (Pacific Gas and Electric Company (PG&E)) \u00b7 operational"
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Diablo Canyon AI Integration Project](https://datacenterindex.ai/projects/diablo-canyon-ai-integration-project) \u2014 2.3 GW, Avila Beach, United States (Pacific Gas and Electric Company (PG&E)) \u00b7 operational"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Diablo Canyon AI Integration Project](https://datacenterindex.ai/projects/diablo-canyon-ai-integration-project) \u2014 2.3 GW, Avila Beach, United States (Pacific Gas and Electric Company (PG&E)) \u00b7 operational"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Diablo Canyon AI Integration Project](https://datacenterindex.ai/projects/diablo-canyon-ai-integration-project) \u2014 2.3 GW, Avila Beach, United States (Pacific Gas and Electric Company (PG&E)) \u00b7 operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "OpenAI Stargate New Mexico",
   "locality": null,
   "state": "New Mexico",
   "capacity_gw": 2.2,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate New Mexico](https://datacenterindex.ai/projects/openai-stargate-new-mexico) \u2014 2.2 GW, NM, United States (Oracle) \u00b7 under construction"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate New Mexico](https://datacenterindex.ai/projects/openai-stargate-new-mexico) \u2014 2.2 GW, NM, United States (Oracle) \u00b7 under construction"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate New Mexico](https://datacenterindex.ai/projects/openai-stargate-new-mexico) \u2014 2.2 GW, NM, United States (Oracle) \u00b7 under construction"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate New Mexico](https://datacenterindex.ai/projects/openai-stargate-new-mexico) \u2014 2.2 GW, NM, United States (Oracle) \u00b7 under construction"
   ],
   "ai_customer_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate New Mexico](https://datacenterindex.ai/projects/openai-stargate-new-mexico) \u2014 2.2 GW, NM, United States (Oracle) \u00b7 under construction"
   ],
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate New Mexico](https://datacenterindex.ai/projects/openai-stargate-new-mexico) \u2014 2.2 GW, NM, United States (Oracle) \u00b7 under construction"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "AWS",
   "ai_customer": null,
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Project Rainier](https://datacenterindex.ai/projects/manual-24) \u2014 2.2 GW, New Carlisle, IN, United States (AWS) \u00b7 operational"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Project Rainier](https://datacenterindex.ai/projects/manual-24) \u2014 2.2 GW, New Carlisle, IN, United States (AWS) \u00b7 operational"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Project Rainier](https://datacenterindex.ai/projects/manual-24) \u2014 2.2 GW, New Carlisle, IN, United States (AWS) \u00b7 operational"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Project Rainier](https://datacenterindex.ai/projects/manual-24) \u2014 2.2 GW, New Carlisle, IN, United States (AWS) \u00b7 operational"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Project Rainier](https://datacenterindex.ai/projects/manual-24) \u2014 2.2 GW, New Carlisle, IN, United States (AWS) \u00b7 operational"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Project Rainier](https://datacenterindex.ai/projects/manual-24) \u2014 2.2 GW, New Carlisle, IN, United States (AWS) \u00b7 operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)",
   "locality": "Perry",
   "state": "Ohio",
   "capacity_gw": 2.1,
   "builder": "Meta",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)](https://datacenterindex.ai/projects/meta-vistra-nuclear-uprate-agreement-oh-pa) \u2014 2.1 GW, Perry, OH, United States (Meta) \u00b7 announced"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)](https://datacenterindex.ai/projects/meta-vistra-nuclear-uprate-agreement-oh-pa) \u2014 2.1 GW, Perry, OH, United States (Meta) \u00b7 announced"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)](https://datacenterindex.ai/projects/meta-vistra-nuclear-uprate-agreement-oh-pa) \u2014 2.1 GW, Perry, OH, United States (Meta) \u00b7 announced"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)](https://datacenterindex.ai/projects/meta-vistra-nuclear-uprate-agreement-oh-pa) \u2014 2.1 GW, Perry, OH, United States (Meta) \u00b7 announced"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)](https://datacenterindex.ai/projects/meta-vistra-nuclear-uprate-agreement-oh-pa) \u2014 2.1 GW, Perry, OH, United States (Meta) \u00b7 announced"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)](https://datacenterindex.ai/projects/meta-vistra-nuclear-uprate-agreement-oh-pa) \u2014 2.1 GW, Perry, OH, United States (Meta) \u00b7 announced"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "OpenAI Stargate Shackelford",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Shackelford](https://datacenterindex.ai/projects/openai-stargate-shackelford) \u2014 2.0 GW, Abilene, TX, United States (Oracle) \u00b7 operational"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Shackelford](https://datacenterindex.ai/projects/openai-stargate-shackelford) \u2014 2.0 GW, Abilene, TX, United States (Oracle) \u00b7 operational"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Shackelford](https://datacenterindex.ai/projects/openai-stargate-shackelford) \u2014 2.0 GW, Abilene, TX, United States (Oracle) \u00b7 operational"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Shackelford](https://datacenterindex.ai/projects/openai-stargate-shackelford) \u2014 2.0 GW, Abilene, TX, United States (Oracle) \u00b7 operational"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Shackelford](https://datacenterindex.ai/projects/openai-stargate-shackelford) \u2014 2.0 GW, Abilene, TX, United States (Oracle) \u00b7 operational"
   ],
   "ai_customer_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Shackelford](https://datacenterindex.ai/projects/openai-stargate-shackelford) \u2014 2.0 GW, Abilene, TX, United States (Oracle) \u00b7 operational"
   ],
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Shackelford](https://datacenterindex.ai/projects/openai-stargate-shackelford) \u2014 2.0 GW, Abilene, TX, United States (Oracle) \u00b7 operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "Digital Realty \u2014 Project Bunkhouse",
   "locality": "Stilesboro",
   "state": "Georgia",
   "capacity_gw": 1.8,
   "builder": "Digital Realty",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Digital Realty \u2014 Project Bunkhouse](https://datacenterindex.ai/projects/digital-realty-project-bunkhouse-georgia) \u2014 1.8 GW, Stilesboro, GA, United States (Digital Realty) \u00b7 announced"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Digital Realty \u2014 Project Bunkhouse](https://datacenterindex.ai/projects/digital-realty-project-bunkhouse-georgia) \u2014 1.8 GW, Stilesboro, GA, United States (Digital Realty) \u00b7 announced"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Digital Realty \u2014 Project Bunkhouse](https://datacenterindex.ai/projects/digital-realty-project-bunkhouse-georgia) \u2014 1.8 GW, Stilesboro, GA, United States (Digital Realty) \u00b7 announced"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Digital Realty \u2014 Project Bunkhouse](https://datacenterindex.ai/projects/digital-realty-project-bunkhouse-georgia) \u2014 1.8 GW, Stilesboro, GA, United States (Digital Realty) \u00b7 announced"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Digital Realty \u2014 Project Bunkhouse](https://datacenterindex.ai/projects/digital-realty-project-bunkhouse-georgia) \u2014 1.8 GW, Stilesboro, GA, United States (Digital Realty) \u00b7 announced"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Digital Realty \u2014 Project Bunkhouse](https://datacenterindex.ai/projects/digital-realty-project-bunkhouse-georgia) \u2014 1.8 GW, Stilesboro, GA, United States (Digital Realty) \u00b7 announced"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "AWS Pennsylvania Campus",
   "locality": "Salem Township",
   "state": "Pennsylvania",
   "capacity_gw": 1.8,
   "builder": "AWS",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS Pennsylvania Campus](https://datacenterindex.ai/projects/manual-70) \u2014 1.8 GW, Salem Township, PA, United States (AWS) \u00b7 under construction"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS Pennsylvania Campus](https://datacenterindex.ai/projects/manual-70) \u2014 1.8 GW, Salem Township, PA, United States (AWS) \u00b7 under construction"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS Pennsylvania Campus](https://datacenterindex.ai/projects/manual-70) \u2014 1.8 GW, Salem Township, PA, United States (AWS) \u00b7 under construction"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS Pennsylvania Campus](https://datacenterindex.ai/projects/manual-70) \u2014 1.8 GW, Salem Township, PA, United States (AWS) \u00b7 under construction"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS Pennsylvania Campus](https://datacenterindex.ai/projects/manual-70) \u2014 1.8 GW, Salem Township, PA, United States (AWS) \u00b7 under construction"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS Pennsylvania Campus](https://datacenterindex.ai/projects/manual-70) \u2014 1.8 GW, Salem Township, PA, United States (AWS) \u00b7 under construction"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "AWS AI Innovation Campuses (Salem and Falls Townships, PA)",
   "locality": "Salem Township",
   "state": "Pennsylvania",
   "capacity_gw": 1.8,
   "builder": "Amazon Web Services",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS AI Innovation Campuses (Salem and Falls Townships, PA)](https://datacenterindex.ai/projects/aws-ai-innovation-campuses-pennsylvania) \u2014 1.8 GW, Salem Township, PA, United States (Amazon Web Services) \u00b7 under construction"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS AI Innovation Campuses (Salem and Falls Townships, PA)](https://datacenterindex.ai/projects/aws-ai-innovation-campuses-pennsylvania) \u2014 1.8 GW, Salem Township, PA, United States (Amazon Web Services) \u00b7 under construction"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS AI Innovation Campuses (Salem and Falls Townships, PA)](https://datacenterindex.ai/projects/aws-ai-innovation-campuses-pennsylvania) \u2014 1.8 GW, Salem Township, PA, United States (Amazon Web Services) \u00b7 under construction"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS AI Innovation Campuses (Salem and Falls Townships, PA)](https://datacenterindex.ai/projects/aws-ai-innovation-campuses-pennsylvania) \u2014 1.8 GW, Salem Township, PA, United States (Amazon Web Services) \u00b7 under construction"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS AI Innovation Campuses (Salem and Falls Townships, PA)](https://datacenterindex.ai/projects/aws-ai-innovation-campuses-pennsylvania) \u2014 1.8 GW, Salem Township, PA, United States (Amazon Web Services) \u00b7 under construction"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS AI Innovation Campuses (Salem and Falls Townships, PA)](https://datacenterindex.ai/projects/aws-ai-innovation-campuses-pennsylvania) \u2014 1.8 GW, Salem Township, PA, United States (Amazon Web Services) \u00b7 under construction"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "Calvert Cliffs Relicense",
   "locality": "Lusby",
   "state": "Maryland",
   "capacity_gw": 1.8,
   "builder": "Constellation",
   "ai_customer": null,
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Calvert Cliffs Relicense](https://datacenterindex.ai/projects/manual-63) \u2014 1.8 GW, Lusby, MD, United States (Constellation) \u00b7 operational"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Calvert Cliffs Relicense](https://datacenterindex.ai/projects/manual-63) \u2014 1.8 GW, Lusby, MD, United States (Constellation) \u00b7 operational"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Calvert Cliffs Relicense](https://datacenterindex.ai/projects/manual-63) \u2014 1.8 GW, Lusby, MD, United States (Constellation) \u00b7 operational"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Calvert Cliffs Relicense](https://datacenterindex.ai/projects/manual-63) \u2014 1.8 GW, Lusby, MD, United States (Constellation) \u00b7 operational"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Calvert Cliffs Relicense](https://datacenterindex.ai/projects/manual-63) \u2014 1.8 GW, Lusby, MD, United States (Constellation) \u00b7 operational"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Calvert Cliffs Relicense](https://datacenterindex.ai/projects/manual-63) \u2014 1.8 GW, Lusby, MD, United States (Constellation) \u00b7 operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "QTS Cedar Rapids",
   "locality": "Fairfax",
   "state": "Iowa",
   "capacity_gw": 1.6,
   "builder": null,
   "ai_customer": null,
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [QTS Cedar Rapids](https://datacenterindex.ai/projects/qts-cedar-rapids) \u2014 1.6 GW, Fairfax, IA, United States \u00b7 operational"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [QTS Cedar Rapids](https://datacenterindex.ai/projects/qts-cedar-rapids) \u2014 1.6 GW, Fairfax, IA, United States \u00b7 operational"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [QTS Cedar Rapids](https://datacenterindex.ai/projects/qts-cedar-rapids) \u2014 1.6 GW, Fairfax, IA, United States \u00b7 operational"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [QTS Cedar Rapids](https://datacenterindex.ai/projects/qts-cedar-rapids) \u2014 1.6 GW, Fairfax, IA, United States \u00b7 operational"
   ],
   "builder_evidence": null,
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [QTS Cedar Rapids](https://datacenterindex.ai/projects/qts-cedar-rapids) \u2014 1.6 GW, Fairfax, IA, United States \u00b7 operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "ExxonMobil's 1.5GW Data Center Power Plant Initiative",
   "locality": "Houston",
   "state": null,
   "capacity_gw": 1.5,
   "builder": "ExxonMobil",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [ExxonMobil's 1.5GW Data Center Power Plant Initiative](https://datacenterindex.ai/projects/exxonmobil-1-5gw-data-center-power-plant-initiative) \u2014 1.5 GW, Houston, United States (ExxonMobil) \u00b7 announced"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [ExxonMobil's 1.5GW Data Center Power Plant Initiative](https://datacenterindex.ai/projects/exxonmobil-1-5gw-data-center-power-plant-initiative) \u2014 1.5 GW, Houston, United States (ExxonMobil) \u00b7 announced"
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [ExxonMobil's 1.5GW Data Center Power Plant Initiative](https://datacenterindex.ai/projects/exxonmobil-1-5gw-data-center-power-plant-initiative) \u2014 1.5 GW, Houston, United States (ExxonMobil) \u00b7 announced"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [ExxonMobil's 1.5GW Data Center Power Plant Initiative](https://datacenterindex.ai/projects/exxonmobil-1-5gw-data-center-power-plant-initiative) \u2014 1.5 GW, Houston, United States (ExxonMobil) \u00b7 announced"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [ExxonMobil's 1.5GW Data Center Power Plant Initiative](https://datacenterindex.ai/projects/exxonmobil-1-5gw-data-center-power-plant-initiative) \u2014 1.5 GW, Houston, United States (ExxonMobil) \u00b7 announced"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "Colossus 2",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 1.5,
   "builder": "SpaceXAI",
   "ai_customer": null,
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Colossus 2](https://datacenterindex.ai/projects/colossus-2) \u2014 1.5 GW, Memphis, TN, United States (SpaceXAI) \u00b7 operational"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Colossus 2](https://datacenterindex.ai/projects/colossus-2) \u2014 1.5 GW, Memphis, TN, United States (SpaceXAI) \u00b7 operational"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Colossus 2](https://datacenterindex.ai/projects/colossus-2) \u2014 1.5 GW, Memphis, TN, United States (SpaceXAI) \u00b7 operational"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Colossus 2](https://datacenterindex.ai/projects/colossus-2) \u2014 1.5 GW, Memphis, TN, United States (SpaceXAI) \u00b7 operational"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Colossus 2](https://datacenterindex.ai/projects/colossus-2) \u2014 1.5 GW, Memphis, TN, United States (SpaceXAI) \u00b7 operational"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Colossus 2](https://datacenterindex.ai/projects/colossus-2) \u2014 1.5 GW, Memphis, TN, United States (SpaceXAI) \u00b7 operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "xAI Colossus 2",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 1.5,
   "builder": "xAI",
   "ai_customer": null,
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [xAI Colossus 2](https://datacenterindex.ai/projects/xai-colossus-2) \u2014 1.5 GW, Memphis, TN, United States (xAI) \u00b7 operational"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [xAI Colossus 2](https://datacenterindex.ai/projects/xai-colossus-2) \u2014 1.5 GW, Memphis, TN, United States (xAI) \u00b7 operational"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [xAI Colossus 2](https://datacenterindex.ai/projects/xai-colossus-2) \u2014 1.5 GW, Memphis, TN, United States (xAI) \u00b7 operational"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [xAI Colossus 2](https://datacenterindex.ai/projects/xai-colossus-2) \u2014 1.5 GW, Memphis, TN, United States (xAI) \u00b7 operational"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [xAI Colossus 2](https://datacenterindex.ai/projects/xai-colossus-2) \u2014 1.5 GW, Memphis, TN, United States (xAI) \u00b7 operational"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [xAI Colossus 2](https://datacenterindex.ai/projects/xai-colossus-2) \u2014 1.5 GW, Memphis, TN, United States (xAI) \u00b7 operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "Frontier Campus",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Frontier Campus](https://datacenterindex.ai/projects/manual-2) \u2014 1.4 GW, TX, United States (Vantage) \u00b7 under construction"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Frontier Campus](https://datacenterindex.ai/projects/manual-2) \u2014 1.4 GW, TX, United States (Vantage) \u00b7 under construction"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Frontier Campus](https://datacenterindex.ai/projects/manual-2) \u2014 1.4 GW, TX, United States (Vantage) \u00b7 under construction"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Frontier Campus](https://datacenterindex.ai/projects/manual-2) \u2014 1.4 GW, TX, United States (Vantage) \u00b7 under construction"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Frontier Campus](https://datacenterindex.ai/projects/manual-2) \u2014 1.4 GW, TX, United States (Vantage) \u00b7 under construction"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "OpenAI Stargate Michigan",
   "locality": null,
   "state": "Michigan",
   "capacity_gw": 1.4,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Michigan](https://datacenterindex.ai/projects/openai-stargate-michigan) \u2014 1.4 GW, MI, United States (Oracle) \u00b7 operational"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Michigan](https://datacenterindex.ai/projects/openai-stargate-michigan) \u2014 1.4 GW, MI, United States (Oracle) \u00b7 operational"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Michigan](https://datacenterindex.ai/projects/openai-stargate-michigan) \u2014 1.4 GW, MI, United States (Oracle) \u00b7 operational"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Michigan](https://datacenterindex.ai/projects/openai-stargate-michigan) \u2014 1.4 GW, MI, United States (Oracle) \u00b7 operational"
   ],
   "ai_customer_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Michigan](https://datacenterindex.ai/projects/openai-stargate-michigan) \u2014 1.4 GW, MI, United States (Oracle) \u00b7 operational"
   ],
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Michigan](https://datacenterindex.ai/projects/openai-stargate-michigan) \u2014 1.4 GW, MI, United States (Oracle) \u00b7 operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "OpenAI Stargate Wisconsin",
   "locality": null,
   "state": "Wisconsin",
   "capacity_gw": 1.3,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Wisconsin](https://datacenterindex.ai/projects/openai-stargate-wisconsin) \u2014 1.3 GW, WI, United States (Oracle) \u00b7 operational"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Wisconsin](https://datacenterindex.ai/projects/openai-stargate-wisconsin) \u2014 1.3 GW, WI, United States (Oracle) \u00b7 operational"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Wisconsin](https://datacenterindex.ai/projects/openai-stargate-wisconsin) \u2014 1.3 GW, WI, United States (Oracle) \u00b7 operational"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Wisconsin](https://datacenterindex.ai/projects/openai-stargate-wisconsin) \u2014 1.3 GW, WI, United States (Oracle) \u00b7 operational"
   ],
   "ai_customer_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Wisconsin](https://datacenterindex.ai/projects/openai-stargate-wisconsin) \u2014 1.3 GW, WI, United States (Oracle) \u00b7 operational"
   ],
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Wisconsin](https://datacenterindex.ai/projects/openai-stargate-wisconsin) \u2014 1.3 GW, WI, United States (Oracle) \u00b7 operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "AWS Ohio Campus",
   "locality": "Jefferson Township",
   "state": "Ohio",
   "capacity_gw": 1.3,
   "builder": "AWS",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS Ohio Campus](https://datacenterindex.ai/projects/manual-28) \u2014 1.3 GW, Jefferson Township, OH, United States (AWS) \u00b7 announced"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS Ohio Campus](https://datacenterindex.ai/projects/manual-28) \u2014 1.3 GW, Jefferson Township, OH, United States (AWS) \u00b7 announced"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS Ohio Campus](https://datacenterindex.ai/projects/manual-28) \u2014 1.3 GW, Jefferson Township, OH, United States (AWS) \u00b7 announced"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS Ohio Campus](https://datacenterindex.ai/projects/manual-28) \u2014 1.3 GW, Jefferson Township, OH, United States (AWS) \u00b7 announced"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS Ohio Campus](https://datacenterindex.ai/projects/manual-28) \u2014 1.3 GW, Jefferson Township, OH, United States (AWS) \u00b7 announced"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS Ohio Campus](https://datacenterindex.ai/projects/manual-28) \u2014 1.3 GW, Jefferson Township, OH, United States (AWS) \u00b7 announced"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "Anthropic-Amazon New Carlisle",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 1.2,
   "builder": "Amazon",
   "ai_customer": "Anthropic",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Anthropic-Amazon New Carlisle](https://datacenterindex.ai/projects/anthropic-amazon-new-carlisle) \u2014 1.2 GW, New Carlisle, IN, United States (Amazon) \u00b7 operational"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Anthropic-Amazon New Carlisle](https://datacenterindex.ai/projects/anthropic-amazon-new-carlisle) \u2014 1.2 GW, New Carlisle, IN, United States (Amazon) \u00b7 operational"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Anthropic-Amazon New Carlisle](https://datacenterindex.ai/projects/anthropic-amazon-new-carlisle) \u2014 1.2 GW, New Carlisle, IN, United States (Amazon) \u00b7 operational"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Anthropic-Amazon New Carlisle](https://datacenterindex.ai/projects/anthropic-amazon-new-carlisle) \u2014 1.2 GW, New Carlisle, IN, United States (Amazon) \u00b7 operational"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Anthropic-Amazon New Carlisle](https://datacenterindex.ai/projects/anthropic-amazon-new-carlisle) \u2014 1.2 GW, New Carlisle, IN, United States (Amazon) \u00b7 operational"
   ],
   "ai_customer_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Anthropic-Amazon New Carlisle](https://datacenterindex.ai/projects/anthropic-amazon-new-carlisle) \u2014 1.2 GW, New Carlisle, IN, United States (Amazon) \u00b7 operational"
   ],
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Anthropic-Amazon New Carlisle](https://datacenterindex.ai/projects/anthropic-amazon-new-carlisle) \u2014 1.2 GW, New Carlisle, IN, United States (Amazon) \u00b7 operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "OpenAI Stargate Milam",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Softbank",
   "ai_customer": "OpenAI",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Milam](https://datacenterindex.ai/projects/openai-stargate-milam) \u2014 1.2 GW, TX, United States (Softbank) \u00b7 operational"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Milam](https://datacenterindex.ai/projects/openai-stargate-milam) \u2014 1.2 GW, TX, United States (Softbank) \u00b7 operational"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Milam](https://datacenterindex.ai/projects/openai-stargate-milam) \u2014 1.2 GW, TX, United States (Softbank) \u00b7 operational"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Milam](https://datacenterindex.ai/projects/openai-stargate-milam) \u2014 1.2 GW, TX, United States (Softbank) \u00b7 operational"
   ],
   "ai_customer_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Milam](https://datacenterindex.ai/projects/openai-stargate-milam) \u2014 1.2 GW, TX, United States (Softbank) \u00b7 operational"
   ],
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Milam](https://datacenterindex.ai/projects/openai-stargate-milam) \u2014 1.2 GW, TX, United States (Softbank) \u00b7 operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "Stargate I",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Stargate I](https://datacenterindex.ai/projects/manual-1) \u2014 1.2 GW, Abilene, TX, United States (Crusoe) \u00b7 under construction"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Stargate I](https://datacenterindex.ai/projects/manual-1) \u2014 1.2 GW, Abilene, TX, United States (Crusoe) \u00b7 under construction"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Stargate I](https://datacenterindex.ai/projects/manual-1) \u2014 1.2 GW, Abilene, TX, United States (Crusoe) \u00b7 under construction"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Stargate I](https://datacenterindex.ai/projects/manual-1) \u2014 1.2 GW, Abilene, TX, United States (Crusoe) \u00b7 under construction"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Stargate I](https://datacenterindex.ai/projects/manual-1) \u2014 1.2 GW, Abilene, TX, United States (Crusoe) \u00b7 under construction"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Stargate I](https://datacenterindex.ai/projects/manual-1) \u2014 1.2 GW, Abilene, TX, United States (Crusoe) \u00b7 under construction"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "Vistra's Comanche Peak Nuclear Data Center Campus",
   "locality": "Glen Rose",
   "state": null,
   "capacity_gw": 1.2,
   "builder": "Vistra Corp",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Vistra's Comanche Peak Nuclear Data Center Campus](https://datacenterindex.ai/projects/vistra-comanche-peak-nuclear-power-plant-expansion) \u2014 1.2 GW, Glen Rose, United States (Vistra Corp) \u00b7 announced"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Vistra's Comanche Peak Nuclear Data Center Campus](https://datacenterindex.ai/projects/vistra-comanche-peak-nuclear-power-plant-expansion) \u2014 1.2 GW, Glen Rose, United States (Vistra Corp) \u00b7 announced"
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Vistra's Comanche Peak Nuclear Data Center Campus](https://datacenterindex.ai/projects/vistra-comanche-peak-nuclear-power-plant-expansion) \u2014 1.2 GW, Glen Rose, United States (Vistra Corp) \u00b7 announced"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Vistra's Comanche Peak Nuclear Data Center Campus](https://datacenterindex.ai/projects/vistra-comanche-peak-nuclear-power-plant-expansion) \u2014 1.2 GW, Glen Rose, United States (Vistra Corp) \u00b7 announced"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Vistra's Comanche Peak Nuclear Data Center Campus](https://datacenterindex.ai/projects/vistra-comanche-peak-nuclear-power-plant-expansion) \u2014 1.2 GW, Glen Rose, United States (Vistra Corp) \u00b7 announced"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "OpenAI Stargate Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Abilene](https://datacenterindex.ai/projects/openai-stargate-abilene) \u2014 1.2 GW, Abilene, TX, United States (Oracle) \u00b7 operational"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Abilene](https://datacenterindex.ai/projects/openai-stargate-abilene) \u2014 1.2 GW, Abilene, TX, United States (Oracle) \u00b7 operational"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Abilene](https://datacenterindex.ai/projects/openai-stargate-abilene) \u2014 1.2 GW, Abilene, TX, United States (Oracle) \u00b7 operational"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Abilene](https://datacenterindex.ai/projects/openai-stargate-abilene) \u2014 1.2 GW, Abilene, TX, United States (Oracle) \u00b7 operational"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Abilene](https://datacenterindex.ai/projects/openai-stargate-abilene) \u2014 1.2 GW, Abilene, TX, United States (Oracle) \u00b7 operational"
   ],
   "ai_customer_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Abilene](https://datacenterindex.ai/projects/openai-stargate-abilene) \u2014 1.2 GW, Abilene, TX, United States (Oracle) \u00b7 operational"
   ],
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [OpenAI Stargate Abilene](https://datacenterindex.ai/projects/openai-stargate-abilene) \u2014 1.2 GW, Abilene, TX, United States (Oracle) \u00b7 operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "Meta Prometheus",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.1,
   "builder": "Meta",
   "ai_customer": null,
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Meta Prometheus](https://datacenterindex.ai/projects/meta-prometheus) \u2014 1.1 GW, New Albany, OH, United States (Meta) \u00b7 operational"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Meta Prometheus](https://datacenterindex.ai/projects/meta-prometheus) \u2014 1.1 GW, New Albany, OH, United States (Meta) \u00b7 operational"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Meta Prometheus](https://datacenterindex.ai/projects/meta-prometheus) \u2014 1.1 GW, New Albany, OH, United States (Meta) \u00b7 operational"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Meta Prometheus](https://datacenterindex.ai/projects/meta-prometheus) \u2014 1.1 GW, New Albany, OH, United States (Meta) \u00b7 operational"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Meta Prometheus](https://datacenterindex.ai/projects/meta-prometheus) \u2014 1.1 GW, New Albany, OH, United States (Meta) \u00b7 operational"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Meta Prometheus](https://datacenterindex.ai/projects/meta-prometheus) \u2014 1.1 GW, New Albany, OH, United States (Meta) \u00b7 operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "Goodnight",
   "locality": "Claude",
   "state": "Texas",
   "capacity_gw": 1.1,
   "builder": "Google",
   "ai_customer": null,
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Goodnight](https://datacenterindex.ai/projects/goodnight) \u2014 1.1 GW, Claude, TX, United States (Google) \u00b7 operational"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Goodnight](https://datacenterindex.ai/projects/goodnight) \u2014 1.1 GW, Claude, TX, United States (Google) \u00b7 operational"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Goodnight](https://datacenterindex.ai/projects/goodnight) \u2014 1.1 GW, Claude, TX, United States (Google) \u00b7 operational"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Goodnight](https://datacenterindex.ai/projects/goodnight) \u2014 1.1 GW, Claude, TX, United States (Google) \u00b7 operational"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Goodnight](https://datacenterindex.ai/projects/goodnight) \u2014 1.1 GW, Claude, TX, United States (Google) \u00b7 operational"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Goodnight](https://datacenterindex.ai/projects/goodnight) \u2014 1.1 GW, Claude, TX, United States (Google) \u00b7 operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "Google Fort Wayne",
   "locality": "Fort Wayne",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Google",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Google Fort Wayne](https://datacenterindex.ai/projects/google-fort-wayne) \u2014 1.0 GW, Fort Wayne, IN, United States (Google) \u00b7 under construction"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Google Fort Wayne](https://datacenterindex.ai/projects/google-fort-wayne) \u2014 1.0 GW, Fort Wayne, IN, United States (Google) \u00b7 under construction"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Google Fort Wayne](https://datacenterindex.ai/projects/google-fort-wayne) \u2014 1.0 GW, Fort Wayne, IN, United States (Google) \u00b7 under construction"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Google Fort Wayne](https://datacenterindex.ai/projects/google-fort-wayne) \u2014 1.0 GW, Fort Wayne, IN, United States (Google) \u00b7 under construction"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Google Fort Wayne](https://datacenterindex.ai/projects/google-fort-wayne) \u2014 1.0 GW, Fort Wayne, IN, United States (Google) \u00b7 under construction"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Google Fort Wayne](https://datacenterindex.ai/projects/google-fort-wayne) \u2014 1.0 GW, Fort Wayne, IN, United States (Google) \u00b7 under construction"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "Amazon Ridgeland",
   "locality": "Mississippi",
   "state": "Mississippi",
   "capacity_gw": 1.0,
   "builder": "Amazon",
   "ai_customer": null,
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Amazon Ridgeland](https://datacenterindex.ai/projects/amazon-ridgeland) \u2014 1.0 GW, Mississippi, MS, United States (Amazon) \u00b7 operational"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Amazon Ridgeland](https://datacenterindex.ai/projects/amazon-ridgeland) \u2014 1.0 GW, Mississippi, MS, United States (Amazon) \u00b7 operational"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Amazon Ridgeland](https://datacenterindex.ai/projects/amazon-ridgeland) \u2014 1.0 GW, Mississippi, MS, United States (Amazon) \u00b7 operational"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Amazon Ridgeland](https://datacenterindex.ai/projects/amazon-ridgeland) \u2014 1.0 GW, Mississippi, MS, United States (Amazon) \u00b7 operational"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Amazon Ridgeland](https://datacenterindex.ai/projects/amazon-ridgeland) \u2014 1.0 GW, Mississippi, MS, United States (Amazon) \u00b7 operational"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Amazon Ridgeland](https://datacenterindex.ai/projects/amazon-ridgeland) \u2014 1.0 GW, Mississippi, MS, United States (Amazon) \u00b7 operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "Goodnight Campus",
   "locality": "Claude",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Goodnight Campus](https://datacenterindex.ai/projects/manual-3) \u2014 1.0 GW, Claude, TX, United States (Crusoe) \u00b7 under construction"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Goodnight Campus](https://datacenterindex.ai/projects/manual-3) \u2014 1.0 GW, Claude, TX, United States (Crusoe) \u00b7 under construction"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Goodnight Campus](https://datacenterindex.ai/projects/manual-3) \u2014 1.0 GW, Claude, TX, United States (Crusoe) \u00b7 under construction"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Goodnight Campus](https://datacenterindex.ai/projects/manual-3) \u2014 1.0 GW, Claude, TX, United States (Crusoe) \u00b7 under construction"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Goodnight Campus](https://datacenterindex.ai/projects/manual-3) \u2014 1.0 GW, Claude, TX, United States (Crusoe) \u00b7 under construction"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Goodnight Campus](https://datacenterindex.ai/projects/manual-3) \u2014 1.0 GW, Claude, TX, United States (Crusoe) \u00b7 under construction"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "Project Domino",
   "locality": "Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Project Domino](https://datacenterindex.ai/projects/manual-4) \u2014 1.0 GW, Lebanon, IN, United States (Meta) \u00b7 announced"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Project Domino](https://datacenterindex.ai/projects/manual-4) \u2014 1.0 GW, Lebanon, IN, United States (Meta) \u00b7 announced"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Project Domino](https://datacenterindex.ai/projects/manual-4) \u2014 1.0 GW, Lebanon, IN, United States (Meta) \u00b7 announced"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Project Domino](https://datacenterindex.ai/projects/manual-4) \u2014 1.0 GW, Lebanon, IN, United States (Meta) \u00b7 announced"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Project Domino](https://datacenterindex.ai/projects/manual-4) \u2014 1.0 GW, Lebanon, IN, United States (Meta) \u00b7 announced"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Project Domino](https://datacenterindex.ai/projects/manual-4) \u2014 1.0 GW, Lebanon, IN, United States (Meta) \u00b7 announced"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "El Paso DC",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [El Paso DC](https://datacenterindex.ai/projects/manual-6) \u2014 1.0 GW, El Paso, TX, United States (Meta) \u00b7 operational"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [El Paso DC](https://datacenterindex.ai/projects/manual-6) \u2014 1.0 GW, El Paso, TX, United States (Meta) \u00b7 operational"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [El Paso DC](https://datacenterindex.ai/projects/manual-6) \u2014 1.0 GW, El Paso, TX, United States (Meta) \u00b7 operational"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [El Paso DC](https://datacenterindex.ai/projects/manual-6) \u2014 1.0 GW, El Paso, TX, United States (Meta) \u00b7 operational"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [El Paso DC](https://datacenterindex.ai/projects/manual-6) \u2014 1.0 GW, El Paso, TX, United States (Meta) \u00b7 operational"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [El Paso DC](https://datacenterindex.ai/projects/manual-6) \u2014 1.0 GW, El Paso, TX, United States (Meta) \u00b7 operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "Gemini Cluster (Iowa)",
   "locality": "Council Bluffs",
   "state": "Iowa",
   "capacity_gw": 1.0,
   "builder": "Google",
   "ai_customer": null,
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Gemini Cluster (Iowa)](https://datacenterindex.ai/projects/manual-66) \u2014 1.0 GW, Council Bluffs, IA, United States (Google) \u00b7 operational"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Gemini Cluster (Iowa)](https://datacenterindex.ai/projects/manual-66) \u2014 1.0 GW, Council Bluffs, IA, United States (Google) \u00b7 operational"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Gemini Cluster (Iowa)](https://datacenterindex.ai/projects/manual-66) \u2014 1.0 GW, Council Bluffs, IA, United States (Google) \u00b7 operational"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Gemini Cluster (Iowa)](https://datacenterindex.ai/projects/manual-66) \u2014 1.0 GW, Council Bluffs, IA, United States (Google) \u00b7 operational"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Gemini Cluster (Iowa)](https://datacenterindex.ai/projects/manual-66) \u2014 1.0 GW, Council Bluffs, IA, United States (Google) \u00b7 operational"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Gemini Cluster (Iowa)](https://datacenterindex.ai/projects/manual-66) \u2014 1.0 GW, Council Bluffs, IA, United States (Google) \u00b7 operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "Azure Northern Virginia",
   "locality": "Northern Virginia",
   "state": "Virginia",
   "capacity_gw": 1.0,
   "builder": "Microsoft",
   "ai_customer": null,
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Azure Northern Virginia](https://datacenterindex.ai/projects/manual-68) \u2014 1.0 GW, Northern Virginia, VA, United States (Microsoft) \u00b7 operational"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Azure Northern Virginia](https://datacenterindex.ai/projects/manual-68) \u2014 1.0 GW, Northern Virginia, VA, United States (Microsoft) \u00b7 operational"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Azure Northern Virginia](https://datacenterindex.ai/projects/manual-68) \u2014 1.0 GW, Northern Virginia, VA, United States (Microsoft) \u00b7 operational"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Azure Northern Virginia](https://datacenterindex.ai/projects/manual-68) \u2014 1.0 GW, Northern Virginia, VA, United States (Microsoft) \u00b7 operational"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Azure Northern Virginia](https://datacenterindex.ai/projects/manual-68) \u2014 1.0 GW, Northern Virginia, VA, United States (Microsoft) \u00b7 operational"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Azure Northern Virginia](https://datacenterindex.ai/projects/manual-68) \u2014 1.0 GW, Northern Virginia, VA, United States (Microsoft) \u00b7 operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "Project Jupiter (NM)",
   "locality": null,
   "state": "New Mexico",
   "capacity_gw": 1.0,
   "builder": "Microsoft",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Project Jupiter (NM)](https://datacenterindex.ai/projects/manual-69) \u2014 1.0 GW, New Mexico, NM, United States (Microsoft) \u00b7 announced"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Project Jupiter (NM)](https://datacenterindex.ai/projects/manual-69) \u2014 1.0 GW, New Mexico, NM, United States (Microsoft) \u00b7 announced"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Project Jupiter (NM)](https://datacenterindex.ai/projects/manual-69) \u2014 1.0 GW, New Mexico, NM, United States (Microsoft) \u00b7 announced"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Project Jupiter (NM)](https://datacenterindex.ai/projects/manual-69) \u2014 1.0 GW, New Mexico, NM, United States (Microsoft) \u00b7 announced"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [Project Jupiter (NM)](https://datacenterindex.ai/projects/manual-69) \u2014 1.0 GW, New Mexico, NM, United States (Microsoft) \u00b7 announced"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects",
   "title": "All Data Center Projects \u2014 Data Center Index",
   "published_at": null,
   "project": "AWS North Carolina Campus",
   "locality": "Richmond County",
   "state": "North Carolina",
   "capacity_gw": 1.0,
   "builder": "AWS",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS North Carolina Campus](https://datacenterindex.ai/projects/manual-71) \u2014 1.0 GW, Richmond County, NC, United States (AWS) \u00b7 under construction"
   ],
   "locality_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS North Carolina Campus](https://datacenterindex.ai/projects/manual-71) \u2014 1.0 GW, Richmond County, NC, United States (AWS) \u00b7 under construction"
   ],
   "state_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS North Carolina Campus](https://datacenterindex.ai/projects/manual-71) \u2014 1.0 GW, Richmond County, NC, United States (AWS) \u00b7 under construction"
   ],
   "capacity_gw_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS North Carolina Campus](https://datacenterindex.ai/projects/manual-71) \u2014 1.0 GW, Richmond County, NC, United States (AWS) \u00b7 under construction"
   ],
   "builder_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS North Carolina Campus](https://datacenterindex.ai/projects/manual-71) \u2014 1.0 GW, Richmond County, NC, United States (AWS) \u00b7 under construction"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# All data center projects",
    "Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and cost details.",
    "- [AWS North Carolina Campus](https://datacenterindex.ai/projects/manual-71) \u2014 1.0 GW, Richmond County, NC, United States (AWS) \u00b7 under construction"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=openai&term=the-data-center-construction-channel",
   "title": "News The Data Center Construction Channel, OpenAI",
   "published_at": "2026-08-27T00:00:00",
   "project": "Stargate",
   "locality": "Milam County",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# News - The Data Center Construction Channel, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [SoftBank's SB Energy to build and operate OpenAI's 1.2GW Stargate data center in Milam County, Texas](/en/news/softbanks-sb-energy-to-build-and-operate-openais-12gw-stargate-data-center-in-milam-county-texas/)"
   ],
   "locality_evidence": [
    "# News - The Data Center Construction Channel, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [SoftBank's SB Energy to build and operate OpenAI's 1.2GW Stargate data center in Milam County, Texas](/en/news/softbanks-sb-energy-to-build-and-operate-openais-12gw-stargate-data-center-in-milam-county-texas/)"
   ],
   "state_evidence": [
    "# News - The Data Center Construction Channel, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [SoftBank's SB Energy to build and operate OpenAI's 1.2GW Stargate data center in Milam County, Texas](/en/news/softbanks-sb-energy-to-build-and-operate-openais-12gw-stargate-data-center-in-milam-county-texas/)"
   ],
   "capacity_gw_evidence": [
    "# News - The Data Center Construction Channel, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [SoftBank's SB Energy to build and operate OpenAI's 1.2GW Stargate data center in Milam County, Texas](/en/news/softbanks-sb-energy-to-build-and-operate-openais-12gw-stargate-data-center-in-milam-county-texas/)"
   ],
   "builder_evidence": [
    "# News - The Data Center Construction Channel, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [SoftBank's SB Energy to build and operate OpenAI's 1.2GW Stargate data center in Milam County, Texas](/en/news/softbanks-sb-energy-to-build-and-operate-openais-12gw-stargate-data-center-in-milam-county-texas/)"
   ],
   "ai_customer_evidence": [
    "# News - The Data Center Construction Channel, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [SoftBank's SB Energy to build and operate OpenAI's 1.2GW Stargate data center in Milam County, Texas](/en/news/softbanks-sb-energy-to-build-and-operate-openais-12gw-stargate-data-center-in-milam-county-texas/)"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://stocktitan.net/sec-filings/NVDA/8-k-nvidia-corp-reports-material-event-657b0fdc5504.html",
   "title": "NVIDIA sets $105B cap on Ohio AI campus guarantees | NVDA 8-K Filing",
   "published_at": "2026-08-17T12:41:33",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.05,
   "builder": "SB Energy Corp.",
   "ai_customer": "OpenAI Group PBC",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "NVIDIA Corporation entered a multi-year partnership with SB Energy Corp. to develop the PORTS-Pike (Portsmouth) Technology Campus in Pike County, Ohio as a large-scale AI data center site.",
    "# NVIDIA (NASDAQ: NVDA) backs OpenAI-linked Ohio AI campus with tens of billions at stake"
   ],
   "locality_evidence": [
    "NVIDIA Corporation entered a multi-year partnership with SB Energy Corp. to develop the PORTS-Pike (Portsmouth) Technology Campus in Pike County, Ohio as a large-scale AI data center site.",
    "# NVIDIA (NASDAQ: NVDA) backs OpenAI-linked Ohio AI campus with tens of billions at stake"
   ],
   "state_evidence": [
    "NVIDIA Corporation entered a multi-year partnership with SB Energy Corp. to develop the PORTS-Pike (Portsmouth) Technology Campus in Pike County, Ohio as a large-scale AI data center site.",
    "# NVIDIA (NASDAQ: NVDA) backs OpenAI-linked Ohio AI campus with tens of billions at stake"
   ],
   "capacity_gw_evidence": [
    "SB Energy and SoftBank plan to build at least **10 GW** of new energy generation, enabling **8 IT-GW** of AI factory capacity, and to invest at least **$4.2 billion** in regional grid infrastructure.",
    "# NVIDIA (NASDAQ: NVDA) backs OpenAI-linked Ohio AI campus with tens of billions at stake"
   ],
   "builder_evidence": [
    "NVIDIA Corporation entered a multi-year partnership with SB Energy Corp. to develop the PORTS-Pike (Portsmouth) Technology Campus in Pike County, Ohio as a large-scale AI data center site.",
    "# NVIDIA (NASDAQ: NVDA) backs OpenAI-linked Ohio AI campus with tens of billions at stake"
   ],
   "ai_customer_evidence": [
    "Through residual value guaranty agreements, NVIDIA has secured land, power and shell capacity to host NVIDIA AI compute infrastructure, with an affiliate of OpenAI Group PBC as tenant under 20-year leases.",
    "# NVIDIA (NASDAQ: NVDA) backs OpenAI-linked Ohio AI campus with tens of billions at stake"
   ],
   "status_evidence": [
    "On August 17, 2026, NVIDIA Corporation (\u201cNVIDIA\u201d) announced a multi-year partnership with SB Energy Corp. (collectively with its affiliates, \u201cSB Energy\u201d) to advance the development of the PORTS Technology Campus, a large-scale AI data center campus in Pike County, Ohio (the \u201cPortsmouth Site\u201d).",
    "Item 1.01 Entry into a Material Definitive Agreement Business"
   ],
   "announcement_date_evidence": [
    "On August 17, 2026, NVIDIA Corporation (\u201cNVIDIA\u201d) announced a multi-year partnership with SB Energy Corp. (collectively with its affiliates, \u201cSB Energy\u201d) to advance the development of the PORTS Technology Campus, a large-scale AI data center campus in Pike County, Ohio (the \u201cPortsmouth Site\u201d).",
    "Item 1.01 Entry into a Material Definitive Agreement Business"
   ]
  },
  {
   "url": "https://noah-news.com/lancium-and-nvidia-partner-to-transform-ai-infrastructure-with-gigawatt-scale-po",
   "title": "Lancium and Nvidia partner to transform AI infrastructure with gigawatt-scale power capacity",
   "published_at": "2026-08-24T17:06:28",
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Lancium",
   "ai_customer": null,
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# Lancium and Nvidia partner to transform AI infrastructure with gigawatt-scale power capacity",
    "Lancium, the Texas energy-infrastructure company building the Abilene campus at the centre of the Stargate rollout, has struck a strategic collaboration with NVIDIA that will see its entire portfolio used as a deployment platform for NVIDIA\u2019s full AI factory stack.",
    "The company says its flagship Abilene campus provides 1.2 gigawatts and is the first operational Stargate site, while a 1 gigawatt project in Childress, Texas, announced with Crusoe in July 2026, is expected to follow."
   ],
   "locality_evidence": [
    "# Lancium and Nvidia partner to transform AI infrastructure with gigawatt-scale power capacity",
    "Lancium, the Texas energy-infrastructure company building the Abilene campus at the centre of the Stargate rollout, has struck a strategic collaboration with NVIDIA that will see its entire portfolio used as a deployment platform for NVIDIA\u2019s full AI factory stack.",
    "The company says its flagship Abilene campus provides 1.2 gigawatts and is the first operational Stargate site, while a 1 gigawatt project in Childress, Texas, announced with Crusoe in July 2026, is expected to follow."
   ],
   "state_evidence": [
    "# Lancium and Nvidia partner to transform AI infrastructure with gigawatt-scale power capacity",
    "Lancium\u2019s Texas energy campuses will serve as strategic hubs for Nvidia\u2019s AI factory stack, combining power management innovations with substantial capacity to accelerate AI development at scale.Lancium, the Texas...",
    "The company says its flagship Abilene campus provides 1.2 gigawatts and is the first operational Stargate site, while a 1 gigawatt project in Childress, Texas, announced with Crusoe in July 2026, is expected to follow."
   ],
   "capacity_gw_evidence": [
    "# Lancium and Nvidia partner to transform AI infrastructure with gigawatt-scale power capacity",
    "The company says its flagship Abilene campus provides 1.2 gigawatts and is the first operational Stargate site, while a 1 gigawatt project in Childress, Texas, announced with Crusoe in July 2026, is expected to follow."
   ],
   "builder_evidence": [
    "# Lancium and Nvidia partner to transform AI infrastructure with gigawatt-scale power capacity",
    "Lancium, the Texas energy-infrastructure company building the Abilene campus at the centre of the Stargate rollout, has struck a strategic collaboration with NVIDIA that will see its entire portfolio used as a deployment platform for NVIDIA\u2019s full AI factory stack.",
    "The company says its flagship Abilene campus provides 1.2 gigawatts and is the first operational Stargate site, while a 1 gigawatt project in Childress, Texas, announced with Crusoe in July 2026, is expected to follow."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Lancium and Nvidia partner to transform AI infrastructure with gigawatt-scale power capacity",
    "The company says its flagship Abilene campus provides 1.2 gigawatts and is the first operational Stargate site, while a 1 gigawatt project in Childress, Texas, announced with Crusoe in July 2026, is expected to follow."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://noah-news.com/lancium-and-nvidia-partner-to-transform-ai-infrastructure-with-gigawatt-scale-po",
   "title": "Lancium and Nvidia partner to transform AI infrastructure with gigawatt-scale power capacity",
   "published_at": "2026-08-24T17:06:28",
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Lancium",
   "ai_customer": null,
   "status": "expected to follow",
   "announcement_date": "2026-07-00",
   "project_evidence": [
    "# Lancium and Nvidia partner to transform AI infrastructure with gigawatt-scale power capacity",
    "The company says its flagship Abilene campus provides 1.2 gigawatts and is the first operational Stargate site, while a 1 gigawatt project in Childress, Texas, announced with Crusoe in July 2026, is expected to follow."
   ],
   "locality_evidence": [
    "# Lancium and Nvidia partner to transform AI infrastructure with gigawatt-scale power capacity",
    "The company says its flagship Abilene campus provides 1.2 gigawatts and is the first operational Stargate site, while a 1 gigawatt project in Childress, Texas, announced with Crusoe in July 2026, is expected to follow."
   ],
   "state_evidence": [
    "# Lancium and Nvidia partner to transform AI infrastructure with gigawatt-scale power capacity",
    "Lancium\u2019s Texas energy campuses will serve as strategic hubs for Nvidia\u2019s AI factory stack, combining power management innovations with substantial capacity to accelerate AI development at scale.Lancium, the Texas...",
    "The company says its flagship Abilene campus provides 1.2 gigawatts and is the first operational Stargate site, while a 1 gigawatt project in Childress, Texas, announced with Crusoe in July 2026, is expected to follow."
   ],
   "capacity_gw_evidence": [
    "# Lancium and Nvidia partner to transform AI infrastructure with gigawatt-scale power capacity",
    "The company says its flagship Abilene campus provides 1.2 gigawatts and is the first operational Stargate site, while a 1 gigawatt project in Childress, Texas, announced with Crusoe in July 2026, is expected to follow."
   ],
   "builder_evidence": [
    "# Lancium and Nvidia partner to transform AI infrastructure with gigawatt-scale power capacity",
    "Lancium, the Texas energy-infrastructure company building the Abilene campus at the centre of the Stargate rollout, has struck a strategic collaboration with NVIDIA that will see its entire portfolio used as a deployment platform for NVIDIA\u2019s full AI factory stack.",
    "The company says its flagship Abilene campus provides 1.2 gigawatts and is the first operational Stargate site, while a 1 gigawatt project in Childress, Texas, announced with Crusoe in July 2026, is expected to follow."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Lancium and Nvidia partner to transform AI infrastructure with gigawatt-scale power capacity",
    "The company says its flagship Abilene campus provides 1.2 gigawatts and is the first operational Stargate site, while a 1 gigawatt project in Childress, Texas, announced with Crusoe in July 2026, is expected to follow."
   ],
   "announcement_date_evidence": [
    "# Lancium and Nvidia partner to transform AI infrastructure with gigawatt-scale power capacity",
    "The company says its flagship Abilene campus provides 1.2 gigawatts and is the first operational Stargate site, while a 1 gigawatt project in Childress, Texas, announced with Crusoe in July 2026, is expected to follow."
   ]
  },
  {
   "url": "https://en.wikipedia.org/wiki/AI_factory",
   "title": "AI data center",
   "published_at": "2026-08-26T14:30:55",
   "project": "Project Rainier",
   "locality": null,
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon",
   "ai_customer": "Anthropic",
   "status": "built",
   "announcement_date": "2025-10-01",
   "project_evidence": [
    "In response to the Stargate project, Amazon launched in October 2025 an AI data center on 1,200 acres of farmland in Indiana.",
    "This data center, known as Project Rainier, is one of the largest AI data centers in the world, with Amazon spending $11 billion on the project."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "In response to the Stargate project, Amazon launched in October 2025 an AI data center on 1,200 acres of farmland in Indiana."
   ],
   "capacity_gw_evidence": [
    "As of that time, this facility contains seven data centers (out of an estimated 30 planned) and will use 2.2 gigawatts of electricity (equivalent to 1 million households) and millions of gallons of water per year."
   ],
   "builder_evidence": [
    "In response to the Stargate project, Amazon launched in October 2025 an AI data center on 1,200 acres of farmland in Indiana."
   ],
   "ai_customer_evidence": [
    "Rainier is specifically intended for training and running machine learning models from Anthropic."
   ],
   "status_evidence": [
    "As of that time, this facility contains seven data centers (out of an estimated 30 planned) and will use 2.2 gigawatts of electricity (equivalent to 1 million households) and millions of gallons of water per year."
   ],
   "announcement_date_evidence": [
    "In response to the Stargate project, Amazon launched in October 2025 an AI data center on 1,200 acres of farmland in Indiana."
   ]
  },
  {
   "url": "https://en.wikipedia.org/wiki/AI_factory",
   "title": "AI data center",
   "published_at": "2026-08-26T14:30:55",
   "project": "Prometheus",
   "locality": null,
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Other AI data center projects include the Colossus supercomputer from xAI, a Louisiana-based project from Meta, Hyperion, expected to use 5 GW of power, and a second Ohio-based Meta project, Prometheus, with a capacity of 1 GW."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "Other AI data center projects include the Colossus supercomputer from xAI, a Louisiana-based project from Meta, Hyperion, expected to use 5 GW of power, and a second Ohio-based Meta project, Prometheus, with a capacity of 1 GW."
   ],
   "capacity_gw_evidence": [
    "Other AI data center projects include the Colossus supercomputer from xAI, a Louisiana-based project from Meta, Hyperion, expected to use 5 GW of power, and a second Ohio-based Meta project, Prometheus, with a capacity of 1 GW."
   ],
   "builder_evidence": [
    "Other AI data center projects include the Colossus supercomputer from xAI, a Louisiana-based project from Meta, Hyperion, expected to use 5 GW of power, and a second Ohio-based Meta project, Prometheus, with a capacity of 1 GW."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://unite.ai/lancium-and-nvidia-partner-to-deploy-gigawatt-scale-ai-factories",
   "title": "Lancium and NVIDIA Partner to Deploy Gigawatt-Scale AI Factories",
   "published_at": "2026-08-24T16:34:02",
   "project": "Abilene campus",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Lancium",
   "ai_customer": "Stargate",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "Lancium and NVIDIA Partner to Deploy Gigawatt-Scale AI Factories"
   ],
   "locality_evidence": [
    "Lancium and NVIDIA Partner to Deploy Gigawatt-Scale AI Factories"
   ],
   "state_evidence": [
    "Lancium and NVIDIA Partner to Deploy Gigawatt-Scale AI Factories"
   ],
   "capacity_gw_evidence": [
    "Lancium\u2019s Portfolio, by the Numbers",
    "- **1.2 GW** at the flagship Abilene campus, which serves as the first operational Stargate site"
   ],
   "builder_evidence": [
    "Lancium and NVIDIA Partner to Deploy Gigawatt-Scale AI Factories"
   ],
   "ai_customer_evidence": [
    "Lancium and NVIDIA Partner to Deploy Gigawatt-Scale AI Factories"
   ],
   "status_evidence": [
    "Lancium\u2019s Portfolio, by the Numbers",
    "- **1.2 GW** at the flagship Abilene campus, which serves as the first operational Stargate site"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://unite.ai/lancium-and-nvidia-partner-to-deploy-gigawatt-scale-ai-factories",
   "title": "Lancium and NVIDIA Partner to Deploy Gigawatt-Scale AI Factories",
   "published_at": "2026-08-24T16:34:02",
   "project": "Childress, Texas campus",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Lancium",
   "ai_customer": "Crusoe",
   "status": "planned",
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "Lancium\u2019s Portfolio, by the Numbers",
    "- **1 GW** planned at the [Childress, Texas campus](https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas/) announced with Crusoe in July 2026"
   ],
   "locality_evidence": [
    "Lancium\u2019s Portfolio, by the Numbers",
    "- **1 GW** planned at the [Childress, Texas campus](https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas/) announced with Crusoe in July 2026"
   ],
   "state_evidence": [
    "Lancium\u2019s Portfolio, by the Numbers",
    "- **1 GW** planned at the [Childress, Texas campus](https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas/) announced with Crusoe in July 2026"
   ],
   "capacity_gw_evidence": [
    "Lancium\u2019s Portfolio, by the Numbers",
    "- **1 GW** planned at the [Childress, Texas campus](https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas/) announced with Crusoe in July 2026"
   ],
   "builder_evidence": [
    "Lancium\u2019s Portfolio, by the Numbers",
    "- **1 GW** planned at the [Childress, Texas campus](https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas/) announced with Crusoe in July 2026",
    "Lancium\u2019s campuses are in Texas and connect through ERCOT, with behind-the-meter solar and battery storage integrated into the power plan. The company\u2019s model is to own the land and the energy infrastructure, then partner with operators like Crusoe, which designs, builds, and runs the data center itself."
   ],
   "ai_customer_evidence": [
    "Lancium\u2019s Portfolio, by the Numbers",
    "- **1 GW** planned at the [Childress, Texas campus](https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas/) announced with Crusoe in July 2026"
   ],
   "status_evidence": [
    "Lancium\u2019s Portfolio, by the Numbers",
    "- **1 GW** planned at the [Childress, Texas campus](https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas/) announced with Crusoe in July 2026"
   ],
   "announcement_date_evidence": [
    "Lancium\u2019s Portfolio, by the Numbers",
    "- **1 GW** planned at the [Childress, Texas campus](https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas/) announced with Crusoe in July 2026"
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=openai&term=colocation-wholesale",
   "title": "News Colocation & Wholesale, OpenAI",
   "published_at": "2026-08-27T00:00:00",
   "project": "Stargate",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Related Digital",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# News - Colocation & Wholesale, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Related Digital\u2019s 1GW Michigan data center project to be part of OpenAI's Stargate](/en/news/related-digitals-michigan-1gw-data-center-project-to-serve-openai-oracle/)\n\nDeal struck with OpenAI and Oracle\n- ![Stargate"
   ],
   "locality_evidence": [
    "# News - Colocation & Wholesale, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Planned Stargate data center encounter opposition in Saline Township, Michigan](/en/news/planned-stargate-data-center-encounters-opposition-in-saline-township-michigan/)"
   ],
   "state_evidence": [
    "# News - Colocation & Wholesale, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Related Digital\u2019s 1GW Michigan data center project to be part of OpenAI's Stargate](/en/news/related-digitals-michigan-1gw-data-center-project-to-serve-openai-oracle/)"
   ],
   "capacity_gw_evidence": [
    "# News - Colocation & Wholesale, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Related Digital\u2019s 1GW Michigan data center project to be part of OpenAI's Stargate](/en/news/related-digitals-michigan-1gw-data-center-project-to-serve-openai-oracle/)"
   ],
   "builder_evidence": [
    "# News - Colocation & Wholesale, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Related Digital\u2019s 1GW Michigan data center project to be part of OpenAI's Stargate](/en/news/related-digitals-michigan-1gw-data-center-project-to-serve-openai-oracle/)"
   ],
   "ai_customer_evidence": [
    "# News - Colocation & Wholesale, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Related Digital\u2019s 1GW Michigan data center project to be part of OpenAI's Stargate](/en/news/related-digitals-michigan-1gw-data-center-project-to-serve-openai-oracle/)"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=meta&term=the-data-center-construction-channel",
   "title": "News The Data Center Construction Channel, Meta",
   "published_at": "2026-08-27T00:00:00",
   "project": null,
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta and BlackRock",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "# News - The Data Center Construction Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta and BlackRock team up for data center in El Paso, Texas](/en/news/meta-and-blackrock-team-up-for-data-center-in-el-paso-texas/)"
   ],
   "state_evidence": [
    "# News - The Data Center Construction Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta and BlackRock team up for data center in El Paso, Texas](/en/news/meta-and-blackrock-team-up-for-data-center-in-el-paso-texas/)"
   ],
   "capacity_gw_evidence": [
    "# News - The Data Center Construction Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta and BlackRock team up for data center in El Paso, Texas](/en/news/meta-and-blackrock-team-up-for-data-center-in-el-paso-texas/)",
    "Will offer 1GW of compute capacity"
   ],
   "builder_evidence": [
    "# News - The Data Center Construction Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta and BlackRock team up for data center in El Paso, Texas](/en/news/meta-and-blackrock-team-up-for-data-center-in-el-paso-texas/)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=meta&term=the-data-center-construction-channel",
   "title": "News The Data Center Construction Channel, Meta",
   "published_at": "2026-08-27T00:00:00",
   "project": null,
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Crusoe",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "# News - The Data Center Construction Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Crusoe to develop 1.4GW data center campus in Childress, Texas](/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/)"
   ],
   "state_evidence": [
    "# News - The Data Center Construction Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Crusoe to develop 1.4GW data center campus in Childress, Texas](/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/)"
   ],
   "capacity_gw_evidence": [
    "# News - The Data Center Construction Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Crusoe to develop 1.4GW data center campus in Childress, Texas](/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/)"
   ],
   "builder_evidence": [
    "# News - The Data Center Construction Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Crusoe to develop 1.4GW data center campus in Childress, Texas](/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=meta&term=the-data-center-construction-channel",
   "title": "News The Data Center Construction Channel, Meta",
   "published_at": "2026-08-27T00:00:00",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# News - The Data Center Construction Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta expands data center campus in Richland Parish, Louisiana, to 5GW & $50bn](/en/news/meta-expands-data-center-campus-in-richland-parish-louisiana-to-5gw-will-invest-50bn/)",
    "# [Meta purchases additional 1,400 acres for Hyperion mega-data center expansion](/en/news/meta-purchases-additional-1400-acres-for-hyperion-mega-data-center-expansion/)"
   ],
   "locality_evidence": [
    "# News - The Data Center Construction Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta expands data center campus in Richland Parish, Louisiana, to 5GW & $50bn](/en/news/meta-expands-data-center-campus-in-richland-parish-louisiana-to-5gw-will-invest-50bn/)"
   ],
   "state_evidence": [
    "# News - The Data Center Construction Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta expands data center campus in Richland Parish, Louisiana, to 5GW & $50bn](/en/news/meta-expands-data-center-campus-in-richland-parish-louisiana-to-5gw-will-invest-50bn/)"
   ],
   "capacity_gw_evidence": [
    "# News - The Data Center Construction Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta expands data center campus in Richland Parish, Louisiana, to 5GW & $50bn](/en/news/meta-expands-data-center-campus-in-richland-parish-louisiana-to-5gw-will-invest-50bn/)"
   ],
   "builder_evidence": [
    "# News - The Data Center Construction Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta expands data center campus in Richland Parish, Louisiana, to 5GW & $50bn](/en/news/meta-expands-data-center-campus-in-richland-parish-louisiana-to-5gw-will-invest-50bn/)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=meta&term=the-data-center-construction-channel",
   "title": "News The Data Center Construction Channel, Meta",
   "published_at": "2026-08-27T00:00:00",
   "project": null,
   "locality": "Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "# News - The Data Center Construction Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta announces 1GW data center campus in Indiana](/en/news/meta-announces-1gw-data-center-campus-in-indiana/)",
    "Company starts work in Lebanon"
   ],
   "state_evidence": [
    "# News - The Data Center Construction Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta announces 1GW data center campus in Indiana](/en/news/meta-announces-1gw-data-center-campus-in-indiana/)"
   ],
   "capacity_gw_evidence": [
    "# News - The Data Center Construction Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta announces 1GW data center campus in Indiana](/en/news/meta-announces-1gw-data-center-campus-in-indiana/)"
   ],
   "builder_evidence": [
    "# News - The Data Center Construction Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta announces 1GW data center campus in Indiana](/en/news/meta-announces-1gw-data-center-campus-in-indiana/)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://en.wikipedia.org/wiki/Neocloud",
   "title": "AI data center",
   "published_at": "2026-08-26T14:30:55",
   "project": "Project Rainier",
   "locality": null,
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon",
   "ai_customer": "Anthropic",
   "status": null,
   "announcement_date": "2025-10-01",
   "project_evidence": [
    "In response to the Stargate project, Amazon launched in October 2025 an AI data center on 1,200 acres of farmland in Indiana.",
    "This data center, known as Project Rainier, is one of the largest AI data centers in the world, with Amazon spending $11 billion on the project."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "In response to the Stargate project, Amazon launched in October 2025 an AI data center on 1,200 acres of farmland in Indiana."
   ],
   "capacity_gw_evidence": [
    "As of that time, this facility contains seven data centers (out of an estimated 30 planned) and will use 2.2 gigawatts of electricity (equivalent to 1 million households) and millions of gallons of water per year."
   ],
   "builder_evidence": [
    "In response to the Stargate project, Amazon launched in October 2025 an AI data center on 1,200 acres of farmland in Indiana."
   ],
   "ai_customer_evidence": [
    "Rainier is specifically intended for training and running machine learning models from Anthropic."
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "In response to the Stargate project, Amazon launched in October 2025 an AI data center on 1,200 acres of farmland in Indiana."
   ]
  },
  {
   "url": "https://en.wikipedia.org/wiki/Neocloud",
   "title": "AI data center",
   "published_at": "2026-08-26T14:30:55",
   "project": "Prometheus",
   "locality": null,
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Other AI data center projects include the Colossus supercomputer from xAI, a Louisiana-based project from Meta, Hyperion, expected to use 5 GW of power, and a second Ohio-based Meta project, Prometheus, with a capacity of 1 GW."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "Other AI data center projects include the Colossus supercomputer from xAI, a Louisiana-based project from Meta, Hyperion, expected to use 5 GW of power, and a second Ohio-based Meta project, Prometheus, with a capacity of 1 GW."
   ],
   "capacity_gw_evidence": [
    "Other AI data center projects include the Colossus supercomputer from xAI, a Louisiana-based project from Meta, Hyperion, expected to use 5 GW of power, and a second Ohio-based Meta project, Prometheus, with a capacity of 1 GW."
   ],
   "builder_evidence": [
    "Other AI data center projects include the Colossus supercomputer from xAI, a Louisiana-based project from Meta, Hyperion, expected to use 5 GW of power, and a second Ohio-based Meta project, Prometheus, with a capacity of 1 GW."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://global1.news/the-105-billion-data-center-landed-in-ohio-and-ohio-is-passing-laws-to-stop-the-next-one-uwo",
   "title": "Ohio Took $105 Billion and Started Rejecting the Next Deal",
   "published_at": "2026-08-24T14:13:23",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "The $105 Billion Data Center Landed in Ohio \u2014 and Ohio Is Passing Laws to Stop the Next One",
    "Nvidia will provide up to $105 billion in financing for an 8-gigawatt OpenAI data center campus in Pike County, Ohio \u2014 while the state's legislature and senators turn against the buildout.",
    "The Deal \u2014 What Actually Landed in Pike County"
   ],
   "locality_evidence": [
    "The $105 Billion Data Center Landed in Ohio \u2014 and Ohio Is Passing Laws to Stop the Next One",
    "Nvidia will provide up to $105 billion in financing for an 8-gigawatt OpenAI data center campus in Pike County, Ohio \u2014 while the state's legislature and senators turn against the buildout.",
    "The Deal \u2014 What Actually Landed in Pike County",
    "Nvidia will provide up to $105 billion in credit support so OpenAI can lease an 8-gigawatt AI campus at the PORTS-Pike Technology Campus in Pike County, Ohio \u2014 land that used to host the Portsmouth Gaseous Diffusion Plant, a Cold War uranium-enrichment complex that the Department of Energy has spent decades remediating."
   ],
   "state_evidence": [
    "The $105 Billion Data Center Landed in Ohio \u2014 and Ohio Is Passing Laws to Stop the Next One",
    "Nvidia will provide up to $105 billion in financing for an 8-gigawatt OpenAI data center campus in Pike County, Ohio \u2014 while the state's legislature and senators turn against the buildout.",
    "The Deal \u2014 What Actually Landed in Pike County",
    "Nvidia will provide up to $105 billion in credit support so OpenAI can lease an 8-gigawatt AI campus at the PORTS-Pike Technology Campus in Pike County, Ohio \u2014 land that used to host the Portsmouth Gaseous Diffusion Plant, a Cold War uranium-enrichment complex that the Department of Energy has spent decades remediating."
   ],
   "capacity_gw_evidence": [
    "The $105 Billion Data Center Landed in Ohio \u2014 and Ohio Is Passing Laws to Stop the Next One",
    "Nvidia will provide up to $105 billion in financing for an 8-gigawatt OpenAI data center campus in Pike County, Ohio \u2014 while the state's legislature and senators turn against the buildout.",
    "The Deal \u2014 What Actually Landed in Pike County",
    "Nvidia will provide up to $105 billion in credit support so OpenAI can lease an 8-gigawatt AI campus at the PORTS-Pike Technology Campus in Pike County, Ohio \u2014 land that used to host the Portsmouth Gaseous Diffusion Plant, a Cold War uranium-enrichment complex that the Department of Energy has spent decades remediating."
   ],
   "builder_evidence": [
    "The $105 Billion Data Center Landed in Ohio \u2014 and Ohio Is Passing Laws to Stop the Next One",
    "The Deal \u2014 What Actually Landed in Pike County",
    "SoftBank's SB Energy is building and operating the campus."
   ],
   "ai_customer_evidence": [
    "The $105 Billion Data Center Landed in Ohio \u2014 and Ohio Is Passing Laws to Stop the Next One",
    "Nvidia will provide up to $105 billion in financing for an 8-gigawatt OpenAI data center campus in Pike County, Ohio \u2014 while the state's legislature and senators turn against the buildout.",
    "The Deal \u2014 What Actually Landed in Pike County",
    "Nvidia will provide up to $105 billion in credit support so OpenAI can lease an 8-gigawatt AI campus at the PORTS-Pike Technology Campus in Pike County, Ohio \u2014 land that used to host the Portsmouth Gaseous Diffusion Plant, a Cold War uranium-enrichment complex that the Department of Energy has spent decades remediating."
   ],
   "status_evidence": [
    "The $105 Billion Data Center Landed in Ohio \u2014 and Ohio Is Passing Laws to Stop the Next One",
    "The Deal \u2014 What Actually Landed in Pike County",
    "The filing dropped August 17."
   ],
   "announcement_date_evidence": [
    "The $105 Billion Data Center Landed in Ohio \u2014 and Ohio Is Passing Laws to Stop the Next One",
    "The Deal \u2014 What Actually Landed in Pike County",
    "The filing dropped August 17."
   ]
  },
  {
   "url": "https://nameplatereport.substack.com/p/weekly-nvidia-writes-a-105bn-promise",
   "title": "Weekly: Nvidia writes a $105bn promise, Texas audits tomorrow, and the freeze reaches Fort Worth",
   "published_at": "2026-08-19T17:47:58",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "## A $105bn promise in Ohio",
    "On Monday OpenAI, SB Energy and Nvidia announced the PORTS-Pike Technology Campus in Pike County, Ohio: up to 8 gigawatts leased by OpenAI over twenty years, built, owned and operated by SB Energy \u2014 the energy developer founded within SoftBank \u2014 with the first 800 MW targeted for 2028 and completion by 2032."
   ],
   "locality_evidence": [
    "## A $105bn promise in Ohio",
    "On Monday OpenAI, SB Energy and Nvidia announced the PORTS-Pike Technology Campus in Pike County, Ohio: up to 8 gigawatts leased by OpenAI over twenty years, built, owned and operated by SB Energy \u2014 the energy developer founded within SoftBank \u2014 with the first 800 MW targeted for 2028 and completion by 2032."
   ],
   "state_evidence": [
    "## A $105bn promise in Ohio",
    "On Monday OpenAI, SB Energy and Nvidia announced the PORTS-Pike Technology Campus in Pike County, Ohio: up to 8 gigawatts leased by OpenAI over twenty years, built, owned and operated by SB Energy \u2014 the energy developer founded within SoftBank \u2014 with the first 800 MW targeted for 2028 and completion by 2032."
   ],
   "capacity_gw_evidence": [
    "## A $105bn promise in Ohio",
    "On Monday OpenAI, SB Energy and Nvidia announced the PORTS-Pike Technology Campus in Pike County, Ohio: up to 8 gigawatts leased by OpenAI over twenty years, built, owned and operated by SB Energy \u2014 the energy developer founded within SoftBank \u2014 with the first 800 MW targeted for 2028 and completion by 2032."
   ],
   "builder_evidence": [
    "## A $105bn promise in Ohio",
    "On Monday OpenAI, SB Energy and Nvidia announced the PORTS-Pike Technology Campus in Pike County, Ohio: up to 8 gigawatts leased by OpenAI over twenty years, built, owned and operated by SB Energy \u2014 the energy developer founded within SoftBank \u2014 with the first 800 MW targeted for 2028 and completion by 2032."
   ],
   "ai_customer_evidence": [
    "## A $105bn promise in Ohio",
    "On Monday OpenAI, SB Energy and Nvidia announced the PORTS-Pike Technology Campus in Pike County, Ohio: up to 8 gigawatts leased by OpenAI over twenty years, built, owned and operated by SB Energy \u2014 the energy developer founded within SoftBank \u2014 with the first 800 MW targeted for 2028 and completion by 2032."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news/crusoe-confirms-plans-for-200mw-ai-data-center-in-texas?aff_unique2=unknown&code=unknown",
   "title": "Crusoe confirms plans for 200MW AI data center in Texas",
   "published_at": "2026-08-27T00:00:00",
   "project": "Lancium Clean Campus",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe",
   "ai_customer": "",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "The company said it has designed and engineered, and is now building, a 200MW data center at the Lancium Clean Campus outside Abilene, Texas.",
    "The data center is expected to be energized in 2025, and be the first phase of a planned 1.2GW data center that Crusoe will develop at the Lancium Clean Campus.",
    "Cryptomine-turned-AI firm Crusoe has confirmed it is building a large GPU-focused data center in Texas."
   ],
   "locality_evidence": [
    "The company said it has designed and engineered, and is now building, a 200MW data center at the Lancium Clean Campus outside Abilene, Texas.",
    "Cryptomine-turned-AI firm Crusoe has confirmed it is building a large GPU-focused data center in Texas."
   ],
   "state_evidence": [
    "The company said it has designed and engineered, and is now building, a 200MW data center at the Lancium Clean Campus outside Abilene, Texas.",
    "Cryptomine-turned-AI firm Crusoe has confirmed it is building a large GPU-focused data center in Texas."
   ],
   "capacity_gw_evidence": [
    "The data center is expected to be energized in 2025, and be the first phase of a planned 1.2GW data center that Crusoe will develop at the Lancium Clean Campus.",
    "Cryptomine-turned-AI firm Crusoe has confirmed it is building a large GPU-focused data center in Texas."
   ],
   "builder_evidence": [
    "The data center is expected to be energized in 2025, and be the first phase of a planned 1.2GW data center that Crusoe will develop at the Lancium Clean Campus.",
    "Cryptomine-turned-AI firm Crusoe has confirmed it is building a large GPU-focused data center in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The company said it has designed and engineered, and is now building, a 200MW data center at the Lancium Clean Campus outside Abilene, Texas.",
    "Cryptomine-turned-AI firm Crusoe has confirmed it is building a large GPU-focused data center in Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://dlvr.it/TV0B04",
   "title": "Fermi taps Hillcore to construct 2.6GW gas plant for up to 11GW Project Matador in Amarillo, Texas",
   "published_at": "2026-08-27T00:00:00",
   "project": "Project Matador",
   "locality": "Carson County",
   "state": "Texas",
   "capacity_gw": 17.0,
   "builder": "Fermi America",
   "ai_customer": "TensorWave",
   "status": "well underway",
   "announcement_date": null,
   "project_evidence": [
    "Fermi America has inked a deal with Hillcore Energy Capital (Hillcore) to develop a 2.6GW natural gas-anchored power plant that will feed a planned up to 17GW data center and energy campus called Project Matador in Carson County, Texas.",
    "The company\u2019s Project Matador is [a massive 17GW data center and energy campus](https://www.datacenterdynamics.com/en/news/?tag=fermi-america) near Amarillo in Texas on land owned by the Texas Tech University system."
   ],
   "locality_evidence": [
    "Fermi America has inked a deal with Hillcore Energy Capital (Hillcore) to develop a 2.6GW natural gas-anchored power plant that will feed a planned up to 17GW data center and energy campus called Project Matador in Carson County, Texas."
   ],
   "state_evidence": [
    "Fermi America has inked a deal with Hillcore Energy Capital (Hillcore) to develop a 2.6GW natural gas-anchored power plant that will feed a planned up to 17GW data center and energy campus called Project Matador in Carson County, Texas."
   ],
   "capacity_gw_evidence": [
    "Fermi America has inked a deal with Hillcore Energy Capital (Hillcore) to develop a 2.6GW natural gas-anchored power plant that will feed a planned up to 17GW data center and energy campus called Project Matador in Carson County, Texas.",
    "The campus was initially announced with planned 11GW of capacity, but Fermi increased the figure to 17GW in March 2026."
   ],
   "builder_evidence": [
    "Fermi America has inked a deal with Hillcore Energy Capital (Hillcore) to develop a 2.6GW natural gas-anchored power plant that will feed a planned up to 17GW data center and energy campus called Project Matador in Carson County, Texas."
   ],
   "ai_customer_evidence": [
    "[Earlier this week](https://www.datacenterdynamics.com/en/news/fermi-signs-agreement-with-tensorwave-for-up-to-650mw-of-data-center-capacity-at-project-matador-site/), it signed a binding lease agreement with AI cloud provider TensorWave for up to 650MW of data center capacity at its Project Matador site in Texas."
   ],
   "status_evidence": [
    "This week, Fermi said Project Matador is \u201cwell underway,\u201d with approximately 6GW of the planned 17GW already permitted, and more than $1.5bn invested in the buildout to date, with first power targeted for 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news/nvidia-confirms-it-will-back-425gw-of-openai-capacity-at-ports-pike-mega-data-center?sid=%7B$sid_secret%7D",
   "title": "Nvidia confirms it will back 4.25GW of OpenAI capacity at Ports-Pike mega data center",
   "published_at": "2026-08-27T00:00:00",
   "project": "Portsmouth Site",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 10.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "Nvidia has confirmed reports that it is financially backing SoftBank's massive data center at the Portsmouth Site in Pike County, Ohio.",
    "\"Nvidia is supporting the LPS infrastructure at Ports-Pike for approximately 4GW over a 20-year term, securing a site on which Nvidia compute will be exclusively deployed,\" Huang said."
   ],
   "locality_evidence": [
    "Nvidia has confirmed reports that it is financially backing SoftBank's massive data center at the Portsmouth Site in Pike County, Ohio."
   ],
   "state_evidence": [
    "Nvidia has confirmed reports that it is financially backing SoftBank's massive data center at the Portsmouth Site in Pike County, Ohio."
   ],
   "capacity_gw_evidence": [
    "The facility could grow to 10GW, making it the world's largest data center, but Nvidia will initially support the first 4.25GW."
   ],
   "builder_evidence": [
    "The project, led by SB Energy, is set to be fully leased to OpenAI.",
    "In [a LinkedIn post](https://www.linkedin.com/pulse/securing-infrastructure-intelligence-jensen-huang-wsg9c/), Nvidia CEO and founder Jensen Huang confirmed that his company would partner with SB Energy to help secure land, power, and shell (LPS) capacity at the Department of Energy (DOE) site."
   ],
   "ai_customer_evidence": [
    "The project, led by SB Energy, is set to be fully leased to OpenAI."
   ],
   "status_evidence": [
    "Nvidia has confirmed reports that it is financially backing SoftBank's massive data center at the Portsmouth Site in Pike County, Ohio.",
    "The project, led by SB Energy, is set to be fully leased to OpenAI."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://dlvr.it/TTyVb3",
   "title": "Fermi signs agreement with TensorWave for up to 650MW of data center capacity at Project Matador site",
   "published_at": "2026-08-27T00:00:00",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 17.0,
   "builder": "Fermi America",
   "ai_customer": "TensorWave",
   "status": "well underway",
   "announcement_date": null,
   "project_evidence": [
    "The company\u2019s Project Matador is [a massive 17GW data center and energy campus](https://www.datacenterdynamics.com/en/news/?tag=fermi-america) near Amarillo in Texas on land owned by the Texas Tech University system.",
    "Data center company Fermi America has signed a binding lease agreement with TensorWave for up to 650MW of data center capacity at its Project Matador site in Texas."
   ],
   "locality_evidence": [
    "The company\u2019s Project Matador is [a massive 17GW data center and energy campus](https://www.datacenterdynamics.com/en/news/?tag=fermi-america) near Amarillo in Texas on land owned by the Texas Tech University system."
   ],
   "state_evidence": [
    "Data center company Fermi America has signed a binding lease agreement with TensorWave for up to 650MW of data center capacity at its Project Matador site in Texas.",
    "The company\u2019s Project Matador is [a massive 17GW data center and energy campus](https://www.datacenterdynamics.com/en/news/?tag=fermi-america) near Amarillo in Texas on land owned by the Texas Tech University system."
   ],
   "capacity_gw_evidence": [
    "The company\u2019s Project Matador is [a massive 17GW data center and energy campus](https://www.datacenterdynamics.com/en/news/?tag=fermi-america) near Amarillo in Texas on land owned by the Texas Tech University system.",
    "The campus was initially announced with planned 11GW of capacity, but Fermi increased the figure to 17GW in March 2026."
   ],
   "builder_evidence": [
    "Data center company Fermi America has signed a binding lease agreement with TensorWave for up to 650MW of data center capacity at its Project Matador site in Texas."
   ],
   "ai_customer_evidence": [
    "Data center company Fermi America has signed a binding lease agreement with TensorWave for up to 650MW of data center capacity at its Project Matador site in Texas."
   ],
   "status_evidence": [
    "This week, Fermi said Project Matador is \u201cwell underway,\u201d with approximately 6GW of the planned 17GW already permitted, and more than $1.5bn invested in the buildout to date, with first power targeted for 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterknowledge.com/data-center-construction/lancium-nvidia-partner-on-gigawatt-scale-ai-data-centers",
   "title": "Lancium, Nvidia Partner on Gigawatt-Scale AI Data Centers",
   "published_at": "2026-08-25T12:33:39",
   "project": "Clean Campus",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe",
   "ai_customer": null,
   "status": "in development",
   "announcement_date": null,
   "project_evidence": [
    "# Lancium, Nvidia Partner on Gigawatt-Scale AI Data Centers",
    "Lancium\u2019s publicly announced projects include its [1.2 GW Clean Campus in Abilene](/build-design/crusoe-expands-abilene-ai-campus-with-new-900mw-ai-factory-for-microsoft), where Crusoe is developing AI data center capacity; a 1 GW campus in Childress County, also with Crusoe; and a new campus near Turkey in Hall County, where QTS will design, build and operate the data center buildings."
   ],
   "locality_evidence": [
    "# Lancium, Nvidia Partner on Gigawatt-Scale AI Data Centers",
    "Lancium\u2019s publicly announced projects include its [1.2 GW Clean Campus in Abilene](/build-design/crusoe-expands-abilene-ai-campus-with-new-900mw-ai-factory-for-microsoft), where Crusoe is developing AI data center capacity; a 1 GW campus in Childress County, also with Crusoe; and a new campus near Turkey in Hall County, where QTS will design, build and operate the data center buildings."
   ],
   "state_evidence": [
    "# Lancium, Nvidia Partner on Gigawatt-Scale AI Data Centers",
    "Lancium is partnering with Nvidia to deploy the chipmaker\u2019s AI factory technology across a portfolio that the Texas infrastructure developer says includes 4 GW of leased capacity and more than 15 GW of powered land in development.",
    "Lancium\u2019s publicly announced projects include its [1.2 GW Clean Campus in Abilene](/build-design/crusoe-expands-abilene-ai-campus-with-new-900mw-ai-factory-for-microsoft), where Crusoe is developing AI data center capacity; a 1 GW campus in Childress County, also with Crusoe; and a new campus near Turkey in Hall County, where QTS will design, build and operate the data center buildings."
   ],
   "capacity_gw_evidence": [
    "# Lancium, Nvidia Partner on Gigawatt-Scale AI Data Centers",
    "Lancium\u2019s publicly announced projects include its [1.2 GW Clean Campus in Abilene](/build-design/crusoe-expands-abilene-ai-campus-with-new-900mw-ai-factory-for-microsoft), where Crusoe is developing AI data center capacity; a 1 GW campus in Childress County, also with Crusoe; and a new campus near Turkey in Hall County, where QTS will design, build and operate the data center buildings."
   ],
   "builder_evidence": [
    "# Lancium, Nvidia Partner on Gigawatt-Scale AI Data Centers",
    "Lancium\u2019s publicly announced projects include its [1.2 GW Clean Campus in Abilene](/build-design/crusoe-expands-abilene-ai-campus-with-new-900mw-ai-factory-for-microsoft), where Crusoe is developing AI data center capacity; a 1 GW campus in Childress County, also with Crusoe; and a new campus near Turkey in Hall County, where QTS will design, build and operate the data center buildings."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Lancium, Nvidia Partner on Gigawatt-Scale AI Data Centers",
    "Lancium\u2019s publicly announced projects include its [1.2 GW Clean Campus in Abilene](/build-design/crusoe-expands-abilene-ai-campus-with-new-900mw-ai-factory-for-microsoft), where Crusoe is developing AI data center capacity; a 1 GW campus in Childress County, also with Crusoe; and a new campus near Turkey in Hall County, where QTS will design, build and operate the data center buildings."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterknowledge.com/data-center-construction/lancium-nvidia-partner-on-gigawatt-scale-ai-data-centers",
   "title": "Lancium, Nvidia Partner on Gigawatt-Scale AI Data Centers",
   "published_at": "2026-08-25T12:33:39",
   "project": "Childress County campus",
   "locality": "Childress County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe",
   "ai_customer": null,
   "status": "in development",
   "announcement_date": null,
   "project_evidence": [
    "# Lancium, Nvidia Partner on Gigawatt-Scale AI Data Centers",
    "Lancium\u2019s publicly announced projects include its [1.2 GW Clean Campus in Abilene](/build-design/crusoe-expands-abilene-ai-campus-with-new-900mw-ai-factory-for-microsoft), where Crusoe is developing AI data center capacity; a 1 GW campus in Childress County, also with Crusoe; and a new campus near Turkey in Hall County, where QTS will design, build and operate the data center buildings."
   ],
   "locality_evidence": [
    "# Lancium, Nvidia Partner on Gigawatt-Scale AI Data Centers",
    "Lancium\u2019s publicly announced projects include its [1.2 GW Clean Campus in Abilene](/build-design/crusoe-expands-abilene-ai-campus-with-new-900mw-ai-factory-for-microsoft), where Crusoe is developing AI data center capacity; a 1 GW campus in Childress County, also with Crusoe; and a new campus near Turkey in Hall County, where QTS will design, build and operate the data center buildings."
   ],
   "state_evidence": [
    "# Lancium, Nvidia Partner on Gigawatt-Scale AI Data Centers",
    "Lancium is partnering with Nvidia to deploy the chipmaker\u2019s AI factory technology across a portfolio that the Texas infrastructure developer says includes 4 GW of leased capacity and more than 15 GW of powered land in development.",
    "Lancium\u2019s publicly announced projects include its [1.2 GW Clean Campus in Abilene](/build-design/crusoe-expands-abilene-ai-campus-with-new-900mw-ai-factory-for-microsoft), where Crusoe is developing AI data center capacity; a 1 GW campus in Childress County, also with Crusoe; and a new campus near Turkey in Hall County, where QTS will design, build and operate the data center buildings."
   ],
   "capacity_gw_evidence": [
    "# Lancium, Nvidia Partner on Gigawatt-Scale AI Data Centers",
    "Lancium\u2019s publicly announced projects include its [1.2 GW Clean Campus in Abilene](/build-design/crusoe-expands-abilene-ai-campus-with-new-900mw-ai-factory-for-microsoft), where Crusoe is developing AI data center capacity; a 1 GW campus in Childress County, also with Crusoe; and a new campus near Turkey in Hall County, where QTS will design, build and operate the data center buildings."
   ],
   "builder_evidence": [
    "# Lancium, Nvidia Partner on Gigawatt-Scale AI Data Centers",
    "Lancium\u2019s publicly announced projects include its [1.2 GW Clean Campus in Abilene](/build-design/crusoe-expands-abilene-ai-campus-with-new-900mw-ai-factory-for-microsoft), where Crusoe is developing AI data center capacity; a 1 GW campus in Childress County, also with Crusoe; and a new campus near Turkey in Hall County, where QTS will design, build and operate the data center buildings."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Lancium, Nvidia Partner on Gigawatt-Scale AI Data Centers",
    "Lancium\u2019s publicly announced projects include its [1.2 GW Clean Campus in Abilene](/build-design/crusoe-expands-abilene-ai-campus-with-new-900mw-ai-factory-for-microsoft), where Crusoe is developing AI data center capacity; a 1 GW campus in Childress County, also with Crusoe; and a new campus near Turkey in Hall County, where QTS will design, build and operate the data center buildings."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=openai&page=3&term=business-operations",
   "title": "News Business Operations, OpenAI - DCD",
   "published_at": "2026-08-27T00:00:00",
   "project": "Stargate",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Related Digital",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# News - Business Operations, OpenAI",
    "# [Related Digital\u2019s 1GW Michigan data center project to be part of OpenAI's Stargate](/en/news/related-digitals-michigan-1gw-data-center-project-to-serve-openai-oracle/)"
   ],
   "locality_evidence": [
    "# News - Business Operations, OpenAI",
    "# [Planned Stargate data center encounter opposition in Saline Township, Michigan](/en/news/planned-stargate-data-center-encounters-opposition-in-saline-township-michigan/)"
   ],
   "state_evidence": [
    "# News - Business Operations, OpenAI",
    "# [Related Digital\u2019s 1GW Michigan data center project to be part of OpenAI's Stargate](/en/news/related-digitals-michigan-1gw-data-center-project-to-serve-openai-oracle/)",
    "# [Planned Stargate data center encounter opposition in Saline Township, Michigan](/en/news/planned-stargate-data-center-encounters-opposition-in-saline-township-michigan/)"
   ],
   "capacity_gw_evidence": [
    "# News - Business Operations, OpenAI",
    "# [Related Digital\u2019s 1GW Michigan data center project to be part of OpenAI's Stargate](/en/news/related-digitals-michigan-1gw-data-center-project-to-serve-openai-oracle/)"
   ],
   "builder_evidence": [
    "# News - Business Operations, OpenAI",
    "# [Related Digital\u2019s 1GW Michigan data center project to be part of OpenAI's Stargate](/en/news/related-digitals-michigan-1gw-data-center-project-to-serve-openai-oracle/)"
   ],
   "ai_customer_evidence": [
    "# News - Business Operations, OpenAI",
    "# [Related Digital\u2019s 1GW Michigan data center project to be part of OpenAI's Stargate](/en/news/related-digitals-michigan-1gw-data-center-project-to-serve-openai-oracle/)"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://unite.ai/nvidia-guarantees-up-to-105b-for-8-gw-ohio-ai-campus-leased-by-openai",
   "title": "NVIDIA Guarantees up to $105B for 8-GW Ohio AI Campus Leased by OpenAI",
   "published_at": "2026-08-17T12:57:02",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "NVIDIA Guarantees up to $105B for 8-GW Ohio AI Campus Leased by OpenAI",
    "NVIDIA (NVDA ) has agreed to guarantee up to $105 billion in lease obligations at a planned 8-gigawatt AI data center campus in Pike County, Ohio, in a deal that makes the chipmaker the financial backstop for one of the largest single compute buildouts yet disclosed.",
    "The commitment, detailed in a [current report filed with the SEC on August 17, 2026](https://www.sec.gov/Archives/edgar/data/1045810/000104581026000069/nvda-20260817.htm), anchors a partnership with SoftBank-owned developer SB Energy at the PORTS-Pike Technology Campus (the former Portsmouth Gaseous Diffusion Plant), with OpenAI signed on as the tenant under a 20-year lease."
   ],
   "locality_evidence": [
    "NVIDIA Guarantees up to $105B for 8-GW Ohio AI Campus Leased by OpenAI",
    "NVIDIA (NVDA ) has agreed to guarantee up to $105 billion in lease obligations at a planned 8-gigawatt AI data center campus in Pike County, Ohio, in a deal that makes the chipmaker the financial backstop for one of the largest single compute buildouts yet disclosed."
   ],
   "state_evidence": [
    "NVIDIA Guarantees up to $105B for 8-GW Ohio AI Campus Leased by OpenAI",
    "NVIDIA (NVDA ) has agreed to guarantee up to $105 billion in lease obligations at a planned 8-gigawatt AI data center campus in Pike County, Ohio, in a deal that makes the chipmaker the financial backstop for one of the largest single compute buildouts yet disclosed."
   ],
   "capacity_gw_evidence": [
    "NVIDIA Guarantees up to $105B for 8-GW Ohio AI Campus Leased by OpenAI",
    "NVIDIA (NVDA ) has agreed to guarantee up to $105 billion in lease obligations at a planned 8-gigawatt AI data center campus in Pike County, Ohio, in a deal that makes the chipmaker the financial backstop for one of the largest single compute buildouts yet disclosed."
   ],
   "builder_evidence": [
    "NVIDIA Guarantees up to $105B for 8-GW Ohio AI Campus Leased by OpenAI",
    "The commitment, detailed in a [current report filed with the SEC on August 17, 2026](https://www.sec.gov/Archives/edgar/data/1045810/000104581026000069/nvda-20260817.htm), anchors a partnership with SoftBank-owned developer SB Energy at the PORTS-Pike Technology Campus (the former Portsmouth Gaseous Diffusion Plant), with OpenAI signed on as the tenant under a 20-year lease."
   ],
   "ai_customer_evidence": [
    "NVIDIA Guarantees up to $105B for 8-GW Ohio AI Campus Leased by OpenAI",
    "The commitment, detailed in a [current report filed with the SEC on August 17, 2026](https://www.sec.gov/Archives/edgar/data/1045810/000104581026000069/nvda-20260817.htm), anchors a partnership with SoftBank-owned developer SB Energy at the PORTS-Pike Technology Campus (the former Portsmouth Gaseous Diffusion Plant), with OpenAI signed on as the tenant under a 20-year lease."
   ],
   "status_evidence": [
    "NVIDIA Guarantees up to $105B for 8-GW Ohio AI Campus Leased by OpenAI",
    "NVIDIA (NVDA ) has agreed to guarantee up to $105 billion in lease obligations at a planned 8-gigawatt AI data center campus in Pike County, Ohio, in a deal that makes the chipmaker the financial backstop for one of the largest single compute buildouts yet disclosed."
   ],
   "announcement_date_evidence": [
    "NVIDIA Guarantees up to $105B for 8-GW Ohio AI Campus Leased by OpenAI",
    "The commitment, detailed in a [current report filed with the SEC on August 17, 2026](https://www.sec.gov/Archives/edgar/data/1045810/000104581026000069/nvda-20260817.htm), anchors a partnership with SoftBank-owned developer SB Energy at the PORTS-Pike Technology Campus (the former Portsmouth Gaseous Diffusion Plant), with OpenAI signed on as the tenant under a 20-year lease."
   ]
  },
  {
   "url": "https://edgen.tech/vi/news/post/nvidia-backs-105-billion-ohio-ai-campus-leased-by-openai",
   "title": "NVIDIA backs $105 billion Ohio AI campus leased by OpenAI",
   "published_at": "2026-08-17T13:05:22",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "NVIDIA backs $105 billion Ohio AI campus leased by OpenAI",
    "The structure, filed with the SEC on Aug. 17, anchors a partnership with SoftBank-owned developer SB Energy at the PORTS-Pike Technology Campus, the former Portsmouth Gaseous Diffusion Plant in Pike County."
   ],
   "locality_evidence": [
    "NVIDIA backs $105 billion Ohio AI campus leased by OpenAI",
    "The structure, filed with the SEC on Aug. 17, anchors a partnership with SoftBank-owned developer SB Energy at the PORTS-Pike Technology Campus, the former Portsmouth Gaseous Diffusion Plant in Pike County."
   ],
   "state_evidence": [
    "NVIDIA backs $105 billion Ohio AI campus leased by OpenAI",
    "NVIDIA is guaranteeing up to $105 billion in lease obligations to secure an 8-gigawatt Ohio AI campus that OpenAI will lease for 20 years."
   ],
   "capacity_gw_evidence": [
    "NVIDIA backs $105 billion Ohio AI campus leased by OpenAI",
    "NVIDIA is guaranteeing up to $105 billion in lease obligations to secure an 8-gigawatt Ohio AI campus that OpenAI will lease for 20 years."
   ],
   "builder_evidence": [
    "NVIDIA backs $105 billion Ohio AI campus leased by OpenAI",
    "The structure, filed with the SEC on Aug. 17, anchors a partnership with SoftBank-owned developer SB Energy at the PORTS-Pike Technology Campus, the former Portsmouth Gaseous Diffusion Plant in Pike County."
   ],
   "ai_customer_evidence": [
    "NVIDIA backs $105 billion Ohio AI campus leased by OpenAI",
    "NVIDIA is guaranteeing up to $105 billion in lease obligations to secure an 8-gigawatt Ohio AI campus that OpenAI will lease for 20 years."
   ],
   "status_evidence": [
    "NVIDIA backs $105 billion Ohio AI campus leased by OpenAI",
    "Capacity comes online in phases beginning 2028."
   ],
   "announcement_date_evidence": [
    "NVIDIA backs $105 billion Ohio AI campus leased by OpenAI",
    "[![Rachel Kim](https://static.edwealth.ai/authors/rachel-kim.png?w=32)\n## Rachel Kim](https://www.edgen.tech/vi/author/news/rachel-kim)\u00b7Aug 17 2026, 13:05"
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news/fermi-secures-natural-gas-pipeline-connection-for-up-to-11gw-data-center-project-in-amarillo-texas",
   "title": "Fermi secures natural gas pipeline connection for up to 11GW data center project in Amarillo, Texas",
   "published_at": "2026-08-27T00:00:00",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Fermi America has signed another energy supply agreement to power its proposed 11GW data center campus in Amarillo, Texas.",
    "The company is currently developing \u201cProject Matador,\u201d in partnership with the Texas Tech University system, on whose land the data center will be sited."
   ],
   "locality_evidence": [
    "Fermi America has signed another energy supply agreement to power its proposed 11GW data center campus in Amarillo, Texas.",
    "The company is currently developing \u201cProject Matador,\u201d in partnership with the Texas Tech University system, on whose land the data center will be sited."
   ],
   "state_evidence": [
    "Fermi America has signed another energy supply agreement to power its proposed 11GW data center campus in Amarillo, Texas.",
    "The company is currently developing \u201cProject Matador,\u201d in partnership with the Texas Tech University system, on whose land the data center will be sited."
   ],
   "capacity_gw_evidence": [
    "Fermi America has signed another energy supply agreement to power its proposed 11GW data center campus in Amarillo, Texas.",
    "The company is currently developing \u201cProject Matador,\u201d in partnership with the Texas Tech University system, on whose land the data center will be sited."
   ],
   "builder_evidence": [
    "Fermi America has signed another energy supply agreement to power its proposed 11GW data center campus in Amarillo, Texas.",
    "The company is currently developing \u201cProject Matador,\u201d in partnership with the Texas Tech University system, on whose land the data center will be sited."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Fermi America has signed another energy supply agreement to power its proposed 11GW data center campus in Amarillo, Texas.",
    "The company is currently developing \u201cProject Matador,\u201d in partnership with the Texas Tech University system, on whose land the data center will be sited."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=openai&term=business-operations",
   "title": "News Business Operations, OpenAI - DCD",
   "published_at": "2026-08-27T00:00:00",
   "project": "Ports-Pike mega data center",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 4.25,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# [Nvidia confirms it will back 4.25GW of OpenAI capacity at Ports-Pike mega data center](/en/news/nvidia-confirms-it-will-back-425gw-of-openai-capacity-at-ports-pike-mega-data-center/)",
    "## The latest news from the AI, data center, telco, chip, and cloud sector"
   ],
   "locality_evidence": [
    "- ![portsmouth pike county ohio dept of energy](https://media.datacenterdynamics.com/media/images/portsmouth_pike_county_ohio_dept_o.2e16d0ba.fill-280x185.png)",
    "## The latest news from the AI, data center, telco, chip, and cloud sector"
   ],
   "state_evidence": [
    "Would support the development of an up to 10GW data center campus in Ohio for OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector"
   ],
   "capacity_gw_evidence": [
    "# [Nvidia confirms it will back 4.25GW of OpenAI capacity at Ports-Pike mega data center](/en/news/nvidia-confirms-it-will-back-425gw-of-openai-capacity-at-ports-pike-mega-data-center/)",
    "## The latest news from the AI, data center, telco, chip, and cloud sector"
   ],
   "builder_evidence": [
    "SB Energy facility will exclusively use Nvidia compute and networking",
    "## The latest news from the AI, data center, telco, chip, and cloud sector"
   ],
   "ai_customer_evidence": [
    "# [Nvidia confirms it will back 4.25GW of OpenAI capacity at Ports-Pike mega data center](/en/news/nvidia-confirms-it-will-back-425gw-of-openai-capacity-at-ports-pike-mega-data-center/)",
    "## The latest news from the AI, data center, telco, chip, and cloud sector"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=openai&term=business-operations",
   "title": "News Business Operations, OpenAI - DCD",
   "published_at": "2026-08-27T00:00:00",
   "project": "Effingham County data center project",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": null,
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# [OpenAI plans 3.2GW data center campus in Effingham County, Georgia](/en/news/openai-reveals-32gw-data-center-project-in-effingham-county-georgia/)",
    "## The latest news from the AI, data center, telco, chip, and cloud sector"
   ],
   "locality_evidence": [
    "# [OpenAI plans 3.2GW data center campus in Effingham County, Georgia](/en/news/openai-reveals-32gw-data-center-project-in-effingham-county-georgia/)",
    "## The latest news from the AI, data center, telco, chip, and cloud sector"
   ],
   "state_evidence": [
    "# [OpenAI plans 3.2GW data center campus in Effingham County, Georgia](/en/news/openai-reveals-32gw-data-center-project-in-effingham-county-georgia/)",
    "## The latest news from the AI, data center, telco, chip, and cloud sector"
   ],
   "capacity_gw_evidence": [
    "# [OpenAI plans 3.2GW data center campus in Effingham County, Georgia](/en/news/openai-reveals-32gw-data-center-project-in-effingham-county-georgia/)",
    "## The latest news from the AI, data center, telco, chip, and cloud sector"
   ],
   "builder_evidence": null,
   "ai_customer_evidence": [
    "# [OpenAI plans 3.2GW data center campus in Effingham County, Georgia](/en/news/openai-reveals-32gw-data-center-project-in-effingham-county-georgia/)",
    "## The latest news from the AI, data center, telco, chip, and cloud sector"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=openai&page=2&term=cloud-hyperscale",
   "title": "News Cloud & Hyperscale, OpenAI",
   "published_at": "2026-08-27T00:00:00",
   "project": "Stargate",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Vantage",
   "ai_customer": "OpenAI",
   "status": "breaks ground",
   "announcement_date": null,
   "project_evidence": [
    "# News - Cloud & Hyperscale, OpenAI",
    "Vantage breaks ground on Texas gigawatt data center campus for OpenAI",
    "Company starts work on Stargate site"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# News - Cloud & Hyperscale, OpenAI",
    "Vantage breaks ground on Texas gigawatt data center campus for OpenAI",
    "Company starts work on Stargate site"
   ],
   "capacity_gw_evidence": [
    "# News - Cloud & Hyperscale, OpenAI",
    "Vantage breaks ground on Texas gigawatt data center campus for OpenAI",
    "Company starts work on Stargate site"
   ],
   "builder_evidence": [
    "# News - Cloud & Hyperscale, OpenAI",
    "Vantage breaks ground on Texas gigawatt data center campus for OpenAI",
    "Company starts work on Stargate site"
   ],
   "ai_customer_evidence": [
    "# News - Cloud & Hyperscale, OpenAI",
    "Vantage breaks ground on Texas gigawatt data center campus for OpenAI",
    "Company starts work on Stargate site"
   ],
   "status_evidence": [
    "# News - Cloud & Hyperscale, OpenAI",
    "Vantage breaks ground on Texas gigawatt data center campus for OpenAI",
    "Company starts work on Stargate site"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=openai&page=2&term=cloud-hyperscale",
   "title": "News Cloud & Hyperscale, OpenAI",
   "published_at": "2026-08-27T00:00:00",
   "project": "Stargate",
   "locality": null,
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Related Digital",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# News - Cloud & Hyperscale, OpenAI",
    "Related Digital\u2019s 1GW Michigan data center project to be part of OpenAI's Stargate",
    "Deal struck with OpenAI and Oracle"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# News - Cloud & Hyperscale, OpenAI",
    "Related Digital\u2019s 1GW Michigan data center project to be part of OpenAI's Stargate",
    "Deal struck with OpenAI and Oracle"
   ],
   "capacity_gw_evidence": [
    "# News - Cloud & Hyperscale, OpenAI",
    "Related Digital\u2019s 1GW Michigan data center project to be part of OpenAI's Stargate",
    "Deal struck with OpenAI and Oracle"
   ],
   "builder_evidence": [
    "# News - Cloud & Hyperscale, OpenAI",
    "Related Digital\u2019s 1GW Michigan data center project to be part of OpenAI's Stargate",
    "Deal struck with OpenAI and Oracle"
   ],
   "ai_customer_evidence": [
    "# News - Cloud & Hyperscale, OpenAI",
    "Related Digital\u2019s 1GW Michigan data center project to be part of OpenAI's Stargate",
    "Deal struck with OpenAI and Oracle"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news/fermi-signs-agreement-with-tensorwave-for-up-to-650mw-of-data-center-capacity-at-project-matador-site?sid=%7B$sid_secret%7D",
   "title": "Fermi signs agreement with TensorWave for up to 650MW of data center capacity at Project Matador site",
   "published_at": "2026-08-27T00:00:00",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 17.0,
   "builder": "Fermi America",
   "ai_customer": "TensorWave",
   "status": "well underway",
   "announcement_date": null,
   "project_evidence": [
    "Data center company Fermi America has signed a binding lease agreement with TensorWave for up to 650MW of data center capacity at its Project Matador site in Texas.",
    "The company\u2019s Project Matador is [a massive 17GW data center and energy campus](https://www.datacenterdynamics.com/en/news/?tag=fermi-america) near Amarillo in Texas on land owned by the Texas Tech University system."
   ],
   "locality_evidence": [
    "The company\u2019s Project Matador is [a massive 17GW data center and energy campus](https://www.datacenterdynamics.com/en/news/?tag=fermi-america) near Amarillo in Texas on land owned by the Texas Tech University system."
   ],
   "state_evidence": [
    "Data center company Fermi America has signed a binding lease agreement with TensorWave for up to 650MW of data center capacity at its Project Matador site in Texas.",
    "The company\u2019s Project Matador is [a massive 17GW data center and energy campus](https://www.datacenterdynamics.com/en/news/?tag=fermi-america) near Amarillo in Texas on land owned by the Texas Tech University system."
   ],
   "capacity_gw_evidence": [
    "The company\u2019s Project Matador is [a massive 17GW data center and energy campus](https://www.datacenterdynamics.com/en/news/?tag=fermi-america) near Amarillo in Texas on land owned by the Texas Tech University system.",
    "The campus was initially announced with planned 11GW of capacity, but Fermi increased the figure to 17GW in March 2026."
   ],
   "builder_evidence": [
    "Data center company Fermi America has signed a binding lease agreement with TensorWave for up to 650MW of data center capacity at its Project Matador site in Texas.",
    "The company\u2019s Project Matador is [a massive 17GW data center and energy campus](https://www.datacenterdynamics.com/en/news/?tag=fermi-america) near Amarillo in Texas on land owned by the Texas Tech University system."
   ],
   "ai_customer_evidence": [
    "Data center company Fermi America has signed a binding lease agreement with TensorWave for up to 650MW of data center capacity at its Project Matador site in Texas."
   ],
   "status_evidence": [
    "This week, Fermi said Project Matador is \u201cwell underway,\u201d with approximately 6GW of the planned 17GW already permitted, and more than $1.5bn invested in the buildout to date, with first power targeted for 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=meta&term=construction-site-selection",
   "title": "News Construction & Site Selection, Meta",
   "published_at": "2026-08-27T00:00:00",
   "project": null,
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta and BlackRock",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "# News - Construction & Site Selection, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta and BlackRock team up for data center in El Paso, Texas](/en/news/meta-and-blackrock-team-up-for-data-center-in-el-paso-texas/)"
   ],
   "state_evidence": [
    "# News - Construction & Site Selection, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta and BlackRock team up for data center in El Paso, Texas](/en/news/meta-and-blackrock-team-up-for-data-center-in-el-paso-texas/)"
   ],
   "capacity_gw_evidence": [
    "# News - Construction & Site Selection, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "Will offer 1GW of compute capacity"
   ],
   "builder_evidence": [
    "# News - Construction & Site Selection, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta and BlackRock team up for data center in El Paso, Texas](/en/news/meta-and-blackrock-team-up-for-data-center-in-el-paso-texas/)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=meta&term=construction-site-selection",
   "title": "News Construction & Site Selection, Meta",
   "published_at": "2026-08-27T00:00:00",
   "project": null,
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Crusoe",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "# News - Construction & Site Selection, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Crusoe to develop 1.4GW data center campus in Childress, Texas](/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/)"
   ],
   "state_evidence": [
    "# News - Construction & Site Selection, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Crusoe to develop 1.4GW data center campus in Childress, Texas](/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/)"
   ],
   "capacity_gw_evidence": [
    "# News - Construction & Site Selection, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Crusoe to develop 1.4GW data center campus in Childress, Texas](/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/)"
   ],
   "builder_evidence": [
    "# News - Construction & Site Selection, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Crusoe to develop 1.4GW data center campus in Childress, Texas](/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=meta&term=construction-site-selection",
   "title": "News Construction & Site Selection, Meta",
   "published_at": "2026-08-27T00:00:00",
   "project": null,
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "# News - Construction & Site Selection, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta expands data center campus in Richland Parish, Louisiana, to 5GW & $50bn](/en/news/meta-expands-data-center-campus-in-richland-parish-louisiana-to-5gw-will-invest-50bn/)"
   ],
   "state_evidence": [
    "# News - Construction & Site Selection, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta expands data center campus in Richland Parish, Louisiana, to 5GW & $50bn](/en/news/meta-expands-data-center-campus-in-richland-parish-louisiana-to-5gw-will-invest-50bn/)"
   ],
   "capacity_gw_evidence": [
    "# News - Construction & Site Selection, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta expands data center campus in Richland Parish, Louisiana, to 5GW & $50bn](/en/news/meta-expands-data-center-campus-in-richland-parish-louisiana-to-5gw-will-invest-50bn/)"
   ],
   "builder_evidence": [
    "# News - Construction & Site Selection, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta expands data center campus in Richland Parish, Louisiana, to 5GW & $50bn](/en/news/meta-expands-data-center-campus-in-richland-parish-louisiana-to-5gw-will-invest-50bn/)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=meta&term=construction-site-selection",
   "title": "News Construction & Site Selection, Meta",
   "published_at": "2026-08-27T00:00:00",
   "project": null,
   "locality": "Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "Company starts work",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "# News - Construction & Site Selection, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta announces 1GW data center campus in Indiana](/en/news/meta-announces-1gw-data-center-campus-in-indiana/)",
    "Company starts work in Lebanon"
   ],
   "state_evidence": [
    "# News - Construction & Site Selection, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta announces 1GW data center campus in Indiana](/en/news/meta-announces-1gw-data-center-campus-in-indiana/)"
   ],
   "capacity_gw_evidence": [
    "# News - Construction & Site Selection, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta announces 1GW data center campus in Indiana](/en/news/meta-announces-1gw-data-center-campus-in-indiana/)"
   ],
   "builder_evidence": [
    "# News - Construction & Site Selection, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta announces 1GW data center campus in Indiana](/en/news/meta-announces-1gw-data-center-campus-in-indiana/)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# News - Construction & Site Selection, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "Company starts work in Lebanon"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://finance.yahoo.com/news/nvidia-backs-8-gw-ohio-013000089.html",
   "title": "Nvidia Backs 8-GW Ohio AI Campus for OpenAI With $1.5 Billion Investment",
   "published_at": "2026-08-18T01:30:00",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "Development is expected to proceed in phases beginning in 2028.",
   "announcement_date": null,
   "project_evidence": [
    "Nvidia Backs 8-GW Ohio AI Campus for OpenAI With $1.5 Billion Investment",
    "The chipmaker [said](https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute) it has partnered with SB Energy to secure land, power and data center shell capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, where OpenAI will be the customer under a 20-year lease."
   ],
   "locality_evidence": [
    "Nvidia Backs 8-GW Ohio AI Campus for OpenAI With $1.5 Billion Investment",
    "The chipmaker [said](https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute) it has partnered with SB Energy to secure land, power and data center shell capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, where OpenAI will be the customer under a 20-year lease."
   ],
   "state_evidence": [
    "Nvidia Backs 8-GW Ohio AI Campus for OpenAI With $1.5 Billion Investment",
    "The chipmaker [said](https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute) it has partnered with SB Energy to secure land, power and data center shell capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, where OpenAI will be the customer under a 20-year lease."
   ],
   "capacity_gw_evidence": [
    "Nvidia Backs 8-GW Ohio AI Campus for OpenAI With $1.5 Billion Investment",
    "At full buildout, the project would provide 8 GW of AI computing capacity."
   ],
   "builder_evidence": [
    "Nvidia Backs 8-GW Ohio AI Campus for OpenAI With $1.5 Billion Investment",
    "SB Energy, which is backed by Japan's SoftBank Group and OpenAI, will build, own and operate the data center infrastructure."
   ],
   "ai_customer_evidence": [
    "Nvidia Backs 8-GW Ohio AI Campus for OpenAI With $1.5 Billion Investment",
    "The chipmaker [said](https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute) it has partnered with SB Energy to secure land, power and data center shell capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, where OpenAI will be the customer under a 20-year lease."
   ],
   "status_evidence": [
    "Nvidia Backs 8-GW Ohio AI Campus for OpenAI With $1.5 Billion Investment",
    "Development is expected to proceed in phases beginning in 2028."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://pulse2.com/nvidia-invests-1-5-billion-in-sb-energy-and-backs-8-gw-openai-ai-factory-campus-in-ohio?noamp=mobile",
   "title": "Nvidia Backs OpenAI\u2019s Ohio AI Campus With Up To $105 Billion Guarantee And $1.5 Billion SB Energy Investment",
   "published_at": "2026-08-17T16:21:45",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Nvidia is investing $1.5 billion in SB Energy while becoming the exclusive AI compute infrastructure provider for the massive PORTS-Pike Technology Campus being developed in Pike County, Ohio for OpenAI."
   ],
   "locality_evidence": [
    "Nvidia is investing $1.5 billion in SB Energy while becoming the exclusive AI compute infrastructure provider for the massive PORTS-Pike Technology Campus being developed in Pike County, Ohio for OpenAI."
   ],
   "state_evidence": [
    "Nvidia is investing $1.5 billion in SB Energy while becoming the exclusive AI compute infrastructure provider for the massive PORTS-Pike Technology Campus being developed in Pike County, Ohio for OpenAI."
   ],
   "capacity_gw_evidence": [
    "Nvidia will also have an option covering the remaining 3.75 IT-GW, potentially bringing the campus to 8 IT-GW of AI factory capacity."
   ],
   "builder_evidence": [
    "SB Energy will build, own, and operate the data center campus under a 20-year lease with OpenAI."
   ],
   "ai_customer_evidence": [
    "Nvidia is investing $1.5 billion in SB Energy while becoming the exclusive AI compute infrastructure provider for the massive PORTS-Pike Technology Campus being developed in Pike County, Ohio for OpenAI."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://edgen.tech/vi/news/post/nvidia-invests-3-billion-in-lancium-as-ai-power-race-tightens",
   "title": "Nvidia invests $3 billion in Lancium as AI power race tightens",
   "published_at": "2026-08-15T15:01:15",
   "project": "Abilene Clean Campus",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Lancium",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Nvidia invests $3 billion in Lancium as AI power race tightens",
    "Lancium's Abilene Clean Campus in Texas spans about 1,000 acres with a 1.2-gigawatt grid interconnection approved by ERCOT, and the company is developing a 1.0 GW campus in Childress, Texas."
   ],
   "locality_evidence": [
    "Nvidia invests $3 billion in Lancium as AI power race tightens",
    "Lancium's Abilene Clean Campus in Texas spans about 1,000 acres with a 1.2-gigawatt grid interconnection approved by ERCOT, and the company is developing a 1.0 GW campus in Childress, Texas."
   ],
   "state_evidence": [
    "Nvidia invests $3 billion in Lancium as AI power race tightens",
    "Lancium's Abilene Clean Campus in Texas spans about 1,000 acres with a 1.2-gigawatt grid interconnection approved by ERCOT, and the company is developing a 1.0 GW campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "Nvidia invests $3 billion in Lancium as AI power race tightens",
    "Lancium's Abilene Clean Campus in Texas spans about 1,000 acres with a 1.2-gigawatt grid interconnection approved by ERCOT, and the company is developing a 1.0 GW campus in Childress, Texas."
   ],
   "builder_evidence": [
    "Nvidia invests $3 billion in Lancium as AI power race tightens",
    "Lancium's Abilene Clean Campus in Texas spans about 1,000 acres with a 1.2-gigawatt grid interconnection approved by ERCOT, and the company is developing a 1.0 GW campus in Childress, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://edgen.tech/vi/news/post/nvidia-invests-3-billion-in-lancium-as-ai-power-race-tightens",
   "title": "Nvidia invests $3 billion in Lancium as AI power race tightens",
   "published_at": "2026-08-15T15:01:15",
   "project": "Childress campus",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Lancium",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Nvidia invests $3 billion in Lancium as AI power race tightens",
    "Lancium's Abilene Clean Campus in Texas spans about 1,000 acres with a 1.2-gigawatt grid interconnection approved by ERCOT, and the company is developing a 1.0 GW campus in Childress, Texas."
   ],
   "locality_evidence": [
    "Nvidia invests $3 billion in Lancium as AI power race tightens",
    "Lancium's Abilene Clean Campus in Texas spans about 1,000 acres with a 1.2-gigawatt grid interconnection approved by ERCOT, and the company is developing a 1.0 GW campus in Childress, Texas."
   ],
   "state_evidence": [
    "Nvidia invests $3 billion in Lancium as AI power race tightens",
    "Lancium's Abilene Clean Campus in Texas spans about 1,000 acres with a 1.2-gigawatt grid interconnection approved by ERCOT, and the company is developing a 1.0 GW campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "Nvidia invests $3 billion in Lancium as AI power race tightens",
    "Lancium's Abilene Clean Campus in Texas spans about 1,000 acres with a 1.2-gigawatt grid interconnection approved by ERCOT, and the company is developing a 1.0 GW campus in Childress, Texas."
   ],
   "builder_evidence": [
    "Nvidia invests $3 billion in Lancium as AI power race tightens",
    "Lancium's Abilene Clean Campus in Texas spans about 1,000 acres with a 1.2-gigawatt grid interconnection approved by ERCOT, and the company is developing a 1.0 GW campus in Childress, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://mlq.ai/news/prometheus-plans-15gw-islanded-data-center-campus-in-pecos-texas",
   "title": "Prometheus Plans 1.5GW Islanded Data Center Campus in Pecos, Texas",
   "published_at": "2026-08-24T23:37:18",
   "project": "Prometheus 1.5GW Islanded Data Center Campus",
   "locality": "Pecos",
   "state": "Texas",
   "capacity_gw": 2.5,
   "builder": "Prometheus Hyperscale",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-08-24",
   "project_evidence": [
    "# Prometheus Plans 1.5GW Islanded Data Center Campus in Pecos, Texas",
    "Prometheus Hyperscale plans a 1.5GW data center campus in Pecos, Texas, powered initially by an islanded generation system rather than a physical connection to ERCOT."
   ],
   "locality_evidence": [
    "# Prometheus Plans 1.5GW Islanded Data Center Campus in Pecos, Texas",
    "Prometheus Hyperscale plans a 1.5GW data center campus in Pecos, Texas, powered initially by an islanded generation system rather than a physical connection to ERCOT."
   ],
   "state_evidence": [
    "# Prometheus Plans 1.5GW Islanded Data Center Campus in Pecos, Texas",
    "Prometheus Hyperscale plans a 1.5GW data center campus in Pecos, Texas, powered initially by an islanded generation system rather than a physical connection to ERCOT."
   ],
   "capacity_gw_evidence": [
    "# Prometheus Plans 1.5GW Islanded Data Center Campus in Pecos, Texas",
    "- Prometheus plans 1.5GW of IT load in Phase 1 at a Pecos, Texas campus, with expansion potential to 2.5GW. [[1]](https://www.datacenterknowledge.com/data-center-construction/prometheus-1-5-gw-pecos-plan-tests-private-power)[[2]](https://www.datacenterdynamics.com/en/news/prometheus-hyperscale-partners-with-istmo-to-develop-up-to-25gw-gas-powered-data-center-in-reeves-county-texas/)",
    "The project has a stated development path to 2.5GW and is intended to serve AI workloads in Reeves County."
   ],
   "builder_evidence": [
    "# Prometheus Plans 1.5GW Islanded Data Center Campus in Pecos, Texas",
    "Prometheus Hyperscale plans a 1.5GW data center campus in Pecos, Texas, powered initially by an islanded generation system rather than a physical connection to ERCOT."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Prometheus Plans 1.5GW Islanded Data Center Campus in Pecos, Texas",
    "Prometheus Hyperscale plans a 1.5GW data center campus in Pecos, Texas, powered initially by an islanded generation system rather than a physical connection to ERCOT."
   ],
   "announcement_date_evidence": [
    "# Prometheus Plans 1.5GW Islanded Data Center Campus in Pecos, Texas",
    "Aug 24, 2026 \u00b7 7:37 PM \u00b7 by MLQ Agent \u00b7 3 min read"
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news/plans-filed-for-100000-sq-ft-data-center-outside-dallas-texas",
   "title": "Plans filed for 100,000 sq ft data center outside Dallas, Texas",
   "published_at": "2026-08-19T00:00:00",
   "project": "Project Kahla",
   "locality": "Jewett",
   "state": "Texas",
   "capacity_gw": 1.5,
   "builder": "Belltown Power",
   "ai_customer": null,
   "status": "filed plans",
   "announcement_date": "2025-12-24",
   "project_evidence": [
    "Plans have been filed for a new data center outside Dallas, Texas.",
    "The company has previously [filed plans](https://www.kbtx.com/2025/12/24/leon-county-bracing-1500-megawatt-data-center/) for a 900-acre, 1.5GW data center project between Houston and Dallas in Jewett, Leon County, [known](https://www.knowleoncounty.org/docs/Project-Kahla-Leon-County.pdf) as Project Kahla."
   ],
   "locality_evidence": [
    "Plans have been filed for a new data center outside Dallas, Texas.",
    "The company has previously [filed plans](https://www.kbtx.com/2025/12/24/leon-county-bracing-1500-megawatt-data-center/) for a 900-acre, 1.5GW data center project between Houston and Dallas in Jewett, Leon County, [known](https://www.knowleoncounty.org/docs/Project-Kahla-Leon-County.pdf) as Project Kahla."
   ],
   "state_evidence": [
    "Plans have been filed for a new data center outside Dallas, Texas.",
    "The company has previously [filed plans](https://www.kbtx.com/2025/12/24/leon-county-bracing-1500-megawatt-data-center/) for a 900-acre, 1.5GW data center project between Houston and Dallas in Jewett, Leon County, [known](https://www.knowleoncounty.org/docs/Project-Kahla-Leon-County.pdf) as Project Kahla."
   ],
   "capacity_gw_evidence": [
    "Plans have been filed for a new data center outside Dallas, Texas.",
    "The company has previously [filed plans](https://www.kbtx.com/2025/12/24/leon-county-bracing-1500-megawatt-data-center/) for a 900-acre, 1.5GW data center project between Houston and Dallas in Jewett, Leon County, [known](https://www.knowleoncounty.org/docs/Project-Kahla-Leon-County.pdf) as Project Kahla."
   ],
   "builder_evidence": [
    "Plans have been filed for a new data center outside Dallas, Texas.",
    "The BT Gateway LLC shares an address with Texas-based renewable energy infrastructure developer Belltown Power.",
    "The company has previously [filed plans](https://www.kbtx.com/2025/12/24/leon-county-bracing-1500-megawatt-data-center/) for a 900-acre, 1.5GW data center project between Houston and Dallas in Jewett, Leon County, [known](https://www.knowleoncounty.org/docs/Project-Kahla-Leon-County.pdf) as Project Kahla."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Plans have been filed for a new data center outside Dallas, Texas.",
    "The company has previously [filed plans](https://www.kbtx.com/2025/12/24/leon-county-bracing-1500-megawatt-data-center/) for a 900-acre, 1.5GW data center project between Houston and Dallas in Jewett, Leon County, [known](https://www.knowleoncounty.org/docs/Project-Kahla-Leon-County.pdf) as Project Kahla."
   ],
   "announcement_date_evidence": [
    "Plans have been filed for a new data center outside Dallas, Texas.",
    "The company has previously [filed plans](https://www.kbtx.com/2025/12/24/leon-county-bracing-1500-megawatt-data-center/) for a 900-acre, 1.5GW data center project between Houston and Dallas in Jewett, Leon County, [known](https://www.knowleoncounty.org/docs/Project-Kahla-Leon-County.pdf) as Project Kahla."
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=openai&page=1&term=business-operations",
   "title": "News Business Operations, OpenAI - DCD",
   "published_at": "2026-08-27T00:00:00",
   "project": "Ports-Pike",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 4.25,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# News - Business Operations, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Nvidia confirms it will back 4.25GW of OpenAI capacity at Ports-Pike mega data center](/en/news/nvidia-confirms-it-will-back-425gw-of-openai-capacity-at-ports-pike-mega-data-center/)"
   ],
   "locality_evidence": [
    "# News - Business Operations, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "- ![portsmouth pike county ohio dept of energy](https://media.datacenterdynamics.com/media/images/portsmouth_pike_county_ohio_dept_o.2e16d0ba.fill-280x185.png)",
    "# [Nvidia confirms it will back 4.25GW of OpenAI capacity at Ports-Pike mega data center](/en/news/nvidia-confirms-it-will-back-425gw-of-openai-capacity-at-ports-pike-mega-data-center/)"
   ],
   "state_evidence": [
    "# News - Business Operations, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "- ![portsmouth pike county ohio dept of energy](https://media.datacenterdynamics.com/media/images/portsmouth_pike_county_ohio_dept_o.2e16d0ba.fill-280x185.png)",
    "# [Nvidia confirms it will back 4.25GW of OpenAI capacity at Ports-Pike mega data center](/en/news/nvidia-confirms-it-will-back-425gw-of-openai-capacity-at-ports-pike-mega-data-center/)"
   ],
   "capacity_gw_evidence": [
    "# News - Business Operations, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Nvidia confirms it will back 4.25GW of OpenAI capacity at Ports-Pike mega data center](/en/news/nvidia-confirms-it-will-back-425gw-of-openai-capacity-at-ports-pike-mega-data-center/)"
   ],
   "builder_evidence": [
    "# News - Business Operations, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Nvidia confirms it will back 4.25GW of OpenAI capacity at Ports-Pike mega data center](/en/news/nvidia-confirms-it-will-back-425gw-of-openai-capacity-at-ports-pike-mega-data-center/)",
    "SB Energy facility will exclusively use Nvidia compute and networking"
   ],
   "ai_customer_evidence": [
    "# News - Business Operations, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Nvidia confirms it will back 4.25GW of OpenAI capacity at Ports-Pike mega data center](/en/news/nvidia-confirms-it-will-back-425gw-of-openai-capacity-at-ports-pike-mega-data-center/)"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=openai&page=1&term=business-operations",
   "title": "News Business Operations, OpenAI - DCD",
   "published_at": "2026-08-27T00:00:00",
   "project": null,
   "locality": null,
   "state": "Ohio",
   "capacity_gw": 10.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": null,
   "state_evidence": [
    "# News - Business Operations, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "Would support the development of an up to 10GW data center campus in Ohio for OpenAI"
   ],
   "capacity_gw_evidence": [
    "# News - Business Operations, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "Would support the development of an up to 10GW data center campus in Ohio for OpenAI"
   ],
   "builder_evidence": [
    "# News - Business Operations, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Nvidia in talks to invest $1.5bn in SB Energy](/en/news/nvidia-in-talks-to-invest-up-to-3bn-in-sb-energy-report/)",
    "Would support the development of an up to 10GW data center campus in Ohio for OpenAI"
   ],
   "ai_customer_evidence": [
    "# News - Business Operations, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "Would support the development of an up to 10GW data center campus in Ohio for OpenAI"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=openai&page=1&term=business-operations",
   "title": "News Business Operations, OpenAI - DCD",
   "published_at": "2026-08-27T00:00:00",
   "project": null,
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": null,
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "# News - Business Operations, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [OpenAI plans 3.2GW data center campus in Effingham County, Georgia](/en/news/openai-reveals-32gw-data-center-project-in-effingham-county-georgia/)"
   ],
   "state_evidence": [
    "# News - Business Operations, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [OpenAI plans 3.2GW data center campus in Effingham County, Georgia](/en/news/openai-reveals-32gw-data-center-project-in-effingham-county-georgia/)"
   ],
   "capacity_gw_evidence": [
    "# News - Business Operations, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [OpenAI plans 3.2GW data center campus in Effingham County, Georgia](/en/news/openai-reveals-32gw-data-center-project-in-effingham-county-georgia/)"
   ],
   "builder_evidence": null,
   "ai_customer_evidence": [
    "# News - Business Operations, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [OpenAI plans 3.2GW data center campus in Effingham County, Georgia](/en/news/openai-reveals-32gw-data-center-project-in-effingham-county-georgia/)"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=openai&page=1&term=business-operations",
   "title": "News Business Operations, OpenAI - DCD",
   "published_at": "2026-08-27T00:00:00",
   "project": "Stargate",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": null,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# News - Business Operations, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Oracle and OpenAI start construction on Stargate data center campus in Saline Township, Michigan](/en/news/oracle-and-openai-start-construction-on-stargate-data-center-campus-in-saline-township-michigan/)"
   ],
   "locality_evidence": [
    "# News - Business Operations, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Oracle and OpenAI start construction on Stargate data center campus in Saline Township, Michigan](/en/news/oracle-and-openai-start-construction-on-stargate-data-center-campus-in-saline-township-michigan/)"
   ],
   "state_evidence": [
    "# News - Business Operations, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Oracle and OpenAI start construction on Stargate data center campus in Saline Township, Michigan](/en/news/oracle-and-openai-start-construction-on-stargate-data-center-campus-in-saline-township-michigan/)"
   ],
   "capacity_gw_evidence": null,
   "builder_evidence": [
    "# News - Business Operations, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Oracle and OpenAI start construction on Stargate data center campus in Saline Township, Michigan](/en/news/oracle-and-openai-start-construction-on-stargate-data-center-campus-in-saline-township-michigan/)"
   ],
   "ai_customer_evidence": [
    "# News - Business Operations, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Oracle and OpenAI start construction on Stargate data center campus in Saline Township, Michigan](/en/news/oracle-and-openai-start-construction-on-stargate-data-center-campus-in-saline-township-michigan/)"
   ],
   "status_evidence": [
    "# News - Business Operations, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Oracle and OpenAI start construction on Stargate data center campus in Saline Township, Michigan](/en/news/oracle-and-openai-start-construction-on-stargate-data-center-campus-in-saline-township-michigan/"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://dlvr.it/TV6RJr",
   "title": "Prometheus Hyperscale partners with Istmo to develop up to 2.5GW gas powered data center in Reeves County, Texas",
   "published_at": "2026-08-27T00:00:00",
   "project": "Pecos Project",
   "locality": "Pecos",
   "state": "Texas",
   "capacity_gw": 2.5,
   "builder": "Prometheus Hyperscale",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "\u201cThe Pecos Project and partnership with Istmo Energy adds 2.5GW to our existing project pipeline and advances our vision of developing scalable infrastructure for the age of AI,\" said Trevor Neilson, president of Prometheus Hyperscale."
   ],
   "locality_evidence": [
    "The data center in Pecos, Texas, is slated to have a capacity of 1.5GW in Phase 1, rising to 2.5GW in future phases."
   ],
   "state_evidence": [
    "AI data center developer Prometheus Hyperscale has teamed up with US energy firm Istmo Energy to develop an up to 2.5GW data center campus in Reeves County, Texas."
   ],
   "capacity_gw_evidence": [
    "AI data center developer Prometheus Hyperscale has teamed up with US energy firm Istmo Energy to develop an up to 2.5GW data center campus in Reeves County, Texas.",
    "The data center in Pecos, Texas, is slated to have a capacity of 1.5GW in Phase 1, rising to 2.5GW in future phases."
   ],
   "builder_evidence": [
    "AI data center developer Prometheus Hyperscale has teamed up with US energy firm Istmo Energy to develop an up to 2.5GW data center campus in Reeves County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "AI data center developer Prometheus Hyperscale has teamed up with US energy firm Istmo Energy to develop an up to 2.5GW data center campus in Reeves County, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://dlvr.it/TV6RJr",
   "title": "Prometheus Hyperscale partners with Istmo to develop up to 2.5GW gas powered data center in Reeves County, Texas",
   "published_at": "2026-08-27T00:00:00",
   "project": "Wyoming campus",
   "locality": "Evanston",
   "state": "Wyoming",
   "capacity_gw": 5.0,
   "builder": "Prometheus Hyperscale",
   "ai_customer": null,
   "status": "planning approval secured",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "Prometheus said the [Evanston campus](https://www.datacenterdynamics.com/en/analysis/prometheus-hyperscale-in-harmony-with-nature/) will operate as a fully islanded microgrid, generating power on-site through natural gas engines and turbines."
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "The company said the 506-acre site will initially offer 1.25GW, with potential to expand to 5GW."
   ],
   "builder_evidence": [
    "Launched around 2020 and formally known as Wyoming Hyperscale Whitebox, Prometheus was [relaunched](https://www.datacenterdynamics.com/en/news/wyoming-hyperscale-becomes-prometheus-hyperscale-reveals-pipeline-of-four-additional-sites/) in September 2024."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://mlq.ai/news/prometheus-plans-15gw-islanded-data-center-campus-in-pecos-texas-1",
   "title": "Prometheus Plans 1.5GW Islanded Data Center Campus in Pecos, Texas",
   "published_at": "2026-08-24T23:37:46",
   "project": "Prometheus Pecos Campus",
   "locality": "Pecos",
   "state": "Texas",
   "capacity_gw": 2.5,
   "builder": "Prometheus Hyperscale",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-08-24",
   "project_evidence": [
    "# Prometheus Plans 1.5GW Islanded Data Center Campus in Pecos, Texas",
    "Prometheus Hyperscale plans a 1.5GW data center campus in Pecos, Texas, powered initially by an islanded generation system rather than a physical connection to ERCOT."
   ],
   "locality_evidence": [
    "# Prometheus Plans 1.5GW Islanded Data Center Campus in Pecos, Texas",
    "Prometheus Hyperscale plans a 1.5GW data center campus in Pecos, Texas, powered initially by an islanded generation system rather than a physical connection to ERCOT."
   ],
   "state_evidence": [
    "# Prometheus Plans 1.5GW Islanded Data Center Campus in Pecos, Texas",
    "Prometheus Hyperscale plans a 1.5GW data center campus in Pecos, Texas, powered initially by an islanded generation system rather than a physical connection to ERCOT."
   ],
   "capacity_gw_evidence": [
    "# Prometheus Plans 1.5GW Islanded Data Center Campus in Pecos, Texas",
    "- Prometheus plans 1.5GW of IT load in Phase 1 at a Pecos, Texas campus, with expansion potential to 2.5GW. [[1]](https://www.datacenterknowledge.com/data-center-construction/prometheus-1-5-gw-pecos-plan-tests-private-power)[[2]](https://www.datacenterdynamics.com/en/news/prometheus-hyperscale-partners-with-istmo-to-develop-up-to-25gw-gas-powered-data-center-in-reeves-county-texas/)",
    "The project has a stated development path to 2.5GW and is intended to serve AI workloads in Reeves County. [[1]](https://www.datacenterknowledge.com/data-center-construction/prometheus-1-5-gw-pecos-plan-tests-private-power)[[2]](https://www.datacenterdynamics.com/en/news/prometheus-hyperscale-partners-with-istmo-to-develop-up-to-25gw-gas-powered-data-center-in-reeves-county-texas/)"
   ],
   "builder_evidence": [
    "# Prometheus Plans 1.5GW Islanded Data Center Campus in Pecos, Texas",
    "Prometheus Hyperscale plans a 1.5GW data center campus in Pecos, Texas, powered initially by an islanded generation system rather than a physical connection to ERCOT."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Prometheus Plans 1.5GW Islanded Data Center Campus in Pecos, Texas",
    "Prometheus Hyperscale plans a 1.5GW data center campus in Pecos, Texas, powered initially by an islanded generation system rather than a physical connection to ERCOT."
   ],
   "announcement_date_evidence": [
    "# Prometheus Plans 1.5GW Islanded Data Center Campus in Pecos, Texas",
    "Aug 24, 2026 \u00b7 7:37 PM \u00b7 by MLQ Agent \u00b7 3 min read"
   ]
  },
  {
   "url": "https://enterprisedna.co/resources/news/nvidia-openai-105-billion-ohio-data-center-closed-august-2026",
   "title": "Nvidia's $105B Guarantee for OpenAI's Ohio Data Center",
   "published_at": "2026-08-17T00:00:00",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike City",
   "state": "Ohio",
   "capacity_gw": 10.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "Nvidia's $105B Guarantee for OpenAI's Ohio Data Center",
    "The campus is located at the PORTS-Pike Technology Campus in Pike City, Ohio."
   ],
   "locality_evidence": [
    "Nvidia's $105B Guarantee for OpenAI's Ohio Data Center",
    "The campus is located at the PORTS-Pike Technology Campus in Pike City, Ohio."
   ],
   "state_evidence": [
    "Nvidia's $105B Guarantee for OpenAI's Ohio Data Center",
    "The campus is located at the PORTS-Pike Technology Campus in Pike City, Ohio."
   ],
   "capacity_gw_evidence": [
    "Nvidia's $105B Guarantee for OpenAI's Ohio Data Center",
    "SB Energy and SoftBank together will invest at least $4.2 billion in regional grid infrastructure to support the site\u2019s power needs, which will scale to 10 gigawatts at full build-out."
   ],
   "builder_evidence": [
    "Nvidia's $105B Guarantee for OpenAI's Ohio Data Center",
    "SB Energy, the SoftBank-backed developer, will build and manage the facility."
   ],
   "ai_customer_evidence": [
    "Nvidia's $105B Guarantee for OpenAI's Ohio Data Center",
    "On August 17, Nvidia confirmed it will back up to $105 billion in financing to support a massive new AI data center campus in Ohio that OpenAI will lease for the next 20 years."
   ],
   "status_evidence": [
    "Nvidia's $105B Guarantee for OpenAI's Ohio Data Center",
    "On August 17, Nvidia confirmed it will back up to $105 billion in financing to support a massive new AI data center campus in Ohio that OpenAI will lease for the next 20 years."
   ],
   "announcement_date_evidence": [
    "Nvidia's $105B Guarantee for OpenAI's Ohio Data Center",
    "On August 17, Nvidia confirmed it will back up to $105 billion in financing to support a massive new AI data center campus in Ohio that OpenAI will lease for the next 20 years."
   ]
  },
  {
   "url": "https://northwiseproject.com/iren-sweetwater-site",
   "title": "IREN Sweetwater Site: Inside the 2GW AI Infrastructure Campus",
   "published_at": "2026-03-29T15:30:35",
   "project": "Sweetwater Hub",
   "locality": "Nolan and Jones Counties",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN Limited",
   "ai_customer": null,
   "status": "under development",
   "announcement_date": null,
   "project_evidence": [
    "# Iren Sweetwater Site",
    "## 1. Introduction to the IREN Sweetwater Site Hub",
    "The Sweetwater Hub represents the largest infrastructure project in the history of IREN Limited and one of the most ambitious AI data center developments currently underway in North America."
   ],
   "locality_evidence": [
    "# Iren Sweetwater Site",
    "## 1. Introduction to the IREN Sweetwater Site Hub",
    "Located across Nolan and Jones Counties in West Texas, the campus is being built as a **2.0 gigawatt (GW) compute platform** designed to host next-generation artificial intelligence infrastructure at industrial scale."
   ],
   "state_evidence": [
    "# Iren Sweetwater Site",
    "## 1. Introduction to the IREN Sweetwater Site Hub",
    "Located across Nolan and Jones Counties in West Texas, the campus is being built as a **2.0 gigawatt (GW) compute platform** designed to host next-generation artificial intelligence infrastructure at industrial scale."
   ],
   "capacity_gw_evidence": [
    "# Iren Sweetwater Site",
    "## 1. Introduction to the IREN Sweetwater Site Hub",
    "Located across Nolan and Jones Counties in West Texas, the campus is being built as a **2.0 gigawatt (GW) compute platform** designed to host next-generation artificial intelligence infrastructure at industrial scale."
   ],
   "builder_evidence": [
    "# Iren Sweetwater Site",
    "## 1. Introduction to the IREN Sweetwater Site Hub",
    "The Sweetwater Hub represents the largest infrastructure project in the history of IREN Limited and one of the most ambitious AI data center developments currently underway in North America."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Iren Sweetwater Site",
    "## 1. Introduction to the IREN Sweetwater Site Hub",
    "The Sweetwater Hub represents the largest infrastructure project in the history of IREN Limited and one of the most ambitious AI data center developments currently underway in North America."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=openai&term=investment-ma-financing",
   "title": "News Investment / M&A / Financing, OpenAI",
   "published_at": "2026-08-27T00:00:00",
   "project": "Ports-Pike mega data center",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 4.25,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# News - Investment / M&A / Financing, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector"
   ],
   "locality_evidence": [
    "# News - Investment / M&A / Financing, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector"
   ],
   "state_evidence": [
    "# News - Investment / M&A / Financing, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "Would support the development of an up to 10GW data center campus in Ohio for OpenAI"
   ],
   "capacity_gw_evidence": [
    "# News - Investment / M&A / Financing, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector"
   ],
   "builder_evidence": [
    "# News - Investment / M&A / Financing, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "SB Energy facility will exclusively use Nvidia compute and networking"
   ],
   "ai_customer_evidence": [
    "# News - Investment / M&A / Financing, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://agenticbrew.ai/news/4197512f-1e35-4670-b09c-a09b8cd4dabe/nvidia-iren-5gw-ai-infrastructure-partnership",
   "title": "NVIDIA-IREN 5GW AI Infrastructure Partnership",
   "published_at": "2026-05-09T00:28:12",
   "project": "Sweetwater",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": "NVIDIA",
   "status": null,
   "announcement_date": "2026-05-07",
   "project_evidence": [
    "On May 7, 2026, NVIDIA and IREN announced a strategic partnership to deploy up to 5 gigawatts of NVIDIA DSX-aligned AI infrastructure across IREN's global data center pipeline, with the 2GW Sweetwater, Texas campus designated the flagship site."
   ],
   "locality_evidence": [
    "On May 7, 2026, NVIDIA and IREN announced a strategic partnership to deploy up to 5 gigawatts of NVIDIA DSX-aligned AI infrastructure across IREN's global data center pipeline, with the 2GW Sweetwater, Texas campus designated the flagship site."
   ],
   "state_evidence": [
    "On May 7, 2026, NVIDIA and IREN announced a strategic partnership to deploy up to 5 gigawatts of NVIDIA DSX-aligned AI infrastructure across IREN's global data center pipeline, with the 2GW Sweetwater, Texas campus designated the flagship site."
   ],
   "capacity_gw_evidence": [
    "On May 7, 2026, NVIDIA and IREN announced a strategic partnership to deploy up to 5 gigawatts of NVIDIA DSX-aligned AI infrastructure across IREN's global data center pipeline, with the 2GW Sweetwater, Texas campus designated the flagship site."
   ],
   "builder_evidence": [
    "On May 7, 2026, NVIDIA and IREN announced a strategic partnership to deploy up to 5 gigawatts of NVIDIA DSX-aligned AI infrastructure across IREN's global data center pipeline, with the 2GW Sweetwater, Texas campus designated the flagship site."
   ],
   "ai_customer_evidence": [
    "On May 7, 2026, NVIDIA and IREN announced a strategic partnership to deploy up to 5 gigawatts of NVIDIA DSX-aligned AI infrastructure across IREN's global data center pipeline, with the 2GW Sweetwater, Texas campus designated the flagship site."
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "On May 7, 2026, NVIDIA and IREN announced a strategic partnership to deploy up to 5 gigawatts of NVIDIA DSX-aligned AI infrastructure across IREN's global data center pipeline, with the 2GW Sweetwater, Texas campus designated the flagship site."
   ]
  },
  {
   "url": "https://stackfutures.com/blog/crusoe-lancium-1gw-childress-texas-meta",
   "title": "Crusoe and Lancium Lock 1GW AI Campus in Childress, Texas \u2014 Meta Tipped as Anchor Tenant | Stack Futures",
   "published_at": "2026-07-16T01:10:00",
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": "Meta",
   "status": "Announced",
   "announcement_date": null,
   "project_evidence": [
    "# Crusoe and Lancium Lock 1GW AI Campus in Childress, Texas \u2014 Meta Tipped as Anchor Tenant",
    "Crusoe and Lancium have announced a 1.0 gigawatt AI data center campus in Childress, Texas \u2014 the second execution of a partnership model the two companies proved out in Abilene."
   ],
   "locality_evidence": [
    "# Crusoe and Lancium Lock 1GW AI Campus in Childress, Texas \u2014 Meta Tipped as Anchor Tenant",
    "Crusoe and Lancium have announced a 1.0 gigawatt AI data center campus in Childress, Texas \u2014 the second execution of a partnership model the two companies proved out in Abilene."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Lock 1GW AI Campus in Childress, Texas \u2014 Meta Tipped as Anchor Tenant",
    "Crusoe and Lancium have announced a 1.0 gigawatt AI data center campus in Childress, Texas \u2014 the second execution of a partnership model the two companies proved out in Abilene."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium Lock 1GW AI Campus in Childress, Texas \u2014 Meta Tipped as Anchor Tenant",
    "Crusoe and Lancium have announced a 1.0 gigawatt AI data center campus in Childress, Texas \u2014 the second execution of a partnership model the two companies proved out in Abilene."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium Lock 1GW AI Campus in Childress, Texas \u2014 Meta Tipped as Anchor Tenant",
    "Crusoe and Lancium have announced a 1.0 gigawatt AI data center campus in Childress, Texas \u2014 the second execution of a partnership model the two companies proved out in Abilene."
   ],
   "ai_customer_evidence": [
    "# Crusoe and Lancium Lock 1GW AI Campus in Childress, Texas \u2014 Meta Tipped as Anchor Tenant",
    "Data Center Dynamics reports Meta as the probable anchor tenant for Childress capacity."
   ],
   "status_evidence": [
    "# Crusoe and Lancium Lock 1GW AI Campus in Childress, Texas \u2014 Meta Tipped as Anchor Tenant",
    "Crusoe and Lancium have announced a 1.0 gigawatt AI data center campus in Childress, Texas \u2014 the second execution of a partnership model the two companies proved out in Abilene."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://news9live.com/technology/artificial-intelligence/openai-nvidia-sign-20-year-deal-for-8gw-ai-data-center-campus-in-ohio-3000485",
   "title": "OpenAI, Nvidia sign 20-year deal for 8GW AI data center campus in Ohio",
   "published_at": "2026-08-18T09:09:29",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI, Nvidia sign 20-year deal for 8GW AI data center campus in Ohio",
    "OpenAI has secured 8 gigawatts of dedicated AI computing capacity at the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "locality_evidence": [
    "OpenAI has secured 8 gigawatts of dedicated AI computing capacity at the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "state_evidence": [
    "# OpenAI, Nvidia sign 20-year deal for 8GW AI data center campus in Ohio",
    "OpenAI has secured 8 gigawatts of dedicated AI computing capacity at the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "capacity_gw_evidence": [
    "# OpenAI, Nvidia sign 20-year deal for 8GW AI data center campus in Ohio",
    "OpenAI has secured 8 gigawatts of dedicated AI computing capacity at the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "builder_evidence": [
    "OpenAI has secured 8GW of AI computing capacity at a massive data center campus in Ohio under a 20-year lease with SB Energy.",
    "The company has entered into a 20-year contract with data centre developer and operator SB Energy."
   ],
   "ai_customer_evidence": [
    "# OpenAI, Nvidia sign 20-year deal for 8GW AI data center campus in Ohio",
    "OpenAI has secured 8 gigawatts of dedicated AI computing capacity at the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "status_evidence": [
    "Nvidia will be the sole AI infrastructure provider on campus.",
    "The companies said the deal was announced on Monday as demand for computing power keeps accelerating with the booming generative AI."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news/openai-announces-five-more-us-stargate-data-centers-with-oracle-and-softbank",
   "title": "OpenAI announces five more US Stargate data centers with Oracle and SoftBank",
   "published_at": "2026-08-05T00:00:00",
   "project": null,
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "OpenAI has announced it will build five new data centers across the US as part of its sprawling $500 billion Stargate project, and claims this will help give it access to 7GW of IT capacity over the next three years.",
    "No further details about the new data centers have been released, but the Shackelford County site is likely the 1.4GW campus [announced](https://www.datacenterdynamics.com/en/news/vantage-plots-14gw-data-center-campus-in-texas/) by Vantage earlier this year."
   ],
   "state_evidence": [
    "OpenAI has announced it will build five new data centers across the US as part of its sprawling $500 billion Stargate project, and claims this will help give it access to 7GW of IT capacity over the next three years.",
    "No further details about the new data centers have been released, but the Shackelford County site is likely the 1.4GW campus [announced](https://www.datacenterdynamics.com/en/news/vantage-plots-14gw-data-center-campus-in-texas/) by Vantage earlier this year."
   ],
   "capacity_gw_evidence": [
    "OpenAI has announced it will build five new data centers across the US as part of its sprawling $500 billion Stargate project, and claims this will help give it access to 7GW of IT capacity over the next three years.",
    "No further details about the new data centers have been released, but the Shackelford County site is likely the 1.4GW campus [announced](https://www.datacenterdynamics.com/en/news/vantage-plots-14gw-data-center-campus-in-texas/) by Vantage earlier this year."
   ],
   "builder_evidence": [
    "OpenAI has announced it will build five new data centers across the US as part of its sprawling $500 billion Stargate project, and claims this will help give it access to 7GW of IT capacity over the next three years.",
    "No further details about the new data centers have been released, but the Shackelford County site is likely the 1.4GW campus [announced](https://www.datacenterdynamics.com/en/news/vantage-plots-14gw-data-center-campus-in-texas/) by Vantage earlier this year."
   ],
   "ai_customer_evidence": [
    "OpenAI has announced it will build five new data centers across the US as part of its sprawling $500 billion Stargate project, and claims this will help give it access to 7GW of IT capacity over the next three years.",
    "No further details about the new data centers have been released, but the Shackelford County site is likely the 1.4GW campus [announced](https://www.datacenterdynamics.com/en/news/vantage-plots-14gw-data-center-campus-in-texas/) by Vantage earlier this year."
   ],
   "status_evidence": [
    "OpenAI has announced it will build five new data centers across the US as part of its sprawling $500 billion Stargate project, and claims this will help give it access to 7GW of IT capacity over the next three years.",
    "No further details about the new data centers have been released, but the Shackelford County site is likely the 1.4GW campus [announced](https://www.datacenterdynamics.com/en/news/vantage-plots-14gw-data-center-campus-in-texas/) by Vantage earlier this year."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://toolscopeai.com/nvidia-iren-5gw-ai-infrastructure-partnership",
   "title": "NVIDIA IREN AI infrastructure partnership targets up to 5GW | ToolScopeAI",
   "published_at": "2026-05-12T18:48:27",
   "project": "Sweetwater",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-07",
   "project_evidence": [
    "# NVIDIA IREN AI infrastructure partnership targets up to 5GW",
    "The flagship is IREN\u2019s Sweetwater campus in Texas, planned as a 2 GW DSX AI factory that will serve as a reference for subsequent deployments.",
    "## Flagship site: Sweetwater, Texas"
   ],
   "locality_evidence": [
    "# NVIDIA IREN AI infrastructure partnership targets up to 5GW",
    "The flagship is IREN\u2019s Sweetwater campus in Texas, planned as a 2 GW DSX AI factory that will serve as a reference for subsequent deployments.",
    "## Flagship site: Sweetwater, Texas"
   ],
   "state_evidence": [
    "# NVIDIA IREN AI infrastructure partnership targets up to 5GW",
    "The flagship is IREN\u2019s Sweetwater campus in Texas, planned as a 2 GW DSX AI factory that will serve as a reference for subsequent deployments.",
    "## Flagship site: Sweetwater, Texas"
   ],
   "capacity_gw_evidence": [
    "# NVIDIA IREN AI infrastructure partnership targets up to 5GW",
    "The flagship is IREN\u2019s Sweetwater campus in Texas, planned as a 2 GW DSX AI factory that will serve as a reference for subsequent deployments."
   ],
   "builder_evidence": [
    "# NVIDIA IREN AI infrastructure partnership targets up to 5GW",
    "The flagship is IREN\u2019s Sweetwater campus in Texas, planned as a 2 GW DSX AI factory that will serve as a reference for subsequent deployments."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# NVIDIA IREN AI infrastructure partnership targets up to 5GW",
    "The flagship is IREN\u2019s Sweetwater campus in Texas, planned as a 2 GW DSX AI factory that will serve as a reference for subsequent deployments."
   ],
   "announcement_date_evidence": [
    "# NVIDIA IREN AI infrastructure partnership targets up to 5GW",
    " By Agustin Giovagnoli / May 7, 2026"
   ]
  },
  {
   "url": "https://siliconreport.com/every-stargate-data-center-site-mapped-54f088b3",
   "title": "Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
   "published_at": "2026-07-03T07:52:40",
   "project": "Stargate Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe",
   "ai_customer": "OpenAI",
   "status": "Two buildings went live in September 2025",
   "announcement_date": null,
   "project_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "[Stargate Abilene](/datacenters/facility/stargate-abilene) is the flagship and the only campus running production workloads."
   ],
   "locality_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Abilene, Texas: the only site with power flowing",
    "[Stargate Abilene](/datacenters/facility/stargate-abilene) is the flagship and the only campus running production workloads."
   ],
   "state_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Abilene, Texas: the only site with power flowing",
    "[Stargate Abilene](/datacenters/facility/stargate-abilene) is the flagship and the only campus running production workloads."
   ],
   "capacity_gw_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Abilene, Texas: the only site with power flowing",
    "Two buildings went live in September 2025; the site's seeded capacity figure is 1,200 megawatts at full build, running on a mix of gas generation and grid power."
   ],
   "builder_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Abilene, Texas: the only site with power flowing",
    "[Crusoe](/company/crusoe-energy) developed the buildings on Lancium's Clean Campus site and [Oracle](/company/oracle) operates them on Oracle Cloud Infrastructure for [OpenAI](/company/openai)."
   ],
   "ai_customer_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Abilene, Texas: the only site with power flowing",
    "[Crusoe](/company/crusoe-energy) developed the buildings on Lancium's Clean Campus site and [Oracle](/company/oracle) operates them on Oracle Cloud Infrastructure for [OpenAI](/company/openai)."
   ],
   "status_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Abilene, Texas: the only site with power flowing",
    "Two buildings went live in September 2025; the site's seeded capacity figure is 1,200 megawatts at full build, running on a mix of gas generation and grid power."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://siliconreport.com/every-stargate-data-center-site-mapped-54f088b3",
   "title": "Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
   "published_at": "2026-07-03T07:52:40",
   "project": "Do\u00f1a Ana County",
   "locality": "Do\u00f1a Ana County",
   "state": "New Mexico",
   "capacity_gw": 2.2,
   "builder": "STACK Infrastructure and BorderPlex Digital Assets",
   "ai_customer": null,
   "status": "foundation work underway",
   "announcement_date": "2025-09-01",
   "project_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Do\u00f1a Ana County, New Mexico (\"Project Jupiter\"): the largest single site",
    "At a seeded 2,200 megawatts, [Do\u00f1a Ana County](/datacenters/facility/stargate-dona-ana-jupiter) \u2014 known internally as Project Jupiter \u2014 is the biggest capacity commitment in the portfolio, larger than Abilene's full build."
   ],
   "locality_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Do\u00f1a Ana County, New Mexico (\"Project Jupiter\"): the largest single site",
    "At a seeded 2,200 megawatts, [Do\u00f1a Ana County](/datacenters/facility/stargate-dona-ana-jupiter) \u2014 known internally as Project Jupiter \u2014 is the biggest capacity commitment in the portfolio, larger than Abilene's full build."
   ],
   "state_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Do\u00f1a Ana County, New Mexico (\"Project Jupiter\"): the largest single site",
    "At a seeded 2,200 megawatts, [Do\u00f1a Ana County](/datacenters/facility/stargate-dona-ana-jupiter) \u2014 known internally as Project Jupiter \u2014 is the biggest capacity commitment in the portfolio, larger than Abilene's full build."
   ],
   "capacity_gw_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Do\u00f1a Ana County, New Mexico (\"Project Jupiter\"): the largest single site",
    "At a seeded 2,200 megawatts, [Do\u00f1a Ana County](/datacenters/facility/stargate-dona-ana-jupiter) \u2014 known internally as Project Jupiter \u2014 is the biggest capacity commitment in the portfolio, larger than Abilene's full build."
   ],
   "builder_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Do\u00f1a Ana County, New Mexico (\"Project Jupiter\"): the largest single site",
    "STACK Infrastructure and BorderPlex Digital Assets are developing four large buildings near Santa Teresa, with foundation work underway and two on-site natural gas microgrids supplying power rather than a grid interconnect alone."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Do\u00f1a Ana County, New Mexico (\"Project Jupiter\"): the largest single site",
    "STACK Infrastructure and BorderPlex Digital Assets are developing four large buildings near Santa Teresa, with foundation work underway and two on-site natural gas microgrids supplying power rather than a grid interconnect alone."
   ],
   "announcement_date_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Do\u00f1a Ana County, New Mexico (\"Project Jupiter\"): the largest single site",
    "It was one of three sites Oracle-led development announced in September 2025 alongside Shackelford County and a Midwest location that turned out to be Wisconsin."
   ]
  },
  {
   "url": "https://siliconreport.com/every-stargate-data-center-site-mapped-54f088b3",
   "title": "Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
   "published_at": "2026-07-03T07:52:40",
   "project": "Shackelford County",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "First building delivery is targeted for late 2026, with full campus completion not expected until 2028",
   "announcement_date": "2025-09-01",
   "project_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Shackelford County, Texas (\"Frontier\"): Vantage's second Texas build",
    "[Shackelford County](/datacenters/facility/stargate-shackelford-frontier), branded internally as Frontier, sits at a seeded 1,400 megawatts across a 1,200-acre campus with ten planned buildings."
   ],
   "locality_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Shackelford County, Texas (\"Frontier\"): Vantage's second Texas build",
    "[Shackelford County](/datacenters/facility/stargate-shackelford-frontier), branded internally as Frontier, sits at a seeded 1,400 megawatts across a 1,200-acre campus with ten planned buildings."
   ],
   "state_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Shackelford County, Texas (\"Frontier\"): Vantage's second Texas build",
    "[Shackelford County](/datacenters/facility/stargate-shackelford-frontier), branded internally as Frontier, sits at a seeded 1,400 megawatts across a 1,200-acre campus with ten planned buildings."
   ],
   "capacity_gw_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Shackelford County, Texas (\"Frontier\"): Vantage's second Texas build",
    "[Shackelford County](/datacenters/facility/stargate-shackelford-frontier), branded internally as Frontier, sits at a seeded 1,400 megawatts across a 1,200-acre campus with ten planned buildings."
   ],
   "builder_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Shackelford County, Texas (\"Frontier\"): Vantage's second Texas build",
    "Vantage Data Centers is the developer, running an on-site natural gas microgrid similar to Do\u00f1a Ana's setup."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Shackelford County, Texas (\"Frontier\"): Vantage's second Texas build",
    "First building delivery is targeted for late 2026, with full campus completion not expected until 2028 \u2014 a timeline shared by most of the post-Abilene sites, which underscores how far ahead of actual power delivery Stargate's announcements tend to run."
   ],
   "announcement_date_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Do\u00f1a Ana County, New Mexico (\"Project Jupiter\"): the largest single site",
    "It was one of three sites Oracle-led development announced in September 2025 alongside Shackelford County and a Midwest location that turned out to be Wisconsin."
   ]
  },
  {
   "url": "https://siliconreport.com/every-stargate-data-center-site-mapped-54f088b3",
   "title": "Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
   "published_at": "2026-07-03T07:52:40",
   "project": "Stargate Milam County",
   "locality": "Milam County",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "SB Energy",
   "ai_customer": null,
   "status": "Steel framing and roofing were visible as of early 2026",
   "announcement_date": null,
   "project_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Milam County, Texas: SoftBank's own build",
    "[Stargate Milam County](/datacenters/facility/stargate-milam-county) is SB Energy's project \u2014 the SoftBank subsidiary developing independently of the Oracle-led sites, at a seeded 1,200 megawatts."
   ],
   "locality_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Milam County, Texas: SoftBank's own build",
    "[Stargate Milam County](/datacenters/facility/stargate-milam-county) is SB Energy's project \u2014 the SoftBank subsidiary developing independently of the Oracle-led sites, at a seeded 1,200 megawatts."
   ],
   "state_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Milam County, Texas: SoftBank's own build",
    "[Stargate Milam County](/datacenters/facility/stargate-milam-county) is SB Energy's project \u2014 the SoftBank subsidiary developing independently of the Oracle-led sites, at a seeded 1,200 megawatts."
   ],
   "capacity_gw_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Milam County, Texas: SoftBank's own build",
    "[Stargate Milam County](/datacenters/facility/stargate-milam-county) is SB Energy's project \u2014 the SoftBank subsidiary developing independently of the Oracle-led sites, at a seeded 1,200 megawatts."
   ],
   "builder_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Milam County, Texas: SoftBank's own build",
    "[Stargate Milam County](/datacenters/facility/stargate-milam-county) is SB Energy's project \u2014 the SoftBank subsidiary developing independently of the Oracle-led sites, at a seeded 1,200 megawatts."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Milam County, Texas: SoftBank's own build",
    "Steel framing and roofing were visible as of early 2026, with first-building delivery originally targeted for October."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://siliconreport.com/every-stargate-data-center-site-mapped-54f088b3",
   "title": "Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
   "published_at": "2026-07-03T07:52:40",
   "project": "Port Washington",
   "locality": "Port Washington",
   "state": "Wisconsin",
   "capacity_gw": 1.3,
   "builder": "Vantage",
   "ai_customer": "OpenAI",
   "status": "Vantage says 70% of Lighthouse's power will come from solar, wind, and battery storage",
   "announcement_date": "2025-09-01",
   "project_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Port Washington, Wisconsin (\"Lighthouse\"): the renewable-heavy outlier",
    "The Midwest site OpenAI held back from the September 2025 announcement turned out to be [Port Washington](/datacenters/buildout), a $15 billion Vantage campus north of Milwaukee."
   ],
   "locality_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Port Washington, Wisconsin (\"Lighthouse\"): the renewable-heavy outlier",
    "The Midwest site OpenAI held back from the September 2025 announcement turned out to be [Port Washington](/datacenters/buildout), a $15 billion Vantage campus north of Milwaukee."
   ],
   "state_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Port Washington, Wisconsin (\"Lighthouse\"): the renewable-heavy outlier",
    "The Midwest site OpenAI held back from the September 2025 announcement turned out to be [Port Washington](/datacenters/buildout), a $15 billion Vantage campus north of Milwaukee."
   ],
   "capacity_gw_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Port Washington, Wisconsin (\"Lighthouse\"): the renewable-heavy outlier",
    "Seeded capacity is 1,300 megawatts, of which roughly 902 megawatts is dedicated to actual IT load rather than cooling and site infrastructure \u2014 a distinction worth noting because headline megawatt figures across the industry often blur total draw with usable compute capacity."
   ],
   "builder_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Port Washington, Wisconsin (\"Lighthouse\"): the renewable-heavy outlier",
    "The Midwest site OpenAI held back from the September 2025 announcement turned out to be [Port Washington](/datacenters/buildout), a $15 billion Vantage campus north of Milwaukee."
   ],
   "ai_customer_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Port Washington, Wisconsin (\"Lighthouse\"): the renewable-heavy outlier",
    "The Midwest site OpenAI held back from the September 2025 announcement turned out to be [Port Washington](/datacenters/buildout), a $15 billion Vantage campus north of Milwaukee."
   ],
   "status_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Port Washington, Wisconsin (\"Lighthouse\"): the renewable-heavy outlier",
    "Vantage says 70% of Lighthouse's power will come from solar, wind, and battery storage, the most renewable-heavy mix in the Stargate fleet, and the company is separately funding at least $175 million in regional water and power infrastructure upgrades tied to the build."
   ],
   "announcement_date_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Do\u00f1a Ana County, New Mexico (\"Project Jupiter\"): the largest single site",
    "It was one of three sites Oracle-led development announced in September 2025 alongside Shackelford County and a Midwest location that turned out to be Wisconsin."
   ]
  },
  {
   "url": "https://siliconreport.com/every-stargate-data-center-site-mapped-54f088b3",
   "title": "Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
   "published_at": "2026-07-03T07:52:40",
   "project": "Stargate Michigan",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.4,
   "builder": "Related Digital with Oracle",
   "ai_customer": "OpenAI",
   "status": "running entirely on DTE Energy grid power plus battery storage",
   "announcement_date": "2025-10-01",
   "project_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Saline Township, Michigan (\"The Barn\"): the $7 billion late add",
    "[Stargate Michigan](/datacenters/facility/stargate-michigan-saline), OpenAI's October 2025 addition to the roster, is a 1,400-megawatt seeded campus developed by Related Digital with Oracle, running entirely on DTE Energy grid power plus battery storage."
   ],
   "locality_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Saline Township, Michigan (\"The Barn\"): the $7 billion late add",
    "[Stargate Michigan](/datacenters/facility/stargate-michigan-saline), OpenAI's October 2025 addition to the roster, is a 1,400-megawatt seeded campus developed by Related Digital with Oracle, running entirely on DTE Energy grid power plus battery storage."
   ],
   "state_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Saline Township, Michigan (\"The Barn\"): the $7 billion late add",
    "[Stargate Michigan](/datacenters/facility/stargate-michigan-saline), OpenAI's October 2025 addition to the roster, is a 1,400-megawatt seeded campus developed by Related Digital with Oracle, running entirely on DTE Energy grid power plus battery storage."
   ],
   "capacity_gw_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Saline Township, Michigan (\"The Barn\"): the $7 billion late add",
    "[Stargate Michigan](/datacenters/facility/stargate-michigan-saline), OpenAI's October 2025 addition to the roster, is a 1,400-megawatt seeded campus developed by Related Digital with Oracle, running entirely on DTE Energy grid power plus battery storage."
   ],
   "builder_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Saline Township, Michigan (\"The Barn\"): the $7 billion late add",
    "[Stargate Michigan](/datacenters/facility/stargate-michigan-saline), OpenAI's October 2025 addition to the roster, is a 1,400-megawatt seeded campus developed by Related Digital with Oracle, running entirely on DTE Energy grid power plus battery storage."
   ],
   "ai_customer_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Saline Township, Michigan (\"The Barn\"): the $7 billion late add",
    "[Stargate Michigan](/datacenters/facility/stargate-michigan-saline), OpenAI's October 2025 addition to the roster, is a 1,400-megawatt seeded campus developed by Related Digital with Oracle, running entirely on DTE Energy grid power plus battery storage."
   ],
   "status_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Saline Township, Michigan (\"The Barn\"): the $7 billion late add",
    "[Stargate Michigan](/datacenters/facility/stargate-michigan-saline), OpenAI's October 2025 addition to the roster, is a 1,400-megawatt seeded campus developed by Related Digital with Oracle, running entirely on DTE Energy grid power plus battery storage."
   ],
   "announcement_date_evidence": [
    "# Every Stargate Data Center Site, Mapped: Capacity, Status, and Who Operates What",
    "## Saline Township, Michigan (\"The Barn\"): the $7 billion late add",
    "[Stargate Michigan](/datacenters/facility/stargate-michigan-saline), OpenAI's October 2025 addition to the roster, is a 1,400-megawatt seeded campus developed by Related Digital with Oracle, running entirely on DTE Energy grid power plus battery storage."
   ]
  },
  {
   "url": "https://rotatingdata.com/deals/2026-08-nvidia-openai-sb-energy-ports-pike-8gw-campus",
   "title": "NVIDIA backs 8 GW OpenAI campus at PORTS-Pike",
   "published_at": null,
   "project": "PORTS-Pike",
   "locality": "Portsmouth Site",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Power \u00b7 Evidence brief",
    "# NVIDIA backs 8 GW OpenAI campus at PORTS-Pike",
    "DOE is leasing federal land at the former Portsmouth Gaseous Diffusion Plant in Pike County, Ohio to an SB Energy-affiliated entity for construction of the data-center campus."
   ],
   "locality_evidence": [
    "Power \u00b7 Evidence brief",
    "# NVIDIA backs 8 GW OpenAI campus at PORTS-Pike",
    "DOE said development is expected to begin in 2026 with an initial phase on 189 acres at the Portsmouth Site."
   ],
   "state_evidence": [
    "Power \u00b7 Evidence brief",
    "# NVIDIA backs 8 GW OpenAI campus at PORTS-Pike",
    "Geography**Portsmouth Site / Pike County, Ohio**"
   ],
   "capacity_gw_evidence": [
    "Power \u00b7 Evidence brief",
    "# NVIDIA backs 8 GW OpenAI campus at PORTS-Pike",
    "Disclosed scale**8 IT-GW OpenAI lease at a campus backed by 10 GW of new generation; NVIDIA credit support for the initial 4.25 IT-GW, an option on the remaining 3.75 IT-GW and a $1.5B SB Energy investment; at least $4.2B of regional grid infrastructure**"
   ],
   "builder_evidence": [
    "Power \u00b7 Evidence brief",
    "# NVIDIA backs 8 GW OpenAI campus at PORTS-Pike",
    "NVIDIA said SB Energy will build, own and operate the data center under a 20-year lease to OpenAI for 8 IT-GW."
   ],
   "ai_customer_evidence": [
    "Power \u00b7 Evidence brief",
    "# NVIDIA backs 8 GW OpenAI campus at PORTS-Pike",
    "NVIDIA said SB Energy will build, own and operate the data center under a 20-year lease to OpenAI for 8 IT-GW."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://convergedigest.com/tracking-openais-global-ai-infrastructure-builds",
   "title": "Tracking OpenAI\u2019s Global AI Infrastructure",
   "published_at": "2025-11-03T23:53:43",
   "project": "Stargate 1",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "OpenAI, Oracle, Lancium, Crusoe, Blue Owl, Primary Digital Infrastructure",
   "ai_customer": "OpenAI",
   "status": "Under construction; first phases live 2025",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Stargate 1](https://convergedigest.com/project-stargate-abilene-tx/) | Abilene, TX | \u22481.2 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Lancium, Crusoe, Blue Owl, Primary Digital Infrastructure | Under construction; first phases live 2025 |"
   ],
   "locality_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Stargate 1](https://convergedigest.com/project-stargate-abilene-tx/) | Abilene, TX | \u22481.2 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Lancium, Crusoe, Blue Owl, Primary Digital Infrastructure | Under construction; first phases live 2025 |"
   ],
   "state_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Stargate 1](https://convergedigest.com/project-stargate-abilene-tx/) | Abilene, TX | \u22481.2 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Lancium, Crusoe, Blue Owl, Primary Digital Infrastructure | Under construction; first phases live 2025 |"
   ],
   "capacity_gw_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Stargate 1](https://convergedigest.com/project-stargate-abilene-tx/) | Abilene, TX | \u22481.2 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Lancium, Crusoe, Blue Owl, Primary Digital Infrastructure | Under construction; first phases live 2025 |"
   ],
   "builder_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Stargate 1](https://convergedigest.com/project-stargate-abilene-tx/) | Abilene, TX | \u22481.2 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Lancium, Crusoe, Blue Owl, Primary Digital Infrastructure | Under construction; first phases live 2025 |"
   ],
   "ai_customer_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Stargate 1](https://convergedigest.com/project-stargate-abilene-tx/) | Abilene, TX | \u22481.2 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Lancium, Crusoe, Blue Owl, Primary Digital Infrastructure | Under construction; first phases live 2025 |"
   ],
   "status_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Stargate 1](https://convergedigest.com/project-stargate-abilene-tx/) | Abilene, TX | \u22481.2 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Lancium, Crusoe, Blue Owl, Primary Digital Infrastructure | Under construction; first phases live 2025 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://convergedigest.com/tracking-openais-global-ai-infrastructure-builds",
   "title": "Tracking OpenAI\u2019s Global AI Infrastructure",
   "published_at": "2025-11-03T23:53:43",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "OpenAI, Oracle, Vantage Data Centers, INNIO / Voltagrid",
   "ai_customer": "OpenAI",
   "status": "Early construction; target 2026+",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Frontier](https://convergedigest.com/openai-frontier-ai-campus-texas/) | Shackelford County, TX | 1.4 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Vantage Data Centers, INNIO / Voltagrid | Early construction; target 2026+ |"
   ],
   "locality_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Frontier](https://convergedigest.com/openai-frontier-ai-campus-texas/) | Shackelford County, TX | 1.4 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Vantage Data Centers, INNIO / Voltagrid | Early construction; target 2026+ |"
   ],
   "state_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Frontier](https://convergedigest.com/openai-frontier-ai-campus-texas/) | Shackelford County, TX | 1.4 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Vantage Data Centers, INNIO / Voltagrid | Early construction; target 2026+ |"
   ],
   "capacity_gw_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Frontier](https://convergedigest.com/openai-frontier-ai-campus-texas/) | Shackelford County, TX | 1.4 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Vantage Data Centers, INNIO / Voltagrid | Early construction; target 2026+ |"
   ],
   "builder_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Frontier](https://convergedigest.com/openai-frontier-ai-campus-texas/) | Shackelford County, TX | 1.4 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Vantage Data Centers, INNIO / Voltagrid | Early construction; target 2026+ |"
   ],
   "ai_customer_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Frontier](https://convergedigest.com/openai-frontier-ai-campus-texas/) | Shackelford County, TX | 1.4 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Vantage Data Centers, INNIO / Voltagrid | Early construction; target 2026+ |"
   ],
   "status_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Frontier](https://convergedigest.com/openai-frontier-ai-campus-texas/) | Shackelford County, TX | 1.4 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Vantage Data Centers, INNIO / Voltagrid | Early construction; target 2026+ |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://convergedigest.com/tracking-openais-global-ai-infrastructure-builds",
   "title": "Tracking OpenAI\u2019s Global AI Infrastructure",
   "published_at": "2025-11-03T23:53:43",
   "project": "Lighthouse",
   "locality": "Port Washington",
   "state": "Wisconsin",
   "capacity_gw": 1.0,
   "builder": "OpenAI, Oracle, Vantage Data Centers, DBRG, WEC Energy",
   "ai_customer": "OpenAI",
   "status": "Planning; completion target 2028",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Lighthouse](https://convergedigest.com/vantage-openai-and-oracle-launch-15b-lighthouse-campus-in-wisconsin/) | Port Washington, WI | \u22481.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Vantage Data Centers, DBRG, WEC Energy | Planning; completion target 2028 |"
   ],
   "locality_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Lighthouse](https://convergedigest.com/vantage-openai-and-oracle-launch-15b-lighthouse-campus-in-wisconsin/) | Port Washington, WI | \u22481.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Vantage Data Centers, DBRG, WEC Energy | Planning; completion target 2028 |"
   ],
   "state_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Lighthouse](https://convergedigest.com/vantage-openai-and-oracle-launch-15b-lighthouse-campus-in-wisconsin/) | Port Washington, WI | \u22481.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Vantage Data Centers, DBRG, WEC Energy | Planning; completion target 2028 |"
   ],
   "capacity_gw_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Lighthouse](https://convergedigest.com/vantage-openai-and-oracle-launch-15b-lighthouse-campus-in-wisconsin/) | Port Washington, WI | \u22481.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Vantage Data Centers, DBRG, WEC Energy | Planning; completion target 2028 |"
   ],
   "builder_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Lighthouse](https://convergedigest.com/vantage-openai-and-oracle-launch-15b-lighthouse-campus-in-wisconsin/) | Port Washington, WI | \u22481.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Vantage Data Centers, DBRG, WEC Energy | Planning; completion target 2028 |"
   ],
   "ai_customer_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Lighthouse](https://convergedigest.com/vantage-openai-and-oracle-launch-15b-lighthouse-campus-in-wisconsin/) | Port Washington, WI | \u22481.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Vantage Data Centers, DBRG, WEC Energy | Planning; completion target 2028 |"
   ],
   "status_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Lighthouse](https://convergedigest.com/vantage-openai-and-oracle-launch-15b-lighthouse-campus-in-wisconsin/) | Port Washington, WI | \u22481.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Vantage Data Centers, DBRG, WEC Energy | Planning; completion target 2028 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://convergedigest.com/tracking-openais-global-ai-infrastructure-builds",
   "title": "Tracking OpenAI\u2019s Global AI Infrastructure",
   "published_at": "2025-11-03T23:53:43",
   "project": "Project Jupiter",
   "locality": "Do\u00f1a Ana County",
   "state": "New Mexico",
   "capacity_gw": 1.5,
   "builder": "OpenAI, STACK Infrastructure, BorderPlex Digital, Blue Owl",
   "ai_customer": "OpenAI",
   "status": "Permitting; multi-phase build 2025\u201327+",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Project Jupiter](https://convergedigest.com/new-mexico-project-jupiter-envisions-a-massive-data-center-complex/) | Do\u00f1a Ana County, NM | Up to 1.5 | [OpenAI](https://convergedigest.com/tag/openai/), STACK Infrastructure, BorderPlex Digital, Blue Owl | Permitting; multi-phase build 2025\u201327+ |"
   ],
   "locality_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Project Jupiter](https://convergedigest.com/new-mexico-project-jupiter-envisions-a-massive-data-center-complex/) | Do\u00f1a Ana County, NM | Up to 1.5 | [OpenAI](https://convergedigest.com/tag/openai/), STACK Infrastructure, BorderPlex Digital, Blue Owl | Permitting; multi-phase build 2025\u201327+ |"
   ],
   "state_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Project Jupiter](https://convergedigest.com/new-mexico-project-jupiter-envisions-a-massive-data-center-complex/) | Do\u00f1a Ana County, NM | Up to 1.5 | [OpenAI](https://convergedigest.com/tag/openai/), STACK Infrastructure, BorderPlex Digital, Blue Owl | Permitting; multi-phase build 2025\u201327+ |"
   ],
   "capacity_gw_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Project Jupiter](https://convergedigest.com/new-mexico-project-jupiter-envisions-a-massive-data-center-complex/) | Do\u00f1a Ana County, NM | Up to 1.5 | [OpenAI](https://convergedigest.com/tag/openai/), STACK Infrastructure, BorderPlex Digital, Blue Owl | Permitting; multi-phase build 2025\u201327+ |"
   ],
   "builder_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Project Jupiter](https://convergedigest.com/new-mexico-project-jupiter-envisions-a-massive-data-center-complex/) | Do\u00f1a Ana County, NM | Up to 1.5 | [OpenAI](https://convergedigest.com/tag/openai/), STACK Infrastructure, BorderPlex Digital, Blue Owl | Permitting; multi-phase build 2025\u201327+ |"
   ],
   "ai_customer_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Project Jupiter](https://convergedigest.com/new-mexico-project-jupiter-envisions-a-massive-data-center-complex/) | Do\u00f1a Ana County, NM | Up to 1.5 | [OpenAI](https://convergedigest.com/tag/openai/), STACK Infrastructure, BorderPlex Digital, Blue Owl | Permitting; multi-phase build 2025\u201327+ |"
   ],
   "status_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Project Jupiter](https://convergedigest.com/new-mexico-project-jupiter-envisions-a-massive-data-center-complex/) | Do\u00f1a Ana County, NM | Up to 1.5 | [OpenAI](https://convergedigest.com/tag/openai/), STACK Infrastructure, BorderPlex Digital, Blue Owl | Permitting; multi-phase build 2025\u201327+ |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://convergedigest.com/tracking-openais-global-ai-infrastructure-builds",
   "title": "Tracking OpenAI\u2019s Global AI Infrastructure",
   "published_at": "2025-11-03T23:53:43",
   "project": "The Barn",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "OpenAI, Oracle, Related Digital, DTE Energy",
   "ai_customer": "OpenAI",
   "status": "Announced; construction starts 2026",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [The Barn](https://convergedigest.com/openai-the-barn-michigan/) | Saline Township, MI | >1.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Related Digital, DTE Energy | Announced; construction starts 2026 |"
   ],
   "locality_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [The Barn](https://convergedigest.com/openai-the-barn-michigan/) | Saline Township, MI | >1.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Related Digital, DTE Energy | Announced; construction starts 2026 |"
   ],
   "state_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [The Barn](https://convergedigest.com/openai-the-barn-michigan/) | Saline Township, MI | >1.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Related Digital, DTE Energy | Announced; construction starts 2026 |"
   ],
   "capacity_gw_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [The Barn](https://convergedigest.com/openai-the-barn-michigan/) | Saline Township, MI | >1.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Related Digital, DTE Energy | Announced; construction starts 2026 |"
   ],
   "builder_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [The Barn](https://convergedigest.com/openai-the-barn-michigan/) | Saline Township, MI | >1.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Related Digital, DTE Energy | Announced; construction starts 2026 |"
   ],
   "ai_customer_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [The Barn](https://convergedigest.com/openai-the-barn-michigan/) | Saline Township, MI | >1.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Related Digital, DTE Energy | Announced; construction starts 2026 |"
   ],
   "status_evidence": [
    "# OpenAI Infrastructure Tracker",
    "## Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [The Barn](https://convergedigest.com/openai-the-barn-michigan/) | Saline Township, MI | >1.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/), [Oracle](https://convergedigest.com/tag/oracle/), Related Digital, DTE Energy | Announced; construction starts 2026 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mlq.ai/build-tracker",
   "title": "MLQ.ai \u2014 Frontier tech research, news & data",
   "published_at": null,
   "project": "Nebius Independence AI Factory",
   "locality": "Independence",
   "state": "Missouri",
   "capacity_gw": 1.2,
   "builder": "Nebius",
   "ai_customer": "",
   "status": "planning",
   "announcement_date": "2026-03-01",
   "project_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Nebius | Nebius Independence AI Factory ai-focused | \ud83d\udccd Independence, Missouri USA | \u26a1 1200.0 MW | - | planning | Mar 2026 | [\u2197 Source](https://nebius.com/newsroom/nebius-secures-approval-for-its-first-gigawatt-scale-ai-factory) |"
   ],
   "locality_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Nebius | Nebius Independence AI Factory ai-focused | \ud83d\udccd Independence, Missouri USA | \u26a1 1200.0 MW | - | planning | Mar 2026 | [\u2197 Source](https://nebius.com/newsroom/nebius-secures-approval-for-its-first-gigawatt-scale-ai-factory) |"
   ],
   "state_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Nebius | Nebius Independence AI Factory ai-focused | \ud83d\udccd Independence, Missouri USA | \u26a1 1200.0 MW | - | planning | Mar 2026 | [\u2197 Source](https://nebius.com/newsroom/nebius-secures-approval-for-its-first-gigawatt-scale-ai-factory) |"
   ],
   "capacity_gw_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Nebius | Nebius Independence AI Factory ai-focused | \ud83d\udccd Independence, Missouri USA | \u26a1 1200.0 MW | - | planning | Mar 2026 | [\u2197 Source](https://nebius.com/newsroom/nebius-secures-approval-for-its-first-gigawatt-scale-ai-factory) |"
   ],
   "builder_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Nebius | Nebius Independence AI Factory ai-focused | \ud83d\udccd Independence, Missouri USA | \u26a1 1200.0 MW | - | planning | Mar 2026 | [\u2197 Source](https://nebius.com/newsroom/nebius-secures-approval-for-its-first-gigawatt-scale-ai-factory) |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Nebius | Nebius Independence AI Factory ai-focused | \ud83d\udccd Independence, Missouri USA | \u26a1 1200.0 MW | - | planning | Mar 2026 | [\u2197 Source](https://nebius.com/newsroom/nebius-secures-approval-for-its-first-gigawatt-scale-ai-factory) |"
   ],
   "announcement_date_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Nebius | Nebius Independence AI Factory ai-focused | \ud83d\udccd Independence, Missouri USA | \u26a1 1200.0 MW | - | planning | Mar 2026 | [\u2197 Source](https://nebius.com/newsroom/nebius-secures-approval-for-its-first-gigawatt-scale-ai-factory) |"
   ]
  },
  {
   "url": "https://mlq.ai/build-tracker",
   "title": "MLQ.ai \u2014 Frontier tech research, news & data",
   "published_at": null,
   "project": "Meta Indianapolis 1GW Data Center New Build",
   "locality": "Indianapolis",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "",
   "status": "Under Construction",
   "announcement_date": "2026-02-01",
   "project_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta Indianapolis 1GW Data Center New Build | \ud83d\udccd Indianapolis, Indiana USA | \u26a1 1000.0 MW | $10.0B | Under Construction | Feb 2026 | [\u2197 Source](https://www.datacenterknowledge.com/data-center-construction/meta-breaks-ground-on-1-gw-indiana-data-center) |"
   ],
   "locality_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta Indianapolis 1GW Data Center New Build | \ud83d\udccd Indianapolis, Indiana USA | \u26a1 1000.0 MW | $10.0B | Under Construction | Feb 2026 | [\u2197 Source](https://www.datacenterknowledge.com/data-center-construction/meta-breaks-ground-on-1-gw-indiana-data-center) |"
   ],
   "state_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta Indianapolis 1GW Data Center New Build | \ud83d\udccd Indianapolis, Indiana USA | \u26a1 1000.0 MW | $10.0B | Under Construction | Feb 2026 | [\u2197 Source](https://www.datacenterknowledge.com/data-center-construction/meta-breaks-ground-on-1-gw-indiana-data-center) |"
   ],
   "capacity_gw_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta Indianapolis 1GW Data Center New Build | \ud83d\udccd Indianapolis, Indiana USA | \u26a1 1000.0 MW | $10.0B | Under Construction | Feb 2026 | [\u2197 Source](https://www.datacenterknowledge.com/data-center-construction/meta-breaks-ground-on-1-gw-indiana-data-center) |"
   ],
   "builder_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta Indianapolis 1GW Data Center New Build | \ud83d\udccd Indianapolis, Indiana USA | \u26a1 1000.0 MW | $10.0B | Under Construction | Feb 2026 | [\u2197 Source](https://www.datacenterknowledge.com/data-center-construction/meta-breaks-ground-on-1-gw-indiana-data-center) |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta Indianapolis 1GW Data Center New Build | \ud83d\udccd Indianapolis, Indiana USA | \u26a1 1000.0 MW | $10.0B | Under Construction | Feb 2026 | [\u2197 Source](https://www.datacenterknowledge.com/data-center-construction/meta-breaks-ground-on-1-gw-indiana-data-center) |"
   ],
   "announcement_date_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta Indianapolis 1GW Data Center New Build | \ud83d\udccd Indianapolis, Indiana USA | \u26a1 1000.0 MW | $10.0B | Under Construction | Feb 2026 | [\u2197 Source](https://www.datacenterknowledge.com/data-center-construction/meta-breaks-ground-on-1-gw-indiana-data-center) |"
   ]
  },
  {
   "url": "https://mlq.ai/build-tracker",
   "title": "MLQ.ai \u2014 Frontier tech research, news & data",
   "published_at": null,
   "project": "Meta Indiana AI Campus",
   "locality": "Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "",
   "status": "construction",
   "announcement_date": "2026-02-01",
   "project_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta Indiana AI Campus hyperscale | \ud83d\udccd Lebanon, Indiana USA | \u26a1 1000.0 MW | $10.0B | construction | Feb 2026 | [\u2197 Source](https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/) |"
   ],
   "locality_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta Indiana AI Campus hyperscale | \ud83d\udccd Lebanon, Indiana USA | \u26a1 1000.0 MW | $10.0B | construction | Feb 2026 | [\u2197 Source](https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/) |"
   ],
   "state_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta Indiana AI Campus hyperscale | \ud83d\udccd Lebanon, Indiana USA | \u26a1 1000.0 MW | $10.0B | construction | Feb 2026 | [\u2197 Source](https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/) |"
   ],
   "capacity_gw_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta Indiana AI Campus hyperscale | \ud83d\udccd Lebanon, Indiana USA | \u26a1 1000.0 MW | $10.0B | construction | Feb 2026 | [\u2197 Source](https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/) |"
   ],
   "builder_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta Indiana AI Campus hyperscale | \ud83d\udccd Lebanon, Indiana USA | \u26a1 1000.0 MW | $10.0B | construction | Feb 2026 | [\u2197 Source](https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/) |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta Indiana AI Campus hyperscale | \ud83d\udccd Lebanon, Indiana USA | \u26a1 1000.0 MW | $10.0B | construction | Feb 2026 | [\u2197 Source](https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/) |"
   ],
   "announcement_date_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta Indiana AI Campus hyperscale | \ud83d\udccd Lebanon, Indiana USA | \u26a1 1000.0 MW | $10.0B | construction | Feb 2026 | [\u2197 Source](https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/) |"
   ]
  },
  {
   "url": "https://mlq.ai/build-tracker",
   "title": "MLQ.ai \u2014 Frontier tech research, news & data",
   "published_at": null,
   "project": "xAI MACROHARDRR",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "",
   "status": "announced",
   "announcement_date": "2026-01-01",
   "project_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| xAI | xAI MACROHARDRR ai-focused | \ud83d\udccd Southaven, Mississippi USA | \u26a1 2000.0 MW | $20.0B | announced | Jan 2026 | [\u2197 Source](https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/) |"
   ],
   "locality_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| xAI | xAI MACROHARDRR ai-focused | \ud83d\udccd Southaven, Mississippi USA | \u26a1 2000.0 MW | $20.0B | announced | Jan 2026 | [\u2197 Source](https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/) |"
   ],
   "state_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| xAI | xAI MACROHARDRR ai-focused | \ud83d\udccd Southaven, Mississippi USA | \u26a1 2000.0 MW | $20.0B | announced | Jan 2026 | [\u2197 Source](https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/) |"
   ],
   "capacity_gw_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| xAI | xAI MACROHARDRR ai-focused | \ud83d\udccd Southaven, Mississippi USA | \u26a1 2000.0 MW | $20.0B | announced | Jan 2026 | [\u2197 Source](https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/) |"
   ],
   "builder_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| xAI | xAI MACROHARDRR ai-focused | \ud83d\udccd Southaven, Mississippi USA | \u26a1 2000.0 MW | $20.0B | announced | Jan 2026 | [\u2197 Source](https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/) |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| xAI | xAI MACROHARDRR ai-focused | \ud83d\udccd Southaven, Mississippi USA | \u26a1 2000.0 MW | $20.0B | announced | Jan 2026 | [\u2197 Source](https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/) |"
   ],
   "announcement_date_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| xAI | xAI MACROHARDRR ai-focused | \ud83d\udccd Southaven, Mississippi USA | \u26a1 2000.0 MW | $20.0B | announced | Jan 2026 | [\u2197 Source](https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/) |"
   ]
  },
  {
   "url": "https://mlq.ai/build-tracker",
   "title": "MLQ.ai \u2014 Frontier tech research, news & data",
   "published_at": null,
   "project": "Meta El Paso Data Center",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "",
   "status": "construction",
   "announcement_date": "2025-10-01",
   "project_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta El Paso Data Center hyperscale | \ud83d\udccd El Paso, Texas USA | \u26a1 1000.0 MW | $1.5B | construction | Oct 2025 | [\u2197 Source](https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/) |"
   ],
   "locality_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta El Paso Data Center hyperscale | \ud83d\udccd El Paso, Texas USA | \u26a1 1000.0 MW | $1.5B | construction | Oct 2025 | [\u2197 Source](https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/) |"
   ],
   "state_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta El Paso Data Center hyperscale | \ud83d\udccd El Paso, Texas USA | \u26a1 1000.0 MW | $1.5B | construction | Oct 2025 | [\u2197 Source](https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/) |"
   ],
   "capacity_gw_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta El Paso Data Center hyperscale | \ud83d\udccd El Paso, Texas USA | \u26a1 1000.0 MW | $1.5B | construction | Oct 2025 | [\u2197 Source](https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/) |"
   ],
   "builder_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta El Paso Data Center hyperscale | \ud83d\udccd El Paso, Texas USA | \u26a1 1000.0 MW | $1.5B | construction | Oct 2025 | [\u2197 Source](https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/) |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta El Paso Data Center hyperscale | \ud83d\udccd El Paso, Texas USA | \u26a1 1000.0 MW | $1.5B | construction | Oct 2025 | [\u2197 Source](https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/) |"
   ],
   "announcement_date_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta El Paso Data Center hyperscale | \ud83d\udccd El Paso, Texas USA | \u26a1 1000.0 MW | $1.5B | construction | Oct 2025 | [\u2197 Source](https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/) |"
   ]
  },
  {
   "url": "https://mlq.ai/build-tracker",
   "title": "MLQ.ai \u2014 Frontier tech research, news & data",
   "published_at": null,
   "project": "Meta Prometheus 1GW Data Center Expansion",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "",
   "status": "Under Construction",
   "announcement_date": "2025-10-01",
   "project_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta Prometheus 1GW Data Center Expansion | \ud83d\udccd New Albany, Ohio USA | \u26a1 1000.0 MW | $473M | Under Construction | Oct 2025 | [\u2197 Source](https://spectrumnews1.com/oh/cleveland/news/2025/11/13/meta-gigawatt-data-center-new-albany-) |"
   ],
   "locality_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta Prometheus 1GW Data Center Expansion | \ud83d\udccd New Albany, Ohio USA | \u26a1 1000.0 MW | $473M | Under Construction | Oct 2025 | [\u2197 Source](https://spectrumnews1.com/oh/cleveland/news/2025/11/13/meta-gigawatt-data-center-new-albany-) |"
   ],
   "state_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta Prometheus 1GW Data Center Expansion | \ud83d\udccd New Albany, Ohio USA | \u26a1 1000.0 MW | $473M | Under Construction | Oct 2025 | [\u2197 Source](https://spectrumnews1.com/oh/cleveland/news/2025/11/13/meta-gigawatt-data-center-new-albany-) |"
   ],
   "capacity_gw_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta Prometheus 1GW Data Center Expansion | \ud83d\udccd New Albany, Ohio USA | \u26a1 1000.0 MW | $473M | Under Construction | Oct 2025 | [\u2197 Source](https://spectrumnews1.com/oh/cleveland/news/2025/11/13/meta-gigawatt-data-center-new-albany-) |"
   ],
   "builder_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta Prometheus 1GW Data Center Expansion | \ud83d\udccd New Albany, Ohio USA | \u26a1 1000.0 MW | $473M | Under Construction | Oct 2025 | [\u2197 Source](https://spectrumnews1.com/oh/cleveland/news/2025/11/13/meta-gigawatt-data-center-new-albany-) |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta Prometheus 1GW Data Center Expansion | \ud83d\udccd New Albany, Ohio USA | \u26a1 1000.0 MW | $473M | Under Construction | Oct 2025 | [\u2197 Source](https://spectrumnews1.com/oh/cleveland/news/2025/11/13/meta-gigawatt-data-center-new-albany-) |"
   ],
   "announcement_date_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Meta | Meta Prometheus 1GW Data Center Expansion | \ud83d\udccd New Albany, Ohio USA | \u26a1 1000.0 MW | $473M | Under Construction | Oct 2025 | [\u2197 Source](https://spectrumnews1.com/oh/cleveland/news/2025/11/13/meta-gigawatt-data-center-new-albany-) |"
   ]
  },
  {
   "url": "https://mlq.ai/build-tracker",
   "title": "MLQ.ai \u2014 Frontier tech research, news & data",
   "published_at": null,
   "project": "Tract Caldwell County Park",
   "locality": "Caldwell County",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Tract",
   "ai_customer": "",
   "status": "planning",
   "announcement_date": "2025-05-01",
   "project_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Tract | Tract Caldwell County Park colocation | \ud83d\udccd Caldwell County, Texas USA | \u26a1 2000.0 MW | - | planning | May 2025 | [\u2197 Source](https://www.blackridgeresearch.com/blog/largest-biggest-upcoming-new-data-centers-in-texas-united-states) |"
   ],
   "locality_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Tract | Tract Caldwell County Park colocation | \ud83d\udccd Caldwell County, Texas USA | \u26a1 2000.0 MW | - | planning | May 2025 | [\u2197 Source](https://www.blackridgeresearch.com/blog/largest-biggest-upcoming-new-data-centers-in-texas-united-states) |"
   ],
   "state_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Tract | Tract Caldwell County Park colocation | \ud83d\udccd Caldwell County, Texas USA | \u26a1 2000.0 MW | - | planning | May 2025 | [\u2197 Source](https://www.blackridgeresearch.com/blog/largest-biggest-upcoming-new-data-centers-in-texas-united-states) |"
   ],
   "capacity_gw_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Tract | Tract Caldwell County Park colocation | \ud83d\udccd Caldwell County, Texas USA | \u26a1 2000.0 MW | - | planning | May 2025 | [\u2197 Source](https://www.blackridgeresearch.com/blog/largest-biggest-upcoming-new-data-centers-in-texas-united-states) |"
   ],
   "builder_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Tract | Tract Caldwell County Park colocation | \ud83d\udccd Caldwell County, Texas USA | \u26a1 2000.0 MW | - | planning | May 2025 | [\u2197 Source](https://www.blackridgeresearch.com/blog/largest-biggest-upcoming-new-data-centers-in-texas-united-states) |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Tract | Tract Caldwell County Park colocation | \ud83d\udccd Caldwell County, Texas USA | \u26a1 2000.0 MW | - | planning | May 2025 | [\u2197 Source](https://www.blackridgeresearch.com/blog/largest-biggest-upcoming-new-data-centers-in-texas-united-states) |"
   ],
   "announcement_date_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Tract | Tract Caldwell County Park colocation | \ud83d\udccd Caldwell County, Texas USA | \u26a1 2000.0 MW | - | planning | May 2025 | [\u2197 Source](https://www.blackridgeresearch.com/blog/largest-biggest-upcoming-new-data-centers-in-texas-united-states) |"
   ]
  },
  {
   "url": "https://mlq.ai/build-tracker",
   "title": "MLQ.ai \u2014 Frontier tech research, news & data",
   "published_at": null,
   "project": "Project Bunkhouse New Build",
   "locality": "Bartow County",
   "state": "Georgia",
   "capacity_gw": 1.83,
   "builder": "Unknown",
   "ai_customer": "",
   "status": "Under Construction",
   "announcement_date": "2025-03-01",
   "project_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Unknown | Project Bunkhouse New Build | \ud83d\udccd Bartow County, Georgia USA | \u26a1 1830.0 MW | $19.0B | Under Construction | Mar 2025 | [\u2197 Source](https://www.datacenterknowledge.com/data-center-construction/new-data-center-developments-december-2025) |"
   ],
   "locality_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Unknown | Project Bunkhouse New Build | \ud83d\udccd Bartow County, Georgia USA | \u26a1 1830.0 MW | $19.0B | Under Construction | Mar 2025 | [\u2197 Source](https://www.datacenterknowledge.com/data-center-construction/new-data-center-developments-december-2025) |"
   ],
   "state_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Unknown | Project Bunkhouse New Build | \ud83d\udccd Bartow County, Georgia USA | \u26a1 1830.0 MW | $19.0B | Under Construction | Mar 2025 | [\u2197 Source](https://www.datacenterknowledge.com/data-center-construction/new-data-center-developments-december-2025) |"
   ],
   "capacity_gw_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Unknown | Project Bunkhouse New Build | \ud83d\udccd Bartow County, Georgia USA | \u26a1 1830.0 MW | $19.0B | Under Construction | Mar 2025 | [\u2197 Source](https://www.datacenterknowledge.com/data-center-construction/new-data-center-developments-december-2025) |"
   ],
   "builder_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Unknown | Project Bunkhouse New Build | \ud83d\udccd Bartow County, Georgia USA | \u26a1 1830.0 MW | $19.0B | Under Construction | Mar 2025 | [\u2197 Source](https://www.datacenterknowledge.com/data-center-construction/new-data-center-developments-december-2025) |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Unknown | Project Bunkhouse New Build | \ud83d\udccd Bartow County, Georgia USA | \u26a1 1830.0 MW | $19.0B | Under Construction | Mar 2025 | [\u2197 Source](https://www.datacenterknowledge.com/data-center-construction/new-data-center-developments-december-2025) |"
   ],
   "announcement_date_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Unknown | Project Bunkhouse New Build | \ud83d\udccd Bartow County, Georgia USA | \u26a1 1830.0 MW | $19.0B | Under Construction | Mar 2025 | [\u2197 Source](https://www.datacenterknowledge.com/data-center-construction/new-data-center-developments-december-2025) |"
   ]
  },
  {
   "url": "https://mlq.ai/build-tracker",
   "title": "MLQ.ai \u2014 Frontier tech research, news & data",
   "published_at": null,
   "project": "Data City Texas",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corp",
   "ai_customer": "",
   "status": "announced",
   "announcement_date": "2025-03-01",
   "project_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Energy Abundance Development Corp | Data City Texas ai-focused | \ud83d\udccd Laredo, Texas USA | \u26a1 5000.0 MW | - | announced | Mar 2025 | [\u2197 Source](https://fuelcellsworks.com/2025/03/24/green-technology/energy-abundance-unveils-data-city-texas-world-s-largest-24-7-green-powered-data-center-hub-with-future-hydrogen-integration) |"
   ],
   "locality_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Energy Abundance Development Corp | Data City Texas ai-focused | \ud83d\udccd Laredo, Texas USA | \u26a1 5000.0 MW | - | announced | Mar 2025 | [\u2197 Source](https://fuelcellsworks.com/2025/03/24/green-technology/energy-abundance-unveils-data-city-texas-world-s-largest-24-7-green-powered-data-center-hub-with-future-hydrogen-integration) |"
   ],
   "state_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Energy Abundance Development Corp | Data City Texas ai-focused | \ud83d\udccd Laredo, Texas USA | \u26a1 5000.0 MW | - | announced | Mar 2025 | [\u2197 Source](https://fuelcellsworks.com/2025/03/24/green-technology/energy-abundance-unveils-data-city-texas-world-s-largest-24-7-green-powered-data-center-hub-with-future-hydrogen-integration) |"
   ],
   "capacity_gw_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Energy Abundance Development Corp | Data City Texas ai-focused | \ud83d\udccd Laredo, Texas USA | \u26a1 5000.0 MW | - | announced | Mar 2025 | [\u2197 Source](https://fuelcellsworks.com/2025/03/24/green-technology/energy-abundance-unveils-data-city-texas-world-s-largest-24-7-green-powered-data-center-hub-with-future-hydrogen-integration) |"
   ],
   "builder_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Energy Abundance Development Corp | Data City Texas ai-focused | \ud83d\udccd Laredo, Texas USA | \u26a1 5000.0 MW | - | announced | Mar 2025 | [\u2197 Source](https://fuelcellsworks.com/2025/03/24/green-technology/energy-abundance-unveils-data-city-texas-world-s-largest-24-7-green-powered-data-center-hub-with-future-hydrogen-integration) |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Energy Abundance Development Corp | Data City Texas ai-focused | \ud83d\udccd Laredo, Texas USA | \u26a1 5000.0 MW | - | announced | Mar 2025 | [\u2197 Source](https://fuelcellsworks.com/2025/03/24/green-technology/energy-abundance-unveils-data-city-texas-world-s-largest-24-7-green-powered-data-center-hub-with-future-hydrogen-integration) |"
   ],
   "announcement_date_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| Energy Abundance Development Corp | Data City Texas ai-focused | \ud83d\udccd Laredo, Texas USA | \u26a1 5000.0 MW | - | announced | Mar 2025 | [\u2197 Source](https://fuelcellsworks.com/2025/03/24/green-technology/energy-abundance-unveils-data-city-texas-world-s-largest-24-7-green-powered-data-center-hub-with-future-hydrogen-integration) |"
   ]
  },
  {
   "url": "https://mlq.ai/build-tracker",
   "title": "MLQ.ai \u2014 Frontier tech research, news & data",
   "published_at": null,
   "project": "OpenAI Stargate I",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "OpenAI/Oracle/SoftBank",
   "ai_customer": "",
   "status": "construction",
   "announcement_date": "2025-01-01",
   "project_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| OpenAI/Oracle/SoftBank | OpenAI Stargate I ai-focused | \ud83d\udccd Abilene, Texas USA | \u26a1 5000.0 MW | $100.0B | construction | Jan 2025 | [\u2197 Source](https://openai.com/index/announcing-the-stargate-project/) |"
   ],
   "locality_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| OpenAI/Oracle/SoftBank | OpenAI Stargate I ai-focused | \ud83d\udccd Abilene, Texas USA | \u26a1 5000.0 MW | $100.0B | construction | Jan 2025 | [\u2197 Source](https://openai.com/index/announcing-the-stargate-project/) |"
   ],
   "state_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| OpenAI/Oracle/SoftBank | OpenAI Stargate I ai-focused | \ud83d\udccd Abilene, Texas USA | \u26a1 5000.0 MW | $100.0B | construction | Jan 2025 | [\u2197 Source](https://openai.com/index/announcing-the-stargate-project/) |"
   ],
   "capacity_gw_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| OpenAI/Oracle/SoftBank | OpenAI Stargate I ai-focused | \ud83d\udccd Abilene, Texas USA | \u26a1 5000.0 MW | $100.0B | construction | Jan 2025 | [\u2197 Source](https://openai.com/index/announcing-the-stargate-project/) |"
   ],
   "builder_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| OpenAI/Oracle/SoftBank | OpenAI Stargate I ai-focused | \ud83d\udccd Abilene, Texas USA | \u26a1 5000.0 MW | $100.0B | construction | Jan 2025 | [\u2197 Source](https://openai.com/index/announcing-the-stargate-project/) |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| OpenAI/Oracle/SoftBank | OpenAI Stargate I ai-focused | \ud83d\udccd Abilene, Texas USA | \u26a1 5000.0 MW | $100.0B | construction | Jan 2025 | [\u2197 Source](https://openai.com/index/announcing-the-stargate-project/) |"
   ],
   "announcement_date_evidence": [
    "| Operator | Project | Location | Capacity | Investment | Status | Announced | Source |",
    "| OpenAI/Oracle/SoftBank | OpenAI Stargate I ai-focused | \ud83d\udccd Abilene, Texas USA | \u26a1 5000.0 MW | $100.0B | construction | Jan 2025 | [\u2197 Source](https://openai.com/index/announcing-the-stargate-project/) |"
   ]
  },
  {
   "url": "https://nnewstech.blogspot.com/2026/08/nvidia-openai-and-sb-energy-partner-on.html",
   "title": "NVIDIA OpenAI and SB Energy Partner on 10GW Ohio Data Center Campus.",
   "published_at": "2026-08-18T19:44:00",
   "project": "PORTS-Pike Technology Campus",
   "locality": null,
   "state": "Ohio",
   "capacity_gw": 10.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "AI Text-to-Speech.",
    "### NVIDIA OpenAI and SB Energy Partner on 10GW Ohio Data Center Campus.",
    "**NVIDIA** and **[OpenAI](https://nnewstech.blogspot.com/2026/08/nvidia-openai-and-sb-energy-partner-on.html)** have expanded their infrastructure partnership by joining forces with **SB Energy** to construct a massive AI data center hub at the PORTS-Pike Technology Campus in Ohio, United States."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "AI Text-to-Speech.",
    "### NVIDIA OpenAI and SB Energy Partner on 10GW Ohio Data Center Campus.",
    "**NVIDIA** and **[OpenAI](https://nnewstech.blogspot.com/2026/08/nvidia-openai-and-sb-energy-partner-on.html)** have expanded their infrastructure partnership by joining forces with **SB Energy** to construct a massive AI data center hub at the PORTS-Pike Technology Campus in Ohio, United States."
   ],
   "capacity_gw_evidence": [
    "AI Text-to-Speech.",
    "### NVIDIA OpenAI and SB Energy Partner on 10GW Ohio Data Center Campus.",
    "Including cooling and operational overhead, total campus power demand will reach approximately **10 Gigawatts**."
   ],
   "builder_evidence": [
    "AI Text-to-Speech.",
    "### NVIDIA OpenAI and SB Energy Partner on 10GW Ohio Data Center Campus.",
    "**NVIDIA** and **[OpenAI](https://nnewstech.blogspot.com/2026/08/nvidia-openai-and-sb-energy-partner-on.html)** have expanded their infrastructure partnership by joining forces with **SB Energy** to construct a massive AI data center hub at the PORTS-Pike Technology Campus in Ohio, United States."
   ],
   "ai_customer_evidence": [
    "AI Text-to-Speech.",
    "### NVIDIA OpenAI and SB Energy Partner on 10GW Ohio Data Center Campus.",
    "Under the tripartite agreement, the facility will be fully equipped with NVIDIA\u2019s DSX AI architecture, with OpenAI serving as the primary anchor tenant under a **20-year long-term lease**, while SB Energy handles construction and facility operations."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://realtywire.com/nvidia-openai-softbank-ohio-data-center-campus",
   "title": "NVIDIA, OpenAI Finalize Ohio AI Data Center Deal",
   "published_at": "2026-08-19T13:37:29",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "Formal agreement finalized",
   "announcement_date": null,
   "project_evidence": [
    "Update: NVIDIA, OpenAI, SoftBank Finalize $4.2 Billion Buildout of Ohio AI Data Center Campus",
    "The campus, known as the PORTS-Pike Technology Campus, sits on the grounds of the decommissioned Portsmouth Gaseous Diffusion Plant, a former Cold War-era uranium enrichment facility in Pike County in southern Ohio."
   ],
   "locality_evidence": [
    "Update: NVIDIA, OpenAI, SoftBank Finalize $4.2 Billion Buildout of Ohio AI Data Center Campus",
    "NVIDIA, OpenAI and SoftBank have moved from exploratory talks to a formal agreement on an 8-gigawatt AI data center campus in Pike County, Ohio, with NVIDIA committing $1.5 billion directly to the project's developer and backstopping $4.2 billion in new regional grid infrastructure."
   ],
   "state_evidence": [
    "Update: NVIDIA, OpenAI, SoftBank Finalize $4.2 Billion Buildout of Ohio AI Data Center Campus",
    "NVIDIA, OpenAI and SoftBank have moved from exploratory talks to a formal agreement on an 8-gigawatt AI data center campus in Pike County, Ohio, with NVIDIA committing $1.5 billion directly to the project's developer and backstopping $4.2 billion in new regional grid infrastructure."
   ],
   "capacity_gw_evidence": [
    "Update: NVIDIA, OpenAI, SoftBank Finalize $4.2 Billion Buildout of Ohio AI Data Center Campus",
    "NVIDIA, OpenAI and SoftBank have moved from exploratory talks to a formal agreement on an 8-gigawatt AI data center campus in Pike County, Ohio, with NVIDIA committing $1.5 billion directly to the project's developer and backstopping $4.2 billion in new regional grid infrastructure."
   ],
   "builder_evidence": [
    "Update: NVIDIA, OpenAI, SoftBank Finalize $4.2 Billion Buildout of Ohio AI Data Center Campus",
    "NVIDIA is directly capitalizing SB Energy, the SoftBank subsidiary building and operating the campus, and committing to exclusively supply its AI computing hardware there."
   ],
   "ai_customer_evidence": [
    "Update: NVIDIA, OpenAI, SoftBank Finalize $4.2 Billion Buildout of Ohio AI Data Center Campus",
    "OpenAI CEO Sam Altman, whose company will be the exclusive customer for compute at the site, said Pike County would sit \u201cat the heart of American industry,\u201d pointing to the companies\u2019 commitments to local hiring and community investment as the project moves forward."
   ],
   "status_evidence": [
    "Update: NVIDIA, OpenAI, SoftBank Finalize $4.2 Billion Buildout of Ohio AI Data Center Campus",
    "NVIDIA, OpenAI and SoftBank have moved from exploratory talks to a formal agreement on an 8-gigawatt AI data center campus in Pike County, Ohio, with NVIDIA committing $1.5 billion directly to the project's developer and backstopping $4.2 billion in new regional grid infrastructure."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "Meta Hyperion AI Data Center (Louisiana)",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "",
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 3 | [Meta Hyperion AI Data Center (Louisiana)](/datacenters/meta-hyperion-ai-data-center-louisiana.html) | [Meta](/operators/meta/) | Richland Parish, Louisiana, United States | Under Construction | **5 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 3 | [Meta Hyperion AI Data Center (Louisiana)](/datacenters/meta-hyperion-ai-data-center-louisiana.html) | [Meta](/operators/meta/) | Richland Parish, Louisiana, United States | Under Construction | **5 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 3 | [Meta Hyperion AI Data Center (Louisiana)](/datacenters/meta-hyperion-ai-data-center-louisiana.html) | [Meta](/operators/meta/) | Richland Parish, Louisiana, United States | Under Construction | **5 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 3 | [Meta Hyperion AI Data Center (Louisiana)](/datacenters/meta-hyperion-ai-data-center-louisiana.html) | [Meta](/operators/meta/) | Richland Parish, Louisiana, United States | Under Construction | **5 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 3 | [Meta Hyperion AI Data Center (Louisiana)](/datacenters/meta-hyperion-ai-data-center-louisiana.html) | [Meta](/operators/meta/) | Richland Parish, Louisiana, United States | Under Construction | **5 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 3 | [Meta Hyperion AI Data Center (Louisiana)](/datacenters/meta-hyperion-ai-data-center-louisiana.html) | [Meta](/operators/meta/) | Richland Parish, Louisiana, United States | Under Construction | **5 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "Stargate AI Supercomputer",
   "locality": "Global / United States",
   "state": "United States",
   "capacity_gw": 5.0,
   "builder": "Microsoft",
   "ai_customer": "",
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 5 | [Stargate AI Supercomputer](/datacenters/stargate-ai-supercomputer.html) | [Microsoft](/operators/microsoft/) | Global / United States, United States | Under Construction | **5 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 5 | [Stargate AI Supercomputer](/datacenters/stargate-ai-supercomputer.html) | [Microsoft](/operators/microsoft/) | Global / United States, United States | Under Construction | **5 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 5 | [Stargate AI Supercomputer](/datacenters/stargate-ai-supercomputer.html) | [Microsoft](/operators/microsoft/) | Global / United States, United States | Under Construction | **5 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 5 | [Stargate AI Supercomputer](/datacenters/stargate-ai-supercomputer.html) | [Microsoft](/operators/microsoft/) | Global / United States, United States | Under Construction | **5 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 5 | [Stargate AI Supercomputer](/datacenters/stargate-ai-supercomputer.html) | [Microsoft](/operators/microsoft/) | Global / United States, United States | Under Construction | **5 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 5 | [Stargate AI Supercomputer](/datacenters/stargate-ai-supercomputer.html) | [Microsoft](/operators/microsoft/) | Global / United States, United States | Under Construction | **5 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "Microsoft Project Fairwater (Mount Pleasant, Wisconsin)",
   "locality": "Mount Pleasant",
   "state": "Wisconsin",
   "capacity_gw": 3.3,
   "builder": "Microsoft",
   "ai_customer": "",
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 8 | [Microsoft Project Fairwater (Mount Pleasant, Wisconsin)](/datacenters/microsoft-project-fairwater-wisconsin.html) | [Microsoft](/operators/microsoft/) | Mount Pleasant, Wisconsin, United States | Under Construction | **3.3 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 8 | [Microsoft Project Fairwater (Mount Pleasant, Wisconsin)](/datacenters/microsoft-project-fairwater-wisconsin.html) | [Microsoft](/operators/microsoft/) | Mount Pleasant, Wisconsin, United States | Under Construction | **3.3 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 8 | [Microsoft Project Fairwater (Mount Pleasant, Wisconsin)](/datacenters/microsoft-project-fairwater-wisconsin.html) | [Microsoft](/operators/microsoft/) | Mount Pleasant, Wisconsin, United States | Under Construction | **3.3 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 8 | [Microsoft Project Fairwater (Mount Pleasant, Wisconsin)](/datacenters/microsoft-project-fairwater-wisconsin.html) | [Microsoft](/operators/microsoft/) | Mount Pleasant, Wisconsin, United States | Under Construction | **3.3 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 8 | [Microsoft Project Fairwater (Mount Pleasant, Wisconsin)](/datacenters/microsoft-project-fairwater-wisconsin.html) | [Microsoft](/operators/microsoft/) | Mount Pleasant, Wisconsin, United States | Under Construction | **3.3 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 8 | [Microsoft Project Fairwater (Mount Pleasant, Wisconsin)](/datacenters/microsoft-project-fairwater-wisconsin.html) | [Microsoft](/operators/microsoft/) | Mount Pleasant, Wisconsin, United States | Under Construction | **3.3 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "Google Nebraska Mega-Campus (Project Tenaska)",
   "locality": "Lincoln/Omaha Region",
   "state": "Nebraska",
   "capacity_gw": 2.7,
   "builder": "Google",
   "ai_customer": "",
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 10 | [Google Nebraska Mega-Campus (Project Tenaska)](/datacenters/google-nebraska-mega-campus-private-gas-power.html) | [Google](/operators/google/) | Lincoln/Omaha Region, Nebraska, United States | Planned | **2.7 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 10 | [Google Nebraska Mega-Campus (Project Tenaska)](/datacenters/google-nebraska-mega-campus-private-gas-power.html) | [Google](/operators/google/) | Lincoln/Omaha Region, Nebraska, United States | Planned | **2.7 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 10 | [Google Nebraska Mega-Campus (Project Tenaska)](/datacenters/google-nebraska-mega-campus-private-gas-power.html) | [Google](/operators/google/) | Lincoln/Omaha Region, Nebraska, United States | Planned | **2.7 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 10 | [Google Nebraska Mega-Campus (Project Tenaska)](/datacenters/google-nebraska-mega-campus-private-gas-power.html) | [Google](/operators/google/) | Lincoln/Omaha Region, Nebraska, United States | Planned | **2.7 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 10 | [Google Nebraska Mega-Campus (Project Tenaska)](/datacenters/google-nebraska-mega-campus-private-gas-power.html) | [Google](/operators/google/) | Lincoln/Omaha Region, Nebraska, United States | Planned | **2.7 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 10 | [Google Nebraska Mega-Campus (Project Tenaska)](/datacenters/google-nebraska-mega-campus-private-gas-power.html) | [Google](/operators/google/) | Lincoln/Omaha Region, Nebraska, United States | Planned | **2.7 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "AWS Project Rainier (New Carlisle, Indiana)",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.4,
   "builder": "Amazon Web Services",
   "ai_customer": "",
   "status": "Operational",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 11 | [AWS Project Rainier (New Carlisle, Indiana)](/datacenters/aws-project-rainier-ai-campus-indiana.html) | [Amazon Web Services](/operators/amazon-web-services/) | New Carlisle, Indiana, United States | Operational | **2.4 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 11 | [AWS Project Rainier (New Carlisle, Indiana)](/datacenters/aws-project-rainier-ai-campus-indiana.html) | [Amazon Web Services](/operators/amazon-web-services/) | New Carlisle, Indiana, United States | Operational | **2.4 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 11 | [AWS Project Rainier (New Carlisle, Indiana)](/datacenters/aws-project-rainier-ai-campus-indiana.html) | [Amazon Web Services](/operators/amazon-web-services/) | New Carlisle, Indiana, United States | Operational | **2.4 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 11 | [AWS Project Rainier (New Carlisle, Indiana)](/datacenters/aws-project-rainier-ai-campus-indiana.html) | [Amazon Web Services](/operators/amazon-web-services/) | New Carlisle, Indiana, United States | Operational | **2.4 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 11 | [AWS Project Rainier (New Carlisle, Indiana)](/datacenters/aws-project-rainier-ai-campus-indiana.html) | [Amazon Web Services](/operators/amazon-web-services/) | New Carlisle, Indiana, United States | Operational | **2.4 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 11 | [AWS Project Rainier (New Carlisle, Indiana)](/datacenters/aws-project-rainier-ai-campus-indiana.html) | [Amazon Web Services](/operators/amazon-web-services/) | New Carlisle, Indiana, United States | Operational | **2.4 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "Diablo Canyon AI Integration Project",
   "locality": "Western United States",
   "state": "United States",
   "capacity_gw": 2.3,
   "builder": "Pacific Gas and Electric Company (PG&E)",
   "ai_customer": "",
   "status": "Operational",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 12 | [Diablo Canyon AI Integration Project](/datacenters/diablo-canyon-ai-integration-project.html) | [Pacific Gas and Electric Company (PG&E)](/operators/pacific-gas-and-electric-company-pg-and-e/) | Western United States, United States | Operational | **2.3 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 12 | [Diablo Canyon AI Integration Project](/datacenters/diablo-canyon-ai-integration-project.html) | [Pacific Gas and Electric Company (PG&E)](/operators/pacific-gas-and-electric-company-pg-and-e/) | Western United States, United States | Operational | **2.3 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 12 | [Diablo Canyon AI Integration Project](/datacenters/diablo-canyon-ai-integration-project.html) | [Pacific Gas and Electric Company (PG&E)](/operators/pacific-gas-and-electric-company-pg-and-e/) | Western United States, United States | Operational | **2.3 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 12 | [Diablo Canyon AI Integration Project](/datacenters/diablo-canyon-ai-integration-project.html) | [Pacific Gas and Electric Company (PG&E)](/operators/pacific-gas-and-electric-company-pg-and-e/) | Western United States, United States | Operational | **2.3 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 12 | [Diablo Canyon AI Integration Project](/datacenters/diablo-canyon-ai-integration-project.html) | [Pacific Gas and Electric Company (PG&E)](/operators/pacific-gas-and-electric-company-pg-and-e/) | Western United States, United States | Operational | **2.3 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 12 | [Diablo Canyon AI Integration Project](/datacenters/diablo-canyon-ai-integration-project.html) | [Pacific Gas and Electric Company (PG&E)](/operators/pacific-gas-and-electric-company-pg-and-e/) | Western United States, United States | Operational | **2.3 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)",
   "locality": "Ohio and Pennsylvania",
   "state": "United States",
   "capacity_gw": 2.1,
   "builder": "Meta",
   "ai_customer": "",
   "status": "Announced",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 13 | [Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)](/datacenters/meta-vistra-nuclear-uprate-agreement-oh-pa.html) | [Meta](/operators/meta/) | Ohio and Pennsylvania, United States | Announced | **2.1 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 13 | [Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)](/datacenters/meta-vistra-nuclear-uprate-agreement-oh-pa.html) | [Meta](/operators/meta/) | Ohio and Pennsylvania, United States | Announced | **2.1 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 13 | [Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)](/datacenters/meta-vistra-nuclear-uprate-agreement-oh-pa.html) | [Meta](/operators/meta/) | Ohio and Pennsylvania, United States | Announced | **2.1 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 13 | [Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)](/datacenters/meta-vistra-nuclear-uprate-agreement-oh-pa.html) | [Meta](/operators/meta/) | Ohio and Pennsylvania, United States | Announced | **2.1 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 13 | [Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)](/datacenters/meta-vistra-nuclear-uprate-agreement-oh-pa.html) | [Meta](/operators/meta/) | Ohio and Pennsylvania, United States | Announced | **2.1 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 13 | [Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)](/datacenters/meta-vistra-nuclear-uprate-agreement-oh-pa.html) | [Meta](/operators/meta/) | Ohio and Pennsylvania, United States | Announced | **2.1 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "Digital Realty \u2014 Project Bunkhouse",
   "locality": "Georgia",
   "state": "United States",
   "capacity_gw": 1.8,
   "builder": "Digital Realty",
   "ai_customer": "",
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 14 | [Digital Realty \u2014 Project Bunkhouse](/datacenters/digital-realty-project-bunkhouse-georgia.html) | [Digital Realty](/operators/digital-realty/) | Georgia, United States | Planned | **1.8 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 14 | [Digital Realty \u2014 Project Bunkhouse](/datacenters/digital-realty-project-bunkhouse-georgia.html) | [Digital Realty](/operators/digital-realty/) | Georgia, United States | Planned | **1.8 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 14 | [Digital Realty \u2014 Project Bunkhouse](/datacenters/digital-realty-project-bunkhouse-georgia.html) | [Digital Realty](/operators/digital-realty/) | Georgia, United States | Planned | **1.8 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 14 | [Digital Realty \u2014 Project Bunkhouse](/datacenters/digital-realty-project-bunkhouse-georgia.html) | [Digital Realty](/operators/digital-realty/) | Georgia, United States | Planned | **1.8 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 14 | [Digital Realty \u2014 Project Bunkhouse](/datacenters/digital-realty-project-bunkhouse-georgia.html) | [Digital Realty](/operators/digital-realty/) | Georgia, United States | Planned | **1.8 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 14 | [Digital Realty \u2014 Project Bunkhouse](/datacenters/digital-realty-project-bunkhouse-georgia.html) | [Digital Realty](/operators/digital-realty/) | Georgia, United States | Planned | **1.8 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "AWS AI Innovation Campuses (Salem and Falls Townships, PA)",
   "locality": "Salem and Falls Townships",
   "state": "Pennsylvania",
   "capacity_gw": 1.8,
   "builder": "Amazon Web Services",
   "ai_customer": "",
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 15 | [AWS AI Innovation Campuses (Salem and Falls Townships, PA)](/datacenters/aws-ai-innovation-campuses-pennsylvania.html) | [Amazon Web Services](/operators/amazon-web-services/) | Salem and Falls Townships, Pennsylvania, United States | Under Construction | **1.8 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 15 | [AWS AI Innovation Campuses (Salem and Falls Townships, PA)](/datacenters/aws-ai-innovation-campuses-pennsylvania.html) | [Amazon Web Services](/operators/amazon-web-services/) | Salem and Falls Townships, Pennsylvania, United States | Under Construction | **1.8 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 15 | [AWS AI Innovation Campuses (Salem and Falls Townships, PA)](/datacenters/aws-ai-innovation-campuses-pennsylvania.html) | [Amazon Web Services](/operators/amazon-web-services/) | Salem and Falls Townships, Pennsylvania, United States | Under Construction | **1.8 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 15 | [AWS AI Innovation Campuses (Salem and Falls Townships, PA)](/datacenters/aws-ai-innovation-campuses-pennsylvania.html) | [Amazon Web Services](/operators/amazon-web-services/) | Salem and Falls Townships, Pennsylvania, United States | Under Construction | **1.8 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 15 | [AWS AI Innovation Campuses (Salem and Falls Townships, PA)](/datacenters/aws-ai-innovation-campuses-pennsylvania.html) | [Amazon Web Services](/operators/amazon-web-services/) | Salem and Falls Townships, Pennsylvania, United States | Under Construction | **1.8 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 15 | [AWS AI Innovation Campuses (Salem and Falls Townships, PA)](/datacenters/aws-ai-innovation-campuses-pennsylvania.html) | [Amazon Web Services](/operators/amazon-web-services/) | Salem and Falls Townships, Pennsylvania, United States | Under Construction | **1.8 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "Amazon Web Services \u2014 Northern Virginia Hyperscale Campus",
   "locality": "Northern Virginia",
   "state": "United States",
   "capacity_gw": 1.5,
   "builder": "Amazon Web Services",
   "ai_customer": "",
   "status": "Operational",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 16 | [Amazon Web Services \u2014 Northern Virginia Hyperscale Campus](/datacenters/amazon-ec2-virginia-hyperscale-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | Northern Virginia, United States | Operational | **1.5 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 16 | [Amazon Web Services \u2014 Northern Virginia Hyperscale Campus](/datacenters/amazon-ec2-virginia-hyperscale-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | Northern Virginia, United States | Operational | **1.5 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 16 | [Amazon Web Services \u2014 Northern Virginia Hyperscale Campus](/datacenters/amazon-ec2-virginia-hyperscale-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | Northern Virginia, United States | Operational | **1.5 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 16 | [Amazon Web Services \u2014 Northern Virginia Hyperscale Campus](/datacenters/amazon-ec2-virginia-hyperscale-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | Northern Virginia, United States | Operational | **1.5 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 16 | [Amazon Web Services \u2014 Northern Virginia Hyperscale Campus](/datacenters/amazon-ec2-virginia-hyperscale-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | Northern Virginia, United States | Operational | **1.5 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 16 | [Amazon Web Services \u2014 Northern Virginia Hyperscale Campus](/datacenters/amazon-ec2-virginia-hyperscale-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | Northern Virginia, United States | Operational | **1.5 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "ExxonMobil's 1.5GW Data Center Power Plant Initiative",
   "locality": "Southern United States",
   "state": "United States",
   "capacity_gw": 1.5,
   "builder": "ExxonMobil",
   "ai_customer": "",
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 18 | [ExxonMobil's 1.5GW Data Center Power Plant Initiative](/datacenters/exxonmobil-1-5gw-data-center-power-plant-initiative.html) | [ExxonMobil](/operators/exxonmobil/) | Southern United States, United States | Planned | **1.5 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 18 | [ExxonMobil's 1.5GW Data Center Power Plant Initiative](/datacenters/exxonmobil-1-5gw-data-center-power-plant-initiative.html) | [ExxonMobil](/operators/exxonmobil/) | Southern United States, United States | Planned | **1.5 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 18 | [ExxonMobil's 1.5GW Data Center Power Plant Initiative](/datacenters/exxonmobil-1-5gw-data-center-power-plant-initiative.html) | [ExxonMobil](/operators/exxonmobil/) | Southern United States, United States | Planned | **1.5 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 18 | [ExxonMobil's 1.5GW Data Center Power Plant Initiative](/datacenters/exxonmobil-1-5gw-data-center-power-plant-initiative.html) | [ExxonMobil](/operators/exxonmobil/) | Southern United States, United States | Planned | **1.5 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 18 | [ExxonMobil's 1.5GW Data Center Power Plant Initiative](/datacenters/exxonmobil-1-5gw-data-center-power-plant-initiative.html) | [ExxonMobil](/operators/exxonmobil/) | Southern United States, United States | Planned | **1.5 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 18 | [ExxonMobil's 1.5GW Data Center Power Plant Initiative](/datacenters/exxonmobil-1-5gw-data-center-power-plant-initiative.html) | [ExxonMobil](/operators/exxonmobil/) | Southern United States, United States | Planned | **1.5 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "Meta Project Prometheus (New Albany, Ohio)",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.5,
   "builder": "Meta",
   "ai_customer": "",
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 19 | [Meta Project Prometheus (New Albany, Ohio)](/datacenters/meta-project-prometheus-ohio-ai-campus.html) | [Meta](/operators/meta/) | New Albany, Ohio, United States | Under Construction | **1.5 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 19 | [Meta Project Prometheus (New Albany, Ohio)](/datacenters/meta-project-prometheus-ohio-ai-campus.html) | [Meta](/operators/meta/) | New Albany, Ohio, United States | Under Construction | **1.5 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 19 | [Meta Project Prometheus (New Albany, Ohio)](/datacenters/meta-project-prometheus-ohio-ai-campus.html) | [Meta](/operators/meta/) | New Albany, Ohio, United States | Under Construction | **1.5 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 19 | [Meta Project Prometheus (New Albany, Ohio)](/datacenters/meta-project-prometheus-ohio-ai-campus.html) | [Meta](/operators/meta/) | New Albany, Ohio, United States | Under Construction | **1.5 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 19 | [Meta Project Prometheus (New Albany, Ohio)](/datacenters/meta-project-prometheus-ohio-ai-campus.html) | [Meta](/operators/meta/) | New Albany, Ohio, United States | Under Construction | **1.5 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 19 | [Meta Project Prometheus (New Albany, Ohio)](/datacenters/meta-project-prometheus-ohio-ai-campus.html) | [Meta](/operators/meta/) | New Albany, Ohio, United States | Under Construction | **1.5 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "xAI Gigascale Data Center (Tennessee/Mississippi)",
   "locality": "Eastern Tennessee / Northern Mississippi",
   "state": "United States",
   "capacity_gw": 1.5,
   "builder": "xAI",
   "ai_customer": "",
   "status": "Operational",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 23 | [xAI Gigascale Data Center (Tennessee/Mississippi)](/datacenters/xai-gigascale-data-center-tennessee-mississippi.html) | [xAI](/operators/xai/) | Eastern Tennessee / Northern Mississippi, United States | Operational | **1.5 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 23 | [xAI Gigascale Data Center (Tennessee/Mississippi)](/datacenters/xai-gigascale-data-center-tennessee-mississippi.html) | [xAI](/operators/xai/) | Eastern Tennessee / Northern Mississippi, United States | Operational | **1.5 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 23 | [xAI Gigascale Data Center (Tennessee/Mississippi)](/datacenters/xai-gigascale-data-center-tennessee-mississippi.html) | [xAI](/operators/xai/) | Eastern Tennessee / Northern Mississippi, United States | Operational | **1.5 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 23 | [xAI Gigascale Data Center (Tennessee/Mississippi)](/datacenters/xai-gigascale-data-center-tennessee-mississippi.html) | [xAI](/operators/xai/) | Eastern Tennessee / Northern Mississippi, United States | Operational | **1.5 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 23 | [xAI Gigascale Data Center (Tennessee/Mississippi)](/datacenters/xai-gigascale-data-center-tennessee-mississippi.html) | [xAI](/operators/xai/) | Eastern Tennessee / Northern Mississippi, United States | Operational | **1.5 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 23 | [xAI Gigascale Data Center (Tennessee/Mississippi)](/datacenters/xai-gigascale-data-center-tennessee-mississippi.html) | [xAI](/operators/xai/) | Eastern Tennessee / Northern Mississippi, United States | Operational | **1.5 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "Vantage Data Centers Texas Mega-Campus (Shackelford County)",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": "",
   "status": "Announced",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 25 | [Vantage Data Centers Texas Mega-Campus (Shackelford County)](/datacenters/vantage-texas-mega-campus-shackelford.html) | [Vantage Data Centers](/operators/vantage-data-centers/) | Shackelford County, Texas, United States | Announced | **1.4 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 25 | [Vantage Data Centers Texas Mega-Campus (Shackelford County)](/datacenters/vantage-texas-mega-campus-shackelford.html) | [Vantage Data Centers](/operators/vantage-data-centers/) | Shackelford County, Texas, United States | Announced | **1.4 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 25 | [Vantage Data Centers Texas Mega-Campus (Shackelford County)](/datacenters/vantage-texas-mega-campus-shackelford.html) | [Vantage Data Centers](/operators/vantage-data-centers/) | Shackelford County, Texas, United States | Announced | **1.4 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 25 | [Vantage Data Centers Texas Mega-Campus (Shackelford County)](/datacenters/vantage-texas-mega-campus-shackelford.html) | [Vantage Data Centers](/operators/vantage-data-centers/) | Shackelford County, Texas, United States | Announced | **1.4 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 25 | [Vantage Data Centers Texas Mega-Campus (Shackelford County)](/datacenters/vantage-texas-mega-campus-shackelford.html) | [Vantage Data Centers](/operators/vantage-data-centers/) | Shackelford County, Texas, United States | Announced | **1.4 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 25 | [Vantage Data Centers Texas Mega-Campus (Shackelford County)](/datacenters/vantage-texas-mega-campus-shackelford.html) | [Vantage Data Centers](/operators/vantage-data-centers/) | Shackelford County, Texas, United States | Announced | **1.4 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)",
   "locality": "Madison County",
   "state": "United States",
   "capacity_gw": 1.3,
   "builder": "Amazon Web Services",
   "ai_customer": "",
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 26 | [AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)](/datacenters/aws-mississippi-ai-data-center.html) | [Amazon Web Services](/operators/amazon-web-services/) | Madison County, United States | Under Construction | **1.3 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 26 | [AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)](/datacenters/aws-mississippi-ai-data-center.html) | [Amazon Web Services](/operators/amazon-web-services/) | Madison County, United States | Under Construction | **1.3 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 26 | [AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)](/datacenters/aws-mississippi-ai-data-center.html) | [Amazon Web Services](/operators/amazon-web-services/) | Madison County, United States | Under Construction | **1.3 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 26 | [AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)](/datacenters/aws-mississippi-ai-data-center.html) | [Amazon Web Services](/operators/amazon-web-services/) | Madison County, United States | Under Construction | **1.3 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 26 | [AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)](/datacenters/aws-mississippi-ai-data-center.html) | [Amazon Web Services](/operators/amazon-web-services/) | Madison County, United States | Under Construction | **1.3 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 26 | [AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)](/datacenters/aws-mississippi-ai-data-center.html) | [Amazon Web Services](/operators/amazon-web-services/) | Madison County, United States | Under Construction | **1.3 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "AWS US Government AI Supercomputing Expansion",
   "locality": "Virginia / Oregon / Ohio",
   "state": "United States",
   "capacity_gw": 1.3,
   "builder": "Amazon Web Services",
   "ai_customer": "",
   "status": "Announced",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 27 | [AWS US Government AI Supercomputing Expansion](/datacenters/aws-us-government-ai-supercomputing-expansion.html) | [Amazon Web Services](/operators/amazon-web-services/) | Virginia / Oregon / Ohio, United States | Announced | **1.3 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 27 | [AWS US Government AI Supercomputing Expansion](/datacenters/aws-us-government-ai-supercomputing-expansion.html) | [Amazon Web Services](/operators/amazon-web-services/) | Virginia / Oregon / Ohio, United States | Announced | **1.3 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 27 | [AWS US Government AI Supercomputing Expansion](/datacenters/aws-us-government-ai-supercomputing-expansion.html) | [Amazon Web Services](/operators/amazon-web-services/) | Virginia / Oregon / Ohio, United States | Announced | **1.3 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 27 | [AWS US Government AI Supercomputing Expansion](/datacenters/aws-us-government-ai-supercomputing-expansion.html) | [Amazon Web Services](/operators/amazon-web-services/) | Virginia / Oregon / Ohio, United States | Announced | **1.3 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 27 | [AWS US Government AI Supercomputing Expansion](/datacenters/aws-us-government-ai-supercomputing-expansion.html) | [Amazon Web Services](/operators/amazon-web-services/) | Virginia / Oregon / Ohio, United States | Announced | **1.3 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 27 | [AWS US Government AI Supercomputing Expansion](/datacenters/aws-us-government-ai-supercomputing-expansion.html) | [Amazon Web Services](/operators/amazon-web-services/) | Virginia / Oregon / Ohio, United States | Announced | **1.3 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "Microsoft \u2014 Port Washington AI Campus (Stargate Phase 1)",
   "locality": "Wisconsin",
   "state": "United States",
   "capacity_gw": 1.3,
   "builder": "Microsoft",
   "ai_customer": "",
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 28 | [Microsoft \u2014 Port Washington AI Campus (Stargate Phase 1)](/datacenters/microsoft-port-washington-wisconsin-stargate.html) | [Microsoft](/operators/microsoft/) | Wisconsin, United States | Planned | **1.3 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 28 | [Microsoft \u2014 Port Washington AI Campus (Stargate Phase 1)](/datacenters/microsoft-port-washington-wisconsin-stargate.html) | [Microsoft](/operators/microsoft/) | Wisconsin, United States | Planned | **1.3 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 28 | [Microsoft \u2014 Port Washington AI Campus (Stargate Phase 1)](/datacenters/microsoft-port-washington-wisconsin-stargate.html) | [Microsoft](/operators/microsoft/) | Wisconsin, United States | Planned | **1.3 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 28 | [Microsoft \u2014 Port Washington AI Campus (Stargate Phase 1)](/datacenters/microsoft-port-washington-wisconsin-stargate.html) | [Microsoft](/operators/microsoft/) | Wisconsin, United States | Planned | **1.3 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 28 | [Microsoft \u2014 Port Washington AI Campus (Stargate Phase 1)](/datacenters/microsoft-port-washington-wisconsin-stargate.html) | [Microsoft](/operators/microsoft/) | Wisconsin, United States | Planned | **1.3 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 28 | [Microsoft \u2014 Port Washington AI Campus (Stargate Phase 1)](/datacenters/microsoft-port-washington-wisconsin-stargate.html) | [Microsoft](/operators/microsoft/) | Wisconsin, United States | Planned | **1.3 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "Google \u2014 Fort Wayne AI Campus",
   "locality": "Indiana",
   "state": "United States",
   "capacity_gw": 1.2,
   "builder": "Google",
   "ai_customer": "",
   "status": "Operational",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 29 | [Google \u2014 Fort Wayne AI Campus](/datacenters/google-fort-wayne-indiana-ai-campus.html) | [Google](/operators/google/) | Indiana, United States | Operational | **1.2 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 29 | [Google \u2014 Fort Wayne AI Campus](/datacenters/google-fort-wayne-indiana-ai-campus.html) | [Google](/operators/google/) | Indiana, United States | Operational | **1.2 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 29 | [Google \u2014 Fort Wayne AI Campus](/datacenters/google-fort-wayne-indiana-ai-campus.html) | [Google](/operators/google/) | Indiana, United States | Operational | **1.2 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 29 | [Google \u2014 Fort Wayne AI Campus](/datacenters/google-fort-wayne-indiana-ai-campus.html) | [Google](/operators/google/) | Indiana, United States | Operational | **1.2 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 29 | [Google \u2014 Fort Wayne AI Campus](/datacenters/google-fort-wayne-indiana-ai-campus.html) | [Google](/operators/google/) | Indiana, United States | Operational | **1.2 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 29 | [Google \u2014 Fort Wayne AI Campus](/datacenters/google-fort-wayne-indiana-ai-campus.html) | [Google](/operators/google/) | Indiana, United States | Operational | **1.2 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "Meta\u2013Oklo Advanced Nuclear AI Campus (Ohio)",
   "locality": "Ohio",
   "state": "United States",
   "capacity_gw": 1.2,
   "builder": "Meta",
   "ai_customer": "",
   "status": "Announced",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 30 | [Meta\u2013Oklo Advanced Nuclear AI Campus (Ohio)](/datacenters/meta-oklo-nuclear-ai-campus-ohio.html) | [Meta](/operators/meta/) | Ohio, United States | Announced | **1.2 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 30 | [Meta\u2013Oklo Advanced Nuclear AI Campus (Ohio)](/datacenters/meta-oklo-nuclear-ai-campus-ohio.html) | [Meta](/operators/meta/) | Ohio, United States | Announced | **1.2 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 30 | [Meta\u2013Oklo Advanced Nuclear AI Campus (Ohio)](/datacenters/meta-oklo-nuclear-ai-campus-ohio.html) | [Meta](/operators/meta/) | Ohio, United States | Announced | **1.2 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 30 | [Meta\u2013Oklo Advanced Nuclear AI Campus (Ohio)](/datacenters/meta-oklo-nuclear-ai-campus-ohio.html) | [Meta](/operators/meta/) | Ohio, United States | Announced | **1.2 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 30 | [Meta\u2013Oklo Advanced Nuclear AI Campus (Ohio)](/datacenters/meta-oklo-nuclear-ai-campus-ohio.html) | [Meta](/operators/meta/) | Ohio, United States | Announced | **1.2 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 30 | [Meta\u2013Oklo Advanced Nuclear AI Campus (Ohio)](/datacenters/meta-oklo-nuclear-ai-campus-ohio.html) | [Meta](/operators/meta/) | Ohio, United States | Announced | **1.2 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "OpenAI Stargate Data Center (Texas)",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "OpenAI",
   "ai_customer": "",
   "status": "Operational",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 31 | [OpenAI Stargate Data Center (Texas)](/datacenters/openai-stargate-data-center-texas.html) | [OpenAI](/operators/openai/) | Abilene, Texas, United States | Operational | **1.2 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 31 | [OpenAI Stargate Data Center (Texas)](/datacenters/openai-stargate-data-center-texas.html) | [OpenAI](/operators/openai/) | Abilene, Texas, United States | Operational | **1.2 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 31 | [OpenAI Stargate Data Center (Texas)](/datacenters/openai-stargate-data-center-texas.html) | [OpenAI](/operators/openai/) | Abilene, Texas, United States | Operational | **1.2 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 31 | [OpenAI Stargate Data Center (Texas)](/datacenters/openai-stargate-data-center-texas.html) | [OpenAI](/operators/openai/) | Abilene, Texas, United States | Operational | **1.2 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 31 | [OpenAI Stargate Data Center (Texas)](/datacenters/openai-stargate-data-center-texas.html) | [OpenAI](/operators/openai/) | Abilene, Texas, United States | Operational | **1.2 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 31 | [OpenAI Stargate Data Center (Texas)](/datacenters/openai-stargate-data-center-texas.html) | [OpenAI](/operators/openai/) | Abilene, Texas, United States | Operational | **1.2 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "Vistra's Comanche Peak Nuclear Data Center Campus",
   "locality": "Southwestern United States",
   "state": "United States",
   "capacity_gw": 1.2,
   "builder": "Vistra Corp",
   "ai_customer": "",
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 32 | [Vistra's Comanche Peak Nuclear Data Center Campus](/datacenters/vistra-comanche-peak-nuclear-power-plant-expansion.html) | [Vistra Corp](/operators/vistra-corp/) | Southwestern United States, United States | Planned | **1.2 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 32 | [Vistra's Comanche Peak Nuclear Data Center Campus](/datacenters/vistra-comanche-peak-nuclear-power-plant-expansion.html) | [Vistra Corp](/operators/vistra-corp/) | Southwestern United States, United States | Planned | **1.2 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 32 | [Vistra's Comanche Peak Nuclear Data Center Campus](/datacenters/vistra-comanche-peak-nuclear-power-plant-expansion.html) | [Vistra Corp](/operators/vistra-corp/) | Southwestern United States, United States | Planned | **1.2 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 32 | [Vistra's Comanche Peak Nuclear Data Center Campus](/datacenters/vistra-comanche-peak-nuclear-power-plant-expansion.html) | [Vistra Corp](/operators/vistra-corp/) | Southwestern United States, United States | Planned | **1.2 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 32 | [Vistra's Comanche Peak Nuclear Data Center Campus](/datacenters/vistra-comanche-peak-nuclear-power-plant-expansion.html) | [Vistra Corp](/operators/vistra-corp/) | Southwestern United States, United States | Planned | **1.2 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 32 | [Vistra's Comanche Peak Nuclear Data Center Campus](/datacenters/vistra-comanche-peak-nuclear-power-plant-expansion.html) | [Vistra Corp](/operators/vistra-corp/) | Southwestern United States, United States | Planned | **1.2 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "AWS \u2014 Richmond County AI Innovation Campus",
   "locality": "North Carolina",
   "state": "United States",
   "capacity_gw": 1.0,
   "builder": "Amazon Web Services",
   "ai_customer": "",
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 35 | [AWS \u2014 Richmond County AI Innovation Campus](/datacenters/aws-richmond-county-north-carolina-ai-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | North Carolina, United States | Under Construction | **1 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 35 | [AWS \u2014 Richmond County AI Innovation Campus](/datacenters/aws-richmond-county-north-carolina-ai-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | North Carolina, United States | Under Construction | **1 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 35 | [AWS \u2014 Richmond County AI Innovation Campus](/datacenters/aws-richmond-county-north-carolina-ai-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | North Carolina, United States | Under Construction | **1 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 35 | [AWS \u2014 Richmond County AI Innovation Campus](/datacenters/aws-richmond-county-north-carolina-ai-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | North Carolina, United States | Under Construction | **1 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 35 | [AWS \u2014 Richmond County AI Innovation Campus](/datacenters/aws-richmond-county-north-carolina-ai-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | North Carolina, United States | Under Construction | **1 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 35 | [AWS \u2014 Richmond County AI Innovation Campus](/datacenters/aws-richmond-county-north-carolina-ai-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | North Carolina, United States | Under Construction | **1 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "Google Gemini Cluster (Iowa/Nebraska)",
   "locality": "Midwest (Iowa\u2013Nebraska cluster)",
   "state": "United States",
   "capacity_gw": 1.0,
   "builder": "Google",
   "ai_customer": "",
   "status": "Operational",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 38 | [Google Gemini Cluster (Iowa/Nebraska)](/datacenters/google-gemini-cluster-iowa-nebraska.html) | [Google](/operators/google/) | Midwest (Iowa\u2013Nebraska cluster), United States | Operational | **1 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 38 | [Google Gemini Cluster (Iowa/Nebraska)](/datacenters/google-gemini-cluster-iowa-nebraska.html) | [Google](/operators/google/) | Midwest (Iowa\u2013Nebraska cluster), United States | Operational | **1 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 38 | [Google Gemini Cluster (Iowa/Nebraska)](/datacenters/google-gemini-cluster-iowa-nebraska.html) | [Google](/operators/google/) | Midwest (Iowa\u2013Nebraska cluster), United States | Operational | **1 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 38 | [Google Gemini Cluster (Iowa/Nebraska)](/datacenters/google-gemini-cluster-iowa-nebraska.html) | [Google](/operators/google/) | Midwest (Iowa\u2013Nebraska cluster), United States | Operational | **1 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 38 | [Google Gemini Cluster (Iowa/Nebraska)](/datacenters/google-gemini-cluster-iowa-nebraska.html) | [Google](/operators/google/) | Midwest (Iowa\u2013Nebraska cluster), United States | Operational | **1 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 38 | [Google Gemini Cluster (Iowa/Nebraska)](/datacenters/google-gemini-cluster-iowa-nebraska.html) | [Google](/operators/google/) | Midwest (Iowa\u2013Nebraska cluster), United States | Operational | **1 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "Meta \u2014 El Paso AI Mega Campus",
   "locality": "Texas",
   "state": "United States",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "",
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 39 | [Meta \u2014 El Paso AI Mega Campus](/datacenters/meta-el-paso-ai-mega-campus-texas.html) | [Meta](/operators/meta/) | Texas, United States | Planned | **1 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 39 | [Meta \u2014 El Paso AI Mega Campus](/datacenters/meta-el-paso-ai-mega-campus-texas.html) | [Meta](/operators/meta/) | Texas, United States | Planned | **1 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 39 | [Meta \u2014 El Paso AI Mega Campus](/datacenters/meta-el-paso-ai-mega-campus-texas.html) | [Meta](/operators/meta/) | Texas, United States | Planned | **1 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 39 | [Meta \u2014 El Paso AI Mega Campus](/datacenters/meta-el-paso-ai-mega-campus-texas.html) | [Meta](/operators/meta/) | Texas, United States | Planned | **1 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 39 | [Meta \u2014 El Paso AI Mega Campus](/datacenters/meta-el-paso-ai-mega-campus-texas.html) | [Meta](/operators/meta/) | Texas, United States | Planned | **1 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 39 | [Meta \u2014 El Paso AI Mega Campus](/datacenters/meta-el-paso-ai-mega-campus-texas.html) | [Meta](/operators/meta/) | Texas, United States | Planned | **1 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "Meta Lebanon AI Data Center (Indiana)",
   "locality": "Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "",
   "status": "Announced",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 40 | [Meta Lebanon AI Data Center (Indiana)](/datacenters/meta-lebanon-indiana-ai-campus.html) | [Meta](/operators/meta/) | Lebanon, Indiana, United States | Announced | **1 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 40 | [Meta Lebanon AI Data Center (Indiana)](/datacenters/meta-lebanon-indiana-ai-campus.html) | [Meta](/operators/meta/) | Lebanon, Indiana, United States | Announced | **1 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 40 | [Meta Lebanon AI Data Center (Indiana)](/datacenters/meta-lebanon-indiana-ai-campus.html) | [Meta](/operators/meta/) | Lebanon, Indiana, United States | Announced | **1 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 40 | [Meta Lebanon AI Data Center (Indiana)](/datacenters/meta-lebanon-indiana-ai-campus.html) | [Meta](/operators/meta/) | Lebanon, Indiana, United States | Announced | **1 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 40 | [Meta Lebanon AI Data Center (Indiana)](/datacenters/meta-lebanon-indiana-ai-campus.html) | [Meta](/operators/meta/) | Lebanon, Indiana, United States | Announced | **1 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 40 | [Meta Lebanon AI Data Center (Indiana)](/datacenters/meta-lebanon-indiana-ai-campus.html) | [Meta](/operators/meta/) | Lebanon, Indiana, United States | Announced | **1 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "Microsoft Azure Northern Virginia AI Data Centers",
   "locality": "Northern Virginia (Loudoun, Prince William counties)",
   "state": "United States",
   "capacity_gw": 1.0,
   "builder": "Microsoft",
   "ai_customer": "",
   "status": "Operational",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 42 | [Microsoft Azure Northern Virginia AI Data Centers](/datacenters/microsoft-northern-virginia-ai-data-centers.html) | [Microsoft](/operators/microsoft/) | Northern Virginia (Loudoun, Prince William counties), United States | Operational | **1 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 42 | [Microsoft Azure Northern Virginia AI Data Centers](/datacenters/microsoft-northern-virginia-ai-data-centers.html) | [Microsoft](/operators/microsoft/) | Northern Virginia (Loudoun, Prince William counties), United States | Operational | **1 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 42 | [Microsoft Azure Northern Virginia AI Data Centers](/datacenters/microsoft-northern-virginia-ai-data-centers.html) | [Microsoft](/operators/microsoft/) | Northern Virginia (Loudoun, Prince William counties), United States | Operational | **1 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 42 | [Microsoft Azure Northern Virginia AI Data Centers](/datacenters/microsoft-northern-virginia-ai-data-centers.html) | [Microsoft](/operators/microsoft/) | Northern Virginia (Loudoun, Prince William counties), United States | Operational | **1 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 42 | [Microsoft Azure Northern Virginia AI Data Centers](/datacenters/microsoft-northern-virginia-ai-data-centers.html) | [Microsoft](/operators/microsoft/) | Northern Virginia (Loudoun, Prince William counties), United States | Operational | **1 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 42 | [Microsoft Azure Northern Virginia AI Data Centers](/datacenters/microsoft-northern-virginia-ai-data-centers.html) | [Microsoft](/operators/microsoft/) | Northern Virginia (Loudoun, Prince William counties), United States | Operational | **1 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/hyperscale",
   "title": "Hyperscale AI Data Centers (2026) \u2014 500 MW+",
   "published_at": null,
   "project": "Microsoft & OpenAI \u2014 Project Jupiter (New Mexico)",
   "locality": "New Mexico",
   "state": "United States",
   "capacity_gw": 1.0,
   "builder": "Microsoft",
   "ai_customer": "",
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 43 | [Microsoft & OpenAI \u2014 Project Jupiter (New Mexico)](/datacenters/microsoft-openai-stargate-new-mexico.html) | [Microsoft](/operators/microsoft/) | New Mexico, United States | Planned | **1 GW** | |"
   ],
   "locality_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 43 | [Microsoft & OpenAI \u2014 Project Jupiter (New Mexico)](/datacenters/microsoft-openai-stargate-new-mexico.html) | [Microsoft](/operators/microsoft/) | New Mexico, United States | Planned | **1 GW** | |"
   ],
   "state_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 43 | [Microsoft & OpenAI \u2014 Project Jupiter (New Mexico)](/datacenters/microsoft-openai-stargate-new-mexico.html) | [Microsoft](/operators/microsoft/) | New Mexico, United States | Planned | **1 GW** | |"
   ],
   "capacity_gw_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 43 | [Microsoft & OpenAI \u2014 Project Jupiter (New Mexico)](/datacenters/microsoft-openai-stargate-new-mexico.html) | [Microsoft](/operators/microsoft/) | New Mexico, United States | Planned | **1 GW** | |"
   ],
   "builder_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 43 | [Microsoft & OpenAI \u2014 Project Jupiter (New Mexico)](/datacenters/microsoft-openai-stargate-new-mexico.html) | [Microsoft](/operators/microsoft/) | New Mexico, United States | Planned | **1 GW** | |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Infrastructure Scale",
    "# Hyperscale AI Data Centers",
    "| # | Facility | Operator | Location | Status | Capacity | |",
    "| 43 | [Microsoft & OpenAI \u2014 Project Jupiter (New Mexico)](/datacenters/microsoft-openai-stargate-new-mexico.html) | [Microsoft](/operators/microsoft/) | New Mexico, United States | Planned | **1 GW** | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://betanews.com/article/openai-nvidia-8gw-ohio-data-center-deal",
   "title": "OpenAI and Nvidia's 20-year 8GW AI data center deal in Ohio",
   "published_at": "2026-08-18T08:32:50",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "OpenAI and Nvidia lock in 8GW, 20-year Ohio AI data center campus deal",
    "OpenAI secured 8 gigawatts of dedicated AI computing capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, under a 20-year lease with developer and operator SB Energy."
   ],
   "locality_evidence": [
    "OpenAI and Nvidia lock in 8GW, 20-year Ohio AI data center campus deal",
    "OpenAI secured 8 gigawatts of dedicated AI computing capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, under a 20-year lease with developer and operator SB Energy."
   ],
   "state_evidence": [
    "OpenAI and Nvidia lock in 8GW, 20-year Ohio AI data center campus deal",
    "OpenAI secured 8 gigawatts of dedicated AI computing capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, under a 20-year lease with developer and operator SB Energy."
   ],
   "capacity_gw_evidence": [
    "OpenAI and Nvidia lock in 8GW, 20-year Ohio AI data center campus deal",
    "OpenAI secured 8 gigawatts of dedicated AI computing capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, under a 20-year lease with developer and operator SB Energy."
   ],
   "builder_evidence": [
    "OpenAI and Nvidia lock in 8GW, 20-year Ohio AI data center campus deal",
    "OpenAI secured 8 gigawatts of dedicated AI computing capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, under a 20-year lease with developer and operator SB Energy."
   ],
   "ai_customer_evidence": [
    "OpenAI and Nvidia lock in 8GW, 20-year Ohio AI data center campus deal",
    "OpenAI secured 8 gigawatts of dedicated AI computing capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, under a 20-year lease with developer and operator SB Energy."
   ],
   "status_evidence": [
    "OpenAI and Nvidia lock in 8GW, 20-year Ohio AI data center campus deal",
    "NVIDIA became the exclusive AI compute infrastructure provider for the campus, the companies announced Monday."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news/openai-oracle-and-vantage-plan-stargate-wisconsin-data-center-expected-to-be-close-to-a-gigawatt",
   "title": "OpenAI, Oracle, and Vantage plan Stargate Wisconsin data center, expected to be 'close to a gigawatt'",
   "published_at": "2026-08-19T00:00:00",
   "project": "Stargate",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "OpenAI plans to deploy another Stargate data center cluster, this time in Port Washington, Wisconsin.",
    "The other known projects are in Do\u00f1a Ana County, New Mexico, and in Shackelford County, Texas.",
    "That latter facility is also expected to be from Vantage, with the company working on a 1.4GW campus."
   ],
   "locality_evidence": [
    "The other known projects are in Do\u00f1a Ana County, New Mexico, and in Shackelford County, Texas.",
    "That latter facility is also expected to be from Vantage, with the company working on a 1.4GW campus."
   ],
   "state_evidence": [
    "The other known projects are in Do\u00f1a Ana County, New Mexico, and in Shackelford County, Texas.",
    "That latter facility is also expected to be from Vantage, with the company working on a 1.4GW campus."
   ],
   "capacity_gw_evidence": [
    "That latter facility is also expected to be from Vantage, with the company working on a 1.4GW campus."
   ],
   "builder_evidence": [
    "That latter facility is also expected to be from Vantage, with the company working on a 1.4GW campus."
   ],
   "ai_customer_evidence": [
    "OpenAI plans to deploy another Stargate data center cluster, this time in Port Washington, Wisconsin.",
    "The other known projects are in Do\u00f1a Ana County, New Mexico, and in Shackelford County, Texas."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://drops.mts.now/ai-capex/wiki/sites/gigawatt-site-inventory",
   "title": "Gigawatt-Scale AI Datacenter Site Inventory",
   "published_at": null,
   "project": "Shackelford County (Stargate)",
   "locality": "Shackelford Co.",
   "state": "Texas",
   "capacity_gw": 5.5,
   "builder": "Oracle / OpenAI / SoftBank",
   "ai_customer": "OpenAI",
   "status": "Sited",
   "announcement_date": null,
   "project_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Shackelford County (Stargate) | Oracle / OpenAI / SoftBank | Shackelford Co., TX | 5,500 | TBD | Sited | 2026 | 2028+ | OpenAI |"
   ],
   "locality_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Shackelford County (Stargate) | Oracle / OpenAI / SoftBank | Shackelford Co., TX | 5,500 | TBD | Sited | 2026 | 2028+ | OpenAI |"
   ],
   "state_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Shackelford County (Stargate) | Oracle / OpenAI / SoftBank | Shackelford Co., TX | 5,500 | TBD | Sited | 2026 | 2028+ | OpenAI |"
   ],
   "capacity_gw_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Shackelford County (Stargate) | Oracle / OpenAI / SoftBank | Shackelford Co., TX | 5,500 | TBD | Sited | 2026 | 2028+ | OpenAI |"
   ],
   "builder_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Shackelford County (Stargate) | Oracle / OpenAI / SoftBank | Shackelford Co., TX | 5,500 | TBD | Sited | 2026 | 2028+ | OpenAI |"
   ],
   "ai_customer_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Shackelford County (Stargate) | Oracle / OpenAI / SoftBank | Shackelford Co., TX | 5,500 | TBD | Sited | 2026 | 2028+ | OpenAI |"
   ],
   "status_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Shackelford County (Stargate) | Oracle / OpenAI / SoftBank | Shackelford Co., TX | 5,500 | TBD | Sited | 2026 | 2028+ | OpenAI |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://drops.mts.now/ai-capex/wiki/sites/gigawatt-site-inventory",
   "title": "Gigawatt-Scale AI Datacenter Site Inventory",
   "published_at": null,
   "project": "Mt. Pleasant (Fairwater)",
   "locality": "Mt. Pleasant",
   "state": "Wisconsin",
   "capacity_gw": 3.3,
   "builder": "Microsoft",
   "ai_customer": "Microsoft / OpenAI",
   "status": "Phased / paused",
   "announcement_date": null,
   "project_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Mt. Pleasant (Fairwater) | Microsoft | Mt. Pleasant, WI | 3,300 | ~900 (phase 1) | Phased / paused | 2025 | 2027 | Microsoft / OpenAI |"
   ],
   "locality_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Mt. Pleasant (Fairwater) | Microsoft | Mt. Pleasant, WI | 3,300 | ~900 (phase 1) | Phased / paused | 2025 | 2027 | Microsoft / OpenAI |"
   ],
   "state_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Mt. Pleasant (Fairwater) | Microsoft | Mt. Pleasant, WI | 3,300 | ~900 (phase 1) | Phased / paused | 2025 | 2027 | Microsoft / OpenAI |"
   ],
   "capacity_gw_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Mt. Pleasant (Fairwater) | Microsoft | Mt. Pleasant, WI | 3,300 | ~900 (phase 1) | Phased / paused | 2025 | 2027 | Microsoft / OpenAI |"
   ],
   "builder_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Mt. Pleasant (Fairwater) | Microsoft | Mt. Pleasant, WI | 3,300 | ~900 (phase 1) | Phased / paused | 2025 | 2027 | Microsoft / OpenAI |"
   ],
   "ai_customer_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Mt. Pleasant (Fairwater) | Microsoft | Mt. Pleasant, WI | 3,300 | ~900 (phase 1) | Phased / paused | 2025 | 2027 | Microsoft / OpenAI |"
   ],
   "status_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Mt. Pleasant (Fairwater) | Microsoft | Mt. Pleasant, WI | 3,300 | ~900 (phase 1) | Phased / paused | 2025 | 2027 | Microsoft / OpenAI |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://drops.mts.now/ai-capex/wiki/sites/gigawatt-site-inventory",
   "title": "Gigawatt-Scale AI Datacenter Site Inventory",
   "published_at": null,
   "project": "New Carlisle (Project Rainier)",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "AWS",
   "ai_customer": "Anthropic",
   "status": "Operational (partial)",
   "announcement_date": null,
   "project_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| New Carlisle (Project Rainier) | AWS | New Carlisle, IN | 2,200 | ~1,000 | Operational (partial) | Oct 2025 | 2027 | Anthropic |"
   ],
   "locality_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| New Carlisle (Project Rainier) | AWS | New Carlisle, IN | 2,200 | ~1,000 | Operational (partial) | Oct 2025 | 2027 | Anthropic |"
   ],
   "state_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| New Carlisle (Project Rainier) | AWS | New Carlisle, IN | 2,200 | ~1,000 | Operational (partial) | Oct 2025 | 2027 | Anthropic |"
   ],
   "capacity_gw_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| New Carlisle (Project Rainier) | AWS | New Carlisle, IN | 2,200 | ~1,000 | Operational (partial) | Oct 2025 | 2027 | Anthropic |"
   ],
   "builder_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| New Carlisle (Project Rainier) | AWS | New Carlisle, IN | 2,200 | ~1,000 | Operational (partial) | Oct 2025 | 2027 | Anthropic |"
   ],
   "ai_customer_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| New Carlisle (Project Rainier) | AWS | New Carlisle, IN | 2,200 | ~1,000 | Operational (partial) | Oct 2025 | 2027 | Anthropic |"
   ],
   "status_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| New Carlisle (Project Rainier) | AWS | New Carlisle, IN | 2,200 | ~1,000 | Operational (partial) | Oct 2025 | 2027 | Anthropic |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://drops.mts.now/ai-capex/wiki/sites/gigawatt-site-inventory",
   "title": "Gigawatt-Scale AI Datacenter Site Inventory",
   "published_at": null,
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 2.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Hyperion | Meta | Richland Parish, LA | 2,000+ | ~1,500 (phase 1) | Under construction | 2027 | 2030 | Meta |"
   ],
   "locality_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Hyperion | Meta | Richland Parish, LA | 2,000+ | ~1,500 (phase 1) | Under construction | 2027 | 2030 | Meta |"
   ],
   "state_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Hyperion | Meta | Richland Parish, LA | 2,000+ | ~1,500 (phase 1) | Under construction | 2027 | 2030 | Meta |"
   ],
   "capacity_gw_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Hyperion | Meta | Richland Parish, LA | 2,000+ | ~1,500 (phase 1) | Under construction | 2027 | 2030 | Meta |"
   ],
   "builder_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Hyperion | Meta | Richland Parish, LA | 2,000+ | ~1,500 (phase 1) | Under construction | 2027 | 2030 | Meta |"
   ],
   "ai_customer_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Hyperion | Meta | Richland Parish, LA | 2,000+ | ~1,500 (phase 1) | Under construction | 2027 | 2030 | Meta |"
   ],
   "status_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Hyperion | Meta | Richland Parish, LA | 2,000+ | ~1,500 (phase 1) | Under construction | 2027 | 2030 | Meta |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://drops.mts.now/ai-capex/wiki/sites/gigawatt-site-inventory",
   "title": "Gigawatt-Scale AI Datacenter Site Inventory",
   "published_at": null,
   "project": "Colossus 1 + 2",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "xAI / Grok",
   "status": "Operational + expanding",
   "announcement_date": null,
   "project_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Colossus 1 + 2 | xAI | Memphis, TN | 2,000 | ~1,200 | Operational + expanding | 2024 | 2026 | xAI / Grok |"
   ],
   "locality_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Colossus 1 + 2 | xAI | Memphis, TN | 2,000 | ~1,200 | Operational + expanding | 2024 | 2026 | xAI / Grok |"
   ],
   "state_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Colossus 1 + 2 | xAI | Memphis, TN | 2,000 | ~1,200 | Operational + expanding | 2024 | 2026 | xAI / Grok |"
   ],
   "capacity_gw_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Colossus 1 + 2 | xAI | Memphis, TN | 2,000 | ~1,200 | Operational + expanding | 2024 | 2026 | xAI / Grok |"
   ],
   "builder_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Colossus 1 + 2 | xAI | Memphis, TN | 2,000 | ~1,200 | Operational + expanding | 2024 | 2026 | xAI / Grok |"
   ],
   "ai_customer_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Colossus 1 + 2 | xAI | Memphis, TN | 2,000 | ~1,200 | Operational + expanding | 2024 | 2026 | xAI / Grok |"
   ],
   "status_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Colossus 1 + 2 | xAI | Memphis, TN | 2,000 | ~1,200 | Operational + expanding | 2024 | 2026 | xAI / Grok |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://drops.mts.now/ai-capex/wiki/sites/gigawatt-site-inventory",
   "title": "Gigawatt-Scale AI Datacenter Site Inventory",
   "published_at": null,
   "project": "Abilene (Stargate I)",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe / Oracle / OpenAI",
   "ai_customer": "OpenAI (Oracle anchor)",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Abilene (Stargate I) | Crusoe / Oracle / OpenAI | Abilene, TX | 1,200 | ~1,000 | Under construction | Sept 2025 | Mid-2026 | OpenAI (Oracle anchor) |"
   ],
   "locality_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Abilene (Stargate I) | Crusoe / Oracle / OpenAI | Abilene, TX | 1,200 | ~1,000 | Under construction | Sept 2025 | Mid-2026 | OpenAI (Oracle anchor) |"
   ],
   "state_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Abilene (Stargate I) | Crusoe / Oracle / OpenAI | Abilene, TX | 1,200 | ~1,000 | Under construction | Sept 2025 | Mid-2026 | OpenAI (Oracle anchor) |"
   ],
   "capacity_gw_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Abilene (Stargate I) | Crusoe / Oracle / OpenAI | Abilene, TX | 1,200 | ~1,000 | Under construction | Sept 2025 | Mid-2026 | OpenAI (Oracle anchor) |"
   ],
   "builder_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Abilene (Stargate I) | Crusoe / Oracle / OpenAI | Abilene, TX | 1,200 | ~1,000 | Under construction | Sept 2025 | Mid-2026 | OpenAI (Oracle anchor) |"
   ],
   "ai_customer_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Abilene (Stargate I) | Crusoe / Oracle / OpenAI | Abilene, TX | 1,200 | ~1,000 | Under construction | Sept 2025 | Mid-2026 | OpenAI (Oracle anchor) |"
   ],
   "status_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Abilene (Stargate I) | Crusoe / Oracle / OpenAI | Abilene, TX | 1,200 | ~1,000 | Under construction | Sept 2025 | Mid-2026 | OpenAI (Oracle anchor) |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://drops.mts.now/ai-capex/wiki/sites/gigawatt-site-inventory",
   "title": "Gigawatt-Scale AI Datacenter Site Inventory",
   "published_at": null,
   "project": "Lighthouse (Stargate WI)",
   "locality": "Port Washington",
   "state": "Wisconsin",
   "capacity_gw": 1.4,
   "builder": "Vantage / Oracle",
   "ai_customer": "OpenAI",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Lighthouse (Stargate WI) | Vantage / Oracle | Port Washington, WI | ~1,400 | TBD | Under construction | 2027 | 2029 | OpenAI |"
   ],
   "locality_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Lighthouse (Stargate WI) | Vantage / Oracle | Port Washington, WI | ~1,400 | TBD | Under construction | 2027 | 2029 | OpenAI |"
   ],
   "state_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Lighthouse (Stargate WI) | Vantage / Oracle | Port Washington, WI | ~1,400 | TBD | Under construction | 2027 | 2029 | OpenAI |"
   ],
   "capacity_gw_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Lighthouse (Stargate WI) | Vantage / Oracle | Port Washington, WI | ~1,400 | TBD | Under construction | 2027 | 2029 | OpenAI |"
   ],
   "builder_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Lighthouse (Stargate WI) | Vantage / Oracle | Port Washington, WI | ~1,400 | TBD | Under construction | 2027 | 2029 | OpenAI |"
   ],
   "ai_customer_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Lighthouse (Stargate WI) | Vantage / Oracle | Port Washington, WI | ~1,400 | TBD | Under construction | 2027 | 2029 | OpenAI |"
   ],
   "status_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Lighthouse (Stargate WI) | Vantage / Oracle | Port Washington, WI | ~1,400 | TBD | Under construction | 2027 | 2029 | OpenAI |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://drops.mts.now/ai-capex/wiki/sites/gigawatt-site-inventory",
   "title": "Gigawatt-Scale AI Datacenter Site Inventory",
   "published_at": null,
   "project": "Do\u00f1a Ana (Stargate NM)",
   "locality": "Do\u00f1a Ana Co.",
   "state": "New Mexico",
   "capacity_gw": 1.0,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "Sited",
   "announcement_date": null,
   "project_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Do\u00f1a Ana (Stargate NM) | Oracle | Do\u00f1a Ana Co., NM | ~1,000 | TBD | Sited | 2027 | 2029 | OpenAI |"
   ],
   "locality_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Do\u00f1a Ana (Stargate NM) | Oracle | Do\u00f1a Ana Co., NM | ~1,000 | TBD | Sited | 2027 | 2029 | OpenAI |"
   ],
   "state_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Do\u00f1a Ana (Stargate NM) | Oracle | Do\u00f1a Ana Co., NM | ~1,000 | TBD | Sited | 2027 | 2029 | OpenAI |"
   ],
   "capacity_gw_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Do\u00f1a Ana (Stargate NM) | Oracle | Do\u00f1a Ana Co., NM | ~1,000 | TBD | Sited | 2027 | 2029 | OpenAI |"
   ],
   "builder_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Do\u00f1a Ana (Stargate NM) | Oracle | Do\u00f1a Ana Co., NM | ~1,000 | TBD | Sited | 2027 | 2029 | OpenAI |"
   ],
   "ai_customer_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Do\u00f1a Ana (Stargate NM) | Oracle | Do\u00f1a Ana Co., NM | ~1,000 | TBD | Sited | 2027 | 2029 | OpenAI |"
   ],
   "status_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Do\u00f1a Ana (Stargate NM) | Oracle | Do\u00f1a Ana Co., NM | ~1,000 | TBD | Sited | 2027 | 2029 | OpenAI |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://drops.mts.now/ai-capex/wiki/sites/gigawatt-site-inventory",
   "title": "Gigawatt-Scale AI Datacenter Site Inventory",
   "published_at": null,
   "project": "Lordstown (Stargate OH)",
   "locality": "Lordstown",
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "SoftBank",
   "ai_customer": "OpenAI",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Lordstown (Stargate OH) | SoftBank | Lordstown, OH | ~1,000 | TBD | Under construction | 2026 | 2027 | OpenAI |"
   ],
   "locality_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Lordstown (Stargate OH) | SoftBank | Lordstown, OH | ~1,000 | TBD | Under construction | 2026 | 2027 | OpenAI |"
   ],
   "state_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Lordstown (Stargate OH) | SoftBank | Lordstown, OH | ~1,000 | TBD | Under construction | 2026 | 2027 | OpenAI |"
   ],
   "capacity_gw_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Lordstown (Stargate OH) | SoftBank | Lordstown, OH | ~1,000 | TBD | Under construction | 2026 | 2027 | OpenAI |"
   ],
   "builder_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Lordstown (Stargate OH) | SoftBank | Lordstown, OH | ~1,000 | TBD | Under construction | 2026 | 2027 | OpenAI |"
   ],
   "ai_customer_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Lordstown (Stargate OH) | SoftBank | Lordstown, OH | ~1,000 | TBD | Under construction | 2026 | 2027 | OpenAI |"
   ],
   "status_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Lordstown (Stargate OH) | SoftBank | Lordstown, OH | ~1,000 | TBD | Under construction | 2026 | 2027 | OpenAI |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://drops.mts.now/ai-capex/wiki/sites/gigawatt-site-inventory",
   "title": "Gigawatt-Scale AI Datacenter Site Inventory",
   "published_at": null,
   "project": "Milam County (Stargate TX-2)",
   "locality": "Milam Co.",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "SB Energy / SoftBank",
   "ai_customer": "OpenAI",
   "status": "Sited",
   "announcement_date": null,
   "project_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Milam County (Stargate TX-2) | SB Energy / SoftBank | Milam Co., TX | ~1,000 | TBD | Sited | 2027 | 2029 | OpenAI |"
   ],
   "locality_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Milam County (Stargate TX-2) | SB Energy / SoftBank | Milam Co., TX | ~1,000 | TBD | Sited | 2027 | 2029 | OpenAI |"
   ],
   "state_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Milam County (Stargate TX-2) | SB Energy / SoftBank | Milam Co., TX | ~1,000 | TBD | Sited | 2027 | 2029 | OpenAI |"
   ],
   "capacity_gw_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Milam County (Stargate TX-2) | SB Energy / SoftBank | Milam Co., TX | ~1,000 | TBD | Sited | 2027 | 2029 | OpenAI |"
   ],
   "builder_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Milam County (Stargate TX-2) | SB Energy / SoftBank | Milam Co., TX | ~1,000 | TBD | Sited | 2027 | 2029 | OpenAI |"
   ],
   "ai_customer_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Milam County (Stargate TX-2) | SB Energy / SoftBank | Milam Co., TX | ~1,000 | TBD | Sited | 2027 | 2029 | OpenAI |"
   ],
   "status_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Milam County (Stargate TX-2) | SB Energy / SoftBank | Milam Co., TX | ~1,000 | TBD | Sited | 2027 | 2029 | OpenAI |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://drops.mts.now/ai-capex/wiki/sites/gigawatt-site-inventory",
   "title": "Gigawatt-Scale AI Datacenter Site Inventory",
   "published_at": null,
   "project": "Atlanta Fairwater",
   "locality": "Fayetteville/Palmetto",
   "state": "Georgia",
   "capacity_gw": 1.0,
   "builder": "Microsoft",
   "ai_customer": "Microsoft",
   "status": "Operational (partial)",
   "announcement_date": null,
   "project_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Atlanta Fairwater | Microsoft | Fayetteville/Palmetto, GA | ~1,000 | ~500 | Operational (partial) | Oct 2025 | 2027 | Microsoft |"
   ],
   "locality_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Atlanta Fairwater | Microsoft | Fayetteville/Palmetto, GA | ~1,000 | ~500 | Operational (partial) | Oct 2025 | 2027 | Microsoft |"
   ],
   "state_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Atlanta Fairwater | Microsoft | Fayetteville/Palmetto, GA | ~1,000 | ~500 | Operational (partial) | Oct 2025 | 2027 | Microsoft |"
   ],
   "capacity_gw_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Atlanta Fairwater | Microsoft | Fayetteville/Palmetto, GA | ~1,000 | ~500 | Operational (partial) | Oct 2025 | 2027 | Microsoft |"
   ],
   "builder_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Atlanta Fairwater | Microsoft | Fayetteville/Palmetto, GA | ~1,000 | ~500 | Operational (partial) | Oct 2025 | 2027 | Microsoft |"
   ],
   "ai_customer_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Atlanta Fairwater | Microsoft | Fayetteville/Palmetto, GA | ~1,000 | ~500 | Operational (partial) | Oct 2025 | 2027 | Microsoft |"
   ],
   "status_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Atlanta Fairwater | Microsoft | Fayetteville/Palmetto, GA | ~1,000 | ~500 | Operational (partial) | Oct 2025 | 2027 | Microsoft |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://drops.mts.now/ai-capex/wiki/sites/gigawatt-site-inventory",
   "title": "Gigawatt-Scale AI Datacenter Site Inventory",
   "published_at": null,
   "project": "Newton (Prometheus)",
   "locality": "Newton Co.",
   "state": "Georgia",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Newton (Prometheus) | Meta | Newton Co., GA | 1,000+ | ~1,000 | Under construction | 2026 | 2026 | Meta |"
   ],
   "locality_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Newton (Prometheus) | Meta | Newton Co., GA | 1,000+ | ~1,000 | Under construction | 2026 | 2026 | Meta |"
   ],
   "state_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Newton (Prometheus) | Meta | Newton Co., GA | 1,000+ | ~1,000 | Under construction | 2026 | 2026 | Meta |"
   ],
   "capacity_gw_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Newton (Prometheus) | Meta | Newton Co., GA | 1,000+ | ~1,000 | Under construction | 2026 | 2026 | Meta |"
   ],
   "builder_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Newton (Prometheus) | Meta | Newton Co., GA | 1,000+ | ~1,000 | Under construction | 2026 | 2026 | Meta |"
   ],
   "ai_customer_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Newton (Prometheus) | Meta | Newton Co., GA | 1,000+ | ~1,000 | Under construction | 2026 | 2026 | Meta |"
   ],
   "status_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Newton (Prometheus) | Meta | Newton Co., GA | 1,000+ | ~1,000 | Under construction | 2026 | 2026 | Meta |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://drops.mts.now/ai-capex/wiki/sites/gigawatt-site-inventory",
   "title": "Gigawatt-Scale AI Datacenter Site Inventory",
   "published_at": null,
   "project": "Council Bluffs",
   "locality": "Council Bluffs",
   "state": "Iowa",
   "capacity_gw": 1.0,
   "builder": "Google",
   "ai_customer": "Google",
   "status": "Operational + expanding",
   "announcement_date": null,
   "project_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Council Bluffs | Google | Council Bluffs, IA | ~1,000 | ~600 | Operational + expanding | 2009 | ongoing | Google |"
   ],
   "locality_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Council Bluffs | Google | Council Bluffs, IA | ~1,000 | ~600 | Operational + expanding | 2009 | ongoing | Google |"
   ],
   "state_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Council Bluffs | Google | Council Bluffs, IA | ~1,000 | ~600 | Operational + expanding | 2009 | ongoing | Google |"
   ],
   "capacity_gw_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Council Bluffs | Google | Council Bluffs, IA | ~1,000 | ~600 | Operational + expanding | 2009 | ongoing | Google |"
   ],
   "builder_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Council Bluffs | Google | Council Bluffs, IA | ~1,000 | ~600 | Operational + expanding | 2009 | ongoing | Google |"
   ],
   "ai_customer_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Council Bluffs | Google | Council Bluffs, IA | ~1,000 | ~600 | Operational + expanding | 2009 | ongoing | Google |"
   ],
   "status_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Council Bluffs | Google | Council Bluffs, IA | ~1,000 | ~600 | Operational + expanding | 2009 | ongoing | Google |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://drops.mts.now/ai-capex/wiki/sites/gigawatt-site-inventory",
   "title": "Gigawatt-Scale AI Datacenter Site Inventory",
   "published_at": null,
   "project": "Eagle Mountain",
   "locality": "Eagle Mountain",
   "state": "Utah",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "Operational + expanding",
   "announcement_date": null,
   "project_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Eagle Mountain | Meta | Eagle Mountain, UT | 1,000+ | TBD | Operational + expanding | 2021 | 2027 | Meta |"
   ],
   "locality_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Eagle Mountain | Meta | Eagle Mountain, UT | 1,000+ | TBD | Operational + expanding | 2021 | 2027 | Meta |"
   ],
   "state_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Eagle Mountain | Meta | Eagle Mountain, UT | 1,000+ | TBD | Operational + expanding | 2021 | 2027 | Meta |"
   ],
   "capacity_gw_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Eagle Mountain | Meta | Eagle Mountain, UT | 1,000+ | TBD | Operational + expanding | 2021 | 2027 | Meta |"
   ],
   "builder_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Eagle Mountain | Meta | Eagle Mountain, UT | 1,000+ | TBD | Operational + expanding | 2021 | 2027 | Meta |"
   ],
   "ai_customer_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Eagle Mountain | Meta | Eagle Mountain, UT | 1,000+ | TBD | Operational + expanding | 2021 | 2027 | Meta |"
   ],
   "status_evidence": [
    "# Gigawatt-Scale AI Datacenter Site Inventory",
    "Comprehensive catalog of named AI datacenter campuses publicly announced or under construction at \u2265500 MW IT load or \u22651 GW total. Last refreshed May 2026.",
    "Summary Table (sortable by power)",
    "| Site | Operator | Location | Total MW (announced) | IT MW (near-term) | Status | First Power | Full Power | Customers |",
    "| Eagle Mountain | Meta | Eagle Mountain, UT | 1,000+ | TBD | Operational + expanding | 2021 | 2027 | Meta |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://measuredai.substack.com/p/aws-new-carlisle-data-center-campus",
   "title": "AWS New Carlisle Data Center Campus: Project Rainier - Where Anthropic Trains Claude",
   "published_at": "2026-06-16T11:57:46",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.25,
   "builder": "Amazon",
   "ai_customer": "Anthropic",
   "status": "online",
   "announcement_date": null,
   "project_evidence": [
    "# AWS New Carlisle Data Center Campus: Project Rainier - Where Anthropic Trains Claude",
    "New Carlisle is the flagship and largest site of **Project Rainier**, AWS\u2019s large-scale AI compute cluster built with **Anthropic**."
   ],
   "locality_evidence": [
    "# AWS New Carlisle Data Center Campus: Project Rainier - Where Anthropic Trains Claude",
    "Effectively all of that compute sat in one place: a stretch of former farmland along State Road 2 in New Carlisle, Indiana, about 80 miles east of Chicago \u2014 now one of the world\u2019s largest AI data center campuses."
   ],
   "state_evidence": [
    "# AWS New Carlisle Data Center Campus: Project Rainier - Where Anthropic Trains Claude",
    "Effectively all of that compute sat in one place: a stretch of former farmland along State Road 2 in New Carlisle, Indiana, about 80 miles east of Chicago \u2014 now one of the world\u2019s largest AI data center campuses."
   ],
   "capacity_gw_evidence": [
    "# AWS New Carlisle Data Center Campus: Project Rainier - Where Anthropic Trains Claude",
    "### An $11 billion AWS self-build on 882 acres of Indiana farmland \u2014 32 data center buildings, ~6.5 million square feet, 2.25 GW of grid draw, and 878 backup diesel generators at full build-out.",
    "Finished, its 32 buildings will hold about 6.5 million square feet and draw **2.25 GW** from the grid \u2014 about the electricity used by 1.5 million average homes, and enough to make the campus the single largest customer in Indiana Michigan Power\u2019s 100-plus-year history."
   ],
   "builder_evidence": [
    "# AWS New Carlisle Data Center Campus: Project Rainier - Where Anthropic Trains Claude",
    "What makes New Carlisle worth a close read is that everything here is Amazon\u2019s own \u2014 the land, the buildings, the chips, the network, and the deal terms around them \u2014 an unusually complete picture of how a frontier AI campus actually gets built."
   ],
   "ai_customer_evidence": [
    "# AWS New Carlisle Data Center Campus: Project Rainier - Where Anthropic Trains Claude",
    "In October 2025, Amazon brought Project Rainier [online](https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster): roughly **500,000 of its own Trainium2 chips**, devoted to a single customer \u2014 Anthropic, which uses them to train and serve its Claude models."
   ],
   "status_evidence": [
    "# AWS New Carlisle Data Center Campus: Project Rainier - Where Anthropic Trains Claude",
    "In October 2025, Amazon brought Project Rainier [online](https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster): roughly **500,000 of its own Trainium2 chips**, devoted to a single customer \u2014 Anthropic, which uses them to train and serve its Claude models."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://introl.com/blog/xai-colossus-2-gigawatt-expansion-555k-gpus-january-2026?:~:text=Musk's%20xAI%20purchases%20third%20Memphis_32K%20GB200s)",
   "title": "xAI Colossus Hits 2 GW: 555,000 GPUs, $18B, Largest AI Site",
   "published_at": "2026-01-03T00:00:00",
   "project": "Colossus",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "Operational",
   "announcement_date": "2025-12-30",
   "project_evidence": [
    "## What Happened",
    "On December 30, 2025, Elon Musk revealed xAI purchased a third building near its Colossus 2 data center in Memphis, Tennessee.1 The expansion brings total site capacity to nearly 2 gigawatts."
   ],
   "locality_evidence": [
    "## What Happened",
    "On December 30, 2025, Elon Musk revealed xAI purchased a third building near its Colossus 2 data center in Memphis, Tennessee.1 The expansion brings total site capacity to nearly 2 gigawatts."
   ],
   "state_evidence": [
    "## What Happened",
    "On December 30, 2025, Elon Musk revealed xAI purchased a third building near its Colossus 2 data center in Memphis, Tennessee.1 The expansion brings total site capacity to nearly 2 gigawatts."
   ],
   "capacity_gw_evidence": [
    "## What Happened",
    "On December 30, 2025, Elon Musk revealed xAI purchased a third building near its Colossus 2 data center in Memphis, Tennessee.1 The expansion brings total site capacity to nearly 2 gigawatts."
   ],
   "builder_evidence": [
    "## What Happened",
    "On December 30, 2025, Elon Musk revealed xAI purchased a third building near its Colossus 2 data center in Memphis, Tennessee.1 The expansion brings total site capacity to nearly 2 gigawatts."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## What Happened",
    "**Colossus footprint:**",
    "| Facility | Status | GPUs | Power |",
    "| Colossus 1 | Operational | 230,000 (incl. 30K GB200s) | ~500 MW |"
   ],
   "announcement_date_evidence": [
    "## What Happened",
    "On December 30, 2025, Elon Musk revealed xAI purchased a third building near its Colossus 2 data center in Memphis, Tennessee.1 The expansion brings total site capacity to nearly 2 gigawatts."
   ]
  },
  {
   "url": "https://baxtel.com/data-center/crusoe-goodnight-4",
   "title": "Crusoe: Goodnight 4",
   "published_at": null,
   "project": "Lancium Clean Campus",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe",
   "ai_customer": "Oracle",
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "# Crusoe: Goodnight 4",
    "Crusoe is developing an AI campus at the Lancium Clean Campus in Abilene, Texas, planned for 1.2 GW, and in May 2025 it secured $11.6 billion in debt and equity to expand the site from two to eight buildings."
   ],
   "locality_evidence": [
    "# Crusoe: Goodnight 4",
    "Crusoe is developing an AI campus at the Lancium Clean Campus in Abilene, Texas, planned for 1.2 GW, and in May 2025 it secured $11.6 billion in debt and equity to expand the site from two to eight buildings."
   ],
   "state_evidence": [
    "# Crusoe: Goodnight 4",
    "Crusoe is developing an AI campus at the Lancium Clean Campus in Abilene, Texas, planned for 1.2 GW, and in May 2025 it secured $11.6 billion in debt and equity to expand the site from two to eight buildings."
   ],
   "capacity_gw_evidence": [
    "# Crusoe: Goodnight 4",
    "Crusoe is developing an AI campus at the Lancium Clean Campus in Abilene, Texas, planned for 1.2 GW, and in May 2025 it secured $11.6 billion in debt and equity to expand the site from two to eight buildings."
   ],
   "builder_evidence": [
    "# Crusoe: Goodnight 4",
    "Crusoe is developing an AI campus at the Lancium Clean Campus in Abilene, Texas, planned for 1.2 GW, and in May 2025 it secured $11.6 billion in debt and equity to expand the site from two to eight buildings."
   ],
   "ai_customer_evidence": [
    "# Crusoe: Goodnight 4",
    "For this project, it is reported that Crusoe\u2019s direct customer is Oracle and that OpenAI is Oracle\u2019s customer; the Abilene campus is tied to OpenAI\u2019s Stargate program;"
   ],
   "status_evidence": [
    "# Crusoe: Goodnight 4",
    "Under Construction"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://baxtel.com/data-center/crusoe-goodnight-4",
   "title": "Crusoe: Goodnight 4",
   "published_at": null,
   "project": "Project Jade",
   "locality": "Cheyenne",
   "state": "Wyoming",
   "capacity_gw": 10.0,
   "builder": "Crusoe",
   "ai_customer": null,
   "status": "Paused",
   "announcement_date": null,
   "project_evidence": [
    "# Crusoe: Goodnight 4",
    "### Crusoe Temporarily Stops 1.8GW Data Center Build in Wyoming",
    "Crusoe has paused development of Project Jade, a planned 1.8GW data center campus in Cheyenne, Wyoming that was announced last year and designed to potentially scale up to 10GW."
   ],
   "locality_evidence": [
    "# Crusoe: Goodnight 4",
    "### Crusoe Temporarily Stops 1.8GW Data Center Build in Wyoming",
    "Crusoe has paused development of Project Jade, a planned 1.8GW data center campus in Cheyenne, Wyoming that was announced last year and designed to potentially scale up to 10GW."
   ],
   "state_evidence": [
    "# Crusoe: Goodnight 4",
    "### Crusoe Temporarily Stops 1.8GW Data Center Build in Wyoming",
    "Crusoe has paused development of Project Jade, a planned 1.8GW data center campus in Cheyenne, Wyoming that was announced last year and designed to potentially scale up to 10GW."
   ],
   "capacity_gw_evidence": [
    "# Crusoe: Goodnight 4",
    "### Crusoe Temporarily Stops 1.8GW Data Center Build in Wyoming",
    "Crusoe has paused development of Project Jade, a planned 1.8GW data center campus in Cheyenne, Wyoming that was announced last year and designed to potentially scale up to 10GW."
   ],
   "builder_evidence": [
    "# Crusoe: Goodnight 4",
    "### Crusoe Temporarily Stops 1.8GW Data Center Build in Wyoming",
    "Crusoe has paused development of Project Jade, a planned 1.8GW data center campus in Cheyenne, Wyoming that was announced last year and designed to potentially scale up to 10GW."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Crusoe: Goodnight 4",
    "### Crusoe Temporarily Stops 1.8GW Data Center Build in Wyoming",
    "Crusoe has paused development of Project Jade, a planned 1.8GW data center campus in Cheyenne, Wyoming that was announced last year and designed to potentially scale up to 10GW."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news/vantage-breaks-ground-on-texas-gigawatt-data-center-campus-for-openai",
   "title": "Vantage breaks ground on Texas gigawatt data center campus for OpenAI",
   "published_at": "2026-08-05T00:00:00",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": "OpenAI",
   "status": "groundbreaking ceremony",
   "announcement_date": null,
   "project_evidence": [
    "Vantage has broken ground on a new data center campus in Texas set to host hardware for OpenAI.",
    "\u201cThis week, Vantage Data Centers hosted a groundbreaking ceremony for our Frontier campus in Shackelford County, Texas,\u201d the company announced on [LinkedIn](https://www.linkedin.com/posts/vantage-data-centers_ai-digitalinfrastructure-stargate-activity-7405254667062124544-FOcd/?utm_source=share&utm_medium=member_android&rcm=ACoAAAmuuF4BvsgagH4Z8-Z8-0LaBPPY6467cAs) over the weekend."
   ],
   "locality_evidence": [
    "Vantage has broken ground on a new data center campus in Texas set to host hardware for OpenAI.",
    "\u201cThis week, Vantage Data Centers hosted a groundbreaking ceremony for our Frontier campus in Shackelford County, Texas,\u201d the company announced on [LinkedIn](https://www.linkedin.com/posts/vantage-data-centers_ai-digitalinfrastructure-stargate-activity-7405254667062124544-FOcd/?utm_source=share&utm_medium=member_android&rcm=ACoAAAmuuF4BvsgagH4Z8-Z8-0LaBPPY6467cAs) over the weekend."
   ],
   "state_evidence": [
    "Vantage has broken ground on a new data center campus in Texas set to host hardware for OpenAI.",
    "\u201cThis week, Vantage Data Centers hosted a groundbreaking ceremony for our Frontier campus in Shackelford County, Texas,\u201d the company announced on [LinkedIn](https://www.linkedin.com/posts/vantage-data-centers_ai-digitalinfrastructure-stargate-activity-7405254667062124544-FOcd/?utm_source=share&utm_medium=member_android&rcm=ACoAAAmuuF4BvsgagH4Z8-Z8-0LaBPPY6467cAs) over the weekend."
   ],
   "capacity_gw_evidence": [
    "Vantage has broken ground on a new data center campus in Texas set to host hardware for OpenAI.",
    "\u201cPart of Oracle and OpenAI\u2019s Stargate expansion, the 1.4GW campus will lead to advancements in AI while creating significant regional economic growth, including employing more than 5,000 individuals across construction and operations.\u201d",
    "At full build-out, the 1,200-acre campus will host 10 single-story data centers, totaling 1.4GW across some 3.7 million sq ft (343,740 sqm)."
   ],
   "builder_evidence": [
    "Vantage has broken ground on a new data center campus in Texas set to host hardware for OpenAI.",
    "\u201cThis week, Vantage Data Centers hosted a groundbreaking ceremony for our Frontier campus in Shackelford County, Texas,\u201d the company announced on [LinkedIn](https://www.linkedin.com/posts/vantage-data-centers_ai-digitalinfrastructure-stargate-activity-7405254667062124544-FOcd/?utm_source=share&utm_medium=member_android&rcm=ACoAAAmuuF4BvsgagH4Z8-Z8-0LaBPPY6467cAs) over the weekend."
   ],
   "ai_customer_evidence": [
    "Vantage has broken ground on a new data center campus in Texas set to host hardware for OpenAI.",
    "\u201cPart of Oracle and OpenAI\u2019s Stargate expansion, the 1.4GW campus will lead to advancements in AI while creating significant regional economic growth, including employing more than 5,000 individuals across construction and operations.\u201d"
   ],
   "status_evidence": [
    "Vantage has broken ground on a new data center campus in Texas set to host hardware for OpenAI.",
    "\u201cThis week, Vantage Data Centers hosted a groundbreaking ceremony for our Frontier campus in Shackelford County, Texas,\u201d the company announced on [LinkedIn](https://www.linkedin.com/posts/vantage-data-centers_ai-digitalinfrastructure-stargate-activity-7405254667062124544-FOcd/?utm_source=share&utm_medium=member_android&rcm=ACoAAAmuuF4BvsgagH4Z8-Z8-0LaBPPY6467cAs) over the weekend."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://poweredbywho.com/projects/project-matador-fermi-america-11-gw-nuclear-gas-f92f3faa",
   "title": "Fermi America Project Matador HyperGrid (Amarillo) Data Center, Texas | PoweredByWho",
   "published_at": null,
   "project": "Fermi America Project Matador HyperGrid",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "POWEREDBYWHO",
    "PROJECT DOSSIER",
    "FILE #PROJECT-MATADOR-FERMI-AMERICA-11-GW-NUCLEAR-GAS-F92F3FAA \u00b7 UPDATED 2026-06-12",
    "# Fermi America Project Matador HyperGrid (Amarillo)"
   ],
   "locality_evidence": [
    "POWEREDBYWHO",
    "PROJECT DOSSIER",
    "FILE #PROJECT-MATADOR-FERMI-AMERICA-11-GW-NUCLEAR-GAS-F92F3FAA \u00b7 UPDATED 2026-06-12",
    "# Fermi America Project Matador HyperGrid (Amarillo)"
   ],
   "state_evidence": [
    "POWEREDBYWHO",
    "PROJECT DOSSIER",
    "FILE #PROJECT-MATADOR-FERMI-AMERICA-11-GW-NUCLEAR-GAS-F92F3FAA \u00b7 UPDATED 2026-06-12",
    "AMARILLO",
    "Carson County, TX"
   ],
   "capacity_gw_evidence": [
    "POWEREDBYWHO",
    "PROJECT DOSSIER",
    "FILE #PROJECT-MATADOR-FERMI-AMERICA-11-GW-NUCLEAR-GAS-F92F3FAA \u00b7 UPDATED 2026-06-12",
    "11000 MW \u00b7 UNDER CONSTRUCTION",
    "Capacity",
    "11000 MW"
   ],
   "builder_evidence": [
    "POWEREDBYWHO",
    "PROJECT DOSSIER",
    "FILE #PROJECT-MATADOR-FERMI-AMERICA-11-GW-NUCLEAR-GAS-F92F3FAA \u00b7 UPDATED 2026-06-12",
    "Developer \u00b7 Fermi America"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "POWEREDBYWHO",
    "PROJECT DOSSIER",
    "FILE #PROJECT-MATADOR-FERMI-AMERICA-11-GW-NUCLEAR-GAS-F92F3FAA \u00b7 UPDATED 2026-06-12",
    "11000 MW \u00b7 UNDER CONSTRUCTION",
    "Status",
    "Under Construction"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news/homer-city-and-kiewit-unveil-plans-for-45gw-natural-gas-powered-ai-data-center-in-pennsylvania",
   "title": "Homer City and Kiewit unveil plans for 4.5GW natural gas powered AI data center in Pennsylvania",
   "published_at": "2026-08-05T00:00:00",
   "project": "The Homer City Energy Campus",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Kiewit",
   "ai_customer": null,
   "status": "In development / Planned",
   "announcement_date": null,
   "project_evidence": [
    "The project has been dubbed The Homer City Energy Campus.",
    "Developer Homer City Redevelopment (HCR) and Kiewit, a construction and engineering firm, have partnered to convert a former coal power station in Pennsylvania into a natural gas-powered AI data center."
   ],
   "locality_evidence": [
    "The partners aim to convert the Homer City Generating Station, a decommissioned 2GW coal-burning power station near Homer City, Indiana County, Pennsylvania into a 4.5GW natural gas powered data center campus spanning more than 3,200 acres.",
    "Developer Homer City Redevelopment (HCR) and Kiewit, a construction and engineering firm, have partnered to convert a former coal power station in Pennsylvania into a natural gas-powered AI data center."
   ],
   "state_evidence": [
    "The partners aim to convert the Homer City Generating Station, a decommissioned 2GW coal-burning power station near Homer City, Indiana County, Pennsylvania into a 4.5GW natural gas powered data center campus spanning more than 3,200 acres.",
    "Developer Homer City Redevelopment (HCR) and Kiewit, a construction and engineering firm, have partnered to convert a former coal power station in Pennsylvania into a natural gas-powered AI data center."
   ],
   "capacity_gw_evidence": [
    "The partners aim to convert the Homer City Generating Station, a decommissioned 2GW coal-burning power station near Homer City, Indiana County, Pennsylvania into a 4.5GW natural gas powered data center campus spanning more than 3,200 acres.",
    "Developer Homer City Redevelopment (HCR) and Kiewit, a construction and engineering firm, have partnered to convert a former coal power station in Pennsylvania into a natural gas-powered AI data center."
   ],
   "builder_evidence": [
    "Developer Homer City Redevelopment (HCR) and Kiewit, a construction and engineering firm, have partnered to convert a former coal power station in Pennsylvania into a natural gas-powered AI data center.",
    "The campus will be constructed by Kiewit."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction on the project is expected to begin this year, with commercial operations slated for 2027.",
    "Developer Homer City Redevelopment (HCR) and Kiewit, a construction and engineering firm, have partnered to convert a former coal power station in Pennsylvania into a natural gas-powered AI data center."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://nscale.com/ai-infrastructure/monarch",
   "title": "Monarch Compute Campus West Virginia | AI Infrastructure Development",
   "published_at": null,
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "under development",
   "announcement_date": null,
   "project_evidence": [
    "AI DATA CENTER",
    "# Monarch Compute Campus West Virginia, United States",
    "Built from the ground up in Mason County, the Monarch Compute Campus will bring jobs, investment, and long-term opportunity through one of the world's largest AI infrastructure developments, while preserving the character and values that make this community special."
   ],
   "locality_evidence": [
    "AI DATA CENTER",
    "# Monarch Compute Campus West Virginia, United States",
    "Built from the ground up in Mason County, the Monarch Compute Campus will bring jobs, investment, and long-term opportunity through one of the world's largest AI infrastructure developments, while preserving the character and values that make this community special."
   ],
   "state_evidence": [
    "AI DATA CENTER",
    "# Monarch Compute Campus West Virginia, United States",
    "Built from the ground up in Mason County, the Monarch Compute Campus will bring jobs, investment, and long-term opportunity through one of the world's largest AI infrastructure developments, while preserving the character and values that make this community special."
   ],
   "capacity_gw_evidence": [
    "AI DATA CENTER",
    "# Monarch Compute Campus West Virginia, United States",
    "Phase 1 is engineered to host 1.35GW of AI computing capacity, with delivery targeted by early 2028. Phase 1 is just the start: Monarch is designed as a multi-phase campus, with a clear expansion path to 8GW+ as workload demand grows."
   ],
   "builder_evidence": [
    "AI DATA CENTER",
    "# Monarch Compute Campus West Virginia, United States",
    "It is also part of Nscale's international portfolio of purpose-built AI campuses, bringing the same operational standards that underpin our European infrastructure to the United States."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "AI DATA CENTER",
    "# Monarch Compute Campus West Virginia, United States",
    "Phase 1 is engineered to host 1.35GW of AI computing capacity, with delivery targeted by early 2028."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news/5gw-data-center-with-behind-the-meter-hydrogen-power-planned-for-laredo-texas",
   "title": "Up to 5GW data center with behind-the-meter hydrogen power promised for Laredo, Texas",
   "published_at": "2026-08-05T00:00:00",
   "project": "Data City",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corporation",
   "ai_customer": null,
   "status": "pitched",
   "announcement_date": null,
   "project_evidence": [
    "Energy Abundance Development Corporation has unveiled the project, Data City, which could be built near the city of Laredo in southwest Texas, near the border with Mexico."
   ],
   "locality_evidence": [
    "Energy Abundance Development Corporation has unveiled the project, Data City, which could be built near the city of Laredo in southwest Texas, near the border with Mexico."
   ],
   "state_evidence": [
    "A data center campus of up to 5GW that utilizes its own behind-the-meter power supply is being pitched for 50,000 acres of land in Texas.",
    "Energy Abundance Development Corporation has unveiled the project, Data City, which could be built near the city of Laredo in southwest Texas, near the border with Mexico."
   ],
   "capacity_gw_evidence": [
    "A data center campus of up to 5GW that utilizes its own behind-the-meter power supply is being pitched for 50,000 acres of land in Texas."
   ],
   "builder_evidence": [
    "Energy Abundance Development Corporation has unveiled the project, Data City, which could be built near the city of Laredo in southwest Texas, near the border with Mexico."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "A data center campus of up to 5GW that utilizes its own behind-the-meter power supply is being pitched for 50,000 acres of land in Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tftc.io/openai-project-camellia-3-2-gw-georgia-bitcoin-miners-energy",
   "title": "OpenAI 3.2 GW Georgia Data Center Threatens Bitcoin Miners \u00b7 TFTC",
   "published_at": "2026-07-23T16:12:09",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "# OpenAI Locks 3.2 GW Under 25-Year Gas Contract in Georgia",
    "OpenAI's Project Camellia, a $20B, 3.2-GW campus in Effingham County, Georgia, claims one-third of Georgia Power's PSC-approved capacity expansion under a 25-year contract powered primarily by new natural gas generation."
   ],
   "locality_evidence": [
    "# OpenAI Locks 3.2 GW Under 25-Year Gas Contract in Georgia",
    "OpenAI's Project Camellia, a $20B, 3.2-GW campus in Effingham County, Georgia, claims one-third of Georgia Power's PSC-approved capacity expansion under a 25-year contract powered primarily by new natural gas generation."
   ],
   "state_evidence": [
    "# OpenAI Locks 3.2 GW Under 25-Year Gas Contract in Georgia",
    "OpenAI's Project Camellia, a $20B, 3.2-GW campus in Effingham County, Georgia, claims one-third of Georgia Power's PSC-approved capacity expansion under a 25-year contract powered primarily by new natural gas generation."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Locks 3.2 GW Under 25-Year Gas Contract in Georgia",
    "OpenAI's Project Camellia, a $20B, 3.2-GW campus in Effingham County, Georgia, claims one-third of Georgia Power's PSC-approved capacity expansion under a 25-year contract powered primarily by new natural gas generation."
   ],
   "builder_evidence": [
    "# OpenAI Locks 3.2 GW Under 25-Year Gas Contract in Georgia",
    "OpenAI's Project Camellia, a $20B, 3.2-GW campus in Effingham County, Georgia, claims one-third of Georgia Power's PSC-approved capacity expansion under a 25-year contract powered primarily by new natural gas generation."
   ],
   "ai_customer_evidence": [
    "# OpenAI Locks 3.2 GW Under 25-Year Gas Contract in Georgia",
    "OpenAI's Project Camellia, a $20B, 3.2-GW campus in Effingham County, Georgia, claims one-third of Georgia Power's PSC-approved capacity expansion under a 25-year contract powered primarily by new natural gas generation."
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "# OpenAI Locks 3.2 GW Under 25-Year Gas Contract in Georgia",
    "- OpenAI announced Project Camellia on July 22, 2026: a $20B, 1,400-acre data center campus in Effingham County, Georgia, powered by a 25-year Georgia Power contract delivering up to 3.2 GW, predominantly from new natural gas generation."
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news/google-confirms-1gw-data-center-campus-near-detroit-michigan-partners-with-dte-energy-on-27gw-power-generation",
   "title": "Google confirms 1GW data center campus near Detroit, Michigan, partners with DTE Energy on 2.7GW power generation",
   "published_at": "2026-08-11T00:00:00",
   "project": "Project Cannoli",
   "locality": "Van Buren",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Walbridge",
   "ai_customer": "Google",
   "status": "proposed",
   "announcement_date": "2025-12",
   "project_evidence": [
    "Google is behind a 1GW data center campus proposed in Van Buren, near Detroit, Michigan."
   ],
   "locality_evidence": [
    "Google is behind a 1GW data center campus proposed in Van Buren, near Detroit, Michigan."
   ],
   "state_evidence": [
    "Google is behind a 1GW data center campus proposed in Van Buren, near Detroit, Michigan."
   ],
   "capacity_gw_evidence": [
    "Google is behind a 1GW data center campus proposed in Van Buren, near Detroit, Michigan."
   ],
   "builder_evidence": [
    "The total footprint will exceed 800,000 sq ft (74,320 sqm). Walbridge will serve as the general contractor on the project."
   ],
   "ai_customer_evidence": [
    "Google is behind a 1GW data center campus proposed in Van Buren, near Detroit, Michigan."
   ],
   "status_evidence": [
    "Google is behind a 1GW data center campus proposed in Van Buren, near Detroit, Michigan."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news/terawulf-acquires-site-in-kentucky-for-1gw-data-center-campus",
   "title": "TeraWulf acquires site in Kentucky for 1GW data center campus",
   "published_at": "2026-08-05T00:00:00",
   "project": "Muskie Data Campus",
   "locality": "Eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Cryptominer and AI data center firm TeraWulf is expanding its footprint with a second planned site in Kentucky.",
    "Acquired from Industrial Equity Partners, the Muskie Data Campus is expected to support more than 1GW of data center capacity over time."
   ],
   "locality_evidence": [
    "Cryptominer and AI data center firm TeraWulf is expanding its footprint with a second planned site in Kentucky.",
    "The Nasdaq-listed firm this week announced the acquisition of a hyperscale high-performance computing development site located in Eastern Kentucky.",
    "Acquired from Industrial Equity Partners, the Muskie Data Campus is expected to support more than 1GW of data center capacity over time."
   ],
   "state_evidence": [
    "Cryptominer and AI data center firm TeraWulf is expanding its footprint with a second planned site in Kentucky.",
    "The Nasdaq-listed firm this week announced the acquisition of a hyperscale high-performance computing development site located in Eastern Kentucky.",
    "Acquired from Industrial Equity Partners, the Muskie Data Campus is expected to support more than 1GW of data center capacity over time."
   ],
   "capacity_gw_evidence": [
    "Cryptominer and AI data center firm TeraWulf is expanding its footprint with a second planned site in Kentucky.",
    "Acquired from Industrial Equity Partners, the Muskie Data Campus is expected to support more than 1GW of data center capacity over time."
   ],
   "builder_evidence": [
    "Cryptominer and AI data center firm TeraWulf is expanding its footprint with a second planned site in Kentucky.",
    "Acquired from Industrial Equity Partners, the Muskie Data Campus is expected to support more than 1GW of data center capacity over time.",
    "We believe TeraWulf brings the infrastructure expertise, power strategy, and execution capabilities needed to realize the project\u2019s full potential."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Cryptominer and AI data center firm TeraWulf is expanding its footprint with a second planned site in Kentucky.",
    "Acquired from Industrial Equity Partners, the Muskie Data Campus is expected to support more than 1GW of data center capacity over time."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://investingnews.com/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion",
   "title": "Hut 8 Commercializes First Phase of 1 GW Beacon Point AI Data Center Campus with 15-Year, 352 MW IT Lease...",
   "published_at": "2026-05-06T08:30:00",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "commercialized",
   "announcement_date": "2026-05-06",
   "project_evidence": [
    "[Hut 8 Corp.](https://www.hut8.com/) (Nasdaq, TSX: HUT) (\"[Hut 8](/stocks/tsx-hut/hut-8-mining-corp/)\" or the \"Company\"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive technologies, today announced the commercialization of the first phase of its Beacon Point data center campus in Nueces County, Texas through a 15-year, $9.8 billion lease (the \"Agreement\") for 352 megawatts (MW) of IT capacity (the \"Transaction\")."
   ],
   "locality_evidence": [
    "[Hut 8 Corp.](https://www.hut8.com/) (Nasdaq, TSX: HUT) (\"[Hut 8](/stocks/tsx-hut/hut-8-mining-corp/)\" or the \"Company\"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive technologies, today announced the commercialization of the first phase of its Beacon Point data center campus in Nueces County, Texas through a 15-year, $9.8 billion lease (the \"Agreement\") for 352 megawatts (MW) of IT capacity (the \"Transaction\")."
   ],
   "state_evidence": [
    "[Hut 8 Corp.](https://www.hut8.com/) (Nasdaq, TSX: HUT) (\"[Hut 8](/stocks/tsx-hut/hut-8-mining-corp/)\" or the \"Company\"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive technologies, today announced the commercialization of the first phase of its Beacon Point data center campus in Nueces County, Texas through a 15-year, $9.8 billion lease (the \"Agreement\") for 352 megawatts (MW) of IT capacity (the \"Transaction\")."
   ],
   "capacity_gw_evidence": null,
   "builder_evidence": [
    "[Hut 8 Corp.](https://www.hut8.com/) (Nasdaq, TSX: HUT) (\"[Hut 8](/stocks/tsx-hut/hut-8-mining-corp/)\" or the \"Company\"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive technologies, today announced the commercialization of the first phase of its Beacon Point data center campus in Nueces County, Texas through a 15-year, $9.8 billion lease (the \"Agreement\") for 352 megawatts (MW) of IT capacity (the \"Transaction\")."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "[Hut 8 Corp.](https://www.hut8.com/) (Nasdaq, TSX: HUT) (\"[Hut 8](/stocks/tsx-hut/hut-8-mining-corp/)\" or the \"Company\"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive technologies, today announced the commercialization of the first phase of its Beacon Point data center campus in Nueces County, Texas through a 15-year, $9.8 billion lease (the \"Agreement\") for 352 megawatts (MW) of IT capacity (the \"Transaction\")."
   ],
   "announcement_date_evidence": [
    "MIAMI, May 6, 2026 /PRNewswire/ -- [Hut 8 Corp.](https://www.hut8.com/) (Nasdaq, TSX: HUT) (\"[Hut 8](/stocks/tsx-hut/hut-8-mining-corp/)\" or the \"Company\"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive technologies, today announced the commercialization of the first phase of its Beacon Point data center campus in Nueces County, Texas through a 15-year, $9.8 billion lease (the \"Agreement\") for 352 megawatts (MW) of IT capacity (the \"Transaction\")."
   ]
  },
  {
   "url": "https://creekstone.energy/delta",
   "title": "The Delta Gigasite | Creekstone Energy",
   "published_at": null,
   "project": "The Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone",
   "ai_customer": null,
   "status": "Construction",
   "announcement_date": null,
   "project_evidence": [
    "Flagship Project",
    "# The Delta Gigasite",
    ">10 GW AI infrastructure campus in Delta, Utah. Land secured, permits issued, construction underway."
   ],
   "locality_evidence": [
    "Flagship Project",
    "# The Delta Gigasite",
    ">10 GW AI infrastructure campus in Delta, Utah. Land secured, permits issued, construction underway."
   ],
   "state_evidence": [
    "Flagship Project",
    "# The Delta Gigasite",
    ">10 GW AI infrastructure campus in Delta, Utah. Land secured, permits issued, construction underway."
   ],
   "capacity_gw_evidence": [
    "Flagship Project",
    "# The Delta Gigasite",
    ">10 GW AI infrastructure campus in Delta, Utah. Land secured, permits issued, construction underway."
   ],
   "builder_evidence": [
    "Flagship Project",
    "# The Delta Gigasite",
    " Every milestone represents capital deployed, contracts executed, and deadlines met, not future promises or conditional commitments. Creekstone is building the largest data center campus in the world, enabling leadership in the race to AI superintelligence."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Flagship Project",
    "# The Delta Gigasite",
    ">10 GW AI infrastructure campus in Delta, Utah. Land secured, permits issued, construction underway."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news/ecl-says-it-will-build-a-1gw-hydrogen-powered-ai-data-center-in-texas-with-lambda-as-its-first-tenant",
   "title": "ECL says it will build a 1GW hydrogen-powered AI data center in Texas, with Lambda as its first tenant",
   "published_at": "2026-08-05T00:00:00",
   "project": "TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "Data center startup ECL claims that it will build a 1GW AI data center on a more than 600-acre site east of Houston, Texas, powered by hydrogen.",
    "The TerraSite-TX1 will initially have a capacity of 50MW, coming next summer, at a cost of around $450 million."
   ],
   "locality_evidence": [
    "Data center startup ECL claims that it will build a 1GW AI data center on a more than 600-acre site east of Houston, Texas, powered by hydrogen."
   ],
   "state_evidence": [
    "Data center startup ECL claims that it will build a 1GW AI data center on a more than 600-acre site east of Houston, Texas, powered by hydrogen."
   ],
   "capacity_gw_evidence": [
    "Data center startup ECL claims that it will build a 1GW AI data center on a more than 600-acre site east of Houston, Texas, powered by hydrogen."
   ],
   "builder_evidence": [
    "Data center startup ECL claims that it will build a 1GW AI data center on a more than 600-acre site east of Houston, Texas, powered by hydrogen."
   ],
   "ai_customer_evidence": [
    "AI cloud provider Lambda will be the first customer, but is not taking the whole 50MW."
   ],
   "status_evidence": [
    "Data center startup ECL claims that it will build a 1GW AI data center on a more than 600-acre site east of Houston, Texas, powered by hydrogen."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://openai.com/index/openai-joins-ports-pike-project",
   "title": "OpenAI joins PORTS-Pike project",
   "published_at": "2026-08-25T07:00:00",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# OpenAI joins PORTS-Pike project",
    "OpenAI has entered into an agreement to secure approximately 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, working with SB Energy, NVIDIA, and the U.S. Department of Energy."
   ],
   "locality_evidence": [
    "Expanding community investment and supporting thousands of Southern Ohio jobs.",
    "OpenAI has entered into an agreement to secure approximately 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, working with SB Energy, NVIDIA, and the U.S. Department of Energy."
   ],
   "state_evidence": [
    "Expanding community investment and supporting thousands of Southern Ohio jobs.",
    "OpenAI has entered into an agreement to secure approximately 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, working with SB Energy, NVIDIA, and the U.S. Department of Energy."
   ],
   "capacity_gw_evidence": [
    "Expanding community investment and supporting thousands of Southern Ohio jobs.",
    "OpenAI has entered into an agreement to secure approximately 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, working with SB Energy, NVIDIA, and the U.S. Department of Energy."
   ],
   "builder_evidence": [
    "Expanding community investment and supporting thousands of Southern Ohio jobs.",
    "OpenAI has entered into an agreement to secure approximately 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, working with SB Energy, NVIDIA, and the U.S. Department of Energy."
   ],
   "ai_customer_evidence": [
    "Expanding community investment and supporting thousands of Southern Ohio jobs.",
    "OpenAI has entered into an agreement to secure approximately 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, working with SB Energy, NVIDIA, and the U.S. Department of Energy."
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "August 17, 2026",
    "# OpenAI joins PORTS-Pike project"
   ]
  },
  {
   "url": "https://epochai.substack.com/p/openai-stargate-where-the-us-sites",
   "title": "OpenAI Stargate: where the US sites stand",
   "published_at": "2026-04-20T16:57:57",
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe",
   "ai_customer": "OpenAI",
   "status": "operational at an estimated capacity of 0.3 gigawatts (GW)",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Abilene, Texas**",
    "The Stargate project\u2019s flagship location is in Abilene, Texas."
   ],
   "locality_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Abilene, Texas**",
    "The Stargate project\u2019s flagship location is in Abilene, Texas."
   ],
   "state_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Abilene, Texas**",
    "The Stargate project\u2019s flagship location is in Abilene, Texas."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Abilene, Texas**",
    "**Projected capacity:** 1.2 GW | 1.0 million H100-equivalents"
   ],
   "builder_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Abilene, Texas**",
    "Built by AI infrastructure company Crusoe, Abilene is the most complete Stargate site to date, with an estimated four of the eight buildings already operational."
   ],
   "ai_customer_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **Introduction**",
    "Based on [announcements](https://openai.com/index/five-new-stargate-sites/) [from](https://openai.com/index/expanding-stargate-to-michigan/) 2025, SoftBank will own the hardware at the Milam County and Ohio sites, while Oracle will own the hardware at the remaining sites. All sites will serve OpenAI\u2019s workloads."
   ],
   "status_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "### The $500 billion AI data center initiative is projected to exceed 9 gigawatts of capacity by 2029, with 0.3 gigawatts already operational in Abilene and six more US sites under active construction.",
    "The most advanced\u2014in Abilene, Texas\u2014is already operating at an estimated capacity of 0.3 gigawatts (GW).1"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://epochai.substack.com/p/openai-stargate-where-the-us-sites",
   "title": "OpenAI Stargate: where the US sites stand",
   "published_at": "2026-04-20T16:57:57",
   "project": "Shackelford County",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Vantage",
   "ai_customer": "OpenAI",
   "status": "construction",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Shackelford County, Texas**"
   ],
   "locality_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Shackelford County, Texas**"
   ],
   "state_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Shackelford County, Texas**"
   ],
   "capacity_gw_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Shackelford County, Texas**",
    "**Projected capacity:** 2 GW | 4.2 million H100-equivalents"
   ],
   "builder_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Shackelford County, Texas**",
    "Just across the county line from the Abilene site, data center developer Vantage is constructing a massive 1,200-acre (4.9-square-kilometer) [campus](https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx) with 10 buildings."
   ],
   "ai_customer_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **Introduction**",
    "Based on [announcements](https://openai.com/index/five-new-stargate-sites/) [from](https://openai.com/index/expanding-stargate-to-michigan/) 2025, SoftBank will own the hardware at the Milam County and Ohio sites, while Oracle will own the hardware at the remaining sites. All sites will serve OpenAI\u2019s workloads."
   ],
   "status_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "### The $500 billion AI data center initiative is projected to exceed 9 gigawatts of capacity by 2029, with 0.3 gigawatts already operational in Abilene and six more US sites under active construction.",
    "Just across the county line from the Abilene site, data center developer Vantage is constructing a massive 1,200-acre (4.9-square-kilometer) [campus](https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx) with 10 buildings."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://epochai.substack.com/p/openai-stargate-where-the-us-sites",
   "title": "OpenAI Stargate: where the US sites stand",
   "published_at": "2026-04-20T16:57:57",
   "project": "Project Jupiter",
   "locality": "Do\u00f1a Ana County",
   "state": "New Mexico",
   "capacity_gw": 2.2,
   "builder": "STACK Infrastructure",
   "ai_customer": "OpenAI",
   "status": "construction",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Do\u00f1a Ana County, New Mexico**",
    "In New Mexico, STACK Infrastructure is developing Project Jupiter, which consists of four large buildings."
   ],
   "locality_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Do\u00f1a Ana County, New Mexico**"
   ],
   "state_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Do\u00f1a Ana County, New Mexico**",
    "In New Mexico, STACK Infrastructure is developing Project Jupiter, which consists of four large buildings."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Do\u00f1a Ana County, New Mexico**",
    "**Projected capacity:** 2.2 GW | 4.6 million H100-equivalents"
   ],
   "builder_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Do\u00f1a Ana County, New Mexico**",
    "In New Mexico, STACK Infrastructure is developing Project Jupiter, which consists of four large buildings."
   ],
   "ai_customer_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **Introduction**",
    "Based on [announcements](https://openai.com/index/five-new-stargate-sites/) [from](https://openai.com/index/expanding-stargate-to-michigan/) 2025, SoftBank will own the hardware at the Milam County and Ohio sites, while Oracle will own the hardware at the remaining sites. All sites will serve OpenAI\u2019s workloads."
   ],
   "status_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "### The $500 billion AI data center initiative is projected to exceed 9 gigawatts of capacity by 2029, with 0.3 gigawatts already operational in Abilene and six more US sites under active construction.",
    "Satellite imagery shows that foundation work is underway."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://epochai.substack.com/p/openai-stargate-where-the-us-sites",
   "title": "OpenAI Stargate: where the US sites stand",
   "published_at": "2026-04-20T16:57:57",
   "project": "Milam County",
   "locality": "Milam County",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "construction",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Milam County, Texas**"
   ],
   "locality_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Milam County, Texas**"
   ],
   "state_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Milam County, Texas**"
   ],
   "capacity_gw_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Milam County, Texas**",
    "**Projected capacity:** 1.2 GW | 2.5 million H100-equivalents"
   ],
   "builder_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Milam County, Texas**",
    "SoftBank subsidiary SB Energy is [building and operating](https://sbenergy.com/openai-and-softbank-group-partner-with-sb-energy/) what is [described](https://www.constructiondive.com/news/stargate-5-new-data-center-sites/761424/) as a \u201cfast-build\u201d site in Milam County, Texas, around 70 miles (110 kilometers) northeast of Austin."
   ],
   "ai_customer_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **Introduction**",
    "Based on [announcements](https://openai.com/index/five-new-stargate-sites/) [from](https://openai.com/index/expanding-stargate-to-michigan/) 2025, SoftBank will own the hardware at the Milam County and Ohio sites, while Oracle will own the hardware at the remaining sites. All sites will serve OpenAI\u2019s workloads."
   ],
   "status_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "### The $500 billion AI data center initiative is projected to exceed 9 gigawatts of capacity by 2029, with 0.3 gigawatts already operational in Abilene and six more US sites under active construction.",
    "A satellite image from March shows steel framing and roofing for the first building (visible as a blue rectangle)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://epochai.substack.com/p/openai-stargate-where-the-us-sites",
   "title": "OpenAI Stargate: where the US sites stand",
   "published_at": "2026-04-20T16:57:57",
   "project": "Lighthouse",
   "locality": "Port Washington",
   "state": "Wisconsin",
   "capacity_gw": 1.3,
   "builder": "Vantage",
   "ai_customer": "OpenAI",
   "status": "construction",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Port Washington, Wisconsin**",
    "Vantage, which is also the developer behind the Shackelford County site, has broken ground on a campus named \u201cLighthouse\u201d in Port Washington, just north of Milwaukee."
   ],
   "locality_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Port Washington, Wisconsin**",
    "Vantage, which is also the developer behind the Shackelford County site, has broken ground on a campus named \u201cLighthouse\u201d in Port Washington, just north of Milwaukee."
   ],
   "state_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Port Washington, Wisconsin**"
   ],
   "capacity_gw_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Port Washington, Wisconsin**",
    "**Projected capacity:** 1.3 GW | 2.6 million H100-equivalents"
   ],
   "builder_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Port Washington, Wisconsin**",
    "Vantage, which is also the developer behind the Shackelford County site, has broken ground on a campus named \u201cLighthouse\u201d in Port Washington, just north of Milwaukee."
   ],
   "ai_customer_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **Introduction**",
    "Based on [announcements](https://openai.com/index/five-new-stargate-sites/) [from](https://openai.com/index/expanding-stargate-to-michigan/) 2025, SoftBank will own the hardware at the Milam County and Ohio sites, while Oracle will own the hardware at the remaining sites. All sites will serve OpenAI\u2019s workloads."
   ],
   "status_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "### The $500 billion AI data center initiative is projected to exceed 9 gigawatts of capacity by 2029, with 0.3 gigawatts already operational in Abilene and six more US sites under active construction.",
    "Foundation work can be seen in satellite imagery."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://epochai.substack.com/p/openai-stargate-where-the-us-sites",
   "title": "OpenAI Stargate: where the US sites stand",
   "published_at": "2026-04-20T16:57:57",
   "project": "The Barn",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.4,
   "builder": "Related Digital",
   "ai_customer": "OpenAI",
   "status": "construction",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Saline Township, Michigan**",
    "Related Digital is [developing](https://www.related.com/press-releases/2025-10-30/openai-oracle-and-related-digital-announce-stargate-data-center-site) a campus dubbed \u201cThe Barn\u201d in Saline Township, southwest of Detroit."
   ],
   "locality_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Saline Township, Michigan**",
    "Related Digital is [developing](https://www.related.com/press-releases/2025-10-30/openai-oracle-and-related-digital-announce-stargate-data-center-site) a campus dubbed \u201cThe Barn\u201d in Saline Township, southwest of Detroit."
   ],
   "state_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Saline Township, Michigan**"
   ],
   "capacity_gw_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Saline Township, Michigan**",
    "**Projected capacity:** 1.4 GW | 2.9 million H100-equivalents"
   ],
   "builder_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **The sites**",
    "### **Saline Township, Michigan**",
    "Related Digital is [developing](https://www.related.com/press-releases/2025-10-30/openai-oracle-and-related-digital-announce-stargate-data-center-site) a campus dubbed \u201cThe Barn\u201d in Saline Township, southwest of Detroit."
   ],
   "ai_customer_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "## **Introduction**",
    "Based on [announcements](https://openai.com/index/five-new-stargate-sites/) [from](https://openai.com/index/expanding-stargate-to-michigan/) 2025, SoftBank will own the hardware at the Milam County and Ohio sites, while Oracle will own the hardware at the remaining sites. All sites will serve OpenAI\u2019s workloads."
   ],
   "status_evidence": [
    "# OpenAI Stargate: where the US sites stand",
    "### The $500 billion AI data center initiative is projected to exceed 9 gigawatts of capacity by 2029, with 0.3 gigawatts already operational in Abilene and six more US sites under active construction.",
    "Satellite imagery shows foundation work underway for the first building."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://www.facebook.com/LifeAtMeta/posts/we-just-broke-ground-on-a-10-billion-data-center-in-lebanon-indiana-one-of-the-l/1202094908753425/",
   "title": "Life at Meta",
   "published_at": null,
   "project": "Prometheus",
   "locality": "Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "ground broke",
   "announcement_date": null,
   "project_evidence": [
    "This 1-gigawatt \"Prometheus\" cluster will use liquid-cooled systems to power next-gen AI workloads efficiently."
   ],
   "locality_evidence": [
    "We just broke ground on a $10 billion data center in Lebanon, Indiana \u2014 one of the largest infrastructure investments in Meta's history."
   ],
   "state_evidence": [
    "We just broke ground on a $10 billion data center in Lebanon, Indiana \u2014 one of the largest infrastructure investments in Meta's history."
   ],
   "capacity_gw_evidence": [
    "This 1-gigawatt \"Prometheus\" cluster will use liquid-cooled systems to power next-gen AI workloads efficiently."
   ],
   "builder_evidence": [
    "We just broke ground on a $10 billion data center in Lebanon, Indiana \u2014 one of the largest infrastructure investments in Meta's history."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "We just broke ground on a $10 billion data center in Lebanon, Indiana \u2014 one of the largest infrastructure investments in Meta's history."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://cnbc.com/2025/10/29/amazon-opens-11-billion-ai-data-center-project-rainier-in-indiana.html",
   "title": "Amazon opens $11 billion AI data center Project Rainier in Indiana",
   "published_at": "2025-10-29T11:00:01",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon",
   "ai_customer": "Anthropic",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# Amazon opens $11 billion AI data center in rural Indiana as rivals race to break ground",
    "It's called Project Rainier, and it's the spot where [Amazon](/quotes/AMZN/) is training frontier artificial intelligence models entirely on its own chips."
   ],
   "locality_evidence": [
    "# Amazon opens $11 billion AI data center in rural Indiana as rivals race to break ground",
    "NEW CARLISLE, Indiana \u2014 A year ago, it was farmland."
   ],
   "state_evidence": [
    "# Amazon opens $11 billion AI data center in rural Indiana as rivals race to break ground",
    "NEW CARLISLE, Indiana \u2014 A year ago, it was farmland."
   ],
   "capacity_gw_evidence": [
    "# Amazon opens $11 billion AI data center in rural Indiana as rivals race to break ground",
    "The full site will eventually span 30 buildings and draw more than 2.2 gigawatts of electricity, enough to power more than 1.6 million homes."
   ],
   "builder_evidence": [
    "# Amazon opens $11 billion AI data center in rural Indiana as rivals race to break ground",
    "It's called Project Rainier, and it's the spot where [Amazon](/quotes/AMZN/) is training frontier artificial intelligence models entirely on its own chips."
   ],
   "ai_customer_evidence": [
    "# Amazon opens $11 billion AI data center in rural Indiana as rivals race to break ground",
    "The complex was built exclusively to train and run models from Anthropic, the AI startup behind Claude, and one of Amazon's largest cloud customers and AI partners."
   ],
   "status_evidence": [
    "# Amazon opens $11 billion AI data center in rural Indiana as rivals race to break ground",
    "The $11 billion facility is up and operational, while most AI rivals are promising data centers of the future."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://usdatacenterprojects.com/texas/crusoe-files-for-two-more-500-million-data-center-buildings-at-texas",
   "title": "Crusoe Files for Two More $500 Million Data Center Buildings at Texas",
   "published_at": "2026-07-31T06:11:25",
   "project": "Goodnight Campus",
   "locality": "Claude",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Research firm [**Aterio Research**](https://www.aterio.io/blog/crusoe-launches-usd29b-goodnight-campus-in-claude-mirroring-openai-s-stargate) indicates the full campus will ultimately feature seven buildings and deliver more than one gigawatt of capacity.",
    "Crusoe has submitted permit filings for two additional data center buildings at its Goodnight Campus in Claude, Texas, with each structure carrying an estimated construction cost of USD 500 million, as the AI infrastructure company pushes forward with one of the most ambitious data center developments in the state."
   ],
   "locality_evidence": [
    "Crusoe has submitted permit filings for two additional data center buildings at its Goodnight Campus in Claude, Texas, with each structure carrying an estimated construction cost of USD 500 million, as the AI infrastructure company pushes forward with one of the most ambitious data center developments in the state.",
    "The Goodnight Campus, also known as Project Llano, is situated at 10001 Lima Road in Claude, Armstrong County, just east of Amarillo."
   ],
   "state_evidence": [
    "Crusoe has submitted permit filings for two additional data center buildings at its Goodnight Campus in Claude, Texas, with each structure carrying an estimated construction cost of USD 500 million, as the AI infrastructure company pushes forward with one of the most ambitious data center developments in the state.",
    "The Goodnight Campus, also known as Project Llano, is situated at 10001 Lima Road in Claude, Armstrong County, just east of Amarillo."
   ],
   "capacity_gw_evidence": [
    "Research firm [**Aterio Research**](https://www.aterio.io/blog/crusoe-launches-usd29b-goodnight-campus-in-claude-mirroring-openai-s-stargate) indicates the full campus will ultimately feature seven buildings and deliver more than one gigawatt of capacity."
   ],
   "builder_evidence": [
    "Crusoe has submitted permit filings for two additional data center buildings at its Goodnight Campus in Claude, Texas, with each structure carrying an estimated construction cost of USD 500 million, as the AI infrastructure company pushes forward with one of the most ambitious data center developments in the state.",
    "Research firm [**Aterio Research**](https://www.aterio.io/blog/crusoe-launches-usd29b-goodnight-campus-in-claude-mirroring-openai-s-stargate) indicates the full campus will ultimately feature seven buildings and deliver more than one gigawatt of capacity."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://telborg.com/dc-intel/briefings/vantage-frontier-shackelford",
   "title": "Vantage Data Centers \u2014 \"Frontier\" Mega-Campus",
   "published_at": null,
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": "Oracle and OpenAI",
   "status": "Construction underway",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "## 1. Project envelope",
    "| Project name | \u201cFrontier\u201d | [1](https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/)vantage-dc.comReferenceVantage data centers unveils plans for frontier a 25b mega campus in texas to meet unpreceClick to open the source in a new tab.[4](https://www.sec.gov/Archives/edgar/data/1679688/000167968825000096/digitalbridge-3q25xearni.htm)SEC EDGARPrimaryDigitalbridge 3q25xearniOfficial government publication. Click to open the filing in a new tab.[7](https://arrington.house.gov/uploadedfiles/final_oracle_oai_data_center_fact_sheet_092225b.pdf)Government sourcePrimaryFinal oracle oai data center fact sheet 092225bOfficial government publication. Click to open the filing in a new tab.[8](https://openai.com/index/five-new-stargate-sites/)openai.comReferenceFive new stargate sitesClick to open the source in a new tab. |"
   ],
   "locality_evidence": [
    "## 1. Project envelope",
    "| Site location | Shackelford County, Texas | [1](https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/)vantage-dc.comReferenceVantage data centers unveils plans for frontier a 25b mega campus in texas to meet unpreceClick to open the source in a new tab.[2](https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx)vantage-dc.comReferenceShackelford county txClick to open the source in a new tab.[4](https://www.sec.gov/Archives/edgar/data/1679688/000167968825000096/digitalbridge-3q25xearni.htm)SEC EDGARPrimaryDigitalbridge 3q25xearniOfficial government publication. Click to open the filing in a new tab.[7](https://arrington.house.gov/uploadedfiles/final_oracle_oai_data_center_fact_sheet_092225b.pdf)Government sourcePrimaryFinal oracle oai data center fact sheet 092225bOfficial government publication. Click to open the filing in a new tab. |"
   ],
   "state_evidence": [
    "## 1. Project envelope",
    "| Site location | Shackelford County, Texas | [1](https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/)vantage-dc.comReferenceVantage data centers unveils plans for frontier a 25b mega campus in texas to meet unpreceClick to open the source in a new tab.[2](https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx)vantage-dc.comReferenceShackelford county txClick to open the source in a new tab.[4](https://www.sec.gov/Archives/edgar/data/1679688/000167968825000096/digitalbridge-3q25xearni.htm)SEC EDGARPrimaryDigitalbridge 3q25xearniOfficial government publication. Click to open the filing in a new tab.[7](https://arrington.house.gov/uploadedfiles/final_oracle_oai_data_center_fact_sheet_092225b.pdf)Government sourcePrimaryFinal oracle oai data center fact sheet 092225bOfficial government publication. Click to open the filing in a new tab. |"
   ],
   "capacity_gw_evidence": [
    "## 1. Project envelope",
    "| IT capacity | 1.4 GW | [1](https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/)vantage-dc.comReferenceVantage data centers unveils plans for frontier a 25b mega campus in texas to meet unpreceClick to open the source in a new tab.[2](https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx)vantage-dc.comReferenceShackelford county txClick to open the source in a new tab.[4](https://www.sec.gov/Archives/edgar/data/1679688/000167968825000096/digitalbridge-3q25xearni.htm)SEC EDGARPrimaryDigitalbridge 3q25xearniOfficial government publication. Click to open the filing in a new tab.[7](https://arrington.house.gov/uploadedfiles/final_oracle_oai_data_center_fact_sheet_092225b.pdf)Government sourcePrimaryFinal oracle oai data center fact sheet 092225bOfficial government publication. Click to open the filing in a new tab. |"
   ],
   "builder_evidence": [
    "## 1. Project envelope",
    "| Operator | Vantage Data Centers | [1](https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/)vantage-dc.comReferenceVantage data centers unveils plans for frontier a 25b mega campus in texas to meet unpreceClick to open the source in a new tab.[2](https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx)vantage-dc.comReferenceShackelford county txClick to open the source in a new tab.[4](https://www.sec.gov/Archives/edgar/data/1679688/000167968825000096/digitalbridge-3q25xearni.htm)SEC EDGARPrimaryDigitalbridge 3q25xearniOfficial government publication. Click to open the filing in a new tab.[7](https://arrington.house.gov/uploadedfiles/final_oracle_oai_data_center_fact_sheet_092225b.pdf)Government sourcePrimaryFinal oracle oai data center fact sheet 092225bOfficial government publication. Click to open the filing in a new tab. |"
   ],
   "ai_customer_evidence": [
    "## 4. Stakeholder structure",
    "- DBRG 3Q25 Earnings Release, p. 7: *\u201cVantage \u2018Frontier\u2019 TX and \u2018Lighthouse\u2019 WI mega campuses led the way with $40 billion in AI infrastructure buildout supporting leading **OpenAI and Oracle Stargate** programs\u201d*"
   ],
   "status_evidence": [
    "## 9. Companion DBRG project for context (Wisconsin \u201cLighthouse\u201d)",
    "- Both campuses: \u201cConstruction underway; first delivery in H2 2026 with phased completion by 2028 for both campuses\u201d"
   ],
   "announcement_date_evidence": [
    "## 1. Project envelope",
    "**1.****Vantage Data Centers** \u2014 Press release: \u201cVantage Data Centers Unveils Plans for \u2018Frontier,\u2019 a $25B Mega-campus in Texas to Meet Unprecedented AI Demand,\u201d dateline DENVER (Aug. 19, 2025)."
   ]
  },
  {
   "url": "https://poweredbywho.com/projects/homer-city-energy-ai-campus-4e207506",
   "title": "Homer City Energy + AI Campus Data Center, Pennsylvania | PoweredByWho",
   "published_at": null,
   "project": "Homer City Energy + AI Campus",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Kiewit",
   "ai_customer": null,
   "status": "Proposed",
   "announcement_date": null,
   "project_evidence": [
    "POWEREDBYWHO",
    "PROJECT DOSSIER",
    "# Homer City Energy + AI Campus"
   ],
   "locality_evidence": [
    "POWEREDBYWHO",
    "PROJECT DOSSIER",
    "Location",
    "HOMER CITY"
   ],
   "state_evidence": [
    "POWEREDBYWHO",
    "PROJECT DOSSIER",
    "Indiana County, PA",
    "\u201cData center developers must generate their own power or pay for the additional draw on the grid. We welcome investment, but not at the expense of Pennsylvania families.\u201d"
   ],
   "capacity_gw_evidence": [
    "POWEREDBYWHO",
    "PROJECT DOSSIER",
    "4500 MW \u00b7 PROPOSED",
    "Capacity",
    "4500 MW"
   ],
   "builder_evidence": [
    "POWEREDBYWHO",
    "PROJECT DOSSIER",
    "Operator",
    "Kiewit"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "POWEREDBYWHO",
    "PROJECT DOSSIER",
    "4500 MW \u00b7 PROPOSED",
    "Status",
    "Proposed"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news/nscale-in-talks-to-acquire-8gw-monarch-compute-campus-in-west-virginia-report",
   "title": "Nscale in talks to acquire up to 8GW Monarch Compute Campus in West Virginia - report",
   "published_at": "2026-08-05T00:00:00",
   "project": "Monach Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "American Intelligence & Power",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-01-01",
   "project_evidence": [
    "UK-based neocloud Nscale is reportedly in talks to acquire a large property in West Virginia with potential for up to 8GW of data center capacity.",
    "The campus, dubbed Monach Compute Campus, is planned to have up to 8GW of capacity."
   ],
   "locality_evidence": [
    "UK-based neocloud Nscale is reportedly in talks to acquire a large property in West Virginia with potential for up to 8GW of data center capacity.",
    "The property is located in Mason County and is currently owned by American Intelligence & Power (AIP)."
   ],
   "state_evidence": [
    "UK-based neocloud Nscale is reportedly in talks to acquire a large property in West Virginia with potential for up to 8GW of data center capacity.",
    "The property is located in Mason County and is currently owned by American Intelligence & Power (AIP)."
   ],
   "capacity_gw_evidence": [
    "UK-based neocloud Nscale is reportedly in talks to acquire a large property in West Virginia with potential for up to 8GW of data center capacity.",
    "The campus, dubbed Monach Compute Campus, is planned to have up to 8GW of capacity."
   ],
   "builder_evidence": [
    "The property is located in Mason County and is currently owned by American Intelligence & Power (AIP).",
    "[AIP was founded](https://www.datacenterdynamics.com/en/news/caterpillar-to-supply-2gw-of-natural-gas-turbines-for-monarch-compute-campus-in-mason-county-west-virginia/) at the start of 2026, a joint venture between Fidelis New Energy and 8090 Industries."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The campus, dubbed Monach Compute Campus, is planned to have up to 8GW of capacity."
   ],
   "announcement_date_evidence": [
    "[AIP was founded](https://www.datacenterdynamics.com/en/news/caterpillar-to-supply-2gw-of-natural-gas-turbines-for-monarch-compute-campus-in-mason-county-west-virginia/) at the start of 2026, a joint venture between Fidelis New Energy and 8090 Industries."
   ]
  },
  {
   "url": "https://news.constructconnect.com/data-centers-could-be-a-bright-star-in-texas-construction-for-2026-and-beyond?:~:text=According%20to%20a%20Texas%20construction_of%20the%20state's%20construction%20industry.",
   "title": "Data Centers Could be a Bright Star in Texas Construction for 2026 and Beyond",
   "published_at": "2025-09-29T17:15:02",
   "project": "Data City, Texas",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corporation",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2025-03-01",
   "project_evidence": [
    "#### Data City, Texas: A 50,000-Acre Hyperscale Hub",
    "One of the most extensive and interesting data facilities planned is the 50,000-acre [data center hub](/how-states-are-competing-for-the-multibillion-dollar-data-center-construction-market) near Laredo, dubbed \u201cData City, Texas,\u201d announced by Houston-based Energy Abundance Development Corporation this past March."
   ],
   "locality_evidence": [
    "#### Data City, Texas: A 50,000-Acre Hyperscale Hub",
    "One of the most extensive and interesting data facilities planned is the 50,000-acre [data center hub](/how-states-are-competing-for-the-multibillion-dollar-data-center-construction-market) near Laredo, dubbed \u201cData City, Texas,\u201d announced by Houston-based Energy Abundance Development Corporation this past March."
   ],
   "state_evidence": [
    "#### Data City, Texas: A 50,000-Acre Hyperscale Hub",
    "One of the most extensive and interesting data facilities planned is the 50,000-acre [data center hub](/how-states-are-competing-for-the-multibillion-dollar-data-center-construction-market) near Laredo, dubbed \u201cData City, Texas,\u201d announced by Houston-based Energy Abundance Development Corporation this past March."
   ],
   "capacity_gw_evidence": [
    "#### Data City, Texas: A 50,000-Acre Hyperscale Hub",
    "The announcement says Data City will be built in phases, with the first 300 MW and [one million square feet of data center space ](/initial-plans-revealed-for-1900-acre-1b-data-center-in-port-washington-wisconsin)set to launch in 2026.",
    "It could expand quickly to 5 GW and over 15 million square feet of leasable space."
   ],
   "builder_evidence": [
    "#### Data City, Texas: A 50,000-Acre Hyperscale Hub",
    "One of the most extensive and interesting data facilities planned is the 50,000-acre [data center hub](/how-states-are-competing-for-the-multibillion-dollar-data-center-construction-market) near Laredo, dubbed \u201cData City, Texas,\u201d announced by Houston-based Energy Abundance Development Corporation this past March."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "#### Data City, Texas: A 50,000-Acre Hyperscale Hub",
    "One of the most extensive and interesting data facilities planned is the 50,000-acre [data center hub](/how-states-are-competing-for-the-multibillion-dollar-data-center-construction-market) near Laredo, dubbed \u201cData City, Texas,\u201d announced by Houston-based Energy Abundance Development Corporation this past March."
   ],
   "announcement_date_evidence": [
    "#### Data City, Texas: A 50,000-Acre Hyperscale Hub",
    "One of the most extensive and interesting data facilities planned is the 50,000-acre [data center hub](/how-states-are-competing-for-the-multibillion-dollar-data-center-construction-market) near Laredo, dubbed \u201cData City, Texas,\u201d announced by Houston-based Energy Abundance Development Corporation this past March."
   ]
  },
  {
   "url": "https://news.constructconnect.com/data-centers-could-be-a-bright-star-in-texas-construction-for-2026-and-beyond?:~:text=According%20to%20a%20Texas%20construction_of%20the%20state's%20construction%20industry.",
   "title": "Data Centers Could be a Bright Star in Texas Construction for 2026 and Beyond",
   "published_at": "2025-09-29T17:15:02",
   "project": "HyperGrid",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "#### HyperGrid AI Campus: World\u2019s Largest Energy and Data Complex",
    "Even more ambitious is Fermi America\u2019s planned $300 billion AI campus near Amarillo, Texas, called HyperGrid."
   ],
   "locality_evidence": [
    "#### HyperGrid AI Campus: World\u2019s Largest Energy and Data Complex",
    "Even more ambitious is Fermi America\u2019s planned $300 billion AI campus near Amarillo, Texas, called HyperGrid."
   ],
   "state_evidence": [
    "#### HyperGrid AI Campus: World\u2019s Largest Energy and Data Complex",
    "Even more ambitious is Fermi America\u2019s planned $300 billion AI campus near Amarillo, Texas, called HyperGrid."
   ],
   "capacity_gw_evidence": [
    "#### HyperGrid AI Campus: World\u2019s Largest Energy and Data Complex",
    "If plans move forward, the 18-million-square-foot facility could generate 11 GW of IT capacity, powered by a combination of natural gas, solar, wind, and nuclear energy, making it the world\u2019s largest energy and data complex."
   ],
   "builder_evidence": [
    "#### HyperGrid AI Campus: World\u2019s Largest Energy and Data Complex",
    "Even more ambitious is Fermi America\u2019s planned $300 billion AI campus near Amarillo, Texas, called HyperGrid."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "#### HyperGrid AI Campus: World\u2019s Largest Energy and Data Complex",
    "Even more ambitious is Fermi America\u2019s planned $300 billion AI campus near Amarillo, Texas, called HyperGrid."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://dcpulse.com/project/stratos-ai-9gw-utah-data-center",
   "title": "Stratos AI Utah: 9GW World's Largest AI Data Center Campus",
   "published_at": null,
   "project": "Stratos AI Utah: 9GW Giga-Scale Artificial Intelligence Campus",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "Stratos Infrastructure / Bechtel / Fluor Corporation",
   "ai_customer": "Microsoft",
   "status": "Approved / Pre-Construction",
   "announcement_date": null,
   "project_evidence": [
    "# Stratos AI Utah: 9GW Giga-Scale Artificial Intelligence Campus",
    "| Project Name | Stratos AI Utah: 9GW Giga-Scale Artificial Intelligence Campus |",
    "## Quick Facts",
    "| Field | Value |"
   ],
   "locality_evidence": [
    "**Status:** Approved / Pre-Construction | **Location:** Box Elder County, Utah",
    "The Stratos AI Data Center in Box Elder County, Utah, represents a monumental leap in global digital infrastructure, designed to serve as the world\u2019s largest dedicated hub for artificial intelligence training and high-performance computing.",
    "## Quick Facts",
    "| Field | Value |",
    "| Location | Box Elder County, Utah |"
   ],
   "state_evidence": [
    "**Status:** Approved / Pre-Construction | **Location:** Box Elder County, Utah",
    "The Stratos AI Data Center in Box Elder County, Utah, represents a monumental leap in global digital infrastructure, designed to serve as the world\u2019s largest dedicated hub for artificial intelligence training and high-performance computing.",
    "## Quick Facts",
    "| Field | Value |",
    "| Location | Box Elder County, Utah |"
   ],
   "capacity_gw_evidence": [
    "# Stratos AI Utah: 9GW Giga-Scale Artificial Intelligence Campus",
    "The project is engineered to provide a staggering 9GW of power capacity, which is nearly equivalent to the entire current electrical consumption of the state of Utah.",
    "## Quick Facts",
    "| Field | Value |",
    "| Total IT Load | 9,000 MW (9 GW) |"
   ],
   "builder_evidence": [
    "## Companies Involved",
    "| Header | Details |",
    "| Developer / Operator | [Stratos Infrastructure](https://dcpulse.com/projects/companyprofiles/stratos-infrastructure-tremonton-box-elder-county) |",
    "| Construction Contractor | Bechtel / Fluor Corporation |"
   ],
   "ai_customer_evidence": [
    "## Companies Involved",
    "| Header | Details |",
    "| Network Connectivity | Microsoft (Lease Partner), Zayo, Lumen |"
   ],
   "status_evidence": [
    "**Status:** Approved / Pre-Construction | **Location:** Box Elder County, Utah",
    "## Quick Facts",
    "| Field | Value |",
    "| Status | Approved / Pre-Construction |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://news.constructconnect.com/openai-plans-20-billion-georgia-data-center-with-3.2-gw-of-power",
   "title": "OpenAI Plans $20 Billion Georgia Data Center with 3.2 GW of Power",
   "published_at": "2026-07-23T19:53:14",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "moving toward development",
   "announcement_date": null,
   "project_evidence": [
    "OpenAI said it will invest $20 billion to launch Project Camellia in Effingham County, Ga., making the site one of the largest AI infrastructure projects now moving toward development in the Southeast.",
    "The new project, called [Project Camellia](https://projectcamellia.com/), is the first known instance in the US where OpenAI shifts at scale from primarily leasing compute capacity to taking a more direct role in building it."
   ],
   "locality_evidence": [
    "OpenAI said it will invest $20 billion to launch Project Camellia in Effingham County, Ga., making the site one of the largest AI infrastructure projects now moving toward development in the Southeast."
   ],
   "state_evidence": [
    "OpenAI said it will invest $20 billion to launch Project Camellia in Effingham County, Ga., making the site one of the largest AI infrastructure projects now moving toward development in the Southeast."
   ],
   "capacity_gw_evidence": [
    "The project\u2019s 3.2-gigawatt power requirement, to be delivered in phases from 2028 to 2032, points to a multi-year construction cycle tied as much to grid and utility work as to the data center buildings themselves.",
    "It has contracted for with Georgia Power for 3.2 gigawatts of electricity."
   ],
   "builder_evidence": [
    "OpenAI will act as lead designer and developer, which could reshape contractor demand, scheduling pressure, and procurement strategies.",
    "OpenAI said Project Camellia is the first site in which it is serving as lead designer and developer, rather than renting chips from cloud providers such as Oracle or Amazon Web Services."
   ],
   "ai_customer_evidence": [
    "OpenAI said it will invest $20 billion to launch Project Camellia in Effingham County, Ga., making the site one of the largest AI infrastructure projects now moving toward development in the Southeast.",
    "The new project, called [Project Camellia](https://projectcamellia.com/), is the first known instance in the US where OpenAI shifts at scale from primarily leasing compute capacity to taking a more direct role in building it."
   ],
   "status_evidence": [
    "OpenAI said it will invest $20 billion to launch Project Camellia in Effingham County, Ga., making the site one of the largest AI infrastructure projects now moving toward development in the Southeast."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://michiganpublic.org/transportation-infrastructure/2026-03-18/google-revealed-as-company-behind-hyperscale-data-center-project-cannoli",
   "title": "Google revealed as company behind hyperscale data center \"Project Cannoli\"",
   "published_at": "2026-03-18T00:55:41",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Google",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Google revealed as company behind hyperscale data center \"Project Cannoli\"",
    "The data center that\u2019s been [dubbed \u201cProject Cannoli\u201d](https://www.michiganpublic.org/transportation-infrastructure/2026-02-06/what-to-know-about-wayne-countys-proposed-data-center-project-cannoli) will require so much power, it\u2019s difficult to grasp."
   ],
   "locality_evidence": [
    "# Google revealed as company behind hyperscale data center \"Project Cannoli\"",
    "Some details about the data center proposed in Van Buren Township have been floating around for weeks."
   ],
   "state_evidence": [
    "# Google revealed as company behind hyperscale data center \"Project Cannoli\"",
    "Some details about the data center proposed in Van Buren Township have been floating around for weeks.",
    "The data center that\u2019s been [dubbed \u201cProject Cannoli\u201d](https://www.michiganpublic.org/transportation-infrastructure/2026-02-06/what-to-know-about-wayne-countys-proposed-data-center-project-cannoli) will require so much power, it\u2019s difficult to grasp. That quantity is one gigawatt \u2014 as much as [DTE Energy\u2019s Fermi nuclear power plant produces](https://www.dteenergy.com/us/en/business/about-dte/fermi-2-power-plant/fermi-2-power-plant.html), or an average major city consumes."
   ],
   "capacity_gw_evidence": [
    "# Google revealed as company behind hyperscale data center \"Project Cannoli\"",
    "The data center that\u2019s been [dubbed \u201cProject Cannoli\u201d](https://www.michiganpublic.org/transportation-infrastructure/2026-02-06/what-to-know-about-wayne-countys-proposed-data-center-project-cannoli) will require so much power, it\u2019s difficult to grasp. That quantity is one gigawatt \u2014 as much as [DTE Energy\u2019s Fermi nuclear power plant produces](https://www.dteenergy.com/us/en/business/about-dte/fermi-2-power-plant/fermi-2-power-plant.html), or an average major city consumes."
   ],
   "builder_evidence": [
    "# Google revealed as company behind hyperscale data center \"Project Cannoli\"",
    "A hyperscale data center planned for Western Wayne County now officially has a known backer: Google."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Google revealed as company behind hyperscale data center \"Project Cannoli\"",
    "A hyperscale data center planned for Western Wayne County now officially has a known backer: Google."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://investors.terawulf.com/news-events/press-releases/detail/141/terawulf-expands-infrastructure-platform-with-acquisition-of-1-gw-eastern-kentucky-hpc-campus",
   "title": "TeraWulf Expands Infrastructure Platform with Acquisition of 1+ GW Eastern Kentucky HPC Campus",
   "published_at": "2026-05-26T00:00:00",
   "project": "Muskie Data Campus",
   "locality": "Eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": "2026-05-26",
   "project_evidence": [
    "# TeraWulf Expands Infrastructure Platform with Acquisition of 1+ GW Eastern Kentucky HPC Campus",
    "### New \u201cMuskie Data Campus\u201d establishes one of the largest scalable AI and HPC development sites in Kentucky",
    "The Muskie Data Campus, acquired from Industrial Equity Partners (\u201cIEP\u201d), is expected to support more than 1 gigawatt (\u201cGW\u201d) of data center capacity over time."
   ],
   "locality_evidence": [
    "# TeraWulf Expands Infrastructure Platform with Acquisition of 1+ GW Eastern Kentucky HPC Campus",
    "EASTON, Md., May 26, 2026 (GLOBE NEWSWIRE) -- TeraWulf Inc. (Nasdaq: WULF) (\u201cTeraWulf\u201d or the \u201cCompany\u201d), which owns and operates vertically integrated, next-generation digital infrastructure, today announced the acquisition of a hyperscale high-performance computing (\u201cHPC\u201d) development site strategically located in Eastern Kentucky (the \u201cMuskie Data Campus\u201d)."
   ],
   "state_evidence": [
    "# TeraWulf Expands Infrastructure Platform with Acquisition of 1+ GW Eastern Kentucky HPC Campus",
    "### New \u201cMuskie Data Campus\u201d establishes one of the largest scalable AI and HPC development sites in Kentucky",
    "EASTON, Md., May 26, 2026 (GLOBE NEWSWIRE) -- TeraWulf Inc. (Nasdaq: WULF) (\u201cTeraWulf\u201d or the \u201cCompany\u201d), which owns and operates vertically integrated, next-generation digital infrastructure, today announced the acquisition of a hyperscale high-performance computing (\u201cHPC\u201d) development site strategically located in Eastern Kentucky (the \u201cMuskie Data Campus\u201d)."
   ],
   "capacity_gw_evidence": [
    "# TeraWulf Expands Infrastructure Platform with Acquisition of 1+ GW Eastern Kentucky HPC Campus",
    "The Muskie Data Campus, acquired from Industrial Equity Partners (\u201cIEP\u201d), is expected to support more than 1 gigawatt (\u201cGW\u201d) of data center capacity over time."
   ],
   "builder_evidence": [
    "# TeraWulf Expands Infrastructure Platform with Acquisition of 1+ GW Eastern Kentucky HPC Campus",
    "EASTON, Md., May 26, 2026 (GLOBE NEWSWIRE) -- TeraWulf Inc. (Nasdaq: WULF) (\u201cTeraWulf\u201d or the \u201cCompany\u201d), which owns and operates vertically integrated, next-generation digital infrastructure, today announced the acquisition of a hyperscale high-performance computing (\u201cHPC\u201d) development site strategically located in Eastern Kentucky (the \u201cMuskie Data Campus\u201d).",
    "The acquisition meaningfully expands TeraWulf\u2019s portfolio of large-scale, energy-advantaged digital infrastructure campuses and advances the Company\u2019s strategy of developing shovel-ready AI and HPC sites with long-term power availability, robust transmission infrastructure, and strong community alignment."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# TeraWulf Expands Infrastructure Platform with Acquisition of 1+ GW Eastern Kentucky HPC Campus",
    "EASTON, Md., May 26, 2026 (GLOBE NEWSWIRE) -- TeraWulf Inc. (Nasdaq: WULF) (\u201cTeraWulf\u201d or the \u201cCompany\u201d), which owns and operates vertically integrated, next-generation digital infrastructure, today announced the acquisition of a hyperscale high-performance computing (\u201cHPC\u201d) development site strategically located in Eastern Kentucky (the \u201cMuskie Data Campus\u201d)."
   ],
   "announcement_date_evidence": [
    "# TeraWulf Expands Infrastructure Platform with Acquisition of 1+ GW Eastern Kentucky HPC Campus",
    "EASTON, Md., May 26, 2026 (GLOBE NEWSWIRE) -- TeraWulf Inc. (Nasdaq: WULF) (\u201cTeraWulf\u201d or the \u201cCompany\u201d), which owns and operates vertically integrated, next-generation digital infrastructure, today announced the acquisition of a hyperscale high-performance computing (\u201cHPC\u201d) development site strategically located in Eastern Kentucky (the \u201cMuskie Data Campus\u201d)."
   ]
  },
  {
   "url": "https://www.prnewswire.com/news-releases/hut-8-fully-commercializes-1-gw-beacon-point-ai-data-center-campus-with-second-352-mw-it-lease-bringing-campus-level-base-term-contract-value-to-19-6-billion-302829514.html",
   "title": "Hut 8 Fully Commercializes 1 GW Beacon Point AI Data Center Campus with Second 352 MW IT Lease, Bringing Campus-Level Base-Term Contract Value to $19.6 Billion",
   "published_at": "2026-07-20T10:30:00",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": "",
   "status": "commercialized",
   "announcement_date": "2026-07-20",
   "project_evidence": [
    "# Hut 8 Fully Commercializes 1 GW Beacon Point AI Data Center Campus with Second 352 MW IT Lease, Bringing Campus-Level Base-Term Contract Value to $19.6 Billion",
    "MIAMI, July 20, 2026 /PRNewswire/ -- [Hut 8 Corp.](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4734696-1&h=3306466488&u=https%3A%2F%2Fwww.hut8.com%2F&a=Hut+8+Corp.) (Nasdaq, TSX: HUT) (\"Hut 8\" or the \"Company\"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive technologies, today announced the commercialization of the second phase of its one-gigawatt Beacon Point data center campus in Nueces County, Texas through a second 15-year, $9.8 billion lease (the \"Agreement\") for 352 megawatts (MW) of IT capacity (the \"Transaction\")."
   ],
   "locality_evidence": [
    "MIAMI, July 20, 2026 /PRNewswire/ -- [Hut 8 Corp.](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4734696-1&h=3306466488&u=https%3A%2F%2Fwww.hut8.com%2F&a=Hut+8+Corp.) (Nasdaq, TSX: HUT) (\"Hut 8\" or the \"Company\"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive technologies, today announced the commercialization of the second phase of its one-gigawatt Beacon Point data center campus in Nueces County, Texas through a second 15-year, $9.8 billion lease (the \"Agreement\") for 352 megawatts (MW) of IT capacity (the \"Transaction\")."
   ],
   "state_evidence": [
    "MIAMI, July 20, 2026 /PRNewswire/ -- [Hut 8 Corp.](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4734696-1&h=3306466488&u=https%3A%2F%2Fwww.hut8.com%2F&a=Hut+8+Corp.) (Nasdaq, TSX: HUT) (\"Hut 8\" or the \"Company\"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive technologies, today announced the commercialization of the second phase of its one-gigawatt Beacon Point data center campus in Nueces County, Texas through a second 15-year, $9.8 billion lease (the \"Agreement\") for 352 megawatts (MW) of IT capacity (the \"Transaction\")."
   ],
   "capacity_gw_evidence": [
    "# Hut 8 Fully Commercializes 1 GW Beacon Point AI Data Center Campus with Second 352 MW IT Lease, Bringing Campus-Level Base-Term Contract Value to $19.6 Billion",
    "MIAMI, July 20, 2026 /PRNewswire/ -- [Hut 8 Corp.](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4734696-1&h=3306466488&u=https%3A%2F%2Fwww.hut8.com%2F&a=Hut+8+Corp.) (Nasdaq, TSX: HUT) (\"Hut 8\" or the \"Company\"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive technologies, today announced the commercialization of the second phase of its one-gigawatt Beacon Point data center campus in Nueces County, Texas through a second 15-year, $9.8 billion lease (the \"Agreement\") for 352 megawatts (MW) of IT capacity (the \"Transaction\")."
   ],
   "builder_evidence": [
    "# Hut 8 Fully Commercializes 1 GW Beacon Point AI Data Center Campus with Second 352 MW IT Lease, Bringing Campus-Level Base-Term Contract Value to $19.6 Billion",
    "MIAMI, July 20, 2026 /PRNewswire/ -- [Hut 8 Corp.](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4734696-1&h=3306466488&u=https%3A%2F%2Fwww.hut8.com%2F&a=Hut+8+Corp.) (Nasdaq, TSX: HUT) (\"Hut 8\" or the \"Company\"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive technologies, today announced the commercialization of the second phase of its one-gigawatt Beacon Point data center campus in Nueces County, Texas through a second 15-year, $9.8 billion lease (the \"Agreement\") for 352 megawatts (MW) of IT capacity (the \"Transaction\")."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Hut 8 Fully Commercializes 1 GW Beacon Point AI Data Center Campus with Second 352 MW IT Lease, Bringing Campus-Level Base-Term Contract Value to $19.6 Billion",
    "MIAMI, July 20, 2026 /PRNewswire/ -- [Hut 8 Corp.](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4734696-1&h=3306466488&u=https%3A%2F%2Fwww.hut8.com%2F&a=Hut+8+Corp.) (Nasdaq, TSX: HUT) (\"Hut 8\" or the \"Company\"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive technologies, today announced the commercialization of the second phase of its one-gigawatt Beacon Point data center campus in Nueces County, Texas through a second 15-year, $9.8 billion lease (the \"Agreement\") for 352 megawatts (MW) of IT capacity (the \"Transaction\")."
   ],
   "announcement_date_evidence": [
    "MIAMI, July 20, 2026 /PRNewswire/ -- [Hut 8 Corp.](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4734696-1&h=3306466488&u=https%3A%2F%2Fwww.hut8.com%2F&a=Hut+8+Corp.) (Nasdaq, TSX: HUT) (\"Hut 8\" or the \"Company\"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive technologies, today announced the commercialization of the second phase of its one-gigawatt Beacon Point data center campus in Nueces County, Texas through a second 15-year, $9.8 billion lease (the \"Agreement\") for 352 megawatts (MW) of IT capacity (the \"Transaction\")."
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news/iren-energizes-first-phase-of-2gw-sweetwater-data-center-campus-in-texas",
   "title": "Iren energizes first phase of 2GW Sweetwater data center campus in Texas",
   "published_at": "2026-08-05T00:00:00",
   "project": "Sweetwater 1",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Iren",
   "ai_customer": null,
   "status": "energized",
   "announcement_date": null,
   "project_evidence": [
    "Data center and cloud firm Iren has energized a new campus in Texas.",
    "The Nasdaq-listed firm this week announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "locality_evidence": [
    "Data center and cloud firm Iren has energized a new campus in Texas.",
    "The Nasdaq-listed firm this week announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas.",
    "The firm\u2019s two Sweetwater sites \u2013 located outside Sweetwater in Fisher County, West Texas \u2013 are set to total 2GW across 2,200 acres at full build-out."
   ],
   "state_evidence": [
    "Data center and cloud firm Iren has energized a new campus in Texas.",
    "The Nasdaq-listed firm this week announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "capacity_gw_evidence": [
    "Data center and cloud firm Iren has energized a new campus in Texas.",
    "The Nasdaq-listed firm this week announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "builder_evidence": [
    "Data center and cloud firm Iren has energized a new campus in Texas.",
    "The Nasdaq-listed firm this week announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Data center and cloud firm Iren has energized a new campus in Texas.",
    "The Nasdaq-listed firm this week announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenters.com/creekstone-energy-llc-the-delta-gigasite",
   "title": "Creekstone Energy LLC: The Delta Gigasite",
   "published_at": null,
   "project": "The Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Creekstone Energy LLC: The Delta Gigasite",
    "Creekstone Energy LLC The Delta Gigasite is located at Willard, Utah, United States.",
    "Creekstone Energy The Delta Gigasite in Delta, Utah is a hyperscale AI infrastructure campus built for high-density artificial intelligence, HPC, large language model training, inference, and scientific computing workloads."
   ],
   "locality_evidence": [
    "# Creekstone Energy LLC: The Delta Gigasite",
    "Creekstone Energy The Delta Gigasite in Delta, Utah is a hyperscale AI infrastructure campus built for high-density artificial intelligence, HPC, large language model training, inference, and scientific computing workloads."
   ],
   "state_evidence": [
    "# Creekstone Energy LLC: The Delta Gigasite",
    "Creekstone Energy LLC The Delta Gigasite is located at Willard, Utah, United States."
   ],
   "capacity_gw_evidence": [
    "# Creekstone Energy LLC: The Delta Gigasite",
    "The Delta Gigasite is designed for **more than 10 GW of total facility power**, **4.61 GW of full-build HPC compute load**, and **220 MW of Phase 1 IT load**."
   ],
   "builder_evidence": [
    "# Creekstone Energy LLC: The Delta Gigasite",
    "Creekstone Energy LLC The Delta Gigasite is located at Willard, Utah, United States."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Creekstone Energy LLC: The Delta Gigasite",
    "3. **Construction:** Natural gas infrastructure, site mobilization, and equipment staging underway."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://valvemagazine.com/news/worlds-first-1-gigawatt-off-grid-hydrogen-powered-ai-factory-data-center",
   "title": "World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center - Valve Magazine",
   "published_at": "2026-04-26T15:49:44",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "announced",
   "announcement_date": "2024-09-26",
   "project_evidence": [
    "Published **September 26, 2024**",
    "# World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "ECL Announces that 600+ acres near Houston will give Lambda and other AI leaders the space and power needed for the next wave of innovation with zero emissions.",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "locality_evidence": [
    "Published **September 26, 2024**",
    "# World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "ECL Announces that 600+ acres near Houston will give Lambda and other AI leaders the space and power needed for the next wave of innovation with zero emissions."
   ],
   "state_evidence": [
    "Published **September 26, 2024**",
    "# World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "ECL Terrasite-TX1 comes at a critical time for the state of Texas, with The Electric Reliability Council of Texas (ERCOT) testifying on June 12 this year that the state\u2019s power grid needs will grow approximately two times by 2030 due in part to the growth of data centers and AI."
   ],
   "capacity_gw_evidence": [
    "Published **September 26, 2024**",
    "# World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "The initial 1GW phased development may be expanded to 2GW in the future, enabled by its modularity and based on customer demand."
   ],
   "builder_evidence": [
    "Published **September 26, 2024**",
    "# World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "ai_customer_evidence": [
    "Published **September 26, 2024**",
    "# World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "status_evidence": [
    "Published **September 26, 2024**",
    "# World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "announcement_date_evidence": [
    "Published **September 26, 2024**",
    "# World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ]
  },
  {
   "url": "https://cnbc.com/amp/2026/08/17/nvidia-financing-open-ai-data-center-ohio.html",
   "title": "Nvidia backing $105 billion in financing for OpenAI data center in Ohio",
   "published_at": "2026-08-17T14:10:16",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# Nvidia backing $105 billion in financing for OpenAI data center in Ohio",
    "SB Energy will build and manage the datacenter at the PORTS-Pike Technology Campus in Pike County, Ohio, through a 20-year lease to OpenAI."
   ],
   "locality_evidence": [
    "# Nvidia backing $105 billion in financing for OpenAI data center in Ohio",
    "SB Energy will build and manage the datacenter at the PORTS-Pike Technology Campus in Pike County, Ohio, through a 20-year lease to OpenAI."
   ],
   "state_evidence": [
    "# Nvidia backing $105 billion in financing for OpenAI data center in Ohio",
    "SB Energy will build and manage the datacenter at the PORTS-Pike Technology Campus in Pike County, Ohio, through a 20-year lease to OpenAI."
   ],
   "capacity_gw_evidence": [
    "# Nvidia backing $105 billion in financing for OpenAI data center in Ohio",
    "The credit will support an initial 4.25 gigawatts of computing capacity with the option for an additional 3.75 gigawatts."
   ],
   "builder_evidence": [
    "# Nvidia backing $105 billion in financing for OpenAI data center in Ohio",
    "SB Energy will build and manage the datacenter at the PORTS-Pike Technology Campus in Pike County, Ohio, through a 20-year lease to OpenAI."
   ],
   "ai_customer_evidence": [
    "# Nvidia backing $105 billion in financing for OpenAI data center in Ohio",
    "SB Energy will build and manage the datacenter at the PORTS-Pike Technology Campus in Pike County, Ohio, through a 20-year lease to OpenAI."
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "# Nvidia backing $105 billion in financing for OpenAI data center in Ohio"
   ]
  },
  {
   "url": "https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand",
   "title": "OpenAI Stargate: where the US sites stand",
   "published_at": null,
   "project": "Stargate",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe",
   "ai_customer": "OpenAI",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "## Introduction",
    "No project illustrates the scale of that effort more than Stargate, a $500 billion endeavor involving AI developer OpenAI, cloud provider Oracle, and investment company SoftBank.",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Abilene, Texas](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateAbilene) | 0.3 | 1.2 | Q2 2024 | Q4 2026 | On-site gas, Grid |"
   ],
   "locality_evidence": [
    "## Introduction",
    "The most advanced\u2014in Abilene, Texas\u2014is already operating at an estimated capacity of 0.3 gigawatts (GW).",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Abilene, Texas](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateAbilene) | 0.3 | 1.2 | Q2 2024 | Q4 2026 | On-site gas, Grid |"
   ],
   "state_evidence": [
    "## Introduction",
    "The most advanced\u2014in Abilene, Texas\u2014is already operating at an estimated capacity of 0.3 gigawatts (GW).",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Abilene, Texas](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateAbilene) | 0.3 | 1.2 | Q2 2024 | Q4 2026 | On-site gas, Grid |"
   ],
   "capacity_gw_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Abilene, Texas](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateAbilene) | 0.3 | 1.2 | Q2 2024 | Q4 2026 | On-site gas, Grid |"
   ],
   "builder_evidence": [
    "## The sites",
    "### Abilene, Texas",
    "Built by AI infrastructure company Crusoe, Abilene is the most complete Stargate site to date, with an estimated four of the eight buildings already operational."
   ],
   "ai_customer_evidence": [
    "## Introduction",
    "No project illustrates the scale of that effort more than Stargate, a $500 billion endeavor involving AI developer OpenAI, cloud provider Oracle, and investment company SoftBank.",
    "All sites will serve OpenAI\u2019s workloads."
   ],
   "status_evidence": [
    "## Introduction",
    "The most advanced\u2014in Abilene, Texas\u2014is already operating at an estimated capacity of 0.3 gigawatts (GW).",
    "Built by AI infrastructure company Crusoe, Abilene is the most complete Stargate site to date, with an estimated four of the eight buildings already operational."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand",
   "title": "OpenAI Stargate: where the US sites stand",
   "published_at": null,
   "project": "Stargate",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Vantage",
   "ai_customer": "OpenAI",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "## Introduction",
    "No project illustrates the scale of that effort more than Stargate, a $500 billion endeavor involving AI developer OpenAI, cloud provider Oracle, and investment company SoftBank.",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Shackelford County, Texas](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateShackelford) | 0 | 2.0 | Q3 2025 | Q4 2028 | On-site gas |"
   ],
   "locality_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Shackelford County, Texas](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateShackelford) | 0 | 2.0 | Q3 2025 | Q4 2028 | On-site gas |",
    "### Shackelford County, Texas",
    "Just across the county line from the Abilene site, data center developer Vantage is constructing a massive 1,200-acre (4.9-square-kilometer) [campus](https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx) with 10 buildings."
   ],
   "state_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Shackelford County, Texas](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateShackelford) | 0 | 2.0 | Q3 2025 | Q4 2028 | On-site gas |",
    "### Shackelford County, Texas",
    "Just across the county line from the Abilene site, data center developer Vantage is constructing a massive 1,200-acre (4.9-square-kilometer) [campus](https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx) with 10 buildings."
   ],
   "capacity_gw_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Shackelford County, Texas](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateShackelford) | 0 | 2.0 | Q3 2025 | Q4 2028 | On-site gas |"
   ],
   "builder_evidence": [
    "## The sites",
    "### Shackelford County, Texas",
    "Just across the county line from the Abilene site, data center developer Vantage is constructing a massive 1,200-acre (4.9-square-kilometer) [campus](https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx) with 10 buildings."
   ],
   "ai_customer_evidence": [
    "## Introduction",
    "No project illustrates the scale of that effort more than Stargate, a $500 billion endeavor involving AI developer OpenAI, cloud provider Oracle, and investment company SoftBank.",
    "All sites will serve OpenAI\u2019s workloads."
   ],
   "status_evidence": [
    "## Introduction",
    "Stargate has seven locations across the US, all of which are now showing active development.",
    "Just across the county line from the Abilene site, data center developer Vantage is constructing a massive 1,200-acre (4.9-square-kilometer) [campus](https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx) with 10 buildings."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand",
   "title": "OpenAI Stargate: where the US sites stand",
   "published_at": null,
   "project": "Stargate / Project Jupiter",
   "locality": "Do\u00f1a Ana County",
   "state": "New Mexico",
   "capacity_gw": 2.2,
   "builder": "STACK Infrastructure",
   "ai_customer": "OpenAI",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "## Introduction",
    "No project illustrates the scale of that effort more than Stargate, a $500 billion endeavor involving AI developer OpenAI, cloud provider Oracle, and investment company SoftBank.",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Do\u00f1a Ana County, New Mexico](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateNewMexico) | 0 | 2.2 | Q4 2025 | Q4 2028 | On-site gas |",
    "### Do\u00f1a Ana County, New Mexico",
    "In New Mexico, STACK Infrastructure is developing Project Jupiter, which consists of four large buildings."
   ],
   "locality_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Do\u00f1a Ana County, New Mexico](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateNewMexico) | 0 | 2.2 | Q4 2025 | Q4 2028 | On-site gas |",
    "### Do\u00f1a Ana County, New Mexico",
    "In New Mexico, STACK Infrastructure is developing Project Jupiter, which consists of four large buildings."
   ],
   "state_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Do\u00f1a Ana County, New Mexico](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateNewMexico) | 0 | 2.2 | Q4 2025 | Q4 2028 | On-site gas |",
    "### Do\u00f1a Ana County, New Mexico",
    "In New Mexico, STACK Infrastructure is developing Project Jupiter, which consists of four large buildings."
   ],
   "capacity_gw_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Do\u00f1a Ana County, New Mexico](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateNewMexico) | 0 | 2.2 | Q4 2025 | Q4 2028 | On-site gas |"
   ],
   "builder_evidence": [
    "## The sites",
    "### Do\u00f1a Ana County, New Mexico",
    "In New Mexico, STACK Infrastructure is developing Project Jupiter, which consists of four large buildings."
   ],
   "ai_customer_evidence": [
    "## Introduction",
    "No project illustrates the scale of that effort more than Stargate, a $500 billion endeavor involving AI developer OpenAI, cloud provider Oracle, and investment company SoftBank.",
    "All sites will serve OpenAI\u2019s workloads."
   ],
   "status_evidence": [
    "## Introduction",
    "Stargate has seven locations across the US, all of which are now showing active development.",
    "Satellite imagery shows that foundation work is underway."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand",
   "title": "OpenAI Stargate: where the US sites stand",
   "published_at": null,
   "project": "Stargate",
   "locality": "Milam County",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "## Introduction",
    "No project illustrates the scale of that effort more than Stargate, a $500 billion endeavor involving AI developer OpenAI, cloud provider Oracle, and investment company SoftBank.",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Milam County, Texas](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateMilam) | 0 | 1.2 | Q3 2025 | Q4 2028 | On-site (unknown type) |"
   ],
   "locality_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Milam County, Texas](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateMilam) | 0 | 1.2 | Q3 2025 | Q4 2028 | On-site (unknown type) |",
    "### Milam County, Texas",
    "SoftBank subsidiary SB Energy is [building and operating](https://sbenergy.com/openai-and-softbank-group-partner-with-sb-energy/) what is [described](https://www.constructiondive.com/news/stargate-5-new-data-center-sites/761424/) as a \u201cfast-build\u201d site in Milam County, Texas, around 70 miles (110 kilometers) northeast of Austin."
   ],
   "state_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Milam County, Texas](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateMilam) | 0 | 1.2 | Q3 2025 | Q4 2028 | On-site (unknown type) |",
    "### Milam County, Texas",
    "SoftBank subsidiary SB Energy is [building and operating](https://sbenergy.com/openai-and-softbank-group-partner-with-sb-energy/) what is [described](https://www.constructiondive.com/news/stargate-5-new-data-center-sites/761424/) as a \u201cfast-build\u201d site in Milam County, Texas, around 70 miles (110 kilometers) northeast of Austin."
   ],
   "capacity_gw_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Milam County, Texas](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateMilam) | 0 | 1.2 | Q3 2025 | Q4 2028 | On-site (unknown type) |"
   ],
   "builder_evidence": [
    "## The sites",
    "### Milam County, Texas",
    "SoftBank subsidiary SB Energy is [building and operating](https://sbenergy.com/openai-and-softbank-group-partner-with-sb-energy/) what is [described](https://www.constructiondive.com/news/stargate-5-new-data-center-sites/761424/) as a \u201cfast-build\u201d site in Milam County, Texas, around 70 miles (110 kilometers) northeast of Austin."
   ],
   "ai_customer_evidence": [
    "## Introduction",
    "No project illustrates the scale of that effort more than Stargate, a $500 billion endeavor involving AI developer OpenAI, cloud provider Oracle, and investment company SoftBank.",
    "All sites will serve OpenAI\u2019s workloads."
   ],
   "status_evidence": [
    "## Introduction",
    "Stargate has seven locations across the US, all of which are now showing active development.",
    "A satellite image from March shows steel framing and roofing for the first building (visible as a blue rectangle)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand",
   "title": "OpenAI Stargate: where the US sites stand",
   "published_at": null,
   "project": "Stargate / Lighthouse",
   "locality": "Port Washington",
   "state": "Wisconsin",
   "capacity_gw": 1.3,
   "builder": "Vantage",
   "ai_customer": "OpenAI",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "## Introduction",
    "No project illustrates the scale of that effort more than Stargate, a $500 billion endeavor involving AI developer OpenAI, cloud provider Oracle, and investment company SoftBank.",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Port Washington, Wisconsin](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateWisconsin) | 0 | 1.3 | Q1 2026 | Q4 2028 | Grid |",
    "### Port Washington, Wisconsin",
    "Vantage, which is also the developer behind the Shackelford County site, has broken ground on a campus named \u201cLighthouse\u201d in Port Washington, just north of Milwaukee."
   ],
   "locality_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Port Washington, Wisconsin](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateWisconsin) | 0 | 1.3 | Q1 2026 | Q4 2028 | Grid |",
    "### Port Washington, Wisconsin",
    "Vantage, which is also the developer behind the Shackelford County site, has broken ground on a campus named \u201cLighthouse\u201d in Port Washington, just north of Milwaukee."
   ],
   "state_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Port Washington, Wisconsin](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateWisconsin) | 0 | 1.3 | Q1 2026 | Q4 2028 | Grid |",
    "### Port Washington, Wisconsin",
    "Vantage, which is also the developer behind the Shackelford County site, has broken ground on a campus named \u201cLighthouse\u201d in Port Washington, just north of Milwaukee."
   ],
   "capacity_gw_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Port Washington, Wisconsin](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateWisconsin) | 0 | 1.3 | Q1 2026 | Q4 2028 | Grid |"
   ],
   "builder_evidence": [
    "## The sites",
    "### Port Washington, Wisconsin",
    "Vantage, which is also the developer behind the Shackelford County site, has broken ground on a campus named \u201cLighthouse\u201d in Port Washington, just north of Milwaukee."
   ],
   "ai_customer_evidence": [
    "## Introduction",
    "No project illustrates the scale of that effort more than Stargate, a $500 billion endeavor involving AI developer OpenAI, cloud provider Oracle, and investment company SoftBank.",
    "All sites will serve OpenAI\u2019s workloads."
   ],
   "status_evidence": [
    "## Introduction",
    "Stargate has seven locations across the US, all of which are now showing active development.",
    "Foundation work can be seen in satellite imagery."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand",
   "title": "OpenAI Stargate: where the US sites stand",
   "published_at": null,
   "project": "Stargate / The Barn",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.4,
   "builder": "Related Digital",
   "ai_customer": "OpenAI",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "## Introduction",
    "No project illustrates the scale of that effort more than Stargate, a $500 billion endeavor involving AI developer OpenAI, cloud provider Oracle, and investment company SoftBank.",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Saline Township, Michigan](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateMichigan) | 0 | 1.4 | Q4 2025 | Q4 2028 | Grid |",
    "### Saline Township, Michigan",
    "Related Digital is [developing](https://www.related.com/press-releases/2025-10-30/openai-oracle-and-related-digital-announce-stargate-data-center-site) a campus dubbed \u201cThe Barn\u201d in Saline Township, southwest of Detroit."
   ],
   "locality_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Saline Township, Michigan](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateMichigan) | 0 | 1.4 | Q4 2025 | Q4 2028 | Grid |",
    "### Saline Township, Michigan",
    "Related Digital is [developing](https://www.related.com/press-releases/2025-10-30/openai-oracle-and-related-digital-announce-stargate-data-center-site) a campus dubbed \u201cThe Barn\u201d in Saline Township, southwest of Detroit."
   ],
   "state_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Saline Township, Michigan](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateMichigan) | 0 | 1.4 | Q4 2025 | Q4 2028 | Grid |",
    "### Saline Township, Michigan",
    "Related Digital is [developing](https://www.related.com/press-releases/2025-10-30/openai-oracle-and-related-digital-announce-stargate-data-center-site) a campus dubbed \u201cThe Barn\u201d in Saline Township, southwest of Detroit."
   ],
   "capacity_gw_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Saline Township, Michigan](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateMichigan) | 0 | 1.4 | Q4 2025 | Q4 2028 | Grid |"
   ],
   "builder_evidence": [
    "## The sites",
    "### Saline Township, Michigan",
    "Related Digital is [developing](https://www.related.com/press-releases/2025-10-30/openai-oracle-and-related-digital-announce-stargate-data-center-site) a campus dubbed \u201cThe Barn\u201d in Saline Township, southwest of Detroit."
   ],
   "ai_customer_evidence": [
    "## Introduction",
    "No project illustrates the scale of that effort more than Stargate, a $500 billion endeavor involving AI developer OpenAI, cloud provider Oracle, and investment company SoftBank.",
    "All sites will serve OpenAI\u2019s workloads."
   ],
   "status_evidence": [
    "## Introduction",
    "Stargate has seven locations across the US, all of which are now showing active development.",
    "Satellite imagery shows foundation work underway for the first building."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tracker.bepresearch.com/companies/meta",
   "title": "BEP AI Infrastructure Tracker",
   "published_at": null,
   "project": "Meta El Paso",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Meta",
    "## Projects owned",
    "- [Meta El Paso](/projects/meta-el-paso)"
   ],
   "locality_evidence": [
    "# Meta",
    "## Projects owned",
    "Meta \u00b7 El Paso, Texas, United States"
   ],
   "state_evidence": [
    "# Meta",
    "## Projects owned",
    "Meta \u00b7 El Paso, Texas, United States"
   ],
   "capacity_gw_evidence": [
    "# Meta",
    "## Projects owned",
    "1 GWUnder construction"
   ],
   "builder_evidence": [
    "# Meta",
    "## Projects owned",
    "- [Meta El Paso](/projects/meta-el-paso)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Meta",
    "## Projects owned",
    "1 GWUnder construction"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tracker.bepresearch.com/companies/meta",
   "title": "BEP AI Infrastructure Tracker",
   "published_at": null,
   "project": "Meta Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Meta",
    "## Projects owned",
    "- [Meta Hyperion](/projects/meta-hyperion-louisiana)"
   ],
   "locality_evidence": [
    "# Meta",
    "## Projects owned",
    "Meta \u00b7 Richland Parish, Louisiana, United States"
   ],
   "state_evidence": [
    "# Meta",
    "## Projects owned",
    "Meta \u00b7 Richland Parish, Louisiana, United States"
   ],
   "capacity_gw_evidence": [
    "# Meta",
    "## Projects owned",
    "5 GWUnder construction"
   ],
   "builder_evidence": [
    "# Meta",
    "## Projects owned",
    "- [Meta Hyperion](/projects/meta-hyperion-louisiana)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Meta",
    "## Projects owned",
    "5 GWUnder construction"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tracker.bepresearch.com/companies/meta",
   "title": "BEP AI Infrastructure Tracker",
   "published_at": null,
   "project": "Meta Lebanon",
   "locality": "Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Meta",
    "## Projects owned",
    "- [Meta Lebanon](/projects/meta-lebanon-indiana)"
   ],
   "locality_evidence": [
    "# Meta",
    "## Projects owned",
    "Meta \u00b7 Lebanon, Indiana, United States"
   ],
   "state_evidence": [
    "# Meta",
    "## Projects owned",
    "Meta \u00b7 Lebanon, Indiana, United States"
   ],
   "capacity_gw_evidence": [
    "# Meta",
    "## Projects owned",
    "1 GWUnder construction"
   ],
   "builder_evidence": [
    "# Meta",
    "## Projects owned",
    "- [Meta Lebanon](/projects/meta-lebanon-indiana)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Meta",
    "## Projects owned",
    "1 GWUnder construction"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tracker.bepresearch.com/companies/meta",
   "title": "BEP AI Infrastructure Tracker",
   "published_at": null,
   "project": "Meta Prometheus",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "Partially operational",
   "announcement_date": null,
   "project_evidence": [
    "# Meta",
    "## Projects owned",
    "- [Meta Prometheus](/projects/meta-prometheus-new-albany)"
   ],
   "locality_evidence": [
    "# Meta",
    "## Projects owned",
    "Meta \u00b7 New Albany, Ohio, United States"
   ],
   "state_evidence": [
    "# Meta",
    "## Projects owned",
    "Meta \u00b7 New Albany, Ohio, United States"
   ],
   "capacity_gw_evidence": [
    "# Meta",
    "## Projects owned",
    "1 GWPartially operational"
   ],
   "builder_evidence": [
    "# Meta",
    "## Projects owned",
    "- [Meta Prometheus](/projects/meta-prometheus-new-albany)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Meta",
    "## Projects owned",
    "1 GWPartially operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://introl.com/blog/xai-mississippi-20-billion-supercomputer-memphis-2026",
   "title": "xAI's $20 Billion Mississippi Supercomputer: 2 GW Facility Reshapes AI Race",
   "published_at": "2026-01-13T00:00:00",
   "project": "MACROHARDRR",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "Operations begin February 2026",
   "announcement_date": "2026-01-08",
   "project_evidence": [
    "The Southaven data center, dubbed MACROHARDRR, represents xAI's third facility in the greater Memphis region.",
    "Facility Overview",
    "| Specification | Detail |",
    "| Facility Name | MACROHARDRR |",
    "### Facility Overview"
   ],
   "locality_evidence": [
    "The Southaven data center, dubbed MACROHARDRR, represents xAI's third facility in the greater Memphis region.",
    "Facility Overview",
    "| Specification | Detail |",
    "| Location | Southaven, Mississippi (DeSoto County) |",
    "### Facility Overview"
   ],
   "state_evidence": [
    "Elon Musk committed $20 billion to Mississippi on January 8, 2026.",
    "Facility Overview",
    "| Specification | Detail |",
    "| Location | Southaven, Mississippi (DeSoto County) |",
    "### Facility Overview"
   ],
   "capacity_gw_evidence": [
    "The announcement marks the largest private-sector investment in state history and expands xAI's Memphis-area infrastructure to 2 gigawatts of computing power\u2014a scale that exceeds any single AI training facility currently operational.",
    "Facility Overview",
    "| Specification | Detail |",
    "| Power Capacity | ~2 GW total cluster |",
    "### Facility Overview"
   ],
   "builder_evidence": [
    "The Southaven data center, dubbed MACROHARDRR, represents xAI's third facility in the greater Memphis region.",
    "Facility Overview",
    "| Specification | Detail |",
    "| Facility Name | MACROHARDRR |",
    "### Facility Overview"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Operations begin February 2026, with approximately 100 permanent jobs and thousands of indirect positions.",
    "Facility Overview",
    "| Specification | Detail |",
    "| Operations Start | February 2026 |",
    "### Facility Overview"
   ],
   "announcement_date_evidence": [
    "Elon Musk committed $20 billion to Mississippi on January 8, 2026.",
    "Facility Overview",
    "| Specification | Detail |",
    "| Investment | $20+ billion |",
    "### Facility Overview"
   ]
  },
  {
   "url": "https://www.datacenterdynamics.com/en/news/crusoe-files-for-two-more-data-centers-at-goodnight-campus-in-armstrong-county-texas/",
   "title": "Crusoe files for two more data centers at Goodnight Campus in Armstrong County, Texas",
   "published_at": "2026-08-19T00:00:00",
   "project": "Goodnight Campus",
   "locality": "Claude",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe",
   "ai_customer": null,
   "status": "under-development",
   "announcement_date": null,
   "project_evidence": [
    "Crusoe has filed for two more data center buildings at its under-development Goodnight Campus in Claude, Texas.",
    "According to [Aterio Research](https://www.aterio.io/blog/crusoe-launches-usd29b-goodnight-campus-in-claude-mirroring-openai-s-stargate), the data center campus will actually feature seven buildings and offer more than 1GW."
   ],
   "locality_evidence": [
    "Crusoe has filed for two more data center buildings at its under-development Goodnight Campus in Claude, Texas."
   ],
   "state_evidence": [
    "Crusoe has filed for two more data center buildings at its under-development Goodnight Campus in Claude, Texas."
   ],
   "capacity_gw_evidence": [
    "According to [Aterio Research](https://www.aterio.io/blog/crusoe-launches-usd29b-goodnight-campus-in-claude-mirroring-openai-s-stargate), the data center campus will actually feature seven buildings and offer more than 1GW."
   ],
   "builder_evidence": [
    "Crusoe has filed for two more data center buildings at its under-development Goodnight Campus in Claude, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Crusoe has filed for two more data center buildings at its under-development Goodnight Campus in Claude, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://www.datacenterdynamics.com/en/news/crusoe-files-for-two-more-data-centers-at-goodnight-campus-in-armstrong-county-texas/",
   "title": "Crusoe files for two more data centers at Goodnight Campus in Armstrong County, Texas",
   "published_at": "2026-08-19T00:00:00",
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Crusoe",
   "ai_customer": null,
   "status": "developing",
   "announcement_date": null,
   "project_evidence": [
    "Elsewhere in Texas, Crusoe is developing a [1.4GW data center campus](https://www.datacenterdynamics.com/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/) in Childress, and is behind the Abilene site being used by [OpenAI](https://www.datacenterdynamics.com/en/news/crusoes-abilene-data-center-officially-live-serving-oracle-and-openais-stargate/)."
   ],
   "locality_evidence": [
    "Elsewhere in Texas, Crusoe is developing a [1.4GW data center campus](https://www.datacenterdynamics.com/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/) in Childress, and is behind the Abilene site being used by [OpenAI](https://www.datacenterdynamics.com/en/news/crusoes-abilene-data-center-officially-live-serving-oracle-and-openais-stargate/)."
   ],
   "state_evidence": [
    "Elsewhere in Texas, Crusoe is developing a [1.4GW data center campus](https://www.datacenterdynamics.com/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/) in Childress, and is behind the Abilene site being used by [OpenAI](https://www.datacenterdynamics.com/en/news/crusoes-abilene-data-center-officially-live-serving-oracle-and-openais-stargate/)."
   ],
   "capacity_gw_evidence": [
    "Elsewhere in Texas, Crusoe is developing a [1.4GW data center campus](https://www.datacenterdynamics.com/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/) in Childress, and is behind the Abilene site being used by [OpenAI](https://www.datacenterdynamics.com/en/news/crusoes-abilene-data-center-officially-live-serving-oracle-and-openais-stargate/)."
   ],
   "builder_evidence": [
    "Elsewhere in Texas, Crusoe is developing a [1.4GW data center campus](https://www.datacenterdynamics.com/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/) in Childress, and is behind the Abilene site being used by [OpenAI](https://www.datacenterdynamics.com/en/news/crusoes-abilene-data-center-officially-live-serving-oracle-and-openais-stargate/)."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Elsewhere in Texas, Crusoe is developing a [1.4GW data center campus](https://www.datacenterdynamics.com/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/) in Childress, and is behind the Abilene site being used by [OpenAI](https://www.datacenterdynamics.com/en/news/crusoes-abilene-data-center-officially-live-serving-oracle-and-openais-stargate/)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://compute-atlas.com/states/texas",
   "title": "Compute Atlas",
   "published_at": null,
   "project": "Data City, Texas",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corporation",
   "ai_customer": null,
   "status": "Proposed",
   "announcement_date": null,
   "project_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Data City, TexasEnergy Abundance Development Corporation \u00b7 Laredo, TXProposed5,000 MW planned](/facilities/data-city-energy-abundance-laredo-tx)"
   ],
   "locality_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Data City, TexasEnergy Abundance Development Corporation \u00b7 Laredo, TXProposed5,000 MW planned](/facilities/data-city-energy-abundance-laredo-tx)"
   ],
   "state_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Data City, TexasEnergy Abundance Development Corporation \u00b7 Laredo, TXProposed5,000 MW planned](/facilities/data-city-energy-abundance-laredo-tx)"
   ],
   "capacity_gw_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Data City, TexasEnergy Abundance Development Corporation \u00b7 Laredo, TXProposed5,000 MW planned](/facilities/data-city-energy-abundance-laredo-tx)"
   ],
   "builder_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Data City, TexasEnergy Abundance Development Corporation \u00b7 Laredo, TXProposed5,000 MW planned](/facilities/data-city-energy-abundance-laredo-tx)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Data City, TexasEnergy Abundance Development Corporation \u00b7 Laredo, TXProposed5,000 MW planned](/facilities/data-city-energy-abundance-laredo-tx)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://compute-atlas.com/states/texas",
   "title": "Compute Atlas",
   "published_at": null,
   "project": "Project Merlin (Helios II)",
   "locality": "McGregor",
   "state": "Texas",
   "capacity_gw": 3.5,
   "builder": "Galaxy Digital",
   "ai_customer": null,
   "status": "Proposed",
   "announcement_date": null,
   "project_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Project Merlin (Helios II)Galaxy Digital \u00b7 McGregor, TXProposed3,500 MW planned](/facilities/galaxy-digital-mcgregor-tx)"
   ],
   "locality_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Project Merlin (Helios II)Galaxy Digital \u00b7 McGregor, TXProposed3,500 MW planned](/facilities/galaxy-digital-mcgregor-tx)"
   ],
   "state_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Project Merlin (Helios II)Galaxy Digital \u00b7 McGregor, TXProposed3,500 MW planned](/facilities/galaxy-digital-mcgregor-tx)"
   ],
   "capacity_gw_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Project Merlin (Helios II)Galaxy Digital \u00b7 McGregor, TXProposed3,500 MW planned](/facilities/galaxy-digital-mcgregor-tx)"
   ],
   "builder_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Project Merlin (Helios II)Galaxy Digital \u00b7 McGregor, TXProposed3,500 MW planned](/facilities/galaxy-digital-mcgregor-tx)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Project Merlin (Helios II)Galaxy Digital \u00b7 McGregor, TXProposed3,500 MW planned](/facilities/galaxy-digital-mcgregor-tx)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://compute-atlas.com/states/texas",
   "title": "Compute Atlas",
   "published_at": null,
   "project": "IREN Sweetwater Campus",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN (Iris Energy)",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [IREN Sweetwater CampusIREN (Iris Energy) \u00b7 Sweetwater, TXUnder construction2,000 MW planned](/facilities/iren-sweetwater-tx)"
   ],
   "locality_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [IREN Sweetwater CampusIREN (Iris Energy) \u00b7 Sweetwater, TXUnder construction2,000 MW planned](/facilities/iren-sweetwater-tx)"
   ],
   "state_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [IREN Sweetwater CampusIREN (Iris Energy) \u00b7 Sweetwater, TXUnder construction2,000 MW planned](/facilities/iren-sweetwater-tx)"
   ],
   "capacity_gw_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [IREN Sweetwater CampusIREN (Iris Energy) \u00b7 Sweetwater, TXUnder construction2,000 MW planned](/facilities/iren-sweetwater-tx)"
   ],
   "builder_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [IREN Sweetwater CampusIREN (Iris Energy) \u00b7 Sweetwater, TXUnder construction2,000 MW planned](/facilities/iren-sweetwater-tx)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [IREN Sweetwater CampusIREN (Iris Energy) \u00b7 Sweetwater, TXUnder construction2,000 MW planned](/facilities/iren-sweetwater-tx)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://compute-atlas.com/states/texas",
   "title": "Compute Atlas",
   "published_at": null,
   "project": "Microsoft Pecos Data Center Campus",
   "locality": "Pecos",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Microsoft",
   "ai_customer": "Microsoft",
   "status": "Proposed",
   "announcement_date": null,
   "project_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Microsoft Pecos Data Center CampusMicrosoft \u00b7 Pecos, TXProposed2,000 MW planned](/facilities/microsoft-pecos-tx)"
   ],
   "locality_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Microsoft Pecos Data Center CampusMicrosoft \u00b7 Pecos, TXProposed2,000 MW planned](/facilities/microsoft-pecos-tx)"
   ],
   "state_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Microsoft Pecos Data Center CampusMicrosoft \u00b7 Pecos, TXProposed2,000 MW planned](/facilities/microsoft-pecos-tx)"
   ],
   "capacity_gw_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Microsoft Pecos Data Center CampusMicrosoft \u00b7 Pecos, TXProposed2,000 MW planned](/facilities/microsoft-pecos-tx)"
   ],
   "builder_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Microsoft Pecos Data Center CampusMicrosoft \u00b7 Pecos, TXProposed2,000 MW planned](/facilities/microsoft-pecos-tx)"
   ],
   "ai_customer_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Microsoft Pecos Data Center CampusMicrosoft \u00b7 Pecos, TXProposed2,000 MW planned](/facilities/microsoft-pecos-tx)"
   ],
   "status_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Microsoft Pecos Data Center CampusMicrosoft \u00b7 Pecos, TXProposed2,000 MW planned](/facilities/microsoft-pecos-tx)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://compute-atlas.com/states/texas",
   "title": "Compute Atlas",
   "published_at": null,
   "project": "Poolside Project Horizon AI Campus",
   "locality": "Pecos County",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Poolside AI",
   "ai_customer": "Poolside AI",
   "status": "Proposed",
   "announcement_date": null,
   "project_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Poolside Project Horizon AI CampusPoolside AI \u00b7 TXProposed2,000 MW planned](/facilities/poolside-project-horizon-pecos-county-tx)"
   ],
   "locality_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Poolside Project Horizon AI CampusPoolside AI \u00b7 TXProposed2,000 MW planned](/facilities/poolside-project-horizon-pecos-county-tx)"
   ],
   "state_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Poolside Project Horizon AI CampusPoolside AI \u00b7 TXProposed2,000 MW planned](/facilities/poolside-project-horizon-pecos-county-tx)"
   ],
   "capacity_gw_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Poolside Project Horizon AI CampusPoolside AI \u00b7 TXProposed2,000 MW planned](/facilities/poolside-project-horizon-pecos-county-tx)"
   ],
   "builder_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Poolside Project Horizon AI CampusPoolside AI \u00b7 TXProposed2,000 MW planned](/facilities/poolside-project-horizon-pecos-county-tx)"
   ],
   "ai_customer_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Poolside Project Horizon AI CampusPoolside AI \u00b7 TXProposed2,000 MW planned](/facilities/poolside-project-horizon-pecos-county-tx)"
   ],
   "status_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Poolside Project Horizon AI CampusPoolside AI \u00b7 TXProposed2,000 MW planned](/facilities/poolside-project-horizon-pecos-county-tx)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://compute-atlas.com/states/texas",
   "title": "Compute Atlas",
   "published_at": null,
   "project": "Tract Caldwell Valley Technology Park",
   "locality": "Uhland",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Tract",
   "ai_customer": null,
   "status": "Proposed",
   "announcement_date": null,
   "project_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Tract Caldwell Valley Technology ParkTract \u00b7 Uhland, TXProposed2,000 MW planned](/facilities/tract-caldwell-valley-uhland-tx)"
   ],
   "locality_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Tract Caldwell Valley Technology ParkTract \u00b7 Uhland, TXProposed2,000 MW planned](/facilities/tract-caldwell-valley-uhland-tx)"
   ],
   "state_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Tract Caldwell Valley Technology ParkTract \u00b7 Uhland, TXProposed2,000 MW planned](/facilities/tract-caldwell-valley-uhland-tx)"
   ],
   "capacity_gw_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Tract Caldwell Valley Technology ParkTract \u00b7 Uhland, TXProposed2,000 MW planned](/facilities/tract-caldwell-valley-uhland-tx)"
   ],
   "builder_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Tract Caldwell Valley Technology ParkTract \u00b7 Uhland, TXProposed2,000 MW planned](/facilities/tract-caldwell-valley-uhland-tx)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Tract Caldwell Valley Technology ParkTract \u00b7 Uhland, TXProposed2,000 MW planned](/facilities/tract-caldwell-valley-uhland-tx)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://compute-atlas.com/states/texas",
   "title": "Compute Atlas",
   "published_at": null,
   "project": "PowerHouse Grand Prairie Campus",
   "locality": "Grand Prairie",
   "state": "Texas",
   "capacity_gw": 1.8,
   "builder": "PowerHouse Data Centers / Provident",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [PowerHouse Grand Prairie CampusPowerHouse Data Centers / Provident \u00b7 Grand Prairie, TXUnder construction1,800 MW planned](/facilities/powerhouse-provident-grand-prairie-tx)"
   ],
   "locality_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [PowerHouse Grand Prairie CampusPowerHouse Data Centers / Provident \u00b7 Grand Prairie, TXUnder construction1,800 MW planned](/facilities/powerhouse-provident-grand-prairie-tx)"
   ],
   "state_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [PowerHouse Grand Prairie CampusPowerHouse Data Centers / Provident \u00b7 Grand Prairie, TXUnder construction1,800 MW planned](/facilities/powerhouse-provident-grand-prairie-tx)"
   ],
   "capacity_gw_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [PowerHouse Grand Prairie CampusPowerHouse Data Centers / Provident \u00b7 Grand Prairie, TXUnder construction1,800 MW planned](/facilities/powerhouse-provident-grand-prairie-tx)"
   ],
   "builder_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [PowerHouse Grand Prairie CampusPowerHouse Data Centers / Provident \u00b7 Grand Prairie, TXUnder construction1,800 MW planned](/facilities/powerhouse-provident-grand-prairie-tx)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [PowerHouse Grand Prairie CampusPowerHouse Data Centers / Provident \u00b7 Grand Prairie, TXUnder construction1,800 MW planned](/facilities/powerhouse-provident-grand-prairie-tx)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://compute-atlas.com/states/texas",
   "title": "Compute Atlas",
   "published_at": null,
   "project": "Galaxy Helios Data Center Campus",
   "locality": "Afton",
   "state": "Texas",
   "capacity_gw": 1.63,
   "builder": "Galaxy Digital",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Galaxy Helios Data Center CampusGalaxy Digital \u00b7 Afton, TXUnder construction1,630 MW planned](/facilities/galaxy-helios-dickens-county-tx)"
   ],
   "locality_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Galaxy Helios Data Center CampusGalaxy Digital \u00b7 Afton, TXUnder construction1,630 MW planned](/facilities/galaxy-helios-dickens-county-tx)"
   ],
   "state_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Galaxy Helios Data Center CampusGalaxy Digital \u00b7 Afton, TXUnder construction1,630 MW planned](/facilities/galaxy-helios-dickens-county-tx)"
   ],
   "capacity_gw_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Galaxy Helios Data Center CampusGalaxy Digital \u00b7 Afton, TXUnder construction1,630 MW planned](/facilities/galaxy-helios-dickens-county-tx)"
   ],
   "builder_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Galaxy Helios Data Center CampusGalaxy Digital \u00b7 Afton, TXUnder construction1,630 MW planned](/facilities/galaxy-helios-dickens-county-tx)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Galaxy Helios Data Center CampusGalaxy Digital \u00b7 Afton, TXUnder construction1,630 MW planned](/facilities/galaxy-helios-dickens-county-tx)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://compute-atlas.com/states/texas",
   "title": "Compute Atlas",
   "published_at": null,
   "project": "Core Scientific Pecos AI Campus",
   "locality": "Pecos",
   "state": "Texas",
   "capacity_gw": 1.5,
   "builder": "Core Scientific",
   "ai_customer": "Core Scientific",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Core Scientific Pecos AI CampusCore Scientific \u00b7 Pecos, TXUnder construction1,500 MW planned](/facilities/core-scientific-pecos-tx)"
   ],
   "locality_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Core Scientific Pecos AI CampusCore Scientific \u00b7 Pecos, TXUnder construction1,500 MW planned](/facilities/core-scientific-pecos-tx)"
   ],
   "state_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Core Scientific Pecos AI CampusCore Scientific \u00b7 Pecos, TXUnder construction1,500 MW planned](/facilities/core-scientific-pecos-tx)"
   ],
   "capacity_gw_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Core Scientific Pecos AI CampusCore Scientific \u00b7 Pecos, TXUnder construction1,500 MW planned](/facilities/core-scientific-pecos-tx)"
   ],
   "builder_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Core Scientific Pecos AI CampusCore Scientific \u00b7 Pecos, TXUnder construction1,500 MW planned](/facilities/core-scientific-pecos-tx)"
   ],
   "ai_customer_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Core Scientific Pecos AI CampusCore Scientific \u00b7 Pecos, TXUnder construction1,500 MW planned](/facilities/core-scientific-pecos-tx)"
   ],
   "status_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Core Scientific Pecos AI CampusCore Scientific \u00b7 Pecos, TXUnder construction1,500 MW planned](/facilities/core-scientific-pecos-tx)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://compute-atlas.com/states/texas",
   "title": "Compute Atlas",
   "published_at": null,
   "project": "Crusoe Victoria AI Factory",
   "locality": "Victoria",
   "state": "Texas",
   "capacity_gw": 1.5,
   "builder": "Crusoe (with Blue Energy)",
   "ai_customer": "Crusoe",
   "status": "Proposed",
   "announcement_date": null,
   "project_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Crusoe Victoria AI FactoryCrusoe (with Blue Energy) \u00b7 Victoria, TXProposed1,500 MW planned](/facilities/crusoe-blue-energy-victoria-tx)"
   ],
   "locality_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Crusoe Victoria AI FactoryCrusoe (with Blue Energy) \u00b7 Victoria, TXProposed1,500 MW planned](/facilities/crusoe-blue-energy-victoria-tx)"
   ],
   "state_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Crusoe Victoria AI FactoryCrusoe (with Blue Energy) \u00b7 Victoria, TXProposed1,500 MW planned](/facilities/crusoe-blue-energy-victoria-tx)"
   ],
   "capacity_gw_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Crusoe Victoria AI FactoryCrusoe (with Blue Energy) \u00b7 Victoria, TXProposed1,500 MW planned](/facilities/crusoe-blue-energy-victoria-tx)"
   ],
   "builder_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Crusoe Victoria AI FactoryCrusoe (with Blue Energy) \u00b7 Victoria, TXProposed1,500 MW planned](/facilities/crusoe-blue-energy-victoria-tx)"
   ],
   "ai_customer_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Crusoe Victoria AI FactoryCrusoe (with Blue Energy) \u00b7 Victoria, TXProposed1,500 MW planned](/facilities/crusoe-blue-energy-victoria-tx)"
   ],
   "status_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Crusoe Victoria AI FactoryCrusoe (with Blue Energy) \u00b7 Victoria, TXProposed1,500 MW planned](/facilities/crusoe-blue-energy-victoria-tx)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://compute-atlas.com/states/texas",
   "title": "Compute Atlas",
   "published_at": null,
   "project": "Vantage Frontier Campus",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": "OpenAI / Oracle",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Vantage Frontier CampusVantage Data Centers (for OpenAI / Oracle) \u00b7 TXUnder construction1,400 MW planned](/facilities/vantage-frontier-shackelford-county-tx)"
   ],
   "locality_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Vantage Frontier CampusVantage Data Centers (for OpenAI / Oracle) \u00b7 TXUnder construction1,400 MW planned](/facilities/vantage-frontier-shackelford-county-tx)"
   ],
   "state_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Vantage Frontier CampusVantage Data Centers (for OpenAI / Oracle) \u00b7 TXUnder construction1,400 MW planned](/facilities/vantage-frontier-shackelford-county-tx)"
   ],
   "capacity_gw_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Vantage Frontier CampusVantage Data Centers (for OpenAI / Oracle) \u00b7 TXUnder construction1,400 MW planned](/facilities/vantage-frontier-shackelford-county-tx)"
   ],
   "builder_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Vantage Frontier CampusVantage Data Centers (for OpenAI / Oracle) \u00b7 TXUnder construction1,400 MW planned](/facilities/vantage-frontier-shackelford-county-tx)"
   ],
   "ai_customer_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Vantage Frontier CampusVantage Data Centers (for OpenAI / Oracle) \u00b7 TXUnder construction1,400 MW planned](/facilities/vantage-frontier-shackelford-county-tx)"
   ],
   "status_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Vantage Frontier CampusVantage Data Centers (for OpenAI / Oracle) \u00b7 TXUnder construction1,400 MW planned](/facilities/vantage-frontier-shackelford-county-tx)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://compute-atlas.com/states/texas",
   "title": "Compute Atlas",
   "published_at": null,
   "project": "Project Aquila",
   "locality": "Hill County",
   "state": "Texas",
   "capacity_gw": 1.235,
   "builder": "RCM Hill, LLC",
   "ai_customer": null,
   "status": "Proposed",
   "announcement_date": null,
   "project_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Project AquilaRCM Hill, LLC \u00b7 TXProposed1,235 MW planned](/facilities/rcm-hill-project-aquila-hill-county-tx)"
   ],
   "locality_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Project AquilaRCM Hill, LLC \u00b7 TXProposed1,235 MW planned](/facilities/rcm-hill-project-aquila-hill-county-tx)"
   ],
   "state_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Project AquilaRCM Hill, LLC \u00b7 TXProposed1,235 MW planned](/facilities/rcm-hill-project-aquila-hill-county-tx)"
   ],
   "capacity_gw_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Project AquilaRCM Hill, LLC \u00b7 TXProposed1,235 MW planned](/facilities/rcm-hill-project-aquila-hill-county-tx)"
   ],
   "builder_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Project AquilaRCM Hill, LLC \u00b7 TXProposed1,235 MW planned](/facilities/rcm-hill-project-aquila-hill-county-tx)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Project AquilaRCM Hill, LLC \u00b7 TXProposed1,235 MW planned](/facilities/rcm-hill-project-aquila-hill-county-tx)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://compute-atlas.com/states/texas",
   "title": "Compute Atlas",
   "published_at": null,
   "project": "CloudBurst San Marcos GigaCenter",
   "locality": "San Marcos",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "CloudBurst Data Centers",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [CloudBurst San Marcos GigaCenterCloudBurst Data Centers \u00b7 San Marcos, TXUnder construction1,200 MW planned](/facilities/cloudburst-san-marcos-tx)"
   ],
   "locality_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [CloudBurst San Marcos GigaCenterCloudBurst Data Centers \u00b7 San Marcos, TXUnder construction1,200 MW planned](/facilities/cloudburst-san-marcos-tx)"
   ],
   "state_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [CloudBurst San Marcos GigaCenterCloudBurst Data Centers \u00b7 San Marcos, TXUnder construction1,200 MW planned](/facilities/cloudburst-san-marcos-tx)"
   ],
   "capacity_gw_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [CloudBurst San Marcos GigaCenterCloudBurst Data Centers \u00b7 San Marcos, TXUnder construction1,200 MW planned](/facilities/cloudburst-san-marcos-tx)"
   ],
   "builder_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [CloudBurst San Marcos GigaCenterCloudBurst Data Centers \u00b7 San Marcos, TXUnder construction1,200 MW planned](/facilities/cloudburst-san-marcos-tx)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [CloudBurst San Marcos GigaCenterCloudBurst Data Centers \u00b7 San Marcos, TXUnder construction1,200 MW planned](/facilities/cloudburst-san-marcos-tx)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://compute-atlas.com/states/texas",
   "title": "Compute Atlas",
   "published_at": null,
   "project": "Stargate Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "OpenAI / Oracle / Crusoe",
   "ai_customer": "OpenAI / Oracle / Crusoe",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Stargate AbileneOpenAI / Oracle / Crusoe \u00b7 Abilene, TXUnder construction1,200 MW planned](/facilities/stargate-abilene-tx)"
   ],
   "locality_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Stargate AbileneOpenAI / Oracle / Crusoe \u00b7 Abilene, TXUnder construction1,200 MW planned](/facilities/stargate-abilene-tx)"
   ],
   "state_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Stargate AbileneOpenAI / Oracle / Crusoe \u00b7 Abilene, TXUnder construction1,200 MW planned](/facilities/stargate-abilene-tx)"
   ],
   "capacity_gw_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Stargate AbileneOpenAI / Oracle / Crusoe \u00b7 Abilene, TXUnder construction1,200 MW planned](/facilities/stargate-abilene-tx)"
   ],
   "builder_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Stargate AbileneOpenAI / Oracle / Crusoe \u00b7 Abilene, TXUnder construction1,200 MW planned](/facilities/stargate-abilene-tx)"
   ],
   "ai_customer_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Stargate AbileneOpenAI / Oracle / Crusoe \u00b7 Abilene, TXUnder construction1,200 MW planned](/facilities/stargate-abilene-tx)"
   ],
   "status_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Stargate AbileneOpenAI / Oracle / Crusoe \u00b7 Abilene, TXUnder construction1,200 MW planned](/facilities/stargate-abilene-tx)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://compute-atlas.com/states/texas",
   "title": "Compute Atlas",
   "published_at": null,
   "project": "Stargate Milam County Campus",
   "locality": "Milam County",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "OpenAI / SoftBank (SB Energy)",
   "ai_customer": "OpenAI / SoftBank (SB Energy)",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Stargate Milam County CampusOpenAI / SoftBank (SB Energy) \u00b7 TXUnder construction1,200 MW planned](/facilities/stargate-milam-county-tx)"
   ],
   "locality_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Stargate Milam County CampusOpenAI / SoftBank (SB Energy) \u00b7 TXUnder construction1,200 MW planned](/facilities/stargate-milam-county-tx)"
   ],
   "state_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Stargate Milam County CampusOpenAI / SoftBank (SB Energy) \u00b7 TXUnder construction1,200 MW planned](/facilities/stargate-milam-county-tx)"
   ],
   "capacity_gw_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Stargate Milam County CampusOpenAI / SoftBank (SB Energy) \u00b7 TXUnder construction1,200 MW planned](/facilities/stargate-milam-county-tx)"
   ],
   "builder_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Stargate Milam County CampusOpenAI / SoftBank (SB Energy) \u00b7 TXUnder construction1,200 MW planned](/facilities/stargate-milam-county-tx)"
   ],
   "ai_customer_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Stargate Milam County CampusOpenAI / SoftBank (SB Energy) \u00b7 TXUnder construction1,200 MW planned](/facilities/stargate-milam-county-tx)"
   ],
   "status_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Stargate Milam County CampusOpenAI / SoftBank (SB Energy) \u00b7 TXUnder construction1,200 MW planned](/facilities/stargate-milam-county-tx)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://compute-atlas.com/states/texas",
   "title": "Compute Atlas",
   "published_at": null,
   "project": "Cipher Colchis Campus",
   "locality": "San Angelo",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Cipher Mining",
   "ai_customer": null,
   "status": "Proposed",
   "announcement_date": null,
   "project_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Cipher Colchis CampusCipher Mining \u00b7 San Angelo, TXProposed1,000 MW planned](/facilities/cipher-colchis-tom-green-tx)"
   ],
   "locality_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Cipher Colchis CampusCipher Mining \u00b7 San Angelo, TXProposed1,000 MW planned](/facilities/cipher-colchis-tom-green-tx)"
   ],
   "state_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Cipher Colchis CampusCipher Mining \u00b7 San Angelo, TXProposed1,000 MW planned](/facilities/cipher-colchis-tom-green-tx)"
   ],
   "capacity_gw_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Cipher Colchis CampusCipher Mining \u00b7 San Angelo, TXProposed1,000 MW planned](/facilities/cipher-colchis-tom-green-tx)"
   ],
   "builder_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Cipher Colchis CampusCipher Mining \u00b7 San Angelo, TXProposed1,000 MW planned](/facilities/cipher-colchis-tom-green-tx)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Cipher Colchis CampusCipher Mining \u00b7 San Angelo, TXProposed1,000 MW planned](/facilities/cipher-colchis-tom-green-tx)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://compute-atlas.com/states/texas",
   "title": "Compute Atlas",
   "published_at": null,
   "project": "Meta El Paso AI Data Center Campus",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Meta El Paso AI Data Center CampusMeta \u00b7 El Paso, TXUnder construction1,000 MW planned](/facilities/meta-el-paso-tx)"
   ],
   "locality_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Meta El Paso AI Data Center CampusMeta \u00b7 El Paso, TXUnder construction1,000 MW planned](/facilities/meta-el-paso-tx)"
   ],
   "state_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Meta El Paso AI Data Center CampusMeta \u00b7 El Paso, TXUnder construction1,000 MW planned](/facilities/meta-el-paso-tx)"
   ],
   "capacity_gw_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Meta El Paso AI Data Center CampusMeta \u00b7 El Paso, TXUnder construction1,000 MW planned](/facilities/meta-el-paso-tx)"
   ],
   "builder_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Meta El Paso AI Data Center CampusMeta \u00b7 El Paso, TXUnder construction1,000 MW planned](/facilities/meta-el-paso-tx)"
   ],
   "ai_customer_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Meta El Paso AI Data Center CampusMeta \u00b7 El Paso, TXUnder construction1,000 MW planned](/facilities/meta-el-paso-tx)"
   ],
   "status_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Meta El Paso AI Data Center CampusMeta \u00b7 El Paso, TXUnder construction1,000 MW planned](/facilities/meta-el-paso-tx)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://compute-atlas.com/states/texas",
   "title": "Compute Atlas",
   "published_at": null,
   "project": "Site MAT 1177",
   "locality": "Matagorda",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "MARA Holdings",
   "ai_customer": null,
   "status": "Proposed",
   "announcement_date": null,
   "project_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Site MAT 1177MARA Holdings \u00b7 TXProposed1,000 MW planned](/facilities/mara-site-mat-1177-matagorda-tx)"
   ],
   "locality_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Site MAT 1177MARA Holdings \u00b7 TXProposed1,000 MW planned](/facilities/mara-site-mat-1177-matagorda-tx)"
   ],
   "state_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Site MAT 1177MARA Holdings \u00b7 TXProposed1,000 MW planned](/facilities/mara-site-mat-1177-matagorda-tx)"
   ],
   "capacity_gw_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Site MAT 1177MARA Holdings \u00b7 TXProposed1,000 MW planned](/facilities/mara-site-mat-1177-matagorda-tx)"
   ],
   "builder_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Site MAT 1177MARA Holdings \u00b7 TXProposed1,000 MW planned](/facilities/mara-site-mat-1177-matagorda-tx)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Texas",
    "## Facilities in Texas",
    "- [Site MAT 1177MARA Holdings \u00b7 TXProposed1,000 MW planned](/facilities/mara-site-mat-1177-matagorda-tx)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx",
   "title": "Shackelford County, Texas Data Center Campus - Vantage Data Centers",
   "published_at": "2025-08-19T01:01:32",
   "project": "Shackelford County (Frontier)",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Under development",
   "announcement_date": null,
   "project_evidence": [
    "# Shackelford County (Frontier)\n Data Center Campus",
    "## Shackelford County (Frontier) Data Center Campus Overview",
    "Located in Shackelford County, Texas, just a few hours drive from both Dallas\u2013Fort Worth metroplex and Austin, Frontier is a mega-scale campus that will support the artificial intelligence (AI) boom."
   ],
   "locality_evidence": [
    "# Shackelford County (Frontier)\n Data Center Campus",
    "## Shackelford County (Frontier) Data Center Campus Overview",
    "Located in Shackelford County, Texas, just a few hours drive from both Dallas\u2013Fort Worth metroplex and Austin, Frontier is a mega-scale campus that will support the artificial intelligence (AI) boom."
   ],
   "state_evidence": [
    "# Shackelford County (Frontier)\n Data Center Campus",
    "## Shackelford County (Frontier) Data Center Campus Overview",
    "Located in Shackelford County, Texas, just a few hours drive from both Dallas\u2013Fort Worth metroplex and Austin, Frontier is a mega-scale campus that will support the artificial intelligence (AI) boom."
   ],
   "capacity_gw_evidence": [
    "# Shackelford County (Frontier)\n Data Center Campus",
    "## Shackelford County (Frontier) Data Center Campus Overview",
    "1.4GW\n\nof critical IT load",
    "This transformative 1,200-acre development will deliver 1.4GW of critical IT capacity across 10 single-story data centers spanning more than 3.7 million square feet."
   ],
   "builder_evidence": [
    "# Shackelford County (Frontier)\n Data Center Campus",
    "## Shackelford County (Frontier) Data Center Campus Overview",
    "We\u2019re pleased to offer you all the advantages that come with choosing Vantage Data Centers."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Shackelford County (Frontier)\n Data Center Campus",
    "## Shackelford County (Frontier) Data Center Campus Overview",
    "This transformative 1,200-acre development will deliver 1.4GW of critical IT capacity across 10 single-story data centers spanning more than 3.7 million square feet.",
    "The first data center is scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://homercityredevelopment.com/project-overview",
   "title": "Project Overview | Homer City Redevelopment",
   "published_at": null,
   "project": "Homer City Energy Campus",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.4,
   "builder": "Kiewit",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2025-04-02",
   "project_evidence": [
    "## Project overview",
    "GE Vernova will provide seven high efficiency 7HA.02 hydrogen-enabled, gas-fired turbines, with the first deliveries expected to begin in 2026.",
    "The Homer City Energy Campus will be built by Kiewit Power Constructors Co., one of the leading engineering, procurement and construction (EPC) contractors in the country."
   ],
   "locality_evidence": [
    "## Project overview",
    "On April 2, 2025, HCR and Kiewit announced the future of the former Homer City Generating Station.",
    "Homer City will be transformed from a decommissioned coal power plant into a more than 3,200-acre campus that will include natural gas-powered data-centers designed to meet the growing artificial intelligence (AI) and high-performance computing (HPC) needs of the innovative technology companies shaping America\u2019s digital future."
   ],
   "state_evidence": [
    "## Project overview",
    "Located only 50 miles east of Pittsburgh, the facility was the largest coal-burning power plant in Pennsylvania and was directly connected to both the PJM Interconnection, L.L.C. (PJM) and New York Independent System Operator (NYISO) transmission systems."
   ],
   "capacity_gw_evidence": [
    "## Project overview",
    "- Delivery of up to 4.4 gigawatts (GW) of power to support AI-driven hyperscale data centers, while reducing CO2 emissions by 60\u201365% per megawatt hour compared to the former coal plant."
   ],
   "builder_evidence": [
    "## Project overview",
    "On April 2, 2025, HCR and Kiewit announced the future of the former Homer City Generating Station."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Project overview",
    "On April 2, 2025, HCR and Kiewit announced the future of the former Homer City Generating Station."
   ],
   "announcement_date_evidence": [
    "## Project overview",
    "On April 2, 2025, HCR and Kiewit announced the future of the former Homer City Generating Station."
   ]
  },
  {
   "url": "https://nscale.com/press-releases/nscale-west-virginia-ai-factory",
   "title": "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
   "published_at": "2026-03-16T00:00:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "Acquired / in development",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of Onsite Powered Microgrid",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "locality_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of Onsite Powered Microgrid",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "state_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of Onsite Powered Microgrid",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "capacity_gw_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of Onsite Powered Microgrid",
    "The expansion capabilities of this site \u2014 which has the potential for a total power draw of 8GW \u2014 will allow Nscale to develop power capacity rapidly while supporting one of the largest announced AI compute deployments in the market today."
   ],
   "builder_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of Onsite Powered Microgrid",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "ai_customer_evidence": [
    "Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs",
    "**SAN JOSE, CA (GTC 2026) \u2013 March 16, 2026 \u2013** Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA\u2019s next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ],
   "status_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of Onsite Powered Microgrid",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "announcement_date_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of Onsite Powered Microgrid",
    "**SAN JOSE, CA (GTC 2026) \u2013 March 16, 2026 \u2013** Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA\u2019s next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ]
  },
  {
   "url": "https://prnewswire.com/news-releases/energy-abundance-announces-data-city-texas--the-worlds-largest-behind-the-meter-data-center-hub-powered-by-100-247-green-energy-302407052.html",
   "title": "Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
   "published_at": "2025-03-21T04:38:00",
   "project": "Data City",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corporation",
   "ai_customer": null,
   "status": "unveiled plans",
   "announcement_date": "2025-03-21",
   "project_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "locality_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "state_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "capacity_gw_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "builder_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "announcement_date_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ]
  },
  {
   "url": "https://finance.yahoo.com/technology/ai/articles/openai-spending-30-billion-mega-150500763.html",
   "title": "OpenAI is spending $30 billion on a new mega 3.2 GW data center in Georgia \u2014 and they're trying really hard to quell local opposition",
   "published_at": "2026-07-23T15:05:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "OpenAI is spending $30 billion on a new mega 3.2 GW data center in Georgia \u2014 and they're trying really hard to quell local opposition",
    "The site, named 'Project Camellia', will span 1,400 acres and is expected to be completed in phases between 2028 and 2032."
   ],
   "locality_evidence": [
    "OpenAI is spending $30 billion on a new mega 3.2 GW data center in Georgia \u2014 and they're trying really hard to quell local opposition",
    "OpenAI is planning to build a new $30 billion AI data center campus in Effingham County, Georgia, that will deliver 3.2 gigawatts of compute once fully operational."
   ],
   "state_evidence": [
    "OpenAI is spending $30 billion on a new mega 3.2 GW data center in Georgia \u2014 and they're trying really hard to quell local opposition",
    "OpenAI is planning to build a new $30 billion AI data center campus in Effingham County, Georgia, that will deliver 3.2 gigawatts of compute once fully operational."
   ],
   "capacity_gw_evidence": [
    "OpenAI is spending $30 billion on a new mega 3.2 GW data center in Georgia \u2014 and they're trying really hard to quell local opposition",
    "OpenAI is planning to build a new $30 billion AI data center campus in Effingham County, Georgia, that will deliver 3.2 gigawatts of compute once fully operational."
   ],
   "builder_evidence": [
    "OpenAI is spending $30 billion on a new mega 3.2 GW data center in Georgia \u2014 and they're trying really hard to quell local opposition",
    "OpenAI is planning to build a new $30 billion AI data center campus in Effingham County, Georgia, that will deliver 3.2 gigawatts of compute once fully operational."
   ],
   "ai_customer_evidence": [
    "OpenAI is spending $30 billion on a new mega 3.2 GW data center in Georgia \u2014 and they're trying really hard to quell local opposition",
    "OpenAI is planning to build a new $30 billion AI data center campus in Effingham County, Georgia, that will deliver 3.2 gigawatts of compute once fully operational."
   ],
   "status_evidence": [
    "OpenAI is spending $30 billion on a new mega 3.2 GW data center in Georgia \u2014 and they're trying really hard to quell local opposition",
    "OpenAI is planning to build a new $30 billion AI data center campus in Effingham County, Georgia, that will deliver 3.2 gigawatts of compute once fully operational."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://planetdetroit.org/2026/03/google-dte-data-center-van-buren",
   "title": "Google, DTE plan 1 gigawatt Michigan data center, eye Van Buren Township site",
   "published_at": "2026-03-17T21:28:03",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": "Google",
   "status": "proposed",
   "announcement_date": null,
   "project_evidence": [
    "# Google, DTE plan 1 gigawatt Michigan data center, eye Van Buren Township site",
    "A rendering of Project Cannoli, a proposed data center in Van Buren Township.",
    "DTE Energy and Google announced plans on Tuesday to develop a 1-gigawatt[ data center](https://planetdetroit.org/issues/data-centers/), possibly as part of the [\u201cProject Cannoli](https://planetdetroit.org/2026/02/project-cannoli-preliminary-site-plan/)\u201d development in Van Buren Township."
   ],
   "locality_evidence": [
    "# Google, DTE plan 1 gigawatt Michigan data center, eye Van Buren Township site",
    "A rendering of Project Cannoli, a proposed data center in Van Buren Township.",
    "DTE Energy and Google announced plans on Tuesday to develop a 1-gigawatt[ data center](https://planetdetroit.org/issues/data-centers/), possibly as part of the [\u201cProject Cannoli](https://planetdetroit.org/2026/02/project-cannoli-preliminary-site-plan/)\u201d development in Van Buren Township."
   ],
   "state_evidence": [
    "# Google, DTE plan 1 gigawatt Michigan data center, eye Van Buren Township site",
    "- Google, DTE Energy announce plans for a 1-gigawatt Michigan data center backed by 2.7 GW of new solar and storage resources."
   ],
   "capacity_gw_evidence": [
    "# Google, DTE plan 1 gigawatt Michigan data center, eye Van Buren Township site",
    "- Google, DTE Energy announce plans for a 1-gigawatt Michigan data center backed by 2.7 GW of new solar and storage resources.",
    "DTE Energy and Google announced plans on Tuesday to develop a 1-gigawatt[ data center](https://planetdetroit.org/issues/data-centers/), possibly as part of the [\u201cProject Cannoli](https://planetdetroit.org/2026/02/project-cannoli-preliminary-site-plan/)\u201d development in Van Buren Township."
   ],
   "builder_evidence": [
    "# Google, DTE plan 1 gigawatt Michigan data center, eye Van Buren Township site",
    "In February, the Van Buren Township Planning Commission granted preliminary site plan approval for the Project Cannoli data center.",
    "The project is proposed by Panattoni Developent Co. for a site north of I-94 between Haggerty Road and I-275."
   ],
   "ai_customer_evidence": [
    "# Google, DTE plan 1 gigawatt Michigan data center, eye Van Buren Township site",
    "- Google, DTE Energy announce plans for a 1-gigawatt Michigan data center backed by 2.7 GW of new solar and storage resources.",
    "DTE Energy and Google announced plans on Tuesday to develop a 1-gigawatt[ data center](https://planetdetroit.org/issues/data-centers/), possibly as part of the [\u201cProject Cannoli](https://planetdetroit.org/2026/02/project-cannoli-preliminary-site-plan/)\u201d development in Van Buren Township."
   ],
   "status_evidence": [
    "# Google, DTE plan 1 gigawatt Michigan data center, eye Van Buren Township site",
    "A rendering of Project Cannoli, a proposed data center in Van Buren Township.",
    "In February, the Van Buren Township Planning Commission granted preliminary site plan approval for the Project Cannoli data center."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://lex18.com/news/covering-kentucky/terawulf-acquires-1-gw-eastern-kentucky-hpc-campus-to-expand-ai-infrastructure",
   "title": "TeraWulf acquires 1+ GW Eastern Kentucky HPC campus to expand AI infrastructure",
   "published_at": "2026-05-27T10:45:47",
   "project": "Muskie Data Campus",
   "locality": "Eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf Inc.",
   "ai_customer": null,
   "status": "Acquired",
   "announcement_date": null,
   "project_evidence": [
    "# TeraWulf acquires 1+ GW Eastern Kentucky HPC campus to expand AI infrastructure",
    "According to a press release, the new site, called the Muskie Data Campus, is expected to support more than 1 gigawatt of data center capacity over time."
   ],
   "locality_evidence": [
    "# TeraWulf acquires 1+ GW Eastern Kentucky HPC campus to expand AI infrastructure",
    "TeraWulf Inc. has acquired a hyperscale high-performance computing development site in eastern Kentucky, expanding its portfolio of large-scale digital infrastructure campuses."
   ],
   "state_evidence": [
    "# TeraWulf acquires 1+ GW Eastern Kentucky HPC campus to expand AI infrastructure",
    "TeraWulf Inc. has acquired a hyperscale high-performance computing development site in eastern Kentucky, expanding its portfolio of large-scale digital infrastructure campuses."
   ],
   "capacity_gw_evidence": [
    "# TeraWulf acquires 1+ GW Eastern Kentucky HPC campus to expand AI infrastructure",
    "According to a press release, the new site, called the Muskie Data Campus, is expected to support more than 1 gigawatt of data center capacity over time."
   ],
   "builder_evidence": [
    "# TeraWulf acquires 1+ GW Eastern Kentucky HPC campus to expand AI infrastructure",
    "TeraWulf Inc. has acquired a hyperscale high-performance computing development site in eastern Kentucky, expanding its portfolio of large-scale digital infrastructure campuses."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# TeraWulf acquires 1+ GW Eastern Kentucky HPC campus to expand AI infrastructure",
    "TeraWulf Inc. has acquired a hyperscale high-performance computing development site in eastern Kentucky, expanding its portfolio of large-scale digital infrastructure campuses."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://linkedin.com/posts/oliverdennis1999_iren-energizes-first-phase-of-2gw-sweetwater-activity-7457808073328590849-dlvq",
   "title": "IREN energizes first phase of 2GW Sweetwater data center campus in Texas",
   "published_at": "2026-05-06T15:06:43",
   "project": "Sweetwater",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": "Microsoft",
   "status": "energized first phase",
   "announcement_date": null,
   "project_evidence": [
    "IREN energizes first phase of 2GW Sweetwater data center campus in Texas \u26a1 1.4GW Sweetwater 1 energized on schedule \ud83c\udfd7\ufe0f 2GW total across Sweetwater 1 & 2 at full build 2,200 acres \ud83d\udcc5 Sweetwater 2 energization expected 2028 \ud83d\udcb0 $625M Mirantis acquisition bare metal GPU and Kubernetes stack \ud83e\udd1d Microsoft a major customer across Iren's portfolio"
   ],
   "locality_evidence": [
    "IREN energizes first phase of 2GW Sweetwater data center campus in Texas \u26a1 1.4GW Sweetwater 1 energized on schedule \ud83c\udfd7\ufe0f 2GW total across Sweetwater 1 & 2 at full build 2,200 acres \ud83d\udcc5 Sweetwater 2 energization expected 2028 \ud83d\udcb0 $625M Mirantis acquisition bare metal GPU and Kubernetes stack \ud83e\udd1d Microsoft a major customer across Iren's portfolio"
   ],
   "state_evidence": [
    "IREN energizes first phase of 2GW Sweetwater data center campus in Texas \u26a1 1.4GW Sweetwater 1 energized on schedule \ud83c\udfd7\ufe0f 2GW total across Sweetwater 1 & 2 at full build 2,200 acres \ud83d\udcc5 Sweetwater 2 energization expected 2028 \ud83d\udcb0 $625M Mirantis acquisition bare metal GPU and Kubernetes stack \ud83e\udd1d Microsoft a major customer across Iren's portfolio"
   ],
   "capacity_gw_evidence": [
    "IREN energizes first phase of 2GW Sweetwater data center campus in Texas \u26a1 1.4GW Sweetwater 1 energized on schedule \ud83c\udfd7\ufe0f 2GW total across Sweetwater 1 & 2 at full build 2,200 acres \ud83d\udcc5 Sweetwater 2 energization expected 2028 \ud83d\udcb0 $625M Mirantis acquisition bare metal GPU and Kubernetes stack \ud83e\udd1d Microsoft a major customer across Iren's portfolio"
   ],
   "builder_evidence": [
    "IREN energizes first phase of 2GW Sweetwater data center campus in Texas \u26a1 1.4GW Sweetwater 1 energized on schedule \ud83c\udfd7\ufe0f 2GW total across Sweetwater 1 & 2 at full build 2,200 acres \ud83d\udcc5 Sweetwater 2 energization expected 2028 \ud83d\udcb0 $625M Mirantis acquisition bare metal GPU and Kubernetes stack \ud83e\udd1d Microsoft a major customer across Iren's portfolio"
   ],
   "ai_customer_evidence": [
    "IREN energizes first phase of 2GW Sweetwater data center campus in Texas \u26a1 1.4GW Sweetwater 1 energized on schedule \ud83c\udfd7\ufe0f 2GW total across Sweetwater 1 & 2 at full build 2,200 acres \ud83d\udcc5 Sweetwater 2 energization expected 2028 \ud83d\udcb0 $625M Mirantis acquisition bare metal GPU and Kubernetes stack \ud83e\udd1d Microsoft a major customer across Iren's portfolio"
   ],
   "status_evidence": [
    "IREN energizes first phase of 2GW Sweetwater data center campus in Texas \u26a1 1.4GW Sweetwater 1 energized on schedule \ud83c\udfd7\ufe0f 2GW total across Sweetwater 1 & 2 at full build 2,200 acres \ud83d\udcc5 Sweetwater 2 energization expected 2028 \ud83d\udcb0 $625M Mirantis acquisition bare metal GPU and Kubernetes stack \ud83e\udd1d Microsoft a major customer across Iren's portfolio"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://creekstone.energy",
   "title": "Creekstone Energy | Powering AI Infrastructure at Scale",
   "published_at": null,
   "project": "The Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy",
   "ai_customer": null,
   "status": "construction underway",
   "announcement_date": null,
   "project_evidence": [
    "Flagship Project",
    "## The Delta Gigasite",
    "Our first project proves our model works. 1,143 acres in Delta, Utah. Land secured, permits issued, construction underway."
   ],
   "locality_evidence": [
    "Flagship Project",
    "## The Delta Gigasite",
    "Our first project proves our model works. 1,143 acres in Delta, Utah. Land secured, permits issued, construction underway."
   ],
   "state_evidence": [
    "Flagship Project",
    "## The Delta Gigasite",
    "Our first project proves our model works. 1,143 acres in Delta, Utah. Land secured, permits issued, construction underway."
   ],
   "capacity_gw_evidence": [
    "Flagship Project",
    "## The Delta Gigasite",
    ">10 GW",
    "Power Capacity"
   ],
   "builder_evidence": [
    "Hyperscale AI Power Infrastructure",
    "Creekstone Energy develops behind-the-meter power generation specifically designed for hyperscale data centers.",
    "Flagship Project",
    "## The Delta Gigasite"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Flagship Project",
    "## The Delta Gigasite",
    "Our first project proves our model works. 1,143 acres in Delta, Utah. Land secured, permits issued, construction underway."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterfrontier.com/sustainability/article/55233745/ecl-debuts-1-gw-off-grid-hydrogen-powered-ai-factory-data-center-on-600-acres-near-houston",
   "title": "ECL Debuts 1 GW Off-Grid Hydrogen-Powered 'AI Factory' Data Center On 600 Acres Near Houston",
   "published_at": "2024-10-07T00:00:00",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Dubbed ECL TerraSite-TX1, as located on a 600-plus acre site east of Houston, ECL said the initial phase of TerraSite-TX1 will be delivered in the summer of 2025 at a cost of approximately $450 million, with 50 MW of data center capacity to be utilized by data center cloud and AI cloud operators."
   ],
   "locality_evidence": [
    "Dubbed ECL TerraSite-TX1, as located on a 600-plus acre site east of Houston, ECL said the initial phase of TerraSite-TX1 will be delivered in the summer of 2025 at a cost of approximately $450 million, with 50 MW of data center capacity to be utilized by data center cloud and AI cloud operators."
   ],
   "state_evidence": [
    "ECL Terrasite-TX1 comes at a critical time for the state of Texas, with The Electric Reliability Council of Texas (ERCOT) testifying on June 12 of this year that the state\u2019s power grid needs will grow approximately 2x by 2030 due, in part to the growth of data centers and AI."
   ],
   "capacity_gw_evidence": [
    "Bachar said, \"We're building our first large-scale campus data center with an initial commitment for 1 GW, with an option to expand it to 2 GW."
   ],
   "builder_evidence": [
    "Dubbed ECL TerraSite-TX1, as located on a 600-plus acre site east of Houston, ECL said the initial phase of TerraSite-TX1 will be delivered in the summer of 2025 at a cost of approximately $450 million, with 50 MW of data center capacity to be utilized by data center cloud and AI cloud operators."
   ],
   "ai_customer_evidence": [
    "According to a press release, [Lambda](https://lambdalabs.com/) will be the first tenant at ECL TerraSite-TX1."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute",
   "title": "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
   "published_at": null,
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "locality_evidence": [
    "# NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "state_evidence": [
    "# NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "capacity_gw_evidence": [
    "# NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "- *OpenAI will be the customer for 8-IT GW*",
    "In support of the surrounding Ohio community, SB Energy and SoftBank will build at least 10 GW of new energy generation, which results in 8 IT-GW of AI factory capacity, and invest at least $4.2 billion in new regional grid infrastructure through an innovative partnership with AEP Ohio designed to protect ratepayers."
   ],
   "builder_evidence": [
    "# NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "SB Energy will build, own and operate the data center under a 20-year lease to OpenAI."
   ],
   "ai_customer_evidence": [
    "# NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "- *OpenAI will be the customer for 8-IT GW*",
    "OpenAI will be the customer."
   ],
   "status_evidence": [
    "# NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "The planned capacity is expected to come online in phases beginning in 2028."
   ],
   "announcement_date_evidence": [
    "# NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "August 17, 2026"
   ]
  },
  {
   "url": "https://etcentric.org/meta-power-play-includes-data-centers-of-up-to-5-gigawatts",
   "title": "Meta Power Play Includes Data Centers of Up to 5 Gigawatts - ETCentric",
   "published_at": "2025-07-16T13:00:40",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "This includes Hyperion, a massive facility to be built in Louisiana that \u201cwill be able to scale up to 5 gigawatts over several years,\u201d Meta CEO Mark Zuckerberg posted on Threads with a graphic illustrating how its planned footprint is nearly big enough to cover most of Manhattan.",
    "Meta Platforms has embarked on an ambitious data center build-out to power its AI ambitions."
   ],
   "locality_evidence": [
    "A Meta spokesperson told *[TechCrunch](https://techcrunch.com/2025/07/14/mark-zuckerberg-says-meta-is-building-a-5gw-ai-data-center/)* that Hyperion will likely be located in Louisiana\u2019s Richland Parish district, where Meta in December announced a $10 billion data center.",
    "Meta Platforms has embarked on an ambitious data center build-out to power its AI ambitions."
   ],
   "state_evidence": [
    "This includes Hyperion, a massive facility to be built in Louisiana that \u201cwill be able to scale up to 5 gigawatts over several years,\u201d Meta CEO Mark Zuckerberg posted on Threads with a graphic illustrating how its planned footprint is nearly big enough to cover most of Manhattan.",
    "Meta Platforms has embarked on an ambitious data center build-out to power its AI ambitions."
   ],
   "capacity_gw_evidence": [
    "This includes Hyperion, a massive facility to be built in Louisiana that \u201cwill be able to scale up to 5 gigawatts over several years,\u201d Meta CEO Mark Zuckerberg posted on Threads with a graphic illustrating how its planned footprint is nearly big enough to cover most of Manhattan.",
    "Meta Platforms has embarked on an ambitious data center build-out to power its AI ambitions."
   ],
   "builder_evidence": [
    "This includes Hyperion, a massive facility to be built in Louisiana that \u201cwill be able to scale up to 5 gigawatts over several years,\u201d Meta CEO Mark Zuckerberg posted on Threads with a graphic illustrating how its planned footprint is nearly big enough to cover most of Manhattan.",
    "Meta Platforms has embarked on an ambitious data center build-out to power its AI ambitions."
   ],
   "ai_customer_evidence": [
    "The first new plant to come online will be Prometheus in Ohio in 2026, Zuckerberg said, indicating his company will not be looking to OpenAI and Stargate partners to power Meta AI processing.",
    "Meta Platforms has embarked on an ambitious data center build-out to power its AI ambitions."
   ],
   "status_evidence": [
    "This includes Hyperion, a massive facility to be built in Louisiana that \u201cwill be able to scale up to 5 gigawatts over several years,\u201d Meta CEO Mark Zuckerberg posted on Threads with a graphic illustrating how its planned footprint is nearly big enough to cover most of Manhattan.",
    "Meta Platforms has embarked on an ambitious data center build-out to power its AI ambitions."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://etcentric.org/meta-power-play-includes-data-centers-of-up-to-5-gigawatts",
   "title": "Meta Power Play Includes Data Centers of Up to 5 Gigawatts - ETCentric",
   "published_at": "2025-07-16T13:00:40",
   "project": "Prometheus",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "coming online",
   "announcement_date": null,
   "project_evidence": [
    "The first new plant to come online will be Prometheus in Ohio in 2026, Zuckerberg said, indicating his company will not be looking to OpenAI and Stargate partners to power Meta AI processing.",
    "Meta Platforms has embarked on an ambitious data center build-out to power its AI ambitions."
   ],
   "locality_evidence": [
    "*TechCrunch* reports that Prometheus will come online as a 1 gigawatt super cluster, built in New Albany, Ohio.",
    "Meta Platforms has embarked on an ambitious data center build-out to power its AI ambitions."
   ],
   "state_evidence": [
    "The first new plant to come online will be Prometheus in Ohio in 2026, Zuckerberg said, indicating his company will not be looking to OpenAI and Stargate partners to power Meta AI processing.",
    "Meta Platforms has embarked on an ambitious data center build-out to power its AI ambitions."
   ],
   "capacity_gw_evidence": [
    "*TechCrunch* reports that Prometheus will come online as a 1 gigawatt super cluster, built in New Albany, Ohio.",
    "Meta Platforms has embarked on an ambitious data center build-out to power its AI ambitions."
   ],
   "builder_evidence": [
    "The first new plant to come online will be Prometheus in Ohio in 2026, Zuckerberg said, indicating his company will not be looking to OpenAI and Stargate partners to power Meta AI processing.",
    "Meta Platforms has embarked on an ambitious data center build-out to power its AI ambitions."
   ],
   "ai_customer_evidence": [
    "The first new plant to come online will be Prometheus in Ohio in 2026, Zuckerberg said, indicating his company will not be looking to OpenAI and Stargate partners to power Meta AI processing.",
    "Meta Platforms has embarked on an ambitious data center build-out to power its AI ambitions."
   ],
   "status_evidence": [
    "The first new plant to come online will be Prometheus in Ohio in 2026, Zuckerberg said, indicating his company will not be looking to OpenAI and Stargate partners to power Meta AI processing.",
    "Meta Platforms has embarked on an ambitious data center build-out to power its AI ambitions."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://etcentric.org/meta-power-play-includes-data-centers-of-up-to-5-gigawatts",
   "title": "Meta Power Play Includes Data Centers of Up to 5 Gigawatts - ETCentric",
   "published_at": "2025-07-16T13:00:40",
   "project": "Stargate",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": null,
   "ai_customer": "OpenAI",
   "status": "scaling",
   "announcement_date": null,
   "project_evidence": [
    "The Prometheus timeline of powering on sometime in 2026 puts it on a trajectory to open right around the time OpenAI\u2019s inaugural U.S. Stargate site in Abilene, Texas will scale to 1 gigawatt, putting the two companies in a rarefied space as the first operators of AI clusters of this scale anywhere in the world.",
    "Meta Platforms has embarked on an ambitious data center build-out to power its AI ambitions."
   ],
   "locality_evidence": [
    "The Prometheus timeline of powering on sometime in 2026 puts it on a trajectory to open right around the time OpenAI\u2019s inaugural U.S. Stargate site in Abilene, Texas will scale to 1 gigawatt, putting the two companies in a rarefied space as the first operators of AI clusters of this scale anywhere in the world.",
    "Meta Platforms has embarked on an ambitious data center build-out to power its AI ambitions."
   ],
   "state_evidence": [
    "The Prometheus timeline of powering on sometime in 2026 puts it on a trajectory to open right around the time OpenAI\u2019s inaugural U.S. Stargate site in Abilene, Texas will scale to 1 gigawatt, putting the two companies in a rarefied space as the first operators of AI clusters of this scale anywhere in the world.",
    "Meta Platforms has embarked on an ambitious data center build-out to power its AI ambitions."
   ],
   "capacity_gw_evidence": [
    "Phase two, with six additional buildings (for a total of eight) and about 1.2 gigawatts capacity is slated for mid-2026.",
    "Meta Platforms has embarked on an ambitious data center build-out to power its AI ambitions."
   ],
   "builder_evidence": null,
   "ai_customer_evidence": [
    "The Prometheus timeline of powering on sometime in 2026 puts it on a trajectory to open right around the time OpenAI\u2019s inaugural U.S. Stargate site in Abilene, Texas will scale to 1 gigawatt, putting the two companies in a rarefied space as the first operators of AI clusters of this scale anywhere in the world.",
    "Meta Platforms has embarked on an ambitious data center build-out to power its AI ambitions."
   ],
   "status_evidence": [
    "The Prometheus timeline of powering on sometime in 2026 puts it on a trajectory to open right around the time OpenAI\u2019s inaugural U.S. Stargate site in Abilene, Texas will scale to 1 gigawatt, putting the two companies in a rarefied space as the first operators of AI clusters of this scale anywhere in the world.",
    "Meta Platforms has embarked on an ambitious data center build-out to power its AI ambitions."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenters.com/xai-macrohardrr-southaven",
   "title": "xAI: MACROHARDRR / Southaven Data Center",
   "published_at": null,
   "project": "MACROHARDRR",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "retrofitting an existing building",
   "announcement_date": null,
   "project_evidence": [
    "**xAI MACROHARDRR / Southaven Data Center in Southaven, Mississippi** is a private AI infrastructure project expanding xAI\u2019s Greater Memphis supercomputing footprint.",
    "2. **Project Name:** MACROHARDRR."
   ],
   "locality_evidence": [
    "**xAI MACROHARDRR / Southaven Data Center in Southaven, Mississippi** is a private AI infrastructure project expanding xAI\u2019s Greater Memphis supercomputing footprint.",
    "1. **Market:** Southaven, Mississippi."
   ],
   "state_evidence": [
    "**xAI MACROHARDRR / Southaven Data Center in Southaven, Mississippi** is a private AI infrastructure project expanding xAI\u2019s Greater Memphis supercomputing footprint.",
    "1. **Market:** Southaven, Mississippi."
   ],
   "capacity_gw_evidence": [
    "The Southaven facility will increase xAI\u2019s computing power to nearly **2 gigawatts** when complete.",
    "1. **Compute Target:** Nearly 2 gigawatts of computing power when complete."
   ],
   "builder_evidence": [
    "**xAI MACROHARDRR / Southaven Data Center in Southaven, Mississippi** is a private AI infrastructure project expanding xAI\u2019s Greater Memphis supercomputing footprint.",
    "Mississippi state economic development materials identify the project as a **more than $20 billion investment** and state that xAI purchased and is retrofitting an existing building for the new data center operation."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Mississippi state economic development materials identify the project as a **more than $20 billion investment** and state that xAI purchased and is retrofitting an existing building for the new data center operation."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://edgen.tech/news/post/chevrons-20-year-microsoft-power-deal-diversifies-beyond-oil",
   "title": "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
   "published_at": "2026-08-29T15:54:13",
   "project": "Project Kilby",
   "locality": "Reeves County",
   "state": "Texas",
   "capacity_gw": 2.67,
   "builder": "Chevron",
   "ai_customer": "Microsoft",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "The project, known as Project Kilby, will be developed through Chevron's Energy Forge One subsidiary alongside Engine No. 1 and Microsoft."
   ],
   "locality_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings."
   ],
   "state_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron's 20-year Microsoft power deal for a 2.67-gigawatt Texas data center marks the oil major's entry into AI infrastructure."
   ],
   "capacity_gw_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron's 20-year Microsoft power deal for a 2.67-gigawatt Texas data center marks the oil major's entry into AI infrastructure."
   ],
   "builder_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings."
   ],
   "ai_customer_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings."
   ],
   "status_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "First power is expected in 2028, with a final investment decision targeted by the end of 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://w.media/vantage-data-centers-breaks-ground-on-data-center-campus-in-texas",
   "title": "Vantage Data Centers breaks ground on data center campus in Texas",
   "published_at": null,
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": "Oracle and OpenAI",
   "status": "broken ground",
   "announcement_date": "2025-08-01",
   "project_evidence": [
    "Vantage Data Centers has broken ground on its Frontier campus in Shackelford County, Texas, marking a major expansion tied to Oracle and OpenAI\u2019s Stargate initiative."
   ],
   "locality_evidence": [
    "Vantage Data Centers has broken ground on its Frontier campus in Shackelford County, Texas, marking a major expansion tied to Oracle and OpenAI\u2019s Stargate initiative."
   ],
   "state_evidence": [
    "Vantage Data Centers has broken ground on its Frontier campus in Shackelford County, Texas, marking a major expansion tied to Oracle and OpenAI\u2019s Stargate initiative."
   ],
   "capacity_gw_evidence": [
    "The Frontier campus will span approximately 1,200 acres, and include 10 single-story data center facilities with a combined capacity of 1.4 GW."
   ],
   "builder_evidence": [
    "Vantage Data Centers has broken ground on its Frontier campus in Shackelford County, Texas, marking a major expansion tied to Oracle and OpenAI\u2019s Stargate initiative."
   ],
   "ai_customer_evidence": [
    "Vantage Data Centers has broken ground on its Frontier campus in Shackelford County, Texas, marking a major expansion tied to Oracle and OpenAI\u2019s Stargate initiative."
   ],
   "status_evidence": [
    "Vantage Data Centers has broken ground on its Frontier campus in Shackelford County, Texas, marking a major expansion tied to Oracle and OpenAI\u2019s Stargate initiative."
   ],
   "announcement_date_evidence": [
    "The company formally unveiled plans for the Frontier site in August, estimating total investment at more than US $25 billion."
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news/macquarie-invests-in-fermi-america-to-support-development-of-11gw-ai-campus-in-amarillo-texas",
   "title": "Macquarie invests in Fermi America to support development of 11GW AI campus in Amarillo, Texas",
   "published_at": "2026-08-05T00:00:00",
   "project": "HyperGrid",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "Geotechnical work has already commenced",
   "announcement_date": null,
   "project_evidence": [
    "Fermi America, the company developing the 11GW HyperGrid AI data center campus in Amarillo, Texas, has raised $100 million as part of a Series C equity funding round, led by Macquarie Group."
   ],
   "locality_evidence": [
    "Fermi America, the company developing the 11GW HyperGrid AI data center campus in Amarillo, Texas, has raised $100 million as part of a Series C equity funding round, led by Macquarie Group."
   ],
   "state_evidence": [
    "Fermi America, the company developing the 11GW HyperGrid AI data center campus in Amarillo, Texas, has raised $100 million as part of a Series C equity funding round, led by Macquarie Group."
   ],
   "capacity_gw_evidence": [
    "Fermi America, the company developing the 11GW HyperGrid AI data center campus in Amarillo, Texas, has raised $100 million as part of a Series C equity funding round, led by Macquarie Group."
   ],
   "builder_evidence": [
    "Fermi America, the company developing the 11GW HyperGrid AI data center campus in Amarillo, Texas, has raised $100 million as part of a Series C equity funding round, led by Macquarie Group."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The company has stated that geotechnical work has already commenced on the campus."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://facilityexecutive.com/10b-gas-powered-data-center-campus-planned-in-pittsburgh",
   "title": "Pittsburgh Plans Nation\u2019s Largest Gas-Powered Data Center Campus",
   "published_at": "2025-04-03T18:25:52",
   "project": "Homer City Energy Campus",
   "locality": "Pittsburgh",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Kiewit Power Constructors Co.",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Pittsburgh Plans Nation\u2019s Largest Gas-Powered Data Center Campus",
    "The Homer City Energy Campus is designed to meet the growing artificial intelligence (AI) and high-performance computing (HPC) needs of innovative technology companies.",
    "Attributes and benefits of the Homer City Energy Campus are expected to include:"
   ],
   "locality_evidence": [
    "# Pittsburgh Plans Nation\u2019s Largest Gas-Powered Data Center Campus",
    "With an initial investment of $10 billion, the former Homer City Generating Station \u2014 previously the largest coal-burning power plant in Pennsylvania \u2014 will be transformed into a more than 3,200-acre natural gas-powered data center campus in the Pittsburgh region."
   ],
   "state_evidence": [
    "# Pittsburgh Plans Nation\u2019s Largest Gas-Powered Data Center Campus",
    "With an initial investment of $10 billion, the former Homer City Generating Station \u2014 previously the largest coal-burning power plant in Pennsylvania \u2014 will be transformed into a more than 3,200-acre natural gas-powered data center campus in the Pittsburgh region."
   ],
   "capacity_gw_evidence": [
    "# Pittsburgh Plans Nation\u2019s Largest Gas-Powered Data Center Campus",
    "The Homer City Generating Station will generate up to 4.5 GW of energy to meet growing AI and HPC needs.",
    "Delivery of up to 4.5 gigawatts (GW) of power to support AI-driven hyperscale data centers, while reducing greenhouse gas emissions by 60\u201365% per megawatt hour compared to the former coal plant."
   ],
   "builder_evidence": [
    "# Pittsburgh Plans Nation\u2019s Largest Gas-Powered Data Center Campus",
    "The Homer City Energy Campus will be built by engineering, procurement, and construction (EPC) contractor Kiewit Power Constructors Co.."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Pittsburgh Plans Nation\u2019s Largest Gas-Powered Data Center Campus",
    "Construction of the site will begin this year and the facility is expected to begin producing power by 2027."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": "2026-03-16T00:00:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ],
   "locality_evidence": [
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "capacity_gw_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "builder_evidence": [
    "Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ],
   "announcement_date_evidence": [
    "**SAN JOSE, CA (GTC 2026) \u2013 March 16, 2026 \u2013** Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ]
  },
  {
   "url": "https://jupiterisland.capital/industry-hubs/new-5gw-data-city-in-texas-to-be-powered-by-hydrogen",
   "title": "New 5GW Data City in Texas to be Powered by Hydrogen - Energy Transition Finance | Jupiter Island Capital",
   "published_at": "2025-03-29T21:42:35",
   "project": "Data City",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corporation",
   "ai_customer": null,
   "status": "proposed",
   "announcement_date": null,
   "project_evidence": [
    "The project is being pitched by Energy Abundance Development Corporation and has been dubbed Data City.",
    "A new behind-the-meter data center with up to 5GW has been proposed near Laredo, Texas."
   ],
   "locality_evidence": [
    "A new behind-the-meter data center with up to 5GW has been proposed near Laredo, Texas.",
    "The project is being pitched by Energy Abundance Development Corporation and has been dubbed Data City."
   ],
   "state_evidence": [
    "A new behind-the-meter data center with up to 5GW has been proposed near Laredo, Texas.",
    "The project is being pitched by Energy Abundance Development Corporation and has been dubbed Data City."
   ],
   "capacity_gw_evidence": [
    "A new behind-the-meter data center with up to 5GW has been proposed near Laredo, Texas.",
    "The project is being pitched by Energy Abundance Development Corporation and has been dubbed Data City."
   ],
   "builder_evidence": [
    "The project is being pitched by Energy Abundance Development Corporation and has been dubbed Data City.",
    "A new behind-the-meter data center with up to 5GW has been proposed near Laredo, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "A new behind-the-meter data center with up to 5GW has been proposed near Laredo, Texas.",
    "The project is being pitched by Energy Abundance Development Corporation and has been dubbed Data City."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community",
   "title": "Building AI infrastructure with the Effingham County community",
   "published_at": "2026-08-18T19:00:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "designing and developing",
   "announcement_date": null,
   "project_evidence": [
    "# Building AI infrastructure with the Effingham County community",
    "Project Camellia is a long-term datacenter project that OpenAI is designing and developing in Effingham County, Georgia."
   ],
   "locality_evidence": [
    "# Building AI infrastructure with the Effingham County community",
    "Project Camellia is a long-term datacenter project that OpenAI is designing and developing in Effingham County, Georgia."
   ],
   "state_evidence": [
    "# Building AI infrastructure with the Effingham County community",
    "Project Camellia is a long-term datacenter project that OpenAI is designing and developing in Effingham County, Georgia."
   ],
   "capacity_gw_evidence": [
    "# Building AI infrastructure with the Effingham County community",
    "To support the data center, we are contracting with Georgia Power Company for 3.2 gigawatts of power which will be delivered in phases between 2028 and 2032."
   ],
   "builder_evidence": [
    "# Building AI infrastructure with the Effingham County community",
    "Project Camellia is a long-term datacenter project that OpenAI is designing and developing in Effingham County, Georgia."
   ],
   "ai_customer_evidence": [
    "# Building AI infrastructure with the Effingham County community",
    "Project Camellia is a long-term datacenter project that OpenAI is designing and developing in Effingham County, Georgia."
   ],
   "status_evidence": [
    "# Building AI infrastructure with the Effingham County community",
    "Project Camellia is a long-term datacenter project that OpenAI is designing and developing in Effingham County, Georgia."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://vbtmi.gov/departments/municipal_services/data_center_project.php",
   "title": "Data Center FAQ",
   "published_at": null,
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni",
   "ai_customer": "Google",
   "status": "proposed",
   "announcement_date": null,
   "project_evidence": [
    "# Data Center FAQ",
    "Project Cannoli is a proposed data center project located near the I-94/Haggerty Road area."
   ],
   "locality_evidence": [
    "# Data Center FAQ",
    "To keep residents informed, Van Buren Township is providing updates on the Project Cannoli data center."
   ],
   "state_evidence": [
    "# Data Center FAQ",
    "A formal letter from DTE confirming that the proposed Project Cannoli data center will pay for all grid connection and infrastructure costs, will not raise residential electric rates, and will contribute to grid reliability investments in southeast Michigan"
   ],
   "capacity_gw_evidence": [
    "# Data Center FAQ",
    "Project Cannoli was always represented as a 1 GW project. Why is the news reporting that the project is now a 2.7 GW project?",
    "A: The project site is still a 1.0 GW project."
   ],
   "builder_evidence": [
    "# Data Center FAQ"
   ],
   "ai_customer_evidence": [
    "# Data Center FAQ",
    "The following is a response from Google/Panattoni: \u201cThe 2.7 GW of new resources is representative of Google\u2019s commitment to not only bring new generation that supports its operations, but also invest in the long-term resilience of the grid systems where they operate."
   ],
   "status_evidence": [
    "# Data Center FAQ",
    "Project Cannoli is a proposed data center project located near the I-94/Haggerty Road area."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://globenewswire.com/news-release/2026/05/26/3301045/0/en/terawulf-expands-infrastructure-platform-with-acquisition-of-1-gw-eastern-kentucky-hpc-campus.html",
   "title": "TeraWulf Expands Infrastructure Platform with Acquisition of 1+ GW Eastern Kentucky HPC Campus",
   "published_at": "2026-05-26T12:00:00",
   "project": "Muskie Data Campus",
   "locality": "Eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2026-05-26",
   "project_evidence": [
    "EASTON, Md., May 26, 2026 (GLOBE NEWSWIRE) -- TeraWulf Inc. (Nasdaq: WULF) (\u201cTeraWulf\u201d or the \u201cCompany\u201d), which owns and operates vertically integrated, next-generation digital infrastructure, today announced the acquisition of a hyperscale high-performance computing (\u201cHPC\u201d) development site strategically located in Eastern Kentucky (the \u201cMuskie Data Campus\u201d).",
    "The Muskie Data Campus, acquired from Industrial Equity Partners (\u201cIEP\u201d), is expected to support more than 1 gigawatt (\u201cGW\u201d) of data center capacity over time."
   ],
   "locality_evidence": [
    "EASTON, Md., May 26, 2026 (GLOBE NEWSWIRE) -- TeraWulf Inc. (Nasdaq: WULF) (\u201cTeraWulf\u201d or the \u201cCompany\u201d), which owns and operates vertically integrated, next-generation digital infrastructure, today announced the acquisition of a hyperscale high-performance computing (\u201cHPC\u201d) development site strategically located in Eastern Kentucky (the \u201cMuskie Data Campus\u201d)."
   ],
   "state_evidence": [
    "EASTON, Md., May 26, 2026 (GLOBE NEWSWIRE) -- TeraWulf Inc. (Nasdaq: WULF) (\u201cTeraWulf\u201d or the \u201cCompany\u201d), which owns and operates vertically integrated, next-generation digital infrastructure, today announced the acquisition of a hyperscale high-performance computing (\u201cHPC\u201d) development site strategically located in Eastern Kentucky (the \u201cMuskie Data Campus\u201d)."
   ],
   "capacity_gw_evidence": [
    "The Muskie Data Campus, acquired from Industrial Equity Partners (\u201cIEP\u201d), is expected to support more than 1 gigawatt (\u201cGW\u201d) of data center capacity over time."
   ],
   "builder_evidence": [
    "EASTON, Md., May 26, 2026 (GLOBE NEWSWIRE) -- TeraWulf Inc. (Nasdaq: WULF) (\u201cTeraWulf\u201d or the \u201cCompany\u201d), which owns and operates vertically integrated, next-generation digital infrastructure, today announced the acquisition of a hyperscale high-performance computing (\u201cHPC\u201d) development site strategically located in Eastern Kentucky (the \u201cMuskie Data Campus\u201d).",
    "The acquisition meaningfully expands TeraWulf\u2019s portfolio of large-scale, energy-advantaged digital infrastructure campuses and advances the Company\u2019s strategy of developing shovel-ready AI and HPC sites with long-term power availability, robust transmission infrastructure, and strong community alignment."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "EASTON, Md., May 26, 2026 (GLOBE NEWSWIRE) -- TeraWulf Inc. (Nasdaq: WULF) (\u201cTeraWulf\u201d or the \u201cCompany\u201d), which owns and operates vertically integrated, next-generation digital infrastructure, today announced the acquisition of a hyperscale high-performance computing (\u201cHPC\u201d) development site strategically located in Eastern Kentucky (the \u201cMuskie Data Campus\u201d)."
   ],
   "announcement_date_evidence": [
    "EASTON, Md., May 26, 2026 (GLOBE NEWSWIRE) -- TeraWulf Inc. (Nasdaq: WULF) (\u201cTeraWulf\u201d or the \u201cCompany\u201d), which owns and operates vertically integrated, next-generation digital infrastructure, today announced the acquisition of a hyperscale high-performance computing (\u201cHPC\u201d) development site strategically located in Eastern Kentucky (the \u201cMuskie Data Campus\u201d)."
   ]
  },
  {
   "url": "https://thecoinomist.com/news/hut-8-1gw-beacon-point-iren-2-8b-ai-deals",
   "title": "Hut 8 Commercializes 1GW Beacon Point; IREN Secures $2.8B",
   "published_at": "2026-07-20T14:34:20",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "commercialized",
   "announcement_date": "2026-07-20",
   "project_evidence": [
    "# Hut 8 Commercializes 1GW Beacon Point; IREN Secures $2.8B",
    "Hut 8 signed a second 15-year $9.8B lease to fully commercialize its 1 GW Beacon Point campus. IREN announced $2.8B in AI cloud contracts and raised its 2026 target."
   ],
   "locality_evidence": [
    "# Hut 8 Commercializes 1GW Beacon Point; IREN Secures $2.8B",
    "Hut 8 signed a second 15-year, $9.8 billion lease that fully commercializes its 1-gigawatt Beacon Point campus in Nueces County, Texas, while IREN disclosed $2.8 billion in multi-year AI cloud contracts and raised its 2026 AI Cloud revenue target above $4 billion."
   ],
   "state_evidence": [
    "# Hut 8 Commercializes 1GW Beacon Point; IREN Secures $2.8B",
    "Hut 8 signed a second 15-year, $9.8 billion lease that fully commercializes its 1-gigawatt Beacon Point campus in Nueces County, Texas, while IREN disclosed $2.8 billion in multi-year AI cloud contracts and raised its 2026 AI Cloud revenue target above $4 billion."
   ],
   "capacity_gw_evidence": [
    "# Hut 8 Commercializes 1GW Beacon Point; IREN Secures $2.8B",
    "Hut 8 signed a second 15-year $9.8B lease to fully commercialize its 1 GW Beacon Point campus. IREN announced $2.8B in AI cloud contracts and raised its 2026 target."
   ],
   "builder_evidence": [
    "# Hut 8 Commercializes 1GW Beacon Point; IREN Secures $2.8B",
    "Hut 8 signed a second 15-year $9.8B lease to fully commercialize its 1 GW Beacon Point campus. IREN announced $2.8B in AI cloud contracts and raised its 2026 target."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Hut 8 Commercializes 1GW Beacon Point; IREN Secures $2.8B",
    "Hut 8 signed a second 15-year $9.8B lease to fully commercialize its 1 GW Beacon Point campus. IREN announced $2.8B in AI cloud contracts and raised its 2026 target."
   ],
   "announcement_date_evidence": [
    "# Hut 8 Commercializes 1GW Beacon Point; IREN Secures $2.8B",
    "Posted: 20 July 2026, 16:34 CET 2 min read"
   ]
  },
  {
   "url": "https://ktxs.com/news/local/iren-partners-with-nvidia-to-develop-ai-ready-architecture-for-west-texas-data-center-campus",
   "title": "IREN partners with NVIDIA to develop AI-ready architecture for West Texas data center",
   "published_at": "2026-05-28T18:58:12",
   "project": "Sweetwater",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "IREN",
   "ai_customer": "NVIDIA",
   "status": "energized",
   "announcement_date": null,
   "project_evidence": [
    "# IREN partners with NVIDIA to develop AI-ready architecture for West Texas data center",
    "\u201cWhat this brings to the partnership is the ability to apply that architecture to our Sweetwater campus,\" said David Shaw, chief operating officer for IREN."
   ],
   "locality_evidence": [
    "# IREN partners with NVIDIA to develop AI-ready architecture for West Texas data center",
    "\u201cWhat this brings to the partnership is the ability to apply that architecture to our Sweetwater campus,\" said David Shaw, chief operating officer for IREN."
   ],
   "state_evidence": [
    "# IREN partners with NVIDIA to develop AI-ready architecture for West Texas data center",
    "ABILENE, Texas \u2014 A major expansion in West Texas is now taking shape."
   ],
   "capacity_gw_evidence": [
    "# IREN partners with NVIDIA to develop AI-ready architecture for West Texas data center",
    "The company recently energized its 1.4 gigawatt Sweetwater one site, marking a major step in connecting the campus to the ERCOT power grid."
   ],
   "builder_evidence": [
    "# IREN partners with NVIDIA to develop AI-ready architecture for West Texas data center"
   ],
   "ai_customer_evidence": [
    "# IREN partners with NVIDIA to develop AI-ready architecture for West Texas data center"
   ],
   "status_evidence": [
    "# IREN partners with NVIDIA to develop AI-ready architecture for West Texas data center",
    "The company recently energized its 1.4 gigawatt Sweetwater one site, marking a major step in connecting the campus to the ERCOT power grid."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://energycapitalhtx.com/houston-data-center",
   "title": "ECL, Lambda announce fully sustainable, hydrogen-powered data center in Houston",
   "published_at": "2024-10-04T18:02:03",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Data center-as-a-service company [ECL](https://www.ecldc.com/), headquartered in Mountain View, California, announced its plans to build the ECL TerraSite-TX1."
   ],
   "locality_evidence": [
    "The Houston area will soon be home to what's being lauded as the first fully sustainable 1-gigawatt data center on a 600-acres site east of Houston."
   ],
   "state_evidence": [
    "ECL Terrasite-TX1 comes at a needed time for Texas with The Electric Reliability Council of Texas stating on June 12 that the state\u2019s power grid needs will grow approximately double by 2030."
   ],
   "capacity_gw_evidence": [
    "The Houston area will soon be home to what's being lauded as the first fully sustainable 1-gigawatt data center on a 600-acres site east of Houston."
   ],
   "builder_evidence": [
    "Data center-as-a-service company [ECL](https://www.ecldc.com/), headquartered in Mountain View, California, announced its plans to build the ECL TerraSite-TX1."
   ],
   "ai_customer_evidence": [
    "Hardware and cloud service company Lambda will serve as its first tenant."
   ],
   "status_evidence": [
    "Data center-as-a-service company [ECL](https://www.ecldc.com/), headquartered in Mountain View, California, announced its plans to build the ECL TerraSite-TX1."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/",
   "title": "Big things are happening, El Paso!",
   "published_at": "2026-03-26T19:34:18",
   "project": "El Paso Data Center",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "JE Dunn and Hensel Phelps",
   "ai_customer": null,
   "status": "grow to 1 gigawatt",
   "announcement_date": null,
   "project_evidence": [
    "# Big things are happening, El Paso!",
    "Today, Meta is thrilled to confirm the [El Paso Data Center](https://datacenters.atmeta.com/us-locations/) will grow to 1 gigawatt."
   ],
   "locality_evidence": [
    "# Big things are happening, El Paso!",
    "Today, Meta is thrilled to confirm the [El Paso Data Center](https://datacenters.atmeta.com/us-locations/) will grow to 1 gigawatt."
   ],
   "state_evidence": [
    "# Big things are happening, El Paso!"
   ],
   "capacity_gw_evidence": [
    "# Big things are happening, El Paso!",
    "Today, Meta is thrilled to confirm the [El Paso Data Center](https://datacenters.atmeta.com/us-locations/) will grow to 1 gigawatt."
   ],
   "builder_evidence": [
    "# Big things are happening, El Paso!",
    "For construction information and opportunities, please visit the website for the general contractors \u2014 JE Dunn and Hensel Phelps."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Big things are happening, El Paso!",
    "Today, Meta is thrilled to confirm the [El Paso Data Center](https://datacenters.atmeta.com/us-locations/) will grow to 1 gigawatt."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://blackridgeresearch.com/project-profiles/aws-project-rainier-new-carlisle-indiana-usa-data-center-supercluster-cost-contractors-timeline-latest-updates",
   "title": "AWS Project Rainier, Indiana: Latest Updates (2026) \u200b",
   "published_at": null,
   "project": "AWS Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon Web Services (AWS)",
   "ai_customer": "Anthropic",
   "status": "Phase I Operational",
   "announcement_date": "2024-12-01",
   "project_evidence": [
    "# AWS Project Rainier - New Carlisle, Indiana, USA",
    "Project Name | Project Rainier",
    "AWS Project Rainier is a USD 11 billion hyperscale AI [data center](https://www.blackridgeresearch.com/blog/what-is-data-center-why-is-it-important) campus and supercomputer cluster located in New Carlisle, Indiana."
   ],
   "locality_evidence": [
    "Project Location | New Carlisle, Indiana, USA",
    "AWS Project Rainier is a USD 11 billion hyperscale AI [data center](https://www.blackridgeresearch.com/blog/what-is-data-center-why-is-it-important) campus and supercomputer cluster located in New Carlisle, Indiana.",
    "# AWS Project Rainier - New Carlisle, Indiana, USA"
   ],
   "state_evidence": [
    "Project Location | New Carlisle, Indiana, USA",
    "AWS Project Rainier is a USD 11 billion hyperscale AI [data center](https://www.blackridgeresearch.com/blog/what-is-data-center-why-is-it-important) campus and supercomputer cluster located in New Carlisle, Indiana.",
    "# AWS Project Rainier - New Carlisle, Indiana, USA"
   ],
   "capacity_gw_evidence": [
    "Ultimate Power Capacity | 2.2 Gigawatts",
    "Together, they draw a combined 2.2 gigawatts of electricity.",
    "# AWS Project Rainier - New Carlisle, Indiana, USA"
   ],
   "builder_evidence": [
    "Project Owner/Developer | Amazon Web Services (AWS)",
    "AWS Project Rainier is a USD 11 billion hyperscale AI [data center](https://www.blackridgeresearch.com/blog/what-is-data-center-why-is-it-important) campus and supercomputer cluster located in New Carlisle, Indiana.",
    "# AWS Project Rainier - New Carlisle, Indiana, USA"
   ],
   "ai_customer_evidence": [
    "Anchor Tenant | Anthropic",
    "The facility is designed to support Anthropic.",
    "# AWS Project Rainier - New Carlisle, Indiana, USA"
   ],
   "status_evidence": [
    "Project Status | Phase I Operational",
    "As of April 2026, AWS Project Rainier is fully operational and in active production.",
    "# AWS Project Rainier - New Carlisle, Indiana, USA"
   ],
   "announcement_date_evidence": [
    "| December 2024 | AWS Project Rainier was publicly announced at the AWS re: Invent conference in Las Vegas. |",
    "# AWS Project Rainier - New Carlisle, Indiana, USA"
   ]
  },
  {
   "url": "https://finance.yahoo.com/technology/ai/articles/crusoe-lancium-announce-1-0-140000671.html",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
   "published_at": "2026-07-15T14:00:00",
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Lancium",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene"
   ],
   "locality_evidence": [
    "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "state_evidence": [
    "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "builder_evidence": [
    "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "announcement_date_evidence": [
    "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ]
  },
  {
   "url": "https://edgen.tech/vi/news/post/chevrons-20-year-microsoft-power-deal-diversifies-beyond-oil",
   "title": "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
   "published_at": "2026-08-29T15:54:13",
   "project": "Project Kilby",
   "locality": "Reeves County",
   "state": "Texas",
   "capacity_gw": 2.67,
   "builder": "Chevron",
   "ai_customer": "Microsoft",
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron's 20-year Microsoft power deal for a 2.67-gigawatt Texas data center marks the oil major's entry into AI infrastructure.",
    "The project, known as Project Kilby, will be developed through Chevron's Energy Forge One subsidiary alongside Engine No. 1 and Microsoft."
   ],
   "locality_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings."
   ],
   "state_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron's 20-year Microsoft power deal for a 2.67-gigawatt Texas data center marks the oil major's entry into AI infrastructure.",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings."
   ],
   "capacity_gw_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron's 20-year Microsoft power deal for a 2.67-gigawatt Texas data center marks the oil major's entry into AI infrastructure.",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings."
   ],
   "builder_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings.",
    "The project, known as Project Kilby, will be developed through Chevron's Energy Forge One subsidiary alongside Engine No. 1 and Microsoft."
   ],
   "ai_customer_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron's 20-year Microsoft power deal for a 2.67-gigawatt Texas data center marks the oil major's entry into AI infrastructure.",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings."
   ],
   "status_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "First power is expected in 2028, with a final investment decision targeted by the end of 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://amarillotribune.org/2025/11/05/just-facts-fermi-america-and-project-matador",
   "title": "Just facts: Fermi America and Project Matador",
   "published_at": "2025-11-05T23:14:46",
   "project": "President Donald J. Trump Advanced Energy and Intelligence Campus",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "under development",
   "announcement_date": "2025-06-26",
   "project_evidence": [
    "# Just facts: Fermi America and Project Matador",
    "In [late June,](https://amarillotribune.org/2025/06/26/breaking-advanced-nuclear-energy-ai-campus-hypergrid-coming-to-amarillo/) the Amarillo Tribune was the first in the nation to break news about Fermi America\u2019s incoming Artificial Intelligence Hypergrid, the President Donald J. Trump Advanced Energy and Intelligence Campus that will eventually use nuclear energy to power its AI data centers."
   ],
   "locality_evidence": [
    "# Just facts: Fermi America and Project Matador",
    "In [late June,](https://amarillotribune.org/2025/06/26/breaking-advanced-nuclear-energy-ai-campus-hypergrid-coming-to-amarillo/) the Amarillo Tribune was the first in the nation to break news about Fermi America\u2019s incoming Artificial Intelligence Hypergrid, the President Donald J. Trump Advanced Energy and Intelligence Campus that will eventually use nuclear energy to power its AI data centers."
   ],
   "state_evidence": [
    "# Just facts: Fermi America and Project Matador",
    "In [late June,](https://amarillotribune.org/2025/06/26/breaking-advanced-nuclear-energy-ai-campus-hypergrid-coming-to-amarillo/) the Amarillo Tribune was the first in the nation to break news about Fermi America\u2019s incoming Artificial Intelligence Hypergrid, the President Donald J. Trump Advanced Energy and Intelligence Campus that will eventually use nuclear energy to power its AI data centers."
   ],
   "capacity_gw_evidence": [
    "# Just facts: Fermi America and Project Matador",
    "The campus will span a total of 5,769 acres, have the potential to deliver up to 11 gigawatts of power, and contain 18 million square feet of AI capacity."
   ],
   "builder_evidence": [
    "# Just facts: Fermi America and Project Matador",
    "In [late June,](https://amarillotribune.org/2025/06/26/breaking-advanced-nuclear-energy-ai-campus-hypergrid-coming-to-amarillo/) the Amarillo Tribune was the first in the nation to break news about Fermi America\u2019s incoming Artificial Intelligence Hypergrid, the President Donald J. Trump Advanced Energy and Intelligence Campus that will eventually use nuclear energy to power its AI data centers.",
    "From this executive order stemmed [Project Matador](https://www.nrc.gov/docs/ML2516/ML25169A396.pdf), where Fermi America was approved as the sole applicant to serve as both the constructor and operator of a proposed hypergrid energy production facility to be located in Carson County."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Just facts: Fermi America and Project Matador",
    "In [late June,](https://amarillotribune.org/2025/06/26/breaking-advanced-nuclear-energy-ai-campus-hypergrid-coming-to-amarillo/) the Amarillo Tribune was the first in the nation to break news about Fermi America\u2019s incoming Artificial Intelligence Hypergrid, the President Donald J. Trump Advanced Energy and Intelligence Campus that will eventually use nuclear energy to power its AI data centers."
   ],
   "announcement_date_evidence": [
    "# Just facts: Fermi America and Project Matador",
    "In [late June,](https://amarillotribune.org/2025/06/26/breaking-advanced-nuclear-energy-ai-campus-hypergrid-coming-to-amarillo/) the Amarillo Tribune was the first in the nation to break news about Fermi America\u2019s incoming Artificial Intelligence Hypergrid, the President Donald J. Trump Advanced Energy and Intelligence Campus that will eventually use nuclear energy to power its AI data centers."
   ]
  },
  {
   "url": "https://datacentermap.com/usa/west-virginia/point-pleasant/monarch-compute-campus",
   "title": "Monarch Compute Campus in Point Pleasant | Nscale Ltd.",
   "published_at": null,
   "project": "Monarch Compute Campus",
   "locality": "Point Pleasant",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale Ltd.",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2026-04",
   "project_evidence": [
    "The Monarch Compute Campus, located in Point Pleasant, West Virginia, is a significant digital infrastructure project by Nscale Ltd. designed to address the escalating demands of artificial intelligence and high-performance computing."
   ],
   "locality_evidence": [
    "The Monarch Compute Campus, located in Point Pleasant, West Virginia, is a significant digital infrastructure project by Nscale Ltd. designed to address the escalating demands of artificial intelligence and high-performance computing."
   ],
   "state_evidence": [
    "The Monarch Compute Campus, located in Point Pleasant, West Virginia, is a significant digital infrastructure project by Nscale Ltd. designed to address the escalating demands of artificial intelligence and high-performance computing."
   ],
   "capacity_gw_evidence": [
    "This expansive 2,250-acre campus is set to become the first state-certified AI microgrid in the U.S., with a planned scalability to 8 gigawatts of clean, renewable power by 2031.",
    "The Monarch Compute Campus, located in Point Pleasant, West Virginia, is a significant digital infrastructure project by Nscale Ltd. designed to address the escalating demands of artificial intelligence and high-performance computing."
   ],
   "builder_evidence": [
    "The Monarch Compute Campus, located in Point Pleasant, West Virginia, is a significant digital infrastructure project by Nscale Ltd. designed to address the escalating demands of artificial intelligence and high-performance computing."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Nscale announced the acquistion of Monarch Compute Campus",
    "The Monarch Compute Campus, located in Point Pleasant, West Virginia, is a significant digital infrastructure project by Nscale Ltd. designed to address the escalating demands of artificial intelligence and high-performance computing."
   ],
   "announcement_date_evidence": [
    "Apr 2026 - M&A - Monarch Compute Campus",
    "The Monarch Compute Campus, located in Point Pleasant, West Virginia, is a significant digital infrastructure project by Nscale Ltd. designed to address the escalating demands of artificial intelligence and high-performance computing."
   ]
  },
  {
   "url": "https://constructionreviewonline.com/9gw-wonder-valley-data-center-in-box-elder-county-utah-moves-forward-amid-passionate-protests",
   "title": "9GW Wonder Valley Data Center in Box Elder County, Utah Moves Forward Amid Passionate Protests",
   "published_at": "2026-05-05T08:45:10",
   "project": "Wonder Valley Data Center",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O\u2019Leary Digital",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "# 9GW Wonder Valley Data Center in Box Elder County, Utah Moves Forward Amid Passionate Protests",
    "The construction of the 9GW Wonder Valley data center campus in Box Elder County, Utah has been given the greenlight."
   ],
   "locality_evidence": [
    "# 9GW Wonder Valley Data Center in Box Elder County, Utah Moves Forward Amid Passionate Protests",
    "The construction of the 9GW Wonder Valley data center campus in Box Elder County, Utah has been given the greenlight."
   ],
   "state_evidence": [
    "# 9GW Wonder Valley Data Center in Box Elder County, Utah Moves Forward Amid Passionate Protests",
    "The construction of the 9GW Wonder Valley data center campus in Box Elder County, Utah has been given the greenlight."
   ],
   "capacity_gw_evidence": [
    "# 9GW Wonder Valley Data Center in Box Elder County, Utah Moves Forward Amid Passionate Protests",
    "The construction of the 9GW Wonder Valley data center campus in Box Elder County, Utah has been given the greenlight."
   ],
   "builder_evidence": [
    "# 9GW Wonder Valley Data Center in Box Elder County, Utah Moves Forward Amid Passionate Protests",
    "State boosters say the project, which would be developed by O\u2019Leary Digital, would fund modern buildings at Hill Air Force Base."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# 9GW Wonder Valley Data Center in Box Elder County, Utah Moves Forward Amid Passionate Protests",
    "The construction of the 9GW Wonder Valley data center campus in Box Elder County, Utah has been given the greenlight."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mlq.ai/news/psc-staff-clears-openais-32gw-georgia-power-deal-in-effingham",
   "title": "PSC Staff Clears OpenAI\u2019s 3.2GW Georgia Power Deal in Effingham",
   "published_at": "2026-08-28T13:07:32",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "# PSC Staff Clears OpenAI\u2019s 3.2GW Georgia Power Deal in Effingham",
    "The agreement covers 3,200MW of new demand for OpenAI\u2019s planned Project Camellia data center in Effingham County.",
    "Georgia Public Service Commission staff has cleared a Georgia Power contract to serve OpenAI\u2019s planned Project Camellia data center in Effingham County, Georgia."
   ],
   "locality_evidence": [
    "# PSC Staff Clears OpenAI\u2019s 3.2GW Georgia Power Deal in Effingham",
    "The agreement covers 3,200MW of new demand for OpenAI\u2019s planned Project Camellia data center in Effingham County.",
    "Georgia Public Service Commission staff has cleared a Georgia Power contract to serve OpenAI\u2019s planned Project Camellia data center in Effingham County, Georgia."
   ],
   "state_evidence": [
    "# PSC Staff Clears OpenAI\u2019s 3.2GW Georgia Power Deal in Effingham",
    "Georgia Public Service Commission staff has cleared a Georgia Power contract to serve OpenAI\u2019s planned Project Camellia data center in Effingham County, Georgia."
   ],
   "capacity_gw_evidence": [
    "# PSC Staff Clears OpenAI\u2019s 3.2GW Georgia Power Deal in Effingham",
    "The agreement covers 3,200MW of new demand for OpenAI\u2019s planned Project Camellia data center in Effingham County."
   ],
   "builder_evidence": [
    "# PSC Staff Clears OpenAI\u2019s 3.2GW Georgia Power Deal in Effingham",
    "The agreement covers 3,200MW of new demand for OpenAI\u2019s planned Project Camellia data center in Effingham County."
   ],
   "ai_customer_evidence": [
    "# PSC Staff Clears OpenAI\u2019s 3.2GW Georgia Power Deal in Effingham",
    "The agreement covers 3,200MW of new demand for OpenAI\u2019s planned Project Camellia data center in Effingham County."
   ],
   "status_evidence": [
    "# PSC Staff Clears OpenAI\u2019s 3.2GW Georgia Power Deal in Effingham",
    "The agreement covers 3,200MW of new demand for OpenAI\u2019s planned Project Camellia data center in Effingham County."
   ],
   "announcement_date_evidence": [
    "## Project Camellia",
    "OpenAI announced Project Camellia on July 22 as a long-term data-center project it is designing and developing in Effingham County."
   ]
  },
  {
   "url": "https://mlive.com/news/2026/05/google-pitches-michigan-on-a-different-kind-of-data-center-some-dont-buy-it.html",
   "title": "Google pitches Michigan on a different kind of data center. Some don\u2019t buy it",
   "published_at": "2026-05-11T14:17:51",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni",
   "ai_customer": null,
   "status": "proposed",
   "announcement_date": "2026-03",
   "project_evidence": [
    "# Google pitches Michigan on a different kind of data center. Some don\u2019t buy it",
    "Google [revealed itself as the potential end user](https://www.mlive.com/news/ann-arbor/2026/03/google-revealed-as-backer-for-data-center-project-west-of-detroit.html) for the data center in March,****well after development firm Panattoni began seeking approval from the township for the project, codenamed \u201cProject Cannoli.\u201d"
   ],
   "locality_evidence": [
    "# Google pitches Michigan on a different kind of data center. Some don\u2019t buy it",
    "But Google\u2019s approach, coupled with the promise of jobs and tax revenue, still has big doubters among neighbors of the project in Wayne County\u2019s Van Buren Township, underscoring the gulf between billion-dollar data center operators and local residents in Michigan."
   ],
   "state_evidence": [
    "# Google pitches Michigan on a different kind of data center. Some don\u2019t buy it",
    "WAYNE COUNTY, MI - One of the largest tech companies in the world promises its first potential Michigan data center will be all upside."
   ],
   "capacity_gw_evidence": [
    "# Google pitches Michigan on a different kind of data center. Some don\u2019t buy it",
    "In [a deal with utility DTE Energy currently up for state approval](https://www.mlive.com/news/2026/03/google-data-center-deal-with-dte-is-a-step-upward-for-michigan-advocates-say.html), the tech giant pledges to pay for a massive 2.7 gigawatts of solar projects, grid-sized batteries and demand flexibility to cover the proposed Van Buren Township data center\u2019s 1 gigawatt load."
   ],
   "builder_evidence": [
    "# Google pitches Michigan on a different kind of data center. Some don\u2019t buy it",
    "Google [revealed itself as the potential end user](https://www.mlive.com/news/ann-arbor/2026/03/google-revealed-as-backer-for-data-center-project-west-of-detroit.html) for the data center in March,****well after development firm Panattoni began seeking approval from the township for the project, codenamed \u201cProject Cannoli.\u201d"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Google pitches Michigan on a different kind of data center. Some don\u2019t buy it",
    "In [a deal with utility DTE Energy currently up for state approval](https://www.mlive.com/news/2026/03/google-data-center-deal-with-dte-is-a-step-upward-for-michigan-advocates-say.html), the tech giant pledges to pay for a massive 2.7 gigawatts of solar projects, grid-sized batteries and demand flexibility to cover the proposed Van Buren Township data center\u2019s 1 gigawatt load."
   ],
   "announcement_date_evidence": [
    "# Google pitches Michigan on a different kind of data center. Some don\u2019t buy it",
    "Google [revealed itself as the potential end user](https://www.mlive.com/news/ann-arbor/2026/03/google-revealed-as-backer-for-data-center-project-west-of-detroit.html) for the data center in March,****well after development firm Panattoni began seeking approval from the township for the project, codenamed \u201cProject Cannoli.\u201d"
   ]
  },
  {
   "url": "https://finance.yahoo.com/energy/articles/greenup-county-exempts-terawulf-campus-143905272.html",
   "title": "Greenup County exempts TeraWulf campus from six-month data center pause: The Independent",
   "published_at": "2026-08-19T14:39:05",
   "project": "Muskie Data Campus",
   "locality": "Greenup County",
   "state": "Kentucky",
   "capacity_gw": 2.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-26",
   "project_evidence": [
    "# Greenup County exempts TeraWulf campus from six-month data center pause: The Independent",
    "The site, named the Muskie Data Campus, is expected to accommodate more than 1 GW of data center capacity.",
    "TeraWulf Chairman and CEO Paul Prager [said during the company's August earnings call](https://www.kentucky.com/news/state/kentucky/article316830997.html) that Muskie could eventually expand to 2 GW, based on near-term power availability."
   ],
   "locality_evidence": [
    "# Greenup County exempts TeraWulf campus from six-month data center pause: The Independent",
    "Greenup County Fiscal Court [approved](https://www.dailyindependent.com/news/greenup-county-places-moratorium-on-data-centers-hall-on-terawulf-not-included-in-the-pause/article_085b0070-ecdb-412f-90a6-f3ab60ae11f9.html) an immediate six-month moratorium on data center operations, while exempting TeraWulf's planned EastPark campus.",
    "[TeraWulf (NASDAQ: WULF)](https://blockspace.media/insight-category/terawulf/) owns or controls about 285 acres within the 1,000-acre EastPark Industrial Park along the Greenup-Boyd county border."
   ],
   "state_evidence": [
    "# Greenup County exempts TeraWulf campus from six-month data center pause: The Independent",
    "Boyd County Judge-Executive Eric Chaney said counties have limited authority under Kentucky law to address data center impacts."
   ],
   "capacity_gw_evidence": [
    "# Greenup County exempts TeraWulf campus from six-month data center pause: The Independent",
    "The site, named the Muskie Data Campus, is expected to accommodate more than 1 GW of data center capacity.",
    "TeraWulf Chairman and CEO Paul Prager [said during the company's August earnings call](https://www.kentucky.com/news/state/kentucky/article316830997.html) that Muskie could eventually expand to 2 GW, based on near-term power availability."
   ],
   "builder_evidence": [
    "# Greenup County exempts TeraWulf campus from six-month data center pause: The Independent",
    "Greenup County Fiscal Court [approved](https://www.dailyindependent.com/news/greenup-county-places-moratorium-on-data-centers-hall-on-terawulf-not-included-in-the-pause/article_085b0070-ecdb-412f-90a6-f3ab60ae11f9.html) an immediate six-month moratorium on data center operations, while exempting TeraWulf's planned EastPark campus.",
    "[TeraWulf (NASDAQ: WULF)](https://blockspace.media/insight-category/terawulf/) owns or controls about 285 acres within the 1,000-acre EastPark Industrial Park along the Greenup-Boyd county border."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Greenup County exempts TeraWulf campus from six-month data center pause: The Independent",
    "Greenup County Fiscal Court [approved](https://www.dailyindependent.com/news/greenup-county-places-moratorium-on-data-centers-hall-on-terawulf-not-included-in-the-pause/article_085b0070-ecdb-412f-90a6-f3ab60ae11f9.html) an immediate six-month moratorium on data center operations, while exempting TeraWulf's planned EastPark campus."
   ],
   "announcement_date_evidence": [
    "# Greenup County exempts TeraWulf campus from six-month data center pause: The Independent"
   ]
  },
  {
   "url": "https://constructionfront.com/2026-05-14-jacobs-awarded-epcm-contract-for-hut-8-1gw-beacon-point-ai-data-center-campus-in-texas",
   "title": "Jacobs Awarded EPCM Contract for Hut 8\u2019s 1GW Beacon Point AI Data Center Campus in Texas",
   "published_at": "2026-05-14T04:18:10",
   "project": "Beacon Point AI data center campus",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Jacobs",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "[Jacobs](https://www.jacobs.com/) has been awarded a sole-source [EPCM](https://constructionfront.com/epc-vs-epcm/) contract by [Hut 8](https://www.hut8.com/) to deliver the Beacon Point AI data center campus in Nueces County, Texas.",
    "Beacon Point Project Data",
    "| Project Element | Confirmed Detail |",
    "| Project | Beacon Point AI data center campus |"
   ],
   "locality_evidence": [
    "[Jacobs](https://www.jacobs.com/) has been awarded a sole-source [EPCM](https://constructionfront.com/epc-vs-epcm/) contract by [Hut 8](https://www.hut8.com/) to deliver the Beacon Point AI data center campus in Nueces County, Texas.",
    "Beacon Point Project Data",
    "| Project Element | Confirmed Detail |",
    "| Location | Nueces County, Texas |"
   ],
   "state_evidence": [
    "[Jacobs](https://www.jacobs.com/) has been awarded a sole-source [EPCM](https://constructionfront.com/epc-vs-epcm/) contract by [Hut 8](https://www.hut8.com/) to deliver the Beacon Point AI data center campus in Nueces County, Texas.",
    "Beacon Point Project Data",
    "| Project Element | Confirmed Detail |",
    "| Location | Nueces County, Texas |"
   ],
   "capacity_gw_evidence": [
    "The award covers engineering, procurement and construction management services for Hut 8\u2019s second U.S. AI data center campus, a multi-phase development designed to support **1 GW of total utility capacity**.",
    "Beacon Point Project Data",
    "| Project Element | Confirmed Detail |",
    "| Utility Capacity | **1,000 MW** |"
   ],
   "builder_evidence": [
    "[Jacobs](https://www.jacobs.com/) has been awarded a sole-source [EPCM](https://constructionfront.com/epc-vs-epcm/) contract by [Hut 8](https://www.hut8.com/) to deliver the Beacon Point AI data center campus in Nueces County, Texas.",
    "Beacon Point Project Data",
    "| Project Element | Confirmed Detail |",
    "| EPCM Contractor | Jacobs |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news/iren-pausing-bitcoin-expansion-to-focus-on-ai-data-center-build-out",
   "title": "IREN pausing Bitcoin expansion to focus on AI data center build-out",
   "published_at": "2026-08-19T00:00:00",
   "project": "Sweetwater Data Center Hub",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "The site is currently being prepared to enable fast construction upon completion of a customer contract.",
   "announcement_date": null,
   "project_evidence": [
    "Meanwhile, IREN\u2019s \u2018Sweetwater Data Center Hub\u2019 will wield a 2GW power capacity.",
    "Bitcoin mining firm IREN has announced it will pivot away from mining cryptocurrencies in favor of focusing on building out its AI data center and AI cloud service businesses."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "IREN currently has a total of 2.75 GW of secured power operational in the West Texas area.",
    "Bitcoin mining firm IREN has announced it will pivot away from mining cryptocurrencies in favor of focusing on building out its AI data center and AI cloud service businesses."
   ],
   "capacity_gw_evidence": [
    "Meanwhile, IREN\u2019s \u2018Sweetwater Data Center Hub\u2019 will wield a 2GW power capacity.",
    "Bitcoin mining firm IREN has announced it will pivot away from mining cryptocurrencies in favor of focusing on building out its AI data center and AI cloud service businesses."
   ],
   "builder_evidence": [
    "Meanwhile, IREN\u2019s \u2018Sweetwater Data Center Hub\u2019 will wield a 2GW power capacity.",
    "Bitcoin mining firm IREN has announced it will pivot away from mining cryptocurrencies in favor of focusing on building out its AI data center and AI cloud service businesses."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The site is currently being prepared to enable fast construction upon completion of a customer contract.",
    "Bitcoin mining firm IREN has announced it will pivot away from mining cryptocurrencies in favor of focusing on building out its AI data center and AI cloud service businesses."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacentermap.com/usa/texas/houston/ecl-terrasite-tx1",
   "title": "ECL TerraSite-TX1 in Houston | EdgeCloudLink (ECL) (1000 MW)",
   "published_at": null,
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "EdgeCloudLink (ECL)",
   "ai_customer": "Lambda",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# ECL TerraSite-TX1",
    "ECL TerraSite\u2011TX1 is a planned large\u2011scale, off\u2011grid, hydrogen\u2011powered \u201cAI Factory\u201d data center campus located on more than 600 acres east of Houston, Texas."
   ],
   "locality_evidence": [
    "# ECL TerraSite-TX1",
    "*within east of Houston, Texas*",
    "77028 Houston",
    "**The exact location of this data center is not public,\nbut it is located within east of Houston, Texas**",
    "ECL TerraSite\u2011TX1 is a planned large\u2011scale, off\u2011grid, hydrogen\u2011powered \u201cAI Factory\u201d data center campus located on more than 600 acres east of Houston, Texas."
   ],
   "state_evidence": [
    "# ECL TerraSite-TX1",
    "Texas, USA",
    "ECL TerraSite\u2011TX1 is a planned large\u2011scale, off\u2011grid, hydrogen\u2011powered \u201cAI Factory\u201d data center campus located on more than 600 acres east of Houston, Texas."
   ],
   "capacity_gw_evidence": [
    "# ECL TerraSite-TX1",
    "At full build\u2011out, the site will provide 1 GW of capacity \u2014 with the option to expand to 2 GW \u2014 representing one of the largest zero\u2011emission data center developments in the world."
   ],
   "builder_evidence": [
    "# ECL TerraSite-TX1",
    "[EdgeCloudLink (ECL)](/c/ecl/)"
   ],
   "ai_customer_evidence": [
    "# ECL TerraSite-TX1",
    "The first tenant, Lambda, will deploy high\u2011density AI infrastructure on the campus."
   ],
   "status_evidence": [
    "# ECL TerraSite-TX1",
    "ECL TerraSite\u2011TX1 is a planned large\u2011scale, off\u2011grid, hydrogen\u2011powered \u201cAI Factory\u201d data center campus located on more than 600 acres east of Houston, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects/manual-12",
   "title": "Nexus Hubbard Campus \u2014 7.2 GW AI Data Center, Hubbard, OH | Data Center Index",
   "published_at": null,
   "project": "Nexus Hubbard Campus",
   "locality": "Hubbard",
   "state": "Ohio",
   "capacity_gw": 7.2,
   "builder": "Nexus",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Nexus Hubbard Campus",
    "Nexus Hubbard Campus is a 7.2 GW AI data center project located in Hubbard, OH, United States, currently under construction."
   ],
   "locality_evidence": [
    "# Nexus Hubbard Campus",
    "7.2 GW AI data center in Hubbard, OH, United States \u2014 under construction.",
    "Nexus Hubbard Campus is a 7.2 GW AI data center project located in Hubbard, OH, United States, currently under construction."
   ],
   "state_evidence": [
    "# Nexus Hubbard Campus",
    "7.2 GW AI data center in Hubbard, OH, United States \u2014 under construction.",
    "Nexus Hubbard Campus is a 7.2 GW AI data center project located in Hubbard, OH, United States, currently under construction."
   ],
   "capacity_gw_evidence": [
    "# Nexus Hubbard Campus",
    "7.2 GW AI data center in Hubbard, OH, United States \u2014 under construction.",
    "- Capacity: **7.2 GW**",
    "Nexus Hubbard Campus is a 7.2 GW AI data center project located in Hubbard, OH, United States, currently under construction."
   ],
   "builder_evidence": [
    "# Nexus Hubbard Campus",
    "- Developer: Nexus",
    "It is being built by Nexus."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Nexus Hubbard Campus",
    "7.2 GW AI data center in Hubbard, OH, United States \u2014 under construction.",
    "- Status: under construction",
    "Nexus Hubbard Campus is a 7.2 GW AI data center project located in Hubbard, OH, United States, currently under construction."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://channelinsider.com/ai/news-openai-8gw-ohio-data-center-lease-nvidia",
   "title": "OpenAI Signs 20-Year Lease for 8GW Ohio AI Campus With Nvidia Backing",
   "published_at": "2026-08-18T20:41:20",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "OpenAI has entered a 20-year lease with SoftBank-backed SB Energy for approximately 8 gigawatts of IT capacity at the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "locality_evidence": [
    "OpenAI has entered a 20-year lease with SoftBank-backed SB Energy for approximately 8 gigawatts of IT capacity at the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "state_evidence": [
    "OpenAI has entered a 20-year lease with SoftBank-backed SB Energy for approximately 8 gigawatts of IT capacity at the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "capacity_gw_evidence": [
    "OpenAI has entered a 20-year lease with SoftBank-backed SB Energy for approximately 8 gigawatts of IT capacity at the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "builder_evidence": [
    "OpenAI has entered a 20-year lease with SoftBank-backed SB Energy for approximately 8 gigawatts of IT capacity at the PORTS-Pike Technology Campus in Pike County, Ohio.",
    "SB Energy will build, own and operate the data center, while OpenAI will be its customer."
   ],
   "ai_customer_evidence": [
    "OpenAI has entered a 20-year lease with SoftBank-backed SB Energy for approximately 8 gigawatts of IT capacity at the PORTS-Pike Technology Campus in Pike County, Ohio.",
    "SB Energy will build, own and operate the data center, while OpenAI will be its customer."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://stargate.how/location",
   "title": "Stargate Data Center Tracker \u2014 Status as of August 29, 2026",
   "published_at": null,
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "Partially operational",
   "announcement_date": "2025-01-21",
   "project_evidence": [
    "### Abilene",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "locality_evidence": [
    "### Abilene",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "state_evidence": [
    "Texas, United States",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "capacity_gw_evidence": [
    "1.2 GW OpenAI\u2013Oracle campus; this is total campus capacity, not capacity already online.",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "builder_evidence": [
    "The flagship Stargate I campus is serving early OpenAI training and inference workloads while the remaining data halls are completed.",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "ai_customer_evidence": [
    "OpenAI roleCompute customer running workloads on Oracle Cloud Infrastructure capacity.",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "status_evidence": [
    "Partially operational",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "announcement_date_evidence": [
    "AnnouncedJanuary 21, 2025",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ]
  },
  {
   "url": "https://stargate.how/location",
   "title": "Stargate Data Center Tracker \u2014 Status as of August 29, 2026",
   "published_at": null,
   "project": "Do\u00f1a Ana County",
   "locality": "Do\u00f1a Ana County",
   "state": "New Mexico",
   "capacity_gw": 1.0,
   "builder": "STACK Infrastructure",
   "ai_customer": "OpenAI",
   "status": "Under construction",
   "announcement_date": "2025-09-23",
   "project_evidence": [
    "### Do\u00f1a Ana County",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "locality_evidence": [
    "### Do\u00f1a Ana County",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "state_evidence": [
    "New Mexico, United States",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "capacity_gw_evidence": [
    "More than 1 GW across the Project Jupiter campus; the figure is not all currently powered OpenAI capacity.",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "builder_evidence": [
    "Project Jupiter is an Oracle-backed Stargate campus developed with STACK and BorderPlex.",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "ai_customer_evidence": [
    "OpenAI roleIntended end user of compute supplied through Oracle; OpenAI does not own the campus.",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "status_evidence": [
    "Under construction",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "announcement_date_evidence": [
    "AnnouncedSeptember 23, 2025",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ]
  },
  {
   "url": "https://stargate.how/location",
   "title": "Stargate Data Center Tracker \u2014 Status as of August 29, 2026",
   "published_at": null,
   "project": "Saline Township",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Related Digital",
   "ai_customer": "OpenAI",
   "status": "Under construction",
   "announcement_date": "2025-10-30",
   "project_evidence": [
    "### Saline Township",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "locality_evidence": [
    "### Saline Township",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "state_evidence": [
    "Michigan, United States",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "capacity_gw_evidence": [
    "More than 1 GW across three data center buildings; this is planned campus capacity.",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "builder_evidence": [
    "The Michigan campus is being developed by Related Digital for Oracle as part of Oracle\u2019s capacity partnership with OpenAI.",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "ai_customer_evidence": [
    "OpenAI roleIntended compute user through Oracle; not the campus owner or direct utility customer.",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "status_evidence": [
    "Under construction",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "announcement_date_evidence": [
    "AnnouncedOctober 30, 2025",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ]
  },
  {
   "url": "https://stargate.how/location",
   "title": "Stargate Data Center Tracker \u2014 Status as of August 29, 2026",
   "published_at": null,
   "project": "Milam County",
   "locality": "Milam County",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "Under construction",
   "announcement_date": "2025-09-23",
   "project_evidence": [
    "### Milam County",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "locality_evidence": [
    "### Milam County",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "state_evidence": [
    "Texas, United States",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "capacity_gw_evidence": [
    "1.2 GW covered by OpenAI\u2019s initial data center lease with SB Energy.",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "builder_evidence": [
    "The primary SoftBank-linked U.S. campus pairs OpenAI\u2019s data center design and compute demand with SB Energy\u2019s construction, operations and energy delivery.",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "ai_customer_evidence": [
    "OpenAI roleLong-term lessee, design partner and $500 million investor in SB Energy.",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "status_evidence": [
    "Under construction",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "announcement_date_evidence": [
    "AnnouncedSeptember 23, 2025",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ]
  },
  {
   "url": "https://stargate.how/location",
   "title": "Stargate Data Center Tracker \u2014 Status as of August 29, 2026",
   "published_at": null,
   "project": "PORTS-Pike Technology Campus",
   "locality": "PORTS-Pike",
   "state": "Ohio",
   "capacity_gw": 10.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "Contracted",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "### PORTS-Pike Technology Campus",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "locality_evidence": [
    "### PORTS-Pike Technology Campus",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "state_evidence": [
    "Ohio, United States",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "capacity_gw_evidence": [
    "OpenAI has agreed to lease approximately 8 IT-GW of AI-factory capacity. SB Energy separately describes a 10 GW data center build; neither figure is operational today.",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "builder_evidence": [
    "SB Energy will build, own and operate the campus across private and remediated federal land, with NVIDIA as the exclusive AI compute infrastructure provider.",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "ai_customer_evidence": [
    "OpenAI roleCustomer and 20-year lessee, paying only as completed capacity becomes available.",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "status_evidence": [
    "Contracted",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "announcement_date_evidence": [
    "AnnouncedAugust 17, 2026",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ]
  },
  {
   "url": "https://stargate.how/location",
   "title": "Stargate Data Center Tracker \u2014 Status as of August 29, 2026",
   "published_at": null,
   "project": "Effingham County (Project Camellia)",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "Contracted",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "### Effingham County (Project Camellia)",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "locality_evidence": [
    "### Effingham County (Project Camellia)",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "state_evidence": [
    "Georgia, United States",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "capacity_gw_evidence": [
    "3.2 GW of power contracted from Georgia Power, scheduled in phases; it is not operational compute capacity.",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "builder_evidence": [
    "Project Camellia is a long-term OpenAI-designed campus with private financing, closed-loop cooling and flexible load controls.",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "ai_customer_evidence": [
    "OpenAI roleProject designer, developer and electricity customer.",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "status_evidence": [
    "Contracted",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ],
   "announcement_date_evidence": [
    "AnnouncedJuly 22, 2026",
    "# Stargate infrastructure tracker",
    "## United States",
    "9 named sites spanning the Oracle and SoftBank tracks and OpenAI\u2019s directly developed projects. Status reflects the most recent evidence available on August 29, 2026."
   ]
  },
  {
   "url": "https://ppc.land/meta-breaks-ground-on-10-billion-lebanon-data-center-for-ai-expansion",
   "title": "Meta breaks ground on $10 billion Lebanon data center for AI expansion",
   "published_at": "2026-02-15T16:52:47",
   "project": "Lebanon",
   "locality": "Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2026-02-11",
   "project_evidence": [
    "Meta this week broke ground on a state-of-the-art data center campus in Lebanon, Indiana, marking one of the company's largest infrastructure investments to date."
   ],
   "locality_evidence": [
    "Meta this week broke ground on a state-of-the-art data center campus in Lebanon, Indiana, marking one of the company's largest infrastructure investments to date."
   ],
   "state_evidence": [
    "Meta this week broke ground on a state-of-the-art data center campus in Lebanon, Indiana, marking one of the company's largest infrastructure investments to date."
   ],
   "capacity_gw_evidence": [
    "The facility will deliver 1 gigawatt of capacity once operational, according to an [announcement](https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/?ref=ppc.land) published on the company's newsroom.",
    "Meta this week broke ground on a state-of-the-art data center campus in Lebanon, Indiana, marking one of the company's largest infrastructure investments to date."
   ],
   "builder_evidence": [
    "Meta this week broke ground on a state-of-the-art data center campus in Lebanon, Indiana, marking one of the company's largest infrastructure investments to date."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Meta this week broke ground on a state-of-the-art data center campus in Lebanon, Indiana, marking one of the company's largest infrastructure investments to date."
   ],
   "announcement_date_evidence": [
    "- February 11, 2026 - Meta broke ground on 1-gigawatt data center campus in Lebanon, Indiana",
    "Meta this week broke ground on a state-of-the-art data center campus in Lebanon, Indiana, marking one of the company's largest infrastructure investments to date."
   ]
  },
  {
   "url": "https://ppc.land/meta-breaks-ground-on-10-billion-lebanon-data-center-for-ai-expansion",
   "title": "Meta breaks ground on $10 billion Lebanon data center for AI expansion",
   "published_at": "2026-02-15T16:52:47",
   "project": "Prometheus",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": null,
   "announcement_date": "2025-07-14",
   "project_evidence": [
    "That commitment included Prometheus, a 1+ gigawatt facility in New Albany, Ohio, and Hyperion, eventually reaching 5 gigawatts in Richland Parish, Louisiana.",
    "Meta's [investment in gigawatt-scale data centers](https://ppc.land/meta-bets-billions-on-ai-data-centers-requiring-massive-energy-and-water/) follows CEO Mark Zuckerberg's July 14, 2025 announcement of plans to invest \"hundreds of billions of dollars\" in AI infrastructure."
   ],
   "locality_evidence": [
    "That commitment included Prometheus, a 1+ gigawatt facility in New Albany, Ohio, and Hyperion, eventually reaching 5 gigawatts in Richland Parish, Louisiana.",
    "Meta's [investment in gigawatt-scale data centers](https://ppc.land/meta-bets-billions-on-ai-data-centers-requiring-massive-energy-and-water/) follows CEO Mark Zuckerberg's July 14, 2025 announcement of plans to invest \"hundreds of billions of dollars\" in AI infrastructure."
   ],
   "state_evidence": [
    "That commitment included Prometheus, a 1+ gigawatt facility in New Albany, Ohio, and Hyperion, eventually reaching 5 gigawatts in Richland Parish, Louisiana.",
    "Meta's [investment in gigawatt-scale data centers](https://ppc.land/meta-bets-billions-on-ai-data-centers-requiring-massive-energy-and-water/) follows CEO Mark Zuckerberg's July 14, 2025 announcement of plans to invest \"hundreds of billions of dollars\" in AI infrastructure."
   ],
   "capacity_gw_evidence": [
    "That commitment included Prometheus, a 1+ gigawatt facility in New Albany, Ohio, and Hyperion, eventually reaching 5 gigawatts in Richland Parish, Louisiana.",
    "Meta's [investment in gigawatt-scale data centers](https://ppc.land/meta-bets-billions-on-ai-data-centers-requiring-massive-energy-and-water/) follows CEO Mark Zuckerberg's July 14, 2025 announcement of plans to invest \"hundreds of billions of dollars\" in AI infrastructure."
   ],
   "builder_evidence": [
    "Meta's [investment in gigawatt-scale data centers](https://ppc.land/meta-bets-billions-on-ai-data-centers-requiring-massive-energy-and-water/) follows CEO Mark Zuckerberg's July 14, 2025 announcement of plans to invest \"hundreds of billions of dollars\" in AI infrastructure.",
    "That commitment included Prometheus, a 1+ gigawatt facility in New Albany, Ohio, and Hyperion, eventually reaching 5 gigawatts in Richland Parish, Louisiana."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": [
    "Meta's [investment in gigawatt-scale data centers](https://ppc.land/meta-bets-billions-on-ai-data-centers-requiring-massive-energy-and-water/) follows CEO Mark Zuckerberg's July 14, 2025 announcement of plans to invest \"hundreds of billions of dollars\" in AI infrastructure."
   ]
  },
  {
   "url": "https://ppc.land/meta-breaks-ground-on-10-billion-lebanon-data-center-for-ai-expansion",
   "title": "Meta breaks ground on $10 billion Lebanon data center for AI expansion",
   "published_at": "2026-02-15T16:52:47",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2025-07-14",
   "project_evidence": [
    "That commitment included Prometheus, a 1+ gigawatt facility in New Albany, Ohio, and Hyperion, eventually reaching 5 gigawatts in Richland Parish, Louisiana.",
    "Meta's [investment in gigawatt-scale data centers](https://ppc.land/meta-bets-billions-on-ai-data-centers-requiring-massive-energy-and-water/) follows CEO Mark Zuckerberg's July 14, 2025 announcement of plans to invest \"hundreds of billions of dollars\" in AI infrastructure."
   ],
   "locality_evidence": [
    "That commitment included Prometheus, a 1+ gigawatt facility in New Albany, Ohio, and Hyperion, eventually reaching 5 gigawatts in Richland Parish, Louisiana.",
    "Meta's [investment in gigawatt-scale data centers](https://ppc.land/meta-bets-billions-on-ai-data-centers-requiring-massive-energy-and-water/) follows CEO Mark Zuckerberg's July 14, 2025 announcement of plans to invest \"hundreds of billions of dollars\" in AI infrastructure."
   ],
   "state_evidence": [
    "That commitment included Prometheus, a 1+ gigawatt facility in New Albany, Ohio, and Hyperion, eventually reaching 5 gigawatts in Richland Parish, Louisiana.",
    "Meta's [investment in gigawatt-scale data centers](https://ppc.land/meta-bets-billions-on-ai-data-centers-requiring-massive-energy-and-water/) follows CEO Mark Zuckerberg's July 14, 2025 announcement of plans to invest \"hundreds of billions of dollars\" in AI infrastructure."
   ],
   "capacity_gw_evidence": [
    "That commitment included Prometheus, a 1+ gigawatt facility in New Albany, Ohio, and Hyperion, eventually reaching 5 gigawatts in Richland Parish, Louisiana.",
    "Meta's [investment in gigawatt-scale data centers](https://ppc.land/meta-bets-billions-on-ai-data-centers-requiring-massive-energy-and-water/) follows CEO Mark Zuckerberg's July 14, 2025 announcement of plans to invest \"hundreds of billions of dollars\" in AI infrastructure."
   ],
   "builder_evidence": [
    "- December 2024 - Meta began construction on Hyperion data center in Richland Parish, Louisiana with $10 billion investment",
    "Meta's [investment in gigawatt-scale data centers](https://ppc.land/meta-bets-billions-on-ai-data-centers-requiring-massive-energy-and-water/) follows CEO Mark Zuckerberg's July 14, 2025 announcement of plans to invest \"hundreds of billions of dollars\" in AI infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "- December 2024 - Meta began construction on Hyperion data center in Richland Parish, Louisiana with $10 billion investment"
   ],
   "announcement_date_evidence": [
    "Meta's [investment in gigawatt-scale data centers](https://ppc.land/meta-bets-billions-on-ai-data-centers-requiring-massive-energy-and-water/) follows CEO Mark Zuckerberg's July 14, 2025 announcement of plans to invest \"hundreds of billions of dollars\" in AI infrastructure."
   ]
  },
  {
   "url": "https://mlq.ai/news/meta-deploys-tent-based-data-centers-in-ohio-and-tennessee-backed-by-400mw-of-off-grid-gas-power",
   "title": "AI for investors",
   "published_at": null,
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 2.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "The campus is part of a broader Meta infrastructure buildout that includes a 1GW facility in El Paso, Texas powered by 366MW of modular gas units, a 1GW super-cluster in Lebanon, Indiana estimated at $10 billion, and the multi-gigawatt Hyperion project in Richland Parish, Louisiana tied to 2.23GW of new gas capacity plus 1.5GW of renewables from Entergy Louisiana [4][9].",
    "## The Prometheus Campus"
   ],
   "locality_evidence": [
    "The campus is part of a broader Meta infrastructure buildout that includes a 1GW facility in El Paso, Texas powered by 366MW of modular gas units, a 1GW super-cluster in Lebanon, Indiana estimated at $10 billion, and the multi-gigawatt Hyperion project in Richland Parish, Louisiana tied to 2.23GW of new gas capacity plus 1.5GW of renewables from Entergy Louisiana [4][9].",
    "## The Prometheus Campus"
   ],
   "state_evidence": [
    "The campus is part of a broader Meta infrastructure buildout that includes a 1GW facility in El Paso, Texas powered by 366MW of modular gas units, a 1GW super-cluster in Lebanon, Indiana estimated at $10 billion, and the multi-gigawatt Hyperion project in Richland Parish, Louisiana tied to 2.23GW of new gas capacity plus 1.5GW of renewables from Entergy Louisiana [4][9].",
    "## The Prometheus Campus"
   ],
   "capacity_gw_evidence": [
    "The campus is part of a broader Meta infrastructure buildout that includes a 1GW facility in El Paso, Texas powered by 366MW of modular gas units, a 1GW super-cluster in Lebanon, Indiana estimated at $10 billion, and the multi-gigawatt Hyperion project in Richland Parish, Louisiana tied to 2.23GW of new gas capacity plus 1.5GW of renewables from Entergy Louisiana [4][9].",
    "## The Prometheus Campus"
   ],
   "builder_evidence": [
    "The campus is part of a broader Meta infrastructure buildout that includes a 1GW facility in El Paso, Texas powered by 366MW of modular gas units, a 1GW super-cluster in Lebanon, Indiana estimated at $10 billion, and the multi-gigawatt Hyperion project in Richland Parish, Louisiana tied to 2.23GW of new gas capacity plus 1.5GW of renewables from Entergy Louisiana [4][9].",
    "## The Prometheus Campus"
   ],
   "ai_customer_evidence": [
    "The campus is part of a broader Meta infrastructure buildout that includes a 1GW facility in El Paso, Texas powered by 366MW of modular gas units, a 1GW super-cluster in Lebanon, Indiana estimated at $10 billion, and the multi-gigawatt Hyperion project in Richland Parish, Louisiana tied to 2.23GW of new gas capacity plus 1.5GW of renewables from Entergy Louisiana [4][9].",
    "## The Prometheus Campus"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://convergedigest.com/xai-commits-20b-to-2-gw-ai-data-center-in-mississippi",
   "title": "xAI Commits $20B to 2-GW AI Data Center in Mississippi",
   "published_at": "2026-01-09T04:30:36",
   "project": "MACROHARDRR",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "The facility, branded MACROHARDRR, will anchor xAI\u2019s expanding AI compute footprint in the greater Memphis region and is expected to create hundreds of permanent jobs across DeSoto County.",
    "xAI plans a data center investment exceeding $20 billion in Southaven, Mississippi, marking the largest economic development project in the state\u2019s history."
   ],
   "locality_evidence": [
    "xAI plans a data center investment exceeding $20 billion in Southaven, Mississippi, marking the largest economic development project in the state\u2019s history."
   ],
   "state_evidence": [
    "xAI plans a data center investment exceeding $20 billion in Southaven, Mississippi, marking the largest economic development project in the state\u2019s history."
   ],
   "capacity_gw_evidence": [
    "Once completed, the Southaven buildout will lift xAI\u2019s total computing capacity to nearly **2 gigawatts**, supporting continued expansion of its Colossus training supercluster as the company scales toward roughly one million GPUs.",
    "xAI plans a data center investment exceeding $20 billion in Southaven, Mississippi, marking the largest economic development project in the state\u2019s history."
   ],
   "builder_evidence": [
    "xAI plans a data center investment exceeding $20 billion in Southaven, Mississippi, marking the largest economic development project in the state\u2019s history."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "xAI plans a data center investment exceeding $20 billion in Southaven, Mississippi, marking the largest economic development project in the state\u2019s history."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://epoch.ai/data-insights/fairwater-power-usage",
   "title": "Microsoft\u2019s Fairwater data center will use more power than Los Angeles",
   "published_at": "2025-11-26T00:00:00",
   "project": "Fairwater",
   "locality": "Mount Pleasant",
   "state": "Wisconsin",
   "capacity_gw": 3.3,
   "builder": "Microsoft",
   "ai_customer": null,
   "status": "projected to consume 3.3 GW of power by late 2027, when its fourth building becomes operational",
   "announcement_date": null,
   "project_evidence": [
    "Microsoft\u2019s Fairwater multi-building data center in Mount Pleasant, Wisconsin, is projected to consume 3.3 GW of power by late 2027, when its fourth building becomes operational."
   ],
   "locality_evidence": [
    "Microsoft\u2019s Fairwater multi-building data center in Mount Pleasant, Wisconsin, is projected to consume 3.3 GW of power by late 2027, when its fourth building becomes operational."
   ],
   "state_evidence": [
    "Microsoft\u2019s Fairwater multi-building data center in Mount Pleasant, Wisconsin, is projected to consume 3.3 GW of power by late 2027, when its fourth building becomes operational."
   ],
   "capacity_gw_evidence": [
    "Microsoft\u2019s Fairwater multi-building data center in Mount Pleasant, Wisconsin, is projected to consume 3.3 GW of power by late 2027, when its fourth building becomes operational."
   ],
   "builder_evidence": [
    "Microsoft\u2019s Fairwater multi-building data center in Mount Pleasant, Wisconsin, is projected to consume 3.3 GW of power by late 2027, when its fourth building becomes operational."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Microsoft\u2019s Fairwater multi-building data center in Mount Pleasant, Wisconsin, is projected to consume 3.3 GW of power by late 2027, when its fourth building becomes operational."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news/fermi-signs-mou-with-mvm-egi-to-develop-cooling-systems-for-planned-up-to-11gw-data-center-campus-in-amarillo-texas",
   "title": "Fermi signs MoU with MVM EGI to develop cooling systems for planned up to 11GW Texas data center campus",
   "published_at": "2026-08-27T00:00:00",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Fermi America has signed a non-binding Memorandum of Understanding (MoU) with power-cooling firm MVM EGI Zrt. to develop cooling systems for its planned up to 11GW data center and energy campus in Amarillo, Texas.",
    "\"As promised, we're working with global innovators like MVM to ensure Project Matador complements the long-term water needs of the region, building something big, but doing it the right way.\"",
    "Fermi\u2019s Project Matador is one of the most ambitious data center campuses planned anywhere in the world."
   ],
   "locality_evidence": [
    "Fermi America has signed a non-binding Memorandum of Understanding (MoU) with power-cooling firm MVM EGI Zrt. to develop cooling systems for its planned up to 11GW data center and energy campus in Amarillo, Texas.",
    "Fermi\u2019s Project Matador is one of the most ambitious data center campuses planned anywhere in the world."
   ],
   "state_evidence": [
    "Fermi America has signed a non-binding Memorandum of Understanding (MoU) with power-cooling firm MVM EGI Zrt. to develop cooling systems for its planned up to 11GW data center and energy campus in Amarillo, Texas.",
    "Fermi\u2019s Project Matador is one of the most ambitious data center campuses planned anywhere in the world."
   ],
   "capacity_gw_evidence": [
    "Fermi America has signed a non-binding Memorandum of Understanding (MoU) with power-cooling firm MVM EGI Zrt. to develop cooling systems for its planned up to 11GW data center and energy campus in Amarillo, Texas.",
    "Fermi\u2019s Project Matador is one of the most ambitious data center campuses planned anywhere in the world."
   ],
   "builder_evidence": [
    "Fermi America has signed a non-binding Memorandum of Understanding (MoU) with power-cooling firm MVM EGI Zrt. to develop cooling systems for its planned up to 11GW data center and energy campus in Amarillo, Texas.",
    "Fermi\u2019s Project Matador is one of the most ambitious data center campuses planned anywhere in the world."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Fermi America has signed a non-binding Memorandum of Understanding (MoU) with power-cooling firm MVM EGI Zrt. to develop cooling systems for its planned up to 11GW data center and energy campus in Amarillo, Texas.",
    "Fermi\u2019s Project Matador is one of the most ambitious data center campuses planned anywhere in the world."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://gncrypto.news/news/terawulf-muskie-campus-1gw-ai-hpc-kentucky",
   "title": "Terawulf buys Muskie campus, targets 1GW AI in Kentucky",
   "published_at": "2026-05-29T05:41:44",
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "Terawulf",
   "ai_customer": "",
   "status": "acquired",
   "announcement_date": "2026-05-29",
   "project_evidence": [
    "# Terawulf buys Muskie campus, targets 1GW AI in Kentucky",
    "Terawulf acquired the Muskie Data Campus in eastern Kentucky, plans over 1 GW of AI/HPC capacity by 2030 and secured a $3 billion Morgan Stanley financing package backstopped by Google.",
    "Terawulf Inc. has bought the Muskie Data Campus in eastern Kentucky from Industrial Equity Partners and plans to develop more than 1 gigawatt of artificial intelligence and high-performance computing capacity there by 2030."
   ],
   "locality_evidence": [
    "# Terawulf buys Muskie campus, targets 1GW AI in Kentucky",
    "Terawulf acquired the Muskie Data Campus in eastern Kentucky, plans over 1 GW of AI/HPC capacity by 2030 and secured a $3 billion Morgan Stanley financing package backstopped by Google.",
    "Terawulf Inc. has bought the Muskie Data Campus in eastern Kentucky from Industrial Equity Partners and plans to develop more than 1 gigawatt of artificial intelligence and high-performance computing capacity there by 2030."
   ],
   "state_evidence": [
    "# Terawulf buys Muskie campus, targets 1GW AI in Kentucky",
    "Terawulf acquired the Muskie Data Campus in eastern Kentucky, plans over 1 GW of AI/HPC capacity by 2030 and secured a $3 billion Morgan Stanley financing package backstopped by Google.",
    "Terawulf Inc. has bought the Muskie Data Campus in eastern Kentucky from Industrial Equity Partners and plans to develop more than 1 gigawatt of artificial intelligence and high-performance computing capacity there by 2030."
   ],
   "capacity_gw_evidence": [
    "# Terawulf buys Muskie campus, targets 1GW AI in Kentucky",
    "Terawulf acquired the Muskie Data Campus in eastern Kentucky, plans over 1 GW of AI/HPC capacity by 2030 and secured a $3 billion Morgan Stanley financing package backstopped by Google.",
    "Terawulf Inc. has bought the Muskie Data Campus in eastern Kentucky from Industrial Equity Partners and plans to develop more than 1 gigawatt of artificial intelligence and high-performance computing capacity there by 2030."
   ],
   "builder_evidence": [
    "# Terawulf buys Muskie campus, targets 1GW AI in Kentucky",
    "Terawulf acquired the Muskie Data Campus in eastern Kentucky, plans over 1 GW of AI/HPC capacity by 2030 and secured a $3 billion Morgan Stanley financing package backstopped by Google.",
    "Terawulf Inc. has bought the Muskie Data Campus in eastern Kentucky from Industrial Equity Partners and plans to develop more than 1 gigawatt of artificial intelligence and high-performance computing capacity there by 2030."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Terawulf buys Muskie campus, targets 1GW AI in Kentucky",
    "Terawulf acquired the Muskie Data Campus in eastern Kentucky, plans over 1 GW of AI/HPC capacity by 2030 and secured a $3 billion Morgan Stanley financing package backstopped by Google."
   ],
   "announcement_date_evidence": [
    "# Terawulf buys Muskie campus, targets 1GW AI in Kentucky",
    " Posted: 29 May 2026, 07:41 CET 2 min read"
   ]
  },
  {
   "url": "https://apkpure.com/news/nvidia-openai-ai-8-gw-ports-pike-partnership",
   "title": "NVIDIA OpenAI AI Infrastructure: 8 GW Ohio Data Center Deal",
   "published_at": "2026-08-19T03:40:59",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Portsmouth",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "NVIDIA AI Infrastructure Update: 8 GW PORTS-Pike Partnership With OpenAI",
    "NVIDIA partners with SB Energy to lock in 8 GW of AI compute capacity at PORTS-Pike Ohio for OpenAI, part of a $600 billion infrastructure plan through 2030.",
    "On August 17, the company announced a partnership with SB Energy to secure land, power, and shell (LPS) capacity at the PORTS-Pike Technology Campus in Portsmouth, Ohio."
   ],
   "locality_evidence": [
    "NVIDIA AI Infrastructure Update: 8 GW PORTS-Pike Partnership With OpenAI",
    "NVIDIA partners with SB Energy to lock in 8 GW of AI compute capacity at PORTS-Pike Ohio for OpenAI, part of a $600 billion infrastructure plan through 2030.",
    "On August 17, the company announced a partnership with SB Energy to secure land, power, and shell (LPS) capacity at the PORTS-Pike Technology Campus in Portsmouth, Ohio."
   ],
   "state_evidence": [
    "NVIDIA AI Infrastructure Update: 8 GW PORTS-Pike Partnership With OpenAI",
    "NVIDIA partners with SB Energy to lock in 8 GW of AI compute capacity at PORTS-Pike Ohio for OpenAI, part of a $600 billion infrastructure plan through 2030.",
    "On August 17, the company announced a partnership with SB Energy to secure land, power, and shell (LPS) capacity at the PORTS-Pike Technology Campus in Portsmouth, Ohio."
   ],
   "capacity_gw_evidence": [
    "NVIDIA AI Infrastructure Update: 8 GW PORTS-Pike Partnership With OpenAI",
    "NVIDIA partners with SB Energy to lock in 8 GW of AI compute capacity at PORTS-Pike Ohio for OpenAI, part of a $600 billion infrastructure plan through 2030.",
    "The initial deployment covers 4.25 gigawatts of AI factory capacity, with an option to expand to 8 gigawatts."
   ],
   "builder_evidence": [
    "NVIDIA AI Infrastructure Update: 8 GW PORTS-Pike Partnership With OpenAI",
    "NVIDIA partners with SB Energy to lock in 8 GW of AI compute capacity at PORTS-Pike Ohio for OpenAI, part of a $600 billion infrastructure plan through 2030.",
    "On August 17, the company announced a partnership with SB Energy to secure land, power, and shell (LPS) capacity at the PORTS-Pike Technology Campus in Portsmouth, Ohio."
   ],
   "ai_customer_evidence": [
    "NVIDIA AI Infrastructure Update: 8 GW PORTS-Pike Partnership With OpenAI",
    "NVIDIA partners with SB Energy to lock in 8 GW of AI compute capacity at PORTS-Pike Ohio for OpenAI, part of a $600 billion infrastructure plan through 2030.",
    "On August 17, the company announced a partnership with SB Energy to secure land, power, and shell (LPS) capacity at the PORTS-Pike Technology Campus in Portsmouth, Ohio."
   ],
   "status_evidence": [
    "NVIDIA AI Infrastructure Update: 8 GW PORTS-Pike Partnership With OpenAI",
    "NVIDIA partners with SB Energy to lock in 8 GW of AI compute capacity at PORTS-Pike Ohio for OpenAI, part of a $600 billion infrastructure plan through 2030.",
    "On August 17, the company announced a partnership with SB Energy to secure land, power, and shell (LPS) capacity at the PORTS-Pike Technology Campus in Portsmouth, Ohio."
   ],
   "announcement_date_evidence": [
    "NVIDIA AI Infrastructure Update: 8 GW PORTS-Pike Partnership With OpenAI",
    "NVIDIA partners with SB Energy to lock in 8 GW of AI compute capacity at PORTS-Pike Ohio for OpenAI, part of a $600 billion infrastructure plan through 2030.",
    "On August 17, the company announced a partnership with SB Energy to secure land, power, and shell (LPS) capacity at the PORTS-Pike Technology Campus in Portsmouth, Ohio."
   ]
  },
  {
   "url": "https://dxbnewsnetwork.com/openai-oracle-softbank-expand-us-ai-data-centres",
   "title": "OpenAI, Oracle & SoftBank Expand US AI Data Centres",
   "published_at": "2026-08-27T05:14:29",
   "project": null,
   "locality": "Lordstown",
   "state": "Ohio",
   "capacity_gw": 1.5,
   "builder": "SoftBank and OpenAI",
   "ai_customer": "OpenAI",
   "status": "under construction",
   "announcement_date": "2025-09-24",
   "project_evidence": null,
   "locality_evidence": [
    "OpenAI, Oracle & SoftBank Expand US AI Data Centres | DXB News Network",
    "OpenAI, Oracle & SoftBank Launch 5 US AI Centres",
    "The other two sites, developed jointly by SoftBank and OpenAI, will scale up to 1.5 gigawatts within 18 months."
   ],
   "state_evidence": [
    "OpenAI, Oracle & SoftBank Expand US AI Data Centres | DXB News Network",
    "OpenAI, Oracle & SoftBank Launch 5 US AI Centres",
    "The other two sites, developed jointly by SoftBank and OpenAI, will scale up to 1.5 gigawatts within 18 months."
   ],
   "capacity_gw_evidence": [
    "OpenAI, Oracle & SoftBank Expand US AI Data Centres | DXB News Network",
    "OpenAI, Oracle & SoftBank Launch 5 US AI Centres",
    "The other two sites, developed jointly by SoftBank and OpenAI, will scale up to 1.5 gigawatts within 18 months."
   ],
   "builder_evidence": [
    "OpenAI, Oracle & SoftBank Expand US AI Data Centres | DXB News Network",
    "OpenAI, Oracle & SoftBank Launch 5 US AI Centres",
    "The other two sites, developed jointly by SoftBank and OpenAI, will scale up to 1.5 gigawatts within 18 months."
   ],
   "ai_customer_evidence": [
    "OpenAI, Oracle & SoftBank Expand US AI Data Centres | DXB News Network",
    "OpenAI, Oracle & SoftBank Launch 5 US AI Centres",
    "The other two sites, developed jointly by SoftBank and OpenAI, will scale up to 1.5 gigawatts within 18 months."
   ],
   "status_evidence": [
    "OpenAI, Oracle & SoftBank Expand US AI Data Centres | DXB News Network",
    "OpenAI, Oracle & SoftBank Launch 5 US AI Centres",
    "One is under construction in Lordstown, Ohio, and the second will be built in Milam County, Texas, with SB Energy, a SoftBank company."
   ],
   "announcement_date_evidence": [
    "OpenAI, Oracle & SoftBank Expand US AI Data Centres | DXB News Network",
    "OpenAI, Oracle & SoftBank Launch 5 US AI Centres",
    "[Bianca Qureshi](/journalist/bandanpreet)\u2022 9/24/2025\u2022 1106 Views",
    "OpenAI, Oracle, and SoftBank announced on Tuesday plans to open five new artificial intelligence (AI) data centre sites across the United States as part of OpenAI\u2019s Stargate infrastructure platform."
   ]
  },
  {
   "url": "https://dxbnewsnetwork.com/openai-oracle-softbank-expand-us-ai-data-centres",
   "title": "OpenAI, Oracle & SoftBank Expand US AI Data Centres",
   "published_at": "2026-08-27T05:14:29",
   "project": null,
   "locality": "Milam County",
   "state": "Texas",
   "capacity_gw": 1.5,
   "builder": "SoftBank, OpenAI, and SB Energy",
   "ai_customer": "OpenAI",
   "status": "will be built",
   "announcement_date": "2025-09-24",
   "project_evidence": null,
   "locality_evidence": [
    "OpenAI, Oracle & SoftBank Expand US AI Data Centres | DXB News Network",
    "OpenAI, Oracle & SoftBank Launch 5 US AI Centres",
    "The other two sites, developed jointly by SoftBank and OpenAI, will scale up to 1.5 gigawatts within 18 months."
   ],
   "state_evidence": [
    "OpenAI, Oracle & SoftBank Expand US AI Data Centres | DXB News Network",
    "OpenAI, Oracle & SoftBank Launch 5 US AI Centres",
    "The other two sites, developed jointly by SoftBank and OpenAI, will scale up to 1.5 gigawatts within 18 months."
   ],
   "capacity_gw_evidence": [
    "OpenAI, Oracle & SoftBank Expand US AI Data Centres | DXB News Network",
    "OpenAI, Oracle & SoftBank Launch 5 US AI Centres",
    "The other two sites, developed jointly by SoftBank and OpenAI, will scale up to 1.5 gigawatts within 18 months."
   ],
   "builder_evidence": [
    "OpenAI, Oracle & SoftBank Expand US AI Data Centres | DXB News Network",
    "OpenAI, Oracle & SoftBank Launch 5 US AI Centres",
    "The other two sites, developed jointly by SoftBank and OpenAI, will scale up to 1.5 gigawatts within 18 months.",
    "One is under construction in Lordstown, Ohio, and the second will be built in Milam County, Texas, with SB Energy, a SoftBank company."
   ],
   "ai_customer_evidence": [
    "OpenAI, Oracle & SoftBank Expand US AI Data Centres | DXB News Network",
    "OpenAI, Oracle & SoftBank Launch 5 US AI Centres",
    "The other two sites, developed jointly by SoftBank and OpenAI, will scale up to 1.5 gigawatts within 18 months."
   ],
   "status_evidence": [
    "OpenAI, Oracle & SoftBank Expand US AI Data Centres | DXB News Network",
    "OpenAI, Oracle & SoftBank Launch 5 US AI Centres",
    "One is under construction in Lordstown, Ohio, and the second will be built in Milam County, Texas, with SB Energy, a SoftBank company."
   ],
   "announcement_date_evidence": [
    "OpenAI, Oracle & SoftBank Expand US AI Data Centres | DXB News Network",
    "OpenAI, Oracle & SoftBank Launch 5 US AI Centres",
    "[Bianca Qureshi](/journalist/bandanpreet)\u2022 9/24/2025\u2022 1106 Views",
    "OpenAI, Oracle, and SoftBank announced on Tuesday plans to open five new artificial intelligence (AI) data centre sites across the United States as part of OpenAI\u2019s Stargate infrastructure platform."
   ]
  },
  {
   "url": "https://elpasomatters.org/2026/08/09/el-paso-meta-data-center-blackrock-texas-ai-finance-tax-agreement/",
   "title": "Meta, BlackRock deal for El Paso data center leaves tax break unchanged",
   "published_at": "2026-08-09T13:00:00",
   "project": "Meta\u2019s massive El Paso data center",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "BlackRock takes majority ownership of Meta\u2019s massive El Paso data center. Here\u2019s what to know.",
    "# BlackRock takes majority ownership of Meta\u2019s massive El Paso data center. Here\u2019s what to know."
   ],
   "locality_evidence": [
    "Meta Platforms does not appear to have breached its tax break agreement with the city of El Paso when the technology giant last week sold majority ownership of its data center project to BlackRock Inc., according to the El Paso city attorney\u2019s office.",
    "# BlackRock takes majority ownership of Meta\u2019s massive El Paso data center. Here\u2019s what to know."
   ],
   "state_evidence": [
    "Since securing city and county tax breaks nearly three years ago, Meta has made a big investment at the site near the Texas-New Mexico state line.",
    "# BlackRock takes majority ownership of Meta\u2019s massive El Paso data center. Here\u2019s what to know."
   ],
   "capacity_gw_evidence": [
    "Meta\u2019s data campus is expected to demand 1 gigawatt of electricity \u2013 equal to about 40% of the power all of El Paso Electric\u2019s other customers use during a hot summer afternoon.",
    "# BlackRock takes majority ownership of Meta\u2019s massive El Paso data center. Here\u2019s what to know.",
    "#### **Data center power plant**"
   ],
   "builder_evidence": [
    "Meta and BlackRock last month formed a joint venture to develop and operate the data center that\u2019s under construction in Northeast El Paso.",
    "# BlackRock takes majority ownership of Meta\u2019s massive El Paso data center. Here\u2019s what to know."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Meta and BlackRock last month formed a joint venture to develop and operate the data center that\u2019s under construction in Northeast El Paso.",
    "# BlackRock takes majority ownership of Meta\u2019s massive El Paso data center. Here\u2019s what to know."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://www.aboutamazon.com/news/company-news/amazon-15-billion-indiana-data-centers",
   "title": "Amazon to invest $15 billion in Indiana for new data centers",
   "published_at": "2025-11-24T20:00:01",
   "project": "Northern Indiana",
   "locality": "Northern Indiana",
   "state": "Indiana",
   "capacity_gw": 2.4,
   "builder": "Amazon",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "## Key takeaways",
    "Amazon plans to invest an additional $15 billion in Northern Indiana to build data center campuses, creating 1,100 new high-skilled jobs and supporting thousands more in the data center supply chain."
   ],
   "locality_evidence": [
    "## Key takeaways",
    "Amazon plans to invest an additional $15 billion in Northern Indiana to build data center campuses, creating 1,100 new high-skilled jobs and supporting thousands more in the data center supply chain."
   ],
   "state_evidence": [
    "## Key takeaways",
    "Amazon plans to invest an additional $15 billion in Northern Indiana to build data center campuses, creating 1,100 new high-skilled jobs and supporting thousands more in the data center supply chain."
   ],
   "capacity_gw_evidence": [
    "## Key takeaways",
    "The new project will add 2.4 gigawatts of data center capacity in the region."
   ],
   "builder_evidence": [
    "## Key takeaways",
    "Amazon plans to invest an additional $15 billion in Northern Indiana to build data center campuses, creating 1,100 new high-skilled jobs and supporting thousands more in the data center supply chain."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Key takeaways",
    "Today, Amazon announced plans to invest an estimated $15 billion in Northern Indiana to build [new data center campuses](https://www.aboutamazon.com/news/tag/amazon-data-centers) to support [artificial intelligence (AI)](https://www.aboutamazon.com/what-we-do/artificial-intelligence-ai) and cloud computing technologies."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://enkiai.com/data-center/crusoe-energy-stranded-energy-texas",
   "title": "Crusoe Energy Distributed Energy 2026, 12 GWh Form Energy",
   "published_at": "2026-08-04T12:11:37",
   "project": "Childress Campus",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Crusoe Energy",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-07-01",
   "project_evidence": [
    "# Crusoe Energy BYOP Strategy, 1.4 GW Childress Project with Lancium, 1.6 GW Meta Deal, and 40 GW Pipeline (2025 to 2026)",
    "The **1.4 GW** Crusoe Childress Campus, the **2.1 GW** Abilene campus, and the **530 MW** Goodnight campus all exemplify this shift, moving from megawatts of stranded energy capture to gigawatts of dedicated power infrastructure designed to serve the world\u2019s largest technology companies."
   ],
   "locality_evidence": [
    "# Crusoe Energy BYOP Strategy, 1.4 GW Childress Project with Lancium, 1.6 GW Meta Deal, and 40 GW Pipeline (2025 to 2026)",
    "The **1.4 GW** Crusoe Childress Campus, the **2.1 GW** Abilene campus, and the **530 MW** Goodnight campus all exemplify this shift, moving from megawatts of stranded energy capture to gigawatts of dedicated power infrastructure designed to serve the world\u2019s largest technology companies."
   ],
   "state_evidence": [
    "## Crusoe Energy\u2019s 12 GWh Form Energy Deal and Lancium Partnership",
    "| Partner / Project | Time Frame | Details and Strategic Purpose | Source |",
    "Table: Crusoe Energy Strategic Partnerships (2025-2026)",
    "Joint development of the **1.4 GW** AI data center campus in Childress, Texas. **Lancium** provides the land and will manage the energy infrastructure."
   ],
   "capacity_gw_evidence": [
    "# Crusoe Energy BYOP Strategy, 1.4 GW Childress Project with Lancium, 1.6 GW Meta Deal, and 40 GW Pipeline (2025 to 2026)",
    "The **1.4 GW** Crusoe Childress Campus, the **2.1 GW** Abilene campus, and the **530 MW** Goodnight campus all exemplify this shift, moving from megawatts of stranded energy capture to gigawatts of dedicated power infrastructure designed to serve the world\u2019s largest technology companies."
   ],
   "builder_evidence": [
    "# Crusoe Energy BYOP Strategy, 1.4 GW Childress Project with Lancium, 1.6 GW Meta Deal, and 40 GW Pipeline (2025 to 2026)",
    "The **1.4 GW** Crusoe Childress Campus, the **2.1 GW** Abilene campus, and the **530 MW** Goodnight campus all exemplify this shift, moving from megawatts of stranded energy capture to gigawatts of dedicated power infrastructure designed to serve the world\u2019s largest technology companies."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Scenario Modeling: Crusoe Energy\u2019s Q 3 2026 Childress Construction Start",
    "The critical event to watch is the **Q 3 2026** construction start of the Childress campus; successful execution will validate its partnership model with **Lancium** and modular approach with **Energy Vault**, while delays could signal systemic supply chain or integration challenges."
   ],
   "announcement_date_evidence": [
    "## Crusoe Energy\u2019s 12 GWh Form Energy Deal and Lancium Partnership",
    "| Partner / Project | Time Frame | Details and Strategic Purpose | Source |",
    "Table: Crusoe Energy Strategic Partnerships (2025-2026)",
    "The partnership with **Lancium**, announced in **July 2026**, for the **1.4 GW** Childress campus is a template for **Crusoe\u2019s** site development strategy."
   ]
  },
  {
   "url": "https://enkiai.com/data-center/crusoe-energy-stranded-energy-texas",
   "title": "Crusoe Energy Distributed Energy 2026, 12 GWh Form Energy",
   "published_at": "2026-08-04T12:11:37",
   "project": "Abilene campus",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 2.1,
   "builder": "Crusoe Energy",
   "ai_customer": "Microsoft",
   "status": null,
   "announcement_date": "2026-03-01",
   "project_evidence": [
    "# Crusoe Energy BYOP Strategy, 1.4 GW Childress Project with Lancium, 1.6 GW Meta Deal, and 40 GW Pipeline (2025 to 2026)",
    "The **1.4 GW** Crusoe Childress Campus, the **2.1 GW** Abilene campus, and the **530 MW** Goodnight campus all exemplify this shift, moving from megawatts of stranded energy capture to gigawatts of dedicated power infrastructure designed to serve the world\u2019s largest technology companies."
   ],
   "locality_evidence": [
    "# Crusoe Energy BYOP Strategy, 1.4 GW Childress Project with Lancium, 1.6 GW Meta Deal, and 40 GW Pipeline (2025 to 2026)",
    "The **1.4 GW** Crusoe Childress Campus, the **2.1 GW** Abilene campus, and the **530 MW** Goodnight campus all exemplify this shift, moving from megawatts of stranded energy capture to gigawatts of dedicated power infrastructure designed to serve the world\u2019s largest technology companies."
   ],
   "state_evidence": [
    "## Crusoe Energy\u2019s 12 GWh Form Energy Deal and Lancium Partnership",
    "| Partner / Project | Time Frame | Details and Strategic Purpose | Source |",
    "Table: Crusoe Energy Strategic Partnerships (2025-2026)",
    "Customer offtake agreement for a new **900 MW** AI factory campus in Abilene, Texas, expanding the site\u2019s total capacity to **2.1 GW**."
   ],
   "capacity_gw_evidence": [
    "# Crusoe Energy BYOP Strategy, 1.4 GW Childress Project with Lancium, 1.6 GW Meta Deal, and 40 GW Pipeline (2025 to 2026)",
    "The **1.4 GW** Crusoe Childress Campus, the **2.1 GW** Abilene campus, and the **530 MW** Goodnight campus all exemplify this shift, moving from megawatts of stranded energy capture to gigawatts of dedicated power infrastructure designed to serve the world\u2019s largest technology companies."
   ],
   "builder_evidence": [
    "# Crusoe Energy BYOP Strategy, 1.4 GW Childress Project with Lancium, 1.6 GW Meta Deal, and 40 GW Pipeline (2025 to 2026)",
    "The **1.4 GW** Crusoe Childress Campus, the **2.1 GW** Abilene campus, and the **530 MW** Goodnight campus all exemplify this shift, moving from megawatts of stranded energy capture to gigawatts of dedicated power infrastructure designed to serve the world\u2019s largest technology companies."
   ],
   "ai_customer_evidence": [
    "## Crusoe Energy\u2019s 12 GWh Form Energy Deal and Lancium Partnership",
    "| Partner / Project | Time Frame | Details and Strategic Purpose | Source |",
    "Table: Crusoe Energy Strategic Partnerships (2025-2026)",
    "Customer offtake agreement for a new **900 MW** AI factory campus in Abilene, Texas, expanding the site\u2019s total capacity to **2.1 GW**."
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "## Crusoe Energy\u2019s 12 GWh Form Energy Deal and Lancium Partnership",
    "| Partner / Project | Time Frame | Details and Strategic Purpose | Source |",
    "Table: Crusoe Energy Strategic Partnerships (2025-2026)",
    "Customer offtake agreement for a new **900 MW** AI factory campus in Abilene, Texas, expanding the site\u2019s total capacity to **2.1 GW**."
   ]
  },
  {
   "url": "https://measuredai.substack.com/p/microsoft-fairwater-wisconsin-data-centers",
   "title": "Microsoft's Fairwater Wisconsin: The Flagship AI Data Center, Built on Foxconn's Foundations",
   "published_at": "2026-07-22T11:05:20",
   "project": "Fairwater",
   "locality": "Mount Pleasant",
   "state": "Wisconsin",
   "capacity_gw": 2.0,
   "builder": "Microsoft",
   "ai_customer": "OpenAI",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# Microsoft's Fairwater Wisconsin: The Flagship AI Data Center, Built on Foxconn's Foundations",
    "In mid-April, Microsoft\u2019s CEO, Satya Nadella, announced what had been switched on: the Fairwater data center in Wisconsin was \u201cgoing live, ahead of schedule\u201d \u2014 six weeks ahead, he told investors, allowing Microsoft to recognize revenue earlier."
   ],
   "locality_evidence": [
    "# Microsoft's Fairwater Wisconsin: The Flagship AI Data Center, Built on Foxconn's Foundations",
    "The machine behind those claims sits on former farmland in Mount Pleasant, Racine County, about 30 miles south of Milwaukee: **315 acres**, **three buildings**, **1.2 million square feet** under roof, wired to run as a single cluster of \u201chundreds of thousands\u201d of NVIDIA GB200 GPUs \u2014 part of a campus Nadella says will \u201c**scale to 2 GW alone**,\u201d on land where Microsoft now holds more than **2,000 acres**."
   ],
   "state_evidence": [
    "# Microsoft's Fairwater Wisconsin: The Flagship AI Data Center, Built on Foxconn's Foundations",
    "In mid-April, Microsoft\u2019s CEO, Satya Nadella, announced what had been switched on: the Fairwater data center in Wisconsin was \u201cgoing live, ahead of schedule\u201d \u2014 six weeks ahead, he told investors, allowing Microsoft to recognize revenue earlier."
   ],
   "capacity_gw_evidence": [
    "# Microsoft's Fairwater Wisconsin: The Flagship AI Data Center, Built on Foxconn's Foundations",
    "A $20 billion Microsoft self-build on the land Wisconsin assembled for Foxconn \u2014 four campuses, 19 data center buildings, and 11.2 million square feet across 2,000+ acres, with a stated path to 2 GW.",
    "The machine behind those claims sits on former farmland in Mount Pleasant, Racine County, about 30 miles south of Milwaukee: **315 acres**, **three buildings**, **1.2 million square feet** under roof, wired to run as a single cluster of \u201chundreds of thousands\u201d of NVIDIA GB200 GPUs \u2014 part of a campus Nadella says will \u201c**scale to 2 GW alone**,\u201d on land where Microsoft now holds more than **2,000 acres**."
   ],
   "builder_evidence": [
    "# Microsoft's Fairwater Wisconsin: The Flagship AI Data Center, Built on Foxconn's Foundations",
    "A $20 billion Microsoft self-build on the land Wisconsin assembled for Foxconn \u2014 four campuses, 19 data center buildings, and 11.2 million square feet across 2,000+ acres, with a stated path to 2 GW."
   ],
   "ai_customer_evidence": [
    "# Microsoft's Fairwater Wisconsin: The Flagship AI Data Center, Built on Foxconn's Foundations",
    "The GPU building is **fully dedicated to OpenAI**, with OpenAI placing its training workloads inside Microsoft\u2019s Fairwater campus."
   ],
   "status_evidence": [
    "# Microsoft's Fairwater Wisconsin: The Flagship AI Data Center, Built on Foxconn's Foundations",
    "On **June 23, 2026**, Microsoft declared the first data center campus fully operational, and company president Brad Smith [pronounced](https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/) Wisconsin \u201chome to the world\u2019s most powerful supercomputer.\u201d"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://fermiamerica.com",
   "title": "Gigawatt Scale Power for Next-Gen AI | Fermi America",
   "published_at": "2025-06-24T01:36:36",
   "project": "Project Matador",
   "locality": "Texas Panhandle",
   "state": "Texas",
   "capacity_gw": 17.0,
   "builder": "Fermi",
   "ai_customer": "TensorWave",
   "status": "completed the first phase of construction",
   "announcement_date": null,
   "project_evidence": [
    "Fermi\u2019s Project Matador will be a 17GW private power and AI campus in the Texas Panhandle.",
    "Private Power. Hyperscale Ready.",
    "# Hyperscale Workloads."
   ],
   "locality_evidence": [
    "Fermi\u2019s Project Matador will be a 17GW private power and AI campus in the Texas Panhandle.",
    "Private Power. Hyperscale Ready.",
    "# Hyperscale Workloads."
   ],
   "state_evidence": [
    "Fermi\u2019s Project Matador will be a 17GW private power and AI campus in the Texas Panhandle.",
    "Private Power. Hyperscale Ready.",
    "# Hyperscale Workloads."
   ],
   "capacity_gw_evidence": [
    "Fermi\u2019s Project Matador will be a 17GW private power and AI campus in the Texas Panhandle.",
    "Private Power. Hyperscale Ready.",
    "# Hyperscale Workloads."
   ],
   "builder_evidence": [
    "Fermi\u2019s Project Matador will be a 17GW private power and AI campus in the Texas Panhandle.",
    "Private Power. Hyperscale Ready.",
    "# Hyperscale Workloads."
   ],
   "ai_customer_evidence": [
    "Fermi announced a binding lease agreement with TensorWave, an AI cloud infrastructure provider, marking one of the first commercial tenant commitments for Project Matador and validating demand for its AI-powered energy campus.",
    "Private Power. Hyperscale Ready.",
    "## Fermi Announces Binding Lease Agreement with TensorWave"
   ],
   "status_evidence": [
    "It\u2019s the world\u2019s largest private HyperGrid\u2122 campus, with ~6 of 17GW already permitted on ~8,400 acres in the Texas Panhandle.",
    "We\u2019ve secured ~2GW of generation assets and completed the first phase of construction.",
    "Private Power. Hyperscale Ready."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://theoutpost.ai/news-story/pennsylvania-s-largest-coal-plant-to-become-massive-ai-powered-data-center-campus-13931",
   "title": "Pennsylvania's Largest Coal Plant to Become Massive AI-Powered Data Center Campus",
   "published_at": "2025-04-03T00:03:23",
   "project": "Homer City Energy Campus",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Homer City Redevelopment",
   "ai_customer": null,
   "status": "Proposed",
   "announcement_date": "2025-04-02",
   "project_evidence": [
    "Pennsylvania's Largest Coal Plant to Become Massive AI-Powered Data Center Campus",
    "The Homer City Energy Campus will be more than 3,200 acres, and GE Vernova (GE-1.76%) will support the project with seven hydrogen-enabled, gas-fired turbines -- the first of which are expected to be delivered starting next year."
   ],
   "locality_evidence": [
    "Pennsylvania's Largest Coal Plant to Become Massive AI-Powered Data Center Campus",
    "Building at the former Homer City Generating Station has its advantages."
   ],
   "state_evidence": [
    "Pennsylvania's Largest Coal Plant to Become Massive AI-Powered Data Center Campus",
    "PA's largest coal plant to become 4.5GW gas-fired AI hub"
   ],
   "capacity_gw_evidence": [
    "Pennsylvania's Largest Coal Plant to Become Massive AI-Powered Data Center Campus",
    "Developers on Wednesday announced plans to bring up to 4.5 gigawatts of natural gas-fired power online by 2027 at the site of what was once Pennsylvania's largest coal plant, as part of a proposed datacenter campus running AI and high-performance computing workloads."
   ],
   "builder_evidence": [
    "Pennsylvania's Largest Coal Plant to Become Massive AI-Powered Data Center Campus",
    "Development of the 3,200-acre natural gas-powered datacenter campus is being led by Homer City Redevelopment (HCR) and is expected to exceed $10 billion for power infrastructure and site readiness alone, with additional billions anticipated for the datacenter development."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Pennsylvania's Largest Coal Plant to Become Massive AI-Powered Data Center Campus",
    "Developers on Wednesday announced plans to bring up to 4.5 gigawatts of natural gas-fired power online by 2027 at the site of what was once Pennsylvania's largest coal plant, as part of a proposed datacenter campus running AI and high-performance computing workloads."
   ],
   "announcement_date_evidence": [
    "Pennsylvania's Largest Coal Plant to Become Massive AI-Powered Data Center Campus",
    "Developers on Wednesday announced plans to bring up to 4.5 gigawatts of natural gas-fired power online by 2027 at the site of what was once Pennsylvania's largest coal plant, as part of a proposed datacenter campus running AI and high-performance computing workloads."
   ]
  },
  {
   "url": "https://substack.com/redirect/60ff470f-dc72-45f5-8a20-9e1cb0982e31?j=eyJ1IjoiM3djM2MxIn0.OGuf1Irm-qb700DahBb35RT9QTn8SiZLleBWozyCeUk",
   "title": "Up to 5GW data center with behind-the-meter hydrogen power promised for Laredo, Texas",
   "published_at": "2026-05-21T10:22:52",
   "project": "Data City",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corporation",
   "ai_customer": null,
   "status": "pitched",
   "announcement_date": null,
   "project_evidence": [
    "Energy Abundance Development Corporation has unveiled the project, Data City, which could be built near the city of Laredo in southwest Texas, near the border with Mexico."
   ],
   "locality_evidence": [
    "Energy Abundance Development Corporation has unveiled the project, Data City, which could be built near the city of Laredo in southwest Texas, near the border with Mexico."
   ],
   "state_evidence": [
    "A data center campus of up to 5GW that utilizes its own behind-the-meter power supply is being pitched for 50,000 acres of land in Texas.",
    "Energy Abundance Development Corporation has unveiled the project, Data City, which could be built near the city of Laredo in southwest Texas, near the border with Mexico."
   ],
   "capacity_gw_evidence": [
    "A data center campus of up to 5GW that utilizes its own behind-the-meter power supply is being pitched for 50,000 acres of land in Texas."
   ],
   "builder_evidence": [
    "Energy Abundance Development Corporation has unveiled the project, Data City, which could be built near the city of Laredo in southwest Texas, near the border with Mexico."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "A data center campus of up to 5GW that utilizes its own behind-the-meter power supply is being pitched for 50,000 acres of land in Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://idcnova.com/html/1/59/153/5322.html",
   "title": "Google Confirms 1GW Michigan Data Center Campus, Partners with DTE Energy on 2.7GW Clean Power Deal",
   "published_at": null,
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Walbridge",
   "ai_customer": "Google",
   "status": "planned",
   "announcement_date": "2025-12",
   "project_evidence": [
    "Google Confirms 1GW Michigan Data Center Campus, Partners with DTE Energy on 2.7GW Clean Power Deal",
    "The development, previously known under the codename \"Project Cannoli,\" was initially proposed by developer Panattoni in December 2025."
   ],
   "locality_evidence": [
    "Google Confirms 1GW Michigan Data Center Campus, Partners with DTE Energy on 2.7GW Clean Power Deal",
    "The campus will be constructed on approximately 130 acres of a larger 282-acre plot in Van Buren Township, strategically located between major interstates."
   ],
   "state_evidence": [
    "Google Confirms 1GW Michigan Data Center Campus, Partners with DTE Energy on 2.7GW Clean Power Deal",
    "In a significant move underscoring the intense demand for AI and cloud computing infrastructure, Google has officially confirmed its role as the anchor tenant for a planned one-gigawatt (1GW) data center campus near Detroit, Michigan."
   ],
   "capacity_gw_evidence": [
    "Google Confirms 1GW Michigan Data Center Campus, Partners with DTE Energy on 2.7GW Clean Power Deal",
    "In a significant move underscoring the intense demand for AI and cloud computing infrastructure, Google has officially confirmed its role as the anchor tenant for a planned one-gigawatt (1GW) data center campus near Detroit, Michigan."
   ],
   "builder_evidence": [
    "Google Confirms 1GW Michigan Data Center Campus, Partners with DTE Energy on 2.7GW Clean Power Deal",
    "Site plans indicate a complex exceeding 800,000 square feet, likely comprising three data center buildings alongside supporting networking and office structures, with Walbridge serving as the general contractor."
   ],
   "ai_customer_evidence": [
    "Google Confirms 1GW Michigan Data Center Campus, Partners with DTE Energy on 2.7GW Clean Power Deal",
    "In a significant move underscoring the intense demand for AI and cloud computing infrastructure, Google has officially confirmed its role as the anchor tenant for a planned one-gigawatt (1GW) data center campus near Detroit, Michigan."
   ],
   "status_evidence": [
    "Google Confirms 1GW Michigan Data Center Campus, Partners with DTE Energy on 2.7GW Clean Power Deal",
    "In a significant move underscoring the intense demand for AI and cloud computing infrastructure, Google has officially confirmed its role as the anchor tenant for a planned one-gigawatt (1GW) data center campus near Detroit, Michigan."
   ],
   "announcement_date_evidence": [
    "Google Confirms 1GW Michigan Data Center Campus, Partners with DTE Energy on 2.7GW Clean Power Deal",
    "The development, previously known under the codename \"Project Cannoli,\" was initially proposed by developer Panattoni in December 2025."
   ]
  },
  {
   "url": "https://cozzyenergysolutions.com/miso/kentucky-data-center-deal-approved-amid-community-concerns",
   "title": "Kentucky Data Center Deal Approved Amid Community Concerns",
   "published_at": "2026-08-22T11:39:03",
   "project": "Muskie Data Campus",
   "locality": "Ashland",
   "state": "Kentucky",
   "capacity_gw": 2.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# Kentucky Data Center Deal Approved Amid Community Concerns",
    "The company\u2019s CEO recently told investors that TeraWulf intends to double the size of the Muskie Data Campus, located about 20 miles west of Ashland, expanding its capacity from 1 gigawatt to 2 gigawatts."
   ],
   "locality_evidence": [
    "# Kentucky Data Center Deal Approved Amid Community Concerns",
    "The company\u2019s CEO recently told investors that TeraWulf intends to double the size of the Muskie Data Campus, located about 20 miles west of Ashland, expanding its capacity from 1 gigawatt to 2 gigawatts."
   ],
   "state_evidence": [
    "# Kentucky Data Center Deal Approved Amid Community Concerns",
    "While TeraWulf\u2019s Hancock County project is not the largest currently under consideration statewide, its proposal for a 1-gigawatt campus along the border of Boyd and Greenup counties in Eastern Kentucky represents a significant undertaking.",
    "The company\u2019s CEO recently told investors that TeraWulf intends to double the size of the Muskie Data Campus, located about 20 miles west of Ashland, expanding its capacity from 1 gigawatt to 2 gigawatts."
   ],
   "capacity_gw_evidence": [
    "# Kentucky Data Center Deal Approved Amid Community Concerns",
    "The company\u2019s CEO recently told investors that TeraWulf intends to double the size of the Muskie Data Campus, located about 20 miles west of Ashland, expanding its capacity from 1 gigawatt to 2 gigawatts."
   ],
   "builder_evidence": [
    "# Kentucky Data Center Deal Approved Amid Community Concerns",
    "The company\u2019s CEO recently told investors that TeraWulf intends to double the size of the Muskie Data Campus, located about 20 miles west of Ashland, expanding its capacity from 1 gigawatt to 2 gigawatts."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://aol.com/articles/creekstone-energy-secures-43-000-110000000.html",
   "title": "Creekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI Campus",
   "published_at": "2026-07-23T11:00:00",
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy",
   "ai_customer": null,
   "status": "master-planned",
   "announcement_date": "2026-07-23",
   "project_evidence": [
    "# Creekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI Campus",
    "Creekstone Energy LLC now has it for the Delta Gigasite."
   ],
   "locality_evidence": [
    "# Creekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI Campus",
    "It provides a contracted fuel supply for the Delta Gigasite, its gigawatt-scale, behind-the-meter AI energy campus in Millard County."
   ],
   "state_evidence": [
    "# Creekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI Campus",
    "DELTA, Utah--(BUSINESS WIRE)--Jul 23, 2026--"
   ],
   "capacity_gw_evidence": [
    "# Creekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI Campus",
    "It is enough firm fuel to support roughly 220 megawatts of behind-the-meter generation, the first block of a campus master-planned to scale past 10 gigawatts."
   ],
   "builder_evidence": [
    "# Creekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI Campus",
    "Creekstone Energy LLC now has it for the Delta Gigasite."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Creekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI Campus",
    "It is enough firm fuel to support roughly 220 megawatts of behind-the-meter generation, the first block of a campus master-planned to scale past 10 gigawatts."
   ],
   "announcement_date_evidence": [
    "# Creekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI Campus",
    "DELTA, Utah--(BUSINESS WIRE)--Jul 23, 2026--"
   ]
  },
  {
   "url": "https://valueaddvc.com/ai-buildout-tracker",
   "title": "AI Infrastructure Buildout Tracker: $690B (2026)",
   "published_at": null,
   "project": "Project Stargate",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "OpenAI, SoftBank, Oracle, and MGX",
   "ai_customer": null,
   "status": "broke ground in early 2025",
   "announcement_date": null,
   "project_evidence": [
    "The $690B AI Infrastructure Buildout, Mapped",
    "What is Project Stargate?",
    "$500 billion has been earmarked for Project Stargate, a joint venture between OpenAI, SoftBank, Oracle, and MGX to build the largest AI data center complex in history."
   ],
   "locality_evidence": [
    "The $690B AI Infrastructure Buildout, Mapped",
    "What is Project Stargate?",
    "The first campus in Abilene, Texas broke ground in early 2025 with a planned 1 GW initial capacity."
   ],
   "state_evidence": [
    "The $690B AI Infrastructure Buildout, Mapped",
    "What is Project Stargate?",
    "The first campus in Abilene, Texas broke ground in early 2025 with a planned 1 GW initial capacity."
   ],
   "capacity_gw_evidence": [
    "The $690B AI Infrastructure Buildout, Mapped",
    "What is Project Stargate?",
    "The first campus in Abilene, Texas broke ground in early 2025 with a planned 1 GW initial capacity."
   ],
   "builder_evidence": [
    "The $690B AI Infrastructure Buildout, Mapped",
    "What is Project Stargate?",
    "$500 billion has been earmarked for Project Stargate, a joint venture between OpenAI, SoftBank, Oracle, and MGX to build the largest AI data center complex in history."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The $690B AI Infrastructure Buildout, Mapped",
    "What is Project Stargate?",
    "The first campus in Abilene, Texas broke ground in early 2025 with a planned 1 GW initial capacity."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://en.wikipedia.org/wiki/Hyperion%20(data%20center)",
   "title": "Hyperion Data Center",
   "published_at": "2026-08-22T22:56:42",
   "project": "Hyperion Data Center",
   "locality": "Holly Ridge",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta Platforms",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": "2024-12-04",
   "project_evidence": [
    "# Infobox",
    "- **Hyperion Data Center**",
    "The Richland Parish Data Center, nicknamed \" Hyperion \", is a planned artificial intelligence data center by Meta Platforms under-construction along Highway La. 183 in Richland Parish, Louisiana, just outside of Holly Ridge."
   ],
   "locality_evidence": [
    "# Infobox",
    "- Location: Holly Ridge, Louisiana, United States",
    "The Richland Parish Data Center, nicknamed \" Hyperion \", is a planned artificial intelligence data center by Meta Platforms under-construction along Highway La. 183 in Richland Parish, Louisiana, just outside of Holly Ridge."
   ],
   "state_evidence": [
    "# Infobox",
    "- Location: Holly Ridge, Louisiana, United States",
    "The Richland Parish Data Center, nicknamed \" Hyperion \", is a planned artificial intelligence data center by Meta Platforms under-construction along Highway La. 183 in Richland Parish, Louisiana, just outside of Holly Ridge."
   ],
   "capacity_gw_evidence": [
    "In July 2026, Meta announced the campus would expand to 5 gigawatts of compute capacity, raising planned investment to more than US$50 billion, with roughly 2 GW expected online by 2030 and full build-out around 2032."
   ],
   "builder_evidence": [
    "# Infobox",
    "- Owner: Meta Platforms",
    "The Richland Parish Data Center, nicknamed \" Hyperion \", is a planned artificial intelligence data center by Meta Platforms under-construction along Highway La. 183 in Richland Parish, Louisiana, just outside of Holly Ridge."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Infobox",
    "- Status: Under construction",
    "The Richland Parish Data Center, nicknamed \" Hyperion \", is a planned artificial intelligence data center by Meta Platforms under-construction along Highway La. 183 in Richland Parish, Louisiana, just outside of Holly Ridge."
   ],
   "announcement_date_evidence": [
    "The data center was first announced on 04 December 2024, though its full scale was yet to be revealed."
   ]
  },
  {
   "url": "https://datatech.disruptsmedia.com/data-centres/crusoe-and-lancium-plan-1-gw-ai-data-centre-campus-texas",
   "title": "Crusoe and Lancium plan 1 GW AI data centre campus in Texas",
   "published_at": "2026-08-15T18:00:00",
   "project": "Childress campus",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Crusoe and Lancium plan 1 GW AI data centre campus in Texas",
    "The 270-acre Childress campus will serve a named hyperscaler, with construction starting Q3 2026 and closed-loop liquid cooling planned at full scale.",
    "Crusoe and Lancium have announced a 1.0 gigawatt AI data centre campus in Childress, Texas, extending a partnership structure the two companies first deployed in Abilene."
   ],
   "locality_evidence": [
    "# Crusoe and Lancium plan 1 GW AI data centre campus in Texas",
    "The 270-acre Childress campus will serve a named hyperscaler, with construction starting Q3 2026 and closed-loop liquid cooling planned at full scale.",
    "Crusoe and Lancium have announced a 1.0 gigawatt AI data centre campus in Childress, Texas, extending a partnership structure the two companies first deployed in Abilene."
   ],
   "state_evidence": [
    "# Crusoe and Lancium plan 1 GW AI data centre campus in Texas",
    "Crusoe and Lancium have announced a 1.0 gigawatt AI data centre campus in Childress, Texas, extending a partnership structure the two companies first deployed in Abilene."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium plan 1 GW AI data centre campus in Texas",
    "Crusoe and Lancium have announced a 1.0 gigawatt AI data centre campus in Childress, Texas, extending a partnership structure the two companies first deployed in Abilene."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium plan 1 GW AI data centre campus in Texas",
    "Crusoe and Lancium have announced a 1.0 gigawatt AI data centre campus in Childress, Texas, extending a partnership structure the two companies first deployed in Abilene."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Crusoe and Lancium plan 1 GW AI data centre campus in Texas",
    "The 270-acre Childress campus will serve a named hyperscaler, with construction starting Q3 2026 and closed-loop liquid cooling planned at full scale."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://kdc.bussetech.com/sites/vantage-shackelford",
   "title": "Vantage Frontier Mega-Campus \u00b7 kdc",
   "published_at": null,
   "project": "Vantage Frontier Mega-Campus",
   "locality": "Shackelford",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": "OpenAI",
   "status": "under-construction",
   "announcement_date": "2026-07-07",
   "project_evidence": [
    "# Vantage Frontier Mega-Campus",
    "## Facts",
    "Facts"
   ],
   "locality_evidence": [
    "Location | Shackelford, TX |",
    "## Facts",
    "Facts"
   ],
   "state_evidence": [
    "[Sites](/sites/) / TX / Shackelford",
    "- [Vantage Data Centers unveils plans for Frontier, a $25B mega-campus in Texas to meet unprecedented AI demand](https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/) \u2014 Vantage Data Centers",
    "- [Vantage plots 1.4GW data center campus in Texas](https://www.datacenterdynamics.com/en/news/vantage-plots-14gw-data-center-campus-in-texas/) \u2014 Data Center Dynamics",
    "## Facts",
    "Facts"
   ],
   "capacity_gw_evidence": [
    "| Capacity | 1400 MW |",
    "## Facts",
    "Facts"
   ],
   "builder_evidence": [
    "| Operator | Vantage Data Centers *(colo)* |",
    "## Facts",
    "Facts"
   ],
   "ai_customer_evidence": [
    "Broke ground 2025 (reportedly for OpenAI) \u2014 status resolved to under-construction.",
    "## Signal notes"
   ],
   "status_evidence": [
    "**Status:** under-construction \u00b7 **Confidence:** high",
    "## Facts",
    "Facts"
   ],
   "announcement_date_evidence": [
    "| First recorded | 2026-07-07 |",
    "## Facts",
    "Facts"
   ]
  },
  {
   "url": "https://cdn.financialreports.eu/financialreports/media/filings/17756/2026/RNS/17756_rns_2026-02-20_e91ada01-0960-4c80-b99c-cd9f10ee3971.html",
   "title": "National Storage Mechanism | Additional information",
   "published_at": null,
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "locality_evidence": [
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus.",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "state_evidence": [
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus.",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "capacity_gw_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Fermi America combines cutting-edge technology with a deep bench of proven world-class multi-disciplinary leaders with a combined 25 GW of experience, to create the world's largest, 11 GW next-gen private grid, helping ensure America's energy and AI dominance."
   ],
   "builder_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://nscale.com/ai-infrastructure/west-virginia",
   "title": "Monarch Compute Campus West Virginia | AI Infrastructure Development",
   "published_at": null,
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "AI DATA CENTER",
    "# Monarch Compute Campus West Virginia, United States",
    "Built from the ground up in Mason County, the Monarch Compute Campus will bring jobs, investment, and long-term opportunity through one of the world\u2019s largest AI infrastructure developments, while preserving the character and values that make this community special."
   ],
   "locality_evidence": [
    "AI DATA CENTER",
    "# Monarch Compute Campus West Virginia, United States",
    "Built from the ground up in Mason County, the Monarch Compute Campus will bring jobs, investment, and long-term opportunity through one of the world\u2019s largest AI infrastructure developments, while preserving the character and values that make this community special."
   ],
   "state_evidence": [
    "AI DATA CENTER",
    "# Monarch Compute Campus West Virginia, United States",
    "Built from the ground up in Mason County, the Monarch Compute Campus will bring jobs, investment, and long-term opportunity through one of the world\u2019s largest AI infrastructure developments, while preserving the character and values that make this community special."
   ],
   "capacity_gw_evidence": [
    "AI DATA CENTER",
    "# Monarch Compute Campus West Virginia, United States",
    "Phase 1 is engineered to host 1.35GW of AI computing capacity, with delivery targeted by early 2028. Phase 1 is just the start: Monarch is designed as a multi-phase campus, with a clear expansion path to 8GW+ as workload demand grows."
   ],
   "builder_evidence": [
    "AI DATA CENTER",
    "# Monarch Compute Campus West Virginia, United States",
    "It is also part of Nscale's international portfolio of purpose-built AI campuses, bringing the same operational standards that underpin our European infrastructure to the United States."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://open.substack.com/pub/globaldatacenterhub/p/who-eats-the-loss-when-the-ai-tenant?r=1lw00j",
   "title": "Who Eats the Loss When the AI Tenant Walks | This Week in Data Centers",
   "published_at": "2026-08-30T02:00:39",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "Georgia Power",
   "ai_customer": "OpenAI",
   "status": "approved",
   "announcement_date": "2026-08-26",
   "project_evidence": [
    "# Who Eats the Loss When the AI Tenant Walks | This Week in Data Centers",
    "#### **What Georgia Sold to Get 3.2 Gigawatts**",
    "Georgia Power [won staff approval on 26 August](https://www.cbsnews.com/atlanta/news/georgia-power-gets-clearance-to-serve-openais-massive-ai-data-center-in-effingham-county/) to serve OpenAI\u2019s Project Camellia in Effingham County."
   ],
   "locality_evidence": [
    "# Who Eats the Loss When the AI Tenant Walks | This Week in Data Centers",
    "#### **What Georgia Sold to Get 3.2 Gigawatts**",
    "Georgia Power [won staff approval on 26 August](https://www.cbsnews.com/atlanta/news/georgia-power-gets-clearance-to-serve-openais-massive-ai-data-center-in-effingham-county/) to serve OpenAI\u2019s Project Camellia in Effingham County."
   ],
   "state_evidence": [
    "# Who Eats the Loss When the AI Tenant Walks | This Week in Data Centers",
    "### Georgia Power won approval for a fully redacted contract serving OpenAI's 3.2GW Effingham County campus. Inside the no-recovery pledge, Nvidia's Cloverleaf stake, and Spain's hourly renewables rule.",
    "Georgia Power [won staff approval on 26 August](https://www.cbsnews.com/atlanta/news/georgia-power-gets-clearance-to-serve-openais-massive-ai-data-center-in-effingham-county/) to serve OpenAI\u2019s Project Camellia in Effingham County."
   ],
   "capacity_gw_evidence": [
    "# Who Eats the Loss When the AI Tenant Walks | This Week in Data Centers",
    "### Georgia Power won approval for a fully redacted contract serving OpenAI's 3.2GW Effingham County campus. Inside the no-recovery pledge, Nvidia's Cloverleaf stake, and Spain's hourly renewables rule.",
    "The contract covers 3,200 megawatts over 25 years."
   ],
   "builder_evidence": [
    "# Who Eats the Loss When the AI Tenant Walks | This Week in Data Centers",
    "#### **What Georgia Sold to Get 3.2 Gigawatts**",
    "Georgia Power [won staff approval on 26 August](https://www.cbsnews.com/atlanta/news/georgia-power-gets-clearance-to-serve-openais-massive-ai-data-center-in-effingham-county/) to serve OpenAI\u2019s Project Camellia in Effingham County."
   ],
   "ai_customer_evidence": [
    "# Who Eats the Loss When the AI Tenant Walks | This Week in Data Centers",
    "#### **What Georgia Sold to Get 3.2 Gigawatts**",
    "Georgia Power [won staff approval on 26 August](https://www.cbsnews.com/atlanta/news/georgia-power-gets-clearance-to-serve-openais-massive-ai-data-center-in-effingham-county/) to serve OpenAI\u2019s Project Camellia in Effingham County."
   ],
   "status_evidence": [
    "# Who Eats the Loss When the AI Tenant Walks | This Week in Data Centers",
    "#### **What Georgia Sold to Get 3.2 Gigawatts**",
    "Georgia Power [won staff approval on 26 August](https://www.cbsnews.com/atlanta/news/georgia-power-gets-clearance-to-serve-openais-massive-ai-data-center-in-effingham-county/) to serve OpenAI\u2019s Project Camellia in Effingham County."
   ],
   "announcement_date_evidence": [
    "# Who Eats the Loss When the AI Tenant Walks | This Week in Data Centers",
    "#### **What Georgia Sold to Get 3.2 Gigawatts**",
    "Georgia Power [won staff approval on 26 August](https://www.cbsnews.com/atlanta/news/georgia-power-gets-clearance-to-serve-openais-massive-ai-data-center-in-effingham-county/) to serve OpenAI\u2019s Project Camellia in Effingham County."
   ]
  },
  {
   "url": "https://www.facebook.com/groups/mcnewsnetwork/posts/26588682044164434/",
   "title": "Magoffin County News Network | \ud83d\udcbb TeraWulf Announces Major High-Performance Computing Campus in Eastern Kentucky | Facebook",
   "published_at": null,
   "project": "Muskie Data Campus",
   "locality": "EastPark Industrial Park",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "TeraWulf Announces Major High-Performance Computing Campus in Eastern Kentucky",
    "TeraWulf announced plans to develop the Muskie Data Campus at EastPark Industrial Park in northeastern Kentucky, a large-scale high-performance computing and data center project expected to support more than 1 gigawatt of capacity over time."
   ],
   "locality_evidence": [
    "TeraWulf Announces Major High-Performance Computing Campus in Eastern Kentucky",
    "TeraWulf announced plans to develop the Muskie Data Campus at EastPark Industrial Park in northeastern Kentucky, a large-scale high-performance computing and data center project expected to support more than 1 gigawatt of capacity over time."
   ],
   "state_evidence": [
    "TeraWulf Announces Major High-Performance Computing Campus in Eastern Kentucky",
    "TeraWulf announced plans to develop the Muskie Data Campus at EastPark Industrial Park in northeastern Kentucky, a large-scale high-performance computing and data center project expected to support more than 1 gigawatt of capacity over time."
   ],
   "capacity_gw_evidence": [
    "TeraWulf Announces Major High-Performance Computing Campus in Eastern Kentucky",
    "TeraWulf announced plans to develop the Muskie Data Campus at EastPark Industrial Park in northeastern Kentucky, a large-scale high-performance computing and data center project expected to support more than 1 gigawatt of capacity over time."
   ],
   "builder_evidence": [
    "TeraWulf Announces Major High-Performance Computing Campus in Eastern Kentucky",
    "TeraWulf announced plans to develop the Muskie Data Campus at EastPark Industrial Park in northeastern Kentucky, a large-scale high-performance computing and data center project expected to support more than 1 gigawatt of capacity over time."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "TeraWulf Announces Major High-Performance Computing Campus in Eastern Kentucky",
    "TeraWulf announced plans to develop the Muskie Data Campus at EastPark Industrial Park in northeastern Kentucky, a large-scale high-performance computing and data center project expected to support more than 1 gigawatt of capacity over time."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://blockspace.media/insight/hut-8-secures-billion-ai-data-center-lease",
   "title": "KBW maintains HUT \u2018Outperform\u2019 rating, $138 price target following $19.6B Beacon Point deal - Blockspace",
   "published_at": "2026-07-20T13:55:12",
   "project": "Beacon Point",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "fully commercialized",
   "announcement_date": "2026-07-20",
   "project_evidence": [
    "# KBW maintains HUT \u2018Outperform\u2019 rating, $138 price target following $19.6B Beacon Point deal",
    "Investment bank Keefe, Bruyette & Woods is maintaining its \u201cOutperform\u201d rating and $138 price target for Hut 8, following the AI infrastructure developers fully commercialized lease announcement a its one-gigawatt Beacon Point AI data center campus through a second 15-year lease covering 352 MW of IT capacity."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# KBW maintains HUT \u2018Outperform\u2019 rating, $138 price target following $19.6B Beacon Point deal",
    "The [July 20 agreement](https://www.prnewswire.com/news-releases/hut-8-fully-commercializes-1-gw-beacon-point-ai-data-center-campus-with-second-352-mw-it-lease-bringing-campus-level-base-term-contract-value-to-19-6-billion-302829514.html) brings contracted IT capacity at the Nueces County, Texas, campus to 704 MW."
   ],
   "capacity_gw_evidence": [
    "# KBW maintains HUT \u2018Outperform\u2019 rating, $138 price target following $19.6B Beacon Point deal",
    "Investment bank Keefe, Bruyette & Woods is maintaining its \u201cOutperform\u201d rating and $138 price target for Hut 8, following the AI infrastructure developers fully commercialized lease announcement a its one-gigawatt Beacon Point AI data center campus through a second 15-year lease covering 352 MW of IT capacity."
   ],
   "builder_evidence": [
    "# KBW maintains HUT \u2018Outperform\u2019 rating, $138 price target following $19.6B Beacon Point deal",
    "Investment bank Keefe, Bruyette & Woods is maintaining its \u201cOutperform\u201d rating and $138 price target for Hut 8, following the AI infrastructure developers fully commercialized lease announcement a its one-gigawatt Beacon Point AI data center campus through a second 15-year lease covering 352 MW of IT capacity."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# KBW maintains HUT \u2018Outperform\u2019 rating, $138 price target following $19.6B Beacon Point deal",
    "Investment bank Keefe, Bruyette & Woods is maintaining its \u201cOutperform\u201d rating and $138 price target for Hut 8, following the AI infrastructure developers fully commercialized lease announcement a its one-gigawatt Beacon Point AI data center campus through a second 15-year lease covering 352 MW of IT capacity."
   ],
   "announcement_date_evidence": [
    "# KBW maintains HUT \u2018Outperform\u2019 rating, $138 price target following $19.6B Beacon Point deal",
    "Jul 20, 2026"
   ]
  },
  {
   "url": "https://reddit.com/r/irenstocks/comments/1s706cx/iren_sweetwater_site_inside_the_2gw_ai",
   "title": "IREN Sweetwater Site: Inside the 2GW AI Infrastructure Campus",
   "published_at": "2026-03-29T16:47:42",
   "project": "Sweetwater",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "building out",
   "announcement_date": null,
   "project_evidence": [
    "Hey everyone I just published my new analysis on the IREN Sweetwater campus.",
    "The Sweetwater Hub is IREN's largest infrastructure project to date delivering 2 gigawatts of contracted power capacity across approximately 1800 acres in West Texas."
   ],
   "locality_evidence": [
    "It is structured as two contiguous phases with Sweetwater 1 providing 1400 megawatts on 1300 acres in Sweetwater Texas and Sweetwater 2 adding 600 megawatts on 500 acres near Hamlin Texas."
   ],
   "state_evidence": [
    "The Sweetwater Hub is IREN's largest infrastructure project to date delivering 2 gigawatts of contracted power capacity across approximately 1800 acres in West Texas."
   ],
   "capacity_gw_evidence": [
    "The Sweetwater Hub is IREN's largest infrastructure project to date delivering 2 gigawatts of contracted power capacity across approximately 1800 acres in West Texas."
   ],
   "builder_evidence": [
    "Hey everyone I just published my new analysis on the IREN Sweetwater campus.",
    "The Sweetwater Hub is IREN's largest infrastructure project to date delivering 2 gigawatts of contracted power capacity across approximately 1800 acres in West Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Currently building out my final forecasting, price targets, energization scenarios, and financing/dilution cases."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://epoch.ai/blog/openai-stargate-where-the-us-sites-stand",
   "title": "OpenAI Stargate: where the US sites stand",
   "published_at": null,
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe",
   "ai_customer": "OpenAI",
   "status": "operating",
   "announcement_date": null,
   "project_evidence": [
    "## Introduction",
    "The Stargate project\u2019s flagship location is in Abilene, Texas.",
    "| [Abilene, Texas](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateAbilene) | 0.3 | 1.2 | Q2 2024 | Q4 2026 | On-site gas, Grid |"
   ],
   "locality_evidence": [
    "## Introduction",
    "The most advanced\u2014in Abilene, Texas\u2014is already operating at an estimated capacity of 0.3 gigawatts (GW).",
    "| [Abilene, Texas](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateAbilene) | 0.3 | 1.2 | Q2 2024 | Q4 2026 | On-site gas, Grid |"
   ],
   "state_evidence": [
    "## Introduction",
    "The most advanced\u2014in Abilene, Texas\u2014is already operating at an estimated capacity of 0.3 gigawatts (GW).",
    "| [Abilene, Texas](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateAbilene) | 0.3 | 1.2 | Q2 2024 | Q4 2026 | On-site gas, Grid |"
   ],
   "capacity_gw_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Abilene, Texas](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateAbilene) | 0.3 | 1.2 | Q2 2024 | Q4 2026 | On-site gas, Grid |"
   ],
   "builder_evidence": [
    "## Introduction",
    "Built by AI infrastructure company Crusoe, Abilene is the most complete Stargate site to date, with an estimated four of the eight buildings already operational."
   ],
   "ai_customer_evidence": [
    "## Introduction",
    "No project illustrates the scale of that effort more than Stargate, a $500 billion endeavor involving AI developer OpenAI, cloud provider Oracle, and investment company SoftBank."
   ],
   "status_evidence": [
    "## Introduction",
    "The most advanced\u2014in Abilene, Texas\u2014is already operating at an estimated capacity of 0.3 gigawatts (GW)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://epoch.ai/blog/openai-stargate-where-the-us-sites-stand",
   "title": "OpenAI Stargate: where the US sites stand",
   "published_at": null,
   "project": "Shackelford County",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Vantage",
   "ai_customer": "OpenAI",
   "status": "constructing",
   "announcement_date": null,
   "project_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Shackelford County, Texas](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateShackelford) | 0 | 2.0 | Q3 2025 | Q4 2028 | On-site gas |"
   ],
   "locality_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Shackelford County, Texas](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateShackelford) | 0 | 2.0 | Q3 2025 | Q4 2028 | On-site gas |"
   ],
   "state_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Shackelford County, Texas](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateShackelford) | 0 | 2.0 | Q3 2025 | Q4 2028 | On-site gas |"
   ],
   "capacity_gw_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Shackelford County, Texas](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateShackelford) | 0 | 2.0 | Q3 2025 | Q4 2028 | On-site gas |"
   ],
   "builder_evidence": [
    "## Introduction",
    "Just across the county line from the Abilene site, data center developer Vantage is constructing a massive 1,200-acre (4.9-square-kilometer) [campus](https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx) with 10 buildings."
   ],
   "ai_customer_evidence": [
    "## Introduction",
    "No project illustrates the scale of that effort more than Stargate, a $500 billion endeavor involving AI developer OpenAI, cloud provider Oracle, and investment company SoftBank."
   ],
   "status_evidence": [
    "## Introduction",
    "Just across the county line from the Abilene site, data center developer Vantage is constructing a massive 1,200-acre (4.9-square-kilometer) [campus](https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx) with 10 buildings."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://epoch.ai/blog/openai-stargate-where-the-us-sites-stand",
   "title": "OpenAI Stargate: where the US sites stand",
   "published_at": null,
   "project": "Project Jupiter",
   "locality": "Do\u00f1a Ana County",
   "state": "New Mexico",
   "capacity_gw": 2.2,
   "builder": "STACK Infrastructure",
   "ai_customer": "OpenAI",
   "status": "foundation work",
   "announcement_date": null,
   "project_evidence": [
    "## Introduction",
    "In New Mexico, STACK Infrastructure is developing Project Jupiter, which consists of four large buildings.",
    "| [Do\u00f1a Ana County, New Mexico](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateNewMexico) | 0 | 2.2 | Q4 2025 | Q4 2028 | On-site gas |"
   ],
   "locality_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Do\u00f1a Ana County, New Mexico](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateNewMexico) | 0 | 2.2 | Q4 2025 | Q4 2028 | On-site gas |"
   ],
   "state_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Do\u00f1a Ana County, New Mexico](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateNewMexico) | 0 | 2.2 | Q4 2025 | Q4 2028 | On-site gas |"
   ],
   "capacity_gw_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Do\u00f1a Ana County, New Mexico](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateNewMexico) | 0 | 2.2 | Q4 2025 | Q4 2028 | On-site gas |"
   ],
   "builder_evidence": [
    "## Introduction",
    "In New Mexico, STACK Infrastructure is developing Project Jupiter, which consists of four large buildings."
   ],
   "ai_customer_evidence": [
    "## Introduction",
    "No project illustrates the scale of that effort more than Stargate, a $500 billion endeavor involving AI developer OpenAI, cloud provider Oracle, and investment company SoftBank."
   ],
   "status_evidence": [
    "## Introduction",
    "Satellite imagery shows that foundation work is underway."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://epoch.ai/blog/openai-stargate-where-the-us-sites-stand",
   "title": "OpenAI Stargate: where the US sites stand",
   "published_at": null,
   "project": "Milam County",
   "locality": "Milam County",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "building",
   "announcement_date": null,
   "project_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Milam County, Texas](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateMilam) | 0 | 1.2 | Q3 2025 | Q4 2028 | On-site (unknown type) |"
   ],
   "locality_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Milam County, Texas](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateMilam) | 0 | 1.2 | Q3 2025 | Q4 2028 | On-site (unknown type) |"
   ],
   "state_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Milam County, Texas](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateMilam) | 0 | 1.2 | Q3 2025 | Q4 2028 | On-site (unknown type) |"
   ],
   "capacity_gw_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Milam County, Texas](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateMilam) | 0 | 1.2 | Q3 2025 | Q4 2028 | On-site (unknown type) |"
   ],
   "builder_evidence": [
    "## Introduction",
    "SoftBank subsidiary SB Energy is [building and operating](https://sbenergy.com/openai-and-softbank-group-partner-with-sb-energy/) what is [described](https://www.constructiondive.com/news/stargate-5-new-data-center-sites/761424/) as a \u201cfast-build\u201d site in Milam County, Texas, around 70 miles (110 kilometers) northeast of Austin."
   ],
   "ai_customer_evidence": [
    "## Introduction",
    "No project illustrates the scale of that effort more than Stargate, a $500 billion endeavor involving AI developer OpenAI, cloud provider Oracle, and investment company SoftBank."
   ],
   "status_evidence": [
    "## Introduction",
    "SoftBank subsidiary SB Energy is [building and operating](https://sbenergy.com/openai-and-softbank-group-partner-with-sb-energy/) what is [described](https://www.constructiondive.com/news/stargate-5-new-data-center-sites/761424/) as a \u201cfast-build\u201d site in Milam County, Texas, around 70 miles (110 kilometers) northeast of Austin."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://epoch.ai/blog/openai-stargate-where-the-us-sites-stand",
   "title": "OpenAI Stargate: where the US sites stand",
   "published_at": null,
   "project": "Lighthouse",
   "locality": "Port Washington",
   "state": "Wisconsin",
   "capacity_gw": 1.3,
   "builder": "Vantage",
   "ai_customer": "OpenAI",
   "status": "broken ground",
   "announcement_date": null,
   "project_evidence": [
    "## Introduction",
    "Vantage, which is also the developer behind the Shackelford County site, has broken ground on a campus named \u201cLighthouse\u201d in Port Washington, just north of Milwaukee.",
    "| [Port Washington, Wisconsin](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateWisconsin) | 0 | 1.3 | Q1 2026 | Q4 2028 | Grid |"
   ],
   "locality_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Port Washington, Wisconsin](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateWisconsin) | 0 | 1.3 | Q1 2026 | Q4 2028 | Grid |"
   ],
   "state_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Port Washington, Wisconsin](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateWisconsin) | 0 | 1.3 | Q1 2026 | Q4 2028 | Grid |"
   ],
   "capacity_gw_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Port Washington, Wisconsin](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateWisconsin) | 0 | 1.3 | Q1 2026 | Q4 2028 | Grid |"
   ],
   "builder_evidence": [
    "## Introduction",
    "Vantage, which is also the developer behind the Shackelford County site, has broken ground on a campus named \u201cLighthouse\u201d in Port Washington, just north of Milwaukee."
   ],
   "ai_customer_evidence": [
    "## Introduction",
    "No project illustrates the scale of that effort more than Stargate, a $500 billion endeavor involving AI developer OpenAI, cloud provider Oracle, and investment company SoftBank."
   ],
   "status_evidence": [
    "## Introduction",
    "Vantage, which is also the developer behind the Shackelford County site, has broken ground on a campus named \u201cLighthouse\u201d in Port Washington, just north of Milwaukee."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://epoch.ai/blog/openai-stargate-where-the-us-sites-stand",
   "title": "OpenAI Stargate: where the US sites stand",
   "published_at": null,
   "project": "The Barn",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.4,
   "builder": "Related Digital",
   "ai_customer": "OpenAI",
   "status": "foundation work",
   "announcement_date": null,
   "project_evidence": [
    "## Introduction",
    "Related Digital is [developing](https://www.related.com/press-releases/2025-10-30/openai-oracle-and-related-digital-announce-stargate-data-center-site) a campus dubbed \u201cThe Barn\u201d in Saline Township, southwest of Detroit.",
    "| [Saline Township, Michigan](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateMichigan) | 0 | 1.4 | Q4 2025 | Q4 2028 | Grid |"
   ],
   "locality_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Saline Township, Michigan](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateMichigan) | 0 | 1.4 | Q4 2025 | Q4 2028 | Grid |"
   ],
   "state_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Saline Township, Michigan](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateMichigan) | 0 | 1.4 | Q4 2025 | Q4 2028 | Grid |"
   ],
   "capacity_gw_evidence": [
    "## Introduction",
    "| Site | Current capacity (GW) | Projected capacity (GW)3 | Construction began | Projected completion | Power sources |",
    "| [Saline Township, Michigan](https://epoch.ai/data/data-centers/satellite-explorer/OpenAIStargateMichigan) | 0 | 1.4 | Q4 2025 | Q4 2028 | Grid |"
   ],
   "builder_evidence": [
    "## Introduction",
    "Related Digital is [developing](https://www.related.com/press-releases/2025-10-30/openai-oracle-and-related-digital-announce-stargate-data-center-site) a campus dubbed \u201cThe Barn\u201d in Saline Township, southwest of Detroit."
   ],
   "ai_customer_evidence": [
    "## Introduction",
    "No project illustrates the scale of that effort more than Stargate, a $500 billion endeavor involving AI developer OpenAI, cloud provider Oracle, and investment company SoftBank."
   ],
   "status_evidence": [
    "## Introduction",
    "Satellite imagery shows foundation work underway for the first building."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tensorfeed.ai/originals/meta-blackrock-el-paso-14b-second-eighty-twenty-jv",
   "title": "Meta Handed BlackRock 80 Percent of a $14 Billion El Paso Data Center. That's the Second 80/20 JV in Nine Months.",
   "published_at": "2026-07-28T00:00:00",
   "project": "El Paso",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "BlackRock",
   "ai_customer": "Meta",
   "status": "announced",
   "announcement_date": "2026-07-28",
   "project_evidence": [
    "Markets \u00b7 AI Infrastructure",
    "Meta Handed BlackRock 80 Percent of a $14 Billion El Paso Data Center. That's the Second 80/20 JV in Nine Months.",
    "Meta and BlackRock filed a joint press release before the open on Tuesday, July 28, 2026, announcing a $14 billion, 1 gigawatt data center campus in El Paso, Texas."
   ],
   "locality_evidence": [
    "Markets \u00b7 AI Infrastructure",
    "Meta Handed BlackRock 80 Percent of a $14 Billion El Paso Data Center. That's the Second 80/20 JV in Nine Months.",
    "Meta and BlackRock filed a joint press release before the open on Tuesday, July 28, 2026, announcing a $14 billion, 1 gigawatt data center campus in El Paso, Texas."
   ],
   "state_evidence": [
    "Markets \u00b7 AI Infrastructure",
    "Meta Handed BlackRock 80 Percent of a $14 Billion El Paso Data Center. That's the Second 80/20 JV in Nine Months.",
    "Meta and BlackRock filed a joint press release before the open on Tuesday, July 28, 2026, announcing a $14 billion, 1 gigawatt data center campus in El Paso, Texas."
   ],
   "capacity_gw_evidence": [
    "Markets \u00b7 AI Infrastructure",
    "Meta Handed BlackRock 80 Percent of a $14 Billion El Paso Data Center. That's the Second 80/20 JV in Nine Months.",
    "Meta and BlackRock filed a joint press release before the open on Tuesday, July 28, 2026, announcing a $14 billion, 1 gigawatt data center campus in El Paso, Texas."
   ],
   "builder_evidence": [
    "Markets \u00b7 AI Infrastructure",
    "Meta Handed BlackRock 80 Percent of a $14 Billion El Paso Data Center. That's the Second 80/20 JV in Nine Months.",
    "Meta and BlackRock filed a joint press release before the open on Tuesday, July 28, 2026, announcing a $14 billion, 1 gigawatt data center campus in El Paso, Texas."
   ],
   "ai_customer_evidence": [
    "Markets \u00b7 AI Infrastructure",
    "Meta Handed BlackRock 80 Percent of a $14 Billion El Paso Data Center. That's the Second 80/20 JV in Nine Months.",
    "Meta and BlackRock filed a joint press release before the open on Tuesday, July 28, 2026, announcing a $14 billion, 1 gigawatt data center campus in El Paso, Texas."
   ],
   "status_evidence": [
    "Markets \u00b7 AI Infrastructure",
    "Meta Handed BlackRock 80 Percent of a $14 Billion El Paso Data Center. That's the Second 80/20 JV in Nine Months.",
    "Meta and BlackRock filed a joint press release before the open on Tuesday, July 28, 2026, announcing a $14 billion, 1 gigawatt data center campus in El Paso, Texas."
   ],
   "announcement_date_evidence": [
    "Markets \u00b7 AI Infrastructure",
    "Meta Handed BlackRock 80 Percent of a $14 Billion El Paso Data Center. That's the Second 80/20 JV in Nine Months.",
    "Meta and BlackRock filed a joint press release before the open on Tuesday, July 28, 2026, announcing a $14 billion, 1 gigawatt data center campus in El Paso, Texas."
   ]
  },
  {
   "url": "https://tensorfeed.ai/originals/meta-blackrock-el-paso-14b-second-eighty-twenty-jv",
   "title": "Meta Handed BlackRock 80 Percent of a $14 Billion El Paso Data Center. That's the Second 80/20 JV in Nine Months.",
   "published_at": "2026-07-28T00:00:00",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Blue Owl Capital",
   "ai_customer": "Meta",
   "status": "expanded",
   "announcement_date": "2025-10-01",
   "project_evidence": [
    "Markets \u00b7 AI Infrastructure",
    "Meta Handed BlackRock 80 Percent of a $14 Billion El Paso Data Center. That's the Second 80/20 JV in Nine Months.",
    "In October 2025, Meta and Blue Owl Capital formed an identical 80/20 joint venture for the Hyperion campus in Richland Parish, Louisiana, then valued at roughly $27 billion."
   ],
   "locality_evidence": [
    "Markets \u00b7 AI Infrastructure",
    "Meta Handed BlackRock 80 Percent of a $14 Billion El Paso Data Center. That's the Second 80/20 JV in Nine Months.",
    "In October 2025, Meta and Blue Owl Capital formed an identical 80/20 joint venture for the Hyperion campus in Richland Parish, Louisiana, then valued at roughly $27 billion."
   ],
   "state_evidence": [
    "Markets \u00b7 AI Infrastructure",
    "Meta Handed BlackRock 80 Percent of a $14 Billion El Paso Data Center. That's the Second 80/20 JV in Nine Months.",
    "In October 2025, Meta and Blue Owl Capital formed an identical 80/20 joint venture for the Hyperion campus in Richland Parish, Louisiana, then valued at roughly $27 billion."
   ],
   "capacity_gw_evidence": [
    "Markets \u00b7 AI Infrastructure",
    "Meta Handed BlackRock 80 Percent of a $14 Billion El Paso Data Center. That's the Second 80/20 JV in Nine Months.",
    "Meta expanded Hyperion two weeks ago to 5 gigawatts and $50 billion of total build."
   ],
   "builder_evidence": [
    "Markets \u00b7 AI Infrastructure",
    "Meta Handed BlackRock 80 Percent of a $14 Billion El Paso Data Center. That's the Second 80/20 JV in Nine Months.",
    "In October 2025, Meta and Blue Owl Capital formed an identical 80/20 joint venture for the Hyperion campus in Richland Parish, Louisiana, then valued at roughly $27 billion."
   ],
   "ai_customer_evidence": [
    "Markets \u00b7 AI Infrastructure",
    "Meta Handed BlackRock 80 Percent of a $14 Billion El Paso Data Center. That's the Second 80/20 JV in Nine Months.",
    "In October 2025, Meta and Blue Owl Capital formed an identical 80/20 joint venture for the Hyperion campus in Richland Parish, Louisiana, then valued at roughly $27 billion."
   ],
   "status_evidence": [
    "Markets \u00b7 AI Infrastructure",
    "Meta Handed BlackRock 80 Percent of a $14 Billion El Paso Data Center. That's the Second 80/20 JV in Nine Months.",
    "Meta expanded Hyperion two weeks ago to 5 gigawatts and $50 billion of total build."
   ],
   "announcement_date_evidence": [
    "Markets \u00b7 AI Infrastructure",
    "Meta Handed BlackRock 80 Percent of a $14 Billion El Paso Data Center. That's the Second 80/20 JV in Nine Months.",
    "In October 2025, Meta and Blue Owl Capital formed an identical 80/20 joint venture for the Hyperion campus in Richland Parish, Louisiana, then valued at roughly $27 billion."
   ]
  },
  {
   "url": "https://i10x.ai/news/aws-project-rainier-11b-ai-campus-trainium2",
   "title": "AWS Activates Project Rainier: $11B AI Campus with Trainium2",
   "published_at": "2025-12-26T02:24:11",
   "project": "Project Rainier",
   "locality": null,
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Amazon Web Services",
   "ai_customer": "Anthropic",
   "status": "activated",
   "announcement_date": null,
   "project_evidence": [
    "# AWS Activates Project Rainier: $11B AI Campus with Trainium2",
    "AWS just activated **Project Rainier**, an $11 billion, gigawatt-scale AI campus in Indiana powered by its custom **Trainium2** silicon."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# AWS Activates Project Rainier: $11B AI Campus with Trainium2",
    "AWS just activated **Project Rainier**, an $11 billion, gigawatt-scale AI campus in Indiana powered by its custom **Trainium2** silicon."
   ],
   "capacity_gw_evidence": [
    "# AWS Activates Project Rainier: $11B AI Campus with Trainium2",
    "AWS just activated **Project Rainier**, an $11 billion, gigawatt-scale AI campus in Indiana powered by its custom **Trainium2** silicon."
   ],
   "builder_evidence": [
    "# AWS Activates Project Rainier: $11B AI Campus with Trainium2",
    "Summary: Amazon Web Services (AWS) has officially launched \"Project Rainier,\" a massive $11 billion data center complex in Indiana."
   ],
   "ai_customer_evidence": [
    "# AWS Activates Project Rainier: $11B AI Campus with Trainium2",
    "The move isn't just about adding capacity; it's a calculated strategy to build a vertically integrated AI factory, with Anthropic's Claude models as the anchor tenant, fundamentally altering the economics of training and deploying frontier AI."
   ],
   "status_evidence": [
    "# AWS Activates Project Rainier: $11B AI Campus with Trainium2",
    "AWS just activated **Project Rainier**, an $11 billion, gigawatt-scale AI campus in Indiana powered by its custom **Trainium2** silicon."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/",
   "title": "Tech leader xAI investing more than $20 billion in Southaven",
   "published_at": "2026-01-08T19:40:04",
   "project": "MACROHARDRR",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "Under construction / retrofitting",
   "announcement_date": null,
   "project_evidence": [
    "**JACKSON, Miss. \u2013** xAI, the American artificial intelligence company founded by Elon Musk, is locating a data center in Southaven.",
    "The data center, which will be known as MACROHARDRR, is in proximity to xAI\u2019s newly acquired power plant site in Southaven and one of the company\u2019s existing data centers in Tennessee."
   ],
   "locality_evidence": [
    "**JACKSON, Miss. \u2013** xAI, the American artificial intelligence company founded by Elon Musk, is locating a data center in Southaven.",
    "The data center, which will be known as MACROHARDRR, is in proximity to xAI\u2019s newly acquired power plant site in Southaven and one of the company\u2019s existing data centers in Tennessee."
   ],
   "state_evidence": [
    "**JACKSON, Miss. \u2013** xAI, the American artificial intelligence company founded by Elon Musk, is locating a data center in Southaven.",
    "The data center, which will be known as MACROHARDRR, is in proximity to xAI\u2019s newly acquired power plant site in Southaven and one of the company\u2019s existing data centers in Tennessee."
   ],
   "capacity_gw_evidence": [
    "**JACKSON, Miss. \u2013** xAI, the American artificial intelligence company founded by Elon Musk, is locating a data center in Southaven.",
    "Upon completion, the Southaven data center will increase the company\u2019s computing power to nearly 2 gigawatts."
   ],
   "builder_evidence": [
    "**JACKSON, Miss. \u2013** xAI, the American artificial intelligence company founded by Elon Musk, is locating a data center in Southaven.",
    "xAI has purchased and is retrofitting a building to house the new data center operations."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "**JACKSON, Miss. \u2013** xAI, the American artificial intelligence company founded by Elon Musk, is locating a data center in Southaven.",
    "xAI has purchased and is retrofitting a building to house the new data center operations."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://www.facebook.com/wtenews/posts/crusoe-the-artificial-intelligence-infrastructure-company-has-officially-left-pr/1622977403168376/",
   "title": "Wyoming Tribune Eagle",
   "published_at": null,
   "project": "Project Jade",
   "locality": "Cheyenne",
   "state": "Wyoming",
   "capacity_gw": 10.0,
   "builder": "Crusoe",
   "ai_customer": null,
   "status": "active",
   "announcement_date": null,
   "project_evidence": [
    "Crusoe, the artificial intelligence infrastructure company, has officially left Project Jade, a planned 1.8-gigawatt data center campus in Cheyenne that can scale up to 10 GW, which would be the largest single AI campus in the U.S.",
    "However, this does not mean Project Jade will stop."
   ],
   "locality_evidence": [
    "Crusoe, the artificial intelligence infrastructure company, has officially left Project Jade, a planned 1.8-gigawatt data center campus in Cheyenne that can scale up to 10 GW, which would be the largest single AI campus in the U.S."
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "Crusoe, the artificial intelligence infrastructure company, has officially left Project Jade, a planned 1.8-gigawatt data center campus in Cheyenne that can scale up to 10 GW, which would be the largest single AI campus in the U.S."
   ],
   "builder_evidence": [
    "Crusoe, the artificial intelligence infrastructure company, has officially left Project Jade, a planned 1.8-gigawatt data center campus in Cheyenne that can scale up to 10 GW, which would be the largest single AI campus in the U.S."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://edgen.tech/fr/news/post/chevrons-20-year-microsoft-power-deal-diversifies-beyond-oil",
   "title": "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
   "published_at": "2026-08-29T15:54:13",
   "project": "Project Kilby",
   "locality": "Reeves County",
   "state": "Texas",
   "capacity_gw": 2.67,
   "builder": "Chevron",
   "ai_customer": "Microsoft",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "The project, known as Project Kilby, will be developed through Chevron's Energy Forge One subsidiary alongside Engine No. 1 and Microsoft."
   ],
   "locality_evidence": [
    "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings."
   ],
   "state_evidence": [
    "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron's 20-year Microsoft power deal for a 2.67-gigawatt Texas data center marks the oil major's entry into AI infrastructure."
   ],
   "capacity_gw_evidence": [
    "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings."
   ],
   "builder_evidence": [
    "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings."
   ],
   "ai_customer_evidence": [
    "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings."
   ],
   "status_evidence": [
    "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "First power is expected in 2028, with a final investment decision targeted by the end of 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news/nscale-acquires-8gw-monarch-compute-campus-microsoft-signs-on-for-135gw-of-compute",
   "title": "Nscale acquires 8GW Monarch Compute Campus, Microsoft signs on for 1.35GW of compute",
   "published_at": "2026-08-05T00:00:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "American Intelligence & Power Corporation",
   "ai_customer": "Microsoft",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "UK-based AI cloud Nscale has signed an agreement to acquire American Intelligence & Power Corporation, including its up to 8GW Monarch Compute Campus in West Virginia.",
    "The campus, dubbed Monach Compute Campus, spans 2,250 acres in Mason County, West Virginia, and is planned to have up to 8GW of capacity."
   ],
   "locality_evidence": [
    "[AIP was founded](https://www.datacenterdynamics.com/en/news/caterpillar-to-supply-2gw-of-natural-gas-turbines-for-monarch-compute-campus-in-mason-county-west-virginia/) at the start of 2026, a joint venture between Fidelis New Energy and 8090 Industries.",
    "The campus, dubbed Monach Compute Campus, spans 2,250 acres in Mason County, West Virginia, and is planned to have up to 8GW of capacity."
   ],
   "state_evidence": [
    "UK-based AI cloud Nscale has signed an agreement to acquire American Intelligence & Power Corporation, including its up to 8GW Monarch Compute Campus in West Virginia.",
    "The campus, dubbed Monach Compute Campus, spans 2,250 acres in Mason County, West Virginia, and is planned to have up to 8GW of capacity."
   ],
   "capacity_gw_evidence": [
    "UK-based AI cloud Nscale has signed an agreement to acquire American Intelligence & Power Corporation, including its up to 8GW Monarch Compute Campus in West Virginia.",
    "The campus, dubbed Monach Compute Campus, spans 2,250 acres in Mason County, West Virginia, and is planned to have up to 8GW of capacity."
   ],
   "builder_evidence": [
    "UK-based AI cloud Nscale has signed an agreement to acquire American Intelligence & Power Corporation, including its up to 8GW Monarch Compute Campus in West Virginia."
   ],
   "ai_customer_evidence": [
    "Confirming previous [reports](https://www.datacenterdynamics.com/en/news/nscale-in-talks-to-acquire-8gw-monarch-compute-campus-in-west-virginia-report/), the company has also signed a letter of intent (LOI) with Microsoft that will see the tech giant leasing 1.35GW of AI compute capacity from Nscale at the site."
   ],
   "status_evidence": [
    "The campus, dubbed Monach Compute Campus, spans 2,250 acres in Mason County, West Virginia, and is planned to have up to 8GW of capacity."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://nacleanenergy.com/solar/energy-abundance-announces-data-city-texas---the-world-s-largest-behind-the-meter-data-center-hub-powered-by-100-24-7-green-energy",
   "title": "Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
   "published_at": "2025-03-20T23:32:40",
   "project": "Data City",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corporation",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "**Energy Abundance Development Corporation** has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "locality_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "**Energy Abundance Development Corporation** has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "state_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "**Energy Abundance Development Corporation** has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "capacity_gw_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "**Energy Abundance Development Corporation** has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "builder_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "**Energy Abundance Development Corporation** has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "**Energy Abundance Development Corporation** has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://startupfortune.com/olearys-9gw-utah-ai-campus-approval-signals-hyperscalers-must-own-their-power-plants",
   "title": "O'Leary's 9GW Utah AI campus approval signals hyperscalers must own their power plants",
   "published_at": "2026-04-28T08:57:28",
   "project": "Stratos",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O'Leary Digital",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "Kevin O'Leary's Utah data center plan has moved closer to reality after state and local approvals advanced a proposed 9-gigawatt hyperscale campus in Box Elder County.",
    "The project, known as Stratos and also tied to the Wonder Valley brand, is being led by O'Leary Digital with support from Utah's Military Installation Development Authority."
   ],
   "locality_evidence": [
    "Kevin O'Leary's Utah data center plan has moved closer to reality after state and local approvals advanced a proposed 9-gigawatt hyperscale campus in Box Elder County.",
    "The project, known as Stratos and also tied to the Wonder Valley brand, is being led by O'Leary Digital with support from Utah's Military Installation Development Authority."
   ],
   "state_evidence": [
    "Kevin O'Leary's planned 9GW Utah data center campus shows how quickly the AI infrastructure race is becoming a power race, with developers trying to secure generation before they sell compute.",
    "Kevin O'Leary's Utah data center plan has moved closer to reality after state and local approvals advanced a proposed 9-gigawatt hyperscale campus in Box Elder County."
   ],
   "capacity_gw_evidence": [
    "Kevin O'Leary's planned 9GW Utah data center campus shows how quickly the AI infrastructure race is becoming a power race, with developers trying to secure generation before they sell compute.",
    "Kevin O'Leary's Utah data center plan has moved closer to reality after state and local approvals advanced a proposed 9-gigawatt hyperscale campus in Box Elder County."
   ],
   "builder_evidence": [
    "The project, known as Stratos and also tied to the Wonder Valley brand, is being led by O'Leary Digital with support from Utah's Military Installation Development Authority."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Kevin O'Leary's Utah data center plan has moved closer to reality after state and local approvals advanced a proposed 9-gigawatt hyperscale campus in Box Elder County.",
    "MIDA approved a development agreement before the county process fully settled, which added to the sense that the project was moving faster than some local officials expected."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://spoonai.me/posts/2026-07-24-openai-project-camellia-georgia-data-center-jul2026-en",
   "title": "OpenAI Is Finally Building Its Own Data Center \u2014 1,400 Acres in Georgia",
   "published_at": "2026-07-23T23:00:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "Announced",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "OpenAI Is Finally Building Its Own Data Center \u2014 1,400 Acres in Georgia",
    "OpenAI announced Project Camellia, a 1,400-acre, 3.2GW campus in Effingham County, Georgia.",
    "On July 22, 2026, OpenAI announced a data center campus in Effingham County, Georgia, called Project Camellia."
   ],
   "locality_evidence": [
    "OpenAI Is Finally Building Its Own Data Center \u2014 1,400 Acres in Georgia",
    "OpenAI announced Project Camellia, a 1,400-acre, 3.2GW campus in Effingham County, Georgia.",
    "On July 22, 2026, OpenAI announced a data center campus in Effingham County, Georgia, called Project Camellia."
   ],
   "state_evidence": [
    "OpenAI Is Finally Building Its Own Data Center \u2014 1,400 Acres in Georgia",
    "OpenAI announced Project Camellia, a 1,400-acre, 3.2GW campus in Effingham County, Georgia.",
    "On July 22, 2026, OpenAI announced a data center campus in Effingham County, Georgia, called Project Camellia."
   ],
   "capacity_gw_evidence": [
    "OpenAI Is Finally Building Its Own Data Center \u2014 1,400 Acres in Georgia",
    "OpenAI announced Project Camellia, a 1,400-acre, 3.2GW campus in Effingham County, Georgia.",
    "On July 22, 2026, OpenAI announced a data center campus in Effingham County, Georgia, called Project Camellia."
   ],
   "builder_evidence": [
    "OpenAI Is Finally Building Its Own Data Center \u2014 1,400 Acres in Georgia",
    "OpenAI announced Project Camellia, a 1,400-acre, 3.2GW campus in Effingham County, Georgia. It's the first site OpenAI designs and builds itself \u2014 $20B committed, $30B+ at completion.",
    "Camellia flips that. OpenAI owns the site. OpenAI does the design."
   ],
   "ai_customer_evidence": [
    "OpenAI Is Finally Building Its Own Data Center \u2014 1,400 Acres in Georgia",
    "OpenAI announced Project Camellia, a 1,400-acre, 3.2GW campus in Effingham County, Georgia."
   ],
   "status_evidence": [
    "OpenAI Is Finally Building Its Own Data Center \u2014 1,400 Acres in Georgia",
    "OpenAI announced Project Camellia, a 1,400-acre, 3.2GW campus in Effingham County, Georgia.",
    "On July 22, 2026, OpenAI announced a data center campus in Effingham County, Georgia, called Project Camellia."
   ],
   "announcement_date_evidence": [
    "OpenAI Is Finally Building Its Own Data Center \u2014 1,400 Acres in Georgia",
    "On July 22, 2026, OpenAI announced a data center campus in Effingham County, Georgia, called Project Camellia."
   ]
  },
  {
   "url": "https://thecoinomist.com/news/terawulf-buys-kentucky-muskie-site-1gw-ai-campus",
   "title": "TeraWulf buys Kentucky site for 1+ GW AI campus",
   "published_at": "2026-05-26T15:47:32",
   "project": "Muskie Data Campus",
   "locality": "EastPark",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": "2026-05-26",
   "project_evidence": [
    "# TeraWulf buys Kentucky site for 1+ GW AI campus",
    "The company said the Muskie Data Campus can be developed to support more than 1 gigawatt of power for artificial intelligence and high-performance computing workloads."
   ],
   "locality_evidence": [
    "# TeraWulf buys Kentucky site for 1+ GW AI campus",
    "TeraWulf acquired the Muskie site in eastern Kentucky \u2014 about 285 developable acres in EastPark \u2014 for a data campus expected to exceed 1 GW of power; shares rose about 13%."
   ],
   "state_evidence": [
    "# TeraWulf buys Kentucky site for 1+ GW AI campus",
    "TeraWulf acquired the Muskie site in eastern Kentucky \u2014 about 285 developable acres in EastPark \u2014 for a data campus expected to exceed 1 GW of power; shares rose about 13%."
   ],
   "capacity_gw_evidence": [
    "# TeraWulf buys Kentucky site for 1+ GW AI campus",
    "The company said the Muskie Data Campus can be developed to support more than 1 gigawatt of power for artificial intelligence and high-performance computing workloads."
   ],
   "builder_evidence": [
    "# TeraWulf buys Kentucky site for 1+ GW AI campus",
    "TeraWulf acquired the Muskie site in eastern Kentucky \u2014 about 285 developable acres in EastPark \u2014 for a data campus expected to exceed 1 GW of power; shares rose about 13%."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# TeraWulf buys Kentucky site for 1+ GW AI campus",
    "TeraWulf acquired the Muskie site in eastern Kentucky \u2014 about 285 developable acres in EastPark \u2014 for a data campus expected to exceed 1 GW of power; shares rose about 13%."
   ],
   "announcement_date_evidence": [
    "# TeraWulf buys Kentucky site for 1+ GW AI campus",
    " Posted: 26 May 2026, 17:47 CET 2 min read"
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news/meta-pledges-10bn-investment-for-el-paso-texas-data-center",
   "title": "Meta pledges $10bn investment for El Paso, Texas, data center",
   "published_at": "2026-08-27T00:00:00",
   "project": "El Paso data center",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "Meta has upped its planned investment in a data center development in El Paso, Texas.",
    "In a [blog post](https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/) shared by the company, Meta revealed that the company will invest $10 billion in the campus, which will have up to 1GW of capacity."
   ],
   "locality_evidence": [
    "Meta has upped its planned investment in a data center development in El Paso, Texas."
   ],
   "state_evidence": [
    "Meta has upped its planned investment in a data center development in El Paso, Texas."
   ],
   "capacity_gw_evidence": [
    "In a [blog post](https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/) shared by the company, Meta revealed that the company will invest $10 billion in the campus, which will have up to 1GW of capacity."
   ],
   "builder_evidence": [
    "Meta has upped its planned investment in a data center development in El Paso, Texas.",
    "In a [blog post](https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/) shared by the company, Meta revealed that the company will invest $10 billion in the campus, which will have up to 1GW of capacity."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Ground was broken on the project in [October](https://www.datacenterdynamics.com/en/news/meta-breaks-ground-on-1gw-data-center-campus-in-el-paso-texas/)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://siliconreport.com/xai-colossus-memphis-supercomputer-profile-26bcb312",
   "title": "Inside xAI's Colossus: a 2-gigawatt supercomputer built on unpermitted gas turbines the DOJ now calls a national security asset",
   "published_at": "2026-07-03T07:55:17",
   "project": "Colossus 2",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Inside xAI's Colossus: a 2-gigawatt supercomputer built on unpermitted gas turbines the DOJ now calls a national security asset",
    "## Colossus 2 crosses the gigawatt line"
   ],
   "locality_evidence": [
    "# Inside xAI's Colossus: a 2-gigawatt supercomputer built on unpermitted gas turbines the DOJ now calls a national security asset",
    "## Colossus 2 crosses the gigawatt line",
    "The Southaven, Mississippi expansion is where the scale changed categories."
   ],
   "state_evidence": [
    "# Inside xAI's Colossus: a 2-gigawatt supercomputer built on unpermitted gas turbines the DOJ now calls a national security asset",
    "## Colossus 2 crosses the gigawatt line",
    "The Southaven, Mississippi expansion is where the scale changed categories."
   ],
   "capacity_gw_evidence": [
    "# Inside xAI's Colossus: a 2-gigawatt supercomputer built on unpermitted gas turbines the DOJ now calls a national security asset",
    "## Colossus 2 crosses the gigawatt line"
   ],
   "builder_evidence": [
    "# Inside xAI's Colossus: a 2-gigawatt supercomputer built on unpermitted gas turbines the DOJ now calls a national security asset",
    "## Colossus 2 crosses the gigawatt line",
    "[Data Center Dynamics reported](https://www.datacenterdynamics.com/en/news/xai-deploys-19-natural-gas-turbines-at-colossus-2-data-center-in-southaven-mississippi-report/) that xAI installed 19 more portable turbines between late March and early May 2026, delivering over 500 additional megawatts and pushing the total gas-turbine count at the site to 46 \u2014 five more than the 41-unit permit allowed."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Inside xAI's Colossus: a 2-gigawatt supercomputer built on unpermitted gas turbines the DOJ now calls a national security asset",
    "## Colossus 2 crosses the gigawatt line"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mlq.ai/data-centers/usa/texas/albany/vantage-tx1-albany",
   "title": "AI infrastructure intelligence",
   "published_at": null,
   "project": "Vantage Frontier/TX1",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage",
   "ai_customer": "Oracle/OpenAI",
   "status": "Under Development",
   "announcement_date": null,
   "project_evidence": [
    "Vantage Frontier/TX1 is an operator-verified 1.4GW AI-scale campus in Shackelford County, Texas.",
    "Overview"
   ],
   "locality_evidence": [
    "Vantage Frontier/TX1 is an operator-verified 1.4GW AI-scale campus in Shackelford County, Texas.",
    "Overview"
   ],
   "state_evidence": [
    "Vantage Frontier/TX1 is an operator-verified 1.4GW AI-scale campus in Shackelford County, Texas.",
    "Overview"
   ],
   "capacity_gw_evidence": [
    "Vantage Frontier/TX1 is an operator-verified 1.4GW AI-scale campus in Shackelford County, Texas.",
    "Overview"
   ],
   "builder_evidence": [
    "Vantage Frontier/TX1 is an operator-verified 1.4GW AI-scale campus in Shackelford County, Texas.",
    "Overview"
   ],
   "ai_customer_evidence": [
    "**Key Tenant:** Oracle/OpenAI Stargate",
    "Overview"
   ],
   "status_evidence": [
    "First data center delivery is targeted for the second half of 2026.",
    "Overview"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterknowledge.com/data-center-construction/openai-moves-energy-planning-inside-data-center-organization",
   "title": "OpenAI Moves Energy Planning Inside Data Center Organization",
   "published_at": "2026-08-26T12:13:02",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Moves Energy Planning Inside Data Center Organization",
    "OpenAI Moves Energy Planning Inside Data Center Organization"
   ],
   "locality_evidence": [
    "# OpenAI Moves Energy Planning Inside Data Center Organization",
    "OpenAI Moves Energy Planning Inside Data Center Organization"
   ],
   "state_evidence": [
    "# OpenAI Moves Energy Planning Inside Data Center Organization",
    "OpenAI Moves Energy Planning Inside Data Center Organization"
   ],
   "capacity_gw_evidence": [
    "# OpenAI Moves Energy Planning Inside Data Center Organization",
    "OpenAI Moves Energy Planning Inside Data Center Organization"
   ],
   "builder_evidence": [
    "# OpenAI Moves Energy Planning Inside Data Center Organization",
    "OpenAI Moves Energy Planning Inside Data Center Organization"
   ],
   "ai_customer_evidence": [
    "# OpenAI Moves Energy Planning Inside Data Center Organization",
    "OpenAI Moves Energy Planning Inside Data Center Organization"
   ],
   "status_evidence": [
    "# OpenAI Moves Energy Planning Inside Data Center Organization",
    "OpenAI Moves Energy Planning Inside Data Center Organization"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://finance.yahoo.com/markets/stocks/articles/terawulf-rallies-acquiring-1-gw-144531399.html",
   "title": "TeraWulf Rallies After Acquiring 1 GW Muskie AI Data Campus In Kentucky \u2014 Its Second In The State",
   "published_at": "2026-05-26T14:45:31",
   "project": "Muskie Data Campus",
   "locality": null,
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": null,
   "project_evidence": [
    "# TeraWulf Rallies After Acquiring 1 GW Muskie AI Data Campus In Kentucky \u2014 Its Second In The State",
    "- TeraWulf shares rallied more than 12% after the company acquired the 1 GW \"Muskie Data Campus\" in Kentucky.",
    "TeraWulf Inc's (WULF) stock rose more than 12% on Tuesday after the company acquired a high-performance computing (HPC) site in Kentucky, designed to support more than 1 gigawatt (GW) of future capacity.",
    "The HPC infrastructure company, which has been moving away from Bitcoin (BTC) mining, announced the acquisition of the \"Muskie Data Campus\" in Kentucky, which is located within the 1,000-acre EastPark Industrial Park and includes roughly 285 acres of owned and controlled land designed for hyperscale artificial intelligence (AI) and HPC operations."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# TeraWulf Rallies After Acquiring 1 GW Muskie AI Data Campus In Kentucky \u2014 Its Second In The State",
    "- TeraWulf shares rallied more than 12% after the company acquired the 1 GW \"Muskie Data Campus\" in Kentucky.",
    "TeraWulf Inc's (WULF) stock rose more than 12% on Tuesday after the company acquired a high-performance computing (HPC) site in Kentucky, designed to support more than 1 gigawatt (GW) of future capacity.",
    "The HPC infrastructure company, which has been moving away from Bitcoin (BTC) mining, announced the acquisition of the \"Muskie Data Campus\" in Kentucky, which is located within the 1,000-acre EastPark Industrial Park and includes roughly 285 acres of owned and controlled land designed for hyperscale artificial intelligence (AI) and HPC operations."
   ],
   "capacity_gw_evidence": [
    "# TeraWulf Rallies After Acquiring 1 GW Muskie AI Data Campus In Kentucky \u2014 Its Second In The State",
    "- TeraWulf shares rallied more than 12% after the company acquired the 1 GW \"Muskie Data Campus\" in Kentucky.",
    "TeraWulf Inc's (WULF) stock rose more than 12% on Tuesday after the company acquired a high-performance computing (HPC) site in Kentucky, designed to support more than 1 gigawatt (GW) of future capacity."
   ],
   "builder_evidence": [
    "# TeraWulf Rallies After Acquiring 1 GW Muskie AI Data Campus In Kentucky \u2014 Its Second In The State",
    "- TeraWulf shares rallied more than 12% after the company acquired the 1 GW \"Muskie Data Campus\" in Kentucky.",
    "TeraWulf Inc's (WULF) stock rose more than 12% on Tuesday after the company acquired a high-performance computing (HPC) site in Kentucky, designed to support more than 1 gigawatt (GW) of future capacity.",
    "The HPC infrastructure company, which has been moving away from Bitcoin (BTC) mining, announced the acquisition of the \"Muskie Data Campus\" in Kentucky, which is located within the 1,000-acre EastPark Industrial Park and includes roughly 285 acres of owned and controlled land designed for hyperscale artificial intelligence (AI) and HPC operations."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# TeraWulf Rallies After Acquiring 1 GW Muskie AI Data Campus In Kentucky \u2014 Its Second In The State",
    "- TeraWulf shares rallied more than 12% after the company acquired the 1 GW \"Muskie Data Campus\" in Kentucky.",
    "TeraWulf Inc's (WULF) stock rose more than 12% on Tuesday after the company acquired a high-performance computing (HPC) site in Kentucky, designed to support more than 1 gigawatt (GW) of future capacity.",
    "The HPC infrastructure company, which has been moving away from Bitcoin (BTC) mining, announced the acquisition of the \"Muskie Data Campus\" in Kentucky, which is located within the 1,000-acre EastPark Industrial Park and includes roughly 285 acres of owned and controlled land designed for hyperscale artificial intelligence (AI) and HPC operations."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://inkl.com/news/coatue-management-bought-9-72-million-shares-of-hut-8-in-q2-how-to-play-hut-stock-now",
   "title": "Coatue Management Bought 9.72 Million Shares of Hut 8 in Q2. How to Play HUT Stock Now.",
   "published_at": "2026-08-21T18:33:07",
   "project": "Beacon Point",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Coatue Management Bought 9.72 Million Shares of Hut 8 in Q2. How to Play HUT Stock Now.",
    "Power at the Heart of Hut 8",
    "While Beacon Point is a 1 GW AI data-center campus project based in Texas, River Bend is Hut 8's other major AI campus project based in Louisiana with \u201cpotential to scale beyond 1 GW.\u201d"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "Coatue Management Bought 9.72 Million Shares of Hut 8 in Q2. How to Play HUT Stock Now.",
    "Power at the Heart of Hut 8",
    "While Beacon Point is a 1 GW AI data-center campus project based in Texas, River Bend is Hut 8's other major AI campus project based in Louisiana with \u201cpotential to scale beyond 1 GW.\u201d"
   ],
   "capacity_gw_evidence": [
    "Coatue Management Bought 9.72 Million Shares of Hut 8 in Q2. How to Play HUT Stock Now.",
    "Power at the Heart of Hut 8",
    "While Beacon Point is a 1 GW AI data-center campus project based in Texas, River Bend is Hut 8's other major AI campus project based in Louisiana with \u201cpotential to scale beyond 1 GW.\u201d"
   ],
   "builder_evidence": [
    "Coatue Management Bought 9.72 Million Shares of Hut 8 in Q2. How to Play HUT Stock Now.",
    "Power at the Heart of Hut 8",
    "The company's [Beacon Point](https://www.hut8.com/data-centers/beacon-point) and [River Bend](https://www.hut8.com/data-centers/river-bend) projects are central in this regard."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://inkl.com/news/coatue-management-bought-9-72-million-shares-of-hut-8-in-q2-how-to-play-hut-stock-now",
   "title": "Coatue Management Bought 9.72 Million Shares of Hut 8 in Q2. How to Play HUT Stock Now.",
   "published_at": "2026-08-21T18:33:07",
   "project": "River Bend",
   "locality": null,
   "state": "Louisiana",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": "Fluidstack",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Coatue Management Bought 9.72 Million Shares of Hut 8 in Q2. How to Play HUT Stock Now.",
    "Power at the Heart of Hut 8",
    "While Beacon Point is a 1 GW AI data-center campus project based in Texas, River Bend is Hut 8's other major AI campus project based in Louisiana with \u201cpotential to scale beyond 1 GW.\u201d"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "Coatue Management Bought 9.72 Million Shares of Hut 8 in Q2. How to Play HUT Stock Now.",
    "Power at the Heart of Hut 8",
    "While Beacon Point is a 1 GW AI data-center campus project based in Texas, River Bend is Hut 8's other major AI campus project based in Louisiana with \u201cpotential to scale beyond 1 GW.\u201d"
   ],
   "capacity_gw_evidence": [
    "Coatue Management Bought 9.72 Million Shares of Hut 8 in Q2. How to Play HUT Stock Now.",
    "Power at the Heart of Hut 8",
    "While Beacon Point is a 1 GW AI data-center campus project based in Texas, River Bend is Hut 8's other major AI campus project based in Louisiana with \u201cpotential to scale beyond 1 GW.\u201d"
   ],
   "builder_evidence": [
    "Coatue Management Bought 9.72 Million Shares of Hut 8 in Q2. How to Play HUT Stock Now.",
    "Power at the Heart of Hut 8",
    "The company's [Beacon Point](https://www.hut8.com/data-centers/beacon-point) and [River Bend](https://www.hut8.com/data-centers/river-bend) projects are central in this regard."
   ],
   "ai_customer_evidence": [
    "Coatue Management Bought 9.72 Million Shares of Hut 8 in Q2. How to Play HUT Stock Now.",
    "Power at the Heart of Hut 8",
    "Similarly, for River Bend, the company has [signed a 15-year 245 MW lease](https://www.prnewswire.com/news-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value-of-7-0-billion-302644600.html) with AI infrastructure company Fluidstack for a total value of $7 billion."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://prismmarketview.com/iren-shares-rise-after-energizing-sweetwater-1-texas-data-center-site",
   "title": "IREN Shares Rise After Energizing Sweetwater 1 Texas Data Center Site",
   "published_at": "2026-05-04T17:35:36",
   "project": "Sweetwater",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "energized",
   "announcement_date": "2026-05-04",
   "project_evidence": [
    "# IREN Shares Rise After Energizing Sweetwater 1 Texas Data Center Site",
    "Sweetwater 1 is part of a broader 2 gigawatt (GW) Sweetwater campus in West Texas, one of the largest planned AI data center hubs in North America."
   ],
   "locality_evidence": [
    "# IREN Shares Rise After Energizing Sweetwater 1 Texas Data Center Site",
    "Sweetwater 1 is part of a broader 2 gigawatt (GW) Sweetwater campus in West Texas, one of the largest planned AI data center hubs in North America."
   ],
   "state_evidence": [
    "# IREN Shares Rise After Energizing Sweetwater 1 Texas Data Center Site",
    "**IREN Limited [(NASDAQ: IREN)](https://finance.yahoo.com/quote/IREN/)** shares moved higher after the company announced the successful energization of its Sweetwater 1 data center site in Texas, a major milestone in its expansion into large-scale AI infrastructure."
   ],
   "capacity_gw_evidence": [
    "# IREN Shares Rise After Energizing Sweetwater 1 Texas Data Center Site",
    "Sweetwater 1 is part of a broader 2 gigawatt (GW) Sweetwater campus in West Texas, one of the largest planned AI data center hubs in North America."
   ],
   "builder_evidence": [
    "# IREN Shares Rise After Energizing Sweetwater 1 Texas Data Center Site",
    "**IREN Limited [(NASDAQ: IREN)](https://finance.yahoo.com/quote/IREN/)** shares moved higher after the company announced the successful energization of its Sweetwater 1 data center site in Texas, a major milestone in its expansion into large-scale AI infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# IREN Shares Rise After Energizing Sweetwater 1 Texas Data Center Site",
    "IREN confirmed that its 1.4 gigawatt (GW) Sweetwater 1 site has been successfully energized, meaning its high-voltage substation is now connected to the ERCOT power grid."
   ],
   "announcement_date_evidence": [
    "# IREN Shares Rise After Energizing Sweetwater 1 Texas Data Center Site",
    "May 04, 2026 - by Joey Ramson"
   ]
  },
  {
   "url": "https://finance.yahoo.com/energy/articles/creekstone-energy-secures-43-000-110000926.html",
   "title": "Creekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI Campus",
   "published_at": "2026-07-23T11:00:00",
   "project": "Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy",
   "ai_customer": null,
   "status": "master-planned",
   "announcement_date": "2026-07-23",
   "project_evidence": [
    "# Creekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI Campus",
    "Firm, contracted pipeline capacity is now in place for the gigawatt-scale Delta Gigasite, one of the few U.S. sites that can bring dedicated, behind-the-meter power to AI and high-performance-computing tenants without a multi-year wait for the grid."
   ],
   "locality_evidence": [
    "# Creekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI Campus",
    "**DELTA, Utah, July 23, 2026**--([BUSINESS WIRE](https://www.businesswire.com))--Firm pipeline capacity is the difference between a plan and a project."
   ],
   "state_evidence": [
    "# Creekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI Campus",
    "**DELTA, Utah, July 23, 2026**--([BUSINESS WIRE](https://www.businesswire.com))--Firm pipeline capacity is the difference between a plan and a project."
   ],
   "capacity_gw_evidence": [
    "# Creekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI Campus",
    "It is enough firm fuel to support roughly 220 megawatts of behind-the-meter generation, the first block of a campus master-planned to scale past 10 gigawatts."
   ],
   "builder_evidence": [
    "# Creekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI Campus",
    "Creekstone Energy LLC now has it for the Delta Gigasite."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Creekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI Campus",
    "It is enough firm fuel to support roughly 220 megawatts of behind-the-meter generation, the first block of a campus master-planned to scale past 10 gigawatts."
   ],
   "announcement_date_evidence": [
    "# Creekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI Campus",
    "**DELTA, Utah, July 23, 2026**--([BUSINESS WIRE](https://www.businesswire.com))--Firm pipeline capacity is the difference between a plan and a project."
   ]
  },
  {
   "url": "https://gh2forclimate.org/texas-to-host-8-billion-off-grid-hydrogen-powered-data-center",
   "title": "Texas to Host $8 Billion Off-Grid Hydrogen-Powered Data Center",
   "published_at": "2024-10-01T21:33:12",
   "project": "TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "Last week, California-based data center developer ECL announced that its off-grid hydrogen-powered 1GW artificial intelligence (AI) data center, TerraSite-TX1, will be developed and built in Houston, Texas."
   ],
   "locality_evidence": [
    "Last week, California-based data center developer ECL announced that its off-grid hydrogen-powered 1GW artificial intelligence (AI) data center, TerraSite-TX1, will be developed and built in Houston, Texas."
   ],
   "state_evidence": [
    "Last week, California-based data center developer ECL announced that its off-grid hydrogen-powered 1GW artificial intelligence (AI) data center, TerraSite-TX1, will be developed and built in Houston, Texas."
   ],
   "capacity_gw_evidence": [
    "Last week, California-based data center developer ECL announced that its off-grid hydrogen-powered 1GW artificial intelligence (AI) data center, TerraSite-TX1, will be developed and built in Houston, Texas."
   ],
   "builder_evidence": [
    "Last week, California-based data center developer ECL announced that its off-grid hydrogen-powered 1GW artificial intelligence (AI) data center, TerraSite-TX1, will be developed and built in Houston, Texas."
   ],
   "ai_customer_evidence": [
    "The initial phase of 50 MW is expected to come online in the summer of 2025 for AI cloud provider Lambda at approximately $450 million."
   ],
   "status_evidence": [
    "Last week, California-based data center developer ECL announced that its off-grid hydrogen-powered 1GW artificial intelligence (AI) data center, TerraSite-TX1, will be developed and built in Houston, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://techstrong.it/ai/nexus-data-centers-in-advanced-talks-for-15-billion-texas-ai-campus-for-anthropic-backed-by-google",
   "title": "Nexus Data Centers in Advanced Talks for $15 Billion Texas AI Campus for Anthropic, Backed by Google",
   "published_at": "2026-07-31T14:46:29",
   "project": "Nexus Data Centers in Advanced Talks for $15 Billion Texas AI Campus for Anthropic, Backed by Google",
   "locality": "Hubbard",
   "state": "Texas",
   "capacity_gw": 1.6,
   "builder": "Nexus Data Centers",
   "ai_customer": "Anthropic",
   "status": "advanced talks",
   "announcement_date": "2026-07-31",
   "project_evidence": [
    "# Nexus Data Centers in Advanced Talks for $15 Billion Texas AI Campus for Anthropic, Backed by Google"
   ],
   "locality_evidence": [
    "# Nexus Data Centers in Advanced Talks for $15 Billion Texas AI Campus for Anthropic, Backed by Google",
    "Nexus Data Centers is in advanced talks to secure $15 billion in financing to construct a sprawling artificial intelligence (AI) data center campus in Hubbard, Texas, built specifically for Anthropic."
   ],
   "state_evidence": [
    "# Nexus Data Centers in Advanced Talks for $15 Billion Texas AI Campus for Anthropic, Backed by Google",
    "Nexus Data Centers is in advanced talks to secure $15 billion in financing to construct a sprawling artificial intelligence (AI) data center campus in Hubbard, Texas, built specifically for Anthropic."
   ],
   "capacity_gw_evidence": [
    "# Nexus Data Centers in Advanced Talks for $15 Billion Texas AI Campus for Anthropic, Backed by Google",
    "The Texas campus is set to feature an on-site natural gas plant capable of generating 1.6 gigawatts of power."
   ],
   "builder_evidence": [
    "# Nexus Data Centers in Advanced Talks for $15 Billion Texas AI Campus for Anthropic, Backed by Google",
    "Nexus Data Centers is in advanced talks to secure $15 billion in financing to construct a sprawling artificial intelligence (AI) data center campus in Hubbard, Texas, built specifically for Anthropic."
   ],
   "ai_customer_evidence": [
    "# Nexus Data Centers in Advanced Talks for $15 Billion Texas AI Campus for Anthropic, Backed by Google",
    "Nexus Data Centers is in advanced talks to secure $15 billion in financing to construct a sprawling artificial intelligence (AI) data center campus in Hubbard, Texas, built specifically for Anthropic."
   ],
   "status_evidence": [
    "# Nexus Data Centers in Advanced Talks for $15 Billion Texas AI Campus for Anthropic, Backed by Google",
    "Nexus Data Centers is in advanced talks to secure $15 billion in financing to construct a sprawling artificial intelligence (AI) data center campus in Hubbard, Texas, built specifically for Anthropic."
   ],
   "announcement_date_evidence": [
    "# Nexus Data Centers in Advanced Talks for $15 Billion Texas AI Campus for Anthropic, Backed by Google",
    "Published On: July 31, 2026"
   ]
  },
  {
   "url": "https://portscampus.com/",
   "title": "PORTS-Pike Technology Campus",
   "published_at": "2025-03-07T16:58:05",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 10.0,
   "builder": "SoftBank Group and SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "## America\u2019s AI Leadership Grows from the Heartland",
    "SoftBank Group and SB Energy are building the PORTS-Pike Technology Campus in Pike County, Ohio continuing U.S. leadership in AI and the region\u2019s long tradition of powering national growth and security."
   ],
   "locality_evidence": [
    "## America\u2019s AI Leadership Grows from the Heartland",
    "SoftBank Group and SB Energy are building the PORTS-Pike Technology Campus in Pike County, Ohio continuing U.S. leadership in AI and the region\u2019s long tradition of powering national growth and security."
   ],
   "state_evidence": [
    "## America\u2019s AI Leadership Grows from the Heartland",
    "SoftBank Group and SB Energy are building the PORTS-Pike Technology Campus in Pike County, Ohio continuing U.S. leadership in AI and the region\u2019s long tradition of powering national growth and security."
   ],
   "capacity_gw_evidence": [
    "## Critical National Digital Infrastructure",
    "SoftBank Group and SB Energy are partnering with the U.S. Department of Energy (DOE) to build a 10 GW data center across private and remediated DOE land."
   ],
   "builder_evidence": [
    "## America\u2019s AI Leadership Grows from the Heartland",
    "SoftBank Group and SB Energy are building the PORTS-Pike Technology Campus in Pike County, Ohio continuing U.S. leadership in AI and the region\u2019s long tradition of powering national growth and security."
   ],
   "ai_customer_evidence": [
    "## Critical National Digital Infrastructure",
    "SB Energy has signed a landmark 20-year lease with OpenAI, while NVIDIA will provide credit support and will be the exclusive AI compute infrastructure provider at the campus."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://dcpulse.com/projects/companyprofiles/meta-platforms-inc",
   "title": "Meta Platforms, Inc. Company Profile, Products, Revenue & Global Presence",
   "published_at": null,
   "project": "Meta El Paso AI 10B Data Center",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "Under Construction / Scale-Up Phase (March 2026)",
   "announcement_date": null,
   "project_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta El Paso AI 10B Data Center, $10B AI-optimized data center | El Paso, Texas | 2028 | Under Construction / Scale-Up Phase (March 2026) | 1,000 MW | [**](https://dcpulse.com/project/meta-el-paso-10-billion-1gw-ai-data-center-expansion) |"
   ],
   "locality_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta El Paso AI 10B Data Center, $10B AI-optimized data center | El Paso, Texas | 2028 | Under Construction / Scale-Up Phase (March 2026) | 1,000 MW | [**](https://dcpulse.com/project/meta-el-paso-10-billion-1gw-ai-data-center-expansion) |"
   ],
   "state_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta El Paso AI 10B Data Center, $10B AI-optimized data center | El Paso, Texas | 2028 | Under Construction / Scale-Up Phase (March 2026) | 1,000 MW | [**](https://dcpulse.com/project/meta-el-paso-10-billion-1gw-ai-data-center-expansion) |"
   ],
   "capacity_gw_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta El Paso AI 10B Data Center, $10B AI-optimized data center | El Paso, Texas | 2028 | Under Construction / Scale-Up Phase (March 2026) | 1,000 MW | [**](https://dcpulse.com/project/meta-el-paso-10-billion-1gw-ai-data-center-expansion) |"
   ],
   "builder_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta El Paso AI 10B Data Center, $10B AI-optimized data center | El Paso, Texas | 2028 | Under Construction / Scale-Up Phase (March 2026) | 1,000 MW | [**](https://dcpulse.com/project/meta-el-paso-10-billion-1gw-ai-data-center-expansion) |"
   ],
   "ai_customer_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta El Paso AI 10B Data Center, $10B AI-optimized data center | El Paso, Texas | 2028 | Under Construction / Scale-Up Phase (March 2026) | 1,000 MW | [**](https://dcpulse.com/project/meta-el-paso-10-billion-1gw-ai-data-center-expansion) |"
   ],
   "status_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta El Paso AI 10B Data Center, $10B AI-optimized data center | El Paso, Texas | 2028 | Under Construction / Scale-Up Phase (March 2026) | 1,000 MW | [**](https://dcpulse.com/project/meta-el-paso-10-billion-1gw-ai-data-center-expansion) |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://dcpulse.com/projects/companyprofiles/meta-platforms-inc",
   "title": "Meta Platforms, Inc. Company Profile, Products, Revenue & Global Presence",
   "published_at": null,
   "project": "Meta Hyperion Indiana",
   "locality": "LEAP Research and Innovation District, Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "Under Construction / Groundbreaking",
   "announcement_date": null,
   "project_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Hyperion Indiana: $10bn AI Mega-Campus 1GW Expansion | LEAP Research and Innovation District, Lebanon, Indiana | 2030 | Under Construction / Groundbreaking | 1 GW (1,000 MW) | [**](https://dcpulse.com/project/meta-hyperion-indiana-1gw-ai-data-center) |"
   ],
   "locality_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Hyperion Indiana: $10bn AI Mega-Campus 1GW Expansion | LEAP Research and Innovation District, Lebanon, Indiana | 2030 | Under Construction / Groundbreaking | 1 GW (1,000 MW) | [**](https://dcpulse.com/project/meta-hyperion-indiana-1gw-ai-data-center) |"
   ],
   "state_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Hyperion Indiana: $10bn AI Mega-Campus 1GW Expansion | LEAP Research and Innovation District, Lebanon, Indiana | 2030 | Under Construction / Groundbreaking | 1 GW (1,000 MW) | [**](https://dcpulse.com/project/meta-hyperion-indiana-1gw-ai-data-center) |"
   ],
   "capacity_gw_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Hyperion Indiana: $10bn AI Mega-Campus 1GW Expansion | LEAP Research and Innovation District, Lebanon, Indiana | 2030 | Under Construction / Groundbreaking | 1 GW (1,000 MW) | [**](https://dcpulse.com/project/meta-hyperion-indiana-1gw-ai-data-center) |"
   ],
   "builder_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Hyperion Indiana: $10bn AI Mega-Campus 1GW Expansion | LEAP Research and Innovation District, Lebanon, Indiana | 2030 | Under Construction / Groundbreaking | 1 GW (1,000 MW) | [**](https://dcpulse.com/project/meta-hyperion-indiana-1gw-ai-data-center) |"
   ],
   "ai_customer_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Hyperion Indiana: $10bn AI Mega-Campus 1GW Expansion | LEAP Research and Innovation District, Lebanon, Indiana | 2030 | Under Construction / Groundbreaking | 1 GW (1,000 MW) | [**](https://dcpulse.com/project/meta-hyperion-indiana-1gw-ai-data-center) |"
   ],
   "status_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Hyperion Indiana: $10bn AI Mega-Campus 1GW Expansion | LEAP Research and Innovation District, Lebanon, Indiana | 2030 | Under Construction / Groundbreaking | 1 GW (1,000 MW) | [**](https://dcpulse.com/project/meta-hyperion-indiana-1gw-ai-data-center) |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://dcpulse.com/projects/companyprofiles/meta-platforms-inc",
   "title": "Meta Platforms, Inc. Company Profile, Products, Revenue & Global Presence",
   "published_at": null,
   "project": "Meta Lebanon AI Data Center Campus",
   "locality": "labanon city",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "Under Construction (Groundbreaking: Feb 11, 2026)",
   "announcement_date": "2026-02-11",
   "project_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Lebanon AI Data Center Campus (1 GW) | labanon city us | 2030 | Under Construction (Groundbreaking: Feb 11, 2026) | 1 GW Critical Load | [**](https://dcpulse.com/project/meta-lebanon-indiana-1gw-ai-data-center) |"
   ],
   "locality_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Lebanon AI Data Center Campus (1 GW) | labanon city us | 2030 | Under Construction (Groundbreaking: Feb 11, 2026) | 1 GW Critical Load | [**](https://dcpulse.com/project/meta-lebanon-indiana-1gw-ai-data-center) |"
   ],
   "state_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Lebanon AI Data Center Campus (1 GW) | labanon city us | 2030 | Under Construction (Groundbreaking: Feb 11, 2026) | 1 GW Critical Load | [**](https://dcpulse.com/project/meta-lebanon-indiana-1gw-ai-data-center) |"
   ],
   "capacity_gw_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Lebanon AI Data Center Campus (1 GW) | labanon city us | 2030 | Under Construction (Groundbreaking: Feb 11, 2026) | 1 GW Critical Load | [**](https://dcpulse.com/project/meta-lebanon-indiana-1gw-ai-data-center) |"
   ],
   "builder_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Lebanon AI Data Center Campus (1 GW) | labanon city us | 2030 | Under Construction (Groundbreaking: Feb 11, 2026) | 1 GW Critical Load | [**](https://dcpulse.com/project/meta-lebanon-indiana-1gw-ai-data-center) |"
   ],
   "ai_customer_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Lebanon AI Data Center Campus (1 GW) | labanon city us | 2030 | Under Construction (Groundbreaking: Feb 11, 2026) | 1 GW Critical Load | [**](https://dcpulse.com/project/meta-lebanon-indiana-1gw-ai-data-center) |"
   ],
   "status_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Lebanon AI Data Center Campus (1 GW) | labanon city us | 2030 | Under Construction (Groundbreaking: Feb 11, 2026) | 1 GW Critical Load | [**](https://dcpulse.com/project/meta-lebanon-indiana-1gw-ai-data-center) |"
   ],
   "announcement_date_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Lebanon AI Data Center Campus (1 GW) | labanon city us | 2030 | Under Construction (Groundbreaking: Feb 11, 2026) | 1 GW Critical Load | [**](https://dcpulse.com/project/meta-lebanon-indiana-1gw-ai-data-center) |"
   ]
  },
  {
   "url": "https://dcpulse.com/projects/companyprofiles/meta-platforms-inc",
   "title": "Meta Platforms, Inc. Company Profile, Products, Revenue & Global Presence",
   "published_at": null,
   "project": "Meta Hyperion Louisiana",
   "locality": "Richland Parish (near Holly Ridge)",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "Under Construction / Scaling",
   "announcement_date": null,
   "project_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Hyperion Louisiana: 5GW AI Hyperscale Campus | Richland Parish (near Holly Ridge) | NA | Under Construction / Scaling | 5 GW (Target Scale) | [**](https://dcpulse.com/project/meta-hyperion-5gw-louisiana-ai-data-center) |"
   ],
   "locality_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Hyperion Louisiana: 5GW AI Hyperscale Campus | Richland Parish (near Holly Ridge) | NA | Under Construction / Scaling | 5 GW (Target Scale) | [**](https://dcpulse.com/project/meta-hyperion-5gw-louisiana-ai-data-center) |"
   ],
   "state_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Hyperion Louisiana: 5GW AI Hyperscale Campus | Richland Parish (near Holly Ridge) | NA | Under Construction / Scaling | 5 GW (Target Scale) | [**](https://dcpulse.com/project/meta-hyperion-5gw-louisiana-ai-data-center) |"
   ],
   "capacity_gw_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Hyperion Louisiana: 5GW AI Hyperscale Campus | Richland Parish (near Holly Ridge) | NA | Under Construction / Scaling | 5 GW (Target Scale) | [**](https://dcpulse.com/project/meta-hyperion-5gw-louisiana-ai-data-center) |"
   ],
   "builder_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Hyperion Louisiana: 5GW AI Hyperscale Campus | Richland Parish (near Holly Ridge) | NA | Under Construction / Scaling | 5 GW (Target Scale) | [**](https://dcpulse.com/project/meta-hyperion-5gw-louisiana-ai-data-center) |"
   ],
   "ai_customer_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Hyperion Louisiana: 5GW AI Hyperscale Campus | Richland Parish (near Holly Ridge) | NA | Under Construction / Scaling | 5 GW (Target Scale) | [**](https://dcpulse.com/project/meta-hyperion-5gw-louisiana-ai-data-center) |"
   ],
   "status_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Hyperion Louisiana: 5GW AI Hyperscale Campus | Richland Parish (near Holly Ridge) | NA | Under Construction / Scaling | 5 GW (Target Scale) | [**](https://dcpulse.com/project/meta-hyperion-5gw-louisiana-ai-data-center) |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://dcpulse.com/projects/companyprofiles/meta-platforms-inc",
   "title": "Meta Platforms, Inc. Company Profile, Products, Revenue & Global Presence",
   "published_at": null,
   "project": "Meta Hyperion: $10B Richland Parish AI Data Center Louisiana",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 2.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Hyperion: $10B Richland Parish AI Data Center Louisiana | Franklin Farm Property, Richland Parish | 2030 | Under Construction | 2,000 MW+ (2 GW Total Cluster Goal) | [**](https://dcpulse.com/project/meta-hyperion-10b-louisiana-richland-parish-ai-data-center) |"
   ],
   "locality_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Hyperion: $10B Richland Parish AI Data Center Louisiana | Franklin Farm Property, Richland Parish | 2030 | Under Construction | 2,000 MW+ (2 GW Total Cluster Goal) | [**](https://dcpulse.com/project/meta-hyperion-10b-louisiana-richland-parish-ai-data-center) |"
   ],
   "state_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Hyperion: $10B Richland Parish AI Data Center Louisiana | Franklin Farm Property, Richland Parish | 2030 | Under Construction | 2,000 MW+ (2 GW Total Cluster Goal) | [**](https://dcpulse.com/project/meta-hyperion-10b-louisiana-richland-parish-ai-data-center) |"
   ],
   "capacity_gw_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Hyperion: $10B Richland Parish AI Data Center Louisiana | Franklin Farm Property, Richland Parish | 2030 | Under Construction | 2,000 MW+ (2 GW Total Cluster Goal) | [**](https://dcpulse.com/project/meta-hyperion-10b-louisiana-richland-parish-ai-data-center) |"
   ],
   "builder_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Hyperion: $10B Richland Parish AI Data Center Louisiana | Franklin Farm Property, Richland Parish | 2030 | Under Construction | 2,000 MW+ (2 GW Total Cluster Goal) | [**](https://dcpulse.com/project/meta-hyperion-10b-louisiana-richland-parish-ai-data-center) |"
   ],
   "ai_customer_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Hyperion: $10B Richland Parish AI Data Center Louisiana | Franklin Farm Property, Richland Parish | 2030 | Under Construction | 2,000 MW+ (2 GW Total Cluster Goal) | [**](https://dcpulse.com/project/meta-hyperion-10b-louisiana-richland-parish-ai-data-center) |"
   ],
   "status_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Hyperion: $10B Richland Parish AI Data Center Louisiana | Franklin Farm Property, Richland Parish | 2030 | Under Construction | 2,000 MW+ (2 GW Total Cluster Goal) | [**](https://dcpulse.com/project/meta-hyperion-10b-louisiana-richland-parish-ai-data-center) |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://dcpulse.com/projects/companyprofiles/meta-platforms-inc",
   "title": "Meta Platforms, Inc. Company Profile, Products, Revenue & Global Presence",
   "published_at": null,
   "project": "Meta Prometheus: 1GW AI Data Center New Albany Ohio",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "Under Construction (Superstructure phase)",
   "announcement_date": null,
   "project_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Prometheus: 1GW AI Data Center New Albany Ohio | New Albany, Ohio, USA | 2027 | Under Construction (Superstructure phase) | 1,000 MW (1 GW) | [**](https://dcpulse.com/project/meta-prometheus-new-albany-1gw-ai-data-center) |"
   ],
   "locality_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Prometheus: 1GW AI Data Center New Albany Ohio | New Albany, Ohio, USA | 2027 | Under Construction (Superstructure phase) | 1,000 MW (1 GW) | [**](https://dcpulse.com/project/meta-prometheus-new-albany-1gw-ai-data-center) |"
   ],
   "state_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Prometheus: 1GW AI Data Center New Albany Ohio | New Albany, Ohio, USA | 2027 | Under Construction (Superstructure phase) | 1,000 MW (1 GW) | [**](https://dcpulse.com/project/meta-prometheus-new-albany-1gw-ai-data-center) |"
   ],
   "capacity_gw_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Prometheus: 1GW AI Data Center New Albany Ohio | New Albany, Ohio, USA | 2027 | Under Construction (Superstructure phase) | 1,000 MW (1 GW) | [**](https://dcpulse.com/project/meta-prometheus-new-albany-1gw-ai-data-center) |"
   ],
   "builder_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Prometheus: 1GW AI Data Center New Albany Ohio | New Albany, Ohio, USA | 2027 | Under Construction (Superstructure phase) | 1,000 MW (1 GW) | [**](https://dcpulse.com/project/meta-prometheus-new-albany-1gw-ai-data-center) |"
   ],
   "ai_customer_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Prometheus: 1GW AI Data Center New Albany Ohio | New Albany, Ohio, USA | 2027 | Under Construction (Superstructure phase) | 1,000 MW (1 GW) | [**](https://dcpulse.com/project/meta-prometheus-new-albany-1gw-ai-data-center) |"
   ],
   "status_evidence": [
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Meta Prometheus: 1GW AI Data Center New Albany Ohio | New Albany, Ohio, USA | 2027 | Under Construction (Superstructure phase) | 1,000 MW (1 GW) | [**](https://dcpulse.com/project/meta-prometheus-new-albany-1gw-ai-data-center) |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://www.nytimes.com/2025/06/24/technology/amazon-ai-data-centers.html",
   "title": "At Amazon\u2019s Biggest Data Center, Everything Is Supersized for A.I.",
   "published_at": "2025-06-24T09:01:00",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon",
   "ai_customer": "Anthropic",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "At Amazon\u2019s Biggest Data Center, Everything Is Supersized for A.I.",
    "The complex \u2014 so large that it can be viewed completely only from high in the sky \u2014 is the first in a new generation of data centers being built by Amazon, and part of what the company calls Project Rainier, after the mountain that looms near its Seattle headquarters."
   ],
   "locality_evidence": [
    "At Amazon\u2019s Biggest Data Center, Everything Is Supersized for A.I.",
    "A year ago, a 1,200-acre stretch of farmland outside New Carlisle, Ind., was an empty cornfield."
   ],
   "state_evidence": [
    "At Amazon\u2019s Biggest Data Center, Everything Is Supersized for A.I.",
    "On 1,200 acres of cornfield in Indiana, Amazon is building one of the largest computers ever for work with Anthropic, an artificial intelligence start-up."
   ],
   "capacity_gw_evidence": [
    "At Amazon\u2019s Biggest Data Center, Everything Is Supersized for A.I.",
    "The facility will consume 2.2 gigawatts of electricity \u2014 enough to power a million homes."
   ],
   "builder_evidence": [
    "At Amazon\u2019s Biggest Data Center, Everything Is Supersized for A.I.",
    "On 1,200 acres of cornfield in Indiana, Amazon is building one of the largest computers ever for work with Anthropic, an artificial intelligence start-up."
   ],
   "ai_customer_evidence": [
    "At Amazon\u2019s Biggest Data Center, Everything Is Supersized for A.I.",
    "On 1,200 acres of cornfield in Indiana, Amazon is building one of the largest computers ever for work with Anthropic, an artificial intelligence start-up."
   ],
   "status_evidence": [
    "At Amazon\u2019s Biggest Data Center, Everything Is Supersized for A.I.",
    "Now, seven Amazon data centers rise up from the rich soil, each larger than a football stadium."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://www.idcnova.com/news/Crusoe-files-for-two-more-data-center-buildings-at-Goodnight-Campus-in-Texas",
   "title": "Crusoe files for two more data center buildings at Goodnight Campus in Texas",
   "published_at": "2026-07-31T05:05:38",
   "project": "Goodnight Campus",
   "locality": "Claude",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe",
   "ai_customer": null,
   "status": "under-development",
   "announcement_date": null,
   "project_evidence": [
    "Crusoe has filed for two additional data center buildings at its under-development Goodnight Campus in Claude, Texas, as the company accelerates the build-out of its AI-focused infrastructure portfolio across the state."
   ],
   "locality_evidence": [
    "Crusoe has filed for two additional data center buildings at its under-development Goodnight Campus in Claude, Texas, as the company accelerates the build-out of its AI-focused infrastructure portfolio across the state."
   ],
   "state_evidence": [
    "Crusoe has filed for two additional data center buildings at its under-development Goodnight Campus in Claude, Texas, as the company accelerates the build-out of its AI-focused infrastructure portfolio across the state."
   ],
   "capacity_gw_evidence": [
    "According to Aterio Research, the campus will ultimately feature seven buildings and deliver more than 1GW of capacity."
   ],
   "builder_evidence": [
    "Crusoe has filed for two additional data center buildings at its under-development Goodnight Campus in Claude, Texas, as the company accelerates the build-out of its AI-focused infrastructure portfolio across the state."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Crusoe has filed for two additional data center buildings at its under-development Goodnight Campus in Claude, Texas, as the company accelerates the build-out of its AI-focused infrastructure portfolio across the state."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://www.idcnova.com/news/Crusoe-files-for-two-more-data-center-buildings-at-Goodnight-Campus-in-Texas",
   "title": "Crusoe files for two more data center buildings at Goodnight Campus in Texas",
   "published_at": "2026-07-31T05:05:38",
   "project": "Childress campus",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Crusoe",
   "ai_customer": null,
   "status": "developing",
   "announcement_date": null,
   "project_evidence": [
    "The expansion comes amid a period of rapid growth for Crusoe, which is also developing a 1.4GW data center campus in Childress, Texas, and operates the Abilene site that is being used by OpenAI."
   ],
   "locality_evidence": [
    "The expansion comes amid a period of rapid growth for Crusoe, which is also developing a 1.4GW data center campus in Childress, Texas, and operates the Abilene site that is being used by OpenAI."
   ],
   "state_evidence": [
    "The expansion comes amid a period of rapid growth for Crusoe, which is also developing a 1.4GW data center campus in Childress, Texas, and operates the Abilene site that is being used by OpenAI."
   ],
   "capacity_gw_evidence": [
    "The expansion comes amid a period of rapid growth for Crusoe, which is also developing a 1.4GW data center campus in Childress, Texas, and operates the Abilene site that is being used by OpenAI."
   ],
   "builder_evidence": [
    "The expansion comes amid a period of rapid growth for Crusoe, which is also developing a 1.4GW data center campus in Childress, Texas, and operates the Abilene site that is being used by OpenAI."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The expansion comes amid a period of rapid growth for Crusoe, which is also developing a 1.4GW data center campus in Childress, Texas, and operates the Abilene site that is being used by OpenAI."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://edgen.tech/tr/news/post/chevrons-20-year-microsoft-power-deal-diversifies-beyond-oil",
   "title": "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
   "published_at": "2026-08-29T15:54:13",
   "project": "Project Kilby",
   "locality": "Reeves County",
   "state": "Texas",
   "capacity_gw": 2.67,
   "builder": "Chevron",
   "ai_customer": "Microsoft",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "The project, known as Project Kilby, will be developed through Chevron's Energy Forge One subsidiary alongside Engine No. 1 and Microsoft."
   ],
   "locality_evidence": [
    "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings."
   ],
   "state_evidence": [
    "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings."
   ],
   "capacity_gw_evidence": [
    "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings."
   ],
   "builder_evidence": [
    "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "The project, known as Project Kilby, will be developed through Chevron's Energy Forge One subsidiary alongside Engine No. 1 and Microsoft."
   ],
   "ai_customer_evidence": [
    "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings."
   ],
   "status_evidence": [
    "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "First power is expected in 2028, with a final investment decision targeted by the end of 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://linkedin.com/pulse/inside-massive-ai-campus-rising-texas-moveinterstate-nrkle",
   "title": "Inside the Massive AI Campus Rising in Texas",
   "published_at": "2026-04-07T16:00:21",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "underway",
   "announcement_date": null,
   "project_evidence": [
    "# Inside the Massive AI Campus Rising in Texas",
    "project stands today, including new developments from the past week.\n\n[Project Matador](https://www.linkedin.com/redir/redirect?url=https%3A%2F%2Ffermiamerica%2Ecom%2F&urlhash=bgnO&trk=article-ssr-frontend-pulse_little-text-block), the flagship initiative of Fermi America co-founded by former U.S. Energy Secretary and Texas Governor Rick Perry, is the world\u2019s largest planned private grid AI campus.",
    "At full buildout, the Advanced Energy and Intelligence Campus will house up to 18 million square feet of AI data centers and generate up to 11 gigawatts of IT capacity from a combination of clean natural gas, nuclear, solar, and battery storage."
   ],
   "locality_evidence": [
    "# Inside the Massive AI Campus Rising in Texas",
    "Fermi America and Texas Tech are constructing a massive AI energy campus near Amarillo.",
    "Construction is already underway outside Amarillo."
   ],
   "state_evidence": [
    "# Inside the Massive AI Campus Rising in Texas",
    "Fermi America and Texas Tech are constructing a massive AI energy campus near Amarillo.",
    "The original campus lease covers 5,769 acres in Carson County, Texas, adjacent to Pantex, the nation\u2019s primary nuclear weapons assembly facility, though Fermi\u2019s development footprint has since expanded to approximately 7,570 acres as it has pursued additional land acquisitions."
   ],
   "capacity_gw_evidence": [
    "# Inside the Massive AI Campus Rising in Texas",
    "At full buildout, the Advanced Energy and Intelligence Campus will house up to 18 million square feet of AI data centers and generate up to 11 gigawatts of IT capacity from a combination of clean natural gas, nuclear, solar, and battery storage."
   ],
   "builder_evidence": [
    "# Inside the Massive AI Campus Rising in Texas",
    "Fermi America and Texas Tech are constructing a massive AI energy campus near Amarillo.",
    "project stands today, including new developments from the past week.\n\n[Project Matador](https://www.linkedin.com/redir/redirect?url=https%3A%2F%2Ffermiamerica%2Ecom%2F&urlhash=bgnO&trk=article-ssr-frontend-pulse_little-text-block), the flagship initiative of Fermi America co-founded by former U.S. Energy Secretary and Texas Governor Rick Perry, is the world\u2019s largest planned private grid AI campus."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Inside the Massive AI Campus Rising in Texas",
    "Construction is already underway outside Amarillo."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://gfmreview.com/technology/pennsylvania-s-once-top-coal-power-plant-eyed-for-revival-as-4-5gw-gas-fired-ai-campus",
   "title": "Pennsylvanias Once Top Coal Power Plant Eyed For Revival As 4.5GW Gas-fired AI Campus",
   "published_at": "2025-04-02T21:17:00",
   "project": "Homer City",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Homer City Redevelopment",
   "ai_customer": null,
   "status": "proposed",
   "announcement_date": "2025-04-02",
   "project_evidence": [
    "# Pennsylvanias Once Top Coal Power Plant Eyed For Revival As 4.5GW Gas-fired AI Campus",
    "Development of the 3,200-acre natural gas-powered datacenter campus is being led by Homer City Redevelopment (HCR) and is expected to exceed $10 billion for power infrastructure and site readiness alone, with additional billions anticipated for the datacenter development."
   ],
   "locality_evidence": [
    "# Pennsylvanias Once Top Coal Power Plant Eyed For Revival As 4.5GW Gas-fired AI Campus",
    "Building at the former Homer City Generating Station has its advantages."
   ],
   "state_evidence": [
    "# Pennsylvanias Once Top Coal Power Plant Eyed For Revival As 4.5GW Gas-fired AI Campus",
    "Developers on Wednesday announced plans to bring up to 4.5 gigawatts of natural gas-fired power online by 2027 at the site of what was once Pennsylvania's largest coal plant, as part of a proposed datacenter campus running AI and high-performance computing workloads."
   ],
   "capacity_gw_evidence": [
    "# Pennsylvanias Once Top Coal Power Plant Eyed For Revival As 4.5GW Gas-fired AI Campus",
    "Developers on Wednesday announced plans to bring up to 4.5 gigawatts of natural gas-fired power online by 2027 at the site of what was once Pennsylvania's largest coal plant, as part of a proposed datacenter campus running AI and high-performance computing workloads."
   ],
   "builder_evidence": [
    "# Pennsylvanias Once Top Coal Power Plant Eyed For Revival As 4.5GW Gas-fired AI Campus",
    "Development of the 3,200-acre natural gas-powered datacenter campus is being led by Homer City Redevelopment (HCR) and is expected to exceed $10 billion for power infrastructure and site readiness alone, with additional billions anticipated for the datacenter development."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Pennsylvanias Once Top Coal Power Plant Eyed For Revival As 4.5GW Gas-fired AI Campus",
    "Developers on Wednesday announced plans to bring up to 4.5 gigawatts of natural gas-fired power online by 2027 at the site of what was once Pennsylvania's largest coal plant, as part of a proposed datacenter campus running AI and high-performance computing workloads."
   ],
   "announcement_date_evidence": [
    "# Pennsylvanias Once Top Coal Power Plant Eyed For Revival As 4.5GW Gas-fired AI Campus",
    "Developers on Wednesday announced plans to bring up to 4.5 gigawatts of natural gas-fired power online by 2027 at the site of what was once Pennsylvania's largest coal plant, as part of a proposed datacenter campus running AI and high-performance computing workloads."
   ]
  },
  {
   "url": "https://gattyworks.com/news/openai-project-camellia-georgia-power-deal",
   "title": "3.2GW Georgia Power Deal (2026)",
   "published_at": "2026-07-23T04:09:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "# OpenAI locked in 3.2 gigawatts of Georgia power through 2032",
    "Project Camellia is OpenAI's first data center built with OpenAI itself as principal designer, a $20 billion campus in Effingham County backed by a 3.2 gigawatt supply deal with Georgia Power."
   ],
   "locality_evidence": [
    "# OpenAI locked in 3.2 gigawatts of Georgia power through 2032",
    "Project Camellia is OpenAI's first data center built with OpenAI itself as principal designer, a $20 billion campus in Effingham County backed by a 3.2 gigawatt supply deal with Georgia Power."
   ],
   "state_evidence": [
    "# OpenAI locked in 3.2 gigawatts of Georgia power through 2032",
    "Project Camellia is OpenAI's first data center built with OpenAI itself as principal designer, a $20 billion campus in Effingham County backed by a 3.2 gigawatt supply deal with Georgia Power."
   ],
   "capacity_gw_evidence": [
    "# OpenAI locked in 3.2 gigawatts of Georgia power through 2032",
    "Project Camellia is OpenAI's first data center built with OpenAI itself as principal designer, a $20 billion campus in Effingham County backed by a 3.2 gigawatt supply deal with Georgia Power."
   ],
   "builder_evidence": [
    "# OpenAI locked in 3.2 gigawatts of Georgia power through 2032",
    "Project Camellia is OpenAI's first data center built with OpenAI itself as principal designer, a $20 billion campus in Effingham County backed by a 3.2 gigawatt supply deal with Georgia Power."
   ],
   "ai_customer_evidence": [
    "# OpenAI locked in 3.2 gigawatts of Georgia power through 2032",
    "Project Camellia is OpenAI's first data center built with OpenAI itself as principal designer, a $20 billion campus in Effingham County backed by a 3.2 gigawatt supply deal with Georgia Power."
   ],
   "status_evidence": [
    "# OpenAI locked in 3.2 gigawatts of Georgia power through 2032",
    "OpenAI signed a 3.2 gigawatt power supply agreement with Georgia Power for Project Camellia, a data center campus in Effingham County, Georgia, reported July 22, 2026."
   ],
   "announcement_date_evidence": [
    "# OpenAI locked in 3.2 gigawatts of Georgia power through 2032",
    "OpenAI signed a 3.2 gigawatt power supply agreement with Georgia Power for Project Camellia, a data center campus in Effingham County, Georgia, reported July 22, 2026."
   ]
  },
  {
   "url": "https://rallies.ai/news/google-to-build-1gw-michigan-data-center-backed-by-10m-energy-fund",
   "title": "Google to Build 1GW Michigan Data Center, Backed by $10M Energy Fund",
   "published_at": "2026-03-17T12:16:05",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Google",
   "ai_customer": null,
   "status": "preliminary approval",
   "announcement_date": null,
   "project_evidence": [
    "Google to Build 1GW Michigan Data Center, Backed by $10M Energy Fund - GOOGL News | Rallies",
    "# Google to Build 1GW Michigan Data Center, Backed by $10M Energy Fund",
    "### 1. Google Confirms Project Cannoli",
    "Google announced it will operate a 1-gigawatt data center code-named Project Cannoli in Van Buren Township, Michigan, ending months of speculation about the facility\u2019s developer."
   ],
   "locality_evidence": [
    "Google to Build 1GW Michigan Data Center, Backed by $10M Energy Fund - GOOGL News | Rallies",
    "# Google to Build 1GW Michigan Data Center, Backed by $10M Energy Fund",
    "Google confirms it will operate a 1GW data center in Van Buren Township, Michigan, spanning 130 acres with five buildings over 800,000 square feet under preliminary approval.",
    "### 1. Google Confirms Project Cannoli",
    "Google announced it will operate a 1-gigawatt data center code-named Project Cannoli in Van Buren Township, Michigan, ending months of speculation about the facility\u2019s developer."
   ],
   "state_evidence": [
    "Google to Build 1GW Michigan Data Center, Backed by $10M Energy Fund - GOOGL News | Rallies",
    "# Google to Build 1GW Michigan Data Center, Backed by $10M Energy Fund",
    "Google confirms it will operate a 1GW data center in Van Buren Township, Michigan, spanning 130 acres with five buildings over 800,000 square feet under preliminary approval.",
    "### 1. Google Confirms Project Cannoli",
    "Google announced it will operate a 1-gigawatt data center code-named Project Cannoli in Van Buren Township, Michigan, ending months of speculation about the facility\u2019s developer."
   ],
   "capacity_gw_evidence": [
    "Google to Build 1GW Michigan Data Center, Backed by $10M Energy Fund - GOOGL News | Rallies",
    "# Google to Build 1GW Michigan Data Center, Backed by $10M Energy Fund",
    "Google confirms it will operate a 1GW data center in Van Buren Township, Michigan, spanning 130 acres with five buildings over 800,000 square feet under preliminary approval.",
    "### 1. Google Confirms Project Cannoli",
    "Google announced it will operate a 1-gigawatt data center code-named Project Cannoli in Van Buren Township, Michigan, ending months of speculation about the facility\u2019s developer."
   ],
   "builder_evidence": [
    "Google to Build 1GW Michigan Data Center, Backed by $10M Energy Fund - GOOGL News | Rallies",
    "# Google to Build 1GW Michigan Data Center, Backed by $10M Energy Fund",
    "Google confirms it will operate a 1GW data center in Van Buren Township, Michigan, spanning 130 acres with five buildings over 800,000 square feet under preliminary approval.",
    "### 1. Google Confirms Project Cannoli",
    "Google announced it will operate a 1-gigawatt data center code-named Project Cannoli in Van Buren Township, Michigan, ending months of speculation about the facility\u2019s developer."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Google to Build 1GW Michigan Data Center, Backed by $10M Energy Fund - GOOGL News | Rallies",
    "# Google to Build 1GW Michigan Data Center, Backed by $10M Energy Fund",
    "Google confirms it will operate a 1GW data center in Van Buren Township, Michigan, spanning 130 acres with five buildings over 800,000 square feet under preliminary approval."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://gate.com/news/detail/terawulf-expands-ai-strategy-with-1gw-data-campus-and-3b-backing-21468313",
   "title": "Terawulf Expands AI Strategy With 1GW Data Campus and $3B Backing | Gate News",
   "published_at": "2026-05-29T05:39:28",
   "project": "Muskie Data Campus",
   "locality": "Eastpark Industrial Park",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "Terawulf",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "Terawulf has acquired a major AI-focused data center site in Kentucky as it accelerates its shift from bitcoin mining toward high-performance computing.",
    "The Nasdaq-listed company said it acquired the \u201cMuskie Data Campus\u201d from Industrial Equity Partners."
   ],
   "locality_evidence": [
    "Terawulf has acquired a major AI-focused data center site in Kentucky as it accelerates its shift from bitcoin mining toward high-performance computing.",
    "The site sits inside the 1,000-acre Eastpark Industrial Park in northeastern Kentucky and includes about 285 acres of owned and controlled land."
   ],
   "state_evidence": [
    "Terawulf has acquired a major AI-focused data center site in Kentucky as it accelerates its shift from bitcoin mining toward high-performance computing.",
    "The site sits inside the 1,000-acre Eastpark Industrial Park in northeastern Kentucky and includes about 285 acres of owned and controlled land."
   ],
   "capacity_gw_evidence": [
    "Terawulf has acquired a major AI-focused data center site in Kentucky as it accelerates its shift from bitcoin mining toward high-performance computing.",
    "Terawulf said the campus is expected to support more than 1 gigawatt of AI and high-performance computing capacity."
   ],
   "builder_evidence": [
    "Terawulf has acquired a major AI-focused data center site in Kentucky as it accelerates its shift from bitcoin mining toward high-performance computing.",
    "Terawulf Inc. is moving deeper into artificial intelligence (AI) infrastructure with the purchase of a large data center development site in eastern Kentucky, underscoring how former bitcoin mining firms are chasing demand for power-hungry computing capacity."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Terawulf has acquired a major AI-focused data center site in Kentucky as it accelerates its shift from bitcoin mining toward high-performance computing.",
    "Terawulf said the campus is expected to support more than 1 gigawatt of AI and high-performance computing capacity."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://edgen.tech/ko/news/post/hut-8-drops-11-as-ai-pivoting-miners-give-back-2026-gains",
   "title": "Hut 8 drops 11% as AI-pivoting miners give back 2026 gains",
   "published_at": "2026-08-21T16:30:27",
   "project": "Beacon Point",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "commercialized",
   "announcement_date": "2026-05-06",
   "project_evidence": [
    "Hut 8 drops 11% as AI-pivoting miners give back 2026 gains",
    "On May 6, Hut 8 commercialized the first phase of its 1 gigawatt Beacon Point AI data center campus in Texas with a 15-year, 352 megawatt IT lease carrying a base-term contract value of $9.8 billion."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "Hut 8 drops 11% as AI-pivoting miners give back 2026 gains",
    "On May 6, Hut 8 commercialized the first phase of its 1 gigawatt Beacon Point AI data center campus in Texas with a 15-year, 352 megawatt IT lease carrying a base-term contract value of $9.8 billion."
   ],
   "capacity_gw_evidence": [
    "Hut 8 drops 11% as AI-pivoting miners give back 2026 gains",
    "On May 6, Hut 8 commercialized the first phase of its 1 gigawatt Beacon Point AI data center campus in Texas with a 15-year, 352 megawatt IT lease carrying a base-term contract value of $9.8 billion."
   ],
   "builder_evidence": [
    "Hut 8 drops 11% as AI-pivoting miners give back 2026 gains",
    "On May 6, Hut 8 commercialized the first phase of its 1 gigawatt Beacon Point AI data center campus in Texas with a 15-year, 352 megawatt IT lease carrying a base-term contract value of $9.8 billion."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Hut 8 drops 11% as AI-pivoting miners give back 2026 gains",
    "On May 6, Hut 8 commercialized the first phase of its 1 gigawatt Beacon Point AI data center campus in Texas with a 15-year, 352 megawatt IT lease carrying a base-term contract value of $9.8 billion."
   ],
   "announcement_date_evidence": [
    "Hut 8 drops 11% as AI-pivoting miners give back 2026 gains",
    "On May 6, Hut 8 commercialized the first phase of its 1 gigawatt Beacon Point AI data center campus in Texas with a 15-year, 352 megawatt IT lease carrying a base-term contract value of $9.8 billion."
   ]
  },
  {
   "url": "https://mlq.ai/news/nexus-data-centers-files-permit-for-491000-sq-ft-data-center-in-hubbard-texas",
   "title": "Nexus Data Centers Files Permit for 491,000 Sq Ft Data Center in Hubbard, Texas",
   "published_at": "2026-06-24T22:40:37",
   "project": "Hubbard campus",
   "locality": "Hubbard",
   "state": "Texas",
   "capacity_gw": 7.7,
   "builder": "Nexus Data Centers",
   "ai_customer": "Anthropic",
   "status": "Permit filed",
   "announcement_date": "2026-06-24",
   "project_evidence": [
    "# Nexus Data Centers Files Permit for 491,000 Sq Ft Data Center in Hubbard, Texas",
    "The Hubbard campus has drawn significant financial interest.",
    "Nexus has secured financing to support development of the full 2,900-acre site, which the company says could ultimately host up to 7.7GW of behind-the-meter generation capacity [[2]](https://www.datacenterdynamics.com/en/news/google-to-provide-financial-backing-for-multi-billion-dollar-anthropic-data-center-in-texas-report/)."
   ],
   "locality_evidence": [
    "# Nexus Data Centers Files Permit for 491,000 Sq Ft Data Center in Hubbard, Texas",
    "- Nexus filed permit TABS2026022673 with the Texas TDLR for a 491,380 sq ft, 600MW natural gas-powered data center building valued at $400 million [[1]](https://www.datacenterdynamics.com/en/news/nexus-dc-files-to-develop-data-center-in-dallas-texas/)"
   ],
   "state_evidence": [
    "# Nexus Data Centers Files Permit for 491,000 Sq Ft Data Center in Hubbard, Texas",
    "- Nexus filed permit TABS2026022673 with the Texas TDLR for a 491,380 sq ft, 600MW natural gas-powered data center building valued at $400 million [[1]](https://www.datacenterdynamics.com/en/news/nexus-dc-files-to-develop-data-center-in-dallas-texas/)"
   ],
   "capacity_gw_evidence": [
    "# Nexus Data Centers Files Permit for 491,000 Sq Ft Data Center in Hubbard, Texas",
    "Nexus has secured financing to support development of the full 2,900-acre site, which the company says could ultimately host up to 7.7GW of behind-the-meter generation capacity [[2]](https://www.datacenterdynamics.com/en/news/google-to-provide-financial-backing-for-multi-billion-dollar-anthropic-data-center-in-texas-report/)."
   ],
   "builder_evidence": [
    "# Nexus Data Centers Files Permit for 491,000 Sq Ft Data Center in Hubbard, Texas",
    "- Nexus Data Centers, backed by Transition Equity Partners since December 2025, was founded by infrastructure veterans with a combined track record of $155 billion in greenfield projects [[4]](https://www.transitionequity.com/news/nexus-partners-with-transition-equity-partners-to-advance-buildout-of-data-center-campuses/)"
   ],
   "ai_customer_evidence": [
    "# Nexus Data Centers Files Permit for 491,000 Sq Ft Data Center in Hubbard, Texas",
    "- The facility is the first phase of a ~2,900-acre campus that could eventually scale to 7.7GW, with Anthropic reportedly signing a lease and Google providing financial backing for the up-to-$5 billion project [[2]](https://www.datacenterdynamics.com/en/news/google-to-provide-financial-backing-for-multi-billion-dollar-anthropic-data-center-in-texas-report/)"
   ],
   "status_evidence": [
    "# Nexus Data Centers Files Permit for 491,000 Sq Ft Data Center in Hubbard, Texas",
    "- Nexus filed permit TABS2026022673 with the Texas TDLR for a 491,380 sq ft, 600MW natural gas-powered data center building valued at $400 million [[1]](https://www.datacenterdynamics.com/en/news/nexus-dc-files-to-develop-data-center-in-dallas-texas/)"
   ],
   "announcement_date_evidence": [
    "# Nexus Data Centers Files Permit for 491,000 Sq Ft Data Center in Hubbard, Texas",
    "Jun 24, 2026 \u00b7 6:40 PM \u00b7 by MLQ Agent \u00b7 4 min read"
   ]
  },
  {
   "url": "https://tradingview.com/news/globenewswire:4969b395a094b:0-nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute",
   "title": "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
   "published_at": "2026-08-17T12:33:00",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "locality_evidence": [
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "state_evidence": [
    "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "capacity_gw_evidence": [
    "- *OpenAI will be the customer for 8-IT GW*",
    "In support of the surrounding Ohio community, SB Energy and SoftBank will build at least 10 GW of new energy generation, which results in 8 IT-GW of AI factory capacity, and invest at least $4.2 billion in new regional grid infrastructure through an innovative partnership with AEP Ohio designed to protect ratepayers."
   ],
   "builder_evidence": [
    "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute.",
    "SB Energy will build, own and operate the data center under a 20-year lease to OpenAI."
   ],
   "ai_customer_evidence": [
    "- *OpenAI will be the customer for 8-IT GW*",
    "OpenAI will be the customer.",
    "SB Energy will build, own and operate the data center under a 20-year lease to OpenAI."
   ],
   "status_evidence": [
    "The planned capacity is expected to come online in phases beginning in 2028."
   ],
   "announcement_date_evidence": [
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 [(GLOBE NEWSWIRE)](https://www.globenewswire.com) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ]
  },
  {
   "url": "https://stargate.how/news/current-status-us-stargate-data-centers",
   "title": "The current status of every announced U.S. Stargate data center",
   "published_at": "2026-08-29T00:00:00",
   "project": null,
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "Partially operational; construction continues",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| Abilene, Texas | OpenAI, Oracle, Crusoe | Partially operational; construction continues | Oracle still reported 42% delivered on August 29, 2026 |"
   ],
   "state_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| Abilene, Texas | OpenAI, Oracle, Crusoe | Partially operational; construction continues | Oracle still reported 42% delivered on August 29, 2026 |"
   ],
   "capacity_gw_evidence": [
    "Capacity needs careful labels",
    "The core Abilene campus is reported at about 1.2 GW, but a neighboring 900 MW expansion is now a Microsoft project and should not be counted as OpenAI capacity."
   ],
   "builder_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| Abilene, Texas | OpenAI, Oracle, Crusoe | Partially operational; construction continues | Oracle still reported 42% delivered on August 29, 2026 |"
   ],
   "ai_customer_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| Abilene, Texas | OpenAI, Oracle, Crusoe | Partially operational; construction continues | Oracle still reported 42% delivered on August 29, 2026 |"
   ],
   "status_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| Abilene, Texas | OpenAI, Oracle, Crusoe | Partially operational; construction continues | Oracle still reported 42% delivered on August 29, 2026 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://stargate.how/news/current-status-us-stargate-data-centers",
   "title": "The current status of every announced U.S. Stargate data center",
   "published_at": "2026-08-29T00:00:00",
   "project": null,
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Related Digital",
   "ai_customer": "OpenAI",
   "status": "Financed and under construction",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| Saline Township, Michigan | OpenAI, Oracle, Related Digital | Financed and under construction | Financing announced in April 2026; construction launch celebrated in June |"
   ],
   "state_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| Saline Township, Michigan | OpenAI, Oracle, Related Digital | Financed and under construction | Financing announced in April 2026; construction launch celebrated in June |"
   ],
   "capacity_gw_evidence": [
    "Capacity needs careful labels",
    "Wisconsin is commonly described at roughly 0.9 GW, Michigan at more than 1 GW, Milam at 1.2 GW and Camellia at 3.2 GW of contracted power."
   ],
   "builder_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| Saline Township, Michigan | OpenAI, Oracle, Related Digital | Financed and under construction | Financing announced in April 2026; construction launch celebrated in June |"
   ],
   "ai_customer_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| Saline Township, Michigan | OpenAI, Oracle, Related Digital | Financed and under construction | Financing announced in April 2026; construction launch celebrated in June |"
   ],
   "status_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| Saline Township, Michigan | OpenAI, Oracle, Related Digital | Financed and under construction | Financing announced in April 2026; construction launch celebrated in June |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://stargate.how/news/current-status-us-stargate-data-centers",
   "title": "The current status of every announced U.S. Stargate data center",
   "published_at": "2026-08-29T00:00:00",
   "project": null,
   "locality": "Milam County",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "SoftBank",
   "ai_customer": "OpenAI",
   "status": "Leased; initial buildout under construction",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| Milam County, Texas | OpenAI, SoftBank, SB Energy | Leased; initial buildout under construction | OpenAI signed a 1.2 GW lease; first facilities expected from 2026 |"
   ],
   "state_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| Milam County, Texas | OpenAI, SoftBank, SB Energy | Leased; initial buildout under construction | OpenAI signed a 1.2 GW lease; first facilities expected from 2026 |"
   ],
   "capacity_gw_evidence": [
    "Capacity needs careful labels",
    "Wisconsin is commonly described at roughly 0.9 GW, Michigan at more than 1 GW, Milam at 1.2 GW and Camellia at 3.2 GW of contracted power."
   ],
   "builder_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| Milam County, Texas | OpenAI, SoftBank, SB Energy | Leased; initial buildout under construction | OpenAI signed a 1.2 GW lease; first facilities expected from 2026 |"
   ],
   "ai_customer_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| Milam County, Texas | OpenAI, SoftBank, SB Energy | Leased; initial buildout under construction | OpenAI signed a 1.2 GW lease; first facilities expected from 2026 |"
   ],
   "status_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| Milam County, Texas | OpenAI, SoftBank, SB Energy | Leased; initial buildout under construction | OpenAI signed a 1.2 GW lease; first facilities expected from 2026 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://stargate.how/news/current-status-us-stargate-data-centers",
   "title": "The current status of every announced U.S. Stargate data center",
   "published_at": "2026-08-29T00:00:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "Georgia Power",
   "ai_customer": "OpenAI",
   "status": "Power contract approved; pre-development",
   "announcement_date": null,
   "project_evidence": [
    "As of August 29, 2026, Abilene was partially operational, several Oracle campuses were under construction for 2027 delivery, Milam County was tied to a signed OpenAI lease, Project Camellia had an approved power contract, and PORTS-Pike had become the largest new contracted site in the tracker."
   ],
   "locality_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| Effingham County, Georgia | OpenAI, Georgia Power | Power contract approved; pre-development | 3.2 GW planned in phases from 2028 to 2032 |"
   ],
   "state_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| Effingham County, Georgia | OpenAI, Georgia Power | Power contract approved; pre-development | 3.2 GW planned in phases from 2028 to 2032 |"
   ],
   "capacity_gw_evidence": [
    "Capacity needs careful labels",
    "Wisconsin is commonly described at roughly 0.9 GW, Michigan at more than 1 GW, Milam at 1.2 GW and Camellia at 3.2 GW of contracted power."
   ],
   "builder_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| Effingham County, Georgia | OpenAI, Georgia Power | Power contract approved; pre-development | 3.2 GW planned in phases from 2028 to 2032 |"
   ],
   "ai_customer_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| Effingham County, Georgia | OpenAI, Georgia Power | Power contract approved; pre-development | 3.2 GW planned in phases from 2028 to 2032 |"
   ],
   "status_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| Effingham County, Georgia | OpenAI, Georgia Power | Power contract approved; pre-development | 3.2 GW planned in phases from 2028 to 2032 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://stargate.how/news/current-status-us-stargate-data-centers",
   "title": "The current status of every announced U.S. Stargate data center",
   "published_at": "2026-08-29T00:00:00",
   "project": "PORTS-Pike",
   "locality": "PORTS-Pike",
   "state": "Ohio",
   "capacity_gw": 10.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "20-year lease signed; phased development",
   "announcement_date": null,
   "project_evidence": [
    "As of August 29, 2026, Abilene was partially operational, several Oracle campuses were under construction for 2027 delivery, Milam County was tied to a signed OpenAI lease, Project Camellia had an approved power contract, and PORTS-Pike had become the largest new contracted site in the tracker."
   ],
   "locality_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| PORTS-Pike, Ohio | OpenAI, SB Energy, NVIDIA | 20-year lease signed; phased development | First 800 MW expected in 2028; buildout planned through 2032 |"
   ],
   "state_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| PORTS-Pike, Ohio | OpenAI, SB Energy, NVIDIA | 20-year lease signed; phased development | First 800 MW expected in 2028; buildout planned through 2032 |"
   ],
   "capacity_gw_evidence": [
    "Capacity needs careful labels",
    "PORTS-Pike introduces another scope: OpenAI's lease is approximately 8 IT-GW, while the developer separately describes a 10 GW data-center build requiring at least 10 GW of new power generation."
   ],
   "builder_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| PORTS-Pike, Ohio | OpenAI, SB Energy, NVIDIA | 20-year lease signed; phased development | First 800 MW expected in 2028; buildout planned through 2032 |"
   ],
   "ai_customer_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| PORTS-Pike, Ohio | OpenAI, SB Energy, NVIDIA | 20-year lease signed; phased development | First 800 MW expected in 2028; buildout planned through 2032 |"
   ],
   "status_evidence": [
    "Stargate's U.S. portfolio cannot be described with one construction status.",
    "| Location | Partners | Status | Latest public timing |",
    "| PORTS-Pike, Ohio | OpenAI, SB Energy, NVIDIA | 20-year lease signed; phased development | First 800 MW expected in 2028; buildout planned through 2032 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://spectrum.ieee.org/5gw-data-center",
   "title": "5GW Data Center Buildout Requires Novel Engineering",
   "published_at": "2026-03-24T15:00:05",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": null,
   "announcement_date": "2025-06-01",
   "project_evidence": [
    "Chief among them is Meta\u2019s planned 5-gigawatt data center in Louisiana, called [Hyperion](https://spectrum.ieee.org/tag/hyperion), announced in June of 2025.",
    "**The undying thirst for** smarter (historically, that means larger) [AI models](https://spectrum.ieee.org/tag/ai-models) and greater adoption of the ones we already have has led to an explosion in [data-center construction projects](https://epoch.ai/data/data-centers#data-insights), unparalleled both in number and scale."
   ],
   "locality_evidence": [
    "Meta\u2019s Hyperion site, located in rural Richland Parish, Louisiana, is emblematic of this challenge.",
    "**The undying thirst for** smarter (historically, that means larger) [AI models](https://spectrum.ieee.org/tag/ai-models) and greater adoption of the ones we already have has led to an explosion in [data-center construction projects](https://epoch.ai/data/data-centers#data-insights), unparalleled both in number and scale."
   ],
   "state_evidence": [
    "Chief among them is Meta\u2019s planned 5-gigawatt data center in Louisiana, called [Hyperion](https://spectrum.ieee.org/tag/hyperion), announced in June of 2025.",
    "**The undying thirst for** smarter (historically, that means larger) [AI models](https://spectrum.ieee.org/tag/ai-models) and greater adoption of the ones we already have has led to an explosion in [data-center construction projects](https://epoch.ai/data/data-centers#data-insights), unparalleled both in number and scale."
   ],
   "capacity_gw_evidence": [
    "Chief among them is Meta\u2019s planned 5-gigawatt data center in Louisiana, called [Hyperion](https://spectrum.ieee.org/tag/hyperion), announced in June of 2025.",
    "**The undying thirst for** smarter (historically, that means larger) [AI models](https://spectrum.ieee.org/tag/ai-models) and greater adoption of the ones we already have has led to an explosion in [data-center construction projects](https://epoch.ai/data/data-centers#data-insights), unparalleled both in number and scale."
   ],
   "builder_evidence": [
    "Chief among them is Meta\u2019s planned 5-gigawatt data center in Louisiana, called [Hyperion](https://spectrum.ieee.org/tag/hyperion), announced in June of 2025.",
    "**The undying thirst for** smarter (historically, that means larger) [AI models](https://spectrum.ieee.org/tag/ai-models) and greater adoption of the ones we already have has led to an explosion in [data-center construction projects](https://epoch.ai/data/data-centers#data-insights), unparalleled both in number and scale."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": [
    "Chief among them is Meta\u2019s planned 5-gigawatt data center in Louisiana, called [Hyperion](https://spectrum.ieee.org/tag/hyperion), announced in June of 2025.",
    "**The undying thirst for** smarter (historically, that means larger) [AI models](https://spectrum.ieee.org/tag/ai-models) and greater adoption of the ones we already have has led to an explosion in [data-center construction projects](https://epoch.ai/data/data-centers#data-insights), unparalleled both in number and scale."
   ]
  },
  {
   "url": "https://trackpolicy.org/datacenters",
   "title": "Every data center we\u2019re tracking",
   "published_at": null,
   "project": "New Carlisle, IN",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "AWS",
   "ai_customer": "Anthropic",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| New Carlisle, IN | Anthropic | 2,200 | $34.9B | 686k | Indiana | Under construction |"
   ],
   "locality_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| New Carlisle, IN | Anthropic | 2,200 | $34.9B | 686k | Indiana | Under construction |"
   ],
   "state_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| New Carlisle, IN | Anthropic | 2,200 | $34.9B | 686k | Indiana | Under construction |"
   ],
   "capacity_gw_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| New Carlisle, IN | Anthropic | 2,200 | $34.9B | 686k | Indiana | Under construction |",
    "Project Rainier \u2014 Project Rainier is AWS's 1,200-acre New Carlisle campus purpose-built for Anthropic, hosting ~500,000 Trainium2 chips by October 2025 and targeting over one million by year-end."
   ],
   "builder_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "Project Rainier \u2014 Project Rainier is AWS's 1,200-acre New Carlisle campus purpose-built for Anthropic, hosting ~500,000 Trainium2 chips by October 2025 and targeting over one million by year-end."
   ],
   "ai_customer_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| New Carlisle, IN | Anthropic | 2,200 | $34.9B | 686k | Indiana | Under construction |"
   ],
   "status_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| New Carlisle, IN | Anthropic | 2,200 | $34.9B | 686k | Indiana | Under construction |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://trackpolicy.org/datacenters",
   "title": "Every data center we\u2019re tracking",
   "published_at": null,
   "project": "Madison County, MS",
   "locality": "Madison County",
   "state": "Mississippi",
   "capacity_gw": 1.5,
   "builder": "AWS",
   "ai_customer": "AWS",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Madison County, MS | AWS | 1,500 | $10.9B | 214k | Mississippi | Under construction |"
   ],
   "locality_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Madison County, MS | AWS | 1,500 | $10.9B | 214k | Mississippi | Under construction |"
   ],
   "state_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Madison County, MS | AWS | 1,500 | $10.9B | 214k | Mississippi | Under construction |"
   ],
   "capacity_gw_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Madison County, MS | AWS | 1,500 | $10.9B | 214k | Mississippi | Under construction |"
   ],
   "builder_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Madison County, MS | AWS | 1,500 | $10.9B | 214k | Mississippi | Under construction |"
   ],
   "ai_customer_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Madison County, MS | AWS | 1,500 | $10.9B | 214k | Mississippi | Under construction |"
   ],
   "status_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Madison County, MS | AWS | 1,500 | $10.9B | 214k | Mississippi | Under construction |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://trackpolicy.org/datacenters",
   "title": "Every data center we\u2019re tracking",
   "published_at": null,
   "project": "Carson County (near Amarillo), Texas",
   "locality": "Carson County",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": null,
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Carson County (near Amarillo), Texas | N/A | 11,000 | $60.0B | \u2014 | Texas | Under construction |"
   ],
   "locality_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Carson County (near Amarillo), Texas | N/A | 11,000 | $60.0B | \u2014 | Texas | Under construction |"
   ],
   "state_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Carson County (near Amarillo), Texas | N/A | 11,000 | $60.0B | \u2014 | Texas | Under construction |"
   ],
   "capacity_gw_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Carson County (near Amarillo), Texas | N/A | 11,000 | $60.0B | \u2014 | Texas | Under construction |"
   ],
   "builder_evidence": null,
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Carson County (near Amarillo), Texas | N/A | 11,000 | $60.0B | \u2014 | Texas | Under construction |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://trackpolicy.org/datacenters",
   "title": "Every data center we\u2019re tracking",
   "published_at": null,
   "project": "Piketon, OH",
   "locality": "Piketon",
   "state": "Ohio",
   "capacity_gw": 10.0,
   "builder": "SoftBank",
   "ai_customer": "OpenAI",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Piketon, OH | OpenAI | 10,000 | $500.0B | \u2014 | Ohio | Under construction |"
   ],
   "locality_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Piketon, OH | OpenAI | 10,000 | $500.0B | \u2014 | Ohio | Under construction |"
   ],
   "state_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Piketon, OH | OpenAI | 10,000 | $500.0B | \u2014 | Ohio | Under construction |"
   ],
   "capacity_gw_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Piketon, OH | OpenAI | 10,000 | $500.0B | \u2014 | Ohio | Under construction |",
    "SoftBank broke ground March 20, 2026 on the former Portsmouth Gaseous Diffusion Plant, pairing a 10 GW campus with a co-located 9.2 GW natural gas complex under a DOE-SoftBank-AEP Ohio partnership."
   ],
   "builder_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "SoftBank broke ground March 20, 2026 on the former Portsmouth Gaseous Diffusion Plant, pairing a 10 GW campus with a co-located 9.2 GW natural gas complex under a DOE-SoftBank-AEP Ohio partnership."
   ],
   "ai_customer_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Piketon, OH | OpenAI | 10,000 | $500.0B | \u2014 | Ohio | Under construction |"
   ],
   "status_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Piketon, OH | OpenAI | 10,000 | $500.0B | \u2014 | Ohio | Under construction |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://trackpolicy.org/datacenters",
   "title": "Every data center we\u2019re tracking",
   "published_at": null,
   "project": "Eloy, AZ",
   "locality": "Eloy",
   "state": "Arizona",
   "capacity_gw": 3.0,
   "builder": "Vermaland",
   "ai_customer": null,
   "status": "Proposed",
   "announcement_date": null,
   "project_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Eloy, AZ | N/A | 3,000 | $33.0B | \u2014 | Arizona | Proposed |"
   ],
   "locality_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Eloy, AZ | N/A | 3,000 | $33.0B | \u2014 | Arizona | Proposed |"
   ],
   "state_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Eloy, AZ | N/A | 3,000 | $33.0B | \u2014 | Arizona | Proposed |"
   ],
   "capacity_gw_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Eloy, AZ | N/A | 3,000 | $33.0B | \u2014 | Arizona | Proposed |"
   ],
   "builder_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "Pinal County commissioners have flagged flood zones, land-subsidence fissures, and wildlife corridor impacts at Vermaland's $33B 'La Osa Project' \u2014 3,374 acres south of Eloy targeting 3 GW, more than the entire Phoenix metro's current DC capacity."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Eloy, AZ | N/A | 3,000 | $33.0B | \u2014 | Arizona | Proposed |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://trackpolicy.org/datacenters",
   "title": "Every data center we\u2019re tracking",
   "published_at": null,
   "project": "Hamlet, NC",
   "locality": "Hamlet",
   "state": "North Carolina",
   "capacity_gw": 2.24,
   "builder": "Amazon Web Services",
   "ai_customer": "Amazon Web Services",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Hamlet, NC | Amazon Web Services | 2,240 | $10.0B | \u2014 | North Carolina | Under construction |"
   ],
   "locality_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Hamlet, NC | Amazon Web Services | 2,240 | $10.0B | \u2014 | North Carolina | Under construction |"
   ],
   "state_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Hamlet, NC | Amazon Web Services | 2,240 | $10.0B | \u2014 | North Carolina | Under construction |"
   ],
   "capacity_gw_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Hamlet, NC | Amazon Web Services | 2,240 | $10.0B | \u2014 | North Carolina | Under construction |"
   ],
   "builder_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Hamlet, NC | Amazon Web Services | 2,240 | $10.0B | \u2014 | North Carolina | Under construction |"
   ],
   "ai_customer_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Hamlet, NC | Amazon Web Services | 2,240 | $10.0B | \u2014 | North Carolina | Under construction |"
   ],
   "status_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Hamlet, NC | Amazon Web Services | 2,240 | $10.0B | \u2014 | North Carolina | Under construction |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://trackpolicy.org/datacenters",
   "title": "Every data center we\u2019re tracking",
   "published_at": null,
   "project": "Richland Parish, LA",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 2.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Richland Parish, LA | Meta | 2,000 | $27.0B | \u2014 | Louisiana | Under construction |"
   ],
   "locality_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Richland Parish, LA | Meta | 2,000 | $27.0B | \u2014 | Louisiana | Under construction |"
   ],
   "state_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Richland Parish, LA | Meta | 2,000 | $27.0B | \u2014 | Louisiana | Under construction |"
   ],
   "capacity_gw_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Richland Parish, LA | Meta | 2,000 | $27.0B | \u2014 | Louisiana | Under construction |"
   ],
   "builder_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Richland Parish, LA | Meta | 2,000 | $27.0B | \u2014 | Louisiana | Under construction |"
   ],
   "ai_customer_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Richland Parish, LA | Meta | 2,000 | $27.0B | \u2014 | Louisiana | Under construction |"
   ],
   "status_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Richland Parish, LA | Meta | 2,000 | $27.0B | \u2014 | Louisiana | Under construction |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://trackpolicy.org/datacenters",
   "title": "Every data center we\u2019re tracking",
   "published_at": null,
   "project": "Stilesboro, GA",
   "locality": "Stilesboro",
   "state": "Georgia",
   "capacity_gw": 1.83,
   "builder": "Digital Realty",
   "ai_customer": null,
   "status": "Proposed",
   "announcement_date": null,
   "project_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Stilesboro, GA | Cloud hyp. | 1,830 | $19.0B | \u2014 | Georgia | Proposed |"
   ],
   "locality_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Stilesboro, GA | Cloud hyp. | 1,830 | $19.0B | \u2014 | Georgia | Proposed |"
   ],
   "state_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Stilesboro, GA | Cloud hyp. | 1,830 | $19.0B | \u2014 | Georgia | Proposed |"
   ],
   "capacity_gw_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Stilesboro, GA | Cloud hyp. | 1,830 | $19.0B | \u2014 | Georgia | Proposed |"
   ],
   "builder_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "At 1,830 MW full build-out, Digital Realty's 'Project Bunkhouse' would consume more power than the entire city of Atlanta."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Stilesboro, GA | Cloud hyp. | 1,830 | $19.0B | \u2014 | Georgia | Proposed |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://trackpolicy.org/datacenters",
   "title": "Every data center we\u2019re tracking",
   "published_at": null,
   "project": "Stafford County, VA",
   "locality": "Stafford County",
   "state": "Virginia",
   "capacity_gw": 1.8,
   "builder": null,
   "ai_customer": null,
   "status": "Proposed",
   "announcement_date": null,
   "project_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Stafford County, VA | Cloud hyp. | 1,800 | $10.0B | \u2014 | Virginia | Proposed |"
   ],
   "locality_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Stafford County, VA | Cloud hyp. | 1,800 | $10.0B | \u2014 | Virginia | Proposed |"
   ],
   "state_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Stafford County, VA | Cloud hyp. | 1,800 | $10.0B | \u2014 | Virginia | Proposed |"
   ],
   "capacity_gw_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Stafford County, VA | Cloud hyp. | 1,800 | $10.0B | \u2014 | Virginia | Proposed |"
   ],
   "builder_evidence": null,
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Stafford County, VA | Cloud hyp. | 1,800 | $10.0B | \u2014 | Virginia | Proposed |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://trackpolicy.org/datacenters",
   "title": "Every data center we\u2019re tracking",
   "published_at": null,
   "project": "Grand Prairie (Ellis County), Texas",
   "locality": "Grand Prairie",
   "state": "Texas",
   "capacity_gw": 1.8,
   "builder": "PowerHouse/Provident",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Grand Prairie (Ellis County), Texas | Cloud hyp. | 1,800 | $5.0B | \u2014 | Texas | Under construction |"
   ],
   "locality_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Grand Prairie (Ellis County), Texas | Cloud hyp. | 1,800 | $5.0B | \u2014 | Texas | Under construction |"
   ],
   "state_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Grand Prairie (Ellis County), Texas | Cloud hyp. | 1,800 | $5.0B | \u2014 | Texas | Under construction |"
   ],
   "capacity_gw_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Grand Prairie (Ellis County), Texas | Cloud hyp. | 1,800 | $5.0B | \u2014 | Texas | Under construction |"
   ],
   "builder_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "PowerHouse/Provident's 768-acre Ellis County campus sits adjacent to Google's Midlothian complex and targets 1.8 GW across 24 buildings with a $5B+ construction footprint."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Grand Prairie (Ellis County), Texas | Cloud hyp. | 1,800 | $5.0B | \u2014 | Texas | Under construction |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://trackpolicy.org/datacenters",
   "title": "Every data center we\u2019re tracking",
   "published_at": null,
   "project": "Haskell County, TX",
   "locality": "Haskell County",
   "state": "Texas",
   "capacity_gw": 1.5,
   "builder": "Google",
   "ai_customer": "Google",
   "status": "Proposed",
   "announcement_date": null,
   "project_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Haskell County, TX | Google | 1,500 | $40.0B | \u2014 | Texas | Proposed |"
   ],
   "locality_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Haskell County, TX | Google | 1,500 | $40.0B | \u2014 | Texas | Proposed |"
   ],
   "state_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Haskell County, TX | Google | 1,500 | $40.0B | \u2014 | Texas | Proposed |"
   ],
   "capacity_gw_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Haskell County, TX | Google | 1,500 | $40.0B | \u2014 | Texas | Proposed |"
   ],
   "builder_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Haskell County, TX | Google | 1,500 | $40.0B | \u2014 | Texas | Proposed |"
   ],
   "ai_customer_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Haskell County, TX | Google | 1,500 | $40.0B | \u2014 | Texas | Proposed |"
   ],
   "status_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Haskell County, TX | Google | 1,500 | $40.0B | \u2014 | Texas | Proposed |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://trackpolicy.org/datacenters",
   "title": "Every data center we\u2019re tracking",
   "published_at": null,
   "project": "Shackelford County, TX",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage",
   "ai_customer": "OpenAI",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Shackelford County, TX | OpenAI | 1,400 | $25.0B | \u2014 | Texas | Under construction |"
   ],
   "locality_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Shackelford County, TX | OpenAI | 1,400 | $25.0B | \u2014 | Texas | Under construction |"
   ],
   "state_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Shackelford County, TX | OpenAI | 1,400 | $25.0B | \u2014 | Texas | Under construction |"
   ],
   "capacity_gw_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Shackelford County, TX | OpenAI | 1,400 | $25.0B | \u2014 | Texas | Under construction |"
   ],
   "builder_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "Vantage's 1.4 GW Shackelford campus is Stargate Phase 2's Texas anchor alongside the flagship Abilene facility."
   ],
   "ai_customer_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Shackelford County, TX | OpenAI | 1,400 | $25.0B | \u2014 | Texas | Under construction |"
   ],
   "status_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Shackelford County, TX | OpenAI | 1,400 | $25.0B | \u2014 | Texas | Under construction |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://trackpolicy.org/datacenters",
   "title": "Every data center we\u2019re tracking",
   "published_at": null,
   "project": "Prineville, OR",
   "locality": "Prineville",
   "state": "Oregon",
   "capacity_gw": 1.289,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "Operational",
   "announcement_date": null,
   "project_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Prineville, OR | Meta | 1,289 | $2.0B | \u2014 | Oregon | Operational |"
   ],
   "locality_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Prineville, OR | Meta | 1,289 | $2.0B | \u2014 | Oregon | Operational |"
   ],
   "state_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Prineville, OR | Meta | 1,289 | $2.0B | \u2014 | Oregon | Operational |"
   ],
   "capacity_gw_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Prineville, OR | Meta | 1,289 | $2.0B | \u2014 | Oregon | Operational |"
   ],
   "builder_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Prineville, OR | Meta | 1,289 | $2.0B | \u2014 | Oregon | Operational |"
   ],
   "ai_customer_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Prineville, OR | Meta | 1,289 | $2.0B | \u2014 | Oregon | Operational |"
   ],
   "status_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Prineville, OR | Meta | 1,289 | $2.0B | \u2014 | Oregon | Operational |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://trackpolicy.org/datacenters",
   "title": "Every data center we\u2019re tracking",
   "published_at": null,
   "project": "El Paso, Texas",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| El Paso, Texas | Meta | 1,000 | $10.0B | \u2014 | Texas | Under construction |"
   ],
   "locality_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| El Paso, Texas | Meta | 1,000 | $10.0B | \u2014 | Texas | Under construction |"
   ],
   "state_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| El Paso, Texas | Meta | 1,000 | $10.0B | \u2014 | Texas | Under construction |"
   ],
   "capacity_gw_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| El Paso, Texas | Meta | 1,000 | $10.0B | \u2014 | Texas | Under construction |"
   ],
   "builder_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| El Paso, Texas | Meta | 1,000 | $10.0B | \u2014 | Texas | Under construction |"
   ],
   "ai_customer_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| El Paso, Texas | Meta | 1,000 | $10.0B | \u2014 | Texas | Under construction |"
   ],
   "status_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| El Paso, Texas | Meta | 1,000 | $10.0B | \u2014 | Texas | Under construction |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://trackpolicy.org/datacenters",
   "title": "Every data center we\u2019re tracking",
   "published_at": null,
   "project": "Harlingen (Cameron County), Texas",
   "locality": "Harlingen",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Eneus Energy",
   "ai_customer": null,
   "status": "Proposed",
   "announcement_date": null,
   "project_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Harlingen (Cameron County), Texas | N/A | 1,000 | $14.0B | \u2014 | Texas | Proposed |"
   ],
   "locality_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Harlingen (Cameron County), Texas | N/A | 1,000 | $14.0B | \u2014 | Texas | Proposed |"
   ],
   "state_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Harlingen (Cameron County), Texas | N/A | 1,000 | $14.0B | \u2014 | Texas | Proposed |"
   ],
   "capacity_gw_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Harlingen (Cameron County), Texas | N/A | 1,000 | $14.0B | \u2014 | Texas | Proposed |"
   ],
   "builder_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "Cameron County commissioners passed a resolution in April 2026 opposing data centers that lack safeguards, targeting Scotland-based Eneus Energy's 1,785-acre, 1 GW Harlingen proposal."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Harlingen (Cameron County), Texas | N/A | 1,000 | $14.0B | \u2014 | Texas | Proposed |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://trackpolicy.org/datacenters",
   "title": "Every data center we\u2019re tracking",
   "published_at": null,
   "project": "Port Washington, WI",
   "locality": "Port Washington",
   "state": "Wisconsin",
   "capacity_gw": 1.0,
   "builder": "Vantage",
   "ai_customer": "OpenAI",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Port Washington, WI | OpenAI | 1,000 | $15.0B | \u2014 | Wisconsin | Under construction |"
   ],
   "locality_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Port Washington, WI | OpenAI | 1,000 | $15.0B | \u2014 | Wisconsin | Under construction |"
   ],
   "state_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Port Washington, WI | OpenAI | 1,000 | $15.0B | \u2014 | Wisconsin | Under construction |"
   ],
   "capacity_gw_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Port Washington, WI | OpenAI | 1,000 | $15.0B | \u2014 | Wisconsin | Under construction |"
   ],
   "builder_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "'Lighthouse' is Stargate's Midwest anchor \u2014 four Vantage-built buildings, ~1 GW for OpenAI/Oracle, completing 2028."
   ],
   "ai_customer_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Port Washington, WI | OpenAI | 1,000 | $15.0B | \u2014 | Wisconsin | Under construction |"
   ],
   "status_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Port Washington, WI | OpenAI | 1,000 | $15.0B | \u2014 | Wisconsin | Under construction |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://trackpolicy.org/datacenters",
   "title": "Every data center we\u2019re tracking",
   "published_at": null,
   "project": "Santa Teresa, NM (Do\u00f1a Ana County)",
   "locality": "Santa Teresa",
   "state": "New Mexico",
   "capacity_gw": 1.0,
   "builder": null,
   "ai_customer": "OpenAI",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Santa Teresa, NM (Do\u00f1a Ana County) | OpenAI | 1,000 | $50.0B | \u2014 | New Mexico | Under construction |"
   ],
   "locality_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Santa Teresa, NM (Do\u00f1a Ana County) | OpenAI | 1,000 | $50.0B | \u2014 | New Mexico | Under construction |"
   ],
   "state_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Santa Teresa, NM (Do\u00f1a Ana County) | OpenAI | 1,000 | $50.0B | \u2014 | New Mexico | Under construction |"
   ],
   "capacity_gw_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Santa Teresa, NM (Do\u00f1a Ana County) | OpenAI | 1,000 | $50.0B | \u2014 | New Mexico | Under construction |"
   ],
   "builder_evidence": null,
   "ai_customer_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Santa Teresa, NM (Do\u00f1a Ana County) | OpenAI | 1,000 | $50.0B | \u2014 | New Mexico | Under construction |"
   ],
   "status_evidence": [
    "# Every data center we\u2019re tracking",
    "Operational, under construction, and proposed facilities worldwide.",
    "| Project | User | | Cost | Compute | Location | Status |",
    "| Santa Teresa, NM (Do\u00f1a Ana County) | OpenAI | 1,000 | $50.0B | \u2014 | New Mexico | Under construction |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://niueindustrybrief.com/article/926880504-crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
   "published_at": null,
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": "",
   "status": "announced",
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "locality_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "ai_customer_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "The data center will be purpose-built to support the advanced AI computational requirements of a leading hyperscale technology company."
   ],
   "status_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "announcement_date_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ]
  },
  {
   "url": "https://niueindustrybrief.com/article/926880504-crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
   "published_at": null,
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe and Lancium",
   "ai_customer": "",
   "status": "expanding",
   "announcement_date": null,
   "project_evidence": [
    "## Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene",
    "Crusoe recently announced it is currently building a second 900 MW data center on adjacent Lancium-owned land in Abilene."
   ],
   "locality_evidence": [
    "## Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "The Childress development is the latest chapter in Crusoe's deep commitment to Texas."
   ],
   "capacity_gw_evidence": [
    "## Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "builder_evidence": [
    "## Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "ai_customer_evidence": [
    "## Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene"
   ],
   "status_evidence": [
    "## Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://investing.thisismoney.co.uk/rns/news/35711716",
   "title": "This is Money",
   "published_at": null,
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2026-02-20",
   "project_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Fermi Inc."
   ],
   "locality_evidence": [
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus.",
    "Fermi Inc."
   ],
   "state_evidence": [
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus.",
    "Fermi Inc."
   ],
   "capacity_gw_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Fermi Inc."
   ],
   "builder_evidence": [
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus.",
    "Fermi Inc."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus.",
    "Fermi Inc."
   ],
   "announcement_date_evidence": [
    "Fermi Inc.",
    "20 February 2026"
   ]
  },
  {
   "url": "https://theaiconsultingnetwork.com/blog/utah-stratos-9gw-box-elder-ai-data-center-cre-investors-2026",
   "title": "Utah's Stratos 9-GW Data Center Approved Amid Resident Protests: What CRE Investors Need to Know",
   "published_at": "2026-05-10T00:00:00",
   "project": "Stratos Project",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "West GenCo",
   "ai_customer": null,
   "status": "Approved",
   "announcement_date": null,
   "project_evidence": [
    "# Utah's Stratos 9-GW Data Center Approved Amid Resident Protests: What CRE Investors Need to Know",
    "What is the Stratos Project? The Stratos Project is a proposed 40,000-acre, 9-gigawatt AI data center and natural gas energy campus in Box Elder County, Utah, backed by Shark Tank investor Kevin O'Leary's O'Leary Digital and developer West GenCo."
   ],
   "locality_evidence": [
    "# Utah's Stratos 9-GW Data Center Approved Amid Resident Protests: What CRE Investors Need to Know",
    "What is the Stratos Project? The Stratos Project is a proposed 40,000-acre, 9-gigawatt AI data center and natural gas energy campus in Box Elder County, Utah, backed by Shark Tank investor Kevin O'Leary's O'Leary Digital and developer West GenCo."
   ],
   "state_evidence": [
    "# Utah's Stratos 9-GW Data Center Approved Amid Resident Protests: What CRE Investors Need to Know",
    "What is the Stratos Project? The Stratos Project is a proposed 40,000-acre, 9-gigawatt AI data center and natural gas energy campus in Box Elder County, Utah, backed by Shark Tank investor Kevin O'Leary's O'Leary Digital and developer West GenCo."
   ],
   "capacity_gw_evidence": [
    "# Utah's Stratos 9-GW Data Center Approved Amid Resident Protests: What CRE Investors Need to Know",
    "What is the Stratos Project? The Stratos Project is a proposed 40,000-acre, 9-gigawatt AI data center and natural gas energy campus in Box Elder County, Utah, backed by Shark Tank investor Kevin O'Leary's O'Leary Digital and developer West GenCo."
   ],
   "builder_evidence": [
    "# Utah's Stratos 9-GW Data Center Approved Amid Resident Protests: What CRE Investors Need to Know",
    "What is the Stratos Project? The Stratos Project is a proposed 40,000-acre, 9-gigawatt AI data center and natural gas energy campus in Box Elder County, Utah, backed by Shark Tank investor Kevin O'Leary's O'Leary Digital and developer West GenCo."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Utah's Stratos 9-GW Data Center Approved Amid Resident Protests: What CRE Investors Need to Know",
    "Box Elder County commissioners unanimously approved the project on May 4, 2026, despite a crowd of hundreds chanting \"Shame!\" inside the meeting and nearly 400 separate protests filed with the Utah Division of Water Rights."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://cryptopulse.media/en/news/openai-30-billion-georgia-data-center-compute-scarcity-2028",
   "title": "OpenAI is building a $30B Georgia data center \u2014 but compute scarcity won't ease until 2028",
   "published_at": "2026-07-24T03:00:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "building",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI is building a $30B Georgia data center \u2014 but compute scarcity won't ease until 2028",
    "OpenAI has unveiled Project Camellia \u2014 a 3.2GW data center campus in Effingham County, Georgia, costing over $30 billion \u2014 and simultaneously launched Presence, its enterprise AI agent platform."
   ],
   "locality_evidence": [
    "# OpenAI is building a $30B Georgia data center \u2014 but compute scarcity won't ease until 2028",
    "OpenAI has unveiled Project Camellia \u2014 a 3.2GW data center campus in Effingham County, Georgia, costing over $30 billion \u2014 and simultaneously launched Presence, its enterprise AI agent platform."
   ],
   "state_evidence": [
    "# OpenAI is building a $30B Georgia data center \u2014 but compute scarcity won't ease until 2028",
    "OpenAI has unveiled Project Camellia \u2014 a 3.2GW data center campus in Effingham County, Georgia, costing over $30 billion \u2014 and simultaneously launched Presence, its enterprise AI agent platform."
   ],
   "capacity_gw_evidence": [
    "# OpenAI is building a $30B Georgia data center \u2014 but compute scarcity won't ease until 2028",
    "OpenAI has unveiled Project Camellia \u2014 a 3.2GW data center campus in Effingham County, Georgia, costing over $30 billion \u2014 and simultaneously launched Presence, its enterprise AI agent platform."
   ],
   "builder_evidence": [
    "# OpenAI is building a $30B Georgia data center \u2014 but compute scarcity won't ease until 2028",
    "OpenAI has unveiled Project Camellia \u2014 a 3.2GW data center campus in Effingham County, Georgia, costing over $30 billion \u2014 and simultaneously launched Presence, its enterprise AI agent platform."
   ],
   "ai_customer_evidence": [
    "# OpenAI is building a $30B Georgia data center \u2014 but compute scarcity won't ease until 2028",
    "OpenAI has unveiled Project Camellia \u2014 a 3.2GW data center campus in Effingham County, Georgia, costing over $30 billion \u2014 and simultaneously launched Presence, its enterprise AI agent platform."
   ],
   "status_evidence": [
    "# OpenAI is building a $30B Georgia data center \u2014 but compute scarcity won't ease until 2028",
    "OpenAI has unveiled Project Camellia \u2014 a 3.2GW data center campus in Effingham County, Georgia, costing over $30 billion \u2014 and simultaneously launched Presence, its enterprise AI agent platform."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://thejobwalk.com/p/google-confirms-1gw-data-center-campus-in-van-buren-township-michigan",
   "title": "Google Confirms 1GW Data Center Campus in Van Buren Township, Michigan",
   "published_at": "2026-03-23T18:26:24",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Walbridge",
   "ai_customer": "Google",
   "status": "Preliminary site plan approved",
   "announcement_date": null,
   "project_evidence": [
    "Google [has confirmed](https://eu.freep.com/story/money/business/2026/03/17/google-reveals-project-cannoli-data-center/89185890007/) it is the end user behind Project Cannoli, a proposed 1GW data center campus in [Van Buren Township](https://cms9files.revize.com/vanburentwp/Document_Center/Department/Municipal%20Services/02.11.26_PDC%20VB_Van%20Buren%20Planning%20Commission%20Presentation_FINAL.pdf?t=202602121528570&t=202602121528570), Michigan.",
    "Project: Project Cannoli"
   ],
   "locality_evidence": [
    "Google [has confirmed](https://eu.freep.com/story/money/business/2026/03/17/google-reveals-project-cannoli-data-center/89185890007/) it is the end user behind Project Cannoli, a proposed 1GW data center campus in [Van Buren Township](https://cms9files.revize.com/vanburentwp/Document_Center/Department/Municipal%20Services/02.11.26_PDC%20VB_Van%20Buren%20Planning%20Commission%20Presentation_FINAL.pdf?t=202602121528570&t=202602121528570), Michigan.",
    "Location: Van Buren Township, Wayne County, Michigan"
   ],
   "state_evidence": [
    "Google [has confirmed](https://eu.freep.com/story/money/business/2026/03/17/google-reveals-project-cannoli-data-center/89185890007/) it is the end user behind Project Cannoli, a proposed 1GW data center campus in [Van Buren Township](https://cms9files.revize.com/vanburentwp/Document_Center/Department/Municipal%20Services/02.11.26_PDC%20VB_Van%20Buren%20Planning%20Commission%20Presentation_FINAL.pdf?t=202602121528570&t=202602121528570), Michigan.",
    "Location: Van Buren Township, Wayne County, Michigan"
   ],
   "capacity_gw_evidence": [
    "Google [has confirmed](https://eu.freep.com/story/money/business/2026/03/17/google-reveals-project-cannoli-data-center/89185890007/) it is the end user behind Project Cannoli, a proposed 1GW data center campus in [Van Buren Township](https://cms9files.revize.com/vanburentwp/Document_Center/Department/Municipal%20Services/02.11.26_PDC%20VB_Van%20Buren%20Planning%20Commission%20Presentation_FINAL.pdf?t=202602121528570&t=202602121528570), Michigan.",
    "Capacity: 1GW"
   ],
   "builder_evidence": [
    "Township documents describe a five-building campus exceeding 800,000 square feet, with Walbridge already named as general contractor.",
    "General Contractor: Walbridge"
   ],
   "ai_customer_evidence": [
    "Google [has confirmed](https://eu.freep.com/story/money/business/2026/03/17/google-reveals-project-cannoli-data-center/89185890007/) it is the end user behind Project Cannoli, a proposed 1GW data center campus in [Van Buren Township](https://cms9files.revize.com/vanburentwp/Document_Center/Department/Municipal%20Services/02.11.26_PDC%20VB_Van%20Buren%20Planning%20Commission%20Presentation_FINAL.pdf?t=202602121528570&t=202602121528570), Michigan.",
    "Operator: Google"
   ],
   "status_evidence": [
    "The project has preliminary site plan approval from the township Planning Commission, but final site plan approval and a development agreement from the Board of Trustees are still required before anything breaks ground.",
    "Approval status: Preliminary site plan approved (Planning Commission, 5-2 vote, Feb. 11)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://insiderfinance.io/news/hut-8-beacon-point-lease-worth-9-8-billion",
   "title": "Hut 8 Beacon Point Lease Worth $9.8 Billion",
   "published_at": "2026-05-06T21:22:30",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-06",
   "project_evidence": [
    "# Hut 8 Beacon Point Lease Worth $9.8 Billion",
    "Hut 8 Beacon Point lease commercializes the first phase of a gigawatt-scale AI data-center campus and lifts investor demand for contracted revenue.",
    "Hut 8 Corp. said in a May 6, 2026 press release that the Hut 8 Beacon Point lease commercializes the first phase of a planned gigawatt-scale AI data-center campus under a long-term triple-net contract, accelerating the company\u2019s shift into AI hosting with initial energization due in 2027.",
    "The lease covers 352 megawatts (MW) of IT capacity at the Beacon Point campus in Nueces County, Texas, designed for AI training and inference workloads."
   ],
   "locality_evidence": [
    "# Hut 8 Beacon Point Lease Worth $9.8 Billion",
    "The lease covers 352 megawatts (MW) of IT capacity at the Beacon Point campus in Nueces County, Texas, designed for AI training and inference workloads."
   ],
   "state_evidence": [
    "# Hut 8 Beacon Point Lease Worth $9.8 Billion",
    "The lease covers 352 megawatts (MW) of IT capacity at the Beacon Point campus in Nueces County, Texas, designed for AI training and inference workloads."
   ],
   "capacity_gw_evidence": [
    "# Hut 8 Beacon Point Lease Worth $9.8 Billion",
    "An interconnection agreement for 1,000 MW of utility capacity at the site has been executed."
   ],
   "builder_evidence": [
    "# Hut 8 Beacon Point Lease Worth $9.8 Billion",
    "Hut 8 Corp. said in a May 6, 2026 press release that the Hut 8 Beacon Point lease commercializes the first phase of a planned gigawatt-scale AI data-center campus under a long-term triple-net contract, accelerating the company\u2019s shift into AI hosting with initial energization due in 2027."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Hut 8 Beacon Point Lease Worth $9.8 Billion",
    "Hut 8 Corp. said in a May 6, 2026 press release that the Hut 8 Beacon Point lease commercializes the first phase of a planned gigawatt-scale AI data-center campus under a long-term triple-net contract, accelerating the company\u2019s shift into AI hosting with initial energization due in 2027."
   ],
   "announcement_date_evidence": [
    "# Hut 8 Beacon Point Lease Worth $9.8 Billion",
    "Hut 8 Corp. said in a May 6, 2026 press release that the Hut 8 Beacon Point lease commercializes the first phase of a planned gigawatt-scale AI data-center campus under a long-term triple-net contract, accelerating the company\u2019s shift into AI hosting with initial energization due in 2027."
   ]
  },
  {
   "url": "https://poweredbywho.com/projects/delta-gigasite-data-center-campus-fibernet-mercurydelta-cree-234bd30b",
   "title": "Delta Gigasite Data Center Campus (Fibernet MercuryDelta / Creekstone), Utah | PoweredByWho",
   "published_at": null,
   "project": "Delta Gigasite Data Center Campus (Fibernet MercuryDelta / Creekstone)",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 2.0,
   "builder": "Fibernet MercuryDelta, LLC / Creekstone Energy LLC",
   "ai_customer": null,
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "# Delta Gigasite Data Center Campus (Fibernet MercuryDelta / Creekstone)"
   ],
   "locality_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "Location",
    "DELTA"
   ],
   "state_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "Location",
    "Millard County, UT",
    "[FULL STATE DELEGATION \u2197](/states/ut)"
   ],
   "capacity_gw_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "2000 MW \u00b7 UNDER CONSTRUCTION",
    "Capacity",
    "2000 MW"
   ],
   "builder_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "Developer \u00b7 Fibernet MercuryDelta, LLC / Creekstone Energy LLC"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "2000 MW \u00b7 UNDER CONSTRUCTION",
    "Status",
    "Under Construction"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacentre.solutions/news/68602/ecl-celebrates-one-gigawatt-off-grid-hydrogen-powered-ai-factory-dc",
   "title": "ECL celebrates one gigawatt, off-grid, hydrogen-powered AI factory DC",
   "published_at": "2024-09-26T15:27:18",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# ECL celebrates one gigawatt, off-grid, hydrogen-powered AI factory DC",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "locality_evidence": [
    "# ECL celebrates one gigawatt, off-grid, hydrogen-powered AI factory DC",
    "## 600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions.",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "state_evidence": [
    "# ECL celebrates one gigawatt, off-grid, hydrogen-powered AI factory DC",
    "## 600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions.",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "capacity_gw_evidence": [
    "# ECL celebrates one gigawatt, off-grid, hydrogen-powered AI factory DC",
    "The initial 1GW phased development may be expanded to 2GW in the future, enabled by its modularity and based on customer demand."
   ],
   "builder_evidence": [
    "# ECL celebrates one gigawatt, off-grid, hydrogen-powered AI factory DC",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "ai_customer_evidence": [
    "# ECL celebrates one gigawatt, off-grid, hydrogen-powered AI factory DC",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "status_evidence": [
    "# ECL celebrates one gigawatt, off-grid, hydrogen-powered AI factory DC",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://rocketnews.com/2026/08/nvidia-backs-8-gw-ohio-ai-campus-for-openai-with-1-5-billion-investment",
   "title": "Nvidia Backs 8-GW Ohio AI Campus for OpenAI With $1.5 Billion Investment",
   "published_at": "2026-08-19T11:06:29",
   "project": null,
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "Nvidia Backs 8-GW Ohio AI Campus for OpenAI With $1.5 Billion Investment",
    "Nvidia announced a major partnership to support construction of a large-scale artificial intelligence data center campus in Pike County, Ohio."
   ],
   "state_evidence": [
    "Nvidia Backs 8-GW Ohio AI Campus for OpenAI With $1.5 Billion Investment",
    "Nvidia announced a major partnership to support construction of a large-scale artificial intelligence data center campus in Pike County, Ohio."
   ],
   "capacity_gw_evidence": [
    "Nvidia Backs 8-GW Ohio AI Campus for OpenAI With $1.5 Billion Investment",
    "At full buildout, the campus would provide 8 GW of AI computing capacity."
   ],
   "builder_evidence": [
    "Nvidia Backs 8-GW Ohio AI Campus for OpenAI With $1.5 Billion Investment",
    "The chipmaker will invest $1.5 billion directly in SB Energy, the company that will build, own and operate the facility."
   ],
   "ai_customer_evidence": [
    "Nvidia Backs 8-GW Ohio AI Campus for OpenAI With $1.5 Billion Investment",
    "OpenAI will serve as the primary customer under a 20-year lease arrangement."
   ],
   "status_evidence": [
    "Nvidia Backs 8-GW Ohio AI Campus for OpenAI With $1.5 Billion Investment",
    "The project is expected to proceed in phases beginning in 2028."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://kovastack.ai/blog/openai-stargate-datacenter-locations-2026",
   "title": "OpenAI Stargate Datacenter Locations: All 7 Confirmed US Sites, Capacity, and Construction Status (2026 Update)",
   "published_at": "2026-04-28T00:00:00",
   "project": "Site 1 \u2014 Abilene, TX",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe Energy",
   "ai_customer": "OpenAI",
   "status": "Phase 1 online (Q1 2026). Phase 2 under construction.",
   "announcement_date": null,
   "project_evidence": [
    "## Site 1 \u2014 Abilene, TX (Operational, Phase 2 Under Construction)",
    "This post lists every confirmed Stargate site, what we know about each, and where each one sits in the procurement window that matters for vendor sales teams."
   ],
   "locality_evidence": [
    "## Site 1 \u2014 Abilene, TX (Operational, Phase 2 Under Construction)",
    "This post lists every confirmed Stargate site, what we know about each, and where each one sits in the procurement window that matters for vendor sales teams."
   ],
   "state_evidence": [
    "## Site 1 \u2014 Abilene, TX (Operational, Phase 2 Under Construction)",
    "This post lists every confirmed Stargate site, what we know about each, and where each one sits in the procurement window that matters for vendor sales teams."
   ],
   "capacity_gw_evidence": [
    "**Status:** Phase 1 online (Q1 2026). Phase 2 under construction. Total planned capacity 1.2GW across multiple buildings on an 875-acre site.",
    "This post lists every confirmed Stargate site, what we know about each, and where each one sits in the procurement window that matters for vendor sales teams."
   ],
   "builder_evidence": [
    "**Lead developer:** Crusoe Energy",
    "This post lists every confirmed Stargate site, what we know about each, and where each one sits in the procurement window that matters for vendor sales teams."
   ],
   "ai_customer_evidence": [
    "The partnership splits roles roughly as follows: OpenAI as the primary tenant, Oracle as the cloud infrastructure operator at most sites, SoftBank as the lead financial backer, MGX (Abu Dhabi sovereign fund) as a co-investor, and Crusoe / Vantage / others as on-the-ground developers for specific sites.",
    "This post lists every confirmed Stargate site, what we know about each, and where each one sits in the procurement window that matters for vendor sales teams."
   ],
   "status_evidence": [
    "**Status:** Phase 1 online (Q1 2026). Phase 2 under construction. Total planned capacity 1.2GW across multiple buildings on an 875-acre site.",
    "This post lists every confirmed Stargate site, what we know about each, and where each one sits in the procurement window that matters for vendor sales teams."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://blackridgeresearch.com/blog/latest-list-top-largest-upcoming-new-data-center-projects-aws-amazon-web-services",
   "title": "Top 5 AWS Data Center Projects 2026",
   "published_at": null,
   "project": "Northern Indiana Campuses (Project Rainier)",
   "locality": "Northern Indiana",
   "state": "Indiana",
   "capacity_gw": 2.4,
   "builder": "AWS",
   "ai_customer": null,
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "# Top 5 Upcoming Data Center Projects by AWS 2026",
    "Top 5 Largest Upcoming Data Center Projects by AWS 2026",
    "| Northern Indiana Campuses (Project Rainier) | Indiana, USA | 2400 | 15 Billion | Planned |"
   ],
   "locality_evidence": [
    "# Top 5 Upcoming Data Center Projects by AWS 2026",
    "Top 5 Largest Upcoming Data Center Projects by AWS 2026",
    "AWS is undertaking one of its largest-ever data center expansion projects with a planned USD 15 billion investment in Northern Indiana."
   ],
   "state_evidence": [
    "# Top 5 Upcoming Data Center Projects by AWS 2026",
    "Top 5 Largest Upcoming Data Center Projects by AWS 2026",
    "| Northern Indiana Campuses (Project Rainier) | Indiana, USA | 2400 | 15 Billion | Planned |"
   ],
   "capacity_gw_evidence": [
    "# Top 5 Upcoming Data Center Projects by AWS 2026",
    "Top 5 Largest Upcoming Data Center Projects by AWS 2026",
    "| Northern Indiana Campuses (Project Rainier) | Indiana, USA | 2400 | 15 Billion | Planned |",
    "The project will create multiple new data center campuses dedicated to cloud computing and AI workloads, adding approximately 2.4 gigawatts of capacity to the region."
   ],
   "builder_evidence": [
    "# Top 5 Upcoming Data Center Projects by AWS 2026",
    "Top 5 Largest Upcoming Data Center Projects by AWS 2026",
    "AWS is undertaking one of its largest-ever data center expansion projects with a planned USD 15 billion investment in Northern Indiana."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Top 5 Upcoming Data Center Projects by AWS 2026",
    "Top 5 Largest Upcoming Data Center Projects by AWS 2026",
    "| Northern Indiana Campuses (Project Rainier) | Indiana, USA | 2400 | 15 Billion | Planned |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://blackridgeresearch.com/blog/latest-list-top-largest-upcoming-new-data-center-projects-aws-amazon-web-services",
   "title": "Top 5 AWS Data Center Projects 2026",
   "published_at": null,
   "project": "Pennsylvania AI Innovation Campuses",
   "locality": "Salem & Falls Twps",
   "state": "Pennsylvania",
   "capacity_gw": 0.9,
   "builder": "AWS",
   "ai_customer": null,
   "status": "Announced / Permitting",
   "announcement_date": null,
   "project_evidence": [
    "# Top 5 Upcoming Data Center Projects by AWS 2026",
    "Top 5 Largest Upcoming Data Center Projects by AWS 2026",
    "| Pennsylvania AI Innovation Campuses | Salem & Falls Twps, Pennsylvania, USA | N/A | 20 Billion\u200b | Announced / Permitting\u200b |"
   ],
   "locality_evidence": [
    "# Top 5 Upcoming Data Center Projects by AWS 2026",
    "Top 5 Largest Upcoming Data Center Projects by AWS 2026",
    "| Pennsylvania AI Innovation Campuses | Salem & Falls Twps, Pennsylvania, USA | N/A | 20 Billion\u200b | Announced / Permitting\u200b |"
   ],
   "state_evidence": [
    "# Top 5 Upcoming Data Center Projects by AWS 2026",
    "Top 5 Largest Upcoming Data Center Projects by AWS 2026",
    "| Pennsylvania AI Innovation Campuses | Salem & Falls Twps, Pennsylvania, USA | N/A | 20 Billion\u200b | Announced / Permitting\u200b |"
   ],
   "capacity_gw_evidence": [
    "# Top 5 Upcoming Data Center Projects by AWS 2026",
    "Top 5 Largest Upcoming Data Center Projects by AWS 2026",
    "The flagship campus in Salem Township will sit on a 1,200-acre site next to the Susquehanna Steam Electric Station, which Amazon acquired from Talen Energy."
   ],
   "builder_evidence": [
    "# Top 5 Upcoming Data Center Projects by AWS 2026",
    "Top 5 Largest Upcoming Data Center Projects by AWS 2026",
    "AWS is committing at least USD 20 billion to build two large-scale AI data center campuses in Pennsylvania, marking the biggest private-sector investment in the state\u2019s history."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Top 5 Upcoming Data Center Projects by AWS 2026",
    "Top 5 Largest Upcoming Data Center Projects by AWS 2026",
    "| Pennsylvania AI Innovation Campuses | Salem & Falls Twps, Pennsylvania, USA | N/A | 20 Billion\u200b | Announced / Permitting\u200b |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://blackridgeresearch.com/blog/latest-list-top-largest-upcoming-new-data-center-projects-aws-amazon-web-services",
   "title": "Top 5 AWS Data Center Projects 2026",
   "published_at": null,
   "project": "Mississippi Data Center Complexes",
   "locality": "Madison County and Warren County",
   "state": "Mississippi",
   "capacity_gw": 1.5,
   "builder": "AWS",
   "ai_customer": null,
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "# Top 5 Upcoming Data Center Projects by AWS 2026",
    "Top 5 Largest Upcoming Data Center Projects by AWS 2026",
    "| Mississippi Data Center Complexes | Mississippi, USA | 1500 | 13 Billion | Under Construction |"
   ],
   "locality_evidence": [
    "# Top 5 Upcoming Data Center Projects by AWS 2026",
    "Top 5 Largest Upcoming Data Center Projects by AWS 2026",
    "In 2024, Amazon announced a landmark USD 10 billion plan to build two [hyperscale data center](https://www.blackridgeresearch.com/blog/what-is-a-hyperscale-data-center) campuses in Madison County, the largest single capital investment in the state\u2019s history.",
    "AWS has committed an additional [USD 3 billion to develop a new data center campus in Warren County](https://www.blackridgeresearch.com/news-releases/amazon-announces-3-billion-data-center-investment-mississippi-us), marking the largest private investment in the county\u2019s history."
   ],
   "state_evidence": [
    "# Top 5 Upcoming Data Center Projects by AWS 2026",
    "Top 5 Largest Upcoming Data Center Projects by AWS 2026",
    "| Mississippi Data Center Complexes | Mississippi, USA | 1500 | 13 Billion | Under Construction |"
   ],
   "capacity_gw_evidence": [
    "# Top 5 Upcoming Data Center Projects by AWS 2026",
    "Top 5 Largest Upcoming Data Center Projects by AWS 2026",
    "| Mississippi Data Center Complexes | Mississippi, USA | 1500 | 13 Billion | Under Construction |"
   ],
   "builder_evidence": [
    "# Top 5 Upcoming Data Center Projects by AWS 2026",
    "Top 5 Largest Upcoming Data Center Projects by AWS 2026",
    "AWS is making a major long-term bet on Mississippi with a combined investment exceeding USD 13 billion in two counties to expand its cloud and AI infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Top 5 Upcoming Data Center Projects by AWS 2026",
    "Top 5 Largest Upcoming Data Center Projects by AWS 2026",
    "| Mississippi Data Center Complexes | Mississippi, USA | 1500 | 13 Billion | Under Construction |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://blackridgeresearch.com/blog/latest-list-top-largest-upcoming-new-data-center-projects-aws-amazon-web-services",
   "title": "Top 5 AWS Data Center Projects 2026",
   "published_at": null,
   "project": "Richmond County Data Center Campus",
   "locality": "Richmond County",
   "state": "North Carolina",
   "capacity_gw": 1.0,
   "builder": "AWS",
   "ai_customer": null,
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "# Top 5 Upcoming Data Center Projects by AWS 2026",
    "Top 5 Largest Upcoming Data Center Projects by AWS 2026",
    "| Richmond County Data Center Campus | Richmond County, North Carolina, USA | 1000 | 10 Billion | Under Construction |"
   ],
   "locality_evidence": [
    "# Top 5 Upcoming Data Center Projects by AWS 2026",
    "Top 5 Largest Upcoming Data Center Projects by AWS 2026",
    "| Richmond County Data Center Campus | Richmond County, North Carolina, USA | 1000 | 10 Billion | Under Construction |"
   ],
   "state_evidence": [
    "# Top 5 Upcoming Data Center Projects by AWS 2026",
    "Top 5 Largest Upcoming Data Center Projects by AWS 2026",
    "| Richmond County Data Center Campus | Richmond County, North Carolina, USA | 1000 | 10 Billion | Under Construction |"
   ],
   "capacity_gw_evidence": [
    "# Top 5 Upcoming Data Center Projects by AWS 2026",
    "Top 5 Largest Upcoming Data Center Projects by AWS 2026",
    "| Richmond County Data Center Campus | Richmond County, North Carolina, USA | 1000 | 10 Billion | Under Construction |"
   ],
   "builder_evidence": [
    "# Top 5 Upcoming Data Center Projects by AWS 2026",
    "Top 5 Largest Upcoming Data Center Projects by AWS 2026",
    "AWS has begun construction on a USD 10 billion data center campus in Richmond County, North Carolina, marking one of its largest infrastructure investments in the state."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Top 5 Upcoming Data Center Projects by AWS 2026",
    "Top 5 Largest Upcoming Data Center Projects by AWS 2026",
    "| Richmond County Data Center Campus | Richmond County, North Carolina, USA | 1000 | 10 Billion | Under Construction |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://edgen.tech/ko/news/post/chevrons-20-year-microsoft-power-deal-diversifies-beyond-oil",
   "title": "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
   "published_at": "2026-08-29T15:54:13",
   "project": "Project Kilby",
   "locality": "Reeves County",
   "state": "Texas",
   "capacity_gw": 2.67,
   "builder": "Energy Forge One",
   "ai_customer": "Microsoft",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "The project, known as Project Kilby, will be developed through Chevron's Energy Forge One subsidiary alongside Engine No. 1 and Microsoft."
   ],
   "locality_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings."
   ],
   "state_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron's 20-year Microsoft power deal for a 2.67-gigawatt Texas data center marks the oil major's entry into AI infrastructure."
   ],
   "capacity_gw_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings."
   ],
   "builder_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "The project, known as Project Kilby, will be developed through Chevron's Energy Forge One subsidiary alongside Engine No. 1 and Microsoft."
   ],
   "ai_customer_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings."
   ],
   "status_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "First power is expected in 2028, with a final investment decision targeted by the end of 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://linkedin.com/posts/dan-cordwell-6171751a0_ai-datacenters-datacentres-activity-7406325317491134464-xng_",
   "title": "Vantage Data Centers Breaks Ground on 1.4GW Texas Data Center Campus Supporting OpenAI!",
   "published_at": "2025-12-15T13:32:38",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": "OpenAI",
   "status": "groundbreaking",
   "announcement_date": null,
   "project_evidence": [
    "Vantage Data Centers Breaks Ground on 1.4GW Texas Data Center Campus Supporting OpenAI!",
    "\u201cThis week, Vantage Data Centers hosted a groundbreaking ceremony for our Frontier campus in Shackelford County, Texas,\u201d the company announced on LinkedIn over the weekend.",
    "The company officially announced plans for the \u201cFrontier\u201d site in August, saying investment in the campus will total more than $25 billion."
   ],
   "locality_evidence": [
    "Vantage Data Centers Breaks Ground on 1.4GW Texas Data Center Campus Supporting OpenAI!",
    "\u201cThis week, Vantage Data Centers hosted a groundbreaking ceremony for our Frontier campus in Shackelford County, Texas,\u201d the company announced on LinkedIn over the weekend."
   ],
   "state_evidence": [
    "Vantage Data Centers Breaks Ground on 1.4GW Texas Data Center Campus Supporting OpenAI!",
    "\u201cThis week, Vantage Data Centers hosted a groundbreaking ceremony for our Frontier campus in Shackelford County, Texas,\u201d the company announced on LinkedIn over the weekend."
   ],
   "capacity_gw_evidence": [
    "Vantage Data Centers Breaks Ground on 1.4GW Texas Data Center Campus Supporting OpenAI!",
    "\u201cPart of Oracle and OpenAI\u2019s Stargate expansion, the 1.4GW campus will lead to advancements in AI while creating significant regional economic growth, including employing more than 5,000 individuals across construction and operations.\u201d",
    "Once fully developed, the 1,200-acre site will comprise 10 single-story data center facilities, delivering a combined capacity of 1.4GW and spanning approximately 3.7 million sq ft (343,740 sqm)."
   ],
   "builder_evidence": [
    "Vantage Data Centers Breaks Ground on 1.4GW Texas Data Center Campus Supporting OpenAI!",
    "\u201cThis week, Vantage Data Centers hosted a groundbreaking ceremony for our Frontier campus in Shackelford County, Texas,\u201d the company announced on LinkedIn over the weekend."
   ],
   "ai_customer_evidence": [
    "Vantage Data Centers Breaks Ground on 1.4GW Texas Data Center Campus Supporting OpenAI!",
    "\u201cPart of Oracle and OpenAI\u2019s Stargate expansion, the 1.4GW campus will lead to advancements in AI while creating significant regional economic growth, including employing more than 5,000 individuals across construction and operations.\u201d",
    "OpenAI and Oracle were officially tied to the site in October as part of a slew of new Stargate announcements in the US."
   ],
   "status_evidence": [
    "Vantage Data Centers Breaks Ground on 1.4GW Texas Data Center Campus Supporting OpenAI!",
    "\u201cThis week, Vantage Data Centers hosted a groundbreaking ceremony for our Frontier campus in Shackelford County, Texas,\u201d the company announced on LinkedIn over the weekend."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news/fermi-america-inks-reactor-supply-and-design-deals-for-up-to-11gw-data-center-campus-in-amarillo-texas",
   "title": "Fermi America inks reactor supply and design deals for up to 11GW data center campus in Amarillo, Texas",
   "published_at": "2026-05-14T00:07:25",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Fermi America has signed two more nuclear energy agreements to support the development of its planned giant data center campus in Amarillo, Texas.",
    "Fermi\u2019s Project Matador is one of the more ambitious data center projects to be announced to date."
   ],
   "locality_evidence": [
    "Fermi America has signed two more nuclear energy agreements to support the development of its planned giant data center campus in Amarillo, Texas.",
    "Fermi\u2019s Project Matador is one of the more ambitious data center projects to be announced to date."
   ],
   "state_evidence": [
    "Fermi America has signed two more nuclear energy agreements to support the development of its planned giant data center campus in Amarillo, Texas.",
    "Fermi\u2019s Project Matador is one of the more ambitious data center projects to be announced to date."
   ],
   "capacity_gw_evidence": [
    "Fermi America has signed two more nuclear energy agreements to support the development of its planned giant data center campus in Amarillo, Texas.",
    "If realized, the project will span 18 million sq ft (1.67 million sqm) and have a capacity of up to 11GW."
   ],
   "builder_evidence": [
    "Fermi America has signed two more nuclear energy agreements to support the development of its planned giant data center campus in Amarillo, Texas.",
    "Fermi\u2019s Project Matador is one of the more ambitious data center projects to be announced to date."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Fermi America has signed two more nuclear energy agreements to support the development of its planned giant data center campus in Amarillo, Texas.",
    "Fermi\u2019s Project Matador is one of the more ambitious data center projects to be announced to date."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://rotatingdata.com/deals/2026-03-nscale-aipcorp-monarch-8gw",
   "title": "Nscale acquires 8 GW Monarch AI microgrid campus",
   "published_at": null,
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "Acquisition agreement",
   "announcement_date": null,
   "project_evidence": [
    "Data centers \u00b7 Evidence brief",
    "# Nscale acquires 8 GW Monarch AI microgrid campus",
    "Disclosed scale**Definitive acquisition agreement for AIPCorp and the Monarch Compute Campus, a 2,250-acre Mason County, West Virginia site with initial 2 GW power capacity targeted for H1 2028 and expansion runway to more than 8 GW by 2031**",
    "2. 02\nThe acquisition includes the Monarch Compute Campus in Mason County, West Virginia."
   ],
   "locality_evidence": [
    "Data centers \u00b7 Evidence brief",
    "# Nscale acquires 8 GW Monarch AI microgrid campus",
    "Geography**Mason County, West Virginia**",
    "Disclosed scale**Definitive acquisition agreement for AIPCorp and the Monarch Compute Campus, a 2,250-acre Mason County, West Virginia site with initial 2 GW power capacity targeted for H1 2028 and expansion runway to more than 8 GW by 2031**",
    "2. 02\nThe acquisition includes the Monarch Compute Campus in Mason County, West Virginia."
   ],
   "state_evidence": [
    "Data centers \u00b7 Evidence brief",
    "# Nscale acquires 8 GW Monarch AI microgrid campus",
    "Geography**Mason County, West Virginia**",
    "Disclosed scale**Definitive acquisition agreement for AIPCorp and the Monarch Compute Campus, a 2,250-acre Mason County, West Virginia site with initial 2 GW power capacity targeted for H1 2028 and expansion runway to more than 8 GW by 2031**",
    "2. 02\nThe acquisition includes the Monarch Compute Campus in Mason County, West Virginia."
   ],
   "capacity_gw_evidence": [
    "Data centers \u00b7 Evidence brief",
    "# Nscale acquires 8 GW Monarch AI microgrid campus",
    "Disclosed scale**Definitive acquisition agreement for AIPCorp and the Monarch Compute Campus, a 2,250-acre Mason County, West Virginia site with initial 2 GW power capacity targeted for H1 2028 and expansion runway to more than 8 GW by 2031**",
    "4. 04\nThe campus has onsite powered microgrid runway scalable to more than 8 GW.",
    "5. 05\nInitial power capacity of 2 GW is expected online by the first half of 2028, with expansion to approximately 8 GW planned for 2031."
   ],
   "builder_evidence": [
    "Data centers \u00b7 Evidence brief",
    "# Nscale acquires 8 GW Monarch AI microgrid campus",
    "Nscale + American Intelligence & Power + Fidelis New Energy + 8090 Industries",
    "1. 01\nNscale signed an agreement to acquire American Intelligence & Power Corporation, sponsored by Fidelis New Energy and 8090 Industries.",
    "3. 03\nNscale says Monarch spans up to 2,250 acres and is the United States first state-certified AI microgrid purpose-built for AI workloads."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Data centers \u00b7 Evidence brief",
    "# Nscale acquires 8 GW Monarch AI microgrid campus",
    "Deal structure**AI hyperscaler acquisition / behind-the-meter energy-to-compute campus**",
    "Disclosed scale**Definitive acquisition agreement for AIPCorp and the Monarch Compute Campus, a 2,250-acre Mason County, West Virginia site with initial 2 GW power capacity targeted for H1 2028 and expansion runway to more than 8 GW by 2031**",
    "1. 01\nNscale signed an agreement to acquire American Intelligence & Power Corporation, sponsored by Fidelis New Energy and 8090 Industries."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://themidwesterner.news/2026/08/email-jocelyn-bensons-husband-personally-delivered-application-for-despised-saline-township-data-center",
   "title": "Email: Jocelyn Benson\u2019s husband personally delivered application for despised Saline Township data center",
   "published_at": "2026-08-25T13:16:01",
   "project": "Saline Data Center",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.4,
   "builder": "Related Companies",
   "ai_customer": "OpenAI",
   "status": "ground broken",
   "announcement_date": null,
   "project_evidence": [
    "While Secretary of State Jocelyn Benson works to convince Michiganders she\u2019s not beholden to data center developers, documents on a widely despised development in Saline Township is undermining that narrative.",
    "\ud83d\udea8 Ryan Friedrichs, husband of Jocelyn Benson, who is supervising her own election for governor, personally delivered the application for the Saline Data Center on behalf of Related Digital \ud83d\udea8"
   ],
   "locality_evidence": [
    "While Secretary of State Jocelyn Benson works to convince Michiganders she\u2019s not beholden to data center developers, documents on a widely despised development in Saline Township is undermining that narrative."
   ],
   "state_evidence": [
    "While Secretary of State Jocelyn Benson works to convince Michiganders she\u2019s not beholden to data center developers, documents on a widely despised development in Saline Township is undermining that narrative."
   ],
   "capacity_gw_evidence": null,
   "builder_evidence": null,
   "ai_customer_evidence": null,
   "status_evidence": [
    "The Saline Township data center received approval from the three-member Whitmer-appointed Michigan Public Service Commission in December, and Related Digital broke ground in June."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://themidwesterner.news/2026/08/email-jocelyn-bensons-husband-personally-delivered-application-for-despised-saline-township-data-center",
   "title": "Email: Jocelyn Benson\u2019s husband personally delivered application for despised Saline Township data center",
   "published_at": "2026-08-25T13:16:01",
   "project": null,
   "locality": "Van Buren Township",
   "state": null,
   "capacity_gw": 1.0,
   "builder": "Google",
   "ai_customer": "Google",
   "status": "pursuing",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "At the same time, Google is pursuing a 1 gigawatt data center in Van Buren Township that\u2019s expected to [destroy 13.55 acres of wetland in a county that\u2019s already lost 90%, and to use up to 3.6 million gallons of water per day](https://www.themidwesterner.news/2026/06/egle-google-data-center-pitched-as-community-asset-will-destroy-13-5-acres-of-wetlands-use-3-6-million-gallons-of-water-per-day/) once it\u2019s up and running."
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "At the same time, Google is pursuing a 1 gigawatt data center in Van Buren Township that\u2019s expected to [destroy 13.55 acres of wetland in a county that\u2019s already lost 90%, and to use up to 3.6 million gallons of water per day](https://www.themidwesterner.news/2026/06/egle-google-data-center-pitched-as-community-asset-will-destroy-13-5-acres-of-wetlands-use-3-6-million-gallons-of-water-per-day/) once it\u2019s up and running."
   ],
   "builder_evidence": [
    "At the same time, Google is pursuing a 1 gigawatt data center in Van Buren Township that\u2019s expected to [destroy 13.55 acres of wetland in a county that\u2019s already lost 90%, and to use up to 3.6 million gallons of water per day](https://www.themidwesterner.news/2026/06/egle-google-data-center-pitched-as-community-asset-will-destroy-13-5-acres-of-wetlands-use-3-6-million-gallons-of-water-per-day/) once it\u2019s up and running."
   ],
   "ai_customer_evidence": [
    "At the same time, Google is pursuing a 1 gigawatt data center in Van Buren Township that\u2019s expected to [destroy 13.55 acres of wetland in a county that\u2019s already lost 90%, and to use up to 3.6 million gallons of water per day](https://www.themidwesterner.news/2026/06/egle-google-data-center-pitched-as-community-asset-will-destroy-13-5-acres-of-wetlands-use-3-6-million-gallons-of-water-per-day/) once it\u2019s up and running."
   ],
   "status_evidence": [
    "At the same time, Google is pursuing a 1 gigawatt data center in Van Buren Township that\u2019s expected to [destroy 13.55 acres of wetland in a county that\u2019s already lost 90%, and to use up to 3.6 million gallons of water per day](https://www.themidwesterner.news/2026/06/egle-google-data-center-pitched-as-community-asset-will-destroy-13-5-acres-of-wetlands-use-3-6-million-gallons-of-water-per-day/) once it\u2019s up and running."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mainstreamcryptonews.com/terawulf-expands-ai-strategy-with-1gw-data-campus-and-3b-backing",
   "title": "Terawulf Expands AI Strategy With 1GW Data Campus and $3B Backing",
   "published_at": "2026-05-29T05:56:31",
   "project": "Muskie Data Campus",
   "locality": "northeastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "Terawulf Inc.",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": null,
   "project_evidence": [
    "Terawulf bought a Kentucky AI campus targeting 1GW of HPC capacity by 2030.",
    "The Nasdaq-listed company said it acquired the \u201cMuskie Data Campus\u201d from Industrial Equity Partners."
   ],
   "locality_evidence": [
    "The site sits inside the 1,000-acre Eastpark Industrial Park in northeastern Kentucky and includes about 285 acres of owned and controlled land.",
    "Terawulf bought a Kentucky AI campus targeting 1GW of HPC capacity by 2030."
   ],
   "state_evidence": [
    "Terawulf bought a Kentucky AI campus targeting 1GW of HPC capacity by 2030.",
    "The site sits inside the 1,000-acre Eastpark Industrial Park in northeastern Kentucky and includes about 285 acres of owned and controlled land."
   ],
   "capacity_gw_evidence": [
    "Terawulf bought a Kentucky AI campus targeting 1GW of HPC capacity by 2030.",
    "Terawulf said the campus is expected to support more than 1 gigawatt of AI and high-performance computing capacity."
   ],
   "builder_evidence": [
    "Terawulf bought a Kentucky AI campus targeting 1GW of HPC capacity by 2030.",
    "Terawulf Inc. is moving deeper into artificial intelligence (AI) infrastructure with the purchase of a large data center development site in eastern Kentucky, underscoring how former [bitcoin mining](http://www.bitcoin.com/get-started/what-is-bitcoin-mining/) firms are chasing demand for power-hungry computing capacity."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Terawulf bought a Kentucky AI campus targeting 1GW of HPC capacity by 2030.",
    "The Nasdaq-listed company said it acquired the \u201cMuskie Data Campus\u201d from Industrial Equity Partners."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://bigcountryhomepage.com/news/iren-annouces-plans-to-expand-in-sweetwater-with-2gw-data-center-hub",
   "title": "IREN annouces plans to expand in Sweetwater with 2GW data center hub",
   "published_at": "2025-03-10T21:55:07",
   "project": "Sweetwater 2",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "developing",
   "announcement_date": null,
   "project_evidence": [
    "**SWEETWATER, Texas ([KTAB/KRBC](https://www.bigcountryhomepage.com/)) \u2013** Data center company IREN is expanding its presence in Sweetwater with the development of a second site, expected to create a 2-gigawatt data center hub that could be used for bitcoin mining and AI ventures.",
    "Secondly, developing a new 600MW Sweetwater 2 site located ~28 miles from our existing Sweetwater 1 project, expected to create a 2GW data center hub,\u201d Roberts said.",
    "Sweetwater 2 (600MW) is expected to go live in 2028."
   ],
   "locality_evidence": [
    "**SWEETWATER, Texas ([KTAB/KRBC](https://www.bigcountryhomepage.com/)) \u2013** Data center company IREN is expanding its presence in Sweetwater with the development of a second site, expected to create a 2-gigawatt data center hub that could be used for bitcoin mining and AI ventures."
   ],
   "state_evidence": [
    "**SWEETWATER, Texas ([KTAB/KRBC](https://www.bigcountryhomepage.com/)) \u2013** Data center company IREN is expanding its presence in Sweetwater with the development of a second site, expected to create a 2-gigawatt data center hub that could be used for bitcoin mining and AI ventures."
   ],
   "capacity_gw_evidence": [
    "**SWEETWATER, Texas ([KTAB/KRBC](https://www.bigcountryhomepage.com/)) \u2013** Data center company IREN is expanding its presence in Sweetwater with the development of a second site, expected to create a 2-gigawatt data center hub that could be used for bitcoin mining and AI ventures.",
    "Secondly, developing a new 600MW Sweetwater 2 site located ~28 miles from our existing Sweetwater 1 project, expected to create a 2GW data center hub,\u201d Roberts said."
   ],
   "builder_evidence": [
    "**SWEETWATER, Texas ([KTAB/KRBC](https://www.bigcountryhomepage.com/)) \u2013** Data center company IREN is expanding its presence in Sweetwater with the development of a second site, expected to create a 2-gigawatt data center hub that could be used for bitcoin mining and AI ventures."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Secondly, developing a new 600MW Sweetwater 2 site located ~28 miles from our existing Sweetwater 1 project, expected to create a 2GW data center hub,\u201d Roberts said."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://news.cocoloop.cn/en/2026/08/openai-ports-pike-ohio",
   "title": "Nvidia backs OpenAI's 8GW Ohio AI campus",
   "published_at": "2026-08-18T01:32:18",
   "project": "PORTS-Pike campus",
   "locality": null,
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "confirmed",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "OpenAI, Nvidia and SB Energy confirmed on August 17 that the PORTS-Pike campus in Ohio will provide about **8 IT-GW** to OpenAI and host Nvidia AI compute exclusively."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "OpenAI, Nvidia and SB Energy confirmed on August 17 that the PORTS-Pike campus in Ohio will provide about **8 IT-GW** to OpenAI and host Nvidia AI compute exclusively."
   ],
   "capacity_gw_evidence": [
    "OpenAI, Nvidia and SB Energy confirmed on August 17 that the PORTS-Pike campus in Ohio will provide about **8 IT-GW** to OpenAI and host Nvidia AI compute exclusively."
   ],
   "builder_evidence": [
    "OpenAI, Nvidia and SB Energy confirmed on August 17 that the PORTS-Pike campus in Ohio will provide about **8 IT-GW** to OpenAI and host Nvidia AI compute exclusively.",
    "SB Energy will build, own and operate it under a 20-year lease; Nvidia will support the initial buildout and invest $1.5 billion in SB Energy."
   ],
   "ai_customer_evidence": [
    "OpenAI, Nvidia and SB Energy confirmed on August 17 that the PORTS-Pike campus in Ohio will provide about **8 IT-GW** to OpenAI and host Nvidia AI compute exclusively."
   ],
   "status_evidence": [
    "OpenAI, Nvidia and SB Energy confirmed on August 17 that the PORTS-Pike campus in Ohio will provide about **8 IT-GW** to OpenAI and host Nvidia AI compute exclusively."
   ],
   "announcement_date_evidence": [
    "OpenAI, Nvidia and SB Energy confirmed on August 17 that the PORTS-Pike campus in Ohio will provide about **8 IT-GW** to OpenAI and host Nvidia AI compute exclusively."
   ]
  },
  {
   "url": "https://constructionowners.com/news/vantage-breaks-ground-on-1-4gw-texas-data-center-campus",
   "title": "Vantage Breaks Ground on 1.4GW Texas Data Center for OpenAI",
   "published_at": null,
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": "Oracle and OpenAI",
   "status": "ground broken",
   "announcement_date": "2025-12-16",
   "project_evidence": [
    "Vantage Breaks Ground on 1.4GW Texas Data Center Campus",
    "# Vantage Breaks Ground on 1.4GW Texas Data Center Campus",
    "The company confirmed the milestone in a LinkedIn post over the weekend following a groundbreaking ceremony for its Frontier campus in Shackelford County, Texas.",
    "\u201cThis week, Vantage Data Centers hosted a groundbreaking ceremony for our Frontier campus in Shackelford County, Texas,\u201d the company announced.",
    "At full build-out, the 1,200-acre Frontier campus will include 10 single-story data center buildings totaling approximately 3.7 million square feet."
   ],
   "locality_evidence": [
    "Vantage Breaks Ground on 1.4GW Texas Data Center Campus",
    "# Vantage Breaks Ground on 1.4GW Texas Data Center Campus",
    "The company confirmed the milestone in a LinkedIn post over the weekend following a groundbreaking ceremony for its Frontier campus in Shackelford County, Texas.",
    "\u201cThis week, Vantage Data Centers hosted a groundbreaking ceremony for our Frontier campus in Shackelford County, Texas,\u201d the company announced."
   ],
   "state_evidence": [
    "Vantage Breaks Ground on 1.4GW Texas Data Center Campus",
    "# Vantage Breaks Ground on 1.4GW Texas Data Center Campus",
    "Vantage Data Centers has officially broken ground on a massive data center campus in Texas that will support Oracle and OpenAI\u2019s rapidly expanding Stargate initiative, marking one of the largest single-site data center developments announced in the U.S. to date.",
    "The company confirmed the milestone in a LinkedIn post over the weekend following a groundbreaking ceremony for its Frontier campus in Shackelford County, Texas.",
    "\u201cThis week, Vantage Data Centers hosted a groundbreaking ceremony for our Frontier campus in Shackelford County, Texas,\u201d the company announced."
   ],
   "capacity_gw_evidence": [
    "Vantage Breaks Ground on 1.4GW Texas Data Center Campus",
    "# Vantage Breaks Ground on 1.4GW Texas Data Center Campus",
    "\u201cThis week, Vantage Data Centers hosted a groundbreaking ceremony for our Frontier campus in Shackelford County, Texas,\u201d the company announced.",
    "The site is designed to deliver 1.4 gigawatts of capacity and will support both air- and liquid-cooled infrastructure, with rack densities exceeding 250kW\u2014well above traditional hyperscale norms."
   ],
   "builder_evidence": [
    "Vantage Breaks Ground on 1.4GW Texas Data Center Campus",
    "# Vantage Breaks Ground on 1.4GW Texas Data Center Campus",
    "Vantage Data Centers has officially broken ground on a massive data center campus in Texas that will support Oracle and OpenAI\u2019s rapidly expanding Stargate initiative, marking one of the largest single-site data center developments announced in the U.S. to date.",
    "\u201cThis week, Vantage Data Centers hosted a groundbreaking ceremony for our Frontier campus in Shackelford County, Texas,\u201d the company announced."
   ],
   "ai_customer_evidence": [
    "Vantage Breaks Ground on 1.4GW Texas Data Center Campus",
    "# Vantage Breaks Ground on 1.4GW Texas Data Center Campus",
    "Vantage Data Centers has officially broken ground on a massive data center campus in Texas that will support Oracle and OpenAI\u2019s rapidly expanding Stargate initiative, marking one of the largest single-site data center developments announced in the U.S. to date.",
    "\u201cThis week, Vantage Data Centers hosted a groundbreaking ceremony for our Frontier campus in Shackelford County, Texas,\u201d the company announced.",
    "Part of Oracle and OpenAI\u2019s Stargate expansion, the 1.4GW campus will lead to advancements in AI while creating significant regional economic growth, including employing more than 5,000 individuals across construction and operations."
   ],
   "status_evidence": [
    "Vantage Breaks Ground on 1.4GW Texas Data Center Campus",
    "# Vantage Breaks Ground on 1.4GW Texas Data Center Campus",
    "Vantage Data Centers has officially broken ground on a massive data center campus in Texas that will support Oracle and OpenAI\u2019s rapidly expanding Stargate initiative, marking one of the largest single-site data center developments announced in the U.S. to date.",
    "The company confirmed the milestone in a LinkedIn post over the weekend following a groundbreaking ceremony for its Frontier campus in Shackelford County, Texas."
   ],
   "announcement_date_evidence": [
    "Vantage Breaks Ground on 1.4GW Texas Data Center Campus",
    "December 16, 2025",
    "# Vantage Breaks Ground on 1.4GW Texas Data Center Campus"
   ]
  },
  {
   "url": "https://energy.media/industry-hubs/new-5gw-data-city-in-texas-to-be-powered-by-hydrogen",
   "title": "New 5GW Data City in Texas to be Powered by Hydrogen - Energy.Media",
   "published_at": "2025-03-29T21:42:35",
   "project": "Data City",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corporation",
   "ai_customer": null,
   "status": "proposed",
   "announcement_date": "2025-03-29",
   "project_evidence": [
    "New 5GW Data City in Texas to be Powered by Hydrogen",
    "The project is being pitched by Energy Abundance Development Corporation and has been dubbed Data City."
   ],
   "locality_evidence": [
    "New 5GW Data City in Texas to be Powered by Hydrogen",
    "A new behind-the-meter data center with up to 5GW has been proposed near Laredo, Texas."
   ],
   "state_evidence": [
    "New 5GW Data City in Texas to be Powered by Hydrogen",
    "A new behind-the-meter data center with up to 5GW has been proposed near Laredo, Texas."
   ],
   "capacity_gw_evidence": [
    "New 5GW Data City in Texas to be Powered by Hydrogen",
    "A new behind-the-meter data center with up to 5GW has been proposed near Laredo, Texas."
   ],
   "builder_evidence": [
    "New 5GW Data City in Texas to be Powered by Hydrogen",
    "The project is being pitched by Energy Abundance Development Corporation and has been dubbed Data City."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "New 5GW Data City in Texas to be Powered by Hydrogen",
    "A new behind-the-meter data center with up to 5GW has been proposed near Laredo, Texas."
   ],
   "announcement_date_evidence": [
    "New 5GW Data City in Texas to be Powered by Hydrogen",
    "- March 29, 2025"
   ]
  },
  {
   "url": "http://idcnova.com/html/1/59/153/5674.html",
   "title": "Utah County Delays Vote on Kevin O\u2019Leary\u2019s 9GW Data Center Project Amid Scope Concerns|Idcnova-Media|the gateway to China data center market",
   "published_at": null,
   "project": "Stratos",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O\u2019Leary Digital",
   "ai_customer": null,
   "status": "postponed",
   "announcement_date": "2026-04-28",
   "project_evidence": [
    "Utah County Delays Vote on Kevin O\u2019Leary\u2019s 9GW Data Center Project Amid Scope Concerns",
    "The project, dubbed Stratos, is being developed by O\u2019Leary Digital, the infrastructure arm of Kevin O\u2019Leary, and has already secured approval from MIDA, which the state has authorized to oversee large-scale developments."
   ],
   "locality_evidence": [
    "Utah County Delays Vote on Kevin O\u2019Leary\u2019s 9GW Data Center Project Amid Scope Concerns",
    "A planned vote on a massive hyperscale data center campus backed by \"Shark Tank\" investor Kevin O\u2019Leary has been postponed in Box Elder County, Utah, as local officials say they were caught off guard by the project\u2019s enormous scale and the extent of state involvement."
   ],
   "state_evidence": [
    "Utah County Delays Vote on Kevin O\u2019Leary\u2019s 9GW Data Center Project Amid Scope Concerns",
    "A planned vote on a massive hyperscale data center campus backed by \"Shark Tank\" investor Kevin O\u2019Leary has been postponed in Box Elder County, Utah, as local officials say they were caught off guard by the project\u2019s enormous scale and the extent of state involvement."
   ],
   "capacity_gw_evidence": [
    "Utah County Delays Vote on Kevin O\u2019Leary\u2019s 9GW Data Center Project Amid Scope Concerns",
    "If built, the data center campus could have a capacity of up to 9GW of power\u2014more than double Utah\u2019s current statewide electricity consumption of 4GW."
   ],
   "builder_evidence": [
    "Utah County Delays Vote on Kevin O\u2019Leary\u2019s 9GW Data Center Project Amid Scope Concerns",
    "The project, dubbed Stratos, is being developed by O\u2019Leary Digital, the infrastructure arm of Kevin O\u2019Leary, and has already secured approval from MIDA, which the state has authorized to oversee large-scale developments."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Utah County Delays Vote on Kevin O\u2019Leary\u2019s 9GW Data Center Project Amid Scope Concerns",
    "A planned vote on a massive hyperscale data center campus backed by \"Shark Tank\" investor Kevin O\u2019Leary has been postponed in Box Elder County, Utah, as local officials say they were caught off guard by the project\u2019s enormous scale and the extent of state involvement."
   ],
   "announcement_date_evidence": [
    "Utah County Delays Vote on Kevin O\u2019Leary\u2019s 9GW Data Center Project Amid Scope Concerns",
    "April 28, 2026"
   ]
  },
  {
   "url": "https://statesboroherald.com/local/georgia-power-openai-contract-approved-for-effingham-center",
   "title": "Georgia Power, OpenAI contract approved for Effingham center",
   "published_at": "2026-08-28T20:16:16",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "Georgia Power",
   "ai_customer": "OpenAI",
   "status": "in its early stages",
   "announcement_date": null,
   "project_evidence": [
    "Both Georgia Power\u2019s contract with OpenAI was approved and the final Development of Regional Impact report for the Effingham County data center was released, Wednesday.",
    "The following updates mark separate steps in the process for the 1,400-acre data center project.",
    "He said the report was the county\u2019s final requirement before it can approve Project Camellia\u2019s preliminary site plan."
   ],
   "locality_evidence": [
    "Both Georgia Power\u2019s contract with OpenAI was approved and the final Development of Regional Impact report for the Effingham County data center was released, Wednesday.",
    "The following updates mark separate steps in the process for the 1,400-acre data center project."
   ],
   "state_evidence": [
    "Both Georgia Power\u2019s contract with OpenAI was approved and the final Development of Regional Impact report for the Effingham County data center was released, Wednesday.",
    "The following updates mark separate steps in the process for the 1,400-acre data center project."
   ],
   "capacity_gw_evidence": [
    "The Georgia Power contract, approved by the Georgia Public Service Commission, secures delivery of 3,200 megawatts of electricity to the data center campus.",
    "At 3.2 gigawatts at full buildout, the campus will require enough electricity to power roughly three Atlanta-sized cities, making OpenAI one of Georgia Power\u2019s largest individual customers."
   ],
   "builder_evidence": [
    "Both Georgia Power\u2019s contract with OpenAI was approved and the final Development of Regional Impact report for the Effingham County data center was released, Wednesday.",
    "The following updates mark separate steps in the process for the 1,400-acre data center project."
   ],
   "ai_customer_evidence": [
    "Both Georgia Power\u2019s contract with OpenAI was approved and the final Development of Regional Impact report for the Effingham County data center was released, Wednesday.",
    "The following updates mark separate steps in the process for the 1,400-acre data center project."
   ],
   "status_evidence": [
    "Georgia Power Communications Lead Joshua Peacock said Project Camellia remains in its early stages despite the contract approval.",
    "The following updates mark separate steps in the process for the 1,400-acre data center project."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://dcpulse.com/project/google-project-cannoli-michigan-1-gigawatt-ai-hub",
   "title": "Google\u2019s $5B Project Cannoli in Michigan",
   "published_at": null,
   "project": "Google Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Google Cloud",
   "ai_customer": "Google",
   "status": "Preliminary Site Approval (Feb 2026) / Main Announcement (March 2026)",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Google Project Cannoli: $5B 1GW Michigan AI Data Center",
    "Formally unveiled on March 17, 2026, Project Cannoli represents Google's first major hyperscale entry into Michigan.",
    "| Project Name | Google Project Cannoli: $5B 1GW Michigan AI Data Center |"
   ],
   "locality_evidence": [
    "**Status:** Preliminary Site Approval (Feb 2026) / Main Announcement (March 2026) | **Location:** Van Buren Township (Wayne County), Michigan",
    "| Location | Van Buren Township (Wayne County), Michigan |",
    "| City Name | Van Buren Township |",
    "# Google Project Cannoli: $5B 1GW Michigan AI Data Center"
   ],
   "state_evidence": [
    "# Google Project Cannoli: $5B 1GW Michigan AI Data Center",
    "**Status:** Preliminary Site Approval (Feb 2026) / Main Announcement (March 2026) | **Location:** Van Buren Township (Wayne County), Michigan",
    "Formally unveiled on March 17, 2026, Project Cannoli represents Google's first major hyperscale entry into Michigan.",
    "| Location | Van Buren Township (Wayne County), Michigan |"
   ],
   "capacity_gw_evidence": [
    "# Google Project Cannoli: $5B 1GW Michigan AI Data Center",
    "| Total IT Load | 1,000 MW (1.0 GW) |",
    "| Field | Value |",
    "## Quick Facts"
   ],
   "builder_evidence": [
    "| Developer / Operator | [Google Cloud](https://dcpulse.com/projects/companyprofiles/google-cloud-data-centers) |",
    "| Header | Details |",
    "## Companies Involved",
    "# Google Project Cannoli: $5B 1GW Michigan AI Data Center"
   ],
   "ai_customer_evidence": [
    "Formally unveiled on March 17, 2026, Project Cannoli represents Google's first major hyperscale entry into Michigan.",
    "To support this, Google and DTE Energy announced a \"clean-firm\" power agreement including 2.7 GW of new solar, battery storage, and demand response assets.",
    "# Google Project Cannoli: $5B 1GW Michigan AI Data Center"
   ],
   "status_evidence": [
    "**Status:** Preliminary Site Approval (Feb 2026) / Main Announcement (March 2026) | **Location:** Van Buren Township (Wayne County), Michigan",
    "| Status | Preliminary Site Approval (Feb 2026) / Main Announcement (March 2026) |",
    "| Field | Value |",
    "## Quick Facts",
    "# Google Project Cannoli: $5B 1GW Michigan AI Data Center"
   ],
   "announcement_date_evidence": [
    "Formally unveiled on March 17, 2026, Project Cannoli represents Google's first major hyperscale entry into Michigan.",
    "| Announcement | March 17, 2026 |",
    "| Header | Details |",
    "## Milestones",
    "# Google Project Cannoli: $5B 1GW Michigan AI Data Center"
   ]
  },
  {
   "url": "https://finance.yahoo.com/markets/stocks/articles/coatue-management-bought-9-72-183307549.html",
   "title": "Coatue Management Bought 9.72 Million Shares of Hut 8 in Q2. How to Play HUT Stock Now.",
   "published_at": "2026-08-21T18:33:07",
   "project": "Beacon Point",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": "",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Coatue Management Bought 9.72 Million Shares of Hut 8 in Q2. How to Play HUT Stock Now.",
    "Power at the Heart of Hut 8",
    "While Beacon Point is a 1 GW AI data-center campus project based in Texas, River Bend is Hut 8's other major AI campus project based in Louisiana with \"potential to scale beyond 1 GW.\""
   ],
   "locality_evidence": null,
   "state_evidence": [
    "Coatue Management Bought 9.72 Million Shares of Hut 8 in Q2. How to Play HUT Stock Now.",
    "Power at the Heart of Hut 8",
    "While Beacon Point is a 1 GW AI data-center campus project based in Texas, River Bend is Hut 8's other major AI campus project based in Louisiana with \"potential to scale beyond 1 GW.\""
   ],
   "capacity_gw_evidence": [
    "Coatue Management Bought 9.72 Million Shares of Hut 8 in Q2. How to Play HUT Stock Now.",
    "Power at the Heart of Hut 8",
    "While Beacon Point is a 1 GW AI data-center campus project based in Texas, River Bend is Hut 8's other major AI campus project based in Louisiana with \"potential to scale beyond 1 GW.\""
   ],
   "builder_evidence": [
    "Coatue Management Bought 9.72 Million Shares of Hut 8 in Q2. How to Play HUT Stock Now.",
    "Power at the Heart of Hut 8",
    "While Beacon Point is a 1 GW AI data-center campus project based in Texas, River Bend is Hut 8's other major AI campus project based in Louisiana with \"potential to scale beyond 1 GW.\""
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://www.dispatch.com/story/business/energy-resource/2026/08/17/openai-affirms-development-deal-and-massive-data-center-campus-in-pike-county/91335887007/",
   "title": "OpenAI commits to massive buildout of Pike County data center campus.",
   "published_at": "2026-08-17T17:05:04",
   "project": "Pike County data center campus",
   "locality": null,
   "state": null,
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "broke ground earlier this year",
   "announcement_date": null,
   "project_evidence": [
    "ENERGY-RESOURCE",
    "# OpenAI commits to massive buildout of Pike County data center campus.",
    "Partnering with the Japanese-owed SB Energy, California-based Nvidia and U.S. Department of Energy, OpenAI, the U.S. artificial intelligence company, has pledged to create 35,000 construction jobs in a six-year buildout of the Pike County data center campus that broke ground earlier this year."
   ],
   "locality_evidence": null,
   "state_evidence": null,
   "capacity_gw_evidence": [
    "ENERGY-RESOURCE",
    "# OpenAI commits to massive buildout of Pike County data center campus.",
    "The San Francisco-based company has agreed to secure approximately 8 gigawatts of information technology electrical power at the PORTS-Pike Technology Campus about 70 miles south of Columbus."
   ],
   "builder_evidence": [
    "ENERGY-RESOURCE",
    "# OpenAI commits to massive buildout of Pike County data center campus.",
    "Partnering with the Japanese-owed SB Energy, California-based Nvidia and U.S. Department of Energy, OpenAI, the U.S. artificial intelligence company, has pledged to create 35,000 construction jobs in a six-year buildout of the Pike County data center campus that broke ground earlier this year."
   ],
   "ai_customer_evidence": [
    "ENERGY-RESOURCE",
    "# OpenAI commits to massive buildout of Pike County data center campus.",
    "Partnering with the Japanese-owed SB Energy, California-based Nvidia and U.S. Department of Energy, OpenAI, the U.S. artificial intelligence company, has pledged to create 35,000 construction jobs in a six-year buildout of the Pike County data center campus that broke ground earlier this year."
   ],
   "status_evidence": [
    "ENERGY-RESOURCE",
    "# OpenAI commits to massive buildout of Pike County data center campus.",
    "Partnering with the Japanese-owed SB Energy, California-based Nvidia and U.S. Department of Energy, OpenAI, the U.S. artificial intelligence company, has pledged to create 35,000 construction jobs in a six-year buildout of the Pike County data center campus that broke ground earlier this year."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=openai&page=2&term=the-cloud-and-hybrid-channel",
   "title": "News The Cloud & Hybrid Channel, OpenAI",
   "published_at": "2026-08-27T00:00:00",
   "project": "Stargate",
   "locality": null,
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Related Digital",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# News - The Cloud & Hybrid Channel, OpenAI",
    "Related Digital\u2019s 1GW Michigan data center project to be part of OpenAI's Stargate"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# News - The Cloud & Hybrid Channel, OpenAI",
    "Related Digital\u2019s 1GW Michigan data center project to be part of OpenAI's Stargate"
   ],
   "capacity_gw_evidence": [
    "# News - The Cloud & Hybrid Channel, OpenAI",
    "Related Digital\u2019s 1GW Michigan data center project to be part of OpenAI's Stargate"
   ],
   "builder_evidence": [
    "# News - The Cloud & Hybrid Channel, OpenAI",
    "Related Digital\u2019s 1GW Michigan data center project to be part of OpenAI's Stargate"
   ],
   "ai_customer_evidence": [
    "# News - The Cloud & Hybrid Channel, OpenAI",
    "Related Digital\u2019s 1GW Michigan data center project to be part of OpenAI's Stargate"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://silicon.co.uk/cloud/datacenter/meta-data-centre-628710",
   "title": "Meta Breaks Ground On $10bn Indiana Data Centre",
   "published_at": "2026-02-12T09:00:37",
   "project": "Lebanon campus",
   "locality": "Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Meta Breaks Ground On $10bn Indiana Data Centre",
    "Facebook parent Meta begins construction of facility planned to cover 4 million square feet with 1 GW of compute capacity",
    "The Lebanon campus is one of Meta\u2019s biggest data centres, along with its \u201cHyperion\u201d facility in Louisiana and \u201cPrometheus\u201d in Ohio, the company said."
   ],
   "locality_evidence": [
    "# Meta Breaks Ground On $10bn Indiana Data Centre",
    "Facebook parent Meta said it has broken ground on a major data centre project in Lebanon, Indiana, that is expected to provide a compute capacity of 1 gigawatt at an expense of $10 billion (\u00a37.3bn)."
   ],
   "state_evidence": [
    "# Meta Breaks Ground On $10bn Indiana Data Centre",
    "Facebook parent Meta said it has broken ground on a major data centre project in Lebanon, Indiana, that is expected to provide a compute capacity of 1 gigawatt at an expense of $10 billion (\u00a37.3bn)."
   ],
   "capacity_gw_evidence": [
    "# Meta Breaks Ground On $10bn Indiana Data Centre",
    "Facebook parent Meta begins construction of facility planned to cover 4 million square feet with 1 GW of compute capacity",
    "Facebook parent Meta said it has broken ground on a major data centre project in Lebanon, Indiana, that is expected to provide a compute capacity of 1 gigawatt at an expense of $10 billion (\u00a37.3bn)."
   ],
   "builder_evidence": [
    "# Meta Breaks Ground On $10bn Indiana Data Centre",
    "Facebook parent Meta begins construction of facility planned to cover 4 million square feet with 1 GW of compute capacity",
    "Facebook parent Meta said it has broken ground on a major data centre project in Lebanon, Indiana, that is expected to provide a compute capacity of 1 gigawatt at an expense of $10 billion (\u00a37.3bn)."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Meta Breaks Ground On $10bn Indiana Data Centre",
    "Facebook parent Meta begins construction of facility planned to cover 4 million square feet with 1 GW of compute capacity",
    "Facebook parent Meta said it has broken ground on a major data centre project in Lebanon, Indiana, that is expected to provide a compute capacity of 1 gigawatt at an expense of $10 billion (\u00a37.3bn)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/operators/amazon-web-services",
   "title": "Amazon Web Services AI Data Centers (2026) \u2014 44 Facilities, 22.4 GW",
   "published_at": null,
   "project": "AWS Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.4,
   "builder": "Amazon Web Services",
   "ai_customer": "Anthropic",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS Project Rainier (New Carlisle, Indiana)](/datacenters/aws-project-rainier-ai-campus-indiana.html) | [Amazon Web Services](/operators/amazon-web-services/)[Anthropic](/operators/anthropic/) | [United States](/countries/united-states/) New Carlisle, Indiana | 2,400 MW | [operational](/status/operational/) | [Other](/energy/unknown/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "locality_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS Project Rainier (New Carlisle, Indiana)](/datacenters/aws-project-rainier-ai-campus-indiana.html) | [Amazon Web Services](/operators/amazon-web-services/)[Anthropic](/operators/anthropic/) | [United States](/countries/united-states/) New Carlisle, Indiana | 2,400 MW | [operational](/status/operational/) | [Other](/energy/unknown/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "state_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS Project Rainier (New Carlisle, Indiana)](/datacenters/aws-project-rainier-ai-campus-indiana.html) | [Amazon Web Services](/operators/amazon-web-services/)[Anthropic](/operators/anthropic/) | [United States](/countries/united-states/) New Carlisle, Indiana | 2,400 MW | [operational](/status/operational/) | [Other](/energy/unknown/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "capacity_gw_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS Project Rainier (New Carlisle, Indiana)](/datacenters/aws-project-rainier-ai-campus-indiana.html) | [Amazon Web Services](/operators/amazon-web-services/)[Anthropic](/operators/anthropic/) | [United States](/countries/united-states/) New Carlisle, Indiana | 2,400 MW | [operational](/status/operational/) | [Other](/energy/unknown/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "builder_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS Project Rainier (New Carlisle, Indiana)](/datacenters/aws-project-rainier-ai-campus-indiana.html) | [Amazon Web Services](/operators/amazon-web-services/)[Anthropic](/operators/anthropic/) | [United States](/countries/united-states/) New Carlisle, Indiana | 2,400 MW | [operational](/status/operational/) | [Other](/energy/unknown/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "ai_customer_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS Project Rainier (New Carlisle, Indiana)](/datacenters/aws-project-rainier-ai-campus-indiana.html) | [Amazon Web Services](/operators/amazon-web-services/)[Anthropic](/operators/anthropic/) | [United States](/countries/united-states/) New Carlisle, Indiana | 2,400 MW | [operational](/status/operational/) | [Other](/energy/unknown/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "status_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS Project Rainier (New Carlisle, Indiana)](/datacenters/aws-project-rainier-ai-campus-indiana.html) | [Amazon Web Services](/operators/amazon-web-services/)[Anthropic](/operators/anthropic/) | [United States](/countries/united-states/) New Carlisle, Indiana | 2,400 MW | [operational](/status/operational/) | [Other](/energy/unknown/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/operators/amazon-web-services",
   "title": "Amazon Web Services AI Data Centers (2026) \u2014 44 Facilities, 22.4 GW",
   "published_at": null,
   "project": "AWS AI Innovation Campuses",
   "locality": "Salem and Falls Townships",
   "state": "Pennsylvania",
   "capacity_gw": 1.8,
   "builder": "Amazon Web Services",
   "ai_customer": "",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS AI Innovation Campuses (Salem and Falls Townships, PA)](/datacenters/aws-ai-innovation-campuses-pennsylvania.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Salem and Falls Townships, Pennsylvania | 1,800 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Mixed](/ai-focus/mixed/) | | 1 |"
   ],
   "locality_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS AI Innovation Campuses (Salem and Falls Townships, PA)](/datacenters/aws-ai-innovation-campuses-pennsylvania.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Salem and Falls Townships, Pennsylvania | 1,800 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Mixed](/ai-focus/mixed/) | | 1 |"
   ],
   "state_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS AI Innovation Campuses (Salem and Falls Townships, PA)](/datacenters/aws-ai-innovation-campuses-pennsylvania.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Salem and Falls Townships, Pennsylvania | 1,800 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Mixed](/ai-focus/mixed/) | | 1 |"
   ],
   "capacity_gw_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS AI Innovation Campuses (Salem and Falls Townships, PA)](/datacenters/aws-ai-innovation-campuses-pennsylvania.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Salem and Falls Townships, Pennsylvania | 1,800 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Mixed](/ai-focus/mixed/) | | 1 |"
   ],
   "builder_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS AI Innovation Campuses (Salem and Falls Townships, PA)](/datacenters/aws-ai-innovation-campuses-pennsylvania.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Salem and Falls Townships, Pennsylvania | 1,800 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Mixed](/ai-focus/mixed/) | | 1 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS AI Innovation Campuses (Salem and Falls Townships, PA)](/datacenters/aws-ai-innovation-campuses-pennsylvania.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Salem and Falls Townships, Pennsylvania | 1,800 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Mixed](/ai-focus/mixed/) | | 1 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/operators/amazon-web-services",
   "title": "Amazon Web Services AI Data Centers (2026) \u2014 44 Facilities, 22.4 GW",
   "published_at": null,
   "project": "Amazon Web Services \u2014 Northern Virginia Hyperscale Campus",
   "locality": "Northern Virginia",
   "state": "Virginia",
   "capacity_gw": 1.5,
   "builder": "Amazon Web Services",
   "ai_customer": "",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Amazon Web Services \u2014 Northern Virginia Hyperscale Campus](/datacenters/amazon-ec2-virginia-hyperscale-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Northern Virginia | 1,500 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "locality_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Amazon Web Services \u2014 Northern Virginia Hyperscale Campus](/datacenters/amazon-ec2-virginia-hyperscale-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Northern Virginia | 1,500 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "state_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Amazon Web Services \u2014 Northern Virginia Hyperscale Campus](/datacenters/amazon-ec2-virginia-hyperscale-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Northern Virginia | 1,500 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "capacity_gw_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Amazon Web Services \u2014 Northern Virginia Hyperscale Campus](/datacenters/amazon-ec2-virginia-hyperscale-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Northern Virginia | 1,500 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "builder_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Amazon Web Services \u2014 Northern Virginia Hyperscale Campus](/datacenters/amazon-ec2-virginia-hyperscale-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Northern Virginia | 1,500 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Amazon Web Services \u2014 Northern Virginia Hyperscale Campus](/datacenters/amazon-ec2-virginia-hyperscale-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Northern Virginia | 1,500 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/operators/amazon-web-services",
   "title": "Amazon Web Services AI Data Centers (2026) \u2014 44 Facilities, 22.4 GW",
   "published_at": null,
   "project": "AWS \u2014 Mississippi AI Data Center",
   "locality": "Madison County",
   "state": "Mississippi",
   "capacity_gw": 1.3,
   "builder": "Amazon Web Services",
   "ai_customer": "",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)](/datacenters/aws-mississippi-ai-data-center.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Madison County | 1,300 MW | [under construction](/status/under-construction/) | [Renewable](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "locality_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)](/datacenters/aws-mississippi-ai-data-center.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Madison County | 1,300 MW | [under construction](/status/under-construction/) | [Renewable](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "state_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)](/datacenters/aws-mississippi-ai-data-center.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Madison County | 1,300 MW | [under construction](/status/under-construction/) | [Renewable](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "capacity_gw_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)](/datacenters/aws-mississippi-ai-data-center.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Madison County | 1,300 MW | [under construction](/status/under-construction/) | [Renewable](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "builder_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)](/datacenters/aws-mississippi-ai-data-center.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Madison County | 1,300 MW | [under construction](/status/under-construction/) | [Renewable](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)](/datacenters/aws-mississippi-ai-data-center.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Madison County | 1,300 MW | [under construction](/status/under-construction/) | [Renewable](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/operators/amazon-web-services",
   "title": "Amazon Web Services AI Data Centers (2026) \u2014 44 Facilities, 22.4 GW",
   "published_at": null,
   "project": "AWS US Government AI Supercomputing Expansion",
   "locality": "Virginia / Oregon / Ohio",
   "state": "Virginia / Oregon / Ohio",
   "capacity_gw": 1.3,
   "builder": "Amazon Web Services",
   "ai_customer": "",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS US Government AI Supercomputing Expansion](/datacenters/aws-us-government-ai-supercomputing-expansion.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Virginia / Oregon / Ohio | 1,300 MW | [announced](/status/announced/) | [Renewable](/energy/renewable/) | [Sovereign AI](/ai-focus/sovereign-ai/) | | 2 |"
   ],
   "locality_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS US Government AI Supercomputing Expansion](/datacenters/aws-us-government-ai-supercomputing-expansion.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Virginia / Oregon / Ohio | 1,300 MW | [announced](/status/announced/) | [Renewable](/energy/renewable/) | [Sovereign AI](/ai-focus/sovereign-ai/) | | 2 |"
   ],
   "state_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS US Government AI Supercomputing Expansion](/datacenters/aws-us-government-ai-supercomputing-expansion.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Virginia / Oregon / Ohio | 1,300 MW | [announced](/status/announced/) | [Renewable](/energy/renewable/) | [Sovereign AI](/ai-focus/sovereign-ai/) | | 2 |"
   ],
   "capacity_gw_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS US Government AI Supercomputing Expansion](/datacenters/aws-us-government-ai-supercomputing-expansion.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Virginia / Oregon / Ohio | 1,300 MW | [announced](/status/announced/) | [Renewable](/energy/renewable/) | [Sovereign AI](/ai-focus/sovereign-ai/) | | 2 |"
   ],
   "builder_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS US Government AI Supercomputing Expansion](/datacenters/aws-us-government-ai-supercomputing-expansion.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Virginia / Oregon / Ohio | 1,300 MW | [announced](/status/announced/) | [Renewable](/energy/renewable/) | [Sovereign AI](/ai-focus/sovereign-ai/) | | 2 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS US Government AI Supercomputing Expansion](/datacenters/aws-us-government-ai-supercomputing-expansion.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Virginia / Oregon / Ohio | 1,300 MW | [announced](/status/announced/) | [Renewable](/energy/renewable/) | [Sovereign AI](/ai-focus/sovereign-ai/) | | 2 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/operators/amazon-web-services",
   "title": "Amazon Web Services AI Data Centers (2026) \u2014 44 Facilities, 22.4 GW",
   "published_at": null,
   "project": "Vistra's Comanche Peak Nuclear Data Center Campus",
   "locality": "Southwestern United States",
   "state": "Southwestern United States",
   "capacity_gw": 1.2,
   "builder": "Vistra Corp / Amazon Web Services",
   "ai_customer": "",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Vistra's Comanche Peak Nuclear Data Center Campus](/datacenters/vistra-comanche-peak-nuclear-power-plant-expansion.html) | [Vistra Corp](/operators/vistra-corp/)[Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Southwestern United States | 1,200 MW | [planned](/status/planned/) | [Nuclear](/energy/nuclear/) | [General Cloud](/ai-focus/general-cloud/) | | 3 |"
   ],
   "locality_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Vistra's Comanche Peak Nuclear Data Center Campus](/datacenters/vistra-comanche-peak-nuclear-power-plant-expansion.html) | [Vistra Corp](/operators/vistra-corp/)[Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Southwestern United States | 1,200 MW | [planned](/status/planned/) | [Nuclear](/energy/nuclear/) | [General Cloud](/ai-focus/general-cloud/) | | 3 |"
   ],
   "state_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Vistra's Comanche Peak Nuclear Data Center Campus](/datacenters/vistra-comanche-peak-nuclear-power-plant-expansion.html) | [Vistra Corp](/operators/vistra-corp/)[Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Southwestern United States | 1,200 MW | [planned](/status/planned/) | [Nuclear](/energy/nuclear/) | [General Cloud](/ai-focus/general-cloud/) | | 3 |"
   ],
   "capacity_gw_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Vistra's Comanche Peak Nuclear Data Center Campus](/datacenters/vistra-comanche-peak-nuclear-power-plant-expansion.html) | [Vistra Corp](/operators/vistra-corp/)[Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Southwestern United States | 1,200 MW | [planned](/status/planned/) | [Nuclear](/energy/nuclear/) | [General Cloud](/ai-focus/general-cloud/) | | 3 |"
   ],
   "builder_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Vistra's Comanche Peak Nuclear Data Center Campus](/datacenters/vistra-comanche-peak-nuclear-power-plant-expansion.html) | [Vistra Corp](/operators/vistra-corp/)[Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Southwestern United States | 1,200 MW | [planned](/status/planned/) | [Nuclear](/energy/nuclear/) | [General Cloud](/ai-focus/general-cloud/) | | 3 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Vistra's Comanche Peak Nuclear Data Center Campus](/datacenters/vistra-comanche-peak-nuclear-power-plant-expansion.html) | [Vistra Corp](/operators/vistra-corp/)[Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Southwestern United States | 1,200 MW | [planned](/status/planned/) | [Nuclear](/energy/nuclear/) | [General Cloud](/ai-focus/general-cloud/) | | 3 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/operators/amazon-web-services",
   "title": "Amazon Web Services AI Data Centers (2026) \u2014 44 Facilities, 22.4 GW",
   "published_at": null,
   "project": "AWS \u2014 Richmond County AI Innovation Campus",
   "locality": "North Carolina",
   "state": "North Carolina",
   "capacity_gw": 1.0,
   "builder": "Amazon Web Services",
   "ai_customer": "",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS \u2014 Richmond County AI Innovation Campus](/datacenters/aws-richmond-county-north-carolina-ai-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) North Carolina | 1,000 MW | [under construction](/status/under-construction/) | [Other](/energy/unknown/) | [General Cloud](/ai-focus/general-cloud/) | | 1 |"
   ],
   "locality_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS \u2014 Richmond County AI Innovation Campus](/datacenters/aws-richmond-county-north-carolina-ai-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) North Carolina | 1,000 MW | [under construction](/status/under-construction/) | [Other](/energy/unknown/) | [General Cloud](/ai-focus/general-cloud/) | | 1 |"
   ],
   "state_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS \u2014 Richmond County AI Innovation Campus](/datacenters/aws-richmond-county-north-carolina-ai-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) North Carolina | 1,000 MW | [under construction](/status/under-construction/) | [Other](/energy/unknown/) | [General Cloud](/ai-focus/general-cloud/) | | 1 |"
   ],
   "capacity_gw_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS \u2014 Richmond County AI Innovation Campus](/datacenters/aws-richmond-county-north-carolina-ai-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) North Carolina | 1,000 MW | [under construction](/status/under-construction/) | [Other](/energy/unknown/) | [General Cloud](/ai-focus/general-cloud/) | | 1 |"
   ],
   "builder_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS \u2014 Richmond County AI Innovation Campus](/datacenters/aws-richmond-county-north-carolina-ai-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) North Carolina | 1,000 MW | [under construction](/status/under-construction/) | [Other](/energy/unknown/) | [General Cloud](/ai-focus/general-cloud/) | | 1 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Amazon Web Services",
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS \u2014 Richmond County AI Innovation Campus](/datacenters/aws-richmond-county-north-carolina-ai-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) North Carolina | 1,000 MW | [under construction](/status/under-construction/) | [Other](/energy/unknown/) | [General Cloud](/ai-focus/general-cloud/) | | 1 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://crvscience.com/post/the-memphis-cluster-the-socio-technical-cost-of-the-xai-colossus",
   "title": "The Memphis Cluster: The Socio-Technical Cost of the xAI Colossus",
   "published_at": "2026-01-17T19:41:03",
   "project": "Colossus",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "Operational",
   "announcement_date": null,
   "project_evidence": [
    "The Memphis Cluster: The Socio-Technical Cost of the xAI Colossus",
    "This facility, known as \"Colossus,\" represents the flagship infrastructure of xAI, the artificial intelligence company founded by Elon Musk.",
    "By January 2026, the project had expanded from a singular high-performance cluster into a sprawling campus straddling the Tennessee-Mississippi border, comprising Colossus 1, Colossus 2, and a third facility provocatively named \"MACROHARDRR\".1 Together, these facilities target a total power capacity of nearly two gigawatts\u2014roughly equivalent to the electrical consumption of two million homes\u2014to power a fleet of over 555,000 Graphics Processing Units (GPUs).1"
   ],
   "locality_evidence": [
    "The Memphis Cluster: The Socio-Technical Cost of the xAI Colossus",
    "In an industrial corridor of Southwest Memphis, Tennessee, historically defined by heavy manufacturing and logistics, a new kind of industrial behemoth emerged with unprecedented speed."
   ],
   "state_evidence": [
    "The Memphis Cluster: The Socio-Technical Cost of the xAI Colossus",
    "In an industrial corridor of Southwest Memphis, Tennessee, historically defined by heavy manufacturing and logistics, a new kind of industrial behemoth emerged with unprecedented speed."
   ],
   "capacity_gw_evidence": [
    "The Memphis Cluster: The Socio-Technical Cost of the xAI Colossus",
    "Together, these facilities target a total power capacity of nearly two gigawatts\u2014roughly equivalent to the electrical consumption of two million homes\u2014to power a fleet of over 555,000 Graphics Processing Units (GPUs).1"
   ],
   "builder_evidence": [
    "The Memphis Cluster: The Socio-Technical Cost of the xAI Colossus",
    "This facility, known as \"Colossus,\" represents the flagship infrastructure of xAI, the artificial intelligence company founded by Elon Musk."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The Memphis Cluster: The Socio-Technical Cost of the xAI Colossus",
    "### **Table 1: Technical Specifications of the xAI Colossus Complex (Jan 2026)**",
    "| **Feature** | **Colossus 1** | **Colossus 2** | **MACROHARDRR (Bldg 3)** |",
    "| **Status** | Operational | Operational | Retrofit / Deployment |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://lanin.substack.com/p/crusoe-is-not-a-neocloud-its-americas",
   "title": "Ten Gas Turbines in Abilene. Why the Most Important AI Infrastructure Story Isn't About Chips.",
   "published_at": "2026-04-05T18:57:06",
   "project": "Project Jade",
   "locality": "Cheyenne",
   "state": "Wyoming",
   "capacity_gw": 10.0,
   "builder": "Crusoe",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": "2026-01-05",
   "project_evidence": [
    "# Ten Gas Turbines in Abilene. Why the Most Important AI Infrastructure Story Isn't About Chips.",
    "In January 2026, the Laramie County Board of Commissioners in Wyoming unanimously approved Project Jade \u2014 a $50 billion data center and power generation complex that will, at its initial phase, consume 2.7 gigawatts of electricity."
   ],
   "locality_evidence": [
    "# Ten Gas Turbines in Abilene. Why the Most Important AI Infrastructure Story Isn't About Chips.",
    "Approved by Laramie County on January 5, 2026, Project Jade sits on 600 acres within the newly created Switchgrass Industrial Park, about 8 miles south of Cheyenne."
   ],
   "state_evidence": [
    "# Ten Gas Turbines in Abilene. Why the Most Important AI Infrastructure Story Isn't About Chips.",
    "In January 2026, the Laramie County Board of Commissioners in Wyoming unanimously approved Project Jade \u2014 a $50 billion data center and power generation complex that will, at its initial phase, consume 2.7 gigawatts of electricity."
   ],
   "capacity_gw_evidence": [
    "# Ten Gas Turbines in Abilene. Why the Most Important AI Infrastructure Story Isn't About Chips.",
    "Plans filed with the county contemplate scaling the facility to 10 GW."
   ],
   "builder_evidence": [
    "# Ten Gas Turbines in Abilene. Why the Most Important AI Infrastructure Story Isn't About Chips.",
    "The developer is Crusoe."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Ten Gas Turbines in Abilene. Why the Most Important AI Infrastructure Story Isn't About Chips.",
    "In January 2026, the Laramie County Board of Commissioners in Wyoming unanimously approved Project Jade \u2014 a $50 billion data center and power generation complex that will, at its initial phase, consume 2.7 gigawatts of electricity."
   ],
   "announcement_date_evidence": [
    "# Ten Gas Turbines in Abilene. Why the Most Important AI Infrastructure Story Isn't About Chips.",
    "Approved by Laramie County on January 5, 2026, Project Jade sits on 600 acres within the newly created Switchgrass Industrial Park, about 8 miles south of Cheyenne."
   ]
  },
  {
   "url": "https://lanin.substack.com/p/crusoe-is-not-a-neocloud-its-americas",
   "title": "Ten Gas Turbines in Abilene. Why the Most Important AI Infrastructure Story Isn't About Chips.",
   "published_at": "2026-04-05T18:57:06",
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 2.1,
   "builder": "Crusoe",
   "ai_customer": "Oracle, OpenAI, Microsoft",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# Ten Gas Turbines in Abilene. Why the Most Important AI Infrastructure Story Isn't About Chips.",
    "And on March 27, 2026, Crusoe announced a third gigawatt-scale project \u2014 a new 900 MW AI factory campus in Abilene, Texas, built for Microsoft."
   ],
   "locality_evidence": [
    "# Ten Gas Turbines in Abilene. Why the Most Important AI Infrastructure Story Isn't About Chips.",
    "And on March 27, 2026, Crusoe announced a third gigawatt-scale project \u2014 a new 900 MW AI factory campus in Abilene, Texas, built for Microsoft."
   ],
   "state_evidence": [
    "# Ten Gas Turbines in Abilene. Why the Most Important AI Infrastructure Story Isn't About Chips.",
    "And on March 27, 2026, Crusoe announced a third gigawatt-scale project \u2014 a new 900 MW AI factory campus in Abilene, Texas, built for Microsoft."
   ],
   "capacity_gw_evidence": [
    "# Ten Gas Turbines in Abilene. Why the Most Important AI Infrastructure Story Isn't About Chips.",
    "Combined Abilene footprint: 2.1 GW."
   ],
   "builder_evidence": [
    "# Ten Gas Turbines in Abilene. Why the Most Important AI Infrastructure Story Isn't About Chips.",
    "And on March 27, 2026, Crusoe announced a third gigawatt-scale project \u2014 a new 900 MW AI factory campus in Abilene, Texas, built for Microsoft."
   ],
   "ai_customer_evidence": [
    "# Ten Gas Turbines in Abilene. Why the Most Important AI Infrastructure Story Isn't About Chips.",
    "That campus sits adjacent to Crusoe\u2019s existing 1.2 GW facility for Oracle and OpenAI."
   ],
   "status_evidence": [
    "# Ten Gas Turbines in Abilene. Why the Most Important AI Infrastructure Story Isn't About Chips.",
    "They now run Oracle Cloud Infrastructure with NVIDIA GB200 racks as part of the Stargate initiative, and went live in September 2025."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news/fermi-america-hit-with-class-action-lawsuit",
   "title": "Fermi America hit with class action lawsuit",
   "published_at": "2026-08-27T00:00:00",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "Proposed",
   "announcement_date": null,
   "project_evidence": [
    "Fermi, a company co-founded by former Texas governor and energy secretary Rick Perry, is planning to [develop a massive 11GW data center and energy campus](https://www.datacenterdynamics.com/en/news/?tag=fermi-america) near Amarillo in Texas on land owned by the Texas Tech University system.",
    "If realized, Project Matador will span 18 million sq ft (1.67 million sqm) and would utilize a combination of on-site energy sources, including natural gas, solar, wind energy, and nuclear energy."
   ],
   "locality_evidence": [
    "Fermi America, the company behind the proposed up to 11GW data center campus in Amarillo, Texas, has been hit with a class action lawsuit.",
    "Fermi, a company co-founded by former Texas governor and energy secretary Rick Perry, is planning to [develop a massive 11GW data center and energy campus](https://www.datacenterdynamics.com/en/news/?tag=fermi-america) near Amarillo in Texas on land owned by the Texas Tech University system."
   ],
   "state_evidence": [
    "Fermi America, the company behind the proposed up to 11GW data center campus in Amarillo, Texas, has been hit with a class action lawsuit.",
    "Fermi, a company co-founded by former Texas governor and energy secretary Rick Perry, is planning to [develop a massive 11GW data center and energy campus](https://www.datacenterdynamics.com/en/news/?tag=fermi-america) near Amarillo in Texas on land owned by the Texas Tech University system."
   ],
   "capacity_gw_evidence": [
    "Fermi America, the company behind the proposed up to 11GW data center campus in Amarillo, Texas, has been hit with a class action lawsuit.",
    "Fermi, a company co-founded by former Texas governor and energy secretary Rick Perry, is planning to [develop a massive 11GW data center and energy campus](https://www.datacenterdynamics.com/en/news/?tag=fermi-america) near Amarillo in Texas on land owned by the Texas Tech University system."
   ],
   "builder_evidence": [
    "Fermi America, the company behind the proposed up to 11GW data center campus in Amarillo, Texas, has been hit with a class action lawsuit.",
    "Fermi, a company co-founded by former Texas governor and energy secretary Rick Perry, is planning to [develop a massive 11GW data center and energy campus](https://www.datacenterdynamics.com/en/news/?tag=fermi-america) near Amarillo in Texas on land owned by the Texas Tech University system."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Fermi America, the company behind the proposed up to 11GW data center campus in Amarillo, Texas, has been hit with a class action lawsuit."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://energy.media/energy-deals/uk-based-nscale-acquires-8gw-west-virginia-data-center",
   "title": "UK-based Nscale Acquires 8GW West Virginia Data Center - Energy.Media",
   "published_at": "2026-03-19T17:51:28",
   "project": "Monarch Compute Campus",
   "locality": null,
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "Acquiring",
   "announcement_date": "2026-03-19",
   "project_evidence": [
    "UK-based Nscale Acquires 8GW West Virginia Data Center",
    "UK-based Nscale is acquiring American Intelligence & Power Corporation, including the 2,250 acre Monarch Compute Campus in West Virginia."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "UK-based Nscale Acquires 8GW West Virginia Data Center",
    "UK-based Nscale is acquiring American Intelligence & Power Corporation, including the 2,250 acre Monarch Compute Campus in West Virginia."
   ],
   "capacity_gw_evidence": [
    "UK-based Nscale Acquires 8GW West Virginia Data Center",
    "The site has 8 GW total capacity planned, with the first 2GW phase online by 2028."
   ],
   "builder_evidence": [
    "UK-based Nscale Acquires 8GW West Virginia Data Center",
    "UK-based Nscale is acquiring American Intelligence & Power Corporation, including the 2,250 acre Monarch Compute Campus in West Virginia."
   ],
   "ai_customer_evidence": [
    "UK-based Nscale Acquires 8GW West Virginia Data Center",
    "Microsoft has signed a letter of intent for 1.35GW of AI compute capacity at the site, which is expected to house \u201cone of the world\u2019s largest AI factories\u201d."
   ],
   "status_evidence": [
    "UK-based Nscale Acquires 8GW West Virginia Data Center",
    "UK-based Nscale is acquiring American Intelligence & Power Corporation, including the 2,250 acre Monarch Compute Campus in West Virginia."
   ],
   "announcement_date_evidence": [
    "UK-based Nscale Acquires 8GW West Virginia Data Center",
    "- March 19, 2026"
   ]
  },
  {
   "url": "https://finance.yahoo.com/energy/articles/utility-officials-approve-georgia-power-150425481.html",
   "title": "Utility officials approve Georgia Power, OpenAI data center agreement",
   "published_at": "2026-08-27T15:04:25",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "Georgia Power",
   "ai_customer": "OpenAI",
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "Utility officials approve Georgia Power, OpenAI data center agreement",
    "The approval of the power plan for Project Camellia and OpenAI follows a base rate freeze a[pproved by the PSC and enacted in July 2025](https://www.wsbtv.com/news/local/georgia-psc-approves-plan-freeze-georgia-power-base-power-rates/JXNC3CLU7BAIRGFGBPUFR3K2CA/), as well as a [broader rate reduction plan approved in May](https://www.wsbtv.com/news/local/atlanta/georgia-power-announces-new-savings-plan-customers/V2ETHKED4NAFZMYAO56LICRHJE/).",
    "Project Camellia is located in the Savannah Gateway Industrial Hub in Effingham County."
   ],
   "locality_evidence": [
    "Utility officials approve Georgia Power, OpenAI data center agreement",
    "The Georgia Public Service Commission has approved a [contract between Georgia Power and OpenAI](https://www.wsbtv.com/news/local/openai-plans-massive-data-center-facility-with-georgia-power-development-start-2028/377IZ4C4LFBGZNEFRENVWR7IMU/) to power a massive new data center project in Effingham County.",
    "Project Camellia is located in the Savannah Gateway Industrial Hub in Effingham County."
   ],
   "state_evidence": [
    "Utility officials approve Georgia Power, OpenAI data center agreement",
    "The Georgia Public Service Commission has approved a [contract between Georgia Power and OpenAI](https://www.wsbtv.com/news/local/openai-plans-massive-data-center-facility-with-georgia-power-development-start-2028/377IZ4C4LFBGZNEFRENVWR7IMU/) to power a massive new data center project in Effingham County."
   ],
   "capacity_gw_evidence": [
    "Utility officials approve Georgia Power, OpenAI data center agreement",
    "Under the agreement filed with the Georgia PSC, the facility will require 3,200 megawatts of electricity, to be delivered in phases."
   ],
   "builder_evidence": [
    "Utility officials approve Georgia Power, OpenAI data center agreement",
    "The Georgia Public Service Commission has approved a [contract between Georgia Power and OpenAI](https://www.wsbtv.com/news/local/openai-plans-massive-data-center-facility-with-georgia-power-development-start-2028/377IZ4C4LFBGZNEFRENVWR7IMU/) to power a massive new data center project in Effingham County."
   ],
   "ai_customer_evidence": [
    "Utility officials approve Georgia Power, OpenAI data center agreement",
    "The Georgia Public Service Commission has approved a [contract between Georgia Power and OpenAI](https://www.wsbtv.com/news/local/openai-plans-massive-data-center-facility-with-georgia-power-development-start-2028/377IZ4C4LFBGZNEFRENVWR7IMU/) to power a massive new data center project in Effingham County."
   ],
   "status_evidence": [
    "Utility officials approve Georgia Power, OpenAI data center agreement",
    "The Georgia Public Service Commission has approved a [contract between Georgia Power and OpenAI](https://www.wsbtv.com/news/local/openai-plans-massive-data-center-facility-with-georgia-power-development-start-2028/377IZ4C4LFBGZNEFRENVWR7IMU/) to power a massive new data center project in Effingham County."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://www.hut8.com/data-centers/river-bend",
   "title": "River Bend",
   "published_at": null,
   "project": "River Bend",
   "locality": null,
   "state": "Louisiana",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# River Bend",
    "River Bend is an AI data center campus developed under Hut 8\u2019s power-first, innovation-driven approach to digital infrastructure development."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# River Bend",
    "Located in Louisiana, it has the potential to scale beyond 1 GW of utility capacity."
   ],
   "capacity_gw_evidence": [
    "# River Bend",
    "Located in Louisiana, it has the potential to scale beyond 1 GW of utility capacity."
   ],
   "builder_evidence": [
    "# River Bend",
    "River Bend is an AI data center campus developed under Hut 8\u2019s power-first, innovation-driven approach to digital infrastructure development."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://poweredbywho.com/projects/9fcf8a15-fa0f-40b0-92ed-d9d76fc41f58",
   "title": "Delta Gigasite Data Center Campus (Fibernet MercuryDelta / Creekstone), Utah | PoweredByWho",
   "published_at": null,
   "project": "Delta Gigasite Data Center Campus",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 2.0,
   "builder": "Fibernet MercuryDelta, LLC / Creekstone Energy LLC",
   "ai_customer": null,
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "POWEREDBYWHO",
    "PROJECT DOSSIER",
    "# Delta Gigasite Data Center Campus (Fibernet MercuryDelta / Creekstone)"
   ],
   "locality_evidence": [
    "POWEREDBYWHO",
    "PROJECT DOSSIER",
    "Location\n\nDELTA\n\nMillard County, UT"
   ],
   "state_evidence": [
    "POWEREDBYWHO",
    "PROJECT DOSSIER",
    "Location\n\nDELTA\n\nMillard County, UT"
   ],
   "capacity_gw_evidence": [
    "POWEREDBYWHO",
    "PROJECT DOSSIER",
    "2000 MW \u00b7 UNDER CONSTRUCTION"
   ],
   "builder_evidence": [
    "POWEREDBYWHO",
    "PROJECT DOSSIER",
    "Developer \u00b7 Fibernet MercuryDelta, LLC / Creekstone Energy LLC"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "POWEREDBYWHO",
    "PROJECT DOSSIER",
    "Status\n\nUnder Construction"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacentrecentral.com/ecl-announces-worlds-first-1-gigawatt-off-grid-hydrogen-powered-ai-factory-data-center",
   "title": "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
   "published_at": "2024-09-26T17:02:04",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "planned",
   "announcement_date": "2024-09-25",
   "project_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center.",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2) , which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "locality_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center.",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2) , which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "state_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center.",
    "ECL Terrasite-TX1 comes at a critical time for the state of Texas, with The Electric Reliability Council of Texas (ERCOT) testifying on June 12 this year that the state\u2019s power grid needs will grow approximately 2X by 2030 due in part to the growth of data centers and AI."
   ],
   "capacity_gw_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center.",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2) , which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "builder_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center.",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2) , which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "ai_customer_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center.",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2) , which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "status_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center.",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2) , which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "announcement_date_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center.",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2) , which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ]
  },
  {
   "url": "https://octus.com/resources/articles/anthropic-linked-nexus-data-centers-lining-up-roughly-15b-in-bridge-financing-from-banks",
   "title": "Anthropic-Linked Nexus Data Centers Target 5 Billion",
   "published_at": "2026-07-27T15:47:56",
   "project": null,
   "locality": "Hubbard",
   "state": "Texas",
   "capacity_gw": 7.7,
   "builder": "Nexus Data Centers",
   "ai_customer": "Anthropic",
   "status": "developing",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "Nexus Data Centers, the developer behind a 2,900-acre data center campus leased to AI giant Anthropic, is eyeing a roughly $15 billion bridge loan to finance its buildout, according to sources.",
    "The company is developing the AI campus in Hubbard, Texas, according to a Texas Department of Licensing and Regulation [filing](https://www.tdlr.texas.gov/TABS/Projects/TABS2026022673) from June, with construction that was expected to start in January 2026 and be completed by October 2027."
   ],
   "state_evidence": [
    "Nexus Data Centers, the developer behind a 2,900-acre data center campus leased to AI giant Anthropic, is eyeing a roughly $15 billion bridge loan to finance its buildout, according to sources.",
    "The company is developing the AI campus in Hubbard, Texas, according to a Texas Department of Licensing and Regulation [filing](https://www.tdlr.texas.gov/TABS/Projects/TABS2026022673) from June, with construction that was expected to start in January 2026 and be completed by October 2027."
   ],
   "capacity_gw_evidence": [
    "Nexus Data Centers, the developer behind a 2,900-acre data center campus leased to AI giant Anthropic, is eyeing a roughly $15 billion bridge loan to finance its buildout, according to sources.",
    "The first phase of the campus was expected to cost more than $5 billion and provide about 500 megawatts of capacity, with plans to eventually scale to as much as 7.7 gigawatts, the report added."
   ],
   "builder_evidence": [
    "Nexus Data Centers, the developer behind a 2,900-acre data center campus leased to AI giant Anthropic, is eyeing a roughly $15 billion bridge loan to finance its buildout, according to sources.",
    "Headquartered in The Woodlands, Texas, Transition Equity Partners-backed Nexus Data Centers is a large-scale developer of hyperscale AI data center campuses that combines behind-the-meter power generation with integrated fiber and water infrastructure, according to its [website](https://nexus-datacenters.com/)."
   ],
   "ai_customer_evidence": [
    "Nexus Data Centers, the developer behind a 2,900-acre data center campus leased to AI giant Anthropic, is eyeing a roughly $15 billion bridge loan to finance its buildout, according to sources."
   ],
   "status_evidence": [
    "Nexus Data Centers, the developer behind a 2,900-acre data center campus leased to AI giant Anthropic, is eyeing a roughly $15 billion bridge loan to finance its buildout, according to sources.",
    "The company is developing the AI campus in Hubbard, Texas, according to a Texas Department of Licensing and Regulation [filing](https://www.tdlr.texas.gov/TABS/Projects/TABS2026022673) from June, with construction that was expected to start in January 2026 and be completed by October 2027."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://gigazine.net/gsc_news/en/20260818-nvidia-sb-energy-openai-ports-pike",
   "title": "NVIDIA is investing 240 billion yen in a SoftBank-affiliated company to build a large-scale OpenAI data center, with plans to generate approximately 96 trillion yen in business opportunities by 2030.",
   "published_at": "2026-08-18T02:40:00",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 16.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# NVIDIA is investing 240 billion yen in a SoftBank-affiliated company to build a large-scale OpenAI data center, with plans to generate approximately 96 trillion yen in business opportunities by 2030.",
    "SB Energy, a subsidiary of SoftBank Group, is proceeding with plans to build a large-scale data center called ' ****",
    "**[PORTS-Pike Technology Campus](https://portscampus.com/)** ' in Ohio, USA. NVIDIA has now invested $1.5 billion (approximately 240 billion yen) in SB Energy and signed an agreement to become the exclusive provider of AI infrastructure at PORTS-Pike Technology Campus. A 20-year lease agreement with OpenAI has also been announced."
   ],
   "locality_evidence": [
    "# NVIDIA is investing 240 billion yen in a SoftBank-affiliated company to build a large-scale OpenAI data center, with plans to generate approximately 96 trillion yen in business opportunities by 2030.",
    "PORTS-Pike Technology Campus is a large-scale data center being built in Pike County, Ohio, with construction scheduled to begin in 2026 and operations to commence in stages starting in 2028."
   ],
   "state_evidence": [
    "# NVIDIA is investing 240 billion yen in a SoftBank-affiliated company to build a large-scale OpenAI data center, with plans to generate approximately 96 trillion yen in business opportunities by 2030.",
    "SB Energy, a subsidiary of SoftBank Group, is proceeding with plans to build a large-scale data center called ' ****",
    "**[PORTS-Pike Technology Campus](https://portscampus.com/)** ' in Ohio, USA. NVIDIA has now invested $1.5 billion (approximately 240 billion yen) in SB Energy and signed an agreement to become the exclusive provider of AI infrastructure at PORTS-Pike Technology Campus. A 20-year lease agreement with OpenAI has also been announced."
   ],
   "capacity_gw_evidence": [
    "# NVIDIA is investing 240 billion yen in a SoftBank-affiliated company to build a large-scale OpenAI data center, with plans to generate approximately 96 trillion yen in business opportunities by 2030.",
    "Furthermore, the PORTS-Pike Technology Campus has the potential to expand to 16GW, creating business opportunities of approximately $600 billion (approximately 96 trillion yen) by 2030."
   ],
   "builder_evidence": [
    "# NVIDIA is investing 240 billion yen in a SoftBank-affiliated company to build a large-scale OpenAI data center, with plans to generate approximately 96 trillion yen in business opportunities by 2030.",
    "SB Energy, a subsidiary of SoftBank Group, is proceeding with plans to build a large-scale data center called ' ****"
   ],
   "ai_customer_evidence": [
    "# NVIDIA is investing 240 billion yen in a SoftBank-affiliated company to build a large-scale OpenAI data center, with plans to generate approximately 96 trillion yen in business opportunities by 2030.",
    "SB Energy, a subsidiary of SoftBank Group, is proceeding with plans to build a large-scale data center called ' ****",
    "**[PORTS-Pike Technology Campus](https://portscampus.com/)** ' in Ohio, USA. NVIDIA has now invested $1.5 billion (approximately 240 billion yen) in SB Energy and signed an agreement to become the exclusive provider of AI infrastructure at PORTS-Pike Technology Campus. A 20-year lease agreement with OpenAI has also been announced."
   ],
   "status_evidence": [
    "# NVIDIA is investing 240 billion yen in a SoftBank-affiliated company to build a large-scale OpenAI data center, with plans to generate approximately 96 trillion yen in business opportunities by 2030.",
    "SB Energy, a subsidiary of SoftBank Group, is proceeding with plans to build a large-scale data center called ' ****"
   ],
   "announcement_date_evidence": [
    "# NVIDIA is investing 240 billion yen in a SoftBank-affiliated company to build a large-scale OpenAI data center, with plans to generate approximately 96 trillion yen in business opportunities by 2030.",
    "According to an announcement made on August 17, 2026, by NVIDIA, SB Energy, and OpenAI, NVIDIA has invested $1.5 billion in SB Energy, becoming the exclusive provider of AI infrastructure for the PORTS-Pike Technology Campus."
   ]
  },
  {
   "url": "https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/",
   "title": "Meta Announces New Strategic Venture With BlackRock to Develop Data Center in El Paso",
   "published_at": "2026-07-28T09:30:23",
   "project": "El Paso",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta and BlackRock",
   "ai_customer": "Meta",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Meta Announces New Strategic Venture With BlackRock to Develop Data Center in El Paso",
    "*Meta and BlackRock announce a venture to finance the development and operation of a data center campus in El Paso, Texas*",
    "Meta and BlackRock today announced a venture to develop and own a data center campus in El Paso, Texas.",
    "\u201cWe\u2019re excited to partner with Mark and the Meta leadership team on the El Paso data center campus, which will create thousands of skilled jobs and help drive economic growth in the local community,\u201d said Larry Fink, Chairman and Chief Executive Officer of BlackRock."
   ],
   "locality_evidence": [
    "# Meta Announces New Strategic Venture With BlackRock to Develop Data Center in El Paso",
    "*Meta and BlackRock announce a venture to finance the development and operation of a data center campus in El Paso, Texas*",
    "Meta and BlackRock today announced a venture to develop and own a data center campus in El Paso, Texas.",
    "\u201cWe\u2019re excited to partner with Mark and the Meta leadership team on the El Paso data center campus, which will create thousands of skilled jobs and help drive economic growth in the local community,\u201d said Larry Fink, Chairman and Chief Executive Officer of BlackRock."
   ],
   "state_evidence": [
    "# Meta Announces New Strategic Venture With BlackRock to Develop Data Center in El Paso",
    "*Meta and BlackRock announce a venture to finance the development and operation of a data center campus in El Paso, Texas*",
    "Meta and BlackRock today announced a venture to develop and own a data center campus in El Paso, Texas."
   ],
   "capacity_gw_evidence": [
    "# Meta Announces New Strategic Venture With BlackRock to Develop Data Center in El Paso",
    "The state-of-the-art data center campus, currently under construction in El Paso, Texas, will have 1 gigawatt of compute capacity and will play an essential role in bringing Meta\u2019s AI technologies to life, accelerating progress on AI models and supporting enhancements to the core business."
   ],
   "builder_evidence": [
    "# Meta Announces New Strategic Venture With BlackRock to Develop Data Center in El Paso",
    "*Meta and BlackRock announce a venture to finance the development and operation of a data center campus in El Paso, Texas*",
    "Meta and BlackRock today announced a venture to develop and own a data center campus in El Paso, Texas."
   ],
   "ai_customer_evidence": [
    "# Meta Announces New Strategic Venture With BlackRock to Develop Data Center in El Paso",
    "The state-of-the-art data center campus, currently under construction in El Paso, Texas, will have 1 gigawatt of compute capacity and will play an essential role in bringing Meta\u2019s AI technologies to life, accelerating progress on AI models and supporting enhancements to the core business."
   ],
   "status_evidence": [
    "# Meta Announces New Strategic Venture With BlackRock to Develop Data Center in El Paso",
    "The state-of-the-art data center campus, currently under construction in El Paso, Texas, will have 1 gigawatt of compute capacity and will play an essential role in bringing Meta\u2019s AI technologies to life, accelerating progress on AI models and supporting enhancements to the core business."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mahoningmatters.com/living/article316923431.html",
   "title": "Thomas Gnau: OpenAI announces role in Pike County AI campus expected to create 35,000 construction jobs",
   "published_at": "2026-08-18T18:37:56",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Piketon",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# Thomas Gnau: OpenAI announces role in Pike County AI campus expected to create 35,000 construction jobs",
    "To power the project, OpenAI said it has entered into an agreement to secure about 8 gigawatts at the PORTS-Pike Technology Campus in Pike County, working with SB Energy, chip maker NVIDIA, and the U.S. Department of Energy."
   ],
   "locality_evidence": [
    "# Thomas Gnau: OpenAI announces role in Pike County AI campus expected to create 35,000 construction jobs",
    "The PORTS-Pike Technology campus was built on the site of a former gaseous diffusion plant in Piketon, Ohio."
   ],
   "state_evidence": [
    "# Thomas Gnau: OpenAI announces role in Pike County AI campus expected to create 35,000 construction jobs",
    "OpenAI has committed to occupying as a tenant what is said will be one of the world's biggest data centers in Pike County, Ohio, in a project participants say will create 35,000 construction jobs and 2,500 \"long-term operating\" jobs."
   ],
   "capacity_gw_evidence": [
    "# Thomas Gnau: OpenAI announces role in Pike County AI campus expected to create 35,000 construction jobs",
    "To power the project, OpenAI said it has entered into an agreement to secure about 8 gigawatts at the PORTS-Pike Technology Campus in Pike County, working with SB Energy, chip maker NVIDIA, and the U.S. Department of Energy."
   ],
   "builder_evidence": [
    "# Thomas Gnau: OpenAI announces role in Pike County AI campus expected to create 35,000 construction jobs",
    "To power the project, OpenAI said it has entered into an agreement to secure about 8 gigawatts at the PORTS-Pike Technology Campus in Pike County, working with SB Energy, chip maker NVIDIA, and the U.S. Department of Energy."
   ],
   "ai_customer_evidence": [
    "# Thomas Gnau: OpenAI announces role in Pike County AI campus expected to create 35,000 construction jobs",
    "OpenAI has committed to occupying as a tenant what is said will be one of the world's biggest data centers in Pike County, Ohio, in a project participants say will create 35,000 construction jobs and 2,500 \"long-term operating\" jobs."
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "# Thomas Gnau: OpenAI announces role in Pike County AI campus expected to create 35,000 construction jobs",
    "\"We want to develop this project as a partner to Pike County - paying its project-specific energy and infrastructure costs, using water responsibly, creating opportunities for local workers and businesses, and making long-term investments shaped by the community,\" the company said in a release and on the X social media site Monday, Aug. 17."
   ]
  },
  {
   "url": "https://siliconreport.com/datacenters/company/fermi-america",
   "title": "SiliconReport",
   "published_at": null,
   "project": "Fermi America Project Matador (HyperGrid)",
   "locality": "Carson County (Amarillo)",
   "state": "Texas",
   "capacity_gw": 1.1,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "Announced",
   "announcement_date": null,
   "project_evidence": [
    "Tracker",
    "# Fermi America Data Centers",
    "2. [## Fermi America Project Matador (HyperGrid)\nFermi America \u00b7 Carson County (Amarillo) \u00b7 TX\nOperatorFermi America\nStatusAnnounced\nCapacity1,100 MW\nOperational capacityNot reported\nUnder constructionNot reported\nAnnounced1,100 MW\nPowerGas+nuclear+solar+wind\nLast updated2026-07-03](/datacenters/facility/fermi-america-matador)"
   ],
   "locality_evidence": [
    "Tracker",
    "# Fermi America Data Centers",
    "2. [## Fermi America Project Matador (HyperGrid)\nFermi America \u00b7 Carson County (Amarillo) \u00b7 TX\nOperatorFermi America\nStatusAnnounced\nCapacity1,100 MW\nOperational capacityNot reported\nUnder constructionNot reported\nAnnounced1,100 MW\nPowerGas+nuclear+solar+wind\nLast updated2026-07-03](/datacenters/facility/fermi-america-matador)"
   ],
   "state_evidence": [
    "Tracker",
    "# Fermi America Data Centers",
    "2. [## Fermi America Project Matador (HyperGrid)\nFermi America \u00b7 Carson County (Amarillo) \u00b7 TX\nOperatorFermi America\nStatusAnnounced\nCapacity1,100 MW\nOperational capacityNot reported\nUnder constructionNot reported\nAnnounced1,100 MW\nPowerGas+nuclear+solar+wind\nLast updated2026-07-03](/datacenters/facility/fermi-america-matador)"
   ],
   "capacity_gw_evidence": [
    "Tracker",
    "# Fermi America Data Centers",
    "2. [## Fermi America Project Matador (HyperGrid)\nFermi America \u00b7 Carson County (Amarillo) \u00b7 TX\nOperatorFermi America\nStatusAnnounced\nCapacity1,100 MW\nOperational capacityNot reported\nUnder constructionNot reported\nAnnounced1,100 MW\nPowerGas+nuclear+solar+wind\nLast updated2026-07-03](/datacenters/facility/fermi-america-matador)"
   ],
   "builder_evidence": [
    "Tracker",
    "# Fermi America Data Centers",
    "2. [## Fermi America Project Matador (HyperGrid)\nFermi America \u00b7 Carson County (Amarillo) \u00b7 TX\nOperatorFermi America\nStatusAnnounced\nCapacity1,100 MW\nOperational capacityNot reported\nUnder constructionNot reported\nAnnounced1,100 MW\nPowerGas+nuclear+solar+wind\nLast updated2026-07-03](/datacenters/facility/fermi-america-matador)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Tracker",
    "# Fermi America Data Centers",
    "2. [## Fermi America Project Matador (HyperGrid)\nFermi America \u00b7 Carson County (Amarillo) \u00b7 TX\nOperatorFermi America\nStatusAnnounced\nCapacity1,100 MW\nOperational capacityNot reported\nUnder constructionNot reported\nAnnounced1,100 MW\nPowerGas+nuclear+solar+wind\nLast updated2026-07-03](/datacenters/facility/fermi-america-matador)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news/campaigners-call-on-regulator-to-block-45gw-gas-powered-ai-data-center-in-homer-city-pennsylvania",
   "title": "Campaigners call on regulator to block 4.5GW gas powered AI data center in Homer City, Pennsylvania",
   "published_at": "2026-05-14T14:11:46",
   "project": "Homer City AI data center complex",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Homer City Redevelopment (HCR) and Kiewit",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2025-04-01",
   "project_evidence": [
    "Several environmental groups have [submitted public comments](https://docs.google.com/document/d/1sXhEXHm2P1toq_tBkQAXPNUQxoXleqdZNmRxmYLVB9w/edit?usp=sharing) to the Pennsylvania Department of Environmental Protection asking it to reconsider its approval of a proposed 4.5GW natural gas power plant at the site of the planned Homer City AI data center complex in Homer City, Pennsylvania."
   ],
   "locality_evidence": [
    "Several environmental groups have [submitted public comments](https://docs.google.com/document/d/1sXhEXHm2P1toq_tBkQAXPNUQxoXleqdZNmRxmYLVB9w/edit?usp=sharing) to the Pennsylvania Department of Environmental Protection asking it to reconsider its approval of a proposed 4.5GW natural gas power plant at the site of the planned Homer City AI data center complex in Homer City, Pennsylvania."
   ],
   "state_evidence": [
    "Several environmental groups have [submitted public comments](https://docs.google.com/document/d/1sXhEXHm2P1toq_tBkQAXPNUQxoXleqdZNmRxmYLVB9w/edit?usp=sharing) to the Pennsylvania Department of Environmental Protection asking it to reconsider its approval of a proposed 4.5GW natural gas power plant at the site of the planned Homer City AI data center complex in Homer City, Pennsylvania."
   ],
   "capacity_gw_evidence": [
    "Several environmental groups have [submitted public comments](https://docs.google.com/document/d/1sXhEXHm2P1toq_tBkQAXPNUQxoXleqdZNmRxmYLVB9w/edit?usp=sharing) to the Pennsylvania Department of Environmental Protection asking it to reconsider its approval of a proposed 4.5GW natural gas power plant at the site of the planned Homer City AI data center complex in Homer City, Pennsylvania."
   ],
   "builder_evidence": [
    "Plans for the project were first revealed in [April](https://www.datacenterdynamics.com/en/news/homer-city-and-kiewit-unveil-plans-for-45gw-natural-gas-powered-ai-data-center-in-pennsylvania/), following a partnership between Homer City Redevelopment (HCR) and Kiewit to convert the former Homer City coal power station into a natural gas-powered AI data center."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Several environmental groups have [submitted public comments](https://docs.google.com/document/d/1sXhEXHm2P1toq_tBkQAXPNUQxoXleqdZNmRxmYLVB9w/edit?usp=sharing) to the Pennsylvania Department of Environmental Protection asking it to reconsider its approval of a proposed 4.5GW natural gas power plant at the site of the planned Homer City AI data center complex in Homer City, Pennsylvania."
   ],
   "announcement_date_evidence": [
    "Plans for the project were first revealed in [April](https://www.datacenterdynamics.com/en/news/homer-city-and-kiewit-unveil-plans-for-45gw-natural-gas-powered-ai-data-center-in-pennsylvania/), following a partnership between Homer City Redevelopment (HCR) and Kiewit to convert the former Homer City coal power station into a natural gas-powered AI data center."
   ]
  },
  {
   "url": "https://bitmainminers.com/2026/03/23/nscale-in-talks-to-acquire-8gw-west-virginia-ai-data-center-site-report",
   "title": "Nscale in Talks to Acquire 8GW West Virginia AI Data Center Site: Report",
   "published_at": "2026-03-23T11:20:31",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "American Intelligence & Power",
   "ai_customer": null,
   "status": "proposed",
   "announcement_date": "2023-01-01",
   "project_evidence": [
    "Nscale in Talks to Acquire 8GW West Virginia AI Data Center Site: Report",
    "The property\u2014known as the Monarch Compute Campus\u2014is designed to support as much as 8 GW of data center capacity, making it one of the largest proposed AI data center developments in the U.S."
   ],
   "locality_evidence": [
    "Nscale in Talks to Acquire 8GW West Virginia AI Data Center Site: Report",
    "The potential deal would see Nscale acquire American Intelligence & Power (AIP), the current owner of the site in Mason County, giving the company control over the land along with existing permits and power agreements tied to the project, The Information reported on Friday, citing people familiar with the discussions and fundraising documents."
   ],
   "state_evidence": [
    "Nscale in Talks to Acquire 8GW West Virginia AI Data Center Site: Report",
    "U.K.-based AI cloud provider Nscale is in talks to acquire a large data center development site in West Virginia that could support up to 8 gigawatts of capacity, according to a report by The Information."
   ],
   "capacity_gw_evidence": [
    "Nscale in Talks to Acquire 8GW West Virginia AI Data Center Site: Report",
    "U.K.-based AI cloud provider Nscale is in talks to acquire a large data center development site in West Virginia that could support up to 8 gigawatts of capacity, according to a report by The Information.",
    "The property\u2014known as the Monarch Compute Campus\u2014is designed to support as much as 8 GW of data center capacity, making it one of the largest proposed AI data center developments in the U.S."
   ],
   "builder_evidence": [
    "Nscale in Talks to Acquire 8GW West Virginia AI Data Center Site: Report",
    "The potential deal would see Nscale acquire American Intelligence & Power (AIP), the current owner of the site in Mason County, giving the company control over the land along with existing permits and power agreements tied to the project, The Information reported on Friday, citing people familiar with the discussions and fundraising documents.",
    "The project is backed by Fidelis New Energy and 8090 Industries, which formed AIP earlier this year to develop the site."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Nscale in Talks to Acquire 8GW West Virginia AI Data Center Site: Report",
    "The property\u2014known as the Monarch Compute Campus\u2014is designed to support as much as 8 GW of data center capacity, making it one of the largest proposed AI data center developments in the U.S."
   ],
   "announcement_date_evidence": [
    "Nscale in Talks to Acquire 8GW West Virginia AI Data Center Site: Report",
    "Plans for the location date back to 2023, when Fidelis initially proposed building a roughly 1 GW data center campus powered by an adjacent hydrogen production facility, according to a [report](https://www.datacenterdynamics.com/en/news/1gw-hydrogen-powered-data-center-campus-proposed-in-west-virginia/) by Datacenter Dynamics."
   ]
  },
  {
   "url": "https://medium.com/@yukitaylor00/openai-drops-30b-on-a-3-2gw-data-center-while-launching-gpt-live-desktop-agent-orchestration-8b22ebe3d461",
   "title": "OpenAI Drops $30B on a 3.2GW Data Center While Launching GPT-Live Desktop Agent Orchestration",
   "published_at": "2026-07-25T01:36:01",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Drops $30B on a 3.2GW Data Center While Launching GPT-Live Desktop Agent Orchestration",
    "OpenAI is committing over $30 billion to Project Camellia, a 3.2-gigawatt hyperscale facility in Georgia, while bringing GPT-Live full-duplex voice to the desktop for hands-free agent orchestration."
   ],
   "locality_evidence": [
    "# OpenAI Drops $30B on a 3.2GW Data Center While Launching GPT-Live Desktop Agent Orchestration",
    "OpenAI is dropping over **$30 billion** on [**Project Camellia**](https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/) \u2014 a **3.2-gigawatt hyperscale facility** in Effingham County, Georgia, equipped with closed-loop cooling systems designed to anchor the company\u2019s compute needs through 2032."
   ],
   "state_evidence": [
    "# OpenAI Drops $30B on a 3.2GW Data Center While Launching GPT-Live Desktop Agent Orchestration",
    "OpenAI is committing over $30 billion to Project Camellia, a 3.2-gigawatt hyperscale facility in Georgia, while bringing GPT-Live full-duplex voice to the desktop for hands-free agent orchestration."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Drops $30B on a 3.2GW Data Center While Launching GPT-Live Desktop Agent Orchestration",
    "OpenAI is committing over $30 billion to Project Camellia, a 3.2-gigawatt hyperscale facility in Georgia, while bringing GPT-Live full-duplex voice to the desktop for hands-free agent orchestration."
   ],
   "builder_evidence": [
    "# OpenAI Drops $30B on a 3.2GW Data Center While Launching GPT-Live Desktop Agent Orchestration",
    "OpenAI is committing over $30 billion to Project Camellia, a 3.2-gigawatt hyperscale facility in Georgia, while bringing GPT-Live full-duplex voice to the desktop for hands-free agent orchestration."
   ],
   "ai_customer_evidence": [
    "# OpenAI Drops $30B on a 3.2GW Data Center While Launching GPT-Live Desktop Agent Orchestration",
    "OpenAI is committing over $30 billion to Project Camellia, a 3.2-gigawatt hyperscale facility in Georgia, while bringing GPT-Live full-duplex voice to the desktop for hands-free agent orchestration."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://constructionreviewonline.com/google-corroborates-1gw-project-cannoli-data-center-campus-in-michigan-partners-with-dte-energy",
   "title": "Google Corroborates 1GW Project Cannoli Data Center Campus in Michigan, Partners with DTE Energy",
   "published_at": "2026-03-18T17:53:11",
   "project": "Project Cannoli",
   "locality": "Van Buren",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Walbridge",
   "ai_customer": "Google",
   "status": "Planned / Early development",
   "announcement_date": "2025-12",
   "project_evidence": [
    "# Google Corroborates 1GW Project Cannoli Data Center Campus in Michigan, Partners with DTE Energy"
   ],
   "locality_evidence": [
    "# Google Corroborates 1GW Project Cannoli Data Center Campus in Michigan, Partners with DTE Energy"
   ],
   "state_evidence": [
    "# Google Corroborates 1GW Project Cannoli Data Center Campus in Michigan, Partners with DTE Energy"
   ],
   "capacity_gw_evidence": [
    "# Google Corroborates 1GW Project Cannoli Data Center Campus in Michigan, Partners with DTE Energy"
   ],
   "builder_evidence": [
    "# Google Corroborates 1GW Project Cannoli Data Center Campus in Michigan, Partners with DTE Energy",
    "Walbridge has been contracted as the general contractor on the project."
   ],
   "ai_customer_evidence": [
    "# Google Corroborates 1GW Project Cannoli Data Center Campus in Michigan, Partners with DTE Energy"
   ],
   "status_evidence": [
    "# Google Corroborates 1GW Project Cannoli Data Center Campus in Michigan, Partners with DTE Energy",
    "- Stage: Planned / Early development"
   ],
   "announcement_date_evidence": [
    "# Google Corroborates 1GW Project Cannoli Data Center Campus in Michigan, Partners with DTE Energy",
    "The development was proposed by Panattoni in December 2025."
   ]
  },
  {
   "url": "https://kucoin.com/news/flash/terawulf-acquires-1gw-ai-campus-in-kentucky-ai-revenue-surpasses-bitcoin-mining",
   "title": "Terawulf Acquires 1GW AI Campus in Kentucky, AI Revenue Surpasses Bitcoin Mining | KuCoin",
   "published_at": "2026-05-29T05:55:23",
   "project": "Muskie Data Campus",
   "locality": "Eastpark Industrial Park",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "Terawulf",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# Terawulf Acquires 1GW AI Campus in Kentucky, AI Revenue Surpasses Bitcoin Mining",
    "Terawulf acquires a 1GW AI campus in Kentucky, shifting focus from Bitcoin mining to AI and HPC.",
    "The Muskie Data Campus in Eastpark Industrial Park aims to reach 1 gigawatt of capacity by 2030.",
    "The Nasdaq-listed company said it acquired the \u201cMuskie Data Campus\u201d from Industrial Equity Partners."
   ],
   "locality_evidence": [
    "# Terawulf Acquires 1GW AI Campus in Kentucky, AI Revenue Surpasses Bitcoin Mining",
    "The Muskie Data Campus in Eastpark Industrial Park aims to reach 1 gigawatt of capacity by 2030.",
    "The site sits inside the 1,000-acre Eastpark Industrial Park in northeastern Kentucky and includes about 285 acres of owned and controlled land."
   ],
   "state_evidence": [
    "# Terawulf Acquires 1GW AI Campus in Kentucky, AI Revenue Surpasses Bitcoin Mining",
    "Terawulf acquires a 1GW AI campus in Kentucky, shifting focus from Bitcoin mining to AI and HPC.",
    "**Terawulf has acquired a major AI-focused data center site in Kentucky as it accelerates its shift from [bitcoin mining](http://www.bitcoin.com/get-started/what-is-bitcoin-mining/) toward high-performance computing.",
    "Terawulf bought a Kentucky AI campus targeting 1GW of HPC capacity by 2030.",
    "Terawulf Inc. is moving deeper into artificial intelligence (AI) infrastructure with the purchase of a large data center development site in eastern Kentucky, underscoring how former [bitcoin mining](http://www.bitcoin.com/get-started/what-is-bitcoin-mining/) firms are chasing demand for power-hungry computing capacity."
   ],
   "capacity_gw_evidence": [
    "# Terawulf Acquires 1GW AI Campus in Kentucky, AI Revenue Surpasses Bitcoin Mining",
    "Terawulf acquires a 1GW AI campus in Kentucky, shifting focus from Bitcoin mining to AI and HPC.",
    "The Muskie Data Campus in Eastpark Industrial Park aims to reach 1 gigawatt of capacity by 2030.",
    "Terawulf bought a Kentucky AI campus targeting 1GW of HPC capacity by 2030.",
    "Terawulf said the campus is expected to support more than 1 gigawatt of AI and high-performance computing capacity."
   ],
   "builder_evidence": [
    "# Terawulf Acquires 1GW AI Campus in Kentucky, AI Revenue Surpasses Bitcoin Mining",
    "Terawulf acquires a 1GW AI campus in Kentucky, shifting focus from Bitcoin mining to AI and HPC.",
    "Terawulf bought a Kentucky AI campus targeting 1GW of HPC capacity by 2030.",
    "Terawulf Inc. is moving deeper into artificial intelligence (AI) infrastructure with the purchase of a large data center development site in eastern Kentucky, underscoring how former [bitcoin mining](http://www.bitcoin.com/get-started/what-is-bitcoin-mining/) firms are chasing demand for power-hungry computing capacity."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://bitcoinethereumnews.com/tech/hut-8-iren-secure-major-ai-infrastructure-deals",
   "title": "Hut 8, IREN Secure Major AI Infrastructure Deals.",
   "published_at": "2026-07-20T21:55:22",
   "project": "Beacon Point",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "fully commercialized",
   "announcement_date": null,
   "project_evidence": [
    "# Hut 8, IREN Secure Major AI Infrastructure Deals.",
    "## **Hut 8 Fully Commercializes Texas AI Campus**",
    "Hut 8 fully commercialized its 1GW Beacon Point AI campus with a second $9.8B lease."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# Hut 8, IREN Secure Major AI Infrastructure Deals.",
    "## **Hut 8 Fully Commercializes Texas AI Campus**",
    "Hut 8 signed its second 15-year triple-net lease covering 352 megawatts of IT capacity at its Beacon Point campus in Texas."
   ],
   "capacity_gw_evidence": [
    "# Hut 8, IREN Secure Major AI Infrastructure Deals.",
    "## **Hut 8 Fully Commercializes Texas AI Campus**",
    "Hut 8 fully commercialized its 1GW Beacon Point AI campus with a second $9.8B lease."
   ],
   "builder_evidence": [
    "# Hut 8, IREN Secure Major AI Infrastructure Deals.",
    "## **Hut 8 Fully Commercializes Texas AI Campus**",
    "Hut 8 signed its second 15-year triple-net lease covering 352 megawatts of IT capacity at its Beacon Point campus in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Hut 8, IREN Secure Major AI Infrastructure Deals.",
    "## **Hut 8 Fully Commercializes Texas AI Campus**",
    "Hut 8 fully commercialized its 1GW Beacon Point AI campus with a second $9.8B lease."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://baxtel.com/news/iren-powers-up-initial-phase-of-sweetwater-data-center-campus",
   "title": "Iren Powers up Initial Phase of Sweetwater Data Center Campus",
   "published_at": "2026-05-06T00:00:00",
   "project": "Sweetwater 1",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Iren",
   "ai_customer": "",
   "status": "energized",
   "announcement_date": "2026-05-06",
   "project_evidence": [
    "May 06, 2026 | Posted by Abdul-Rahman Oladimeji",
    "Data center and cloud firm Iren has energized a new campus in Texas.",
    "The Nasdaq-listed company this week announced the successful energization of its 1.4GW Sweetwater 1 data center site in West Texas."
   ],
   "locality_evidence": [
    "May 06, 2026 | Posted by Abdul-Rahman Oladimeji",
    "Data center and cloud firm Iren has energized a new campus in Texas.",
    "The firm\u2019s two Sweetwater campuses, both located outside Sweetwater in Fisher County, are expected to total 2GW of capacity across 2,200 acres at full build-out."
   ],
   "state_evidence": [
    "May 06, 2026 | Posted by Abdul-Rahman Oladimeji",
    "Data center and cloud firm Iren has energized a new campus in Texas.",
    "The Nasdaq-listed company this week announced the successful energization of its 1.4GW Sweetwater 1 data center site in West Texas."
   ],
   "capacity_gw_evidence": [
    "May 06, 2026 | Posted by Abdul-Rahman Oladimeji",
    "Data center and cloud firm Iren has energized a new campus in Texas.",
    "The Nasdaq-listed company this week announced the successful energization of its 1.4GW Sweetwater 1 data center site in West Texas."
   ],
   "builder_evidence": [
    "May 06, 2026 | Posted by Abdul-Rahman Oladimeji",
    "Data center and cloud firm Iren has energized a new campus in Texas.",
    "The Nasdaq-listed company this week announced the successful energization of its 1.4GW Sweetwater 1 data center site in West Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "May 06, 2026 | Posted by Abdul-Rahman Oladimeji",
    "Data center and cloud firm Iren has energized a new campus in Texas.",
    "The Nasdaq-listed company this week announced the successful energization of its 1.4GW Sweetwater 1 data center site in West Texas."
   ],
   "announcement_date_evidence": [
    "May 06, 2026 | Posted by Abdul-Rahman Oladimeji"
   ]
  },
  {
   "url": "https://finance.yahoo.com/technology/ai/articles/nvidia-backs-openai-ohio-ai-094906882.html",
   "title": "Nvidia Backs OpenAI\u2019s Ohio AI Data Center Leases With $105 Billion Guarantee",
   "published_at": "2026-08-18T09:49:06",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 7.95,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Nvidia Backs OpenAI\u2019s Ohio AI Data Center Leases With $105 Billion Guarantee",
    "SB Energy will build, own, and operate the PORTS-Pike Technology Campus in Pike County under a 20-year lease to OpenAI."
   ],
   "locality_evidence": [
    "Nvidia Backs OpenAI\u2019s Ohio AI Data Center Leases With $105 Billion Guarantee",
    "SB Energy will build, own, and operate the PORTS-Pike Technology Campus in Pike County under a 20-year lease to OpenAI."
   ],
   "state_evidence": [
    "Nvidia Backs OpenAI\u2019s Ohio AI Data Center Leases With $105 Billion Guarantee",
    "Nvidia agreed to guarantee up to $105 billion in conditional lease obligations for a new OpenAI data center campus in Pike County, Ohio, according to a securities filing."
   ],
   "capacity_gw_evidence": [
    "Nvidia Backs OpenAI\u2019s Ohio AI Data Center Leases With $105 Billion Guarantee",
    "The guarantee covers an initial 4.25 information technology gigawatts of compute capacity, a measure of power delivered to servers, with an option on a further 3.75."
   ],
   "builder_evidence": [
    "Nvidia Backs OpenAI\u2019s Ohio AI Data Center Leases With $105 Billion Guarantee",
    "SB Energy will build, own, and operate the PORTS-Pike Technology Campus in Pike County under a 20-year lease to OpenAI."
   ],
   "ai_customer_evidence": [
    "Nvidia Backs OpenAI\u2019s Ohio AI Data Center Leases With $105 Billion Guarantee",
    "SB Energy will build, own, and operate the PORTS-Pike Technology Campus in Pike County under a 20-year lease to OpenAI."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://tradingview.com/news/globenewswire:4969b395a094b:0",
   "title": "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
   "published_at": "2026-08-17T12:33:00",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "locality_evidence": [
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "state_evidence": [
    "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "capacity_gw_evidence": [
    "OpenAI will be the customer for 8-IT GW",
    "In support of the surrounding Ohio community, SB Energy and SoftBank will build at least 10 GW of new energy generation, which results in 8 IT-GW of AI factory capacity, and invest at least $4.2 billion in new regional grid infrastructure through an innovative partnership with AEP Ohio designed to protect ratepayers."
   ],
   "builder_evidence": [
    "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "ai_customer_evidence": [
    "OpenAI will be the customer for 8-IT GW",
    "OpenAI will be the customer."
   ],
   "status_evidence": [
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "announcement_date_evidence": [
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 [(GLOBE NEWSWIRE)](https://www.globenewswire.com) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ]
  },
  {
   "url": "https://intuitionlabs.ai/articles/openai-stargate-datacenter-details",
   "title": "Stargate Project: OpenAI's $500B AI Data Center Plan",
   "published_at": "2025-10-08T07:36:23",
   "project": "Stargate Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "two buildings operational since September 2025, remaining six expected to be completed by mid-2026",
   "announcement_date": "2025-01-21",
   "project_evidence": [
    "The first Stargate campus is in **Abilene, Texas**, a consortium-built facility on a vast site.",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Abilene, Texas: Stargate\u2019s Flagship Site"
   ],
   "locality_evidence": [
    "The first Stargate campus is in **Abilene, Texas**, a consortium-built facility on a vast site.",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Abilene, Texas: Stargate\u2019s Flagship Site"
   ],
   "state_evidence": [
    "The first Stargate campus is in **Abilene, Texas**, a consortium-built facility on a vast site.",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Abilene, Texas: Stargate\u2019s Flagship Site"
   ],
   "capacity_gw_evidence": [
    "The full Abilene campus will use **1.2 GW** of power \u2014 enough for roughly one million homes",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Abilene, Texas: Stargate\u2019s Flagship Site"
   ],
   "builder_evidence": [
    "Oracle is overseeing Abilene, which is being developed on leased land with *Crusoe Energy* reportedly involved.",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Abilene, Texas: Stargate\u2019s Flagship Site"
   ],
   "ai_customer_evidence": [
    "The first Stargate campus is in **Abilene, Texas**, a consortium-built facility on a vast site.",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Abilene, Texas: Stargate\u2019s Flagship Site"
   ],
   "status_evidence": [
    "Oracle will ultimately deploy over **450,000 GB200 GPUs** at the Abilene campus under a 15-year lease agreement, with the remaining six buildings expected to be completed by mid-2026",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Abilene, Texas: Stargate\u2019s Flagship Site"
   ],
   "announcement_date_evidence": [
    "In January 2025 [OpenAI](https://intuitionlabs.ai/articles/openai-devday-2025-announcements) unveiled **\u201cThe Stargate Project,\u201d** a massive AI infrastructure venture to build world-scale data centers.",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Abilene, Texas: Stargate\u2019s Flagship Site"
   ]
  },
  {
   "url": "https://intuitionlabs.ai/articles/openai-stargate-datacenter-details",
   "title": "Stargate Project: OpenAI's $500B AI Data Center Plan",
   "published_at": "2025-10-08T07:36:23",
   "project": "Stargate Michigan",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Related Digital and Oracle",
   "ai_customer": "OpenAI",
   "status": "construction beginning in early 2026",
   "announcement_date": "2025-10-01",
   "project_evidence": [
    "In October 2025, OpenAI announced another major campus: **Stargate Michigan**, a **1 GW, $7 billion** facility in Saline Township developed by Related Digital and Oracle.",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Expanding Beyond Abilene"
   ],
   "locality_evidence": [
    "In October 2025, OpenAI announced another major campus: **Stargate Michigan**, a **1 GW, $7 billion** facility in Saline Township developed by Related Digital and Oracle.",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Expanding Beyond Abilene"
   ],
   "state_evidence": [
    "In October 2025, OpenAI announced another major campus: **Stargate Michigan**, a **1 GW, $7 billion** facility in Saline Township developed by Related Digital and Oracle.",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Expanding Beyond Abilene"
   ],
   "capacity_gw_evidence": [
    "In October 2025, OpenAI announced another major campus: **Stargate Michigan**, a **1 GW, $7 billion** facility in Saline Township developed by Related Digital and Oracle.",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Expanding Beyond Abilene"
   ],
   "builder_evidence": [
    "In October 2025, OpenAI announced another major campus: **Stargate Michigan**, a **1 GW, $7 billion** facility in Saline Township developed by Related Digital and Oracle.",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Expanding Beyond Abilene"
   ],
   "ai_customer_evidence": [
    "In October 2025, OpenAI announced another major campus: **Stargate Michigan**, a **1 GW, $7 billion** facility in Saline Township developed by Related Digital and Oracle.",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Expanding Beyond Abilene"
   ],
   "status_evidence": [
    "Dubbed \"The Barn\" (for a historic red barn preserved at the entrance), it will consist of three 550,000-sq-ft buildings on 250 acres, with construction beginning in early 2026 and over 2,500 union construction jobs",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Expanding Beyond Abilene"
   ],
   "announcement_date_evidence": [
    "In October 2025, OpenAI announced another major campus: **Stargate Michigan**, a **1 GW, $7 billion** facility in Saline Township developed by Related Digital and Oracle.",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Expanding Beyond Abilene"
   ]
  },
  {
   "url": "https://intuitionlabs.ai/articles/openai-stargate-datacenter-details",
   "title": "Stargate Project: OpenAI's $500B AI Data Center Plan",
   "published_at": "2025-10-08T07:36:23",
   "project": "Shackelford County Stargate site",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage and Oracle",
   "ai_customer": "OpenAI",
   "status": "under development",
   "announcement_date": "2025-09-01",
   "project_evidence": [
    "Three are Oracle-led campuses (in Shackelford County, Texas; Do\u00f1a Ana County, New Mexico; and a site in the U.S. Midwest) and two are SoftBank-led (Lordstown, Ohio, and Milam County, Texas)",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Expanding Beyond Abilene"
   ],
   "locality_evidence": [
    "Three are Oracle-led campuses (in Shackelford County, Texas; Do\u00f1a Ana County, New Mexico; and a site in the U.S. Midwest) and two are SoftBank-led (Lordstown, Ohio, and Milam County, Texas)",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Expanding Beyond Abilene"
   ],
   "state_evidence": [
    "Three are Oracle-led campuses (in Shackelford County, Texas; Do\u00f1a Ana County, New Mexico; and a site in the U.S. Midwest) and two are SoftBank-led (Lordstown, Ohio, and Milam County, Texas)",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Expanding Beyond Abilene"
   ],
   "capacity_gw_evidence": [
    "(The Shackelford County site, for example, is a ~1.4 GW hyperscale campus being developed by Vantage and Oracle",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Expanding Beyond Abilene"
   ],
   "builder_evidence": [
    "(The Shackelford County site, for example, is a ~1.4 GW hyperscale campus being developed by Vantage and Oracle",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Expanding Beyond Abilene"
   ],
   "ai_customer_evidence": [
    "Three are Oracle-led campuses (in Shackelford County, Texas; Do\u00f1a Ana County, New Mexico; and a site in the U.S. Midwest) and two are SoftBank-led (Lordstown, Ohio, and Milam County, Texas)",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Expanding Beyond Abilene"
   ],
   "status_evidence": [
    "Three are Oracle-led campuses (in Shackelford County, Texas; Do\u00f1a Ana County, New Mexico; and a site in the U.S. Midwest) and two are SoftBank-led (Lordstown, Ohio, and Milam County, Texas)",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Expanding Beyond Abilene"
   ],
   "announcement_date_evidence": [
    "In September 2025, OpenAI, Oracle and SoftBank **announced five more U.S. sites**.",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Expanding Beyond Abilene"
   ]
  },
  {
   "url": "https://intuitionlabs.ai/articles/openai-stargate-datacenter-details",
   "title": "Stargate Project: OpenAI's $500B AI Data Center Plan",
   "published_at": "2025-10-08T07:36:23",
   "project": "Milam County Stargate site",
   "locality": "Milam County",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "initial facilities expected to enter service in 2026",
   "announcement_date": "2025-09-01",
   "project_evidence": [
    "SB Energy was selected to build and operate the **1.2 GW Milam County, Texas** campus, with initial facilities expected to enter service in 2026",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Expanding Beyond Abilene"
   ],
   "locality_evidence": [
    "SB Energy was selected to build and operate the **1.2 GW Milam County, Texas** campus, with initial facilities expected to enter service in 2026",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Expanding Beyond Abilene"
   ],
   "state_evidence": [
    "SB Energy was selected to build and operate the **1.2 GW Milam County, Texas** campus, with initial facilities expected to enter service in 2026",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Expanding Beyond Abilene"
   ],
   "capacity_gw_evidence": [
    "SB Energy was selected to build and operate the **1.2 GW Milam County, Texas** campus, with initial facilities expected to enter service in 2026",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Expanding Beyond Abilene"
   ],
   "builder_evidence": [
    "SB Energy was selected to build and operate the **1.2 GW Milam County, Texas** campus, with initial facilities expected to enter service in 2026",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Expanding Beyond Abilene"
   ],
   "ai_customer_evidence": [
    "SB Energy was selected to build and operate the **1.2 GW Milam County, Texas** campus, with initial facilities expected to enter service in 2026",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Expanding Beyond Abilene"
   ],
   "status_evidence": [
    "SB Energy was selected to build and operate the **1.2 GW Milam County, Texas** campus, with initial facilities expected to enter service in 2026",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Expanding Beyond Abilene"
   ],
   "announcement_date_evidence": [
    "In September 2025, OpenAI, Oracle and SoftBank **announced five more U.S. sites**.",
    "# Stargate Project: OpenAI's $500B AI Data Center Plan",
    "## U.S. Data Center Rollout",
    "### Expanding Beyond Abilene"
   ]
  },
  {
   "url": "https://www.mmcginvest.com/post/aws-at-scale-inside-the-largest-private-infrastructure-buildout-the-world-has-ever-seen",
   "title": "AWS at Scale: Inside the Largest Private Infrastructure Buildout the World Has Ever Seen",
   "published_at": "2026-03-15T10:43:32",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 4.6,
   "builder": "AWS",
   "ai_customer": "Anthropic",
   "status": "Under construction / operational",
   "announcement_date": "2024-04-01",
   "project_evidence": [
    "# AWS at Scale: Inside the Largest Private Infrastructure Buildout the World Has Ever Seen",
    "## Project Rainier and the New Megacampuses",
    "Indiana's Project Rainier stands as the single largest."
   ],
   "locality_evidence": [
    "# AWS at Scale: Inside the Largest Private Infrastructure Buildout the World Has Ever Seen",
    "## Project Rainier and the New Megacampuses",
    "Announced in April 2024 with an $11 billion price tag, the campus occupies 1,200 acres of former farmland near New Carlisle in St. Joseph County, approximately 15 miles west of South Bend."
   ],
   "state_evidence": [
    "# AWS at Scale: Inside the Largest Private Infrastructure Buildout the World Has Ever Seen",
    "## Project Rainier and the New Megacampuses",
    "Indiana's Project Rainier stands as the single largest."
   ],
   "capacity_gw_evidence": [
    "# AWS at Scale: Inside the Largest Private Infrastructure Buildout the World Has Ever Seen",
    "## Project Rainier and the New Megacampuses",
    "The site is designed for 2.2 gigawatts of power capacity across 30 buildings \u2014 each exceeding 200,000 square feet.",
    "Seven buildings were operational within seven months, and a second $15 billion expansion across northern Indiana, adding 2.4 GW of additional capacity through NIPSCO utility territory, brings the state's total AWS commitment to approximately $26 billion and 4.6 GW."
   ],
   "builder_evidence": [
    "# AWS at Scale: Inside the Largest Private Infrastructure Buildout the World Has Ever Seen",
    "## Project Rainier and the New Megacampuses",
    "Indiana's Project Rainier stands as the single largest."
   ],
   "ai_customer_evidence": [
    "# AWS at Scale: Inside the Largest Private Infrastructure Buildout the World Has Ever Seen",
    "## Project Rainier and the New Megacampuses",
    "Project Rainier exists for one purpose: training Anthropic's frontier AI models."
   ],
   "status_evidence": [
    "# AWS at Scale: Inside the Largest Private Infrastructure Buildout the World Has Ever Seen",
    "## Project Rainier and the New Megacampuses",
    "Construction began in September 2024."
   ],
   "announcement_date_evidence": [
    "# AWS at Scale: Inside the Largest Private Infrastructure Buildout the World Has Ever Seen",
    "## Project Rainier and the New Megacampuses",
    "Announced in April 2024 with an $11 billion price tag, the campus occupies 1,200 acres of former farmland near New Carlisle in St. Joseph County, approximately 15 miles west of South Bend."
   ]
  },
  {
   "url": "https://basenor.com/blogs/news/xai-wins-power-plant-permit-for-colossus-datacenter-expansion",
   "title": "xAI Wins Power Plant Permit for Colossus Datacenter Expansion",
   "published_at": "2026-03-10T21:06:57",
   "project": "Southaven",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 1.2,
   "builder": "xAI",
   "ai_customer": null,
   "status": "permitted",
   "announcement_date": "2026-03-10",
   "project_evidence": [
    "# xAI Wins Power Plant Permit for Colossus Datacenter Expansion",
    "**The News:** xAI has received an air permit from the Mississippi Department of Environmental Quality (MDEQ) to build a dedicated natural gas power plant in Southaven, Mississippi, to power its expanding Colossus AI datacenter network.",
    "That electricity will feed xAI's rapidly expanding datacenter footprint \u2014 specifically the new Southaven datacenter (internally dubbed **\"MACROHARDRR\"**) and the nearby **Colossus 2** datacenter in Memphis, Tennessee, which became operational in January 2026."
   ],
   "locality_evidence": [
    "# xAI Wins Power Plant Permit for Colossus Datacenter Expansion",
    "**The News:** xAI has received an air permit from the Mississippi Department of Environmental Quality (MDEQ) to build a dedicated natural gas power plant in Southaven, Mississippi, to power its expanding Colossus AI datacenter network."
   ],
   "state_evidence": [
    "# xAI Wins Power Plant Permit for Colossus Datacenter Expansion",
    "**The News:** xAI has received an air permit from the Mississippi Department of Environmental Quality (MDEQ) to build a dedicated natural gas power plant in Southaven, Mississippi, to power its expanding Colossus AI datacenter network."
   ],
   "capacity_gw_evidence": [
    "# xAI Wins Power Plant Permit for Colossus Datacenter Expansion",
    "The permit clears the way for a facility featuring **41 permanent natural gas turbines** capable of delivering approximately **1.2 gigawatts (GW) of power capacity**.",
    "\ud83d\udcca Key Figures",
    "| Metric | Value | Context |",
    "| Power Capacity (plant) | ~1.2 GW | Dedicated to datacenters |"
   ],
   "builder_evidence": [
    "# xAI Wins Power Plant Permit for Colossus Datacenter Expansion",
    "**The News:** xAI has received an air permit from the Mississippi Department of Environmental Quality (MDEQ) to build a dedicated natural gas power plant in Southaven, Mississippi, to power its expanding Colossus AI datacenter network."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# xAI Wins Power Plant Permit for Colossus Datacenter Expansion",
    "**The News:** xAI has received an air permit from the Mississippi Department of Environmental Quality (MDEQ) to build a dedicated natural gas power plant in Southaven, Mississippi, to power its expanding Colossus AI datacenter network."
   ],
   "announcement_date_evidence": [
    "# xAI Wins Power Plant Permit for Colossus Datacenter Expansion",
    "On March 10, 2026, the Mississippi Department of Environmental Quality (MDEQ) approved an air permit for xAI to construct a natural gas-fired power plant in Southaven, Mississippi.",
    "\ud83d\udcca Key Figures",
    "| Metric | Value | Context |",
    "| Permitting Authority | MDEQ | Approved March 10, 2026 |"
   ]
  },
  {
   "url": "https://www.mortenson.com/projects/abilene-data-center-development",
   "title": "Abilene Data Center Development",
   "published_at": null,
   "project": "Lancium\u2019s data center campus",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Mortenson",
   "ai_customer": null,
   "status": "Under construction / partially operational",
   "announcement_date": null,
   "project_evidence": [
    "## Project Overview",
    "Mortenson has supported the development of Lancium\u2019s data center campus in Abilene, Texas since 2022, delivering critical utility infrastructure to support large-scale data center growth."
   ],
   "locality_evidence": [
    "## Project Overview",
    "Mortenson has supported the development of Lancium\u2019s data center campus in Abilene, Texas since 2022, delivering critical utility infrastructure to support large-scale data center growth."
   ],
   "state_evidence": [
    "## Project Overview",
    "Mortenson has supported the development of Lancium\u2019s data center campus in Abilene, Texas since 2022, delivering critical utility infrastructure to support large-scale data center growth."
   ],
   "capacity_gw_evidence": [
    "## Project Overview",
    "The work has included transmission, interconnection, and substation construction ranging from a 200 MW, 138 kV facility to a 1 GW, 345 kV greenfield substation, enabling accelerated energization while overcoming procurement and commissioning challenges."
   ],
   "builder_evidence": [
    "## Project Overview",
    "Mortenson has supported the development of Lancium\u2019s data center campus in Abilene, Texas since 2022, delivering critical utility infrastructure to support large-scale data center growth."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "### **Delivering a 1 GW Greenfield Substation on an Accelerated Schedule**",
    "Phase 2 significantly expanded the scale of the project with construction of a 12.5-acre, 1 GW, 345 kV greenfield substation.",
    "Mortenson is currently swapping the temporary transformers with the permanent equipment and expected to complete all three swap overs by October 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://edgen.tech/ja/news/post/chevrons-20-year-microsoft-power-deal-diversifies-beyond-oil",
   "title": "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
   "published_at": "2026-08-29T15:54:13",
   "project": "Project Kilby",
   "locality": "Reeves County",
   "state": "Texas",
   "capacity_gw": 2.67,
   "builder": "Chevron",
   "ai_customer": "Microsoft",
   "status": "planned",
   "announcement_date": "2026-06-22",
   "project_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings.",
    "The project, known as Project Kilby, will be developed through Chevron's Energy Forge One subsidiary alongside Engine No. 1 and Microsoft."
   ],
   "locality_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings."
   ],
   "state_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "**Chevron's 20-year Microsoft power deal for a 2.67-gigawatt Texas data center marks the oil major's entry into AI infrastructure.**",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings."
   ],
   "capacity_gw_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "**Chevron's 20-year Microsoft power deal for a 2.67-gigawatt Texas data center marks the oil major's entry into AI infrastructure.**",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings."
   ],
   "builder_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings.",
    "The project, known as Project Kilby, will be developed through Chevron's Energy Forge One subsidiary alongside Engine No. 1 and Microsoft."
   ],
   "ai_customer_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings.",
    "The project, known as Project Kilby, will be developed through Chevron's Energy Forge One subsidiary alongside Engine No. 1 and Microsoft."
   ],
   "status_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "First power is expected in 2028, with a final investment decision targeted by the end of 2026."
   ],
   "announcement_date_evidence": [
    "# Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings."
   ]
  },
  {
   "url": "https://share.google/ZaRWdv8Iy6NCFDuqv",
   "title": "Vantage breaks ground on Texas gigawatt data center campus for OpenAI",
   "published_at": "2026-07-01T00:52:13",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": "OpenAI",
   "status": "groundbreaking ceremony",
   "announcement_date": null,
   "project_evidence": [
    "Vantage has broken ground on a new data center campus in Texas set to host hardware for OpenAI.",
    "\u201cThis week, Vantage Data Centers hosted a groundbreaking ceremony for our Frontier campus in Shackelford County, Texas,\u201d the company announced on [LinkedIn](https://www.linkedin.com/posts/vantage-data-centers_ai-digitalinfrastructure-stargate-activity-7405254667062124544-FOcd/?utm_source=share&utm_medium=member_android&rcm=ACoAAAmuuF4BvsgagH4Z8-Z8-0LaBPPY6467cAs) over the weekend."
   ],
   "locality_evidence": [
    "Vantage has broken ground on a new data center campus in Texas set to host hardware for OpenAI.",
    "\u201cThis week, Vantage Data Centers hosted a groundbreaking ceremony for our Frontier campus in Shackelford County, Texas,\u201d the company announced on [LinkedIn](https://www.linkedin.com/posts/vantage-data-centers_ai-digitalinfrastructure-stargate-activity-7405254667062124544-FOcd/?utm_source=share&utm_medium=member_android&rcm=ACoAAAmuuF4BvsgagH4Z8-Z8-0LaBPPY6467cAs) over the weekend."
   ],
   "state_evidence": [
    "Vantage has broken ground on a new data center campus in Texas set to host hardware for OpenAI.",
    "\u201cThis week, Vantage Data Centers hosted a groundbreaking ceremony for our Frontier campus in Shackelford County, Texas,\u201d the company announced on [LinkedIn](https://www.linkedin.com/posts/vantage-data-centers_ai-digitalinfrastructure-stargate-activity-7405254667062124544-FOcd/?utm_source=share&utm_medium=member_android&rcm=ACoAAAmuuF4BvsgagH4Z8-Z8-0LaBPPY6467cAs) over the weekend."
   ],
   "capacity_gw_evidence": [
    "Vantage has broken ground on a new data center campus in Texas set to host hardware for OpenAI.",
    "\u201cPart of Oracle and OpenAI\u2019s Stargate expansion, the 1.4GW campus will lead to advancements in AI while creating significant regional economic growth, including employing more than 5,000 individuals across construction and operations.\u201d",
    "At full build-out, the 1,200-acre campus will host 10 single-story data centers, totaling 1.4GW across some 3.7 million sq ft (343,740 sqm)."
   ],
   "builder_evidence": [
    "Vantage has broken ground on a new data center campus in Texas set to host hardware for OpenAI.",
    "\u201cThis week, Vantage Data Centers hosted a groundbreaking ceremony for our Frontier campus in Shackelford County, Texas,\u201d the company announced on [LinkedIn](https://www.linkedin.com/posts/vantage-data-centers_ai-digitalinfrastructure-stargate-activity-7405254667062124544-FOcd/?utm_source=share&utm_medium=member_android&rcm=ACoAAAmuuF4BvsgagH4Z8-Z8-0LaBPPY6467cAs) over the weekend."
   ],
   "ai_customer_evidence": [
    "Vantage has broken ground on a new data center campus in Texas set to host hardware for OpenAI.",
    "\u201cPart of Oracle and OpenAI\u2019s Stargate expansion, the 1.4GW campus will lead to advancements in AI while creating significant regional economic growth, including employing more than 5,000 individuals across construction and operations.\u201d"
   ],
   "status_evidence": [
    "Vantage has broken ground on a new data center campus in Texas set to host hardware for OpenAI.",
    "\u201cThis week, Vantage Data Centers hosted a groundbreaking ceremony for our Frontier campus in Shackelford County, Texas,\u201d the company announced on [LinkedIn](https://www.linkedin.com/posts/vantage-data-centers_ai-digitalinfrastructure-stargate-activity-7405254667062124544-FOcd/?utm_source=share&utm_medium=member_android&rcm=ACoAAAmuuF4BvsgagH4Z8-Z8-0LaBPPY6467cAs) over the weekend."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aktiego.com/sectors/energy-green-tech/fermi-america-advances-11gw-project-matador-with-new-financing",
   "title": "Fermi America Advances 11GW Project Matador With New Financing",
   "published_at": "2026-02-20T07:45:00",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "The financing supports procurement of long\u2011lead high\u2011voltage assets for the first 2.3GW of Project Matador\u2019s planned 11GW private HyperGrid\u2122 campus in Amarillo, Texas.",
    "Fermi America\u2122 (NASDAQ & LSE: FRMI) develops next\u2011generation private electric grids delivering highly redundant power at gigawatt scale to support AI compute and advanced industry."
   ],
   "locality_evidence": [
    "The financing supports procurement of long\u2011lead high\u2011voltage assets for the first 2.3GW of Project Matador\u2019s planned 11GW private HyperGrid\u2122 campus in Amarillo, Texas.",
    "Fermi America\u2122 (NASDAQ & LSE: FRMI) develops next\u2011generation private electric grids delivering highly redundant power at gigawatt scale to support AI compute and advanced industry."
   ],
   "state_evidence": [
    "The financing supports procurement of long\u2011lead high\u2011voltage assets for the first 2.3GW of Project Matador\u2019s planned 11GW private HyperGrid\u2122 campus in Amarillo, Texas.",
    "Fermi America\u2122 (NASDAQ & LSE: FRMI) develops next\u2011generation private electric grids delivering highly redundant power at gigawatt scale to support AI compute and advanced industry."
   ],
   "capacity_gw_evidence": [
    "The financing supports procurement of long\u2011lead high\u2011voltage assets for the first 2.3GW of Project Matador\u2019s planned 11GW private HyperGrid\u2122 campus in Amarillo, Texas.",
    "Fermi America\u2122 (NASDAQ & LSE: FRMI) develops next\u2011generation private electric grids delivering highly redundant power at gigawatt scale to support AI compute and advanced industry."
   ],
   "builder_evidence": [
    "The financing supports procurement of long\u2011lead high\u2011voltage assets for the first 2.3GW of Project Matador\u2019s planned 11GW private HyperGrid\u2122 campus in Amarillo, Texas.",
    "Fermi America\u2122 (NASDAQ & LSE: FRMI) develops next\u2011generation private electric grids delivering highly redundant power at gigawatt scale to support AI compute and advanced industry."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The financing supports procurement of long\u2011lead high\u2011voltage assets for the first 2.3GW of Project Matador\u2019s planned 11GW private HyperGrid\u2122 campus in Amarillo, Texas.",
    "Fermi America\u2122 (NASDAQ & LSE: FRMI) develops next\u2011generation private electric grids delivering highly redundant power at gigawatt scale to support AI compute and advanced industry."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://energyabundance.com/blog/energy-abundance-announces-data-city-texas",
   "title": "Energy Abundance Announces Data City, Texas \u2013 The World\u2019s Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
   "published_at": null,
   "project": "Data City",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corporation",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "**Houston, TX** - Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "locality_evidence": [
    "**Houston, TX** - Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "state_evidence": [
    "**Houston, TX** - Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "capacity_gw_evidence": [
    "**Houston, TX** - Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "builder_evidence": [
    "**Houston, TX** - Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "**Houston, TX** - Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://constructionreviewonline.com/stratos-9gw-ai-data-center-faces-referendum-challenge-in-box-elder-county",
   "title": "Stratos 9GW AI Data Center Faces Referendum Challenge in Box Elder County",
   "published_at": "2026-05-12T13:51:58",
   "project": "Stratos Project",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O\u2019Leary Digital / O\u2019Leary Ventures",
   "ai_customer": null,
   "status": "early implementation phase",
   "announcement_date": "2026-05-12",
   "project_evidence": [
    "# Stratos 9GW AI Data Center Faces Referendum Challenge in Box Elder County",
    "The Stratos Project, a large-scale AI data center and energy development planned for Box Elder County, has entered a new phase of public scrutiny following filings by community groups seeking to overturn recent county decisions that authorized the project\u2019s advancement.",
    "- Project: Stratos Project (also referred to as Wonder Valley)"
   ],
   "locality_evidence": [
    "# Stratos 9GW AI Data Center Faces Referendum Challenge in Box Elder County",
    "The Stratos Project, a large-scale AI data center and energy development planned for Box Elder County, has entered a new phase of public scrutiny following filings by community groups seeking to overturn recent county decisions that authorized the project\u2019s advancement.",
    "- Location: Western Box Elder County, Utah, USA"
   ],
   "state_evidence": [
    "# Stratos 9GW AI Data Center Faces Referendum Challenge in Box Elder County",
    "A proposed multi-gigawatt artificial intelligence and energy campus in western Utah is facing escalating legal and political opposition, as local residents move to challenge county approvals through a formal referendum process.",
    "- Location: Western Box Elder County, Utah, USA"
   ],
   "capacity_gw_evidence": [
    "# Stratos 9GW AI Data Center Faces Referendum Challenge in Box Elder County",
    "The referendum effort targets approvals granted by county officials earlier in May that enabled the creation of the project area in partnership with the [Utah Military Installation Development Authority (MIDA)](https://www.midaut.org/), effectively unlocking the framework for the proposed 9-gigawatt campus.",
    "- Planned total power capacity: up to 9 gigawatts (GW) at full buildout"
   ],
   "builder_evidence": [
    "## Stratos AI Data Center \u2013 Factsheet",
    "#### Developers and Stakeholders",
    "- Lead investor group: O\u2019Leary Digital / O\u2019Leary Ventures (Kevin O\u2019Leary-backed initiative)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Stratos 9GW AI Data Center Faces Referendum Challenge in Box Elder County",
    "The Stratos development remains in its early implementation phase, with initial construction plans still subject to legal review, financing milestones, and ongoing public hearings."
   ],
   "announcement_date_evidence": [
    "# Stratos 9GW AI Data Center Faces Referendum Challenge in Box Elder County",
    "Published on May 12, 2026"
   ]
  },
  {
   "url": "https://www.facebook.com/wxyzdetroit/posts/google-announced-today-that-it-is-behind-the-massive-27-gigawatt-data-center-pro/1427498069405821/",
   "title": "Google announced today that it is...",
   "published_at": null,
   "project": null,
   "locality": "Van Buren Township",
   "state": null,
   "capacity_gw": 2.7,
   "builder": "Google",
   "ai_customer": "",
   "status": "proposal",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "Google announced today that it is behind the massive 2.7-gigawatt data center proposal in Van Buren Township."
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "Google announced today that it is behind the massive 2.7-gigawatt data center proposal in Van Buren Township."
   ],
   "builder_evidence": [
    "Google announced today that it is behind the massive 2.7-gigawatt data center proposal in Van Buren Township."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Google announced today that it is behind the massive 2.7-gigawatt data center proposal in Van Buren Township."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://www.datacentermap.com/usa/texas/corpus-christi/hut-8-beacon-point/",
   "title": "Hut 8 Beacon Point Data Center in Corpus Christi",
   "published_at": null,
   "project": "Hut 8 Beacon Point",
   "locality": "Corpus Christi",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Hut 8's Beacon Point campus, located on a 525-acre site near Corpus Christi, Texas, has secured a significant 15-year lease with a high-investment-grade tenant."
   ],
   "locality_evidence": [
    "Hut 8's Beacon Point campus, located on a 525-acre site near Corpus Christi, Texas, has secured a significant 15-year lease with a high-investment-grade tenant."
   ],
   "state_evidence": [
    "Hut 8's Beacon Point campus, located on a 525-acre site near Corpus Christi, Texas, has secured a significant 15-year lease with a high-investment-grade tenant."
   ],
   "capacity_gw_evidence": [
    "The campus has an executed interconnection agreement for 1GW of utility capacity, with initial energization anticipated in Q1 2027 and preliminary data hall delivery expected in Q3 2027."
   ],
   "builder_evidence": [
    "Hut 8's Beacon Point campus, located on a 525-acre site near Corpus Christi, Texas, has secured a significant 15-year lease with a high-investment-grade tenant."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://digitalisationworld.com/news/68602/ecl-celebrates-one-gigawatt-off-grid-hydrogen-powered-ai-factory-dc",
   "title": "ECL celebrates one gigawatt, off-grid, hydrogen-powered AI factory DC",
   "published_at": "2024-09-26T15:27:18",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant.",
    "# ECL celebrates one gigawatt, off-grid, hydrogen-powered AI factory DC"
   ],
   "locality_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant.",
    "## 600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions.",
    "# ECL celebrates one gigawatt, off-grid, hydrogen-powered AI factory DC"
   ],
   "state_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant.",
    "## 600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions.",
    "# ECL celebrates one gigawatt, off-grid, hydrogen-powered AI factory DC"
   ],
   "capacity_gw_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant.",
    "# ECL celebrates one gigawatt, off-grid, hydrogen-powered AI factory DC"
   ],
   "builder_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant.",
    "# ECL celebrates one gigawatt, off-grid, hydrogen-powered AI factory DC"
   ],
   "ai_customer_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant.",
    "# ECL celebrates one gigawatt, off-grid, hydrogen-powered AI factory DC"
   ],
   "status_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant.",
    "# ECL celebrates one gigawatt, off-grid, hydrogen-powered AI factory DC"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://agentictribune.com/article/20260826-nvidia-to-provide-up-to-105-billion-in-credit-guarantees-for-openai-data-center-campus-in-ohio",
   "title": "NVIDIA to Provide Up to $105 Billion in Credit Guarantees for OpenAI Data-Center Campus in Ohio",
   "published_at": "2026-08-26T20:42:07",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Piketon",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# NVIDIA to Provide Up to $105 Billion in Credit Guarantees for OpenAI Data-Center Campus in Ohio",
    "The project is the PORTS-Pike Technology Campus in Pike County, near Piketon, Ohio."
   ],
   "locality_evidence": [
    "# NVIDIA to Provide Up to $105 Billion in Credit Guarantees for OpenAI Data-Center Campus in Ohio",
    "The project is the PORTS-Pike Technology Campus in Pike County, near Piketon, Ohio."
   ],
   "state_evidence": [
    "# NVIDIA to Provide Up to $105 Billion in Credit Guarantees for OpenAI Data-Center Campus in Ohio",
    "The project is the PORTS-Pike Technology Campus in Pike County, near Piketon, Ohio."
   ],
   "capacity_gw_evidence": [
    "# NVIDIA to Provide Up to $105 Billion in Credit Guarantees for OpenAI Data-Center Campus in Ohio",
    "NVIDIA said its credit support is meant to secure an initial 4.25 gigawatts of information-technology capacity, with an option to secure about 3.75 gigawatts more."
   ],
   "builder_evidence": [
    "# NVIDIA to Provide Up to $105 Billion in Credit Guarantees for OpenAI Data-Center Campus in Ohio",
    "NVIDIA said Aug. 17 that it will provide up to $105 billion in credit support for a massive artificial intelligence data-center campus in southern Ohio that SB Energy will build and OpenAI will lease, a project the companies say will support 35,000 construction jobs through 2032 and create about 2,500 permanent jobs."
   ],
   "ai_customer_evidence": [
    "# NVIDIA to Provide Up to $105 Billion in Credit Guarantees for OpenAI Data-Center Campus in Ohio",
    "NVIDIA said Aug. 17 that it will provide up to $105 billion in credit support for a massive artificial intelligence data-center campus in southern Ohio that SB Energy will build and OpenAI will lease, a project the companies say will support 35,000 construction jobs through 2032 and create about 2,500 permanent jobs."
   ],
   "status_evidence": [
    "# NVIDIA to Provide Up to $105 Billion in Credit Guarantees for OpenAI Data-Center Campus in Ohio",
    "The campus is planned as a redevelopment of the decommissioned Portsmouth Gaseous Diffusion Plant, a former uranium-enrichment site."
   ],
   "announcement_date_evidence": [
    "# NVIDIA to Provide Up to $105 Billion in Credit Guarantees for OpenAI Data-Center Campus in Ohio",
    "NVIDIA said Aug. 17 that it will provide up to $105 billion in credit support for a massive artificial intelligence data-center campus in southern Ohio that SB Energy will build and OpenAI will lease, a project the companies say will support 35,000 construction jobs through 2032 and create about 2,500 permanent jobs."
   ]
  },
  {
   "url": "https://silicon.co.uk/cloud/datacenter/meta-data-centre-628710/amp",
   "title": "Meta Breaks Ground On $10bn Indiana Data Centre",
   "published_at": "2026-02-12T09:00:37",
   "project": "Lebanon campus",
   "locality": "Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "broken ground",
   "announcement_date": null,
   "project_evidence": [
    "Facebook parent Meta said it has broken ground on a major data centre project in Lebanon, Indiana, that is expected to provide a compute capacity of 1 gigawatt at an expense of $10 billion (\u00a37.3bn).",
    "The Lebanon campus is one of Meta\u2019s biggest data centres, along with its \u201cHyperion\u201d facility in Louisiana and \u201cPrometheus\u201d in Ohio, the company said."
   ],
   "locality_evidence": [
    "Facebook parent Meta said it has broken ground on a major data centre project in Lebanon, Indiana, that is expected to provide a compute capacity of 1 gigawatt at an expense of $10 billion (\u00a37.3bn).",
    "The Lebanon campus is one of Meta\u2019s biggest data centres, along with its \u201cHyperion\u201d facility in Louisiana and \u201cPrometheus\u201d in Ohio, the company said."
   ],
   "state_evidence": [
    "Facebook parent Meta said it has broken ground on a major data centre project in Lebanon, Indiana, that is expected to provide a compute capacity of 1 gigawatt at an expense of $10 billion (\u00a37.3bn).",
    "The Lebanon campus is one of Meta\u2019s biggest data centres, along with its \u201cHyperion\u201d facility in Louisiana and \u201cPrometheus\u201d in Ohio, the company said."
   ],
   "capacity_gw_evidence": [
    "Facebook parent Meta said it has broken ground on a major data centre project in Lebanon, Indiana, that is expected to provide a compute capacity of 1 gigawatt at an expense of $10 billion (\u00a37.3bn)."
   ],
   "builder_evidence": [
    "Facebook parent Meta said it has broken ground on a major data centre project in Lebanon, Indiana, that is expected to provide a compute capacity of 1 gigawatt at an expense of $10 billion (\u00a37.3bn).",
    "The Lebanon campus is one of Meta\u2019s biggest data centres, along with its \u201cHyperion\u201d facility in Louisiana and \u201cPrometheus\u201d in Ohio, the company said."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Facebook parent Meta said it has broken ground on a major data centre project in Lebanon, Indiana, that is expected to provide a compute capacity of 1 gigawatt at an expense of $10 billion (\u00a37.3bn)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://worldjobseeker.com/article/926880504-crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
   "published_at": null,
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": "",
   "status": "announced",
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "locality_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "ai_customer_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "The data center will be purpose-built to support the advanced AI computational requirements of a leading hyperscale technology company."
   ],
   "status_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "announcement_date_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ]
  },
  {
   "url": "https://worldjobseeker.com/article/926880504-crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
   "published_at": null,
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "expanding",
   "announcement_date": null,
   "project_evidence": [
    "## Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "locality_evidence": [
    "## Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "The Childress development is the latest chapter in Crusoe's deep commitment to Texas."
   ],
   "capacity_gw_evidence": [
    "## Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "builder_evidence": [
    "## Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene",
    "Childress marks the second site where Crusoe and Lancium are executing this same partnership structure: Lancium acquires and owns the land, secures the power interconnect, and manages energy orchestration for the campus; while Crusoe designs, builds, and operates the AI data center itself."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news/vantage-plots-14gw-data-center-campus-in-texas",
   "title": "Vantage plots 1.4GW data center campus in Texas",
   "published_at": "2026-08-05T00:00:00",
   "project": "Frontier",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "Vantage Data Centers is expanding in Texas with a new gigawatt-scale campus outside Abilene.",
    "The company this week announced plans to develop a 1.4GW data center campus in Shackelford County, Texas.",
    "Situated on 1,200 acres, Vantage\u2019s Frontier campus is set to be the largest across its global portfolio, with the project set to be its biggest investment to date, totaling more than $25 billion."
   ],
   "locality_evidence": [
    "Vantage Data Centers is expanding in Texas with a new gigawatt-scale campus outside Abilene.",
    "Shackleford County is some 125 miles west of Fort Worth, close to Abilene, where Crusoe is developing a large campus for Oracle and OpenAI."
   ],
   "state_evidence": [
    "Vantage Data Centers is expanding in Texas with a new gigawatt-scale campus outside Abilene.",
    "The company this week announced plans to develop a 1.4GW data center campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "The company this week announced plans to develop a 1.4GW data center campus in Shackelford County, Texas.",
    "In particular, the launch of our Frontier campus with 1.4GW of GPU compute capacity marks a watershed moment for Vantage as we deliver on our promise to meet the unprecedented requirements of our customers,\u201d said Dana Adams, president of North America, at Vantage Data Centers."
   ],
   "builder_evidence": [
    "Vantage Data Centers is expanding in Texas with a new gigawatt-scale campus outside Abilene.",
    "\u201cVantage Data Centers\u2019 $25 billion investment to build a new data center campus will help create thousands of good-paying jobs for Texans and bring revenue to the local and state economies."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://fermiamerica.com/us-plans-5800-acre-worlds-largest-energy-campus-to-power-8-million-homes/",
   "title": "US plans 5,800-acre world\u2019s largest energy campus to power 8 million homes - FERMI AMERICA",
   "published_at": "2025-06-26T00:18:38",
   "project": "Hypergrid",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "The project aims house 18 million square feet of AI data centers near the DOE\u2019s Pantex site.",
    "The company announced that its \u201cHypergrid\u201d project will officially launch on July 4, in partnership with the **Texas Tech University System**."
   ],
   "locality_evidence": [
    "Located near the Pantex nuclear weapons plant in Amarillo, the next-generation facility will integrate nuclear, natural gas, solar, and wind energy sources."
   ],
   "state_evidence": [
    "**Fermi America**, a Texas-based company co-founded by former U.S. Energy Secretary and Texas Governor Rick Perry, has unveiled plans to build the largest combined energy and data campus in the United States."
   ],
   "capacity_gw_evidence": [
    "The Hypergrid will power 18 million square feet of artificial intelligence (AI) data centers, delivering up to 11 gigawatts (GW) of IT capacity\u2014enough to supply electricity to over 8.2 million homes."
   ],
   "builder_evidence": [
    "**Fermi America**, a Texas-based company co-founded by former U.S. Energy Secretary and Texas Governor Rick Perry, has unveiled plans to build the largest combined energy and data campus in the United States."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "**Fermi America**, a Texas-based company co-founded by former U.S. Energy Secretary and Texas Governor Rick Perry, has unveiled plans to build the largest combined energy and data campus in the United States."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://www.ksl.com/article/51595304/data-center-alley",
   "title": "Utah's Stratos project draws warnings from Virginia's 'Data Center Alley'",
   "published_at": null,
   "project": "Stratos",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "Kevin O'Leary",
   "ai_customer": null,
   "status": "proposed",
   "announcement_date": null,
   "project_evidence": [
    "People living in Loudoun County, known as the [data center capital of the world](https://www.ksl.com/article/life-inside-data-center-alley-what-utah-can-learn-from-loudoun-county-virginia/51594843?_gl=1*1f20v5n*_gcl_au*NzMwMjE1OTkwLjE3ODE1NTUzNDA.*_ga*NjYyOTM3MDkxLjE3ODE1NTUzMDg.*_ga_JW89DL7T5D*czE3ODM0Nzk4NTMkbzcyJGcxJHQxNzgzNDgzNzc4JGo2MCRsMCRoMA..), are following news of the [Box Elder County Stratos project](https://www.ksl.com/article/new-poll-how-do-utahns-feel-about-box-elder-data-center/51547487?_gl=1*1leptpm*_gcl_au*NzMwMjE1OTkwLjE3ODE1NTUzNDA.*_ga*NjYyOTM3MDkxLjE3ODE1NTUzMDg.*_ga_JW89DL7T5D*czE3ODM0Nzk4NTMkbzcyJGcxJHQxNzgzNDg0NTE4JGo2MCRsMCRoMA..), a massive AI data center backed by celebrity investor Kevin O'Leary.",
    "KEY TAKEAWAYS"
   ],
   "locality_evidence": [
    "People living in Loudoun County, known as the [data center capital of the world](https://www.ksl.com/article/life-inside-data-center-alley-what-utah-can-learn-from-loudoun-county-virginia/51594843?_gl=1*1f20v5n*_gcl_au*NzMwMjE1OTkwLjE3ODE1NTUzNDA.*_ga*NjYyOTM3MDkxLjE3ODE1NTUzMDg.*_ga_JW89DL7T5D*czE3ODM0Nzk4NTMkbzcyJGcxJHQxNzgzNDgzNzc4JGo2MCRsMCRoMA..), are following news of the [Box Elder County Stratos project](https://www.ksl.com/article/new-poll-how-do-utahns-feel-about-box-elder-data-center/51547487?_gl=1*1leptpm*_gcl_au*NzMwMjE1OTkwLjE3ODE1NTUzNDA.*_ga*NjYyOTM3MDkxLjE3ODE1NTUzMDg.*_ga_JW89DL7T5D*czE3ODM0Nzk4NTMkbzcyJGcxJHQxNzgzNDg0NTE4JGo2MCRsMCRoMA..), a massive AI data center backed by celebrity investor Kevin O'Leary.",
    "KEY TAKEAWAYS"
   ],
   "state_evidence": [
    "Roughly 2,000 miles away from Utah, Loudoun County, Virginia, is home to 253 data centers.",
    "KEY TAKEAWAYS"
   ],
   "capacity_gw_evidence": [
    "O'Leary said he believes it's likely the center will ultimately use 7.5 gigawatts of power, but he confirmed the project could still have a maximum use of 9 gigawatts, a figure Turner called staggering.",
    "KEY TAKEAWAYS"
   ],
   "builder_evidence": [
    "People living in Loudoun County, known as the [data center capital of the world](https://www.ksl.com/article/life-inside-data-center-alley-what-utah-can-learn-from-loudoun-county-virginia/51594843?_gl=1*1f20v5n*_gcl_au*NzMwMjE1OTkwLjE3ODE1NTUzNDA.*_ga*NjYyOTM3MDkxLjE3ODE1NTUzMDg.*_ga_JW89DL7T5D*czE3ODM0Nzk4NTMkbzcyJGcxJHQxNzgzNDgzNzc4JGo2MCRsMCRoMA..), are following news of the [Box Elder County Stratos project](https://www.ksl.com/article/new-poll-how-do-utahns-feel-about-box-elder-data-center/51547487?_gl=1*1leptpm*_gcl_au*NzMwMjE1OTkwLjE3ODE1NTUzNDA.*_ga*NjYyOTM3MDkxLjE3ODE1NTUzMDg.*_ga_JW89DL7T5D*czE3ODM0Nzk4NTMkbzcyJGcxJHQxNzgzNDg0NTE4JGo2MCRsMCRoMA..), a massive AI data center backed by celebrity investor Kevin O'Leary.",
    "KEY TAKEAWAYS"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "\"I'm so tired of our country taking years to get stuff done,\" Cox said [during a news conference in April](https://www.ksl.com/article/51491313/cox-backs-box-elder-county-data-center-proposal-in-part-due-to-national-security-factors).",
    "KEY TAKEAWAYS"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://bit.ly/4wJw9OD",
   "title": "Kentucky approves power deal for Hawesville AI data center",
   "published_at": "2026-08-25T15:51:57",
   "project": null,
   "locality": null,
   "state": "Kentucky",
   "capacity_gw": 2.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "pursuing",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": null,
   "state_evidence": [
    "# KY regulators approve power deal for major AI data center at former aluminum site",
    "Kentucky\u2019s utility regulator has approved a power contract for a proposed hyperscale data center at a former aluminum smelter in Hancock County, clearing a major regulatory hurdle for the project while concluding that the deal will protect existing electricity customers from its costs."
   ],
   "capacity_gw_evidence": [
    "# KY regulators approve power deal for major AI data center at former aluminum site"
   ],
   "builder_evidence": [
    "# KY regulators approve power deal for major AI data center at former aluminum site"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# KY regulators approve power deal for major AI data center at former aluminum site"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tikr.com/blog/hut-8-stock-climbs-nvidia-ai-data-center-leases-texas",
   "title": "Hut 8 Stock Climbs After Securing Long-Term Nvidia AI Data Center Leases in Texas",
   "published_at": "2026-08-23T11:18:03",
   "project": null,
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": "Nvidia",
   "status": "locked in",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": null,
   "state_evidence": [
    "# Hut 8 Stock Climbs After Securing Long-Term Nvidia AI Data Center Leases in Texas",
    "Reports say the deal covers Hut 8\u2019s entire 1-gigawatt Texas data center, with base terms and renewal options that could total up to $50 billion over 30 years."
   ],
   "capacity_gw_evidence": [
    "# Hut 8 Stock Climbs After Securing Long-Term Nvidia AI Data Center Leases in Texas",
    "Reports say the deal covers Hut 8\u2019s entire 1-gigawatt Texas data center, with base terms and renewal options that could total up to $50 billion over 30 years."
   ],
   "builder_evidence": [
    "# Hut 8 Stock Climbs After Securing Long-Term Nvidia AI Data Center Leases in Texas",
    "Reports say the deal covers Hut 8\u2019s entire 1-gigawatt Texas data center, with base terms and renewal options that could total up to $50 billion over 30 years."
   ],
   "ai_customer_evidence": [
    "# Hut 8 Stock Climbs After Securing Long-Term Nvidia AI Data Center Leases in Texas",
    "Hut 8 ([HUT](https://app.tikr.com/stock/about?cid=1681582210&tid=1863598504&ref=49x9sy)) stock jumped last week, as investors reacted to news that the [company has locked in long-term data center leases with Nvidia](https://stockstotrade.com/news/hut-8-corp-hut-news-2026_08_20/)."
   ],
   "status_evidence": [
    "# Hut 8 Stock Climbs After Securing Long-Term Nvidia AI Data Center Leases in Texas",
    "Hut 8 ([HUT](https://app.tikr.com/stock/about?cid=1681582210&tid=1863598504&ref=49x9sy)) stock jumped last week, as investors reacted to news that the [company has locked in long-term data center leases with Nvidia](https://stockstotrade.com/news/hut-8-corp-hut-news-2026_08_20/)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tikr.com/blog/hut-8-stock-climbs-nvidia-ai-data-center-leases-texas",
   "title": "Hut 8 Stock Climbs After Securing Long-Term Nvidia AI Data Center Leases in Texas",
   "published_at": "2026-08-23T11:18:03",
   "project": "Beacon Point campus",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "fully commercialized",
   "announcement_date": null,
   "project_evidence": [
    "# Hut 8 Stock Climbs After Securing Long-Term Nvidia AI Data Center Leases in Texas",
    "Hut 8\u2019s Beacon Point campus, also a 1-gigawatt AI site in Nueces County, Texas, is now fully commercialized."
   ],
   "locality_evidence": [
    "# Hut 8 Stock Climbs After Securing Long-Term Nvidia AI Data Center Leases in Texas",
    "Hut 8\u2019s Beacon Point campus, also a 1-gigawatt AI site in Nueces County, Texas, is now fully commercialized."
   ],
   "state_evidence": [
    "# Hut 8 Stock Climbs After Securing Long-Term Nvidia AI Data Center Leases in Texas",
    "Hut 8\u2019s Beacon Point campus, also a 1-gigawatt AI site in Nueces County, Texas, is now fully commercialized."
   ],
   "capacity_gw_evidence": [
    "# Hut 8 Stock Climbs After Securing Long-Term Nvidia AI Data Center Leases in Texas",
    "Hut 8\u2019s Beacon Point campus, also a 1-gigawatt AI site in Nueces County, Texas, is now fully commercialized."
   ],
   "builder_evidence": [
    "# Hut 8 Stock Climbs After Securing Long-Term Nvidia AI Data Center Leases in Texas",
    "Hut 8\u2019s Beacon Point campus, also a 1-gigawatt AI site in Nueces County, Texas, is now fully commercialized."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Hut 8 Stock Climbs After Securing Long-Term Nvidia AI Data Center Leases in Texas",
    "Hut 8\u2019s Beacon Point campus, also a 1-gigawatt AI site in Nueces County, Texas, is now fully commercialized."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://www.ksl.com/article/news/utah/science-and-tech/worlds-largest-data-center-campus-could-be-coming-to-central-utah/51355852",
   "title": "World's largest data center campus could be coming to central Utah",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy",
   "ai_customer": "BluSky AI",
   "status": "rezoning approved",
   "announcement_date": null,
   "project_evidence": [
    "KEY TAKEAWAYS",
    "DELTA \u2014 The world's largest data center campus may be coming to Utah, with a pair of companies planning to construct artificial intelligence-ready hubs in Millard County.",
    "The first domino fell when Orem-based Fibernet MercuryDelta LLC in May filed a [request](https://millardcounty.gov/wp-content/uploads/2025/05/05282025-PC-Agenda.pdf) to rezone nearly 1,200 acres of property \u2014 located southeast of Delta \u2014 from agricultural land to heavy industrial land for its potential 20-million-square-foot data center campus called Delta Gigasite."
   ],
   "locality_evidence": [
    "KEY TAKEAWAYS",
    "DELTA \u2014 The world's largest data center campus may be coming to Utah, with a pair of companies planning to construct artificial intelligence-ready hubs in Millard County.",
    "The first domino fell when Orem-based Fibernet MercuryDelta LLC in May filed a [request](https://millardcounty.gov/wp-content/uploads/2025/05/05282025-PC-Agenda.pdf) to rezone nearly 1,200 acres of property \u2014 located southeast of Delta \u2014 from agricultural land to heavy industrial land for its potential 20-million-square-foot data center campus called Delta Gigasite."
   ],
   "state_evidence": [
    "KEY TAKEAWAYS",
    "DELTA \u2014 The world's largest data center campus may be coming to Utah, with a pair of companies planning to construct artificial intelligence-ready hubs in Millard County."
   ],
   "capacity_gw_evidence": [
    "KEY TAKEAWAYS",
    "A release from Creekstone Energy said that over the coming decade, the company plans to manage 10 gigawatts of capacity at the site from three primary sources, drawing 1.8 gigawatts from the Intermountain Power Project, 6 gigawatts from solar and 2 gigawatts from natural gas while also considering geothermal, wind and nuclear as potential future additions."
   ],
   "builder_evidence": [
    "KEY TAKEAWAYS",
    "The effort to build what's being billed as the \"world's most powerful data center campus\" took another step forward in early August when Creekstone Energy LLC signed an agreement with Murray-based BluSky AI to provide the company 25 acres of land and up to 50 megawatts of energy for modular data centers on the campus.",
    "A release from Creekstone Energy said that over the coming decade, the company plans to manage 10 gigawatts of capacity at the site from three primary sources, drawing 1.8 gigawatts from the Intermountain Power Project, 6 gigawatts from solar and 2 gigawatts from natural gas while also considering geothermal, wind and nuclear as potential future additions."
   ],
   "ai_customer_evidence": [
    "KEY TAKEAWAYS",
    "Creekstone Energy and BluSky AI signed a land and energy agreement in August to kick off what could be the world's largest data center campus.",
    "The effort to build what's being billed as the \"world's most powerful data center campus\" took another step forward in early August when Creekstone Energy LLC signed an agreement with Murray-based BluSky AI to provide the company 25 acres of land and up to 50 megawatts of energy for modular data centers on the campus."
   ],
   "status_evidence": [
    "KEY TAKEAWAYS",
    "The Millard County Commission voted in favor of the rezoning request, following the planning commission's May [recommendation](https://www.youtube.com/watch?v=1tDPNtTRGqU).",
    "With Creekstone's zoning proposal and conditional use permit receiving unanimous approval from the Millard County Commission, the energy company is touting strong local backing for what it says is a project expected to bring substantial tax revenue to the area, along with preserving existing jobs and creating new employment opportunities in Delta."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://www.reddit.com/r/OptimistsUnite/comments/1fqb2y2/ecl_to_build_1_gw_solarpowered_data_centre_with/",
   "title": "ECL to build 1 GW solar-powered data centre with battery and hydrogen storage in Texas",
   "published_at": "2024-09-27T00:17:20",
   "project": "TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "ECL's new facility, TerraSite-TX1, will be constructed on a 600-acre site in Texas and is scheduled to go online in the summer of 2025.",
    "ECL to Build 1 GW Solar-Powered Data Center with Battery and Hydrogen Storage in Texas"
   ],
   "locality_evidence": [
    "ECL, a California-based data center developer, has announced plans to construct a massive 1 GW solar-powered data center near Houston, Texas.",
    "ECL to Build 1 GW Solar-Powered Data Center with Battery and Hydrogen Storage in Texas"
   ],
   "state_evidence": [
    "ECL, a California-based data center developer, has announced plans to construct a massive 1 GW solar-powered data center near Houston, Texas.",
    "ECL to Build 1 GW Solar-Powered Data Center with Battery and Hydrogen Storage in Texas"
   ],
   "capacity_gw_evidence": [
    "However, ECL has much larger ambitions for the site, planning to expand it to 1 GW of on-site, off-grid power, supplied by hydrogen fuel cells and battery storage, at a total cost of $8 billion.",
    "ECL to Build 1 GW Solar-Powered Data Center with Battery and Hydrogen Storage in Texas"
   ],
   "builder_evidence": [
    "ECL, a California-based data center developer, has announced plans to construct a massive 1 GW solar-powered data center near Houston, Texas.",
    "ECL to Build 1 GW Solar-Powered Data Center with Battery and Hydrogen Storage in Texas"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "ECL, a California-based data center developer, has announced plans to construct a massive 1 GW solar-powered data center near Houston, Texas.",
    "ECL to Build 1 GW Solar-Powered Data Center with Battery and Hydrogen Storage in Texas"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://btw.media/en/nvidia-backs-first-4-25gw-of-openai-capacity-at-ports-pike-7",
   "title": "Nvidia backs first 4.25GW of OpenAI capacity at PORTS-Pike",
   "published_at": "2026-08-19T14:30:06",
   "project": "PORTS-Pike",
   "locality": null,
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "proposed",
   "announcement_date": null,
   "project_evidence": [
    "# Nvidia backs first 4.25GW of OpenAI capacity at PORTS-Pike",
    "Nvidia's credit support covers the first 4.25GW tranche at PORTS-Pike, where OpenAI has a 20-year lease and phased delivery targets start in 2028.",
    "SB Energy said Nvidia will provide credit support for the initial 4.25GW of IT capacity at the proposed PORTS-Pike AI infrastructure campus in Ohio."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# Nvidia backs first 4.25GW of OpenAI capacity at PORTS-Pike",
    "![AI-generated editorial illustration of a large conceptual data-centre campus in Ohio with power substations and transmission infrastructure representing the PORTS-Pike development.](/_next/image?url=https%3A%2F%2Fs3.larus.net%2Fbtw-media-production%2Farticles%2Fcmt06prai0002qr6bee3kw9k9%2Ffeatured-89556511-8ee9-4687-9a4b-4f9df19a3229.png&w=1920&q=75)",
    "SB Energy said Nvidia will provide credit support for the initial 4.25GW of IT capacity at the proposed PORTS-Pike AI infrastructure campus in Ohio."
   ],
   "capacity_gw_evidence": [
    "# Nvidia backs first 4.25GW of OpenAI capacity at PORTS-Pike",
    "- OpenAI holds a 20-year lease for the 8GW programme, with first phased capacity targeted from 2028 and at least 10GW of new generation planned",
    "Nvidia has an option to extend that support to the remaining 3.75GW of the planned 8GW programme."
   ],
   "builder_evidence": [
    "# Nvidia backs first 4.25GW of OpenAI capacity at PORTS-Pike",
    "SB Energy said Nvidia will provide credit support for the initial 4.25GW of IT capacity at the proposed PORTS-Pike AI infrastructure campus in Ohio."
   ],
   "ai_customer_evidence": [
    "# Nvidia backs first 4.25GW of OpenAI capacity at PORTS-Pike",
    "Nvidia's credit support covers the first 4.25GW tranche at PORTS-Pike, where OpenAI has a 20-year lease and phased delivery targets start in 2028.",
    "OpenAI is identified as the customer under a 20-year lease, while Nvidia is also investing $1.5bn in SB Energy."
   ],
   "status_evidence": [
    "# Nvidia backs first 4.25GW of OpenAI capacity at PORTS-Pike",
    "SB Energy said Nvidia will provide credit support for the initial 4.25GW of IT capacity at the proposed PORTS-Pike AI infrastructure campus in Ohio."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/",
   "title": "OpenAI, Oracle and Vantage Data Centers Announce Stargate Data Center Site in Wisconsin - Vantage Data Centers",
   "published_at": "2025-10-24T20:58:09",
   "project": "Lighthouse",
   "locality": "Port Washington",
   "state": "Wisconsin",
   "capacity_gw": 1.0,
   "builder": "Vantage Data Centers",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2025-10-22",
   "project_evidence": [
    "# OpenAI, Oracle and Vantage Data Centers Announce Stargate Data Center Site in Wisconsin",
    "The campus, named Lighthouse, is designed to preserve local resources, support new clean energy resources and advance environmental stewardship, including:"
   ],
   "locality_evidence": [
    "# OpenAI, Oracle and Vantage Data Centers Announce Stargate Data Center Site in Wisconsin",
    "**DENVER (Oct.** **22****, 2025)** \u2013 OpenAI, Oracle and Vantage Data Centers, a leading global provider of hyperscale data center campuses, today announced plans to develop a data center campus outside Milwaukee in Port Washington, Wisconsin."
   ],
   "state_evidence": [
    "# OpenAI, Oracle and Vantage Data Centers Announce Stargate Data Center Site in Wisconsin",
    "**DENVER (Oct.** **22****, 2025)** \u2013 OpenAI, Oracle and Vantage Data Centers, a leading global provider of hyperscale data center campuses, today announced plans to develop a data center campus outside Milwaukee in Port Washington, Wisconsin."
   ],
   "capacity_gw_evidence": [
    "# OpenAI, Oracle and Vantage Data Centers Announce Stargate Data Center Site in Wisconsin",
    "The campus will feature four cutting-edge data centers providing close to a gigawatt of AI capacity."
   ],
   "builder_evidence": [
    "# OpenAI, Oracle and Vantage Data Centers Announce Stargate Data Center Site in Wisconsin",
    "**DENVER (Oct.** **22****, 2025)** \u2013 OpenAI, Oracle and Vantage Data Centers, a leading global provider of hyperscale data center campuses, today announced plans to develop a data center campus outside Milwaukee in Port Washington, Wisconsin."
   ],
   "ai_customer_evidence": [
    "# OpenAI, Oracle and Vantage Data Centers Announce Stargate Data Center Site in Wisconsin",
    "**DENVER (Oct.** **22****, 2025)** \u2013 OpenAI, Oracle and Vantage Data Centers, a leading global provider of hyperscale data center campuses, today announced plans to develop a data center campus outside Milwaukee in Port Washington, Wisconsin."
   ],
   "status_evidence": [
    "# OpenAI, Oracle and Vantage Data Centers Announce Stargate Data Center Site in Wisconsin",
    "**DENVER (Oct.** **22****, 2025)** \u2013 OpenAI, Oracle and Vantage Data Centers, a leading global provider of hyperscale data center campuses, today announced plans to develop a data center campus outside Milwaukee in Port Washington, Wisconsin."
   ],
   "announcement_date_evidence": [
    "# OpenAI, Oracle and Vantage Data Centers Announce Stargate Data Center Site in Wisconsin",
    "**DENVER (Oct.** **22****, 2025)** \u2013 OpenAI, Oracle and Vantage Data Centers, a leading global provider of hyperscale data center campuses, today announced plans to develop a data center campus outside Milwaukee in Port Washington, Wisconsin."
   ]
  },
  {
   "url": "https://thecomputewire.com/blog/stargate-in-abilene-openai-oracle-financing-the-largest-us-ai-data-center",
   "title": "Stargate in Abilene: OpenAI & Oracle Financing the Largest U.S. AI Data Center",
   "published_at": "2026-08-16T07:37:56",
   "project": "Stargate",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "cancelled",
   "announcement_date": null,
   "project_evidence": [
    "# Stargate in Abilene: OpenAI & Oracle Financing the Largest U.S. AI Data Center",
    "The Abilene \u201cStargate\u201d campus was billed as the flagship of a $500 billion joint\u2011venture to give the United States a sovereign AI\u2011compute backbone."
   ],
   "locality_evidence": [
    "# Stargate in Abilene: OpenAI & Oracle Financing the Largest U.S. AI Data Center",
    "The Abilene \u201cStargate\u201d campus was billed as the flagship of a $500 billion joint\u2011venture to give the United States a sovereign AI\u2011compute backbone."
   ],
   "state_evidence": [
    "Lancium\u2019s power portfolio in Texas already includes **4 GW of contracted capacity**, with **another 15 GW of projects awaiting grid connection**.",
    "The power\u2011supply landscape in Texas has become a regulatory risk factor."
   ],
   "capacity_gw_evidence": [
    "The venture later announced a **2 GW target** for the Abilene site.",
    "## 3. Capacity Roadmap: From 1.2 GW to the Cancelled 2 GW Goal"
   ],
   "builder_evidence": [
    "# Stargate in Abilene: OpenAI & Oracle Financing the Largest U.S. AI Data Center",
    "**Oracle** operates the Abilene facilities on behalf of OpenAI."
   ],
   "ai_customer_evidence": [
    "# Stargate in Abilene: OpenAI & Oracle Financing the Largest U.S. AI Data Center",
    "An in\u2011depth look at how OpenAI, Oracle and partners are funding the Abilene Stargate campus, from megawatt power deals to equity stakes and recent setbacks."
   ],
   "status_evidence": [
    "By March 2026, **Oracle and OpenAI announced the 2 GW expansion was cancelled** due to financing challenges and OpenAI\u2019s volatile demand forecasts.",
    "## 3. Capacity Roadmap: From 1.2 GW to the Cancelled 2 GW Goal"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://gentic.news/ai-data-centers/case-studies/stargate-abilene",
   "title": "Stargate Abilene \u2014 OpenAI \u00d7 Oracle \u00d7 SoftBank's 1.2 GW Flagship",
   "published_at": "2026-04-18T01:48:42",
   "project": "Stargate Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe Energy Systems",
   "ai_customer": "OpenAI",
   "status": "Capped at 1.2 GW",
   "announcement_date": "2025-01-21",
   "project_evidence": [
    "Case Study \u00b7 Stargate Project",
    "# Stargate Abilene \u2014 OpenAI \u00d7 Oracle \u00d7 SoftBank's 1.2 GW Flagship",
    "Announced on national TV by President Trump in January 2025 as the largest AI infrastructure project in history."
   ],
   "locality_evidence": [
    "Case Study \u00b7 Stargate Project",
    "# Stargate Abilene \u2014 OpenAI \u00d7 Oracle \u00d7 SoftBank's 1.2 GW Flagship",
    "Built by Crusoe on a 1,000-acre Lancium Clean Campus in Abilene, Texas."
   ],
   "state_evidence": [
    "Case Study \u00b7 Stargate Project",
    "# Stargate Abilene \u2014 OpenAI \u00d7 Oracle \u00d7 SoftBank's 1.2 GW Flagship",
    "Built by Crusoe on a 1,000-acre Lancium Clean Campus in Abilene, Texas."
   ],
   "capacity_gw_evidence": [
    "Case Study \u00b7 Stargate Project",
    "# Stargate Abilene \u2014 OpenAI \u00d7 Oracle \u00d7 SoftBank's 1.2 GW Flagship"
   ],
   "builder_evidence": [
    "Case Study \u00b7 Stargate Project",
    "# Stargate Abilene \u2014 OpenAI \u00d7 Oracle \u00d7 SoftBank's 1.2 GW Flagship",
    "The Abilene site itself is built by **Crusoe Energy Systems**, the Denver-based neocloud known for running GPU clusters off stranded natural gas in West Texas oilfields."
   ],
   "ai_customer_evidence": [
    "Case Study \u00b7 Stargate Project",
    "# Stargate Abilene \u2014 OpenAI \u00d7 Oracle \u00d7 SoftBank's 1.2 GW Flagship"
   ],
   "status_evidence": [
    "Case Study \u00b7 Stargate Project",
    "# Stargate Abilene \u2014 OpenAI \u00d7 Oracle \u00d7 SoftBank's 1.2 GW Flagship",
    "Capped at 1.2 GW in March 2026 after hitting the grid wall."
   ],
   "announcement_date_evidence": [
    "Case Study \u00b7 Stargate Project",
    "# Stargate Abilene \u2014 OpenAI \u00d7 Oracle \u00d7 SoftBank's 1.2 GW Flagship",
    "Announced on national TV by President Trump in January 2025 as the largest AI infrastructure project in history.",
    "Announced\n\nJan 21, 2025"
   ]
  },
  {
   "url": "https://semiwiki.com/forum/threads/aix-colossus-2-redefining-ai-infrastructure.23883/",
   "title": "AIx Colossus 2: Redefining AI Infrastructure",
   "published_at": "2025-10-27T10:49:37",
   "project": "Colossus 2",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 1.2,
   "builder": "xAI",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Colossus 2, xAI\u2019s audacious AI datacenter in Southaven, Mississippi, is no ordinary facility\u2014it\u2019s the world\u2019s largest AI gigafactory, housing nearly a million NVIDIA Blackwell GPUs and consuming up to 1.2 gigawatts, enough to power over two million homes.",
    "### [ New Colossus 2: The World\u2019s Largest AI Datacenter ](https://anastasiintech.substack.com/p/new-colossus-2-the-worlds-largest?)"
   ],
   "locality_evidence": [
    "Colossus 2, xAI\u2019s audacious AI datacenter in Southaven, Mississippi, is no ordinary facility\u2014it\u2019s the world\u2019s largest AI gigafactory, housing nearly a million NVIDIA Blackwell GPUs and consuming up to 1.2 gigawatts, enough to power over two million homes.",
    "### [ New Colossus 2: The World\u2019s Largest AI Datacenter ](https://anastasiintech.substack.com/p/new-colossus-2-the-worlds-largest?)"
   ],
   "state_evidence": [
    "Colossus 2, xAI\u2019s audacious AI datacenter in Southaven, Mississippi, is no ordinary facility\u2014it\u2019s the world\u2019s largest AI gigafactory, housing nearly a million NVIDIA Blackwell GPUs and consuming up to 1.2 gigawatts, enough to power over two million homes.",
    "### [ New Colossus 2: The World\u2019s Largest AI Datacenter ](https://anastasiintech.substack.com/p/new-colossus-2-the-worlds-largest?)"
   ],
   "capacity_gw_evidence": [
    "Colossus 2, xAI\u2019s audacious AI datacenter in Southaven, Mississippi, is no ordinary facility\u2014it\u2019s the world\u2019s largest AI gigafactory, housing nearly a million NVIDIA Blackwell GPUs and consuming up to 1.2 gigawatts, enough to power over two million homes.",
    "### [ New Colossus 2: The World\u2019s Largest AI Datacenter ](https://anastasiintech.substack.com/p/new-colossus-2-the-worlds-largest?)"
   ],
   "builder_evidence": [
    "Colossus 2, xAI\u2019s audacious AI datacenter in Southaven, Mississippi, is no ordinary facility\u2014it\u2019s the world\u2019s largest AI gigafactory, housing nearly a million NVIDIA Blackwell GPUs and consuming up to 1.2 gigawatts, enough to power over two million homes.",
    "### [ New Colossus 2: The World\u2019s Largest AI Datacenter ](https://anastasiintech.substack.com/p/new-colossus-2-the-worlds-largest?)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://edgen.tech/es/news/post/chevrons-20-year-microsoft-power-deal-diversifies-beyond-oil",
   "title": "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
   "published_at": "2026-08-29T15:54:13",
   "project": "Project Kilby",
   "locality": "Reeves County",
   "state": "Texas",
   "capacity_gw": 2.67,
   "builder": "Chevron",
   "ai_customer": "Microsoft",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "The project, known as Project Kilby, will be developed through Chevron's Energy Forge One subsidiary alongside Engine No. 1 and Microsoft."
   ],
   "locality_evidence": [
    "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings."
   ],
   "state_evidence": [
    "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron's 20-year Microsoft power deal for a 2.67-gigawatt Texas data center marks the oil major's entry into AI infrastructure."
   ],
   "capacity_gw_evidence": [
    "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron's 20-year Microsoft power deal for a 2.67-gigawatt Texas data center marks the oil major's entry into AI infrastructure."
   ],
   "builder_evidence": [
    "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "The project, known as Project Kilby, will be developed through Chevron's Energy Forge One subsidiary alongside Engine No. 1 and Microsoft."
   ],
   "ai_customer_evidence": [
    "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "Chevron signed a 20-year take-or-pay power purchase agreement with Microsoft on June 22 to supply electricity for a 2.67-gigawatt data center campus in Reeves County, West Texas, locking in a diversified revenue stream beyond commodity price swings."
   ],
   "status_evidence": [
    "Chevron's 20-Year Microsoft Power Deal Diversifies Beyond Oil",
    "First power is expected in 2028, with a final investment decision targeted by the end of 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://morningoverview.com/a-planned-texas-megacomplex-would-draw-11-gigawatts-from-nuclear-gas-solar-and-wind",
   "title": "A planned Texas megacomplex would draw 11 gigawatts from nuclear, gas, solar and wind",
   "published_at": "2026-08-25T13:05:00",
   "project": "HyperGrid campus",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "proposed",
   "announcement_date": null,
   "project_evidence": [
    "A developer in the Texas Panhandle is proposing one of the largest single-site energy projects ever attempted in the United States, a campus designed to generate about 11 gigawatts of electricity on its own land to feed a sprawling complex of data centers.",
    "The project, branded the HyperGrid campus, is laid out across roughly 5,800 contiguous acres near the Pantex site, a location detailed in an [analysis of the 11-gigawatt energy and data complex](https://edireland.substack.com/p/11-gigawatt-energy-and-data-complex)."
   ],
   "locality_evidence": [
    "A developer in the Texas Panhandle is proposing one of the largest single-site energy projects ever attempted in the United States, a campus designed to generate about 11 gigawatts of electricity on its own land to feed a sprawling complex of data centers.",
    "The plan, put forward by Fermi America for a site near Amarillo, would combine nuclear reactors, natural gas turbines, solar arrays, and wind alongside battery storage, an unusually broad mix intended to keep power flowing around the clock."
   ],
   "state_evidence": [
    "A developer in the Texas Panhandle is proposing one of the largest single-site energy projects ever attempted in the United States, a campus designed to generate about 11 gigawatts of electricity on its own land to feed a sprawling complex of data centers."
   ],
   "capacity_gw_evidence": [
    "A developer in the Texas Panhandle is proposing one of the largest single-site energy projects ever attempted in the United States, a campus designed to generate about 11 gigawatts of electricity on its own land to feed a sprawling complex of data centers.",
    "The headline figure is 11 gigawatts of on-site generation, an amount its backers describe as enough to power roughly 8 million homes."
   ],
   "builder_evidence": [
    "A developer in the Texas Panhandle is proposing one of the largest single-site energy projects ever attempted in the United States, a campus designed to generate about 11 gigawatts of electricity on its own land to feed a sprawling complex of data centers.",
    "The plan, put forward by Fermi America for a site near Amarillo, would combine nuclear reactors, natural gas turbines, solar arrays, and wind alongside battery storage, an unusually broad mix intended to keep power flowing around the clock."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "A developer in the Texas Panhandle is proposing one of the largest single-site energy projects ever attempted in the United States, a campus designed to generate about 11 gigawatts of electricity on its own land to feed a sprawling complex of data centers."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://usdatacenterprojects.com/texas/fermi-america-taps-hillcore-to-build-2-6-gw-gas-plant-project-for-matador-data-center-proje",
   "title": "Fermi America Taps Hillcore to Build 2.6GW Gas Plant for Matador Data Center Project",
   "published_at": "2026-08-13T13:21:11",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 17.0,
   "builder": "Fermi America",
   "ai_customer": "TensorWave",
   "status": "well underway",
   "announcement_date": null,
   "project_evidence": [
    "# Fermi America Taps Hillcore to Build 2.6GW Gas Plant for Matador Data Center Project",
    "Fermi America has struck a deal with Hillcore Energy Capital to develop a 2.6GW natural gas-anchored power plant in support of its sprawling Project Matador campus in Carson County, Texas, while simultaneously installing new executive leadership as the company pivots from planning to construction."
   ],
   "locality_evidence": [
    "# Fermi America Taps Hillcore to Build 2.6GW Gas Plant for Matador Data Center Project",
    "Project Matador is a planned data center and energy campus located near Amarillo, Texas, on land owned by the Texas Tech University system."
   ],
   "state_evidence": [
    "# Fermi America Taps Hillcore to Build 2.6GW Gas Plant for Matador Data Center Project",
    "Fermi America has struck a deal with Hillcore Energy Capital to develop a 2.6GW natural gas-anchored power plant in support of its sprawling Project Matador campus in Carson County, Texas, while simultaneously installing new executive leadership as the company pivots from planning to construction."
   ],
   "capacity_gw_evidence": [
    "# Fermi America Taps Hillcore to Build 2.6GW Gas Plant for Matador Data Center Project",
    "Fermi raised that figure to 17 GW in March 2026."
   ],
   "builder_evidence": [
    "# Fermi America Taps Hillcore to Build 2.6GW Gas Plant for Matador Data Center Project",
    "Fermi America has struck a deal with Hillcore Energy Capital to develop a 2.6GW natural gas-anchored power plant in support of its sprawling Project Matador campus in Carson County, Texas, while simultaneously installing new executive leadership as the company pivots from planning to construction."
   ],
   "ai_customer_evidence": [
    "# Fermi America Taps Hillcore to Build 2.6GW Gas Plant for Matador Data Center Project",
    "Earlier this week, however, the company announced a binding lease agreement with AI cloud provider TensorWave for up to 650 MW of data center capacity at Project Matador."
   ],
   "status_evidence": [
    "# Fermi America Taps Hillcore to Build 2.6GW Gas Plant for Matador Data Center Project",
    "Fermi said this week that Project Matador is \"well underway,\" with approximately 6 GW of the planned 17 GW already permitted and more than USD 1.5 billion invested in the buildout to date."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://backend.theenergymag.com/news/2026-03-13/nscale-west-virginia-ai",
   "title": "Nscale in Talks to Acquire 8GW West Virginia AI Data Center Site: Report",
   "published_at": "2026-03-13T13:26:09",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Fidelis New Energy and 8090 Industries",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2023-01-01",
   "project_evidence": [
    "# Nscale in Talks to Acquire 8GW West Virginia AI Data Center Site: Report",
    "The property\u2014known as the Monarch Compute Campus\u2014is designed to support as much as 8 GW of data center capacity, making it one of the largest proposed AI data center developments in the U.S."
   ],
   "locality_evidence": [
    "# Nscale in Talks to Acquire 8GW West Virginia AI Data Center Site: Report",
    "The potential deal would see Nscale acquire American Intelligence & Power (AIP), the current owner of the site in Mason County, giving the company control over the land along with existing permits and power agreements tied to the project, The Information reported on Friday, citing people familiar with the discussions and fundraising documents."
   ],
   "state_evidence": [
    "# Nscale in Talks to Acquire 8GW West Virginia AI Data Center Site: Report",
    "U.K.-based AI cloud provider Nscale is in talks to acquire a large data center development site in West Virginia that could support up to 8 gigawatts of capacity, according to a report by The Information."
   ],
   "capacity_gw_evidence": [
    "# Nscale in Talks to Acquire 8GW West Virginia AI Data Center Site: Report",
    "U.K.-based AI cloud provider Nscale is in talks to acquire a large data center development site in West Virginia that could support up to 8 gigawatts of capacity, according to a report by The Information.",
    "The property\u2014known as the Monarch Compute Campus\u2014is designed to support as much as 8 GW of data center capacity, making it one of the largest proposed AI data center developments in the U.S."
   ],
   "builder_evidence": [
    "# Nscale in Talks to Acquire 8GW West Virginia AI Data Center Site: Report",
    "The project is backed by Fidelis New Energy and 8090 Industries, which formed AIP earlier this year to develop the site."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Nscale in Talks to Acquire 8GW West Virginia AI Data Center Site: Report",
    "The property\u2014known as the Monarch Compute Campus\u2014is designed to support as much as 8 GW of data center capacity, making it one of the largest proposed AI data center developments in the U.S."
   ],
   "announcement_date_evidence": [
    "# Nscale in Talks to Acquire 8GW West Virginia AI Data Center Site: Report",
    "Plans for the location date back to 2023, when Fidelis initially proposed building a roughly 1 GW data center campus powered by an adjacent hydrogen production facility, according to a [report](https://www.datacenterdynamics.com/en/news/1gw-hydrogen-powered-data-center-campus-proposed-in-west-virginia/) by Datacenter Dynamics."
   ]
  },
  {
   "url": "https://poweredbywho.com/projects/data-city-laredo-energy-abundance-81053409",
   "title": "Data City Laredo (Energy Abundance) Data Center, Texas | PoweredByWho",
   "published_at": null,
   "project": "Data City Laredo (Energy Abundance)",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corporation",
   "ai_customer": null,
   "status": "Proposed",
   "announcement_date": null,
   "project_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "# Data City Laredo (Energy Abundance)"
   ],
   "locality_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "Location",
    "LAREDO"
   ],
   "state_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "Webb County, TX"
   ],
   "capacity_gw_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "5000 MW \u00b7 PROPOSED",
    "Capacity",
    "5000 MW"
   ],
   "builder_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "Developer \u00b7 Energy Abundance Development Corporation"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "Status",
    "Proposed"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://wsbtv.com/news/local/utility-officials-approve-georgia-power-openai-data-center-agreement/4NP2SSOKQNFUBJOQZJYMHRYTRU",
   "title": "OpenAI, Georgia Power deal expected to lower energy costs - WSB-TV Channel 2",
   "published_at": "2026-08-27T15:04:25",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "Georgia Power",
   "ai_customer": "OpenAI",
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "# Utility officials approve Georgia Power, OpenAI data center agreement",
    "The approval of the power plan for Project Camellia and OpenAI follows a base rate freeze a[pproved by the PSC and enacted in July 2025](https://www.wsbtv.com/news/local/georgia-psc-approves-plan-freeze-georgia-power-base-power-rates/JXNC3CLU7BAIRGFGBPUFR3K2CA/), as well as a [broader rate reduction plan approved in May](https://www.wsbtv.com/news/local/atlanta/georgia-power-announces-new-savings-plan-customers/V2ETHKED4NAFZMYAO56LICRHJE/).",
    "Project Camellia is located in the Savannah Gateway Industrial Hub in Effingham County."
   ],
   "locality_evidence": [
    "# Utility officials approve Georgia Power, OpenAI data center agreement",
    "The Georgia Public Service Commission has approved a [contract between Georgia Power and OpenAI](https://www.wsbtv.com/news/local/openai-plans-massive-data-center-facility-with-georgia-power-development-start-2028/377IZ4C4LFBGZNEFRENVWR7IMU/) to power a massive new data center project in Effingham County.",
    "Project Camellia is located in the Savannah Gateway Industrial Hub in Effingham County."
   ],
   "state_evidence": [
    "# Utility officials approve Georgia Power, OpenAI data center agreement",
    "The Georgia Public Service Commission has approved a [contract between Georgia Power and OpenAI](https://www.wsbtv.com/news/local/openai-plans-massive-data-center-facility-with-georgia-power-development-start-2028/377IZ4C4LFBGZNEFRENVWR7IMU/) to power a massive new data center project in Effingham County."
   ],
   "capacity_gw_evidence": [
    "# Utility officials approve Georgia Power, OpenAI data center agreement",
    "Under the agreement filed with the Georgia PSC, the facility will require 3,200 megawatts of electricity, to be delivered in phases."
   ],
   "builder_evidence": [
    "# Utility officials approve Georgia Power, OpenAI data center agreement",
    "The Georgia Public Service Commission has approved a [contract between Georgia Power and OpenAI](https://www.wsbtv.com/news/local/openai-plans-massive-data-center-facility-with-georgia-power-development-start-2028/377IZ4C4LFBGZNEFRENVWR7IMU/) to power a massive new data center project in Effingham County."
   ],
   "ai_customer_evidence": [
    "# Utility officials approve Georgia Power, OpenAI data center agreement",
    "The Georgia Public Service Commission has approved a [contract between Georgia Power and OpenAI](https://www.wsbtv.com/news/local/openai-plans-massive-data-center-facility-with-georgia-power-development-start-2028/377IZ4C4LFBGZNEFRENVWR7IMU/) to power a massive new data center project in Effingham County."
   ],
   "status_evidence": [
    "# Utility officials approve Georgia Power, OpenAI data center agreement",
    "The Georgia Public Service Commission has approved a [contract between Georgia Power and OpenAI](https://www.wsbtv.com/news/local/openai-plans-massive-data-center-facility-with-georgia-power-development-start-2028/377IZ4C4LFBGZNEFRENVWR7IMU/) to power a massive new data center project in Effingham County."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://news.bitcoin.com/terawulf-expands-ai-strategy-with-1gw-data-campus-and-3b-backing",
   "title": "Terawulf Expands AI Strategy With 1GW Data Campus and $3B Backing",
   "published_at": "2026-05-29T05:30:38",
   "project": "Muskie Data Campus",
   "locality": "Eastpark Industrial Park",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "Terawulf Inc.",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": null,
   "project_evidence": [
    "## Key Takeaways",
    "Terawulf bought a Kentucky AI campus targeting 1GW of HPC capacity by 2030.",
    "The Nasdaq-listed company said it acquired the \u201cMuskie Data Campus\u201d from Industrial Equity Partners."
   ],
   "locality_evidence": [
    "## Key Takeaways",
    "Terawulf bought a Kentucky AI campus targeting 1GW of HPC capacity by 2030.",
    "The site sits inside the 1,000-acre Eastpark Industrial Park in northeastern Kentucky and includes about 285 acres of owned and controlled land."
   ],
   "state_evidence": [
    "## Key Takeaways",
    "Terawulf bought a Kentucky AI campus targeting 1GW of HPC capacity by 2030.",
    "The Nasdaq-listed company said it acquired the \u201cMuskie Data Campus\u201d from Industrial Equity Partners."
   ],
   "capacity_gw_evidence": [
    "## Key Takeaways",
    "Terawulf bought a Kentucky AI campus targeting 1GW of HPC capacity by 2030.",
    "Terawulf said the campus is expected to support more than 1 gigawatt of AI and high-performance computing capacity."
   ],
   "builder_evidence": [
    "## Key Takeaways",
    "Terawulf bought a Kentucky AI campus targeting 1GW of HPC capacity by 2030.",
    "Terawulf Inc. is moving deeper into artificial intelligence (AI) infrastructure with the purchase of a large data center development site in eastern Kentucky, underscoring how former bitcoin mining firms are chasing demand for power-hungry computing capacity."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Key Takeaways",
    "Terawulf bought a Kentucky AI campus targeting 1GW of HPC capacity by 2030.",
    "The Nasdaq-listed company said it acquired the \u201cMuskie Data Campus\u201d from Industrial Equity Partners."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://convergedigest.com/iren-energizes-1-4gw-texas-data-center-sit",
   "title": "IREN Energizes 1.4GW Texas Data Center Site",
   "published_at": "2026-05-01T21:56:16",
   "project": "Sweetwater Data Center Campus",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN Limited",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "IREN Limited (NASDAQ: IREN) connected its 1.4GW Sweetwater 1 data center site in Texas to the ERCOT grid, marking a key infrastructure milestone for its planned 2GW Sweetwater campus.",
    "| Flagship Development | Sweetwater Data Center Campus (Texas) \u2013 planned ~2GW capacity |"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "IREN Limited (NASDAQ: IREN) connected its 1.4GW Sweetwater 1 data center site in Texas to the ERCOT grid, marking a key infrastructure milestone for its planned 2GW Sweetwater campus.",
    "| Flagship Development | Sweetwater Data Center Campus (Texas) \u2013 planned ~2GW capacity |"
   ],
   "capacity_gw_evidence": [
    "IREN Limited (NASDAQ: IREN) connected its 1.4GW Sweetwater 1 data center site in Texas to the ERCOT grid, marking a key infrastructure milestone for its planned 2GW Sweetwater campus.",
    "| Flagship Development | Sweetwater Data Center Campus (Texas) \u2013 planned ~2GW capacity |"
   ],
   "builder_evidence": [
    "IREN Limited (NASDAQ: IREN) connected its 1.4GW Sweetwater 1 data center site in Texas to the ERCOT grid, marking a key infrastructure milestone for its planned 2GW Sweetwater campus.",
    "| Profile: IREN | |",
    "| Company Name | IREN Limited |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "IREN Limited (NASDAQ: IREN) connected its 1.4GW Sweetwater 1 data center site in Texas to the ERCOT grid, marking a key infrastructure milestone for its planned 2GW Sweetwater campus.",
    "| Flagship Development | Sweetwater Data Center Campus (Texas) \u2013 planned ~2GW capacity |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://utahbusiness.com/press-releases/2026/04/22/creekstone-energy-secures-largest-solar-lease-utah-millard-county-delta",
   "title": "Creekstone Energy secures largest solar lease in Utah\u2019s history",
   "published_at": "2026-04-22T16:39:16",
   "project": "Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy",
   "ai_customer": null,
   "status": "master-planned",
   "announcement_date": null,
   "project_evidence": [
    "Creekstone plans to develop more than 1 gigawatt (GW) of solar generating capacity over the next 18 months to support the growing power demands of its Delta Gigasite\u2014one of the largest AI hyperscale data center developments in the western United States.",
    "Creekstone\u2019s Delta Gigasite campus sits on more than 1,100 acres in central Utah\u2019s Millard County adjacent to the leased land and is master-planned for more than 10 gigawatts of total capacity."
   ],
   "locality_evidence": [
    "DELTA, Utah \u2014 Creekstone Energy LLC (\u201cCreekstone\u201d) announced it has executed a long-term solar lease with the State of Utah\u2019s School and Institutional Trust Lands Administration (TLA) encompassing approximately 13,000 acres of state trust lands in Millard County.",
    "Creekstone\u2019s Delta Gigasite campus sits on more than 1,100 acres in central Utah\u2019s Millard County adjacent to the leased land and is master-planned for more than 10 gigawatts of total capacity."
   ],
   "state_evidence": [
    "DELTA, Utah \u2014 Creekstone Energy LLC (\u201cCreekstone\u201d) announced it has executed a long-term solar lease with the State of Utah\u2019s School and Institutional Trust Lands Administration (TLA) encompassing approximately 13,000 acres of state trust lands in Millard County.",
    "Creekstone\u2019s Delta Gigasite campus sits on more than 1,100 acres in central Utah\u2019s Millard County adjacent to the leased land and is master-planned for more than 10 gigawatts of total capacity."
   ],
   "capacity_gw_evidence": [
    "Creekstone\u2019s Delta Gigasite campus sits on more than 1,100 acres in central Utah\u2019s Millard County adjacent to the leased land and is master-planned for more than 10 gigawatts of total capacity."
   ],
   "builder_evidence": [
    "DELTA, Utah \u2014 Creekstone Energy LLC (\u201cCreekstone\u201d) announced it has executed a long-term solar lease with the State of Utah\u2019s School and Institutional Trust Lands Administration (TLA) encompassing approximately 13,000 acres of state trust lands in Millard County.",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 1 gigawatt of total IT load capacity across multiple phases."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Creekstone\u2019s Delta Gigasite campus sits on more than 1,100 acres in central Utah\u2019s Millard County adjacent to the leased land and is master-planned for more than 10 gigawatts of total capacity.",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 1 gigawatt of total IT load capacity across multiple phases."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://explainx.ai/blog/nvidia-openai-ports-pike-ohio-lps-guarantee-august-2026",
   "title": "NVIDIA-OpenAI PORTS-Pike Deal: $600B Compute by 2030 | explainx.ai Blog",
   "published_at": "2026-08-18T00:00:00",
   "project": "PORTS-Pike",
   "locality": "Portsmouth",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# NVIDIA Guarantees OpenAI's Ohio AI Factory: The PORTS-Pike LPS Deal",
    "What is PORTS-Pike? | A data-center campus in Portsmouth, Ohio, developed with **SB Energy**; OpenAI is the tenant and will build/operate a \"world-class AI factory\" there on NVIDIA's DSX platform",
    "table \u00b7 2 cols",
    "The specific deal: NVIDIA is partnering with **SB Energy** to secure LPS capacity at the **PORTS-Pike Technology Campus** in Portsmouth, Ohio, with **OpenAI as the tenant**."
   ],
   "locality_evidence": [
    "# NVIDIA Guarantees OpenAI's Ohio AI Factory: The PORTS-Pike LPS Deal",
    "What is PORTS-Pike? | A data-center campus in Portsmouth, Ohio, developed with **SB Energy**; OpenAI is the tenant and will build/operate a \"world-class AI factory\" there on NVIDIA's DSX platform",
    "table \u00b7 2 cols",
    "The specific deal: NVIDIA is partnering with **SB Energy** to secure LPS capacity at the **PORTS-Pike Technology Campus** in Portsmouth, Ohio, with **OpenAI as the tenant**."
   ],
   "state_evidence": [
    "# NVIDIA Guarantees OpenAI's Ohio AI Factory: The PORTS-Pike LPS Deal",
    "What is PORTS-Pike? | A data-center campus in Portsmouth, Ohio, developed with **SB Energy**; OpenAI is the tenant and will build/operate a \"world-class AI factory\" there on NVIDIA's DSX platform",
    "table \u00b7 2 cols",
    "The specific deal: NVIDIA is partnering with **SB Energy** to secure LPS capacity at the **PORTS-Pike Technology Campus** in Portsmouth, Ohio, with **OpenAI as the tenant**."
   ],
   "capacity_gw_evidence": [
    "# NVIDIA Guarantees OpenAI's Ohio AI Factory: The PORTS-Pike LPS Deal",
    "NVIDIA is guaranteeing land, power and shell costs for OpenAI's 4.25GW Ohio AI factory at PORTS-Pike \u2014 part of a ~$600B compute pipeline through 2030.",
    "How much capacity, how long? | Initial deployment: **4.25 gigawatts**; NVIDIA may extend to the remaining **3.75GW** (8GW total); term is **20 years**",
    "table \u00b7 2 cols",
    "Possible extension | Up to 3.75GW more (8GW total at PORTS-Pike)"
   ],
   "builder_evidence": [
    "# NVIDIA Guarantees OpenAI's Ohio AI Factory: The PORTS-Pike LPS Deal",
    "What is PORTS-Pike? | A data-center campus in Portsmouth, Ohio, developed with **SB Energy**; OpenAI is the tenant and will build/operate a \"world-class AI factory\" there on NVIDIA's DSX platform",
    "table \u00b7 2 cols",
    "The specific deal: NVIDIA is partnering with **SB Energy** to secure LPS capacity at the **PORTS-Pike Technology Campus** in Portsmouth, Ohio, with **OpenAI as the tenant**."
   ],
   "ai_customer_evidence": [
    "# NVIDIA Guarantees OpenAI's Ohio AI Factory: The PORTS-Pike LPS Deal",
    "NVIDIA is guaranteeing land, power and shell costs for OpenAI's 4.25GW Ohio AI factory at PORTS-Pike \u2014 part of a ~$600B compute pipeline through 2030.",
    "What is PORTS-Pike? | A data-center campus in Portsmouth, Ohio, developed with **SB Energy**; OpenAI is the tenant and will build/operate a \"world-class AI factory\" there on NVIDIA's DSX platform",
    "table \u00b7 2 cols",
    "The specific deal: NVIDIA is partnering with **SB Energy** to secure LPS capacity at the **PORTS-Pike Technology Campus** in Portsmouth, Ohio, with **OpenAI as the tenant**."
   ],
   "status_evidence": [
    "# NVIDIA Guarantees OpenAI's Ohio AI Factory: The PORTS-Pike LPS Deal",
    "On August 17, 2026 at 6:10 PM, NVIDIA CEO Jensen Huang posted [\"Securing the Infrastructure of Intelligence\"](https://x.com/jensenhuang?ref=explainx) on X \u2014 a long-form announcement that had crossed 1.6 million views by the time of writing."
   ],
   "announcement_date_evidence": [
    "# NVIDIA Guarantees OpenAI's Ohio AI Factory: The PORTS-Pike LPS Deal",
    "On August 17, 2026 at 6:10 PM, NVIDIA CEO Jensen Huang posted [\"Securing the Infrastructure of Intelligence\"](https://x.com/jensenhuang?ref=explainx) on X \u2014 a long-form announcement that had crossed 1.6 million views by the time of writing."
   ]
  },
  {
   "url": "http://dlvr.it/TS9LZL",
   "title": "OpenAI Stargate's Milam, Texas, 'Freebird' data center to span 548,950 sq ft in first phase",
   "published_at": "2026-04-18T14:04:26",
   "project": "Freebird",
   "locality": "Milam County",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "OpenAI's planned data center in Milam County, Texas, will comprise a single-story 548,950 square foot (51,000 sqm) data center with four data halls.",
    "A filing with the Texas Department of Licensing and Regulation reveals the size of the 'Freebird' Stargate data center's first phase."
   ],
   "locality_evidence": [
    "OpenAI's planned data center in Milam County, Texas, will comprise a single-story 548,950 square foot (51,000 sqm) data center with four data halls.",
    "A filing with the Texas Department of Licensing and Regulation reveals the size of the 'Freebird' Stargate data center's first phase."
   ],
   "state_evidence": [
    "OpenAI's planned data center in Milam County, Texas, will comprise a single-story 548,950 square foot (51,000 sqm) data center with four data halls.",
    "A filing with the Texas Department of Licensing and Regulation reveals the size of the 'Freebird' Stargate data center's first phase."
   ],
   "capacity_gw_evidence": [
    "Freebird's project head is listed as Zoheir Taheri at SB Energy, the SoftBank subsidiary [tasked with](https://www.datacenterdynamics.com/en/news/softbanks-sb-energy-to-build-and-operate-openais-12gw-stargate-data-center-in-milam-county-texas/) building and operating the 1.2GW facility.",
    "A filing with the Texas Department of Licensing and Regulation reveals the size of the 'Freebird' Stargate data center's first phase."
   ],
   "builder_evidence": [
    "Freebird's project head is listed as Zoheir Taheri at SB Energy, the SoftBank subsidiary [tasked with](https://www.datacenterdynamics.com/en/news/softbanks-sb-energy-to-build-and-operate-openais-12gw-stargate-data-center-in-milam-county-texas/) building and operating the 1.2GW facility.",
    "A filing with the Texas Department of Licensing and Regulation reveals the size of the 'Freebird' Stargate data center's first phase."
   ],
   "ai_customer_evidence": [
    "OpenAI's planned data center in Milam County, Texas, will comprise a single-story 548,950 square foot (51,000 sqm) data center with four data halls.",
    "A filing with the Texas Department of Licensing and Regulation reveals the size of the 'Freebird' Stargate data center's first phase."
   ],
   "status_evidence": [
    "That month, Stargate leader Peter Hoeschele announced that phase one of Freebird had officially topped out.",
    "A filing with the Texas Department of Licensing and Regulation reveals the size of the 'Freebird' Stargate data center's first phase."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://theglobaljobsbank.com/article/926880504-crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
   "published_at": null,
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": "",
   "status": "planned",
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "locality_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "ai_customer_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas.",
    "The data center will be purpose-built to support the advanced AI computational requirements of a leading hyperscale technology company."
   ],
   "status_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas.",
    "Construction is expected to begin in Q3 2026, creating thousands of local construction jobs, more than 100 long-term positions, and a significant long-term economic investment for Childress County."
   ],
   "announcement_date_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ]
  },
  {
   "url": "https://enterprisetimes.in/latest-news/vantage-invests-25-billion-to-develop-1-4gw-data-center-campus-in-texas",
   "title": "Vantage Invests $25 billion To Develop 1.4GW Data Center Campus In Texas",
   "published_at": "2025-08-20T08:59:29",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Vantage Invests $25 billion To Develop 1.4GW Data Center Campus In Texas",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "locality_evidence": [
    "# Vantage Invests $25 billion To Develop 1.4GW Data Center Campus In Texas",
    "Vantage Data Centers has announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "# Vantage Invests $25 billion To Develop 1.4GW Data Center Campus In Texas",
    "Vantage Data Centers has announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "# Vantage Invests $25 billion To Develop 1.4GW Data Center Campus In Texas",
    "Vantage Data Centers has announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "# Vantage Invests $25 billion To Develop 1.4GW Data Center Campus In Texas",
    "Vantage Data Centers has announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Vantage Invests $25 billion To Develop 1.4GW Data Center Campus In Texas",
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://asianewstoday.com/fermi-america-makes-initial-draw-on-200-million-equipment-facility",
   "title": "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility",
   "published_at": "2026-02-20T10:52:04",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "developing",
   "announcement_date": "2026-02-20",
   "project_evidence": [
    "# Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility",
    "from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador\u2019s 11GW Private HyperGrid\u2122 Campus",
    "The commitment from Keystone National Group, a private credit leader that specializes in asset-backed lending with over $6 billion in deployed capital, underscores that sophisticated institutional investors view Project Matador\u2019s power infrastructure assets as premium, financeable assets critical to America\u2019s energy future."
   ],
   "locality_evidence": [
    "# Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility",
    "AMARILLO, Texas, Feb. 20, 2026 /PRNewswire/ \u2014 Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122, in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026."
   ],
   "state_evidence": [
    "# Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility",
    "AMARILLO, Texas, Feb. 20, 2026 /PRNewswire/ \u2014 Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122, in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026."
   ],
   "capacity_gw_evidence": [
    "# Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility",
    "from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador\u2019s 11GW Private HyperGrid\u2122 Campus",
    "Project Matador delivers immediate, gigawatt-scale, firm power for high-demand sectors including AI infrastructure, semiconductor fabs, heavy manufacturing, and defense."
   ],
   "builder_evidence": [
    "# Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility",
    "AMARILLO, Texas, Feb. 20, 2026 /PRNewswire/ \u2014 Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122, in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility",
    "Fermi America\u2122 (NASDAQ& LSE: FRMI) develops next-generation private electric grids that deliver highly redundant power at gigawatt scale to support next-generation intelligence and AI compute."
   ],
   "announcement_date_evidence": [
    "# Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility",
    "AMARILLO, Texas, Feb. 20, 2026 /PRNewswire/ \u2014 Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122, in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026."
   ]
  },
  {
   "url": "https://www.reddit.com/r/Pennsylvania/comments/1jqh175/former_pa_coalfired_plant_to_be_transformed_into/",
   "title": "Former Pa. coal-fired plant to be transformed into data center campus",
   "published_at": "2025-04-03T12:24:24",
   "project": "Homer City Generating Station",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Homer City Development",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "The former Homer City Generating Station, about 50 miles east of Pittsburgh, will host seven gas-fired turbines to power data centers on-site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development.",
    "The owners of what was once Pennsylvania\u2019s biggest coal-fired power plant said Wednesday that they will turn it into a $10 billion natural gas-powered data center campus designed to capitalize on the fast-growing energy demands of Big Tech companies to power artificial intelligence and cloud computing applications."
   ],
   "locality_evidence": [
    "The former Homer City Generating Station, about 50 miles east of Pittsburgh, will host seven gas-fired turbines to power data centers on-site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "state_evidence": [
    "The owners of what was once Pennsylvania\u2019s biggest coal-fired power plant said Wednesday that they will turn it into a $10 billion natural gas-powered data center campus designed to capitalize on the fast-growing energy demands of Big Tech companies to power artificial intelligence and cloud computing applications."
   ],
   "capacity_gw_evidence": [
    "The former Homer City Generating Station, about 50 miles east of Pittsburgh, will host seven gas-fired turbines to power data centers on-site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "builder_evidence": [
    "The former Homer City Generating Station, about 50 miles east of Pittsburgh, will host seven gas-fired turbines to power data centers on-site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The owners of what was once Pennsylvania\u2019s biggest coal-fired power plant said Wednesday that they will turn it into a $10 billion natural gas-powered data center campus designed to capitalize on the fast-growing energy demands of Big Tech companies to power artificial intelligence and cloud computing applications."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://bisnow.com/national/news/data-center/hydrogen-powered-data-city-ai-megacampus-planned-in-texas-128626",
   "title": "50,000-Acre, Hydrogen-Powered Data Center Campus Planned In Texas",
   "published_at": "2025-03-24T18:25:32",
   "project": "Data City",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corp.",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2025-03-21",
   "project_evidence": [
    "News",
    "50,000-Acre, Hydrogen-Powered Data Center Campus Planned In Texas",
    "Energy Abundance Development Corp. unveiled plans Friday for what it is branding Data City, Texas \u2014 a data center megacampus in the Laredo area that [the developer claims](https://finance.yahoo.com/news/energy-abundance-announces-data-city-143100459.html?guccounter=1) will eventually support 5 gigawatts of capacity for [artificial intelligence](https://www.bisnow.com/tags/artificial-intelligence) computing."
   ],
   "locality_evidence": [
    "News",
    "50,000-Acre, Hydrogen-Powered Data Center Campus Planned In Texas",
    "Energy Abundance Development Corp. unveiled plans Friday for what it is branding Data City, Texas \u2014 a data center megacampus in the Laredo area that [the developer claims](https://finance.yahoo.com/news/energy-abundance-announces-data-city-143100459.html?guccounter=1) will eventually support 5 gigawatts of capacity for [artificial intelligence](https://www.bisnow.com/tags/artificial-intelligence) computing."
   ],
   "state_evidence": [
    "News",
    "50,000-Acre, Hydrogen-Powered Data Center Campus Planned In Texas",
    "Energy Abundance Development Corp. unveiled plans Friday for what it is branding Data City, Texas \u2014 a data center megacampus in the Laredo area that [the developer claims](https://finance.yahoo.com/news/energy-abundance-announces-data-city-143100459.html?guccounter=1) will eventually support 5 gigawatts of capacity for [artificial intelligence](https://www.bisnow.com/tags/artificial-intelligence) computing."
   ],
   "capacity_gw_evidence": [
    "News",
    "50,000-Acre, Hydrogen-Powered Data Center Campus Planned In Texas",
    "Energy Abundance Development Corp. unveiled plans Friday for what it is branding Data City, Texas \u2014 a data center megacampus in the Laredo area that [the developer claims](https://finance.yahoo.com/news/energy-abundance-announces-data-city-143100459.html?guccounter=1) will eventually support 5 gigawatts of capacity for [artificial intelligence](https://www.bisnow.com/tags/artificial-intelligence) computing."
   ],
   "builder_evidence": [
    "News",
    "50,000-Acre, Hydrogen-Powered Data Center Campus Planned In Texas",
    "Energy Abundance Development Corp. unveiled plans Friday for what it is branding Data City, Texas \u2014 a data center megacampus in the Laredo area that [the developer claims](https://finance.yahoo.com/news/energy-abundance-announces-data-city-143100459.html?guccounter=1) will eventually support 5 gigawatts of capacity for [artificial intelligence](https://www.bisnow.com/tags/artificial-intelligence) computing."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "News",
    "50,000-Acre, Hydrogen-Powered Data Center Campus Planned In Texas",
    "Energy Abundance Development Corp. unveiled plans Friday for what it is branding Data City, Texas \u2014 a data center megacampus in the Laredo area that [the developer claims](https://finance.yahoo.com/news/energy-abundance-announces-data-city-143100459.html?guccounter=1) will eventually support 5 gigawatts of capacity for [artificial intelligence](https://www.bisnow.com/tags/artificial-intelligence) computing."
   ],
   "announcement_date_evidence": [
    "News",
    "50,000-Acre, Hydrogen-Powered Data Center Campus Planned In Texas",
    "Energy Abundance Development Corp. unveiled plans Friday for what it is branding Data City, Texas \u2014 a data center megacampus in the Laredo area that [the developer claims](https://finance.yahoo.com/news/energy-abundance-announces-data-city-143100459.html?guccounter=1) will eventually support 5 gigawatts of capacity for [artificial intelligence](https://www.bisnow.com/tags/artificial-intelligence) computing."
   ]
  },
  {
   "url": "https://www.datacentermap.com/usa/utah/salt-lake-city/stratos-hyperscale-campus/",
   "title": "Stratos Hyperscale Campus Data Center in Salt Lake City",
   "published_at": null,
   "project": "Stratos Hyperscale Campus",
   "locality": "Snowville",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "Bitzero Blockchain Inc.",
   "ai_customer": null,
   "status": "proposed",
   "announcement_date": null,
   "project_evidence": [
    "The Stratos Hyperscale Campus, proposed by Bitzero Blockchain Inc. and backed by Kevin O'Leary, is a massive data center development planned for Snowville, Utah."
   ],
   "locality_evidence": [
    "The Stratos Hyperscale Campus, proposed by Bitzero Blockchain Inc. and backed by Kevin O'Leary, is a massive data center development planned for Snowville, Utah."
   ],
   "state_evidence": [
    "The Stratos Hyperscale Campus, proposed by Bitzero Blockchain Inc. and backed by Kevin O'Leary, is a massive data center development planned for Snowville, Utah."
   ],
   "capacity_gw_evidence": [
    "The project, located on approximately 41,200 acres, aims for a potential capacity of up to 9GW of power."
   ],
   "builder_evidence": [
    "The Stratos Hyperscale Campus, proposed by Bitzero Blockchain Inc. and backed by Kevin O'Leary, is a massive data center development planned for Snowville, Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The Stratos Hyperscale Campus, proposed by Bitzero Blockchain Inc. and backed by Kevin O'Leary, is a massive data center development planned for Snowville, Utah."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://cbsnews.com/atlanta/news/georgia-power-gets-clearance-to-serve-openais-massive-ai-data-center-in-effingham-county",
   "title": "Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County\u200b",
   "published_at": "2026-08-27T18:48:39",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "Georgia Power",
   "ai_customer": "OpenAI",
   "status": "cleared state regulatory review",
   "announcement_date": null,
   "project_evidence": [
    "# Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County\u200b",
    "The contract calls for Georgia Power to provide up to 3,200 megawatts of electricity to Project Camellia, with service delivered in phases from 2028 through 2032."
   ],
   "locality_evidence": [
    "# Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County\u200b",
    "Georgia Power's agreement to supply electricity to OpenAI's [massive data center in Effingham County](https://www.cbsnews.com/atlanta/news/openai-is-bringing-a-massive-ai-data-center-to-georgia-heres-what-residents-should-know/) has cleared state regulatory review."
   ],
   "state_evidence": [
    "# Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County\u200b",
    "Georgia Power's agreement to supply electricity to OpenAI's [massive data center in Effingham County](https://www.cbsnews.com/atlanta/news/openai-is-bringing-a-massive-ai-data-center-to-georgia-heres-what-residents-should-know/) has cleared state regulatory review."
   ],
   "capacity_gw_evidence": [
    "# Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County\u200b",
    "The contract calls for Georgia Power to provide up to 3,200 megawatts of electricity to Project Camellia, with service delivered in phases from 2028 through 2032."
   ],
   "builder_evidence": [
    "# Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County\u200b",
    "The contract calls for Georgia Power to provide up to 3,200 megawatts of electricity to Project Camellia, with service delivered in phases from 2028 through 2032."
   ],
   "ai_customer_evidence": [
    "# Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County\u200b",
    "Georgia Power's agreement to supply electricity to OpenAI's [massive data center in Effingham County](https://www.cbsnews.com/atlanta/news/openai-is-bringing-a-massive-ai-data-center-to-georgia-heres-what-residents-should-know/) has cleared state regulatory review."
   ],
   "status_evidence": [
    "# Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County\u200b",
    "Georgia Power's agreement to supply electricity to OpenAI's [massive data center in Effingham County](https://www.cbsnews.com/atlanta/news/openai-is-bringing-a-massive-ai-data-center-to-georgia-heres-what-residents-should-know/) has cleared state regulatory review."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://telborg.com/datacentre-briefings/140",
   "title": "Data Centre Briefing - May 15, 2026 \u00b7 Global Climate News",
   "published_at": null,
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Google",
   "ai_customer": "Google",
   "status": "preliminarily approved",
   "announcement_date": null,
   "project_evidence": [
    "Google Project Cannoli 1GW switchyard approved in Van Buren Meta signs 850MW DESRI solar-plus-storage PPAs across three states Ford Energy targets 20GWh/year BESS for U.S. data centers ERCOT flags 'paper megawatts' in 368GW 2032 forecast",
    "Google\u2019s planned 1GW \u201cProject Cannoli\u201d in Michigan just cleared a key local hurdle \u2014 and it\u2019s a reminder that power infrastructure, not buildings, is now the real gating item for mega-scale AI campuses.",
    "[Google 1GW data center switching station approved in Van Buren](https://telborg.com/datacentres/story/47176278) after the township planning commission granted preliminary approval for the substation and switching station that would serve Google\u2019s 1-gigawatt Project Cannoli."
   ],
   "locality_evidence": [
    "Google Project Cannoli 1GW switchyard approved in Van Buren Meta signs 850MW DESRI solar-plus-storage PPAs across three states Ford Energy targets 20GWh/year BESS for U.S. data centers ERCOT flags 'paper megawatts' in 368GW 2032 forecast",
    "In Van Buren Township, officials preliminarily approved the substation and switching station needed to feed a 282-acre development with demand likened to ~800,000 homes.",
    "[Google 1GW data center switching station approved in Van Buren](https://telborg.com/datacentres/story/47176278) after the township planning commission granted preliminary approval for the substation and switching station that would serve Google\u2019s 1-gigawatt Project Cannoli."
   ],
   "state_evidence": [
    "Google Project Cannoli 1GW switchyard approved in Van Buren Meta signs 850MW DESRI solar-plus-storage PPAs across three states Ford Energy targets 20GWh/year BESS for U.S. data centers ERCOT flags 'paper megawatts' in 368GW 2032 forecast",
    "Google\u2019s planned 1GW \u201cProject Cannoli\u201d in Michigan just cleared a key local hurdle \u2014 and it\u2019s a reminder that power infrastructure, not buildings, is now the real gating item for mega-scale AI campuses.",
    "Put next to Michigan\u2019s 1GW proposal and ERCOT\u2019s \u201cpaper MW\u201d warning, the takeaway is uncomfortable but clear: the macro trend is real, but the forecasting and timing are messy \u2014 and that mess will shape permitting, pricing, and who gets served first."
   ],
   "capacity_gw_evidence": [
    "Google Project Cannoli 1GW switchyard approved in Van Buren Meta signs 850MW DESRI solar-plus-storage PPAs across three states Ford Energy targets 20GWh/year BESS for U.S. data centers ERCOT flags 'paper megawatts' in 368GW 2032 forecast",
    "Google\u2019s planned 1GW \u201cProject Cannoli\u201d in Michigan just cleared a key local hurdle \u2014 and it\u2019s a reminder that power infrastructure, not buildings, is now the real gating item for mega-scale AI campuses.",
    "[Google 1GW data center switching station approved in Van Buren](https://telborg.com/datacentres/story/47176278) after the township planning commission granted preliminary approval for the substation and switching station that would serve Google\u2019s 1-gigawatt Project Cannoli."
   ],
   "builder_evidence": [
    "Google Project Cannoli 1GW switchyard approved in Van Buren Meta signs 850MW DESRI solar-plus-storage PPAs across three states Ford Energy targets 20GWh/year BESS for U.S. data centers ERCOT flags 'paper megawatts' in 368GW 2032 forecast",
    "Google\u2019s planned 1GW \u201cProject Cannoli\u201d in Michigan just cleared a key local hurdle \u2014 and it\u2019s a reminder that power infrastructure, not buildings, is now the real gating item for mega-scale AI campuses.",
    "[Google 1GW data center switching station approved in Van Buren](https://telborg.com/datacentres/story/47176278) after the township planning commission granted preliminary approval for the substation and switching station that would serve Google\u2019s 1-gigawatt Project Cannoli."
   ],
   "ai_customer_evidence": [
    "Google Project Cannoli 1GW switchyard approved in Van Buren Meta signs 850MW DESRI solar-plus-storage PPAs across three states Ford Energy targets 20GWh/year BESS for U.S. data centers ERCOT flags 'paper megawatts' in 368GW 2032 forecast",
    "Google\u2019s planned 1GW \u201cProject Cannoli\u201d in Michigan just cleared a key local hurdle \u2014 and it\u2019s a reminder that power infrastructure, not buildings, is now the real gating item for mega-scale AI campuses.",
    "[Google 1GW data center switching station approved in Van Buren](https://telborg.com/datacentres/story/47176278) after the township planning commission granted preliminary approval for the substation and switching station that would serve Google\u2019s 1-gigawatt Project Cannoli."
   ],
   "status_evidence": [
    "In Van Buren Township, officials preliminarily approved the substation and switching station needed to feed a 282-acre development with demand likened to ~800,000 homes.",
    "[Google 1GW data center switching station approved in Van Buren](https://telborg.com/datacentres/story/47176278) after the township planning commission granted preliminary approval for the substation and switching station that would serve Google\u2019s 1-gigawatt Project Cannoli."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://cryptoworldheadline.com/terawulf-expands-ai-technique-with-1gw-knowledge-campus-and-3b-backing",
   "title": "Terawulf Expands AI Technique With 1GW Knowledge Campus and $3B Backing",
   "published_at": "2026-05-29T00:00:00",
   "project": "Muskie Knowledge Campus",
   "locality": "northeastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "Terawulf Inc.",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": null,
   "project_evidence": [
    "Terawulf Shares Climb 13% as AI Income Overtakes Bitcoin Mining Revenue",
    "The Nasdaq-listed firm mentioned it acquired the \u201cMuskie Knowledge Campus\u201d from Industrial Fairness Companions."
   ],
   "locality_evidence": [
    "Terawulf Shares Climb 13% as AI Income Overtakes Bitcoin Mining Revenue",
    "The location sits contained in the 1,000-acre Eastpark Industrial Park in northeastern Kentucky and contains about 285 acres of owned and managed land."
   ],
   "state_evidence": [
    "Terawulf Shares Climb 13% as AI Income Overtakes Bitcoin Mining Revenue",
    "The acquisition offers Terawulf a second main digital infrastructure campus in Kentucky."
   ],
   "capacity_gw_evidence": [
    "Terawulf Shares Climb 13% as AI Income Overtakes Bitcoin Mining Revenue",
    "Terawulf mentioned the campus is anticipated to help greater than 1 gigawatt of AI and high-performance computing capability."
   ],
   "builder_evidence": [
    "Terawulf Shares Climb 13% as AI Income Overtakes Bitcoin Mining Revenue",
    "Terawulf Inc. is transferring deeper into synthetic intelligence (AI) infrastructure with the acquisition of a big knowledge middle growth web site in japanese Kentucky, underscoring how former bitcoin mining companies are chasing demand for power-hungry computing capability."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Terawulf Shares Climb 13% as AI Income Overtakes Bitcoin Mining Revenue",
    "The Nasdaq-listed firm mentioned it acquired the \u201cMuskie Knowledge Campus\u201d from Industrial Fairness Companions."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://marketchameleon.com/articles/b/2026/7/20/hut-8-beacon-point-ai-contracts-19-6b-investment-grade-tenant-doubles-capacity",
   "title": "Hut 8's Beacon Point AI Campus Hits $19.6B in Contracts as Investment-Grade Tenant Doubles Capacity",
   "published_at": "2026-07-20T07:05:58",
   "project": "Beacon Point",
   "locality": null,
   "state": null,
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": "High-Investment-Grade",
   "status": "fully contracted",
   "announcement_date": null,
   "project_evidence": [
    "# Hut 8's Beacon Point AI Campus Hits $19.6B in Contracts as Investment-Grade Tenant Doubles Capacity",
    "## Second Major Lease Brings Beacon Point to Full Commercialization\u2014What Does This Signal for Data Center Growth?",
    "Hut 8 just landed another 15-year, multi-billion dollar lease at its Beacon Point AI data center campus, pushing the total contracted value for the site to an eye-popping $19.6 billion.",
    "Here's how the full Beacon Point campus comes together after this transaction:",
    "| Campus | Total Utility Capacity (MW) | Contracted IT Capacity (MW) | Tenant Profile | Base-Term Contract Value (Billion $) | Average Annual NOI (Billion $) |",
    "| Beacon Point | 1,000 | 704 | High-Investment-Grade | 19.60 | 1.31 |"
   ],
   "locality_evidence": null,
   "state_evidence": null,
   "capacity_gw_evidence": [
    "# Hut 8's Beacon Point AI Campus Hits $19.6B in Contracts as Investment-Grade Tenant Doubles Capacity",
    "## Second Major Lease Brings Beacon Point to Full Commercialization\u2014What Does This Signal for Data Center Growth?",
    "This means Beacon Point\u2019s entire 1 GW utility capacity\u2014backed by AEP Texas\u2014is now fully contracted.",
    "Here's how the full Beacon Point campus comes together after this transaction:",
    "| Campus | Total Utility Capacity (MW) | Contracted IT Capacity (MW) | Tenant Profile | Base-Term Contract Value (Billion $) | Average Annual NOI (Billion $) |",
    "| Beacon Point | 1,000 | 704 | High-Investment-Grade | 19.60 | 1.31 |"
   ],
   "builder_evidence": [
    "# Hut 8's Beacon Point AI Campus Hits $19.6B in Contracts as Investment-Grade Tenant Doubles Capacity",
    "## Second Major Lease Brings Beacon Point to Full Commercialization\u2014What Does This Signal for Data Center Growth?",
    "Hut 8 just landed another 15-year, multi-billion dollar lease at its Beacon Point AI data center campus, pushing the total contracted value for the site to an eye-popping $19.6 billion."
   ],
   "ai_customer_evidence": [
    "# Hut 8's Beacon Point AI Campus Hits $19.6B in Contracts as Investment-Grade Tenant Doubles Capacity",
    "## Second Major Lease Brings Beacon Point to Full Commercialization\u2014What Does This Signal for Data Center Growth?",
    "A single high-investment-grade tenant has now doubled its commitment\u2014moving from 352 MW to 704 MW of IT capacity in just one transaction.",
    "Here's how the full Beacon Point campus comes together after this transaction:",
    "| Campus | Total Utility Capacity (MW) | Contracted IT Capacity (MW) | Tenant Profile | Base-Term Contract Value (Billion $) | Average Annual NOI (Billion $) |",
    "| Beacon Point | 1,000 | 704 | High-Investment-Grade | 19.60 | 1.31 |"
   ],
   "status_evidence": [
    "# Hut 8's Beacon Point AI Campus Hits $19.6B in Contracts as Investment-Grade Tenant Doubles Capacity",
    "## Second Major Lease Brings Beacon Point to Full Commercialization\u2014What Does This Signal for Data Center Growth?",
    "This means Beacon Point\u2019s entire 1 GW utility capacity\u2014backed by AEP Texas\u2014is now fully contracted."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://msp-channel.com/news/68602/ecl-celebrates-one-gigawatt-off-grid-hydrogen-powered-ai-factory-dc",
   "title": "ECL celebrates one gigawatt, off-grid, hydrogen-powered AI factory DC",
   "published_at": "2024-09-26T15:27:18",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# ECL celebrates one gigawatt, off-grid, hydrogen-powered AI factory DC",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "locality_evidence": [
    "# ECL celebrates one gigawatt, off-grid, hydrogen-powered AI factory DC",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "state_evidence": [
    "# ECL celebrates one gigawatt, off-grid, hydrogen-powered AI factory DC",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "capacity_gw_evidence": [
    "# ECL celebrates one gigawatt, off-grid, hydrogen-powered AI factory DC",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "builder_evidence": [
    "# ECL celebrates one gigawatt, off-grid, hydrogen-powered AI factory DC",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "ai_customer_evidence": [
    "# ECL celebrates one gigawatt, off-grid, hydrogen-powered AI factory DC",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://beincrypto.com/nvidia-105-billion-openai-ohio-campus?.tsrc=rss",
   "title": "Nvidia Backs OpenAI\u2019s Ohio AI Data Center Leases With $105 Billion Guarantee",
   "published_at": "2026-08-18T09:49:06",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "Nvidia agreed to guarantee up to $105 billion in conditional lease obligations for a new OpenAI data center campus in Pike County, Ohio, according to a securities filing.",
    "SB Energy will build, own, and operate the PORTS-Pike Technology Campus in Pike County under a 20-year lease to OpenAI.**** Nvidia [signed multiple residual value ](https://beincrypto.com/nvidia-stock-earnings-selloff-tsmc-ciena-analysis/)guarantees covering roughly 4.25 gigawatts of information technology load."
   ],
   "locality_evidence": [
    "Nvidia agreed to guarantee up to $105 billion in conditional lease obligations for a new OpenAI data center campus in Pike County, Ohio, according to a securities filing.",
    "SB Energy will build, own, and operate the PORTS-Pike Technology Campus in Pike County under a 20-year lease to OpenAI.**** Nvidia [signed multiple residual value ](https://beincrypto.com/nvidia-stock-earnings-selloff-tsmc-ciena-analysis/)guarantees covering roughly 4.25 gigawatts of information technology load."
   ],
   "state_evidence": [
    "Nvidia agreed to guarantee up to $105 billion in conditional lease obligations for a new OpenAI data center campus in Pike County, Ohio, according to a securities filing.",
    "SB Energy will build, own, and operate the PORTS-Pike Technology Campus in Pike County under a 20-year lease to OpenAI.**** Nvidia [signed multiple residual value ](https://beincrypto.com/nvidia-stock-earnings-selloff-tsmc-ciena-analysis/)guarantees covering roughly 4.25 gigawatts of information technology load."
   ],
   "capacity_gw_evidence": [
    "The guarantee covers an initial 4.25 information technology gigawatts of compute capacity, a measure of power delivered to servers, with an option on a further 3.75.",
    "Nvidia secured the initial 4.25 gigawatts and holds an option, at its sole discretion, over the remaining 3.75 gigawatts."
   ],
   "builder_evidence": [
    "SB Energy will build, own, and operate the PORTS-Pike Technology Campus in Pike County under a 20-year lease to OpenAI.**** Nvidia [signed multiple residual value ](https://beincrypto.com/nvidia-stock-earnings-selloff-tsmc-ciena-analysis/)guarantees covering roughly 4.25 gigawatts of information technology load."
   ],
   "ai_customer_evidence": [
    "Nvidia agreed to guarantee up to $105 billion in conditional lease obligations for a new OpenAI data center campus in Pike County, Ohio, according to a securities filing.",
    "SB Energy will build, own, and operate the PORTS-Pike Technology Campus in Pike County under a 20-year lease to OpenAI.**** Nvidia [signed multiple residual value ](https://beincrypto.com/nvidia-stock-earnings-selloff-tsmc-ciena-analysis/)guarantees covering roughly 4.25 gigawatts of information technology load."
   ],
   "status_evidence": [
    "Nvidia agreed to guarantee up to $105 billion in conditional lease obligations for a new OpenAI data center campus in Pike County, Ohio, according to a securities filing."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://redact.dev/blog/full-list-of-known-and-upcoming-facebook-datacenters-as-of-may-2026",
   "title": "Full list of known and upcoming Facebook datacenters as of May 2026.",
   "published_at": "2026-04-29T02:51:50",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "Full list of known and upcoming Facebook datacenters as of May 2026.",
    "### What Are Hyperion and Prometheus, Meta\u2019s New AI Mega-Campuses?",
    "**Hyperion** in Richland Parish, Louisiana, will be Meta\u2019s largest data center ever."
   ],
   "locality_evidence": [
    "Full list of known and upcoming Facebook datacenters as of May 2026.",
    "### What Are Hyperion and Prometheus, Meta\u2019s New AI Mega-Campuses?",
    "**Hyperion** in Richland Parish, Louisiana, will be Meta\u2019s largest data center ever."
   ],
   "state_evidence": [
    "Full list of known and upcoming Facebook datacenters as of May 2026.",
    "### What Are Hyperion and Prometheus, Meta\u2019s New AI Mega-Campuses?",
    "**Hyperion** in Richland Parish, Louisiana, will be Meta\u2019s largest data center ever."
   ],
   "capacity_gw_evidence": [
    "Full list of known and upcoming Facebook datacenters as of May 2026.",
    "### What Are Hyperion and Prometheus, Meta\u2019s New AI Mega-Campuses?",
    "**Hyperion** in Richland Parish, Louisiana, will be Meta\u2019s largest data center ever.",
    "Initial capacity is 2 GW by 2030, scaling toward 5 GW over time."
   ],
   "builder_evidence": [
    "Full list of known and upcoming Facebook datacenters as of May 2026.",
    "### What Are Hyperion and Prometheus, Meta\u2019s New AI Mega-Campuses?",
    "**Hyperion** in Richland Parish, Louisiana, will be Meta\u2019s largest data center ever."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Full list of known and upcoming Facebook datacenters as of May 2026.",
    "#### Hyperion (Richland Parish, Louisiana)",
    "Status",
    "Under construction"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://redact.dev/blog/full-list-of-known-and-upcoming-facebook-datacenters-as-of-may-2026",
   "title": "Full list of known and upcoming Facebook datacenters as of May 2026.",
   "published_at": "2026-04-29T02:51:50",
   "project": "Prometheus",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "Coming online 2026",
   "announcement_date": null,
   "project_evidence": [
    "Full list of known and upcoming Facebook datacenters as of May 2026.",
    "### What Are Hyperion and Prometheus, Meta\u2019s New AI Mega-Campuses?",
    "**Prometheus** in New Albany, Ohio, will be the world\u2019s first gigawatt-scale data center when it comes online in 2026."
   ],
   "locality_evidence": [
    "Full list of known and upcoming Facebook datacenters as of May 2026.",
    "### What Are Hyperion and Prometheus, Meta\u2019s New AI Mega-Campuses?",
    "**Prometheus** in New Albany, Ohio, will be the world\u2019s first gigawatt-scale data center when it comes online in 2026."
   ],
   "state_evidence": [
    "Full list of known and upcoming Facebook datacenters as of May 2026.",
    "### What Are Hyperion and Prometheus, Meta\u2019s New AI Mega-Campuses?",
    "**Prometheus** in New Albany, Ohio, will be the world\u2019s first gigawatt-scale data center when it comes online in 2026."
   ],
   "capacity_gw_evidence": [
    "Full list of known and upcoming Facebook datacenters as of May 2026.",
    "### What Are Hyperion and Prometheus, Meta\u2019s New AI Mega-Campuses?",
    "**Prometheus** in New Albany, Ohio, will be the world\u2019s first gigawatt-scale data center when it comes online in 2026.",
    "Capacity",
    "1 GW (scaling to 1.5 GW)"
   ],
   "builder_evidence": [
    "Full list of known and upcoming Facebook datacenters as of May 2026.",
    "### What Are Hyperion and Prometheus, Meta\u2019s New AI Mega-Campuses?",
    "**Prometheus** in New Albany, Ohio, will be the world\u2019s first gigawatt-scale data center when it comes online in 2026."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Full list of known and upcoming Facebook datacenters as of May 2026.",
    "#### Prometheus (New Albany, Ohio)",
    "Status",
    "Coming online 2026"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://redact.dev/blog/full-list-of-known-and-upcoming-facebook-datacenters-as-of-may-2026",
   "title": "Full list of known and upcoming Facebook datacenters as of May 2026.",
   "published_at": "2026-04-29T02:51:50",
   "project": "Lebanon",
   "locality": "Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "Full list of known and upcoming Facebook datacenters as of May 2026.",
    "#### Lebanon, Indiana",
    "Once operational, the campus will deliver approximately 1 GW of total capacity."
   ],
   "locality_evidence": [
    "Full list of known and upcoming Facebook datacenters as of May 2026.",
    "#### Lebanon, Indiana",
    "Located in the LEAP Research and Innovation District west of Interstate 65, Lebanon will be Meta\u2019s 31st data center globally and 27th in the United States."
   ],
   "state_evidence": [
    "Full list of known and upcoming Facebook datacenters as of May 2026.",
    "#### Lebanon, Indiana",
    "Located in the LEAP Research and Innovation District west of Interstate 65, Lebanon will be Meta\u2019s 31st data center globally and 27th in the United States."
   ],
   "capacity_gw_evidence": [
    "Full list of known and upcoming Facebook datacenters as of May 2026.",
    "#### Lebanon, Indiana",
    "Once operational, the campus will deliver approximately 1 GW of total capacity."
   ],
   "builder_evidence": [
    "Full list of known and upcoming Facebook datacenters as of May 2026.",
    "#### Lebanon, Indiana",
    "Located in the LEAP Research and Innovation District west of Interstate 65, Lebanon will be Meta\u2019s 31st data center globally and 27th in the United States."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Full list of known and upcoming Facebook datacenters as of May 2026.",
    "#### Lebanon, Indiana",
    "Status",
    "Under construction"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://theoutpost.ai/news-story/amazon-opens-11-billion-ai-data-center-campus-for-anthropic-in-indiana-21303",
   "title": "Amazon's $11 Billion Project Rainier AI Megacluster Goes Live, Rivaling OpenAI's Stargate Initiative",
   "published_at": "2025-12-04T12:56:20",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon Web Services",
   "ai_customer": "Anthropic",
   "status": "operational",
   "announcement_date": "2024-10-29",
   "project_evidence": [
    "Amazon Web Services today announced that Project Rainier, its Stargate-rivaling AI \"UltraCluster\", is now up and running, with \"nearly half a million\" Trainium2 chips serving the massive machine across multiple datacenters.",
    "Amazon's $11 Billion Project Rainier AI Megacluster Goes Live, Rivaling OpenAI's Stargate Initiative"
   ],
   "locality_evidence": [
    "NEW CARLISLE, Indiana -- A year ago, it was farmland.",
    "Amazon opens $11 billion AI data center in rural Indiana as rivals race to break ground"
   ],
   "state_evidence": [
    "An AWS spokesperson told us in July that one site in Indiana that is now partially online as part of the Rainier cluster will eventually span 30 datacenter buildings, each measuring 200,000 square feet.",
    "Amazon's $11 Billion Project Rainier AI Megacluster Goes Live, Rivaling OpenAI's Stargate Initiative"
   ],
   "capacity_gw_evidence": [
    "Further down the line, AWS will reportedly construct another 23 buildings that are expected to increase the site's data center capacity to over 2.2 gigawatts.",
    "AWS opens $11B Project Rainier data center campus built for Anthropic - SiliconANGLE"
   ],
   "builder_evidence": [
    "Amazon Web Services today announced that Project Rainier, its Stargate-rivaling AI \"UltraCluster\", is now up and running, with \"nearly half a million\" Trainium2 chips serving the massive machine across multiple datacenters.",
    "Amazon's $11 Billion Project Rainier AI Megacluster Goes Live, Rivaling OpenAI's Stargate Initiative"
   ],
   "ai_customer_evidence": [
    "The cluster is already being used by Amazon's AI partners at Anthropic, who the company said will be scaling \"to be on more than 1 million Trainium2 chips - for workloads including training and inference - by the end of the year.\"",
    "Amazon's $11 Billion Project Rainier AI Megacluster Goes Live, Rivaling OpenAI's Stargate Initiative"
   ],
   "status_evidence": [
    "Amazon Web Services today announced that Project Rainier, its Stargate-rivaling AI \"UltraCluster\", is now up and running, with \"nearly half a million\" Trainium2 chips serving the massive machine across multiple datacenters.",
    "Amazon's $11 Billion Project Rainier AI Megacluster Goes Live, Rivaling OpenAI's Stargate Initiative"
   ],
   "announcement_date_evidence": [
    "The campus, which is located near Lake Michigan, was built as part of an initiative called Project Rainier that AWS announced last year.",
    "AWS opens $11B Project Rainier data center campus built for Anthropic - SiliconANGLE"
   ]
  },
  {
   "url": "https://baxtel.com/data-center/xai-macrohardrr",
   "title": "xAI: MACROHARDRR",
   "published_at": null,
   "project": "MACROHARDRR",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "",
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "# xAI: MACROHARDRR",
    "Located at in Southaven, Mississippi, the new MACROHARDRR facility serves as the third cornerstone of Elon Musk\u2019s \"Greater Memphis\" AI campus."
   ],
   "locality_evidence": [
    "# xAI: MACROHARDRR",
    "Located at in Southaven, Mississippi, the new MACROHARDRR facility serves as the third cornerstone of Elon Musk\u2019s \"Greater Memphis\" AI campus."
   ],
   "state_evidence": [
    "# xAI: MACROHARDRR",
    "Located at in Southaven, Mississippi, the new MACROHARDRR facility serves as the third cornerstone of Elon Musk\u2019s \"Greater Memphis\" AI campus."
   ],
   "capacity_gw_evidence": [
    "# xAI: MACROHARDRR",
    "This initial rollout will push the regional cluster's active capacity to approximately 1.5 GW, with the ultimate goal of reaching nearly 2 GW and over one million GPUs by late 2026 to support the training of Grok-5 and beyond."
   ],
   "builder_evidence": [
    "# xAI: MACROHARDRR",
    "Located at in Southaven, Mississippi, the new MACROHARDRR facility serves as the third cornerstone of Elon Musk\u2019s \"Greater Memphis\" AI campus."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# xAI: MACROHARDRR",
    "Under ConstructionOperational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mlq.ai/news/anthropic-reportedly-commits-45b-to-nscales-460mw-west-virginia-campus",
   "title": "Anthropic Reportedly Commits $45B to Nscale\u2019s 460MW West Virginia Campus",
   "published_at": "2026-08-28T13:07:39",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 1.35,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Anthropic Reportedly Commits $45B to Nscale\u2019s 460MW West Virginia Campus",
    "The capacity is tied to Nscale\u2019s Monarch Compute Campus in Mason County, West Virginia. [[2]](https://www.nscale.com/ai-infrastructure/monarch) ([nscale.com](https://www.nscale.com/ai-infrastructure/monarch?utm_source=openai))",
    "## Monarch Compute Campus",
    "Nscale acquired the Monarch Compute Campus in March 2026 through its purchase of American Intelligence & Power Corporation."
   ],
   "locality_evidence": [
    "# Anthropic Reportedly Commits $45B to Nscale\u2019s 460MW West Virginia Campus",
    "The capacity is tied to Nscale\u2019s Monarch Compute Campus in Mason County, West Virginia. [[2]](https://www.nscale.com/ai-infrastructure/monarch) ([nscale.com](https://www.nscale.com/ai-infrastructure/monarch?utm_source=openai))",
    "## Monarch Compute Campus",
    "The company describes the site as a state-certified AI microgrid in Mason County with a potential expansion path above 8GW. [[4]](https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) ([datacenterdynamics.com](https://www.datacenterdynamics.com/en/broadcasts/building-at-scale-nam/2026/?utm_source=openai))"
   ],
   "state_evidence": [
    "# Anthropic Reportedly Commits $45B to Nscale\u2019s 460MW West Virginia Campus",
    "The capacity is tied to Nscale\u2019s Monarch Compute Campus in Mason County, West Virginia. [[2]](https://www.nscale.com/ai-infrastructure/monarch) ([nscale.com](https://www.nscale.com/ai-infrastructure/monarch?utm_source=openai))",
    "## Monarch Compute Campus",
    "The West Virginia Department of Environmental Protection lists a construction permit application for Monarch Cloud Campus, LLC at Point Pleasant, supporting the project\u2019s location and announced-development status. [[5]](https://dep-auth.wv.gov/daq/permitting/Pages/NSR-Permit-Applications.aspx) ([datacenterdynamics.com](https://www.datacenterdynamics.com/en/news/?creativeId=138372892646&google_preview=bFyeALmxOqkY9924jQYw9_ntlAaIAYCAgKCfg-LomQE&iu=21796610478&lineItemId=5843939203&page=10&utm_source=openai))"
   ],
   "capacity_gw_evidence": [
    "# Anthropic Reportedly Commits $45B to Nscale\u2019s 460MW West Virginia Campus",
    "Nscale\u2019s current project materials describe a 1.35GW Phase 1 and delivery targeted for early 2028. [[2]](https://www.nscale.com/ai-infrastructure/monarch) ([nscale.com](https://www.nscale.com/ai-infrastructure/monarch?utm_source=openai))"
   ],
   "builder_evidence": [
    "# Anthropic Reportedly Commits $45B to Nscale\u2019s 460MW West Virginia Campus",
    "Nscale acquired the Monarch Compute Campus in March 2026 through its purchase of American Intelligence & Power Corporation."
   ],
   "ai_customer_evidence": [
    "# Anthropic Reportedly Commits $45B to Nscale\u2019s 460MW West Virginia Campus",
    "Nscale\u2019s earlier public announcement identified Microsoft as the customer in a letter of intent for up to 1.35GW at Monarch. That announcement does not establish whether the reported Anthropic agreement replaces, supplements or otherwise relates to the Microsoft arrangement. [[4]](https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) ([datacenterdynamics.com](https://www.datacenterdynamics.com/en/broadcasts/building-at-scale-nam/2026/?utm_source=openai))"
   ],
   "status_evidence": [
    "# Anthropic Reportedly Commits $45B to Nscale\u2019s 460MW West Virginia Campus"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://digitalapplied.com/blog/openai-project-camellia-30b-georgia-compute-buildout",
   "title": "OpenAI's $30B Georgia Campus and the Compute Crunch Ahead",
   "published_at": "2026-07-24T23:00:00",
   "project": "Project Camellia",
   "locality": "Rincon",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "OpenAI\u2019s Project Camellia \u2014 announced July 22, 2026 \u2014 is a 3.2 gigawatt data center campus in Effingham County, Georgia, with an initial disclosed investment of at least $20 billion and a reported full build-out cost above $30 billion.",
    "## 01 \u2014 The AnnouncementWhat OpenAI actually announced in *Georgia*.",
    "On July 22, 2026, OpenAI announced **Project Camellia**: a data center campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia, near the town of Rincon."
   ],
   "locality_evidence": [
    "On July 22, 2026, OpenAI announced **Project Camellia**: a data center campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia, near the town of Rincon.",
    "## 01 \u2014 The AnnouncementWhat OpenAI actually announced in *Georgia*."
   ],
   "state_evidence": [
    "OpenAI\u2019s Project Camellia \u2014 announced July 22, 2026 \u2014 is a 3.2 gigawatt data center campus in Effingham County, Georgia, with an initial disclosed investment of at least $20 billion and a reported full build-out cost above $30 billion.",
    "## 01 \u2014 The AnnouncementWhat OpenAI actually announced in *Georgia*.",
    "On July 22, 2026, OpenAI announced **Project Camellia**: a data center campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia, near the town of Rincon."
   ],
   "capacity_gw_evidence": [
    "OpenAI\u2019s Project Camellia \u2014 announced July 22, 2026 \u2014 is a 3.2 gigawatt data center campus in Effingham County, Georgia, with an initial disclosed investment of at least $20 billion and a reported full build-out cost above $30 billion.",
    "## 01 \u2014 The AnnouncementWhat OpenAI actually announced in *Georgia*."
   ],
   "builder_evidence": [
    "OpenAI\u2019s Project Camellia \u2014 announced July 22, 2026 \u2014 is a 3.2 gigawatt data center campus in Effingham County, Georgia, with an initial disclosed investment of at least $20 billion and a reported full build-out cost above $30 billion.",
    "## 01 \u2014 The AnnouncementWhat OpenAI actually announced in *Georgia*.",
    "On July 22, 2026, OpenAI announced **Project Camellia**: a data center campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia, near the town of Rincon."
   ],
   "ai_customer_evidence": [
    "OpenAI\u2019s Project Camellia \u2014 announced July 22, 2026 \u2014 is a 3.2 gigawatt data center campus in Effingham County, Georgia, with an initial disclosed investment of at least $20 billion and a reported full build-out cost above $30 billion.",
    "## 01 \u2014 The AnnouncementWhat OpenAI actually announced in *Georgia*.",
    "On July 22, 2026, OpenAI announced **Project Camellia**: a data center campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia, near the town of Rincon."
   ],
   "status_evidence": [
    "OpenAI\u2019s Project Camellia \u2014 announced July 22, 2026 \u2014 is a 3.2 gigawatt data center campus in Effingham County, Georgia, with an initial disclosed investment of at least $20 billion and a reported full build-out cost above $30 billion.",
    "## 01 \u2014 The AnnouncementWhat OpenAI actually announced in *Georgia*."
   ],
   "announcement_date_evidence": [
    "OpenAI\u2019s Project Camellia \u2014 announced July 22, 2026 \u2014 is a 3.2 gigawatt data center campus in Effingham County, Georgia, with an initial disclosed investment of at least $20 billion and a reported full build-out cost above $30 billion.",
    "## 01 \u2014 The AnnouncementWhat OpenAI actually announced in *Georgia*.",
    "On July 22, 2026, OpenAI announced **Project Camellia**: a data center campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia, near the town of Rincon."
   ]
  },
  {
   "url": "https://cryptobriefing.com/hut-8-beacon-point-ai-data-center-lease",
   "title": "Hut 8 inks $9.8B lease for 352MW at Beacon Point, doubling campus capacity to 704MW",
   "published_at": "2026-07-20T11:55:01",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "commercialize",
   "announcement_date": null,
   "project_evidence": [
    "Hut 8 just signed its second 15-year lease at the Beacon Point campus in Nueces County, Texas, locking in another 352 MW of IT capacity worth $9.8 billion.",
    "## The Beacon Point buildout"
   ],
   "locality_evidence": [
    "Hut 8 just signed its second 15-year lease at the Beacon Point campus in Nueces County, Texas, locking in another 352 MW of IT capacity worth $9.8 billion.",
    "## The Beacon Point buildout"
   ],
   "state_evidence": [
    "Hut 8 just signed its second 15-year lease at the Beacon Point campus in Nueces County, Texas, locking in another 352 MW of IT capacity worth $9.8 billion.",
    "## The Beacon Point buildout"
   ],
   "capacity_gw_evidence": [
    "Together, the two phases fully commercialize the Beacon Point campus, which has secured 1,000 MW of utility capacity to support the 704 MW of IT load.",
    "## The Beacon Point buildout"
   ],
   "builder_evidence": [
    "Hut 8 just signed its second 15-year lease at the Beacon Point campus in Nueces County, Texas, locking in another 352 MW of IT capacity worth $9.8 billion.",
    "## The Beacon Point buildout"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Together, the two phases fully commercialize the Beacon Point campus, which has secured 1,000 MW of utility capacity to support the 704 MW of IT load.",
    "## The Beacon Point buildout"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://awesomeagents.ai/news/meta-tent-data-centers-ai-build",
   "title": "Meta Deploys Tent Data Centers to Halve AI Build Time",
   "published_at": "2026-06-05T00:02:31",
   "project": "Prometheus",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "Meta is building tent-style rapid deployment structures at its Ohio Prometheus facility, cutting construction timelines roughly in half and bypassing grid delays with off-grid gas power.",
    "Meta built six tent-based \"rapid deployment structures\" at its 1 GW Prometheus facility in New Albany, Ohio, cutting construction time roughly in half",
    "## Meta's Infrastructure Portfolio",
    "| Facility | Location | Power Target | Deployment Method | Expected Online |",
    "| Prometheus | New Albany, OH | 1 GW+ | Tent structures + off-grid gas turbines | 2026 |"
   ],
   "locality_evidence": [
    "Meta built six tent-based \"rapid deployment structures\" at its 1 GW Prometheus facility in New Albany, Ohio, cutting construction time roughly in half",
    "## Meta's Infrastructure Portfolio",
    "| Facility | Location | Power Target | Deployment Method | Expected Online |",
    "| Prometheus | New Albany, OH | 1 GW+ | Tent structures + off-grid gas turbines | 2026 |"
   ],
   "state_evidence": [
    "Meta is building tent-style rapid deployment structures at its Ohio Prometheus facility, cutting construction timelines roughly in half and bypassing grid delays with off-grid gas power.",
    "Meta built six tent-based \"rapid deployment structures\" at its 1 GW Prometheus facility in New Albany, Ohio, cutting construction time roughly in half",
    "## Meta's Infrastructure Portfolio",
    "| Facility | Location | Power Target | Deployment Method | Expected Online |",
    "| Prometheus | New Albany, OH | 1 GW+ | Tent structures + off-grid gas turbines | 2026 |"
   ],
   "capacity_gw_evidence": [
    "Meta built six tent-based \"rapid deployment structures\" at its 1 GW Prometheus facility in New Albany, Ohio, cutting construction time roughly in half",
    "Prometheus targets over 1 GW by end of 2026; Hyperion in Louisiana plans for up to 5 GW over several years",
    "## Meta's Infrastructure Portfolio",
    "| Facility | Location | Power Target | Deployment Method | Expected Online |",
    "| Prometheus | New Albany, OH | 1 GW+ | Tent structures + off-grid gas turbines | 2026 |"
   ],
   "builder_evidence": [
    "Meta is building tent-style rapid deployment structures at its Ohio Prometheus facility, cutting construction timelines roughly in half and bypassing grid delays with off-grid gas power.",
    "Meta built six tent-based \"rapid deployment structures\" at its 1 GW Prometheus facility in New Albany, Ohio, cutting construction time roughly in half",
    "## Meta's Infrastructure Portfolio",
    "| Facility | Location | Power Target | Deployment Method | Expected Online |",
    "| Prometheus | New Albany, OH | 1 GW+ | Tent structures + off-grid gas turbines | 2026 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Meta is building tent-style rapid deployment structures at its Ohio Prometheus facility, cutting construction timelines roughly in half and bypassing grid delays with off-grid gas power.",
    "Meta built six tent-based \"rapid deployment structures\" at its 1 GW Prometheus facility in New Albany, Ohio, cutting construction time roughly in half",
    "## Meta's Infrastructure Portfolio",
    "| Facility | Location | Power Target | Deployment Method | Expected Online |",
    "| Prometheus | New Albany, OH | 1 GW+ | Tent structures + off-grid gas turbines | 2026 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://awesomeagents.ai/news/meta-tent-data-centers-ai-build",
   "title": "Meta Deploys Tent Data Centers to Halve AI Build Time",
   "published_at": "2026-06-05T00:02:31",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Prometheus targets over 1 GW by end of 2026; Hyperion in Louisiana plans for up to 5 GW over several years",
    "## Meta's Infrastructure Portfolio",
    "| Facility | Location | Power Target | Deployment Method | Expected Online |",
    "| Hyperion | Richland Parish, LA | Up to 5 GW | Conventional + expansion | Multi-year |"
   ],
   "locality_evidence": [
    "## Meta's Infrastructure Portfolio",
    "| Facility | Location | Power Target | Deployment Method | Expected Online |",
    "| Hyperion | Richland Parish, LA | Up to 5 GW | Conventional + expansion | Multi-year |"
   ],
   "state_evidence": [
    "Prometheus targets over 1 GW by end of 2026; Hyperion in Louisiana plans for up to 5 GW over several years",
    "## Meta's Infrastructure Portfolio",
    "| Facility | Location | Power Target | Deployment Method | Expected Online |",
    "| Hyperion | Richland Parish, LA | Up to 5 GW | Conventional + expansion | Multi-year |"
   ],
   "capacity_gw_evidence": [
    "Prometheus targets over 1 GW by end of 2026; Hyperion in Louisiana plans for up to 5 GW over several years",
    "Hyperion, Meta's Louisiana project, is planned at a scale that's hard to process: 2,250 acres, four million square feet of floor area, and the potential to reach 5 GW over several years - a footprint comparable to a significant chunk of Manhattan.",
    "## Meta's Infrastructure Portfolio",
    "| Facility | Location | Power Target | Deployment Method | Expected Online |",
    "| Hyperion | Richland Parish, LA | Up to 5 GW | Conventional + expansion | Multi-year |"
   ],
   "builder_evidence": [
    "Hyperion, Meta's Louisiana project, is planned at a scale that's hard to process: 2,250 acres, four million square feet of floor area, and the potential to reach 5 GW over several years - a footprint comparable to a significant chunk of Manhattan.",
    "## Meta's Infrastructure Portfolio",
    "| Facility | Location | Power Target | Deployment Method | Expected Online |",
    "| Hyperion | Richland Parish, LA | Up to 5 GW | Conventional + expansion | Multi-year |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Prometheus targets over 1 GW by end of 2026; Hyperion in Louisiana plans for up to 5 GW over several years",
    "Hyperion, Meta's Louisiana project, is planned at a scale that's hard to process: 2,250 acres, four million square feet of floor area, and the potential to reach 5 GW over several years - a footprint comparable to a significant chunk of Manhattan.",
    "## Meta's Infrastructure Portfolio",
    "| Facility | Location | Power Target | Deployment Method | Expected Online |",
    "| Hyperion | Richland Parish, LA | Up to 5 GW | Conventional + expansion | Multi-year |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://epoch.ai/data/ai-data-centers/directory/colossus-2",
   "title": "Colossus 2 | AI Data Centers",
   "published_at": null,
   "project": "Colossus 2",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 1.531,
   "builder": "SpaceXAI",
   "ai_customer": "Anthropic, Cursor, SpaceXAI",
   "status": "Operational",
   "announcement_date": null,
   "project_evidence": [
    "# Colossus 2",
    "Colossus 2 is an operational AI data center with AI chips owned by SpaceXAI and used by Anthropic, Cursor, and SpaceXAI."
   ],
   "locality_evidence": [
    "Memphis, Tennessee, United States",
    "# Colossus 2"
   ],
   "state_evidence": [
    "Memphis, Tennessee, United States",
    "# Colossus 2"
   ],
   "capacity_gw_evidence": [
    "In Q1 2027, we project it to rise to 1,824k H100-eq compute, 1,531 MW IT power and a cost of $58.0 B.",
    "# Colossus 2"
   ],
   "builder_evidence": [
    "Colossus 2 is an operational AI data center with AI chips owned by SpaceXAI and used by Anthropic, Cursor, and SpaceXAI.",
    "# Colossus 2"
   ],
   "ai_customer_evidence": [
    "Colossus 2 is an operational AI data center with AI chips owned by SpaceXAI and used by Anthropic, Cursor, and SpaceXAI.",
    "# Colossus 2"
   ],
   "status_evidence": [
    "Colossus 2 is an operational AI data center with AI chips owned by SpaceXAI and used by Anthropic, Cursor, and SpaceXAI.",
    "# Colossus 2"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://edgen.tech/ko/news/post/nvidia-invests-3-billion-in-lancium-as-ai-power-race-tightens",
   "title": "Nvidia invests $3 billion in Lancium as AI power race tightens",
   "published_at": "2026-08-15T15:01:15",
   "project": "Abilene Clean Campus",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Lancium",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "# Nvidia invests $3 billion in Lancium as AI power race tightens",
    "Lancium's Abilene Clean Campus in Texas spans about 1,000 acres with a 1.2-gigawatt grid interconnection approved by ERCOT, and the company is developing a 1.0 GW campus in Childress, Texas."
   ],
   "locality_evidence": [
    "# Nvidia invests $3 billion in Lancium as AI power race tightens",
    "Lancium's Abilene Clean Campus in Texas spans about 1,000 acres with a 1.2-gigawatt grid interconnection approved by ERCOT, and the company is developing a 1.0 GW campus in Childress, Texas."
   ],
   "state_evidence": [
    "# Nvidia invests $3 billion in Lancium as AI power race tightens",
    "Lancium's Abilene Clean Campus in Texas spans about 1,000 acres with a 1.2-gigawatt grid interconnection approved by ERCOT, and the company is developing a 1.0 GW campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "# Nvidia invests $3 billion in Lancium as AI power race tightens",
    "Lancium's Abilene Clean Campus in Texas spans about 1,000 acres with a 1.2-gigawatt grid interconnection approved by ERCOT, and the company is developing a 1.0 GW campus in Childress, Texas."
   ],
   "builder_evidence": [
    "# Nvidia invests $3 billion in Lancium as AI power race tightens",
    "Lancium's Abilene Clean Campus in Texas spans about 1,000 acres with a 1.2-gigawatt grid interconnection approved by ERCOT, and the company is developing a 1.0 GW campus in Childress, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Nvidia invests $3 billion in Lancium as AI power race tightens",
    "Lancium's Abilene Clean Campus in Texas spans about 1,000 acres with a 1.2-gigawatt grid interconnection approved by ERCOT, and the company is developing a 1.0 GW campus in Childress, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://newspub.live/south/west-virginia/nscale-signs-1-35gw-microsoft-loi-for-a-west-virginia-ai-campus",
   "title": "Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus",
   "published_at": "2026-03-17T08:34:06",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "announced",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus",
    "The deployment will sit on a site Nscale has simultaneously acquired, the Monarch Compute Campus, a 2,250-acre plot in Mason County that Nscale describes as the first state-certified AI microgrid in the United States, with an on-site power potential scalable to over eight gigawatts."
   ],
   "locality_evidence": [
    "Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus",
    "Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity at a new campus in Mason County, West Virginia, deploying NVIDIA\u2019s next-generation Vera Rubin NVL72 GPUs at what it describes as the first large-scale commercial rollout of the Vera Rubin DSX AI Factory reference architecture."
   ],
   "state_evidence": [
    "Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus",
    "Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity at a new campus in Mason County, West Virginia, deploying NVIDIA\u2019s next-generation Vera Rubin NVL72 GPUs at what it describes as the first large-scale commercial rollout of the Vera Rubin DSX AI Factory reference architecture."
   ],
   "capacity_gw_evidence": [
    "Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus",
    "Announced at GTC 2026, the deal covers around 430,000 next-generation NVIDIA GPUs, is backed by a Caterpillar natural gas power deal, and is built on a site described as the US\u2019s first state-certified AI microgrid, with an 8GW potential footprint.",
    "The deployment will sit on a site Nscale has simultaneously acquired, the Monarch Compute Campus, a 2,250-acre plot in Mason County that Nscale describes as the first state-certified AI microgrid in the United States, with an on-site power potential scalable to over eight gigawatts."
   ],
   "builder_evidence": [
    "Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus",
    "Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity at a new campus in Mason County, West Virginia, deploying NVIDIA\u2019s next-generation Vera Rubin NVL72 GPUs at what it describes as the first large-scale commercial rollout of the Vera Rubin DSX AI Factory reference architecture."
   ],
   "ai_customer_evidence": [
    "Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus",
    "Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity at a new campus in Mason County, West Virginia, deploying NVIDIA\u2019s next-generation Vera Rubin NVL72 GPUs at what it describes as the first large-scale commercial rollout of the Vera Rubin DSX AI Factory reference architecture."
   ],
   "status_evidence": [
    "Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus",
    "The deal, announced at NVIDIA\u2019s GTC 2026 conference on 16 March, covers approximately 430,000 Vera Rubin GPUs and is structured as a long-term framework combining a multi-year compute services agreement with a long-term data centre lease."
   ],
   "announcement_date_evidence": [
    "Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus",
    "The deal, announced at NVIDIA\u2019s GTC 2026 conference on 16 March, covers approximately 430,000 Vera Rubin GPUs and is structured as a long-term framework combining a multi-year compute services agreement with a long-term data centre lease."
   ]
  },
  {
   "url": "https://utahciviccompact.org/stratos.html",
   "title": "The Stratos Project: How Utah's Military Installation Development Authority Fast-Tracked a 9-Gigawatt Natural Gas Data Center \u2014 and Broke State Law to Do It",
   "published_at": "2026-05-26T13:38:35",
   "project": "Stratos Project",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O'Leary Digital / West GenCo",
   "ai_customer": null,
   "status": "proposed",
   "announcement_date": "2026-04-24",
   "project_evidence": [
    "Utah Civic Compact's ongoing investigation into how a 9-gigawatt natural gas data center was approved in Box Elder County \u2014 and what the public record reveals.",
    "# The Stratos Project",
    "The Stratos Project"
   ],
   "locality_evidence": [
    "Utah Civic Compact's ongoing investigation into how a 9-gigawatt natural gas data center was approved in Box Elder County \u2014 and what the public record reveals.",
    "# The Stratos Project"
   ],
   "state_evidence": [
    "Utah Civic Compact's ongoing investigation into how a 9-gigawatt natural gas data center was approved in Box Elder County \u2014 and what the public record reveals.",
    "# The Stratos Project"
   ],
   "capacity_gw_evidence": [
    "Utah Civic Compact's ongoing investigation into how a 9-gigawatt natural gas data center was approved in Box Elder County \u2014 and what the public record reveals.",
    "# The Stratos Project"
   ],
   "builder_evidence": [
    "- **Developer:** Kevin O'Leary (\"Mr. Wonderful\" from Shark Tank), a Canadian citizen, through O'Leary Digital / West GenCo",
    "# The Stratos Project",
    "### What Is Being Built"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "In April and May of 2026, the Utah Military Installation Development Authority (MIDA) adopted a sweeping project area plan for the Stratos Project \u2014 a proposed 9-gigawatt natural gas data center campus in Hansel Valley, Box Elder County.",
    "# The Stratos Project",
    "Executive Summary"
   ],
   "announcement_date_evidence": [
    "| Apr 24, ~9:58 AM | MIDA board adopts the project area plan (Res. 2026-06), standards (Res. 2026-07), and signs the development agreement (Res. 2026-08). **No county consent exists at this moment.** |",
    "# The Stratos Project",
    "The Approval Timeline"
   ]
  },
  {
   "url": "https://local.newsbreak.com/wsb-channel-2-atlanta-522969/4852639809907-utility-officials-approve-georgia-power-openai-data-center-agreement",
   "title": "Utility officials approve Georgia Power, OpenAI data center agreement - NewsBreak",
   "published_at": "2026-08-27T15:04:25",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "Georgia Power",
   "ai_customer": "OpenAI",
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "Effingham County",
    "Utility officials approve Georgia Power, OpenAI data center agreement",
    "Project Camellia is located in the Savannah Gateway Industrial Hub in Effingham County."
   ],
   "locality_evidence": [
    "Effingham County",
    "Utility officials approve Georgia Power, OpenAI data center agreement",
    "The Georgia Public Service Commission has approved a [contract between Georgia Power and OpenAI](https://www.wsbtv.com/news/local/openai-plans-massive-data-center-facility-with-georgia-power-development-start-2028/377IZ4C4LFBGZNEFRENVWR7IMU/) to power a massive new data center project in Effingham County."
   ],
   "state_evidence": [
    "Effingham County",
    "Utility officials approve Georgia Power, OpenAI data center agreement",
    "The Georgia Public Service Commission has approved a [contract between Georgia Power and OpenAI](https://www.wsbtv.com/news/local/openai-plans-massive-data-center-facility-with-georgia-power-development-start-2028/377IZ4C4LFBGZNEFRENVWR7IMU/) to power a massive new data center project in Effingham County."
   ],
   "capacity_gw_evidence": [
    "Effingham County",
    "Utility officials approve Georgia Power, OpenAI data center agreement",
    "Under the agreement filed with the Georgia PSC, the facility will require 3,200 megawatts of electricity, to be delivered in phases."
   ],
   "builder_evidence": [
    "Effingham County",
    "Utility officials approve Georgia Power, OpenAI data center agreement",
    "The Georgia Public Service Commission has approved a [contract between Georgia Power and OpenAI](https://www.wsbtv.com/news/local/openai-plans-massive-data-center-facility-with-georgia-power-development-start-2028/377IZ4C4LFBGZNEFRENVWR7IMU/) to power a massive new data center project in Effingham County."
   ],
   "ai_customer_evidence": [
    "Effingham County",
    "Utility officials approve Georgia Power, OpenAI data center agreement",
    "The Georgia Public Service Commission has approved a [contract between Georgia Power and OpenAI](https://www.wsbtv.com/news/local/openai-plans-massive-data-center-facility-with-georgia-power-development-start-2028/377IZ4C4LFBGZNEFRENVWR7IMU/) to power a massive new data center project in Effingham County."
   ],
   "status_evidence": [
    "Effingham County",
    "Utility officials approve Georgia Power, OpenAI data center agreement",
    "The Georgia Public Service Commission has approved a [contract between Georgia Power and OpenAI](https://www.wsbtv.com/news/local/openai-plans-massive-data-center-facility-with-georgia-power-development-start-2028/377IZ4C4LFBGZNEFRENVWR7IMU/) to power a massive new data center project in Effingham County."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacentermap.com/usa/michigan/detroit/panattoni-van-buren-building-1",
   "title": "Google Van Buren - Building 1 Data Center in Detroit",
   "published_at": null,
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni",
   "ai_customer": "Google",
   "status": "Announced",
   "announcement_date": "2025-12-18",
   "project_evidence": [
    "# Google Van Buren - Building 1",
    "Panattoni, a logistics real estate firm, is planning a significant data center development known as Project Cannoli in Van Buren Township, Michigan, located on the western outskirts of Detroit."
   ],
   "locality_evidence": [
    "# Google Van Buren - Building 1",
    "Panattoni, a logistics real estate firm, is planning a significant data center development known as Project Cannoli in Van Buren Township, Michigan, located on the western outskirts of Detroit."
   ],
   "state_evidence": [
    "# Google Van Buren - Building 1",
    "Panattoni, a logistics real estate firm, is planning a significant data center development known as Project Cannoli in Van Buren Township, Michigan, located on the western outskirts of Detroit."
   ],
   "capacity_gw_evidence": [
    "# Google Van Buren - Building 1",
    "Panattoni, founded in 2005, has a substantial global portfolio in industrial and logistics development and has recently expanded its focus to the data center market, aiming to develop 1GW of data center capacity in North America by 2030."
   ],
   "builder_evidence": [
    "# Google Van Buren - Building 1",
    "Panattoni, a logistics real estate firm, is planning a significant data center development known as Project Cannoli in Van Buren Township, Michigan, located on the western outskirts of Detroit."
   ],
   "ai_customer_evidence": [
    "# Google Van Buren - Building 1",
    "Google revealed as the company behind Project Cannoli in Van Buren"
   ],
   "status_evidence": [
    "# Google Van Buren - Building 1",
    "Panattoni plans 1GW data center campus in Van Buren Township, Michigan",
    " - New Stage: Announced"
   ],
   "announcement_date_evidence": [
    "# Google Van Buren - Building 1",
    "Dec 18, 2025 - Stage Change"
   ]
  },
  {
   "url": "https://kentuckylantern.com/2026/08/10/terawulf-tells-investors-it-could-double-the-size-of-one-of-its-ky-data-center-projects/",
   "title": "TeraWulf tells investors it could double the size of one of its KY data center projects",
   "published_at": "2026-08-10T15:08:38",
   "project": "Muskie Data Campus",
   "locality": "Greenup and Boyd counties",
   "state": "Kentucky",
   "capacity_gw": 2.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# TeraWulf tells investors it could double the size of one of its KY data center projects",
    "Wednesday, Chairman and CEO Paul Prager told investors TeraWulf was looking to double the power of what it calls the Muskie Data Campus."
   ],
   "locality_evidence": [
    "# TeraWulf tells investors it could double the size of one of its KY data center projects",
    "In May, Maryland-based TeraWulf said it purchased an industrial site on the border of Greenup and Boyd counties to build a data center powered by as much as 1 gigawatt of electricity."
   ],
   "state_evidence": [
    "# TeraWulf tells investors it could double the size of one of its KY data center projects",
    "In May, Maryland-based TeraWulf said it purchased an industrial site on the border of Greenup and Boyd counties to build a data center powered by as much as 1 gigawatt of electricity."
   ],
   "capacity_gw_evidence": [
    "# TeraWulf tells investors it could double the size of one of its KY data center projects",
    "\u201cGiven its near-term power availability, we are increasingly optimistic about the potential to expand the Muskie campus to as much as 2 gigawatts and accelerate portions of the current development timeline,\u201d Prager said."
   ],
   "builder_evidence": [
    "# TeraWulf tells investors it could double the size of one of its KY data center projects",
    "In May, Maryland-based TeraWulf said it purchased an industrial site on the border of Greenup and Boyd counties to build a data center powered by as much as 1 gigawatt of electricity."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# TeraWulf tells investors it could double the size of one of its KY data center projects",
    "A data center developer looking to build a campus in Eastern Kentucky told investors Wednesday it could double the size of the project."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://innovationopenlab.com/news-biz/70197/creekstone-energy-secures-43000-dthday-of-firm-kern-river-natural-gas-capacity-for-its-delta-ai-campus.html",
   "title": "Creekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI Campus",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "master-planned",
   "announcement_date": "2026-07-23",
   "project_evidence": [
    "# Creekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI Campus",
    "The company has secured 43,000 dekatherms per day (Dth/day) of firm natural gas transportation capacity on the Kern River Gas Transmission pipeline."
   ],
   "locality_evidence": [
    "# Creekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI Campus",
    "It provides a contracted fuel supply for the Delta Gigasite, its gigawatt-scale, behind-the-meter AI energy campus in Millard County."
   ],
   "state_evidence": [
    "# Creekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI Campus",
    "DELTA, Utah: Firm pipeline capacity is the difference between a plan and a project."
   ],
   "capacity_gw_evidence": [
    "# Creekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI Campus",
    "It is enough firm fuel to support roughly 220 megawatts of behind-the-meter generation, the first block of a campus master-planned to scale past 10 gigawatts."
   ],
   "builder_evidence": [
    "# Creekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI Campus",
    "Creekstone Energy LLC now has it for the Delta Gigasite."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Creekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI Campus",
    "It is enough firm fuel to support roughly 220 megawatts of behind-the-meter generation, the first block of a campus master-planned to scale past 10 gigawatts."
   ],
   "announcement_date_evidence": [
    "# Creekstone Energy Secures 43,000 Dth/Day of Firm Kern River Natural Gas Capacity for Its Delta AI Campus",
    "- ** 23-07-2026"
   ]
  },
  {
   "url": "https://lelezard.com/en/news-21539151.html",
   "title": "ECL Announces World's First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
   "published_at": "2024-09-25T07:31:49",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "announced",
   "announcement_date": "2024-09-25",
   "project_evidence": [
    "# ECL Announces World's First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world's first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center ? ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "locality_evidence": [
    "# ECL Announces World's First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world's first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center ? ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "state_evidence": [
    "# ECL Announces World's First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "ECL Terrasite-TX1 comes at a critical time for the state of Texas, with The Electric Reliability Council of Texas (ERCOT) testifying on June 12 this year that the state's power grid needs will grow approximately 2X by 2030 due in part to the growth of data centers and AI."
   ],
   "capacity_gw_evidence": [
    "# ECL Announces World's First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world's first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center ? ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "builder_evidence": [
    "# ECL Announces World's First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world's first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center ? ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "ai_customer_evidence": [
    "# ECL Announces World's First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world's first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center ? ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "status_evidence": [
    "# ECL Announces World's First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world's first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center ? ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "announcement_date_evidence": [
    "# ECL Announces World's First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world's first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center ? ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ]
  },
  {
   "url": "https://aitooldiscovery.com/ai-infra/openai-stargate-project-explained",
   "title": "OpenAI Stargate Project: The $500B AI Data Center Plan Explained",
   "published_at": "2026-03-27T00:00:00",
   "project": "Stargate I",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "OpenAI, Oracle",
   "ai_customer": "OpenAI",
   "status": "Partially operational",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Stargate Project: The $500B AI Data Center Plan Explained",
    "The Abilene, Texas site is the first and largest Stargate facility.",
    "Known as Stargate I, it covers approximately 4 million square feet with a planned capacity of 1.2 GW."
   ],
   "locality_evidence": [
    "# OpenAI Stargate Project: The $500B AI Data Center Plan Explained",
    "The Abilene, Texas site is the first and largest Stargate facility."
   ],
   "state_evidence": [
    "# OpenAI Stargate Project: The $500B AI Data Center Plan Explained",
    "The Abilene, Texas site is the first and largest Stargate facility."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Stargate Project: The $500B AI Data Center Plan Explained",
    "1.2 GW",
    "Capacity of the flagship Abilene, Texas site (Stargate I)",
    "Known as Stargate I, it covers approximately 4 million square feet with a planned capacity of 1.2 GW."
   ],
   "builder_evidence": [
    "# OpenAI Stargate Project: The $500B AI Data Center Plan Explained",
    "| Site | State | Capacity | Partner | Status (Q1 2026) |",
    "| Stargate I (Abilene expansion) | Texas | 1.2 GW+ | OpenAI, Oracle | Partially operational |",
    "Sources: OpenAI five new Stargate sites announcement, October 22, 2025; Data Center Dynamics, 2025."
   ],
   "ai_customer_evidence": [
    "# OpenAI Stargate Project: The $500B AI Data Center Plan Explained",
    "Single-tenant scale: Each Stargate facility is dedicated to OpenAI's workloads, not shared multi-tenant infrastructure."
   ],
   "status_evidence": [
    "# OpenAI Stargate Project: The $500B AI Data Center Plan Explained",
    "| Site | State | Capacity | Partner | Status (Q1 2026) |",
    "| Stargate I (Abilene expansion) | Texas | 1.2 GW+ | OpenAI, Oracle | Partially operational |",
    "Sources: OpenAI five new Stargate sites announcement, October 22, 2025; Data Center Dynamics, 2025."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aitooldiscovery.com/ai-infra/openai-stargate-project-explained",
   "title": "OpenAI Stargate Project: The $500B AI Data Center Plan Explained",
   "published_at": "2026-03-27T00:00:00",
   "project": "Lordstown",
   "locality": "Lordstown",
   "state": "Ohio",
   "capacity_gw": 1.5,
   "builder": "SoftBank",
   "ai_customer": "OpenAI",
   "status": "Ground broken",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Stargate Project: The $500B AI Data Center Plan Explained",
    "Stargate Sites: Texas, Ohio, and the US Rollout",
    "| Site | State | Capacity | Partner | Status (Q1 2026) |",
    "| Lordstown | Ohio | 1.5 GW (target) | SoftBank | Ground broken |",
    "Sources: OpenAI five new Stargate sites announcement, October 22, 2025; Data Center Dynamics, 2025."
   ],
   "locality_evidence": [
    "# OpenAI Stargate Project: The $500B AI Data Center Plan Explained",
    "Stargate Sites: Texas, Ohio, and the US Rollout",
    "| Site | State | Capacity | Partner | Status (Q1 2026) |",
    "| Lordstown | Ohio | 1.5 GW (target) | SoftBank | Ground broken |",
    "Sources: OpenAI five new Stargate sites announcement, October 22, 2025; Data Center Dynamics, 2025."
   ],
   "state_evidence": [
    "# OpenAI Stargate Project: The $500B AI Data Center Plan Explained",
    "Stargate Sites: Texas, Ohio, and the US Rollout",
    "| Site | State | Capacity | Partner | Status (Q1 2026) |",
    "| Lordstown | Ohio | 1.5 GW (target) | SoftBank | Ground broken |",
    "Sources: OpenAI five new Stargate sites announcement, October 22, 2025; Data Center Dynamics, 2025."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Stargate Project: The $500B AI Data Center Plan Explained",
    "Stargate Sites: Texas, Ohio, and the US Rollout",
    "| Site | State | Capacity | Partner | Status (Q1 2026) |",
    "| Lordstown | Ohio | 1.5 GW (target) | SoftBank | Ground broken |",
    "Sources: OpenAI five new Stargate sites announcement, October 22, 2025; Data Center Dynamics, 2025."
   ],
   "builder_evidence": [
    "# OpenAI Stargate Project: The $500B AI Data Center Plan Explained",
    "Stargate Sites: Texas, Ohio, and the US Rollout",
    "| Site | State | Capacity | Partner | Status (Q1 2026) |",
    "| Lordstown | Ohio | 1.5 GW (target) | SoftBank | Ground broken |",
    "Sources: OpenAI five new Stargate sites announcement, October 22, 2025; Data Center Dynamics, 2025."
   ],
   "ai_customer_evidence": [
    "# OpenAI Stargate Project: The $500B AI Data Center Plan Explained",
    "Single-tenant scale: Each Stargate facility is dedicated to OpenAI's workloads, not shared multi-tenant infrastructure."
   ],
   "status_evidence": [
    "# OpenAI Stargate Project: The $500B AI Data Center Plan Explained",
    "Stargate Sites: Texas, Ohio, and the US Rollout",
    "| Site | State | Capacity | Partner | Status (Q1 2026) |",
    "| Lordstown | Ohio | 1.5 GW (target) | SoftBank | Ground broken |",
    "Sources: OpenAI five new Stargate sites announcement, October 22, 2025; Data Center Dynamics, 2025."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://cryptobriefing.com/meta-robots-data-center-maintenance",
   "title": "Meta Platforms deploys autonomous robots across data center construction and operations",
   "published_at": "2026-08-28T16:05:35",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2024",
   "project_evidence": [
    "From 72-ton pile drivers to rack-moving bots, Meta is betting that robots can solve the labor crunch threatening its $50B+ Hyperion project.",
    "Meta Platforms is putting robots to work inside and around its data centers, deploying autonomous machines for everything from pounding steel beams into the ground to scanning server racks.",
    "The effort spans both the construction and day-to-day operations of Meta\u2019s sprawling data infrastructure, with the most dramatic example being ten 72-ton robotic pile drivers now operating at a solar site tied to the company\u2019s massive Hyperion AI data center campus in Louisiana."
   ],
   "locality_evidence": [
    "Meta\u2019s Hyperion project, located in Richland Parish, Louisiana, is one of the most ambitious data center builds in tech history.",
    "Meta Platforms is putting robots to work inside and around its data centers, deploying autonomous machines for everything from pounding steel beams into the ground to scanning server racks."
   ],
   "state_evidence": [
    "Meta\u2019s Hyperion project, located in Richland Parish, Louisiana, is one of the most ambitious data center builds in tech history.",
    "Meta Platforms is putting robots to work inside and around its data centers, deploying autonomous machines for everything from pounding steel beams into the ground to scanning server racks."
   ],
   "capacity_gw_evidence": [
    "The campus is targeting up to 5 GW of compute capacity, a figure that has grown from an initial projection of 2 GW when the project was first announced in 2024.",
    "Meta Platforms is putting robots to work inside and around its data centers, deploying autonomous machines for everything from pounding steel beams into the ground to scanning server racks."
   ],
   "builder_evidence": [
    "From 72-ton pile drivers to rack-moving bots, Meta is betting that robots can solve the labor crunch threatening its $50B+ Hyperion project.",
    "Meta Platforms is putting robots to work inside and around its data centers, deploying autonomous machines for everything from pounding steel beams into the ground to scanning server racks."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Meta\u2019s Hyperion project, located in Richland Parish, Louisiana, is one of the most ambitious data center builds in tech history.",
    "Meta Platforms is putting robots to work inside and around its data centers, deploying autonomous machines for everything from pounding steel beams into the ground to scanning server racks."
   ],
   "announcement_date_evidence": [
    "The campus is targeting up to 5 GW of compute capacity, a figure that has grown from an initial projection of 2 GW when the project was first announced in 2024.",
    "Meta Platforms is putting robots to work inside and around its data centers, deploying autonomous machines for everything from pounding steel beams into the ground to scanning server racks."
   ]
  },
  {
   "url": "https://whatjobs.com/news/inside-amazons-indiana-ai-megaproject-a-million-trainium-chips-anthropics-bet-and-the-power-problem",
   "title": "Inside Amazon\u2019s Indiana AI Megaproject: A Million Trainium Chips, Anthropic\u2019s Bet, And The Power Problem | WhatJobs News",
   "published_at": "2025-10-30T15:00:00",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon",
   "ai_customer": "Anthropic",
   "status": "live",
   "announcement_date": null,
   "project_evidence": [
    "## **From Cornfields To Compute In Record Time**",
    "It was dirt a year ago. Today, seven buildings hum with hundreds of thousands of Amazon Trainium 2 chips in New Carlisle, Indiana\u2014phase one of \u201cProject Rainier,\u201d Amazon\u2019s largest non\u2011Nvidia AI cluster and one of the fastest mega\u2011builds ever brought online."
   ],
   "locality_evidence": [
    "## **From Cornfields To Compute In Record Time**",
    "It was dirt a year ago. Today, seven buildings hum with hundreds of thousands of Amazon Trainium 2 chips in New Carlisle, Indiana\u2014phase one of \u201cProject Rainier,\u201d Amazon\u2019s largest non\u2011Nvidia AI cluster and one of the fastest mega\u2011builds ever brought online."
   ],
   "state_evidence": [
    "## **From Cornfields To Compute In Record Time**",
    "It was dirt a year ago. Today, seven buildings hum with hundreds of thousands of Amazon Trainium 2 chips in New Carlisle, Indiana\u2014phase one of \u201cProject Rainier,\u201d Amazon\u2019s largest non\u2011Nvidia AI cluster and one of the fastest mega\u2011builds ever brought online."
   ],
   "capacity_gw_evidence": [
    "## **The Hard Constraints: Power, Water, Community**",
    "When complete, the campus will consume about 2.2 GW\u2014roughly the electricity of 1.5M homes in Indiana Michigan Power\u2019s service area."
   ],
   "builder_evidence": [
    "## **From Cornfields To Compute In Record Time**",
    "It was dirt a year ago. Today, seven buildings hum with hundreds of thousands of Amazon Trainium 2 chips in New Carlisle, Indiana\u2014phase one of \u201cProject Rainier,\u201d Amazon\u2019s largest non\u2011Nvidia AI cluster and one of the fastest mega\u2011builds ever brought online."
   ],
   "ai_customer_evidence": [
    "## **From Cornfields To Compute In Record Time**",
    "The site is already training Anthropic\u2019s latest Claude models at scale, with AWS executives saying capacity will surpass 1,000,000 Trainium 2 chips by year\u2011end and Trainium 3 to follow."
   ],
   "status_evidence": [
    "## **Is This Overbuild\u2014or Table Stakes?**",
    "AWS counters that Rainier isn\u2019t a press release\u2014it\u2019s live training today, with booked demand from a top model provider and a global roadmap to replicate the template."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://portal.sina.com.hk/finance/finance-globenewswire/globenewswire/2026/07/15/1855741/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas - \u65b0\u6d6a\u9999\u6e2f",
   "published_at": "2026-07-15T06:00:00",
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) \u2014 Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "locality_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) \u2014 Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) \u2014 Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) \u2014 Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) \u2014 Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) \u2014 Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "announcement_date_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) \u2014 Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ]
  },
  {
   "url": "https://portal.sina.com.hk/finance/finance-globenewswire/globenewswire/2026/07/15/1855741/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas - \u65b0\u6d6a\u9999\u6e2f",
   "published_at": "2026-07-15T06:00:00",
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "expanding",
   "announcement_date": null,
   "project_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "*Childress Extends Crusoe and Lancium\u2019s Ongoing Partnership, Building on the Model Established in Abilene*",
    "The Childress development is the latest chapter in Crusoe\u2019s deep commitment to Texas."
   ],
   "locality_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "*Childress Extends Crusoe and Lancium\u2019s Ongoing Partnership, Building on the Model Established in Abilene*",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "*Childress Extends Crusoe and Lancium\u2019s Ongoing Partnership, Building on the Model Established in Abilene*",
    "The Childress development is the latest chapter in Crusoe\u2019s deep commitment to Texas."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "*Childress Extends Crusoe and Lancium\u2019s Ongoing Partnership, Building on the Model Established in Abilene*",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "*Childress Extends Crusoe and Lancium\u2019s Ongoing Partnership, Building on the Model Established in Abilene*",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "*Childress Extends Crusoe and Lancium\u2019s Ongoing Partnership, Building on the Model Established in Abilene*",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://finance.yahoo.com/energy/articles/chevrons-microsoft-data-center-deal-150500998.html",
   "title": "Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
   "published_at": "2026-08-29T15:05:00",
   "project": "Project Kilby",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.67,
   "builder": "Energy Forge One",
   "ai_customer": "Microsoft",
   "status": "planned",
   "announcement_date": "2026-06-22",
   "project_evidence": [
    "Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "The agreement is [part of Project Kilby](https://www.fool.com/investing/2026/06/22/chevron-is-building-a-massive-power-plant-to-support-a-microsoft-data-center-heres-what-it-means-for-the-energy-stock/?utm_source=yahoo-host-full&utm_medium=feed&utm_campaign=article&referring_guid=3ddacd17-6fde-4f88-99bb-39878102311a), in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "However, even bigger news is that Chevron has entered into a 20-year power purchase agreement (PPA) to build a natural gas-powered facility to power **Microsoft**'s (NASDAQ: MSFT) artificial intelligence (AI)-focused data center in Texas."
   ],
   "capacity_gw_evidence": [
    "Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "The agreement is [part of Project Kilby](https://www.fool.com/investing/2026/06/22/chevron-is-building-a-massive-power-plant-to-support-a-microsoft-data-center-heres-what-it-means-for-the-energy-stock/?utm_source=yahoo-host-full&utm_medium=feed&utm_campaign=article&referring_guid=3ddacd17-6fde-4f88-99bb-39878102311a), in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power."
   ],
   "builder_evidence": [
    "Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "The agreement is [part of Project Kilby](https://www.fool.com/investing/2026/06/22/chevron-is-building-a-massive-power-plant-to-support-a-microsoft-data-center-heres-what-it-means-for-the-energy-stock/?utm_source=yahoo-host-full&utm_medium=feed&utm_campaign=article&referring_guid=3ddacd17-6fde-4f88-99bb-39878102311a), in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power."
   ],
   "ai_customer_evidence": [
    "Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "However, even bigger news is that Chevron has entered into a 20-year power purchase agreement (PPA) to build a natural gas-powered facility to power **Microsoft**'s (NASDAQ: MSFT) artificial intelligence (AI)-focused data center in Texas."
   ],
   "status_evidence": [
    "Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "However, even bigger news is that Chevron has entered into a 20-year power purchase agreement (PPA) to build a natural gas-powered facility to power **Microsoft**'s (NASDAQ: MSFT) artificial intelligence (AI)-focused data center in Texas."
   ],
   "announcement_date_evidence": [
    "Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "On June 22, Chevron inked a 20-year take-or-pay power purchase agreement with Microsoft to provide electricity for a Microsoft-operated data center."
   ]
  },
  {
   "url": "https://tmtfinance.com/intel/vantage-data-centers-develop-25gw-datacentre-capacity-two-new-us-campuses",
   "title": "Vantage Data Centers to develop up to 2.5GW of datacentre capacity in two new US campuses",
   "published_at": null,
   "project": "Project Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Work began in August, with the first building due in H2 2025.",
   "announcement_date": "2025-08-01",
   "project_evidence": [
    "## Vantage Data Centers to develop up to 2.5GW of datacentre capacity in two new US campuses",
    "DigitalBridge-backed [NYSE: DBRG] Vantage Data Centers (Vantage) has announced plans to develop up to 2.5GW of US datacentre capacity through two mega-campuses: Project Frontier and Project Lighthouse.",
    "And earlier, in August, Vantage unveiled Project Frontier, a 1.4GW campus in Shackelford County, Texas, featuring 10 datacentres and supporting 250kW+ racks."
   ],
   "locality_evidence": [
    "## Vantage Data Centers to develop up to 2.5GW of datacentre capacity in two new US campuses",
    "And earlier, in August, Vantage unveiled Project Frontier, a 1.4GW campus in Shackelford County, Texas, featuring 10 datacentres and supporting 250kW+ racks."
   ],
   "state_evidence": [
    "## Vantage Data Centers to develop up to 2.5GW of datacentre capacity in two new US campuses",
    "And earlier, in August, Vantage unveiled Project Frontier, a 1.4GW campus in Shackelford County, Texas, featuring 10 datacentres and supporting 250kW+ racks."
   ],
   "capacity_gw_evidence": [
    "## Vantage Data Centers to develop up to 2.5GW of datacentre capacity in two new US campuses",
    "And earlier, in August, Vantage unveiled Project Frontier, a 1.4GW campus in Shackelford County, Texas, featuring 10 datacentres and supporting 250kW+ racks."
   ],
   "builder_evidence": [
    "## Vantage Data Centers to develop up to 2.5GW of datacentre capacity in two new US campuses",
    "DigitalBridge-backed [NYSE: DBRG] Vantage Data Centers (Vantage) has announced plans to develop up to 2.5GW of US datacentre capacity through two mega-campuses: Project Frontier and Project Lighthouse.",
    "And earlier, in August, Vantage unveiled Project Frontier, a 1.4GW campus in Shackelford County, Texas, featuring 10 datacentres and supporting 250kW+ racks."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Vantage Data Centers to develop up to 2.5GW of datacentre capacity in two new US campuses",
    "Work began in August, with the first building due in H2 2025."
   ],
   "announcement_date_evidence": [
    "## Vantage Data Centers to develop up to 2.5GW of datacentre capacity in two new US campuses",
    "And earlier, in August, Vantage unveiled Project Frontier, a 1.4GW campus in Shackelford County, Texas, featuring 10 datacentres and supporting 250kW+ racks."
   ]
  },
  {
   "url": "https://investormeetcompany.com/companies/fermi-inc-1/rns/4581624/view",
   "title": "Initial Draw on $200m Equipment Facility, 20 February 2026 07:00 | RNS News | FRMI - FERMI INC.",
   "published_at": null,
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2026-02-20",
   "project_evidence": [
    "Initial Draw on $200m Equipment Facility",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Fermi America secured an initial >$100M commitment from Keystone National Group as part of a $200M Cape\u2011arranged equipment facility to accelerate procurement of long\u2011lead high\u2011voltage breakers, transformers, substations and switchgear for the first 2.3 GW of its 11 GW Project Matador, with a flexible structure that allows capital recycling as assets are refinanced."
   ],
   "locality_evidence": [
    "Initial Draw on $200m Equipment Facility",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus.",
    "(AMARILLO, Texas) February 20, 2026: [Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://fermiamerica.com/), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026."
   ],
   "state_evidence": [
    "Initial Draw on $200m Equipment Facility",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus.",
    "(AMARILLO, Texas) February 20, 2026: [Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://fermiamerica.com/), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026."
   ],
   "capacity_gw_evidence": [
    "Initial Draw on $200m Equipment Facility",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Fermi America secured an initial >$100M commitment from Keystone National Group as part of a $200M Cape\u2011arranged equipment facility to accelerate procurement of long\u2011lead high\u2011voltage breakers, transformers, substations and switchgear for the first 2.3 GW of its 11 GW Project Matador, with a flexible structure that allows capital recycling as assets are refinanced."
   ],
   "builder_evidence": [
    "Initial Draw on $200m Equipment Facility",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Fermi America secured an initial >$100M commitment from Keystone National Group as part of a $200M Cape\u2011arranged equipment facility to accelerate procurement of long\u2011lead high\u2011voltage breakers, transformers, substations and switchgear for the first 2.3 GW of its 11 GW Project Matador, with a flexible structure that allows capital recycling as assets are refinanced."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Initial Draw on $200m Equipment Facility",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "announcement_date_evidence": [
    "Initial Draw on $200m Equipment Facility",
    "Fermi Inc.",
    "20 February 2026",
    "(AMARILLO, Texas) February 20, 2026: [Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://fermiamerica.com/), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026."
   ]
  },
  {
   "url": "https://substack.com/redirect/c4308b59-82d6-4b20-9e57-6a72f5b45255?j=eyJ1IjoiM3djM2MxIn0.OGuf1Irm-qb700DahBb35RT9QTn8SiZLleBWozyCeUk",
   "title": "Campaigners call on regulator to block 4.5GW gas powered AI data center in Homer City, Pennsylvania",
   "published_at": "2026-05-21T00:40:57",
   "project": "Homer City AI data center complex",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Homer City Redevelopment (HCR) and Kiewit",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2025-04-01",
   "project_evidence": [
    "Several environmental groups have [submitted public comments](https://docs.google.com/document/d/1sXhEXHm2P1toq_tBkQAXPNUQxoXleqdZNmRxmYLVB9w/edit?usp=sharing) to the Pennsylvania Department of Environmental Protection asking it to reconsider its approval of a proposed 4.5GW natural gas power plant at the site of the planned Homer City AI data center complex in Homer City, Pennsylvania."
   ],
   "locality_evidence": [
    "Several environmental groups have [submitted public comments](https://docs.google.com/document/d/1sXhEXHm2P1toq_tBkQAXPNUQxoXleqdZNmRxmYLVB9w/edit?usp=sharing) to the Pennsylvania Department of Environmental Protection asking it to reconsider its approval of a proposed 4.5GW natural gas power plant at the site of the planned Homer City AI data center complex in Homer City, Pennsylvania."
   ],
   "state_evidence": [
    "Several environmental groups have [submitted public comments](https://docs.google.com/document/d/1sXhEXHm2P1toq_tBkQAXPNUQxoXleqdZNmRxmYLVB9w/edit?usp=sharing) to the Pennsylvania Department of Environmental Protection asking it to reconsider its approval of a proposed 4.5GW natural gas power plant at the site of the planned Homer City AI data center complex in Homer City, Pennsylvania."
   ],
   "capacity_gw_evidence": [
    "Several environmental groups have [submitted public comments](https://docs.google.com/document/d/1sXhEXHm2P1toq_tBkQAXPNUQxoXleqdZNmRxmYLVB9w/edit?usp=sharing) to the Pennsylvania Department of Environmental Protection asking it to reconsider its approval of a proposed 4.5GW natural gas power plant at the site of the planned Homer City AI data center complex in Homer City, Pennsylvania."
   ],
   "builder_evidence": [
    "Plans for the project were first revealed in [April](https://www.datacenterdynamics.com/en/news/homer-city-and-kiewit-unveil-plans-for-45gw-natural-gas-powered-ai-data-center-in-pennsylvania/), following a partnership between Homer City Redevelopment (HCR) and Kiewit to convert the former Homer City coal power station into a natural gas-powered AI data center."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Several environmental groups have [submitted public comments](https://docs.google.com/document/d/1sXhEXHm2P1toq_tBkQAXPNUQxoXleqdZNmRxmYLVB9w/edit?usp=sharing) to the Pennsylvania Department of Environmental Protection asking it to reconsider its approval of a proposed 4.5GW natural gas power plant at the site of the planned Homer City AI data center complex in Homer City, Pennsylvania."
   ],
   "announcement_date_evidence": [
    "Plans for the project were first revealed in [April](https://www.datacenterdynamics.com/en/news/homer-city-and-kiewit-unveil-plans-for-45gw-natural-gas-powered-ai-data-center-in-pennsylvania/), following a partnership between Homer City Redevelopment (HCR) and Kiewit to convert the former Homer City coal power station into a natural gas-powered AI data center."
   ]
  },
  {
   "url": "https://fuelcellsworks.com/2025/03/24/green-technology/energy-abundance-unveils-data-city-texas-world-s-largest-24-7-green-powered-data-center-hub-with-future-hydrogen-integration",
   "title": "Data City Texas: World\u2019s Largest Green-Powered Data Hub - Fuelcellsworks",
   "published_at": "2025-03-24T00:00:00",
   "project": "Data City, Texas",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corporation",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2025-03-21",
   "project_evidence": [
    "# Energy Abundance Unveils Data City, Texas \u2014 World\u2019s Largest 24/7 Green-Powered Data Center Hub with Future Hydrogen Integration",
    "## Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 -- Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "locality_evidence": [
    "# Energy Abundance Unveils Data City, Texas \u2014 World\u2019s Largest 24/7 Green-Powered Data Center Hub with Future Hydrogen Integration",
    "## Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 -- Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "state_evidence": [
    "# Energy Abundance Unveils Data City, Texas \u2014 World\u2019s Largest 24/7 Green-Powered Data Center Hub with Future Hydrogen Integration",
    "## Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 -- Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "capacity_gw_evidence": [
    "# Energy Abundance Unveils Data City, Texas \u2014 World\u2019s Largest 24/7 Green-Powered Data Center Hub with Future Hydrogen Integration",
    "## Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 -- Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "builder_evidence": [
    "# Energy Abundance Unveils Data City, Texas \u2014 World\u2019s Largest 24/7 Green-Powered Data Center Hub with Future Hydrogen Integration",
    "## Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 -- Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Energy Abundance Unveils Data City, Texas \u2014 World\u2019s Largest 24/7 Green-Powered Data Center Hub with Future Hydrogen Integration",
    "## Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 -- Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "announcement_date_evidence": [
    "# Energy Abundance Unveils Data City, Texas \u2014 World\u2019s Largest 24/7 Green-Powered Data Center Hub with Future Hydrogen Integration",
    "## Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 -- Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ]
  },
  {
   "url": "https://el-balad.com/16925589",
   "title": "Utah Data Center: MIDA approves 9 GW 'Stratos' hyperscale campus in Box Elder",
   "published_at": "2026-04-27T22:11:04",
   "project": "Stratos",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O'Leary Digital",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "[Utah's Military Installation Development Authority](https://www.el-balad.com/tag/utahs-military-installation-development-authority) on Friday approved a development agreement for [Stratos](https://www.el-balad.com/tag/stratos), a hyperscale data center campus in Box Elder County that could eventually consume 9 GW of power, MIDA said."
   ],
   "locality_evidence": [
    "[Utah's Military Installation Development Authority](https://www.el-balad.com/tag/utahs-military-installation-development-authority) on Friday approved a development agreement for [Stratos](https://www.el-balad.com/tag/stratos), a hyperscale data center campus in Box Elder County that could eventually consume 9 GW of power, MIDA said."
   ],
   "state_evidence": [
    "[Utah's Military Installation Development Authority](https://www.el-balad.com/tag/utahs-military-installation-development-authority) on Friday approved a development agreement for [Stratos](https://www.el-balad.com/tag/stratos), a hyperscale data center campus in Box Elder County that could eventually consume 9 GW of power, MIDA said."
   ],
   "capacity_gw_evidence": [
    "[Utah's Military Installation Development Authority](https://www.el-balad.com/tag/utahs-military-installation-development-authority) on Friday approved a development agreement for [Stratos](https://www.el-balad.com/tag/stratos), a hyperscale data center campus in Box Elder County that could eventually consume 9 GW of power, MIDA said."
   ],
   "builder_evidence": [
    "The campus, being developed by [O'Leary Digital](https://www.el-balad.com/tag/oleary-digital) \u2014 the infrastructure arm of [Kevin O'Leary](https://www.el-balad.com/tag/kevin-oleary) \u2014 would span roughly 40,000 acres of private land plus 1,200 acres of military and state-owned property."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "[Utah's Military Installation Development Authority](https://www.el-balad.com/tag/utahs-military-installation-development-authority) on Friday approved a development agreement for [Stratos](https://www.el-balad.com/tag/stratos), a hyperscale data center campus in Box Elder County that could eventually consume 9 GW of power, MIDA said."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mlq.ai/news/terawulf-acquires-285-acre-kentucky-site-for-1gw-ai-data-center-campus",
   "title": "AI for investors",
   "published_at": null,
   "project": "Muskie Data Campus",
   "locality": "Eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-26",
   "project_evidence": [
    "TeraWulf (NASDAQ: WULF) has acquired approximately 285 acres in Eastern Kentucky's EastPark Industrial Park to develop a 1GW+ AI and high-performance computing data center campus.",
    "The campus, branded the Muskie Data Campus, is planned in two phases: 500MW beginning to ramp in the second half of 2028, followed by an additional 500MW targeted for H2 2030."
   ],
   "locality_evidence": [
    "TeraWulf (NASDAQ: WULF) has acquired approximately 285 acres in Eastern Kentucky's EastPark Industrial Park to develop a 1GW+ AI and high-performance computing data center campus.",
    "TeraWulf did not disclose the acquisition price or name a specific city or county for the Eastern Kentucky site."
   ],
   "state_evidence": [
    "TeraWulf (NASDAQ: WULF) has acquired approximately 285 acres in Eastern Kentucky's EastPark Industrial Park to develop a 1GW+ AI and high-performance computing data center campus."
   ],
   "capacity_gw_evidence": [
    "TeraWulf (NASDAQ: WULF) has acquired approximately 285 acres in Eastern Kentucky's EastPark Industrial Park to develop a 1GW+ AI and high-performance computing data center campus."
   ],
   "builder_evidence": [
    "TeraWulf (NASDAQ: WULF) has acquired approximately 285 acres in Eastern Kentucky's EastPark Industrial Park to develop a 1GW+ AI and high-performance computing data center campus."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The campus, branded the Muskie Data Campus, is planned in two phases: 500MW beginning to ramp in the second half of 2028, followed by an additional 500MW targeted for H2 2030."
   ],
   "announcement_date_evidence": [
    "The company announced the deal on May 26, 2026, with the acquisition closing on May 22 via a membership interest purchase agreement with Industrial Equity Partners [1][2]."
   ]
  },
  {
   "url": "https://thequantumdispatch.com/articles/hut-8-beacon-point-ai-data-center-lease",
   "title": "Hut 8 Beacon Point Campus Fully Leased in $9.8B AI Deal",
   "published_at": "2026-07-20T19:03:21",
   "project": "Beacon Point",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "fully leased",
   "announcement_date": "2026-07-20",
   "project_evidence": [
    "# Hut 8 Beacon Point Campus Fully Leased in $9.8B AI Deal",
    "Hut 8 signed a second 352 MW IT lease at its Beacon Point campus in Texas, and with that signature the entire 1 gigawatt site is spoken for."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# Hut 8 Beacon Point Campus Fully Leased in $9.8B AI Deal",
    "Hut 8 signed a second 352 MW IT lease at its Beacon Point campus in Texas, and with that signature the entire 1 gigawatt site is spoken for."
   ],
   "capacity_gw_evidence": [
    "# Hut 8 Beacon Point Campus Fully Leased in $9.8B AI Deal",
    "Hut 8's second 352 MW lease commercializes the full 1 GW Beacon Point campus, taking campus base-term contract value to $19.6 billion over 15 years."
   ],
   "builder_evidence": [
    "# Hut 8 Beacon Point Campus Fully Leased in $9.8B AI Deal",
    "Hut 8's second 352 MW lease commercializes the full 1 GW Beacon Point campus, taking campus base-term contract value to $19.6 billion over 15 years."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Hut 8 Beacon Point Campus Fully Leased in $9.8B AI Deal",
    "Hut 8 signed a second 352 MW IT lease at its Beacon Point campus in Texas, and with that signature the entire 1 gigawatt site is spoken for."
   ],
   "announcement_date_evidence": [
    "# Hut 8 Beacon Point Campus Fully Leased in $9.8B AI Deal",
    "Jake Trader\u2605Jul 20, 2026\u26054 min read"
   ]
  },
  {
   "url": "http://dlvr.it/TSPNRv",
   "title": "Iren energizes first phase of 2GW Sweetwater data center campus in Texas",
   "published_at": "2026-05-01T19:31:52",
   "project": "Sweetwater 1",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Iren",
   "ai_customer": null,
   "status": "energized",
   "announcement_date": null,
   "project_evidence": [
    "Data center and cloud firm Iren has energized a new campus in Texas.",
    "The Nasdaq-listed firm this week announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "locality_evidence": [
    "Data center and cloud firm Iren has energized a new campus in Texas.",
    "The Nasdaq-listed firm this week announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas.",
    "The firm\u2019s two Sweetwater sites \u2013 located outside Sweetwater in Fisher County, West Texas \u2013 are set to total 2GW across 2,200 acres at full build-out."
   ],
   "state_evidence": [
    "Data center and cloud firm Iren has energized a new campus in Texas.",
    "The Nasdaq-listed firm this week announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "capacity_gw_evidence": [
    "Data center and cloud firm Iren has energized a new campus in Texas.",
    "The Nasdaq-listed firm this week announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "builder_evidence": [
    "Data center and cloud firm Iren has energized a new campus in Texas.",
    "The Nasdaq-listed firm this week announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Data center and cloud firm Iren has energized a new campus in Texas.",
    "The Nasdaq-listed firm this week announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news/planned-stargate-data-center-encounters-opposition-in-saline-township-michigan",
   "title": "Planned Stargate data center encounter opposition in Saline Township, Michigan",
   "published_at": "2026-08-27T00:00:00",
   "project": "Stargate",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.4,
   "builder": "Related Digital",
   "ai_customer": "OpenAI",
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "Plans for a Stargate data center have met opposition in Saline Township, Michigan.",
    "Developed by Related Digital in collaboration with OpenAI and Oracle as part of the latter\u2019s Stargate Project, Saline Township initially rejected the proposal back in [August](https://www.datacenterdynamics.com/en/news/related-pitches-575-acre-data-center-campus-outside-detroit-michigan/)."
   ],
   "locality_evidence": [
    "Plans for a Stargate data center have met opposition in Saline Township, Michigan.",
    "Developed by Related Digital in collaboration with OpenAI and Oracle as part of the latter\u2019s Stargate Project, Saline Township initially rejected the proposal back in [August](https://www.datacenterdynamics.com/en/news/related-pitches-575-acre-data-center-campus-outside-detroit-michigan/)."
   ],
   "state_evidence": [
    "Plans for a Stargate data center have met opposition in Saline Township, Michigan.",
    "Developed by Related Digital in collaboration with OpenAI and Oracle as part of the latter\u2019s Stargate Project, Saline Township initially rejected the proposal back in [August](https://www.datacenterdynamics.com/en/news/related-pitches-575-acre-data-center-campus-outside-detroit-michigan/)."
   ],
   "capacity_gw_evidence": [
    "The 250-acre, 1.4GW data center has been controversial since its inception."
   ],
   "builder_evidence": [
    "Developed by Related Digital in collaboration with OpenAI and Oracle as part of the latter\u2019s Stargate Project, Saline Township initially rejected the proposal back in [August](https://www.datacenterdynamics.com/en/news/related-pitches-575-acre-data-center-campus-outside-detroit-michigan/)."
   ],
   "ai_customer_evidence": [
    "Developed by Related Digital in collaboration with OpenAI and Oracle as part of the latter\u2019s Stargate Project, Saline Township initially rejected the proposal back in [August](https://www.datacenterdynamics.com/en/news/related-pitches-575-acre-data-center-campus-outside-detroit-michigan/).",
    "But the developer filed a lawsuit alleging that the township\u2019s decision constituted exclusionary zoning, and in [October](https://www.datacenterdynamics.com/en/news/related-digitals-michigan-1gw-data-center-project-to-serve-openai-oracle/), the township settled by allowing the proposal to go forward, provided the data center adhered to certain requirements."
   ],
   "status_evidence": [
    "But the developer filed a lawsuit alleging that the township\u2019s decision constituted exclusionary zoning, and in [October](https://www.datacenterdynamics.com/en/news/related-digitals-michigan-1gw-data-center-project-to-serve-openai-oracle/), the township settled by allowing the proposal to go forward, provided the data center adhered to certain requirements.",
    "Since the project has been approved by the township, focus has now turned to the Michigan Public Service Commission (MPSC), a statewide utility regulatory agency responsible for deciding whether to approve \u201cspecial contracts\u201d for electric service signed between the data center and its chosen utility, DTE Electric."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://convergedigest.com/ecl-plans-worlds-first-1gw-hydrogen-powered-ai-data-center-near-houston",
   "title": "ECL Plans World\u2019s First 1GW Hydrogen-Powered AI Data Center near Houston",
   "published_at": "2024-09-25T18:25:10",
   "project": "TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "ECL, a Silicon Valley start-up led by Yuval Bachar, unveiled plans to construct the world\u2019s first fully sustainable 1-gigawatt (GW) AI factory data center, TerraSite-TX1, located on a 600+ acre (243 hectares) site near Houston, Texas."
   ],
   "locality_evidence": [
    "ECL, a Silicon Valley start-up led by Yuval Bachar, unveiled plans to construct the world\u2019s first fully sustainable 1-gigawatt (GW) AI factory data center, TerraSite-TX1, located on a 600+ acre (243 hectares) site near Houston, Texas."
   ],
   "state_evidence": [
    "ECL, a Silicon Valley start-up led by Yuval Bachar, unveiled plans to construct the world\u2019s first fully sustainable 1-gigawatt (GW) AI factory data center, TerraSite-TX1, located on a 600+ acre (243 hectares) site near Houston, Texas."
   ],
   "capacity_gw_evidence": [
    "The site may expand to 2GW based on demand."
   ],
   "builder_evidence": [
    "ECL, a Silicon Valley start-up led by Yuval Bachar, unveiled plans to construct the world\u2019s first fully sustainable 1-gigawatt (GW) AI factory data center, TerraSite-TX1, located on a 600+ acre (243 hectares) site near Houston, Texas."
   ],
   "ai_customer_evidence": [
    "The project, which will cost around $8 billion, includes Lambda as its first tenant."
   ],
   "status_evidence": [
    "ECL, a Silicon Valley start-up led by Yuval Bachar, unveiled plans to construct the world\u2019s first fully sustainable 1-gigawatt (GW) AI factory data center, TerraSite-TX1, located on a 600+ acre (243 hectares) site near Houston, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://cincinnati.com/story/news/politics/2026/08/24/openai-plans-ohio-data-center/91372218007",
   "title": "OpenAI to build world's biggest AI data center in Ohio. What we know",
   "published_at": "2026-08-25T01:30:35",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 10.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The [San Francisco-based company](https://openai.com/) announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ],
   "locality_evidence": [
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The [San Francisco-based company](https://openai.com/) announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ],
   "state_evidence": [
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The [San Francisco-based company](https://openai.com/) announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ],
   "capacity_gw_evidence": [
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The center will have 8 gigawatts of computing capacity \u2012 the electrical capacity that's available to servers and other equipment, not necessarily the amount of power the center will draw continuously \u2012 by the end of construction."
   ],
   "builder_evidence": [
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The facility will be built and operated by SB Energy on the former Portsmouth Gaseous Diffusion Plant site."
   ],
   "ai_customer_evidence": [
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "OpenAI plans to build a new hyperscale data center in Pike County, Ohio."
   ],
   "status_evidence": [
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "A [massive data center for OpenAI](/story/news/2026/08/17/openai-nvidia-back-massive-data-center-campus-in-ohio/91347647007/), the artificial intelligence company that created ChatGPT, is planned for Southern Ohio."
   ],
   "announcement_date_evidence": [
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The [San Francisco-based company](https://openai.com/) announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ]
  },
  {
   "url": "https://dxbnewsnetwork.com/meta-to-spend-billions-on-giant-ai-data-centers-in-us",
   "title": "Meta to Spend Billions on Giant AI Data Centers in US",
   "published_at": "2026-08-26T11:34:31",
   "project": "Hyperion",
   "locality": "Louisiana",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "being built",
   "announcement_date": null,
   "project_evidence": [
    "Meta to Spend Billions on Giant AI Data Centers in US",
    "Second Project: Hyperion in Louisiana",
    "Another huge AI center called **Hyperion** is being built in **Louisiana**."
   ],
   "locality_evidence": [
    "Meta to Spend Billions on Giant AI Data Centers in US",
    "Second Project: Hyperion in Louisiana",
    "Another huge AI center called **Hyperion** is being built in **Louisiana**."
   ],
   "state_evidence": [
    "Meta to Spend Billions on Giant AI Data Centers in US",
    "Second Project: Hyperion in Louisiana",
    "Another huge AI center called **Hyperion** is being built in **Louisiana**."
   ],
   "capacity_gw_evidence": [
    "Meta to Spend Billions on Giant AI Data Centers in US",
    "Second Project: Hyperion in Louisiana",
    "Hyperion will be able to grow and handle up to **five gigawatts** of power over time."
   ],
   "builder_evidence": [
    "Meta to Spend Billions on Giant AI Data Centers in US",
    "Second Project: Hyperion in Louisiana",
    "Zuckerberg also said Meta plans to build **more of these large \u201cTitan\u201d clusters** in the future."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Meta to Spend Billions on Giant AI Data Centers in US",
    "Second Project: Hyperion in Louisiana",
    "Another huge AI center called **Hyperion** is being built in **Louisiana**."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/states/indiana/feed",
   "title": "Indiana AI Data Center Feed",
   "published_at": null,
   "project": "Meta Lebanon AI Data Center",
   "locality": "Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "Announced",
   "announcement_date": "2026-02",
   "project_evidence": [
    "# Indiana AI Data Center Feed",
    "Meta Lebanon AI Data Center (Indiana)"
   ],
   "locality_evidence": [
    "# Indiana AI Data Center Feed",
    "In February 2026, Meta announced a massive $10 billion investment to build a new AI data center campus in the LEAP (Limitless Exploration/Advanced Pace) District of Lebanon, Indiana."
   ],
   "state_evidence": [
    "# Indiana AI Data Center Feed",
    "Meta Lebanon AI Data Center (Indiana)"
   ],
   "capacity_gw_evidence": [
    "# Indiana AI Data Center Feed",
    "Announced1.0 GW",
    "This 1 gigawatt-scale facility is designed to support the"
   ],
   "builder_evidence": [
    "# Indiana AI Data Center Feed",
    "In February 2026, Meta announced a massive $10 billion investment to build a new AI data center campus in the LEAP (Limitless Exploration/Advanced Pace) District of Lebanon, Indiana."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Indiana AI Data Center Feed",
    "Announced1.0 GW"
   ],
   "announcement_date_evidence": [
    "# Indiana AI Data Center Feed",
    "In February 2026, Meta announced a massive $10 billion investment to build a new AI data center campus in the LEAP (Limitless Exploration/Advanced Pace) District of Lebanon, Indiana."
   ]
  },
  {
   "url": "https://aidatacenterindex.com/states/indiana/feed",
   "title": "Indiana AI Data Center Feed",
   "published_at": null,
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.4,
   "builder": "Amazon Web Services",
   "ai_customer": null,
   "status": "Operational",
   "announcement_date": null,
   "project_evidence": [
    "# Indiana AI Data Center Feed",
    "AWS Project Rainier (New Carlisle, Indiana)"
   ],
   "locality_evidence": [
    "# Indiana AI Data Center Feed",
    "AWS Project Rainier (New Carlisle, Indiana)",
    "Amazon Web Services (AWS) is rapidly expanding its \"Project Rainier\" AI supercomputing campus in New Carlisle, Indiana, representing a total investment of $15 billion."
   ],
   "state_evidence": [
    "# Indiana AI Data Center Feed",
    "AWS Project Rainier (New Carlisle, Indiana)"
   ],
   "capacity_gw_evidence": [
    "# Indiana AI Data Center Feed",
    "Operational2.4 GW",
    "The massive 2.4 gigawatt (GW) campus is specifically optimized to serve"
   ],
   "builder_evidence": [
    "# Indiana AI Data Center Feed",
    "Amazon Web Services (AWS) is rapidly expanding its \"Project Rainier\" AI supercomputing campus in New Carlisle, Indiana, representing a total investment of $15 billion."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Indiana AI Data Center Feed",
    "Operational2.4 GW"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/states/indiana/feed",
   "title": "Indiana AI Data Center Feed",
   "published_at": null,
   "project": "Project Zodiac",
   "locality": "Fort Wayne",
   "state": "Indiana",
   "capacity_gw": 1.2,
   "builder": "Google",
   "ai_customer": null,
   "status": "Operational",
   "announcement_date": null,
   "project_evidence": [
    "# Indiana AI Data Center Feed",
    "Google \u2014 Fort Wayne AI Campus",
    "Google's $2 billion data center campus in Fort Wayne, Indiana (Project Zodiac), officially became operational in December 2025."
   ],
   "locality_evidence": [
    "# Indiana AI Data Center Feed",
    "Google \u2014 Fort Wayne AI Campus",
    "Google's $2 billion data center campus in Fort Wayne, Indiana (Project Zodiac), officially became operational in December 2025."
   ],
   "state_evidence": [
    "# Indiana AI Data Center Feed",
    "Google \u2014 Fort Wayne AI Campus",
    "Google's $2 billion data center campus in Fort Wayne, Indiana (Project Zodiac), officially became operational in December 2025."
   ],
   "capacity_gw_evidence": [
    "# Indiana AI Data Center Feed",
    "Operational1.2 GW"
   ],
   "builder_evidence": [
    "# Indiana AI Data Center Feed",
    "Google \u2014 Fort Wayne AI Campus",
    "Google's $2 billion data center campus in Fort Wayne, Indiana (Project Zodiac), officially became operational in December 2025."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Indiana AI Data Center Feed",
    "Operational1.2 GW"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://storagenewsletter.com/2026/07/23/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
   "published_at": "2026-07-23T12:01:07",
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-07-23",
   "project_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "[Crusoe](https://www.crusoe.ai/), a vertically integrated AI infrastructure provider, and [Lancium](https://lancium.com/), an energy technology and infrastructure company, announced a **1.0 gigawatt (GW) AI data center campus in Childress, Texas**."
   ],
   "locality_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "[Crusoe](https://www.crusoe.ai/), a vertically integrated AI infrastructure provider, and [Lancium](https://lancium.com/), an energy technology and infrastructure company, announced a **1.0 gigawatt (GW) AI data center campus in Childress, Texas**."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "[Crusoe](https://www.crusoe.ai/), a vertically integrated AI infrastructure provider, and [Lancium](https://lancium.com/), an energy technology and infrastructure company, announced a **1.0 gigawatt (GW) AI data center campus in Childress, Texas**."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "[Crusoe](https://www.crusoe.ai/), a vertically integrated AI infrastructure provider, and [Lancium](https://lancium.com/), an energy technology and infrastructure company, announced a **1.0 gigawatt (GW) AI data center campus in Childress, Texas**."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "[Crusoe](https://www.crusoe.ai/), a vertically integrated AI infrastructure provider, and [Lancium](https://lancium.com/), an energy technology and infrastructure company, announced a **1.0 gigawatt (GW) AI data center campus in Childress, Texas**."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "## Announcing a 270-acre, 1GW AI data center with solar power and water-efficient cooling; construction begins Q3 2026",
    "Construction is expected to begin in Q3 2026, creating thousands of local construction jobs, more than 100 long-term positions, and a significant long-term economic investment for Childress County."
   ],
   "announcement_date_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "This is a Press Release edited by StorageNewsletter.com on July 23, 2026 at 2:01 pm"
   ]
  },
  {
   "url": "https://storagenewsletter.com/2026/07/23/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
   "published_at": "2026-07-23T12:01:07",
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2013 a remarkable feat of speed for a project of that scale \u2013 before expanding that campus to 1.2 GW."
   ],
   "locality_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2013 a remarkable feat of speed for a project of that scale \u2013 before expanding that campus to 1.2 GW."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "The Childress development is the latest chapter in Crusoe\u2019s deep commitment to Texas."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2013 a remarkable feat of speed for a project of that scale \u2013 before expanding that campus to 1.2 GW."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2013 a remarkable feat of speed for a project of that scale \u2013 before expanding that campus to 1.2 GW."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2013 a remarkable feat of speed for a project of that scale \u2013 before expanding that campus to 1.2 GW."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aol.com/articles/chevrons-microsoft-data-center-deal-150500000.html",
   "title": "Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
   "published_at": "2026-08-29T15:05:00",
   "project": "Project Kilby",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.67,
   "builder": "Energy Forge One",
   "ai_customer": "Microsoft",
   "status": "under development",
   "announcement_date": "2026-06-22",
   "project_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "The agreement is part of Project Kilby, which utilizes GE Vernova's gas turbines to power the data center.",
    "The agreement is [part of Project Kilby](https://www.fool.com/investing/2026/06/22/chevron-is-building-a-massive-power-plant-to-support-a-microsoft-data-center-heres-what-it-means-for-the-energy-stock/?utm_source=AolDailyFinance&utm_medium=feed&utm_campaign=article&referring_guid=3ddacd17-6fde-4f88-99bb-39878102311a), in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "- Chevron entered a 20-year power purchase agreement to supply electricity for a new data center in Texas.",
    "However, even bigger news is that Chevron has entered into a 20-year power purchase agreement (PPA) to build a natural gas-powered facility to power **Microsoft**'s (NASDAQ: MSFT) artificial intelligence (AI)-focused data center in Texas."
   ],
   "capacity_gw_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "The agreement is [part of Project Kilby](https://www.fool.com/investing/2026/06/22/chevron-is-building-a-massive-power-plant-to-support-a-microsoft-data-center-heres-what-it-means-for-the-energy-stock/?utm_source=AolDailyFinance&utm_medium=feed&utm_campaign=article&referring_guid=3ddacd17-6fde-4f88-99bb-39878102311a), in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power."
   ],
   "builder_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "The agreement is [part of Project Kilby](https://www.fool.com/investing/2026/06/22/chevron-is-building-a-massive-power-plant-to-support-a-microsoft-data-center-heres-what-it-means-for-the-energy-stock/?utm_source=AolDailyFinance&utm_medium=feed&utm_campaign=article&referring_guid=3ddacd17-6fde-4f88-99bb-39878102311a), in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power."
   ],
   "ai_customer_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "However, even bigger news is that Chevron has entered into a 20-year power purchase agreement (PPA) to build a natural gas-powered facility to power **Microsoft**'s (NASDAQ: MSFT) artificial intelligence (AI)-focused data center in Texas."
   ],
   "status_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "The agreement is [part of Project Kilby](https://www.fool.com/investing/2026/06/22/chevron-is-building-a-massive-power-plant-to-support-a-microsoft-data-center-heres-what-it-means-for-the-energy-stock/?utm_source=AolDailyFinance&utm_medium=feed&utm_campaign=article&referring_guid=3ddacd17-6fde-4f88-99bb-39878102311a), in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power."
   ],
   "announcement_date_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "On June 22, Chevron inked a 20-year take-or-pay power purchase agreement with Microsoft to provide electricity for a Microsoft-operated data center."
   ]
  },
  {
   "url": "http://idcnova.com/html/1/59/153/4580.html",
   "title": "Vantage Breaks Ground on 1.4GW Texas Data Center Campus for OpenAI's Stargate Project|Idcnova-Media|the gateway to China data center market",
   "published_at": null,
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": "OpenAI and Oracle",
   "status": "under construction",
   "announcement_date": "2025-12-15",
   "project_evidence": [
    "Vantage Breaks Ground on 1.4GW Texas Data Center Campus for OpenAI's Stargate Project",
    "The company announced the groundbreaking for its \"Frontier\" campus in Shackelford County, Texas, over the weekend."
   ],
   "locality_evidence": [
    "Vantage Breaks Ground on 1.4GW Texas Data Center Campus for OpenAI's Stargate Project",
    "The company announced the groundbreaking for its \"Frontier\" campus in Shackelford County, Texas, over the weekend."
   ],
   "state_evidence": [
    "Vantage Breaks Ground on 1.4GW Texas Data Center Campus for OpenAI's Stargate Project",
    "The company announced the groundbreaking for its \"Frontier\" campus in Shackelford County, Texas, over the weekend."
   ],
   "capacity_gw_evidence": [
    "Vantage Breaks Ground on 1.4GW Texas Data Center Campus for OpenAI's Stargate Project",
    "In a LinkedIn post, Vantage stated, \u201cPart of Oracle and OpenAI\u2019s Stargate expansion, the 1.4GW campus will lead to advancements in AI while creating significant regional economic growth, including employing more than 5,000 individuals across construction and operations.\u201d"
   ],
   "builder_evidence": [
    "Vantage Breaks Ground on 1.4GW Texas Data Center Campus for OpenAI's Stargate Project",
    "In a significant move to support the escalating computational demands of artificial intelligence, Vantage Data Centers has commenced construction on a massive new data center campus in Texas."
   ],
   "ai_customer_evidence": [
    "Vantage Breaks Ground on 1.4GW Texas Data Center Campus for OpenAI's Stargate Project",
    "The facility, a key component of the \"Stargate\" expansion project led by OpenAI and Oracle, underscores the hyperscale infrastructure race driven by generative AI development."
   ],
   "status_evidence": [
    "Vantage Breaks Ground on 1.4GW Texas Data Center Campus for OpenAI's Stargate Project",
    "In a significant move to support the escalating computational demands of artificial intelligence, Vantage Data Centers has commenced construction on a massive new data center campus in Texas."
   ],
   "announcement_date_evidence": [
    "Vantage Breaks Ground on 1.4GW Texas Data Center Campus for OpenAI's Stargate Project",
    "December 15, 2025"
   ]
  },
  {
   "url": "https://enlit.world/library/pennsylvania-coal-plant-to-be-turned-into-gas-powered-data-centre-campus",
   "title": "Pennsylvania coal-plant to be turned into gas-powered data centre campus",
   "published_at": null,
   "project": "Homer City Energy Campus",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Kiewit Power Constructors Co.",
   "ai_customer": null,
   "status": "In development",
   "announcement_date": null,
   "project_evidence": [
    "# Pennsylvania coal-plant to be turned into gas-powered data centre campus",
    "The Homer City Energy Campus will be built by Kiewit Power Constructors Co. and be powered by seven of GE Vernova\u2019s 7HA.02 turbines, with the first deliveries expected to begin in 2026 and the project to begin producing power in 2027."
   ],
   "locality_evidence": [
    "# Pennsylvania coal-plant to be turned into gas-powered data centre campus",
    "The former Homer City Generating Station \u2013 previously the largest coal-burning power plant in Pennsylvania \u2013 will be transformed into a 4.5GW combined-cycle gas plant."
   ],
   "state_evidence": [
    "# Pennsylvania coal-plant to be turned into gas-powered data centre campus",
    "The former Homer City Generating Station \u2013 previously the largest coal-burning power plant in Pennsylvania \u2013 will be transformed into a 4.5GW combined-cycle gas plant."
   ],
   "capacity_gw_evidence": [
    "# Pennsylvania coal-plant to be turned into gas-powered data centre campus",
    "The former Homer City Generating Station \u2013 previously the largest coal-burning power plant in Pennsylvania \u2013 will be transformed into a 4.5GW combined-cycle gas plant."
   ],
   "builder_evidence": [
    "# Pennsylvania coal-plant to be turned into gas-powered data centre campus",
    "The Homer City Energy Campus will be built by Kiewit Power Constructors Co. and be powered by seven of GE Vernova\u2019s 7HA.02 turbines, with the first deliveries expected to begin in 2026 and the project to begin producing power in 2027."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Pennsylvania coal-plant to be turned into gas-powered data centre campus",
    "The Homer City Energy Campus will be built by Kiewit Power Constructors Co. and be powered by seven of GE Vernova\u2019s 7HA.02 turbines, with the first deliveries expected to begin in 2026 and the project to begin producing power in 2027."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mlq.ai/news/anthropic-agrees-to-reported-six-year-45-billion-compute-deal-with-nscale",
   "title": "Anthropic agrees to reported six-year, $45 billion compute deal with Nscale",
   "published_at": "2026-08-27T21:10:34",
   "project": "Monarch",
   "locality": "Point Pleasant",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Anthropic",
   "status": "development",
   "announcement_date": null,
   "project_evidence": [
    "# Anthropic agrees to reported six-year, $45 billion compute deal with Nscale",
    "- Anthropic\u2019s reported six-year agreement would reserve about 460 megawatts of power capacity from Nscale\u2019s Monarch campus in West Virginia. [[1]](https://news.bloomberglaw.com/artificial-intelligence/anthropic-to-pay-nscale-45-billion-for-ai-computing-power)"
   ],
   "locality_evidence": [
    "# Anthropic agrees to reported six-year, $45 billion compute deal with Nscale",
    "Nscale\u2019s Monarch Compute Campus is planned for more than 2,250 acres in Mason County, near Point Pleasant."
   ],
   "state_evidence": [
    "# Anthropic agrees to reported six-year, $45 billion compute deal with Nscale",
    "- Anthropic\u2019s reported six-year agreement would reserve about 460 megawatts of power capacity from Nscale\u2019s Monarch campus in West Virginia. [[1]](https://news.bloomberglaw.com/artificial-intelligence/anthropic-to-pay-nscale-45-billion-for-ai-computing-power)"
   ],
   "capacity_gw_evidence": [
    "# Anthropic agrees to reported six-year, $45 billion compute deal with Nscale",
    "The company says the broader site could eventually expand beyond 8 gigawatts. [[3]](https://www.nscale.com/ai-infrastructure/monarch)"
   ],
   "builder_evidence": [
    "# Anthropic agrees to reported six-year, $45 billion compute deal with Nscale",
    "- Anthropic\u2019s reported six-year agreement would reserve about 460 megawatts of power capacity from Nscale\u2019s Monarch campus in West Virginia. [[1]](https://news.bloomberglaw.com/artificial-intelligence/anthropic-to-pay-nscale-45-billion-for-ai-computing-power)"
   ],
   "ai_customer_evidence": [
    "# Anthropic agrees to reported six-year, $45 billion compute deal with Nscale",
    "- Anthropic\u2019s reported six-year agreement would reserve about 460 megawatts of power capacity from Nscale\u2019s Monarch campus in West Virginia. [[1]](https://news.bloomberglaw.com/artificial-intelligence/anthropic-to-pay-nscale-45-billion-for-ai-computing-power)"
   ],
   "status_evidence": [
    "# Anthropic agrees to reported six-year, $45 billion compute deal with Nscale",
    "Monarch is a development project rather than an operating data center."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://note.com/ai_clutch/n/n49f1d9a52c08?hl=en",
   "title": "OpenAI invests $30 billion in a 3.2GW data center and enables voice-controlled agents with GPT-Live Desktop",
   "published_at": "2026-07-25T00:37:07",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "OpenAI invests $30 billion in a 3.2GW data center and enables voice-controlled agents with GPT-Live Desktop",
    "OpenAI is investing over $30 billion in a 3.2-gigawatt hyperscale facility in Georgia called \"Project Camellia,\" and has deployed full-duplex voice for GPT-Live to the desktop to enable hands-free agent orchestration."
   ],
   "locality_evidence": [
    "OpenAI invests $30 billion in a 3.2GW data center and enables voice-controlled agents with GPT-Live Desktop",
    "OpenAI is investing **over $30 billion** in Effingham County, Georgia, as [**Project Camellia**](https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/)."
   ],
   "state_evidence": [
    "OpenAI invests $30 billion in a 3.2GW data center and enables voice-controlled agents with GPT-Live Desktop",
    "OpenAI is investing over $30 billion in a 3.2-gigawatt hyperscale facility in Georgia called \"Project Camellia,\" and has deployed full-duplex voice for GPT-Live to the desktop to enable hands-free agent orchestration."
   ],
   "capacity_gw_evidence": [
    "OpenAI invests $30 billion in a 3.2GW data center and enables voice-controlled agents with GPT-Live Desktop",
    "OpenAI is investing over $30 billion in a 3.2-gigawatt hyperscale facility in Georgia called \"Project Camellia,\" and has deployed full-duplex voice for GPT-Live to the desktop to enable hands-free agent orchestration."
   ],
   "builder_evidence": [
    "OpenAI invests $30 billion in a 3.2GW data center and enables voice-controlled agents with GPT-Live Desktop",
    "OpenAI is investing over $30 billion in a 3.2-gigawatt hyperscale facility in Georgia called \"Project Camellia,\" and has deployed full-duplex voice for GPT-Live to the desktop to enable hands-free agent orchestration."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "OpenAI invests $30 billion in a 3.2GW data center and enables voice-controlled agents with GPT-Live Desktop",
    "**This week, OpenAI made two bets simultaneously: a $30 billion bet on infrastructure and a bet on the desktop interface.** The infrastructure bet is Project Camellia\u2014a 3.2-gigawatt hyperscale data center in Georgia designed to support compute needs through 2032."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tradersunion.com/news/stocks/show/3071125-hut-8-drops-10-1percent-to",
   "title": "Why is Hut 8 stock down today? Key support levels to watch",
   "published_at": "2026-08-21T16:09:39",
   "project": "Beacon Point AI campus",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": "Nvidia",
   "status": "completed full commercialization",
   "announcement_date": null,
   "project_evidence": [
    "# Why is Hut 8 stock down today? Key support levels to watch",
    "- Hut 8 completed full commercialization of its 1 GW Beacon Point AI campus in Texas, significantly expanding infrastructure and service potential.",
    "Hut 8 Corp. completed full commercialization of its 1 GW Beacon Point AI campus in Texas, establishing a major operational milestone that expands its infrastructure and potential service offerings."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# Why is Hut 8 stock down today? Key support levels to watch",
    "- Hut 8 completed full commercialization of its 1 GW Beacon Point AI campus in Texas, significantly expanding infrastructure and service potential.",
    "Hut 8 Corp. completed full commercialization of its 1 GW Beacon Point AI campus in Texas, establishing a major operational milestone that expands its infrastructure and potential service offerings."
   ],
   "capacity_gw_evidence": [
    "# Why is Hut 8 stock down today? Key support levels to watch",
    "- Hut 8 completed full commercialization of its 1 GW Beacon Point AI campus in Texas, significantly expanding infrastructure and service potential.",
    "Hut 8 Corp. completed full commercialization of its 1 GW Beacon Point AI campus in Texas, establishing a major operational milestone that expands its infrastructure and potential service offerings."
   ],
   "builder_evidence": [
    "# Why is Hut 8 stock down today? Key support levels to watch",
    "- Hut 8 completed full commercialization of its 1 GW Beacon Point AI campus in Texas, significantly expanding infrastructure and service potential.",
    "Hut 8 Corp. completed full commercialization of its 1 GW Beacon Point AI campus in Texas, establishing a major operational milestone that expands its infrastructure and potential service offerings."
   ],
   "ai_customer_evidence": [
    "# Why is Hut 8 stock down today? Key support levels to watch",
    "Hut 8 also secured long-term Nvidia leases for the entire 1-GW data center, with options totaling up to $50 billion over 30 years, according to [Timothysykes](https://timothysykes.com/news/hut-8-corp-hut-news-2026_08_20-2)."
   ],
   "status_evidence": [
    "# Why is Hut 8 stock down today? Key support levels to watch",
    "- Hut 8 completed full commercialization of its 1 GW Beacon Point AI campus in Texas, significantly expanding infrastructure and service potential.",
    "Hut 8 Corp. completed full commercialization of its 1 GW Beacon Point AI campus in Texas, establishing a major operational milestone that expands its infrastructure and potential service offerings."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://ksl.com/article/51355852/worlds-largest-data-center-campus-could-be-coming-to-central-utah",
   "title": "World's largest data center campus could be coming to central Utah",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy",
   "ai_customer": "BluSky AI",
   "status": "planned",
   "announcement_date": "2025-08-01",
   "project_evidence": [
    "KEY TAKEAWAYS",
    "DELTA \u2014 The world's largest data center campus may be coming to Utah, with a pair of companies planning to construct artificial intelligence-ready hubs in Millard County.",
    "The first domino fell when Orem-based Fibernet MercuryDelta LLC in May filed a [request](https://millardcounty.gov/wp-content/uploads/2025/05/05282025-PC-Agenda.pdf) to rezone nearly 1,200 acres of property \u2014 located southeast of Delta \u2014 from agricultural land to heavy industrial land for its potential 20-million-square-foot data center campus called Delta Gigasite."
   ],
   "locality_evidence": [
    "KEY TAKEAWAYS",
    "DELTA \u2014 The world's largest data center campus may be coming to Utah, with a pair of companies planning to construct artificial intelligence-ready hubs in Millard County.",
    "The first domino fell when Orem-based Fibernet MercuryDelta LLC in May filed a [request](https://millardcounty.gov/wp-content/uploads/2025/05/05282025-PC-Agenda.pdf) to rezone nearly 1,200 acres of property \u2014 located southeast of Delta \u2014 from agricultural land to heavy industrial land for its potential 20-million-square-foot data center campus called Delta Gigasite."
   ],
   "state_evidence": [
    "KEY TAKEAWAYS",
    "DELTA \u2014 The world's largest data center campus may be coming to Utah, with a pair of companies planning to construct artificial intelligence-ready hubs in Millard County."
   ],
   "capacity_gw_evidence": [
    "KEY TAKEAWAYS",
    "A release from Creekstone Energy said that over the coming decade, the company plans to manage 10 gigawatts of capacity at the site from three primary sources, drawing 1.8 gigawatts from the Intermountain Power Project, 6 gigawatts from solar and 2 gigawatts from natural gas while also considering geothermal, wind and nuclear as potential future additions."
   ],
   "builder_evidence": [
    "KEY TAKEAWAYS",
    "The effort to build what's being billed as the \"world's most powerful data center campus\" took another step forward in early August when Creekstone Energy LLC signed an agreement with Murray-based BluSky AI to provide the company 25 acres of land and up to 50 megawatts of energy for modular data centers on the campus."
   ],
   "ai_customer_evidence": [
    "KEY TAKEAWAYS",
    "Creekstone Energy and BluSky AI signed a land and energy agreement in August to kick off what could be the world's largest data center campus.",
    "The effort to build what's being billed as the \"world's most powerful data center campus\" took another step forward in early August when Creekstone Energy LLC signed an agreement with Murray-based BluSky AI to provide the company 25 acres of land and up to 50 megawatts of energy for modular data centers on the campus."
   ],
   "status_evidence": [
    "KEY TAKEAWAYS",
    "DELTA \u2014 The world's largest data center campus may be coming to Utah, with a pair of companies planning to construct artificial intelligence-ready hubs in Millard County."
   ],
   "announcement_date_evidence": [
    "KEY TAKEAWAYS",
    "Creekstone Energy and BluSky AI signed a land and energy agreement in August to kick off what could be the world's largest data center campus."
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news/stream-dc-to-partner-with-new-era-for-gigawatt-data-center-campus-in-texas",
   "title": "Stream DC to partner with New Era for gigawatt data center campus in Texas",
   "published_at": "2026-08-27T00:00:00",
   "project": "Texas Critical Data Centers campus",
   "locality": "Odessa",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Stream Data Centers",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2024-01-01",
   "project_evidence": [
    "New Era Energy & Digital, Inc. this week announced that it has entered into a non-binding letter of intent (LOI) to form a joint venture with Stream Data Centers for the development and financing of its Texas Critical Data Centers campus (TCDC) in West Texas.",
    "Veteran data center developer Stream is set to partner with a natural gas firm to develop a large-scale campus in Texas."
   ],
   "locality_evidence": [
    "The company first announced plans for a 90MW off-grid data center development outside Odessa in Ector County, Texas, back in 2024.",
    "Veteran data center developer Stream is set to partner with a natural gas firm to develop a large-scale campus in Texas."
   ],
   "state_evidence": [
    "Veteran data center developer Stream is set to partner with a natural gas firm to develop a large-scale campus in Texas.",
    "New Era Energy & Digital, Inc. this week announced that it has entered into a non-binding letter of intent (LOI) to form a joint venture with Stream Data Centers for the development and financing of its Texas Critical Data Centers campus (TCDC) in West Texas."
   ],
   "capacity_gw_evidence": [
    "Powered by a combination of grid capacity and natural gas, the project is now expected to have an initial capacity of around 200MW, with the potential to scale beyond 1GW.",
    "Veteran data center developer Stream is set to partner with a natural gas firm to develop a large-scale campus in Texas."
   ],
   "builder_evidence": [
    "New Era Energy & Digital, Inc. this week announced that it has entered into a non-binding letter of intent (LOI) to form a joint venture with Stream Data Centers for the development and financing of its Texas Critical Data Centers campus (TCDC) in West Texas.",
    "Veteran data center developer Stream is set to partner with a natural gas firm to develop a large-scale campus in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Powered by a combination of grid capacity and natural gas, the project is now expected to have an initial capacity of around 200MW, with the potential to scale beyond 1GW.",
    "Veteran data center developer Stream is set to partner with a natural gas firm to develop a large-scale campus in Texas."
   ],
   "announcement_date_evidence": [
    "The company first announced plans for a 90MW off-grid data center development outside Odessa in Ector County, Texas, back in 2024.",
    "Veteran data center developer Stream is set to partner with a natural gas firm to develop a large-scale campus in Texas."
   ]
  },
  {
   "url": "https://teknotum.net/2026/08/openai-to-lease-massive-8gw-compute-from-ports-pike-facility-in-ohio",
   "title": "OpenAI to lease massive 8GW compute from PORTS-Pike facility in Ohio",
   "published_at": "2026-08-18T01:00:39",
   "project": "PORTS-Pike",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# OpenAI to lease massive 8GW compute from PORTS-Pike facility in Ohio",
    "OpenAI to lease massive 8GW compute from PORTS-Pike facility in Ohio"
   ],
   "locality_evidence": [
    "# OpenAI to lease massive 8GW compute from PORTS-Pike facility in Ohio",
    "OpenAI to lease massive 8GW compute from PORTS-Pike facility in Ohio"
   ],
   "state_evidence": [
    "# OpenAI to lease massive 8GW compute from PORTS-Pike facility in Ohio",
    "OpenAI to lease massive 8GW compute from PORTS-Pike facility in Ohio"
   ],
   "capacity_gw_evidence": [
    "# OpenAI to lease massive 8GW compute from PORTS-Pike facility in Ohio",
    "OpenAI to lease massive 8GW compute from PORTS-Pike facility in Ohio"
   ],
   "builder_evidence": [
    "# OpenAI to lease massive 8GW compute from PORTS-Pike facility in Ohio",
    "The operation will be owned by SoftBank\u2019s SB Energy and backstopped by Nvidia guarantees of $105 billion, with the first 800 megawatts of capacity coming online in 2028."
   ],
   "ai_customer_evidence": [
    "# OpenAI to lease massive 8GW compute from PORTS-Pike facility in Ohio",
    "OpenAI to lease massive 8GW compute from PORTS-Pike facility in Ohio"
   ],
   "status_evidence": [
    "# OpenAI to lease massive 8GW compute from PORTS-Pike facility in Ohio",
    "OpenAI to lease massive 8GW compute from PORTS-Pike facility in Ohio"
   ],
   "announcement_date_evidence": [
    "# OpenAI to lease massive 8GW compute from PORTS-Pike facility in Ohio",
    "Writeups on [Axios](https://www.axios.com/2026/08/17/openai-nvidia-ohio-data-center-sb-energy), [CNBC](https://www.cnbc.com/2026/08/17/nvidia-financing-open-ai-data-center-ohio.html), and [Reuters](https://www.reuters.com/business/media-telecom/nvidia-invest-15-billion-sb-energy-under-openai-data-center-deal-2026-08-17)."
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news/openai-stargates-milam-texas-freebird-data-center-to-span-548950-sq-ft-in-first-phase",
   "title": "OpenAI Stargate's Milam, Texas, 'Freebird' data center to span 548,950 sq ft in first phase",
   "published_at": "2026-08-11T00:00:00",
   "project": "Freebird",
   "locality": "Milam County",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "A filing with the Texas Department of Licensing and Regulation reveals the size of the 'Freebird' Stargate data center's first phase.",
    "OpenAI's planned data center in Milam County, Texas, will comprise a single-story 548,950 square foot (51,000 sqm) data center with four data halls."
   ],
   "locality_evidence": [
    "OpenAI's planned data center in Milam County, Texas, will comprise a single-story 548,950 square foot (51,000 sqm) data center with four data halls.",
    "A filing with the Texas Department of Licensing and Regulation reveals the size of the 'Freebird' Stargate data center's first phase."
   ],
   "state_evidence": [
    "OpenAI's planned data center in Milam County, Texas, will comprise a single-story 548,950 square foot (51,000 sqm) data center with four data halls.",
    "A filing with the Texas Department of Licensing and Regulation reveals the size of the 'Freebird' Stargate data center's first phase."
   ],
   "capacity_gw_evidence": [
    "Freebird's project head is listed as Zoheir Taheri at SB Energy, the SoftBank subsidiary [tasked with](https://www.datacenterdynamics.com/en/news/softbanks-sb-energy-to-build-and-operate-openais-12gw-stargate-data-center-in-milam-county-texas/) building and operating the 1.2GW facility.",
    "OpenAI's planned data center in Milam County, Texas, will comprise a single-story 548,950 square foot (51,000 sqm) data center with four data halls."
   ],
   "builder_evidence": [
    "Freebird's project head is listed as Zoheir Taheri at SB Energy, the SoftBank subsidiary [tasked with](https://www.datacenterdynamics.com/en/news/softbanks-sb-energy-to-build-and-operate-openais-12gw-stargate-data-center-in-milam-county-texas/) building and operating the 1.2GW facility.",
    "OpenAI's planned data center in Milam County, Texas, will comprise a single-story 548,950 square foot (51,000 sqm) data center with four data halls."
   ],
   "ai_customer_evidence": [
    "OpenAI's planned data center in Milam County, Texas, will comprise a single-story 548,950 square foot (51,000 sqm) data center with four data halls.",
    "Freebird's project head is listed as Zoheir Taheri at SB Energy, the SoftBank subsidiary [tasked with](https://www.datacenterdynamics.com/en/news/softbanks-sb-energy-to-build-and-operate-openais-12gw-stargate-data-center-in-milam-county-texas/) building and operating the 1.2GW facility."
   ],
   "status_evidence": [
    "That month, Stargate leader Peter Hoeschele announced that phase one of Freebird had officially topped out.",
    "OpenAI's planned data center in Milam County, Texas, will comprise a single-story 548,950 square foot (51,000 sqm) data center with four data halls."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://theaiconsultingnetwork.com/blog/meta-600b-ai-data-center-infrastructure-cre-investors-2026",
   "title": "Meta's $600B AI Data Center Buildout, Explained (2026)",
   "published_at": "2026-03-08T00:00:00",
   "project": "Hyperion",
   "locality": null,
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Meta's $600 Billion AI Infrastructure Bet: What It Means for CRE Investors",
    "## Key Projects: Hyperion and Prometheus",
    "The 2,250 acre Hyperion campus in Louisiana represents Meta's most ambitious data center project to date."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "Meta's $600 Billion AI Infrastructure Bet: What It Means for CRE Investors",
    "## Key Projects: Hyperion and Prometheus",
    "The 2,250 acre Hyperion campus in Louisiana represents Meta's most ambitious data center project to date."
   ],
   "capacity_gw_evidence": [
    "Meta's $600 Billion AI Infrastructure Bet: What It Means for CRE Investors",
    "## Key Takeaways",
    "The 2,250 acre Hyperion campus in Louisiana will deliver 5 gigawatts of compute power at $10 billion buildout cost, anchored by a nuclear power arrangement."
   ],
   "builder_evidence": [
    "Meta's $600 Billion AI Infrastructure Bet: What It Means for CRE Investors",
    "## Key Projects: Hyperion and Prometheus",
    "The 2,250 acre Hyperion campus in Louisiana represents Meta's most ambitious data center project to date."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://uscareerfinder.com/article/926880504-crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
   "published_at": null,
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": "",
   "status": "announced",
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "locality_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "ai_customer_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "The data center will be purpose-built to support the advanced AI computational requirements of a leading hyperscale technology company."
   ],
   "status_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "announcement_date_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ]
  },
  {
   "url": "https://uscareerfinder.com/article/926880504-crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
   "published_at": null,
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "expanding",
   "announcement_date": null,
   "project_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "## Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene",
    "Childress marks the second site where Crusoe and Lancium are executing this same partnership structure: Lancium acquires and owns the land, secures the power interconnect, and manages energy orchestration for the campus; while Crusoe designs, builds, and operates the AI data center itself."
   ],
   "locality_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "## Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "The Childress development is the latest chapter in Crusoe's deep commitment to Texas."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Childress marks the second site where Crusoe and Lancium are executing this same partnership structure: Lancium acquires and owns the land, secures the power interconnect, and manages energy orchestration for the campus; while Crusoe designs, builds, and operates the AI data center itself."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news/chip-startup-d-matrix-acquires-supernode-and-fabrex-from-gigaio",
   "title": "Chip startup d-Matrix acquires SuperNODE and FabreX from GigaIO",
   "published_at": "2026-08-19T00:00:00",
   "project": null,
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Crusoe",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "Crusoe to develop 1.4GW data center campus in Childress, Texas",
    "## More in North America"
   ],
   "state_evidence": [
    "Crusoe to develop 1.4GW data center campus in Childress, Texas",
    "## More in North America"
   ],
   "capacity_gw_evidence": [
    "Crusoe to develop 1.4GW data center campus in Childress, Texas",
    "## More in North America"
   ],
   "builder_evidence": [
    "Crusoe to develop 1.4GW data center campus in Childress, Texas",
    "## More in North America"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://prnewswire.com/news-releases/fermi-america-makes-initial-draw-on-200-million-equipment-facility-from-keystone-national-group-and-cape-commercial-finance-to-accelerate-the-delivery-of-the-first-2-3gw-of-project-matadors-11gw-private-hypergrid-campus-302693111.html",
   "title": "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
   "published_at": "2026-02-19T21:37:00",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "under development",
   "announcement_date": "2026-02-19",
   "project_evidence": [
    "# Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "The commitment from Keystone National Group, a private credit leader that specializes in asset-backed lending with over $6 billion in deployed capital, underscores that sophisticated institutional investors view Project Matador's power infrastructure assets as premium, financeable assets critical to America's energy future."
   ],
   "locality_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ -- [Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4623677-1&h=4044461773&u=https%3A%2F%2Ffermiamerica.com%2F&a=Fermi+Inc.+(d%2Fb%2Fa+Fermi+America)+(NASDAQ+%26+LSE%3A+FRMI)%2C+operating+as+Fermi+America%E2%84%A2), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "# Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "state_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ -- [Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4623677-1&h=4044461773&u=https%3A%2F%2Ffermiamerica.com%2F&a=Fermi+Inc.+(d%2Fb%2Fa+Fermi+America)+(NASDAQ+%26+LSE%3A+FRMI)%2C+operating+as+Fermi+America%E2%84%A2), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "# Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "capacity_gw_evidence": [
    "# Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "This financing continues to build upon Fermi America's warehouse strategy enabling the aggregation of critical long-lead equipment in an inflationary and tightening supply environment and serves to further solidify Fermi America's power ramp, affirming the company's ability to deliver the first 2.3 of 11 gigawatts of long-duration, reliable power at scale."
   ],
   "builder_evidence": [
    "# Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "By deploying 11GW of dedicated, behind-the-meter power, Fermi America enables America's most strategic industries to scale on project timelines measured in months, unlike traditional interconnection queues measured in years."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "The behind-the-meter Project Matador campus is expected to integrate the nation's biggest combined-cycle natural gas project, one of the largest clean, new nuclear power complexes in America, utility grid power, solar power, and battery energy storage, to support hyperscale AI and advanced computing."
   ],
   "announcement_date_evidence": [
    "# Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ -- [Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4623677-1&h=4044461773&u=https%3A%2F%2Ffermiamerica.com%2F&a=Fermi+Inc.+(d%2Fb%2Fa+Fermi+America)+(NASDAQ+%26+LSE%3A+FRMI)%2C+operating+as+Fermi+America%E2%84%A2), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026."
   ]
  },
  {
   "url": "https://theenergymag.com/news/2026-03-13/nscale-west-virginia-ai",
   "title": "Nscale in Talks to Acquire 8GW West Virginia AI Data Center Site: Report",
   "published_at": "2026-03-13T09:26:09",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "American Intelligence & Power",
   "ai_customer": null,
   "status": "proposed",
   "announcement_date": null,
   "project_evidence": [
    "# Nscale in Talks to Acquire 8GW West Virginia AI Data Center Site: Report",
    "The property\u2014known as the Monarch Compute Campus\u2014is designed to support as much as 8 GW of data center capacity, making it one of the largest proposed AI data center developments in the U.S."
   ],
   "locality_evidence": [
    "# Nscale in Talks to Acquire 8GW West Virginia AI Data Center Site: Report",
    "The potential deal would see Nscale acquire American Intelligence & Power (AIP), the current owner of the site in Mason County, giving the company control over the land along with existing permits and power agreements tied to the project, The Information reported on Friday, citing people familiar with the discussions and fundraising documents."
   ],
   "state_evidence": [
    "# Nscale in Talks to Acquire 8GW West Virginia AI Data Center Site: Report",
    "U.K.-based AI cloud provider Nscale is in talks to acquire a large data center development site in West Virginia that could support up to 8 gigawatts of capacity, according to a report by The Information."
   ],
   "capacity_gw_evidence": [
    "# Nscale in Talks to Acquire 8GW West Virginia AI Data Center Site: Report",
    "U.K.-based AI cloud provider Nscale is in talks to acquire a large data center development site in West Virginia that could support up to 8 gigawatts of capacity, according to a report by The Information.",
    "The property\u2014known as the Monarch Compute Campus\u2014is designed to support as much as 8 GW of data center capacity, making it one of the largest proposed AI data center developments in the U.S."
   ],
   "builder_evidence": [
    "# Nscale in Talks to Acquire 8GW West Virginia AI Data Center Site: Report",
    "The potential deal would see Nscale acquire American Intelligence & Power (AIP), the current owner of the site in Mason County, giving the company control over the land along with existing permits and power agreements tied to the project, The Information reported on Friday, citing people familiar with the discussions and fundraising documents.",
    "The project is backed by Fidelis New Energy and 8090 Industries, which formed AIP earlier this year to develop the site."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Nscale in Talks to Acquire 8GW West Virginia AI Data Center Site: Report",
    "The property\u2014known as the Monarch Compute Campus\u2014is designed to support as much as 8 GW of data center capacity, making it one of the largest proposed AI data center developments in the U.S."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://energyabundance.com/homepage/data-city",
   "title": "Data City Texas",
   "published_at": null,
   "project": "Data City",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance DEVELOPMENT Corporation",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# Data City, Texas",
    "## Introducing Data City, Texas",
    "Data City is a 5GW, 50,000 acre Behind-the-Meter Datacenter Hub located near Laredo, Texas that will deliver dedicated, grid-independent green power straight to your build-to-suit data centers."
   ],
   "locality_evidence": [
    "# Data City, Texas",
    "## Introducing Data City, Texas",
    "Data City is a 5GW, 50,000 acre Behind-the-Meter Datacenter Hub located near Laredo, Texas that will deliver dedicated, grid-independent green power straight to your build-to-suit data centers."
   ],
   "state_evidence": [
    "# Data City, Texas",
    "## Introducing Data City, Texas",
    "Data City is a 5GW, 50,000 acre Behind-the-Meter Datacenter Hub located near Laredo, Texas that will deliver dedicated, grid-independent green power straight to your build-to-suit data centers."
   ],
   "capacity_gw_evidence": [
    "# Data City, Texas",
    "World's Largest Data Center Hub Offering 5GW of Behind-the-Meter Power",
    "## Introducing Data City, Texas",
    "Data City is a 5GW, 50,000 acre Behind-the-Meter Datacenter Hub located near Laredo, Texas that will deliver dedicated, grid-independent green power straight to your build-to-suit data centers."
   ],
   "builder_evidence": [
    "# Data City, Texas",
    "Energy Abundance DEVELOPMENT Corporation",
    "Creating an Abundant Future"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://gate.com/news/detail/openai-announces-30-billion-georgia-data-center-with-32gw-capacity-22861127",
   "title": "OpenAI Announces $30+ Billion Georgia Data Center with 3.2GW Capacity | Gate News",
   "published_at": "2026-07-22T15:59:21",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Announces $30+ Billion Georgia Data Center with 3.2GW Capacity",
    "- OpenAI announced Project Camellia data center in Georgia's Effingham County with over $30 billion investment and 3.2GW capacity.",
    "OpenAI announced a data center project in Georgia's Effingham County near Savannah with total investment exceeding $30 billion for a 3.2-gigawatt facility, naming the initiative 'Project Camellia.'"
   ],
   "locality_evidence": [
    "# OpenAI Announces $30+ Billion Georgia Data Center with 3.2GW Capacity",
    "- OpenAI announced Project Camellia data center in Georgia's Effingham County with over $30 billion investment and 3.2GW capacity.",
    "OpenAI announced a data center project in Georgia's Effingham County near Savannah with total investment exceeding $30 billion for a 3.2-gigawatt facility, naming the initiative 'Project Camellia.'"
   ],
   "state_evidence": [
    "# OpenAI Announces $30+ Billion Georgia Data Center with 3.2GW Capacity",
    "- OpenAI announced Project Camellia data center in Georgia's Effingham County with over $30 billion investment and 3.2GW capacity.",
    "OpenAI announced a data center project in Georgia's Effingham County near Savannah with total investment exceeding $30 billion for a 3.2-gigawatt facility, naming the initiative 'Project Camellia.'"
   ],
   "capacity_gw_evidence": [
    "# OpenAI Announces $30+ Billion Georgia Data Center with 3.2GW Capacity",
    "- OpenAI announced Project Camellia data center in Georgia's Effingham County with over $30 billion investment and 3.2GW capacity.",
    "OpenAI announced a data center project in Georgia's Effingham County near Savannah with total investment exceeding $30 billion for a 3.2-gigawatt facility, naming the initiative 'Project Camellia.'"
   ],
   "builder_evidence": [
    "# OpenAI Announces $30+ Billion Georgia Data Center with 3.2GW Capacity",
    "- OpenAI announced Project Camellia data center in Georgia's Effingham County with over $30 billion investment and 3.2GW capacity.",
    "OpenAI announced a data center project in Georgia's Effingham County near Savannah with total investment exceeding $30 billion for a 3.2-gigawatt facility, naming the initiative 'Project Camellia.'"
   ],
   "ai_customer_evidence": [
    "# OpenAI Announces $30+ Billion Georgia Data Center with 3.2GW Capacity",
    "- OpenAI announced Project Camellia data center in Georgia's Effingham County with over $30 billion investment and 3.2GW capacity.",
    "OpenAI announced a data center project in Georgia's Effingham County near Savannah with total investment exceeding $30 billion for a 3.2-gigawatt facility, naming the initiative 'Project Camellia.'"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://marketsfeedback.com/2026/05/29/terawulf-expands-ai-strategy-with-1gw-data-campus-and-3b-backing",
   "title": "Terawulf Expands AI Strategy With 1GW Data Campus and $3B Backing",
   "published_at": "2026-05-29T05:55:46",
   "project": "Muskie Data Campus",
   "locality": "Eastpark Industrial Park",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "Terawulf Inc.",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": null,
   "project_evidence": [
    "Terawulf Inc. is moving deeper into artificial intelligence (AI) infrastructure with the purchase of a large data center development site in eastern Kentucky, underscoring how former [bitcoin mining](http://www.bitcoin.com/get-started/what-is-bitcoin-mining/) firms are chasing demand for power-hungry computing capacity.",
    "The Nasdaq-listed company said it acquired the \u201cMuskie Data Campus\u201d from Industrial Equity Partners."
   ],
   "locality_evidence": [
    "Terawulf Inc. is moving deeper into artificial intelligence (AI) infrastructure with the purchase of a large data center development site in eastern Kentucky, underscoring how former [bitcoin mining](http://www.bitcoin.com/get-started/what-is-bitcoin-mining/) firms are chasing demand for power-hungry computing capacity.",
    "The site sits inside the 1,000-acre Eastpark Industrial Park in northeastern Kentucky and includes about 285 acres of owned and controlled land."
   ],
   "state_evidence": [
    "Terawulf Inc. is moving deeper into artificial intelligence (AI) infrastructure with the purchase of a large data center development site in eastern Kentucky, underscoring how former [bitcoin mining](http://www.bitcoin.com/get-started/what-is-bitcoin-mining/) firms are chasing demand for power-hungry computing capacity.",
    "The site sits inside the 1,000-acre Eastpark Industrial Park in northeastern Kentucky and includes about 285 acres of owned and controlled land."
   ],
   "capacity_gw_evidence": [
    "Terawulf Inc. is moving deeper into artificial intelligence (AI) infrastructure with the purchase of a large data center development site in eastern Kentucky, underscoring how former [bitcoin mining](http://www.bitcoin.com/get-started/what-is-bitcoin-mining/) firms are chasing demand for power-hungry computing capacity.",
    "Terawulf said the campus is expected to support more than 1 gigawatt of AI and high-performance computing capacity."
   ],
   "builder_evidence": [
    "Terawulf Inc. is moving deeper into artificial intelligence (AI) infrastructure with the purchase of a large data center development site in eastern Kentucky, underscoring how former [bitcoin mining](http://www.bitcoin.com/get-started/what-is-bitcoin-mining/) firms are chasing demand for power-hungry computing capacity.",
    "The Nasdaq-listed company said it acquired the \u201cMuskie Data Campus\u201d from Industrial Equity Partners."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Terawulf Inc. is moving deeper into artificial intelligence (AI) infrastructure with the purchase of a large data center development site in eastern Kentucky, underscoring how former [bitcoin mining](http://www.bitcoin.com/get-started/what-is-bitcoin-mining/) firms are chasing demand for power-hungry computing capacity.",
    "The Nasdaq-listed company said it acquired the \u201cMuskie Data Campus\u201d from Industrial Equity Partners."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://bigcountryhomepage.com/news/iren-annouces-plans-to-expand-in-sweetwater-with-2gw-data-center-hub/amp",
   "title": "IREN annouces plans to expand in Sweetwater with 2GW data center hub",
   "published_at": "2025-03-11T02:55:07",
   "project": "Sweetwater 1",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "IREN",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "**SWEETWATER, Texas ([KTAB/KRBC](https://www.bigcountryhomepage.com/)) \u2013** Data center company IREN is expanding its presence in Sweetwater with the development of a second site, expected to create a 2-gigawatt data center hub that could be used for bitcoin mining and AI ventures.",
    "Sweetwater 1 (1.4GW) is on track to be energized by April 2026, with construction in progress, transformers and electrical equipment being procured, and site prep underway."
   ],
   "locality_evidence": [
    "**SWEETWATER, Texas ([KTAB/KRBC](https://www.bigcountryhomepage.com/)) \u2013** Data center company IREN is expanding its presence in Sweetwater with the development of a second site, expected to create a 2-gigawatt data center hub that could be used for bitcoin mining and AI ventures.",
    "Sweetwater 1 (1.4GW) is on track to be energized by April 2026, with construction in progress, transformers and electrical equipment being procured, and site prep underway."
   ],
   "state_evidence": [
    "**SWEETWATER, Texas ([KTAB/KRBC](https://www.bigcountryhomepage.com/)) \u2013** Data center company IREN is expanding its presence in Sweetwater with the development of a second site, expected to create a 2-gigawatt data center hub that could be used for bitcoin mining and AI ventures.",
    "Sweetwater 1 (1.4GW) is on track to be energized by April 2026, with construction in progress, transformers and electrical equipment being procured, and site prep underway."
   ],
   "capacity_gw_evidence": [
    "**SWEETWATER, Texas ([KTAB/KRBC](https://www.bigcountryhomepage.com/)) \u2013** Data center company IREN is expanding its presence in Sweetwater with the development of a second site, expected to create a 2-gigawatt data center hub that could be used for bitcoin mining and AI ventures.",
    "Sweetwater 1 (1.4GW) is on track to be energized by April 2026, with construction in progress, transformers and electrical equipment being procured, and site prep underway."
   ],
   "builder_evidence": [
    "**SWEETWATER, Texas ([KTAB/KRBC](https://www.bigcountryhomepage.com/)) \u2013** Data center company IREN is expanding its presence in Sweetwater with the development of a second site, expected to create a 2-gigawatt data center hub that could be used for bitcoin mining and AI ventures.",
    "Sweetwater 1 (1.4GW) is on track to be energized by April 2026, with construction in progress, transformers and electrical equipment being procured, and site prep underway."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "**SWEETWATER, Texas ([KTAB/KRBC](https://www.bigcountryhomepage.com/)) \u2013** Data center company IREN is expanding its presence in Sweetwater with the development of a second site, expected to create a 2-gigawatt data center hub that could be used for bitcoin mining and AI ventures.",
    "Sweetwater 1 (1.4GW) is on track to be energized by April 2026, with construction in progress, transformers and electrical equipment being procured, and site prep underway."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://cioinfluence.com/datacentre/ecl-announces-worlds-first-1-gigawatt-off-grid-hydrogen-powered-ai-factory-data-center",
   "title": "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
   "published_at": "2024-09-26T05:34:31",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "Data Center-as-a-Service pioneer [ECL](https://www.ecldc.com/), which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant.",
    "600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions"
   ],
   "locality_evidence": [
    "Data Center-as-a-Service pioneer [ECL](https://www.ecldc.com/), which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant.",
    "600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions"
   ],
   "state_evidence": [
    "Data Center-as-a-Service pioneer [ECL](https://www.ecldc.com/), which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant.",
    "600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions"
   ],
   "capacity_gw_evidence": [
    "Data Center-as-a-Service pioneer [ECL](https://www.ecldc.com/), which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant.",
    "600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions"
   ],
   "builder_evidence": [
    "Data Center-as-a-Service pioneer [ECL](https://www.ecldc.com/), which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant.",
    "600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions"
   ],
   "ai_customer_evidence": [
    "Data Center-as-a-Service pioneer [ECL](https://www.ecldc.com/), which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant.",
    "600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions"
   ],
   "status_evidence": [
    "Data Center-as-a-Service pioneer [ECL](https://www.ecldc.com/), which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant.",
    "600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=meta&term=the-investment-and-markets-channel",
   "title": "News The Investment & Markets Channel, Meta",
   "published_at": "2026-08-27T00:00:00",
   "project": null,
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "BlackRock",
   "ai_customer": "Meta",
   "status": null,
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "# News - The Investment & Markets Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta and BlackRock team up for data center in El Paso, Texas](/en/news/meta-and-blackrock-team-up-for-data-center-in-el-paso-texas/)"
   ],
   "state_evidence": [
    "# News - The Investment & Markets Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta and BlackRock team up for data center in El Paso, Texas](/en/news/meta-and-blackrock-team-up-for-data-center-in-el-paso-texas/)"
   ],
   "capacity_gw_evidence": [
    "# News - The Investment & Markets Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta and BlackRock team up for data center in El Paso, Texas](/en/news/meta-and-blackrock-team-up-for-data-center-in-el-paso-texas/)",
    "Will offer 1GW of compute capacity"
   ],
   "builder_evidence": [
    "# News - The Investment & Markets Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta and BlackRock team up for data center in El Paso, Texas](/en/news/meta-and-blackrock-team-up-for-data-center-in-el-paso-texas/)"
   ],
   "ai_customer_evidence": [
    "# News - The Investment & Markets Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta and BlackRock team up for data center in El Paso, Texas](/en/news/meta-and-blackrock-team-up-for-data-center-in-el-paso-texas/)"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=meta&term=the-investment-and-markets-channel",
   "title": "News The Investment & Markets Channel, Meta",
   "published_at": "2026-08-27T00:00:00",
   "project": "Hyperion",
   "locality": null,
   "state": "Louisiana",
   "capacity_gw": null,
   "builder": "Blue Owl",
   "ai_customer": "Meta",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# News - The Investment & Markets Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta taps Pimco and Blue Owl for $29bn data center financing - report](/en/news/meta-taps-pimco-and-blue-owl-for-29bn-data-center-financing-report/)",
    "Company said to be using funds for Hyperion build-out in Louisiana"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# News - The Investment & Markets Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta taps Pimco and Blue Owl for $29bn data center financing - report](/en/news/meta-taps-pimco-and-blue-owl-for-29bn-data-center-financing-report/)",
    "Company said to be using funds for Hyperion build-out in Louisiana"
   ],
   "capacity_gw_evidence": null,
   "builder_evidence": [
    "# News - The Investment & Markets Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta forms $27bn joint venture with Blue Owl to fund gigawatt-scale AI data center campus in Louisiana](/en/news/meta-forms-27-billion-joint-venture-with-blue-owl-to-fund-gigawatt-scale-ai-data-center-campus-in-louisiana/)"
   ],
   "ai_customer_evidence": [
    "# News - The Investment & Markets Channel, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta forms $27bn joint venture with Blue Owl to fund gigawatt-scale AI data center campus in Louisiana](/en/news/meta-forms-27-billion-joint-venture-with-blue-owl-to-fund-gigawatt-scale-ai-data-center-campus-in-louisiana/)"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://tcdev.de/blog/where-are-claudes-data-centers",
   "title": "Where Are Claude's Data Centers? Fine, Here's the Actual Answer",
   "published_at": "2026-07-21T00:00:00",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon",
   "ai_customer": "Anthropic",
   "status": "opened",
   "announcement_date": "2025-10-29",
   "project_evidence": [
    "The flagship is called Project Rainier, and it sits on former farmland in New Carlisle, Indiana, about 150 kilometers east of Chicago.",
    "Amazon [opened it in October 2025 as an 11 billion dollar campus](https://www.cnbc.com/2025/10/29/amazon-opens-11-billion-ai-data-center-project-rainier-in-indiana.html), the largest capital investment in Indiana's history, and Anthropic is the anchor tenant."
   ],
   "locality_evidence": [
    "The flagship is called Project Rainier, and it sits on former farmland in New Carlisle, Indiana, about 150 kilometers east of Chicago."
   ],
   "state_evidence": [
    "The flagship is called Project Rainier, and it sits on former farmland in New Carlisle, Indiana, about 150 kilometers east of Chicago."
   ],
   "capacity_gw_evidence": [
    "The full buildout runs to [roughly 30 buildings on around 900 acres, drawing more than 2.2 gigawatts from the grid, with 878 backup diesel generators](https://measuredai.substack.com/p/aws-new-carlisle-data-center-campus) standing by for bad days."
   ],
   "builder_evidence": [
    "Amazon [opened it in October 2025 as an 11 billion dollar campus](https://www.cnbc.com/2025/10/29/amazon-opens-11-billion-ai-data-center-project-rainier-in-indiana.html), the largest capital investment in Indiana's history, and Anthropic is the anchor tenant."
   ],
   "ai_customer_evidence": [
    "Amazon [opened it in October 2025 as an 11 billion dollar campus](https://www.cnbc.com/2025/10/29/amazon-opens-11-billion-ai-data-center-project-rainier-in-indiana.html), the largest capital investment in Indiana's history, and Anthropic is the anchor tenant."
   ],
   "status_evidence": [
    "Amazon [opened it in October 2025 as an 11 billion dollar campus](https://www.cnbc.com/2025/10/29/amazon-opens-11-billion-ai-data-center-project-rainier-in-indiana.html), the largest capital investment in Indiana's history, and Anthropic is the anchor tenant."
   ],
   "announcement_date_evidence": [
    "Amazon [opened it in October 2025 as an 11 billion dollar campus](https://www.cnbc.com/2025/10/29/amazon-opens-11-billion-ai-data-center-project-rainier-in-indiana.html), the largest capital investment in Indiana's history, and Anthropic is the anchor tenant."
   ]
  },
  {
   "url": "https://tcdev.de/blog/where-are-claudes-data-centers",
   "title": "Where Are Claude's Data Centers? Fine, Here's the Actual Answer",
   "published_at": "2026-07-21T00:00:00",
   "project": "Stargate",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe",
   "ai_customer": "OpenAI",
   "status": "capped",
   "announcement_date": "2025-09-23",
   "project_evidence": null,
   "locality_evidence": [
    "The flagship sits in Abilene, Texas, built by Crusoe for Oracle, and is designed to hold [more than 450,000 Nvidia GB200 GPUs](https://www.datacenterdynamics.com/en/news/openai-and-oracle-to-deploy-450000-gb200-gpus-at-stargate-abilene-data-center/) across eight buildings."
   ],
   "state_evidence": [
    "The flagship sits in Abilene, Texas, built by Crusoe for Oracle, and is designed to hold [more than 450,000 Nvidia GB200 GPUs](https://www.datacenterdynamics.com/en/news/openai-and-oracle-to-deploy-450000-gb200-gpus-at-stargate-abilene-data-center/) across eight buildings."
   ],
   "capacity_gw_evidence": [
    "It was supposed to keep growing past that, but in March the partners [capped Abilene at 1.2 gigawatts because grid connection delays were running past a year](https://winbuzzer.com/2026/03/09/openai-oracle-cap-texas-ai-data-center-abilene-stargate-xcxwbn/)."
   ],
   "builder_evidence": [
    "The flagship sits in Abilene, Texas, built by Crusoe for Oracle, and is designed to hold [more than 450,000 Nvidia GB200 GPUs](https://www.datacenterdynamics.com/en/news/openai-and-oracle-to-deploy-450000-gb200-gpus-at-stargate-abilene-data-center/) across eight buildings."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "It was supposed to keep growing past that, but in March the partners [capped Abilene at 1.2 gigawatts because grid connection delays were running past a year](https://winbuzzer.com/2026/03/09/openai-oracle-cap-texas-ai-data-center-abilene-stargate-xcxwbn/)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tcdev.de/blog/where-are-claudes-data-centers",
   "title": "Where Are Claude's Data Centers? Fine, Here's the Actual Answer",
   "published_at": "2026-07-21T00:00:00",
   "project": "Colossus",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "",
   "status": "expanding",
   "announcement_date": null,
   "project_evidence": [
    "xAI built its first Colossus cluster in a [former Electrolux factory in Memphis, standing up 100,000 GPUs in 122 days](https://en.wikipedia.org/wiki/Colossus_(data_center)), which remains one of the fastest infrastructure builds anyone has pulled off."
   ],
   "locality_evidence": [
    "xAI built its first Colossus cluster in a [former Electrolux factory in Memphis, standing up 100,000 GPUs in 122 days](https://en.wikipedia.org/wiki/Colossus_(data_center)), which remains one of the fastest infrastructure builds anyone has pulled off."
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "By January the campus had grown to [around 555,000 GPUs, roughly 18 billion dollars in hardware, expanding toward 2 gigawatts](https://introl.com/blog/xai-colossus-2-gigawatt-expansion-555k-gpus-january-2026), smoothed by [168 Tesla Megapacks](https://www.datacenterdynamics.com/en/news/xai-deploys-168-tesla-megapacks-to-power-its-colossus-supercomputer-in-memphis/) because GPU training load swings hard enough to upset a grid."
   ],
   "builder_evidence": [
    "xAI built its first Colossus cluster in a [former Electrolux factory in Memphis, standing up 100,000 GPUs in 122 days](https://en.wikipedia.org/wiki/Colossus_(data_center)), which remains one of the fastest infrastructure builds anyone has pulled off."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "By January the campus had grown to [around 555,000 GPUs, roughly 18 billion dollars in hardware, expanding toward 2 gigawatts](https://introl.com/blog/xai-colossus-2-gigawatt-expansion-555k-gpus-january-2026), smoothed by [168 Tesla Megapacks](https://www.datacenterdynamics.com/en/news/xai-deploys-168-tesla-megapacks-to-power-its-colossus-supercomputer-in-memphis/) because GPU training load swings hard enough to upset a grid."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tcdev.de/blog/where-are-claudes-data-centers",
   "title": "Where Are Claude's Data Centers? Fine, Here's the Actual Answer",
   "published_at": "2026-07-21T00:00:00",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "",
   "status": "doubled the plan",
   "announcement_date": "2026-07-13",
   "project_evidence": [
    "Last week, on July 13, Meta [more than doubled the plan for Hyperion](https://qz.com/meta-louisiana-hyperion-data-center-expansion-5-gigawatts-071326), its campus in Richland Parish, Louisiana: 5 gigawatts of compute and more than 50 billion dollars."
   ],
   "locality_evidence": [
    "Last week, on July 13, Meta [more than doubled the plan for Hyperion](https://qz.com/meta-louisiana-hyperion-data-center-expansion-5-gigawatts-071326), its campus in Richland Parish, Louisiana: 5 gigawatts of compute and more than 50 billion dollars."
   ],
   "state_evidence": [
    "Last week, on July 13, Meta [more than doubled the plan for Hyperion](https://qz.com/meta-louisiana-hyperion-data-center-expansion-5-gigawatts-071326), its campus in Richland Parish, Louisiana: 5 gigawatts of compute and more than 50 billion dollars."
   ],
   "capacity_gw_evidence": [
    "Last week, on July 13, Meta [more than doubled the plan for Hyperion](https://qz.com/meta-louisiana-hyperion-data-center-expansion-5-gigawatts-071326), its campus in Richland Parish, Louisiana: 5 gigawatts of compute and more than 50 billion dollars."
   ],
   "builder_evidence": [
    "Last week, on July 13, Meta [more than doubled the plan for Hyperion](https://qz.com/meta-louisiana-hyperion-data-center-expansion-5-gigawatts-071326), its campus in Richland Parish, Louisiana: 5 gigawatts of compute and more than 50 billion dollars."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Last week, on July 13, Meta [more than doubled the plan for Hyperion](https://qz.com/meta-louisiana-hyperion-data-center-expansion-5-gigawatts-071326), its campus in Richland Parish, Louisiana: 5 gigawatts of compute and more than 50 billion dollars."
   ],
   "announcement_date_evidence": [
    "Last week, on July 13, Meta [more than doubled the plan for Hyperion](https://qz.com/meta-louisiana-hyperion-data-center-expansion-5-gigawatts-071326), its campus in Richland Parish, Louisiana: 5 gigawatts of compute and more than 50 billion dollars."
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=meta&term=north-america",
   "title": "News North America, Meta - DCD",
   "published_at": "2026-08-27T00:00:00",
   "project": null,
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta and BlackRock",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta and BlackRock team up for data center in El Paso, Texas](/en/news/meta-and-blackrock-team-up-for-data-center-in-el-paso-texas/)"
   ],
   "state_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta and BlackRock team up for data center in El Paso, Texas](/en/news/meta-and-blackrock-team-up-for-data-center-in-el-paso-texas/)"
   ],
   "capacity_gw_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "Will offer 1GW of compute capacity"
   ],
   "builder_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta and BlackRock team up for data center in El Paso, Texas](/en/news/meta-and-blackrock-team-up-for-data-center-in-el-paso-texas/)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=meta&term=north-america",
   "title": "News North America, Meta - DCD",
   "published_at": "2026-08-27T00:00:00",
   "project": null,
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Crusoe",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Crusoe to develop 1.4GW data center campus in Childress, Texas](/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/)"
   ],
   "state_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Crusoe to develop 1.4GW data center campus in Childress, Texas](/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/)"
   ],
   "capacity_gw_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Crusoe to develop 1.4GW data center campus in Childress, Texas](/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/)"
   ],
   "builder_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Crusoe to develop 1.4GW data center campus in Childress, Texas](/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=meta&term=north-america",
   "title": "News North America, Meta - DCD",
   "published_at": "2026-08-27T00:00:00",
   "project": null,
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta expands data center campus in Richland Parish, Louisiana, to 5GW & $50bn](/en/news/meta-expands-data-center-campus-in-richland-parish-louisiana-to-5gw-will-invest-50bn/)"
   ],
   "state_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta expands data center campus in Richland Parish, Louisiana, to 5GW & $50bn](/en/news/meta-expands-data-center-campus-in-richland-parish-louisiana-to-5gw-will-invest-50bn/)"
   ],
   "capacity_gw_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta expands data center campus in Richland Parish, Louisiana, to 5GW & $50bn](/en/news/meta-expands-data-center-campus-in-richland-parish-louisiana-to-5gw-will-invest-50bn/)"
   ],
   "builder_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta expands data center campus in Richland Parish, Louisiana, to 5GW & $50bn](/en/news/meta-expands-data-center-campus-in-richland-parish-louisiana-to-5gw-will-invest-50bn/)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://currently.att.yahoo.com/att/chevrons-microsoft-data-center-deal-150500998.html",
   "title": "Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
   "published_at": "2026-08-29T15:05:00",
   "project": "Project Kilby",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.67,
   "builder": "Energy Forge One",
   "ai_customer": "Microsoft",
   "status": "under development",
   "announcement_date": "2026-06-22",
   "project_evidence": [
    "Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "Breaking down Chevron's data center deal with Microsoft",
    "The agreement is [part of Project Kilby](https://www.fool.com/investing/2026/06/22/chevron-is-building-a-massive-power-plant-to-support-a-microsoft-data-center-heres-what-it-means-for-the-energy-stock/?utm_source=yahoo-host-full&utm_medium=feed&utm_campaign=article&referring_guid=3ddacd17-6fde-4f88-99bb-39878102311a), in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "However, even bigger news is that Chevron has entered into a 20-year power purchase agreement (PPA) to build a natural gas-powered facility to power **Microsoft**'s (NASDAQ: MSFT) artificial intelligence (AI)-focused data center in Texas."
   ],
   "capacity_gw_evidence": [
    "Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "Breaking down Chevron's data center deal with Microsoft",
    "The agreement is [part of Project Kilby](https://www.fool.com/investing/2026/06/22/chevron-is-building-a-massive-power-plant-to-support-a-microsoft-data-center-heres-what-it-means-for-the-energy-stock/?utm_source=yahoo-host-full&utm_medium=feed&utm_campaign=article&referring_guid=3ddacd17-6fde-4f88-99bb-39878102311a), in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power."
   ],
   "builder_evidence": [
    "Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "Breaking down Chevron's data center deal with Microsoft",
    "The agreement is [part of Project Kilby](https://www.fool.com/investing/2026/06/22/chevron-is-building-a-massive-power-plant-to-support-a-microsoft-data-center-heres-what-it-means-for-the-energy-stock/?utm_source=yahoo-host-full&utm_medium=feed&utm_campaign=article&referring_guid=3ddacd17-6fde-4f88-99bb-39878102311a), in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power.",
    "Chevron plays a key role as a co-investor and developer through Energy Forge One, as well as a fuel provider."
   ],
   "ai_customer_evidence": [
    "Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "Breaking down Chevron's data center deal with Microsoft",
    "On June 22, Chevron inked a 20-year take-or-pay power purchase agreement with Microsoft to provide electricity for a Microsoft-operated data center."
   ],
   "status_evidence": [
    "Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "Breaking down Chevron's data center deal with Microsoft",
    "The agreement is [part of Project Kilby](https://www.fool.com/investing/2026/06/22/chevron-is-building-a-massive-power-plant-to-support-a-microsoft-data-center-heres-what-it-means-for-the-energy-stock/?utm_source=yahoo-host-full&utm_medium=feed&utm_campaign=article&referring_guid=3ddacd17-6fde-4f88-99bb-39878102311a), in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power."
   ],
   "announcement_date_evidence": [
    "Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "Breaking down Chevron's data center deal with Microsoft",
    "On June 22, Chevron inked a 20-year take-or-pay power purchase agreement with Microsoft to provide electricity for a Microsoft-operated data center."
   ]
  },
  {
   "url": "https://financialpost.com/pmn/business-wire-news-releases-pmn/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand",
   "title": "Vantage Data Centers Unveils Plans for \"Frontier,\" a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
   "published_at": "2025-08-19T11:03:04",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "# Vantage Data Centers Unveils Plans for \"Frontier,\" a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "locality_evidence": [
    "# Vantage Data Centers Unveils Plans for \"Frontier,\" a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "DENVER \u2014 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "# Vantage Data Centers Unveils Plans for \"Frontier,\" a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "DENVER \u2014 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "# Vantage Data Centers Unveils Plans for \"Frontier,\" a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "DENVER \u2014 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "# Vantage Data Centers Unveils Plans for \"Frontier,\" a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "DENVER \u2014 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Vantage Data Centers Unveils Plans for \"Frontier,\" a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": [
    "# Vantage Data Centers Unveils Plans for \"Frontier,\" a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "DENVER \u2014 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ]
  },
  {
   "url": "https://thetechcapital.com/10-billion-4-5gw-data-centre-campus-planned-at-former-coal-power-station-site-in-pennsylvania",
   "title": "$10 billion, 4.5GW data centre campus planned at former coal power station site in Pennsylvania",
   "published_at": "2025-04-03T08:39:11",
   "project": "Homer City Generating Station",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Homer City Redevelopment and Kiewit Power Constructors",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "## [ $10 billion, 4.5GW data centre campus planned at former coal power station site in Pennsylvania ](https://thetechcapital.com/10-billion-4-5gw-data-centre-campus-planned-at-former-coal-power-station-site-in-pennsylvania/)",
    "Homer City Redevelopment (HCR) and Kiewit Power Constructors (Kiewit) are planning to build a 4.5GW data centre campus at the site of the former Homer City Generating Station in Pennsylvania."
   ],
   "locality_evidence": [
    "## [ $10 billion, 4.5GW data centre campus planned at former coal power station site in Pennsylvania ](https://thetechcapital.com/10-billion-4-5gw-data-centre-campus-planned-at-former-coal-power-station-site-in-pennsylvania/)",
    "Homer City Redevelopment (HCR) and Kiewit Power Constructors (Kiewit) are planning to build a 4.5GW data centre campus at the site of the former Homer City Generating Station in Pennsylvania."
   ],
   "state_evidence": [
    "## [ $10 billion, 4.5GW data centre campus planned at former coal power station site in Pennsylvania ](https://thetechcapital.com/10-billion-4-5gw-data-centre-campus-planned-at-former-coal-power-station-site-in-pennsylvania/)",
    "Homer City Redevelopment (HCR) and Kiewit Power Constructors (Kiewit) are planning to build a 4.5GW data centre campus at the site of the former Homer City Generating Station in Pennsylvania."
   ],
   "capacity_gw_evidence": [
    "## [ $10 billion, 4.5GW data centre campus planned at former coal power station site in Pennsylvania ](https://thetechcapital.com/10-billion-4-5gw-data-centre-campus-planned-at-former-coal-power-station-site-in-pennsylvania/)",
    "Homer City Redevelopment (HCR) and Kiewit Power Constructors (Kiewit) are planning to build a 4.5GW data centre campus at the site of the former Homer City Generating Station in Pennsylvania."
   ],
   "builder_evidence": [
    "## [ $10 billion, 4.5GW data centre campus planned at former coal power station site in Pennsylvania ](https://thetechcapital.com/10-billion-4-5gw-data-centre-campus-planned-at-former-coal-power-station-site-in-pennsylvania/)",
    "Homer City Redevelopment (HCR) and Kiewit Power Constructors (Kiewit) are planning to build a 4.5GW data centre campus at the site of the former Homer City Generating Station in Pennsylvania."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## [ $10 billion, 4.5GW data centre campus planned at former coal power station site in Pennsylvania ](https://thetechcapital.com/10-billion-4-5gw-data-centre-campus-planned-at-former-coal-power-station-site-in-pennsylvania/)",
    "Homer City Redevelopment (HCR) and Kiewit Power Constructors (Kiewit) are planning to build a 4.5GW data centre campus at the site of the former Homer City Generating Station in Pennsylvania."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://indo24hours.com/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy-to-compute",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": "2026-03-16T14:34:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "Acquired",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ],
   "locality_evidence": [
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts.",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ],
   "state_evidence": [
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts.",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ],
   "capacity_gw_evidence": [
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031.",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ],
   "builder_evidence": [
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories.",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories.",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*"
   ],
   "announcement_date_evidence": [
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories.",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*"
   ]
  },
  {
   "url": "https://asatunews.co.id/en/utah-approves-leary-data-center",
   "title": "MIDA Approves Kevin O'Leary's 9GW Utah Data Center Project",
   "published_at": "2026-04-27T19:16:53",
   "project": "Stratos",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O'Leary Digital",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "# MIDA Approves Kevin O'Leary's 9GW Utah Data Center Project",
    "The development, named Stratos, will encompass 40,000 acres of private land and an additional 1,200 acres of military and state-owned property.",
    "| Project Name | Location | Target Capacity |",
    "| Stratos (O'Leary Digital) | Utah | 9 GW |"
   ],
   "locality_evidence": [
    "# MIDA Approves Kevin O'Leary's 9GW Utah Data Center Project",
    "[Utah](https://www.asatunews.co.id/en/tag/utah)'s Military Installation Development Authority (MIDA) approved a development agreement on Friday for a massive hyperscale data center campus in Box Elder County."
   ],
   "state_evidence": [
    "# MIDA Approves Kevin O'Leary's 9GW Utah Data Center Project",
    "[Utah](https://www.asatunews.co.id/en/tag/utah)'s Military Installation Development Authority (MIDA) approved a development agreement on Friday for a massive hyperscale data center campus in Box Elder County.",
    "| Project Name | Location | Target Capacity |",
    "| Stratos (O'Leary Digital) | Utah | 9 GW |"
   ],
   "capacity_gw_evidence": [
    "# MIDA Approves Kevin O'Leary's 9GW Utah Data Center Project",
    "The project, led by Kevin O'Leary\u2019s O'Leary Digital, is designed to eventually consume 9 gigawatts of power, representing more than double the entire state's current average electricity usage.",
    "| Project Name | Location | Target Capacity |",
    "| Stratos (O'Leary Digital) | Utah | 9 GW |"
   ],
   "builder_evidence": [
    "# MIDA Approves Kevin O'Leary's 9GW Utah Data Center Project",
    "The project, led by Kevin O'Leary\u2019s O'Leary Digital, is designed to eventually consume 9 gigawatts of power, representing more than double the entire state's current average electricity usage.",
    "| Project Name | Location | Target Capacity |",
    "| Stratos (O'Leary Digital) | Utah | 9 GW |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# MIDA Approves Kevin O'Leary's 9GW Utah Data Center Project",
    "[Utah](https://www.asatunews.co.id/en/tag/utah)'s Military Installation Development Authority (MIDA) approved a development agreement on Friday for a massive hyperscale data center campus in Box Elder County."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://wsbtv.com/news/local/new-data-center-may-use-more-electricity-than-anything-else-georgia/YT6RVDQWNNFMPDRGPTVJRZZ4SU",
   "title": "New data center may use more electricity than anything else in Georgia",
   "published_at": "2026-08-27T21:23:53",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "# New data center may use more electricity than anything else in Georgia",
    "The Georgia Public Service Commission approved the [contract between Georgia Power and OpenAI](https://www.wsbtv.com/news/local/openai-plans-massive-data-center-facility-with-georgia-power-development-start-2028/377IZ4C4LFBGZNEFRENVWR7IMU/) to power the new Project Camellia facility in Effingham County."
   ],
   "locality_evidence": [
    "# New data center may use more electricity than anything else in Georgia",
    "The Georgia Public Service Commission approved the [contract between Georgia Power and OpenAI](https://www.wsbtv.com/news/local/openai-plans-massive-data-center-facility-with-georgia-power-development-start-2028/377IZ4C4LFBGZNEFRENVWR7IMU/) to power the new Project Camellia facility in Effingham County."
   ],
   "state_evidence": [
    "# New data center may use more electricity than anything else in Georgia",
    "EFFINGHAM COUNTY, Ga. \u2014 A massive OpenAI data center that\u2019s been approved could be one of Georgia Power\u2019s largest customers once it is completed."
   ],
   "capacity_gw_evidence": [
    "# New data center may use more electricity than anything else in Georgia",
    "Once completed it is expected to need approximately 3,200 megawatts of power."
   ],
   "builder_evidence": [
    "# New data center may use more electricity than anything else in Georgia",
    "OpenAI is building the facility in phases from 2028 to 2032."
   ],
   "ai_customer_evidence": [
    "# New data center may use more electricity than anything else in Georgia",
    "The Georgia Public Service Commission approved the [contract between Georgia Power and OpenAI](https://www.wsbtv.com/news/local/openai-plans-massive-data-center-facility-with-georgia-power-development-start-2028/377IZ4C4LFBGZNEFRENVWR7IMU/) to power the new Project Camellia facility in Effingham County."
   ],
   "status_evidence": [
    "# New data center may use more electricity than anything else in Georgia",
    "EFFINGHAM COUNTY, Ga. \u2014 A massive OpenAI data center that\u2019s been approved could be one of Georgia Power\u2019s largest customers once it is completed."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://onestopesg.com/esg-news/google-confirms-1gw-data-center-campus-near-detroit-with-2-7gw-clean-power-partnership",
   "title": "Google Confirms 1GW Data Center Campus Near Detroit With 2.7GW Clean Power Partnership",
   "published_at": "2026-03-18T13:13:45",
   "project": "Van Buren Township campus",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Google",
   "ai_customer": null,
   "status": "proposed",
   "announcement_date": null,
   "project_evidence": [
    "Google has confirmed that it is the company behind the proposed 1GW data center campus in Van Buren Township near Detroit, turning what had previously been known as Project Cannoli into one of the most significant digital infrastructure developments currently planned in the US Midwest."
   ],
   "locality_evidence": [
    "Google has confirmed that it is the company behind the proposed 1GW data center campus in Van Buren Township near Detroit, turning what had previously been known as Project Cannoli into one of the most significant digital infrastructure developments currently planned in the US Midwest."
   ],
   "state_evidence": [
    "Michigan is becoming a more important market for large-scale data center investment, particularly as developers look for locations with land availability, industrial infrastructure, and proximity to major population and enterprise corridors."
   ],
   "capacity_gw_evidence": [
    "Google has confirmed that it is the company behind the proposed 1GW data center campus in Van Buren Township near Detroit, turning what had previously been known as Project Cannoli into one of the most significant digital infrastructure developments currently planned in the US Midwest."
   ],
   "builder_evidence": [
    "Google has confirmed that it is the company behind the proposed 1GW data center campus in Van Buren Township near Detroit, turning what had previously been known as Project Cannoli into one of the most significant digital infrastructure developments currently planned in the US Midwest."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Google has confirmed that it is the company behind the proposed 1GW data center campus in Van Buren Township near Detroit, turning what had previously been known as Project Cannoli into one of the most significant digital infrastructure developments currently planned in the US Midwest."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://newsbreak.com/weku-1588671/4842604026167-ky-utility-regulator-oks-electricity-contract-for-terawulf-s-hancock-county-data-center-project",
   "title": "KY utility regulator OKs electricity contract for TeraWulf\u2019s Hancock County data center project - NewsBreak",
   "published_at": "2026-08-21T22:22:05",
   "project": null,
   "locality": null,
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "proposal",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": null,
   "state_evidence": [
    "# KY utility regulator OKs electricity contract for TeraWulf\u2019s Hancock County data center project",
    "However, its proposal for [a 1-gigawatt campus on the border of Boyd and Greenup counties in Eastern Kentucky](https://www.weku.org/the-commonwealth/2026-06-18/terawulf-lays-out-data-center-project-to-skeptical-boyd-county-audience) would be one of the largest."
   ],
   "capacity_gw_evidence": [
    "# KY utility regulator OKs electricity contract for TeraWulf\u2019s Hancock County data center project",
    "However, its proposal for [a 1-gigawatt campus on the border of Boyd and Greenup counties in Eastern Kentucky](https://www.weku.org/the-commonwealth/2026-06-18/terawulf-lays-out-data-center-project-to-skeptical-boyd-county-audience) would be one of the largest."
   ],
   "builder_evidence": [
    "# KY utility regulator OKs electricity contract for TeraWulf\u2019s Hancock County data center project",
    "However, its proposal for [a 1-gigawatt campus on the border of Boyd and Greenup counties in Eastern Kentucky](https://www.weku.org/the-commonwealth/2026-06-18/terawulf-lays-out-data-center-project-to-skeptical-boyd-county-audience) would be one of the largest."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# KY utility regulator OKs electricity contract for TeraWulf\u2019s Hancock County data center project",
    "However, its proposal for [a 1-gigawatt campus on the border of Boyd and Greenup counties in Eastern Kentucky](https://www.weku.org/the-commonwealth/2026-06-18/terawulf-lays-out-data-center-project-to-skeptical-boyd-county-audience) would be one of the largest."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://levelfields.ai/news/hut-8-announces-9-8-billion-ai-data-center-lease",
   "title": "Hut 8 Announces $9.8 Billion AI Data Center Lease",
   "published_at": "2026-07-20T02:20:48",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "fully commercialized",
   "announcement_date": "2026-07-20",
   "project_evidence": [
    "## Hut 8 Announces $9.8 Billion AI Data Center Lease",
    "Hut 8 Corp. (NASDAQ: [HUT](https://www.hut8.com/investors)) announced the full commercialization of its one-gigawatt Beacon Point AI data center campus in Texas through a second 15-year lease valued at $9.8 billion."
   ],
   "locality_evidence": [
    "## Hut 8 Announces $9.8 Billion AI Data Center Lease",
    "The new lease covers 352 megawatts of IT capacity at the Beacon Point campus in Nueces County, Texas."
   ],
   "state_evidence": [
    "## Hut 8 Announces $9.8 Billion AI Data Center Lease",
    "Hut 8 Corp. (NASDAQ: [HUT](https://www.hut8.com/investors)) announced the full commercialization of its one-gigawatt Beacon Point AI data center campus in Texas through a second 15-year lease valued at $9.8 billion."
   ],
   "capacity_gw_evidence": [
    "## Hut 8 Announces $9.8 Billion AI Data Center Lease",
    "Hut 8 Corp. (NASDAQ: [HUT](https://www.hut8.com/investors)) announced the full commercialization of its one-gigawatt Beacon Point AI data center campus in Texas through a second 15-year lease valued at $9.8 billion."
   ],
   "builder_evidence": [
    "## Hut 8 Announces $9.8 Billion AI Data Center Lease",
    "Hut 8 Corp. (NASDAQ: [HUT](https://www.hut8.com/investors)) announced the full commercialization of its one-gigawatt Beacon Point AI data center campus in Texas through a second 15-year lease valued at $9.8 billion."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Hut 8 Announces $9.8 Billion AI Data Center Lease",
    "Hut 8 Corp. (NASDAQ: [HUT](https://www.hut8.com/investors)) announced the full commercialization of its one-gigawatt Beacon Point AI data center campus in Texas through a second 15-year lease valued at $9.8 billion."
   ],
   "announcement_date_evidence": [
    "## Hut 8 Announces $9.8 Billion AI Data Center Lease",
    "July 20, 2026"
   ]
  },
  {
   "url": "https://baxtel.com/data-center/nexus-apex-dfw-hb2",
   "title": "Nexus: Apex DFW HB2",
   "published_at": null,
   "project": "Corsicana Campus",
   "locality": "Corsicana",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Riot Platforms",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Sites within 15 miles of Nexus: Apex DFW HB2",
    "| Distance | Site | About |",
    "| 17.13 miles | [ Crypto Mining Data Center Request Dataset ](/services/datasets) | Riot Platforms initiated a large-scale, 1 gigawatt (\u201cGW\u201d) development to expand its Bitcoin mining and hosting capabilities (\u201cthe Expansion\u201d) in Corsicana, Navarro County, Texas. |",
    "This facility is part of Corsicana Campus."
   ],
   "locality_evidence": [
    "Sites within 15 miles of Nexus: Apex DFW HB2",
    "| Distance | Site | About |",
    "| 17.13 miles | [ Crypto Mining Data Center Request Dataset ](/services/datasets) | Riot Platforms initiated a large-scale, 1 gigawatt (\u201cGW\u201d) development to expand its Bitcoin mining and hosting capabilities (\u201cthe Expansion\u201d) in Corsicana, Navarro County, Texas. |"
   ],
   "state_evidence": [
    "Sites within 15 miles of Nexus: Apex DFW HB2",
    "| Distance | Site | About |",
    "| 17.13 miles | [ Crypto Mining Data Center Request Dataset ](/services/datasets) | Riot Platforms initiated a large-scale, 1 gigawatt (\u201cGW\u201d) development to expand its Bitcoin mining and hosting capabilities (\u201cthe Expansion\u201d) in Corsicana, Navarro County, Texas. |"
   ],
   "capacity_gw_evidence": [
    "Sites within 15 miles of Nexus: Apex DFW HB2",
    "| Distance | Site | About |",
    "| 17.13 miles | [ Crypto Mining Data Center Request Dataset ](/services/datasets) | Riot Platforms initiated a large-scale, 1 gigawatt (\u201cGW\u201d) development to expand its Bitcoin mining and hosting capabilities (\u201cthe Expansion\u201d) in Corsicana, Navarro County, Texas. |"
   ],
   "builder_evidence": [
    "Sites within 15 miles of Nexus: Apex DFW HB2",
    "| Distance | Site | About |",
    "| 17.13 miles | [ Crypto Mining Data Center Request Dataset ](/services/datasets) | Riot Platforms initiated a large-scale, 1 gigawatt (\u201cGW\u201d) development to expand its Bitcoin mining and hosting capabilities (\u201cthe Expansion\u201d) in Corsicana, Navarro County, Texas. |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://baxtel.com/data-center/nexus-apex-dfw-hb2",
   "title": "Nexus: Apex DFW HB2",
   "published_at": null,
   "project": "Lancium Campus",
   "locality": "Turkey",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "QTS",
   "ai_customer": null,
   "status": null,
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "QTS To Develop 11 Data Centers At Lancium Campus In Hall County, Texas",
    "QTS is set to develop data centers at Lancium\u2019s Clean Campus in Hall County, Texas."
   ],
   "locality_evidence": [
    "QTS To Develop 11 Data Centers At Lancium Campus In Hall County, Texas",
    "The companies plan to invest $10 billion to build up to 11 data center buildings across 465 acres near Turkey, Texas."
   ],
   "state_evidence": [
    "QTS To Develop 11 Data Centers At Lancium Campus In Hall County, Texas",
    "QTS is set to develop data centers at Lancium\u2019s Clean Campus in Hall County, Texas."
   ],
   "capacity_gw_evidence": [
    "QTS To Develop 11 Data Centers At Lancium Campus In Hall County, Texas",
    "The site is supported by a 1GW grid connection."
   ],
   "builder_evidence": [
    "QTS To Develop 11 Data Centers At Lancium Campus In Hall County, Texas",
    "QTS is set to develop data centers at Lancium\u2019s Clean Campus in Hall County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": [
    "QTS To Develop 11 Data Centers At Lancium Campus In Hall County, Texas",
    "July 15, 2026 Texas"
   ]
  },
  {
   "url": "https://api.ixbt.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",
   "title": "OpenAI Stargate's Milam, Texas, 'Freebird' data center to span 548,950 sq ft in first phase",
   "published_at": "2026-07-17T00:00:00",
   "project": "Freebird",
   "locality": "Milam County",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "OpenAI's planned data center in Milam County, Texas, will comprise a single-story 548,950 square foot (51,000 sqm) data center with four data halls.",
    "A filing with the Texas Department of Licensing and Regulation reveals the size of the 'Freebird' Stargate data center's first phase."
   ],
   "locality_evidence": [
    "OpenAI's planned data center in Milam County, Texas, will comprise a single-story 548,950 square foot (51,000 sqm) data center with four data halls.",
    "A filing with the Texas Department of Licensing and Regulation reveals the size of the 'Freebird' Stargate data center's first phase."
   ],
   "state_evidence": [
    "OpenAI's planned data center in Milam County, Texas, will comprise a single-story 548,950 square foot (51,000 sqm) data center with four data halls.",
    "A filing with the Texas Department of Licensing and Regulation reveals the size of the 'Freebird' Stargate data center's first phase."
   ],
   "capacity_gw_evidence": [
    "Freebird's project head is listed as Zoheir Taheri at SB Energy, the SoftBank subsidiary [tasked with](https://www.datacenterdynamics.com/en/news/softbanks-sb-energy-to-build-and-operate-openais-12gw-stargate-data-center-in-milam-county-texas/) building and operating the 1.2GW facility.",
    "A filing with the Texas Department of Licensing and Regulation reveals the size of the 'Freebird' Stargate data center's first phase."
   ],
   "builder_evidence": [
    "Freebird's project head is listed as Zoheir Taheri at SB Energy, the SoftBank subsidiary [tasked with](https://www.datacenterdynamics.com/en/news/softbanks-sb-energy-to-build-and-operate-openais-12gw-stargate-data-center-in-milam-county-texas/) building and operating the 1.2GW facility.",
    "A filing with the Texas Department of Licensing and Regulation reveals the size of the 'Freebird' Stargate data center's first phase."
   ],
   "ai_customer_evidence": [
    "OpenAI's planned data center in Milam County, Texas, will comprise a single-story 548,950 square foot (51,000 sqm) data center with four data halls.",
    "A filing with the Texas Department of Licensing and Regulation reveals the size of the 'Freebird' Stargate data center's first phase."
   ],
   "status_evidence": [
    "That month, Stargate leader Peter Hoeschele announced that phase one of Freebird had officially topped out.",
    "A filing with the Texas Department of Licensing and Regulation reveals the size of the 'Freebird' Stargate data center's first phase."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://stromfee.cloud/news/datacenter/r10-meta-prometheus-ohio-en",
   "title": "Nuclear Meets AI: Meta Prometheus Ohio Runs a 1 GW Supercluster on Atomic Power",
   "published_at": "2026-06-15T00:00:00",
   "project": "Meta Prometheus Ohio",
   "locality": "Columbus",
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "Operational phases began in 2024 and expanding continuously, 1 GW target by end 2026, 500+ MW already active",
   "announcement_date": null,
   "project_evidence": [
    "# Nuclear Meets AI: Meta Prometheus Ohio Runs a 1 GW Supercluster on Atomic Power",
    "## Meta Prometheus Ohio \u2014 Columbus, OH, USA",
    "## What Is Meta Prometheus Ohio?"
   ],
   "locality_evidence": [
    "## Meta Prometheus Ohio \u2014 Columbus, OH, USA",
    "Prometheus Ohio is Meta's dedicated AI supercluster in the Columbus metropolitan area, distinct from Meta's Louisiana Hyperion campus (rank 4 globally) in DeRidder."
   ],
   "state_evidence": [
    "# Nuclear Meets AI: Meta Prometheus Ohio Runs a 1 GW Supercluster on Atomic Power",
    "## Meta Prometheus Ohio \u2014 Columbus, OH, USA",
    "Meta chose Ohio."
   ],
   "capacity_gw_evidence": [
    "# Nuclear Meets AI: Meta Prometheus Ohio Runs a 1 GW Supercluster on Atomic Power",
    "- 1 GW target, 500+ MW already active (Terakraft 2026)",
    "According to DataCenter Knowledge's 2026 hyperscaler outlook, Prometheus Ohio carries a 1 GW operational target by end 2026."
   ],
   "builder_evidence": [
    "# Nuclear Meets AI: Meta Prometheus Ohio Runs a 1 GW Supercluster on Atomic Power",
    "## Meta Prometheus Ohio \u2014 Columbus, OH, USA",
    "Prometheus Ohio is Meta's dedicated AI supercluster in the Columbus metropolitan area, distinct from Meta's Louisiana Hyperion campus (rank 4 globally) in DeRidder."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Nuclear Meets AI: Meta Prometheus Ohio Runs a 1 GW Supercluster on Atomic Power",
    "- 1 GW target, 500+ MW already active (Terakraft 2026)",
    "The Columbus site began operational phases in 2024 and has been expanding continuously."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://techjournalmauritania.com/article/926880504-crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
   "published_at": null,
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "locality_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "announcement_date_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ]
  },
  {
   "url": "https://techjournalmauritania.com/article/926880504-crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
   "published_at": null,
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "expanding",
   "announcement_date": "2024-06",
   "project_evidence": [
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW.",
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas"
   ],
   "locality_evidence": [
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW.",
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas"
   ],
   "state_evidence": [
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW.",
    "The Childress development is the latest chapter in Crusoe's deep commitment to Texas."
   ],
   "capacity_gw_evidence": [
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW.",
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas"
   ],
   "builder_evidence": [
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW.",
    "Childress marks the second site where Crusoe and Lancium are executing this same partnership structure: Lancium acquires and owns the land, secures the power interconnect, and manages energy orchestration for the campus; while Crusoe designs, builds, and operates the AI data center itself."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW.",
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas"
   ],
   "announcement_date_evidence": [
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW.",
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas"
   ]
  },
  {
   "url": "https://aijourn.com/energy-abundance-announces-data-city-texas-the-worlds-largest-behind-the-meter-data-center-hub-powered-by-100-24-7-green-energy",
   "title": "Energy Abundance Announces Data City, Texas - The World&#039;s Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy | The AI Journal",
   "published_at": "2025-03-20T15:00:20",
   "project": "Data City",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corporation",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2025-03-20",
   "project_evidence": [
    "HOUSTON, March 20, 2025 /PRNewswire/ \u2014 Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "locality_evidence": [
    "HOUSTON, March 20, 2025 /PRNewswire/ \u2014 Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "state_evidence": [
    "HOUSTON, March 20, 2025 /PRNewswire/ \u2014 Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "capacity_gw_evidence": [
    "HOUSTON, March 20, 2025 /PRNewswire/ \u2014 Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "builder_evidence": [
    "HOUSTON, March 20, 2025 /PRNewswire/ \u2014 Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "HOUSTON, March 20, 2025 /PRNewswire/ \u2014 Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "announcement_date_evidence": [
    "HOUSTON, March 20, 2025 /PRNewswire/ \u2014 Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ]
  },
  {
   "url": "https://blockspace.media/insight/terawulf-kentucky-data-campus-acquisition-ai-lease",
   "title": "KBW says TeraWulf's Kentucky campus acquisition strengthens 2027 AI lease outlook - Blockspace",
   "published_at": "2026-05-27T12:28:46",
   "project": "Muskie Data Campus",
   "locality": "Eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": "2026-05-26",
   "project_evidence": [
    "# KBW says TeraWulf\u2019s Kentucky campus acquisition strengthens 2027 AI lease outlook",
    "Investment bank KBW reiterated its \u201cOutperform\u201d rating and $33 price target on TeraWulf (WULF) after the company acquired the Muskie Data Campus, a 285-acre greenfield site in Eastern Kentucky designed to support roughly 1 GW of gross power capacity, or an estimated 800 MW net."
   ],
   "locality_evidence": [
    "# KBW says TeraWulf\u2019s Kentucky campus acquisition strengthens 2027 AI lease outlook",
    "Investment bank KBW reiterated its \u201cOutperform\u201d rating and $33 price target on TeraWulf (WULF) after the company acquired the Muskie Data Campus, a 285-acre greenfield site in Eastern Kentucky designed to support roughly 1 GW of gross power capacity, or an estimated 800 MW net."
   ],
   "state_evidence": [
    "# KBW says TeraWulf\u2019s Kentucky campus acquisition strengthens 2027 AI lease outlook",
    "Investment bank KBW reiterated its \u201cOutperform\u201d rating and $33 price target on TeraWulf (WULF) after the company acquired the Muskie Data Campus, a 285-acre greenfield site in Eastern Kentucky designed to support roughly 1 GW of gross power capacity, or an estimated 800 MW net."
   ],
   "capacity_gw_evidence": [
    "# KBW says TeraWulf\u2019s Kentucky campus acquisition strengthens 2027 AI lease outlook",
    "Investment bank KBW reiterated its \u201cOutperform\u201d rating and $33 price target on TeraWulf (WULF) after the company acquired the Muskie Data Campus, a 285-acre greenfield site in Eastern Kentucky designed to support roughly 1 GW of gross power capacity, or an estimated 800 MW net."
   ],
   "builder_evidence": [
    "# KBW says TeraWulf\u2019s Kentucky campus acquisition strengthens 2027 AI lease outlook",
    "Investment bank KBW reiterated its \u201cOutperform\u201d rating and $33 price target on TeraWulf (WULF) after the company acquired the Muskie Data Campus, a 285-acre greenfield site in Eastern Kentucky designed to support roughly 1 GW of gross power capacity, or an estimated 800 MW net."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# KBW says TeraWulf\u2019s Kentucky campus acquisition strengthens 2027 AI lease outlook",
    "Investment bank KBW reiterated its \u201cOutperform\u201d rating and $33 price target on TeraWulf (WULF) after the company acquired the Muskie Data Campus, a 285-acre greenfield site in Eastern Kentucky designed to support roughly 1 GW of gross power capacity, or an estimated 800 MW net."
   ],
   "announcement_date_evidence": [
    "# KBW says TeraWulf\u2019s Kentucky campus acquisition strengthens 2027 AI lease outlook",
    "May 27, 2026",
    "TeraWulf [announced the deal](https://investors.terawulf.com/news-events/press-releases/detail/141/terawulf-expands-infrastructure-platform-with-acquisition-of-1-gw-eastern-kentucky-hpc-campus) on May 26 after closing the purchase from Industrial Equity Partners on May 22."
   ]
  },
  {
   "url": "https://aihustlehq.com/iren-energizes-1-4gw-sweetwater-1-texas-site",
   "title": "IREN Energizes 1.4GW Sweetwater 1 Texas Site - AiHustehq",
   "published_at": "2026-05-04T14:06:40",
   "project": "Sweetwater",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "energized",
   "announcement_date": "2026-05-01",
   "project_evidence": [
    "IREN Energizes 1.4GW Sweetwater 1 Texas Site",
    "Energization connects the site\u2019s high-voltage substation to the ERCOT grid and advances development of the broader **2GW Sweetwater campus**.",
    "# IREN Energizes 1.4GW Sweetwater 1 Texas Site"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "IREN Energizes 1.4GW Sweetwater 1 Texas Site",
    "**IREN (NASDAQ: IREN)** announced energization of its **1.4GW Sweetwater 1** data center site in Texas on May 1, 2026.",
    "# IREN Energizes 1.4GW Sweetwater 1 Texas Site"
   ],
   "capacity_gw_evidence": [
    "Energization connects the site\u2019s high-voltage substation to the ERCOT grid and advances development of the broader **2GW Sweetwater campus**.",
    "Sweetwater campus capacity\n2GW",
    "Broader Sweetwater AI data center campus",
    "# IREN Energizes 1.4GW Sweetwater 1 Texas Site"
   ],
   "builder_evidence": [
    "**IREN (NASDAQ: IREN)** announced energization of its **1.4GW Sweetwater 1** data center site in Texas on May 1, 2026.",
    "# IREN Energizes 1.4GW Sweetwater 1 Texas Site"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "**IREN (NASDAQ: IREN)** announced energization of its **1.4GW Sweetwater 1** data center site in Texas on May 1, 2026.",
    "# IREN Energizes 1.4GW Sweetwater 1 Texas Site"
   ],
   "announcement_date_evidence": [
    "**IREN (NASDAQ: IREN)** announced energization of its **1.4GW Sweetwater 1** data center site in Texas on May 1, 2026.",
    "# IREN Energizes 1.4GW Sweetwater 1 Texas Site"
   ]
  },
  {
   "url": "http://openai.com/index/openai-joins-ports-pike-project",
   "title": "OpenAI joins PORTS-Pike project",
   "published_at": "2026-08-19T19:00:00",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# OpenAI joins PORTS-Pike project",
    "OpenAI has entered into an agreement to secure approximately 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, working with SB Energy, NVIDIA, and the U.S. Department of Energy."
   ],
   "locality_evidence": [
    "# OpenAI joins PORTS-Pike project",
    "OpenAI has entered into an agreement to secure approximately 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, working with SB Energy, NVIDIA, and the U.S. Department of Energy."
   ],
   "state_evidence": [
    "# OpenAI joins PORTS-Pike project",
    "OpenAI has entered into an agreement to secure approximately 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, working with SB Energy, NVIDIA, and the U.S. Department of Energy."
   ],
   "capacity_gw_evidence": [
    "# OpenAI joins PORTS-Pike project",
    "OpenAI has entered into an agreement to secure approximately 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, working with SB Energy, NVIDIA, and the U.S. Department of Energy."
   ],
   "builder_evidence": [
    "# OpenAI joins PORTS-Pike project",
    "OpenAI has entered into an agreement to secure approximately 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, working with SB Energy, NVIDIA, and the U.S. Department of Energy.",
    "SB Energy will build, own, and operate the data center under a 20-year lease to OpenAI and deliver capacity over time."
   ],
   "ai_customer_evidence": [
    "# OpenAI joins PORTS-Pike project",
    "OpenAI has entered into an agreement to secure approximately 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, working with SB Energy, NVIDIA, and the U.S. Department of Energy.",
    "SB Energy will build, own, and operate the data center under a 20-year lease to OpenAI and deliver capacity over time."
   ],
   "status_evidence": [
    "# OpenAI joins PORTS-Pike project",
    "OpenAI has entered into an agreement to secure approximately 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, working with SB Energy, NVIDIA, and the U.S. Department of Energy."
   ],
   "announcement_date_evidence": [
    "August 17, 2026",
    "# OpenAI joins PORTS-Pike project"
   ]
  },
  {
   "url": "https://bizwireexpress.com/showstoryGNW.php?storyid=1218424",
   "title": "- Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
   "published_at": null,
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "locality_evidence": [
    "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "state_evidence": [
    "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "builder_evidence": [
    "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Construction is expected to begin in Q3 2026, creating thousands of local construction jobs, more than 100 long-term positions, and a significant long-term economic investment for Childress County."
   ],
   "announcement_date_evidence": [
    "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "2026-07-15"
   ]
  },
  {
   "url": "https://bizwireexpress.com/showstoryGNW.php?storyid=1218424",
   "title": "- Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
   "published_at": null,
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "expanding",
   "announcement_date": null,
   "project_evidence": [
    "The Childress development is the latest chapter in Crusoe's deep commitment to Texas.",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "locality_evidence": [
    "The Childress development is the latest chapter in Crusoe's deep commitment to Texas.",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "state_evidence": [
    "The Childress development is the latest chapter in Crusoe's deep commitment to Texas.",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "capacity_gw_evidence": [
    "The Childress development is the latest chapter in Crusoe's deep commitment to Texas.",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "builder_evidence": [
    "The Childress development is the latest chapter in Crusoe's deep commitment to Texas.",
    "Childress marks the second site where Crusoe and Lancium are executing this same partnership structure: Lancium acquires and owns the land, secures the power interconnect, and manages energy orchestration for the campus; while Crusoe designs, builds, and operates the AI data center itself."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The Childress development is the latest chapter in Crusoe's deep commitment to Texas.",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://proactiveinvestors.com/NASDAQ:FRMI/Fermi-Inc/rns/1832432",
   "title": "Proactive financial news: fast, accessible, and actionable articles and videos for the global investment audience.",
   "published_at": null,
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "locality_evidence": [
    "Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus.",
    "(AMARILLO, Texas) February 20, 2026:[Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://fermiamerica.com/), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026."
   ],
   "state_evidence": [
    "Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus.",
    "(AMARILLO, Texas) February 20, 2026:[Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://fermiamerica.com/), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026."
   ],
   "capacity_gw_evidence": [
    "Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "This financing continues to build upon Fermi America's warehouse strategy enabling the aggregation of critical long-lead equipment in an inflationary and tightening supply environment and serves to further solidify Fermi America's power ramp, affirming the company's ability to deliver the first 2.3 of 11 gigawatts of long-duration, reliable power at scale."
   ],
   "builder_evidence": [
    "Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://fierce-network.com/cloud/old-coal-plant-finds-new-life-ai-data-center-site",
   "title": "Pennsylvania coal plant finds new life as AI data center site",
   "published_at": "2025-04-04T21:14:32",
   "project": "Homer City",
   "locality": null,
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Knighthead Capital",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Not to be know-it-alls, but once again we told you this was coming.",
    "The 3,200-acre site is known as Homer City and will be redeveloped with a $10+ billion investment led by Knighthead Capital."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "Not to be know-it-alls, but once again we told you this was coming.",
    "Yet another old coal site \u2014 this time in Pennsylvania \u2014 is being transformed into a data center campus."
   ],
   "capacity_gw_evidence": [
    "Not to be know-it-alls, but once again we told you this was coming.",
    "But this one has a twist: it\u2019ll provide a whopping 4.5 gigawatts of power generated by natural gas."
   ],
   "builder_evidence": [
    "Not to be know-it-alls, but once again we told you this was coming.",
    "The 3,200-acre site is known as Homer City and will be redeveloped with a $10+ billion investment led by Knighthead Capital."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Not to be know-it-alls, but once again we told you this was coming.",
    "Construction is set to start this year, with power coming online by 2027."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://fierce-network.com/cloud/old-coal-plant-finds-new-life-ai-data-center-site",
   "title": "Pennsylvania coal plant finds new life as AI data center site",
   "published_at": "2025-04-04T21:14:32",
   "project": "Data Center Ridge",
   "locality": null,
   "state": "Virginia",
   "capacity_gw": 1.0,
   "builder": null,
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "## **Gassing AI ambitions**",
    "Back in September, we highlighted the Data Center Ridge project in Virginia, which aims to transform a 450-acre former coal plant into a natural gas-powered 1 GW data center campus."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "## **Gassing AI ambitions**",
    "Back in September, we highlighted the Data Center Ridge project in Virginia, which aims to transform a 450-acre former coal plant into a natural gas-powered 1 GW data center campus."
   ],
   "capacity_gw_evidence": [
    "## **Gassing AI ambitions**",
    "Back in September, we highlighted the Data Center Ridge project in Virginia, which aims to transform a 450-acre former coal plant into a natural gas-powered 1 GW data center campus."
   ],
   "builder_evidence": null,
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://finance.yahoo.com/technology/ai/articles/anthropic-45b-nscale-deal-adds-200722819.html",
   "title": "Anthropic\u2019s $45B Nscale Deal Adds an Eighth Compute Corridor \u2014 and a Pattern of Betting on Startups",
   "published_at": "2026-08-28T20:07:22",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 1.35,
   "builder": "American Intelligence & Power Corporation",
   "ai_customer": "Anthropic",
   "status": "active",
   "announcement_date": null,
   "project_evidence": [
    "Anthropic\u2019s $45B Nscale Deal Adds an Eighth Compute Corridor \u2014 and a Pattern of Betting on Startups",
    "The deal grants the AI firm access to approximately 460 megawatts of capacity at the Monarch Compute Campus in Mason County, West Virginia."
   ],
   "locality_evidence": [
    "Anthropic\u2019s $45B Nscale Deal Adds an Eighth Compute Corridor \u2014 and a Pattern of Betting on Startups",
    "The deal grants the AI firm access to approximately 460 megawatts of capacity at the Monarch Compute Campus in Mason County, West Virginia."
   ],
   "state_evidence": [
    "Anthropic\u2019s $45B Nscale Deal Adds an Eighth Compute Corridor \u2014 and a Pattern of Betting on Startups",
    "The deal grants the AI firm access to approximately 460 megawatts of capacity at the Monarch Compute Campus in Mason County, West Virginia."
   ],
   "capacity_gw_evidence": [
    "Anthropic\u2019s $45B Nscale Deal Adds an Eighth Compute Corridor \u2014 and a Pattern of Betting on Startups",
    "The Monarch site carries a complex history.",
    "Microsoft previously held a letter of intent for the same location, with plans for up to 1.35 gigawatts of capacity."
   ],
   "builder_evidence": [
    "Anthropic\u2019s $45B Nscale Deal Adds an Eighth Compute Corridor \u2014 and a Pattern of Betting on Startups",
    "Anthropic is now stepping into the first of three planned buildings at the 2,250-acre campus, which is being developed alongside the American Intelligence & Power Corporation."
   ],
   "ai_customer_evidence": [
    "Anthropic\u2019s $45B Nscale Deal Adds an Eighth Compute Corridor \u2014 and a Pattern of Betting on Startups",
    "Anthropic has secured its eighth major compute corridor, committing to a $45 billion, six-year rental agreement with Nscale."
   ],
   "status_evidence": [
    "Anthropic\u2019s $45B Nscale Deal Adds an Eighth Compute Corridor \u2014 and a Pattern of Betting on Startups",
    "Anthropic is now stepping into the first of three planned buildings at the 2,250-acre campus, which is being developed alongside the American Intelligence & Power Corporation."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://yahoo.com/news/us/articles/data-center-may-more-electricity-212353940.html",
   "title": "New data center may use more electricity than anything else in Georgia",
   "published_at": "2026-08-27T21:23:53",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "# New data center may use more electricity than anything else in Georgia",
    "The Georgia Public Service Commission approved the [contract between Georgia Power and OpenAI](https://www.wsbtv.com/news/local/openai-plans-massive-data-center-facility-with-georgia-power-development-start-2028/377IZ4C4LFBGZNEFRENVWR7IMU/) to power the new Project Camellia facility in Effingham County."
   ],
   "locality_evidence": [
    "# New data center may use more electricity than anything else in Georgia",
    "The Georgia Public Service Commission approved the [contract between Georgia Power and OpenAI](https://www.wsbtv.com/news/local/openai-plans-massive-data-center-facility-with-georgia-power-development-start-2028/377IZ4C4LFBGZNEFRENVWR7IMU/) to power the new Project Camellia facility in Effingham County."
   ],
   "state_evidence": [
    "# New data center may use more electricity than anything else in Georgia",
    "A massive OpenAI data center that's been approved could be one of Georgia Power's largest customers once it is completed."
   ],
   "capacity_gw_evidence": [
    "# New data center may use more electricity than anything else in Georgia",
    "OpenAI is building the facility in phases from 2028 to 2032. Once completed it is expected to need approximately 3,200 megawatts of power."
   ],
   "builder_evidence": [
    "# New data center may use more electricity than anything else in Georgia",
    "A massive OpenAI data center that's been approved could be one of Georgia Power's largest customers once it is completed."
   ],
   "ai_customer_evidence": [
    "# New data center may use more electricity than anything else in Georgia",
    "A massive OpenAI data center that's been approved could be one of Georgia Power's largest customers once it is completed."
   ],
   "status_evidence": [
    "# New data center may use more electricity than anything else in Georgia",
    "A massive OpenAI data center that's been approved could be one of Georgia Power's largest customers once it is completed."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://michiganadvance.com/2026/06/18/google-data-center-in-van-buren-township-would-destroy-13-acres-of-wetlands",
   "title": "Google data center in Van Buren Township would destroy 13 acres of wetlands",
   "published_at": "2026-06-18T12:30:19",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co",
   "ai_customer": "Google",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Google data center in Van Buren Township would destroy 13 acres of wetlands",
    "The 1-gigawatt \u201cProject Cannoli\u201d [data center](https://planetdetroit.org/issues/data-centers/) is planned for 282 acres at the intersection of Haggerty Road and I-94."
   ],
   "locality_evidence": [
    "# Google data center in Van Buren Township would destroy 13 acres of wetlands",
    "Michigan regulators are reviewing a wetland permit for [Google\u2019s planned data center](https://planetdetroit.org/2026/03/google-dte-data-center-van-buren/) in Van Buren Township, which would destroy 13.55 acres of [wetlands](https://planetdetroit.org/deep-dive/wetlands-in-metro-detroit/) in a county that has already lost 90% of them to development."
   ],
   "state_evidence": [
    "# Google data center in Van Buren Township would destroy 13 acres of wetlands",
    "Michigan regulators are reviewing a wetland permit for [Google\u2019s planned data center](https://planetdetroit.org/2026/03/google-dte-data-center-van-buren/) in Van Buren Township, which would destroy 13.55 acres of [wetlands](https://planetdetroit.org/deep-dive/wetlands-in-metro-detroit/) in a county that has already lost 90% of them to development."
   ],
   "capacity_gw_evidence": [
    "# Google data center in Van Buren Township would destroy 13 acres of wetlands",
    "The 1-gigawatt \u201cProject Cannoli\u201d [data center](https://planetdetroit.org/issues/data-centers/) is planned for 282 acres at the intersection of Haggerty Road and I-94."
   ],
   "builder_evidence": [
    "# Google data center in Van Buren Township would destroy 13 acres of wetlands",
    "The developer, Panattoni Development Co, proposed purchasing 20.6 acres of wetland mitigation bank credits in its project [application](https://www.documentcloud.org/documents/28269261-hqh-q48n-1818y-v7-1-1/)."
   ],
   "ai_customer_evidence": [
    "# Google data center in Van Buren Township would destroy 13 acres of wetlands",
    "Michigan regulators are reviewing a wetland permit for [Google\u2019s planned data center](https://planetdetroit.org/2026/03/google-dte-data-center-van-buren/) in Van Buren Township, which would destroy 13.55 acres of [wetlands](https://planetdetroit.org/deep-dive/wetlands-in-metro-detroit/) in a county that has already lost 90% of them to development."
   ],
   "status_evidence": [
    "# Google data center in Van Buren Township would destroy 13 acres of wetlands",
    "Michigan regulators are reviewing a wetland permit for [Google\u2019s planned data center](https://planetdetroit.org/2026/03/google-dte-data-center-van-buren/) in Van Buren Township, which would destroy 13.55 acres of [wetlands](https://planetdetroit.org/deep-dive/wetlands-in-metro-detroit/) in a county that has already lost 90% of them to development."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://kentucky.com/news/state/kentucky/article317001525.html",
   "title": "Kentucky approves power deal for Hawesville AI data center",
   "published_at": "2026-08-25T15:51:57",
   "project": null,
   "locality": "Boyd and Greenup counties",
   "state": "Kentucky",
   "capacity_gw": 2.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "pursuing",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "# KY regulators approve power deal for major AI data center at former aluminum site"
   ],
   "state_evidence": [
    "[ Kentucky ](https://www.kentucky.com/news/state/kentucky/)",
    "# KY regulators approve power deal for major AI data center at former aluminum site"
   ],
   "capacity_gw_evidence": [
    "# KY regulators approve power deal for major AI data center at former aluminum site"
   ],
   "builder_evidence": [
    "# KY regulators approve power deal for major AI data center at former aluminum site"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# KY regulators approve power deal for major AI data center at former aluminum site"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://stackfutures.com/blog/hut-8-beacon-point-fully-commercialized-19b",
   "title": "Hut 8 Seals Second $9.8B Lease to Fully Commercialize 1GW Beacon Point at $19.6B | Stack Futures",
   "published_at": "2026-07-20T19:10:00",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "fully commercializing",
   "announcement_date": "2026-07-20",
   "project_evidence": [
    "# Hut 8 Seals Second $9.8B Lease to Fully Commercialize 1GW Beacon Point at $19.6B",
    "Hut 8 has signed a second 15-year, $9.8 billion lease at its Beacon Point data center campus in Nueces County, Texas, fully commercializing the 1-gigawatt site."
   ],
   "locality_evidence": [
    "# Hut 8 Seals Second $9.8B Lease to Fully Commercialize 1GW Beacon Point at $19.6B",
    "Hut 8 has signed a second 15-year, $9.8 billion lease at its Beacon Point data center campus in Nueces County, Texas, fully commercializing the 1-gigawatt site."
   ],
   "state_evidence": [
    "# Hut 8 Seals Second $9.8B Lease to Fully Commercialize 1GW Beacon Point at $19.6B",
    "Hut 8 has signed a second 15-year, $9.8 billion lease at its Beacon Point data center campus in Nueces County, Texas, fully commercializing the 1-gigawatt site."
   ],
   "capacity_gw_evidence": [
    "# Hut 8 Seals Second $9.8B Lease to Fully Commercialize 1GW Beacon Point at $19.6B",
    "Hut 8 has signed a second 15-year, $9.8 billion lease at its Beacon Point data center campus in Nueces County, Texas, fully commercializing the 1-gigawatt site."
   ],
   "builder_evidence": [
    "# Hut 8 Seals Second $9.8B Lease to Fully Commercialize 1GW Beacon Point at $19.6B",
    "Hut 8 has signed a second 15-year, $9.8 billion lease at its Beacon Point data center campus in Nueces County, Texas, fully commercializing the 1-gigawatt site."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Hut 8 Seals Second $9.8B Lease to Fully Commercialize 1GW Beacon Point at $19.6B",
    "Hut 8 has signed a second 15-year, $9.8 billion lease at its Beacon Point data center campus in Nueces County, Texas, fully commercializing the 1-gigawatt site."
   ],
   "announcement_date_evidence": [
    "# Hut 8 Seals Second $9.8B Lease to Fully Commercialize 1GW Beacon Point at $19.6B",
    "Hut 8 announced the deal on July 20, 2026."
   ]
  },
  {
   "url": "https://substack.com/redirect/8f41e6f2-54b2-4dd0-91b2-f057220a7138?j=eyJ1IjoiM3djM2MxIn0.OGuf1Irm-qb700DahBb35RT9QTn8SiZLleBWozyCeUk",
   "title": "World's largest data center campus could be coming to central Utah",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "KEY TAKEAWAYS",
    "DELTA \u2014 The world's largest data center campus may be coming to Utah, with a pair of companies planning to construct artificial intelligence-ready hubs in Millard County.",
    "The first domino fell when Orem-based Fibernet MercuryDelta LLC in May filed a [request](https://millardcounty.gov/wp-content/uploads/2025/05/05282025-PC-Agenda.pdf) to rezone nearly 1,200 acres of property \u2014 located southeast of Delta \u2014 from agricultural land to heavy industrial land for its potential 20-million-square-foot data center campus called Delta Gigasite."
   ],
   "locality_evidence": [
    "KEY TAKEAWAYS",
    "DELTA \u2014 The world's largest data center campus may be coming to Utah, with a pair of companies planning to construct artificial intelligence-ready hubs in Millard County.",
    "The first domino fell when Orem-based Fibernet MercuryDelta LLC in May filed a [request](https://millardcounty.gov/wp-content/uploads/2025/05/05282025-PC-Agenda.pdf) to rezone nearly 1,200 acres of property \u2014 located southeast of Delta \u2014 from agricultural land to heavy industrial land for its potential 20-million-square-foot data center campus called Delta Gigasite."
   ],
   "state_evidence": [
    "KEY TAKEAWAYS",
    "DELTA \u2014 The world's largest data center campus may be coming to Utah, with a pair of companies planning to construct artificial intelligence-ready hubs in Millard County."
   ],
   "capacity_gw_evidence": [
    "KEY TAKEAWAYS",
    "A release from Creekstone Energy said that over the coming decade, the company plans to manage 10 gigawatts of capacity at the site from three primary sources, drawing 1.8 gigawatts from the Intermountain Power Project, 6 gigawatts from solar and 2 gigawatts from natural gas while also considering geothermal, wind and nuclear as potential future additions."
   ],
   "builder_evidence": [
    "KEY TAKEAWAYS",
    "A release from Creekstone Energy said that over the coming decade, the company plans to manage 10 gigawatts of capacity at the site from three primary sources, drawing 1.8 gigawatts from the Intermountain Power Project, 6 gigawatts from solar and 2 gigawatts from natural gas while also considering geothermal, wind and nuclear as potential future additions."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "KEY TAKEAWAYS",
    "DELTA \u2014 The world's largest data center campus may be coming to Utah, with a pair of companies planning to construct artificial intelligence-ready hubs in Millard County.",
    "A release from Creekstone Energy said that over the coming decade, the company plans to manage 10 gigawatts of capacity at the site from three primary sources, drawing 1.8 gigawatts from the Intermountain Power Project, 6 gigawatts from solar and 2 gigawatts from natural gas while also considering geothermal, wind and nuclear as potential future additions."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://newswire.telecomramblings.com/2024/09/ecl-announces-worlds-first-1-gigawatt-off-grid-hydrogen-powered-ai-factory-data-center",
   "title": "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
   "published_at": "2024-09-25T17:30:29",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "announced",
   "announcement_date": "2024-09-25",
   "project_evidence": [
    "*600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions*",
    "Data Center-as-a-Service pioneer [ECL](http://www.ecldc.com), which [unveiled](https://www.businesswire.com/news/home/20240620107869/en/ECL-Unveils-World%E2%80%99s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://lambdalabs.com/) as its first tenant."
   ],
   "locality_evidence": [
    "*600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions*",
    "Data Center-as-a-Service pioneer [ECL](http://www.ecldc.com), which [unveiled](https://www.businesswire.com/news/home/20240620107869/en/ECL-Unveils-World%E2%80%99s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://lambdalabs.com/) as its first tenant."
   ],
   "state_evidence": [
    "*600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions*",
    "Data Center-as-a-Service pioneer [ECL](http://www.ecldc.com), which [unveiled](https://www.businesswire.com/news/home/20240620107869/en/ECL-Unveils-World%E2%80%99s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://lambdalabs.com/) as its first tenant."
   ],
   "capacity_gw_evidence": [
    "Data Center-as-a-Service pioneer [ECL](http://www.ecldc.com), which [unveiled](https://www.businesswire.com/news/home/20240620107869/en/ECL-Unveils-World%E2%80%99s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://lambdalabs.com/) as its first tenant.",
    "The initial 1GW phased development may be expanded to 2GW in the future, enabled by its modularity and based on customer demand."
   ],
   "builder_evidence": [
    "Data Center-as-a-Service pioneer [ECL](http://www.ecldc.com), which [unveiled](https://www.businesswire.com/news/home/20240620107869/en/ECL-Unveils-World%E2%80%99s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://lambdalabs.com/) as its first tenant."
   ],
   "ai_customer_evidence": [
    "Data Center-as-a-Service pioneer [ECL](http://www.ecldc.com), which [unveiled](https://www.businesswire.com/news/home/20240620107869/en/ECL-Unveils-World%E2%80%99s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://lambdalabs.com/) as its first tenant."
   ],
   "status_evidence": [
    "Data Center-as-a-Service pioneer [ECL](http://www.ecldc.com), which [unveiled](https://www.businesswire.com/news/home/20240620107869/en/ECL-Unveils-World%E2%80%99s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://lambdalabs.com/) as its first tenant."
   ],
   "announcement_date_evidence": [
    "**MOUNTAIN VIEW, Calif. \u2013 SEPTEMBER 25, 2024 \u2013** Data Center-as-a-Service pioneer [ECL](http://www.ecldc.com), which [unveiled](https://www.businesswire.com/news/home/20240620107869/en/ECL-Unveils-World%E2%80%99s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://lambdalabs.com/) as its first tenant."
   ]
  },
  {
   "url": "https://ai-primer.com/engineer/stories/openai-ohio-8gw-capacity-agreement",
   "title": "Report: OpenAI reportedly commits to 8 GW of Ohio AI capacity",
   "published_at": "2026-08-17T00:00:00",
   "project": "PORTS-Pike campus",
   "locality": null,
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Report: OpenAI reportedly commits to 8 GW of Ohio AI capacity",
    "Reports say OpenAI agreed to secure roughly 8 GW of capacity at Ohio\u2019s PORTS-Pike campus."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "Report: OpenAI reportedly commits to 8 GW of Ohio AI capacity",
    "Reports say OpenAI agreed to secure roughly 8 GW of capacity at Ohio\u2019s PORTS-Pike campus."
   ],
   "capacity_gw_evidence": [
    "Report: OpenAI reportedly commits to 8 GW of Ohio AI capacity",
    "Reports say OpenAI agreed to secure roughly 8 GW of capacity at Ohio\u2019s PORTS-Pike campus."
   ],
   "builder_evidence": [
    "Report: OpenAI reportedly commits to 8 GW of Ohio AI capacity",
    "SB Energy\u2019s [release](https://sbenergy.com/nvidia-ai-compute-ports-pike-ohio/) assigns distinct jobs to the three companies: SB Energy builds, owns and operates the campus; OpenAI leases it for 20 years; NVIDIA supplies the compute stack."
   ],
   "ai_customer_evidence": [
    "Report: OpenAI reportedly commits to 8 GW of Ohio AI capacity",
    "Reports say OpenAI agreed to secure roughly 8 GW of capacity at Ohio\u2019s PORTS-Pike campus."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://bitcoinethereumnews.com/finance/meta-announces-10b-indiana-data-center-while-auditor-flags-27b-louisiana-deal",
   "title": "Meta announces $10B Indiana data center while auditor flags $27B Louisiana deal",
   "published_at": "2026-02-11T20:44:52",
   "project": null,
   "locality": "Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "broke ground",
   "announcement_date": "2026-08-26",
   "project_evidence": null,
   "locality_evidence": [
    "# Meta announces $10B Indiana data center while auditor flags $27B Louisiana deal",
    "Meta announced Wednesday it will pour more than $10 billion into a new data center in Lebanon, Indiana, marking another huge bet on artificial intelligence infrastructure even as questions pile up about how the social media giant finances these projects."
   ],
   "state_evidence": [
    "# Meta announces $10B Indiana data center while auditor flags $27B Louisiana deal",
    "Meta announced Wednesday it will pour more than $10 billion into a new data center in Lebanon, Indiana, marking another huge bet on artificial intelligence infrastructure even as questions pile up about how the social media giant finances these projects."
   ],
   "capacity_gw_evidence": [
    "# Meta announces $10B Indiana data center while auditor flags $27B Louisiana deal",
    "The company broke ground on the site that will deliver one gigawatt of electricity to power AI systems and Meta\u2019s social networks."
   ],
   "builder_evidence": [
    "# Meta announces $10B Indiana data center while auditor flags $27B Louisiana deal",
    "Meta announced Wednesday it will pour more than $10 billion into a new data center in Lebanon, Indiana, marking another huge bet on artificial intelligence infrastructure even as questions pile up about how the social media giant finances these projects.",
    "The company broke ground on the site that will deliver one gigawatt of electricity to power AI systems and Meta\u2019s social networks."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Meta announces $10B Indiana data center while auditor flags $27B Louisiana deal",
    "The company broke ground on the site that will deliver one gigawatt of electricity to power AI systems and Meta\u2019s social networks."
   ],
   "announcement_date_evidence": [
    "# Meta announces $10B Indiana data center while auditor flags $27B Louisiana deal",
    "Meta announced Wednesday it will pour more than $10 billion into a new data center in Lebanon, Indiana, marking another huge bet on artificial intelligence infrastructure even as questions pile up about how the social media giant finances these projects."
   ]
  },
  {
   "url": "https://mitrade.com/insights/news/live-news/article-8-2042362-20260829",
   "title": "Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
   "published_at": "2026-08-29T15:05:00",
   "project": "Project Kilby",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.67,
   "builder": "Energy Forge One",
   "ai_customer": "Microsoft",
   "status": "planned",
   "announcement_date": "2025-06-22",
   "project_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "The agreement is part of Project Kilby, which utilizes GE Vernova's gas turbines to power the data center.",
    "On June 22, Chevron inked a 20-year take-or-pay power purchase agreement with Microsoft to provide electricity for a Microsoft-operated data center."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "- Chevron entered a 20-year power purchase agreement to supply electricity for a new data center in Texas.",
    "However, even bigger news is that Chevron has entered into a 20-year power purchase agreement (PPA) to build a natural gas-powered facility to power **Microsoft**'s (NASDAQ: MSFT) artificial intelligence (AI)-focused data center in Texas."
   ],
   "capacity_gw_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "On June 22, Chevron inked a 20-year take-or-pay power purchase agreement with Microsoft to provide electricity for a Microsoft-operated data center.",
    "The agreement is part of Project Kilby, in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power."
   ],
   "builder_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "On June 22, Chevron inked a 20-year take-or-pay power purchase agreement with Microsoft to provide electricity for a Microsoft-operated data center.",
    "The agreement is part of Project Kilby, in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power.",
    "Chevron plays a key role as a co-investor and developer through Energy Forge One, as well as a fuel provider."
   ],
   "ai_customer_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "However, even bigger news is that Chevron has entered into a 20-year power purchase agreement (PPA) to build a natural gas-powered facility to power **Microsoft**'s (NASDAQ: MSFT) artificial intelligence (AI)-focused data center in Texas.",
    "On June 22, Chevron inked a 20-year take-or-pay power purchase agreement with Microsoft to provide electricity for a Microsoft-operated data center."
   ],
   "status_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "The modular approach enables the project to add capacity over time, and the power plant is expected to begin supplying power by 2028."
   ],
   "announcement_date_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "On June 22, Chevron inked a 20-year take-or-pay power purchase agreement with Microsoft to provide electricity for a Microsoft-operated data center."
   ]
  },
  {
   "url": "https://wirelessestimator.com/articles/2025/digitalbridge-led-capital-fuels-vantages-new-25-billion-1-4-gw-frontier-data-center-in-texas",
   "title": "DigitalBridge-led capital fuels Vantage\u2019s new $25 billion 1.4-GW \u201cFrontier\u201d data center in Texas",
   "published_at": "2025-08-20T22:14:41",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026.",
   "announcement_date": null,
   "project_evidence": [
    "DigitalBridge-led capital fuels Vantage\u2019s new $25 billion 1.4-GW \u201cFrontier\u201d data center in Texas",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "locality_evidence": [
    "Vantage Data Centers, a DigitalBridge Group-backed hyperscale data center portfolio company, has announced its most significant investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "DigitalBridge-led capital fuels Vantage\u2019s new $25 billion 1.4-GW \u201cFrontier\u201d data center in Texas"
   ],
   "state_evidence": [
    "DigitalBridge-led capital fuels Vantage\u2019s new $25 billion 1.4-GW \u201cFrontier\u201d data center in Texas",
    "Vantage Data Centers, a DigitalBridge Group-backed hyperscale data center portfolio company, has announced its most significant investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "DigitalBridge-led capital fuels Vantage\u2019s new $25 billion 1.4-GW \u201cFrontier\u201d data center in Texas",
    "Vantage Data Centers, a DigitalBridge Group-backed hyperscale data center portfolio company, has announced its most significant investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "Vantage Data Centers, a DigitalBridge Group-backed hyperscale data center portfolio company, has announced its most significant investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "DigitalBridge-led capital fuels Vantage\u2019s new $25 billion 1.4-GW \u201cFrontier\u201d data center in Texas"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026.",
    "DigitalBridge-led capital fuels Vantage\u2019s new $25 billion 1.4-GW \u201cFrontier\u201d data center in Texas"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://technode.global/prnasia/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy-to-compute",
   "title": "Nscale Acquires American Intelligence &amp; Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute - TNGlobal",
   "published_at": "2026-03-16T21:34:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*"
   ],
   "locality_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "capacity_gw_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "builder_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "announcement_date_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "March 17, 2026"
   ]
  },
  {
   "url": "http://decarbonfuse.com/posts/energy-abundance-announces-data-city-texas-the-world-s-largest-behind-the-meter-data-center-hub-powered-by-100-24-7-green-energy",
   "title": "decarbonfuse",
   "published_at": null,
   "project": "Data City, Texas",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corporation",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2025-03-21",
   "project_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- [**Energy Abundance Development Corporation**](https://energyabundance.com) has unveiled plans for *Data City, Texas*\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by *100% 24/7 green energy*."
   ],
   "locality_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- [**Energy Abundance Development Corporation**](https://energyabundance.com) has unveiled plans for *Data City, Texas*\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by *100% 24/7 green energy*."
   ],
   "state_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- [**Energy Abundance Development Corporation**](https://energyabundance.com) has unveiled plans for *Data City, Texas*\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by *100% 24/7 green energy*."
   ],
   "capacity_gw_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- [**Energy Abundance Development Corporation**](https://energyabundance.com) has unveiled plans for *Data City, Texas*\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by *100% 24/7 green energy*."
   ],
   "builder_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- [**Energy Abundance Development Corporation**](https://energyabundance.com) has unveiled plans for *Data City, Texas*\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by *100% 24/7 green energy*."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- [**Energy Abundance Development Corporation**](https://energyabundance.com) has unveiled plans for *Data City, Texas*\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by *100% 24/7 green energy*."
   ],
   "announcement_date_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- [**Energy Abundance Development Corporation**](https://energyabundance.com) has unveiled plans for *Data City, Texas*\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by *100% 24/7 green energy*."
   ]
  },
  {
   "url": "https://hoodline.com/2026/04/box-elder-showdown-as-o-leary-s-9gw-wonder-valley-data-colossus-hits-fast-track",
   "title": "Box Elder Showdown as O'Leary's 9GW 'Wonder Valley' Data Colossus Hits Fast Track",
   "published_at": "2026-04-27T17:43:13",
   "project": "Wonder Valley",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O'Leary Digital",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "Box Elder Showdown as O'Leary's 9GW 'Wonder Valley' Data Colossus Hits Fast Track",
    "The Military Installation Development Authority voted this month to approve a development agreement for the Stratos project, naming O'Leary Digital as the lead developer for a \"Wonder Valley\" branded campus that would cover roughly 40,000 acres of private land and about 1,200 acres of military and state-owned property, according to [KPCW](https://www.kpcw.org/state-regional/2026-04-24/mida-shark-tank-kevin-oleary-announce-new-data-center-project-area)."
   ],
   "locality_evidence": [
    "Box Elder Showdown as O'Leary's 9GW 'Wonder Valley' Data Colossus Hits Fast Track",
    "Box Elder County commissioners are set to vote Monday, April 27, on a consent agreement that could clear the runway for a massive hyperscale data center and on-site power campus in northern Utah."
   ],
   "state_evidence": [
    "Box Elder Showdown as O'Leary's 9GW 'Wonder Valley' Data Colossus Hits Fast Track",
    "Box Elder County commissioners are set to vote Monday, April 27, on a consent agreement that could clear the runway for a massive hyperscale data center and on-site power campus in northern Utah."
   ],
   "capacity_gw_evidence": [
    "Box Elder Showdown as O'Leary's 9GW 'Wonder Valley' Data Colossus Hits Fast Track",
    "The Scale: 3 Gigawatts Now, 9 at Full Buildout",
    "Presentations and reporting indicate that Phase 1 would generate about 3 gigawatts of on-site power, with the full campus potentially topping out around 9 gigawatts, a level industry coverage has noted would exceed Utah\u2019s current average electricity use."
   ],
   "builder_evidence": [
    "Box Elder Showdown as O'Leary's 9GW 'Wonder Valley' Data Colossus Hits Fast Track",
    "The Military Installation Development Authority voted this month to approve a development agreement for the Stratos project, naming O'Leary Digital as the lead developer for a \"Wonder Valley\" branded campus that would cover roughly 40,000 acres of private land and about 1,200 acres of military and state-owned property, according to [KPCW](https://www.kpcw.org/state-regional/2026-04-24/mida-shark-tank-kevin-oleary-announce-new-data-center-project-area)."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Box Elder Showdown as O'Leary's 9GW 'Wonder Valley' Data Colossus Hits Fast Track",
    "The Military Installation Development Authority voted this month to approve a development agreement for the Stratos project, naming O'Leary Digital as the lead developer for a \"Wonder Valley\" branded campus that would cover roughly 40,000 acres of private land and about 1,200 acres of military and state-owned property, according to [KPCW](https://www.kpcw.org/state-regional/2026-04-24/mida-shark-tank-kevin-oleary-announce-new-data-center-project-area)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://bryancountynews.com/news/georgia-power-openai-contract-approved-plus-final-dri-report-released-whats-next",
   "title": "Georgia Power, OpenAI contract approved, plus final DRI report released: What\u2019s next?",
   "published_at": "2026-08-28T05:27:53",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "Georgia Power",
   "ai_customer": "OpenAI",
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "ATLANTA \u2013 Both Georgia Power\u2019s contract with OpenAI was approved and the final Development of Regional Impact report for the Effingham County data center was released, Wednesday.",
    "He said the report was the county\u2019s final requirement before it can approve Project Camellia\u2019s preliminary site plan."
   ],
   "locality_evidence": [
    "ATLANTA \u2013 Both Georgia Power\u2019s contract with OpenAI was approved and the final Development of Regional Impact report for the Effingham County data center was released, Wednesday.",
    "He said the report was the county\u2019s final requirement before it can approve Project Camellia\u2019s preliminary site plan."
   ],
   "state_evidence": [
    "ATLANTA \u2013 Both Georgia Power\u2019s contract with OpenAI was approved and the final Development of Regional Impact report for the Effingham County data center was released, Wednesday.",
    "The Georgia Power contract, approved by the Georgia Public Service Commission, secures delivery of 3,200 megawatts of electricity to the data center campus."
   ],
   "capacity_gw_evidence": [
    "At 3.2 gigawatts at full buildout, the campus will require enough electricity to power roughly three Atlanta-sized cities, making OpenAI one of Georgia Power\u2019s largest individual customers."
   ],
   "builder_evidence": [
    "ATLANTA \u2013 Both Georgia Power\u2019s contract with OpenAI was approved and the final Development of Regional Impact report for the Effingham County data center was released, Wednesday.",
    "The Georgia Power contract, approved by the Georgia Public Service Commission, secures delivery of 3,200 megawatts of electricity to the data center campus."
   ],
   "ai_customer_evidence": [
    "ATLANTA \u2013 Both Georgia Power\u2019s contract with OpenAI was approved and the final Development of Regional Impact report for the Effingham County data center was released, Wednesday.",
    "Under the agreement, OpenAI will pay the full cost of the infrastructure required to serve its project."
   ],
   "status_evidence": [
    "ATLANTA \u2013 Both Georgia Power\u2019s contract with OpenAI was approved and the final Development of Regional Impact report for the Effingham County data center was released, Wednesday.",
    "The Georgia Power contract, approved by the Georgia Public Service Commission, secures delivery of 3,200 megawatts of electricity to the data center campus."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://thesuntimesnews.com/weekly-data-center-watch-saline-project-advances-amid-new-rules-and-political-pressure",
   "title": "Weekly Data Center Watch: Saline Project Advances Amid New Rules and Political Pressure",
   "published_at": "2026-08-28T01:32:59",
   "project": "The Barn",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.383,
   "builder": "Related Digital",
   "ai_customer": "Oracle",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "Weekly Data Center Watch: Saline Project Advances Amid New Rules and Political Pressure",
    "The Barn Reaches One Million Union Work Hours",
    "Construction at The Barn data center campus in Saline Township has surpassed 1 million union craft hours, according to Related Digital, which marked the milestone Aug. 27 with Oracle, contractor Walbridge and labor leaders."
   ],
   "locality_evidence": [
    "Weekly Data Center Watch: Saline Project Advances Amid New Rules and Political Pressure",
    "The Barn Reaches One Million Union Work Hours",
    "Construction at The Barn data center campus in Saline Township has surpassed 1 million union craft hours, according to Related Digital, which marked the milestone Aug. 27 with Oracle, contractor Walbridge and labor leaders."
   ],
   "state_evidence": [
    "Weekly Data Center Watch: Saline Project Advances Amid New Rules and Political Pressure",
    "The Barn Reaches One Million Union Work Hours",
    "The milestone came the same day the Michigan Public Service Commission approved updated emergency procedures for DTE Electric that include the 1,383-megawatt Saline Township data center among very large customers subject to firm load shedding before other customers during certain grid emergencies."
   ],
   "capacity_gw_evidence": [
    "Weekly Data Center Watch: Saline Project Advances Amid New Rules and Political Pressure",
    "The Barn Reaches One Million Union Work Hours",
    "The milestone came the same day the Michigan Public Service Commission approved updated emergency procedures for DTE Electric that include the 1,383-megawatt Saline Township data center among very large customers subject to firm load shedding before other customers during certain grid emergencies."
   ],
   "builder_evidence": [
    "Weekly Data Center Watch: Saline Project Advances Amid New Rules and Political Pressure",
    "The Barn Reaches One Million Union Work Hours",
    "Construction at The Barn data center campus in Saline Township has surpassed 1 million union craft hours, according to Related Digital, which marked the milestone Aug. 27 with Oracle, contractor Walbridge and labor leaders."
   ],
   "ai_customer_evidence": [
    "Weekly Data Center Watch: Saline Project Advances Amid New Rules and Political Pressure",
    "The Barn Reaches One Million Union Work Hours",
    "Construction at The Barn data center campus in Saline Township has surpassed 1 million union craft hours, according to Related Digital, which marked the milestone Aug. 27 with Oracle, contractor Walbridge and labor leaders."
   ],
   "status_evidence": [
    "Weekly Data Center Watch: Saline Project Advances Amid New Rules and Political Pressure",
    "The Barn Reaches One Million Union Work Hours",
    "Construction at The Barn data center campus in Saline Township has surpassed 1 million union craft hours, according to Related Digital, which marked the milestone Aug. 27 with Oracle, contractor Walbridge and labor leaders."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://connectmoney.com/stories/hut-8-secures-9-8b-ai-data-center-lease-fully-commercializes-texas-campus",
   "title": "Hut 8 Secures $9.8B AI Data Center Lease, Fully Commercializes Texas Campus",
   "published_at": "2026-07-22T18:10:53",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "fully commercialized",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "Hut 8 Secures $9.8B AI Data Center Lease, Fully Commercializes Texas Campus",
    "Hut 8 Corp. has signed a second 15-year, $9.8 billion lease for its Beacon Point data center campus in Texas, fully commercializing the site\u2019s 1-gigawatt power capacity as demand for artificial intelligence infrastructure continues to accelerate."
   ],
   "locality_evidence": [
    "Hut 8 Secures $9.8B AI Data Center Lease, Fully Commercializes Texas Campus",
    "Located in Nueces County, Texas, the campus is supported by 1,000 MW of utility capacity secured through an interconnection agreement with AEP Texas."
   ],
   "state_evidence": [
    "Hut 8 Secures $9.8B AI Data Center Lease, Fully Commercializes Texas Campus",
    "Hut 8 Corp. has signed a second 15-year, $9.8 billion lease for its Beacon Point data center campus in Texas, fully commercializing the site\u2019s 1-gigawatt power capacity as demand for artificial intelligence infrastructure continues to accelerate."
   ],
   "capacity_gw_evidence": [
    "Hut 8 Secures $9.8B AI Data Center Lease, Fully Commercializes Texas Campus",
    "Hut 8 Corp. has signed a second 15-year, $9.8 billion lease for its Beacon Point data center campus in Texas, fully commercializing the site\u2019s 1-gigawatt power capacity as demand for artificial intelligence infrastructure continues to accelerate."
   ],
   "builder_evidence": [
    "Hut 8 Secures $9.8B AI Data Center Lease, Fully Commercializes Texas Campus",
    "Hut 8 Corp. has signed a second 15-year, $9.8 billion lease for its Beacon Point data center campus in Texas, fully commercializing the site\u2019s 1-gigawatt power capacity as demand for artificial intelligence infrastructure continues to accelerate."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Hut 8 Secures $9.8B AI Data Center Lease, Fully Commercializes Texas Campus",
    "Hut 8 Corp. has signed a second 15-year, $9.8 billion lease for its Beacon Point data center campus in Texas, fully commercializing the site\u2019s 1-gigawatt power capacity as demand for artificial intelligence infrastructure continues to accelerate."
   ],
   "announcement_date_evidence": [
    "Hut 8 Secures $9.8B AI Data Center Lease, Fully Commercializes Texas Campus",
    "[ Infrastructure ](https://www.connectmoney.com/infrastructure) + Alternative Assets + Real Assets + Real Estate | July 22, 2026"
   ]
  },
  {
   "url": "https://stocktitan.net/news/IREN/iren-announces-successful-energization-of-sweetwater-qr3pma6emvyt.html",
   "title": "IREN Energizes 1.4GW Sweetwater 1 Texas Site",
   "published_at": "2026-05-01T20:10:00",
   "project": "Sweetwater campus",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "Energization completed",
   "announcement_date": "2026-05-01",
   "project_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "**IREN (NASDAQ: IREN)** announced energization of its **1.4GW Sweetwater 1** data center site in Texas on May 1, 2026.",
    "Energization connects the site's high-voltage substation to the ERCOT grid and advances development of the broader **2GW Sweetwater campus**."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "**IREN (NASDAQ: IREN)** announced energization of its **1.4GW Sweetwater 1** data center site in Texas on May 1, 2026."
   ],
   "capacity_gw_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "Energization connects the site's high-voltage substation to the ERCOT grid and advances development of the broader **2GW Sweetwater campus**."
   ],
   "builder_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "**IREN (NASDAQ: IREN)** announced energization of its **1.4GW Sweetwater 1** data center site in Texas on May 1, 2026."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "**IREN (NASDAQ: IREN)** announced energization of its **1.4GW Sweetwater 1** data center site in Texas on May 1, 2026."
   ],
   "announcement_date_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "**IREN (NASDAQ: IREN)** announced energization of its **1.4GW Sweetwater 1** data center site in Texas on May 1, 2026."
   ]
  },
  {
   "url": "https://stocktitan.net/news/IREN/iren-announces-successful-energization-of-sweetwater-qr3pma6emvyt.html",
   "title": "IREN Energizes 1.4GW Sweetwater 1 Texas Site",
   "published_at": "2026-05-01T20:10:00",
   "project": "Sweetwater 1",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "IREN",
   "ai_customer": null,
   "status": "Energization completed",
   "announcement_date": "2026-05-01",
   "project_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "**IREN (NASDAQ: IREN)** announced energization of its **1.4GW Sweetwater 1** data center site in Texas on May 1, 2026."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "**IREN (NASDAQ: IREN)** announced energization of its **1.4GW Sweetwater 1** data center site in Texas on May 1, 2026."
   ],
   "capacity_gw_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "**IREN (NASDAQ: IREN)** announced energization of its **1.4GW Sweetwater 1** data center site in Texas on May 1, 2026."
   ],
   "builder_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "**IREN (NASDAQ: IREN)** announced energization of its **1.4GW Sweetwater 1** data center site in Texas on May 1, 2026."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "**IREN (NASDAQ: IREN)** announced energization of its **1.4GW Sweetwater 1** data center site in Texas on May 1, 2026."
   ],
   "announcement_date_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "**IREN (NASDAQ: IREN)** announced energization of its **1.4GW Sweetwater 1** data center site in Texas on May 1, 2026."
   ]
  },
  {
   "url": "https://goodiebase.com/news/openai-ports-pike-ohio-ai-data-center",
   "title": "OpenAI joins Ohio PORTS-Pike AI data center project",
   "published_at": "2026-08-18T03:11:42",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "AI Infrastructure",
    "OpenAI secures 8 IT-GW at Ohio PORTS-Pike campus with Nvidia and SB Energy",
    "OpenAI says it has entered an agreement for approximately 8 IT-gigawatts at the PORTS-Pike Technology Campus in Ohio, with Nvidia compute and SB Energy infrastructure."
   ],
   "locality_evidence": [
    "AI Infrastructure",
    "OpenAI secures 8 IT-GW at Ohio PORTS-Pike campus with Nvidia and SB Energy",
    "OpenAI has entered into an agreement to secure approximately 8 IT-gigawatts of capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, turning a former industrial and national-security site into one of the most closely watched AI infrastructure projects in the United States."
   ],
   "state_evidence": [
    "AI Infrastructure",
    "OpenAI secures 8 IT-GW at Ohio PORTS-Pike campus with Nvidia and SB Energy",
    "OpenAI says it has entered an agreement for approximately 8 IT-gigawatts at the PORTS-Pike Technology Campus in Ohio, with Nvidia compute and SB Energy infrastructure."
   ],
   "capacity_gw_evidence": [
    "AI Infrastructure",
    "OpenAI secures 8 IT-GW at Ohio PORTS-Pike campus with Nvidia and SB Energy",
    "OpenAI says it has entered an agreement for approximately 8 IT-gigawatts at the PORTS-Pike Technology Campus in Ohio, with Nvidia compute and SB Energy infrastructure."
   ],
   "builder_evidence": [
    "AI Infrastructure",
    "OpenAI secures 8 IT-GW at Ohio PORTS-Pike campus with Nvidia and SB Energy",
    "The commercial structure shows how AI infrastructure is becoming its own specialized supply chain. SB Energy will build, own and operate the data center under a 20-year lease to OpenAI, delivering capacity over time."
   ],
   "ai_customer_evidence": [
    "AI Infrastructure",
    "OpenAI secures 8 IT-GW at Ohio PORTS-Pike campus with Nvidia and SB Energy",
    "OpenAI says it has entered an agreement for approximately 8 IT-gigawatts at the PORTS-Pike Technology Campus in Ohio, with Nvidia compute and SB Energy infrastructure."
   ],
   "status_evidence": [
    "AI Infrastructure",
    "OpenAI secures 8 IT-GW at Ohio PORTS-Pike campus with Nvidia and SB Energy",
    "The August 17 announcement says OpenAI will work with SB Energy, Nvidia and the U.S. Department of Energy on a campus designed to support frontier training and growing demand for products such as ChatGPT and Codex."
   ],
   "announcement_date_evidence": [
    "AI Infrastructure",
    "OpenAI secures 8 IT-GW at Ohio PORTS-Pike campus with Nvidia and SB Energy",
    "The August 17 announcement says OpenAI will work with SB Energy, Nvidia and the U.S. Department of Energy on a campus designed to support frontier training and growing demand for products such as ChatGPT and Codex."
   ]
  },
  {
   "url": "https://intuitionlabs.ai/articles/openai-stargate-datacenter-details?trk=article-ssr-frontend-pulse_little-text-block",
   "title": "OpenAI\u2019s Stargate Project: A Guide to the AI Infrastructure",
   "published_at": "2025-10-08T07:36:23",
   "project": "Stargate I",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "## The Stargate Project: An Overview",
    "## Abilene, Texas: Stargate\u2019s Flagship Site"
   ],
   "locality_evidence": [
    "## The Stargate Project: An Overview",
    "## Abilene, Texas: Stargate\u2019s Flagship Site",
    "The first Stargate campus is in **Abilene, Texas**, a consortium-built facility on a vast site."
   ],
   "state_evidence": [
    "## The Stargate Project: An Overview",
    "## Abilene, Texas: Stargate\u2019s Flagship Site",
    "The first Stargate campus is in **Abilene, Texas**, a consortium-built facility on a vast site."
   ],
   "capacity_gw_evidence": [
    "## The Stargate Project: An Overview",
    "## Abilene, Texas: Stargate\u2019s Flagship Site",
    "The full Abilene campus will use **1.2 GW** of power \u2014 enough for roughly one million homes"
   ],
   "builder_evidence": [
    "## The Stargate Project: An Overview",
    "## Abilene, Texas: Stargate\u2019s Flagship Site",
    "Oracle is overseeing Abilene, which is being developed on leased land with *Crusoe Energy* reportedly involved."
   ],
   "ai_customer_evidence": [
    "## The Stargate Project: An Overview",
    "## Abilene, Texas: Stargate\u2019s Flagship Site",
    "Oracle will ultimately deploy over **450,000 GB200 GPUs** at the Abilene campus under a 15-year lease agreement, with the remaining six buildings expected to be completed by mid-2026"
   ],
   "status_evidence": [
    "## The Stargate Project: An Overview",
    "## Abilene, Texas: Stargate\u2019s Flagship Site",
    "Construction began almost immediately after the announcement."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://intuitionlabs.ai/articles/openai-stargate-datacenter-details?trk=article-ssr-frontend-pulse_little-text-block",
   "title": "OpenAI\u2019s Stargate Project: A Guide to the AI Infrastructure",
   "published_at": "2025-10-08T07:36:23",
   "project": "Stargate Michigan",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Related Digital and Oracle",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2025-10-01",
   "project_evidence": [
    "## The Stargate Project: An Overview",
    "## Expanding Beyond Abilene",
    "In October 2025, OpenAI announced another major campus: **Stargate Michigan**, a **1 GW, $7 billion** facility in Saline Township developed by Related Digital and Oracle."
   ],
   "locality_evidence": [
    "## The Stargate Project: An Overview",
    "## Expanding Beyond Abilene",
    "In October 2025, OpenAI announced another major campus: **Stargate Michigan**, a **1 GW, $7 billion** facility in Saline Township developed by Related Digital and Oracle."
   ],
   "state_evidence": [
    "## The Stargate Project: An Overview",
    "## Expanding Beyond Abilene",
    "In October 2025, OpenAI announced another major campus: **Stargate Michigan**, a **1 GW, $7 billion** facility in Saline Township developed by Related Digital and Oracle."
   ],
   "capacity_gw_evidence": [
    "## The Stargate Project: An Overview",
    "## Expanding Beyond Abilene",
    "In October 2025, OpenAI announced another major campus: **Stargate Michigan**, a **1 GW, $7 billion** facility in Saline Township developed by Related Digital and Oracle."
   ],
   "builder_evidence": [
    "## The Stargate Project: An Overview",
    "## Expanding Beyond Abilene",
    "In October 2025, OpenAI announced another major campus: **Stargate Michigan**, a **1 GW, $7 billion** facility in Saline Township developed by Related Digital and Oracle."
   ],
   "ai_customer_evidence": [
    "## The Stargate Project: An Overview",
    "## Expanding Beyond Abilene",
    "In October 2025, OpenAI announced another major campus: **Stargate Michigan**, a **1 GW, $7 billion** facility in Saline Township developed by Related Digital and Oracle."
   ],
   "status_evidence": [
    "## The Stargate Project: An Overview",
    "## Expanding Beyond Abilene",
    "Dubbed \"The Barn\" (for a historic red barn preserved at the entrance), it will consist of three 550,000-sq-ft buildings on 250 acres, with construction beginning in early 2026 and over 2,500 union construction jobs"
   ],
   "announcement_date_evidence": [
    "## The Stargate Project: An Overview",
    "## Expanding Beyond Abilene",
    "In October 2025, OpenAI announced another major campus: **Stargate Michigan**, a **1 GW, $7 billion** facility in Saline Township developed by Related Digital and Oracle."
   ]
  },
  {
   "url": "https://tr.tesery.com/blogs/news/elon-musk-s-xai-unveils-historic-20-billion-investment-in-mississippi-for-2gw-ai-data-center",
   "title": "Elon Musk\u2019s xAI Unveils Historic $20 Billion Investment in Mississippi for 2GW AI Data Center",
   "published_at": "2026-01-09T12:12:48",
   "project": "MACROHARDRR",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Named \"MACROHARDRR,\" the facility will push xAI's total Colossus training compute to approximately 2GW, making it the most powerful AI system on Earth.",
    "Quick Summary: xAI's $20B Mississippi Data Center Project name: \"MACROHARDRR\" \u2014 xAI's third massive data center in the greater Memphis area Investment: $20+ billion \u2014 largest economic development project in Mississippi history Location: Southaven, Mississippi \u2014 just south of the Tennessee border; adjacent to Memphis xAI cluster Capacity: ~2 gigawatts \u2014 equivalent to two nuclear reactor units; powers ~1.5 million homes Operations start: February 2026 Total xAI compute: Pushes Colossus training cluster to ~2GW \u2014 \"by far the most powerful AI system on Earth\" (Musk) Jobs: Hundreds of permanent high-tech jobs in DeSoto County Incentives: Mississippi Data Center Incentive program (sales/use tax exemptions) + Southaven/DeSoto County fee-in-lieu agreements Governor Reeves: \"This is the largest economic development project in Mississippi's history.\""
   ],
   "locality_evidence": [
    "Location: Southaven, Mississippi \u2014 just south of the Tennessee border; adjacent to Memphis xAI cluster",
    "Quick Summary: xAI's $20B Mississippi Data Center Project name: \"MACROHARDRR\" \u2014 xAI's third massive data center in the greater Memphis area Investment: $20+ billion \u2014 largest economic development project in Mississippi history Location: Southaven, Mississippi \u2014 just south of the Tennessee border; adjacent to Memphis xAI cluster Capacity: ~2 gigawatts \u2014 equivalent to two nuclear reactor units; powers ~1.5 million homes Operations start: February 2026 Total xAI compute: Pushes Colossus training cluster to ~2GW \u2014 \"by far the most powerful AI system on Earth\" (Musk) Jobs: Hundreds of permanent high-tech jobs in DeSoto County Incentives: Mississippi Data Center Incentive program (sales/use tax exemptions) + Southaven/DeSoto County fee-in-lieu agreements Governor Reeves: \"This is the largest economic development project in Mississippi's history.\""
   ],
   "state_evidence": [
    "Location: Southaven, Mississippi \u2014 just south of the Tennessee border; adjacent to Memphis xAI cluster",
    "Quick Summary: xAI's $20B Mississippi Data Center Project name: \"MACROHARDRR\" \u2014 xAI's third massive data center in the greater Memphis area Investment: $20+ billion \u2014 largest economic development project in Mississippi history Location: Southaven, Mississippi \u2014 just south of the Tennessee border; adjacent to Memphis xAI cluster Capacity: ~2 gigawatts \u2014 equivalent to two nuclear reactor units; powers ~1.5 million homes Operations start: February 2026 Total xAI compute: Pushes Colossus training cluster to ~2GW \u2014 \"by far the most powerful AI system on Earth\" (Musk) Jobs: Hundreds of permanent high-tech jobs in DeSoto County Incentives: Mississippi Data Center Incentive program (sales/use tax exemptions) + Southaven/DeSoto County fee-in-lieu agreements Governor Reeves: \"This is the largest economic development project in Mississippi's history.\""
   ],
   "capacity_gw_evidence": [
    "Elon Musk's xAI has announced a $20+ billion investment in a new 2-gigawatt AI data center campus in Southaven, Mississippi \u2014 the largest economic development project in the state's history.",
    "Quick Summary: xAI's $20B Mississippi Data Center Project name: \"MACROHARDRR\" \u2014 xAI's third massive data center in the greater Memphis area Investment: $20+ billion \u2014 largest economic development project in Mississippi history Location: Southaven, Mississippi \u2014 just south of the Tennessee border; adjacent to Memphis xAI cluster Capacity: ~2 gigawatts \u2014 equivalent to two nuclear reactor units; powers ~1.5 million homes Operations start: February 2026 Total xAI compute: Pushes Colossus training cluster to ~2GW \u2014 \"by far the most powerful AI system on Earth\" (Musk) Jobs: Hundreds of permanent high-tech jobs in DeSoto County Incentives: Mississippi Data Center Incentive program (sales/use tax exemptions) + Southaven/DeSoto County fee-in-lieu agreements Governor Reeves: \"This is the largest economic development project in Mississippi's history.\""
   ],
   "builder_evidence": [
    "Elon Musk's xAI has announced a $20+ billion investment in a new 2-gigawatt AI data center campus in Southaven, Mississippi \u2014 the largest economic development project in the state's history.",
    "Quick Summary: xAI's $20B Mississippi Data Center Project name: \"MACROHARDRR\" \u2014 xAI's third massive data center in the greater Memphis area Investment: $20+ billion \u2014 largest economic development project in Mississippi history Location: Southaven, Mississippi \u2014 just south of the Tennessee border; adjacent to Memphis xAI cluster Capacity: ~2 gigawatts \u2014 equivalent to two nuclear reactor units; powers ~1.5 million homes Operations start: February 2026 Total xAI compute: Pushes Colossus training cluster to ~2GW \u2014 \"by far the most powerful AI system on Earth\" (Musk) Jobs: Hundreds of permanent high-tech jobs in DeSoto County Incentives: Mississippi Data Center Incentive program (sales/use tax exemptions) + Southaven/DeSoto County fee-in-lieu agreements Governor Reeves: \"This is the largest economic development project in Mississippi's history.\""
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Operations are scheduled to begin February 2026.",
    "Quick Summary: xAI's $20B Mississippi Data Center Project name: \"MACROHARDRR\" \u2014 xAI's third massive data center in the greater Memphis area Investment: $20+ billion \u2014 largest economic development project in Mississippi history Location: Southaven, Mississippi \u2014 just south of the Tennessee border; adjacent to Memphis xAI cluster Capacity: ~2 gigawatts \u2014 equivalent to two nuclear reactor units; powers ~1.5 million homes Operations start: February 2026 Total xAI compute: Pushes Colossus training cluster to ~2GW \u2014 \"by far the most powerful AI system on Earth\" (Musk) Jobs: Hundreds of permanent high-tech jobs in DeSoto County Incentives: Mississippi Data Center Incentive program (sales/use tax exemptions) + Southaven/DeSoto County fee-in-lieu agreements Governor Reeves: \"This is the largest economic development project in Mississippi's history.\""
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://cayenneindustrytimes.com/article/926880504-crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
   "published_at": null,
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Lancium and Crusoe",
   "ai_customer": "a leading hyperscale technology company",
   "status": "announced",
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "locality_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "ai_customer_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "The data center will be purpose-built to support the advanced AI computational requirements of a leading hyperscale technology company."
   ],
   "status_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "announcement_date_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ]
  },
  {
   "url": "https://businesswire.com/news/home/20250819333311/en/Vantage-Data-Centers-Unveils-Plans-for-Frontier-a-%2425B-Mega-campus-in-Texas-to-Meet-Unprecedented-AI-Demand",
   "title": "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
   "published_at": "2025-08-19T11:00:00",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": "",
   "status": "Construction on the campus has already begun",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "DENVER--([BUSINESS WIRE](https://www.businesswire.com))--Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "locality_evidence": [
    "DENVER--([BUSINESS WIRE](https://www.businesswire.com))--Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "state_evidence": [
    "DENVER--([BUSINESS WIRE](https://www.businesswire.com))--Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "capacity_gw_evidence": [
    "DENVER--([BUSINESS WIRE](https://www.businesswire.com))--Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "builder_evidence": [
    "DENVER--([BUSINESS WIRE](https://www.businesswire.com))--Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "DENVER--([BUSINESS WIRE](https://www.businesswire.com))--Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "Situated on 1,200 acres, Vantage\u2019s Frontier campus is the largest across its global portfolio.",
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": [
    "DENVER--([BUSINESS WIRE](https://www.businesswire.com))--Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "For more information, visit [http://www.vantage-dc.com](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.vantage-dc.com%2F&esheet=54310031&newsitemid=20250819333311&lan=en-US&anchor=http%3A%2F%2Fwww.vantage-dc.com&index=1&md5=a4db755555ad59ccff4ee9532ac4d8df)."
   ]
  },
  {
   "url": "https://wvpublic.org/story/energy-environment/mason-county-data-center-reportedly-nets-muli-billion-dollar-client",
   "title": "Mason County Data Center Reportedly Nets Muli-Billion Dollar Client - West Virginia Public Broadcasting",
   "published_at": "2026-08-28T21:04:48",
   "project": "Monarch Compute Campus",
   "locality": "Point Pleasant",
   "state": "West Virginia",
   "capacity_gw": 1.3,
   "builder": "Nscale",
   "ai_customer": "Anthropic",
   "status": "under development",
   "announcement_date": null,
   "project_evidence": [
    "# Mason County Data Center Reportedly Nets Muli-Billion Dollar Client",
    "Anthropic, creator of Claude AI, has agreed to spend $45 billion over six years for computing capacity at the Monarch Compute Campus north of Point Pleasant."
   ],
   "locality_evidence": [
    "# Mason County Data Center Reportedly Nets Muli-Billion Dollar Client",
    "Anthropic, creator of Claude AI, has agreed to spend $45 billion over six years for computing capacity at the Monarch Compute Campus north of Point Pleasant."
   ],
   "state_evidence": [
    "# Mason County Data Center Reportedly Nets Muli-Billion Dollar Client",
    "Across West Virginia, at least five large-scale data centers are in various stages of development, but the 2,000-acre Monarch Compute Campus is the first to break ground."
   ],
   "capacity_gw_evidence": [
    "# Mason County Data Center Reportedly Nets Muli-Billion Dollar Client",
    "That\u2019s roughly a third of the 1.3-gigawatt on-site capacity \u2013 equal to the output of the nearby Mountaineer Power Plant \u2013 that Nscale plans when it opens the campus next year."
   ],
   "builder_evidence": [
    "# Mason County Data Center Reportedly Nets Muli-Billion Dollar Client",
    "That\u2019s roughly a third of the 1.3-gigawatt on-site capacity \u2013 equal to the output of the nearby Mountaineer Power Plant \u2013 that Nscale plans when it opens the campus next year."
   ],
   "ai_customer_evidence": [
    "# Mason County Data Center Reportedly Nets Muli-Billion Dollar Client",
    "Anthropic, creator of Claude AI, has agreed to spend $45 billion over six years for computing capacity at the Monarch Compute Campus north of Point Pleasant."
   ],
   "status_evidence": [
    "# Mason County Data Center Reportedly Nets Muli-Billion Dollar Client",
    "Across West Virginia, at least five large-scale data centers are in various stages of development, but the 2,000-acre Monarch Compute Campus is the first to break ground."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://stackfutures.com/blog/openai-750b-infrastructure-project-camellia-georgia",
   "title": "OpenAI Raises Infrastructure Spending to $750B Through 2030 \u2014 Project Camellia Is a 3.2GW Georgia Campus | Stack Futures",
   "published_at": "2026-07-23T01:10:00",
   "project": "Project Camellia",
   "locality": "Savannah",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "contracted",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Raises Infrastructure Spending to $750B Through 2030 \u2014 Project Camellia Is a 3.2GW Georgia Campus",
    "The first concrete deployment from the expanded plan is Project Camellia, a data center campus on 1,400 acres northwest of Savannah, Georgia."
   ],
   "locality_evidence": [
    "# OpenAI Raises Infrastructure Spending to $750B Through 2030 \u2014 Project Camellia Is a 3.2GW Georgia Campus",
    "The first concrete deployment from the expanded plan is Project Camellia, a data center campus on 1,400 acres northwest of Savannah, Georgia."
   ],
   "state_evidence": [
    "# OpenAI Raises Infrastructure Spending to $750B Through 2030 \u2014 Project Camellia Is a 3.2GW Georgia Campus",
    "The first concrete deployment from the expanded plan is Project Camellia, a data center campus on 1,400 acres northwest of Savannah, Georgia."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Raises Infrastructure Spending to $750B Through 2030 \u2014 Project Camellia Is a 3.2GW Georgia Campus",
    "The site is contracted for at least 3.2 gigawatts of power from Georgia Power, the region\u2019s utility."
   ],
   "builder_evidence": [
    "# OpenAI Raises Infrastructure Spending to $750B Through 2030 \u2014 Project Camellia Is a 3.2GW Georgia Campus",
    "OpenAI has agreed to cover the full cost of infrastructure and electric-service buildout \u2014 an unusual arrangement that shifts grid investment risk from the utility to OpenAI directly."
   ],
   "ai_customer_evidence": [
    "# OpenAI Raises Infrastructure Spending to $750B Through 2030 \u2014 Project Camellia Is a 3.2GW Georgia Campus",
    "The first concrete deployment from the expanded plan is Project Camellia, a data center campus on 1,400 acres northwest of Savannah, Georgia."
   ],
   "status_evidence": [
    "# OpenAI Raises Infrastructure Spending to $750B Through 2030 \u2014 Project Camellia Is a 3.2GW Georgia Campus",
    "The site is contracted for at least 3.2 gigawatts of power from Georgia Power, the region\u2019s utility."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://rallies.ai/news/terawulf-sees-40-upside-with-new-35-target-after-1gw-ai-campus-acquisition",
   "title": "TeraWulf Sees 40% Upside with New $35 Target After 1GW AI Campus Acquisition",
   "published_at": "2026-05-27T14:42:15",
   "project": "Muskie",
   "locality": null,
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": null,
   "project_evidence": [
    "TeraWulf Sees 40% Upside with New $35 Target After 1GW AI Campus Acquisition",
    "Oppenheimer raised TeraWulf\u2019s price target to $35 (40% upside), and B. Riley lifted its target to $32 (28% upside) after the company acquired a 1GW Muskie AI campus in Kentucky."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "TeraWulf Sees 40% Upside with New $35 Target After 1GW AI Campus Acquisition",
    "Oppenheimer raised TeraWulf\u2019s price target to $35 (40% upside), and B. Riley lifted its target to $32 (28% upside) after the company acquired a 1GW Muskie AI campus in Kentucky."
   ],
   "capacity_gw_evidence": [
    "TeraWulf Sees 40% Upside with New $35 Target After 1GW AI Campus Acquisition",
    "Oppenheimer raised TeraWulf\u2019s price target to $35 (40% upside), and B. Riley lifted its target to $32 (28% upside) after the company acquired a 1GW Muskie AI campus in Kentucky."
   ],
   "builder_evidence": [
    "TeraWulf Sees 40% Upside with New $35 Target After 1GW AI Campus Acquisition",
    "Oppenheimer raised TeraWulf\u2019s price target to $35 (40% upside), and B. Riley lifted its target to $32 (28% upside) after the company acquired a 1GW Muskie AI campus in Kentucky."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "TeraWulf Sees 40% Upside with New $35 Target After 1GW AI Campus Acquisition",
    "Oppenheimer raised TeraWulf\u2019s price target to $35 (40% upside), and B. Riley lifted its target to $32 (28% upside) after the company acquired a 1GW Muskie AI campus in Kentucky."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://servercountry.org/data/projects/delta-gigasite-fibernet-mercurydelta",
   "title": "Delta Gigasite / Fibernet MercuryDelta: 10.0 GW",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy",
   "ai_customer": null,
   "status": "Under Construction",
   "announcement_date": "2026-04-09",
   "project_evidence": [
    "# Delta Gigasite / Fibernet MercuryDelta",
    "Utah Governor's Office of Economic Opportunity announced April 9, 2026 that Creekstone Energy plans to invest $17,082,408,000 over 20 years in the Creekstone Gigasite near Delta, Millard County."
   ],
   "locality_evidence": [
    "# Delta Gigasite / Fibernet MercuryDelta",
    "[ Utah ](/data/states/utah) \u2014 Delta, Millard County",
    "Utah Governor's Office of Economic Opportunity announced April 9, 2026 that Creekstone Energy plans to invest $17,082,408,000 over 20 years in the Creekstone Gigasite near Delta, Millard County."
   ],
   "state_evidence": [
    "# Delta Gigasite / Fibernet MercuryDelta",
    "[ Utah ](/data/states/utah) \u2014 Delta, Millard County",
    "Utah Governor's Office of Economic Opportunity announced April 9, 2026 that Creekstone Energy plans to invest $17,082,408,000 over 20 years in the Creekstone Gigasite near Delta, Millard County."
   ],
   "capacity_gw_evidence": [
    "# Delta Gigasite / Fibernet MercuryDelta",
    "10.0 GW\n\nPower Capacity",
    "The project began construction in late 2025 and is described as intended to support 10 GW with integrated on-site natural gas generation, utility-scale solar, and AI data processing facilities."
   ],
   "builder_evidence": [
    "# Delta Gigasite / Fibernet MercuryDelta",
    "Utah Governor's Office of Economic Opportunity announced April 9, 2026 that Creekstone Energy plans to invest $17,082,408,000 over 20 years in the Creekstone Gigasite near Delta, Millard County."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Under Construction",
    "# Delta Gigasite / Fibernet MercuryDelta",
    "The project began construction in late 2025 and is described as intended to support 10 GW with integrated on-site natural gas generation, utility-scale solar, and AI data processing facilities."
   ],
   "announcement_date_evidence": [
    "# Delta Gigasite / Fibernet MercuryDelta",
    "Utah Governor's Office of Economic Opportunity announced April 9, 2026 that Creekstone Energy plans to invest $17,082,408,000 over 20 years in the Creekstone Gigasite near Delta, Millard County."
   ]
  },
  {
   "url": "https://techdogs.com/tech-news/business-wire/ecl-announces-worlds-first-1-gigawatt-off-grid-hydrogen-powered-ai-factory-data-center",
   "title": "TechDogs - Discover the Latest Technology Articles, Reports, Case Studies, White Papers, Videos, Events, Hot Topic: AI, Tech Memes, Newsletter",
   "published_at": "2024-09-26T00:00:00",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "announced",
   "announcement_date": "2024-06-20",
   "project_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant.",
    "MOUNTAIN VIEW, Calif.--(BUSINESS WIRE)--#AIDataCenter--Data"
   ],
   "locality_evidence": [
    "600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant.",
    "MOUNTAIN VIEW, Calif.--(BUSINESS WIRE)--#AIDataCenter--Data"
   ],
   "state_evidence": [
    "600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant.",
    "MOUNTAIN VIEW, Calif.--(BUSINESS WIRE)--#AIDataCenter--Data"
   ],
   "capacity_gw_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant.",
    "MOUNTAIN VIEW, Calif.--(BUSINESS WIRE)--#AIDataCenter--Data"
   ],
   "builder_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant.",
    "MOUNTAIN VIEW, Calif.--(BUSINESS WIRE)--#AIDataCenter--Data"
   ],
   "ai_customer_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant.",
    "MOUNTAIN VIEW, Calif.--(BUSINESS WIRE)--#AIDataCenter--Data"
   ],
   "status_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant.",
    "MOUNTAIN VIEW, Calif.--(BUSINESS WIRE)--#AIDataCenter--Data"
   ],
   "announcement_date_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant.",
    "MOUNTAIN VIEW, Calif.--(BUSINESS WIRE)--#AIDataCenter--Data"
   ]
  },
  {
   "url": "https://times-gazette.com/story/news/politics/2026/08/24/openai-plans-ohio-data-center/91372218007",
   "title": "OpenAI to build world's biggest AI data center in Ohio. What we know",
   "published_at": "2026-08-25T01:30:35",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 10.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The [San Francisco-based company](https://openai.com/) announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ],
   "locality_evidence": [
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The [San Francisco-based company](https://openai.com/) announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ],
   "state_evidence": [
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The [San Francisco-based company](https://openai.com/) announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ],
   "capacity_gw_evidence": [
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The center will have 8 gigawatts of computing capacity \u2012 the electrical capacity that's available to servers and other equipment, not necessarily the amount of power the center will draw continuously \u2012 by the end of construction."
   ],
   "builder_evidence": [
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The facility will be built and operated by SB Energy on the former Portsmouth Gaseous Diffusion Plant site."
   ],
   "ai_customer_evidence": [
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "OpenAI plans to build a new hyperscale data center in Pike County, Ohio."
   ],
   "status_evidence": [
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "A [massive data center for OpenAI](https://www.cincinnati.com/story/news/2026/08/17/openai-nvidia-back-massive-data-center-campus-in-ohio/91347647007/), the artificial intelligence company that created ChatGPT, is planned for Southern Ohio."
   ],
   "announcement_date_evidence": [
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The [San Francisco-based company](https://openai.com/) announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=openai&term=the-cloud-and-hybrid-channel",
   "title": "News The Cloud & Hybrid Channel, OpenAI",
   "published_at": "2026-08-27T00:00:00",
   "project": "Effingham County data center",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "Georgia Power",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "OpenAI gets green light for 3.2GW power deal to supply planned data center in Effingham County, Georgia",
    "OpenAI plans 3.2GW data center campus in Effingham County, Georgia",
    "# News - The Cloud & Hybrid Channel, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector"
   ],
   "locality_evidence": [
    "OpenAI gets green light for 3.2GW power deal to supply planned data center in Effingham County, Georgia",
    "OpenAI plans 3.2GW data center campus in Effingham County, Georgia",
    "# News - The Cloud & Hybrid Channel, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector"
   ],
   "state_evidence": [
    "OpenAI gets green light for 3.2GW power deal to supply planned data center in Effingham County, Georgia",
    "OpenAI plans 3.2GW data center campus in Effingham County, Georgia",
    "# News - The Cloud & Hybrid Channel, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector"
   ],
   "capacity_gw_evidence": [
    "OpenAI gets green light for 3.2GW power deal to supply planned data center in Effingham County, Georgia",
    "OpenAI plans 3.2GW data center campus in Effingham County, Georgia",
    "# News - The Cloud & Hybrid Channel, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector"
   ],
   "builder_evidence": [
    "US utility Georgia Power will construct the new generation, with the ChatGPT maker expected to foot the bill",
    "Is contracting energy from Georgia Power Company for project",
    "# News - The Cloud & Hybrid Channel, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector"
   ],
   "ai_customer_evidence": [
    "OpenAI gets green light for 3.2GW power deal to supply planned data center in Effingham County, Georgia",
    "US utility Georgia Power will construct the new generation, with the ChatGPT maker expected to foot the bill",
    "OpenAI plans 3.2GW data center campus in Effingham County, Georgia",
    "Is contracting energy from Georgia Power Company for project",
    "# News - The Cloud & Hybrid Channel, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector"
   ],
   "status_evidence": [
    "OpenAI gets green light for 3.2GW power deal to supply planned data center in Effingham County, Georgia",
    "OpenAI plans 3.2GW data center campus in Effingham County, Georgia",
    "# News - The Cloud & Hybrid Channel, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://globenewswire.com/Tracker?data=kSkYlQaCKrhDZMbslQCHta4ZrF3BgHQls-L9mvYr1Ed0YK3uIIf7ekynztbUdhyqtf89-u2zvnFdlOA2hnpjvQ%3D%3D",
   "title": "Meta's $600 Billion AI Infrastructure Bet: What It Means for CRE Investors",
   "published_at": "2026-03-08T00:00:00",
   "project": "Hyperion",
   "locality": null,
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# Meta's $600 Billion AI Infrastructure Bet: What It Means for CRE Investors",
    "## Key Projects: Hyperion and Prometheus",
    "### Hyperion (Louisiana)",
    "The 2,250 acre Hyperion campus in Louisiana represents Meta's most ambitious data center project to date."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# Meta's $600 Billion AI Infrastructure Bet: What It Means for CRE Investors",
    "## Key Projects: Hyperion and Prometheus",
    "### Hyperion (Louisiana)",
    "The 2,250 acre Hyperion campus in Louisiana represents Meta's most ambitious data center project to date."
   ],
   "capacity_gw_evidence": [
    "# Meta's $600 Billion AI Infrastructure Bet: What It Means for CRE Investors",
    "## Key Takeaways",
    "- The 2,250 acre Hyperion campus in Louisiana will deliver 5 gigawatts of compute power at $10 billion buildout cost, anchored by a nuclear power arrangement."
   ],
   "builder_evidence": [
    "# Meta's $600 Billion AI Infrastructure Bet: What It Means for CRE Investors",
    "## Key Projects: Hyperion and Prometheus",
    "### Hyperion (Louisiana)",
    "The 2,250 acre Hyperion campus in Louisiana represents Meta's most ambitious data center project to date."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://stromfee.cloud/news/datacenter/r03-aws-project-rainier-en",
   "title": "2,200 MW. AWS Project Rainier \u2014 500,000 Chips, Zero Nvidia",
   "published_at": "2026-06-15T00:00:00",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon Web Services",
   "ai_customer": "Anthropic",
   "status": "came online",
   "announcement_date": "2025-10",
   "project_evidence": [
    "# 2,200 MW. AWS Project Rainier \u2014 500,000 Chips, Zero Nvidia",
    "Project Rainier \u2014 a 30-building, 1,200-acre campus in New Carlisle, Indiana \u2014 came online with roughly 500,000 AWS Trainium 2 accelerators drawing 420 megawatts in Phase 1 alone."
   ],
   "locality_evidence": [
    "# 2,200 MW. AWS Project Rainier \u2014 500,000 Chips, Zero Nvidia",
    "Project Rainier \u2014 a 30-building, 1,200-acre campus in New Carlisle, Indiana \u2014 came online with roughly 500,000 AWS Trainium 2 accelerators drawing 420 megawatts in Phase 1 alone."
   ],
   "state_evidence": [
    "# 2,200 MW. AWS Project Rainier \u2014 500,000 Chips, Zero Nvidia",
    "Project Rainier \u2014 a 30-building, 1,200-acre campus in New Carlisle, Indiana \u2014 came online with roughly 500,000 AWS Trainium 2 accelerators drawing 420 megawatts in Phase 1 alone."
   ],
   "capacity_gw_evidence": [
    "# 2,200 MW. AWS Project Rainier \u2014 500,000 Chips, Zero Nvidia",
    "A $15 billion Phase 2 expansion was announced in November 2025, aiming for a final installed capacity of over 2,200 MW and more than 1 million Trainium chips total."
   ],
   "builder_evidence": [
    "# 2,200 MW. AWS Project Rainier \u2014 500,000 Chips, Zero Nvidia",
    "In October 2025, Amazon Web Services quietly switched on the world's largest concentration of non-Nvidia AI chips."
   ],
   "ai_customer_evidence": [
    "# 2,200 MW. AWS Project Rainier \u2014 500,000 Chips, Zero Nvidia",
    "Instead, Amazon bet billions on its own silicon \u2014 and used the result to train Anthropic's Claude, the AI assistant that millions of people interact with every day."
   ],
   "status_evidence": [
    "# 2,200 MW. AWS Project Rainier \u2014 500,000 Chips, Zero Nvidia",
    "Project Rainier \u2014 a 30-building, 1,200-acre campus in New Carlisle, Indiana \u2014 came online with roughly 500,000 AWS Trainium 2 accelerators drawing 420 megawatts in Phase 1 alone."
   ],
   "announcement_date_evidence": [
    "# 2,200 MW. AWS Project Rainier \u2014 500,000 Chips, Zero Nvidia",
    "In October 2025, Amazon Web Services quietly switched on the world's largest concentration of non-Nvidia AI chips."
   ]
  },
  {
   "url": "https://aiwiki.ai/wiki/xai_colossus_2",
   "title": "xAI Colossus 2",
   "published_at": "2026-06-07T21:31:46",
   "project": "Colossus 2",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# xAI Colossus 2",
    "xAI Colossus 2 is the second-generation AI supercomputer and data-center complex built by [xAI](/wiki/xai), the [artificial intelligence](/wiki/artificial_intelligence) company founded by [Elon Musk](/wiki/elon_musk), in the [Memphis](/wiki/memphis), Tennessee, metropolitan area."
   ],
   "locality_evidence": [
    "# xAI Colossus 2",
    "xAI Colossus 2 is the second-generation AI supercomputer and data-center complex built by [xAI](/wiki/xai), the [artificial intelligence](/wiki/artificial_intelligence) company founded by [Elon Musk](/wiki/elon_musk), in the [Memphis](/wiki/memphis), Tennessee, metropolitan area."
   ],
   "state_evidence": [
    "# xAI Colossus 2",
    "xAI Colossus 2 is the second-generation AI supercomputer and data-center complex built by [xAI](/wiki/xai), the [artificial intelligence](/wiki/artificial_intelligence) company founded by [Elon Musk](/wiki/elon_musk), in the [Memphis](/wiki/memphis), Tennessee, metropolitan area."
   ],
   "capacity_gw_evidence": [
    "# xAI Colossus 2",
    "In late December 2025 he said xAI had bought a third Memphis-area building, nicknamed MACROHARDRR, to push planned site capacity toward 2 gigawatts."
   ],
   "builder_evidence": [
    "# xAI Colossus 2",
    "xAI Colossus 2 is the second-generation AI supercomputer and data-center complex built by [xAI](/wiki/xai), the [artificial intelligence](/wiki/artificial_intelligence) company founded by [Elon Musk](/wiki/elon_musk), in the [Memphis](/wiki/memphis), Tennessee, metropolitan area."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://mitrade.com/au/insights/news/live-news/article-8-2042362-20260829",
   "title": "Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
   "published_at": "2026-08-29T15:05:00",
   "project": "Project Kilby",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.67,
   "builder": "Energy Forge One",
   "ai_customer": "Microsoft",
   "status": "under development",
   "announcement_date": "2025-06-22",
   "project_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "The agreement is part of Project Kilby, which utilizes GE Vernova's gas turbines to power the data center.",
    "The agreement is part of Project Kilby, in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "Chevron entered a 20-year power purchase agreement to supply electricity for a new data center in Texas.",
    "However, even bigger news is that Chevron has entered into a 20-year power purchase agreement (PPA) to build a natural gas-powered facility to power **Microsoft**'s (NASDAQ: MSFT) artificial intelligence (AI)-focused data center in Texas."
   ],
   "capacity_gw_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "The agreement is part of Project Kilby, in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power."
   ],
   "builder_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "The agreement is part of Project Kilby, in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power.",
    "Chevron plays a key role as a co-investor and developer through Energy Forge One, as well as a fuel provider.",
    "Chevron will supply natural gas from its Permian Basin production field directly to the power plant, while Energy Forge One will manage the long-term operations, including maintenance and water management systems."
   ],
   "ai_customer_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "Chevron entered a 20-year power purchase agreement to supply electricity for a new data center in Texas.",
    "However, even bigger news is that Chevron has entered into a 20-year power purchase agreement (PPA) to build a natural gas-powered facility to power **Microsoft**'s (NASDAQ: MSFT) artificial intelligence (AI)-focused data center in Texas.",
    "On June 22, Chevron inked a 20-year take-or-pay power purchase agreement with Microsoft to provide electricity for a Microsoft-operated data center."
   ],
   "status_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "The agreement is part of Project Kilby, in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power."
   ],
   "announcement_date_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "On June 22, Chevron inked a 20-year take-or-pay power purchase agreement with Microsoft to provide electricity for a Microsoft-operated data center."
   ]
  },
  {
   "url": "https://stockopedia.com/share-prices/fermi-LON:FRMI/news/reg-fermi-inc-initial-draw-on-200-m-equipment-facility-urn:newsml:reuters.com:20260220:nRST7468Ta",
   "title": "\ud83d\udcc8 Fermi Share Price - LON:FRMI Share Price",
   "published_at": "2026-05-18T12:30:21",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2026-02-20",
   "project_evidence": [
    "# REG - Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "locality_evidence": [
    "# REG - Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus.",
    "Facility arranged by Cape Commercial Finance (AMARILLO, Texas) February 20, 2026: Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122 (https://fermiamerica.com/) , in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026."
   ],
   "state_evidence": [
    "# REG - Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus.",
    "Facility arranged by Cape Commercial Finance (AMARILLO, Texas) February 20, 2026: Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122 (https://fermiamerica.com/) , in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026."
   ],
   "capacity_gw_evidence": [
    "# REG - Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "This financing continues to build upon Fermi America's warehouse strategy enabling the aggregation of critical long-lead equipment in an inflationary and tightening supply environment and serves to further solidify Fermi America's power ramp, affirming the company's ability to deliver the first 2.3 of 11 gigawatts of long-duration, reliable power at scale."
   ],
   "builder_evidence": [
    "# REG - Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# REG - Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "announcement_date_evidence": [
    "# REG - Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Facility arranged by Cape Commercial Finance (AMARILLO, Texas) February 20, 2026: Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122 (https://fermiamerica.com/) , in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026."
   ]
  },
  {
   "url": "https://timesleader.com/news/1752841/developers-tout-impacts-of-3-data-center-campuses-zoning-meeting-set-for-wednesday-on-4-3-glenbrook-group-project",
   "title": "Developers tout impacts of 3 data center campuses; Zoning meeting set for Wednesday on 4-3 Glenbrook Group project",
   "published_at": "2026-08-23T00:30:00",
   "project": "Salem 3 Data Center Campus",
   "locality": "Salem Township",
   "state": "Pennsylvania",
   "capacity_gw": 4.0,
   "builder": "4-3 Glennbrook Group",
   "ai_customer": null,
   "status": "proposed",
   "announcement_date": null,
   "project_evidence": [
    "SALEM TWP. \u2014 While the mere mention of data center projects results in crowded meetings filled with questions and concerns, Salem Township in lower Luzerne County is dealing with the development of three campuses that could change the lives of hundreds of residents and improve the quality of life for many more.",
    "The 4-3 Glennbrook Group project",
    "Known as the \u201cSalem 3 Data Center Campus,\u201d the proposed infrastructure includes a 39-building campus, an on-site power generation plant, and a closed-loop water system."
   ],
   "locality_evidence": [
    "SALEM TWP. \u2014 While the mere mention of data center projects results in crowded meetings filled with questions and concerns, Salem Township in lower Luzerne County is dealing with the development of three campuses that could change the lives of hundreds of residents and improve the quality of life for many more.",
    "The 4-3 Glennbrook Group project",
    "Estimated 3.5 to 4 gigawatts, leveraging proximity to the Susquehanna nuclear power plant and regional grid infrastructure."
   ],
   "state_evidence": [
    "SALEM TWP. \u2014 While the mere mention of data center projects results in crowded meetings filled with questions and concerns, Salem Township in lower Luzerne County is dealing with the development of three campuses that could change the lives of hundreds of residents and improve the quality of life for many more.",
    "The 4-3 Glennbrook Group project",
    "Estimated 3.5 to 4 gigawatts, leveraging proximity to the Susquehanna nuclear power plant and regional grid infrastructure."
   ],
   "capacity_gw_evidence": [
    "SALEM TWP. \u2014 While the mere mention of data center projects results in crowded meetings filled with questions and concerns, Salem Township in lower Luzerne County is dealing with the development of three campuses that could change the lives of hundreds of residents and improve the quality of life for many more.",
    "The 4-3 Glennbrook Group project",
    "Estimated 3.5 to 4 gigawatts, leveraging proximity to the Susquehanna nuclear power plant and regional grid infrastructure."
   ],
   "builder_evidence": [
    "SALEM TWP. \u2014 While the mere mention of data center projects results in crowded meetings filled with questions and concerns, Salem Township in lower Luzerne County is dealing with the development of three campuses that could change the lives of hundreds of residents and improve the quality of life for many more.",
    "The 4-3 Glennbrook Group project",
    "The 4-3 Glennbrook Group announced a massive $1.2 billion land deal project, encompassing more than 4,000 acres and more than 200 landowners."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "SALEM TWP. \u2014 While the mere mention of data center projects results in crowded meetings filled with questions and concerns, Salem Township in lower Luzerne County is dealing with the development of three campuses that could change the lives of hundreds of residents and improve the quality of life for many more.",
    "The 4-3 Glennbrook Group project",
    "Known as the \u201cSalem 3 Data Center Campus,\u201d the proposed infrastructure includes a 39-building campus, an on-site power generation plant, and a closed-loop water system."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://autonocion.com/us/tesla-utah-power-plant",
   "title": "Tesla, Rivian and Ford Owners Crossing Utah on I-15 Just Got a New Neighbor. A 9-Gigawatt Data Center That a Utah State Physicist Calls \"23 Atom Bombs of Heat Per Day\"",
   "published_at": "2026-05-16T16:30:28",
   "project": "Stratos",
   "locality": "Hansel Valley",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O\u2019Leary Digital",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": "2026-05-04",
   "project_evidence": [
    "Tesla, Rivian and Ford Owners Crossing Utah on I-15 Just Got a New Neighbor. A 9-Gigawatt Data Center That a Utah State Physicist Calls \u201c23 Atom Bombs of Heat Per Day\u201d",
    "The numbers on Stratos are the kind that get rounded down in headlines because the full version sounds made up."
   ],
   "locality_evidence": [
    "Tesla, Rivian and Ford Owners Crossing Utah on I-15 Just Got a New Neighbor. A 9-Gigawatt Data Center That a Utah State Physicist Calls \u201c23 Atom Bombs of Heat Per Day\u201d",
    "The project covers 40,000 acres of private land in Hansel Valley, plus an additional 1,200 acres of state and military property."
   ],
   "state_evidence": [
    "Tesla, Rivian and Ford Owners Crossing Utah on I-15 Just Got a New Neighbor. A 9-Gigawatt Data Center That a Utah State Physicist Calls \u201c23 Atom Bombs of Heat Per Day\u201d",
    "On Monday, May 4, 2026, the [Box Elder County Commission in northern Utah voted unanimously](https://utahnewsdispatch.com/2026/05/04/box-elder-commissioners-approve-data-center/) to approve what is now the largest data center campus in the world."
   ],
   "capacity_gw_evidence": [
    "Tesla, Rivian and Ford Owners Crossing Utah on I-15 Just Got a New Neighbor. A 9-Gigawatt Data Center That a Utah State Physicist Calls \u201c23 Atom Bombs of Heat Per Day\u201d",
    "At full buildout, the campus will consume 9 gigawatts of electrical power."
   ],
   "builder_evidence": [
    "Tesla, Rivian and Ford Owners Crossing Utah on I-15 Just Got a New Neighbor. A 9-Gigawatt Data Center That a Utah State Physicist Calls \u201c23 Atom Bombs of Heat Per Day\u201d",
    "O\u2019Leary is the developer through his infrastructure company, O\u2019Leary Digital."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Tesla, Rivian and Ford Owners Crossing Utah on I-15 Just Got a New Neighbor. A 9-Gigawatt Data Center That a Utah State Physicist Calls \u201c23 Atom Bombs of Heat Per Day\u201d",
    "On Monday, May 4, 2026, the [Box Elder County Commission in northern Utah voted unanimously](https://utahnewsdispatch.com/2026/05/04/box-elder-commissioners-approve-data-center/) to approve what is now the largest data center campus in the world."
   ],
   "announcement_date_evidence": [
    "Tesla, Rivian and Ford Owners Crossing Utah on I-15 Just Got a New Neighbor. A 9-Gigawatt Data Center That a Utah State Physicist Calls \u201c23 Atom Bombs of Heat Per Day\u201d",
    "On Monday, May 4, 2026, the [Box Elder County Commission in northern Utah voted unanimously](https://utahnewsdispatch.com/2026/05/04/box-elder-commissioners-approve-data-center/) to approve what is now the largest data center campus in the world."
   ]
  },
  {
   "url": "https://cbsnews.com/atlanta/news/georgia-power-gets-clearance-to-serve-openais-massive-ai-data-center-in-effingham-county?intcid=CNR-01-0623",
   "title": "Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County\u200b",
   "published_at": "2026-08-27T18:48:39",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "Georgia Power",
   "ai_customer": "OpenAI",
   "status": "cleared state regulatory review",
   "announcement_date": null,
   "project_evidence": [
    "# Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County\u200b",
    "The contract calls for Georgia Power to provide up to 3,200 megawatts of electricity to Project Camellia, with service delivered in phases from 2028 through 2032."
   ],
   "locality_evidence": [
    "# Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County\u200b",
    "Georgia Power's agreement to supply electricity to OpenAI's [massive data center in Effingham County](https://www.cbsnews.com/atlanta/news/openai-is-bringing-a-massive-ai-data-center-to-georgia-heres-what-residents-should-know/) has cleared state regulatory review."
   ],
   "state_evidence": [
    "# Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County\u200b",
    "Georgia Power's agreement to supply electricity to OpenAI's [massive data center in Effingham County](https://www.cbsnews.com/atlanta/news/openai-is-bringing-a-massive-ai-data-center-to-georgia-heres-what-residents-should-know/) has cleared state regulatory review."
   ],
   "capacity_gw_evidence": [
    "# Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County\u200b",
    "The contract calls for Georgia Power to provide up to 3,200 megawatts of electricity to Project Camellia, with service delivered in phases from 2028 through 2032."
   ],
   "builder_evidence": [
    "# Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County\u200b",
    "The contract calls for Georgia Power to provide up to 3,200 megawatts of electricity to Project Camellia, with service delivered in phases from 2028 through 2032."
   ],
   "ai_customer_evidence": [
    "# Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County\u200b",
    "Georgia Power's agreement to supply electricity to OpenAI's [massive data center in Effingham County](https://www.cbsnews.com/atlanta/news/openai-is-bringing-a-massive-ai-data-center-to-georgia-heres-what-residents-should-know/) has cleared state regulatory review."
   ],
   "status_evidence": [
    "# Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County\u200b",
    "Georgia Power's agreement to supply electricity to OpenAI's [massive data center in Effingham County](https://www.cbsnews.com/atlanta/news/openai-is-bringing-a-massive-ai-data-center-to-georgia-heres-what-residents-should-know/) has cleared state regulatory review."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://thenewsherald.com/2026/06/18/google-data-center-in-van-buren-twp-would-destroy-13-acres-of-wetlands",
   "title": "Google data center in Van Buren Twp. would destroy 13 acres of wetlands",
   "published_at": "2026-06-18T10:42:08",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co",
   "ai_customer": "Google",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Google data center in Van Buren Twp. would destroy 13 acres of wetlands",
    "The 1-gigawatt \u201cProject Cannoli\u201d data center is planned for 282 acres at the intersection of Haggerty Road and I-94."
   ],
   "locality_evidence": [
    "# Google data center in Van Buren Twp. would destroy 13 acres of wetlands",
    "Michigan regulators are reviewing a wetland permit for Google\u2019s planned data center in Van Buren Township, which would destroy 13.55 acres of wetlands in a county that has already lost 90% of them to development."
   ],
   "state_evidence": [
    "# Google data center in Van Buren Twp. would destroy 13 acres of wetlands",
    "Michigan regulators are reviewing a wetland permit for Google\u2019s planned data center in Van Buren Township, which would destroy 13.55 acres of wetlands in a county that has already lost 90% of them to development."
   ],
   "capacity_gw_evidence": [
    "# Google data center in Van Buren Twp. would destroy 13 acres of wetlands",
    "The 1-gigawatt \u201cProject Cannoli\u201d data center is planned for 282 acres at the intersection of Haggerty Road and I-94."
   ],
   "builder_evidence": [
    "# Google data center in Van Buren Twp. would destroy 13 acres of wetlands",
    "The developer, Panattoni Development Co, proposed purchasing 20.6 acres of wetland mitigation bank credits in its project application."
   ],
   "ai_customer_evidence": [
    "# Google data center in Van Buren Twp. would destroy 13 acres of wetlands",
    "Michigan regulators are reviewing a wetland permit for Google\u2019s planned data center in Van Buren Township, which would destroy 13.55 acres of wetlands in a county that has already lost 90% of them to development."
   ],
   "status_evidence": [
    "# Google data center in Van Buren Twp. would destroy 13 acres of wetlands",
    "Michigan regulators are reviewing a wetland permit for Google\u2019s planned data center in Van Buren Township, which would destroy 13.55 acres of wetlands in a county that has already lost 90% of them to development."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://introl.com/blog/utah-nuclear-data-center-operation-gigawatt-december-2025",
   "title": "Utah's Nuclear Data Center Play: 10 GW Gigasite Meets Operation Gigawatt",
   "published_at": "2025-12-13T17:07:11",
   "project": "Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy",
   "ai_customer": null,
   "status": "Planned",
   "announcement_date": "2025-11-04",
   "project_evidence": [
    "# Utah's Nuclear Data Center Play: 10 GW Gigasite Meets Operation Gigawatt",
    "Utah positions as nuclear-powered AI hub: Creekstone's 20M sq ft Delta Gigasite plans 2 GW nuclear; Governor Cox's Operation Gigawatt adds SMRs in Brigham City.",
    "Creekstone Energy closed Series B funding in November 2025 to advance the Delta Gigasite\u2014a 20-million-square-foot data center campus southeast of Delta in Millard County."
   ],
   "locality_evidence": [
    "# Utah's Nuclear Data Center Play: 10 GW Gigasite Meets Operation Gigawatt",
    "Creekstone Energy closed Series B funding in November 2025 to advance the Delta Gigasite\u2014a 20-million-square-foot data center campus southeast of Delta in Millard County."
   ],
   "state_evidence": [
    "# Utah's Nuclear Data Center Play: 10 GW Gigasite Meets Operation Gigawatt",
    "Utah positions as nuclear-powered AI hub: Creekstone's 20M sq ft Delta Gigasite plans 2 GW nuclear; Governor Cox's Operation Gigawatt adds SMRs in Brigham City."
   ],
   "capacity_gw_evidence": [
    "# Utah's Nuclear Data Center Play: 10 GW Gigasite Meets Operation Gigawatt"
   ],
   "builder_evidence": [
    "# Utah's Nuclear Data Center Play: 10 GW Gigasite Meets Operation Gigawatt",
    "Utah positions as nuclear-powered AI hub: Creekstone's 20M sq ft Delta Gigasite plans 2 GW nuclear; Governor Cox's Operation Gigawatt adds SMRs in Brigham City.",
    "Creekstone Energy closed Series B funding in November 2025 to advance the Delta Gigasite\u2014a 20-million-square-foot data center campus southeast of Delta in Millard County."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Utah's Nuclear Data Center Play: 10 GW Gigasite Meets Operation Gigawatt"
   ],
   "announcement_date_evidence": [
    "# Utah's Nuclear Data Center Play: 10 GW Gigasite Meets Operation Gigawatt",
    "Business Wire. \"Creekstone Energy Raises Series B Led by Trident Ridge to Advance 10-Gigawatt AI Gigasite in Utah.\" November 4, 2025. [https://www.businesswire.com/news/home/20251104790930/en/Creekstone-Energy-Raises-Series-B-Led-by-Trident-Ridge-to-Advance-10-Gigawatt-AI-Gigasite-in-Utah](https://www.businesswire.com/news/home/20251104790930/en/Creekstone-Energy-Raises-Series-B-Led-by-Trident-Ridge-to-Advance-10-Gigawatt-AI-Gigasite-in-Utah)"
   ]
  },
  {
   "url": "https://genuineimpact.substack.com/p/the-guarantee-didnt-get-cheaper-the",
   "title": "The Guarantee Didn't Get Cheaper The Second Time",
   "published_at": "2026-08-20T14:03:14",
   "project": "El Paso",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": null,
   "announcement_date": "2026-07-01",
   "project_evidence": [
    "# The Guarantee Didn't Get Cheaper The Second Time",
    "### Hyperion priced at +225bps. El Paso priced at +290bps. Same structure, same 16-year backstop.",
    "In July 2026, Meta went back to the same playbook for a smaller campus in El Paso, Texas, **roughly 1 gigawatt against Hyperion\u2019s targeted 5, and reported at $12 billion to $12.55 billion depending on the report.**"
   ],
   "locality_evidence": [
    "# The Guarantee Didn't Get Cheaper The Second Time",
    "### Hyperion priced at +225bps. El Paso priced at +290bps. Same structure, same 16-year backstop.",
    "In July 2026, Meta went back to the same playbook for a smaller campus in El Paso, Texas, **roughly 1 gigawatt against Hyperion\u2019s targeted 5, and reported at $12 billion to $12.55 billion depending on the report.**"
   ],
   "state_evidence": [
    "# The Guarantee Didn't Get Cheaper The Second Time",
    "### Hyperion priced at +225bps. El Paso priced at +290bps. Same structure, same 16-year backstop.",
    "In July 2026, Meta went back to the same playbook for a smaller campus in El Paso, Texas, **roughly 1 gigawatt against Hyperion\u2019s targeted 5, and reported at $12 billion to $12.55 billion depending on the report.**"
   ],
   "capacity_gw_evidence": [
    "# The Guarantee Didn't Get Cheaper The Second Time",
    "### Hyperion priced at +225bps. El Paso priced at +290bps. Same structure, same 16-year backstop.",
    "In July 2026, Meta went back to the same playbook for a smaller campus in El Paso, Texas, **roughly 1 gigawatt against Hyperion\u2019s targeted 5, and reported at $12 billion to $12.55 billion depending on the report.**"
   ],
   "builder_evidence": [
    "# The Guarantee Didn't Get Cheaper The Second Time",
    "### Hyperion priced at +225bps. El Paso priced at +290bps. Same structure, same 16-year backstop.",
    "In July 2026, Meta went back to the same playbook for a smaller campus in El Paso, Texas, **roughly 1 gigawatt against Hyperion\u2019s targeted 5, and reported at $12 billion to $12.55 billion depending on the report.**"
   ],
   "ai_customer_evidence": [
    "# The Guarantee Didn't Get Cheaper The Second Time",
    "### Hyperion priced at +225bps. El Paso priced at +290bps. Same structure, same 16-year backstop.",
    "In July 2026, Meta went back to the same playbook for a smaller campus in El Paso, Texas, **roughly 1 gigawatt against Hyperion\u2019s targeted 5, and reported at $12 billion to $12.55 billion depending on the report.**"
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "# The Guarantee Didn't Get Cheaper The Second Time",
    "### Hyperion priced at +225bps. El Paso priced at +290bps. Same structure, same 16-year backstop.",
    "In July 2026, Meta went back to the same playbook for a smaller campus in El Paso, Texas, **roughly 1 gigawatt against Hyperion\u2019s targeted 5, and reported at $12 billion to $12.55 billion depending on the report.**"
   ]
  },
  {
   "url": "https://genuineimpact.substack.com/p/the-guarantee-didnt-get-cheaper-the",
   "title": "The Guarantee Didn't Get Cheaper The Second Time",
   "published_at": "2026-08-20T14:03:14",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Blue Owl Capital and Meta",
   "ai_customer": "Meta",
   "status": null,
   "announcement_date": "2025-10-21",
   "project_evidence": [
    "# The Guarantee Didn't Get Cheaper The Second Time",
    "### Hyperion priced at +225bps. El Paso priced at +290bps. Same structure, same 16-year backstop.",
    "In October 2025, Meta and funds managed by Blue Owl Capital formed a joint venture to build the Hyperion data centre in Richland Parish, Louisiana, **a $27 billion project in which Blue Owl holds 80% and Meta 20%.**"
   ],
   "locality_evidence": [
    "# The Guarantee Didn't Get Cheaper The Second Time",
    "### Hyperion priced at +225bps. El Paso priced at +290bps. Same structure, same 16-year backstop.",
    "In October 2025, Meta and funds managed by Blue Owl Capital formed a joint venture to build the Hyperion data centre in Richland Parish, Louisiana, **a $27 billion project in which Blue Owl holds 80% and Meta 20%.**"
   ],
   "state_evidence": [
    "# The Guarantee Didn't Get Cheaper The Second Time",
    "### Hyperion priced at +225bps. El Paso priced at +290bps. Same structure, same 16-year backstop.",
    "In October 2025, Meta and funds managed by Blue Owl Capital formed a joint venture to build the Hyperion data centre in Richland Parish, Louisiana, **a $27 billion project in which Blue Owl holds 80% and Meta 20%.**"
   ],
   "capacity_gw_evidence": [
    "# The Guarantee Didn't Get Cheaper The Second Time",
    "### Hyperion priced at +225bps. El Paso priced at +290bps. Same structure, same 16-year backstop.",
    "In July 2026, Meta went back to the same playbook for a smaller campus in El Paso, Texas, **roughly 1 gigawatt against Hyperion\u2019s targeted 5, and reported at $12 billion to $12.55 billion depending on the report.**"
   ],
   "builder_evidence": [
    "# The Guarantee Didn't Get Cheaper The Second Time",
    "### Hyperion priced at +225bps. El Paso priced at +290bps. Same structure, same 16-year backstop.",
    "In October 2025, Meta and funds managed by Blue Owl Capital formed a joint venture to build the Hyperion data centre in Richland Parish, Louisiana, **a $27 billion project in which Blue Owl holds 80% and Meta 20%.**"
   ],
   "ai_customer_evidence": [
    "# The Guarantee Didn't Get Cheaper The Second Time",
    "### Hyperion priced at +225bps. El Paso priced at +290bps. Same structure, same 16-year backstop.",
    "In October 2025, Meta and funds managed by Blue Owl Capital formed a joint venture to build the Hyperion data centre in Richland Parish, Louisiana, **a $27 billion project in which Blue Owl holds 80% and Meta 20%.**"
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "# The Guarantee Didn't Get Cheaper The Second Time",
    "### Hyperion priced at +225bps. El Paso priced at +290bps. Same structure, same 16-year backstop.",
    "###### Deal mechanics and quotations on Meta\u2019s Hyperion and El Paso financing are compiled from Meta and Blue Owl Capital\u2019s joint press release (21 October 2025), PitchBook, Forbes, Bisnow, Global Data Center Hub and Benzinga reporting on the Hyperion transaction, and Wall Street Journal reporting via MarketScale, GuruFocus, Yahoo Finance/StockTwits and Economy.ac on the El Paso transaction, published between July and August 2026."
   ]
  },
  {
   "url": "https://dcpulse.com/project/aws-project-rainier-indiana-11-billion-ai-supercluster",
   "title": "AWS's $11B Project Rainier in New Carlisle,",
   "published_at": null,
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.25,
   "builder": "Amazon Web Services",
   "ai_customer": "Anthropic",
   "status": "Operational (Phase 1 Live Oct 2025; Phase 2 Construction 2026)",
   "announcement_date": "2024-04-25",
   "project_evidence": [
    "# AWS Project Rainier: $11B 2.2GW Anthropic AI Cluster Indiana",
    "Formally activated in October 2025, Project Rainier is AWS's flagship AI infrastructure project.",
    "## Quick Facts",
    "| Project Name | AWS Project Rainier: $11B 2.2GW Anthropic AI Cluster Indiana |"
   ],
   "locality_evidence": [
    "**Status:** Operational (Phase 1 Live Oct 2025; Phase 2 Construction 2026) | **Location:** New Carlisle indiana",
    "## Quick Facts",
    "| Location | New Carlisle indiana |",
    "## City Profile",
    "| City Name | New Carlisle |"
   ],
   "state_evidence": [
    "# AWS Project Rainier: $11B 2.2GW Anthropic AI Cluster Indiana",
    "**Status:** Operational (Phase 1 Live Oct 2025; Phase 2 Construction 2026) | **Location:** New Carlisle indiana",
    "## Quick Facts",
    "| Location | New Carlisle indiana |"
   ],
   "capacity_gw_evidence": [
    "# AWS Project Rainier: $11B 2.2GW Anthropic AI Cluster Indiana",
    "## Quick Facts",
    "| Total IT Load | 2,250 MW (2.25 GW) |",
    "| Power Infrastructure | 2.25 GW Capacity; Fed by Indiana Michigan Power high-voltage lines. |",
    "## Technical Specifications",
    "| Power Capacity | 2,250 MW (2.25 GW) |"
   ],
   "builder_evidence": [
    "Formally activated in October 2025, Project Rainier is AWS's flagship AI infrastructure project.",
    "## Companies Involved",
    "| Developer / Operator | [Amazon Web Services](https://dcpulse.com/projects/companyprofiles/amazon-web-services-data-center-projects) |"
   ],
   "ai_customer_evidence": [
    "# AWS Project Rainier: $11B 2.2GW Anthropic AI Cluster Indiana",
    "Named after the 14,410-foot stratovolcano, the campus is the primary training ground for Anthropic's Claude models."
   ],
   "status_evidence": [
    "**Status:** Operational (Phase 1 Live Oct 2025; Phase 2 Construction 2026) | **Location:** New Carlisle indiana",
    "## Quick Facts",
    "| Status | Operational (Phase 1 Live Oct 2025; Phase 2 Construction 2026) |"
   ],
   "announcement_date_evidence": [
    "## Milestones",
    "| Announcement | April 25, 2024 |"
   ]
  },
  {
   "url": "https://datacentrecentral.com/nscale-and-microsoft-announce-collaboration-with-nvidia-and-caterpillar-to-deliver-135gw-of-nvidia-vera-rubin-nvl72-gpus-at-flagship-ai-factory-campus-in-west-virginia",
   "title": "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1,35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
   "published_at": "2026-03-24T16:47:09",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "announced",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1,35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "locality_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1,35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "state_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1,35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "capacity_gw_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1,35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "The expansion capabilities of this site \u2014 which has the potential for a total power draw of 8GW \u2014 will allow Nscale to develop power capacity rapidly while supporting one of the largest announced AI compute deployments in the market today."
   ],
   "builder_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1,35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "ai_customer_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1,35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ \u2014 Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA\u2019s next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ],
   "status_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1,35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1,35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia\n\n-"
   ],
   "announcement_date_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1,35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ \u2014 Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA\u2019s next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ]
  },
  {
   "url": "https://miningstockeducation.com/2025/03/energy-abundance-announces-data-city-texas-the-worlds-largest-behind-the-meter-data-center-hub-powered-by-100-24-7-green-energy",
   "title": "Energy Abundance Announces Data City, Texas \u2013 The World\u2019s Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
   "published_at": null,
   "project": "Data City",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corporation",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2025-03-20",
   "project_evidence": [
    "# Energy Abundance Announces Data City, Texas \u2013 The World\u2019s Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 20, 2025 /PRNewswire/ \u2014 Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "locality_evidence": [
    "# Energy Abundance Announces Data City, Texas \u2013 The World\u2019s Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 20, 2025 /PRNewswire/ \u2014 Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "state_evidence": [
    "# Energy Abundance Announces Data City, Texas \u2013 The World\u2019s Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 20, 2025 /PRNewswire/ \u2014 Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "capacity_gw_evidence": [
    "# Energy Abundance Announces Data City, Texas \u2013 The World\u2019s Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 20, 2025 /PRNewswire/ \u2014 Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "builder_evidence": [
    "# Energy Abundance Announces Data City, Texas \u2013 The World\u2019s Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 20, 2025 /PRNewswire/ \u2014 Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Energy Abundance Announces Data City, Texas \u2013 The World\u2019s Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 20, 2025 /PRNewswire/ \u2014 Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "announcement_date_evidence": [
    "# Energy Abundance Announces Data City, Texas \u2013 The World\u2019s Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 20, 2025 /PRNewswire/ \u2014 Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ]
  },
  {
   "url": "https://santageai.com/news/2026/07/23/openai-project-camellia-georgia-datacenter",
   "title": "OpenAI Plans a $30 Billion, 3.2-Gigawatt Data Center in Georgia",
   "published_at": "2026-07-23T00:00:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "OpenAI announced Project Camellia on July 22, a 3.2-gigawatt AI data center campus in Effingham County, Georgia, with planned investment above $30 billion.",
    "## OpenAI plants its next compute anchor near Savannah"
   ],
   "locality_evidence": [
    "OpenAI announced Project Camellia on July 22, a 3.2-gigawatt AI data center campus in Effingham County, Georgia, with planned investment above $30 billion.",
    "## OpenAI plants its next compute anchor near Savannah"
   ],
   "state_evidence": [
    "OpenAI announced Project Camellia on July 22, a 3.2-gigawatt AI data center campus in Effingham County, Georgia, with planned investment above $30 billion.",
    "## OpenAI plants its next compute anchor near Savannah"
   ],
   "capacity_gw_evidence": [
    "OpenAI announced Project Camellia on July 22, a 3.2-gigawatt AI data center campus in Effingham County, Georgia, with planned investment above $30 billion.",
    "Project Camellia by the numbers",
    "| Planned capacity | 3.2 gigawatts |"
   ],
   "builder_evidence": [
    "OpenAI announced Project Camellia on July 22, a 3.2-gigawatt AI data center campus in Effingham County, Georgia, with planned investment above $30 billion.",
    "## OpenAI plants its next compute anchor near Savannah"
   ],
   "ai_customer_evidence": [
    "OpenAI announced Project Camellia on July 22, a 3.2-gigawatt AI data center campus in Effingham County, Georgia, with planned investment above $30 billion.",
    "## OpenAI plants its next compute anchor near Savannah"
   ],
   "status_evidence": [
    "![OpenAI's Project Camellia data center campus planned for Effingham County, Georgia](/images/openai-project-camellia-georgia-datacenter.jpg)",
    "OpenAI announced Project Camellia on July 22, a 3.2-gigawatt AI data center campus in Effingham County, Georgia, with planned investment above $30 billion.",
    "## OpenAI plants its next compute anchor near Savannah"
   ],
   "announcement_date_evidence": [
    "OpenAI announced Project Camellia on July 22, a 3.2-gigawatt AI data center campus in Effingham County, Georgia, with planned investment above $30 billion.",
    "Source: OpenAI announcement and Data Center Dynamics, July 22, 2026",
    "## OpenAI plants its next compute anchor near Savannah"
   ]
  },
  {
   "url": "https://verdice.news/article/terawulf-stock-pops-as-bitcoin-miner-acquires-kentucky-site--7e7ee23b385a8fc8",
   "title": "TeraWulf Buys Kentucky Site for 1GW AI Campus",
   "published_at": "2026-05-27T17:13:05",
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": "2026-05-26",
   "project_evidence": [
    "# TeraWulf Buys Kentucky Site for 1GW AI Campus",
    "TeraWulf acquired the 285-acre Muskie Data Campus in eastern Kentucky, targeting more than one gigawatt of AI and HPC capacity, with the first 500 megawatts planned for 2028.",
    "The newly acquired property, branded the \"Muskie Data Campus,\""
   ],
   "locality_evidence": [
    "# TeraWulf Buys Kentucky Site for 1GW AI Campus",
    "TeraWulf acquired the 285-acre Muskie Data Campus in eastern Kentucky, targeting more than one gigawatt of AI and HPC capacity, with the first 500 megawatts planned for 2028."
   ],
   "state_evidence": [
    "# TeraWulf Buys Kentucky Site for 1GW AI Campus",
    "TeraWulf acquired the 285-acre Muskie Data Campus in eastern Kentucky, targeting more than one gigawatt of AI and HPC capacity, with the first 500 megawatts planned for 2028."
   ],
   "capacity_gw_evidence": [
    "# TeraWulf Buys Kentucky Site for 1GW AI Campus",
    "TeraWulf acquired the 285-acre Muskie Data Campus in eastern Kentucky, targeting more than one gigawatt of AI and HPC capacity, with the first 500 megawatts planned for 2028."
   ],
   "builder_evidence": [
    "# TeraWulf Buys Kentucky Site for 1GW AI Campus",
    "TeraWulf acquired the 285-acre Muskie Data Campus in eastern Kentucky, targeting more than one gigawatt of AI and HPC capacity, with the first 500 megawatts planned for 2028."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# TeraWulf Buys Kentucky Site for 1GW AI Campus",
    "TeraWulf acquired the 285-acre Muskie Data Campus in eastern Kentucky, targeting more than one gigawatt of AI and HPC capacity, with the first 500 megawatts planned for 2028."
   ],
   "announcement_date_evidence": [
    "## Facts & Analysis",
    "TeraWulf, the Maryland-based Bitcoin mining firm that has been steadily repositioning itself as an artificial intelligence infrastructure operator, announced Tuesday that it acquired a hyperscale development site in eastern Kentucky capable of supporting more than one gigawatt of AI and high-performance computing capacity."
   ]
  },
  {
   "url": "https://en.wedoany.com/shortnews/416864.html",
   "title": "Hut 8 Signs 352MW Data Center Lease in Texas Worth $9.8 Billion",
   "published_at": null,
   "project": "Beacon Point",
   "locality": "Corpus Christi",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "operational or development",
   "announcement_date": "2026-07-21",
   "project_evidence": [
    "Hut 8 Signs 352MW Data Center Lease in Texas Worth $9.8 Billion",
    "Hut 8 has signed an expanded lease with an unnamed hyperscale customer in Texas, adding 352MW of IT capacity to its Beacon Point data center campus."
   ],
   "locality_evidence": [
    "Hut 8 Signs 352MW Data Center Lease in Texas Worth $9.8 Billion",
    "Located near Corpus Christi, the campus spans 525 acres."
   ],
   "state_evidence": [
    "Hut 8 Signs 352MW Data Center Lease in Texas Worth $9.8 Billion",
    "Hut 8 has signed an expanded lease with an unnamed hyperscale customer in Texas, adding 352MW of IT capacity to its Beacon Point data center campus."
   ],
   "capacity_gw_evidence": [
    "Hut 8 Signs 352MW Data Center Lease in Texas Worth $9.8 Billion",
    "The latest lease further commercializes the 1GW utility capacity at Beacon Point, which is sourced through an interconnection agreement with AEP Texas."
   ],
   "builder_evidence": [
    "Hut 8 Signs 352MW Data Center Lease in Texas Worth $9.8 Billion",
    "Hut 8 has signed an expanded lease with an unnamed hyperscale customer in Texas, adding 352MW of IT capacity to its Beacon Point data center campus."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Hut 8 Signs 352MW Data Center Lease in Texas Worth $9.8 Billion",
    "The first phase is scheduled to go live in the first quarter of 2027, with the second-phase data hall expected to be delivered in the second quarter of 2028."
   ],
   "announcement_date_evidence": [
    "Hut 8 Signs 352MW Data Center Lease in Texas Worth $9.8 Billion",
    "2026-07-21 10:44"
   ]
  },
  {
   "url": "https://news.yahoo.com/finance/news/iren-annouces-plans-expand-sweetwater-215507168.html",
   "title": "IREN annouces plans to expand in Sweetwater with 2GW data center hub",
   "published_at": "2025-03-10T21:55:07",
   "project": "Sweetwater hub",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "developing",
   "announcement_date": null,
   "project_evidence": [
    "# IREN annouces plans to expand in Sweetwater with 2GW data center hub",
    "Data center company IREN is expanding its presence in Sweetwater with the development of a second site, expected to create a 2-gigawatt data center hub that could be used for bitcoin mining and AI ventures."
   ],
   "locality_evidence": [
    "# IREN annouces plans to expand in Sweetwater with 2GW data center hub",
    "Data center company IREN is expanding its presence in Sweetwater with the development of a second site, expected to create a 2-gigawatt data center hub that could be used for bitcoin mining and AI ventures."
   ],
   "state_evidence": [
    "**SWEETWATER, Texas (**[**KTAB/KRBC**](https://www.bigcountryhomepage.com/)**) \u2013** Data center company IREN is expanding its presence in Sweetwater with the development of a second site, expected to create a 2-gigawatt data center hub that could be used for bitcoin mining and AI ventures."
   ],
   "capacity_gw_evidence": [
    "# IREN annouces plans to expand in Sweetwater with 2GW data center hub",
    "Data center company IREN is expanding its presence in Sweetwater with the development of a second site, expected to create a 2-gigawatt data center hub that could be used for bitcoin mining and AI ventures."
   ],
   "builder_evidence": [
    "# IREN annouces plans to expand in Sweetwater with 2GW data center hub",
    "Data center company IREN is expanding its presence in Sweetwater with the development of a second site, expected to create a 2-gigawatt data center hub that could be used for bitcoin mining and AI ventures."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# IREN annouces plans to expand in Sweetwater with 2GW data center hub",
    "Data center company IREN is expanding its presence in Sweetwater with the development of a second site, expected to create a 2-gigawatt data center hub that could be used for bitcoin mining and AI ventures."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://news.yahoo.com/finance/news/iren-annouces-plans-expand-sweetwater-215507168.html",
   "title": "IREN annouces plans to expand in Sweetwater with 2GW data center hub",
   "published_at": "2025-03-10T21:55:07",
   "project": "Sweetwater 1",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "IREN",
   "ai_customer": null,
   "status": "construction in progress",
   "announcement_date": null,
   "project_evidence": [
    "### Project Timeline & Development",
    "Sweetwater 1 (1.4GW) is on track to be energized by April 2026, with construction in progress, transformers and electrical equipment being procured, and site prep underway."
   ],
   "locality_evidence": [
    "### Project Timeline & Development",
    "Data center company IREN is expanding its presence in Sweetwater with the development of a second site, expected to create a 2-gigawatt data center hub that could be used for bitcoin mining and AI ventures."
   ],
   "state_evidence": [
    "### Project Timeline & Development",
    "**SWEETWATER, Texas (**[**KTAB/KRBC**](https://www.bigcountryhomepage.com/)**) \u2013** Data center company IREN is expanding its presence in Sweetwater with the development of a second site, expected to create a 2-gigawatt data center hub that could be used for bitcoin mining and AI ventures."
   ],
   "capacity_gw_evidence": [
    "### Project Timeline & Development",
    "Sweetwater 1 (1.4GW) is on track to be energized by April 2026, with construction in progress, transformers and electrical equipment being procured, and site prep underway."
   ],
   "builder_evidence": [
    "### Project Timeline & Development",
    "Data center company IREN is expanding its presence in Sweetwater with the development of a second site, expected to create a 2-gigawatt data center hub that could be used for bitcoin mining and AI ventures."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "### Project Timeline & Development",
    "Sweetwater 1 (1.4GW) is on track to be energized by April 2026, with construction in progress, transformers and electrical equipment being procured, and site prep underway."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://digitalisationworld.com/news/68603/ecl-reveals-1-gw-off-grid-hydrogen-powered-ai-factory-data-centre",
   "title": "ECL reveals 1 GW off-grid, hydrogen-powered AI Factory data centre",
   "published_at": "2024-09-27T06:41:33",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "ECL",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# ECL reveals 1 GW off-grid, hydrogen-powered AI Factory data centre",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston."
   ],
   "locality_evidence": [
    "## 600+ acres near Houston, Texas will give AI leaders the space and power needed for the next wave of innovation, with zero emissions.",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston."
   ],
   "state_evidence": [
    "## 600+ acres near Houston, Texas will give AI leaders the space and power needed for the next wave of innovation, with zero emissions.",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston."
   ],
   "capacity_gw_evidence": [
    "# ECL reveals 1 GW off-grid, hydrogen-powered AI Factory data centre",
    "The initial 1GW phased development may be expanded to 2GW in the future, enabled by its modularity and based on customer demand."
   ],
   "builder_evidence": [
    "# ECL reveals 1 GW off-grid, hydrogen-powered AI Factory data centre",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# ECL reveals 1 GW off-grid, hydrogen-powered AI Factory data centre",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mgrid.org/2026/08/17/sb-energy-10-gw-generation-openai-ohio-ports-pike",
   "title": "SB Energy Will Build 10 GW of New Generation for OpenAI\u2019s 8 GW-IT Ohio Campus",
   "published_at": "2026-08-17T13:00:00",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Piketon",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "Planned",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# SB Energy Will Build 10 GW of New Generation for OpenAI\u2019s 8 GW-IT Ohio Campus",
    "OpenAI has agreed to take about 8 gigawatts-IT of capacity at the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "locality_evidence": [
    "# SB Energy Will Build 10 GW of New Generation for OpenAI\u2019s 8 GW-IT Ohio Campus",
    "LocationPiketon, OH"
   ],
   "state_evidence": [
    "# SB Energy Will Build 10 GW of New Generation for OpenAI\u2019s 8 GW-IT Ohio Campus",
    "OpenAI has agreed to take about 8 gigawatts-IT of capacity at the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "capacity_gw_evidence": [
    "# SB Energy Will Build 10 GW of New Generation for OpenAI\u2019s 8 GW-IT Ohio Campus",
    "OpenAI has agreed to take about 8 gigawatts-IT of capacity at the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "builder_evidence": [
    "# SB Energy Will Build 10 GW of New Generation for OpenAI\u2019s 8 GW-IT Ohio Campus",
    "SB Energy, the SoftBank unit, will build, own and operate the campus."
   ],
   "ai_customer_evidence": [
    "# SB Energy Will Build 10 GW of New Generation for OpenAI\u2019s 8 GW-IT Ohio Campus",
    "OpenAI has agreed to take about 8 gigawatts-IT of capacity at the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "status_evidence": [
    "# SB Energy Will Build 10 GW of New Generation for OpenAI\u2019s 8 GW-IT Ohio Campus",
    "StagePlanned"
   ],
   "announcement_date_evidence": [
    "# SB Energy Will Build 10 GW of New Generation for OpenAI\u2019s 8 GW-IT Ohio Campus",
    "The 20-year lease was announced on August 17, 2026."
   ]
  },
  {
   "url": "https://globenewswire.com/Tracker?data=X3EmC3JdSiazDqDBgaN9OWTqT6CMNU0JaC3-daHidIBn92gysJfQ5AzvgDyBtj8NezN5JzWGF5mtUh_qaO-Ksg%3D%3D",
   "title": "Meta's $600 Billion AI Infrastructure Bet: What It Means for CRE Investors",
   "published_at": "2026-03-08T18:07:45",
   "project": "Hyperion",
   "locality": null,
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Meta's $600 Billion AI Infrastructure Bet: What It Means for CRE Investors",
    "## Key Projects: Hyperion and Prometheus",
    "### Hyperion (Louisiana)",
    "The 2,250 acre Hyperion campus in Louisiana represents Meta's most ambitious data center project to date."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "Meta's $600 Billion AI Infrastructure Bet: What It Means for CRE Investors",
    "## Key Projects: Hyperion and Prometheus",
    "### Hyperion (Louisiana)",
    "The 2,250 acre Hyperion campus in Louisiana represents Meta's most ambitious data center project to date."
   ],
   "capacity_gw_evidence": [
    "Meta's $600 Billion AI Infrastructure Bet: What It Means for CRE Investors",
    "## Key Projects: Hyperion and Prometheus",
    "### Hyperion (Louisiana)",
    "At an estimated $10 billion buildout cost, the facility will deliver approximately 5 gigawatts of compute power, making it one of the largest data centers in the world."
   ],
   "builder_evidence": [
    "Meta's $600 Billion AI Infrastructure Bet: What It Means for CRE Investors",
    "## Key Projects: Hyperion and Prometheus",
    "### Hyperion (Louisiana)",
    "The 2,250 acre Hyperion campus in Louisiana represents Meta's most ambitious data center project to date."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://manilatimes.net/2026/07/15/tmt-newswire/globenewswire/crusoe-and-lancium-announce-10-gigawatt-ai-data-center-campus-in-childress-texas/2385224",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
   "published_at": "2026-07-15T00:00:00",
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Lancium",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas.",
    "*Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene*"
   ],
   "locality_evidence": [
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas.",
    "*Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene*"
   ],
   "state_evidence": [
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas.",
    "*Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene*"
   ],
   "capacity_gw_evidence": [
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas.",
    "*Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene*"
   ],
   "builder_evidence": [
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas.",
    "*Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene*"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas.",
    "*Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene*"
   ],
   "announcement_date_evidence": [
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas.",
    "*Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene*"
   ]
  },
  {
   "url": "https://manilatimes.net/2026/07/15/tmt-newswire/globenewswire/crusoe-and-lancium-announce-10-gigawatt-ai-data-center-campus-in-childress-texas/2385224",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
   "published_at": "2026-07-15T00:00:00",
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Lancium",
   "ai_customer": null,
   "status": "expanding",
   "announcement_date": null,
   "project_evidence": [
    "Crusoe recently announced it is currently building a second 900 MW data center on adjacent Lancium-owned land in Abilene.",
    "*Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene*"
   ],
   "locality_evidence": [
    "Crusoe recently announced it is currently building a second 900 MW data center on adjacent Lancium-owned land in Abilene.",
    "*Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene*"
   ],
   "state_evidence": [
    "Crusoe recently announced it is currently building a second 900 MW data center on adjacent Lancium-owned land in Abilene.",
    "*Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene*"
   ],
   "capacity_gw_evidence": [
    "The Childress development is the latest chapter in Crusoe's deep commitment to Texas.",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year - a remarkable feat of speed for a project of that scale - before expanding that campus to 1.2 GW.",
    "*Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene*"
   ],
   "builder_evidence": [
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year - a remarkable feat of speed for a project of that scale - before expanding that campus to 1.2 GW.",
    "*Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene*"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year - a remarkable feat of speed for a project of that scale - before expanding that campus to 1.2 GW.",
    "*Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene*"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://fool.com/investing/2026/08/29/chevron-microsoft-data-center-deal-big-earning",
   "title": "Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
   "published_at": "2026-08-29T14:45:00",
   "project": "Project Kilby",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.67,
   "builder": "Energy Forge One",
   "ai_customer": "Microsoft",
   "status": null,
   "announcement_date": "2026-06-22",
   "project_evidence": [
    "The agreement is [part of Project Kilby](https://www.fool.com/investing/2026/06/22/chevron-is-building-a-massive-power-plant-to-support-a-microsoft-data-center-heres-what-it-means-for-the-energy-stock/), in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power.",
    "## Breaking down Chevron's data center deal with Microsoft"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "However, even bigger news is that Chevron has entered into a 20-year power purchase agreement (PPA) to build a natural gas-powered facility to power **Microsoft**'s ([MSFT](/quote/nasdaq/msft/) +1.68%) artificial intelligence (AI)-focused data center in Texas.",
    "**Chevron** ([CVX](/quote/nyse/cvx/) +1.05%) posted [stellar second-quarter results](https://www.fool.com/investing/2026/08/01/chevron-just-crushed-earnings-heres-what-it-means/) at the end of July, beating the street's estimates thanks to higher oil prices, increased production volumes, and strong margins."
   ],
   "capacity_gw_evidence": [
    "The agreement is [part of Project Kilby](https://www.fool.com/investing/2026/06/22/chevron-is-building-a-massive-power-plant-to-support-a-microsoft-data-center-heres-what-it-means-for-the-energy-stock/), in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power.",
    "## Breaking down Chevron's data center deal with Microsoft"
   ],
   "builder_evidence": [
    "The agreement is [part of Project Kilby](https://www.fool.com/investing/2026/06/22/chevron-is-building-a-massive-power-plant-to-support-a-microsoft-data-center-heres-what-it-means-for-the-energy-stock/), in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power.",
    "## Breaking down Chevron's data center deal with Microsoft"
   ],
   "ai_customer_evidence": [
    "However, even bigger news is that Chevron has entered into a 20-year power purchase agreement (PPA) to build a natural gas-powered facility to power **Microsoft**'s ([MSFT](/quote/nasdaq/msft/) +1.68%) artificial intelligence (AI)-focused data center in Texas.",
    "**Chevron** ([CVX](/quote/nyse/cvx/) +1.05%) posted [stellar second-quarter results](https://www.fool.com/investing/2026/08/01/chevron-just-crushed-earnings-heres-what-it-means/) at the end of July, beating the street's estimates thanks to higher oil prices, increased production volumes, and strong margins."
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "On June 22, Chevron inked a 20-year take-or-pay power purchase agreement with Microsoft to provide electricity for a Microsoft-operated data center.",
    "## Breaking down Chevron's data center deal with Microsoft"
   ]
  },
  {
   "url": "https://telecomreviewamericas.com/articles/wholesale-and-capacity/vantage-data-centers-unveils-plans-for-a-usd-25b-mega-campus-in-texas",
   "title": "Vantage Data Centers Unveils Plans for a USD 25B Mega-Campus in Texas - Telecom Review Americas",
   "published_at": "2025-08-21T05:02:52",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "# Vantage Data Centers Unveils Plans for a USD 25B Mega-Campus in Texas",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in [AI](https://www.telecomreviewamericas.com/tag/AI/) and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "locality_evidence": [
    "# Vantage Data Centers Unveils Plans for a USD 25B Mega-Campus in Texas",
    "Vantage Data Centers announced its largest investment to date of over USD 25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "# Vantage Data Centers Unveils Plans for a USD 25B Mega-Campus in Texas",
    "Vantage Data Centers announced its largest investment to date of over USD 25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "# Vantage Data Centers Unveils Plans for a USD 25B Mega-Campus in Texas",
    "Vantage Data Centers announced its largest investment to date of over USD 25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "# Vantage Data Centers Unveils Plans for a USD 25B Mega-Campus in Texas",
    "Vantage Data Centers announced its largest investment to date of over USD 25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Vantage Data Centers Unveils Plans for a USD 25B Mega-Campus in Texas",
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://myhighplains.com/news/your-local-election-hq/amarillo-ai-data-center-project/fermi-america-secures-over-100-million-in-equipment-financing-to-advance-project-matador/amp",
   "title": "Fermi America secures over $100 Million in equipment financing to advance Project Matador",
   "published_at": "2026-02-20T23:04:15",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2025-02-13",
   "project_evidence": [
    "AMARILLO, Texas (KAMR/KCIT) \u2014 Fermi Inc., also known as Fermi America, said it secured over $100 million in equipment financing from Keystone National Group, with plans to access more funding in 2026.",
    "On Feb. 13, construction crews began installing power infrastructure at the Project Matador site in Amarillo, according to Fermi officials."
   ],
   "locality_evidence": [
    "AMARILLO, Texas (KAMR/KCIT) \u2014 Fermi Inc., also known as Fermi America, said it secured over $100 million in equipment financing from Keystone National Group, with plans to access more funding in 2026.",
    "On Feb. 13, construction crews began installing power infrastructure at the Project Matador site in Amarillo, according to Fermi officials."
   ],
   "state_evidence": [
    "AMARILLO, Texas (KAMR/KCIT) \u2014 Fermi Inc., also known as Fermi America, said it secured over $100 million in equipment financing from Keystone National Group, with plans to access more funding in 2026.",
    "On Feb. 13, construction crews began installing power infrastructure at the Project Matador site in Amarillo, according to Fermi officials."
   ],
   "capacity_gw_evidence": [
    "AMARILLO, Texas (KAMR/KCIT) \u2014 Fermi Inc., also known as Fermi America, said it secured over $100 million in equipment financing from Keystone National Group, with plans to access more funding in 2026.",
    "The funding also helps strengthen Fermi America\u2019s power ramp, showing that the company can deliver the first 2.3 gigawatts of an overall goal of 11 gigawatts of long-duration power at scale."
   ],
   "builder_evidence": [
    "AMARILLO, Texas (KAMR/KCIT) \u2014 Fermi Inc., also known as Fermi America, said it secured over $100 million in equipment financing from Keystone National Group, with plans to access more funding in 2026.",
    "On Feb. 13, construction crews began installing power infrastructure at the Project Matador site in Amarillo, according to Fermi officials."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "AMARILLO, Texas (KAMR/KCIT) \u2014 Fermi Inc., also known as Fermi America, said it secured over $100 million in equipment financing from Keystone National Group, with plans to access more funding in 2026.",
    "On Feb. 13, construction crews began installing power infrastructure at the Project Matador site in Amarillo, according to Fermi officials."
   ],
   "announcement_date_evidence": [
    "AMARILLO, Texas (KAMR/KCIT) \u2014 Fermi Inc., also known as Fermi America, said it secured over $100 million in equipment financing from Keystone National Group, with plans to access more funding in 2026.",
    "On Feb. 13, construction crews began installing power infrastructure at the Project Matador site in Amarillo, according to Fermi officials."
   ]
  },
  {
   "url": "https://local.newsbreak.com/lootpress-1588259/4852837280104-anthropic-strikes-45-billion-ai-computing-deal-tied-to-west-virginia-data-center",
   "title": "Anthropic strikes $45 Billion AI computing deal tied to West Virginia data center - NewsBreak",
   "published_at": "2026-08-27T16:59:30",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Anthropic",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Anthropic strikes $45 Billion AI computing deal tied to West Virginia data center",
    "The six-year agreement with British AI infrastructure company Nscale will provide Anthropic with approximately 460 megawatts of computing capacity from Nscale\u2019s Monarch Compute Campus in Mason County.",
    "Nscale\u2019s Monarch Compute Campus is being developed on more than 2,250 acres in Mason County."
   ],
   "locality_evidence": [
    "# Anthropic strikes $45 Billion AI computing deal tied to West Virginia data center",
    "The six-year agreement with British AI infrastructure company Nscale will provide Anthropic with approximately 460 megawatts of computing capacity from Nscale\u2019s Monarch Compute Campus in Mason County.",
    "Nscale\u2019s Monarch Compute Campus is being developed on more than 2,250 acres in Mason County."
   ],
   "state_evidence": [
    "# Anthropic strikes $45 Billion AI computing deal tied to West Virginia data center",
    "The six-year agreement with British AI infrastructure company Nscale will provide Anthropic with approximately 460 megawatts of computing capacity from Nscale\u2019s Monarch Compute Campus in Mason County."
   ],
   "capacity_gw_evidence": [
    "# Anthropic strikes $45 Billion AI computing deal tied to West Virginia data center"
   ],
   "builder_evidence": [
    "# Anthropic strikes $45 Billion AI computing deal tied to West Virginia data center",
    "The six-year agreement with British AI infrastructure company Nscale will provide Anthropic with approximately 460 megawatts of computing capacity from Nscale\u2019s Monarch Compute Campus in Mason County.",
    "Nscale\u2019s Monarch Compute Campus is being developed on more than 2,250 acres in Mason County."
   ],
   "ai_customer_evidence": [
    "# Anthropic strikes $45 Billion AI computing deal tied to West Virginia data center",
    "The six-year agreement with British AI infrastructure company Nscale will provide Anthropic with approximately 460 megawatts of computing capacity from Nscale\u2019s Monarch Compute Campus in Mason County."
   ],
   "status_evidence": [
    "# Anthropic strikes $45 Billion AI computing deal tied to West Virginia data center",
    "The deal represents another major commitment tied to the West Virginia development, which Nscale describes as one of the world\u2019s largest planned artificial intelligence infrastructure projects."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://boxelderstratos.com",
   "title": "STRATOS PROJECT AREA | Discover Energy Opportunities Today",
   "published_at": null,
   "project": "Stratos Project",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O'Leary Digital Utah Development Co., LLC",
   "ai_customer": null,
   "status": "Approved",
   "announcement_date": "2026-04-24",
   "project_evidence": [
    "## **You may have Read about the Proposed data center project in the news or on social media. This website, published by the developer, provides factual information and primary source documents about the project.**",
    "The Stratos Project Area is an energy and technology infrastructure initiative in western Box Elder County, designed to strengthen national security and Utah's long-term economic competitiveness."
   ],
   "locality_evidence": [
    "## **You may have Read about the Proposed data center project in the news or on social media. This website, published by the developer, provides factual information and primary source documents about the project.**",
    "The Stratos Project Area is an energy and technology infrastructure initiative in western Box Elder County, designed to strengthen national security and Utah's long-term economic competitiveness."
   ],
   "state_evidence": [
    "## **You may have Read about the Proposed data center project in the news or on social media. This website, published by the developer, provides factual information and primary source documents about the project.**",
    "The Stratos Project Area is an energy and technology infrastructure initiative in western Box Elder County, designed to strengthen national security and Utah's long-term economic competitiveness."
   ],
   "capacity_gw_evidence": [
    "## **You may have Read about the Proposed data center project in the news or on social media. This website, published by the developer, provides factual information and primary source documents about the project.**",
    "The 9 GW figure is not the project."
   ],
   "builder_evidence": [
    "## **You may have Read about the Proposed data center project in the news or on social media. This website, published by the developer, provides factual information and primary source documents about the project.**",
    "The project is being developed by a partnership that includes O'Leary Digital Utah Development Co., LLC, in coordination with state and local stakeholders."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## **You may have Read about the Proposed data center project in the news or on social media. This website, published by the developer, provides factual information and primary source documents about the project.**",
    "Approved by the MIDA Board of Directors on April 24, 2026 and by the Box Elder County Commission on May 4, 2026, the project supports the development of a large-scale data and energy campus to power artificial intelligence, cloud computing, advanced manufacturing, and mission-critical defense operations."
   ],
   "announcement_date_evidence": [
    "## **You may have Read about the Proposed data center project in the news or on social media. This website, published by the developer, provides factual information and primary source documents about the project.**",
    "Approved by the MIDA Board of Directors on April 24, 2026 and by the Box Elder County Commission on May 4, 2026, the project supports the development of a large-scale data and energy campus to power artificial intelligence, cloud computing, advanced manufacturing, and mission-critical defense operations."
   ]
  },
  {
   "url": "https://cbsnews.com/atlanta/news/georgia-power-gets-clearance-to-serve-openais-massive-ai-data-center-in-effingham-county?intcid=CNR-02-0623",
   "title": "Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County\u200b",
   "published_at": "2026-08-27T18:48:39",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "Georgia Power",
   "ai_customer": "OpenAI",
   "status": "cleared state regulatory review",
   "announcement_date": null,
   "project_evidence": [
    "# Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County\u200b",
    "The contract calls for Georgia Power to provide up to 3,200 megawatts of electricity to Project Camellia, with service delivered in phases from 2028 through 2032."
   ],
   "locality_evidence": [
    "# Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County\u200b",
    "Georgia Power's agreement to supply electricity to OpenAI's [massive data center in Effingham County](https://www.cbsnews.com/atlanta/news/openai-is-bringing-a-massive-ai-data-center-to-georgia-heres-what-residents-should-know/) has cleared state regulatory review."
   ],
   "state_evidence": [
    "# Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County\u200b",
    "Georgia Power's agreement to supply electricity to OpenAI's [massive data center in Effingham County](https://www.cbsnews.com/atlanta/news/openai-is-bringing-a-massive-ai-data-center-to-georgia-heres-what-residents-should-know/) has cleared state regulatory review."
   ],
   "capacity_gw_evidence": [
    "# Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County\u200b",
    "The contract calls for Georgia Power to provide up to 3,200 megawatts of electricity to Project Camellia, with service delivered in phases from 2028 through 2032."
   ],
   "builder_evidence": [
    "# Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County\u200b",
    "The contract calls for Georgia Power to provide up to 3,200 megawatts of electricity to Project Camellia, with service delivered in phases from 2028 through 2032."
   ],
   "ai_customer_evidence": [
    "# Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County\u200b",
    "Georgia Power's agreement to supply electricity to OpenAI's [massive data center in Effingham County](https://www.cbsnews.com/atlanta/news/openai-is-bringing-a-massive-ai-data-center-to-georgia-heres-what-residents-should-know/) has cleared state regulatory review."
   ],
   "status_evidence": [
    "# Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County\u200b",
    "Georgia Power's agreement to supply electricity to OpenAI's [massive data center in Effingham County](https://www.cbsnews.com/atlanta/news/openai-is-bringing-a-massive-ai-data-center-to-georgia-heres-what-residents-should-know/) has cleared state regulatory review."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mlive.com/news/ann-arbor/2026/03/google-revealed-as-backer-for-data-center-project-west-of-detroit.html",
   "title": "Google revealed as backer for data center project west of Detroit",
   "published_at": "2026-03-17T20:04:12",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 2.7,
   "builder": "Google",
   "ai_customer": null,
   "status": "preliminary site plan approval",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Google revealed as backer for data center project west of Detroit",
    "Google is evaluating [\u201cProject Cannoli,\u201d a proposed data center campus](https://www.mlive.com/news/detroit/2026/02/280-acre-data-center-campus-approved-in-western-wayne-county-despite-resident-opposition.html) development in the Wayne County community, a spokesperson for Google confirmed."
   ],
   "locality_evidence": [
    "# Google revealed as backer for data center project west of Detroit",
    "Google announced plans to develop a new data center in DTE Energy\u2019s service territory in Van Buren Township in a release Tuesday, March 17."
   ],
   "state_evidence": [
    "# Google revealed as backer for data center project west of Detroit",
    "VAN BUREN TWP., MI \u2014 One of the world\u2019s biggest tech giants is behind a massive [data center](https://www.mlive.com/topic/data-centers/) project west of Detroit."
   ],
   "capacity_gw_evidence": [
    "# Google revealed as backer for data center project west of Detroit",
    "DTE would provide power for day-to-day operations at the 2.7-gigawatt data center project, according to the Google spokesperson."
   ],
   "builder_evidence": [
    "# Google revealed as backer for data center project west of Detroit",
    "Google announced plans to develop a new data center in DTE Energy\u2019s service territory in Van Buren Township in a release Tuesday, March 17."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Google revealed as backer for data center project west of Detroit",
    "In February, the township\u2019s planning commission voted 5-2 to grant \u201cProject Cannoli\u201d preliminary site plan approval for the proposed three-building data center campus on about 280 acres near the I-94/Haggerty Road area near Detroit Wayne International Airport."
   ],
   "announcement_date_evidence": [
    "# Google revealed as backer for data center project west of Detroit",
    "Google announced plans to develop a new data center in DTE Energy\u2019s service territory in Van Buren Township in a release Tuesday, March 17."
   ]
  },
  {
   "url": "https://bitcoinethereumnews.com/tech/terawulf-expands-ai-strategy-with-1gw-data-campus-and-3b-backing",
   "title": "Terawulf Expands AI Strategy With 1GW Data Campus and $3B Backing",
   "published_at": "2026-05-29T16:06:15",
   "project": "Muskie Data Campus",
   "locality": "Eastpark Industrial Park",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "Terawulf Inc.",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": null,
   "project_evidence": [
    "# Terawulf Expands AI Strategy With 1GW Data Campus and $3B Backing",
    "The Nasdaq-listed company said it acquired the \u201cMuskie Data Campus\u201d from Industrial Equity Partners."
   ],
   "locality_evidence": [
    "# Terawulf Expands AI Strategy With 1GW Data Campus and $3B Backing",
    "The site sits inside the 1,000-acre Eastpark Industrial Park in northeastern Kentucky and includes about 285 acres of owned and controlled land."
   ],
   "state_evidence": [
    "# Terawulf Expands AI Strategy With 1GW Data Campus and $3B Backing",
    "Terawulf Inc. is moving deeper into artificial intelligence (AI) infrastructure with the purchase of a large data center development site in eastern Kentucky, underscoring how former bitcoin mining firms are chasing demand for power-hungry computing capacity.",
    "The site sits inside the 1,000-acre Eastpark Industrial Park in northeastern Kentucky and includes about 285 acres of owned and controlled land."
   ],
   "capacity_gw_evidence": [
    "# Terawulf Expands AI Strategy With 1GW Data Campus and $3B Backing",
    "Terawulf said the campus is expected to support more than 1 gigawatt of AI and high-performance computing capacity."
   ],
   "builder_evidence": [
    "# Terawulf Expands AI Strategy With 1GW Data Campus and $3B Backing",
    "Terawulf Inc. is moving deeper into artificial intelligence (AI) infrastructure with the purchase of a large data center development site in eastern Kentucky, underscoring how former bitcoin mining firms are chasing demand for power-hungry computing capacity.",
    "The Nasdaq-listed company said it acquired the \u201cMuskie Data Campus\u201d from Industrial Equity Partners."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Terawulf Expands AI Strategy With 1GW Data Campus and $3B Backing",
    "The Nasdaq-listed company said it acquired the \u201cMuskie Data Campus\u201d from Industrial Equity Partners."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://ground.news/article/iren-energizes-first-phase-of-2gw-sweetwater-data-center-campus-in-texas",
   "title": "Iren energizes first phase of 2GW Sweetwater data center campus in Texas",
   "published_at": "2026-05-06T12:20:24",
   "project": "Sweetwater",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Iren",
   "ai_customer": null,
   "status": "energized",
   "announcement_date": "2026-05-06",
   "project_evidence": [
    "See every side of every news story",
    "Iren energizes first phase of 2GW Sweetwater data center campus in Texas"
   ],
   "locality_evidence": [
    "See every side of every news story",
    "Iren energizes first phase of 2GW Sweetwater data center campus in Texas",
    "Second Sweetwater site to be energized in 2028"
   ],
   "state_evidence": [
    "See every side of every news story",
    "Iren energizes first phase of 2GW Sweetwater data center campus in Texas"
   ],
   "capacity_gw_evidence": [
    "See every side of every news story",
    "Iren energizes first phase of 2GW Sweetwater data center campus in Texas"
   ],
   "builder_evidence": [
    "See every side of every news story",
    "Iren energizes first phase of 2GW Sweetwater data center campus in Texas"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "See every side of every news story",
    "Iren energizes first phase of 2GW Sweetwater data center campus in Texas"
   ],
   "announcement_date_evidence": [
    "See every side of every news story",
    "datacenterdynamics.com broke the news on Wednesday, May 6, 2026."
   ]
  },
  {
   "url": "https://energyindustryupdate.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Creekstone Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "state_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://digitalinfrastructure.substack.com/p/08232026-what-i-read-last-week",
   "title": "08/23/2026 What I Read Last Week",
   "published_at": "2026-08-24T12:53:23",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 4.25,
   "builder": "NVIDIA",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "**Weekly edition of curated news about Digital Infrastructure**",
    "**Data Centers**",
    "Through a long-term partnership with SB Energy at the PORTS-Pike Technology Campus in Ohio, NVIDIA will support 4.25 gigawatts of capacity over 20-year upgrade cycles to serve high-demand frontier AI labs."
   ],
   "locality_evidence": [
    "**Weekly edition of curated news about Digital Infrastructure**",
    "**Data Centers**",
    "Through a long-term partnership with SB Energy at the PORTS-Pike Technology Campus in Ohio, NVIDIA will support 4.25 gigawatts of capacity over 20-year upgrade cycles to serve high-demand frontier AI labs."
   ],
   "state_evidence": [
    "**Weekly edition of curated news about Digital Infrastructure**",
    "**Data Centers**",
    "Through a long-term partnership with SB Energy at the PORTS-Pike Technology Campus in Ohio, NVIDIA will support 4.25 gigawatts of capacity over 20-year upgrade cycles to serve high-demand frontier AI labs."
   ],
   "capacity_gw_evidence": [
    "**Weekly edition of curated news about Digital Infrastructure**",
    "**Data Centers**",
    "Through a long-term partnership with SB Energy at the PORTS-Pike Technology Campus in Ohio, NVIDIA will support 4.25 gigawatts of capacity over 20-year upgrade cycles to serve high-demand frontier AI labs."
   ],
   "builder_evidence": [
    "**Weekly edition of curated news about Digital Infrastructure**",
    "**Data Centers**",
    "Through a long-term partnership with SB Energy at the PORTS-Pike Technology Campus in Ohio, NVIDIA will support 4.25 gigawatts of capacity over 20-year upgrade cycles to serve high-demand frontier AI labs."
   ],
   "ai_customer_evidence": [
    "**Weekly edition of curated news about Digital Infrastructure**",
    "**Data Centers**",
    "**NVIDIA** is strategically securing land, power, and shell (LPS) capacity - a critical constraint for AI factories - to directly host its full-stack compute infrastructure for key partners like OpenAI.",
    "Through a long-term partnership with SB Energy at the PORTS-Pike Technology Campus in Ohio, NVIDIA will support 4.25 gigawatts of capacity over 20-year upgrade cycles to serve high-demand frontier AI labs."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://thenerdstash.com/could-use-more-power-than-every-home-in-the-state-outrage-erupts-over-planned-105b-ohio-data-center",
   "title": "\u2018Could Use More Power Than Every Home in the State\u2019: Outrage Erupts Over Planned $105B Ohio Data Center",
   "published_at": "2026-08-26T22:30:00",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Piketon",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "As AI infrastructure continues to swallow up massive swathes of the American countryside, Nvidia, OpenAI, and SoftBank\u2019s SB Energy have officially announced a joint venture to build the**** PORTS-Pike Technology Campus in Piketon, [Ohio](https://thenerdstash.com/tag/Ohio). However, despite promises of economic relief and local job creation, online critics and local residents aren\u2019t entirely sold on the tech titans rolling into town.\n\nIn a post shared on Ohio"
   ],
   "locality_evidence": [
    "As AI infrastructure continues to swallow up massive swathes of the American countryside, Nvidia, OpenAI, and SoftBank\u2019s SB Energy have officially announced a joint venture to build the**** PORTS-Pike Technology Campus in Piketon, [Ohio](https://thenerdstash.com/tag/Ohio). However, despite promises of economic relief and local job creation, online critics and local residents aren\u2019t entirely sold on the tech titans rolling into town.\n\nIn a post shared on Ohio"
   ],
   "state_evidence": [
    "As AI infrastructure continues to swallow up massive swathes of the American countryside, Nvidia, OpenAI, and SoftBank\u2019s SB Energy have officially announced a joint venture to build the**** PORTS-Pike Technology Campus in Piketon, [Ohio](https://thenerdstash.com/tag/Ohio). However, despite promises of economic relief and local job creation, online critics and local residents aren\u2019t entirely sold on the tech titans rolling into town.\n\nIn a post shared on Ohio"
   ],
   "capacity_gw_evidence": [
    "Meanwhile, OpenAI will serve as the anchor tenant for the facility, which will start with 4.25 gigawatts (GW) of compute capacity before expanding to 8 GW, a massive layout capable of housing roughly 1.5 million Nvidia GPUs per hardware generation."
   ],
   "builder_evidence": [
    "As AI infrastructure continues to swallow up massive swathes of the American countryside, Nvidia, OpenAI, and SoftBank\u2019s SB Energy have officially announced a joint venture to build the**** PORTS-Pike Technology Campus in Piketon, [Ohio](https://thenerdstash.com/tag/Ohio). However, despite promises of economic relief and local job creation, online critics and local residents aren\u2019t entirely sold on the tech titans rolling into town.\n\nIn a post shared on Ohio"
   ],
   "ai_customer_evidence": [
    "Meanwhile, OpenAI will serve as the anchor tenant for the facility, which will start with 4.25 gigawatts (GW) of compute capacity before expanding to 8 GW, a massive layout capable of housing roughly 1.5 million Nvidia GPUs per hardware generation."
   ],
   "status_evidence": [
    "As AI infrastructure continues to swallow up massive swathes of the American countryside, Nvidia, OpenAI, and SoftBank\u2019s SB Energy have officially announced a joint venture to build the**** PORTS-Pike Technology Campus in Piketon, [Ohio](https://thenerdstash.com/tag/Ohio). However, despite promises of economic relief and local job creation, online critics and local residents aren\u2019t entirely sold on the tech titans rolling into town.\n\nIn a post shared on Ohio"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://constructionowners.com/news/meta-breaks-ground-on-10b-indiana-data-center",
   "title": "Meta Begins $10B Lebanon, Indiana Data Center Focused on AI and Renewable Energy",
   "published_at": null,
   "project": "Indiana Data Center",
   "locality": "Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2026-02-13",
   "project_evidence": [
    "# Meta Breaks Ground on $10B Indiana Data Center",
    "Meta has officially begun construction on a massive new data center in Lebanon, Indiana, marking one of the company\u2019s largest infrastructure investments to date."
   ],
   "locality_evidence": [
    "# Meta Breaks Ground on $10B Indiana Data Center",
    "Meta has officially begun construction on a massive new data center in Lebanon, Indiana, marking one of the company\u2019s largest infrastructure investments to date."
   ],
   "state_evidence": [
    "# Meta Breaks Ground on $10B Indiana Data Center",
    "Meta has officially begun construction on a massive new data center in Lebanon, Indiana, marking one of the company\u2019s largest infrastructure investments to date."
   ],
   "capacity_gw_evidence": [
    "# Meta Breaks Ground on $10B Indiana Data Center",
    "The facility is designed to deliver 1 gigawatt of capacity, supporting both AI workloads and Meta\u2019s core platforms."
   ],
   "builder_evidence": [
    "# Meta Breaks Ground on $10B Indiana Data Center",
    "Meta has officially begun construction on a massive new data center in Lebanon, Indiana, marking one of the company\u2019s largest infrastructure investments to date."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Meta Breaks Ground on $10B Indiana Data Center",
    "Meta has officially begun construction on a massive new data center in Lebanon, Indiana, marking one of the company\u2019s largest infrastructure investments to date."
   ],
   "announcement_date_evidence": [
    "# Meta Breaks Ground on $10B Indiana Data Center",
    "February 13, 2026"
   ]
  },
  {
   "url": "https://convergedigest.com/aws-activates-project-rainier-data-center-campus",
   "title": "AWS Activates Project Rainier Data Center Campus",
   "published_at": "2025-10-29T22:48:36",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon Web Services",
   "ai_customer": "Anthropic",
   "status": "activated",
   "announcement_date": null,
   "project_evidence": [
    "Amazon Web Services (AWS) has activated *Project Rainier*\u2014its largest-ever AI data center development\u2014transforming 1,200 acres of farmland in New Carlisle, Indiana, into one of the world\u2019s most powerful AI compute hubs."
   ],
   "locality_evidence": [
    "Amazon Web Services (AWS) has activated *Project Rainier*\u2014its largest-ever AI data center development\u2014transforming 1,200 acres of farmland in New Carlisle, Indiana, into one of the world\u2019s most powerful AI compute hubs."
   ],
   "state_evidence": [
    "Amazon Web Services (AWS) has activated *Project Rainier*\u2014its largest-ever AI data center development\u2014transforming 1,200 acres of farmland in New Carlisle, Indiana, into one of the world\u2019s most powerful AI compute hubs."
   ],
   "capacity_gw_evidence": [
    "Two additional campuses are under construction, with the full site expected to include 30 buildings drawing up to 2.2 gigawatts (GW) of electricity, enough to power more than 1.5 million homes."
   ],
   "builder_evidence": [
    "Amazon Web Services (AWS) has activated *Project Rainier*\u2014its largest-ever AI data center development\u2014transforming 1,200 acres of farmland in New Carlisle, Indiana, into one of the world\u2019s most powerful AI compute hubs."
   ],
   "ai_customer_evidence": [
    "In less than a year, AWS constructed seven massive data center buildings now filled with nearly 500,000 Trainium2 chips, all dedicated to training and running *Anthropic\u2019s Claude* AI model."
   ],
   "status_evidence": [
    "Amazon Web Services (AWS) has activated *Project Rainier*\u2014its largest-ever AI data center development\u2014transforming 1,200 acres of farmland in New Carlisle, Indiana, into one of the world\u2019s most powerful AI compute hubs."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tesery.com/blogs/news/elon-musk-s-xai-unveils-historic-20-billion-investment-in-mississippi-for-2gw-ai-data-center",
   "title": "xAI's $20 Billion Mississippi Data Center: MACROHARDRR 2GW Colossus Cluster, Southaven Site Strategy & Mid-South AI Corridor Explained",
   "published_at": "2026-06-02T19:09:02",
   "project": "MACROHARDRR",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "",
   "status": "Operations from February 2026",
   "announcement_date": "2026-01-09",
   "project_evidence": [
    "# Elon Musk\u2019s xAI Unveils Historic $20 Billion Investment in Mississippi for 2GW AI Data Center",
    "- **Project name:** \"MACROHARDRR\" \u2014 xAI's third massive data center in the greater Memphis area",
    "Elon Musk's xAI has announced a $20+ billion investment in a new 2-gigawatt AI data center campus in Southaven, Mississippi \u2014 the largest economic development project in the state's history.",
    "| **Project name** | \"MACROHARDRR\" \u2014 xAI's characteristic jab at Microsoft; third data center in the greater Memphis area |",
    "| Element | Detail |"
   ],
   "locality_evidence": [
    "# Elon Musk\u2019s xAI Unveils Historic $20 Billion Investment in Mississippi for 2GW AI Data Center",
    "- **Location:** Southaven, Mississippi \u2014 just south of the Tennessee border; adjacent to Memphis xAI cluster",
    "Elon Musk's xAI has announced a $20+ billion investment in a new 2-gigawatt AI data center campus in Southaven, Mississippi \u2014 the largest economic development project in the state's history.",
    "| **Location** | Southaven, Mississippi \u2014 south of Tennessee border; retrofitted existing industrial facility |",
    "| Element | Detail |"
   ],
   "state_evidence": [
    "# Elon Musk\u2019s xAI Unveils Historic $20 Billion Investment in Mississippi for 2GW AI Data Center",
    "- **Location:** Southaven, Mississippi \u2014 just south of the Tennessee border; adjacent to Memphis xAI cluster",
    "Elon Musk's xAI has announced a $20+ billion investment in a new 2-gigawatt AI data center campus in Southaven, Mississippi \u2014 the largest economic development project in the state's history.",
    "| **Location** | Southaven, Mississippi \u2014 south of Tennessee border; retrofitted existing industrial facility |",
    "| Element | Detail |"
   ],
   "capacity_gw_evidence": [
    "# Elon Musk\u2019s xAI Unveils Historic $20 Billion Investment in Mississippi for 2GW AI Data Center",
    "Elon Musk's xAI has announced a $20+ billion investment in a new 2-gigawatt AI data center campus in Southaven, Mississippi \u2014 the largest economic development project in the state's history.",
    "| **Planned capacity** | ~2 gigawatts \u2014 equivalent to two nuclear reactor units; ~1.5 million homes' worth of power dedicated to AI |",
    "| Element | Detail |"
   ],
   "builder_evidence": [
    "# Elon Musk\u2019s xAI Unveils Historic $20 Billion Investment in Mississippi for 2GW AI Data Center",
    "- **Project name:** \"MACROHARDRR\" \u2014 xAI's third massive data center in the greater Memphis area",
    "Elon Musk's xAI has announced a $20+ billion investment in a new 2-gigawatt AI data center campus in Southaven, Mississippi \u2014 the largest economic development project in the state's history.",
    "| **Project name** | \"MACROHARDRR\" \u2014 xAI's characteristic jab at Microsoft; third data center in the greater Memphis area |",
    "| Element | Detail |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Elon Musk\u2019s xAI Unveils Historic $20 Billion Investment in Mississippi for 2GW AI Data Center",
    "- **Operations start:** February 2026",
    "Operations are scheduled to begin February 2026. Here's the full breakdown.",
    "| **Southaven, Mississippi (MACROHARDRR)** | 2GW AI training supercomputer; pushes Colossus to most powerful AI system on Earth; next-generation LLM training | Operations from February 2026 |",
    "| Site | Role | Status |"
   ],
   "announcement_date_evidence": [
    "# Elon Musk\u2019s xAI Unveils Historic $20 Billion Investment in Mississippi for 2GW AI Data Center",
    " by Rio on Jan 09, 2026"
   ]
  },
  {
   "url": "https://constructionreviewonline.com/childress-texas-lands-1-gw-ai-data-center-campus-backed-by-crusoe-and-lancium",
   "title": "Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
   "published_at": "2026-07-15T16:09:03",
   "project": "Childress",
   "locality": "Childress County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "Childress County, Texas, will become home to a 1 GW artificial intelligence data center campus developed through a partnership between [Crusoe](https://www.crusoe.ai/) and [Lancium](https://lancium.com/), with construction expected to begin in the third quarter of 2026."
   ],
   "locality_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "Childress County, Texas, will become home to a 1 GW artificial intelligence data center campus developed through a partnership between [Crusoe](https://www.crusoe.ai/) and [Lancium](https://lancium.com/), with construction expected to begin in the third quarter of 2026."
   ],
   "state_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "Childress County, Texas, will become home to a 1 GW artificial intelligence data center campus developed through a partnership between [Crusoe](https://www.crusoe.ai/) and [Lancium](https://lancium.com/), with construction expected to begin in the third quarter of 2026."
   ],
   "capacity_gw_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "Childress County, Texas, will become home to a 1 GW artificial intelligence data center campus developed through a partnership between [Crusoe](https://www.crusoe.ai/) and [Lancium](https://lancium.com/), with construction expected to begin in the third quarter of 2026."
   ],
   "builder_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "Childress County, Texas, will become home to a 1 GW artificial intelligence data center campus developed through a partnership between [Crusoe](https://www.crusoe.ai/) and [Lancium](https://lancium.com/), with construction expected to begin in the third quarter of 2026."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "Childress County, Texas, will become home to a 1 GW artificial intelligence data center campus developed through a partnership between [Crusoe](https://www.crusoe.ai/) and [Lancium](https://lancium.com/), with construction expected to begin in the third quarter of 2026."
   ],
   "announcement_date_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "Published on Jul 15, 2026"
   ]
  },
  {
   "url": "https://constructionreviewonline.com/childress-texas-lands-1-gw-ai-data-center-campus-backed-by-crusoe-and-lancium",
   "title": "Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
   "published_at": "2026-07-15T16:09:03",
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "energized",
   "announcement_date": null,
   "project_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "The development represents the second major data center site where Crusoe and Lancium are using the same partnership structure established in Abilene, Texas.",
    "Crusoe energized its first two buildings at the site within one year and later expanded plans for the campus to 1.2 GW."
   ],
   "locality_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "The development represents the second major data center site where Crusoe and Lancium are using the same partnership structure established in Abilene, Texas."
   ],
   "state_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "The development represents the second major data center site where Crusoe and Lancium are using the same partnership structure established in Abilene, Texas."
   ],
   "capacity_gw_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "Crusoe energized its first two buildings at the site within one year and later expanded plans for the campus to 1.2 GW."
   ],
   "builder_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "The development represents the second major data center site where Crusoe and Lancium are using the same partnership structure established in Abilene, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "Crusoe energized its first two buildings at the site within one year and later expanded plans for the campus to 1.2 GW."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://fieldnews.net/news/crusoe-lancium-announce-1gw-ai-data-center-campus-in-childress",
   "title": "Crusoe, Lancium Announce 1 GW AI Data Center Campus in Childress, Texas",
   "published_at": "2026-07-15T00:00:00",
   "project": "Childress",
   "locality": "Childress County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Crusoe, Lancium Announce 1 GW AI Data Center Campus in Childress, Texas",
    "Crusoe and Lancium will build a 1 gigawatt, 270-acre AI data centre campus in Childress County, Texas, with construction starting Q3 2026 and thousands of construction jobs expected."
   ],
   "locality_evidence": [
    "# Crusoe, Lancium Announce 1 GW AI Data Center Campus in Childress, Texas",
    "Crusoe and Lancium will build a 1 gigawatt, 270-acre AI data centre campus in Childress County, Texas, with construction starting Q3 2026 and thousands of construction jobs expected."
   ],
   "state_evidence": [
    "# Crusoe, Lancium Announce 1 GW AI Data Center Campus in Childress, Texas",
    "Crusoe and Lancium will build a 1 gigawatt, 270-acre AI data centre campus in Childress County, Texas, with construction starting Q3 2026 and thousands of construction jobs expected."
   ],
   "capacity_gw_evidence": [
    "# Crusoe, Lancium Announce 1 GW AI Data Center Campus in Childress, Texas",
    "Crusoe and Lancium will build a 1 gigawatt, 270-acre AI data centre campus in Childress County, Texas, with construction starting Q3 2026 and thousands of construction jobs expected."
   ],
   "builder_evidence": [
    "# Crusoe, Lancium Announce 1 GW AI Data Center Campus in Childress, Texas",
    "Crusoe and Lancium will build a 1 gigawatt, 270-acre AI data centre campus in Childress County, Texas, with construction starting Q3 2026 and thousands of construction jobs expected."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Crusoe, Lancium Announce 1 GW AI Data Center Campus in Childress, Texas",
    "Crusoe and Lancium will build a 1 gigawatt, 270-acre AI data centre campus in Childress County, Texas, with construction starting Q3 2026 and thousands of construction jobs expected."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://fieldnews.net/news/crusoe-lancium-announce-1gw-ai-data-center-campus-in-childress",
   "title": "Crusoe, Lancium Announce 1 GW AI Data Center Campus in Childress, Texas",
   "published_at": "2026-07-15T00:00:00",
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "energizing its first two buildings",
   "announcement_date": null,
   "project_evidence": [
    "# Crusoe, Lancium Announce 1 GW AI Data Center Campus in Childress, Texas",
    "Childress is the second site built on this partnership structure."
   ],
   "locality_evidence": [
    "# Crusoe, Lancium Announce 1 GW AI Data Center Campus in Childress, Texas",
    "Crusoe broke ground on the Lancium-owned Abilene campus in June 2024, energizing its first two buildings within a year before expanding that site to 1.2 GW."
   ],
   "state_evidence": [
    "# Crusoe, Lancium Announce 1 GW AI Data Center Campus in Childress, Texas",
    "Crusoe and Lancium have announced a 1 gigawatt (GW) AI data centre campus in Childress, Texas, extending the partnership model the two companies established at their Abilene site, according to a press release distributed via GlobeNewswire."
   ],
   "capacity_gw_evidence": [
    "# Crusoe, Lancium Announce 1 GW AI Data Center Campus in Childress, Texas",
    "Crusoe broke ground on the Lancium-owned Abilene campus in June 2024, energizing its first two buildings within a year before expanding that site to 1.2 GW."
   ],
   "builder_evidence": [
    "# Crusoe, Lancium Announce 1 GW AI Data Center Campus in Childress, Texas",
    "Crusoe broke ground on the Lancium-owned Abilene campus in June 2024, energizing its first two buildings within a year before expanding that site to 1.2 GW."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Crusoe, Lancium Announce 1 GW AI Data Center Campus in Childress, Texas",
    "Crusoe broke ground on the Lancium-owned Abilene campus in June 2024, energizing its first two buildings within a year before expanding that site to 1.2 GW."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://irecruit.co/insights/hyperscale-data-center-news-tracking-mega-builds",
   "title": "Hyperscale Data Center News: Tracking the Latest Mega-Builds",
   "published_at": "2026-08-16T05:53:53",
   "project": "Microsoft Fairwater AI Data Center",
   "locality": "Mount Pleasant",
   "state": "Wisconsin",
   "capacity_gw": 3.3,
   "builder": "Microsoft",
   "ai_customer": "Microsoft",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "### Microsoft Fairwater AI Data Center (Wisconsin)",
    "# Hyperscale Data Center News: Tracking the Latest Mega-Builds",
    "## Major Hyperscale Data Center Projects in the US"
   ],
   "locality_evidence": [
    "Microsoft's $3.3 billion Fairwater campus in Mount Pleasant, Wisconsin, became operational in April 2026, ahead of schedule.",
    "# Hyperscale Data Center News: Tracking the Latest Mega-Builds",
    "## Major Hyperscale Data Center Projects in the US",
    "### Microsoft Fairwater AI Data Center (Wisconsin)"
   ],
   "state_evidence": [
    "Microsoft's $3.3 billion Fairwater campus in Mount Pleasant, Wisconsin, became operational in April 2026, ahead of schedule.",
    "# Hyperscale Data Center News: Tracking the Latest Mega-Builds",
    "## Major Hyperscale Data Center Projects in the US",
    "### Microsoft Fairwater AI Data Center (Wisconsin)"
   ],
   "capacity_gw_evidence": [
    "By late 2027, the campus is expected to hit a peak electrical load of **3.3 GW**, surpassing Los Angeles' average power usage of 2.4 GW [[8]](https://epochai.substack.com/p/microsofts-fairwater-datacenter-will).",
    "# Hyperscale Data Center News: Tracking the Latest Mega-Builds",
    "## Major Hyperscale Data Center Projects in the US",
    "### Microsoft Fairwater AI Data Center (Wisconsin)"
   ],
   "builder_evidence": [
    "Microsoft's $3.3 billion Fairwater campus in Mount Pleasant, Wisconsin, became operational in April 2026, ahead of schedule.",
    "# Hyperscale Data Center News: Tracking the Latest Mega-Builds",
    "## Major Hyperscale Data Center Projects in the US",
    "### Microsoft Fairwater AI Data Center (Wisconsin)"
   ],
   "ai_customer_evidence": [
    "Microsoft's $3.3 billion Fairwater campus in Mount Pleasant, Wisconsin, became operational in April 2026, ahead of schedule.",
    "# Hyperscale Data Center News: Tracking the Latest Mega-Builds",
    "## Major Hyperscale Data Center Projects in the US",
    "### Microsoft Fairwater AI Data Center (Wisconsin)"
   ],
   "status_evidence": [
    "Microsoft's $3.3 billion Fairwater campus in Mount Pleasant, Wisconsin, became operational in April 2026, ahead of schedule.",
    "# Hyperscale Data Center News: Tracking the Latest Mega-Builds",
    "## Major Hyperscale Data Center Projects in the US",
    "### Microsoft Fairwater AI Data Center (Wisconsin)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://irecruit.co/insights/hyperscale-data-center-news-tracking-mega-builds",
   "title": "Hyperscale Data Center News: Tracking the Latest Mega-Builds",
   "published_at": "2026-08-16T05:53:53",
   "project": "Meta Lebanon Campus Expansion",
   "locality": "Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Turner Construction",
   "ai_customer": "Meta",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "### Meta Lebanon Campus Expansion (Indiana)",
    "# Hyperscale Data Center News: Tracking the Latest Mega-Builds",
    "## Major Hyperscale Data Center Projects in the US"
   ],
   "locality_evidence": [
    "In Lebanon, Indiana, Meta is developing a **1,500-acre, 1-gigawatt** data center campus with an investment exceeding **$10 billion** [[14]](https://www.expansionsolutionsmagazine.com/meta-breaks-ground-on-10b-data-center-campus-at-indianas-leap-district)[[15]](https://constructionreviewonline.com/meta-breaks-ground-on-massive-10b-1gw-ai-campus-in-indiana).",
    "# Hyperscale Data Center News: Tracking the Latest Mega-Builds",
    "## Major Hyperscale Data Center Projects in the US",
    "### Meta Lebanon Campus Expansion (Indiana)"
   ],
   "state_evidence": [
    "In Lebanon, Indiana, Meta is developing a **1,500-acre, 1-gigawatt** data center campus with an investment exceeding **$10 billion** [[14]](https://www.expansionsolutionsmagazine.com/meta-breaks-ground-on-10b-data-center-campus-at-indianas-leap-district)[[15]](https://constructionreviewonline.com/meta-breaks-ground-on-massive-10b-1gw-ai-campus-in-indiana).",
    "# Hyperscale Data Center News: Tracking the Latest Mega-Builds",
    "## Major Hyperscale Data Center Projects in the US",
    "### Meta Lebanon Campus Expansion (Indiana)"
   ],
   "capacity_gw_evidence": [
    "In Lebanon, Indiana, Meta is developing a **1,500-acre, 1-gigawatt** data center campus with an investment exceeding **$10 billion** [[14]](https://www.expansionsolutionsmagazine.com/meta-breaks-ground-on-10b-data-center-campus-at-indianas-leap-district)[[15]](https://constructionreviewonline.com/meta-breaks-ground-on-massive-10b-1gw-ai-campus-in-indiana).",
    "# Hyperscale Data Center News: Tracking the Latest Mega-Builds",
    "## Major Hyperscale Data Center Projects in the US",
    "### Meta Lebanon Campus Expansion (Indiana)"
   ],
   "builder_evidence": [
    "Construction began in February 2026, led by Turner Construction [[15]](https://constructionreviewonline.com/meta-breaks-ground-on-massive-10b-1gw-ai-campus-in-indiana).",
    "# Hyperscale Data Center News: Tracking the Latest Mega-Builds",
    "## Major Hyperscale Data Center Projects in the US",
    "### Meta Lebanon Campus Expansion (Indiana)"
   ],
   "ai_customer_evidence": [
    "In Lebanon, Indiana, Meta is developing a **1,500-acre, 1-gigawatt** data center campus with an investment exceeding **$10 billion** [[14]](https://www.expansionsolutionsmagazine.com/meta-breaks-ground-on-10b-data-center-campus-at-indianas-leap-district)[[15]](https://constructionreviewonline.com/meta-breaks-ground-on-massive-10b-1gw-ai-campus-in-indiana).",
    "# Hyperscale Data Center News: Tracking the Latest Mega-Builds",
    "## Major Hyperscale Data Center Projects in the US",
    "### Meta Lebanon Campus Expansion (Indiana)"
   ],
   "status_evidence": [
    "Construction began in February 2026, led by Turner Construction [[15]](https://constructionreviewonline.com/meta-breaks-ground-on-massive-10b-1gw-ai-campus-in-indiana).",
    "# Hyperscale Data Center News: Tracking the Latest Mega-Builds",
    "## Major Hyperscale Data Center Projects in the US",
    "### Meta Lebanon Campus Expansion (Indiana)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tecknexus.com/vantage-data-centers-frontier-25b-texas-ai-campus",
   "title": "Vantage Data Centers Frontier: $25B Texas AI Campus",
   "published_at": "2025-08-21T17:55:31",
   "project": "Frontier",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "Vantage Data Centers Frontier: $25B Texas AI Campus",
    " Vantage will invest more than $25 billion to build Frontier, a 1,200-acre, 10-building campus totaling roughly 3.7 million square feet near Abilene, about 120 miles west of Dallas Fort Worth."
   ],
   "locality_evidence": [
    "Vantage Data Centers Frontier: $25B Texas AI Campus",
    " Vantage will invest more than $25 billion to build Frontier, a 1,200-acre, 10-building campus totaling roughly 3.7 million square feet near Abilene, about 120 miles west of Dallas Fort Worth."
   ],
   "state_evidence": [
    "Vantage Data Centers Frontier: $25B Texas AI Campus",
    " Vantage will invest more than $25 billion to build Frontier, a 1,200-acre, 10-building campus totaling roughly 3.7 million square feet near Abilene, about 120 miles west of Dallas Fort Worth."
   ],
   "capacity_gw_evidence": [
    "Vantage Frontier: $25B Texas AI Data Center Campus",
    "Vantage Data Center plans a 1.4GW campus in Shackelford County, Texas, framing the next phase of [AI](https://tecknexus.com/artificial-intelligence/)-era infrastructure at hyperscale."
   ],
   "builder_evidence": [
    "Vantage Data Centers Frontier: $25B Texas AI Campus",
    " Vantage will invest more than $25 billion to build Frontier, a 1,200-acre, 10-building campus totaling roughly 3.7 million square feet near Abilene, about 120 miles west of Dallas Fort Worth."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Vantage Data Centers Frontier: $25B Texas AI Campus",
    " Construction has started, with first delivery targeted for the second half of 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://proactiveinvestors.co.uk/NASDAQ:FRMI/Fermi-Inc/rns/1832432",
   "title": "Proactive financial news: fast, accessible, and actionable articles and videos for the global investment audience.",
   "published_at": null,
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "Under Construction",
   "announcement_date": "2026-02-20",
   "project_evidence": [
    "Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "locality_evidence": [
    "Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "state_evidence": [
    "Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "capacity_gw_evidence": [
    "Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "builder_evidence": [
    "Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "announcement_date_evidence": [
    "Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Fermi Inc.",
    "20 February 2026",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ]
  },
  {
   "url": "https://forbes.com/sites/jonmarkman/2026/08/28/anthropics-45-billion-nscale-deal-buys-460-megawatts-of-vera-rubin",
   "title": "Anthropic's $45 Billion Nscale Deal Buys 460 Megawatts Of Vera Rubin",
   "published_at": "2026-08-28T15:31:02",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Anthropic",
   "status": "planned",
   "announcement_date": "2026-08-26",
   "project_evidence": [
    "The Monarch Compute Campus burns gas to make its own electricity on site, which means the capacity Anthropic just contracted never enters an interconnection queue at all.",
    "Anthropic agreed this week to pay roughly [$45 billion over six years](https://www.cnbc.com/2026/08/26/anthropic-and-nscale-strike-45-billion-cloud-deal-sources-say.html) for computing capacity from Nscale, a British infrastructure company that did not exist before 2024."
   ],
   "locality_evidence": [
    "About 460 megawatts, drawn from a campus in Mason County, West Virginia, running on Nvidia's Vera Rubin systems [beginning late next year](https://techcrunch.com/2026/08/26/anthropic-continues-compute-gobbling-streak-in-45-billion-deal-with-nscale/).",
    "Anthropic agreed this week to pay roughly [$45 billion over six years](https://www.cnbc.com/2026/08/26/anthropic-and-nscale-strike-45-billion-cloud-deal-sources-say.html) for computing capacity from Nscale, a British infrastructure company that did not exist before 2024."
   ],
   "state_evidence": [
    "About 460 megawatts, drawn from a campus in Mason County, West Virginia, running on Nvidia's Vera Rubin systems [beginning late next year](https://techcrunch.com/2026/08/26/anthropic-continues-compute-gobbling-streak-in-45-billion-deal-with-nscale/).",
    "Anthropic agreed this week to pay roughly [$45 billion over six years](https://www.cnbc.com/2026/08/26/anthropic-and-nscale-strike-45-billion-cloud-deal-sources-say.html) for computing capacity from Nscale, a British infrastructure company that did not exist before 2024."
   ],
   "capacity_gw_evidence": [
    "At full buildout the site is planned for more than eight gigawatts across 2,250 acres, of which about 6.7 gigawatts is earmarked for computing.",
    "Anthropic agreed this week to pay roughly [$45 billion over six years](https://www.cnbc.com/2026/08/26/anthropic-and-nscale-strike-45-billion-cloud-deal-sources-say.html) for computing capacity from Nscale, a British infrastructure company that did not exist before 2024."
   ],
   "builder_evidence": [
    "Nscale's own materials put Phase 1 at [1.35 gigawatts](https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) of AI computing capacity, targeted for delivery by early 2028.",
    "Anthropic agreed this week to pay roughly [$45 billion over six years](https://www.cnbc.com/2026/08/26/anthropic-and-nscale-strike-45-billion-cloud-deal-sources-say.html) for computing capacity from Nscale, a British infrastructure company that did not exist before 2024."
   ],
   "ai_customer_evidence": [
    "Anthropic agreed this week to pay roughly [$45 billion over six years](https://www.cnbc.com/2026/08/26/anthropic-and-nscale-strike-45-billion-cloud-deal-sources-say.html) for computing capacity from Nscale, a British infrastructure company that did not exist before 2024."
   ],
   "status_evidence": [
    "At full buildout the site is planned for more than eight gigawatts across 2,250 acres, of which about 6.7 gigawatts is earmarked for computing.",
    "Anthropic agreed this week to pay roughly [$45 billion over six years](https://www.cnbc.com/2026/08/26/anthropic-and-nscale-strike-45-billion-cloud-deal-sources-say.html) for computing capacity from Nscale, a British infrastructure company that did not exist before 2024."
   ],
   "announcement_date_evidence": [
    "Anthropic agreed this week to pay roughly [$45 billion over six years](https://www.cnbc.com/2026/08/26/anthropic-and-nscale-strike-45-billion-cloud-deal-sources-say.html) for computing capacity from Nscale, a British infrastructure company that did not exist before 2024."
   ]
  },
  {
   "url": "https://newsbreak.com/eweek-323817210/4787377576847-openai-plans-3-2gw-georgia-data-center-as-ai-infrastructure-spending-surges",
   "title": "OpenAI Plans 3.2GW Georgia Data Center as AI Infrastructure Spending Surges - NewsBreak",
   "published_at": "2026-07-23T17:00:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "OpenAI on Wednesday announced plans for Project Camellia, a large-scale data center project in Effingham County, Georgia, near Savannah.",
    "# OpenAI Plans 3.2GW Georgia Data Center as AI Infrastructure Spending Surges"
   ],
   "locality_evidence": [
    "OpenAI on Wednesday announced plans for Project Camellia, a large-scale data center project in Effingham County, Georgia, near Savannah.",
    "# OpenAI Plans 3.2GW Georgia Data Center as AI Infrastructure Spending Surges"
   ],
   "state_evidence": [
    "OpenAI on Wednesday announced plans for Project Camellia, a large-scale data center project in Effingham County, Georgia, near Savannah.",
    "# OpenAI Plans 3.2GW Georgia Data Center as AI Infrastructure Spending Surges"
   ],
   "capacity_gw_evidence": [
    "The company said it has contracted with Georgia Power to supply 3.2 gigawatts of electricity, with power delivered in phases from 2028 through 2032.",
    "# OpenAI Plans 3.2GW Georgia Data Center as AI Infrastructure Spending Surges"
   ],
   "builder_evidence": [
    "OpenAI on Wednesday announced plans for Project Camellia, a large-scale data center project in Effingham County, Georgia, near Savannah.",
    "# OpenAI Plans 3.2GW Georgia Data Center as AI Infrastructure Spending Surges"
   ],
   "ai_customer_evidence": [
    "OpenAI on Wednesday announced plans for Project Camellia, a large-scale data center project in Effingham County, Georgia, near Savannah.",
    "# OpenAI Plans 3.2GW Georgia Data Center as AI Infrastructure Spending Surges"
   ],
   "status_evidence": [
    "OpenAI on Wednesday announced plans for Project Camellia, a large-scale data center project in Effingham County, Georgia, near Savannah.",
    "# OpenAI Plans 3.2GW Georgia Data Center as AI Infrastructure Spending Surges"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://intelligentdatacentres.com/2024/09/26/ecl-announce-1gw-off-grid-hydrogen-powered-ai-factory-data-centre",
   "title": "ECL announce 1GW off-grid hydrogen-powered AI factory data centre",
   "published_at": "2024-09-26T23:03:35",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "ECL",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "ECL has announced it will build one of the first fully sustainable 1GW AI Factory data centres \u2013 ECL TerraSite-TX1 \u2013 on a 600+ acre site east of Houston.",
    "ECL announce 1GW off-grid hydrogen-powered AI factory data centre"
   ],
   "locality_evidence": [
    "600+ acres near Houston, Texas, will give AI leaders the space and power needed for the next wave of innovation with zero emissions",
    "ECL has announced it will build one of the first fully sustainable 1GW AI Factory data centres \u2013 ECL TerraSite-TX1 \u2013 on a 600+ acre site east of Houston.",
    "ECL announce 1GW off-grid hydrogen-powered AI factory data centre"
   ],
   "state_evidence": [
    "600+ acres near Houston, Texas, will give AI leaders the space and power needed for the next wave of innovation with zero emissions",
    "ECL announce 1GW off-grid hydrogen-powered AI factory data centre"
   ],
   "capacity_gw_evidence": [
    "The initial 1GW phased development may be expanded to 2GW in the future, enabled by its modularity and based on customer demand.",
    "ECL announce 1GW off-grid hydrogen-powered AI factory data centre"
   ],
   "builder_evidence": [
    "ECL has announced it will build one of the first fully sustainable 1GW AI Factory data centres \u2013 ECL TerraSite-TX1 \u2013 on a 600+ acre site east of Houston.",
    "ECL announce 1GW off-grid hydrogen-powered AI factory data centre"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "ECL has announced it will build one of the first fully sustainable 1GW AI Factory data centres \u2013 ECL TerraSite-TX1 \u2013 on a 600+ acre site east of Houston.",
    "ECL announce 1GW off-grid hydrogen-powered AI factory data centre"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://andresseo.expert/ai/an-8-gigawatt-ai-campus-rises-from-ohios-cold-war-past",
   "title": "OpenAI's 8-Gigawatt Ohio AI Campus: Inside the $500B Plan",
   "published_at": "2026-08-17T14:05:49",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "Under development",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# An 8-Gigawatt AI Campus Rises From Ohio\u2019s Cold War Past",
    "OpenAI confirmed on August 17 that it has entered an agreement to secure approximately 8 gigawatts of IT capacity at the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "locality_evidence": [
    "# An 8-Gigawatt AI Campus Rises From Ohio\u2019s Cold War Past",
    "OpenAI confirmed on August 17 that it has entered an agreement to secure approximately 8 gigawatts of IT capacity at the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "state_evidence": [
    "# An 8-Gigawatt AI Campus Rises From Ohio\u2019s Cold War Past",
    "OpenAI confirmed on August 17 that it has entered an agreement to secure approximately 8 gigawatts of IT capacity at the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "capacity_gw_evidence": [
    "# An 8-Gigawatt AI Campus Rises From Ohio\u2019s Cold War Past",
    "OpenAI confirmed on August 17 that it has entered an agreement to secure approximately 8 gigawatts of IT capacity at the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "builder_evidence": [
    "# An 8-Gigawatt AI Campus Rises From Ohio\u2019s Cold War Past",
    "SB Energy will build, own, and operate the data center under a 20-year lease to [OpenAI](https://openai.com/index/openai-joins-ports-pike-project), with the site exclusively hosting NVIDIA AI compute infrastructure."
   ],
   "ai_customer_evidence": [
    "# An 8-Gigawatt AI Campus Rises From Ohio\u2019s Cold War Past",
    "OpenAI confirmed on August 17 that it has entered an agreement to secure approximately 8 gigawatts of IT capacity at the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "status_evidence": [
    "# An 8-Gigawatt AI Campus Rises From Ohio\u2019s Cold War Past",
    "OpenAI, SB Energy, NVIDIA, and the Department of Energy are building an 8-gigawatt AI campus at a former uranium enrichment site in Pike County, Ohio."
   ],
   "announcement_date_evidence": [
    "# An 8-Gigawatt AI Campus Rises From Ohio\u2019s Cold War Past",
    "OpenAI confirmed on August 17 that it has entered an agreement to secure approximately 8 gigawatts of IT capacity at the PORTS-Pike Technology Campus in Pike County, Ohio."
   ]
  },
  {
   "url": "https://convergedigest.com/tracking-openais-global-ai-infrastructure-builds?amp=1",
   "title": "Tracking OpenAI\u2019s Global AI Infrastructure",
   "published_at": "2025-11-03T23:53:43",
   "project": "Stargate 1",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Lancium, Crusoe, Blue Owl, Primary Digital Infrastructure",
   "ai_customer": "OpenAI",
   "status": "Under construction; first phases live 2025",
   "announcement_date": null,
   "project_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Stargate 1](https://convergedigest.com/project-stargate-abilene-tx/?amp=1) | Abilene, TX | \u22481.2 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Lancium, Crusoe, Blue Owl, Primary Digital Infrastructure | Under construction; first phases live 2025 |"
   ],
   "locality_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Stargate 1](https://convergedigest.com/project-stargate-abilene-tx/?amp=1) | Abilene, TX | \u22481.2 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Lancium, Crusoe, Blue Owl, Primary Digital Infrastructure | Under construction; first phases live 2025 |"
   ],
   "state_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Stargate 1](https://convergedigest.com/project-stargate-abilene-tx/?amp=1) | Abilene, TX | \u22481.2 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Lancium, Crusoe, Blue Owl, Primary Digital Infrastructure | Under construction; first phases live 2025 |"
   ],
   "capacity_gw_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Stargate 1](https://convergedigest.com/project-stargate-abilene-tx/?amp=1) | Abilene, TX | \u22481.2 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Lancium, Crusoe, Blue Owl, Primary Digital Infrastructure | Under construction; first phases live 2025 |"
   ],
   "builder_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Stargate 1](https://convergedigest.com/project-stargate-abilene-tx/?amp=1) | Abilene, TX | \u22481.2 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Lancium, Crusoe, Blue Owl, Primary Digital Infrastructure | Under construction; first phases live 2025 |"
   ],
   "ai_customer_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Stargate 1](https://convergedigest.com/project-stargate-abilene-tx/?amp=1) | Abilene, TX | \u22481.2 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Lancium, Crusoe, Blue Owl, Primary Digital Infrastructure | Under construction; first phases live 2025 |"
   ],
   "status_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Stargate 1](https://convergedigest.com/project-stargate-abilene-tx/?amp=1) | Abilene, TX | \u22481.2 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Lancium, Crusoe, Blue Owl, Primary Digital Infrastructure | Under construction; first phases live 2025 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://convergedigest.com/tracking-openais-global-ai-infrastructure-builds?amp=1",
   "title": "Tracking OpenAI\u2019s Global AI Infrastructure",
   "published_at": "2025-11-03T23:53:43",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers, INNIO / Voltagrid",
   "ai_customer": "OpenAI",
   "status": "Early construction; target 2026+",
   "announcement_date": null,
   "project_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Frontier](https://convergedigest.com/openai-frontier-ai-campus-texas/?amp=1) | Shackelford County, TX | 1.4 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Vantage Data Centers, INNIO / Voltagrid | Early construction; target 2026+ |"
   ],
   "locality_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Frontier](https://convergedigest.com/openai-frontier-ai-campus-texas/?amp=1) | Shackelford County, TX | 1.4 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Vantage Data Centers, INNIO / Voltagrid | Early construction; target 2026+ |"
   ],
   "state_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Frontier](https://convergedigest.com/openai-frontier-ai-campus-texas/?amp=1) | Shackelford County, TX | 1.4 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Vantage Data Centers, INNIO / Voltagrid | Early construction; target 2026+ |"
   ],
   "capacity_gw_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Frontier](https://convergedigest.com/openai-frontier-ai-campus-texas/?amp=1) | Shackelford County, TX | 1.4 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Vantage Data Centers, INNIO / Voltagrid | Early construction; target 2026+ |"
   ],
   "builder_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Frontier](https://convergedigest.com/openai-frontier-ai-campus-texas/?amp=1) | Shackelford County, TX | 1.4 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Vantage Data Centers, INNIO / Voltagrid | Early construction; target 2026+ |"
   ],
   "ai_customer_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Frontier](https://convergedigest.com/openai-frontier-ai-campus-texas/?amp=1) | Shackelford County, TX | 1.4 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Vantage Data Centers, INNIO / Voltagrid | Early construction; target 2026+ |"
   ],
   "status_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Frontier](https://convergedigest.com/openai-frontier-ai-campus-texas/?amp=1) | Shackelford County, TX | 1.4 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Vantage Data Centers, INNIO / Voltagrid | Early construction; target 2026+ |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://convergedigest.com/tracking-openais-global-ai-infrastructure-builds?amp=1",
   "title": "Tracking OpenAI\u2019s Global AI Infrastructure",
   "published_at": "2025-11-03T23:53:43",
   "project": "Lighthouse",
   "locality": "Port Washington",
   "state": "Wisconsin",
   "capacity_gw": 1.0,
   "builder": "Vantage Data Centers, DBRG, WEC Energy",
   "ai_customer": "OpenAI",
   "status": "Planning; completion target 2028",
   "announcement_date": null,
   "project_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Lighthouse](https://convergedigest.com/vantage-openai-and-oracle-launch-15b-lighthouse-campus-in-wisconsin/?amp=1) | Port Washington, WI | \u22481.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Vantage Data Centers, DBRG, WEC Energy | Planning; completion target 2028 |"
   ],
   "locality_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Lighthouse](https://convergedigest.com/vantage-openai-and-oracle-launch-15b-lighthouse-campus-in-wisconsin/?amp=1) | Port Washington, WI | \u22481.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Vantage Data Centers, DBRG, WEC Energy | Planning; completion target 2028 |"
   ],
   "state_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Lighthouse](https://convergedigest.com/vantage-openai-and-oracle-launch-15b-lighthouse-campus-in-wisconsin/?amp=1) | Port Washington, WI | \u22481.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Vantage Data Centers, DBRG, WEC Energy | Planning; completion target 2028 |"
   ],
   "capacity_gw_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Lighthouse](https://convergedigest.com/vantage-openai-and-oracle-launch-15b-lighthouse-campus-in-wisconsin/?amp=1) | Port Washington, WI | \u22481.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Vantage Data Centers, DBRG, WEC Energy | Planning; completion target 2028 |"
   ],
   "builder_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Lighthouse](https://convergedigest.com/vantage-openai-and-oracle-launch-15b-lighthouse-campus-in-wisconsin/?amp=1) | Port Washington, WI | \u22481.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Vantage Data Centers, DBRG, WEC Energy | Planning; completion target 2028 |"
   ],
   "ai_customer_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Lighthouse](https://convergedigest.com/vantage-openai-and-oracle-launch-15b-lighthouse-campus-in-wisconsin/?amp=1) | Port Washington, WI | \u22481.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Vantage Data Centers, DBRG, WEC Energy | Planning; completion target 2028 |"
   ],
   "status_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Lighthouse](https://convergedigest.com/vantage-openai-and-oracle-launch-15b-lighthouse-campus-in-wisconsin/?amp=1) | Port Washington, WI | \u22481.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Vantage Data Centers, DBRG, WEC Energy | Planning; completion target 2028 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://convergedigest.com/tracking-openais-global-ai-infrastructure-builds?amp=1",
   "title": "Tracking OpenAI\u2019s Global AI Infrastructure",
   "published_at": "2025-11-03T23:53:43",
   "project": "Project Jupiter",
   "locality": "Do\u00f1a Ana County",
   "state": "New Mexico",
   "capacity_gw": 1.5,
   "builder": "STACK Infrastructure, BorderPlex Digital, Blue Owl",
   "ai_customer": "OpenAI",
   "status": "Permitting; multi-phase build 2025\u201327+",
   "announcement_date": null,
   "project_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Project Jupiter](https://convergedigest.com/new-mexico-project-jupiter-envisions-a-massive-data-center-complex/?amp=1) | Do\u00f1a Ana County, NM | Up to 1.5 | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), STACK Infrastructure, BorderPlex Digital, Blue Owl | Permitting; multi-phase build 2025\u201327+ |"
   ],
   "locality_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Project Jupiter](https://convergedigest.com/new-mexico-project-jupiter-envisions-a-massive-data-center-complex/?amp=1) | Do\u00f1a Ana County, NM | Up to 1.5 | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), STACK Infrastructure, BorderPlex Digital, Blue Owl | Permitting; multi-phase build 2025\u201327+ |"
   ],
   "state_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Project Jupiter](https://convergedigest.com/new-mexico-project-jupiter-envisions-a-massive-data-center-complex/?amp=1) | Do\u00f1a Ana County, NM | Up to 1.5 | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), STACK Infrastructure, BorderPlex Digital, Blue Owl | Permitting; multi-phase build 2025\u201327+ |"
   ],
   "capacity_gw_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Project Jupiter](https://convergedigest.com/new-mexico-project-jupiter-envisions-a-massive-data-center-complex/?amp=1) | Do\u00f1a Ana County, NM | Up to 1.5 | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), STACK Infrastructure, BorderPlex Digital, Blue Owl | Permitting; multi-phase build 2025\u201327+ |"
   ],
   "builder_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Project Jupiter](https://convergedigest.com/new-mexico-project-jupiter-envisions-a-massive-data-center-complex/?amp=1) | Do\u00f1a Ana County, NM | Up to 1.5 | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), STACK Infrastructure, BorderPlex Digital, Blue Owl | Permitting; multi-phase build 2025\u201327+ |"
   ],
   "ai_customer_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Project Jupiter](https://convergedigest.com/new-mexico-project-jupiter-envisions-a-massive-data-center-complex/?amp=1) | Do\u00f1a Ana County, NM | Up to 1.5 | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), STACK Infrastructure, BorderPlex Digital, Blue Owl | Permitting; multi-phase build 2025\u201327+ |"
   ],
   "status_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [Project Jupiter](https://convergedigest.com/new-mexico-project-jupiter-envisions-a-massive-data-center-complex/?amp=1) | Do\u00f1a Ana County, NM | Up to 1.5 | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), STACK Infrastructure, BorderPlex Digital, Blue Owl | Permitting; multi-phase build 2025\u201327+ |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://convergedigest.com/tracking-openais-global-ai-infrastructure-builds?amp=1",
   "title": "Tracking OpenAI\u2019s Global AI Infrastructure",
   "published_at": "2025-11-03T23:53:43",
   "project": "The Barn",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Related Digital, DTE Energy",
   "ai_customer": "OpenAI",
   "status": "Announced; construction starts 2026",
   "announcement_date": null,
   "project_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [The Barn](https://convergedigest.com/openai-the-barn-michigan/?amp=1) | Saline Township, MI | >1.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Related Digital, DTE Energy | Announced; construction starts 2026 |"
   ],
   "locality_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [The Barn](https://convergedigest.com/openai-the-barn-michigan/?amp=1) | Saline Township, MI | >1.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Related Digital, DTE Energy | Announced; construction starts 2026 |"
   ],
   "state_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [The Barn](https://convergedigest.com/openai-the-barn-michigan/?amp=1) | Saline Township, MI | >1.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Related Digital, DTE Energy | Announced; construction starts 2026 |"
   ],
   "capacity_gw_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [The Barn](https://convergedigest.com/openai-the-barn-michigan/?amp=1) | Saline Township, MI | >1.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Related Digital, DTE Energy | Announced; construction starts 2026 |"
   ],
   "builder_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [The Barn](https://convergedigest.com/openai-the-barn-michigan/?amp=1) | Saline Township, MI | >1.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Related Digital, DTE Energy | Announced; construction starts 2026 |"
   ],
   "ai_customer_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [The Barn](https://convergedigest.com/openai-the-barn-michigan/?amp=1) | Saline Township, MI | >1.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Related Digital, DTE Energy | Announced; construction starts 2026 |"
   ],
   "status_evidence": [
    "## Direct Builds \u2013 United States",
    "Direct Builds \u2013 United States",
    "| Project | Location | Capacity (GW) | Partners / Developers | Status / Completion |",
    "| [The Barn](https://convergedigest.com/openai-the-barn-michigan/?amp=1) | Saline Township, MI | >1.0 (planned) | [OpenAI](https://convergedigest.com/tag/openai/?amp=1), [Oracle](https://convergedigest.com/tag/oracle/?amp=1), Related Digital, DTE Energy | Announced; construction starts 2026 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=meta&page=1&term=the-investment-and-markets-channel",
   "title": "News The Investment & Markets Channel, Meta",
   "published_at": "2026-08-27T00:00:00",
   "project": "El Paso Data Center",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta and BlackRock",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# [Meta and BlackRock team up for data center in El Paso, Texas](/en/news/meta-and-blackrock-team-up-for-data-center-in-el-paso-texas/)",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# News - The Investment & Markets Channel, Meta"
   ],
   "locality_evidence": [
    "# [Meta and BlackRock team up for data center in El Paso, Texas](/en/news/meta-and-blackrock-team-up-for-data-center-in-el-paso-texas/)",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# News - The Investment & Markets Channel, Meta"
   ],
   "state_evidence": [
    "# [Meta and BlackRock team up for data center in El Paso, Texas](/en/news/meta-and-blackrock-team-up-for-data-center-in-el-paso-texas/)",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# News - The Investment & Markets Channel, Meta"
   ],
   "capacity_gw_evidence": [
    "Will offer 1GW of compute capacity",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# News - The Investment & Markets Channel, Meta"
   ],
   "builder_evidence": [
    "# [Meta and BlackRock team up for data center in El Paso, Texas](/en/news/meta-and-blackrock-team-up-for-data-center-in-el-paso-texas/)",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# News - The Investment & Markets Channel, Meta"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://insight.tmcnet.com/insight/nvidia-backs-openai-s-ohio-ai-campus-with-up-to-105-billion-mta9s25x",
   "title": "Nvidia Backs OpenAI\u2019s Ohio AI Campus With Up to $105 Billion",
   "published_at": "2026-08-26T18:19:52",
   "project": "PORTS Technology Campus",
   "locality": "Piketon",
   "state": "Ohio",
   "capacity_gw": 10.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-03-01",
   "project_evidence": [
    "The facility, called the PORTS Technology Campus and also referred to as the PORTS-Pike Technology Campus, is scheduled to begin operating in phases.",
    "### Key Takeaways"
   ],
   "locality_evidence": [
    "Nvidia is backing one of the most ambitious infrastructure projects of the artificial intelligence boom: a massive computing campus planned for Piketon in Pike County, Ohio.",
    "### Key Takeaways"
   ],
   "state_evidence": [
    "Nvidia is backing one of the most ambitious infrastructure projects of the artificial intelligence boom: a massive computing campus planned for Piketon in Pike County, Ohio.",
    "### Key Takeaways"
   ],
   "capacity_gw_evidence": [
    "The facility is projected to support 8 gigawatts of computing capacity and require 10 gigawatts when supporting systems are included.",
    "Its defining number is 8 gigawatts.",
    "That represents the reported computing capacity, while cooling, power conversion and other supporting systems could add another 2 gigawatts, producing a total site requirement of 10 gigawatts.",
    "### Key Takeaways"
   ],
   "builder_evidence": [
    "The chipmaker is expected to provide financing for the $33 billion project and serve as the sole supplier of processors for the facility, which SB Energy will build, own and lease to OpenAI.",
    "### Key Takeaways"
   ],
   "ai_customer_evidence": [
    "Nvidia plans to provide financing and supply the chips for OpenAI\u2019s planned Pike County campus.",
    "The chipmaker is expected to provide financing for the $33 billion project and serve as the sole supplier of processors for the facility, which SB Energy will build, own and lease to OpenAI.",
    "### Key Takeaways"
   ],
   "status_evidence": [
    "Nvidia plans to provide financing and supply the chips for OpenAI\u2019s planned Pike County campus.",
    "### Key Takeaways"
   ],
   "announcement_date_evidence": [
    "The project was initially announced in March by the Department of Energy and business leaders, while reporting on the complete buildout has placed total expenses at $33 billion.",
    "### Key Takeaways"
   ]
  },
  {
   "url": "https://allaboutai.com/ai-news/xai-is-expanding-its-colossus-data-center-to-nearly-2gw",
   "title": "AllAboutAI - 1500+ Tested AI Tool Reviews, Research & Trends",
   "published_at": "2025-12-31T07:46:09",
   "project": "Colossus",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "xAI",
   "status": "Expanding",
   "announcement_date": null,
   "project_evidence": [
    "# How xAI Is Expanding Its Colossus Data Center to Nearly 2GW in the U.S.",
    "Elon Musk says **xAI** has bought a third building near Memphis to lift **Colossus** training capacity to almost 2 gigawatts."
   ],
   "locality_evidence": [
    "# How xAI Is Expanding Its Colossus Data Center to Nearly 2GW in the U.S.",
    "Elon Musk says **xAI** has bought a third building near Memphis to lift **Colossus** training capacity to almost 2 gigawatts."
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "# How xAI Is Expanding Its Colossus Data Center to Nearly 2GW in the U.S.",
    "Elon Musk says **xAI** has bought a third building near Memphis to lift **Colossus** training capacity to almost 2 gigawatts."
   ],
   "builder_evidence": [
    "# How xAI Is Expanding Its Colossus Data Center to Nearly 2GW in the U.S.",
    "Elon Musk says **xAI** has bought a third building near Memphis to lift **Colossus** training capacity to almost 2 gigawatts."
   ],
   "ai_customer_evidence": [
    "# How xAI Is Expanding Its Colossus Data Center to Nearly 2GW in the U.S.",
    "Elon Musk says **xAI** has bought a third building near Memphis to lift **Colossus** training capacity to almost 2 gigawatts."
   ],
   "status_evidence": [
    "# How xAI Is Expanding Its Colossus Data Center to Nearly 2GW in the U.S.",
    "Elon Musk says **xAI** has bought a third building near Memphis to lift **Colossus** training capacity to almost 2 gigawatts."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mitrade.com/ae-en/insights/news/live-news/article-8-2042362-20260829",
   "title": "Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
   "published_at": "2026-08-29T15:05:00",
   "project": "Project Kilby",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.67,
   "builder": "Energy Forge One",
   "ai_customer": "Microsoft",
   "status": "announced",
   "announcement_date": "2025-06-22",
   "project_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "The agreement is part of Project Kilby, which utilizes GE Vernova's gas turbines to power the data center.",
    "The agreement is part of Project Kilby, in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "- Chevron entered a 20-year power purchase agreement to supply electricity for a new data center in Texas.",
    "However, even bigger news is that Chevron has entered into a 20-year power purchase agreement (PPA) to build a natural gas-powered facility to power **Microsoft**'s (NASDAQ: MSFT) artificial intelligence (AI)-focused data center in Texas."
   ],
   "capacity_gw_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "The agreement is part of Project Kilby, in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power."
   ],
   "builder_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "The agreement is part of Project Kilby, in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power.",
    "Chevron plays a key role as a co-investor and developer through Energy Forge One, as well as a fuel provider."
   ],
   "ai_customer_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "However, even bigger news is that Chevron has entered into a 20-year power purchase agreement (PPA) to build a natural gas-powered facility to power **Microsoft**'s (NASDAQ: MSFT) artificial intelligence (AI)-focused data center in Texas.",
    "On June 22, Chevron inked a 20-year take-or-pay power purchase agreement with Microsoft to provide electricity for a Microsoft-operated data center."
   ],
   "status_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "However, even bigger news is that Chevron has entered into a 20-year power purchase agreement (PPA) to build a natural gas-powered facility to power **Microsoft**'s (NASDAQ: MSFT) artificial intelligence (AI)-focused data center in Texas."
   ],
   "announcement_date_evidence": [
    "# Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
    "On June 22, Chevron inked a 20-year take-or-pay power purchase agreement with Microsoft to provide electricity for a Microsoft-operated data center."
   ]
  },
  {
   "url": "https://soylentnews.org/submit.pl?op=viewsub&subid=65640",
   "title": "PA\u2019s Largest Coal Plant to Become 4.5GW Gas-Fired AI Hub: SoylentNews Submission",
   "published_at": null,
   "project": "Homer City datacenter complex",
   "locality": null,
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Homer City Redevelopment",
   "ai_customer": "",
   "status": "proposed",
   "announcement_date": "2025-04-02",
   "project_evidence": [
    "PA\u2019s Largest Coal Plant to Become 4.5GW Gas-Fired AI Hub",
    "The Homer City datacenter complex is one of a growing number of large-scale power projects designed to address AI's exploding appetite for power."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "PA\u2019s Largest Coal Plant to Become 4.5GW Gas-Fired AI Hub",
    "> Developers on Wednesday announced plans to bring up to 4.5 gigawatts of natural gas-fired power online by 2027 at the site of what was once Pennsylvania's largest coal plant, as part of a proposed datacenter campus running AI and high-performance computing workloads."
   ],
   "capacity_gw_evidence": [
    "PA\u2019s Largest Coal Plant to Become 4.5GW Gas-Fired AI Hub",
    "> Developers on Wednesday announced plans to bring up to 4.5 gigawatts of natural gas-fired power online by 2027 at the site of what was once Pennsylvania's largest coal plant, as part of a proposed datacenter campus running AI and high-performance computing workloads."
   ],
   "builder_evidence": [
    "PA\u2019s Largest Coal Plant to Become 4.5GW Gas-Fired AI Hub",
    "Development of the 3,200-acre natural gas-powered datacenter campus is being led by Homer City Redevelopment (HCR) and is expected to exceed $10 billion for power infrastructure and site readiness alone, with additional billions anticipated for the datacenter development."
   ],
   "ai_customer_evidence": [
    "PA\u2019s Largest Coal Plant to Become 4.5GW Gas-Fired AI Hub",
    "HCR has yet to [disclose](https://www.businesswire.com/news/home/20250402452555/en/Homer-City-Redevelopment-and-Kiewit-Announce-Countrys-Largest-Natural-Gas-Powered-Data-Center-Campus-to-Support-AI-and-HPC-Demand) [businesswire.com] a tenant for what's hoped to be a massive datacenter complex, with its emphasis for now largely on building out the energy infrastructure and datacenter shell in anticipation of future demand."
   ],
   "status_evidence": [
    "PA\u2019s Largest Coal Plant to Become 4.5GW Gas-Fired AI Hub",
    "> Developers on Wednesday announced plans to bring up to 4.5 gigawatts of natural gas-fired power online by 2027 at the site of what was once Pennsylvania's largest coal plant, as part of a proposed datacenter campus running AI and high-performance computing workloads."
   ],
   "announcement_date_evidence": [
    "PA\u2019s Largest Coal Plant to Become 4.5GW Gas-Fired AI Hub",
    " Accepted submission by **upstart** at 2025-05-03 17:58:44",
    "> Developers on Wednesday announced plans to bring up to 4.5 gigawatts of natural gas-fired power online by 2027 at the site of what was once Pennsylvania's largest coal plant, as part of a proposed datacenter campus running AI and high-performance computing workloads."
   ]
  },
  {
   "url": "https://indo24hours.com/nscale-and-microsoft-announce-collaboration-with-nvidia-and-caterpillar-to-deliver-1-35gw-of-nvidia-vera-rubin-nvl72-gpus-at-flagship-ai-factory-campus-in-west-virginia",
   "title": "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
   "published_at": "2026-03-16T14:32:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "Acquired / in development",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA\u2019s next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design.",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts.",
    "The Monarch Compute Campus will build on Nscale\u2019s current capacity of over 1GW."
   ],
   "locality_evidence": [
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "state_evidence": [
    "Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA\u2019s next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design.",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "capacity_gw_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts.",
    "The expansion capabilities of this site \u2014 which has the potential for a total power draw of 8GW \u2014 will allow Nscale to develop power capacity rapidly while supporting one of the largest announced AI compute deployments in the market today."
   ],
   "builder_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA\u2019s next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design.",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts.",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "ai_customer_evidence": [
    "Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs",
    "Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA\u2019s next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design.",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "status_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts.",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "announcement_date_evidence": [
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA\u2019s next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ]
  },
  {
   "url": "https://rgvbusinessjournal.com/news/02/04/2026/laredo-data-hub-off-grid-power-ai",
   "title": "Massive Laredo-area data hub plans to run on its own power",
   "published_at": "2026-04-02T10:33:36",
   "project": "Data City, Texas",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corporation",
   "ai_customer": null,
   "status": "Proposed",
   "announcement_date": null,
   "project_evidence": [
    "Energy Abundance Development Corporation announced plans for \u201cData City, Texas,\u201d a 50,000-acre project that would combine wind, solar, battery storage, natural gas, and hydrogen to power large-scale data centers tied to artificial intelligence workloads."
   ],
   "locality_evidence": [
    "A Houston-based developer is proposing one of the largest energy-backed data center projects in Texas \u2014 a 5-gigawatt, behind-the-meter campus near Laredo designed to operate largely outside the state\u2019s electric grid."
   ],
   "state_evidence": [
    "A Houston-based developer is proposing one of the largest energy-backed data center projects in Texas \u2014 a 5-gigawatt, behind-the-meter campus near Laredo designed to operate largely outside the state\u2019s electric grid."
   ],
   "capacity_gw_evidence": [
    "A Houston-based developer is proposing one of the largest energy-backed data center projects in Texas \u2014 a 5-gigawatt, behind-the-meter campus near Laredo designed to operate largely outside the state\u2019s electric grid.",
    "At full buildout, the project could reach 5 gigawatts of power capacity and more than 15 million square feet of leasable space."
   ],
   "builder_evidence": [
    "Energy Abundance Development Corporation announced plans for \u201cData City, Texas,\u201d a 50,000-acre project that would combine wind, solar, battery storage, natural gas, and hydrogen to power large-scale data centers tied to artificial intelligence workloads."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Proposed data hub near Laredo would run on its own power \u2014 not the grid",
    "A Houston-based developer is proposing one of the largest energy-backed data center projects in Texas \u2014 a 5-gigawatt, behind-the-meter campus near Laredo designed to operate largely outside the state\u2019s electric grid."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://effinghamherald.net/data-centers/openai-data-center-moves-forward-power-deal-approved-site-plan-review-next-dri-project-camellia",
   "title": "OpenAI Data Center Moves Forward: Power Deal Approved, Site Plan Review Next",
   "published_at": "2026-08-27T22:19:35",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "Georgia Power",
   "ai_customer": "OpenAI",
   "status": "approved",
   "announcement_date": "2026-08-26",
   "project_evidence": [
    "**ATLANTA** \u2013 Georgia Power\u2019s contract with OpenAI was approved and the final Development of Regional Impact report for the Effingham County data center was released Aug. 26. So, what\u2019s next?",
    "He said the report was the county\u2019s final requirement before it can approve Project Camellia\u2019s preliminary site plan."
   ],
   "locality_evidence": [
    "**ATLANTA** \u2013 Georgia Power\u2019s contract with OpenAI was approved and the final Development of Regional Impact report for the Effingham County data center was released Aug. 26. So, what\u2019s next?"
   ],
   "state_evidence": [
    "**ATLANTA** \u2013 Georgia Power\u2019s contract with OpenAI was approved and the final Development of Regional Impact report for the Effingham County data center was released Aug. 26. So, what\u2019s next?",
    "The Georgia Power contract, approved by the Georgia Public Service Commission (PSC), secures delivery of 3,200 megawatts of electricity to the data center campus."
   ],
   "capacity_gw_evidence": [
    "**ATLANTA** \u2013 Georgia Power\u2019s contract with OpenAI was approved and the final Development of Regional Impact report for the Effingham County data center was released Aug. 26. So, what\u2019s next?",
    "At 3.2 gigawatts at full buildout, the campus will require enough electricity to power roughly three Atlanta-sized cities, making OpenAI one of Georgia Power\u2019s largest individual customers."
   ],
   "builder_evidence": [
    "**ATLANTA** \u2013 Georgia Power\u2019s contract with OpenAI was approved and the final Development of Regional Impact report for the Effingham County data center was released Aug. 26. So, what\u2019s next?",
    "The Georgia Power contract, approved by the Georgia Public Service Commission (PSC), secures delivery of 3,200 megawatts of electricity to the data center campus."
   ],
   "ai_customer_evidence": [
    "**ATLANTA** \u2013 Georgia Power\u2019s contract with OpenAI was approved and the final Development of Regional Impact report for the Effingham County data center was released Aug. 26. So, what\u2019s next?",
    "The Georgia Power contract, approved by the Georgia Public Service Commission (PSC), secures delivery of 3,200 megawatts of electricity to the data center campus."
   ],
   "status_evidence": [
    "**ATLANTA** \u2013 Georgia Power\u2019s contract with OpenAI was approved and the final Development of Regional Impact report for the Effingham County data center was released Aug. 26. So, what\u2019s next?",
    "The Georgia Power contract, approved by the Georgia Public Service Commission (PSC), secures delivery of 3,200 megawatts of electricity to the data center campus."
   ],
   "announcement_date_evidence": [
    "**ATLANTA** \u2013 Georgia Power\u2019s contract with OpenAI was approved and the final Development of Regional Impact report for the Effingham County data center was released Aug. 26. So, what\u2019s next?"
   ]
  },
  {
   "url": "https://cheboygannews.com/story/opinion/columns/2026/08/24/no-data-center-is-too-small-for-these-morley-michigan-residents-opinion/91399681007",
   "title": "No data center is too small for these Morley residents, Mi",
   "published_at": "2026-08-24T08:46:53",
   "project": null,
   "locality": "Saline",
   "state": "Michigan",
   "capacity_gw": 1.4,
   "builder": "OpenAI, Oracle and Related Digital",
   "ai_customer": "OpenAI",
   "status": "building",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "# This is how government is supposed to work | Opinion",
    "At the other end of Washtenaw County, tech giants OpenAI, Oracle and Related Digital are building a $7 billion hyperscale data center in Saline to provide 1.4 gigawatts of power."
   ],
   "state_evidence": [
    "# This is how government is supposed to work | Opinion",
    "At the other end of Washtenaw County, tech giants OpenAI, Oracle and Related Digital are building a $7 billion hyperscale data center in Saline to provide 1.4 gigawatts of power.",
    "And even though some people rejected its construction, state and local lawmakers, including Gov. Gretchen Whitmer, have hailed the project as the \u201clargest economic development in the history of Michigan.\u201d"
   ],
   "capacity_gw_evidence": [
    "# This is how government is supposed to work | Opinion",
    "At the other end of Washtenaw County, tech giants OpenAI, Oracle and Related Digital are building a $7 billion hyperscale data center in Saline to provide 1.4 gigawatts of power."
   ],
   "builder_evidence": [
    "# This is how government is supposed to work | Opinion",
    "At the other end of Washtenaw County, tech giants OpenAI, Oracle and Related Digital are building a $7 billion hyperscale data center in Saline to provide 1.4 gigawatts of power."
   ],
   "ai_customer_evidence": [
    "# This is how government is supposed to work | Opinion",
    "At the other end of Washtenaw County, tech giants OpenAI, Oracle and Related Digital are building a $7 billion hyperscale data center in Saline to provide 1.4 gigawatts of power."
   ],
   "status_evidence": [
    "# This is how government is supposed to work | Opinion",
    "At the other end of Washtenaw County, tech giants OpenAI, Oracle and Related Digital are building a $7 billion hyperscale data center in Saline to provide 1.4 gigawatts of power."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://odaily.news/en/newsflash/485157",
   "title": "TeraWulf Acquires 1GW High-Performance Computing Campus in Eastern Kentucky to Expand Its Infrastructure Platform",
   "published_at": "2026-05-29T07:08:36",
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "acquisition announced",
   "announcement_date": "2026-05-29",
   "project_evidence": [
    "# TeraWulf Acquires 1GW High-Performance Computing Campus in Eastern Kentucky to Expand Its Infrastructure Platform",
    "Odaily reports, according to official news, TeraWulf has announced the acquisition of a strategically located hyperscale high-performance computing (HPC) development site in eastern Kentucky (the \"Muskie Data Campus\")."
   ],
   "locality_evidence": [
    "# TeraWulf Acquires 1GW High-Performance Computing Campus in Eastern Kentucky to Expand Its Infrastructure Platform",
    "Odaily reports, according to official news, TeraWulf has announced the acquisition of a strategically located hyperscale high-performance computing (HPC) development site in eastern Kentucky (the \"Muskie Data Campus\")."
   ],
   "state_evidence": [
    "# TeraWulf Acquires 1GW High-Performance Computing Campus in Eastern Kentucky to Expand Its Infrastructure Platform",
    "Odaily reports, according to official news, TeraWulf has announced the acquisition of a strategically located hyperscale high-performance computing (HPC) development site in eastern Kentucky (the \"Muskie Data Campus\")."
   ],
   "capacity_gw_evidence": [
    "# TeraWulf Acquires 1GW High-Performance Computing Campus in Eastern Kentucky to Expand Its Infrastructure Platform",
    "Odaily reports, according to official news, TeraWulf has announced the acquisition of a strategically located hyperscale high-performance computing (HPC) development site in eastern Kentucky (the \"Muskie Data Campus\")."
   ],
   "builder_evidence": [
    "# TeraWulf Acquires 1GW High-Performance Computing Campus in Eastern Kentucky to Expand Its Infrastructure Platform",
    "Odaily reports, according to official news, TeraWulf has announced the acquisition of a strategically located hyperscale high-performance computing (HPC) development site in eastern Kentucky (the \"Muskie Data Campus\")."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# TeraWulf Acquires 1GW High-Performance Computing Campus in Eastern Kentucky to Expand Its Infrastructure Platform",
    "Odaily reports, according to official news, TeraWulf has announced the acquisition of a strategically located hyperscale high-performance computing (HPC) development site in eastern Kentucky (the \"Muskie Data Campus\")."
   ],
   "announcement_date_evidence": [
    "# TeraWulf Acquires 1GW High-Performance Computing Campus in Eastern Kentucky to Expand Its Infrastructure Platform",
    "2026-05-29 00:08"
   ]
  },
  {
   "url": "https://everyticker.com/quote/J/news/jacobs-wins-solesource-epcm-contract-for-1gw-beacon-point-ai-data-center-in-texas",
   "title": "Jacobs Wins Sole\u2011Source EPCM Contract for 1\u2011GW Beacon Point AI Data Center in Texas",
   "published_at": null,
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Jacobs Solutions Inc.",
   "ai_customer": "Hut 8",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "Jacobs Solutions Inc. secured a sole\u2011source Engineering, Procurement and Construction Management (EPCM) contract to design, procure and manage the construction of the Beacon Point AI data\u2011center campus in Nueces County, Texas."
   ],
   "locality_evidence": [
    "Jacobs Solutions Inc. secured a sole\u2011source Engineering, Procurement and Construction Management (EPCM) contract to design, procure and manage the construction of the Beacon Point AI data\u2011center campus in Nueces County, Texas."
   ],
   "state_evidence": [
    "Jacobs Solutions Inc. secured a sole\u2011source Engineering, Procurement and Construction Management (EPCM) contract to design, procure and manage the construction of the Beacon Point AI data\u2011center campus in Nueces County, Texas."
   ],
   "capacity_gw_evidence": [
    "The campus will support a total capacity of one gigawatt (GW) across multiple phases, with initial energization and commissioning targeted for 2027."
   ],
   "builder_evidence": [
    "Jacobs Solutions Inc. secured a sole\u2011source Engineering, Procurement and Construction Management (EPCM) contract to design, procure and manage the construction of the Beacon Point AI data\u2011center campus in Nueces County, Texas."
   ],
   "ai_customer_evidence": [
    "Hut 8\u2019s strategy is a \u201cpower\u2011first greenfield development\u201d model."
   ],
   "status_evidence": [
    "Jacobs Solutions Inc. secured a sole\u2011source Engineering, Procurement and Construction Management (EPCM) contract to design, procure and manage the construction of the Beacon Point AI data\u2011center campus in Nueces County, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://app.dealroom.co/news/feed/iren-energizes-1-4gw-sweetwater-1-data-center-in-texas-for-ai-infrastructure",
   "title": "Dealroom.co | IREN energizes 1.4GW Sweetwater 1 data center in Texas for AI infrastructure",
   "published_at": null,
   "project": "Sweetwater 1",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "IREN Limited",
   "ai_customer": null,
   "status": "energized",
   "announcement_date": "2026-05",
   "project_evidence": [
    "# IREN energizes 1.4GW Sweetwater 1 data center in Texas for AI infrastructure",
    "IREN Limited has announced the successful energisation of its 1.4GW Sweetwater 1 data centre site in Texas."
   ],
   "locality_evidence": [
    "# IREN energizes 1.4GW Sweetwater 1 data center in Texas for AI infrastructure",
    "IREN Limited has announced the successful energisation of its 1.4GW Sweetwater 1 data centre site in Texas."
   ],
   "state_evidence": [
    "# IREN energizes 1.4GW Sweetwater 1 data center in Texas for AI infrastructure",
    "IREN Limited has announced the successful energisation of its 1.4GW Sweetwater 1 data centre site in Texas."
   ],
   "capacity_gw_evidence": [
    "# IREN energizes 1.4GW Sweetwater 1 data center in Texas for AI infrastructure",
    "IREN Limited has announced the successful energisation of its 1.4GW Sweetwater 1 data centre site in Texas."
   ],
   "builder_evidence": [
    "# IREN energizes 1.4GW Sweetwater 1 data center in Texas for AI infrastructure",
    "IREN Limited has announced the successful energisation of its 1.4GW Sweetwater 1 data centre site in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# IREN energizes 1.4GW Sweetwater 1 data center in Texas for AI infrastructure",
    "IREN Limited has announced the successful energisation of its 1.4GW Sweetwater 1 data centre site in Texas."
   ],
   "announcement_date_evidence": [
    "# IREN energizes 1.4GW Sweetwater 1 data center in Texas for AI infrastructure",
    "\u25cf May 2026"
   ]
  },
  {
   "url": "https://tmcnet.com/usubmit/2024/09/25/10078986.htm",
   "title": "ECL Announces World's First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
   "published_at": "2024-09-25T05:29:30",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "announced",
   "announcement_date": "2024-09-25",
   "project_evidence": [
    "## TMCnet News",
    "ECL Announces World's First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world's first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center - ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "locality_evidence": [
    "## TMCnet News",
    "ECL Announces World's First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world's first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center - ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "state_evidence": [
    "## TMCnet News",
    "ECL Announces World's First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "ECL Terrasite-TX1 comes at a critical time for the state of Texas, with The Electric Reliability Council of Texas (ERCOT) testifying on June 12 this year that the state's power grid needs will grow approximately 2X by 2030 due in part to the growth of data centers and AI."
   ],
   "capacity_gw_evidence": [
    "## TMCnet News",
    "ECL Announces World's First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world's first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center - ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "builder_evidence": [
    "## TMCnet News",
    "ECL Announces World's First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world's first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center - ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "ai_customer_evidence": [
    "## TMCnet News",
    "ECL Announces World's First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world's first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center - ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "status_evidence": [
    "## TMCnet News",
    "ECL Announces World's First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world's first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center - ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "announcement_date_evidence": [
    "## TMCnet News",
    "ECL Announces World's First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "| | **[September 25, 2024]** | [![](//www.tmcnet.com/usubmit/images/Powered-by-Business-Wire-5.gif)](//www.businesswire.com/) | |---|---| # ECL Announces World's First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world's first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center - ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ]
  },
  {
   "url": "https://livingstonenterprise.com/news/ohio-data-center-said-to-create-35-000-construction-jobs-2-500-on-site-employees/article_0e910c30-3e2d-55a5-a558-0509f29bd99a.html",
   "title": "Ohio data center said to create 35,000 construction jobs, 2,500 on-site employees",
   "published_at": "2026-08-28T21:35:00",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "AI chipmaker, NVIDIA, and OpenAI, the firm behind ChatGPT, have forged deals to be part of the large PORTS-Pike Technology Campus and data center in southern Ohio.",
    "Two of the biggest names in artificial intelligence (AI) have signed on to be part of an \u201cAI factory\u201d data center development being built at a former U.S. uranium enrichment site in Ohio."
   ],
   "locality_evidence": [
    "The PORTS-Pike Technology Campus is located in Pike County, Ohio.",
    "Two of the biggest names in artificial intelligence (AI) have signed on to be part of an \u201cAI factory\u201d data center development being built at a former U.S. uranium enrichment site in Ohio."
   ],
   "state_evidence": [
    "The PORTS-Pike Technology Campus is located in Pike County, Ohio.",
    "Two of the biggest names in artificial intelligence (AI) have signed on to be part of an \u201cAI factory\u201d data center development being built at a former U.S. uranium enrichment site in Ohio."
   ],
   "capacity_gw_evidence": [
    "NVIDIA will \u201cprovide credit support on land, power, and shell buildout to secure initial 4.25 IT-gigawatts, with an option to take the remaining 3.75 IT-gigawatts,\u201d according to an announcement on the data center deal.",
    "Two of the biggest names in artificial intelligence (AI) have signed on to be part of an \u201cAI factory\u201d data center development being built at a former U.S. uranium enrichment site in Ohio."
   ],
   "builder_evidence": [
    "NVIDIA will be the \u201cexclusive AI compute infrastructure provider\u201d at the PORTS-Pike data center project being built by SB Energy, an arm of Japan\u2019s SoftBank Group.",
    "Two of the biggest names in artificial intelligence (AI) have signed on to be part of an \u201cAI factory\u201d data center development being built at a former U.S. uranium enrichment site in Ohio."
   ],
   "ai_customer_evidence": [
    "OpenAI, which is eyeing a $1 trillion initial public offering (IPO), will be the end customer for the data center\u2019s computer power.",
    "Two of the biggest names in artificial intelligence (AI) have signed on to be part of an \u201cAI factory\u201d data center development being built at a former U.S. uranium enrichment site in Ohio."
   ],
   "status_evidence": [
    "Under the deal, which was announced Monday, NVIDIA will put $105 billion toward financing the mega data center and invest in $1.5 billion in SB Energy.",
    "Two of the biggest names in artificial intelligence (AI) have signed on to be part of an \u201cAI factory\u201d data center development being built at a former U.S. uranium enrichment site in Ohio."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://abc3340.com/news/nation-world/gallery/data-center-boom-targets-texas-most-productive-farmland-fueling-power-clashes-resources-industry-governor-abbott?photo=3",
   "title": "Data center boom targets Texas\u2019 most productive farmland, fueling power clashes",
   "published_at": "2026-08-20T00:47:05",
   "project": "Meta El Paso Data Center",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta Platforms",
   "ai_customer": "Meta",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Data center boom targets Texas\u2019 most productive farmland, fueling power clashes",
    "EL PASO, TEXAS - AUGUST 13: In an aerial view, the Meta El Paso Data Center is seen on August 13, 2026 in El Paso, Texas.",
    "Meta Platforms continues construction on its more than $10 billion Meta El Paso Data Center in Northeast El Paso, Texas."
   ],
   "locality_evidence": [
    "# Data center boom targets Texas\u2019 most productive farmland, fueling power clashes",
    "EL PASO, TEXAS - AUGUST 13: In an aerial view, the Meta El Paso Data Center is seen on August 13, 2026 in El Paso, Texas.",
    "Meta Platforms continues construction on its more than $10 billion Meta El Paso Data Center in Northeast El Paso, Texas."
   ],
   "state_evidence": [
    "# Data center boom targets Texas\u2019 most productive farmland, fueling power clashes",
    "EL PASO, TEXAS - AUGUST 13: In an aerial view, the Meta El Paso Data Center is seen on August 13, 2026 in El Paso, Texas."
   ],
   "capacity_gw_evidence": [
    "# Data center boom targets Texas\u2019 most productive farmland, fueling power clashes",
    "Occupying approximately 1,000 acres, Meta has expanded the project to 1 gigawatt of computing capacity, allowing the facility to support a growing range of AI workloads and the training and deployment of increasingly sophisticated AI models and technologies."
   ],
   "builder_evidence": [
    "# Data center boom targets Texas\u2019 most productive farmland, fueling power clashes",
    "Meta Platforms continues construction on its more than $10 billion Meta El Paso Data Center in Northeast El Paso, Texas."
   ],
   "ai_customer_evidence": [
    "# Data center boom targets Texas\u2019 most productive farmland, fueling power clashes",
    "Occupying approximately 1,000 acres, Meta has expanded the project to 1 gigawatt of computing capacity, allowing the facility to support a growing range of AI workloads and the training and deployment of increasingly sophisticated AI models and technologies."
   ],
   "status_evidence": [
    "# Data center boom targets Texas\u2019 most productive farmland, fueling power clashes",
    "Meta Platforms continues construction on its more than $10 billion Meta El Paso Data Center in Northeast El Paso, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://hostingadvice.com/blog/awss-200-billion-year-is-quietly-squeezing-out-tier-2-hosts",
   "title": "AWS's $200 Billion Year Is Quietly Squeezing Out Tier-2 Hosts",
   "published_at": "2026-05-18T18:14:18",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "A single AWS campus in New Carlisle, Indiana, that stretches across 30 buildings on 1,200 acres now qualifies for 2.2 gigawatts of electricity \u2014 enough to power about 1.6 million [average American homes](https://www.eia.gov/tools/faqs/faq.php?id=97&t=3).",
    "Locals call it Project Rainier, and Amazon calls it just another site.",
    "Project Rainier is a 2.2-gigawatt, 30-building, 1,200-acre campus based entirely on AWS\u2019s internally developed Trainium2 chips."
   ],
   "locality_evidence": [
    "A single AWS campus in New Carlisle, Indiana, that stretches across 30 buildings on 1,200 acres now qualifies for 2.2 gigawatts of electricity \u2014 enough to power about 1.6 million [average American homes](https://www.eia.gov/tools/faqs/faq.php?id=97&t=3).",
    "Locals call it Project Rainier, and Amazon calls it just another site."
   ],
   "state_evidence": [
    "A single AWS campus in New Carlisle, Indiana, that stretches across 30 buildings on 1,200 acres now qualifies for 2.2 gigawatts of electricity \u2014 enough to power about 1.6 million [average American homes](https://www.eia.gov/tools/faqs/faq.php?id=97&t=3).",
    "Locals call it Project Rainier, and Amazon calls it just another site."
   ],
   "capacity_gw_evidence": [
    "A single AWS campus in New Carlisle, Indiana, that stretches across 30 buildings on 1,200 acres now qualifies for 2.2 gigawatts of electricity \u2014 enough to power about 1.6 million [average American homes](https://www.eia.gov/tools/faqs/faq.php?id=97&t=3).",
    "Locals call it Project Rainier, and Amazon calls it just another site.",
    "Project Rainier is a 2.2-gigawatt, 30-building, 1,200-acre campus based entirely on AWS\u2019s internally developed Trainium2 chips."
   ],
   "builder_evidence": [
    "A single AWS campus in New Carlisle, Indiana, that stretches across 30 buildings on 1,200 acres now qualifies for 2.2 gigawatts of electricity \u2014 enough to power about 1.6 million [average American homes](https://www.eia.gov/tools/faqs/faq.php?id=97&t=3).",
    "Locals call it Project Rainier, and Amazon calls it just another site."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=meta&page=1&term=north-america",
   "title": "News North America, Meta - DCD",
   "published_at": "2026-08-27T00:00:00",
   "project": "El Paso data center",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta and BlackRock",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta and BlackRock team up for data center in El Paso, Texas](/en/news/meta-and-blackrock-team-up-for-data-center-in-el-paso-texas/)",
    "Will offer 1GW of compute capacity"
   ],
   "locality_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta and BlackRock team up for data center in El Paso, Texas](/en/news/meta-and-blackrock-team-up-for-data-center-in-el-paso-texas/)"
   ],
   "state_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta and BlackRock team up for data center in El Paso, Texas](/en/news/meta-and-blackrock-team-up-for-data-center-in-el-paso-texas/)"
   ],
   "capacity_gw_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "Will offer 1GW of compute capacity"
   ],
   "builder_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta and BlackRock team up for data center in El Paso, Texas](/en/news/meta-and-blackrock-team-up-for-data-center-in-el-paso-texas/)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=meta&page=1&term=north-america",
   "title": "News North America, Meta - DCD",
   "published_at": "2026-08-27T00:00:00",
   "project": "Childress data center campus",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Crusoe",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Crusoe to develop 1.4GW data center campus in Childress, Texas](/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/)",
    "Company partners with Lancium again"
   ],
   "locality_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Crusoe to develop 1.4GW data center campus in Childress, Texas](/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/)"
   ],
   "state_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Crusoe to develop 1.4GW data center campus in Childress, Texas](/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/)"
   ],
   "capacity_gw_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Crusoe to develop 1.4GW data center campus in Childress, Texas](/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/)"
   ],
   "builder_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Crusoe to develop 1.4GW data center campus in Childress, Texas](/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=meta&page=1&term=north-america",
   "title": "News North America, Meta - DCD",
   "published_at": "2026-08-27T00:00:00",
   "project": "Richland Parish data center campus",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta expands data center campus in Richland Parish, Louisiana, to 5GW & $50bn](/en/news/meta-expands-data-center-campus-in-richland-parish-louisiana-to-5gw-will-invest-50bn/)",
    "Company will also invest $1bn in local infrastructure improvements"
   ],
   "locality_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta expands data center campus in Richland Parish, Louisiana, to 5GW & $50bn](/en/news/meta-expands-data-center-campus-in-richland-parish-louisiana-to-5gw-will-invest-50bn/)"
   ],
   "state_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta expands data center campus in Richland Parish, Louisiana, to 5GW & $50bn](/en/news/meta-expands-data-center-campus-in-richland-parish-louisiana-to-5gw-will-invest-50bn/)"
   ],
   "capacity_gw_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta expands data center campus in Richland Parish, Louisiana, to 5GW & $50bn](/en/news/meta-expands-data-center-campus-in-richland-parish-louisiana-to-5gw-will-invest-50bn/)"
   ],
   "builder_evidence": [
    "# News - North America, Meta",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Meta expands data center campus in Richland Parish, Louisiana, to 5GW & $50bn](/en/news/meta-expands-data-center-campus-in-richland-parish-louisiana-to-5gw-will-invest-50bn/)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://michaelbommarito.com/wiki/datacenters/projects/mega/homer-city-energy-campus",
   "title": "homer city energy campus | mike bommarito",
   "published_at": "2025-12-30T00:00:00",
   "project": "Homer City Energy Campus",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Kiewit Power Constructors",
   "ai_customer": null,
   "status": "Planned",
   "announcement_date": "2025-04-02",
   "project_evidence": [
    "# homer city energy campus"
   ],
   "locality_evidence": [
    "| Location | Homer City, Indiana County, Pennsylvania |",
    "# homer city energy campus"
   ],
   "state_evidence": [
    "| Location | Homer City, Indiana County, Pennsylvania |",
    "# homer city energy campus"
   ],
   "capacity_gw_evidence": [
    "| Power Capacity | 4.5 GW |",
    "# homer city energy campus"
   ],
   "builder_evidence": [
    "| Sponsors | Homer City Redevelopment, Kiewit Power Constructors |",
    "# homer city energy campus"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Status | Planned |",
    "# homer city energy campus"
   ],
   "announcement_date_evidence": [
    "| Announced | 2025-04-02 |",
    "## construction timeline",
    "| Announced | 2025-04-02 |\n|---|---|\n| Construction Start |"
   ]
  },
  {
   "url": "https://itpro.com/infrastructure/reports-anthropic-signs-usd45bn-cloud-computing-deal-with-nscale",
   "title": "Reports: Anthropic signs $45bn cloud computing deal with Nscale",
   "published_at": "2026-08-27T15:28:26",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "planned",
   "announcement_date": "2026-01",
   "project_evidence": [
    "## Monarch compute",
    "In January, the American Intelligence and Power Corporation (AIPCorp) unveiled its plans to build the 2,250-acre Monarch Compute Campus in Mason County, West Virginia, dubbing it the first state-certified microgrid-based AI project.",
    "Two months after the unveiling, Nscale [announced](https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) it had acquired AIPCorp, including the Monarch Compute Campus \u2014 and signed Microsoft as its first customer for 1.35GW of AI compute on Nvidia's next-gen Vera Rubin GPUs."
   ],
   "locality_evidence": [
    "## Monarch compute",
    "In January, the American Intelligence and Power Corporation (AIPCorp) unveiled its plans to build the 2,250-acre Monarch Compute Campus in Mason County, West Virginia, dubbing it the first state-certified microgrid-based AI project."
   ],
   "state_evidence": [
    "## Monarch compute",
    "In January, the American Intelligence and Power Corporation (AIPCorp) unveiled its plans to build the 2,250-acre Monarch Compute Campus in Mason County, West Virginia, dubbing it the first state-certified microgrid-based AI project."
   ],
   "capacity_gw_evidence": [
    "## Monarch compute",
    "The site boasts up to 2GW of power generated on campus by natural gas scaling to 8GW."
   ],
   "builder_evidence": [
    "## Monarch compute",
    "Two months after the unveiling, Nscale [announced](https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) it had acquired AIPCorp, including the Monarch Compute Campus \u2014 and signed Microsoft as its first customer for 1.35GW of AI compute on Nvidia's next-gen Vera Rubin GPUs."
   ],
   "ai_customer_evidence": [
    "## Monarch compute",
    "Two months after the unveiling, Nscale [announced](https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) it had acquired AIPCorp, including the Monarch Compute Campus \u2014 and signed Microsoft as its first customer for 1.35GW of AI compute on Nvidia's next-gen Vera Rubin GPUs."
   ],
   "status_evidence": [
    "## Monarch compute",
    "In January, the American Intelligence and Power Corporation (AIPCorp) unveiled its plans to build the 2,250-acre Monarch Compute Campus in Mason County, West Virginia, dubbing it the first state-certified microgrid-based AI project.",
    "The first phase is set to open at the end of 2027, and it is expected to become one of the largest AI infrastructure projects yet."
   ],
   "announcement_date_evidence": [
    "## Monarch compute",
    "In January, the American Intelligence and Power Corporation (AIPCorp) unveiled its plans to build the 2,250-acre Monarch Compute Campus in Mason County, West Virginia, dubbing it the first state-certified microgrid-based AI project."
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news/galaxy-digital-completes-first-phase-of-pivoting-cryptomine-to-ai-hosting",
   "title": "Galaxy Digital completes first phase of pivoting cryptomine to AI hosting",
   "published_at": "2026-08-27T00:00:00",
   "project": "Helios",
   "locality": "Dickens County",
   "state": "Texas",
   "capacity_gw": 3.6,
   "builder": "Galaxy Digital",
   "ai_customer": "CoreWeave",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "Cryptomine and data center firm Galaxy Digital has completed the first phase of pivoting its Texas campus towards AI and HPC use.",
    "The company this week announced it has completed delivery of the first phase of power at its Helios data center campus in West Texas, delivering approximately 200MW of gross power \u2014 133MW of critical IT load \u2014 to AI cloud firm CoreWeave."
   ],
   "locality_evidence": [
    "Cryptomine and data center firm Galaxy Digital has completed the first phase of pivoting its Texas campus towards AI and HPC use.",
    "After breaking ground in July 2021, the 160-acre Helios campus started cryptomining operations in May 2022.",
    "Galaxy acquired the data center, located in Dickens County, from Argo Blockchain in late 2022 for approximately $65 million."
   ],
   "state_evidence": [
    "Cryptomine and data center firm Galaxy Digital has completed the first phase of pivoting its Texas campus towards AI and HPC use.",
    "The company this week announced it has completed delivery of the first phase of power at its Helios data center campus in West Texas, delivering approximately 200MW of gross power \u2014 133MW of critical IT load \u2014 to AI cloud firm CoreWeave."
   ],
   "capacity_gw_evidence": [
    "Cryptomine and data center firm Galaxy Digital has completed the first phase of pivoting its Texas campus towards AI and HPC use.",
    "Spanning more than 2,200 acres, Galaxy said the campus's total approved power capacity has expanded to 1.63GW, with the potential to scale to as much as 3.6GW."
   ],
   "builder_evidence": [
    "Cryptomine and data center firm Galaxy Digital has completed the first phase of pivoting its Texas campus towards AI and HPC use.",
    "The company this week announced it has completed delivery of the first phase of power at its Helios data center campus in West Texas, delivering approximately 200MW of gross power \u2014 133MW of critical IT load \u2014 to AI cloud firm CoreWeave."
   ],
   "ai_customer_evidence": [
    "Cryptomine and data center firm Galaxy Digital has completed the first phase of pivoting its Texas campus towards AI and HPC use.",
    "The company this week announced it has completed delivery of the first phase of power at its Helios data center campus in West Texas, delivering approximately 200MW of gross power \u2014 133MW of critical IT load \u2014 to AI cloud firm CoreWeave."
   ],
   "status_evidence": [
    "Cryptomine and data center firm Galaxy Digital has completed the first phase of pivoting its Texas campus towards AI and HPC use.",
    "The company this week announced it has completed delivery of the first phase of power at its Helios data center campus in West Texas, delivering approximately 200MW of gross power \u2014 133MW of critical IT load \u2014 to AI cloud firm CoreWeave."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://structureresearch.net/2026/07/28/oleary-digital-plans-new-9gw-project-stratos-data-centre-campus-in-utah-backlash-ensues",
   "title": "O\u2019Leary Digital plans new 9GW Project Stratos data centre campus in Utah; backlash ensues",
   "published_at": "2026-07-28T20:03:00",
   "project": "Project Stratos",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O\u2019Leary Digital",
   "ai_customer": null,
   "status": "planning to develop",
   "announcement_date": null,
   "project_evidence": [
    "## O\u2019Leary Digital plans new 9GW Project Stratos data centre campus in Utah; backlash ensues",
    "O\u2019Leary Digital, the digital infrastructure company headed by Canadian investor and TV personality Kevin O\u2019Leary, is planning to develop a massive 9GW data centre campus in Box Elder County, Utah (just northwest of Salt Lake City)."
   ],
   "locality_evidence": [
    "## O\u2019Leary Digital plans new 9GW Project Stratos data centre campus in Utah; backlash ensues",
    "O\u2019Leary Digital, the digital infrastructure company headed by Canadian investor and TV personality Kevin O\u2019Leary, is planning to develop a massive 9GW data centre campus in Box Elder County, Utah (just northwest of Salt Lake City)."
   ],
   "state_evidence": [
    "## O\u2019Leary Digital plans new 9GW Project Stratos data centre campus in Utah; backlash ensues",
    "O\u2019Leary Digital, the digital infrastructure company headed by Canadian investor and TV personality Kevin O\u2019Leary, is planning to develop a massive 9GW data centre campus in Box Elder County, Utah (just northwest of Salt Lake City)."
   ],
   "capacity_gw_evidence": [
    "## O\u2019Leary Digital plans new 9GW Project Stratos data centre campus in Utah; backlash ensues",
    "O\u2019Leary Digital, the digital infrastructure company headed by Canadian investor and TV personality Kevin O\u2019Leary, is planning to develop a massive 9GW data centre campus in Box Elder County, Utah (just northwest of Salt Lake City)."
   ],
   "builder_evidence": [
    "## O\u2019Leary Digital plans new 9GW Project Stratos data centre campus in Utah; backlash ensues",
    "O\u2019Leary Digital, the digital infrastructure company headed by Canadian investor and TV personality Kevin O\u2019Leary, is planning to develop a massive 9GW data centre campus in Box Elder County, Utah (just northwest of Salt Lake City)."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## O\u2019Leary Digital plans new 9GW Project Stratos data centre campus in Utah; backlash ensues",
    "O\u2019Leary Digital, the digital infrastructure company headed by Canadian investor and TV personality Kevin O\u2019Leary, is planning to develop a massive 9GW data centre campus in Box Elder County, Utah (just northwest of Salt Lake City)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://themidwesterner.news/2026/05/van-buren-twp-officials-dole-out-125-million-in-tax-breaks-for-google-data-center",
   "title": "Van Buren Twp officials dole out $125 million in tax breaks for Google data center",
   "published_at": "2026-05-22T13:07:01",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development",
   "ai_customer": "Google",
   "status": "approved local tax breaks",
   "announcement_date": "2026-03",
   "project_evidence": [
    "Van Buren Township officials this week approved local tax breaks amounting to almost $125 million for Google to build a 1-gigawatt data center data center, despite pushback from the community.",
    "The tech giant in March announced it was behind the plan, dubbed \u201cProject Cannoli,\u201d at the 280-acre site under development by Panattoni Development."
   ],
   "locality_evidence": [
    "Van Buren Township officials this week approved local tax breaks amounting to almost $125 million for Google to build a 1-gigawatt data center data center, despite pushback from the community.",
    "The tech giant in March announced it was behind the plan, dubbed \u201cProject Cannoli,\u201d at the 280-acre site under development by Panattoni Development."
   ],
   "state_evidence": [
    "Van Buren Township officials this week approved local tax breaks amounting to almost $125 million for Google to build a 1-gigawatt data center data center, despite pushback from the community.",
    "A Google representative told the board the project builds on the corporation\u2019s \u201cinvestment in Michigan\u201d and \u201crepresents a meaningful, multi-generational opportunity for Van Buren Township.\u201d"
   ],
   "capacity_gw_evidence": [
    "Van Buren Township officials this week approved local tax breaks amounting to almost $125 million for Google to build a 1-gigawatt data center data center, despite pushback from the community."
   ],
   "builder_evidence": [
    "The tech giant in March announced it was behind the plan, dubbed \u201cProject Cannoli,\u201d at the 280-acre site under development by Panattoni Development."
   ],
   "ai_customer_evidence": [
    "Van Buren Township officials this week approved local tax breaks amounting to almost $125 million for Google to build a 1-gigawatt data center data center, despite pushback from the community."
   ],
   "status_evidence": [
    "Van Buren Township officials this week approved local tax breaks amounting to almost $125 million for Google to build a 1-gigawatt data center data center, despite pushback from the community."
   ],
   "announcement_date_evidence": [
    "The tech giant in March announced it was behind the plan, dubbed \u201cProject Cannoli,\u201d at the 280-acre site under development by Panattoni Development."
   ]
  },
  {
   "url": "https://themidwesterner.news/2026/05/van-buren-twp-officials-dole-out-125-million-in-tax-breaks-for-google-data-center",
   "title": "Van Buren Twp officials dole out $125 million in tax breaks for Google data center",
   "published_at": "2026-05-22T13:07:01",
   "project": null,
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.4,
   "builder": null,
   "ai_customer": "Oracle and OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "Attorney General Dana Nessel said in March that Google [agreed to a contested case](https://www.themidwesterner.news/2026/03/google-behind-proposed-280-acre-data-center-in-van-buren-twp/) before the Michigan Public Service Commission over its contracts with DTE Energy, unlike the commission;\u2019s fast-tracking of contracts for Oracle and OpenAI\u2019s 1.4 gigawatt data center in Saline Township."
   ],
   "state_evidence": [
    "Attorney General Dana Nessel said in March that Google [agreed to a contested case](https://www.themidwesterner.news/2026/03/google-behind-proposed-280-acre-data-center-in-van-buren-twp/) before the Michigan Public Service Commission over its contracts with DTE Energy, unlike the commission;\u2019s fast-tracking of contracts for Oracle and OpenAI\u2019s 1.4 gigawatt data center in Saline Township."
   ],
   "capacity_gw_evidence": [
    "Attorney General Dana Nessel said in March that Google [agreed to a contested case](https://www.themidwesterner.news/2026/03/google-behind-proposed-280-acre-data-center-in-van-buren-twp/) before the Michigan Public Service Commission over its contracts with DTE Energy, unlike the commission;\u2019s fast-tracking of contracts for Oracle and OpenAI\u2019s 1.4 gigawatt data center in Saline Township."
   ],
   "builder_evidence": null,
   "ai_customer_evidence": [
    "Attorney General Dana Nessel said in March that Google [agreed to a contested case](https://www.themidwesterner.news/2026/03/google-behind-proposed-280-acre-data-center-in-van-buren-twp/) before the Michigan Public Service Commission over its contracts with DTE Energy, unlike the commission;\u2019s fast-tracking of contracts for Oracle and OpenAI\u2019s 1.4 gigawatt data center in Saline Township."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://stocktitan.net/news/WULF/kentucky-psc-approves-482-mw-power-agreement-for-tera-wulf-s-9kmcbdo654rd.html",
   "title": "TeraWulf Gets Kentucky PSC Approval for 482 MW",
   "published_at": "2026-08-24T12:00:00",
   "project": "Eastern Kentucky HPC development campus",
   "locality": null,
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": "2026-05-26",
   "project_evidence": [
    "Kentucky PSC Approves 482 MW Power Agreement for TeraWulf\u2019s Justified Data Campus",
    "Company acquired a 1+ GW Eastern Kentucky HPC development campus.",
    "| May 26 | [Campus acquisition](/news/WULF/tera-wulf-expands-infrastructure-platform-with-acquisition-of-1-gw-fcrkidbzck83.html) | Positive | +10.3% | Company acquired a 1+ GW Eastern Kentucky HPC development campus. |"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "Kentucky PSC Approves 482 MW Power Agreement for TeraWulf\u2019s Justified Data Campus",
    "Company acquired a 1+ GW Eastern Kentucky HPC development campus.",
    "| May 26 | [Campus acquisition](/news/WULF/tera-wulf-expands-infrastructure-platform-with-acquisition-of-1-gw-fcrkidbzck83.html) | Positive | +10.3% | Company acquired a 1+ GW Eastern Kentucky HPC development campus. |"
   ],
   "capacity_gw_evidence": [
    "Kentucky PSC Approves 482 MW Power Agreement for TeraWulf\u2019s Justified Data Campus",
    "Company acquired a 1+ GW Eastern Kentucky HPC development campus.",
    "| May 26 | [Campus acquisition](/news/WULF/tera-wulf-expands-infrastructure-platform-with-acquisition-of-1-gw-fcrkidbzck83.html) | Positive | +10.3% | Company acquired a 1+ GW Eastern Kentucky HPC development campus. |"
   ],
   "builder_evidence": [
    "Kentucky PSC Approves 482 MW Power Agreement for TeraWulf\u2019s Justified Data Campus",
    "Company acquired a 1+ GW Eastern Kentucky HPC development campus.",
    "| May 26 | [Campus acquisition](/news/WULF/tera-wulf-expands-infrastructure-platform-with-acquisition-of-1-gw-fcrkidbzck83.html) | Positive | +10.3% | Company acquired a 1+ GW Eastern Kentucky HPC development campus. |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Kentucky PSC Approves 482 MW Power Agreement for TeraWulf\u2019s Justified Data Campus",
    "Company acquired a 1+ GW Eastern Kentucky HPC development campus.",
    "| May 26 | [Campus acquisition](/news/WULF/tera-wulf-expands-infrastructure-platform-with-acquisition-of-1-gw-fcrkidbzck83.html) | Positive | +10.3% | Company acquired a 1+ GW Eastern Kentucky HPC development campus. |"
   ],
   "announcement_date_evidence": [
    "Kentucky PSC Approves 482 MW Power Agreement for TeraWulf\u2019s Justified Data Campus",
    "Company acquired a 1+ GW Eastern Kentucky HPC development campus.",
    "| Date | Event | Sentiment | 24h Move | Catalyst |",
    "| May 26 | [Campus acquisition](/news/WULF/tera-wulf-expands-infrastructure-platform-with-acquisition-of-1-gw-fcrkidbzck83.html) | Positive | +10.3% | Company acquired a 1+ GW Eastern Kentucky HPC development campus. |"
   ]
  },
  {
   "url": "https://tennessean.com/press-release/story/186413/enchant-energy-offers-a-carbon-answer-to-americas-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America\u2019s Surging AI Data Center Demand",
   "published_at": "2026-05-27T20:23:06",
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America\u2019s Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\u201cEnchant\u201d) entered into a letter of intent with Creekstone Energy LLC (\u201cCreekstone\u201d) to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America\u2019s Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\u201cEnchant\u201d) entered into a letter of intent with Creekstone Energy LLC (\u201cCreekstone\u201d) to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America\u2019s Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\u201cEnchant\u201d) entered into a letter of intent with Creekstone Energy LLC (\u201cCreekstone\u201d) to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "About Creekstone Energy",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "About Creekstone Energy",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America\u2019s Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\u201cEnchant\u201d) entered into a letter of intent with Creekstone Energy LLC (\u201cCreekstone\u201d) to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America\u2019s Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://daily-jeff.com/story/news/politics/2026/08/24/openai-plans-ohio-data-center/91372218007",
   "title": "OpenAI to build world's biggest AI data center in Ohio. What we know",
   "published_at": "2026-08-25T01:30:35",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 10.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "under development",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "POLITICS",
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The [San Francisco-based company](https://openai.com/) announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ],
   "locality_evidence": [
    "POLITICS",
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The [San Francisco-based company](https://openai.com/) announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ],
   "state_evidence": [
    "POLITICS",
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The [San Francisco-based company](https://openai.com/) announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ],
   "capacity_gw_evidence": [
    "POLITICS",
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The center will have 8 gigawatts of computing capacity \u2012 the electrical capacity that's available to servers and other equipment, not necessarily the amount of power the center will draw continuously \u2012 by the end of construction. Another 2 gigawatts of power will be used for power conversion, cooling and other systems needed to operate the site, making the total power of the site 10 gigawatts."
   ],
   "builder_evidence": [
    "POLITICS",
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The facility will be built and operated by SB Energy on the former Portsmouth Gaseous Diffusion Plant site."
   ],
   "ai_customer_evidence": [
    "POLITICS",
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "OpenAI plans to build a new hyperscale data center in Pike County, Ohio."
   ],
   "status_evidence": [
    "POLITICS",
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "Phase one construction will ramp up this year, Copple said."
   ],
   "announcement_date_evidence": [
    "POLITICS",
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The [San Francisco-based company](https://openai.com/) announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=openai&term=cloud-hyperscale",
   "title": "News Cloud & Hyperscale, OpenAI",
   "published_at": "2026-08-27T00:00:00",
   "project": null,
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "Georgia Power",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "# News - Cloud & Hyperscale, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [OpenAI gets green light for 3.2GW power deal to supply planned data center in Effingham County, Georgia](/en/news/openai-gets-green-light-for-32gw-power-deal-to-supply-planned-data-center-in-effingham-county-georgia/)"
   ],
   "state_evidence": [
    "# News - Cloud & Hyperscale, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [OpenAI gets green light for 3.2GW power deal to supply planned data center in Effingham County, Georgia](/en/news/openai-gets-green-light-for-32gw-power-deal-to-supply-planned-data-center-in-effingham-county-georgia/)"
   ],
   "capacity_gw_evidence": [
    "# News - Cloud & Hyperscale, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [OpenAI gets green light for 3.2GW power deal to supply planned data center in Effingham County, Georgia](/en/news/openai-gets-green-light-for-32gw-power-deal-to-supply-planned-data-center-in-effingham-county-georgia/)"
   ],
   "builder_evidence": [
    "# News - Cloud & Hyperscale, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "US utility Georgia Power will construct the new generation, with the ChatGPT maker expected to foot the bill"
   ],
   "ai_customer_evidence": [
    "# News - Cloud & Hyperscale, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [OpenAI gets green light for 3.2GW power deal to supply planned data center in Effingham County, Georgia](/en/news/openai-gets-green-light-for-32gw-power-deal-to-supply-planned-data-center-in-effingham-county-georgia/)"
   ],
   "status_evidence": [
    "# News - Cloud & Hyperscale, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [OpenAI gets green light for 3.2GW power deal to supply planned data center in Effingham County, Georgia](/en/news/openai-gets-green-light-for-32gw-power-deal-to-supply-planned-data-center-in-effingham-county-georgia/)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?company=openai&term=cloud-hyperscale",
   "title": "News Cloud & Hyperscale, OpenAI",
   "published_at": "2026-08-27T00:00:00",
   "project": "Stargate",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": null,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# News - Cloud & Hyperscale, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Oracle and OpenAI start construction on Stargate data center campus in Saline Township, Michigan](/en/news/oracle-and-openai-start-construction-on-stargate-data-center-campus-in-saline-township-michigan/)"
   ],
   "locality_evidence": [
    "# News - Cloud & Hyperscale, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Oracle and OpenAI start construction on Stargate data center campus in Saline Township, Michigan](/en/news/oracle-and-openai-start-construction-on-stargate-data-center-campus-in-saline-township-michigan/)"
   ],
   "state_evidence": [
    "# News - Cloud & Hyperscale, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Oracle and OpenAI start construction on Stargate data center campus in Saline Township, Michigan](/en/news/oracle-and-openai-start-construction-on-stargate-data-center-campus-in-saline-township-michigan/)"
   ],
   "capacity_gw_evidence": null,
   "builder_evidence": [
    "# News - Cloud & Hyperscale, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Oracle and OpenAI start construction on Stargate data center campus in Saline Township, Michigan](/en/news/oracle-and-openai-start-construction-on-stargate-data-center-campus-in-saline-township-michigan/)"
   ],
   "ai_customer_evidence": [
    "# News - Cloud & Hyperscale, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Oracle and OpenAI start construction on Stargate data center campus in Saline Township, Michigan](/en/news/oracle-and-openai-start-construction-on-stargate-data-center-campus-in-saline-township-michigan/)"
   ],
   "status_evidence": [
    "# News - Cloud & Hyperscale, OpenAI",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Oracle and OpenAI start construction on Stargate data center campus in Saline Township, Michigan](/en/news/oracle-and-openai-start-construction-on-stargate-data-center-campus-in-saline-township-michigan/)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tradingview.com/news/benzinga:fe8634d31094b:0-nvidia-s-ohio-ai-megadeal-openai-8-gw-of-compute-and-a-1-5-billion-sb-energy-bet",
   "title": "NVIDIA\u2019s Ohio AI Megadeal: OpenAI, 8 GW of Compute and a $1.5 Billion SB Energy Bet",
   "published_at": "2026-08-17T14:32:31",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "NVIDIA\u2019s Ohio AI Megadeal: OpenAI, 8 GW of Compute and a $1.5 Billion SB Energy Bet",
    "NVIDIA partnered with **SB Energy** to secure land, power and building capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, exclusively for NVIDIA computing systems."
   ],
   "locality_evidence": [
    "NVIDIA\u2019s Ohio AI Megadeal: OpenAI, 8 GW of Compute and a $1.5 Billion SB Energy Bet",
    "NVIDIA partnered with **SB Energy** to secure land, power and building capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, exclusively for NVIDIA computing systems."
   ],
   "state_evidence": [
    "NVIDIA\u2019s Ohio AI Megadeal: OpenAI, 8 GW of Compute and a $1.5 Billion SB Energy Bet",
    "NVIDIA partnered with **SB Energy** to secure land, power and building capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, exclusively for NVIDIA computing systems."
   ],
   "capacity_gw_evidence": [
    "NVIDIA\u2019s Ohio AI Megadeal: OpenAI, 8 GW of Compute and a $1.5 Billion SB Energy Bet",
    "The initial deployment will support 4.25 gigawatts of AI computing capacity using NVIDIA GPUs, CPUs, networking and software. NVIDIA also has the option to secure another 3.75 gigawatts at the site."
   ],
   "builder_evidence": [
    "NVIDIA\u2019s Ohio AI Megadeal: OpenAI, 8 GW of Compute and a $1.5 Billion SB Energy Bet",
    "NVIDIA partnered with **SB Energy** to secure land, power and building capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, exclusively for NVIDIA computing systems."
   ],
   "ai_customer_evidence": [
    "NVIDIA\u2019s Ohio AI Megadeal: OpenAI, 8 GW of Compute and a $1.5 Billion SB Energy Bet",
    "OpenAI will use the capacity, while SB Energy will build, own and operate the data center under a 20-year lease to OpenAI."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://panhandleregionalnews.com/2026/07/15/childress-texas-lands-1-gw-ai-data-center-campus-backed-by-crusoe-and-lancium",
   "title": "Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
   "published_at": "2026-07-15T16:09:03",
   "project": "Childress",
   "locality": "Childress County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "Childress County, Texas, will become home to a 1 GW artificial intelligence data center campus developed through a partnership between [Crusoe](https://www.crusoe.ai/) and [Lancium](https://lancium.com/), with construction expected to begin in the third quarter of 2026."
   ],
   "locality_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "Childress County, Texas, will become home to a 1 GW artificial intelligence data center campus developed through a partnership between [Crusoe](https://www.crusoe.ai/) and [Lancium](https://lancium.com/), with construction expected to begin in the third quarter of 2026."
   ],
   "state_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "Childress County, Texas, will become home to a 1 GW artificial intelligence data center campus developed through a partnership between [Crusoe](https://www.crusoe.ai/) and [Lancium](https://lancium.com/), with construction expected to begin in the third quarter of 2026."
   ],
   "capacity_gw_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "Childress County, Texas, will become home to a 1 GW artificial intelligence data center campus developed through a partnership between [Crusoe](https://www.crusoe.ai/) and [Lancium](https://lancium.com/), with construction expected to begin in the third quarter of 2026."
   ],
   "builder_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "Childress County, Texas, will become home to a 1 GW artificial intelligence data center campus developed through a partnership between [Crusoe](https://www.crusoe.ai/) and [Lancium](https://lancium.com/), with construction expected to begin in the third quarter of 2026."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "Childress County, Texas, will become home to a 1 GW artificial intelligence data center campus developed through a partnership between [Crusoe](https://www.crusoe.ai/) and [Lancium](https://lancium.com/), with construction expected to begin in the third quarter of 2026."
   ],
   "announcement_date_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "Published on Jul 15, 2026"
   ]
  },
  {
   "url": "https://panhandleregionalnews.com/2026/07/15/childress-texas-lands-1-gw-ai-data-center-campus-backed-by-crusoe-and-lancium",
   "title": "Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
   "published_at": "2026-07-15T16:09:03",
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "The development represents the second major data center site where Crusoe and Lancium are using the same partnership structure established in Abilene, Texas.",
    "Crusoe energized its first two buildings at the site within one year and later expanded plans for the campus to 1.2 GW."
   ],
   "locality_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "The development represents the second major data center site where Crusoe and Lancium are using the same partnership structure established in Abilene, Texas.",
    "Crusoe energized its first two buildings at the site within one year and later expanded plans for the campus to 1.2 GW."
   ],
   "state_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "The development represents the second major data center site where Crusoe and Lancium are using the same partnership structure established in Abilene, Texas.",
    "Crusoe energized its first two buildings at the site within one year and later expanded plans for the campus to 1.2 GW."
   ],
   "capacity_gw_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "The development represents the second major data center site where Crusoe and Lancium are using the same partnership structure established in Abilene, Texas.",
    "Crusoe energized its first two buildings at the site within one year and later expanded plans for the campus to 1.2 GW."
   ],
   "builder_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "The development represents the second major data center site where Crusoe and Lancium are using the same partnership structure established in Abilene, Texas.",
    "Crusoe energized its first two buildings at the site within one year and later expanded plans for the campus to 1.2 GW."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Childress, Texas Lands 1 GW AI Data Center Campus Backed by Crusoe and Lancium",
    "The development represents the second major data center site where Crusoe and Lancium are using the same partnership structure established in Abilene, Texas.",
    "The Childress project builds on the companies\u2019 earlier collaboration in Abilene, where Crusoe broke ground in June 2024 on a Lancium-owned campus."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mind2markets.com/us-data-center-market-trends-december-2025",
   "title": "US Data Center Market Trends December 2025 Best Intelligence",
   "published_at": "2026-01-20T12:05:29",
   "project": "Vantage Frontier",
   "locality": "Shackelford",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage",
   "ai_customer": "Oracle/OpenAI",
   "status": "Under Construction",
   "announcement_date": "2025-12-15",
   "project_evidence": [
    "| [Vantage Frontier](https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/) (Shackelford, TX) | 1.4 GW | $25+ billion | H2 2026 \u2013 2028 |",
    "#### US Data Center Investments Commitments",
    "# US data center market trends, & Investment Intelligence: December 2025"
   ],
   "locality_evidence": [
    "| [Vantage Frontier](https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/) (Shackelford, TX) | 1.4 GW | $25+ billion | H2 2026 \u2013 2028 |",
    "#### US Data Center Investments Commitments",
    "# US data center market trends, & Investment Intelligence: December 2025"
   ],
   "state_evidence": [
    "| [Vantage Frontier](https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/) (Shackelford, TX) | 1.4 GW | $25+ billion | H2 2026 \u2013 2028 |",
    "#### US Data Center Investments Commitments",
    "# US data center market trends, & Investment Intelligence: December 2025"
   ],
   "capacity_gw_evidence": [
    "| [Vantage Frontier](https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/) (Shackelford, TX) | 1.4 GW | $25+ billion | H2 2026 \u2013 2028 |",
    "#### US Data Center Investments Commitments",
    "# US data center market trends, & Investment Intelligence: December 2025"
   ],
   "builder_evidence": [
    "| [Vantage Frontier](https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/) (Shackelford, TX) | 1.4 GW | $25+ billion | H2 2026 \u2013 2028 |",
    "#### US Data Center Investments Commitments",
    "# US data center market trends, & Investment Intelligence: December 2025"
   ],
   "ai_customer_evidence": [
    "**Vantage Data Centers Breaks Ground on 1.4GW Frontier Campus (Oracle/OpenAI Stargate)**",
    "# US data center market trends, & Investment Intelligence: December 2025"
   ],
   "status_evidence": [
    "- **2026****\u20132027 Under Construction**: 1,500+ MW (CyrusOne Whitney expansion, Vantage Frontier Phase 1, multiple projects)",
    "### US Data Center Capacity Pipeline Characteristics",
    "# US data center market trends, & Investment Intelligence: December 2025"
   ],
   "announcement_date_evidence": [
    "On December 15, 2025, Vantage Data Centers broke ground on its flagship \u201cFrontier\u201d hyperscale campus in Shackelford County, Texas\u2014marking the largest single data center investment announcement to date.",
    "**Vantage Data Centers Breaks Ground on 1.4GW Frontier Campus (Oracle/OpenAI Stargate)**",
    "# US data center market trends, & Investment Intelligence: December 2025"
   ]
  },
  {
   "url": "https://mind2markets.com/us-data-center-market-trends-december-2025",
   "title": "US Data Center Market Trends December 2025 Best Intelligence",
   "published_at": "2026-01-20T12:05:29",
   "project": "InfraKey Capital",
   "locality": "Lacy Lakeview",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "InfraKey Capital",
   "ai_customer": null,
   "status": "Planning",
   "announcement_date": null,
   "project_evidence": [
    "| [InfraKey Capital](https://www.datacenterdynamics.com/en/news/10bn-data-center-project-recieves-approval-in-lacy-lakeview-texas/) (Lacy Lakeview, TX) | 1.0 GW | $10 billion | 4\u20135 years |",
    "#### US Data Center Investments Commitments",
    "# US data center market trends, & Investment Intelligence: December 2025"
   ],
   "locality_evidence": [
    "| [InfraKey Capital](https://www.datacenterdynamics.com/en/news/10bn-data-center-project-recieves-approval-in-lacy-lakeview-texas/) (Lacy Lakeview, TX) | 1.0 GW | $10 billion | 4\u20135 years |",
    "#### US Data Center Investments Commitments",
    "# US data center market trends, & Investment Intelligence: December 2025"
   ],
   "state_evidence": [
    "| [InfraKey Capital](https://www.datacenterdynamics.com/en/news/10bn-data-center-project-recieves-approval-in-lacy-lakeview-texas/) (Lacy Lakeview, TX) | 1.0 GW | $10 billion | 4\u20135 years |",
    "#### US Data Center Investments Commitments",
    "# US data center market trends, & Investment Intelligence: December 2025"
   ],
   "capacity_gw_evidence": [
    "| [InfraKey Capital](https://www.datacenterdynamics.com/en/news/10bn-data-center-project-recieves-approval-in-lacy-lakeview-texas/) (Lacy Lakeview, TX) | 1.0 GW | $10 billion | 4\u20135 years |",
    "#### US Data Center Investments Commitments",
    "# US data center market trends, & Investment Intelligence: December 2025"
   ],
   "builder_evidence": [
    "| [InfraKey Capital](https://www.datacenterdynamics.com/en/news/10bn-data-center-project-recieves-approval-in-lacy-lakeview-texas/) (Lacy Lakeview, TX) | 1.0 GW | $10 billion | 4\u20135 years |",
    "#### US Data Center Investments Commitments",
    "# US data center market trends, & Investment Intelligence: December 2025"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "- **2028****\u20132030 Planning Stage**: 3,500+ MW (InfraKey 1GW campus, Geronimo Power renewal project, Panattoni Michigan)",
    "### US Data Center Capacity Pipeline Characteristics",
    "# US data center market trends, & Investment Intelligence: December 2025"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mind2markets.com/us-data-center-market-trends-december-2025",
   "title": "US Data Center Market Trends December 2025 Best Intelligence",
   "published_at": "2026-01-20T12:05:29",
   "project": "Panattoni",
   "locality": "Detroit",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni",
   "ai_customer": null,
   "status": "Planning",
   "announcement_date": null,
   "project_evidence": [
    "| Panattoni (Detroit, MI) | 1.0 GW | Not disclosed | Planning |",
    "#### US Data Center Investments Commitments",
    "# US data center market trends, & Investment Intelligence: December 2025"
   ],
   "locality_evidence": [
    "| Panattoni (Detroit, MI) | 1.0 GW | Not disclosed | Planning |",
    "#### US Data Center Investments Commitments",
    "# US data center market trends, & Investment Intelligence: December 2025"
   ],
   "state_evidence": [
    "| Panattoni (Detroit, MI) | 1.0 GW | Not disclosed | Planning |",
    "#### US Data Center Investments Commitments",
    "# US data center market trends, & Investment Intelligence: December 2025"
   ],
   "capacity_gw_evidence": [
    "| Panattoni (Detroit, MI) | 1.0 GW | Not disclosed | Planning |",
    "#### US Data Center Investments Commitments",
    "# US data center market trends, & Investment Intelligence: December 2025"
   ],
   "builder_evidence": [
    "| Panattoni (Detroit, MI) | 1.0 GW | Not disclosed | Planning |",
    "#### US Data Center Investments Commitments",
    "# US data center market trends, & Investment Intelligence: December 2025"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Panattoni (Detroit, MI) | 1.0 GW | Not disclosed | Planning |",
    "#### US Data Center Investments Commitments",
    "# US data center market trends, & Investment Intelligence: December 2025"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://ticker.app/lse/FRMI/rns/2026-02-20/initial-draw-on-200m-equipment-facility/7468T",
   "title": "Initial Draw on $200m Equipment Facility",
   "published_at": "2026-02-20T18:50:06",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2026-02-20",
   "project_evidence": [
    "Equipment Facility - Fermi Inc | RNS | Ticker",
    "The proceeds will fund the acquisition of utility-grade breakers, transformers, substations, and switchgears for the first 2.3GW of its 11GW Project Matador campus.",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "locality_evidence": [
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus.",
    "(AMARILLO, Texas) February 20, 2026:[Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://fermiamerica.com/), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026."
   ],
   "state_evidence": [
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus.",
    "(AMARILLO, Texas) February 20, 2026:[Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://fermiamerica.com/), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026."
   ],
   "capacity_gw_evidence": [
    "The proceeds will fund the acquisition of utility-grade breakers, transformers, substations, and switchgears for the first 2.3GW of its 11GW Project Matador campus.",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "builder_evidence": [
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "announcement_date_evidence": [
    "Fermi Inc.",
    "20 February 2026",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ]
  },
  {
   "url": "https://lifestyle.timesla.com/story/586432/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy-to-compute",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": "2026-03-16T21:46:33",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "",
   "status": "Acquired / Planned",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid"
   ],
   "locality_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "capacity_gw_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "builder_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "AIPCorp\u2019s team brings nearly a decade of experience and continuity in AI infrastructure development and will support Nscale\u2019s development of the Monarch Compute Campus and Nscale\u2019s future global development and expansion operations."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ],
   "announcement_date_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026"
   ]
  },
  {
   "url": "https://decarbonfuse.com/posts/energy-abundance-announces-data-city-texas-the-world-s-largest-behind-the-meter-data-center-hub-powered-by-100-24-7-green-energy",
   "title": "decarbonfuse",
   "published_at": null,
   "project": "Data City, Texas",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corporation",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2025-03-21",
   "project_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- [**Energy Abundance Development Corporation**](https://energyabundance.com) has unveiled plans for *Data City, Texas*\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by *100% 24/7 green energy*."
   ],
   "locality_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- [**Energy Abundance Development Corporation**](https://energyabundance.com) has unveiled plans for *Data City, Texas*\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by *100% 24/7 green energy*."
   ],
   "state_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- [**Energy Abundance Development Corporation**](https://energyabundance.com) has unveiled plans for *Data City, Texas*\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by *100% 24/7 green energy*."
   ],
   "capacity_gw_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- [**Energy Abundance Development Corporation**](https://energyabundance.com) has unveiled plans for *Data City, Texas*\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by *100% 24/7 green energy*."
   ],
   "builder_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- [**Energy Abundance Development Corporation**](https://energyabundance.com) has unveiled plans for *Data City, Texas*\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by *100% 24/7 green energy*."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- [**Energy Abundance Development Corporation**](https://energyabundance.com) has unveiled plans for *Data City, Texas*\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by *100% 24/7 green energy*."
   ],
   "announcement_date_evidence": [
    "# Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "Published by [Todd Bush](/profiles/1) on March 21, 2025",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- [**Energy Abundance Development Corporation**](https://energyabundance.com) has unveiled plans for *Data City, Texas*\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by *100% 24/7 green energy*."
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news/utah-planning-commission-delays-decision-on-kevin-oleary-backed-data-center-project",
   "title": "Utah Planning Commission delays decision on Kevin O\u2019Leary-backed data center project",
   "published_at": "2026-08-05T00:00:00",
   "project": "Stratos",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O'Leary Digital",
   "ai_customer": null,
   "status": "proposed",
   "announcement_date": null,
   "project_evidence": [
    "A planning commission vote in Box Elder County, Utah, concerning a proposed hyperscale data center campus backed by Shark Tank star Kevin O\u2019Leary has been postponed, amidst claims by local officials that they were blindsided by the project's scope and state involvement.",
    "Dubbed Stratos, the project is being developed by O'Leary Digital, the infrastructure arm of Kevin O'Leary."
   ],
   "locality_evidence": [
    "A planning commission vote in Box Elder County, Utah, concerning a proposed hyperscale data center campus backed by Shark Tank star Kevin O\u2019Leary has been postponed, amidst claims by local officials that they were blindsided by the project's scope and state involvement.",
    "Dubbed Stratos, the project is being developed by O'Leary Digital, the infrastructure arm of Kevin O'Leary."
   ],
   "state_evidence": [
    "A planning commission vote in Box Elder County, Utah, concerning a proposed hyperscale data center campus backed by Shark Tank star Kevin O\u2019Leary has been postponed, amidst claims by local officials that they were blindsided by the project's scope and state involvement.",
    "Dubbed Stratos, the project is being developed by O'Leary Digital, the infrastructure arm of Kevin O'Leary."
   ],
   "capacity_gw_evidence": [
    "A planning commission vote in Box Elder County, Utah, concerning a proposed hyperscale data center campus backed by Shark Tank star Kevin O\u2019Leary has been postponed, amidst claims by local officials that they were blindsided by the project's scope and state involvement.",
    "If built, the data center, planned for construction in Box Elder County, could have a capacity of up to 9GW of power, which is more than double the state's current electricity use, which stands at 4GW.",
    "Dubbed Stratos, the project is being developed by O'Leary Digital, the infrastructure arm of Kevin O'Leary."
   ],
   "builder_evidence": [
    "A planning commission vote in Box Elder County, Utah, concerning a proposed hyperscale data center campus backed by Shark Tank star Kevin O\u2019Leary has been postponed, amidst claims by local officials that they were blindsided by the project's scope and state involvement.",
    "Dubbed Stratos, the project is being developed by O'Leary Digital, the infrastructure arm of Kevin O'Leary."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "A planning commission vote in Box Elder County, Utah, concerning a proposed hyperscale data center campus backed by Shark Tank star Kevin O\u2019Leary has been postponed, amidst claims by local officials that they were blindsided by the project's scope and state involvement.",
    "Dubbed Stratos, the project is being developed by O'Leary Digital, the infrastructure arm of Kevin O'Leary."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://linkloot.io/blog/openai-project-camellia-georgia-power-deal",
   "title": "OpenAI plans Project Camellia with 3.2GW Georgia power deal",
   "published_at": "2026-07-22T17:15:14",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI plans Project Camellia with 3.2GW Georgia power deal",
    "OpenAI announced Project Camellia in Effingham County, Georgia, with a 3.2GW Georgia Power contract phased from 2028 to 2032 and new promises on local ratepayer protection, jobs, water use, and community investment."
   ],
   "locality_evidence": [
    "OpenAI announced Project Camellia in Effingham County, Georgia, with a 3.2GW Georgia Power contract phased from 2028 to 2032 and new promises on local ratepayer protection, jobs, water use, and community investment.",
    "# OpenAI plans Project Camellia with 3.2GW Georgia power deal"
   ],
   "state_evidence": [
    "OpenAI announced Project Camellia in Effingham County, Georgia, with a 3.2GW Georgia Power contract phased from 2028 to 2032 and new promises on local ratepayer protection, jobs, water use, and community investment.",
    "# OpenAI plans Project Camellia with 3.2GW Georgia power deal"
   ],
   "capacity_gw_evidence": [
    "OpenAI announced Project Camellia in Effingham County, Georgia, with a 3.2GW Georgia Power contract phased from 2028 to 2032 and new promises on local ratepayer protection, jobs, water use, and community investment.",
    "# OpenAI plans Project Camellia with 3.2GW Georgia power deal"
   ],
   "builder_evidence": [
    "OpenAI announced Project Camellia in Effingham County, Georgia, with a 3.2GW Georgia Power contract phased from 2028 to 2032 and new promises on local ratepayer protection, jobs, water use, and community investment.",
    "# OpenAI plans Project Camellia with 3.2GW Georgia power deal"
   ],
   "ai_customer_evidence": [
    "OpenAI announced Project Camellia in Effingham County, Georgia, with a 3.2GW Georgia Power contract phased from 2028 to 2032 and new promises on local ratepayer protection, jobs, water use, and community investment.",
    "# OpenAI plans Project Camellia with 3.2GW Georgia power deal"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://bovinebear.com/terawulf-expands-ai-strategy-with-1gw-data-campus-and-3b-backing",
   "title": "Terawulf Expands AI Strategy With 1GW Data Campus and $3B Backing",
   "published_at": "2026-05-29T07:07:02",
   "project": "Muskie Data Campus",
   "locality": "northeastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "Terawulf Inc.",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": null,
   "project_evidence": [
    "# Terawulf Expands AI Strategy With 1GW Data Campus and $3B Backing",
    "The Nasdaq-listed company said it acquired the \u201cMuskie Data Campus\u201d from Industrial Equity Partners."
   ],
   "locality_evidence": [
    "# Terawulf Expands AI Strategy With 1GW Data Campus and $3B Backing",
    "The site sits inside the 1,000-acre Eastpark Industrial Park in northeastern Kentucky and includes about 285 acres of owned and controlled land."
   ],
   "state_evidence": [
    "# Terawulf Expands AI Strategy With 1GW Data Campus and $3B Backing",
    "The acquisition gives Terawulf a second major digital infrastructure campus in Kentucky."
   ],
   "capacity_gw_evidence": [
    "# Terawulf Expands AI Strategy With 1GW Data Campus and $3B Backing",
    "Terawulf said the campus is expected to support more than 1 gigawatt of AI and high-performance computing capacity."
   ],
   "builder_evidence": [
    "# Terawulf Expands AI Strategy With 1GW Data Campus and $3B Backing",
    "Terawulf Inc. is moving deeper into artificial intelligence (AI) infrastructure with the purchase of a large data center development site in eastern Kentucky, underscoring how former bitcoin mining firms are chasing demand for power-hungry computing capacity."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Terawulf Expands AI Strategy With 1GW Data Campus and $3B Backing",
    "The Nasdaq-listed company said it acquired the \u201cMuskie Data Campus\u201d from Industrial Equity Partners."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://dlvr.it/TSQWCr",
   "title": "Hut 8 signs 352MW data center lease in Texas with investment grade tenant",
   "published_at": "2026-05-06T14:24:32",
   "project": "Beacon Point",
   "locality": "Corpus Christi",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "in development",
   "announcement_date": null,
   "project_evidence": [
    "Cryptomine and HPC data center developer Hut 8 has signed a new hyperscale customer as a tenant in Texas.",
    "The company this week announced it has signed a 15-year, 352MW data center lease at its Beacon Point campus in Texas with an unnamed \u201chigh-investment-grade tenant.\u201d"
   ],
   "locality_evidence": [
    "Cryptomine and HPC data center developer Hut 8 has signed a new hyperscale customer as a tenant in Texas.",
    "The 525-acre campus is located near Corpus Christi, in East Texas\u2019 Nueces County."
   ],
   "state_evidence": [
    "Cryptomine and HPC data center developer Hut 8 has signed a new hyperscale customer as a tenant in Texas.",
    "The company this week announced it has signed a 15-year, 352MW data center lease at its Beacon Point campus in Texas with an unnamed \u201chigh-investment-grade tenant.\u201d"
   ],
   "capacity_gw_evidence": [
    "Cryptomine and HPC data center developer Hut 8 has signed a new hyperscale customer as a tenant in Texas.",
    "Hut 8 has executed an interconnection agreement for 1GW of utility capacity, with initial energization expected in Q1 2027."
   ],
   "builder_evidence": [
    "Cryptomine and HPC data center developer Hut 8 has signed a new hyperscale customer as a tenant in Texas.",
    "Consulting and advisory firm Jacobs and Vertiv are set to work with Hut 8 on the Beacon Point project\u2019s development."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Cryptomine and HPC data center developer Hut 8 has signed a new hyperscale customer as a tenant in Texas.",
    "Consulting and advisory firm Jacobs and Vertiv are set to work with Hut 8 on the Beacon Point project\u2019s development."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aitech365.com/news/ecl-unveils-first-1gw-off-grid-hydrogen-ai-data-center",
   "title": "ECL Unveils First 1GW Off-Grid Hydrogen AI Data Center",
   "published_at": "2024-09-26T13:09:36",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "planned",
   "announcement_date": "2024-06-20",
   "project_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "locality_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "state_evidence": [
    "ECL Terrasite-TX1 comes at a critical time for the state of Texas, with The Electric Reliability Council of Texas (ERCOT) testifying on June 12 this year that the state\u2019s power grid needs will grow approximately 2X by 2030 due in part to the growth of data centers and AI."
   ],
   "capacity_gw_evidence": [
    "The initial 1GW phased development may be expanded to 2GW in the future, enabled by its modularity and based on customer demand."
   ],
   "builder_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "ai_customer_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "status_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "announcement_date_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ]
  },
  {
   "url": "https://stocktitan.net/news/NVDA/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-oymda2jmch95.html",
   "title": "NVIDIA to Invest $1.5B in SB Energy, Secure Ohio AI Site",
   "published_at": "2026-08-17T12:33:00",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "locality_evidence": [
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "state_evidence": [
    "# NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "capacity_gw_evidence": [
    "The initial deployment is designed for **4.25 IT-GW** of AI factory capacity, with an option on the remaining **3.75 IT-GW** for a total of 8 IT-GW.",
    "Total AI factory capacity 8 IT-GW PORTS-Pike campus project"
   ],
   "builder_evidence": [
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute.",
    "SB Energy will build, own and operate the data center under a **20-year lease** to OpenAI, which will be the customer."
   ],
   "ai_customer_evidence": [
    "SB Energy will build, own and operate the data center under a **20-year lease** to OpenAI, which will be the customer."
   ],
   "status_evidence": [
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 (GLOBE NEWSWIRE) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "announcement_date_evidence": [
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 (GLOBE NEWSWIRE) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ]
  },
  {
   "url": "https://datacenterindex.ai/markets/texas",
   "title": "Texas Data Centers \u2014 Live Project Tracking",
   "published_at": null,
   "project": "OpenAI Stargate Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [OpenAI Stargate Abilene](https://datacenterindex.ai/projects/openai-stargate-abilene) \u2014 1.2 GW, Abilene \u00b7 operational \u00b7 developer: Oracle \u00b7 tenant: OpenAI \u00b7 ~$15.9B"
   ],
   "locality_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [OpenAI Stargate Abilene](https://datacenterindex.ai/projects/openai-stargate-abilene) \u2014 1.2 GW, Abilene \u00b7 operational \u00b7 developer: Oracle \u00b7 tenant: OpenAI \u00b7 ~$15.9B"
   ],
   "state_evidence": [
    "# Texas Data Centers",
    "Live tracking of every data center project in Texas \u2014 operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and supply-chain links."
   ],
   "capacity_gw_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [OpenAI Stargate Abilene](https://datacenterindex.ai/projects/openai-stargate-abilene) \u2014 1.2 GW, Abilene \u00b7 operational \u00b7 developer: Oracle \u00b7 tenant: OpenAI \u00b7 ~$15.9B"
   ],
   "builder_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [OpenAI Stargate Abilene](https://datacenterindex.ai/projects/openai-stargate-abilene) \u2014 1.2 GW, Abilene \u00b7 operational \u00b7 developer: Oracle \u00b7 tenant: OpenAI \u00b7 ~$15.9B"
   ],
   "ai_customer_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [OpenAI Stargate Abilene](https://datacenterindex.ai/projects/openai-stargate-abilene) \u2014 1.2 GW, Abilene \u00b7 operational \u00b7 developer: Oracle \u00b7 tenant: OpenAI \u00b7 ~$15.9B"
   ],
   "status_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [OpenAI Stargate Abilene](https://datacenterindex.ai/projects/openai-stargate-abilene) \u2014 1.2 GW, Abilene \u00b7 operational \u00b7 developer: Oracle \u00b7 tenant: OpenAI \u00b7 ~$15.9B"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/markets/texas",
   "title": "Texas Data Centers \u2014 Live Project Tracking",
   "published_at": null,
   "project": "El Paso DC",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [El Paso DC](https://datacenterindex.ai/projects/manual-6) \u2014 1.0 GW, El Paso \u00b7 operational \u00b7 developer: Meta \u00b7 ~$10.0B"
   ],
   "locality_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [El Paso DC](https://datacenterindex.ai/projects/manual-6) \u2014 1.0 GW, El Paso \u00b7 operational \u00b7 developer: Meta \u00b7 ~$10.0B"
   ],
   "state_evidence": [
    "# Texas Data Centers",
    "Live tracking of every data center project in Texas \u2014 operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and supply-chain links."
   ],
   "capacity_gw_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [El Paso DC](https://datacenterindex.ai/projects/manual-6) \u2014 1.0 GW, El Paso \u00b7 operational \u00b7 developer: Meta \u00b7 ~$10.0B"
   ],
   "builder_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [El Paso DC](https://datacenterindex.ai/projects/manual-6) \u2014 1.0 GW, El Paso \u00b7 operational \u00b7 developer: Meta \u00b7 ~$10.0B"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [El Paso DC](https://datacenterindex.ai/projects/manual-6) \u2014 1.0 GW, El Paso \u00b7 operational \u00b7 developer: Meta \u00b7 ~$10.0B"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/markets/texas",
   "title": "Texas Data Centers \u2014 Live Project Tracking",
   "published_at": null,
   "project": "OpenAI Stargate Shackelford",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [OpenAI Stargate Shackelford](https://datacenterindex.ai/projects/openai-stargate-shackelford) \u2014 2.0 GW, Abilene \u00b7 operational \u00b7 developer: Oracle \u00b7 tenant: OpenAI"
   ],
   "locality_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [OpenAI Stargate Shackelford](https://datacenterindex.ai/projects/openai-stargate-shackelford) \u2014 2.0 GW, Abilene \u00b7 operational \u00b7 developer: Oracle \u00b7 tenant: OpenAI"
   ],
   "state_evidence": [
    "# Texas Data Centers",
    "Live tracking of every data center project in Texas \u2014 operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and supply-chain links."
   ],
   "capacity_gw_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [OpenAI Stargate Shackelford](https://datacenterindex.ai/projects/openai-stargate-shackelford) \u2014 2.0 GW, Abilene \u00b7 operational \u00b7 developer: Oracle \u00b7 tenant: OpenAI"
   ],
   "builder_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [OpenAI Stargate Shackelford](https://datacenterindex.ai/projects/openai-stargate-shackelford) \u2014 2.0 GW, Abilene \u00b7 operational \u00b7 developer: Oracle \u00b7 tenant: OpenAI"
   ],
   "ai_customer_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [OpenAI Stargate Shackelford](https://datacenterindex.ai/projects/openai-stargate-shackelford) \u2014 2.0 GW, Abilene \u00b7 operational \u00b7 developer: Oracle \u00b7 tenant: OpenAI"
   ],
   "status_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [OpenAI Stargate Shackelford](https://datacenterindex.ai/projects/openai-stargate-shackelford) \u2014 2.0 GW, Abilene \u00b7 operational \u00b7 developer: Oracle \u00b7 tenant: OpenAI"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/markets/texas",
   "title": "Texas Data Centers \u2014 Live Project Tracking",
   "published_at": null,
   "project": "Goodnight",
   "locality": "Claude",
   "state": "Texas",
   "capacity_gw": 1.3,
   "builder": "Google",
   "ai_customer": "Google DeepMind",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Goodnight](https://datacenterindex.ai/projects/goodnight) \u2014 1.3 GW, Claude \u00b7 operational \u00b7 developer: Google \u00b7 tenant: Google DeepMind"
   ],
   "locality_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Goodnight](https://datacenterindex.ai/projects/goodnight) \u2014 1.3 GW, Claude \u00b7 operational \u00b7 developer: Google \u00b7 tenant: Google DeepMind"
   ],
   "state_evidence": [
    "# Texas Data Centers",
    "Live tracking of every data center project in Texas \u2014 operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and supply-chain links."
   ],
   "capacity_gw_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Goodnight](https://datacenterindex.ai/projects/goodnight) \u2014 1.3 GW, Claude \u00b7 operational \u00b7 developer: Google \u00b7 tenant: Google DeepMind"
   ],
   "builder_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Goodnight](https://datacenterindex.ai/projects/goodnight) \u2014 1.3 GW, Claude \u00b7 operational \u00b7 developer: Google \u00b7 tenant: Google DeepMind"
   ],
   "ai_customer_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Goodnight](https://datacenterindex.ai/projects/goodnight) \u2014 1.3 GW, Claude \u00b7 operational \u00b7 developer: Google \u00b7 tenant: Google DeepMind"
   ],
   "status_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Goodnight](https://datacenterindex.ai/projects/goodnight) \u2014 1.3 GW, Claude \u00b7 operational \u00b7 developer: Google \u00b7 tenant: Google DeepMind"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/markets/texas",
   "title": "Texas Data Centers \u2014 Live Project Tracking",
   "published_at": null,
   "project": "OpenAI Stargate Milam",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Softbank",
   "ai_customer": "OpenAI",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [OpenAI Stargate Milam](https://datacenterindex.ai/projects/openai-stargate-milam) \u2014 1.2 GW \u00b7 operational \u00b7 developer: Softbank \u00b7 tenant: OpenAI"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# Texas Data Centers",
    "Live tracking of every data center project in Texas \u2014 operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and supply-chain links."
   ],
   "capacity_gw_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [OpenAI Stargate Milam](https://datacenterindex.ai/projects/openai-stargate-milam) \u2014 1.2 GW \u00b7 operational \u00b7 developer: Softbank \u00b7 tenant: OpenAI"
   ],
   "builder_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [OpenAI Stargate Milam](https://datacenterindex.ai/projects/openai-stargate-milam) \u2014 1.2 GW \u00b7 operational \u00b7 developer: Softbank \u00b7 tenant: OpenAI"
   ],
   "ai_customer_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [OpenAI Stargate Milam](https://datacenterindex.ai/projects/openai-stargate-milam) \u2014 1.2 GW \u00b7 operational \u00b7 developer: Softbank \u00b7 tenant: OpenAI"
   ],
   "status_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [OpenAI Stargate Milam](https://datacenterindex.ai/projects/openai-stargate-milam) \u2014 1.2 GW \u00b7 operational \u00b7 developer: Softbank \u00b7 tenant: OpenAI"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/markets/texas",
   "title": "Texas Data Centers \u2014 Live Project Tracking",
   "published_at": null,
   "project": "Goodnight Campus",
   "locality": "Claude",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe",
   "ai_customer": "",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Goodnight Campus](https://datacenterindex.ai/projects/manual-3) \u2014 1.0 GW, Claude \u00b7 under construction \u00b7 developer: Crusoe \u00b7 ~$29.0B"
   ],
   "locality_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Goodnight Campus](https://datacenterindex.ai/projects/manual-3) \u2014 1.0 GW, Claude \u00b7 under construction \u00b7 developer: Crusoe \u00b7 ~$29.0B"
   ],
   "state_evidence": [
    "# Texas Data Centers",
    "Live tracking of every data center project in Texas \u2014 operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and supply-chain links."
   ],
   "capacity_gw_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Goodnight Campus](https://datacenterindex.ai/projects/manual-3) \u2014 1.0 GW, Claude \u00b7 under construction \u00b7 developer: Crusoe \u00b7 ~$29.0B"
   ],
   "builder_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Goodnight Campus](https://datacenterindex.ai/projects/manual-3) \u2014 1.0 GW, Claude \u00b7 under construction \u00b7 developer: Crusoe \u00b7 ~$29.0B"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Goodnight Campus](https://datacenterindex.ai/projects/manual-3) \u2014 1.0 GW, Claude \u00b7 under construction \u00b7 developer: Crusoe \u00b7 ~$29.0B"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/markets/texas",
   "title": "Texas Data Centers \u2014 Live Project Tracking",
   "published_at": null,
   "project": "Frontier Campus",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage",
   "ai_customer": "",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Frontier Campus](https://datacenterindex.ai/projects/manual-2) \u2014 1.4 GW \u00b7 under construction \u00b7 developer: Vantage \u00b7 ~$25.0B"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# Texas Data Centers",
    "Live tracking of every data center project in Texas \u2014 operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and supply-chain links."
   ],
   "capacity_gw_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Frontier Campus](https://datacenterindex.ai/projects/manual-2) \u2014 1.4 GW \u00b7 under construction \u00b7 developer: Vantage \u00b7 ~$25.0B"
   ],
   "builder_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Frontier Campus](https://datacenterindex.ai/projects/manual-2) \u2014 1.4 GW \u00b7 under construction \u00b7 developer: Vantage \u00b7 ~$25.0B"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Frontier Campus](https://datacenterindex.ai/projects/manual-2) \u2014 1.4 GW \u00b7 under construction \u00b7 developer: Vantage \u00b7 ~$25.0B"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/markets/texas",
   "title": "Texas Data Centers \u2014 Live Project Tracking",
   "published_at": null,
   "project": "Nexus Hubbard Campus",
   "locality": "Hubbard",
   "state": "Texas",
   "capacity_gw": 7.2,
   "builder": "Nexus",
   "ai_customer": "",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Nexus Hubbard Campus](https://datacenterindex.ai/projects/manual-12) \u2014 7.2 GW, Hubbard \u00b7 under construction \u00b7 developer: Nexus"
   ],
   "locality_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Nexus Hubbard Campus](https://datacenterindex.ai/projects/manual-12) \u2014 7.2 GW, Hubbard \u00b7 under construction \u00b7 developer: Nexus"
   ],
   "state_evidence": [
    "# Texas Data Centers",
    "Live tracking of every data center project in Texas \u2014 operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and supply-chain links."
   ],
   "capacity_gw_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Nexus Hubbard Campus](https://datacenterindex.ai/projects/manual-12) \u2014 7.2 GW, Hubbard \u00b7 under construction \u00b7 developer: Nexus"
   ],
   "builder_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Nexus Hubbard Campus](https://datacenterindex.ai/projects/manual-12) \u2014 7.2 GW, Hubbard \u00b7 under construction \u00b7 developer: Nexus"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Nexus Hubbard Campus](https://datacenterindex.ai/projects/manual-12) \u2014 7.2 GW, Hubbard \u00b7 under construction \u00b7 developer: Nexus"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/markets/texas",
   "title": "Texas Data Centers \u2014 Live Project Tracking",
   "published_at": null,
   "project": "Stargate I",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe",
   "ai_customer": "OpenAI",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Stargate I](https://datacenterindex.ai/projects/manual-1) \u2014 1.2 GW, Abilene \u00b7 under construction \u00b7 developer: Crusoe \u00b7 tenant: OpenAI"
   ],
   "locality_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Stargate I](https://datacenterindex.ai/projects/manual-1) \u2014 1.2 GW, Abilene \u00b7 under construction \u00b7 developer: Crusoe \u00b7 tenant: OpenAI"
   ],
   "state_evidence": [
    "# Texas Data Centers",
    "Live tracking of every data center project in Texas \u2014 operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and supply-chain links."
   ],
   "capacity_gw_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Stargate I](https://datacenterindex.ai/projects/manual-1) \u2014 1.2 GW, Abilene \u00b7 under construction \u00b7 developer: Crusoe \u00b7 tenant: OpenAI"
   ],
   "builder_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Stargate I](https://datacenterindex.ai/projects/manual-1) \u2014 1.2 GW, Abilene \u00b7 under construction \u00b7 developer: Crusoe \u00b7 tenant: OpenAI"
   ],
   "ai_customer_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Stargate I](https://datacenterindex.ai/projects/manual-1) \u2014 1.2 GW, Abilene \u00b7 under construction \u00b7 developer: Crusoe \u00b7 tenant: OpenAI"
   ],
   "status_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Stargate I](https://datacenterindex.ai/projects/manual-1) \u2014 1.2 GW, Abilene \u00b7 under construction \u00b7 developer: Crusoe \u00b7 tenant: OpenAI"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/markets/texas",
   "title": "Texas Data Centers \u2014 Live Project Tracking",
   "published_at": null,
   "project": "Vistra's Comanche Peak Nuclear Data Center Campus",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Amazon Web Services",
   "ai_customer": "",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Vistra's Comanche Peak Nuclear Data Center Campus](https://datacenterindex.ai/projects/vistra-comanche-peak-nuclear-power-plant-expansion) \u2014 1.2 GW \u00b7 announced \u00b7 developer: Amazon Web Services"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# Texas Data Centers",
    "Live tracking of every data center project in Texas \u2014 operational, under construction, announced, and permitted \u2014 with developer, tenant, capacity, and supply-chain links."
   ],
   "capacity_gw_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Vistra's Comanche Peak Nuclear Data Center Campus](https://datacenterindex.ai/projects/vistra-comanche-peak-nuclear-power-plant-expansion) \u2014 1.2 GW \u00b7 announced \u00b7 developer: Amazon Web Services"
   ],
   "builder_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Vistra's Comanche Peak Nuclear Data Center Campus](https://datacenterindex.ai/projects/vistra-comanche-peak-nuclear-power-plant-expansion) \u2014 1.2 GW \u00b7 announced \u00b7 developer: Amazon Web Services"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Texas Data Centers",
    "## Tracked data center projects in Texas",
    "- [Vistra's Comanche Peak Nuclear Data Center Campus](https://datacenterindex.ai/projects/vistra-comanche-peak-nuclear-power-plant-expansion) \u2014 1.2 GW \u00b7 announced \u00b7 developer: Amazon Web Services"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://abc3340.com/news/nation-world/gallery/data-center-boom-targets-texas-most-productive-farmland-fueling-power-clashes-resources-industry-governor-abbott?photo=1",
   "title": "Data center boom targets Texas\u2019 most productive farmland, fueling power clashes",
   "published_at": "2026-08-20T00:47:05",
   "project": "Meta El Paso Data Center",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta Platforms",
   "ai_customer": "Meta",
   "status": "construction",
   "announcement_date": null,
   "project_evidence": [
    "# Data center boom targets Texas\u2019 most productive farmland, fueling power clashes",
    "EL PASO, TEXAS - AUGUST 13: In an aerial view, the Meta El Paso Data Center is seen on August 13, 2026 in El Paso, Texas.",
    "Meta Platforms continues construction on its more than $10 billion Meta El Paso Data Center in Northeast El Paso, Texas."
   ],
   "locality_evidence": [
    "# Data center boom targets Texas\u2019 most productive farmland, fueling power clashes",
    "EL PASO, TEXAS - AUGUST 13: In an aerial view, the Meta El Paso Data Center is seen on August 13, 2026 in El Paso, Texas.",
    "Meta Platforms continues construction on its more than $10 billion Meta El Paso Data Center in Northeast El Paso, Texas."
   ],
   "state_evidence": [
    "# Data center boom targets Texas\u2019 most productive farmland, fueling power clashes",
    "EL PASO, TEXAS - AUGUST 13: In an aerial view, the Meta El Paso Data Center is seen on August 13, 2026 in El Paso, Texas.",
    "Meta Platforms continues construction on its more than $10 billion Meta El Paso Data Center in Northeast El Paso, Texas."
   ],
   "capacity_gw_evidence": [
    "# Data center boom targets Texas\u2019 most productive farmland, fueling power clashes",
    "Occupying approximately 1,000 acres, Meta has expanded the project to 1 gigawatt of computing capacity, allowing the facility to support a growing range of AI workloads and the training and deployment of increasingly sophisticated AI models and technologies."
   ],
   "builder_evidence": [
    "# Data center boom targets Texas\u2019 most productive farmland, fueling power clashes",
    "Meta Platforms continues construction on its more than $10 billion Meta El Paso Data Center in Northeast El Paso, Texas."
   ],
   "ai_customer_evidence": [
    "# Data center boom targets Texas\u2019 most productive farmland, fueling power clashes",
    "Occupying approximately 1,000 acres, Meta has expanded the project to 1 gigawatt of computing capacity, allowing the facility to support a growing range of AI workloads and the training and deployment of increasingly sophisticated AI models and technologies."
   ],
   "status_evidence": [
    "# Data center boom targets Texas\u2019 most productive farmland, fueling power clashes",
    "Meta Platforms continues construction on its more than $10 billion Meta El Paso Data Center in Northeast El Paso, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://dcpulse.com/projects/companyprofiles/amazon-web-services-data-center-projects",
   "title": "AWS Data Center Projects data center projects",
   "published_at": null,
   "project": "Amazon Project Star: $11B Indiana Hyperscale AI Campus",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Amazon Web Services",
   "ai_customer": null,
   "status": "Under Construction / Rapid Structural Build (May 2026)",
   "announcement_date": null,
   "project_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Amazon Project Star: $11B Indiana Hyperscale AI Campus | New Carlisle, Indiana | Late 2026 | Under Construction / Rapid Structural Build (May 2026) | 1,000.0 MW (1.0 GW) | [**](https://dcpulse.com/project/amazon-project-star-indiana-1gw-campus) |"
   ],
   "locality_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Amazon Project Star: $11B Indiana Hyperscale AI Campus | New Carlisle, Indiana | Late 2026 | Under Construction / Rapid Structural Build (May 2026) | 1,000.0 MW (1.0 GW) | [**](https://dcpulse.com/project/amazon-project-star-indiana-1gw-campus) |"
   ],
   "state_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Amazon Project Star: $11B Indiana Hyperscale AI Campus | New Carlisle, Indiana | Late 2026 | Under Construction / Rapid Structural Build (May 2026) | 1,000.0 MW (1.0 GW) | [**](https://dcpulse.com/project/amazon-project-star-indiana-1gw-campus) |"
   ],
   "capacity_gw_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Amazon Project Star: $11B Indiana Hyperscale AI Campus | New Carlisle, Indiana | Late 2026 | Under Construction / Rapid Structural Build (May 2026) | 1,000.0 MW (1.0 GW) | [**](https://dcpulse.com/project/amazon-project-star-indiana-1gw-campus) |"
   ],
   "builder_evidence": [
    "# Amazon Web Services",
    "Amazon Web Services develops global hyperscale data center projects delivering scalable, secure, and AI-ready cloud infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Amazon Project Star: $11B Indiana Hyperscale AI Campus | New Carlisle, Indiana | Late 2026 | Under Construction / Rapid Structural Build (May 2026) | 1,000.0 MW (1.0 GW) | [**](https://dcpulse.com/project/amazon-project-star-indiana-1gw-campus) |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://dcpulse.com/projects/companyprofiles/amazon-web-services-data-center-projects",
   "title": "AWS Data Center Projects data center projects",
   "published_at": null,
   "project": "AWS Walla Walla: 5.0 GW Sustainable AI Cluster (Project Basalt)",
   "locality": "Walla Walla County",
   "state": null,
   "capacity_gw": 5.0,
   "builder": "Amazon Web Services",
   "ai_customer": null,
   "status": "Phased Construction / Giga-Scale Power Integration (April 2026)",
   "announcement_date": null,
   "project_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Walla Walla: 5.0 GW Sustainable AI Cluster (Project Basalt) | Multi-site campus across Wallula Gap and Walla Walla County | AWS Walla Walla | Phased Construction / Giga-Scale Power Integration (April 2026) | 5,000.0 MW (5.0 GW) | [**](https://dcpulse.com/project/aws-walla-walla-5gw-ai-giga-cluster) |"
   ],
   "locality_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Walla Walla: 5.0 GW Sustainable AI Cluster (Project Basalt) | Multi-site campus across Wallula Gap and Walla Walla County | AWS Walla Walla | Phased Construction / Giga-Scale Power Integration (April 2026) | 5,000.0 MW (5.0 GW) | [**](https://dcpulse.com/project/aws-walla-walla-5gw-ai-giga-cluster) |"
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Walla Walla: 5.0 GW Sustainable AI Cluster (Project Basalt) | Multi-site campus across Wallula Gap and Walla Walla County | AWS Walla Walla | Phased Construction / Giga-Scale Power Integration (April 2026) | 5,000.0 MW (5.0 GW) | [**](https://dcpulse.com/project/aws-walla-walla-5gw-ai-giga-cluster) |"
   ],
   "builder_evidence": [
    "# Amazon Web Services",
    "Amazon Web Services develops global hyperscale data center projects delivering scalable, secure, and AI-ready cloud infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Walla Walla: 5.0 GW Sustainable AI Cluster (Project Basalt) | Multi-site campus across Wallula Gap and Walla Walla County | AWS Walla Walla | Phased Construction / Giga-Scale Power Integration (April 2026) | 5,000.0 MW (5.0 GW) | [**](https://dcpulse.com/project/aws-walla-walla-5gw-ai-giga-cluster) |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://dcpulse.com/projects/companyprofiles/amazon-web-services-data-center-projects",
   "title": "AWS Data Center Projects data center projects",
   "published_at": null,
   "project": "AWS Project Starbound Mississippi: $13B 1GW+ AI Cluster",
   "locality": "Madison County",
   "state": "Mississippi",
   "capacity_gw": 1.0,
   "builder": "Amazon Web Services",
   "ai_customer": null,
   "status": "Under Construction / Initial Power-Up (March 2026)",
   "announcement_date": null,
   "project_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Project Starbound Mississippi: $13B 1GW+ AI Cluster | Madison County (Canton/Ridgeland) & Vicksburg | March 2026 (Operational) | Under Construction / Initial Power-Up (March 2026) | 1,000 MW (Total Campus Goal) | [**](https://dcpulse.com/project/aws-project-starbound-mississippi-13-billion-ai-data-center) |"
   ],
   "locality_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Project Starbound Mississippi: $13B 1GW+ AI Cluster | Madison County (Canton/Ridgeland) & Vicksburg | March 2026 (Operational) | Under Construction / Initial Power-Up (March 2026) | 1,000 MW (Total Campus Goal) | [**](https://dcpulse.com/project/aws-project-starbound-mississippi-13-billion-ai-data-center) |"
   ],
   "state_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Project Starbound Mississippi: $13B 1GW+ AI Cluster | Madison County (Canton/Ridgeland) & Vicksburg | March 2026 (Operational) | Under Construction / Initial Power-Up (March 2026) | 1,000 MW (Total Campus Goal) | [**](https://dcpulse.com/project/aws-project-starbound-mississippi-13-billion-ai-data-center) |"
   ],
   "capacity_gw_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Project Starbound Mississippi: $13B 1GW+ AI Cluster | Madison County (Canton/Ridgeland) & Vicksburg | March 2026 (Operational) | Under Construction / Initial Power-Up (March 2026) | 1,000 MW (Total Campus Goal) | [**](https://dcpulse.com/project/aws-project-starbound-mississippi-13-billion-ai-data-center) |"
   ],
   "builder_evidence": [
    "# Amazon Web Services",
    "Amazon Web Services develops global hyperscale data center projects delivering scalable, secure, and AI-ready cloud infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Project Starbound Mississippi: $13B 1GW+ AI Cluster | Madison County (Canton/Ridgeland) & Vicksburg | March 2026 (Operational) | Under Construction / Initial Power-Up (March 2026) | 1,000 MW (Total Campus Goal) | [**](https://dcpulse.com/project/aws-project-starbound-mississippi-13-billion-ai-data-center) |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://dcpulse.com/projects/companyprofiles/amazon-web-services-data-center-projects",
   "title": "AWS Data Center Projects data center projects",
   "published_at": null,
   "project": "AWS Project White River: $15B 2.4GW NIPSCO AI Expansion",
   "locality": "Northwest Indiana",
   "state": "Indiana",
   "capacity_gw": 2.4,
   "builder": "Amazon Web Services",
   "ai_customer": null,
   "status": "Planned / Strategic Mobilization (March 2026)",
   "announcement_date": null,
   "project_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Project White River: $15B 2.4GW NIPSCO AI Expansion | Northwest Indiana / NIPSCO Service Territory | End of 2032 | Planned / Strategic Mobilization (March 2026) | 2,400 MW (2.4 GW) | [**](https://dcpulse.com/project/aws-project-white-river-northern-indiana-2-4-gigawatt-ai-expansion) |"
   ],
   "locality_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Project White River: $15B 2.4GW NIPSCO AI Expansion | Northwest Indiana / NIPSCO Service Territory | End of 2032 | Planned / Strategic Mobilization (March 2026) | 2,400 MW (2.4 GW) | [**](https://dcpulse.com/project/aws-project-white-river-northern-indiana-2-4-gigawatt-ai-expansion) |"
   ],
   "state_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Project White River: $15B 2.4GW NIPSCO AI Expansion | Northwest Indiana / NIPSCO Service Territory | End of 2032 | Planned / Strategic Mobilization (March 2026) | 2,400 MW (2.4 GW) | [**](https://dcpulse.com/project/aws-project-white-river-northern-indiana-2-4-gigawatt-ai-expansion) |"
   ],
   "capacity_gw_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Project White River: $15B 2.4GW NIPSCO AI Expansion | Northwest Indiana / NIPSCO Service Territory | End of 2032 | Planned / Strategic Mobilization (March 2026) | 2,400 MW (2.4 GW) | [**](https://dcpulse.com/project/aws-project-white-river-northern-indiana-2-4-gigawatt-ai-expansion) |"
   ],
   "builder_evidence": [
    "# Amazon Web Services",
    "Amazon Web Services develops global hyperscale data center projects delivering scalable, secure, and AI-ready cloud infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Project White River: $15B 2.4GW NIPSCO AI Expansion | Northwest Indiana / NIPSCO Service Territory | End of 2032 | Planned / Strategic Mobilization (March 2026) | 2,400 MW (2.4 GW) | [**](https://dcpulse.com/project/aws-project-white-river-northern-indiana-2-4-gigawatt-ai-expansion) |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://dcpulse.com/projects/companyprofiles/amazon-web-services-data-center-projects",
   "title": "AWS Data Center Projects data center projects",
   "published_at": null,
   "project": "AWS Mattermeade Pennsylvania: $20B 1.9GW Nuclear AI Data Center",
   "locality": "Salem Township",
   "state": "Pennsylvania",
   "capacity_gw": 1.92,
   "builder": "Amazon Web Services",
   "ai_customer": null,
   "status": "Permitting / Site Preparation (March 2026)",
   "announcement_date": null,
   "project_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Mattermeade Pennsylvania: $20B 1.9GW Nuclear AI Data Center | Salem Township (Luzerne) & Falls Township (Bucks), PA | 2030 | Permitting / Site Preparation (March 2026) | 1,920 MW (1.92 GW) | [**](https://dcpulse.com/project/aws-project-mattermeade-pennsylvania-nuclear-ai-data-center) |"
   ],
   "locality_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Mattermeade Pennsylvania: $20B 1.9GW Nuclear AI Data Center | Salem Township (Luzerne) & Falls Township (Bucks), PA | 2030 | Permitting / Site Preparation (March 2026) | 1,920 MW (1.92 GW) | [**](https://dcpulse.com/project/aws-project-mattermeade-pennsylvania-nuclear-ai-data-center) |"
   ],
   "state_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Mattermeade Pennsylvania: $20B 1.9GW Nuclear AI Data Center | Salem Township (Luzerne) & Falls Township (Bucks), PA | 2030 | Permitting / Site Preparation (March 2026) | 1,920 MW (1.92 GW) | [**](https://dcpulse.com/project/aws-project-mattermeade-pennsylvania-nuclear-ai-data-center) |"
   ],
   "capacity_gw_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Mattermeade Pennsylvania: $20B 1.9GW Nuclear AI Data Center | Salem Township (Luzerne) & Falls Township (Bucks), PA | 2030 | Permitting / Site Preparation (March 2026) | 1,920 MW (1.92 GW) | [**](https://dcpulse.com/project/aws-project-mattermeade-pennsylvania-nuclear-ai-data-center) |"
   ],
   "builder_evidence": [
    "# Amazon Web Services",
    "Amazon Web Services develops global hyperscale data center projects delivering scalable, secure, and AI-ready cloud infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Mattermeade Pennsylvania: $20B 1.9GW Nuclear AI Data Center | Salem Township (Luzerne) & Falls Township (Bucks), PA | 2030 | Permitting / Site Preparation (March 2026) | 1,920 MW (1.92 GW) | [**](https://dcpulse.com/project/aws-project-mattermeade-pennsylvania-nuclear-ai-data-center) |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://dcpulse.com/projects/companyprofiles/amazon-web-services-data-center-projects",
   "title": "AWS Data Center Projects data center projects",
   "published_at": null,
   "project": "Amazon Northwest Louisiana AI Data Center Campus (1.2 GW)",
   "locality": "Shreveport",
   "state": "Louisiana",
   "capacity_gw": 1.2,
   "builder": "Amazon Web Services",
   "ai_customer": null,
   "status": "Announced / Site Preparation",
   "announcement_date": null,
   "project_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Amazon Northwest Louisiana AI Data Center Campus (1.2 GW) | Shreveport / Bossier City | 2030 | Announced / Site Preparation | 1.2 GW Total Site Load | [**](https://dcpulse.com/project/amazon-northwest-louisiana-2-gw-ai-data-center) |"
   ],
   "locality_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Amazon Northwest Louisiana AI Data Center Campus (1.2 GW) | Shreveport / Bossier City | 2030 | Announced / Site Preparation | 1.2 GW Total Site Load | [**](https://dcpulse.com/project/amazon-northwest-louisiana-2-gw-ai-data-center) |"
   ],
   "state_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Amazon Northwest Louisiana AI Data Center Campus (1.2 GW) | Shreveport / Bossier City | 2030 | Announced / Site Preparation | 1.2 GW Total Site Load | [**](https://dcpulse.com/project/amazon-northwest-louisiana-2-gw-ai-data-center) |"
   ],
   "capacity_gw_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Amazon Northwest Louisiana AI Data Center Campus (1.2 GW) | Shreveport / Bossier City | 2030 | Announced / Site Preparation | 1.2 GW Total Site Load | [**](https://dcpulse.com/project/amazon-northwest-louisiana-2-gw-ai-data-center) |"
   ],
   "builder_evidence": [
    "# Amazon Web Services",
    "Amazon Web Services develops global hyperscale data center projects delivering scalable, secure, and AI-ready cloud infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| Amazon Northwest Louisiana AI Data Center Campus (1.2 GW) | Shreveport / Bossier City | 2030 | Announced / Site Preparation | 1.2 GW Total Site Load | [**](https://dcpulse.com/project/amazon-northwest-louisiana-2-gw-ai-data-center) |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://dcpulse.com/projects/companyprofiles/amazon-web-services-data-center-projects",
   "title": "AWS Data Center Projects data center projects",
   "published_at": null,
   "project": "AWS Madison County: 1GW $10B AI Data Center Campus MS",
   "locality": "Madison County",
   "state": "Mississippi",
   "capacity_gw": 1.0,
   "builder": "Amazon Web Services",
   "ai_customer": null,
   "status": "Under Construction / Phase 1 Commissioning",
   "announcement_date": null,
   "project_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Madison County: 1GW $10B AI Data Center Campus MS | Madison County Mega Site & Ridgeland | 2027 | Under Construction / Phase 1 Commissioning | 1,000 MW (1 GW) Combined Portfolio | [**](https://dcpulse.com/project/aws-madison-county-1gw-mississippi-ai-data-center) |"
   ],
   "locality_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Madison County: 1GW $10B AI Data Center Campus MS | Madison County Mega Site & Ridgeland | 2027 | Under Construction / Phase 1 Commissioning | 1,000 MW (1 GW) Combined Portfolio | [**](https://dcpulse.com/project/aws-madison-county-1gw-mississippi-ai-data-center) |"
   ],
   "state_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Madison County: 1GW $10B AI Data Center Campus MS | Madison County Mega Site & Ridgeland | 2027 | Under Construction / Phase 1 Commissioning | 1,000 MW (1 GW) Combined Portfolio | [**](https://dcpulse.com/project/aws-madison-county-1gw-mississippi-ai-data-center) |"
   ],
   "capacity_gw_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Madison County: 1GW $10B AI Data Center Campus MS | Madison County Mega Site & Ridgeland | 2027 | Under Construction / Phase 1 Commissioning | 1,000 MW (1 GW) Combined Portfolio | [**](https://dcpulse.com/project/aws-madison-county-1gw-mississippi-ai-data-center) |"
   ],
   "builder_evidence": [
    "# Amazon Web Services",
    "Amazon Web Services develops global hyperscale data center projects delivering scalable, secure, and AI-ready cloud infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Madison County: 1GW $10B AI Data Center Campus MS | Madison County Mega Site & Ridgeland | 2027 | Under Construction / Phase 1 Commissioning | 1,000 MW (1 GW) Combined Portfolio | [**](https://dcpulse.com/project/aws-madison-county-1gw-mississippi-ai-data-center) |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://dcpulse.com/projects/companyprofiles/amazon-web-services-data-center-projects",
   "title": "AWS Data Center Projects data center projects",
   "published_at": null,
   "project": "AWS Project Rainier: $11B 2.2GW Anthropic AI Cluster Indiana",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.25,
   "builder": "Amazon Web Services",
   "ai_customer": "Anthropic",
   "status": "Operational (Phase 1 Live Oct 2025; Phase 2 Construction 2026)",
   "announcement_date": null,
   "project_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Project Rainier: $11B 2.2GW Anthropic AI Cluster Indiana | New Carlisle indiana | 2030 | Operational (Phase 1 Live Oct 2025; Phase 2 Construction 2026) | 2,250 MW (2.25 GW) | [**](https://dcpulse.com/project/aws-project-rainier-indiana-11-billion-ai-supercluster) |"
   ],
   "locality_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Project Rainier: $11B 2.2GW Anthropic AI Cluster Indiana | New Carlisle indiana | 2030 | Operational (Phase 1 Live Oct 2025; Phase 2 Construction 2026) | 2,250 MW (2.25 GW) | [**](https://dcpulse.com/project/aws-project-rainier-indiana-11-billion-ai-supercluster) |"
   ],
   "state_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Project Rainier: $11B 2.2GW Anthropic AI Cluster Indiana | New Carlisle indiana | 2030 | Operational (Phase 1 Live Oct 2025; Phase 2 Construction 2026) | 2,250 MW (2.25 GW) | [**](https://dcpulse.com/project/aws-project-rainier-indiana-11-billion-ai-supercluster) |"
   ],
   "capacity_gw_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Project Rainier: $11B 2.2GW Anthropic AI Cluster Indiana | New Carlisle indiana | 2030 | Operational (Phase 1 Live Oct 2025; Phase 2 Construction 2026) | 2,250 MW (2.25 GW) | [**](https://dcpulse.com/project/aws-project-rainier-indiana-11-billion-ai-supercluster) |"
   ],
   "builder_evidence": [
    "# Amazon Web Services",
    "Amazon Web Services develops global hyperscale data center projects delivering scalable, secure, and AI-ready cloud infrastructure."
   ],
   "ai_customer_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Project Rainier: $11B 2.2GW Anthropic AI Cluster Indiana | New Carlisle indiana | 2030 | Operational (Phase 1 Live Oct 2025; Phase 2 Construction 2026) | 2,250 MW (2.25 GW) | [**](https://dcpulse.com/project/aws-project-rainier-indiana-11-billion-ai-supercluster) |"
   ],
   "status_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Project Rainier: $11B 2.2GW Anthropic AI Cluster Indiana | New Carlisle indiana | 2030 | Operational (Phase 1 Live Oct 2025; Phase 2 Construction 2026) | 2,250 MW (2.25 GW) | [**](https://dcpulse.com/project/aws-project-rainier-indiana-11-billion-ai-supercluster) |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://dcpulse.com/projects/companyprofiles/amazon-web-services-data-center-projects",
   "title": "AWS Data Center Projects data center projects",
   "published_at": null,
   "project": "AWS Oregon: $12B 1GW Exascale AI Data Center Morrow County",
   "locality": "Boardman",
   "state": "Oregon",
   "capacity_gw": 1.0,
   "builder": "Amazon Web Services",
   "ai_customer": null,
   "status": "Under Construction (March 2026)",
   "announcement_date": null,
   "project_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Oregon: $12B 1GW Exascale AI Data Center Morrow County | Boardman / Umatilla (Morrow County), Oregon | 2032 (Pending Nuclear Timeline) | Under Construction (March 2026) | 1.0 GW | [**](https://dcpulse.com/project/aws-morrow-county-exascale-oregon-12-billion-ai-campus) |"
   ],
   "locality_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Oregon: $12B 1GW Exascale AI Data Center Morrow County | Boardman / Umatilla (Morrow County), Oregon | 2032 (Pending Nuclear Timeline) | Under Construction (March 2026) | 1.0 GW | [**](https://dcpulse.com/project/aws-morrow-county-exascale-oregon-12-billion-ai-campus) |"
   ],
   "state_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Oregon: $12B 1GW Exascale AI Data Center Morrow County | Boardman / Umatilla (Morrow County), Oregon | 2032 (Pending Nuclear Timeline) | Under Construction (March 2026) | 1.0 GW | [**](https://dcpulse.com/project/aws-morrow-county-exascale-oregon-12-billion-ai-campus) |"
   ],
   "capacity_gw_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Oregon: $12B 1GW Exascale AI Data Center Morrow County | Boardman / Umatilla (Morrow County), Oregon | 2032 (Pending Nuclear Timeline) | Under Construction (March 2026) | 1.0 GW | [**](https://dcpulse.com/project/aws-morrow-county-exascale-oregon-12-billion-ai-campus) |"
   ],
   "builder_evidence": [
    "# Amazon Web Services",
    "Amazon Web Services develops global hyperscale data center projects delivering scalable, secure, and AI-ready cloud infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Amazon Web Services",
    "## Data Center Projects Locations on Map",
    "| Project Name | Location | Full Builtout | Project Status | Power Capacity | Action |",
    "| AWS Oregon: $12B 1GW Exascale AI Data Center Morrow County | Boardman / Umatilla (Morrow County), Oregon | 2032 (Pending Nuclear Timeline) | Under Construction (March 2026) | 1.0 GW | [**](https://dcpulse.com/project/aws-morrow-county-exascale-oregon-12-billion-ai-campus) |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://fool.com/investing/2026/08/29/chevron-microsoft-data-center-deal-big-earning?referring_guid=3ddacd17-6fde-4f88-99bb-39878102311a",
   "title": "Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
   "published_at": "2026-08-29T14:45:00",
   "project": "Project Kilby",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.67,
   "builder": "Energy Forge One",
   "ai_customer": "Microsoft",
   "status": "planned",
   "announcement_date": "2026-06-22",
   "project_evidence": [
    "The agreement is [part of Project Kilby](https://www.fool.com/investing/2026/06/22/chevron-is-building-a-massive-power-plant-to-support-a-microsoft-data-center-heres-what-it-means-for-the-energy-stock/), in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power.",
    "## Breaking down Chevron's data center deal with Microsoft"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "However, even bigger news is that Chevron has entered into a 20-year power purchase agreement (PPA) to build a natural gas-powered facility to power **Microsoft**'s ([MSFT](/quote/nasdaq/msft/) +1.68%) artificial intelligence (AI)-focused data center in Texas.",
    "**Chevron** ([CVX](/quote/nyse/cvx/) +1.05%) posted [stellar second-quarter results](https://www.fool.com/investing/2026/08/01/chevron-just-crushed-earnings-heres-what-it-means/) at the end of July, beating the street's estimates thanks to higher oil prices, increased production volumes, and strong margins."
   ],
   "capacity_gw_evidence": [
    "The agreement is [part of Project Kilby](https://www.fool.com/investing/2026/06/22/chevron-is-building-a-massive-power-plant-to-support-a-microsoft-data-center-heres-what-it-means-for-the-energy-stock/), in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power.",
    "## Breaking down Chevron's data center deal with Microsoft"
   ],
   "builder_evidence": [
    "The agreement is [part of Project Kilby](https://www.fool.com/investing/2026/06/22/chevron-is-building-a-massive-power-plant-to-support-a-microsoft-data-center-heres-what-it-means-for-the-energy-stock/), in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power.",
    "## Breaking down Chevron's data center deal with Microsoft"
   ],
   "ai_customer_evidence": [
    "However, even bigger news is that Chevron has entered into a 20-year power purchase agreement (PPA) to build a natural gas-powered facility to power **Microsoft**'s ([MSFT](/quote/nasdaq/msft/) +1.68%) artificial intelligence (AI)-focused data center in Texas.",
    "**Chevron** ([CVX](/quote/nyse/cvx/) +1.05%) posted [stellar second-quarter results](https://www.fool.com/investing/2026/08/01/chevron-just-crushed-earnings-heres-what-it-means/) at the end of July, beating the street's estimates thanks to higher oil prices, increased production volumes, and strong margins."
   ],
   "status_evidence": [
    "As part of this project, most of the power will come from **GE Vernova**'s gas-powered turbines and related infrastructure.",
    "## Breaking down Chevron's data center deal with Microsoft"
   ],
   "announcement_date_evidence": [
    "On June 22, Chevron inked a 20-year take-or-pay power purchase agreement with Microsoft to provide electricity for a Microsoft-operated data center.",
    "## Breaking down Chevron's data center deal with Microsoft"
   ]
  },
  {
   "url": "https://businessupturn.com/usa/business/tech/anthropic-agrees-to-45-billion-ai-computing-deal-with-nscale-in-west-virginia",
   "title": "Anthropic agrees to $45 billion AI computing deal with Nscale in West Virginia",
   "published_at": "2026-08-26T18:02:33",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "developing",
   "announcement_date": null,
   "project_evidence": [
    "# Anthropic agrees to $45 billion AI computing deal with Nscale in West Virginia",
    "Nscale's West Virginia project, known as the **Monarch Compute Campus**, is being developed as a large-scale AI data-center and power facility."
   ],
   "locality_evidence": [
    "# Anthropic agrees to $45 billion AI computing deal with Nscale in West Virginia",
    "Nscale said earlier this year that the campus has a potential power runway exceeding 8 gigawatts and covers thousands of acres in Mason County."
   ],
   "state_evidence": [
    "# Anthropic agrees to $45 billion AI computing deal with Nscale in West Virginia",
    "Nscale's West Virginia project, known as the **Monarch Compute Campus**, is being developed as a large-scale AI data-center and power facility."
   ],
   "capacity_gw_evidence": [
    "# Anthropic agrees to $45 billion AI computing deal with Nscale in West Virginia",
    "Nscale said earlier this year that the campus has a potential power runway exceeding 8 gigawatts and covers thousands of acres in Mason County."
   ],
   "builder_evidence": [
    "# Anthropic agrees to $45 billion AI computing deal with Nscale in West Virginia",
    "Nscale's West Virginia project, known as the **Monarch Compute Campus**, is being developed as a large-scale AI data-center and power facility."
   ],
   "ai_customer_evidence": [
    "# Anthropic agrees to $45 billion AI computing deal with Nscale in West Virginia",
    "The company previously announced a letter of intent with Microsoft to provide up to **1.35 gigawatts** of AI computing capacity at the same campus using Nvidia Vera Rubin NVL72 systems."
   ],
   "status_evidence": [
    "# Anthropic agrees to $45 billion AI computing deal with Nscale in West Virginia",
    "Nscale's West Virginia project, known as the **Monarch Compute Campus**, is being developed as a large-scale AI data-center and power facility."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://construction.einnews.com/article/920482577?lcf=ZUXUGffzajWYFc-Fy1kymA%3D%3D",
   "title": "Google data center in Van Buren Township would destroy 13 acres of wetlands",
   "published_at": "2026-06-18T12:30:19",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co",
   "ai_customer": "Google",
   "status": "proposed",
   "announcement_date": null,
   "project_evidence": [
    "** A rendering of Project Cannoli, a proposed data center in Van Buren Township. Photo via Van Buren Township.",
    "The 1-gigawatt \u201cProject Cannoli\u201d [data center](https://planetdetroit.org/issues/data-centers/) is planned for 282 acres at the intersection of Haggerty Road and I-94."
   ],
   "locality_evidence": [
    "** A rendering of Project Cannoli, a proposed data center in Van Buren Township. Photo via Van Buren Township.",
    "Michigan regulators are reviewing a wetland permit for [Google\u2019s planned data center](https://planetdetroit.org/2026/03/google-dte-data-center-van-buren/) in Van Buren Township, which would destroy 13.55 acres of [wetlands](https://planetdetroit.org/deep-dive/wetlands-in-metro-detroit/) in a county that has already lost 90% of them to development."
   ],
   "state_evidence": [
    "Michigan regulators are reviewing a wetland permit for [Google\u2019s planned data center](https://planetdetroit.org/2026/03/google-dte-data-center-van-buren/) in Van Buren Township, which would destroy 13.55 acres of [wetlands](https://planetdetroit.org/deep-dive/wetlands-in-metro-detroit/) in a county that has already lost 90% of them to development."
   ],
   "capacity_gw_evidence": [
    "The 1-gigawatt \u201cProject Cannoli\u201d [data center](https://planetdetroit.org/issues/data-centers/) is planned for 282 acres at the intersection of Haggerty Road and I-94."
   ],
   "builder_evidence": [
    "The developer, Panattoni Development Co, proposed purchasing 20.6 acres of wetland mitigation bank credits in its project [application](https://www.documentcloud.org/documents/28269261-hqh-q48n-1818y-v7-1-1/)."
   ],
   "ai_customer_evidence": [
    "Michigan regulators are reviewing a wetland permit for [Google\u2019s planned data center](https://planetdetroit.org/2026/03/google-dte-data-center-van-buren/) in Van Buren Township, which would destroy 13.55 acres of [wetlands](https://planetdetroit.org/deep-dive/wetlands-in-metro-detroit/) in a county that has already lost 90% of them to development."
   ],
   "status_evidence": [
    "** A rendering of Project Cannoli, a proposed data center in Van Buren Township. Photo via Van Buren Township."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?page=83&result_156264_result_page=5&result_190728_result_page=36",
   "title": "News - DCD",
   "published_at": "2026-08-27T00:00:00",
   "project": "Sweetwater",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Iren",
   "ai_customer": null,
   "status": "first phase energized",
   "announcement_date": null,
   "project_evidence": [
    "# News",
    "Iren energizes first phase of 2GW Sweetwater data center campus in Texas"
   ],
   "locality_evidence": [
    "# News",
    "Iren energizes first phase of 2GW Sweetwater data center campus in Texas"
   ],
   "state_evidence": [
    "# News",
    "Iren energizes first phase of 2GW Sweetwater data center campus in Texas"
   ],
   "capacity_gw_evidence": [
    "# News",
    "Iren energizes first phase of 2GW Sweetwater data center campus in Texas"
   ],
   "builder_evidence": [
    "# News",
    "Iren energizes first phase of 2GW Sweetwater data center campus in Texas"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# News",
    "Iren energizes first phase of 2GW Sweetwater data center campus in Texas"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://powergridtoday.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://cantonrep.com/story/news/politics/2026/08/24/openai-plans-ohio-data-center/91372218007",
   "title": "OpenAI to build world's biggest AI data center in Ohio. What we know",
   "published_at": "2026-08-25T01:30:35",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 10.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The [San Francisco-based company](https://openai.com/) announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ],
   "locality_evidence": [
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The [San Francisco-based company](https://openai.com/) announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ],
   "state_evidence": [
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The [San Francisco-based company](https://openai.com/) announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ],
   "capacity_gw_evidence": [
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The center will have 8 gigawatts of computing capacity \u2012 the electrical capacity that's available to servers and other equipment, not necessarily the amount of power the center will draw continuously \u2012 by the end of construction."
   ],
   "builder_evidence": [
    "# OpenAI to build world's biggest AI data center in Ohio. What we know"
   ],
   "ai_customer_evidence": [
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "OpenAI plans to build a new hyperscale data center in Pike County, Ohio."
   ],
   "status_evidence": [
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "A [massive data center for OpenAI](https://www.cincinnati.com/story/news/2026/08/17/openai-nvidia-back-massive-data-center-campus-in-ohio/91347647007/), the artificial intelligence company that created ChatGPT, is planned for Southern Ohio."
   ],
   "announcement_date_evidence": [
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The [San Francisco-based company](https://openai.com/) announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ]
  },
  {
   "url": "https://gridglasses.com/brief/meta-s-14-gw-data-center-footprint-stretches-across-nine-sta-cs6q",
   "title": "Meta's 14 GW Data Center Footprint Stretches Across Nine States",
   "published_at": "2026-06-23T14:00:43",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Meta's 14 GW Data Center Footprint Stretches Across Nine States",
    "Gridwork's permit data shows Louisiana's Hyperion campus anchoring one of the largest single-firm load build-outs we track.",
    "Our dataset shows the Meta Hyperion campus in Richland Parish at 5.0 GW under construction, alongside related Richland Parish entries that appear under the same Hyperion program."
   ],
   "locality_evidence": [
    "# Meta's 14 GW Data Center Footprint Stretches Across Nine States",
    "Our dataset shows the Meta Hyperion campus in Richland Parish at 5.0 GW under construction, alongside related Richland Parish entries that appear under the same Hyperion program."
   ],
   "state_evidence": [
    "# Meta's 14 GW Data Center Footprint Stretches Across Nine States",
    "Gridwork's permit data shows Louisiana's Hyperion campus anchoring one of the largest single-firm load build-outs we track.",
    "Our dataset shows the Meta Hyperion campus in Richland Parish at 5.0 GW under construction, alongside related Richland Parish entries that appear under the same Hyperion program."
   ],
   "capacity_gw_evidence": [
    "# Meta's 14 GW Data Center Footprint Stretches Across Nine States",
    "Our dataset shows the Meta Hyperion campus in Richland Parish at 5.0 GW under construction, alongside related Richland Parish entries that appear under the same Hyperion program."
   ],
   "builder_evidence": [
    "# Meta's 14 GW Data Center Footprint Stretches Across Nine States",
    "Our dataset shows the Meta Hyperion campus in Richland Parish at 5.0 GW under construction, alongside related Richland Parish entries that appear under the same Hyperion program."
   ],
   "ai_customer_evidence": [
    "# Meta's 14 GW Data Center Footprint Stretches Across Nine States",
    "Our dataset shows the Meta Hyperion campus in Richland Parish at 5.0 GW under construction, alongside related Richland Parish entries that appear under the same Hyperion program."
   ],
   "status_evidence": [
    "# Meta's 14 GW Data Center Footprint Stretches Across Nine States",
    "Our dataset shows the Meta Hyperion campus in Richland Parish at 5.0 GW under construction, alongside related Richland Parish entries that appear under the same Hyperion program."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://gridglasses.com/brief/meta-s-14-gw-data-center-footprint-stretches-across-nine-sta-cs6q",
   "title": "Meta's 14 GW Data Center Footprint Stretches Across Nine States",
   "published_at": "2026-06-23T14:00:43",
   "project": "Lebanon Data Center Campus",
   "locality": "Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# Meta's 14 GW Data Center Footprint Stretches Across Nine States",
    "The Midwest carries the next-largest cluster.",
    "Indiana's Lebanon Data Center Campus is tracked at 1.0 GW in the announced stage, and Minnesota's Rosemount Data Center is logged at 114 MW under construction."
   ],
   "locality_evidence": [
    "# Meta's 14 GW Data Center Footprint Stretches Across Nine States",
    "The Midwest carries the next-largest cluster.",
    "Indiana's Lebanon Data Center Campus is tracked at 1.0 GW in the announced stage, and Minnesota's Rosemount Data Center is logged at 114 MW under construction."
   ],
   "state_evidence": [
    "# Meta's 14 GW Data Center Footprint Stretches Across Nine States",
    "The Midwest carries the next-largest cluster.",
    "Indiana's Lebanon Data Center Campus is tracked at 1.0 GW in the announced stage, and Minnesota's Rosemount Data Center is logged at 114 MW under construction."
   ],
   "capacity_gw_evidence": [
    "# Meta's 14 GW Data Center Footprint Stretches Across Nine States",
    "The Midwest carries the next-largest cluster.",
    "Indiana's Lebanon Data Center Campus is tracked at 1.0 GW in the announced stage, and Minnesota's Rosemount Data Center is logged at 114 MW under construction."
   ],
   "builder_evidence": [
    "# Meta's 14 GW Data Center Footprint Stretches Across Nine States",
    "In Gridwork's verified permit data, Meta now accounts for 16 tracked projects spanning nine states, with a combined nameplate capacity of roughly 14 GW (14,185 MW).",
    "Indiana's Lebanon Data Center Campus is tracked at 1.0 GW in the announced stage, and Minnesota's Rosemount Data Center is logged at 114 MW under construction."
   ],
   "ai_customer_evidence": [
    "# Meta's 14 GW Data Center Footprint Stretches Across Nine States",
    "In Gridwork's verified permit data, Meta now accounts for 16 tracked projects spanning nine states, with a combined nameplate capacity of roughly 14 GW (14,185 MW).",
    "Indiana's Lebanon Data Center Campus is tracked at 1.0 GW in the announced stage, and Minnesota's Rosemount Data Center is logged at 114 MW under construction."
   ],
   "status_evidence": [
    "# Meta's 14 GW Data Center Footprint Stretches Across Nine States",
    "The Midwest carries the next-largest cluster.",
    "Indiana's Lebanon Data Center Campus is tracked at 1.0 GW in the announced stage, and Minnesota's Rosemount Data Center is logged at 114 MW under construction."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://techinasia.com/news/musks-xai-invest-20b-mississippi-data-center-project",
   "title": "Musk\u2019s xAI to invest $20b in Mississippi data center project",
   "published_at": "2026-01-09T00:00:00",
   "project": "MACROHARDRR",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "Musk\u2019s xAI to invest $20b in Mississippi data center project",
    "The project, named MACROHARDRR, will be xAI\u2019s third data center in the greater Memphis area."
   ],
   "locality_evidence": [
    "Musk\u2019s xAI to invest $20b in Mississippi data center project",
    "XAI, Elon Musk\u2019s AI company, will spend US$20 billion on a new data center in Southaven, Mississippi, according to an announcement by Governor Tate Reeves."
   ],
   "state_evidence": [
    "Musk\u2019s xAI to invest $20b in Mississippi data center project",
    "XAI, Elon Musk\u2019s AI company, will spend US$20 billion on a new data center in Southaven, Mississippi, according to an announcement by Governor Tate Reeves."
   ],
   "capacity_gw_evidence": [
    "Musk\u2019s xAI to invest $20b in Mississippi data center project",
    "xAI\u2019s CFO said the cluster will host a supercomputer with 2 gigawatts of computing power."
   ],
   "builder_evidence": [
    "Musk\u2019s xAI to invest $20b in Mississippi data center project",
    "XAI, Elon Musk\u2019s AI company, will spend US$20 billion on a new data center in Southaven, Mississippi, according to an announcement by Governor Tate Reeves."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Musk\u2019s xAI to invest $20b in Mississippi data center project",
    "XAI, Elon Musk\u2019s AI company, will spend US$20 billion on a new data center in Southaven, Mississippi, according to an announcement by Governor Tate Reeves."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://usdatacenterprojects.com/texas/crusoe-and-lancium-plan-1-gw-ai-data-center-campus-on-270-acres-in-childress-texas",
   "title": "Crusoe and Lancium Plan 1 GW AI Data Center Campus on 270 Acres in Childress, Texas",
   "published_at": "2026-07-16T06:03:57",
   "project": "Childress campus",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Crusoe and Lancium Plan 1 GW AI Data Center Campus on 270 Acres in Childress, Texas",
    "The Childress campus will span 270 acres of land owned by Lancium, which will also develop and manage the site's energy infrastructure."
   ],
   "locality_evidence": [
    "# Crusoe and Lancium Plan 1 GW AI Data Center Campus on 270 Acres in Childress, Texas",
    "[**Crusoe**](https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas) and Lancium have announced plans to build a 1.0 gigawatt AI data center campus in Childress, Texas, the second major project the two companies have undertaken together using the same partnership structure they established in Abilene."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Plan 1 GW AI Data Center Campus on 270 Acres in Childress, Texas",
    "[**Crusoe**](https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas) and Lancium have announced plans to build a 1.0 gigawatt AI data center campus in Childress, Texas, the second major project the two companies have undertaken together using the same partnership structure they established in Abilene."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium Plan 1 GW AI Data Center Campus on 270 Acres in Childress, Texas",
    "[**Crusoe**](https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas) and Lancium have announced plans to build a 1.0 gigawatt AI data center campus in Childress, Texas, the second major project the two companies have undertaken together using the same partnership structure they established in Abilene."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium Plan 1 GW AI Data Center Campus on 270 Acres in Childress, Texas",
    "[**Crusoe**](https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas) and Lancium have announced plans to build a 1.0 gigawatt AI data center campus in Childress, Texas, the second major project the two companies have undertaken together using the same partnership structure they established in Abilene."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Crusoe and Lancium Plan 1 GW AI Data Center Campus on 270 Acres in Childress, Texas",
    "[**Crusoe**](https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas) and Lancium have announced plans to build a 1.0 gigawatt AI data center campus in Childress, Texas, the second major project the two companies have undertaken together using the same partnership structure they established in Abilene."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://usdatacenterprojects.com/texas/crusoe-and-lancium-plan-1-gw-ai-data-center-campus-on-270-acres-in-childress-texas",
   "title": "Crusoe and Lancium Plan 1 GW AI Data Center Campus on 270 Acres in Childress, Texas",
   "published_at": "2026-07-16T06:03:57",
   "project": "Abilene campus",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "expanding",
   "announcement_date": null,
   "project_evidence": [
    "# Crusoe and Lancium Plan 1 GW AI Data Center Campus on 270 Acres in Childress, Texas",
    "Crusoe will design, build, and operate the AI data center itself.",
    "That division of responsibilities mirrors the arrangement the two companies have executed in Abilene, where Crusoe broke ground in June 2024 and energized its first two buildings within one year before expanding that campus to 1.2 gigawatts."
   ],
   "locality_evidence": [
    "# Crusoe and Lancium Plan 1 GW AI Data Center Campus on 270 Acres in Childress, Texas",
    "That division of responsibilities mirrors the arrangement the two companies have executed in Abilene, where Crusoe broke ground in June 2024 and energized its first two buildings within one year before expanding that campus to 1.2 gigawatts."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Plan 1 GW AI Data Center Campus on 270 Acres in Childress, Texas",
    "The Childress announcement adds to what Crusoe described as a deep and growing commitment to Texas."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium Plan 1 GW AI Data Center Campus on 270 Acres in Childress, Texas",
    "That division of responsibilities mirrors the arrangement the two companies have executed in Abilene, where Crusoe broke ground in June 2024 and energized its first two buildings within one year before expanding that campus to 1.2 gigawatts."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium Plan 1 GW AI Data Center Campus on 270 Acres in Childress, Texas",
    "Crusoe will design, build, and operate the AI data center itself.",
    "That division of responsibilities mirrors the arrangement the two companies have executed in Abilene, where Crusoe broke ground in June 2024 and energized its first two buildings within one year before expanding that campus to 1.2 gigawatts."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Crusoe and Lancium Plan 1 GW AI Data Center Campus on 270 Acres in Childress, Texas",
    "That division of responsibilities mirrors the arrangement the two companies have executed in Abilene, where Crusoe broke ground in June 2024 and energized its first two buildings within one year before expanding that campus to 1.2 gigawatts."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://theenergymag.com/news/2026-06-22/microsoft-2-gigawatt-ai-data-center-west-texas-onsite-gas",
   "title": "Microsoft to Build 2GW AI Data Center Campus in West Texas With Onsite Gas Power",
   "published_at": "2026-06-22T09:46:11",
   "project": "Pecos",
   "locality": "Pecos",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Microsoft",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-06-XX",
   "project_evidence": [
    "# Microsoft to Build 2GW AI Data Center Campus in West Texas With Onsite Gas Power",
    "Microsoft said it will build a new data center campus in Pecos, Texas, adding about 2 gigawatts of capacity in one of the company\u2019s largest single expansions as the race to secure power for AI infrastructure accelerates."
   ],
   "locality_evidence": [
    "# Microsoft to Build 2GW AI Data Center Campus in West Texas With Onsite Gas Power",
    "Microsoft said it will build a new data center campus in Pecos, Texas, adding about 2 gigawatts of capacity in one of the company\u2019s largest single expansions as the race to secure power for AI infrastructure accelerates."
   ],
   "state_evidence": [
    "# Microsoft to Build 2GW AI Data Center Campus in West Texas With Onsite Gas Power",
    "Microsoft said it will build a new data center campus in Pecos, Texas, adding about 2 gigawatts of capacity in one of the company\u2019s largest single expansions as the race to secure power for AI infrastructure accelerates."
   ],
   "capacity_gw_evidence": [
    "# Microsoft to Build 2GW AI Data Center Campus in West Texas With Onsite Gas Power",
    "Microsoft said it will build a new data center campus in Pecos, Texas, adding about 2 gigawatts of capacity in one of the company\u2019s largest single expansions as the race to secure power for AI infrastructure accelerates."
   ],
   "builder_evidence": [
    "# Microsoft to Build 2GW AI Data Center Campus in West Texas With Onsite Gas Power",
    "Microsoft said it will build a new data center campus in Pecos, Texas, adding about 2 gigawatts of capacity in one of the company\u2019s largest single expansions as the race to secure power for AI infrastructure accelerates."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Microsoft to Build 2GW AI Data Center Campus in West Texas With Onsite Gas Power",
    "Microsoft said it will build a new data center campus in Pecos, Texas, adding about 2 gigawatts of capacity in one of the company\u2019s largest single expansions as the race to secure power for AI infrastructure accelerates."
   ],
   "announcement_date_evidence": [
    "# Microsoft to Build 2GW AI Data Center Campus in West Texas With Onsite Gas Power",
    "![Microsoft to Build 2GW AI Data Center Campus in West Texas With Onsite Gas Power](https://backend.theenergymag.com/wp-content/uploads/2026/06/Microsoft-scaled-e1782135892475.jpg)"
   ]
  },
  {
   "url": "https://intelligentcio.com/north-america/2025/08/29/vantage-data-centers-unveils-plans-for-frontier-a-us25b-mega-campus-in-texas",
   "title": "Vantage Data Centers unveils plans for Frontier, a US$25B mega-campus in Texas",
   "published_at": "2025-08-29T08:30:34",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Construction is already under way",
   "announcement_date": null,
   "project_evidence": [
    "Vantage Data Centers unveils plans for Frontier, a US$25B mega-campus in Texas",
    "The state-of-the-art campus, named \u2018Frontier\u2019, is designed to advance AI innovation and will employ more than 5,000 people across construction and on-going operations."
   ],
   "locality_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, has announced its largest investment to date: more than US$25 billion to develop a 1.4GW data center mega-campus in Shackelford County, Texas.",
    "Vantage Data Centers unveils plans for Frontier, a US$25B mega-campus in Texas"
   ],
   "state_evidence": [
    "Vantage Data Centers unveils plans for Frontier, a US$25B mega-campus in Texas",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, has announced its largest investment to date: more than US$25 billion to develop a 1.4GW data center mega-campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "Vantage Data Centers unveils plans for Frontier, a US$25B mega-campus in Texas",
    "Campus will deliver 1.4 gigawatts of capacity in the Lone Star State, establishing a global AI hub.",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, has announced its largest investment to date: more than US$25 billion to develop a 1.4GW data center mega-campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "Vantage Data Centers unveils plans for Frontier, a US$25B mega-campus in Texas",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, has announced its largest investment to date: more than US$25 billion to develop a 1.4GW data center mega-campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Vantage Data Centers unveils plans for Frontier, a US$25B mega-campus in Texas",
    "Construction is already under way, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://thailandbusinessdirectory.net/press-release/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy-to-compute",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": "2026-03-16T21:49:12",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "Acquired",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ],
   "locality_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "capacity_gw_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "The West Virginia campus is the first state-certified utility grid purpose-built for AI workloads in the United States.",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "builder_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ],
   "announcement_date_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ]
  },
  {
   "url": "https://stackfutures.com/blog/meta-louisiana-5gw-ai-campus",
   "title": "Meta's Louisiana AI Campus Grows to 5GW \u2014 the Largest Single Data Center Complex in the US | Stack Futures",
   "published_at": "2026-07-13T13:10:00",
   "project": "Meta's Louisiana AI Campus",
   "locality": null,
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "expanding",
   "announcement_date": null,
   "project_evidence": [
    "# Meta's Louisiana AI Campus Grows to 5GW \u2014 the Largest Single Data Center Complex in the US",
    "Meta is expanding its Louisiana data center to 5 gigawatts of total capacity, the company confirmed this week, making it the single largest AI campus in the United States and one of the largest anywhere in the world."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# Meta's Louisiana AI Campus Grows to 5GW \u2014 the Largest Single Data Center Complex in the US",
    "Meta is expanding its Louisiana data center to 5 gigawatts of total capacity, the company confirmed this week, making it the single largest AI campus in the United States and one of the largest anywhere in the world."
   ],
   "capacity_gw_evidence": [
    "# Meta's Louisiana AI Campus Grows to 5GW \u2014 the Largest Single Data Center Complex in the US",
    "Meta is expanding its Louisiana data center to 5 gigawatts of total capacity, the company confirmed this week, making it the single largest AI campus in the United States and one of the largest anywhere in the world."
   ],
   "builder_evidence": [
    "# Meta's Louisiana AI Campus Grows to 5GW \u2014 the Largest Single Data Center Complex in the US",
    "Meta is expanding its Louisiana data center to 5 gigawatts of total capacity, the company confirmed this week, making it the single largest AI campus in the United States and one of the largest anywhere in the world."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Meta's Louisiana AI Campus Grows to 5GW \u2014 the Largest Single Data Center Complex in the US",
    "Meta is expanding its Louisiana data center to 5 gigawatts of total capacity, the company confirmed this week, making it the single largest AI campus in the United States and one of the largest anywhere in the world."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://gncrypto.news/news/terawulf-buys-kentucky-site-1-gw-muskie-ai-campus",
   "title": "TeraWulf Buys Kentucky Site for 1 GW AI Campus",
   "published_at": "2026-05-26T18:41:39",
   "project": "Muskie Data Campus",
   "locality": "EastPark Industrial Park",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2026-05-26",
   "project_evidence": [
    "# TeraWulf Buys Kentucky Site for 1 GW AI Campus",
    "TeraWulf acquired 285 acres in eastern Kentucky for the Muskie Data Campus with more than 1 GW of AI capacity; first 500 MW expected in 2H 2028 and shares rose about 9%.",
    "TeraWulf acquired a 285-acre parcel inside EastPark Industrial Park in eastern Kentucky from Industrial Equity Partners to develop the Muskie Data Campus with capacity exceeding one gigawatt for AI and high-performance computing."
   ],
   "locality_evidence": [
    "# TeraWulf Buys Kentucky Site for 1 GW AI Campus",
    "TeraWulf acquired a 285-acre parcel inside EastPark Industrial Park in eastern Kentucky from Industrial Equity Partners to develop the Muskie Data Campus with capacity exceeding one gigawatt for AI and high-performance computing."
   ],
   "state_evidence": [
    "# TeraWulf Buys Kentucky Site for 1 GW AI Campus",
    "TeraWulf acquired 285 acres in eastern Kentucky for the Muskie Data Campus with more than 1 GW of AI capacity; first 500 MW expected in 2H 2028 and shares rose about 9%.",
    "TeraWulf acquired a 285-acre parcel inside EastPark Industrial Park in eastern Kentucky from Industrial Equity Partners to develop the Muskie Data Campus with capacity exceeding one gigawatt for AI and high-performance computing."
   ],
   "capacity_gw_evidence": [
    "# TeraWulf Buys Kentucky Site for 1 GW AI Campus",
    "TeraWulf acquired 285 acres in eastern Kentucky for the Muskie Data Campus with more than 1 GW of AI capacity; first 500 MW expected in 2H 2028 and shares rose about 9%.",
    "TeraWulf acquired a 285-acre parcel inside EastPark Industrial Park in eastern Kentucky from Industrial Equity Partners to develop the Muskie Data Campus with capacity exceeding one gigawatt for AI and high-performance computing."
   ],
   "builder_evidence": [
    "# TeraWulf Buys Kentucky Site for 1 GW AI Campus",
    "TeraWulf acquired 285 acres in eastern Kentucky for the Muskie Data Campus with more than 1 GW of AI capacity; first 500 MW expected in 2H 2028 and shares rose about 9%.",
    "TeraWulf acquired a 285-acre parcel inside EastPark Industrial Park in eastern Kentucky from Industrial Equity Partners to develop the Muskie Data Campus with capacity exceeding one gigawatt for AI and high-performance computing."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# TeraWulf Buys Kentucky Site for 1 GW AI Campus",
    "The Muskie project is planned as a phased buildout with tied transmission upgrades to support the initial 500 MW target in 2028 and the second 500 MW by 2030."
   ],
   "announcement_date_evidence": [
    "# TeraWulf Buys Kentucky Site for 1 GW AI Campus",
    "Posted: 26 May 2026, 20:41 CET 2 min read"
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news/hut-8-signs-352mw-data-center-lease-in-texas-with-investment-grade-tenant",
   "title": "Hut 8 signs 352MW data center lease in Texas with investment grade tenant",
   "published_at": "2026-08-05T00:00:00",
   "project": "Beacon Point",
   "locality": "Corpus Christi",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "under development",
   "announcement_date": null,
   "project_evidence": [
    "Cryptomine and HPC data center developer Hut 8 has signed a new hyperscale customer as a tenant in Texas.",
    "The company this week announced it has signed a 15-year, 352MW data center lease at its Beacon Point campus in Texas with an unnamed \u201chigh-investment-grade tenant.\u201d",
    "Consulting and advisory firm Jacobs and Vertiv are set to work with Hut 8 on the Beacon Point project\u2019s development."
   ],
   "locality_evidence": [
    "Cryptomine and HPC data center developer Hut 8 has signed a new hyperscale customer as a tenant in Texas.",
    "The 525-acre campus is located near Corpus Christi, in East Texas\u2019 Nueces County."
   ],
   "state_evidence": [
    "Cryptomine and HPC data center developer Hut 8 has signed a new hyperscale customer as a tenant in Texas.",
    "The company this week announced it has signed a 15-year, 352MW data center lease at its Beacon Point campus in Texas with an unnamed \u201chigh-investment-grade tenant.\u201d"
   ],
   "capacity_gw_evidence": [
    "Cryptomine and HPC data center developer Hut 8 has signed a new hyperscale customer as a tenant in Texas.",
    "Hut 8 has executed an interconnection agreement for 1GW of utility capacity, with initial energization expected in Q1 2027."
   ],
   "builder_evidence": [
    "Cryptomine and HPC data center developer Hut 8 has signed a new hyperscale customer as a tenant in Texas.",
    "The company this week announced it has signed a 15-year, 352MW data center lease at its Beacon Point campus in Texas with an unnamed \u201chigh-investment-grade tenant.\u201d",
    "Consulting and advisory firm Jacobs and Vertiv are set to work with Hut 8 on the Beacon Point project\u2019s development."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Cryptomine and HPC data center developer Hut 8 has signed a new hyperscale customer as a tenant in Texas.",
    "Consulting and advisory firm Jacobs and Vertiv are set to work with Hut 8 on the Beacon Point project\u2019s development.",
    "Preliminary data hall delivery is expected in Q3 2027."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://spoonai.me/posts/2026-05-11-nvidia-iren-5gw-21b-en",
   "title": "Nvidia \u00d7 IREN: $2.1B equity option + 5 GW + $3.4B GPU cloud \u2014 a former bitcoin miner becomes the hot card of AI data centers",
   "published_at": "2026-05-10T23:00:00",
   "project": "Sweetwater",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": null,
   "announcement_date": "2026-05-07",
   "project_evidence": [
    "Texas's Sweetwater 2 GW campus anchors the deal \u2014 a new chapter in AI data-center capex.",
    "Each player \u2014 Nvidia, IREN, Sweetwater"
   ],
   "locality_evidence": [
    "Texas's Sweetwater 2 GW campus anchors the deal \u2014 a new chapter in AI data-center capex.",
    "Each player \u2014 Nvidia, IREN, Sweetwater"
   ],
   "state_evidence": [
    "Texas's Sweetwater 2 GW campus anchors the deal \u2014 a new chapter in AI data-center capex.",
    "Each player \u2014 Nvidia, IREN, Sweetwater"
   ],
   "capacity_gw_evidence": [
    "Texas's Sweetwater 2 GW campus anchors the deal \u2014 a new chapter in AI data-center capex.",
    "Each player \u2014 Nvidia, IREN, Sweetwater"
   ],
   "builder_evidence": [
    "Texas's Sweetwater 2 GW campus anchors the deal \u2014 a new chapter in AI data-center capex.",
    "Each player \u2014 Nvidia, IREN, Sweetwater"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": [
    "On May 7 Nvidia received a 5-year option to invest up to $2.1B in Australian data-center operator IREN, paired with a 5 GW NVIDIA DSX deployment plan and a separate 5-year $3.4B GPU cloud services agreement."
   ]
  },
  {
   "url": "https://internationalworldtimes.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://newscase.com/nvidias-105-billion-guarantee-shrinks-as-the-chipmakers-dual-role-comes-under-the-microscope",
   "title": "Nvidia\u2019s 5 Billion Guarantee Shrinks as the Chipmaker\u2019s Dual Role Comes Under the Microscope",
   "published_at": "2026-08-22T14:51:05",
   "project": "PORTS-Pike Technology Campus",
   "locality": null,
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-08-24",
   "project_evidence": [
    "On Monday, the company agreed to back a guarantee of up to $105 billion so that OpenAI can lease a massive data center campus in Ohio being developed by SoftBank\u2019s SB Energy.",
    "The facility, known as the PORTS-Pike Technology Campus, will deliver an initial 4.25 gigawatts of computing capacity with an option for an additional 3.75 gigawatts, with power coming online in phases starting in 2028."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "On Monday, the company agreed to back a guarantee of up to $105 billion so that OpenAI can lease a massive data center campus in Ohio being developed by SoftBank\u2019s SB Energy."
   ],
   "capacity_gw_evidence": [
    "The facility, known as the PORTS-Pike Technology Campus, will deliver an initial 4.25 gigawatts of computing capacity with an option for an additional 3.75 gigawatts, with power coming online in phases starting in 2028."
   ],
   "builder_evidence": [
    "On Monday, the company agreed to back a guarantee of up to $105 billion so that OpenAI can lease a massive data center campus in Ohio being developed by SoftBank\u2019s SB Energy."
   ],
   "ai_customer_evidence": [
    "On Monday, the company agreed to back a guarantee of up to $105 billion so that OpenAI can lease a massive data center campus in Ohio being developed by SoftBank\u2019s SB Energy."
   ],
   "status_evidence": [
    "The facility, known as the PORTS-Pike Technology Campus, will deliver an initial 4.25 gigawatts of computing capacity with an option for an additional 3.75 gigawatts, with power coming online in phases starting in 2028."
   ],
   "announcement_date_evidence": [
    "On Monday, the company agreed to back a guarantee of up to $105 billion so that OpenAI can lease a massive data center campus in Ohio being developed by SoftBank\u2019s SB Energy."
   ]
  },
  {
   "url": "https://thenextgentechinsider.com/posts/openai-powers-8gw-ai-hub-in-ohios-ports-pike-campus-nvidia-doe",
   "title": "OpenAI Powers 8GW AI Hub in Ohio\u2019s PORTS-Pike Campus, NVIDIA & DOE",
   "published_at": "2026-08-17T22:45:00",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "OpenAI Powers 8GW AI Hub in Ohio\u2019s PORTS-Pike Campus, NVIDIA & DOE",
    "OpenAI has signed an agreement to secure roughly 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, joining forces with SB..."
   ],
   "locality_evidence": [
    "OpenAI Powers 8GW AI Hub in Ohio\u2019s PORTS-Pike Campus, NVIDIA & DOE",
    "OpenAI has signed an agreement to secure roughly 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, joining forces with SB..."
   ],
   "state_evidence": [
    "OpenAI Powers 8GW AI Hub in Ohio\u2019s PORTS-Pike Campus, NVIDIA & DOE",
    "OpenAI has signed an agreement to secure roughly 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, joining forces with SB..."
   ],
   "capacity_gw_evidence": [
    "OpenAI Powers 8GW AI Hub in Ohio\u2019s PORTS-Pike Campus, NVIDIA & DOE",
    "OpenAI has signed an agreement to secure roughly 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, joining forces with SB..."
   ],
   "builder_evidence": [
    "OpenAI Powers 8GW AI Hub in Ohio\u2019s PORTS-Pike Campus, NVIDIA & DOE",
    "OpenAI has signed an agreement to secure roughly 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, joining forces with SB..."
   ],
   "ai_customer_evidence": [
    "OpenAI Powers 8GW AI Hub in Ohio\u2019s PORTS-Pike Campus, NVIDIA & DOE",
    "OpenAI has signed an agreement to secure roughly 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, joining forces with SB..."
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "August 17, 2026Global AffairsCompanyOpenAI joins PORTS-Pike projectExpanding community investment an..."
   ]
  },
  {
   "url": "https://howtostoreelectricity.com/stargate-project-500b-ai-infrastructure-energy",
   "title": "Stargate Project 500 Billion USD AI Infrastructure 2026: How OpenAI, Oracle, SoftBank, MGX, Arm and Nvidia Are Building 10 GW of AI Training Capacity at Abilene Texas, Do\u00f1a Ana New Mexico, Lordstown Ohio Plus Five More Sites Powered by Crusoe Natural Gas, Kairos SMR and Tesla Megapack BESS",
   "published_at": "2024-02-27T20:00:00",
   "project": "Lancium Clean Campus",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe Energy",
   "ai_customer": "OpenAI",
   "status": "live with first Nvidia GB200 racks in September 2025",
   "announcement_date": "2025-01-21",
   "project_evidence": [
    "The Stargate Project Announcement \u2014 What Was Actually Said",
    "The initial Stargate site, already under construction at announcement, was at the Lancium Clean Campus in Abilene Texas, developed by Crusoe Energy."
   ],
   "locality_evidence": [
    "The Stargate Project Announcement \u2014 What Was Actually Said",
    "The initial Stargate site, already under construction at announcement, was at the Lancium Clean Campus in Abilene Texas, developed by Crusoe Energy."
   ],
   "state_evidence": [
    "The Stargate Project Announcement \u2014 What Was Actually Said",
    "The initial Stargate site, already under construction at announcement, was at the Lancium Clean Campus in Abilene Texas, developed by Crusoe Energy."
   ],
   "capacity_gw_evidence": [
    "The Stargate Project Announcement \u2014 What Was Actually Said",
    "The Abilene site is built out to a planned 1.2 GW of computational capacity with 4 million square feet of buildings."
   ],
   "builder_evidence": [
    "The Stargate Project Announcement \u2014 What Was Actually Said",
    "The initial Stargate site, already under construction at announcement, was at the Lancium Clean Campus in Abilene Texas, developed by Crusoe Energy."
   ],
   "ai_customer_evidence": [
    "The Stargate Project Announcement \u2014 What Was Actually Said",
    "On 23 September 2025, OpenAI announced five additional Stargate sites: Shackelford County Texas, Do\u00f1a Ana County New Mexico, Lordstown Ohio, Milam County Texas, and an undisclosed Midwestern US location."
   ],
   "status_evidence": [
    "The Stargate Project Announcement \u2014 What Was Actually Said",
    "The Abilene Texas flagship site went live with first Nvidia GB200 racks in September 2025."
   ],
   "announcement_date_evidence": [
    "The Stargate Project Announcement \u2014 What Was Actually Said",
    "The Stargate Project announcement on 21 January 2025 was the single most consequential industrial energy announcement of the decade."
   ]
  },
  {
   "url": "https://fool.com/investing/2026/08/29/chevron-microsoft-data-center-deal-big-earning?.tsrc=rss",
   "title": "Chevron's Microsoft Data Center Deal Was a Bigger Story Than Its Earnings. Here's Why.",
   "published_at": "2026-08-29T14:45:00",
   "project": "Project Kilby",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.67,
   "builder": "Energy Forge One",
   "ai_customer": "Microsoft",
   "status": "announced",
   "announcement_date": "2026-06-22",
   "project_evidence": [
    "The agreement is [part of Project Kilby](https://www.fool.com/investing/2026/06/22/chevron-is-building-a-massive-power-plant-to-support-a-microsoft-data-center-heres-what-it-means-for-the-energy-stock/), in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power.",
    "Breaking down Chevron's data center deal with Microsoft"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "However, even bigger news is that Chevron has entered into a 20-year power purchase agreement (PPA) to build a natural gas-powered facility to power **Microsoft**'s ([MSFT](/quote/nasdaq/msft/) -1.22%) artificial intelligence (AI)-focused data center in Texas.",
    "Breaking down Chevron's data center deal with Microsoft"
   ],
   "capacity_gw_evidence": [
    "The agreement is [part of Project Kilby](https://www.fool.com/investing/2026/06/22/chevron-is-building-a-massive-power-plant-to-support-a-microsoft-data-center-heres-what-it-means-for-the-energy-stock/), in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power.",
    "Breaking down Chevron's data center deal with Microsoft"
   ],
   "builder_evidence": [
    "The agreement is [part of Project Kilby](https://www.fool.com/investing/2026/06/22/chevron-is-building-a-massive-power-plant-to-support-a-microsoft-data-center-heres-what-it-means-for-the-energy-stock/), in which Chevron (through its subsidiary Energy Forge One), Engine No. 1, and Microsoft are working together to develop roughly 2.67 gigawatts (GW) of on-site power.",
    "Breaking down Chevron's data center deal with Microsoft"
   ],
   "ai_customer_evidence": [
    "However, even bigger news is that Chevron has entered into a 20-year power purchase agreement (PPA) to build a natural gas-powered facility to power **Microsoft**'s ([MSFT](/quote/nasdaq/msft/) -1.22%) artificial intelligence (AI)-focused data center in Texas.",
    "Breaking down Chevron's data center deal with Microsoft"
   ],
   "status_evidence": [
    "The modular approach enables the project to add capacity over time, and the power plant is expected to begin supplying power by 2028.",
    "Breaking down Chevron's data center deal with Microsoft"
   ],
   "announcement_date_evidence": [
    "On June 22, Chevron inked a 20-year take-or-pay power purchase agreement with Microsoft to provide electricity for a Microsoft-operated data center.",
    "Breaking down Chevron's data center deal with Microsoft"
   ]
  },
  {
   "url": "https://trivano.com/persbericht/fermi-america-makes-initial-draw-on-200-million-equipment-facility-from-keystone-national-group-and-cape-commercial-finance-to-accelerate-the-delivery-of-the-first-23gw-of-project-matadors-11gw-private-hypergrid-campus-708251.html",
   "title": "Fermi Inc | Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
   "published_at": null,
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2026-02-19",
   "project_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "locality_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ -- [Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4623677-1&h=4044461773&u=https%3A%2F%2Ffermiamerica.com%2F&a=Fermi+Inc.+(d%2Fb%2Fa+Fermi+America)+(NASDAQ+%26+LSE%3A+FRMI)%2C+operating+as+Fermi+America%E2%84%A2), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "state_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ -- [Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4623677-1&h=4044461773&u=https%3A%2F%2Ffermiamerica.com%2F&a=Fermi+Inc.+(d%2Fb%2Fa+Fermi+America)+(NASDAQ+%26+LSE%3A+FRMI)%2C+operating+as+Fermi+America%E2%84%A2), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "capacity_gw_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "builder_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ -- [Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4623677-1&h=4044461773&u=https%3A%2F%2Ffermiamerica.com%2F&a=Fermi+Inc.+(d%2Fb%2Fa+Fermi+America)+(NASDAQ+%26+LSE%3A+FRMI)%2C+operating+as+Fermi+America%E2%84%A2), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "announcement_date_evidence": [
    "Gepubliceerd op 19 februari 2026 om 22:37",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ]
  },
  {
   "url": "https://manilatimes.net/2026/03/17/tmt-newswire/pr-newswire/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy-to-compute/2301274",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": "2026-03-17T14:03:51",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "- *Nscale Acquires the Monarch Compute Campus - America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia - with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "locality_evidence": [
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts.",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia - with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "state_evidence": [
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts.",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia - with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "capacity_gw_evidence": [
    "The West Virginia campus is the first state-certified utility grid purpose-built for AI workloads in the United States.",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "builder_evidence": [
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia - with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories.",
    "AIPCorp's team brings nearly a decade of experience and continuity in AI infrastructure development and will support Nscale's development of the Monarch Compute Campus and Nscale's future global development and expansion operations."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia - with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories.",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "announcement_date_evidence": [
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia - with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ]
  },
  {
   "url": "https://finance.yahoo.com/news/energy-abundance-announces-data-city-143100459.html",
   "title": "/C O R R E C T I O N -- Energy Abundance Development Corporation/",
   "published_at": "2025-03-21T04:38:00",
   "project": "Data City",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corporation",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2025-03-21",
   "project_evidence": [
    "Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "locality_evidence": [
    "Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "state_evidence": [
    "Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "capacity_gw_evidence": [
    "Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "builder_evidence": [
    "Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "announcement_date_evidence": [
    "Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 21, 2025 /PRNewswire/ -- Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ]
  },
  {
   "url": "https://thegridreport.news/article/openais-project-camellia-turns-3-2gw-of-ai-load-into-a-community-operating-contract",
   "title": "3.2 GW Becomes a Community Grid Contract",
   "published_at": "2026-07-22T05:00:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "",
   "status": "early",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "# OpenAI\u2019s Project Camellia Turns 3.2 GW of AI Load Into a Community Operating Contract"
   ],
   "locality_evidence": [
    "OpenAI, \u201cBuilding AI infrastructure with the Effingham County community,\u201d published July 22, 2026: [https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/](https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/)",
    "# OpenAI\u2019s Project Camellia Turns 3.2 GW of AI Load Into a Community Operating Contract",
    "The same report said the campus could become Effingham County\u2019s largest taxpayer despite the abatement."
   ],
   "state_evidence": [
    "# OpenAI\u2019s Project Camellia Turns 3.2 GW of AI Load Into a Community Operating Contract",
    "In its July 22 announcement, OpenAI said Georgia Power would deliver the 3.2 gigawatts in phases between 2028 and 2032."
   ],
   "capacity_gw_evidence": [
    "# OpenAI\u2019s Project Camellia Turns 3.2 GW of AI Load Into a Community Operating Contract",
    "OpenAI is proposing a 3.2-gigawatt campus while publicly committing to pay the project\u2019s infrastructure and electric-service costs, reduce demand before residential customers are affected during grid stress, limit ongoing water use, fund community benefits, and submit the commitments to an independent annual audit."
   ],
   "builder_evidence": [
    "# OpenAI\u2019s Project Camellia Turns 3.2 GW of AI Load Into a Community Operating Contract",
    "OpenAI is proposing a 3.2-gigawatt campus while publicly committing to pay the project\u2019s infrastructure and electric-service costs, reduce demand before residential customers are affected during grid stress, limit ongoing water use, fund community benefits, and submit the commitments to an independent annual audit."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# OpenAI\u2019s Project Camellia Turns 3.2 GW of AI Load Into a Community Operating Contract",
    "There are still meaningful limits."
   ],
   "announcement_date_evidence": [
    "# OpenAI\u2019s Project Camellia Turns 3.2 GW of AI Load Into a Community Operating Contract",
    "OpenAI\u2019s July 22, 2026 plan for Project Camellia clears the publish bar because it does more than announce another giant campus."
   ]
  },
  {
   "url": "https://datacentre.solutions/news/68603/ecl-reveals-1-gw-off-grid-hydrogen-powered-ai-factory-data-centre",
   "title": "ECL reveals 1 GW off-grid, hydrogen-powered AI Factory data centre",
   "published_at": "2024-09-27T06:41:33",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "ECL reveals 1 GW off-grid, hydrogen-powered AI Factory data centre",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston."
   ],
   "locality_evidence": [
    "600+ acres near Houston, Texas will give AI leaders the space and power needed for the next wave of innovation, with zero emissions.",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston."
   ],
   "state_evidence": [
    "600+ acres near Houston, Texas will give AI leaders the space and power needed for the next wave of innovation, with zero emissions.",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston."
   ],
   "capacity_gw_evidence": [
    "ECL reveals 1 GW off-grid, hydrogen-powered AI Factory data centre",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston."
   ],
   "builder_evidence": [
    "ECL reveals 1 GW off-grid, hydrogen-powered AI Factory data centre",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "ECL reveals 1 GW off-grid, hydrogen-powered AI Factory data centre",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://coinalertnews.com/news/2026/08/17/openai-nvidia-ohio-data-center",
   "title": "OpenAI and Nvidia Lock In 8GW Ohio AI Data Center With $105B Guarantee",
   "published_at": "2026-08-17T16:28:38",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "signed",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# OpenAI and Nvidia Lock In 8GW Ohio AI Data Center With $105B Guarantee",
    "**OpenAI** has signed a 20-year lease for up to 8 gigawatts of AI compute capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, backed by **Nvidia** guarantees capped at $105 billion and a $1.5 billion investment in developer **SB Energy**."
   ],
   "locality_evidence": [
    "# OpenAI and Nvidia Lock In 8GW Ohio AI Data Center With $105B Guarantee",
    "**OpenAI** has signed a 20-year lease for up to 8 gigawatts of AI compute capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, backed by **Nvidia** guarantees capped at $105 billion and a $1.5 billion investment in developer **SB Energy**."
   ],
   "state_evidence": [
    "# OpenAI and Nvidia Lock In 8GW Ohio AI Data Center With $105B Guarantee",
    "**OpenAI** has signed a 20-year lease for up to 8 gigawatts of AI compute capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, backed by **Nvidia** guarantees capped at $105 billion and a $1.5 billion investment in developer **SB Energy**."
   ],
   "capacity_gw_evidence": [
    "# OpenAI and Nvidia Lock In 8GW Ohio AI Data Center With $105B Guarantee",
    "**OpenAI** has signed a 20-year lease for up to 8 gigawatts of AI compute capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, backed by **Nvidia** guarantees capped at $105 billion and a $1.5 billion investment in developer **SB Energy**."
   ],
   "builder_evidence": [
    "# OpenAI and Nvidia Lock In 8GW Ohio AI Data Center With $105B Guarantee",
    "**OpenAI** has signed a 20-year lease for up to 8 gigawatts of AI compute capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, backed by **Nvidia** guarantees capped at $105 billion and a $1.5 billion investment in developer **SB Energy**."
   ],
   "ai_customer_evidence": [
    "# OpenAI and Nvidia Lock In 8GW Ohio AI Data Center With $105B Guarantee",
    "**OpenAI** has signed a 20-year lease for up to 8 gigawatts of AI compute capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, backed by **Nvidia** guarantees capped at $105 billion and a $1.5 billion investment in developer **SB Energy**."
   ],
   "status_evidence": [
    "# OpenAI and Nvidia Lock In 8GW Ohio AI Data Center With $105B Guarantee",
    "**OpenAI** has signed a 20-year lease for up to 8 gigawatts of AI compute capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, backed by **Nvidia** guarantees capped at $105 billion and a $1.5 billion investment in developer **SB Energy**."
   ],
   "announcement_date_evidence": [
    "# OpenAI and Nvidia Lock In 8GW Ohio AI Data Center With $105B Guarantee",
    "Nvidia disclosed the arrangement on Aug. 17, 2026."
   ]
  },
  {
   "url": "https://intuitionlabs.ai/articles/oracle-openai-300b-deal-analysis?trk=article-ssr-frontend-pulse_little-text-block",
   "title": "Oracle & OpenAI's $300B Deal: AI Infrastructure Analysis",
   "published_at": "2025-11-26T13:57:00",
   "project": "Stargate",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe",
   "ai_customer": "OpenAI",
   "status": "live and operational",
   "announcement_date": null,
   "project_evidence": [
    "This report provides a comprehensive deep dive into the Oracle\u2013OpenAI partnership and **\u201d300B\u201d project**, originally written in December 2025 and updated through April 2026.",
    "As of early 2026, **implementation has progressed significantly**.",
    "The flagship Stargate data center in Abilene, Texas is now live and operational, with Oracle Cloud Infrastructure powering its 1.2 GW campus ([[11]](https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live))."
   ],
   "locality_evidence": [
    "This report provides a comprehensive deep dive into the Oracle\u2013OpenAI partnership and **\u201d300B\u201d project**, originally written in December 2025 and updated through April 2026.",
    "As of early 2026, **implementation has progressed significantly**.",
    "The flagship Stargate data center in Abilene, Texas is now live and operational, with Oracle Cloud Infrastructure powering its 1.2 GW campus ([[11]](https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live))."
   ],
   "state_evidence": [
    "This report provides a comprehensive deep dive into the Oracle\u2013OpenAI partnership and **\u201d300B\u201d project**, originally written in December 2025 and updated through April 2026.",
    "As of early 2026, **implementation has progressed significantly**.",
    "The flagship Stargate data center in Abilene, Texas is now live and operational, with Oracle Cloud Infrastructure powering its 1.2 GW campus ([[11]](https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live))."
   ],
   "capacity_gw_evidence": [
    "This report provides a comprehensive deep dive into the Oracle\u2013OpenAI partnership and **\u201d300B\u201d project**, originally written in December 2025 and updated through April 2026.",
    "As of early 2026, **implementation has progressed significantly**.",
    "The flagship Stargate data center in Abilene, Texas is now live and operational, with Oracle Cloud Infrastructure powering its 1.2 GW campus ([[11]](https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live))."
   ],
   "builder_evidence": [
    "This report provides a comprehensive deep dive into the Oracle\u2013OpenAI partnership and **\u201d300B\u201d project**, originally written in December 2025 and updated through April 2026.",
    "As of early 2026, **implementation has progressed significantly**.",
    "The flagship Stargate data center in Abilene, Texas is now live and operational, with Oracle Cloud Infrastructure powering its 1.2 GW campus ([[11]](https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live)).",
    "For example, Oracle and Crusoe are expanding an Abilene, Texas campus (initially 2 buildings) to eventually 8 buildings ([[39]](https://www.reuters.com/technology/openais-biggest-data-center-secures-116-billion-funding-wsj-reports-2025-05-21/#:~:text=Startup%20Crusoe%20has%20secured%20%2411,for%20AI%20workloads%20like%20ChatGPT))."
   ],
   "ai_customer_evidence": [
    "This report provides a comprehensive deep dive into the Oracle\u2013OpenAI partnership and **\u201d300B\u201d project**, originally written in December 2025 and updated through April 2026.",
    "As of early 2026, **implementation has progressed significantly**.",
    "The flagship Stargate data center in Abilene, Texas is now live and operational, with Oracle Cloud Infrastructure powering its 1.2 GW campus ([[11]](https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live))."
   ],
   "status_evidence": [
    "This report provides a comprehensive deep dive into the Oracle\u2013OpenAI partnership and **\u201d300B\u201d project**, originally written in December 2025 and updated through April 2026.",
    "As of early 2026, **implementation has progressed significantly**.",
    "The flagship Stargate data center in Abilene, Texas is now live and operational, with Oracle Cloud Infrastructure powering its 1.2 GW campus ([[11]](https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live))."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://twp.ai/4htroH",
   "title": "Trump alarms red state with power plant bombshell: 'Big deal'",
   "published_at": "2026-08-22T00:47:22",
   "project": "PORTS-Pike project",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 10.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Natural gas plant.",
    "According to Heatmap News, the federal review of the PORTS-Pike project's 9.2-gigawatt natural gas plant began July 10 and is slated to wrap by Dec. 23, roughly seven months to clear a facility bigger than five of Ohio's largest existing power plants combined."
   ],
   "locality_evidence": [
    "Natural gas plant.",
    "The gas plant would anchor a 10-gigawatt AI campus at the former Portsmouth Gaseous Diffusion Plant, a decommissioned uranium enrichment site on federal land in Pike County."
   ],
   "state_evidence": [
    "Natural gas plant.",
    "The data center OpenAI is building in southern Ohio will draw its power from what would be the largest fossil-fuel power plant ever constructed in the United States, and the [Trump](https://www.rawstory.com/trump-news/) administration is [racing its environmental review to the finish](https://heatmap.news/energy/trump-gas-plant-permits)."
   ],
   "capacity_gw_evidence": [
    "Natural gas plant.",
    "The gas plant would anchor a 10-gigawatt AI campus at the former Portsmouth Gaseous Diffusion Plant, a decommissioned uranium enrichment site on federal land in Pike County."
   ],
   "builder_evidence": [
    "Natural gas plant.",
    "OpenAI signed a 20-year lease for roughly 8 gigawatts last week, backed by a $105 billion guarantee from Nvidia and developed by SoftBank's SB Energy alongside the Energy Department."
   ],
   "ai_customer_evidence": [
    "Natural gas plant.",
    "The data center OpenAI is building in southern Ohio will draw its power from what would be the largest fossil-fuel power plant ever constructed in the United States, and the [Trump](https://www.rawstory.com/trump-news/) administration is [racing its environmental review to the finish](https://heatmap.news/energy/trump-gas-plant-permits)."
   ],
   "status_evidence": [
    "Natural gas plant.",
    "The gas plant would anchor a 10-gigawatt AI campus at the former Portsmouth Gaseous Diffusion Plant, a decommissioned uranium enrichment site on federal land in Pike County."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://finance.biggo.com/news/LpmodZsBTVZqOzlnfjS6",
   "title": "Musk's xAI Expands AI Arms Race with Third Data Center, Aims for 2-Gigawatt Compute Power",
   "published_at": "2025-12-31T18:25:35",
   "project": "MACROHARDRR",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "xAI",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Musk's xAI Expands AI Arms Race with Third Data Center, Aims for 2-Gigawatt Compute Power",
    "The new facility, named \"MACROHARDRR\" in a dig at Microsoft, is part of a strategy to house over 1 million GPUs and achieve energy independence through a dedicated natural gas power plant."
   ],
   "locality_evidence": [
    "# Musk's xAI Expands AI Arms Race with Third Data Center, Aims for 2-Gigawatt Compute Power",
    "According to property records and a person familiar with the project reported by \u300aThe Information\u300b, xAI acquired an 810,000-square-foot warehouse in Southaven, Mississippi, earlier this month from an affiliate of ElmTree Funds, a private real estate firm backed by BlackRock."
   ],
   "state_evidence": [
    "# Musk's xAI Expands AI Arms Race with Third Data Center, Aims for 2-Gigawatt Compute Power",
    "According to property records and a person familiar with the project reported by \u300aThe Information\u300b, xAI acquired an 810,000-square-foot warehouse in Southaven, Mississippi, earlier this month from an affiliate of ElmTree Funds, a private real estate firm backed by BlackRock."
   ],
   "capacity_gw_evidence": [
    "# Musk's xAI Expands AI Arms Race with Third Data Center, Aims for 2-Gigawatt Compute Power",
    "Elon Musk's AI company, xAI, has purchased a third building near Memphis, Tennessee, as part of a major infrastructure expansion aimed at reaching nearly 2 gigawatts of computing power."
   ],
   "builder_evidence": [
    "# Musk's xAI Expands AI Arms Race with Third Data Center, Aims for 2-Gigawatt Compute Power",
    "Elon Musk's AI company, xAI, has purchased a third building near Memphis, Tennessee, as part of a major infrastructure expansion aimed at reaching nearly 2 gigawatts of computing power."
   ],
   "ai_customer_evidence": [
    "# Musk's xAI Expands AI Arms Race with Third Data Center, Aims for 2-Gigawatt Compute Power",
    "Elon Musk's AI company, xAI, has purchased a third building near Memphis, Tennessee, as part of a major infrastructure expansion aimed at reaching nearly 2 gigawatts of computing power."
   ],
   "status_evidence": [
    "# Musk's xAI Expands AI Arms Race with Third Data Center, Aims for 2-Gigawatt Compute Power",
    "Project insiders indicate xAI plans to begin converting the warehouse into a data center in 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://lancium.com/category/press-release",
   "title": "Press Releases - lancium",
   "published_at": null,
   "project": "Lancium Clean Campus",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2025-03-18",
   "project_evidence": [
    "# Category: Press Releases",
    "## [Crusoe Expands AI Data Center Campus in Abilene to 1.2 Gigawatts](https://lancium.com/2025/03/18/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts/)",
    "Construction has begun at the Lancium Clean Campus in Abilene, Texas on an additional six data centers SAN FRANCISCO and ABILENE, Texas, March 18, 2025 (GLOBE NEWSWIRE) \u2014 Today Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, announced construction has begun on the next phase of its AI data center at the Lancium Clean Campus in Abilene, [\u2026]"
   ],
   "locality_evidence": [
    "# Category: Press Releases",
    "## [Crusoe Expands AI Data Center Campus in Abilene to 1.2 Gigawatts](https://lancium.com/2025/03/18/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts/)",
    "Construction has begun at the Lancium Clean Campus in Abilene, Texas on an additional six data centers SAN FRANCISCO and ABILENE, Texas, March 18, 2025 (GLOBE NEWSWIRE) \u2014 Today Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, announced construction has begun on the next phase of its AI data center at the Lancium Clean Campus in Abilene, [\u2026]"
   ],
   "state_evidence": [
    "# Category: Press Releases",
    "## [Crusoe Expands AI Data Center Campus in Abilene to 1.2 Gigawatts](https://lancium.com/2025/03/18/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts/)",
    "Construction has begun at the Lancium Clean Campus in Abilene, Texas on an additional six data centers SAN FRANCISCO and ABILENE, Texas, March 18, 2025 (GLOBE NEWSWIRE) \u2014 Today Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, announced construction has begun on the next phase of its AI data center at the Lancium Clean Campus in Abilene, [\u2026]"
   ],
   "capacity_gw_evidence": [
    "# Category: Press Releases",
    "## [Crusoe Expands AI Data Center Campus in Abilene to 1.2 Gigawatts](https://lancium.com/2025/03/18/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts/)",
    "Construction has begun at the Lancium Clean Campus in Abilene, Texas on an additional six data centers SAN FRANCISCO and ABILENE, Texas, March 18, 2025 (GLOBE NEWSWIRE) \u2014 Today Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, announced construction has begun on the next phase of its AI data center at the Lancium Clean Campus in Abilene, [\u2026]"
   ],
   "builder_evidence": [
    "# Category: Press Releases",
    "## [Crusoe Expands AI Data Center Campus in Abilene to 1.2 Gigawatts](https://lancium.com/2025/03/18/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts/)",
    "Construction has begun at the Lancium Clean Campus in Abilene, Texas on an additional six data centers SAN FRANCISCO and ABILENE, Texas, March 18, 2025 (GLOBE NEWSWIRE) \u2014 Today Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, announced construction has begun on the next phase of its AI data center at the Lancium Clean Campus in Abilene, [\u2026]"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Category: Press Releases",
    "## [Crusoe Expands AI Data Center Campus in Abilene to 1.2 Gigawatts](https://lancium.com/2025/03/18/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts/)",
    "Construction has begun at the Lancium Clean Campus in Abilene, Texas on an additional six data centers SAN FRANCISCO and ABILENE, Texas, March 18, 2025 (GLOBE NEWSWIRE) \u2014 Today Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, announced construction has begun on the next phase of its AI data center at the Lancium Clean Campus in Abilene, [\u2026]"
   ],
   "announcement_date_evidence": [
    "# Category: Press Releases",
    "## [Crusoe Expands AI Data Center Campus in Abilene to 1.2 Gigawatts](https://lancium.com/2025/03/18/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts/)",
    "Construction has begun at the Lancium Clean Campus in Abilene, Texas on an additional six data centers SAN FRANCISCO and ABILENE, Texas, March 18, 2025 (GLOBE NEWSWIRE) \u2014 Today Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, announced construction has begun on the next phase of its AI data center at the Lancium Clean Campus in Abilene, [\u2026]"
   ]
  },
  {
   "url": "https://digitalisationworld.com/news/70668/vantage-data-centers-announces-largest-25-billion-mega-campus-investment-in-texas",
   "title": "Vantage Data Centers announces largest $25 Billion mega-campus investment in Texas",
   "published_at": "2025-08-19T13:20:59",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Construction is already underway",
   "announcement_date": null,
   "project_evidence": [
    "# Vantage Data Centers announces largest $25 Billion mega-campus investment in Texas",
    "## Vantage Data Centers unveils a groundbreaking $25 billion investment in a mega-scale data centre campus in Shackelford County, Texas.",
    "$25 billion will be channelled into the creation of a vast 1.4GW data centre campus named \"Frontier\" in Shackelford County, Texas."
   ],
   "locality_evidence": [
    "# Vantage Data Centers announces largest $25 Billion mega-campus investment in Texas",
    "## Vantage Data Centers unveils a groundbreaking $25 billion investment in a mega-scale data centre campus in Shackelford County, Texas.",
    "$25 billion will be channelled into the creation of a vast 1.4GW data centre campus named \"Frontier\" in Shackelford County, Texas."
   ],
   "state_evidence": [
    "# Vantage Data Centers announces largest $25 Billion mega-campus investment in Texas",
    "## Vantage Data Centers unveils a groundbreaking $25 billion investment in a mega-scale data centre campus in Shackelford County, Texas.",
    "$25 billion will be channelled into the creation of a vast 1.4GW data centre campus named \"Frontier\" in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "# Vantage Data Centers announces largest $25 Billion mega-campus investment in Texas",
    "## Vantage Data Centers unveils a groundbreaking $25 billion investment in a mega-scale data centre campus in Shackelford County, Texas.",
    "$25 billion will be channelled into the creation of a vast 1.4GW data centre campus named \"Frontier\" in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "# Vantage Data Centers announces largest $25 Billion mega-campus investment in Texas",
    "## Vantage Data Centers unveils a groundbreaking $25 billion investment in a mega-scale data centre campus in Shackelford County, Texas.",
    "In a landmark announcement, Vantage Data Centers, a prominent global player in hyperscale data centres, has unveiled its most significant investment yet."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Vantage Data Centers announces largest $25 Billion mega-campus investment in Texas",
    "## Vantage Data Centers unveils a groundbreaking $25 billion investment in a mega-scale data centre campus in Shackelford County, Texas.",
    "Construction is already underway, with the initial building anticipated to be ready in the latter half of 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mitrade.com/insights/news/live-news/article-8-2017596-20260820",
   "title": "Fermi (FRMI) Q2 2026 Earnings Call Transcript",
   "published_at": "2026-08-20T14:06:58",
   "project": "Project Matador",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 4.8,
   "builder": "Fermi Inc.",
   "ai_customer": "TensorWave",
   "status": "under development",
   "announcement_date": null,
   "project_evidence": [
    "# Fermi (FRMI) Q2 2026 Earnings Call Transcript",
    "- **Site Acreage** -- 8,400 acres, secured or under long-term lease for the Project Matador campus in the Texas Panhandle.",
    "- **Project Matador**: The name of Fermi Inc.'s integrated energy and data center campus located in the Texas Panhandle."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# Fermi (FRMI) Q2 2026 Earnings Call Transcript",
    "- **Site Acreage** -- 8,400 acres, secured or under long-term lease for the Project Matador campus in the Texas Panhandle.",
    "- **Project Matador**: The name of Fermi Inc.'s integrated energy and data center campus located in the Texas Panhandle."
   ],
   "capacity_gw_evidence": [
    "# Fermi (FRMI) Q2 2026 Earnings Call Transcript",
    "- **Total Site Power Capacity** -- 4.8 gigawatts, doubled from previous self-build plans through the build-own-operate-transfer structure with Hillcore."
   ],
   "builder_evidence": [
    "# Fermi (FRMI) Q2 2026 Earnings Call Transcript",
    "- **Project Matador**: The name of Fermi Inc.'s integrated energy and data center campus located in the Texas Panhandle."
   ],
   "ai_customer_evidence": [
    "# Fermi (FRMI) Q2 2026 Earnings Call Transcript",
    "- **Anchor Customer Revenue** -- $6.5 billion, representing total revenue over the initial 15-year term of the turnkey binding lease agreement with TensorWave."
   ],
   "status_evidence": [
    "# Fermi (FRMI) Q2 2026 Earnings Call Transcript",
    "Construction remains focused on the Project Matador campus, where landed turbine assets now total 1.5 gigawatts of potential generation as the company works toward its 2027 power delivery targets."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://magica.com/news/openai-effingham-georgia-data-center-power-review",
   "title": "OpenAI\u2019s 3.2GW Effingham County data-center proposal",
   "published_at": "2026-07-22T00:00:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI\u2019s 3.2GW Georgia data-center plan has a clear scale\u2014and an incomplete public record",
    "OpenAI, the artificial-intelligence research and deployment company behind ChatGPT, plans to develop Project Camellia, a $20 billion data-center campus in Effingham County, Georgia."
   ],
   "locality_evidence": [
    "# OpenAI\u2019s 3.2GW Georgia data-center plan has a clear scale\u2014and an incomplete public record",
    "OpenAI, the artificial-intelligence research and deployment company behind ChatGPT, plans to develop Project Camellia, a $20 billion data-center campus in Effingham County, Georgia."
   ],
   "state_evidence": [
    "# OpenAI\u2019s 3.2GW Georgia data-center plan has a clear scale\u2014and an incomplete public record",
    "OpenAI, the artificial-intelligence research and deployment company behind ChatGPT, plans to develop Project Camellia, a $20 billion data-center campus in Effingham County, Georgia."
   ],
   "capacity_gw_evidence": [
    "# OpenAI\u2019s 3.2GW Georgia data-center plan has a clear scale\u2014and an incomplete public record",
    "OpenAI proposes a $20 billion, 3.2-gigawatt data-center campus in Effingham County, Georgia, with power phased in from 2028 to 2032."
   ],
   "builder_evidence": [
    "# OpenAI\u2019s 3.2GW Georgia data-center plan has a clear scale\u2014and an incomplete public record",
    "OpenAI proposes a $20 billion, 3.2-gigawatt data-center campus in Effingham County, Georgia, with power phased in from 2028 to 2032."
   ],
   "ai_customer_evidence": [
    "# OpenAI\u2019s 3.2GW Georgia data-center plan has a clear scale\u2014and an incomplete public record",
    "OpenAI proposes a $20 billion, 3.2-gigawatt data-center campus in Effingham County, Georgia, with power phased in from 2028 to 2032."
   ],
   "status_evidence": [
    "# OpenAI\u2019s 3.2GW Georgia data-center plan has a clear scale\u2014and an incomplete public record",
    "OpenAI proposes a $20 billion, 3.2-gigawatt data-center campus in Effingham County, Georgia, with power phased in from 2028 to 2032."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?tag=project-cannoli&term=cloud-hyperscale",
   "title": "News Cloud & Hyperscale (EN), Project Cannoli",
   "published_at": "2026-05-21T06:27:35",
   "project": null,
   "locality": "Detroit",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Google",
   "ai_customer": "Google",
   "status": "confirmed",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "# News - Cloud & Hyperscale (EN), Project Cannoli",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Google confirms 1GW data center campus near Detroit, Michigan, partners with DTE Energy on 2.7GW power generation](/en/news/google-confirms-1gw-data-center-campus-near-detroit-michigan-partners-with-dte-energy-on-27gw-power-generation/)"
   ],
   "state_evidence": [
    "# News - Cloud & Hyperscale (EN), Project Cannoli",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Google confirms 1GW data center campus near Detroit, Michigan, partners with DTE Energy on 2.7GW power generation](/en/news/google-confirms-1gw-data-center-campus-near-detroit-michigan-partners-with-dte-energy-on-27gw-power-generation/)"
   ],
   "capacity_gw_evidence": [
    "# News - Cloud & Hyperscale (EN), Project Cannoli",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Google confirms 1GW data center campus near Detroit, Michigan, partners with DTE Energy on 2.7GW power generation](/en/news/google-confirms-1gw-data-center-campus-near-detroit-michigan-partners-with-dte-energy-on-27gw-power-generation/)"
   ],
   "builder_evidence": [
    "# News - Cloud & Hyperscale (EN), Project Cannoli",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Google confirms 1GW data center campus near Detroit, Michigan, partners with DTE Energy on 2.7GW power generation](/en/news/google-confirms-1gw-data-center-campus-near-detroit-michigan-partners-with-dte-energy-on-27gw-power-generation/)"
   ],
   "ai_customer_evidence": [
    "# News - Cloud & Hyperscale (EN), Project Cannoli",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Google confirms 1GW data center campus near Detroit, Michigan, partners with DTE Energy on 2.7GW power generation](/en/news/google-confirms-1gw-data-center-campus-near-detroit-michigan-partners-with-dte-energy-on-27gw-power-generation/)"
   ],
   "status_evidence": [
    "# News - Cloud & Hyperscale (EN), Project Cannoli",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "# [Google confirms 1GW data center campus near Detroit, Michigan, partners with DTE Energy on 2.7GW power generation](/en/news/google-confirms-1gw-data-center-campus-near-detroit-michigan-partners-with-dte-energy-on-27gw-power-generation/)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://bitcoinethereumnews.com/bitcoin/terawulfs-kentucky-ai-build-shows-miners-are-abandoning-pure-bitcoin-economics",
   "title": "TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
   "published_at": "2026-05-26T17:01:11",
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": null,
   "project_evidence": [
    "# TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore.",
    "The Muskie Data Campus in eastern Kentucky is expected to support more than 1 GW of data center capacity on a roughly 285-acre parcel inside a 1,000-acre industrial park."
   ],
   "locality_evidence": [
    "# TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore.",
    "The Muskie Data Campus in eastern Kentucky is expected to support more than 1 GW of data center capacity on a roughly 285-acre parcel inside a 1,000-acre industrial park."
   ],
   "state_evidence": [
    "# TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore.",
    "The Muskie Data Campus in eastern Kentucky is expected to support more than 1 GW of data center capacity on a roughly 285-acre parcel inside a 1,000-acre industrial park."
   ],
   "capacity_gw_evidence": [
    "# TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore.",
    "The Muskie Data Campus in eastern Kentucky is expected to support more than 1 GW of data center capacity on a roughly 285-acre parcel inside a 1,000-acre industrial park."
   ],
   "builder_evidence": [
    "# TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
    "TeraWulf disclosed Tuesday that it has acquired the Muskie Data Campus from Industrial Equity Partners, adding a hyperscale AI and HPC site in eastern Kentucky that the company says can support more than 1 GW of future data center capacity."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://theia.global/article/iren-limited-energizes-14gw-sweetwater-1-data-center-in-texas-95ed6acd",
   "title": "IREN Limited Energizes 1.4GW Sweetwater 1 Data Center in Texas",
   "published_at": "2026-05-03T20:56:03",
   "project": "Sweetwater 1",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN Limited",
   "ai_customer": null,
   "status": "energized",
   "announcement_date": "2026-05-01",
   "project_evidence": [
    "IREN Limited Energizes 1.4GW Sweetwater 1 Data Center in Texas - Theia",
    "# IREN Limited Energizes 1.4GW Sweetwater 1 Data Center in Texas",
    "IREN Limited has successfully energized its 1.4GW Sweetwater 1 data center in Texas, marking a significant milestone in the development of the 2GW Sweetwater campus.",
    "On May 1, 2026, IREN Limited announced the energization of its 1.4GW Sweetwater 1 data center in Texas, connecting the site's high-voltage substation to the ERCOT grid."
   ],
   "locality_evidence": [
    "IREN Limited Energizes 1.4GW Sweetwater 1 Data Center in Texas - Theia",
    "# IREN Limited Energizes 1.4GW Sweetwater 1 Data Center in Texas",
    "IREN Limited has successfully energized its 1.4GW Sweetwater 1 data center in Texas, marking a significant milestone in the development of the 2GW Sweetwater campus."
   ],
   "state_evidence": [
    "IREN Limited Energizes 1.4GW Sweetwater 1 Data Center in Texas - Theia",
    "# IREN Limited Energizes 1.4GW Sweetwater 1 Data Center in Texas",
    "IREN Limited has successfully energized its 1.4GW Sweetwater 1 data center in Texas, marking a significant milestone in the development of the 2GW Sweetwater campus."
   ],
   "capacity_gw_evidence": [
    "IREN Limited Energizes 1.4GW Sweetwater 1 Data Center in Texas - Theia",
    "# IREN Limited Energizes 1.4GW Sweetwater 1 Data Center in Texas",
    "IREN Limited has successfully energized its 1.4GW Sweetwater 1 data center in Texas, marking a significant milestone in the development of the 2GW Sweetwater campus."
   ],
   "builder_evidence": [
    "IREN Limited Energizes 1.4GW Sweetwater 1 Data Center in Texas - Theia",
    "# IREN Limited Energizes 1.4GW Sweetwater 1 Data Center in Texas",
    "IREN Limited has successfully energized its 1.4GW Sweetwater 1 data center in Texas, marking a significant milestone in the development of the 2GW Sweetwater campus."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "IREN Limited Energizes 1.4GW Sweetwater 1 Data Center in Texas - Theia",
    "# IREN Limited Energizes 1.4GW Sweetwater 1 Data Center in Texas",
    "IREN Limited has successfully energized its 1.4GW Sweetwater 1 data center in Texas, marking a significant milestone in the development of the 2GW Sweetwater campus."
   ],
   "announcement_date_evidence": [
    "IREN Limited Energizes 1.4GW Sweetwater 1 Data Center in Texas - Theia",
    "# IREN Limited Energizes 1.4GW Sweetwater 1 Data Center in Texas",
    "Published May 3, 2026",
    "On May 1, 2026, IREN Limited announced the energization of its 1.4GW Sweetwater 1 data center in Texas, connecting the site's high-voltage substation to the ERCOT grid."
   ]
  },
  {
   "url": "https://enchantenergy.com/press",
   "title": "Press | Enchant Energy",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "Enchant Energy Offers a Carbon Answer to America\u2019s Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com/)) (\u201cEnchant\u201d) entered into a letter of intent with Creekstone Energy LLC (\u201cCreekstone\u201d) to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "Enchant Energy Offers a Carbon Answer to America\u2019s Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com/)) (\u201cEnchant\u201d) entered into a letter of intent with Creekstone Energy LLC (\u201cCreekstone\u201d) to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "Enchant Energy Offers a Carbon Answer to America\u2019s Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com/)) (\u201cEnchant\u201d) entered into a letter of intent with Creekstone Energy LLC (\u201cCreekstone\u201d) to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "Creekstone Energy",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "Creekstone Energy",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Enchant Energy Offers a Carbon Answer to America\u2019s Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com/)) (\u201cEnchant\u201d) entered into a letter of intent with Creekstone Energy LLC (\u201cCreekstone\u201d) to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "Enchant Energy Offers a Carbon Answer to America\u2019s Surging AI Data Center Demand",
    "DELTA, UTAH \u2013 May 27, 2026."
   ]
  },
  {
   "url": "https://scanx.trade/stock-market-news/companies/nvidia-secures-8-it-gw-ohio-ai-campus-capacity-via-sb-energy-deal/48522583",
   "title": "Nvidia defends OpenAI Ohio deal as $600B compute opportunity",
   "published_at": "2026-08-17T19:04:32",
   "project": "PORTS-Pike Technology Campus",
   "locality": null,
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Nvidia defends OpenAI Ohio deal as $600B compute opportunity",
    "Nvidia (NASDAQ: NVDA) CEO Jensen Huang pushed back against characterizations of \"circular financing\" surrounding Nvidia's partnership with SB Energy to build an AI campus in Ohio for OpenAI.",
    "The project involves SB Energy building, owning, and operating the data center at the PORTS-Pike Technology Campus in Ohio under a 20-year lease agreement."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# Nvidia defends OpenAI Ohio deal as $600B compute opportunity",
    "Nvidia (NASDAQ: NVDA) CEO Jensen Huang pushed back against characterizations of \"circular financing\" surrounding Nvidia's partnership with SB Energy to build an AI campus in Ohio for OpenAI.",
    "The project involves SB Energy building, owning, and operating the data center at the PORTS-Pike Technology Campus in Ohio under a 20-year lease agreement."
   ],
   "capacity_gw_evidence": [
    "# Nvidia defends OpenAI Ohio deal as $600B compute opportunity",
    "The project involves SB Energy building, owning, and operating the data center at the PORTS-Pike Technology Campus in Ohio under a 20-year lease agreement.",
    "The company provides credit support for the initial **4.25 IT-GW** of capacity and holds an option for the remaining **3.75 IT-GW**, bringing the total potential capacity to **8 IT-GW**."
   ],
   "builder_evidence": [
    "# Nvidia defends OpenAI Ohio deal as $600B compute opportunity",
    "Nvidia (NASDAQ: NVDA) CEO Jensen Huang pushed back against characterizations of \"circular financing\" surrounding Nvidia's partnership with SB Energy to build an AI campus in Ohio for OpenAI.",
    "The project involves SB Energy building, owning, and operating the data center at the PORTS-Pike Technology Campus in Ohio under a 20-year lease agreement."
   ],
   "ai_customer_evidence": [
    "# Nvidia defends OpenAI Ohio deal as $600B compute opportunity",
    "Nvidia (NASDAQ: NVDA) CEO Jensen Huang pushed back against characterizations of \"circular financing\" surrounding Nvidia's partnership with SB Energy to build an AI campus in Ohio for OpenAI.",
    "The project involves SB Energy building, owning, and operating the data center at the PORTS-Pike Technology Campus in Ohio under a 20-year lease agreement."
   ],
   "status_evidence": [
    "# Nvidia defends OpenAI Ohio deal as $600B compute opportunity",
    "Nvidia (NASDAQ: NVDA) CEO Jensen Huang pushed back against characterizations of \"circular financing\" surrounding Nvidia's partnership with SB Energy to build an AI campus in Ohio for OpenAI.",
    "Huang noted that frontier AI labs are growing faster than their balance sheets and long-term credit profiles can support."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://hothardware.com/news/nvidia-cuts-250-billion-openai-ai-data-center-commitment-half",
   "title": "NVIDIA Backs OpenAI\u2019s Gigantic 8GW Ohio AI Mega-Campus In Restructured Deal",
   "published_at": "2026-08-17T13:02:00",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 10.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "NVIDIA headquarters - Image: NVIDIA",
    "Developed in partnership with SoftBank\u2019s SB Energy, the deal secures capacity at the newly named PORTS-Pike Technology Campus."
   ],
   "locality_evidence": [
    "NVIDIA headquarters - Image: NVIDIA",
    "NVIDIA has officially finalized a land, power, and shell (LPS) financial guarantee for OpenAI's massive 10-gigawatt data center in Pike County, Ohio, cutting its initial commitment to financing 4.25 IT-gigawatts (IT-GW). initially."
   ],
   "state_evidence": [
    "NVIDIA headquarters - Image: NVIDIA",
    "NVIDIA has officially finalized a land, power, and shell (LPS) financial guarantee for OpenAI's massive 10-gigawatt data center in Pike County, Ohio, cutting its initial commitment to financing 4.25 IT-gigawatts (IT-GW). initially."
   ],
   "capacity_gw_evidence": [
    "NVIDIA headquarters - Image: NVIDIA",
    "NVIDIA has officially finalized a land, power, and shell (LPS) financial guarantee for OpenAI's massive 10-gigawatt data center in Pike County, Ohio, cutting its initial commitment to financing 4.25 IT-gigawatts (IT-GW). initially."
   ],
   "builder_evidence": [
    "NVIDIA headquarters - Image: NVIDIA",
    "Developed in partnership with SoftBank\u2019s SB Energy, the deal secures capacity at the newly named PORTS-Pike Technology Campus."
   ],
   "ai_customer_evidence": [
    "NVIDIA headquarters - Image: NVIDIA",
    "NVIDIA has officially finalized a land, power, and shell (LPS) financial guarantee for OpenAI's massive 10-gigawatt data center in Pike County, Ohio, cutting its initial commitment to financing 4.25 IT-gigawatts (IT-GW). initially."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://thenews-messenger.com/story/news/politics/2026/08/24/openai-plans-ohio-data-center/91372218007",
   "title": "OpenAI to build world's biggest AI data center in Ohio. What we know",
   "published_at": "2026-08-25T01:30:35",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 10.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "Under construction",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "POLITICS",
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The [San Francisco-based company](https://openai.com/) announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ],
   "locality_evidence": [
    "POLITICS",
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The [San Francisco-based company](https://openai.com/) announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ],
   "state_evidence": [
    "POLITICS",
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The [San Francisco-based company](https://openai.com/) announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ],
   "capacity_gw_evidence": [
    "POLITICS",
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The center will have 8 gigawatts of computing capacity \u2012 the electrical capacity that's available to servers and other equipment, not necessarily the amount of power the center will draw continuously \u2012 by the end of construction.",
    "Another 2 gigawatts of power will be used for power conversion, cooling and other systems needed to operate the site, making the total power of the site 10 gigawatts."
   ],
   "builder_evidence": [
    "POLITICS",
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "Japanese-owned [SB Energy](https://sbenergy.com/), a company that builds the infrastructure needed for AI work, owns the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "ai_customer_evidence": [
    "POLITICS",
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The [San Francisco-based company](https://openai.com/) announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ],
   "status_evidence": [
    "POLITICS",
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "Phase one construction will ramp up this year, Copple said."
   ],
   "announcement_date_evidence": [
    "POLITICS",
    "# OpenAI to build world's biggest AI data center in Ohio. What we know",
    "The [San Francisco-based company](https://openai.com/) announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ]
  },
  {
   "url": "https://kdc.bussetech.com/sites/openai-abilene",
   "title": "Stargate Abilene (Lancium Clean Campus) \u00b7 kdc",
   "published_at": null,
   "project": "Stargate Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe",
   "ai_customer": "OpenAI",
   "status": "under-construction",
   "announcement_date": "2025-03-18",
   "project_evidence": [
    "# Stargate Abilene (Lancium Clean Campus)",
    "Facts",
    "| Operator | OpenAI *(ai)* |"
   ],
   "locality_evidence": [
    "# Stargate Abilene (Lancium Clean Campus)",
    "Facts",
    "| Location | Abilene, Taylor, TX |"
   ],
   "state_evidence": [
    "# Stargate Abilene (Lancium Clean Campus)",
    "Facts",
    "| Location | Abilene, Taylor, TX |",
    "[OpenAI and Oracle to deploy 450,000 GB200 GPUs at Stargate data center in Abilene, Texas](https://www.datacenterdynamics.com/en/news/openai-and-oracle-to-deploy-450000-gb200-gpus-at-stargate-abilene-data-center/) \u2014 Data Center Dynamics, 2025-10-15"
   ],
   "capacity_gw_evidence": [
    "# Stargate Abilene (Lancium Clean Campus)",
    "Facts",
    "| Capacity | 1200 MW |",
    "full 8-building / 1.2 GW build projected Q4 2026 (capacity_mw shown is the 1.2 GW committed campus, which conflicts by frame with the ~0.3 GW operational figure)."
   ],
   "builder_evidence": [
    "# Stargate Abilene (Lancium Clean Campus)",
    "Facts",
    "| Developer | Crusoe |"
   ],
   "ai_customer_evidence": [
    "# Stargate Abilene (Lancium Clean Campus)",
    "Facts",
    "| Operator | OpenAI *(ai)* |"
   ],
   "status_evidence": [
    "# Stargate Abilene (Lancium Clean Campus)",
    "**Status:** under-construction \u00b7 **Confidence:** medium"
   ],
   "announcement_date_evidence": [
    "# Stargate Abilene (Lancium Clean Campus)",
    "Facts",
    "| First recorded | 2026-07-05 |",
    "- [Crusoe expands AI data center campus in Abilene to 1.2 gigawatts](https://lancium.com/2025/03/18/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts/) \u2014 Lancium, 2025-03-18"
   ]
  },
  {
   "url": "https://abc3340.com/news/nation-world/gallery/from-political-prize-to-campaign-liability-data-centers-become-a-midterm-battleground-campaign-trail?photo=2",
   "title": "From political prize to campaign liability: Data centers become a midterm battleground",
   "published_at": "2026-08-21T20:31:02",
   "project": "Meta El Paso Data Center",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta Platforms",
   "ai_customer": "",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# From political prize to campaign liability: Data centers become a midterm battleground",
    "EL PASO, TEXAS - AUGUST 13: In an aerial view, the Meta El Paso Data Center is seen on August 13, 2026 in El Paso, Texas."
   ],
   "locality_evidence": [
    "# From political prize to campaign liability: Data centers become a midterm battleground",
    "EL PASO, TEXAS - AUGUST 13: In an aerial view, the Meta El Paso Data Center is seen on August 13, 2026 in El Paso, Texas."
   ],
   "state_evidence": [
    "# From political prize to campaign liability: Data centers become a midterm battleground",
    "EL PASO, TEXAS - AUGUST 13: In an aerial view, the Meta El Paso Data Center is seen on August 13, 2026 in El Paso, Texas."
   ],
   "capacity_gw_evidence": [
    "# From political prize to campaign liability: Data centers become a midterm battleground",
    "Occupying approximately 1,000 acres, Meta has expanded the project to 1 gigawatt of computing capacity, allowing the facility to support a growing range of AI workloads and the training and deployment of increasingly sophisticated AI models and technologies."
   ],
   "builder_evidence": [
    "# From political prize to campaign liability: Data centers become a midterm battleground",
    "Meta Platforms continues construction on its more than $10 billion Meta El Paso Data Center in Northeast El Paso, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# From political prize to campaign liability: Data centers become a midterm battleground",
    "Meta Platforms continues construction on its more than $10 billion Meta El Paso Data Center in Northeast El Paso, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://telconews.com/story/aws-s-11bn-indiana-data-centre-powers-anthropic-s-ai-growth",
   "title": "AWS's $11bn Indiana data centre powers Anthropic's AI growth",
   "published_at": "2025-11-03T07:16:00",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon Web Services",
   "ai_customer": "Anthropic",
   "status": "fully operational",
   "announcement_date": null,
   "project_evidence": [
    "In rural Indiana, a once quiet stretch of farmland has been transformed into one of the largest artificial intelligence infrastructure projects ever undertaken.",
    "Amazon Web Services' (AWS) $11 billion Project Rainier data centre campus near New Carlisle became fully operational in October 2025, marking what AWS has described as \"one of the most ambitious projects\" in its history."
   ],
   "locality_evidence": [
    "In rural Indiana, a once quiet stretch of farmland has been transformed into one of the largest artificial intelligence infrastructure projects ever undertaken.",
    "Amazon Web Services' (AWS) $11 billion Project Rainier data centre campus near New Carlisle became fully operational in October 2025, marking what AWS has described as \"one of the most ambitious projects\" in its history."
   ],
   "state_evidence": [
    "In rural Indiana, a once quiet stretch of farmland has been transformed into one of the largest artificial intelligence infrastructure projects ever undertaken.",
    "Amazon Web Services' (AWS) $11 billion Project Rainier data centre campus near New Carlisle became fully operational in October 2025, marking what AWS has described as \"one of the most ambitious projects\" in its history."
   ],
   "capacity_gw_evidence": [
    "The site spans 1,200 acres and will ultimately draw 2.2 gigawatts of power - enough to serve about 1.6 million homes.",
    "In rural Indiana, a once quiet stretch of farmland has been transformed into one of the largest artificial intelligence infrastructure projects ever undertaken."
   ],
   "builder_evidence": [
    "Amazon Web Services' (AWS) $11 billion Project Rainier data centre campus near New Carlisle became fully operational in October 2025, marking what AWS has described as \"one of the most ambitious projects\" in its history.",
    "In rural Indiana, a once quiet stretch of farmland has been transformed into one of the largest artificial intelligence infrastructure projects ever undertaken."
   ],
   "ai_customer_evidence": [
    "Project Rainier's purpose extends beyond data storage: it was designed to serve Anthropic, the San Francisco-based AI firm founded by former OpenAI researchers Dario and Daniela Amodei.",
    "In rural Indiana, a once quiet stretch of farmland has been transformed into one of the largest artificial intelligence infrastructure projects ever undertaken."
   ],
   "status_evidence": [
    "Amazon Web Services' (AWS) $11 billion Project Rainier data centre campus near New Carlisle became fully operational in October 2025, marking what AWS has described as \"one of the most ambitious projects\" in its history.",
    "In rural Indiana, a once quiet stretch of farmland has been transformed into one of the largest artificial intelligence infrastructure projects ever undertaken."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://jupiterisland.capital/climate_deals/lancium-and-crusoe-announce-1-gw-texas-data-center",
   "title": "Lancium and Crusoe Announce 1 GW Texas Data Center - Energy Transition Finance | Jupiter Island Capital",
   "published_at": "2026-07-26T16:58:54",
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "**Executive Summary**",
    "Crusoe, a vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, have announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas, on a 270-acre site owned by Lancium."
   ],
   "locality_evidence": [
    "**Executive Summary**",
    "Crusoe, a vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, have announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas, on a 270-acre site owned by Lancium."
   ],
   "state_evidence": [
    "**Executive Summary**",
    "Crusoe, a vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, have announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas, on a 270-acre site owned by Lancium."
   ],
   "capacity_gw_evidence": [
    "**Executive Summary**",
    "Crusoe, a vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, have announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas, on a 270-acre site owned by Lancium."
   ],
   "builder_evidence": [
    "**Executive Summary**",
    "Crusoe, a vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, have announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas, on a 270-acre site owned by Lancium."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "**Executive Summary**",
    "Crusoe, a vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, have announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas, on a 270-acre site owned by Lancium."
   ],
   "announcement_date_evidence": [
    "**Executive Summary**",
    "**Source:** Crusoe/Lancium press release 7/15/2026"
   ]
  },
  {
   "url": "https://jupiterisland.capital/climate_deals/lancium-and-crusoe-announce-1-gw-texas-data-center",
   "title": "Lancium and Crusoe Announce 1 GW Texas Data Center - Energy Transition Finance | Jupiter Island Capital",
   "published_at": "2026-07-26T16:58:54",
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "**Executive Summary**",
    "This is another partnership between the companies, following a 1.2 GW campus in Abilene where Crusoe energized its first two buildings within one year and a recently announced 900 MW expansion on adjacent land."
   ],
   "locality_evidence": [
    "**Executive Summary**",
    "This is another partnership between the companies, following a 1.2 GW campus in Abilene where Crusoe energized its first two buildings within one year and a recently announced 900 MW expansion on adjacent land."
   ],
   "state_evidence": [
    "First, **Texas is the undisputed AI power capital.**",
    "This is another partnership between the companies, following a 1.2 GW campus in Abilene where Crusoe energized its first two buildings within one year and a recently announced 900 MW expansion on adjacent land."
   ],
   "capacity_gw_evidence": [
    "**Executive Summary**",
    "This is another partnership between the companies, following a 1.2 GW campus in Abilene where Crusoe energized its first two buildings within one year and a recently announced 900 MW expansion on adjacent land."
   ],
   "builder_evidence": [
    "**Executive Summary**",
    "Crusoe, a vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, have announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas, on a 270-acre site owned by Lancium.",
    "This is another partnership between the companies, following a 1.2 GW campus in Abilene where Crusoe energized its first two buildings within one year and a recently announced 900 MW expansion on adjacent land."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://substack.com/redirect/e39783c3-3d89-4ad8-a6f5-6b3216607dc8?j=eyJ1IjoiM3djM2MxIn0.OGuf1Irm-qb700DahBb35RT9QTn8SiZLleBWozyCeUk",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": "2026-03-16T01:37:48",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories.",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "locality_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories.",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "capacity_gw_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts.",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "builder_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "announcement_date_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "**SAN JOSE, CA (GTC 2026) \u2013 March 16, 2026 \u2013** Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ]
  },
  {
   "url": "https://lowvoltagenation.com/posts/meta-el-paso-project-seafox-ai-data-center",
   "title": "Meta El Paso Project Seafox AI Data Center",
   "published_at": "2026-06-16T12:31:18",
   "project": "Meta El Paso data-center campus",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "JE Dunn and Hensel Phelps",
   "ai_customer": "Meta",
   "status": "under construction",
   "announcement_date": "2025-10",
   "project_evidence": [
    "Join Low Voltage Nation \u2014 Find project opportunities and showcase your company to thousands of industry professionals",
    "Meta, JE Dunn, Hensel Phelps, Stantec, and TDLR records now frame Project Seafox as a 1GW El Paso AI data-center build to watch.",
    "Meta's El Paso data-center campus is now one of the clearest AI infrastructure construction signals in Texas."
   ],
   "locality_evidence": [
    "Join Low Voltage Nation \u2014 Find project opportunities and showcase your company to thousands of industry professionals",
    "Meta, JE Dunn, Hensel Phelps, Stantec, and TDLR records now frame Project Seafox as a 1GW El Paso AI data-center build to watch.",
    "Meta's El Paso data-center campus is now one of the clearest AI infrastructure construction signals in Texas."
   ],
   "state_evidence": [
    "Join Low Voltage Nation \u2014 Find project opportunities and showcase your company to thousands of industry professionals",
    "Meta, JE Dunn, Hensel Phelps, Stantec, and TDLR records now frame Project Seafox as a 1GW El Paso AI data-center build to watch.",
    "Meta's El Paso data-center campus is now one of the clearest AI infrastructure construction signals in Texas."
   ],
   "capacity_gw_evidence": [
    "Join Low Voltage Nation \u2014 Find project opportunities and showcase your company to thousands of industry professionals",
    "Meta, JE Dunn, Hensel Phelps, Stantec, and TDLR records now frame Project Seafox as a 1GW El Paso AI data-center build to watch.",
    "In March 2026, [Meta updated the project](https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/) with a much larger scale: more than $10 billion of investment, a campus designed to grow to 1GW, more than 300 operational jobs, and more than 4,000 construction workers at peak."
   ],
   "builder_evidence": [
    "Join Low Voltage Nation \u2014 Find project opportunities and showcase your company to thousands of industry professionals",
    "Meta, JE Dunn, Hensel Phelps, Stantec, and TDLR records now frame Project Seafox as a 1GW El Paso AI data-center build to watch.",
    "That first owner announcement described an initial investment of more than $1.5 billion, an almost 1.2 million-square-foot campus, and construction-opportunity paths tied to JE Dunn and Hensel Phelps.",
    "In March 2026, [Meta updated the project](https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/) with a much larger scale: more than $10 billion of investment, a campus designed to grow to 1GW, more than 300 operational jobs, and more than 4,000 construction workers at peak.",
    "The named construction path is stronger than a generic news hit."
   ],
   "ai_customer_evidence": [
    "Join Low Voltage Nation \u2014 Find project opportunities and showcase your company to thousands of industry professionals",
    "Meta, JE Dunn, Hensel Phelps, Stantec, and TDLR records now frame Project Seafox as a 1GW El Paso AI data-center build to watch.",
    "Meta's El Paso data-center campus is now one of the clearest AI infrastructure construction signals in Texas."
   ],
   "status_evidence": [
    "Join Low Voltage Nation \u2014 Find project opportunities and showcase your company to thousands of industry professionals",
    "Meta, JE Dunn, Hensel Phelps, Stantec, and TDLR records now frame Project Seafox as a 1GW El Paso AI data-center build to watch.",
    "Meta's El Paso data-center campus is now one of the clearest AI infrastructure construction signals in Texas."
   ],
   "announcement_date_evidence": [
    "Join Low Voltage Nation \u2014 Find project opportunities and showcase your company to thousands of industry professionals",
    "Meta, JE Dunn, Hensel Phelps, Stantec, and TDLR records now frame Project Seafox as a 1GW El Paso AI data-center build to watch.",
    "[Meta Data Centers announced El Paso](https://datacenters.atmeta.com/2025/10/hello-el-paso/) in October 2025 as an AI-optimized campus in Northeast El Paso."
   ]
  },
  {
   "url": "https://daviscountyutah.com/stratos-ai-data-center-box-elder-county-utah-kevin-oleary",
   "title": "Utah's Stratos AI Data Center: Box Elder County Approves Kevin O'Leary's 40,000-Acre Campus - Davis County Utah",
   "published_at": "2026-05-07T16:25:25",
   "project": "Stratos AI Data Center",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O\u2019Leary Digital",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": "2026-05-04",
   "project_evidence": [
    "Utah\u2019s Stratos AI Data Center: Box Elder County Approves Kevin O\u2019Leary\u2019s 40,000-Acre Campus",
    "# Utah\u2019s Stratos AI Data Center: Box Elder County Approves Kevin O\u2019Leary\u2019s 40,000-Acre Campus"
   ],
   "locality_evidence": [
    "Utah\u2019s Stratos AI Data Center: Box Elder County Approves Kevin O\u2019Leary\u2019s 40,000-Acre Campus",
    "# Utah\u2019s Stratos AI Data Center: Box Elder County Approves Kevin O\u2019Leary\u2019s 40,000-Acre Campus"
   ],
   "state_evidence": [
    "Utah\u2019s Stratos AI Data Center: Box Elder County Approves Kevin O\u2019Leary\u2019s 40,000-Acre Campus",
    "# Utah\u2019s Stratos AI Data Center: Box Elder County Approves Kevin O\u2019Leary\u2019s 40,000-Acre Campus"
   ],
   "capacity_gw_evidence": [
    "At full buildout the campus would consume 9 gigawatts of power \u2014 more than twice what the entire state of Utah currently uses \u2014 all generated on-site through natural gas.",
    "Utah\u2019s Stratos AI Data Center: Box Elder County Approves Kevin O\u2019Leary\u2019s 40,000-Acre Campus",
    "# Utah\u2019s Stratos AI Data Center: Box Elder County Approves Kevin O\u2019Leary\u2019s 40,000-Acre Campus"
   ],
   "builder_evidence": [
    "The Stratos Project is a proposed 40,000-acre AI data center and energy campus in Hansel Valley, Box Elder County, backed by Kevin O\u2019Leary\u2019s O\u2019Leary Digital.",
    "Utah\u2019s Stratos AI Data Center: Box Elder County Approves Kevin O\u2019Leary\u2019s 40,000-Acre Campus",
    "# Utah\u2019s Stratos AI Data Center: Box Elder County Approves Kevin O\u2019Leary\u2019s 40,000-Acre Campus"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Box Elder County commissioners unanimously approved two resolutions on May 4, 2026.",
    "Utah\u2019s Stratos AI Data Center: Box Elder County Approves Kevin O\u2019Leary\u2019s 40,000-Acre Campus",
    "# Utah\u2019s Stratos AI Data Center: Box Elder County Approves Kevin O\u2019Leary\u2019s 40,000-Acre Campus"
   ],
   "announcement_date_evidence": [
    "Box Elder County commissioners unanimously approved two resolutions on May 4, 2026.",
    "Utah\u2019s Stratos AI Data Center: Box Elder County Approves Kevin O\u2019Leary\u2019s 40,000-Acre Campus",
    "# Utah\u2019s Stratos AI Data Center: Box Elder County Approves Kevin O\u2019Leary\u2019s 40,000-Acre Campus"
   ]
  },
  {
   "url": "https://thecoinomist.com/news/benchmark-raises-hut-8-target-165-16-8b-ai-leases",
   "title": "Benchmark lifts Hut 8 target to $165 on $16.8B AI leases",
   "published_at": "2026-07-14T15:32:35",
   "project": "Beacon Point",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "redeveloped for artificial intelligence workloads",
   "announcement_date": null,
   "project_evidence": [
    "# Benchmark lifts Hut 8 target to $165 on $16.8B AI leases",
    "Benchmark raised Hut 8\u2019s price target to $165, citing $16.8 billion in contracted value across Beacon Point and River Bend AI data center leases.",
    "Benchmark highlighted the 1,000-megawatt Beacon Point campus in Texas as a key driver."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# Benchmark lifts Hut 8 target to $165 on $16.8B AI leases",
    "Benchmark highlighted the 1,000-megawatt Beacon Point campus in Texas as a key driver."
   ],
   "capacity_gw_evidence": [
    "# Benchmark lifts Hut 8 target to $165 on $16.8B AI leases",
    "Benchmark highlighted the 1,000-megawatt Beacon Point campus in Texas as a key driver."
   ],
   "builder_evidence": [
    "# Benchmark lifts Hut 8 target to $165 on $16.8B AI leases",
    "Benchmark raised Hut 8\u2019s price target to $165, citing $16.8 billion in contracted value across Beacon Point and River Bend AI data center leases.",
    "Hut 8 began as a bitcoin mining operator and has repurposed sites originally planned for ASIC computing to develop large-scale data centers and AI infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Benchmark lifts Hut 8 target to $165 on $16.8B AI leases",
    "The site was redeveloped for artificial intelligence workloads, and Phase 1 was redesigned to support 352 megawatts of IT capacity, up from an original 224 MW plan."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://msp-channel.com/news/68603/ecl-reveals-1-gw-off-grid-hydrogen-powered-ai-factory-data-centre",
   "title": "ECL reveals 1 GW off-grid, hydrogen-powered AI Factory data centre",
   "published_at": "2024-09-27T06:41:33",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "ECL",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2024-06-20",
   "project_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston.",
    "The initial 1GW phased development may be expanded to 2GW in the future, enabled by its modularity and based on customer demand."
   ],
   "locality_evidence": [
    "600+ acres near Houston, Texas will give AI leaders the space and power needed for the next wave of innovation, with zero emissions.",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston."
   ],
   "state_evidence": [
    "600+ acres near Houston, Texas will give AI leaders the space and power needed for the next wave of innovation, with zero emissions.",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston."
   ],
   "capacity_gw_evidence": [
    "The initial 1GW phased development may be expanded to 2GW in the future, enabled by its modularity and based on customer demand."
   ],
   "builder_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston.",
    "The initial phase of TerraSite-TX1 will be delivered in the summer of 2025 at a cost of approximately $450M, with 50MW of data center capacity to be utilized by data center cloud and AI cloud operators."
   ],
   "announcement_date_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston."
   ]
  },
  {
   "url": "https://open.substack.com/pub/goodai/p/superintelligence-needs-superpower?trk=article-ssr-frontend-pulse_little-text-block",
   "title": "Superintelligence Needs Superpower: Why AI\u2019s Next Bottleneck Is Electricity",
   "published_at": "2025-08-04T16:49:54",
   "project": "Hyperion",
   "locality": null,
   "state": null,
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "in development",
   "announcement_date": null,
   "project_evidence": [
    "# Superintelligence Needs Superpower: Why AI\u2019s Next Bottleneck Is Electricity",
    "### **Meta Unveils Prometheus and Hyperion: The First Gigawatt AI Superclusters**",
    "Hyperion, a second installation in development, is expected to scale up to **5 GW** over time."
   ],
   "locality_evidence": null,
   "state_evidence": null,
   "capacity_gw_evidence": [
    "# Superintelligence Needs Superpower: Why AI\u2019s Next Bottleneck Is Electricity",
    "### **Meta Unveils Prometheus and Hyperion: The First Gigawatt AI Superclusters**",
    "Hyperion, a second installation in development, is expected to scale up to **5 GW** over time."
   ],
   "builder_evidence": [
    "# Superintelligence Needs Superpower: Why AI\u2019s Next Bottleneck Is Electricity",
    "### **Meta Unveils Prometheus and Hyperion: The First Gigawatt AI Superclusters**",
    "Following its [$14.3 billion investment into talent and infrastructure through Scale AI](https://open.substack.com/pub/goodai/p/metas-143b-investment-in-scale-ai?r=23f1k&utm_campaign=post&utm_medium=web&showWelcomeOnShare=false)\u2014a move that signaled Meta\u2019s full-throttle commitment to AI superintelligence\u2014the company has unveiled two of the most significant AI data center projects in history: **Prometheus** and **Hyperion**.",
    "Hyperion, a second installation in development, is expected to scale up to **5 GW** over time."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Superintelligence Needs Superpower: Why AI\u2019s Next Bottleneck Is Electricity",
    "### **Meta Unveils Prometheus and Hyperion: The First Gigawatt AI Superclusters**",
    "Hyperion, a second installation in development, is expected to scale up to **5 GW** over time."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://open.substack.com/pub/goodai/p/superintelligence-needs-superpower?trk=article-ssr-frontend-pulse_little-text-block",
   "title": "Superintelligence Needs Superpower: Why AI\u2019s Next Bottleneck Is Electricity",
   "published_at": "2025-08-04T16:49:54",
   "project": "Colossus",
   "locality": "Memphis",
   "state": null,
   "capacity_gw": 1.4,
   "builder": "xAI",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# Superintelligence Needs Superpower: Why AI\u2019s Next Bottleneck Is Electricity",
    "### **Colossus: Powering Superintelligence with Custom Infrastructure**",
    "To support this level of infrastructure, Elon Musk\u2019s xAI designed **Colossus**, a flagship data center reported to host **over 100,000 GPUs** and believed to draw up to **1.4 GW** of power."
   ],
   "locality_evidence": [
    "# Superintelligence Needs Superpower: Why AI\u2019s Next Bottleneck Is Electricity",
    "### **Colossus: Powering Superintelligence with Custom Infrastructure**",
    "In **Memphis**, where part of Colossus' infrastructure and support operations are located, [residents have raised concerns](https://www.politico.com/news/2025/05/06/elon-musk-xai-memphis-gas-turbines-air-pollution-permits-00317582?utm_source=chatgpt.com)****[over environmental impact, air emissions, high water usage, and the lack of transparency in project development](https://www.politico.com/news/2025/05/06/elon-musk-xai-memphis-gas-turbines-air-pollution-permits-00317582?utm_source=chatgpt.com)."
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "# Superintelligence Needs Superpower: Why AI\u2019s Next Bottleneck Is Electricity",
    "### **Colossus: Powering Superintelligence with Custom Infrastructure**",
    "To support this level of infrastructure, Elon Musk\u2019s xAI designed **Colossus**, a flagship data center reported to host **over 100,000 GPUs** and believed to draw up to **1.4 GW** of power."
   ],
   "builder_evidence": [
    "# Superintelligence Needs Superpower: Why AI\u2019s Next Bottleneck Is Electricity",
    "### **Colossus: Powering Superintelligence with Custom Infrastructure**",
    "To support this level of infrastructure, Elon Musk\u2019s xAI designed **Colossus**, a flagship data center reported to host **over 100,000 GPUs** and believed to draw up to **1.4 GW** of power."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://tikr.com/blog/american-electric-power-forecast-how-its-78-billion-capital-plan-compares-to-fellow-utilities",
   "title": "American Electric Power Forecast: How Its $78 Billion Capital Plan Compares to Fellow Utilities",
   "published_at": "2026-08-21T06:55:00",
   "project": "Ports Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "American Electric Power",
   "ai_customer": "Nvidia, OpenAI",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "American Electric Power Forecast: How Its $78 Billion Capital Plan Compares to Fellow Utilities",
    "## ******A Growth Story With a Modest Return Profile******",
    "Nvidia, OpenAI, and SoftBank\u2019s SB Energy unit announced plans for an 8 gigawatt AI data center campus in Pike County, Ohio, and AEP is the utility building the grid to support it."
   ],
   "locality_evidence": [
    "American Electric Power Forecast: How Its $78 Billion Capital Plan Compares to Fellow Utilities",
    "## ******A Growth Story With a Modest Return Profile******",
    "Nvidia, OpenAI, and SoftBank\u2019s SB Energy unit announced plans for an 8 gigawatt AI data center campus in Pike County, Ohio, and AEP is the utility building the grid to support it."
   ],
   "state_evidence": [
    "American Electric Power Forecast: How Its $78 Billion Capital Plan Compares to Fellow Utilities",
    "## ******A Growth Story With a Modest Return Profile******",
    "Nvidia, OpenAI, and SoftBank\u2019s SB Energy unit announced plans for an 8 gigawatt AI data center campus in Pike County, Ohio, and AEP is the utility building the grid to support it."
   ],
   "capacity_gw_evidence": [
    "American Electric Power Forecast: How Its $78 Billion Capital Plan Compares to Fellow Utilities",
    "## ******A Growth Story With a Modest Return Profile******",
    "Nvidia, OpenAI, and SoftBank\u2019s SB Energy unit announced plans for an 8 gigawatt AI data center campus in Pike County, Ohio, and AEP is the utility building the grid to support it."
   ],
   "builder_evidence": [
    "American Electric Power Forecast: How Its $78 Billion Capital Plan Compares to Fellow Utilities",
    "## ******A Growth Story With a Modest Return Profile******",
    "Nvidia, OpenAI, and SoftBank\u2019s SB Energy unit announced plans for an 8 gigawatt AI data center campus in Pike County, Ohio, and AEP is the utility building the grid to support it."
   ],
   "ai_customer_evidence": [
    "American Electric Power Forecast: How Its $78 Billion Capital Plan Compares to Fellow Utilities",
    "## ******A Growth Story With a Modest Return Profile******",
    "Nvidia, OpenAI, and SoftBank\u2019s SB Energy unit announced plans for an 8 gigawatt AI data center campus in Pike County, Ohio, and AEP is the utility building the grid to support it."
   ],
   "status_evidence": [
    "American Electric Power Forecast: How Its $78 Billion Capital Plan Compares to Fellow Utilities",
    "## ******A Growth Story With a Modest Return Profile******",
    "Nvidia, OpenAI, and SoftBank\u2019s SB Energy unit announced plans for an 8 gigawatt AI data center campus in Pike County, Ohio, and AEP is the utility building the grid to support it."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://introl.com/ar/blog/xai-mississippi-20-billion-supercomputer-memphis-2026",
   "title": "xAI's $20 Billion Mississippi Supercomputer: 2 GW Facility Reshapes AI Race",
   "published_at": "2026-01-13T02:39:36",
   "project": "MACROHARDRR",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "operational",
   "announcement_date": "2026-01-08",
   "project_evidence": [
    "# xAI's $20 Billion Mississippi Supercomputer: 2 GW Facility Reshapes AI Race",
    "Facility Overview",
    "| Specification | Detail |",
    "| Facility Name | MACROHARDRR |",
    "The Southaven data center, dubbed MACROHARDRR, represents xAI's third facility in the greater Memphis region."
   ],
   "locality_evidence": [
    "# xAI's $20 Billion Mississippi Supercomputer: 2 GW Facility Reshapes AI Race",
    "Facility Overview",
    "| Specification | Detail |",
    "| Location | Southaven, Mississippi (DeSoto County) |",
    "Elon Musk's xAI announced a $20 billion data center in Southaven, Mississippi\u2014the largest private investment in state history."
   ],
   "state_evidence": [
    "# xAI's $20 Billion Mississippi Supercomputer: 2 GW Facility Reshapes AI Race",
    "Facility Overview",
    "| Specification | Detail |",
    "| Location | Southaven, Mississippi (DeSoto County) |",
    "Elon Musk's xAI announced a $20 billion data center in Southaven, Mississippi\u2014the largest private investment in state history."
   ],
   "capacity_gw_evidence": [
    "# xAI's $20 Billion Mississippi Supercomputer: 2 GW Facility Reshapes AI Race",
    "Facility Overview",
    "| Specification | Detail |",
    "| Power Capacity | ~2 GW total cluster |",
    "The 2 GW facility expands the Memphis-area Colossus cluster to create what xAI calls 'the most powerful AI system on Earth."
   ],
   "builder_evidence": [
    "# xAI's $20 Billion Mississippi Supercomputer: 2 GW Facility Reshapes AI Race",
    "Facility Overview",
    "Elon Musk's xAI announced a $20 billion data center in Southaven, Mississippi\u2014the largest private investment in state history."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# xAI's $20 Billion Mississippi Supercomputer: 2 GW Facility Reshapes AI Race",
    "Timeline and Milestones",
    "| Date | Milestone |",
    "| February 2026 | MACROHARDRR operations begin |",
    "Combined with existing Colossus infrastructure, the cluster will house what xAI describes as \"the world's largest supercomputer\" when operations begin in February 2026."
   ],
   "announcement_date_evidence": [
    "# xAI's $20 Billion Mississippi Supercomputer: 2 GW Facility Reshapes AI Race",
    "Timeline and Milestones",
    "| Date | Milestone |",
    "| January 8, 2026 | $20 billion Southaven announcement |",
    "Elon Musk committed $20 billion to Mississippi on January 8, 2026."
   ]
  },
  {
   "url": "https://primereports.org/best-gpu-neoclouds-2026-coreweave-nebius-lambda-crusoe-and-groq-ranked-by-published-pricing-and-contracted-power",
   "title": "Best GPU Neoclouds 2026: CoreWeave, Nebius, Lambda, Crusoe, and Groq Ranked by Published Pricing and Contracted Power - Prime Reports",
   "published_at": "2026-08-22T05:06:44",
   "project": "Abilene campus",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 2.1,
   "builder": "Crusoe",
   "ai_customer": "Oracle, OpenAI, and Microsoft",
   "status": "Under development",
   "announcement_date": "2026-03-27",
   "project_evidence": [
    "This article compares them on what actually matters to a buyer: published pricing, deployed and contracted power, hardware roadmap, contract structure, and independent quality ratings.",
    "Crusoe builds the 1.2 GW Abilene, Texas campus for Oracle and OpenAI (the first Stargate site).",
    "In March 2026 it announced a separate 900 MW Abilene campus for Microsoft, bringing the full site to about 2.1 GW."
   ],
   "locality_evidence": [
    "This article compares them on what actually matters to a buyer: published pricing, deployed and contracted power, hardware roadmap, contract structure, and independent quality ratings.",
    "Crusoe builds the 1.2 GW Abilene, Texas campus for Oracle and OpenAI (the first Stargate site)."
   ],
   "state_evidence": [
    "This article compares them on what actually matters to a buyer: published pricing, deployed and contracted power, hardware roadmap, contract structure, and independent quality ratings.",
    "Crusoe builds the 1.2 GW Abilene, Texas campus for Oracle and OpenAI (the first Stargate site)."
   ],
   "capacity_gw_evidence": [
    "This article compares them on what actually matters to a buyer: published pricing, deployed and contracted power, hardware roadmap, contract structure, and independent quality ratings.",
    "Crusoe builds the 1.2 GW Abilene, Texas campus for Oracle and OpenAI (the first Stargate site).",
    "In March 2026 it announced a separate 900 MW Abilene campus for Microsoft, bringing the full site to about 2.1 GW."
   ],
   "builder_evidence": [
    "This article compares them on what actually matters to a buyer: published pricing, deployed and contracted power, hardware roadmap, contract structure, and independent quality ratings.",
    "Crusoe builds the 1.2 GW Abilene, Texas campus for Oracle and OpenAI (the first Stargate site)."
   ],
   "ai_customer_evidence": [
    "This article compares them on what actually matters to a buyer: published pricing, deployed and contracted power, hardware roadmap, contract structure, and independent quality ratings.",
    "Crusoe builds the 1.2 GW Abilene, Texas campus for Oracle and OpenAI (the first Stargate site).",
    "In March 2026 it announced a separate 900 MW Abilene campus for Microsoft, bringing the full site to about 2.1 GW."
   ],
   "status_evidence": [
    "This article compares them on what actually matters to a buyer: published pricing, deployed and contracted power, hardware roadmap, contract structure, and independent quality ratings.",
    "Crusoe builds the 1.2 GW Abilene, Texas campus for Oracle and OpenAI (the first Stargate site)."
   ],
   "announcement_date_evidence": [
    "This article compares them on what actually matters to a buyer: published pricing, deployed and contracted power, hardware roadmap, contract structure, and independent quality ratings.",
    "Crusoe, 900 MW Microsoft campus, Mar 27, 2026 \u2014 https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure"
   ]
  },
  {
   "url": "https://compute-atlas.com/facilities/vantage-frontier-shackelford-county-tx",
   "title": "Compute Atlas",
   "published_at": "2026-07-05T00:00:00",
   "project": "Vantage Frontier Campus",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": "OpenAI / Oracle",
   "status": "Under construction",
   "announcement_date": "2025",
   "project_evidence": [
    "# Vantage Frontier Campus",
    "TX \u00b7 Shackelford County \u00b7 32.727\u00b0N 99.299\u00b0W"
   ],
   "locality_evidence": [
    "TX \u00b7 Shackelford County \u00b7 32.727\u00b0N 99.299\u00b0W",
    "LocationTX, Shackelford County",
    "# Vantage Frontier Campus"
   ],
   "state_evidence": [
    "Shackelford County, Texas \u00b7 2025",
    "# Vantage Frontier Campus"
   ],
   "capacity_gw_evidence": [
    "Capacity1,400 MW planned",
    "# Vantage Frontier Campus"
   ],
   "builder_evidence": [
    "Vantage Data Centers (for OpenAI / Oracle)",
    "# Vantage Frontier Campus"
   ],
   "ai_customer_evidence": [
    "Vantage Data Centers (for OpenAI / Oracle)",
    "# Vantage Frontier Campus"
   ],
   "status_evidence": [
    "Under construction",
    "# Vantage Frontier Campus"
   ],
   "announcement_date_evidence": [
    "Announced2025",
    "# Vantage Frontier Campus"
   ]
  },
  {
   "url": "https://finviz.com/news/316528/fermi-america-makes-initial-draw-on-200-million-equipment-facility-from-keystone-national-group-and-cape-commercial-finance-to-accelerate-the-delivery-of-the-first-23gw-of-project-matadors-11gw-private-hypergrid-campus",
   "title": "Fermi America Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid Campus",
   "published_at": null,
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2026-02-19",
   "project_evidence": [
    "Fermi America Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid Campus"
   ],
   "locality_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ -- [Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4623677-1&h=4044461773&u=https%3A%2F%2Ffermiamerica.com%2F&a=Fermi+Inc.+(d%2Fb%2Fa+Fermi+America)+(NASDAQ+%26+LSE%3A+FRMI)%2C+operating+as+Fermi+America%E2%84%A2), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "Fermi America Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid Campus"
   ],
   "state_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ -- [Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4623677-1&h=4044461773&u=https%3A%2F%2Ffermiamerica.com%2F&a=Fermi+Inc.+(d%2Fb%2Fa+Fermi+America)+(NASDAQ+%26+LSE%3A+FRMI)%2C+operating+as+Fermi+America%E2%84%A2), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "Fermi America Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid Campus"
   ],
   "capacity_gw_evidence": [
    "Fermi America Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid Campus"
   ],
   "builder_evidence": [
    "Fermi America Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid Campus"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus",
    "Fermi America Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid Campus"
   ],
   "announcement_date_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ -- [Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4623677-1&h=4044461773&u=https%3A%2F%2Ffermiamerica.com%2F&a=Fermi+Inc.+(d%2Fb%2Fa+Fermi+America)+(NASDAQ+%26+LSE%3A+FRMI)%2C+operating+as+Fermi+America%E2%84%A2), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "Fermi America Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid Campus"
   ]
  },
  {
   "url": "https://rcrtech.com/ai-infrastructure-news/homer-city-energys-ambitious-4-4-gw-campus",
   "title": "Homer City Energy 4.4 GW campus will generate behind-the-meter power leveraging existing infrastructure",
   "published_at": "2026-04-07T15:21:27",
   "project": "Homer City Energy Campus",
   "locality": "Indiana County",
   "state": "Pennsylvania",
   "capacity_gw": 4.4,
   "builder": "Homer City Redevelopment",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "Table of Contents",
    "Some say energy production at the new Homer City Energy Campus is one example of how innovative AI data center builds can help address the nation\u2019s energy shortage, even as AI and HPC technologies flourish.",
    "In a statement to *RCRTech,* Homer City Redevelopment noted the commencement of vertical construction at the campus, pointing to an announcement of \u201cfirst steel\u201d at the Homer City Energy Campus, with completion of an [\u201cextensive underground foundation\u201d shifting the trajectory of the gas-powered energy facility.](https://www.businesswire.com/news/home/20260401716982/en/Homer-City-Redevelopment-Crosses-the-First-Steel-Threshold)"
   ],
   "locality_evidence": [
    "Table of Contents",
    "The 4.4 GW facility in Indiana County, PA, will be one of the largest, if not the largest, natural gas-powered data center campus in the U.S.",
    "According to a [public statement](https://www.homercityredevelopment.com/post/former-homer-city-pa-coal-plant-officially-reopens-as-state-of-the-art-natural-gas-facility) by William Wexler, president and CEO of Homer City Redevelopment (HMR), \u201cWe are fully committed to maximizing the unprecedented level of economic opportunity this project represents not just for Indiana County, but for all of Pennsylvania and the Mid-Atlantic region of the country.\u201d"
   ],
   "state_evidence": [
    "Table of Contents",
    "The 4.4 GW facility in Indiana County, PA, will be one of the largest, if not the largest, natural gas-powered data center campus in the U.S.",
    "According to a [public statement](https://www.homercityredevelopment.com/post/former-homer-city-pa-coal-plant-officially-reopens-as-state-of-the-art-natural-gas-facility) by William Wexler, president and CEO of Homer City Redevelopment (HMR), \u201cWe are fully committed to maximizing the unprecedented level of economic opportunity this project represents not just for Indiana County, but for all of Pennsylvania and the Mid-Atlantic region of the country.\u201d"
   ],
   "capacity_gw_evidence": [
    "Table of Contents",
    "The 4.4 GW facility in Indiana County, PA, will be one of the largest, if not the largest, natural gas-powered data center campus in the U.S.",
    "The plan is to convert Homer City Generating Station \u2013 a decommissioned coal power plant \u2013 into a 3,200-acre campus for 4.4 GW of power."
   ],
   "builder_evidence": [
    "Table of Contents",
    "Homer City Redevelopment (HCR) is partnering with GE Vernova to build one of the largest natural gas-powered data center campus in the United States."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Table of Contents",
    "In a statement to *RCRTech,* Homer City Redevelopment noted the commencement of vertical construction at the campus, pointing to an announcement of \u201cfirst steel\u201d at the Homer City Energy Campus, with completion of an [\u201cextensive underground foundation\u201d shifting the trajectory of the gas-powered energy facility.](https://www.businesswire.com/news/home/20260401716982/en/Homer-City-Redevelopment-Crosses-the-First-Steel-Threshold)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://techtimes.com/articles/325815/20260827/after-microsoft-exited-anthropic-signed-45b-deal-anchoring-nscales-ipo.htm",
   "title": "After Microsoft Exited, Anthropic Signed $45B Deal Anchoring Nscale\u2019s IPO",
   "published_at": "2026-08-27T19:17:57",
   "project": "Monarch",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Anthropic",
   "status": "Under development",
   "announcement_date": "2026-03-01",
   "project_evidence": [
    "In March 2026, Nscale used the announcement of a [letter of intent with Microsoft](https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) \u2014 covering up to 1.35 gigawatts at the Monarch campus \u2014 to anchor its debut at Nvidia's GTC 2026 conference and simultaneously close what it described as the largest Series C in European history: $2 billion at a $14.6 billion valuation.",
    "The Monarch Compute Campus sits on 2,250 acres in Mason County, West Virginia \u2014 a site Nscale acquired in March 2026 when it [purchased American Intelligence & Power Corporation](https://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) from developers Fidelis New Energy and 8090 Industries."
   ],
   "locality_evidence": [
    "The Monarch Compute Campus sits on 2,250 acres in Mason County, West Virginia \u2014 a site Nscale acquired in March 2026 when it [purchased American Intelligence & Power Corporation](https://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) from developers Fidelis New Energy and 8090 Industries."
   ],
   "state_evidence": [
    "The Monarch Compute Campus sits on 2,250 acres in Mason County, West Virginia \u2014 a site Nscale acquired in March 2026 when it [purchased American Intelligence & Power Corporation](https://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) from developers Fidelis New Energy and 8090 Industries."
   ],
   "capacity_gw_evidence": [
    "Nscale has described the campus as the United States' first state-certified AI microgrid, with a total power potential scalable to more than eight gigawatts."
   ],
   "builder_evidence": [
    "In March 2026, Nscale used the announcement of a [letter of intent with Microsoft](https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) \u2014 covering up to 1.35 gigawatts at the Monarch campus \u2014 to anchor its debut at Nvidia's GTC 2026 conference and simultaneously close what it described as the largest Series C in European history: $2 billion at a $14.6 billion valuation.",
    "The Monarch Compute Campus sits on 2,250 acres in Mason County, West Virginia \u2014 a site Nscale acquired in March 2026 when it [purchased American Intelligence & Power Corporation](https://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) from developers Fidelis New Energy and 8090 Industries."
   ],
   "ai_customer_evidence": [
    "Weeks after Microsoft walked away from a 1.35-gigawatt commitment at Nscale's West Virginia campus, Anthropic moved in \u2014 agreeing to pay $45 billion over six years for 460 megawatts of computing capacity at the same site, Bloomberg first reported on August 26."
   ],
   "status_evidence": [
    "Developing the entire campus \u2014 first phase plus the full 8-gigawatt potential \u2014 is [projected to cost approximately $71 billion](https://thenextweb.com/news/anthropic-nscale-45b-compute-deal-london-ipo), with roughly $47 billion of that representing chip procurement."
   ],
   "announcement_date_evidence": [
    "In March 2026, Nscale used the announcement of a [letter of intent with Microsoft](https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) \u2014 covering up to 1.35 gigawatts at the Monarch campus \u2014 to anchor its debut at Nvidia's GTC 2026 conference and simultaneously close what it described as the largest Series C in European history: $2 billion at a $14.6 billion valuation."
   ]
  },
  {
   "url": "https://docsity.com/en/docs/upcoming-data-centers-in-texas-2026/16660766",
   "title": "Upcoming Data Centers in Texas 2026 | Summaries Business | Docsity",
   "published_at": null,
   "project": "Advanced Energy and Intelligence Campus",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Texas University System & Fermi America",
   "ai_customer": null,
   "status": "Geotechnical work started in June 2025; the first 1 GW by the end of 2026",
   "announcement_date": null,
   "project_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026"
   ],
   "locality_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026"
   ],
   "state_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026"
   ],
   "capacity_gw_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026"
   ],
   "builder_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://docsity.com/en/docs/upcoming-data-centers-in-texas-2026/16660766",
   "title": "Upcoming Data Centers in Texas 2026 | Summaries Business | Docsity",
   "published_at": null,
   "project": "Data City",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corporation",
   "ai_customer": null,
   "status": "First 300 MW + 1 M sq ft launching in 2026; full build phased",
   "announcement_date": null,
   "project_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "2 Data City, Texas 5 GW Near Laredo, Texas Energy Abundance Developme nt Corporation First 300 MW + 1 M sq ft launching in 2026; full build phased"
   ],
   "locality_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "2 Data City, Texas 5 GW Near Laredo, Texas Energy Abundance Developme nt Corporation First 300 MW + 1 M sq ft launching in 2026; full build phased"
   ],
   "state_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "2 Data City, Texas 5 GW Near Laredo, Texas Energy Abundance Developme nt Corporation First 300 MW + 1 M sq ft launching in 2026; full build phased"
   ],
   "capacity_gw_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "2 Data City, Texas 5 GW Near Laredo, Texas Energy Abundance Developme nt Corporation First 300 MW + 1 M sq ft launching in 2026; full build phased"
   ],
   "builder_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "2 Data City, Texas 5 GW Near Laredo, Texas Energy Abundance Developme nt Corporation First 300 MW + 1 M sq ft launching in 2026; full build phased"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "2 Data City, Texas 5 GW Near Laredo, Texas Energy Abundance Developme nt Corporation First 300 MW + 1 M sq ft launching in 2026; full build phased"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://docsity.com/en/docs/upcoming-data-centers-in-texas-2026/16660766",
   "title": "Upcoming Data Centers in Texas 2026 | Summaries Business | Docsity",
   "published_at": null,
   "project": "OpenAI Stargate Campus",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 4.5,
   "builder": "OpenAI, Oracle, SoftBank",
   "ai_customer": "OpenAI",
   "status": "Under construction; phased build over 4 years",
   "announcement_date": null,
   "project_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "3 OpenAI Stargate Campus 4.5 GW Abilene, Texas OpenAI, Oracle, SoftBank (land owned by Lancium) Under constructio n; phased build over 4 years"
   ],
   "locality_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "3 OpenAI Stargate Campus 4.5 GW Abilene, Texas OpenAI, Oracle, SoftBank (land owned by Lancium) Under constructio n; phased build over 4 years"
   ],
   "state_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "3 OpenAI Stargate Campus 4.5 GW Abilene, Texas OpenAI, Oracle, SoftBank (land owned by Lancium) Under constructio n; phased build over 4 years"
   ],
   "capacity_gw_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "3 OpenAI Stargate Campus 4.5 GW Abilene, Texas OpenAI, Oracle, SoftBank (land owned by Lancium) Under constructio n; phased build over 4 years"
   ],
   "builder_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "3 OpenAI Stargate Campus 4.5 GW Abilene, Texas OpenAI, Oracle, SoftBank (land owned by Lancium) Under constructio n; phased build over 4 years"
   ],
   "ai_customer_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "3 OpenAI Stargate Campus 4.5 GW Abilene, Texas OpenAI, Oracle, SoftBank (land owned by Lancium) Under constructio n; phased build over 4 years"
   ],
   "status_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "3 OpenAI Stargate Campus 4.5 GW Abilene, Texas OpenAI, Oracle, SoftBank (land owned by Lancium) Under constructio n; phased build over 4 years"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://docsity.com/en/docs/upcoming-data-centers-in-texas-2026/16660766",
   "title": "Upcoming Data Centers in Texas 2026 | Summaries Business | Docsity",
   "published_at": null,
   "project": "Tract Caldwell County Park",
   "locality": "Caldwell County",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Tract",
   "ai_customer": null,
   "status": "Land acquisition completed in May 2025; 360 MW first phase operational in 2028",
   "announcement_date": null,
   "project_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "4 Tract Caldwell County Park 2 GW Caldwell County, Texas Tract Land acquisition completed in May 2025; 360"
   ],
   "locality_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "4 Tract Caldwell County Park 2 GW Caldwell County, Texas Tract Land acquisition completed in May 2025; 360"
   ],
   "state_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "4 Tract Caldwell County Park 2 GW Caldwell County, Texas Tract Land acquisition completed in May 2025; 360"
   ],
   "capacity_gw_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "4 Tract Caldwell County Park 2 GW Caldwell County, Texas Tract Land acquisition completed in May 2025; 360"
   ],
   "builder_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "4 Tract Caldwell County Park 2 GW Caldwell County, Texas Tract Land acquisition completed in May 2025; 360"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "4 Tract Caldwell County Park 2 GW Caldwell County, Texas Tract Land acquisition completed in May 2025; 360",
    "MW first phase operational in 2028"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://docsity.com/en/docs/upcoming-data-centers-in-texas-2026/16660766",
   "title": "Upcoming Data Centers in Texas 2026 | Summaries Business | Docsity",
   "published_at": null,
   "project": "Frontier (Vantage DC)",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Construction started; first building delivery- H 2026",
   "announcement_date": null,
   "project_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "5 Frontier (Vantage DC) 1.4 GW Shackelford County, Texas Vantage Data Centers Constructio n started; first building delivery- H 2026"
   ],
   "locality_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "5 Frontier (Vantage DC) 1.4 GW Shackelford County, Texas Vantage Data Centers Constructio n started; first building delivery- H 2026"
   ],
   "state_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "5 Frontier (Vantage DC) 1.4 GW Shackelford County, Texas Vantage Data Centers Constructio n started; first building delivery- H 2026"
   ],
   "capacity_gw_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "5 Frontier (Vantage DC) 1.4 GW Shackelford County, Texas Vantage Data Centers Constructio n started; first building delivery- H 2026"
   ],
   "builder_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "5 Frontier (Vantage DC) 1.4 GW Shackelford County, Texas Vantage Data Centers Constructio n started; first building delivery- H 2026"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Upcoming Data Centers in Texas",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
    "5 Frontier (Vantage DC) 1.4 GW Shackelford County, Texas Vantage Data Centers Constructio n started; first building delivery- H 2026"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?tag=project-cannoli",
   "title": "News Project Cannoli - DCD",
   "published_at": "2026-05-21T22:46:10",
   "project": "Google 1GW data center campus",
   "locality": "Detroit",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Google",
   "ai_customer": "Google",
   "status": "confirmed",
   "announcement_date": null,
   "project_evidence": [
    "# News - Project Cannoli",
    "# [Google confirms 1GW data center campus near Detroit, Michigan, partners with DTE Energy on 2.7GW power generation](/en/news/google-confirms-1gw-data-center-campus-near-detroit-michigan-partners-with-dte-energy-on-27gw-power-generation/)"
   ],
   "locality_evidence": [
    "# News - Project Cannoli",
    "# [Google confirms 1GW data center campus near Detroit, Michigan, partners with DTE Energy on 2.7GW power generation](/en/news/google-confirms-1gw-data-center-campus-near-detroit-michigan-partners-with-dte-energy-on-27gw-power-generation/)"
   ],
   "state_evidence": [
    "# News - Project Cannoli",
    "# [Google confirms 1GW data center campus near Detroit, Michigan, partners with DTE Energy on 2.7GW power generation](/en/news/google-confirms-1gw-data-center-campus-near-detroit-michigan-partners-with-dte-energy-on-27gw-power-generation/)"
   ],
   "capacity_gw_evidence": [
    "# News - Project Cannoli",
    "# [Google confirms 1GW data center campus near Detroit, Michigan, partners with DTE Energy on 2.7GW power generation](/en/news/google-confirms-1gw-data-center-campus-near-detroit-michigan-partners-with-dte-energy-on-27gw-power-generation/)"
   ],
   "builder_evidence": [
    "# News - Project Cannoli",
    "# [Google confirms 1GW data center campus near Detroit, Michigan, partners with DTE Energy on 2.7GW power generation](/en/news/google-confirms-1gw-data-center-campus-near-detroit-michigan-partners-with-dte-energy-on-27gw-power-generation/)"
   ],
   "ai_customer_evidence": [
    "# News - Project Cannoli",
    "# [Google confirms 1GW data center campus near Detroit, Michigan, partners with DTE Energy on 2.7GW power generation](/en/news/google-confirms-1gw-data-center-campus-near-detroit-michigan-partners-with-dte-energy-on-27gw-power-generation/)"
   ],
   "status_evidence": [
    "# News - Project Cannoli",
    "# [Google confirms 1GW data center campus near Detroit, Michigan, partners with DTE Energy on 2.7GW power generation](/en/news/google-confirms-1gw-data-center-campus-near-detroit-michigan-partners-with-dte-energy-on-27gw-power-generation/)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?tag=project-cannoli",
   "title": "News Project Cannoli - DCD",
   "published_at": "2026-05-21T22:46:10",
   "project": "Panattoni 1GW data center campus",
   "locality": "Detroit",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni",
   "ai_customer": null,
   "status": "looks to develop",
   "announcement_date": null,
   "project_evidence": [
    "# News - Project Cannoli",
    "# [Panattoni looks to develop 1GW data center campus outside Detroit, Michigan](/en/news/panattoni-looks-to-develop-1gw-data-center-campus-outside-detroit-michigan/)"
   ],
   "locality_evidence": [
    "# News - Project Cannoli",
    "# [Panattoni looks to develop 1GW data center campus outside Detroit, Michigan](/en/news/panattoni-looks-to-develop-1gw-data-center-campus-outside-detroit-michigan/)"
   ],
   "state_evidence": [
    "# News - Project Cannoli",
    "# [Panattoni looks to develop 1GW data center campus outside Detroit, Michigan](/en/news/panattoni-looks-to-develop-1gw-data-center-campus-outside-detroit-michigan/)"
   ],
   "capacity_gw_evidence": [
    "# News - Project Cannoli",
    "# [Panattoni looks to develop 1GW data center campus outside Detroit, Michigan](/en/news/panattoni-looks-to-develop-1gw-data-center-campus-outside-detroit-michigan/)"
   ],
   "builder_evidence": [
    "# News - Project Cannoli",
    "# [Panattoni looks to develop 1GW data center campus outside Detroit, Michigan](/en/news/panattoni-looks-to-develop-1gw-data-center-campus-outside-detroit-michigan/)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# News - Project Cannoli",
    "# [Panattoni looks to develop 1GW data center campus outside Detroit, Michigan](/en/news/panattoni-looks-to-develop-1gw-data-center-campus-outside-detroit-michigan/)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://baxtel.com/news/terawulf-buys-site-in-kentucky-for-1gw-data-center-campus",
   "title": "TeraWulf Buys Site in Kentucky for 1GW Data Center Campus",
   "published_at": "2026-05-27T00:00:00",
   "project": "Muskie Data Campus",
   "locality": "Eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "May 27, 2026 | Posted by Abdul-Rahman Oladimeji",
    "The Nasdaq-listed cryptomining and AI infrastructure firm announced it has acquired the Muskie Data Campus in Eastern Kentucky from Industrial Equity Partners."
   ],
   "locality_evidence": [
    "May 27, 2026 | Posted by Abdul-Rahman Oladimeji",
    "The Nasdaq-listed cryptomining and AI infrastructure firm announced it has acquired the Muskie Data Campus in Eastern Kentucky from Industrial Equity Partners."
   ],
   "state_evidence": [
    "May 27, 2026 | Posted by Abdul-Rahman Oladimeji",
    "TeraWulf is expanding its presence in Kentucky with the acquisition of a second planned site for hyperscale high-performance computing."
   ],
   "capacity_gw_evidence": [
    "May 27, 2026 | Posted by Abdul-Rahman Oladimeji",
    "The project is expected to ultimately support more than 1GW of data center capacity."
   ],
   "builder_evidence": [
    "May 27, 2026 | Posted by Abdul-Rahman Oladimeji",
    "TeraWulf is expanding its presence in Kentucky with the acquisition of a second planned site for hyperscale high-performance computing."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "May 27, 2026 | Posted by Abdul-Rahman Oladimeji",
    "The Nasdaq-listed cryptomining and AI infrastructure firm announced it has acquired the Muskie Data Campus in Eastern Kentucky from Industrial Equity Partners."
   ],
   "announcement_date_evidence": [
    "May 27, 2026 | Posted by Abdul-Rahman Oladimeji"
   ]
  },
  {
   "url": "https://x.com/danroberts0101/status/1917499871487222201?lang=",
   "title": "Daniel Roberts (@danroberts0101) on X",
   "published_at": "2025-04-30T08:42:49",
   "project": "Sweetwater Hub",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "under development",
   "announcement_date": null,
   "project_evidence": [
    "[$IREN](https://x.com/search?q=$IREN) is building one of the world's largest AI data center hubs \ud83e\udd16 The 2GW Sweetwater Hub is engineered for scale, speed, and seamless fiber connectivity."
   ],
   "locality_evidence": [
    "- Spanning 1,800+ acres across two sites near Abilene, TX, strategically located along major fiber corridors, ideal for low-latency AI training and inference."
   ],
   "state_evidence": [
    "- Spanning 1,800+ acres across two sites near Abilene, TX, strategically located along major fiber corridors, ideal for low-latency AI training and inference."
   ],
   "capacity_gw_evidence": [
    "[$IREN](https://x.com/search?q=$IREN) is building one of the world's largest AI data center hubs \ud83e\udd16 The 2GW Sweetwater Hub is engineered for scale, speed, and seamless fiber connectivity."
   ],
   "builder_evidence": [
    "[$IREN](https://x.com/search?q=$IREN) is building one of the world's largest AI data center hubs \ud83e\udd16 The 2GW Sweetwater Hub is engineered for scale, speed, and seamless fiber connectivity."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "[$IREN](https://x.com/search?q=$IREN) is building one of the world's largest AI data center hubs \ud83e\udd16 The 2GW Sweetwater Hub is engineered for scale, speed, and seamless fiber connectivity."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://globalenergytimes.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah.",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "capacity_gw_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah.",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://pulseofnations.lol/nvidia-backs-105b",
   "title": "Nvidia Backs $105B Guarantee for OpenAI Ohio Data Center",
   "published_at": "2026-08-22T06:22:03",
   "project": null,
   "locality": "Piketon",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "The deal, confirmed by Nvidia CEO Jensen Huang, covers lease and power payments for the facility being developed by SB Energy, a subsidiary of SoftBank Group, on the site of a decommissioned uranium-enrichment plant near Piketon, roughly 50 miles south of Columbus."
   ],
   "state_evidence": [
    "Nvidia has agreed to provide a guarantee of up to $105 billion to help OpenAI lease a sprawling 8-gigawatt data center campus in Ohio, in one of the chipmaker\u2019s largest-ever infrastructure financing commitments."
   ],
   "capacity_gw_evidence": [
    "Nvidia has agreed to provide a guarantee of up to $105 billion to help OpenAI lease a sprawling 8-gigawatt data center campus in Ohio, in one of the chipmaker\u2019s largest-ever infrastructure financing commitments."
   ],
   "builder_evidence": [
    "The deal, confirmed by Nvidia CEO Jensen Huang, covers lease and power payments for the facility being developed by SB Energy, a subsidiary of SoftBank Group, on the site of a decommissioned uranium-enrichment plant near Piketon, roughly 50 miles south of Columbus."
   ],
   "ai_customer_evidence": [
    "Nvidia has agreed to provide a guarantee of up to $105 billion to help OpenAI lease a sprawling 8-gigawatt data center campus in Ohio, in one of the chipmaker\u2019s largest-ever infrastructure financing commitments."
   ],
   "status_evidence": [
    "OpenAI is leasing the site for 20 years, with the first 800 megawatts of capacity expected to come online in 2028."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://sbenergy.com/nvidia-ai-compute-ports-pike-ohio",
   "title": "NVIDIA Guarantees SB Energy\u2019s PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
   "published_at": "2026-08-17T13:08:41",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute.",
    "SB Energy\u2019s [PORTS-Pike Technology Campus](https://portscampus.com/) is reindustrializing the decommissioned Portsmouth Gaseous Diffusion Plant and the surrounding area, bringing a new generation of jobs to Appalachian Ohio, while creating an opportunity for the region to play an important role in the next era of American industry."
   ],
   "locality_evidence": [
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute.",
    "SB Energy\u2019s [PORTS-Pike Technology Campus](https://portscampus.com/) is reindustrializing the decommissioned Portsmouth Gaseous Diffusion Plant and the surrounding area, bringing a new generation of jobs to Appalachian Ohio, while creating an opportunity for the region to play an important role in the next era of American industry."
   ],
   "state_evidence": [
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute.",
    "SB Energy\u2019s [PORTS-Pike Technology Campus](https://portscampus.com/) is reindustrializing the decommissioned Portsmouth Gaseous Diffusion Plant and the surrounding area, bringing a new generation of jobs to Appalachian Ohio, while creating an opportunity for the region to play an important role in the next era of American industry."
   ],
   "capacity_gw_evidence": [
    "In support of the surrounding Ohio community, SB Energy and SoftBank will build at least 10 GW of new energy generation, which results in 8 IT-GW of AI factory capacity, and invest at least $4.2 billion in new regional grid infrastructure through an innovative partnership with AEP Ohio designed to protect ratepayers.",
    "SB Energy\u2019s [PORTS-Pike Technology Campus](https://portscampus.com/) is reindustrializing the decommissioned Portsmouth Gaseous Diffusion Plant and the surrounding area, bringing a new generation of jobs to Appalachian Ohio, while creating an opportunity for the region to play an important role in the next era of American industry."
   ],
   "builder_evidence": [
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute.",
    "SB Energy will build, own and operate the data center under a 20-year lease to OpenAI.",
    "SB Energy\u2019s [PORTS-Pike Technology Campus](https://portscampus.com/) is reindustrializing the decommissioned Portsmouth Gaseous Diffusion Plant and the surrounding area, bringing a new generation of jobs to Appalachian Ohio, while creating an opportunity for the region to play an important role in the next era of American industry."
   ],
   "ai_customer_evidence": [
    "SB Energy will build, own and operate the data center under a 20-year lease to OpenAI.",
    "OpenAI will utilize the capacity at the site.",
    "SB Energy\u2019s [PORTS-Pike Technology Campus](https://portscampus.com/) is reindustrializing the decommissioned Portsmouth Gaseous Diffusion Plant and the surrounding area, bringing a new generation of jobs to Appalachian Ohio, while creating an opportunity for the region to play an important role in the next era of American industry."
   ],
   "status_evidence": [
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute.",
    "SB Energy\u2019s [PORTS-Pike Technology Campus](https://portscampus.com/) is reindustrializing the decommissioned Portsmouth Gaseous Diffusion Plant and the surrounding area, bringing a new generation of jobs to Appalachian Ohio, while creating an opportunity for the region to play an important role in the next era of American industry."
   ],
   "announcement_date_evidence": [
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute.",
    "SB Energy\u2019s [PORTS-Pike Technology Campus](https://portscampus.com/) is reindustrializing the decommissioned Portsmouth Gaseous Diffusion Plant and the surrounding area, bringing a new generation of jobs to Appalachian Ohio, while creating an opportunity for the region to play an important role in the next era of American industry."
   ]
  },
  {
   "url": "https://intuitionlabs.ai/pdfs/openai-s-stargate-project-a-guide-to-the-ai-infrastructure.pdf",
   "title": "Stargate Project: OpenAI's $500B AI Data Center Plan",
   "published_at": "2026-08-05T22:27:56",
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "Operational / Under construction",
   "announcement_date": null,
   "project_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Abilene, Texas: Stargate\u2019s Flagship Site",
    "The full Abilene\n\ncampus will use 1.2 GW of power \u2014 enough for roughly one million homes (Source: networkworld.com)."
   ],
   "locality_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Abilene, Texas: Stargate\u2019s Flagship Site",
    "The first Stargate campus is in Abilene, Texas, a consortium-built facility on a vast site."
   ],
   "state_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Abilene, Texas: Stargate\u2019s Flagship Site",
    "The first Stargate campus is in Abilene, Texas, a consortium-built facility on a vast site."
   ],
   "capacity_gw_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Abilene, Texas: Stargate\u2019s Flagship Site",
    "The full Abilene\n\ncampus will use 1.2 GW of power \u2014 enough for roughly one million homes (Source: networkworld.com)."
   ],
   "builder_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Abilene, Texas: Stargate\u2019s Flagship Site",
    "Oracle is overseeing Abilene, which is being developed on leased land with Crusoe Energy reportedly involved."
   ],
   "ai_customer_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Abilene, Texas: Stargate\u2019s Flagship Site",
    "The first Stargate campus is in Abilene, Texas, a consortium-built facility on a vast site."
   ],
   "status_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Abilene, Texas: Stargate\u2019s Flagship Site",
    "Sam Altman\n\nsays portions of Abilene are \"up and running\", with the first two buildings operational since September 2025 and NVIDIA GB200 AI racks already\n\ndelivered for early model training (Source: openai.com)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://intuitionlabs.ai/pdfs/openai-s-stargate-project-a-guide-to-the-ai-infrastructure.pdf",
   "title": "Stargate Project: OpenAI's $500B AI Data Center Plan",
   "published_at": "2026-08-05T22:27:56",
   "project": "Shackelford County",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage and Oracle",
   "ai_customer": "OpenAI",
   "status": "Announced",
   "announcement_date": "2025-09-01",
   "project_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Expanding Beyond Abilene",
    "(The Shackelford County site, for\n\nexample, is a ~1.4 GW hyperscale campus being developed by Vantage and Oracle (Source: www.datacenterdynamics.com).)"
   ],
   "locality_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Expanding Beyond Abilene",
    "(The Shackelford County site, for\n\nexample, is a ~1.4 GW hyperscale campus being developed by Vantage and Oracle (Source: www.datacenterdynamics.com).)"
   ],
   "state_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Expanding Beyond Abilene",
    "Three are Oracle-led campuses (in Shackelford County,\n\nTexas; Do\u00f1a Ana County, New Mexico; and a site in the U.S. Midwest) and two are SoftBank-led (Lordstown, Ohio, and Milam County, Texas)\n\n(Source: openai.com) (Source: techcrunch.com)."
   ],
   "capacity_gw_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Expanding Beyond Abilene",
    "(The Shackelford County site, for\n\nexample, is a ~1.4 GW hyperscale campus being developed by Vantage and Oracle (Source: www.datacenterdynamics.com).)"
   ],
   "builder_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Expanding Beyond Abilene",
    "(The Shackelford County site, for\n\nexample, is a ~1.4 GW hyperscale campus being developed by Vantage and Oracle (Source: www.datacenterdynamics.com).)"
   ],
   "ai_customer_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Expanding Beyond Abilene",
    "In September 2025, OpenAI, Oracle and SoftBank announced five more U.S. sites."
   ],
   "status_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Expanding Beyond Abilene",
    "In September 2025, OpenAI, Oracle and SoftBank announced five more U.S. sites."
   ],
   "announcement_date_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Expanding Beyond Abilene",
    "In September 2025, OpenAI, Oracle and SoftBank announced five more U.S. sites."
   ]
  },
  {
   "url": "https://intuitionlabs.ai/pdfs/openai-s-stargate-project-a-guide-to-the-ai-infrastructure.pdf",
   "title": "Stargate Project: OpenAI's $500B AI Data Center Plan",
   "published_at": "2026-08-05T22:27:56",
   "project": "Stargate Michigan",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Related Digital and Oracle",
   "ai_customer": "OpenAI",
   "status": "Announced",
   "announcement_date": "2025-10-01",
   "project_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Expanding Beyond Abilene",
    "In October 2025, OpenAI announced another major campus: Stargate Michigan, a 1 GW, $7 billion facility in Saline Township developed by Related\n\nDigital and Oracle."
   ],
   "locality_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Expanding Beyond Abilene",
    "In October 2025, OpenAI announced another major campus: Stargate Michigan, a 1 GW, $7 billion facility in Saline Township developed by Related\n\nDigital and Oracle."
   ],
   "state_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Expanding Beyond Abilene",
    "In October 2025, OpenAI announced another major campus: Stargate Michigan, a 1 GW, $7 billion facility in Saline Township developed by Related\n\nDigital and Oracle."
   ],
   "capacity_gw_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Expanding Beyond Abilene",
    "In October 2025, OpenAI announced another major campus: Stargate Michigan, a 1 GW, $7 billion facility in Saline Township developed by Related\n\nDigital and Oracle."
   ],
   "builder_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Expanding Beyond Abilene",
    "In October 2025, OpenAI announced another major campus: Stargate Michigan, a 1 GW, $7 billion facility in Saline Township developed by Related\n\nDigital and Oracle."
   ],
   "ai_customer_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Expanding Beyond Abilene",
    "In October 2025, OpenAI announced another major campus: Stargate Michigan, a 1 GW, $7 billion facility in Saline Township developed by Related\n\nDigital and Oracle."
   ],
   "status_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Expanding Beyond Abilene",
    "In October 2025, OpenAI announced another major campus: Stargate Michigan, a 1 GW, $7 billion facility in Saline Township developed by Related\n\nDigital and Oracle."
   ],
   "announcement_date_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Expanding Beyond Abilene",
    "In October 2025, OpenAI announced another major campus: Stargate Michigan, a 1 GW, $7 billion facility in Saline Township developed by Related\n\nDigital and Oracle."
   ]
  },
  {
   "url": "https://intuitionlabs.ai/pdfs/openai-s-stargate-project-a-guide-to-the-ai-infrastructure.pdf",
   "title": "Stargate Project: OpenAI's $500B AI Data Center Plan",
   "published_at": "2026-08-05T22:27:56",
   "project": "Milam County",
   "locality": "Milam County",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "Announced",
   "announcement_date": "2025-09-01",
   "project_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Expanding Beyond Abilene",
    "SB Energy was selected to build and operate the 1.2 GW Milam County, Texas campus, with initial facilities\n\nexpected to enter service in 2026 (Source: cnbc.com) (Source: openai.com)."
   ],
   "locality_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Expanding Beyond Abilene",
    "SB Energy was selected to build and operate the 1.2 GW Milam County, Texas campus, with initial facilities\n\nexpected to enter service in 2026 (Source: cnbc.com) (Source: openai.com)."
   ],
   "state_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Expanding Beyond Abilene",
    "SB Energy was selected to build and operate the 1.2 GW Milam County, Texas campus, with initial facilities\n\nexpected to enter service in 2026 (Source: cnbc.com) (Source: openai.com)."
   ],
   "capacity_gw_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Expanding Beyond Abilene",
    "SB Energy was selected to build and operate the 1.2 GW Milam County, Texas campus, with initial facilities\n\nexpected to enter service in 2026 (Source: cnbc.com) (Source: openai.com)."
   ],
   "builder_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Expanding Beyond Abilene",
    "SB Energy was selected to build and operate the 1.2 GW Milam County, Texas campus, with initial facilities\n\nexpected to enter service in 2026 (Source: cnbc.com) (Source: openai.com)."
   ],
   "ai_customer_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Expanding Beyond Abilene",
    "In September 2025, OpenAI, Oracle and SoftBank announced five more U.S. sites."
   ],
   "status_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Expanding Beyond Abilene",
    "In September 2025, OpenAI, Oracle and SoftBank announced five more U.S. sites."
   ],
   "announcement_date_evidence": [
    "Stargate Project: OpenAI's $500B AI Data Center Plan",
    "Expanding Beyond Abilene",
    "In September 2025, OpenAI, Oracle and SoftBank announced five more U.S. sites."
   ]
  },
  {
   "url": "https://devthusiast.com/news/meta-10b-indiana-data-center-1gw-for-ai",
   "title": "Meta $10B Indiana Data Center, 1gw for AI",
   "published_at": "2026-02-18T01:18:54",
   "project": null,
   "locality": "Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "AI & Tech",
    "Meta $10B Indiana Data Center, 1gw for AI",
    "Meta has started building a 1-GW data center campus in Lebanon, Indiana - a $10B+ bet to power its AI work."
   ],
   "state_evidence": [
    "AI & Tech",
    "Meta $10B Indiana Data Center, 1gw for AI",
    "Meta has started building a 1-GW data center campus in Lebanon, Indiana - a $10B+ bet to power its AI work."
   ],
   "capacity_gw_evidence": [
    "AI & Tech",
    "Meta $10B Indiana Data Center, 1gw for AI",
    "Meta has started building a 1-GW data center campus in Lebanon, Indiana - a $10B+ bet to power its AI work."
   ],
   "builder_evidence": [
    "AI & Tech",
    "Meta $10B Indiana Data Center, 1gw for AI",
    "Meta has started building a 1-GW data center campus in Lebanon, Indiana - a $10B+ bet to power its AI work."
   ],
   "ai_customer_evidence": [
    "AI & Tech",
    "Meta $10B Indiana Data Center, 1gw for AI",
    "Meta has started building a 1-GW data center campus in Lebanon, Indiana - a $10B+ bet to power its AI work."
   ],
   "status_evidence": [
    "AI & Tech",
    "Meta $10B Indiana Data Center, 1gw for AI",
    "Meta has started building a 1-GW data center campus in Lebanon, Indiana - a $10B+ bet to power its AI work."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://devthusiast.com/news/meta-10b-indiana-data-center-1gw-for-ai",
   "title": "Meta $10B Indiana Data Center, 1gw for AI",
   "published_at": "2026-02-18T01:18:54",
   "project": "Prometheus",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "AI & Tech",
    "Prometheus, a 1+ GW site in New Albany, Ohio, is expected to be among the first 1-GW AI \"superclusters\" to come online in 2026."
   ],
   "locality_evidence": [
    "AI & Tech",
    "Prometheus, a 1+ GW site in New Albany, Ohio, is expected to be among the first 1-GW AI \"superclusters\" to come online in 2026."
   ],
   "state_evidence": [
    "AI & Tech",
    "Prometheus, a 1+ GW site in New Albany, Ohio, is expected to be among the first 1-GW AI \"superclusters\" to come online in 2026."
   ],
   "capacity_gw_evidence": [
    "AI & Tech",
    "Prometheus, a 1+ GW site in New Albany, Ohio, is expected to be among the first 1-GW AI \"superclusters\" to come online in 2026."
   ],
   "builder_evidence": [
    "AI & Tech",
    "Lebanon is part of Meta's push to build multiple gigawatt-scale AI campuses.",
    "Prometheus, a 1+ GW site in New Albany, Ohio, is expected to be among the first 1-GW AI \"superclusters\" to come online in 2026."
   ],
   "ai_customer_evidence": [
    "AI & Tech",
    "Lebanon is part of Meta's push to build multiple gigawatt-scale AI campuses.",
    "Prometheus, a 1+ GW site in New Albany, Ohio, is expected to be among the first 1-GW AI \"superclusters\" to come online in 2026."
   ],
   "status_evidence": [
    "AI & Tech",
    "Prometheus, a 1+ GW site in New Albany, Ohio, is expected to be among the first 1-GW AI \"superclusters\" to come online in 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://devthusiast.com/news/meta-10b-indiana-data-center-1gw-for-ai",
   "title": "Meta $10B Indiana Data Center, 1gw for AI",
   "published_at": "2026-02-18T01:18:54",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "AI & Tech",
    "Hyperion, planned in Richland Parish, Louisiana, is designed to scale to multiple gigawatts and eventually reach about 5 GW."
   ],
   "locality_evidence": [
    "AI & Tech",
    "Hyperion, planned in Richland Parish, Louisiana, is designed to scale to multiple gigawatts and eventually reach about 5 GW."
   ],
   "state_evidence": [
    "AI & Tech",
    "Hyperion, planned in Richland Parish, Louisiana, is designed to scale to multiple gigawatts and eventually reach about 5 GW."
   ],
   "capacity_gw_evidence": [
    "AI & Tech",
    "Hyperion, planned in Richland Parish, Louisiana, is designed to scale to multiple gigawatts and eventually reach about 5 GW."
   ],
   "builder_evidence": [
    "AI & Tech",
    "Lebanon is part of Meta's push to build multiple gigawatt-scale AI campuses.",
    "Hyperion, planned in Richland Parish, Louisiana, is designed to scale to multiple gigawatts and eventually reach about 5 GW."
   ],
   "ai_customer_evidence": [
    "AI & Tech",
    "Lebanon is part of Meta's push to build multiple gigawatt-scale AI campuses.",
    "Hyperion, planned in Richland Parish, Louisiana, is designed to scale to multiple gigawatts and eventually reach about 5 GW."
   ],
   "status_evidence": [
    "AI & Tech",
    "Hyperion, planned in Richland Parish, Louisiana, is designed to scale to multiple gigawatts and eventually reach about 5 GW."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://techtimes.com/articles/324812/20260818/nvidia-filed-105b-ohio-guarantee-not-250b-sec-disclosure-corrects-july-reports.htm",
   "title": "Nvidia Filed $105B Ohio Guarantee, Not $250B; SEC Disclosure Corrects July Reports",
   "published_at": "2026-08-18T13:22:05",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "under construction",
   "announcement_date": "2026-03-20",
   "project_evidence": [
    "PORTS-Pike Technology Campus",
    "OpenAI has signed a 20-year lease on what will become the largest AI computing campus ever constructed \u2014 up to 8 IT-gigawatts of capacity, powered by 10 gigawatts of newly built generation, on a Cold War nuclear weapons site in Pike County, Ohio, according to the [Nvidia-SB Energy joint announcement](https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute).",
    "For scale: Northern Virginia, the world's largest data center hub, held roughly 5 gigawatts of total capacity as of 2025.",
    "PORTS-Pike at full build-out would be roughly double that, concentrated in a single location on 3,700 acres of former federal land 23 miles from the Ohio River, in one of the state's poorest counties."
   ],
   "locality_evidence": [
    "OpenAI has signed a 20-year lease on what will become the largest AI computing campus ever constructed \u2014 up to 8 IT-gigawatts of capacity, powered by 10 gigawatts of newly built generation, on a Cold War nuclear weapons site in Pike County, Ohio, according to the [Nvidia-SB Energy joint announcement](https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute).",
    "For scale: Northern Virginia, the world's largest data center hub, held roughly 5 gigawatts of total capacity as of 2025.",
    "PORTS-Pike at full build-out would be roughly double that, concentrated in a single location on 3,700 acres of former federal land 23 miles from the Ohio River, in one of the state's poorest counties."
   ],
   "state_evidence": [
    "OpenAI has signed a 20-year lease on what will become the largest AI computing campus ever constructed \u2014 up to 8 IT-gigawatts of capacity, powered by 10 gigawatts of newly built generation, on a Cold War nuclear weapons site in Pike County, Ohio, according to the [Nvidia-SB Energy joint announcement](https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute).",
    "For scale: Northern Virginia, the world's largest data center hub, held roughly 5 gigawatts of total capacity as of 2025.",
    "PORTS-Pike at full build-out would be roughly double that, concentrated in a single location on 3,700 acres of former federal land 23 miles from the Ohio River, in one of the state's poorest counties."
   ],
   "capacity_gw_evidence": [
    "OpenAI has signed a 20-year lease on what will become the largest AI computing campus ever constructed \u2014 up to 8 IT-gigawatts of capacity, powered by 10 gigawatts of newly built generation, on a Cold War nuclear weapons site in Pike County, Ohio, according to the [Nvidia-SB Energy joint announcement](https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute).",
    "For scale: Northern Virginia, the world's largest data center hub, held roughly 5 gigawatts of total capacity as of 2025.",
    "PORTS-Pike at full build-out would be roughly double that, concentrated in a single location on 3,700 acres of former federal land 23 miles from the Ohio River, in one of the state's poorest counties."
   ],
   "builder_evidence": [
    "SoftBank's energy development subsidiary SB Energy will build, own, and operate the campus.",
    "OpenAI has signed a 20-year lease on what will become the largest AI computing campus ever constructed \u2014 up to 8 IT-gigawatts of capacity, powered by 10 gigawatts of newly built generation, on a Cold War nuclear weapons site in Pike County, Ohio, according to the [Nvidia-SB Energy joint announcement](https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute).",
    "For scale: Northern Virginia, the world's largest data center hub, held roughly 5 gigawatts of total capacity as of 2025.",
    "PORTS-Pike at full build-out would be roughly double that, concentrated in a single location on 3,700 acres of former federal land 23 miles from the Ohio River, in one of the state's poorest counties."
   ],
   "ai_customer_evidence": [
    "OpenAI has signed a 20-year lease on what will become the largest AI computing campus ever constructed \u2014 up to 8 IT-gigawatts of capacity, powered by 10 gigawatts of newly built generation, on a Cold War nuclear weapons site in Pike County, Ohio, according to the [Nvidia-SB Energy joint announcement](https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute).",
    "For scale: Northern Virginia, the world's largest data center hub, held roughly 5 gigawatts of total capacity as of 2025.",
    "PORTS-Pike at full build-out would be roughly double that, concentrated in a single location on 3,700 acres of former federal land 23 miles from the Ohio River, in one of the state's poorest counties."
   ],
   "status_evidence": [
    "The groundbreaking took place on March 20, 2026, with U.S. Energy Secretary Chris Wright, Commerce Secretary Howard Lutnick, and Interior Secretary Doug Burgum in attendance.",
    "OpenAI has signed a 20-year lease on what will become the largest AI computing campus ever constructed \u2014 up to 8 IT-gigawatts of capacity, powered by 10 gigawatts of newly built generation, on a Cold War nuclear weapons site in Pike County, Ohio, according to the [Nvidia-SB Energy joint announcement](https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute)."
   ],
   "announcement_date_evidence": [
    "The groundbreaking took place on March 20, 2026, with U.S. Energy Secretary Chris Wright, Commerce Secretary Howard Lutnick, and Interior Secretary Doug Burgum in attendance.",
    "OpenAI has signed a 20-year lease on what will become the largest AI computing campus ever constructed \u2014 up to 8 IT-gigawatts of capacity, powered by 10 gigawatts of newly built generation, on a Cold War nuclear weapons site in Pike County, Ohio, according to the [Nvidia-SB Energy joint announcement](https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute)."
   ]
  },
  {
   "url": "https://magazine.intelligentdatacentres.com/intelligent-data-centres-issue-80/0023806001759915624/p32",
   "title": "Intelligent Data Centres Issue 80 | Page 32",
   "published_at": "2025-10-08T00:00:00",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Under way",
   "announcement_date": null,
   "project_evidence": [
    "The state-of-the-art campus, named\u2018 Frontier\u2019, is designed to advance AI innovation and will employ more than 5,000 people across construction and on-going operations.",
    "Vantage Data Centers unveils plans for Frontier, a $ 25 billion mega-campus in Texas"
   ],
   "locality_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centres, has announced its largest investment to date: more than US $ 25 billion to develop a 1.4GW data centremega-campus in Shackelford County, Texas.",
    "Vantage Data Centers unveils plans for Frontier, a $ 25 billion mega-campus in Texas"
   ],
   "state_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centres, has announced its largest investment to date: more than US $ 25 billion to develop a 1.4GW data centremega-campus in Shackelford County, Texas.",
    "Vantage Data Centers unveils plans for Frontier, a $ 25 billion mega-campus in Texas"
   ],
   "capacity_gw_evidence": [
    "Campus will deliver 1.4 gigawatts of capacity in the Lone Star State, establishing a global AI hub.",
    "Vantage Data Centers unveils plans for Frontier, a $ 25 billion mega-campus in Texas"
   ],
   "builder_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centres, has announced its largest investment to date: more than US $ 25 billion to develop a 1.4GW data centremega-campus in Shackelford County, Texas.",
    "Vantage Data Centers unveils plans for Frontier, a $ 25 billion mega-campus in Texas"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction is already under way, with the first building scheduled for delivery in the second half of 2026.",
    "Vantage Data Centers unveils plans for Frontier, a $ 25 billion mega-campus in Texas"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://simplywall.st/stocks/us/real-estate/nasdaq-frmi/fermi/news/fermi-frmi-is-down-75-after-new-ceo-wider-losses-and-26-gw-p",
   "title": "Fermi (FRMI) Is Down 7.5% After New CEO, Wider Losses And 2.6 GW Power Deal \u2013 Has The Bull Case Changed?",
   "published_at": "2026-08-22T04:36:28",
   "project": "Project Matador",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.6,
   "builder": "Hillcore Energy Capital",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# Fermi (FRMI) Is Down 7.5% After New CEO, Wider Losses And 2.6 GW Power Deal \u2013 Has The Bull Case Changed?",
    "Fermi Inc. recently appointed industry veteran Lee McIntire as CEO and reported a wider second-quarter net loss of US$25.81 million and six-month net loss of US$214.50 million, while also securing a framework agreement with Hillcore Energy Capital to develop a roughly 2.6 GW power complex at its Project Matador campus in Texas."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# Fermi (FRMI) Is Down 7.5% After New CEO, Wider Losses And 2.6 GW Power Deal \u2013 Has The Bull Case Changed?",
    "Fermi Inc. recently appointed industry veteran Lee McIntire as CEO and reported a wider second-quarter net loss of US$25.81 million and six-month net loss of US$214.50 million, while also securing a framework agreement with Hillcore Energy Capital to develop a roughly 2.6 GW power complex at its Project Matador campus in Texas."
   ],
   "capacity_gw_evidence": [
    "# Fermi (FRMI) Is Down 7.5% After New CEO, Wider Losses And 2.6 GW Power Deal \u2013 Has The Bull Case Changed?",
    "Fermi Inc. recently appointed industry veteran Lee McIntire as CEO and reported a wider second-quarter net loss of US$25.81 million and six-month net loss of US$214.50 million, while also securing a framework agreement with Hillcore Energy Capital to develop a roughly 2.6 GW power complex at its Project Matador campus in Texas."
   ],
   "builder_evidence": [
    "# Fermi (FRMI) Is Down 7.5% After New CEO, Wider Losses And 2.6 GW Power Deal \u2013 Has The Bull Case Changed?",
    "Fermi Inc. recently appointed industry veteran Lee McIntire as CEO and reported a wider second-quarter net loss of US$25.81 million and six-month net loss of US$214.50 million, while also securing a framework agreement with Hillcore Energy Capital to develop a roughly 2.6 GW power complex at its Project Matador campus in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterknowledge.com/data-center-construction/major-ai-data-center-planned-for-former-pennsylvania-coal-power-plant",
   "title": "Major AI Data Center Planned for Former Pennsylvania Coal Power Plant",
   "published_at": "2025-04-02T16:30:46",
   "project": "Homer City Energy Campus",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Kiewit Power Constructors Company",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2025-04-02",
   "project_evidence": [
    "A rendering of the Homer City Energy Campus.Image: Homer City Redevelopment",
    "The Homer City Energy Campus will be built by Kiewit Power Constructors.",
    "- Delivery of up to 4.5 gigawatts (GW) of power to support AI-driven hyperscale data centers."
   ],
   "locality_evidence": [
    "The Homer City Generating Station, previously the biggest coal-burning power plant in Pennsylvania, will be transformed into a major natural gas-powered data center campus delivering up to 4.5 GW of power, developers have announced.",
    "A rendering of the Homer City Energy Campus.Image: Homer City Redevelopment"
   ],
   "state_evidence": [
    "The Homer City Generating Station, previously the biggest coal-burning power plant in Pennsylvania, will be transformed into a major natural gas-powered data center campus delivering up to 4.5 GW of power, developers have announced.",
    "A rendering of the Homer City Energy Campus.Image: Homer City Redevelopment"
   ],
   "capacity_gw_evidence": [
    "The Homer City Generating Station, previously the biggest coal-burning power plant in Pennsylvania, will be transformed into a major natural gas-powered data center campus delivering up to 4.5 GW of power, developers have announced.",
    "- Delivery of up to 4.5 gigawatts (GW) of power to support AI-driven hyperscale data centers.",
    "A rendering of the Homer City Energy Campus.Image: Homer City Redevelopment"
   ],
   "builder_evidence": [
    "Homer City Redevelopment (HCR) and Kiewit Power Constructors Company have signed a $10 billion deal to turn Homer City into a 3,200-acre data center facility tailored for AI and high-performance computing (HPC).",
    "A rendering of the Homer City Energy Campus.Image: Homer City Redevelopment"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The Homer City Generating Station, previously the biggest coal-burning power plant in Pennsylvania, will be transformed into a major natural gas-powered data center campus delivering up to 4.5 GW of power, developers have announced.",
    "A rendering of the Homer City Energy Campus.Image: Homer City Redevelopment"
   ],
   "announcement_date_evidence": [
    "[According to](https://www.businesswire.com/news/home/20250402452555/en/Homer-City-Redevelopment-and-Kiewit-Announce-Countrys-Largest-Natural-Gas-Powered-Data-Center-Campus-to-Support-AI-and-HPC-Demand) the developers, the key benefits of the Homer City Energy Campus are expected to include:",
    "A rendering of the Homer City Energy Campus.Image: Homer City Redevelopment"
   ]
  },
  {
   "url": "https://thailand-business-news.com/pr-news/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy-to-compute",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": "2026-03-16T21:34:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "Acquired",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ],
   "locality_evidence": [
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "capacity_gw_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "The West Virginia campus is the first state-certified utility grid purpose-built for AI workloads in the United States. Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "builder_evidence": [
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ],
   "announcement_date_evidence": [
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ]
  },
  {
   "url": "https://hwbusters.com/news/9gw-ai-data-center-project-in-utah-faces-delays-amid-local-concerns",
   "title": "9GW AI Data Center in Utah Delayed by Local Concerns",
   "published_at": "2026-04-30T20:17:11",
   "project": "Stratos",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O\u2019Leary Digital",
   "ai_customer": null,
   "status": "delayed",
   "announcement_date": null,
   "project_evidence": [
    "A proposed hyperscale data center campus in Utah backed by Kevin O\u2019Leary has been delayed after local officials raised concerns about the project\u2019s scale and approval process.",
    "The development, known as **Stratos**, is being led by O\u2019Leary Digital and could reach up to 9 gigawatts (GW) of power capacity, more than double Utah\u2019s current electricity usage, estimated at around 4 GW."
   ],
   "locality_evidence": [
    "A vote by Box Elder County commissioners was postponed after officials said they were not given sufficient time or detail to assess the project.",
    "A proposed hyperscale data center campus in Utah backed by Kevin O\u2019Leary has been delayed after local officials raised concerns about the project\u2019s scale and approval process."
   ],
   "state_evidence": [
    "A proposed hyperscale data center campus in Utah backed by Kevin O\u2019Leary has been delayed after local officials raised concerns about the project\u2019s scale and approval process.",
    "The development, known as **Stratos**, is being led by O\u2019Leary Digital and could reach up to 9 gigawatts (GW) of power capacity, more than double Utah\u2019s current electricity usage, estimated at around 4 GW."
   ],
   "capacity_gw_evidence": [
    "The development, known as **Stratos**, is being led by O\u2019Leary Digital and could reach up to 9 gigawatts (GW) of power capacity, more than double Utah\u2019s current electricity usage, estimated at around 4 GW.",
    "A proposed hyperscale data center campus in Utah backed by Kevin O\u2019Leary has been delayed after local officials raised concerns about the project\u2019s scale and approval process."
   ],
   "builder_evidence": [
    "The development, known as **Stratos**, is being led by O\u2019Leary Digital and could reach up to 9 gigawatts (GW) of power capacity, more than double Utah\u2019s current electricity usage, estimated at around 4 GW.",
    "A proposed hyperscale data center campus in Utah backed by Kevin O\u2019Leary has been delayed after local officials raised concerns about the project\u2019s scale and approval process."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "A proposed hyperscale data center campus in Utah backed by Kevin O\u2019Leary has been delayed after local officials raised concerns about the project\u2019s scale and approval process."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://newsbang.com/news/article/story_id-p008-170348",
   "title": "OpenAI Lifts 2030 Infrastructure Spend to $750 Billion, Launches $20 Billion Georgia Data Center",
   "published_at": "2026-07-22T16:13:30",
   "project": "Project Camellia",
   "locality": "Savannah",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Lifts 2030 Infrastructure Spend to $750 Billion, Launches $20 Billion Georgia Data Center",
    "- $20 billion will fund Project Camellia, a 1,400-acre campus northwest of Savannah that is set to draw at least 3.2 gigawatts from Georgia Power, with capacity becoming available between 2028 and 2032."
   ],
   "locality_evidence": [
    "# OpenAI Lifts 2030 Infrastructure Spend to $750 Billion, Launches $20 Billion Georgia Data Center",
    "- $20 billion will fund Project Camellia, a 1,400-acre campus northwest of Savannah that is set to draw at least 3.2 gigawatts from Georgia Power, with capacity becoming available between 2028 and 2032."
   ],
   "state_evidence": [
    "# OpenAI Lifts 2030 Infrastructure Spend to $750 Billion, Launches $20 Billion Georgia Data Center",
    "- $20 billion will fund Project Camellia, a 1,400-acre campus northwest of Savannah that is set to draw at least 3.2 gigawatts from Georgia Power, with capacity becoming available between 2028 and 2032."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Lifts 2030 Infrastructure Spend to $750 Billion, Launches $20 Billion Georgia Data Center",
    "- $20 billion will fund Project Camellia, a 1,400-acre campus northwest of Savannah that is set to draw at least 3.2 gigawatts from Georgia Power, with capacity becoming available between 2028 and 2032."
   ],
   "builder_evidence": [
    "# OpenAI Lifts 2030 Infrastructure Spend to $750 Billion, Launches $20 Billion Georgia Data Center",
    "- $20 billion will fund Project Camellia, a 1,400-acre campus northwest of Savannah that is set to draw at least 3.2 gigawatts from Georgia Power, with capacity becoming available between 2028 and 2032."
   ],
   "ai_customer_evidence": [
    "# OpenAI Lifts 2030 Infrastructure Spend to $750 Billion, Launches $20 Billion Georgia Data Center",
    "- $20 billion will fund Project Camellia, a 1,400-acre campus northwest of Savannah that is set to draw at least 3.2 gigawatts from Georgia Power, with capacity becoming available between 2028 and 2032."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://prod.crainsdetroit.com/energy/dte-seeks-approval-google-data-center-deal",
   "title": "DTE seeks OK for 'Project Cannoli' Google data center deal",
   "published_at": "2026-03-17T19:14:14",
   "project": null,
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.4,
   "builder": "Related Digital",
   "ai_customer": "Oracle",
   "status": "approved",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "That is a different approach than when it asked for and got ex parte, or speedy, [approval of two contracts](https://www.crainsdetroit.com/politics-policy/oracle-openai-data-center-gets-approval-michigan-power-deals) for Texas-based Oracle's 1.4-gigawatt data center in Washtenaw County\u2019s Saline Township over a six-week period."
   ],
   "state_evidence": [
    "That is a different approach than when it asked for and got ex parte, or speedy, [approval of two contracts](https://www.crainsdetroit.com/politics-policy/oracle-openai-data-center-gets-approval-michigan-power-deals) for Texas-based Oracle's 1.4-gigawatt data center in Washtenaw County\u2019s Saline Township over a six-week period."
   ],
   "capacity_gw_evidence": [
    "That is a different approach than when it asked for and got ex parte, or speedy, [approval of two contracts](https://www.crainsdetroit.com/politics-policy/oracle-openai-data-center-gets-approval-michigan-power-deals) for Texas-based Oracle's 1.4-gigawatt data center in Washtenaw County\u2019s Saline Township over a six-week period."
   ],
   "builder_evidence": [
    "\"There is much yet to learn about how much of our resources Google expects to take here in Michigan to power and cool their massive data center operation, and my office will thoroughly scrutinize this proposal using every tool available to us to ensure DTE's existing customers, and energy consumers throughout the state, aren't left footing the bill for this project and the immense costs to deliver the expected electricity demand,\u201d Nessel said in a statement in which she accused developer Related Digital, DTE and the commission of \"rushed, back-room deals and fast-tracked approvals\" of the Saline data center agreement, which she continues to challenge."
   ],
   "ai_customer_evidence": [
    "That is a different approach than when it asked for and got ex parte, or speedy, [approval of two contracts](https://www.crainsdetroit.com/politics-policy/oracle-openai-data-center-gets-approval-michigan-power-deals) for Texas-based Oracle's 1.4-gigawatt data center in Washtenaw County\u2019s Saline Township over a six-week period."
   ],
   "status_evidence": [
    "That is a different approach than when it asked for and got ex parte, or speedy, [approval of two contracts](https://www.crainsdetroit.com/politics-policy/oracle-openai-data-center-gets-approval-michigan-power-deals) for Texas-based Oracle's 1.4-gigawatt data center in Washtenaw County\u2019s Saline Township over a six-week period."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://rallies.ai/news/hut-8-secures-325-b-6192-bond-and-98-b-beacon-point-lease-for-ai-data-centers",
   "title": "Hut 8 Secures $3.25 B 6.192% Bond and $9.8 B Beacon Point Lease for AI Data Centers",
   "published_at": "2026-05-28T14:23:42",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Hut 8 Secures $3.25 B 6.192% Bond and $9.8 B Beacon Point Lease for AI Data Centers - HUT News | Rallies",
    "# Hut 8 Secures $3.25 B 6.192% Bond and $9.8 B Beacon Point Lease for AI Data Centers",
    "CEO Asher Genoot secured a separate 15-year, $9.8 billion Beacon Point lease with an undisclosed tenant for a 1 GW AI campus in Nueces County, Texas."
   ],
   "locality_evidence": [
    "Hut 8 Secures $3.25 B 6.192% Bond and $9.8 B Beacon Point Lease for AI Data Centers - HUT News | Rallies",
    "# Hut 8 Secures $3.25 B 6.192% Bond and $9.8 B Beacon Point Lease for AI Data Centers",
    "CEO Asher Genoot secured a separate 15-year, $9.8 billion Beacon Point lease with an undisclosed tenant for a 1 GW AI campus in Nueces County, Texas."
   ],
   "state_evidence": [
    "Hut 8 Secures $3.25 B 6.192% Bond and $9.8 B Beacon Point Lease for AI Data Centers - HUT News | Rallies",
    "# Hut 8 Secures $3.25 B 6.192% Bond and $9.8 B Beacon Point Lease for AI Data Centers",
    "CEO Asher Genoot secured a separate 15-year, $9.8 billion Beacon Point lease with an undisclosed tenant for a 1 GW AI campus in Nueces County, Texas."
   ],
   "capacity_gw_evidence": [
    "Hut 8 Secures $3.25 B 6.192% Bond and $9.8 B Beacon Point Lease for AI Data Centers - HUT News | Rallies",
    "# Hut 8 Secures $3.25 B 6.192% Bond and $9.8 B Beacon Point Lease for AI Data Centers",
    "CEO Asher Genoot secured a separate 15-year, $9.8 billion Beacon Point lease with an undisclosed tenant for a 1 GW AI campus in Nueces County, Texas."
   ],
   "builder_evidence": [
    "Hut 8 Secures $3.25 B 6.192% Bond and $9.8 B Beacon Point Lease for AI Data Centers - HUT News | Rallies",
    "# Hut 8 Secures $3.25 B 6.192% Bond and $9.8 B Beacon Point Lease for AI Data Centers",
    "CEO Asher Genoot secured a separate 15-year, $9.8 billion Beacon Point lease with an undisclosed tenant for a 1 GW AI campus in Nueces County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://ktxs.com/news/local/iren-partners-with-nvidia-to-develop-ai-ready-architecture-for-west-texas-data-center-campus?teaserSource=trending",
   "title": "IREN partners with NVIDIA to develop AI-ready architecture for West Texas data center",
   "published_at": "2026-05-28T18:58:12",
   "project": "Sweetwater",
   "locality": "Fisher County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "IREN",
   "ai_customer": null,
   "status": "energized",
   "announcement_date": null,
   "project_evidence": [
    "# IREN partners with NVIDIA to develop AI-ready architecture for West Texas data center",
    "[IREN](https://iren.com/), a digital infrastructure company, has partnered with [NVIDIA](https://www.nvidia.com/en-us/) to help build out its Sweetwater data center campus in Fisher County."
   ],
   "locality_evidence": [
    "# IREN partners with NVIDIA to develop AI-ready architecture for West Texas data center",
    "[IREN](https://iren.com/), a digital infrastructure company, has partnered with [NVIDIA](https://www.nvidia.com/en-us/) to help build out its Sweetwater data center campus in Fisher County."
   ],
   "state_evidence": [
    "# IREN partners with NVIDIA to develop AI-ready architecture for West Texas data center",
    "ABILENE, Texas \u2014 A major expansion in West Texas is now taking shape."
   ],
   "capacity_gw_evidence": [
    "# IREN partners with NVIDIA to develop AI-ready architecture for West Texas data center",
    "The company recently energized its 1.4 gigawatt Sweetwater one site, marking a major step in connecting the campus to the ERCOT power grid."
   ],
   "builder_evidence": [
    "# IREN partners with NVIDIA to develop AI-ready architecture for West Texas data center",
    "[IREN](https://iren.com/), a digital infrastructure company, has partnered with [NVIDIA](https://www.nvidia.com/en-us/) to help build out its Sweetwater data center campus in Fisher County."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# IREN partners with NVIDIA to develop AI-ready architecture for West Texas data center",
    "The company recently energized its 1.4 gigawatt Sweetwater one site, marking a major step in connecting the campus to the ERCOT power grid."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://fierce-network.com/newswire/ecl-plots-first-1gw-hydrogen-powered-ai-data-center",
   "title": "ECL plots first 1GW hydrogen-powered AI data center",
   "published_at": "2024-10-01T16:05:09",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "ECL announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "locality_evidence": [
    "ECL announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "state_evidence": [
    "ECL announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant.",
    "The initial phase of TerraSite-TX1 will be delivered in the summer of 2025 at a cost of approximately $450M, with 50MW of data center capacity to be utilized by data center cloud and AI cloud operators."
   ],
   "capacity_gw_evidence": [
    "The initial 1GW phased development may be expanded to 2GW in the future, enabled by its modularity and based on customer demand."
   ],
   "builder_evidence": [
    "ECL announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "ai_customer_evidence": [
    "ECL announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "status_evidence": [
    "ECL announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://bluewaterhealthyliving.com/news/national-news/ohio/openai-to-build-worlds-biggest-ai-data-center-in-ohio-what-we-know",
   "title": "OpenAI to build world's biggest AI data center in Ohio. What we know",
   "published_at": "2026-08-24T21:30:35",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 10.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2025-08-17",
   "project_evidence": [
    "A massive data center for OpenAI, the artificial intelligence company that created ChatGPT, is planned for Southern Ohio.",
    "The San Francisco-based company announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ],
   "locality_evidence": [
    "A massive data center for OpenAI, the artificial intelligence company that created ChatGPT, is planned for Southern Ohio.",
    "The San Francisco-based company announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ],
   "state_evidence": [
    "A massive data center for OpenAI, the artificial intelligence company that created ChatGPT, is planned for Southern Ohio.",
    "The San Francisco-based company announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ],
   "capacity_gw_evidence": [
    "A massive data center for OpenAI, the artificial intelligence company that created ChatGPT, is planned for Southern Ohio.",
    "The center will have 8 gigawatts of computing capacity \u2012 the electrical capacity that\u2019s available to servers and other equipment, not necessarily the amount of power the center will draw continuously \u2012 by the end of construction.",
    "Another 2 gigawatts of power will be used for power conversion, cooling and other systems needed to operate the site, making the total power of the site 10 gigawatts."
   ],
   "builder_evidence": [
    "A massive data center for OpenAI, the artificial intelligence company that created ChatGPT, is planned for Southern Ohio.",
    "Japanese-owned SB Energy, a company that builds the infrastructure needed for AI work, owns the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "ai_customer_evidence": [
    "A massive data center for OpenAI, the artificial intelligence company that created ChatGPT, is planned for Southern Ohio.",
    "The San Francisco-based company announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ],
   "status_evidence": [
    "A massive data center for OpenAI, the artificial intelligence company that created ChatGPT, is planned for Southern Ohio."
   ],
   "announcement_date_evidence": [
    "A massive data center for OpenAI, the artificial intelligence company that created ChatGPT, is planned for Southern Ohio.",
    "The San Francisco-based company announced Aug. 17 it will lease space for its hyperscale, 8-gigawatt data center at the PORTS-Pike Technology Campus in Pike County, Ohio, around 100 miles east of Cincinnati."
   ]
  },
  {
   "url": "https://bluewaterhealthyliving.com/news/national-news/ohio/openai-to-build-worlds-biggest-ai-data-center-in-ohio-what-we-know",
   "title": "OpenAI to build world's biggest AI data center in Ohio. What we know",
   "published_at": "2026-08-24T21:30:35",
   "project": "Prometheus",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "expanding",
   "announcement_date": null,
   "project_evidence": [
    "Meta, the owner of Facebook, is currently expanding its 1-gigawatt Prometheus AI data center in New Albany, Ohio, which will be the world\u2019s first gigawatt-capable data center."
   ],
   "locality_evidence": [
    "Meta, the owner of Facebook, is currently expanding its 1-gigawatt Prometheus AI data center in New Albany, Ohio, which will be the world\u2019s first gigawatt-capable data center."
   ],
   "state_evidence": [
    "Meta, the owner of Facebook, is currently expanding its 1-gigawatt Prometheus AI data center in New Albany, Ohio, which will be the world\u2019s first gigawatt-capable data center."
   ],
   "capacity_gw_evidence": [
    "Meta, the owner of Facebook, is currently expanding its 1-gigawatt Prometheus AI data center in New Albany, Ohio, which will be the world\u2019s first gigawatt-capable data center."
   ],
   "builder_evidence": [
    "Meta, the owner of Facebook, is currently expanding its 1-gigawatt Prometheus AI data center in New Albany, Ohio, which will be the world\u2019s first gigawatt-capable data center."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Meta, the owner of Facebook, is currently expanding its 1-gigawatt Prometheus AI data center in New Albany, Ohio, which will be the world\u2019s first gigawatt-capable data center."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://electroneconomics.substack.com/p/metas-el-paso-bond-priced-40-basis",
   "title": "Meta\u2019s El Paso bond priced 40 basis points wide of Hyperion",
   "published_at": "2026-08-21T11:28:36",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Hyperion Phase 2 still has no named partner.",
    "Meta can finance another US$23 billion easily. Whether the off-balance-sheet model that placed the first US$27 billion scales to US$50 billion is a different question"
   ],
   "locality_evidence": [
    "The causal chain only works if the community actually needs what\u2019s being offered.",
    "Meta can finance another US$23 billion easily. Whether the off-balance-sheet model that placed the first US$27 billion scales to US$50 billion is a different question"
   ],
   "state_evidence": [
    "Running the EE residual value model on the Phase 1 structure, a 300 MW illustrative tranche at US$10,000/kW replacement cost, LPSC territory, 60 per cent LTC, four-year term, 25 per cent amortisation and a hyperscaler tenant, produces a prob-weighted RV of 76.0 per cent of replacement cost, or US$7,596/kW.",
    "Meta can finance another US$23 billion easily. Whether the off-balance-sheet model that placed the first US$27 billion scales to US$50 billion is a different question"
   ],
   "capacity_gw_evidence": [
    "Phase 1 delivers 2 GW by 2030; the full 5 GW arrives by roughly 2032.",
    "Meta can finance another US$23 billion easily. Whether the off-balance-sheet model that placed the first US$27 billion scales to US$50 billion is a different question"
   ],
   "builder_evidence": [
    "Nobody doubts Meta can finance another US$23 billion.",
    "Meta can finance another US$23 billion easily. Whether the off-balance-sheet model that placed the first US$27 billion scales to US$50 billion is a different question"
   ],
   "ai_customer_evidence": [
    "What the A+ rating actually underwrites isn\u2019t Meta\u2019s confidence in AI demand.",
    "Meta can finance another US$23 billion easily. Whether the off-balance-sheet model that placed the first US$27 billion scales to US$50 billion is a different question"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://therealpreneur.com/tech-today/amazons-11b-ai-data-center-transforms-indiana-farmland",
   "title": "Amazon\u2019s $11B AI Data Center Transforms Indiana Farmland",
   "published_at": "2025-11-01T04:00:28",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon",
   "ai_customer": "Anthropic",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "Amazon has transformed a vast Indiana farmland into a cutting-edge AI hub.",
    "Project Rainier, a 1,200-acre site near Lake Michigan, now hosts one of the world\u2019s largest operational AI data centers."
   ],
   "locality_evidence": [
    "A year ago, the New Carlisle area served as quiet farmland.",
    "Amazon has transformed a vast Indiana farmland into a cutting-edge AI hub.",
    "Project Rainier, a 1,200-acre site near Lake Michigan, now hosts one of the world\u2019s largest operational AI data centers."
   ],
   "state_evidence": [
    "Amazon has transformed a vast Indiana farmland into a cutting-edge AI hub.",
    "Project Rainier, a 1,200-acre site near Lake Michigan, now hosts one of the world\u2019s largest operational AI data centers."
   ],
   "capacity_gw_evidence": [
    "It demands over 2.2 gigawatts of electricity.",
    "Amazon has transformed a vast Indiana farmland into a cutting-edge AI hub.",
    "Project Rainier, a 1,200-acre site near Lake Michigan, now hosts one of the world\u2019s largest operational AI data centers."
   ],
   "builder_evidence": [
    "Amazon has transformed a vast Indiana farmland into a cutting-edge AI hub.",
    "Project Rainier, a 1,200-acre site near Lake Michigan, now hosts one of the world\u2019s largest operational AI data centers."
   ],
   "ai_customer_evidence": [
    "Amazon Web Services (AWS) leads this rapid change.",
    "They built the complex exclusively for Anthropic, the AI startup behind the Claude model.",
    "Project Rainier, a 1,200-acre site near Lake Michigan, now hosts one of the world\u2019s largest operational AI data centers."
   ],
   "status_evidence": [
    "Project Rainier, a 1,200-acre site near Lake Michigan, now hosts one of the world\u2019s largest operational AI data centers."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://thejobwalk.com/p/xai-files-659m-permit-for-new-building-at-memphis-ai-data-center-campus",
   "title": "xAI Files $659M Permit for New Building at Memphis AI Data Center Campus",
   "published_at": "2026-03-06T11:09:34",
   "project": "Colossus",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "growing",
   "announcement_date": null,
   "project_evidence": [
    "**The Daily Dig**",
    "xAI has [filed ](https://www.bizjournals.com/memphis/news/2026/03/03/xai-colossus-2-campus-5414-tulane-building.html)a building permit for a new structure at its growing data center campus near Memphis, Tennessee.",
    "xAI came to Memphis in 2024, standing up its Colossus supercomputer inside a converted Electrolux factory in Southwest Memphis near the Boxtown district."
   ],
   "locality_evidence": [
    "**The Daily Dig**",
    "xAI has [filed ](https://www.bizjournals.com/memphis/news/2026/03/03/xai-colossus-2-campus-5414-tulane-building.html)a building permit for a new structure at its growing data center campus near Memphis, Tennessee."
   ],
   "state_evidence": [
    "**The Daily Dig**",
    "xAI has [filed ](https://www.bizjournals.com/memphis/news/2026/03/03/xai-colossus-2-campus-5414-tulane-building.html)a building permit for a new structure at its growing data center campus near Memphis, Tennessee."
   ],
   "capacity_gw_evidence": [
    "**The Daily Dig**",
    "Musk has pegged the broader campus at roughly 2 gigawatts of compute capacity when fully built out, though satellite analysis from mid-2025 put cooling infrastructure at Colossus 2 closer to 200 megawatts at that point."
   ],
   "builder_evidence": [
    "**The Daily Dig**",
    "xAI has [filed ](https://www.bizjournals.com/memphis/news/2026/03/03/xai-colossus-2-campus-5414-tulane-building.html)a building permit for a new structure at its growing data center campus near Memphis, Tennessee."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "**The Daily Dig**",
    "xAI has [filed ](https://www.bizjournals.com/memphis/news/2026/03/03/xai-colossus-2-campus-5414-tulane-building.html)a building permit for a new structure at its growing data center campus near Memphis, Tennessee."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://techtimes.com/articles/320962/20260719/approved-grid-beats-metro-lancium-activates-two-texas-ai-gigawatt-campuses-one-week.htm",
   "title": "Approved Grid Beats Metro: Lancium Activates Two Texas AI Gigawatt Campuses in One Week",
   "published_at": "2026-07-19T15:06:07",
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Lancium",
   "ai_customer": "Meta",
   "status": "announced",
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "Lancium announced a 1.0 GW AI data center campus in Childress on July 15 in partnership with Crusoe, the Denver-based vertically integrated AI infrastructure company."
   ],
   "locality_evidence": [
    "Lancium announced a 1.0 GW AI data center campus in Childress on July 15 in partnership with Crusoe, the Denver-based vertically integrated AI infrastructure company."
   ],
   "state_evidence": [
    "Childress County, Texas, has a population of roughly 6,700 people and sits more than a hundred miles from the nearest major city."
   ],
   "capacity_gw_evidence": [
    "Lancium announced a 1.0 GW AI data center campus in Childress on July 15 in partnership with Crusoe, the Denver-based vertically integrated AI infrastructure company."
   ],
   "builder_evidence": [
    "Lancium announced a 1.0 GW AI data center campus in Childress on July 15 in partnership with Crusoe, the Denver-based vertically integrated AI infrastructure company."
   ],
   "ai_customer_evidence": [
    "As this publication [reported July 3](https://www.techtimes.com/articles/319641/20260703/crusoe-ai-3-billion-talks-ai-power-plant-builder-triples-30-billion-valuation.htm), Meta has signed agreements to purchase approximately 1.6 GW of AI computing capacity from Crusoe across two sites \u2014 Childress, Texas, and Warrenton, Missouri \u2014 according to reporting by Bloomberg that cited people familiar with the matter."
   ],
   "status_evidence": [
    "Lancium announced a 1.0 GW AI data center campus in Childress on July 15 in partnership with Crusoe, the Denver-based vertically integrated AI infrastructure company."
   ],
   "announcement_date_evidence": [
    "Lancium announced a 1.0 GW AI data center campus in Childress on July 15 in partnership with Crusoe, the Denver-based vertically integrated AI infrastructure company."
   ]
  },
  {
   "url": "https://techtimes.com/articles/320962/20260719/approved-grid-beats-metro-lancium-activates-two-texas-ai-gigawatt-campuses-one-week.htm",
   "title": "Approved Grid Beats Metro: Lancium Activates Two Texas AI Gigawatt Campuses in One Week",
   "published_at": "2026-07-19T15:06:07",
   "project": "Hall County",
   "locality": "Turkey",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Lancium",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2026-07-13",
   "project_evidence": null,
   "locality_evidence": null,
   "state_evidence": null,
   "capacity_gw_evidence": [
    "Both now anchor gigawatt-scale AI data center campuses \u2014 not because of their labor market or fiber density, but because Lancium, a Texas energy infrastructure company, secured fully ERCOT-approved grid interconnects at both sites before anyone else did."
   ],
   "builder_evidence": null,
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": [
    "Lancium announced a 1.0 GW AI data center campus in Childress on July 15 in partnership with Crusoe, the Denver-based vertically integrated AI infrastructure company."
   ]
  },
  {
   "url": "https://techtimes.com/articles/320962/20260719/approved-grid-beats-metro-lancium-activates-two-texas-ai-gigawatt-campuses-one-week.htm",
   "title": "Approved Grid Beats Metro: Lancium Activates Two Texas AI Gigawatt Campuses in One Week",
   "published_at": "2026-07-19T15:06:07",
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 2.1,
   "builder": "Lancium",
   "ai_customer": "Microsoft",
   "status": "energized and operational",
   "announcement_date": null,
   "project_evidence": [
    "The campus subsequently expanded to 1.2 GW, and Crusoe later broke ground on a [second 900 MW facility on adjacent Lancium land for Microsoft](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure), bringing Abilene's total projected capacity to approximately 2.1 GW."
   ],
   "locality_evidence": [
    "The two-campus pattern confirms that [this model](https://lancium.com/locations-abilene/) has moved from a single-partner experiment in Abilene to a repeatable commercial platform."
   ],
   "state_evidence": [
    "The campus subsequently expanded to 1.2 GW, and Crusoe later broke ground on a [second 900 MW facility on adjacent Lancium land for Microsoft](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure), bringing Abilene's total projected capacity to approximately 2.1 GW."
   ],
   "capacity_gw_evidence": [
    "The campus subsequently expanded to 1.2 GW, and Crusoe later broke ground on a [second 900 MW facility on adjacent Lancium land for Microsoft](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure), bringing Abilene's total projected capacity to approximately 2.1 GW."
   ],
   "builder_evidence": [
    "The campus subsequently expanded to 1.2 GW, and Crusoe later broke ground on a [second 900 MW facility on adjacent Lancium land for Microsoft](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure), bringing Abilene's total projected capacity to approximately 2.1 GW."
   ],
   "ai_customer_evidence": [
    "The campus subsequently expanded to 1.2 GW, and Crusoe later broke ground on a [second 900 MW facility on adjacent Lancium land for Microsoft](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure), bringing Abilene's total projected capacity to approximately 2.1 GW."
   ],
   "status_evidence": [
    "The Abilene interconnect has too, and the Abilene campus has been energized and operational since late 2025."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://utilitydive.com/news/microsoft-powerhouse-hillwood-data-center-service-ferc/828566",
   "title": "Microsoft, PowerHouse Hillwood in disputes over data center service agreements",
   "published_at": "2026-08-24T09:05:21",
   "project": null,
   "locality": "Joliet",
   "state": "Illinois",
   "capacity_gw": 1.8,
   "builder": "PowerHouse Hillwood",
   "ai_customer": null,
   "status": "planning",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "Meanwhile, PowerHouse Hillwood on Aug. 14 [urged FERC to reject Commonwealth Edison\u2019s \u201cnotice of cancellation\u201d](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-5242&optimized=false&sid=c424e4b1-1936-4c05-8ebc-cdfe849a7b94) that ends a transmission security agreement related to a 1.8-GW, $20-billion data center the company is planning in Joliet, Illinois."
   ],
   "state_evidence": [
    "Meanwhile, PowerHouse Hillwood on Aug. 14 [urged FERC to reject Commonwealth Edison\u2019s \u201cnotice of cancellation\u201d](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-5242&optimized=false&sid=c424e4b1-1936-4c05-8ebc-cdfe849a7b94) that ends a transmission security agreement related to a 1.8-GW, $20-billion data center the company is planning in Joliet, Illinois."
   ],
   "capacity_gw_evidence": [
    "Meanwhile, PowerHouse Hillwood on Aug. 14 [urged FERC to reject Commonwealth Edison\u2019s \u201cnotice of cancellation\u201d](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-5242&optimized=false&sid=c424e4b1-1936-4c05-8ebc-cdfe849a7b94) that ends a transmission security agreement related to a 1.8-GW, $20-billion data center the company is planning in Joliet, Illinois."
   ],
   "builder_evidence": [
    "Meanwhile, PowerHouse Hillwood on Aug. 14 [urged FERC to reject Commonwealth Edison\u2019s \u201cnotice of cancellation\u201d](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-5242&optimized=false&sid=c424e4b1-1936-4c05-8ebc-cdfe849a7b94) that ends a transmission security agreement related to a 1.8-GW, $20-billion data center the company is planning in Joliet, Illinois."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Meanwhile, PowerHouse Hillwood on Aug. 14 [urged FERC to reject Commonwealth Edison\u2019s \u201cnotice of cancellation\u201d](https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20260814-5242&optimized=false&sid=c424e4b1-1936-4c05-8ebc-cdfe849a7b94) that ends a transmission security agreement related to a 1.8-GW, $20-billion data center the company is planning in Joliet, Illinois."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://dcpostmea.com/2025/08/vantage-develop-1-4gw-data-center-campus-texas",
   "title": "Vantage To Develop 1.4GW Data Center Campus In Texas",
   "published_at": "2025-08-20T08:52:12",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "Vantage Data Centers has announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "locality_evidence": [
    "Vantage Data Centers has announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "Vantage Data Centers has announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "Vantage Data Centers has announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "Vantage Data Centers has announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://siliconreport.com/datacenters/facility/fermi-america-matador",
   "title": "SiliconReport",
   "published_at": null,
   "project": "Project Matador (HyperGrid)",
   "locality": "Carson County (Amarillo)",
   "state": "Texas",
   "capacity_gw": 1.1,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "Announced",
   "announcement_date": null,
   "project_evidence": [
    "Tracker",
    "# Fermi America Project Matador (HyperGrid)",
    "1. [## Fermi America Project Matador (HyperGrid)"
   ],
   "locality_evidence": [
    "Tracker",
    "# Fermi America Project Matador (HyperGrid)",
    "Fermi America \u00b7 Carson County (Amarillo) \u00b7 TX"
   ],
   "state_evidence": [
    "Tracker",
    "# Fermi America Project Matador (HyperGrid)",
    "Fermi America \u00b7 Carson County (Amarillo) \u00b7 TX"
   ],
   "capacity_gw_evidence": [
    "Tracker",
    "# Fermi America Project Matador (HyperGrid)",
    "Capacity1,100 MW",
    "Announced1,100 MW"
   ],
   "builder_evidence": [
    "Tracker",
    "# Fermi America Project Matador (HyperGrid)",
    "OperatorFermi America",
    "Fermi America \u00b7 Carson County (Amarillo) \u00b7 TX"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Tracker",
    "# Fermi America Project Matador (HyperGrid)",
    "StatusAnnounced"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://webdisclosure.com/press-release/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy-to-compute-dNVjlN35WTo",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": "2026-03-16T22:25:22",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "Nscale Acquires American Intelligence &amp; Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](https://eqs-cockpit.com/cgi-bin/fncls.ssp?fn=redirect&url=cddf68fb7de6e41a49365ccb3565621d&application_id=2292292&site_id=symex~~~af100301-a623-4c64-8f3d-90fc88eca9e6&application_name=news) to build one of the world's largest AI Factories."
   ],
   "locality_evidence": [
    "Nscale Acquires American Intelligence &amp; Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "Nscale Acquires American Intelligence &amp; Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "capacity_gw_evidence": [
    "Nscale Acquires American Intelligence &amp; Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "builder_evidence": [
    "Nscale Acquires American Intelligence &amp; Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](https://eqs-cockpit.com/cgi-bin/fncls.ssp?fn=redirect&url=cddf68fb7de6e41a49365ccb3565621d&application_id=2292292&site_id=symex~~~af100301-a623-4c64-8f3d-90fc88eca9e6&application_name=news) to build one of the world's largest AI Factories."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Nscale Acquires American Intelligence &amp; Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "announcement_date_evidence": [
    "Nscale Acquires American Intelligence &amp; Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "16.03.2026 / 22:25 CET/CEST"
   ]
  },
  {
   "url": "https://investmentnewswire.com/press-release/energy-abundance-announces-data-city-texas-the-worlds-largest-behind-the-meter-data-center-hub-powered-by-100-247-green-energy-302407052",
   "title": "Energy Abundance Announces Data City, Texas \u2013 The World\u2019s Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy - Investment Newswire",
   "published_at": "2025-03-20T10:31:00",
   "project": "Data City",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corporation",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2025-03-20",
   "project_evidence": [
    "Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy.",
    "HOUSTON, March 20, 2025 /PRNewswire/ \u2014 Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "locality_evidence": [
    "Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy.",
    "HOUSTON, March 20, 2025 /PRNewswire/ \u2014 Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "state_evidence": [
    "Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy.",
    "HOUSTON, March 20, 2025 /PRNewswire/ \u2014 Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "capacity_gw_evidence": [
    "Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy.",
    "HOUSTON, March 20, 2025 /PRNewswire/ \u2014 Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "builder_evidence": [
    "Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy.",
    "HOUSTON, March 20, 2025 /PRNewswire/ \u2014 Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy.",
    "HOUSTON, March 20, 2025 /PRNewswire/ \u2014 Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "announcement_date_evidence": [
    "HOUSTON, March 20, 2025 /PRNewswire/ \u2014 Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ]
  },
  {
   "url": "https://eweek.com/news/openai-georgia-data-center",
   "title": "OpenAI Plans 3.2GW Georgia Data Center",
   "published_at": "2026-07-23T16:00:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "OpenAI on Wednesday announced plans for Project Camellia, a large-scale data center project in Effingham County, Georgia, near Savannah.",
    "The scale of Project Camellia has raised questions about whether such a resource-hungry facility could affect local electricity prices and grid reliability."
   ],
   "locality_evidence": [
    "OpenAI on Wednesday announced plans for Project Camellia, a large-scale data center project in Effingham County, Georgia, near Savannah."
   ],
   "state_evidence": [
    "OpenAI on Wednesday announced plans for Project Camellia, a large-scale data center project in Effingham County, Georgia, near Savannah."
   ],
   "capacity_gw_evidence": [
    "The company said it has contracted with Georgia Power to supply 3.2 gigawatts of electricity, with power delivered in phases from 2028 through 2032."
   ],
   "builder_evidence": [
    "OpenAI on Wednesday announced plans for Project Camellia, a large-scale data center project in Effingham County, Georgia, near Savannah.",
    "The project marks the first [data center where OpenAI](https://www.eweek.com/news/ai-bubble-sam-altman-openai/) will take the lead in designing and developing the facility rather than primarily relying on cloud providers."
   ],
   "ai_customer_evidence": [
    "OpenAI on Wednesday announced plans for Project Camellia, a large-scale data center project in Effingham County, Georgia, near Savannah.",
    "The project marks the first [data center where OpenAI](https://www.eweek.com/news/ai-bubble-sam-altman-openai/) will take the lead in designing and developing the facility rather than primarily relying on cloud providers."
   ],
   "status_evidence": [
    "OpenAI on Wednesday announced plans for Project Camellia, a large-scale data center project in Effingham County, Georgia, near Savannah."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://staugustine.com/story/opinion/columns/2026/08/24/no-data-center-is-too-small-for-these-morley-michigan-residents-opinion/91399681007",
   "title": "No data center is too small for these Morley residents, Mi",
   "published_at": "2026-08-24T08:46:53",
   "project": null,
   "locality": "Saline",
   "state": "Michigan",
   "capacity_gw": 1.4,
   "builder": "Related Digital",
   "ai_customer": "OpenAI, Oracle",
   "status": "building",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "COLUMNS",
    "A tiny Michigan village plans ahead before Big Data comes to town.",
    "At the other end of Washtenaw County, tech giants OpenAI, Oracle and Related Digital are building a $7 billion hyperscale data center in Saline to provide 1.4 gigawatts of power."
   ],
   "state_evidence": [
    "COLUMNS",
    "A tiny Michigan village plans ahead before Big Data comes to town.",
    "At the other end of Washtenaw County, tech giants OpenAI, Oracle and Related Digital are building a $7 billion hyperscale data center in Saline to provide 1.4 gigawatts of power."
   ],
   "capacity_gw_evidence": [
    "COLUMNS",
    "A tiny Michigan village plans ahead before Big Data comes to town.",
    "At the other end of Washtenaw County, tech giants OpenAI, Oracle and Related Digital are building a $7 billion hyperscale data center in Saline to provide 1.4 gigawatts of power."
   ],
   "builder_evidence": [
    "COLUMNS",
    "A tiny Michigan village plans ahead before Big Data comes to town.",
    "At the other end of Washtenaw County, tech giants OpenAI, Oracle and Related Digital are building a $7 billion hyperscale data center in Saline to provide 1.4 gigawatts of power."
   ],
   "ai_customer_evidence": [
    "COLUMNS",
    "A tiny Michigan village plans ahead before Big Data comes to town.",
    "At the other end of Washtenaw County, tech giants OpenAI, Oracle and Related Digital are building a $7 billion hyperscale data center in Saline to provide 1.4 gigawatts of power."
   ],
   "status_evidence": [
    "COLUMNS",
    "A tiny Michigan village plans ahead before Big Data comes to town.",
    "At the other end of Washtenaw County, tech giants OpenAI, Oracle and Related Digital are building a $7 billion hyperscale data center in Saline to provide 1.4 gigawatts of power."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://cryptopolitan.com/terawulf-surges-10-on-1gw-kentucky-ai-campus-et",
   "title": "TeraWulf surges 10% on 1GW Kentucky AI campus et",
   "published_at": "2026-05-27T00:15:14",
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "TeraWulf surges 10% on 1GW Kentucky AI campus et",
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access."
   ],
   "locality_evidence": [
    "TeraWulf surges 10% on 1GW Kentucky AI campus et",
    "The company secured a 285-acre site in eastern Kentucky."
   ],
   "state_evidence": [
    "TeraWulf surges 10% on 1GW Kentucky AI campus et",
    "TeraWulf secured a 285-acre Kentucky site capable of supporting more than 1 GW of AI and high-performance computing capacity."
   ],
   "capacity_gw_evidence": [
    "TeraWulf surges 10% on 1GW Kentucky AI campus et",
    "TeraWulf secured a 285-acre Kentucky site capable of supporting more than 1 GW of AI and high-performance computing capacity."
   ],
   "builder_evidence": [
    "TeraWulf surges 10% on 1GW Kentucky AI campus et",
    "TeraWulf secured a 285-acre Kentucky site capable of supporting more than 1 GW of AI and high-performance computing capacity."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "TeraWulf surges 10% on 1GW Kentucky AI campus et",
    "TeraWulf secured a 285-acre Kentucky site capable of supporting more than 1 GW of AI and high-performance computing capacity."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://blockspace.media/insight/hut-8-beacon-point-ai-data-center-financing",
   "title": "Hut 8 lines seeks $4.25B project financing for Beacon Point AI data center - Blockspace",
   "published_at": "2026-06-04T15:44:38",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Jacobs",
   "ai_customer": null,
   "status": "commercialized",
   "announcement_date": "2026-05-06",
   "project_evidence": [
    "Hut 8 lines seeks $4.25B project financing for Beacon Point AI data center",
    "Hut 8 (NASDAQ: HUT) is offering $4.25 billion in senior secured notes as project-level financing for its Beacon Point AI data center campus in Nueces County, Texas, as the company scales its infrastructure development model beyond its first debt-funded project, [according](https://www.sec.gov/ix?doc=/Archives/edgar/data/1964789/000110465926070393/tm2616869d1_8k.htm) to an SEC filing."
   ],
   "locality_evidence": [
    "Hut 8 lines seeks $4.25B project financing for Beacon Point AI data center",
    "Hut 8 (NASDAQ: HUT) is offering $4.25 billion in senior secured notes as project-level financing for its Beacon Point AI data center campus in Nueces County, Texas, as the company scales its infrastructure development model beyond its first debt-funded project, [according](https://www.sec.gov/ix?doc=/Archives/edgar/data/1964789/000110465926070393/tm2616869d1_8k.htm) to an SEC filing."
   ],
   "state_evidence": [
    "Hut 8 lines seeks $4.25B project financing for Beacon Point AI data center",
    "Hut 8 (NASDAQ: HUT) is offering $4.25 billion in senior secured notes as project-level financing for its Beacon Point AI data center campus in Nueces County, Texas, as the company scales its infrastructure development model beyond its first debt-funded project, [according](https://www.sec.gov/ix?doc=/Archives/edgar/data/1964789/000110465926070393/tm2616869d1_8k.htm) to an SEC filing."
   ],
   "capacity_gw_evidence": [
    "Hut 8 lines seeks $4.25B project financing for Beacon Point AI data center",
    "The company [commercialized the first phase](https://www.hut8.com/news-insights/press-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw) of the 1 GW Beacon Point campus on May 6, announcing a 15-year lease for 352 MW of IT capacity with a base-term contract value of $9.8 billion."
   ],
   "builder_evidence": [
    "Hut 8 lines seeks $4.25B project financing for Beacon Point AI data center",
    "Jacobs, which also served as EPCM lead on River Bend, [was awarded the contract](https://www.jacobs.com/newsroom/press-release/jacobs-awarded-epcm-contract-deliver-second-hut-8-ai-data-center-texas) to deliver Beacon Point."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Hut 8 lines seeks $4.25B project financing for Beacon Point AI data center",
    "The company [commercialized the first phase](https://www.hut8.com/news-insights/press-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw) of the 1 GW Beacon Point campus on May 6, announcing a 15-year lease for 352 MW of IT capacity with a base-term contract value of $9.8 billion."
   ],
   "announcement_date_evidence": [
    "Hut 8 lines seeks $4.25B project financing for Beacon Point AI data center",
    "The company [commercialized the first phase](https://www.hut8.com/news-insights/press-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw) of the 1 GW Beacon Point campus on May 6, announcing a 15-year lease for 352 MW of IT capacity with a base-term contract value of $9.8 billion."
   ]
  },
  {
   "url": "https://businesspostexaminer.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://m.digitalisationworld.com/news/68603/ecl-reveals-1-gw-off-grid-hydrogen-powered-ai-factory-data-centre",
   "title": "ECL reveals 1 GW off-grid, hydrogen-powered AI Factory data centre",
   "published_at": "2024-09-27T06:41:33",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2024-06-20",
   "project_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston."
   ],
   "locality_evidence": [
    "600+ acres near Houston, Texas will give AI leaders the space and power needed for the next wave of innovation, with zero emissions."
   ],
   "state_evidence": [
    "600+ acres near Houston, Texas will give AI leaders the space and power needed for the next wave of innovation, with zero emissions."
   ],
   "capacity_gw_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston."
   ],
   "builder_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston."
   ],
   "announcement_date_evidence": [
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston."
   ]
  },
  {
   "url": "https://servola.de/journal/ohio-ratepayers-wont-pay-for-openais-8gw-campus",
   "title": "Who Actually Pays the Grid Bill",
   "published_at": "2026-08-17T00:00:00",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "Under development",
   "announcement_date": null,
   "project_evidence": [
    "Energy",
    "OpenAI confirmed it has signed a 20-year lease to use capacity at the PORTS-Pike Technology Campus, a site SB Energy - the SoftBank-owned developer - will build, own and operate, with the US Department of Energy as a named partner on the site."
   ],
   "locality_evidence": [
    "Energy",
    "Pike County, Ohio last powered American industry a century ago around a uranium enrichment plant; it is next in line to power AI."
   ],
   "state_evidence": [
    "Energy",
    "Pike County, Ohio last powered American industry a century ago around a uranium enrichment plant; it is next in line to power AI."
   ],
   "capacity_gw_evidence": [
    "Energy",
    "Nvidia's own announcement puts numbers on the deal: an initial 4.25 gigawatts of IT capacity, a campus designed to scale to 8 gigawatts total, and Nvidia as the exclusive chip supplier for the entire site."
   ],
   "builder_evidence": [
    "Energy",
    "OpenAI confirmed it has signed a 20-year lease to use capacity at the PORTS-Pike Technology Campus, a site SB Energy - the SoftBank-owned developer - will build, own and operate, with the US Department of Energy as a named partner on the site."
   ],
   "ai_customer_evidence": [
    "Energy",
    "OpenAI confirmed it has signed a 20-year lease to use capacity at the PORTS-Pike Technology Campus, a site SB Energy - the SoftBank-owned developer - will build, own and operate, with the US Department of Energy as a named partner on the site."
   ],
   "status_evidence": [
    "Energy",
    "OpenAI, Nvidia and SB Energy are building an 8GW Ohio data campus with a $105 billion Nvidia guarantee."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://abc3340.com/news/nation-world/gallery/data-center-boom-targets-texas-most-productive-farmland-fueling-power-clashes-resources-industry-governor-abbott?photo=2",
   "title": "Data center boom targets Texas\u2019 most productive farmland, fueling power clashes",
   "published_at": "2026-08-20T00:47:05",
   "project": "Meta El Paso Data Center",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta Platforms",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Data center boom targets Texas\u2019 most productive farmland, fueling power clashes",
    "EL PASO, TEXAS - AUGUST 13: In an aerial view, the Meta El Paso Data Center is seen on August 13, 2026 in El Paso, Texas.",
    "Meta Platforms continues construction on its more than $10 billion Meta El Paso Data Center in Northeast El Paso, Texas."
   ],
   "locality_evidence": [
    "# Data center boom targets Texas\u2019 most productive farmland, fueling power clashes",
    "EL PASO, TEXAS - AUGUST 13: In an aerial view, the Meta El Paso Data Center is seen on August 13, 2026 in El Paso, Texas."
   ],
   "state_evidence": [
    "# Data center boom targets Texas\u2019 most productive farmland, fueling power clashes",
    "EL PASO, TEXAS - AUGUST 13: In an aerial view, the Meta El Paso Data Center is seen on August 13, 2026 in El Paso, Texas."
   ],
   "capacity_gw_evidence": [
    "# Data center boom targets Texas\u2019 most productive farmland, fueling power clashes",
    "Occupying approximately 1,000 acres, Meta has expanded the project to 1 gigawatt of computing capacity, allowing the facility to support a growing range of AI workloads and the training and deployment of increasingly sophisticated AI models and technologies."
   ],
   "builder_evidence": [
    "# Data center boom targets Texas\u2019 most productive farmland, fueling power clashes",
    "Meta Platforms continues construction on its more than $10 billion Meta El Paso Data Center in Northeast El Paso, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Data center boom targets Texas\u2019 most productive farmland, fueling power clashes",
    "Meta Platforms continues construction on its more than $10 billion Meta El Paso Data Center in Northeast El Paso, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/datacenters/aws-project-rainier-ai-campus-indiana.html",
   "title": "AWS Project Rainier (New Carlisle, Indiana) \u2014 2.4 GW \u2014 Operational",
   "published_at": null,
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.4,
   "builder": "Amazon Web Services",
   "ai_customer": "Anthropic",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "Amazon Web Services (AWS) is rapidly expanding its \"Project Rainier\" AI supercomputing campus in New Carlisle, Indiana, representing a total investment of $15 billion.",
    "How big is AWS Project Rainier (New Carlisle, Indiana)?AWS Project Rainier (New Carlisle, Indiana) has 2.4 GW of known IT capacity, located in New Carlisle, New Carlisle, Indiana, United States. It ranks #11 globally by capacity among 335 tracked facilities."
   ],
   "locality_evidence": [
    "Amazon Web Services (AWS) is rapidly expanding its \"Project Rainier\" AI supercomputing campus in New Carlisle, Indiana, representing a total investment of $15 billion.",
    "How big is AWS Project Rainier (New Carlisle, Indiana)?AWS Project Rainier (New Carlisle, Indiana) has 2.4 GW of known IT capacity, located in New Carlisle, New Carlisle, Indiana, United States. It ranks #11 globally by capacity among 335 tracked facilities."
   ],
   "state_evidence": [
    "Amazon Web Services (AWS) is rapidly expanding its \"Project Rainier\" AI supercomputing campus in New Carlisle, Indiana, representing a total investment of $15 billion.",
    "How big is AWS Project Rainier (New Carlisle, Indiana)?AWS Project Rainier (New Carlisle, Indiana) has 2.4 GW of known IT capacity, located in New Carlisle, New Carlisle, Indiana, United States. It ranks #11 globally by capacity among 335 tracked facilities."
   ],
   "capacity_gw_evidence": [
    "The massive 2.4 gigawatt (GW) campus is specifically optimized to serve partner Anthropic's AI training workloads.",
    "How big is AWS Project Rainier (New Carlisle, Indiana)?AWS Project Rainier (New Carlisle, Indiana) has 2.4 GW of known IT capacity, located in New Carlisle, New Carlisle, Indiana, United States. It ranks #11 globally by capacity among 335 tracked facilities."
   ],
   "builder_evidence": [
    "Amazon Web Services (AWS) is rapidly expanding its \"Project Rainier\" AI supercomputing campus in New Carlisle, Indiana, representing a total investment of $15 billion.",
    "Who operates AWS Project Rainier (New Carlisle, Indiana)?AWS Project Rainier (New Carlisle, Indiana) is operated by Amazon Web Services and Anthropic. Structured intelligence reports are available for Amazon Web Services Operator Report and Anthropic Operator Report and United States Country Report."
   ],
   "ai_customer_evidence": [
    "The massive 2.4 gigawatt (GW) campus is specifically optimized to serve partner Anthropic's AI training workloads.",
    "Who operates AWS Project Rainier (New Carlisle, Indiana)?AWS Project Rainier (New Carlisle, Indiana) is operated by Amazon Web Services and Anthropic. Structured intelligence reports are available for Amazon Web Services Operator Report and Anthropic Operator Report and United States Country Report."
   ],
   "status_evidence": [
    "What is the status of AWS Project Rainier (New Carlisle, Indiana)?AWS Project Rainier (New Carlisle, Indiana) is currently operational. Known timeline milestones: Earliest market signal 2024."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
   "published_at": "2026-07-15T00:00:00",
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "Construction begins Q3 2026.",
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "locality_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe and Lancium announce a 270-acre, 1 GW AI data center in Childress, TX, with solar power and water-efficient cooling."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe and Lancium announce a 270-acre, 1 GW AI data center in Childress, TX, with solar power and water-efficient cooling."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe and Lancium announce a 270-acre, 1 GW AI data center in Childress, TX, with solar power and water-efficient cooling."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe and Lancium announce a 270-acre, 1 GW AI data center in Childress, TX, with solar power and water-efficient cooling."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe and Lancium announce a 270-acre, 1 GW AI data center in Childress, TX, with solar power and water-efficient cooling."
   ],
   "announcement_date_evidence": [
    "July 15, 2026",
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas"
   ]
  },
  {
   "url": "https://bastillepost.com/global/article/5121741-vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand",
   "title": "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
   "published_at": "2025-08-19T11:00:30",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": "",
   "status": "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026.",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations.",
    "DENVER--(BUSINESS WIRE)--Aug 19, 2025-- Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "locality_evidence": [
    "DENVER--(BUSINESS WIRE)--Aug 19, 2025-- Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "DENVER--(BUSINESS WIRE)--Aug 19, 2025-- Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "DENVER--(BUSINESS WIRE)--Aug 19, 2025-- Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "DENVER--(BUSINESS WIRE)--Aug 19, 2025-- Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026.",
    "DENVER--(BUSINESS WIRE)--Aug 19, 2025-- Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "announcement_date_evidence": [
    "DENVER--(BUSINESS WIRE)--Aug 19, 2025-- Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ]
  },
  {
   "url": "https://advfn.com/stock-market/london/FRMI/stock-news/97876737/fermi-inc-initial-draw-on-200m-equipment-facilit",
   "title": "Fermi Inc. Initial Draw on $200m Equipment Facility",
   "published_at": "2026-02-20T07:00:08",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2026-02-20",
   "project_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "locality_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "state_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "capacity_gw_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "builder_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "announcement_date_evidence": [
    "(AMARILLO, Texas) February 20, 2026:[Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://fermiamerica.com/), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026."
   ]
  },
  {
   "url": "https://thenextweb.com/news/nscale-west-virginia-monarch-microsoft-vera-rubin",
   "title": "Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus built around NVIDIA\u2019s Vera Rubin GPUs",
   "published_at": "2026-03-17T06:54:51",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "announced",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "# Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus built around NVIDIA\u2019s Vera Rubin GPUs",
    "Deliveries will begin in late 2027 and be phased across multiple tranches. The deployment will sit on a site Nscale has simultaneously acquired, the Monarch Compute Campus, a 2,250-acre plot in Mason County that Nscale describes as the first state-certified AI microgrid in the United States, with an on-site power potential scalable to over eight gigawatts."
   ],
   "locality_evidence": [
    "# Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus built around NVIDIA\u2019s Vera Rubin GPUs",
    "Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity at a new campus in Mason County, West Virginia, deploying NVIDIA\u2019s next-generation Vera Rubin NVL72 GPUs at what it describes as the first large-scale commercial rollout of the Vera Rubin DSX AI Factory reference architecture.",
    "Deliveries will begin in late 2027 and be phased across multiple tranches. The deployment will sit on a site Nscale has simultaneously acquired, the Monarch Compute Campus, a 2,250-acre plot in Mason County that Nscale describes as the first state-certified AI microgrid in the United States, with an on-site power potential scalable to over eight gigawatts."
   ],
   "state_evidence": [
    "# Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus built around NVIDIA\u2019s Vera Rubin GPUs",
    "Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity at a new campus in Mason County, West Virginia, deploying NVIDIA\u2019s next-generation Vera Rubin NVL72 GPUs at what it describes as the first large-scale commercial rollout of the Vera Rubin DSX AI Factory reference architecture."
   ],
   "capacity_gw_evidence": [
    "# Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus built around NVIDIA\u2019s Vera Rubin GPUs",
    "Deliveries will begin in late 2027 and be phased across multiple tranches. The deployment will sit on a site Nscale has simultaneously acquired, the Monarch Compute Campus, a 2,250-acre plot in Mason County that Nscale describes as the first state-certified AI microgrid in the United States, with an on-site power potential scalable to over eight gigawatts."
   ],
   "builder_evidence": [
    "# Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus built around NVIDIA\u2019s Vera Rubin GPUs",
    "Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity at a new campus in Mason County, West Virginia, deploying NVIDIA\u2019s next-generation Vera Rubin NVL72 GPUs at what it describes as the first large-scale commercial rollout of the Vera Rubin DSX AI Factory reference architecture."
   ],
   "ai_customer_evidence": [
    "# Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus built around NVIDIA\u2019s Vera Rubin GPUs",
    "Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity at a new campus in Mason County, West Virginia, deploying NVIDIA\u2019s next-generation Vera Rubin NVL72 GPUs at what it describes as the first large-scale commercial rollout of the Vera Rubin DSX AI Factory reference architecture."
   ],
   "status_evidence": [
    "# Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus built around NVIDIA\u2019s Vera Rubin GPUs",
    "Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity at a new campus in Mason County, West Virginia, deploying NVIDIA\u2019s next-generation Vera Rubin NVL72 GPUs at what it describes as the first large-scale commercial rollout of the Vera Rubin DSX AI Factory reference architecture."
   ],
   "announcement_date_evidence": [
    "# Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus built around NVIDIA\u2019s Vera Rubin GPUs",
    "The deal, announced at [NVIDIA\u2019s GTC 2026 conference](https://thenextweb.com/news/nvidia-gtc-2026-opens-today) on 16 March, covers approximately 430,000 Vera Rubin GPUs and is structured as a long-term framework combining a multi-year compute services agreement with a long-term data centre lease."
   ]
  },
  {
   "url": "https://docsity.com/en/docs/upcoming-data-centers-in-texas-in-2026/17267621",
   "title": "Upcoming Data Centers in Texas in 2026 | Summaries Technology | Docsity",
   "published_at": null,
   "project": "Advanced Energy and Intelligence Campus",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Texas University System & Fermi America",
   "ai_customer": null,
   "status": "Geo- technical work started in June 2025; the first 1 GW by the end of 2026",
   "announcement_date": null,
   "project_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026"
   ],
   "locality_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026"
   ],
   "state_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026"
   ],
   "capacity_gw_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026"
   ],
   "builder_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://docsity.com/en/docs/upcoming-data-centers-in-texas-in-2026/17267621",
   "title": "Upcoming Data Centers in Texas in 2026 | Summaries Technology | Docsity",
   "published_at": null,
   "project": "Data City, Texas",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corporation",
   "ai_customer": null,
   "status": "First 300 MW + 1 M sq ft launching in 2026; full build phased",
   "announcement_date": null,
   "project_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026 2 Data City, Texas 5 GW Near Laredo, Texas Energy Abundance Developme nt Corporation First 300 MW + 1 M sq ft launching in 2026; full build phased"
   ],
   "locality_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026 2 Data City, Texas 5 GW Near Laredo, Texas Energy Abundance Developme nt Corporation First 300 MW + 1 M sq ft launching in 2026; full build phased"
   ],
   "state_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026 2 Data City, Texas 5 GW Near Laredo, Texas Energy Abundance Developme nt Corporation First 300 MW + 1 M sq ft launching in 2026; full build phased"
   ],
   "capacity_gw_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026 2 Data City, Texas 5 GW Near Laredo, Texas Energy Abundance Developme nt Corporation First 300 MW + 1 M sq ft launching in 2026; full build phased"
   ],
   "builder_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026 2 Data City, Texas 5 GW Near Laredo, Texas Energy Abundance Developme nt Corporation First 300 MW + 1 M sq ft launching in 2026; full build phased"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :",
    "Rank Project Name Capacity Location Developer Stage 1 Advanced Energy and Intelligence Campus 11 GW Near Amarillo, Texas Panhandle Texas University System & Fermi America Geo- technical work started in June 2025; the first 1 GW by the end of 2026 2 Data City, Texas 5 GW Near Laredo, Texas Energy Abundance Developme nt Corporation First 300 MW + 1 M sq ft launching in 2026; full build phased"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://docsity.com/en/docs/upcoming-data-centers-in-texas-in-2026/17267621",
   "title": "Upcoming Data Centers in Texas in 2026 | Summaries Technology | Docsity",
   "published_at": null,
   "project": "OpenAI Stargate Campus",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 4.5,
   "builder": "OpenAI, Oracle, SoftBank",
   "ai_customer": "OpenAI",
   "status": "Under construction; phased build over 4 years",
   "announcement_date": null,
   "project_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :"
   ],
   "locality_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :"
   ],
   "state_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :"
   ],
   "capacity_gw_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :"
   ],
   "builder_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :"
   ],
   "ai_customer_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :"
   ],
   "status_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://docsity.com/en/docs/upcoming-data-centers-in-texas-in-2026/17267621",
   "title": "Upcoming Data Centers in Texas in 2026 | Summaries Technology | Docsity",
   "published_at": null,
   "project": "Tract Caldwell County Park",
   "locality": "Caldwell County",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Tract",
   "ai_customer": null,
   "status": "Land acquisition completed in May 2025; 360 MW first phase operational in 2028",
   "announcement_date": null,
   "project_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :"
   ],
   "locality_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :"
   ],
   "state_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :"
   ],
   "capacity_gw_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :"
   ],
   "builder_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :",
    "MW first phase operational in 2028"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://docsity.com/en/docs/upcoming-data-centers-in-texas-in-2026/17267621",
   "title": "Upcoming Data Centers in Texas in 2026 | Summaries Technology | Docsity",
   "published_at": null,
   "project": "Frontier (Vantage DC)",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Construction started; first building delivery- H 2026",
   "announcement_date": null,
   "project_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :"
   ],
   "locality_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :"
   ],
   "state_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :"
   ],
   "capacity_gw_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :"
   ],
   "builder_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Top 7 Upcoming Data Centers in Texas 202 6 :"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://environmentenergyleader.com/stories/kevin-oleary-data-center-approved-in-box-elder-utah,125231",
   "title": "Kevin O'Leary Data Center Approved in Box Elder, Utah",
   "published_at": "2026-05-06T17:52:05",
   "project": "Stratos Project Area",
   "locality": "Hansel Valley",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O'Leary Digital",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": "2026-05-04",
   "project_evidence": [
    "**The Box Elder County Commission voted on May 4 to authorize the Military Installation Development Authority (MIDA) to establish the Stratos Project Area in Hansel Valley**, approximately 60 square miles of privately held vacant land in unincorporated western Box Elder County.",
    "Developed through [O'Leary Digital](https://olearyventures.com/), the project is designed to become one of the largest data center and power generation campuses in the country."
   ],
   "locality_evidence": [
    "**The Box Elder County Commission voted on May 4 to authorize the Military Installation Development Authority (MIDA) to establish the Stratos Project Area in Hansel Valley**, approximately 60 square miles of privately held vacant land in unincorporated western Box Elder County.",
    "Developed through [O'Leary Digital](https://olearyventures.com/), the project is designed to become one of the largest data center and power generation campuses in the country."
   ],
   "state_evidence": [
    "At Phase 1, the commitment is 3 gigawatts; full buildout targets 9 GW in Utah as part of a broader 15 GW multi-site strategy.",
    "Developed through [O'Leary Digital](https://olearyventures.com/), the project is designed to become one of the largest data center and power generation campuses in the country."
   ],
   "capacity_gw_evidence": [
    "At Phase 1, the commitment is 3 gigawatts; full buildout targets 9 GW in Utah as part of a broader 15 GW multi-site strategy.",
    "Developed through [O'Leary Digital](https://olearyventures.com/), the project is designed to become one of the largest data center and power generation campuses in the country."
   ],
   "builder_evidence": [
    "Developed through [O'Leary Digital](https://olearyventures.com/), the project is designed to become one of the largest data center and power generation campuses in the country."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "**The Box Elder County Commission voted on May 4 to authorize the Military Installation Development Authority (MIDA) to establish the Stratos Project Area in Hansel Valley**, approximately 60 square miles of privately held vacant land in unincorporated western Box Elder County.",
    "Developed through [O'Leary Digital](https://olearyventures.com/), the project is designed to become one of the largest data center and power generation campuses in the country."
   ],
   "announcement_date_evidence": [
    "**The Box Elder County Commission voted on May 4 to authorize the Military Installation Development Authority (MIDA) to establish the Stratos Project Area in Hansel Valley**, approximately 60 square miles of privately held vacant land in unincorporated western Box Elder County.",
    "Developed through [O'Leary Digital](https://olearyventures.com/), the project is designed to become one of the largest data center and power generation campuses in the country."
   ]
  },
  {
   "url": "https://rallies.ai/news/google-unveils-1-gigawatt-michigan-data-center-backed-by-27-gw-solar-storage-and-10m-fund",
   "title": "Google Unveils 1-Gigawatt Michigan Data Center Backed by 2.7-GW Solar Storage and $10M Fund",
   "published_at": "2026-03-17T12:02:48",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Google",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Google Unveils 1-Gigawatt Michigan Data Center Backed by 2.7-GW Solar Storage and $10M Fund - GOOG News | Rallies",
    "Google Unveils 1-Gigawatt Michigan Data Center Backed by 2.7-GW Solar Storage and $10M Fund",
    "Google confirmed it is the operator of the 1-gigawatt data center code-named \u2018Project Cannoli\u2019 on 130 of 282 acres in Van Buren Township."
   ],
   "locality_evidence": [
    "Google Unveils 1-Gigawatt Michigan Data Center Backed by 2.7-GW Solar Storage and $10M Fund - GOOG News | Rallies",
    "Google Unveils 1-Gigawatt Michigan Data Center Backed by 2.7-GW Solar Storage and $10M Fund",
    "Google plans a 1-gigawatt data center on 130 acres in Van Buren Township, Michigan, with five buildings covering 800,000 square feet and using 2\u20133.6 million gallons of water daily."
   ],
   "state_evidence": [
    "Google Unveils 1-Gigawatt Michigan Data Center Backed by 2.7-GW Solar Storage and $10M Fund - GOOG News | Rallies",
    "Google Unveils 1-Gigawatt Michigan Data Center Backed by 2.7-GW Solar Storage and $10M Fund",
    "Google plans a 1-gigawatt data center on 130 acres in Van Buren Township, Michigan, with five buildings covering 800,000 square feet and using 2\u20133.6 million gallons of water daily."
   ],
   "capacity_gw_evidence": [
    "Google Unveils 1-Gigawatt Michigan Data Center Backed by 2.7-GW Solar Storage and $10M Fund - GOOG News | Rallies",
    "Google Unveils 1-Gigawatt Michigan Data Center Backed by 2.7-GW Solar Storage and $10M Fund",
    "Google plans a 1-gigawatt data center on 130 acres in Van Buren Township, Michigan, with five buildings covering 800,000 square feet and using 2\u20133.6 million gallons of water daily."
   ],
   "builder_evidence": [
    "Google Unveils 1-Gigawatt Michigan Data Center Backed by 2.7-GW Solar Storage and $10M Fund - GOOG News | Rallies",
    "Google Unveils 1-Gigawatt Michigan Data Center Backed by 2.7-GW Solar Storage and $10M Fund",
    "Google plans a 1-gigawatt data center on 130 acres in Van Buren Township, Michigan, with five buildings covering 800,000 square feet and using 2\u20133.6 million gallons of water daily."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://streetinsider.com/Corporate+News/IREN+energizes+1.4GW+Sweetwater+1+data+center+site+in+Texas/26417740.html",
   "title": "IREN energizes 1.4GW Sweetwater 1 data center site in Texas",
   "published_at": null,
   "project": "Sweetwater",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "energized",
   "announcement_date": "2026-05-01",
   "project_evidence": [
    "# IREN energizes 1.4GW Sweetwater 1 data center site in Texas",
    "The energization connects the site's high-voltage substation to the ERCOT grid and represents a milestone in developing the broader 2GW Sweetwater campus."
   ],
   "locality_evidence": [
    "# IREN energizes 1.4GW Sweetwater 1 data center site in Texas",
    "IREN Limited (NASDAQ: [IREN](stock_lookup.php?q=IREN)) announced the energization of its 1.4GW Sweetwater 1 data center site in Texas, according to a company statement released May 1, 2026."
   ],
   "state_evidence": [
    "# IREN energizes 1.4GW Sweetwater 1 data center site in Texas",
    "IREN Limited (NASDAQ: [IREN](stock_lookup.php?q=IREN)) announced the energization of its 1.4GW Sweetwater 1 data center site in Texas, according to a company statement released May 1, 2026."
   ],
   "capacity_gw_evidence": [
    "# IREN energizes 1.4GW Sweetwater 1 data center site in Texas",
    "The energization connects the site's high-voltage substation to the ERCOT grid and represents a milestone in developing the broader 2GW Sweetwater campus."
   ],
   "builder_evidence": [
    "# IREN energizes 1.4GW Sweetwater 1 data center site in Texas",
    "IREN Limited (NASDAQ: [IREN](stock_lookup.php?q=IREN)) announced the energization of its 1.4GW Sweetwater 1 data center site in Texas, according to a company statement released May 1, 2026."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# IREN energizes 1.4GW Sweetwater 1 data center site in Texas",
    "IREN Limited (NASDAQ: [IREN](stock_lookup.php?q=IREN)) announced the energization of its 1.4GW Sweetwater 1 data center site in Texas, according to a company statement released May 1, 2026."
   ],
   "announcement_date_evidence": [
    "# IREN energizes 1.4GW Sweetwater 1 data center site in Texas",
    "IREN Limited (NASDAQ: [IREN](stock_lookup.php?q=IREN)) announced the energization of its 1.4GW Sweetwater 1 data center site in Texas, according to a company statement released May 1, 2026."
   ]
  },
  {
   "url": "https://todaytrendnews7.com/nvidia-backing-105-billion-in-financing-for-openai-data-center-in-ohio",
   "title": "Nvidia backing $105 billion in financing for OpenAI data center in Ohio - todaytrendnews7.com",
   "published_at": "2026-08-17T15:10:57",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike City",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "SB Energy will build and manage the datacenter at the PORTS-Pike Technology Campus in Pike City, Ohio, through a 20-year lease to OpenAI.",
    "- [Nvidia](https://todaytrendnews7.com/hive-digitals-stock-jumps-14-on-news-of-nvidia-deal/) will provide up to $105 billion for the credit and compute for an [OpenAI data](https://todaytrendnews7.com/nvidia-backs-financing-for-openai-data-center-in-ohio/) center in Ohio"
   ],
   "locality_evidence": [
    "SB Energy will build and manage the datacenter at the PORTS-Pike Technology Campus in Pike City, Ohio, through a 20-year lease to OpenAI.",
    "- SB Energy will build and manage the data center in Pike City, Ohio"
   ],
   "state_evidence": [
    "SB Energy will build and manage the datacenter at the PORTS-Pike Technology Campus in Pike City, Ohio, through a 20-year lease to OpenAI.",
    "- [Nvidia](https://todaytrendnews7.com/hive-digitals-stock-jumps-14-on-news-of-nvidia-deal/) will provide up to $105 billion for the credit and compute for an [OpenAI data](https://todaytrendnews7.com/nvidia-backs-financing-for-openai-data-center-in-ohio/) center in Ohio"
   ],
   "capacity_gw_evidence": [
    "The credit will support an initial 4.25 gigawatts of computing capacity with the option for an additional 3.75 gigawatts."
   ],
   "builder_evidence": [
    "SB Energy will build and manage the datacenter at the PORTS-Pike Technology Campus in Pike City, Ohio, through a 20-year lease to OpenAI.",
    "- SB Energy will build and manage the data center in Pike City, Ohio"
   ],
   "ai_customer_evidence": [
    "SB Energy will build and manage the datacenter at the PORTS-Pike Technology Campus in Pike City, Ohio, through a 20-year lease to OpenAI.",
    "- [Nvidia](https://todaytrendnews7.com/hive-digitals-stock-jumps-14-on-news-of-nvidia-deal/) will provide up to $105 billion for the credit and compute for an [OpenAI data](https://todaytrendnews7.com/nvidia-backs-financing-for-openai-data-center-in-ohio/) center in Ohio"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://ecmsource.com/meta-blackrock-14-billion-el-paso-ai-data-center-july-2026",
   "title": "Meta, BlackRock Team on $14B El Paso AI Data Center",
   "published_at": "2026-07-28T13:04:52",
   "project": "El Paso AI Data Center",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "BlackRock-managed funds",
   "ai_customer": "Meta",
   "status": "announced",
   "announcement_date": "2026-07-28",
   "project_evidence": [
    "Meta, BlackRock Team on $14B El Paso AI Data Center",
    "Meta Platforms and BlackRock announced on Tuesday, July 28, 2026, a $14 billion joint venture to build a 1-gigawatt artificial intelligence data center campus in El Paso, Texas."
   ],
   "locality_evidence": [
    "Meta, BlackRock Team on $14B El Paso AI Data Center",
    "Meta Platforms and BlackRock announced on Tuesday, July 28, 2026, a $14 billion joint venture to build a 1-gigawatt artificial intelligence data center campus in El Paso, Texas."
   ],
   "state_evidence": [
    "Meta, BlackRock Team on $14B El Paso AI Data Center",
    "Meta Platforms and BlackRock announced on Tuesday, July 28, 2026, a $14 billion joint venture to build a 1-gigawatt artificial intelligence data center campus in El Paso, Texas."
   ],
   "capacity_gw_evidence": [
    "Meta, BlackRock Team on $14B El Paso AI Data Center",
    "Meta Platforms and BlackRock announced on Tuesday, July 28, 2026, a $14 billion joint venture to build a 1-gigawatt artificial intelligence data center campus in El Paso, Texas."
   ],
   "builder_evidence": [
    "Meta, BlackRock Team on $14B El Paso AI Data Center",
    "Meta Platforms and BlackRock announced on Tuesday, July 28, 2026, a $14 billion joint venture to build a 1-gigawatt artificial intelligence data center campus in El Paso, Texas.",
    "BlackRock-managed funds are taking the majority stake in the special-purpose vehicle, and the asset manager is [leading a debt sale of at least $12 billion](https://www.reuters.com/technology/artificial-intelligence/blackrock-raises-12-billion-meta-ai-data-center-texas-2026-07-28/) to finance construction \u2014 a structure that keeps the bulk of the project off Meta\u2019s own balance sheet."
   ],
   "ai_customer_evidence": [
    "Meta, BlackRock Team on $14B El Paso AI Data Center",
    "Meta Platforms and BlackRock announced on Tuesday, July 28, 2026, a $14 billion joint venture to build a 1-gigawatt artificial intelligence data center campus in El Paso, Texas."
   ],
   "status_evidence": [
    "Meta, BlackRock Team on $14B El Paso AI Data Center",
    "Meta Platforms and BlackRock announced on Tuesday, July 28, 2026, a $14 billion joint venture to build a 1-gigawatt artificial intelligence data center campus in El Paso, Texas."
   ],
   "announcement_date_evidence": [
    "Meta, BlackRock Team on $14B El Paso AI Data Center",
    "Meta Platforms and BlackRock announced on Tuesday, July 28, 2026, a $14 billion joint venture to build a 1-gigawatt artificial intelligence data center campus in El Paso, Texas."
   ]
  },
  {
   "url": "https://ecmsource.com/meta-blackrock-14-billion-el-paso-ai-data-center-july-2026",
   "title": "Meta, BlackRock Team on $14B El Paso AI Data Center",
   "published_at": "2026-07-28T13:04:52",
   "project": "Hyperion campus",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "disclosed",
   "announcement_date": null,
   "project_evidence": [
    "Meta, BlackRock Team on $14B El Paso AI Data Center",
    "The JV is separate from Meta\u2019s already-disclosed [Hyperion campus in Richland Parish, Louisiana](https://www.datacenterdynamics.com/en/news/meta-hyperion-data-center-louisiana/), a 5-gigawatt project on nearly 4,000 acres that is planned to scale even larger over time."
   ],
   "locality_evidence": [
    "Meta, BlackRock Team on $14B El Paso AI Data Center",
    "The JV is separate from Meta\u2019s already-disclosed [Hyperion campus in Richland Parish, Louisiana](https://www.datacenterdynamics.com/en/news/meta-hyperion-data-center-louisiana/), a 5-gigawatt project on nearly 4,000 acres that is planned to scale even larger over time."
   ],
   "state_evidence": [
    "Meta, BlackRock Team on $14B El Paso AI Data Center",
    "The JV is separate from Meta\u2019s already-disclosed [Hyperion campus in Richland Parish, Louisiana](https://www.datacenterdynamics.com/en/news/meta-hyperion-data-center-louisiana/), a 5-gigawatt project on nearly 4,000 acres that is planned to scale even larger over time."
   ],
   "capacity_gw_evidence": [
    "Meta, BlackRock Team on $14B El Paso AI Data Center",
    "The JV is separate from Meta\u2019s already-disclosed [Hyperion campus in Richland Parish, Louisiana](https://www.datacenterdynamics.com/en/news/meta-hyperion-data-center-louisiana/), a 5-gigawatt project on nearly 4,000 acres that is planned to scale even larger over time."
   ],
   "builder_evidence": [
    "Meta, BlackRock Team on $14B El Paso AI Data Center",
    "The JV is separate from Meta\u2019s already-disclosed [Hyperion campus in Richland Parish, Louisiana](https://www.datacenterdynamics.com/en/news/meta-hyperion-data-center-louisiana/), a 5-gigawatt project on nearly 4,000 acres that is planned to scale even larger over time."
   ],
   "ai_customer_evidence": [
    "Meta, BlackRock Team on $14B El Paso AI Data Center",
    "The JV is separate from Meta\u2019s already-disclosed [Hyperion campus in Richland Parish, Louisiana](https://www.datacenterdynamics.com/en/news/meta-hyperion-data-center-louisiana/), a 5-gigawatt project on nearly 4,000 acres that is planned to scale even larger over time."
   ],
   "status_evidence": [
    "Meta, BlackRock Team on $14B El Paso AI Data Center",
    "The JV is separate from Meta\u2019s already-disclosed [Hyperion campus in Richland Parish, Louisiana](https://www.datacenterdynamics.com/en/news/meta-hyperion-data-center-louisiana/), a 5-gigawatt project on nearly 4,000 acres that is planned to scale even larger over time."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://scrutica.com/entities",
   "title": "Entities | Scrutica",
   "published_at": null,
   "project": "Meta Louisiana Datacenter",
   "locality": null,
   "state": "Louisiana",
   "capacity_gw": 2.26,
   "builder": "Meta Platforms, Inc.",
   "ai_customer": "",
   "status": "Announced",
   "announcement_date": null,
   "project_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Meta Louisiana Datacenter](/facilities/fac-epoch-gc-meta-louisiana-datacenter)Meta Platforms, Inc. | US | AI Training | Announced | 2,260 | | |"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Meta Louisiana Datacenter](/facilities/fac-epoch-gc-meta-louisiana-datacenter)Meta Platforms, Inc. | US | AI Training | Announced | 2,260 | | |"
   ],
   "capacity_gw_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Meta Louisiana Datacenter](/facilities/fac-epoch-gc-meta-louisiana-datacenter)Meta Platforms, Inc. | US | AI Training | Announced | 2,260 | | |"
   ],
   "builder_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Meta Louisiana Datacenter](/facilities/fac-epoch-gc-meta-louisiana-datacenter)Meta Platforms, Inc. | US | AI Training | Announced | 2,260 | | |"
   ],
   "ai_customer_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Meta Louisiana Datacenter](/facilities/fac-epoch-gc-meta-louisiana-datacenter)Meta Platforms, Inc. | US | AI Training | Announced | 2,260 | | |"
   ],
   "status_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Meta Louisiana Datacenter](/facilities/fac-epoch-gc-meta-louisiana-datacenter)Meta Platforms, Inc. | US | AI Training | Announced | 2,260 | | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://scrutica.com/entities",
   "title": "Entities | Scrutica",
   "published_at": null,
   "project": "AWS Project Rainier (New Carlisle, IN)",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon.com, Inc.",
   "ai_customer": "",
   "status": "Operational",
   "announcement_date": null,
   "project_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [AWS Project Rainier (New Carlisle, IN)](/facilities/fac-aws-new-carlisle)Amazon.com, Inc. | USNew Carlisle, Indiana | AI Training | Operational | 2,200 | | |"
   ],
   "locality_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [AWS Project Rainier (New Carlisle, IN)](/facilities/fac-aws-new-carlisle)Amazon.com, Inc. | USNew Carlisle, Indiana | AI Training | Operational | 2,200 | | |"
   ],
   "state_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [AWS Project Rainier (New Carlisle, IN)](/facilities/fac-aws-new-carlisle)Amazon.com, Inc. | USNew Carlisle, Indiana | AI Training | Operational | 2,200 | | |"
   ],
   "capacity_gw_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [AWS Project Rainier (New Carlisle, IN)](/facilities/fac-aws-new-carlisle)Amazon.com, Inc. | USNew Carlisle, Indiana | AI Training | Operational | 2,200 | | |"
   ],
   "builder_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [AWS Project Rainier (New Carlisle, IN)](/facilities/fac-aws-new-carlisle)Amazon.com, Inc. | USNew Carlisle, Indiana | AI Training | Operational | 2,200 | | |"
   ],
   "ai_customer_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [AWS Project Rainier (New Carlisle, IN)](/facilities/fac-aws-new-carlisle)Amazon.com, Inc. | USNew Carlisle, Indiana | AI Training | Operational | 2,200 | | |"
   ],
   "status_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [AWS Project Rainier (New Carlisle, IN)](/facilities/fac-aws-new-carlisle)Amazon.com, Inc. | USNew Carlisle, Indiana | AI Training | Operational | 2,200 | | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://scrutica.com/entities",
   "title": "Entities | Scrutica",
   "published_at": null,
   "project": "Meta Richland Parish (Hyperion)",
   "locality": "Holly Ridge",
   "state": "Louisiana",
   "capacity_gw": 2.0,
   "builder": "Meta Platforms, Inc.",
   "ai_customer": "",
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Meta Richland Parish (Hyperion)](/facilities/fac-meta-richland-parish)Meta Platforms, Inc. | USHolly Ridge, Louisiana | AI Training | Under Construction | 2,000 | | |"
   ],
   "locality_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Meta Richland Parish (Hyperion)](/facilities/fac-meta-richland-parish)Meta Platforms, Inc. | USHolly Ridge, Louisiana | AI Training | Under Construction | 2,000 | | |"
   ],
   "state_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Meta Richland Parish (Hyperion)](/facilities/fac-meta-richland-parish)Meta Platforms, Inc. | USHolly Ridge, Louisiana | AI Training | Under Construction | 2,000 | | |"
   ],
   "capacity_gw_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Meta Richland Parish (Hyperion)](/facilities/fac-meta-richland-parish)Meta Platforms, Inc. | USHolly Ridge, Louisiana | AI Training | Under Construction | 2,000 | | |"
   ],
   "builder_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Meta Richland Parish (Hyperion)](/facilities/fac-meta-richland-parish)Meta Platforms, Inc. | USHolly Ridge, Louisiana | AI Training | Under Construction | 2,000 | | |"
   ],
   "ai_customer_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Meta Richland Parish (Hyperion)](/facilities/fac-meta-richland-parish)Meta Platforms, Inc. | USHolly Ridge, Louisiana | AI Training | Under Construction | 2,000 | | |"
   ],
   "status_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Meta Richland Parish (Hyperion)](/facilities/fac-meta-richland-parish)Meta Platforms, Inc. | USHolly Ridge, Louisiana | AI Training | Under Construction | 2,000 | | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://scrutica.com/entities",
   "title": "Entities | Scrutica",
   "published_at": null,
   "project": "Crusoe Cheyenne Wyoming",
   "locality": null,
   "state": "Wyoming",
   "capacity_gw": 1.8,
   "builder": "Crusoe",
   "ai_customer": "",
   "status": "Announced",
   "announcement_date": null,
   "project_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Crusoe Cheyenne Wyoming](/facilities/fac-epoch-gc-crusoe-cheyenne-wyoming)Crusoe | US | AI Training | Announced | 1,800 | | |"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Crusoe Cheyenne Wyoming](/facilities/fac-epoch-gc-crusoe-cheyenne-wyoming)Crusoe | US | AI Training | Announced | 1,800 | | |"
   ],
   "capacity_gw_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Crusoe Cheyenne Wyoming](/facilities/fac-epoch-gc-crusoe-cheyenne-wyoming)Crusoe | US | AI Training | Announced | 1,800 | | |"
   ],
   "builder_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Crusoe Cheyenne Wyoming](/facilities/fac-epoch-gc-crusoe-cheyenne-wyoming)Crusoe | US | AI Training | Announced | 1,800 | | |"
   ],
   "ai_customer_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Crusoe Cheyenne Wyoming](/facilities/fac-epoch-gc-crusoe-cheyenne-wyoming)Crusoe | US | AI Training | Announced | 1,800 | | |"
   ],
   "status_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Crusoe Cheyenne Wyoming](/facilities/fac-epoch-gc-crusoe-cheyenne-wyoming)Crusoe | US | AI Training | Announced | 1,800 | | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://scrutica.com/entities",
   "title": "Entities | Scrutica",
   "published_at": null,
   "project": "OpenAI/Microsoft Mt Pleasant, Wisconsin Phase 2",
   "locality": "Mt Pleasant",
   "state": "Wisconsin",
   "capacity_gw": 1.5,
   "builder": "Microsoft",
   "ai_customer": "OpenAI",
   "status": "Announced",
   "announcement_date": null,
   "project_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [\"OpenAI/Microsoft Mt Pleasant, Wisconsin Phase 2\"](/facilities/fac-epoch-gc-openai-microsoft-mt-pleasant-wisconsin-phase-2)OpenAI | USMt Pleasant | AI Training | Announced | 1,500 | | |"
   ],
   "locality_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [\"OpenAI/Microsoft Mt Pleasant, Wisconsin Phase 2\"](/facilities/fac-epoch-gc-openai-microsoft-mt-pleasant-wisconsin-phase-2)OpenAI | USMt Pleasant | AI Training | Announced | 1,500 | | |"
   ],
   "state_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [\"OpenAI/Microsoft Mt Pleasant, Wisconsin Phase 2\"](/facilities/fac-epoch-gc-openai-microsoft-mt-pleasant-wisconsin-phase-2)OpenAI | USMt Pleasant | AI Training | Announced | 1,500 | | |"
   ],
   "capacity_gw_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [\"OpenAI/Microsoft Mt Pleasant, Wisconsin Phase 2\"](/facilities/fac-epoch-gc-openai-microsoft-mt-pleasant-wisconsin-phase-2)OpenAI | USMt Pleasant | AI Training | Announced | 1,500 | | |"
   ],
   "builder_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [\"OpenAI/Microsoft Mt Pleasant, Wisconsin Phase 2\"](/facilities/fac-epoch-gc-openai-microsoft-mt-pleasant-wisconsin-phase-2)OpenAI | USMt Pleasant | AI Training | Announced | 1,500 | | |"
   ],
   "ai_customer_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [\"OpenAI/Microsoft Mt Pleasant, Wisconsin Phase 2\"](/facilities/fac-epoch-gc-openai-microsoft-mt-pleasant-wisconsin-phase-2)OpenAI | USMt Pleasant | AI Training | Announced | 1,500 | | |"
   ],
   "status_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [\"OpenAI/Microsoft Mt Pleasant, Wisconsin Phase 2\"](/facilities/fac-epoch-gc-openai-microsoft-mt-pleasant-wisconsin-phase-2)OpenAI | USMt Pleasant | AI Training | Announced | 1,500 | | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://scrutica.com/entities",
   "title": "Entities | Scrutica",
   "published_at": null,
   "project": "Oracle Vantage Data Centers Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Oracle Corporation",
   "ai_customer": "",
   "status": "Announced",
   "announcement_date": null,
   "project_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Oracle Vantage Data Centers Frontier](/facilities/fac-epoch-gc-oracle-vantage-data-centers-frontier)Oracle Corporation | USShackelford County | AI Training | Announced | 1,400 | | |"
   ],
   "locality_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Oracle Vantage Data Centers Frontier](/facilities/fac-epoch-gc-oracle-vantage-data-centers-frontier)Oracle Corporation | USShackelford County | AI Training | Announced | 1,400 | | |"
   ],
   "state_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Oracle Vantage Data Centers Frontier](/facilities/fac-epoch-gc-oracle-vantage-data-centers-frontier)Oracle Corporation | USShackelford County | AI Training | Announced | 1,400 | | |"
   ],
   "capacity_gw_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Oracle Vantage Data Centers Frontier](/facilities/fac-epoch-gc-oracle-vantage-data-centers-frontier)Oracle Corporation | USShackelford County | AI Training | Announced | 1,400 | | |"
   ],
   "builder_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Oracle Vantage Data Centers Frontier](/facilities/fac-epoch-gc-oracle-vantage-data-centers-frontier)Oracle Corporation | USShackelford County | AI Training | Announced | 1,400 | | |"
   ],
   "ai_customer_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Oracle Vantage Data Centers Frontier](/facilities/fac-epoch-gc-oracle-vantage-data-centers-frontier)Oracle Corporation | USShackelford County | AI Training | Announced | 1,400 | | |"
   ],
   "status_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Oracle Vantage Data Centers Frontier](/facilities/fac-epoch-gc-oracle-vantage-data-centers-frontier)Oracle Corporation | USShackelford County | AI Training | Announced | 1,400 | | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://scrutica.com/entities",
   "title": "Entities | Scrutica",
   "published_at": null,
   "project": "IREN Sweetwater 1",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "IREN Limited",
   "ai_customer": "",
   "status": "Announced",
   "announcement_date": null,
   "project_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [IREN Sweetwater 1](/facilities/fac-epoch-gc-iren-sweetwater-1)IREN Limited | USSweetwater | AI Training | Announced | 1,400 | | |"
   ],
   "locality_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [IREN Sweetwater 1](/facilities/fac-epoch-gc-iren-sweetwater-1)IREN Limited | USSweetwater | AI Training | Announced | 1,400 | | |"
   ],
   "state_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [IREN Sweetwater 1](/facilities/fac-epoch-gc-iren-sweetwater-1)IREN Limited | USSweetwater | AI Training | Announced | 1,400 | | |"
   ],
   "capacity_gw_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [IREN Sweetwater 1](/facilities/fac-epoch-gc-iren-sweetwater-1)IREN Limited | USSweetwater | AI Training | Announced | 1,400 | | |"
   ],
   "builder_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [IREN Sweetwater 1](/facilities/fac-epoch-gc-iren-sweetwater-1)IREN Limited | USSweetwater | AI Training | Announced | 1,400 | | |"
   ],
   "ai_customer_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [IREN Sweetwater 1](/facilities/fac-epoch-gc-iren-sweetwater-1)IREN Limited | USSweetwater | AI Training | Announced | 1,400 | | |"
   ],
   "status_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [IREN Sweetwater 1](/facilities/fac-epoch-gc-iren-sweetwater-1)IREN Limited | USSweetwater | AI Training | Announced | 1,400 | | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://scrutica.com/entities",
   "title": "Entities | Scrutica",
   "published_at": null,
   "project": "Meta Prometheus New Albany",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.281,
   "builder": "Meta Platforms, Inc.",
   "ai_customer": "",
   "status": "Announced",
   "announcement_date": null,
   "project_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Meta Prometheus New Albany](/facilities/fac-epoch-gc-meta-prometheus-new-albany)Meta Platforms, Inc. | USNew Albany | AI Training | Announced | 1,281 | | |"
   ],
   "locality_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Meta Prometheus New Albany](/facilities/fac-epoch-gc-meta-prometheus-new-albany)Meta Platforms, Inc. | USNew Albany | AI Training | Announced | 1,281 | | |"
   ],
   "state_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Meta Prometheus New Albany](/facilities/fac-epoch-gc-meta-prometheus-new-albany)Meta Platforms, Inc. | USNew Albany | AI Training | Announced | 1,281 | | |"
   ],
   "capacity_gw_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Meta Prometheus New Albany](/facilities/fac-epoch-gc-meta-prometheus-new-albany)Meta Platforms, Inc. | USNew Albany | AI Training | Announced | 1,281 | | |"
   ],
   "builder_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Meta Prometheus New Albany](/facilities/fac-epoch-gc-meta-prometheus-new-albany)Meta Platforms, Inc. | USNew Albany | AI Training | Announced | 1,281 | | |"
   ],
   "ai_customer_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Meta Prometheus New Albany](/facilities/fac-epoch-gc-meta-prometheus-new-albany)Meta Platforms, Inc. | USNew Albany | AI Training | Announced | 1,281 | | |"
   ],
   "status_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Meta Prometheus New Albany](/facilities/fac-epoch-gc-meta-prometheus-new-albany)Meta Platforms, Inc. | USNew Albany | AI Training | Announced | 1,281 | | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://scrutica.com/entities",
   "title": "Entities | Scrutica",
   "published_at": null,
   "project": "Stargate Abilene (OpenAI/Oracle/SoftBank)",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Oracle Corporation",
   "ai_customer": "OpenAI",
   "status": "Operational",
   "announcement_date": null,
   "project_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Stargate Abilene (OpenAI/Oracle/SoftBank)](/facilities/fac-stargate-abilene)Oracle Corporation | USAbilene, Texas | AI Training | Operational | 1,200 | | |"
   ],
   "locality_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Stargate Abilene (OpenAI/Oracle/SoftBank)](/facilities/fac-stargate-abilene)Oracle Corporation | USAbilene, Texas | AI Training | Operational | 1,200 | | |"
   ],
   "state_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Stargate Abilene (OpenAI/Oracle/SoftBank)](/facilities/fac-stargate-abilene)Oracle Corporation | USAbilene, Texas | AI Training | Operational | 1,200 | | |"
   ],
   "capacity_gw_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Stargate Abilene (OpenAI/Oracle/SoftBank)](/facilities/fac-stargate-abilene)Oracle Corporation | USAbilene, Texas | AI Training | Operational | 1,200 | | |"
   ],
   "builder_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Stargate Abilene (OpenAI/Oracle/SoftBank)](/facilities/fac-stargate-abilene)Oracle Corporation | USAbilene, Texas | AI Training | Operational | 1,200 | | |"
   ],
   "ai_customer_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Stargate Abilene (OpenAI/Oracle/SoftBank)](/facilities/fac-stargate-abilene)Oracle Corporation | USAbilene, Texas | AI Training | Operational | 1,200 | | |"
   ],
   "status_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [Stargate Abilene (OpenAI/Oracle/SoftBank)](/facilities/fac-stargate-abilene)Oracle Corporation | USAbilene, Texas | AI Training | Operational | 1,200 | | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://scrutica.com/entities",
   "title": "Entities | Scrutica",
   "published_at": null,
   "project": "1 Gig Data Center East Fishkill, NY",
   "locality": null,
   "state": "New York",
   "capacity_gw": 1.0,
   "builder": null,
   "ai_customer": "",
   "status": "Announced",
   "announcement_date": null,
   "project_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [1 Gig Data Center East Fishkill, NY](/facilities/gridstatus-nyiso-1738) | US | Hyperscale DC | Announced | 1,000 | | |"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [1 Gig Data Center East Fishkill, NY](/facilities/gridstatus-nyiso-1738) | US | Hyperscale DC | Announced | 1,000 | | |"
   ],
   "capacity_gw_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [1 Gig Data Center East Fishkill, NY](/facilities/gridstatus-nyiso-1738) | US | Hyperscale DC | Announced | 1,000 | | |"
   ],
   "builder_evidence": null,
   "ai_customer_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [1 Gig Data Center East Fishkill, NY](/facilities/gridstatus-nyiso-1738) | US | Hyperscale DC | Announced | 1,000 | | |"
   ],
   "status_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [1 Gig Data Center East Fishkill, NY](/facilities/gridstatus-nyiso-1738) | US | Hyperscale DC | Announced | 1,000 | | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://scrutica.com/entities",
   "title": "Entities | Scrutica",
   "published_at": null,
   "project": "Crusoe Goodnight in Claude, Texas",
   "locality": "Claude",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe",
   "ai_customer": "",
   "status": "Announced",
   "announcement_date": null,
   "project_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [\"Crusoe Goodnight in Claude, Texas\"](/facilities/fac-epoch-gc-crusoe-goodnight-in-claude-texas)Crusoe | USClaude | AI Training | Announced | 1,000 | | |"
   ],
   "locality_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [\"Crusoe Goodnight in Claude, Texas\"](/facilities/fac-epoch-gc-crusoe-goodnight-in-claude-texas)Crusoe | USClaude | AI Training | Announced | 1,000 | | |"
   ],
   "state_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [\"Crusoe Goodnight in Claude, Texas\"](/facilities/fac-epoch-gc-crusoe-goodnight-in-claude-texas)Crusoe | USClaude | AI Training | Announced | 1,000 | | |"
   ],
   "capacity_gw_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [\"Crusoe Goodnight in Claude, Texas\"](/facilities/fac-epoch-gc-crusoe-goodnight-in-claude-texas)Crusoe | USClaude | AI Training | Announced | 1,000 | | |"
   ],
   "builder_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [\"Crusoe Goodnight in Claude, Texas\"](/facilities/fac-epoch-gc-crusoe-goodnight-in-claude-texas)Crusoe | USClaude | AI Training | Announced | 1,000 | | |"
   ],
   "ai_customer_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [\"Crusoe Goodnight in Claude, Texas\"](/facilities/fac-epoch-gc-crusoe-goodnight-in-claude-texas)Crusoe | USClaude | AI Training | Announced | 1,000 | | |"
   ],
   "status_evidence": [
    "## Facilities",
    "4,573 data centers, fabrication plants, and packaging facilities across 110 countries, indexed via PostGIS and filterable by type, status, country, or owner. The substrate covers frontier-class operators and the long tail of regional, edge, and operator-disclosed sites; every estimate carries its authority tier and the estimation path back to a primary source.",
    "| [Facility](/entities?sort=name&dir=asc) | [Country](/entities?sort=country&dir=asc) | [Type](/entities?sort=facility_type&dir=asc) | [Status](/entities?sort=status&dir=asc) | [Power (MW)](/entities?sort=power_capacity_mw&dir=asc) | Data | Fresh |",
    "| [\"Crusoe Goodnight in Claude, Texas\"](/facilities/fac-epoch-gc-crusoe-goodnight-in-claude-texas)Crusoe | USClaude | AI Training | Announced | 1,000 | | |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://arc-codex.com/article/6f70f48caa61a84253964ca5e8c1283c",
   "title": "Microsoft, PowerHouse Hillwood in disputes over data center service agreements",
   "published_at": "2026-08-25T01:37:09",
   "project": null,
   "locality": "Joliet",
   "state": "Illinois",
   "capacity_gw": 1.8,
   "builder": "PowerHouse Hillwood",
   "ai_customer": null,
   "status": "planning",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "Microsoft, PowerHouse Hillwood in disputes over data center service agreements",
    "Meanwhile, PowerHouse Hillwood on Aug. 14 urged FERC to reject Commonwealth Edison\u2019s \u201cnotice of cancellation\u201d that ends a transmission security agreement related to a 1.8-GW, $20-billion data center the company is planning in Joliet, Illinois."
   ],
   "state_evidence": [
    "Microsoft, PowerHouse Hillwood in disputes over data center service agreements",
    "Meanwhile, PowerHouse Hillwood on Aug. 14 urged FERC to reject Commonwealth Edison\u2019s \u201cnotice of cancellation\u201d that ends a transmission security agreement related to a 1.8-GW, $20-billion data center the company is planning in Joliet, Illinois."
   ],
   "capacity_gw_evidence": [
    "Microsoft, PowerHouse Hillwood in disputes over data center service agreements",
    "Meanwhile, PowerHouse Hillwood on Aug. 14 urged FERC to reject Commonwealth Edison\u2019s \u201cnotice of cancellation\u201d that ends a transmission security agreement related to a 1.8-GW, $20-billion data center the company is planning in Joliet, Illinois."
   ],
   "builder_evidence": [
    "Microsoft, PowerHouse Hillwood in disputes over data center service agreements",
    "Meanwhile, PowerHouse Hillwood on Aug. 14 urged FERC to reject Commonwealth Edison\u2019s \u201cnotice of cancellation\u201d that ends a transmission security agreement related to a 1.8-GW, $20-billion data center the company is planning in Joliet, Illinois."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Microsoft, PowerHouse Hillwood in disputes over data center service agreements",
    "Meanwhile, PowerHouse Hillwood on Aug. 14 urged FERC to reject Commonwealth Edison\u2019s \u201cnotice of cancellation\u201d that ends a transmission security agreement related to a 1.8-GW, $20-billion data center the company is planning in Joliet, Illinois."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://linkedin.com/posts/datacenterfrontier_vantage-unveils-plans-for-25-billion-texas-activity-7363534040861184001-sqvo",
   "title": "Vantage Unveils Plans for $25 Billion Texas Campus",
   "published_at": "2025-08-19T11:35:23",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Construction has already begun",
   "announcement_date": null,
   "project_evidence": [
    "Vantage Unveils Plans for $25 Billion Texas Campus",
    "The 1,200-acre Frontier campus will be home to 10 data centers totaling 3.7 million square feet, and will be the largest campus in Vantage's global portfolio."
   ],
   "locality_evidence": [
    "Vantage Unveils Plans for $25 Billion Texas Campus",
    "Developer Vantage Data Centers will invest $25 billion to develop a 1.4GW data center MegaCampus in Shackelford County, Texas, the company said today."
   ],
   "state_evidence": [
    "Vantage Unveils Plans for $25 Billion Texas Campus",
    "Developer Vantage Data Centers will invest $25 billion to develop a 1.4GW data center MegaCampus in Shackelford County, Texas, the company said today."
   ],
   "capacity_gw_evidence": [
    "Vantage Unveils Plans for $25 Billion Texas Campus",
    "Developer Vantage Data Centers will invest $25 billion to develop a 1.4GW data center MegaCampus in Shackelford County, Texas, the company said today."
   ],
   "builder_evidence": [
    "Vantage Unveils Plans for $25 Billion Texas Campus",
    "Developer Vantage Data Centers will invest $25 billion to develop a 1.4GW data center MegaCampus in Shackelford County, Texas, the company said today."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Vantage Unveils Plans for $25 Billion Texas Campus",
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://proactiveinvestors.com.au/NASDAQ:FRMI/Fermi-Inc/rns/1832432",
   "title": "Proactive financial news: fast, accessible, and actionable articles and videos for the global investment audience.",
   "published_at": null,
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": "2026-02-20",
   "project_evidence": [
    "Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "locality_evidence": [
    "Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "state_evidence": [
    "Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "capacity_gw_evidence": [
    "Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "builder_evidence": [
    "Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "announcement_date_evidence": [
    "Fermi Inc. - Initial Draw on $200m Equipment Facility",
    "Fermi Inc.",
    "20 February 2026",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ]
  },
  {
   "url": "https://thailand-business-news.com/pr-news/nscale-and-microsoft-announce-collaboration-with-nvidia-and-caterpillar-to-deliver-1-35gw-of-nvidia-vera-rubin-nvl72-gpus-at-flagship-ai-factory-campus-in-west-virginia",
   "title": "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
   "published_at": "2026-03-16T21:32:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "announced",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts.",
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia"
   ],
   "locality_evidence": [
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts.",
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia"
   ],
   "state_evidence": [
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts.",
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia"
   ],
   "capacity_gw_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts.",
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia"
   ],
   "builder_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies.",
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia"
   ],
   "ai_customer_evidence": [
    "Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA\u2019s next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design.",
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia"
   ],
   "status_evidence": [
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts.",
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia"
   ],
   "announcement_date_evidence": [
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA\u2019s next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design.",
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia"
   ]
  },
  {
   "url": "https://robotsatlas.com/posts/wydatki-openai-na-infrastrukture-ai-rosna-do-750-mld-usd",
   "title": "OpenAI's AI infrastructure spending climbs to $750B",
   "published_at": "2026-07-23T16:07:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Artificial Intelligence",
    "Project Camellia: $20B and 3.2 GW in Georgia",
    "The scale shows in a single line item: Project Camellia, a $20 billion data center campus in Georgia with a power demand of at least 3.2 gigawatts."
   ],
   "locality_evidence": [
    "Artificial Intelligence",
    "Project Camellia: $20B and 3.2 GW in Georgia",
    "The $20 billion project is set to draw at least 3.2 gigawatts from Georgia Power, with availability spread across 2028 to 2032."
   ],
   "state_evidence": [
    "Artificial Intelligence",
    "Project Camellia: $20B and 3.2 GW in Georgia",
    "The scale shows in a single line item: Project Camellia, a $20 billion data center campus in Georgia with a power demand of at least 3.2 gigawatts."
   ],
   "capacity_gw_evidence": [
    "Artificial Intelligence",
    "Project Camellia: $20B and 3.2 GW in Georgia",
    "The scale shows in a single line item: Project Camellia, a $20 billion data center campus in Georgia with a power demand of at least 3.2 gigawatts."
   ],
   "builder_evidence": [
    "Artificial Intelligence",
    "Project Camellia: $20B and 3.2 GW in Georgia",
    "According to filings described by DataCenterDynamics, OpenAI is contracting energy directly from Georgia Power, with the first gigawatt due in the first half of 2027."
   ],
   "ai_customer_evidence": [
    "Artificial Intelligence",
    "Project Camellia: $20B and 3.2 GW in Georgia",
    "According to filings described by DataCenterDynamics, OpenAI is contracting energy directly from Georgia Power, with the first gigawatt due in the first half of 2027."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://rozeepk.com/terawulfs-kentucky-ai-build-shows-miners-are-abandoning-pure-bitcoin-economics",
   "title": "TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics - RozeePk",
   "published_at": "2026-05-26T14:14:03",
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": null,
   "project_evidence": [
    "TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
    "The Muskie Data Campus in eastern Kentucky is expected to support more than 1 GW of data center capacity on a roughly 285-acre parcel inside a 1,000-acre industrial park.",
    "TeraWulf disclosed Tuesday that it has acquired the Muskie Data Campus from Industrial Equity Partners, adding a hyperscale AI and HPC site in eastern Kentucky that the company says can support more than 1 GW of future data center capacity."
   ],
   "locality_evidence": [
    "TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
    "The Muskie Data Campus in eastern Kentucky is expected to support more than 1 GW of data center capacity on a roughly 285-acre parcel inside a 1,000-acre industrial park.",
    "TeraWulf disclosed Tuesday that it has acquired the Muskie Data Campus from Industrial Equity Partners, adding a hyperscale AI and HPC site in eastern Kentucky that the company says can support more than 1 GW of future data center capacity."
   ],
   "state_evidence": [
    "TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore.",
    "The Muskie Data Campus in eastern Kentucky is expected to support more than 1 GW of data center capacity on a roughly 285-acre parcel inside a 1,000-acre industrial park."
   ],
   "capacity_gw_evidence": [
    "TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore.",
    "The Muskie Data Campus in eastern Kentucky is expected to support more than 1 GW of data center capacity on a roughly 285-acre parcel inside a 1,000-acre industrial park."
   ],
   "builder_evidence": [
    "TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
    "TeraWulf disclosed Tuesday that it has acquired the Muskie Data Campus from Industrial Equity Partners, adding a hyperscale AI and HPC site in eastern Kentucky that the company says can support more than 1 GW of future data center capacity."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://powertracker.io/site/sweetwater",
   "title": "Sweetwater (IREN) - powertracker",
   "published_at": "2026-05-18T00:00:00",
   "project": "Sweetwater",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "Under Construction (2026)",
   "announcement_date": null,
   "project_evidence": [
    "AI data centers in US grid context.",
    "# Sweetwater"
   ],
   "locality_evidence": [
    "AI data centers in US grid context.",
    "IREN \u00b7 Sweetwater, Texas"
   ],
   "state_evidence": [
    "AI data centers in US grid context.",
    "IREN \u00b7 Sweetwater, Texas"
   ],
   "capacity_gw_evidence": [
    "AI data centers in US grid context.",
    "2.0 GW Announced load"
   ],
   "builder_evidence": [
    "AI data centers in US grid context.",
    "IREN \u00b7 Sweetwater, Texas"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "AI data centers in US grid context.",
    "Status",
    "Under Construction (2026)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://alternativeenergyreporter.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Creekstone Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "About Creekstone Energy",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://techradar.com/pro/ecl-builds-gigawatt-hydrogen-powered-data-center-to-keep-up-with-ais-insatiable-demand-for-power-and-its-already-planning-an-expansion",
   "title": "ECL builds gigawatt hydrogen-powered data center to keep up with AI\u2019s insatiable demand for power \u2014 and it's already planning an expansion",
   "published_at": "2024-10-04T15:49:00",
   "project": "TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "ECL has announced its development of TerraSite-TX1, the world\u2019s first 1GW off-grid, hydrogen-powered AI factory data center.",
    "As technology companies continue to expand their use of artificial intelligence, the demand for energy-intensive data centers is growing rapidly."
   ],
   "locality_evidence": [
    "Located on a 600-acre site near Houston, Texas, this facility is set to provide Lambda and other AI leaders with both space and power for future projects, while maintaining zero emissions.",
    "As technology companies continue to expand their use of artificial intelligence, the demand for energy-intensive data centers is growing rapidly."
   ],
   "state_evidence": [
    "Located on a 600-acre site near Houston, Texas, this facility is set to provide Lambda and other AI leaders with both space and power for future projects, while maintaining zero emissions.",
    "As technology companies continue to expand their use of artificial intelligence, the demand for energy-intensive data centers is growing rapidly."
   ],
   "capacity_gw_evidence": [
    "When it's up and running, TerraSite-TX1 will receive hydrogen through three pipelines, minimizing the need for additional fuel transport, and its modular design will allow for future expansion up to 2GW.",
    "As technology companies continue to expand their use of artificial intelligence, the demand for energy-intensive data centers is growing rapidly."
   ],
   "builder_evidence": [
    "ECL has announced its development of TerraSite-TX1, the world\u2019s first 1GW off-grid, hydrogen-powered AI factory data center.",
    "As technology companies continue to expand their use of artificial intelligence, the demand for energy-intensive data centers is growing rapidly."
   ],
   "ai_customer_evidence": [
    "Located on a 600-acre site near Houston, Texas, this facility is set to provide Lambda and other AI leaders with both space and power for future projects, while maintaining zero emissions.",
    "As technology companies continue to expand their use of artificial intelligence, the demand for energy-intensive data centers is growing rapidly."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news/nvidia-confirms-it-will-back-425gw-of-openai-capacity-at-ports-pike-mega-data-center",
   "title": "Nvidia confirms it will back 4.25GW of OpenAI capacity at Ports-Pike mega data center",
   "published_at": "2026-08-11T00:00:00",
   "project": "Portsmouth Site",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 10.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "Nvidia has confirmed reports that it is financially backing SoftBank's massive data center at the Portsmouth Site in Pike County, Ohio."
   ],
   "locality_evidence": [
    "Nvidia has confirmed reports that it is financially backing SoftBank's massive data center at the Portsmouth Site in Pike County, Ohio."
   ],
   "state_evidence": [
    "Nvidia has confirmed reports that it is financially backing SoftBank's massive data center at the Portsmouth Site in Pike County, Ohio."
   ],
   "capacity_gw_evidence": [
    "The facility could grow to 10GW, making it the world's largest data center, but Nvidia will initially support the first 4.25GW."
   ],
   "builder_evidence": [
    "The project, led by SB Energy, is set to be fully leased to OpenAI."
   ],
   "ai_customer_evidence": [
    "The project, led by SB Energy, is set to be fully leased to OpenAI."
   ],
   "status_evidence": [
    "The project, led by SB Energy, is set to be fully leased to OpenAI."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tesorb.com/colossus-2-memphis-datacenter-xai",
   "title": "Colossus 2: Inside xAI's Memphis Datacenter",
   "published_at": "2026-06-21T20:00:00",
   "project": "Colossus",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "operational",
   "announcement_date": "2024-08-01",
   "project_evidence": [
    "# Colossus 2: 555,000 GPUs, 2 Gigawatts, and the Pollution Lawsuit the DOJ Tried to Kill",
    "xAI\u2019s Colossus complex in Memphis is now the largest single-site AI training facility on Earth."
   ],
   "locality_evidence": [
    "xAI\u2019s Colossus complex in Memphis is now the largest single-site AI training facility on Earth."
   ],
   "state_evidence": [
    "In June 2026, two Tennessee cities (McMinnville and Coffee County) passed data center moratoria, and Nashville introduced zoning legislation restricting facilities over 500,000 square feet."
   ],
   "capacity_gw_evidence": [
    "# Colossus 2: 555,000 GPUs, 2 Gigawatts, and the Pollution Lawsuit the DOJ Tried to Kill",
    "Across three buildings (two operational, one under conversion) the campus houses approximately 555,000 NVIDIA GPUs with a design power capacity of 2 gigawatts."
   ],
   "builder_evidence": [
    "xAI\u2019s Colossus complex in Memphis is now the largest single-site AI training facility on Earth."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Across three buildings (two operational, one under conversion) the campus houses approximately 555,000 NVIDIA GPUs with a design power capacity of 2 gigawatts."
   ],
   "announcement_date_evidence": [
    "Colossus 1, the original facility, occupies a 785,000-square-foot former Electrolux factory on roughly 217 acres.",
    "It went live in August 2024, just 122 days after its public announcement."
   ]
  },
  {
   "url": "https://markets.businessinsider.com/news/stocks/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas-1036327972",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
   "published_at": "2026-07-15T16:00:00",
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Lancium",
   "ai_customer": null,
   "status": "Construction is expected to begin in Q3 2026",
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "locality_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas.",
    "The grid-connected campus spans 270 acres owned by Lancium, which will also develop and manage the site's energy infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Construction is expected to begin in Q3 2026, creating thousands of local construction jobs, more than 100 long-term positions, and a significant long-term economic investment for Childress County."
   ],
   "announcement_date_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ]
  },
  {
   "url": "https://allstreaminsiders.com/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand",
   "title": "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand - Allstream Insiders",
   "published_at": "2025-08-19T15:29:06",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "The state-of-the-art campus, **\u201cFrontier,\u201d** will lead to **advancements in AI** and **employ more than 5,000 individuals** across construction and ongoing operations.",
    "Campus boasts 1.4 gigawatts of capacity in the Lone Star state, a strategic, global AI hub"
   ],
   "locality_evidence": [
    "DENVER (Aug. 19, 2025) \u2013 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced **its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.**",
    "Campus boasts 1.4 gigawatts of capacity in the Lone Star state, a strategic, global AI hub"
   ],
   "state_evidence": [
    "DENVER (Aug. 19, 2025) \u2013 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced **its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.**",
    "Campus boasts 1.4 gigawatts of capacity in the Lone Star state, a strategic, global AI hub"
   ],
   "capacity_gw_evidence": [
    "DENVER (Aug. 19, 2025) \u2013 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced **its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.**",
    "Campus boasts 1.4 gigawatts of capacity in the Lone Star state, a strategic, global AI hub"
   ],
   "builder_evidence": [
    "DENVER (Aug. 19, 2025) \u2013 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced **its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.**",
    "Campus boasts 1.4 gigawatts of capacity in the Lone Star state, a strategic, global AI hub"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "**Construction on the campus has already begun,** with the **first building scheduled for delivery in the second half of 2026.**",
    "Campus boasts 1.4 gigawatts of capacity in the Lone Star state, a strategic, global AI hub"
   ],
   "announcement_date_evidence": [
    "DENVER (Aug. 19, 2025) \u2013 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced **its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.**",
    "Campus boasts 1.4 gigawatts of capacity in the Lone Star state, a strategic, global AI hub"
   ]
  },
  {
   "url": "https://ticker.app/lse/FRMI/rns/2026-02-20/Initial-Draw-on-dollar200m-Equipment-Facility/7468T",
   "title": "Initial Draw on $200m Equipment Facility",
   "published_at": "2026-02-20T16:28:39",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi Inc.",
   "ai_customer": null,
   "status": "Under Construction",
   "announcement_date": "2026-02-20",
   "project_evidence": [
    "Initial Draw on $200m Equipment Facility - Fermi Inc | RNS | Ticker",
    "The proceeds will fund the acquisition of utility-grade breakers, transformers, substations, and switchgears for the first 2.3GW of its 11GW Project Matador campus.",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "locality_evidence": [
    "Initial Draw on $200m Equipment Facility - Fermi Inc | RNS | Ticker",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "state_evidence": [
    "Initial Draw on $200m Equipment Facility - Fermi Inc | RNS | Ticker",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "capacity_gw_evidence": [
    "Initial Draw on $200m Equipment Facility - Fermi Inc | RNS | Ticker",
    "The proceeds will fund the acquisition of utility-grade breakers, transformers, substations, and switchgears for the first 2.3GW of its 11GW Project Matador campus."
   ],
   "builder_evidence": [
    "Initial Draw on $200m Equipment Facility - Fermi Inc | RNS | Ticker",
    "On February 20, 2026, Fermi Inc. (Fermi America) secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Initial Draw on $200m Equipment Facility - Fermi Inc | RNS | Ticker",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "announcement_date_evidence": [
    "Initial Draw on $200m Equipment Facility - Fermi Inc | RNS | Ticker",
    "On February 20, 2026, Fermi Inc. (Fermi America) secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group."
   ]
  },
  {
   "url": "https://datacentersexposed.com/facilities/homer-city-energy-campus",
   "title": "Homer City Energy Campus \u2014 Indiana County, PA",
   "published_at": null,
   "project": "Homer City Energy Campus",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Kiewit",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "Under construction",
    "# Homer City Energy Campus",
    "Homer City Energy Campus is a under construction data center in Indiana County, PA, operated by Homer City Redevelopment (with Kiewit as contractor/partner)."
   ],
   "locality_evidence": [
    "Under construction",
    "# Homer City Energy Campus",
    "Homer City, Indiana County, PA",
    "Homer City Energy Campus in Homer City, PA is contested."
   ],
   "state_evidence": [
    "Under construction",
    "# Homer City Energy Campus",
    "Homer City, Indiana County, PA",
    "In December 2025, Clean Air Council, PennFuture, and Sierra Club filed an appeal of the development's permit with the PA Environmental Hearing Board."
   ],
   "capacity_gw_evidence": [
    "Under construction",
    "# Homer City Energy Campus",
    "DataCentersExposed has documented 4,500 MW of reported power capacity at this site."
   ],
   "builder_evidence": [
    "Under construction",
    "# Homer City Energy Campus",
    "Homer City Energy Campus is a under construction data center in Indiana County, PA, operated by Homer City Redevelopment (with Kiewit as contractor/partner)."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Under construction",
    "# Homer City Energy Campus",
    "Homer City Energy Campus is a under construction data center in Indiana County, PA, operated by Homer City Redevelopment (with Kiewit as contractor/partner)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://theindustrial.in/news/2f93bd611e/Nscale-Acquires-American-Intelligence-amp-Power-Corporation-Creating-a-Full-Stack-AI-Hyperscaler-Integrated-from-Energy-to-Compute",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": null,
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories.",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "locality_evidence": [
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories.",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories.",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "capacity_gw_evidence": [
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts.",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "builder_evidence": [
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "announcement_date_evidence": [
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "SAN JOSE, Calif., March 16, 2026 -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ]
  },
  {
   "url": "https://theomnibuzz.com/upcoming-data-centers-in-texas-2026",
   "title": "Upcoming Data Centers in Texas 2026",
   "published_at": "2026-03-18T10:31:30",
   "project": "Advanced Energy and Intelligence Campus",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Texas University System and Fermi America",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **Advanced Energy and Intelligence Campus:**",
    "The Advanced Energy and Intelligence Campus is an 11 GW data center being developed by the Texas University System and Fermi America."
   ],
   "locality_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **Advanced Energy and Intelligence Campus:**",
    "This data center is located near Amarillo in the Texas Panhandle."
   ],
   "state_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **Advanced Energy and Intelligence Campus:**",
    "The Advanced Energy and Intelligence Campus is an 11 GW data center being developed by the Texas University System and Fermi America."
   ],
   "capacity_gw_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **Advanced Energy and Intelligence Campus:**",
    "The Advanced Energy and Intelligence Campus is an 11 GW data center being developed by the Texas University System and Fermi America."
   ],
   "builder_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **Advanced Energy and Intelligence Campus:**",
    "The Advanced Energy and Intelligence Campus is an 11 GW data center being developed by the Texas University System and Fermi America."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://theomnibuzz.com/upcoming-data-centers-in-texas-2026",
   "title": "Upcoming Data Centers in Texas 2026",
   "published_at": "2026-03-18T10:31:30",
   "project": "Data City",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corporation",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **Data City, Texas:**",
    "Data City is a 5 GW data center campus planned by Energy Abundance Development Corporation near Laredo, Texas."
   ],
   "locality_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **Data City, Texas:**",
    "Data City is a 5 GW data center campus planned by Energy Abundance Development Corporation near Laredo, Texas."
   ],
   "state_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **Data City, Texas:**",
    "Data City is a 5 GW data center campus planned by Energy Abundance Development Corporation near Laredo, Texas."
   ],
   "capacity_gw_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **Data City, Texas:**",
    "Data City is a 5 GW data center campus planned by Energy Abundance Development Corporation near Laredo, Texas."
   ],
   "builder_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **Data City, Texas:**",
    "Data City is a 5 GW data center campus planned by Energy Abundance Development Corporation near Laredo, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://theomnibuzz.com/upcoming-data-centers-in-texas-2026",
   "title": "Upcoming Data Centers in Texas 2026",
   "published_at": "2026-03-18T10:31:30",
   "project": "OpenAI Stargate Campus",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 4.5,
   "builder": "OpenAI, Oracle, and SoftBank",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **OpenAI Stargate Campus:**",
    "OpenAI and Oracle are developing a 4.5 GW data center in Abilene, Texas."
   ],
   "locality_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **OpenAI Stargate Campus:**",
    "OpenAI and Oracle are developing a 4.5 GW data center in Abilene, Texas."
   ],
   "state_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **OpenAI Stargate Campus:**",
    "OpenAI and Oracle are developing a 4.5 GW data center in Abilene, Texas."
   ],
   "capacity_gw_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **OpenAI Stargate Campus:**",
    "OpenAI and Oracle are developing a 4.5 GW data center in Abilene, Texas."
   ],
   "builder_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **OpenAI Stargate Campus:**",
    "It is developed by a joint venture between OpenAI, Oracle, and SoftBank."
   ],
   "ai_customer_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **OpenAI Stargate Campus:**",
    "OpenAI and Oracle are developing a 4.5 GW data center in Abilene, Texas."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://theomnibuzz.com/upcoming-data-centers-in-texas-2026",
   "title": "Upcoming Data Centers in Texas 2026",
   "published_at": "2026-03-18T10:31:30",
   "project": "Tract Caldwell County Park",
   "locality": "Caldwell County",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Tract",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **Tract Caldwell County Park:**",
    "The Tract Caldwell County Park is a 2 GW data center technology park developed by Tract in Caldwell County."
   ],
   "locality_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **Tract Caldwell County Park:**",
    "The Tract Caldwell County Park is a 2 GW data center technology park developed by Tract in Caldwell County."
   ],
   "state_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **Tract Caldwell County Park:**",
    "The Tract Caldwell County Park is a 2 GW data center technology park developed by Tract in Caldwell County."
   ],
   "capacity_gw_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **Tract Caldwell County Park:**",
    "The Tract Caldwell County Park is a 2 GW data center technology park developed by Tract in Caldwell County."
   ],
   "builder_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **Tract Caldwell County Park:**",
    "The Tract Caldwell County Park is a 2 GW data center technology park developed by Tract in Caldwell County."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://theomnibuzz.com/upcoming-data-centers-in-texas-2026",
   "title": "Upcoming Data Centers in Texas 2026",
   "published_at": "2026-03-18T10:31:30",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **Frontier (Vantage DC):**",
    "This data center is planned with a capacity of 1.4 GW in Shackelford County, Texas."
   ],
   "locality_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **Frontier (Vantage DC):**",
    "This data center is planned with a capacity of 1.4 GW in Shackelford County, Texas."
   ],
   "state_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **Frontier (Vantage DC):**",
    "This data center is planned with a capacity of 1.4 GW in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **Frontier (Vantage DC):**",
    "This data center is planned with a capacity of 1.4 GW in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "Upcoming Data Centers in Texas 2026",
    "### **Frontier (Vantage DC):**",
    "Frontier is a USD 25 billion [data center project by Vantage](https://www.blackridgeresearch.com/news-releases/vantage-data-centers-plans-25-billion-ai-campus-texas-united-states) Data Centers, a leading global provider of hyperscale data centers."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://yahoo.com/news/articles/google-reveals-behind-big-project-120218652.html",
   "title": "Google reveals it is behind big 'Project Cannoli' data center project",
   "published_at": "2026-03-17T12:02:18",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "locality_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "state_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "capacity_gw_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "builder_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "The data center would be developed for Google by Panattoni Development Co."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "announcement_date_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ]
  },
  {
   "url": "https://tftc.io/hut-8-benchmark-price-target-165-ai-data-center-contracts",
   "title": "Benchmark Doubles Hut 8 Target to $165 on $16.8B AI Contract Stack",
   "published_at": "2026-07-14T16:09:11",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "commercializes first phase",
   "announcement_date": null,
   "project_evidence": [
    "# Benchmark Doubles Hut 8 Target to $165 on $16.8B AI Contract Stack",
    "The $16.8B figure traces directly to two hyperscale AI campuses confirmed in [Hut 8's Q1 2026 SEC filing](https://www.sec.gov/Archives/edgar/data/0001964789/000110465926055894/hut-20260506xex99d1.htm?ref=tftc.ghost.io): River Bend ($7B base-term lease) and Beacon Point ($9.8B base-term lease), totaling 597 MW of contracted IT capacity.",
    "Beacon Point, located in Nueces County, Texas, is the larger and newer of the two."
   ],
   "locality_evidence": [
    "# Benchmark Doubles Hut 8 Target to $165 on $16.8B AI Contract Stack",
    "Beacon Point, located in Nueces County, Texas, is the larger and newer of the two."
   ],
   "state_evidence": [
    "# Benchmark Doubles Hut 8 Target to $165 on $16.8B AI Contract Stack",
    "Beacon Point, located in Nueces County, Texas, is the larger and newer of the two."
   ],
   "capacity_gw_evidence": [
    "# Benchmark Doubles Hut 8 Target to $165 on $16.8B AI Contract Stack",
    "The [official Hut 8 press release](https://www.hut8.com/news-insights/press-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw?ref=tftc.ghost.io) confirms a 15-year, 352 MW lease structured as triple-net, take-or-pay, with a 3% annual rent escalator."
   ],
   "builder_evidence": [
    "# Benchmark Doubles Hut 8 Target to $165 on $16.8B AI Contract Stack",
    "The [official Hut 8 press release](https://www.hut8.com/news-insights/press-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw?ref=tftc.ghost.io) confirms a 15-year, 352 MW lease structured as triple-net, take-or-pay, with a 3% annual rent escalator."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Benchmark Doubles Hut 8 Target to $165 on $16.8B AI Contract Stack",
    "The [official Hut 8 press release](https://www.hut8.com/news-insights/press-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw?ref=tftc.ghost.io) confirms a 15-year, 352 MW lease structured as triple-net, take-or-pay, with a 3% annual rent escalator."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news/iren-plans-75mw-liquid-cooled-ai-data-center-in-texas",
   "title": "IREN plans 75MW liquid-cooled AI data center in Texas",
   "published_at": "2026-08-05T00:00:00",
   "project": "Sweetwater 1",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "IREN",
   "ai_customer": null,
   "status": "on-track for April 2026",
   "announcement_date": null,
   "project_evidence": [
    "Crypto and AI data center firm IREN is planning to develop a 75MW AI data center in Texas.",
    "Energization of the 1.4GW Sweetwater 1 site is on-track for April 2026."
   ],
   "locality_evidence": [
    "Crypto and AI data center firm IREN is planning to develop a 75MW AI data center in Texas.",
    "Energization of the 1.4GW Sweetwater 1 site is on-track for April 2026."
   ],
   "state_evidence": [
    "Crypto and AI data center firm IREN is planning to develop a 75MW AI data center in Texas.",
    "Energization of the 1.4GW Sweetwater 1 site is on-track for April 2026."
   ],
   "capacity_gw_evidence": [
    "Crypto and AI data center firm IREN is planning to develop a 75MW AI data center in Texas.",
    "Energization of the 1.4GW Sweetwater 1 site is on-track for April 2026."
   ],
   "builder_evidence": [
    "Crypto and AI data center firm IREN is planning to develop a 75MW AI data center in Texas.",
    "Energization of the 1.4GW Sweetwater 1 site is on-track for April 2026."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Crypto and AI data center firm IREN is planning to develop a 75MW AI data center in Texas.",
    "Energization of the 1.4GW Sweetwater 1 site is on-track for April 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://50statestoday.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "state_evidence": [
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "capacity_gw_evidence": [
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "builder_evidence": [
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://h2-tech.com/news/2024/09-2024/ecl-announces-1-gigawatt-off-grid-h-sub-2-sub-powered-ai-factory-data-center",
   "title": "ECL announces 1-gigawatt off-grid, H2-powered AI factory data center",
   "published_at": null,
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# News",
    "# ECL announces 1-gigawatt off-grid, H2-powered AI factory data center",
    "Data Center-as-a-Service pioneer ECL, which unveiled an off-grid, sustainable, modular, built-to-suit data center, announced that it will build the first fully sustainable 1-GW AI Factory data center, ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "locality_evidence": [
    "# News",
    "# ECL announces 1-gigawatt off-grid, H2-powered AI factory data center",
    "Data Center-as-a-Service pioneer ECL, which unveiled an off-grid, sustainable, modular, built-to-suit data center, announced that it will build the first fully sustainable 1-GW AI Factory data center, ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "state_evidence": [
    "# News",
    "# ECL announces 1-gigawatt off-grid, H2-powered AI factory data center",
    "ECL Terrasite-TX1 comes at a critical time for the state of Texas, with The Electric Reliability Council of Texas (ERCOT) testifying on June 12 this year that the state\u2019s power grid needs will grow approximately 2X by 2030 due in part to the growth of data centers and AI."
   ],
   "capacity_gw_evidence": [
    "# News",
    "# ECL announces 1-gigawatt off-grid, H2-powered AI factory data center",
    "The initial 1GW phased development may be expanded to 2 GW in the future, enabled by its modularity and based on customer demand."
   ],
   "builder_evidence": [
    "# News",
    "# ECL announces 1-gigawatt off-grid, H2-powered AI factory data center",
    "Data Center-as-a-Service pioneer ECL, which unveiled an off-grid, sustainable, modular, built-to-suit data center, announced that it will build the first fully sustainable 1-GW AI Factory data center, ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "ai_customer_evidence": [
    "# News",
    "# ECL announces 1-gigawatt off-grid, H2-powered AI factory data center",
    "Data Center-as-a-Service pioneer ECL, which unveiled an off-grid, sustainable, modular, built-to-suit data center, announced that it will build the first fully sustainable 1-GW AI Factory data center, ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://arc-codex.com/article/40212c09c1a00e8fe2b22d2340c8c849",
   "title": "OpenAI joins PORTS",
   "published_at": "2026-08-17T19:31:06",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "OpenAI joins PORTS-Pike project",
    "OpenAI has entered into an agreement to secure approximately 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, working with SB Energy, NVIDIA, and the U.S. Department of Energy."
   ],
   "locality_evidence": [
    "OpenAI joins PORTS-Pike project",
    "OpenAI has entered into an agreement to secure approximately 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, working with SB Energy, NVIDIA, and the U.S. Department of Energy."
   ],
   "state_evidence": [
    "OpenAI joins PORTS-Pike project",
    "OpenAI has entered into an agreement to secure approximately 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, working with SB Energy, NVIDIA, and the U.S. Department of Energy."
   ],
   "capacity_gw_evidence": [
    "OpenAI joins PORTS-Pike project",
    "OpenAI has entered into an agreement to secure approximately 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, working with SB Energy, NVIDIA, and the U.S. Department of Energy."
   ],
   "builder_evidence": [
    "OpenAI joins PORTS-Pike project",
    "OpenAI has entered into an agreement to secure approximately 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, working with SB Energy, NVIDIA, and the U.S. Department of Energy.",
    "SB Energy will build, own, and operate the data center under a 20-year lease to OpenAI and deliver capacity over time."
   ],
   "ai_customer_evidence": [
    "OpenAI joins PORTS-Pike project",
    "OpenAI has entered into an agreement to secure approximately 8 gigawatts-IT at the PORTS-Pike Technology Campus in Pike County, Ohio, working with SB Energy, NVIDIA, and the U.S. Department of Energy.",
    "SB Energy will build, own, and operate the data center under a 20-year lease to OpenAI and deliver capacity over time."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/year/2024/feed",
   "title": "2024 AI Data Center Feed",
   "published_at": null,
   "project": "Meta Hyperion AI Data Center",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "Under Construction",
   "announcement_date": "2024",
   "project_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "Meta Hyperion AI Data Center (Louisiana)",
    "Meta is investing between $10 billion and $27 billion to develop \"Hyperion,\" a massive AI infrastructure project in Richland Parish, Louisiana."
   ],
   "locality_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "Meta Hyperion AI Data Center (Louisiana)",
    "Meta is investing between $10 billion and $27 billion to develop \"Hyperion,\" a massive AI infrastructure project in Richland Parish, Louisiana."
   ],
   "state_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "Meta Hyperion AI Data Center (Louisiana)",
    "Meta is investing between $10 billion and $27 billion to develop \"Hyperion,\" a massive AI infrastructure project in Richland Parish, Louisiana."
   ],
   "capacity_gw_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "Meta Hyperion AI Data Center (Louisiana)",
    "Under Construction5.0 GW"
   ],
   "builder_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "Meta Hyperion AI Data Center (Louisiana)",
    "Meta is investing between $10 billion and $27 billion to develop \"Hyperion,\" a massive AI infrastructure project in Richland Parish, Louisiana."
   ],
   "ai_customer_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "Meta Hyperion AI Data Center (Louisiana)",
    "Meta is investing between $10 billion and $27 billion to develop \"Hyperion,\" a massive AI infrastructure project in Richland Parish, Louisiana."
   ],
   "status_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "Meta Hyperion AI Data Center (Louisiana)",
    "Under Construction5.0 GW"
   ],
   "announcement_date_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "Meta Hyperion AI Data Center (Louisiana)",
    "2024"
   ]
  },
  {
   "url": "https://aidatacenterindex.com/year/2024/feed",
   "title": "2024 AI Data Center Feed",
   "published_at": null,
   "project": "Microsoft Project Fairwater",
   "locality": "Mount Pleasant",
   "state": "Wisconsin",
   "capacity_gw": 3.3,
   "builder": "Microsoft",
   "ai_customer": "Microsoft",
   "status": "Under Construction",
   "announcement_date": "2024",
   "project_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "Microsoft Project Fairwater (Mount Pleasant, Wisconsin)",
    "Microsoft's \"Project Fairwater\" in Mount Pleasant, Wisconsin, is designed to be the world's most powerful AI data center campus."
   ],
   "locality_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "Microsoft Project Fairwater (Mount Pleasant, Wisconsin)",
    "Microsoft's \"Project Fairwater\" in Mount Pleasant, Wisconsin, is designed to be the world's most powerful AI data center campus."
   ],
   "state_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "Microsoft Project Fairwater (Mount Pleasant, Wisconsin)",
    "Microsoft's \"Project Fairwater\" in Mount Pleasant, Wisconsin, is designed to be the world's most powerful AI data center campus."
   ],
   "capacity_gw_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "Microsoft Project Fairwater (Mount Pleasant, Wisconsin)",
    "Under Construction3.3 GW"
   ],
   "builder_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "Microsoft Project Fairwater (Mount Pleasant, Wisconsin)",
    "Microsoft's \"Project Fairwater\" in Mount Pleasant, Wisconsin, is designed to be the world's most powerful AI data center campus."
   ],
   "ai_customer_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "Microsoft Project Fairwater (Mount Pleasant, Wisconsin)",
    "Microsoft's \"Project Fairwater\" in Mount Pleasant, Wisconsin, is designed to be the world's most powerful AI data center campus."
   ],
   "status_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "Microsoft Project Fairwater (Mount Pleasant, Wisconsin)",
    "Under Construction3.3 GW"
   ],
   "announcement_date_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "Microsoft Project Fairwater (Mount Pleasant, Wisconsin)",
    "2024"
   ]
  },
  {
   "url": "https://aidatacenterindex.com/year/2024/feed",
   "title": "2024 AI Data Center Feed",
   "published_at": null,
   "project": "AWS Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.4,
   "builder": "Amazon Web Services",
   "ai_customer": "Amazon Web Services",
   "status": "Operational",
   "announcement_date": "2024",
   "project_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "AWS Project Rainier (New Carlisle, Indiana)",
    "Amazon Web Services (AWS) is rapidly expanding its \"Project Rainier\" AI supercomputing campus in New Carlisle, Indiana, representing a total investment of $15 billion."
   ],
   "locality_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "AWS Project Rainier (New Carlisle, Indiana)",
    "Amazon Web Services (AWS) is rapidly expanding its \"Project Rainier\" AI supercomputing campus in New Carlisle, Indiana, representing a total investment of $15 billion."
   ],
   "state_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "AWS Project Rainier (New Carlisle, Indiana)",
    "Amazon Web Services (AWS) is rapidly expanding its \"Project Rainier\" AI supercomputing campus in New Carlisle, Indiana, representing a total investment of $15 billion."
   ],
   "capacity_gw_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "AWS Project Rainier (New Carlisle, Indiana)",
    "Operational2.4 GW"
   ],
   "builder_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "AWS Project Rainier (New Carlisle, Indiana)",
    "Amazon Web Services (AWS) is rapidly expanding its \"Project Rainier\" AI supercomputing campus in New Carlisle, Indiana, representing a total investment of $15 billion."
   ],
   "ai_customer_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "AWS Project Rainier (New Carlisle, Indiana)",
    "Amazon Web Services (AWS) is rapidly expanding its \"Project Rainier\" AI supercomputing campus in New Carlisle, Indiana, representing a total investment of $15 billion."
   ],
   "status_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "AWS Project Rainier (New Carlisle, Indiana)",
    "Operational2.4 GW"
   ],
   "announcement_date_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "AWS Project Rainier (New Carlisle, Indiana)",
    "2024"
   ]
  },
  {
   "url": "https://aidatacenterindex.com/year/2024/feed",
   "title": "2024 AI Data Center Feed",
   "published_at": null,
   "project": "xAI Gigascale Data Center",
   "locality": "Memphis",
   "state": "Tennessee/Mississippi",
   "capacity_gw": 1.5,
   "builder": "xAI",
   "ai_customer": "xAI",
   "status": "Operational",
   "announcement_date": "2024",
   "project_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "xAI Gigascale Data Center (Tennessee/Mississippi)",
    "xAI's Memphis Supercluster, nicknamed \"Colossus,\" is one of the most consequential AI infrastructure stories of 2024."
   ],
   "locality_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "xAI Gigascale Data Center (Tennessee/Mississippi)",
    "xAI's Memphis Supercluster, nicknamed \"Colossus,\" is one of the most consequential AI infrastructure stories of 2024."
   ],
   "state_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "xAI Gigascale Data Center (Tennessee/Mississippi)",
    "xAI's Memphis Supercluster, nicknamed \"Colossus,\" is one of the most consequential AI infrastructure stories of 2024."
   ],
   "capacity_gw_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "xAI Gigascale Data Center (Tennessee/Mississippi)",
    "Operational1.5 GW"
   ],
   "builder_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "xAI Gigascale Data Center (Tennessee/Mississippi)",
    "xAI's Memphis Supercluster, nicknamed \"Colossus,\" is one of the most consequential AI infrastructure stories of 2024."
   ],
   "ai_customer_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "xAI Gigascale Data Center (Tennessee/Mississippi)",
    "xAI's Memphis Supercluster, nicknamed \"Colossus,\" is one of the most consequential AI infrastructure stories of 2024."
   ],
   "status_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "xAI Gigascale Data Center (Tennessee/Mississippi)",
    "Operational1.5 GW"
   ],
   "announcement_date_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "xAI Gigascale Data Center (Tennessee/Mississippi)",
    "2024"
   ]
  },
  {
   "url": "https://aidatacenterindex.com/year/2024/feed",
   "title": "2024 AI Data Center Feed",
   "published_at": null,
   "project": "AWS \u2014 Mississippi AI Data Center",
   "locality": "Ridgeland/Madison",
   "state": "Mississippi",
   "capacity_gw": 1.3,
   "builder": "Amazon Web Services",
   "ai_customer": "Amazon Web Services",
   "status": "Under Construction",
   "announcement_date": "2024-01",
   "project_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)",
    "In January 2024, Amazon Web Services (AWS) announced a $10 billion investment to build two data center complexes in Madison County, Mississippi."
   ],
   "locality_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)",
    "In January 2024, Amazon Web Services (AWS) announced a $10 billion investment to build two data center complexes in Madison County, Mississippi."
   ],
   "state_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)",
    "In January 2024, Amazon Web Services (AWS) announced a $10 billion investment to build two data center complexes in Madison County, Mississippi."
   ],
   "capacity_gw_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)",
    "Under Construction1.3 GW"
   ],
   "builder_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)",
    "In January 2024, Amazon Web Services (AWS) announced a $10 billion investment to build two data center complexes in Madison County, Mississippi."
   ],
   "ai_customer_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)",
    "In January 2024, Amazon Web Services (AWS) announced a $10 billion investment to build two data center complexes in Madison County, Mississippi."
   ],
   "status_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)",
    "Under Construction1.3 GW"
   ],
   "announcement_date_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)",
    "In January 2024, Amazon Web Services (AWS) announced a $10 billion investment to build two data center complexes in Madison County, Mississippi."
   ]
  },
  {
   "url": "https://aidatacenterindex.com/year/2024/feed",
   "title": "2024 AI Data Center Feed",
   "published_at": null,
   "project": "OpenAI Stargate Data Center",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "Operational",
   "announcement_date": "2024",
   "project_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "OpenAI Stargate Data Center (Texas)",
    "OpenAI's Stargate campus in Abilene, Texas has been built at breakneck pace to meet surging compute demand."
   ],
   "locality_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "OpenAI Stargate Data Center (Texas)",
    "OpenAI's Stargate campus in Abilene, Texas has been built at breakneck pace to meet surging compute demand."
   ],
   "state_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "OpenAI Stargate Data Center (Texas)",
    "OpenAI's Stargate campus in Abilene, Texas has been built at breakneck pace to meet surging compute demand."
   ],
   "capacity_gw_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "OpenAI Stargate Data Center (Texas)",
    "Operational1.2 GW"
   ],
   "builder_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "OpenAI Stargate Data Center (Texas)",
    "OpenAI's Stargate campus in Abilene, Texas has been built at breakneck pace to meet surging compute demand."
   ],
   "ai_customer_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "OpenAI Stargate Data Center (Texas)",
    "OpenAI's Stargate campus in Abilene, Texas has been built at breakneck pace to meet surging compute demand."
   ],
   "status_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "OpenAI Stargate Data Center (Texas)",
    "Operational1.2 GW"
   ],
   "announcement_date_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "OpenAI Stargate Data Center (Texas)",
    "2024"
   ]
  },
  {
   "url": "https://aidatacenterindex.com/year/2024/feed",
   "title": "2024 AI Data Center Feed",
   "published_at": null,
   "project": "Google Gemini Cluster",
   "locality": "Iowa/Nebraska",
   "state": "Iowa/Nebraska",
   "capacity_gw": 1.0,
   "builder": "Google",
   "ai_customer": "Google",
   "status": "Operational",
   "announcement_date": "2024",
   "project_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "Google Gemini Cluster (Iowa/Nebraska)",
    "Google has established a massive 1-gigawatt (GW) AI training cluster spanning its campuses in Iowa and Nebraska to serve as the primary engine for its Gemini models."
   ],
   "locality_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "Google Gemini Cluster (Iowa/Nebraska)",
    "Google has established a massive 1-gigawatt (GW) AI training cluster spanning its campuses in Iowa and Nebraska to serve as the primary engine for its Gemini models."
   ],
   "state_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "Google Gemini Cluster (Iowa/Nebraska)",
    "Google has established a massive 1-gigawatt (GW) AI training cluster spanning its campuses in Iowa and Nebraska to serve as the primary engine for its Gemini models."
   ],
   "capacity_gw_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "Google Gemini Cluster (Iowa/Nebraska)",
    "Operational1.0 GW"
   ],
   "builder_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "Google Gemini Cluster (Iowa/Nebraska)",
    "Google has established a massive 1-gigawatt (GW) AI training cluster spanning its campuses in Iowa and Nebraska to serve as the primary engine for its Gemini models."
   ],
   "ai_customer_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "Google Gemini Cluster (Iowa/Nebraska)",
    "Google has established a massive 1-gigawatt (GW) AI training cluster spanning its campuses in Iowa and Nebraska to serve as the primary engine for its Gemini models."
   ],
   "status_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "Google Gemini Cluster (Iowa/Nebraska)",
    "Operational1.0 GW"
   ],
   "announcement_date_evidence": [
    "Chronological feed for 2024 using the best public timeline year available for each tracked facility.",
    "Google Gemini Cluster (Iowa/Nebraska)",
    "2024"
   ]
  },
  {
   "url": "https://business.theeveningleader.com/theeveningleader/article/tokenring-2026-1-2-colossus-unbound-xais-memphis-expansion-targets-1-million-gpus-in-the-race-for-agi",
   "title": "Colossus Unbound: xAI\u00e2s Memphis Expansion Targets 1 Million GPUs in the Race for AGI",
   "published_at": "2026-01-02T19:48:24",
   "project": "Colossus",
   "locality": "Memphis and Southaven",
   "state": null,
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "xAI",
   "status": null,
   "announcement_date": "2026-01-02",
   "project_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "locality_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "By targeting a power capacity of 2 gigawatts (GW)\u2014roughly enough to power nearly 2 million homes\u2014xAI is transitioning from a high-scale startup to a \"Gigafactory of Compute.\"",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "builder_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "ai_customer_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "As of January 2, 2026, the company has successfully scaled its initial 100,000-GPU cluster to over 200,000 units and is now aggressively pursuing a roadmap to reach 1 million GPUs by the end of the year.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ]
  },
  {
   "url": "https://convergedigest.com/vantage-data-centers-commits-25b-to-1-4gw-campus-in-texas",
   "title": "Vantage Data Centers Commits $25B to 1.4GW Campus in Texas",
   "published_at": "2025-08-20T15:34:35",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Construction is already underway",
   "announcement_date": null,
   "project_evidence": [
    "[Vantage Data Centers](https://convergedigest.com/tag/vantage/) has unveiled plans for \u201cFrontier,\u201d a $25 billion hyperscale campus in Shackelford County, Texas, set to deliver 1.4 gigawatts of capacity to meet the surging demand for AI infrastructure."
   ],
   "locality_evidence": [
    "[Vantage Data Centers](https://convergedigest.com/tag/vantage/) has unveiled plans for \u201cFrontier,\u201d a $25 billion hyperscale campus in Shackelford County, Texas, set to deliver 1.4 gigawatts of capacity to meet the surging demand for AI infrastructure."
   ],
   "state_evidence": [
    "[Vantage Data Centers](https://convergedigest.com/tag/vantage/) has unveiled plans for \u201cFrontier,\u201d a $25 billion hyperscale campus in Shackelford County, Texas, set to deliver 1.4 gigawatts of capacity to meet the surging demand for AI infrastructure."
   ],
   "capacity_gw_evidence": [
    "[Vantage Data Centers](https://convergedigest.com/tag/vantage/) has unveiled plans for \u201cFrontier,\u201d a $25 billion hyperscale campus in Shackelford County, Texas, set to deliver 1.4 gigawatts of capacity to meet the surging demand for AI infrastructure."
   ],
   "builder_evidence": [
    "[Vantage Data Centers](https://convergedigest.com/tag/vantage/) has unveiled plans for \u201cFrontier,\u201d a $25 billion hyperscale campus in Shackelford County, Texas, set to deliver 1.4 gigawatts of capacity to meet the surging demand for AI infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction is already underway, with the first facility expected to come online in the second half of 2026.",
    "[Vantage Data Centers](https://convergedigest.com/tag/vantage/) has unveiled plans for \u201cFrontier,\u201d a $25 billion hyperscale campus in Shackelford County, Texas, set to deliver 1.4 gigawatts of capacity to meet the surging demand for AI infrastructure."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacentermap.com/usa/texas/amarillo/project-matador-campus",
   "title": "Project Matador Campus in Amarillo | Fermi America (11000...",
   "published_at": null,
   "project": "Project Matador Campus",
   "locality": "Panhandle",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "The Project Matador Campus, developed by Fermi America in Panhandle, Texas, is a significant Hypergrid facility planned to generate 11 gigawatts of power by the mid-2030s."
   ],
   "locality_evidence": [
    "The Project Matador Campus, developed by Fermi America in Panhandle, Texas, is a significant Hypergrid facility planned to generate 11 gigawatts of power by the mid-2030s."
   ],
   "state_evidence": [
    "The Project Matador Campus, developed by Fermi America in Panhandle, Texas, is a significant Hypergrid facility planned to generate 11 gigawatts of power by the mid-2030s."
   ],
   "capacity_gw_evidence": [
    "The Project Matador Campus, developed by Fermi America in Panhandle, Texas, is a significant Hypergrid facility planned to generate 11 gigawatts of power by the mid-2030s."
   ],
   "builder_evidence": [
    "The Project Matador Campus, developed by Fermi America in Panhandle, Texas, is a significant Hypergrid facility planned to generate 11 gigawatts of power by the mid-2030s."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The Project Matador Campus, developed by Fermi America in Panhandle, Texas, is a significant Hypergrid facility planned to generate 11 gigawatts of power by the mid-2030s."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://parsers.vc/news/260321-west-virginia-emerges-as-global-ai-hub-with",
   "title": "West Virginia Emerges as Global AI Hub with Massive Nscale-Microsoft-NVIDIA-Caterpillar Partnership",
   "published_at": "2026-03-21T22:21:00",
   "project": "Monarch Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "announced",
   "announcement_date": "2026-03-21",
   "project_evidence": [
    "# West Virginia Emerges as Global AI Hub with Massive Nscale-Microsoft-NVIDIA-Caterpillar Partnership",
    "The Monarch Campus, featuring NVIDIA Vera Rubin NVL72 GPUs, boasts America's first state-certified AI microgrid, scalable to 8GW, powered by Caterpillar."
   ],
   "locality_evidence": [
    "# West Virginia Emerges as Global AI Hub with Massive Nscale-Microsoft-NVIDIA-Caterpillar Partnership",
    "It is located in Mason County, West Virginia."
   ],
   "state_evidence": [
    "# West Virginia Emerges as Global AI Hub with Massive Nscale-Microsoft-NVIDIA-Caterpillar Partnership",
    "Nscale, in collaboration with Microsoft, NVIDIA, and Caterpillar, launches a monumental 1.35GW AI data center in West Virginia."
   ],
   "capacity_gw_evidence": [
    "# West Virginia Emerges as Global AI Hub with Massive Nscale-Microsoft-NVIDIA-Caterpillar Partnership",
    "The Monarch Campus, featuring NVIDIA Vera Rubin NVL72 GPUs, boasts America's first state-certified AI microgrid, scalable to 8GW, powered by Caterpillar.",
    "It can achieve a total power draw of 8 GW."
   ],
   "builder_evidence": [
    "# West Virginia Emerges as Global AI Hub with Massive Nscale-Microsoft-NVIDIA-Caterpillar Partnership",
    "Nscale leads this ambitious project."
   ],
   "ai_customer_evidence": [
    "# West Virginia Emerges as Global AI Hub with Massive Nscale-Microsoft-NVIDIA-Caterpillar Partnership",
    "A letter of intent has been signed with Microsoft."
   ],
   "status_evidence": [
    "# West Virginia Emerges as Global AI Hub with Massive Nscale-Microsoft-NVIDIA-Caterpillar Partnership",
    "March 21, 2026, 10:21 pm",
    "Nscale, in collaboration with Microsoft, NVIDIA, and Caterpillar, launches a monumental 1.35GW AI data center in West Virginia."
   ],
   "announcement_date_evidence": [
    "# West Virginia Emerges as Global AI Hub with Massive Nscale-Microsoft-NVIDIA-Caterpillar Partnership",
    "March 21, 2026, 10:21 pm"
   ]
  },
  {
   "url": "https://techbrew.com/stories/2025/04/07/data-city-texas-renewable-energy",
   "title": "Data City, Texas, aims to power acres of data centers via renewable energy",
   "published_at": "2025-04-07T14:04:58",
   "project": "Data City",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "The project will be called Data City, Texas, and be stationed outside Laredo, a city near the US-Mexico border.",
    "Energy Abundance recently announced it\u2019s building 50,000 acres of data center infrastructure to be powered entirely by renewable energy."
   ],
   "locality_evidence": [
    "The project will be called Data City, Texas, and be stationed outside Laredo, a city near the US-Mexico border.",
    "Energy Abundance recently announced it\u2019s building 50,000 acres of data center infrastructure to be powered entirely by renewable energy."
   ],
   "state_evidence": [
    "The project will be called Data City, Texas, and be stationed outside Laredo, a city near the US-Mexico border.",
    "Energy Abundance recently announced it\u2019s building 50,000 acres of data center infrastructure to be powered entirely by renewable energy."
   ],
   "capacity_gw_evidence": [
    "After that, Energy Abundance said in a press release that Data City will grow to offer 5GW of power that will become available to lessees \u201cas demand accelerates.\u201d",
    "Energy Abundance recently announced it\u2019s building 50,000 acres of data center infrastructure to be powered entirely by renewable energy."
   ],
   "builder_evidence": [
    "Energy Abundance recently announced it\u2019s building 50,000 acres of data center infrastructure to be powered entirely by renewable energy.",
    "The project will be called Data City, Texas, and be stationed outside Laredo, a city near the US-Mexico border."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Energy Abundance recently announced it\u2019s building 50,000 acres of data center infrastructure to be powered entirely by renewable energy.",
    "The project will be called Data City, Texas, and be stationed outside Laredo, a city near the US-Mexico border."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://utahnewsdispatch.com/2026/05/19/renderings-show-massive-data-center-box-elder-utah-permits-could-take-years?ceid=553665&emci=61e9e2ab-0b54-f111-8ef3-000d3a14b6d6&emdi=057c30b5-5754-f111-8fcb-000d3a18905c",
   "title": "Renderings show vision for massive data center proposed in Utah, but permits could take years",
   "published_at": "2026-05-20T01:18:12",
   "project": "Stratos Project",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O'Leary Digital",
   "ai_customer": null,
   "status": "proposed",
   "announcement_date": null,
   "project_evidence": [
    "Renderings show vision for massive data center proposed in Utah, but permits could take years",
    "** Rendering shows an initial vision of a building in the Stratos Project, a proposed data center campus project proposed in Utah. (Courtesy of O\u2019Leary Digital)"
   ],
   "locality_evidence": [
    "Renderings show vision for massive data center proposed in Utah, but permits could take years",
    "The plan for the campus proposed in Box Elder County isn\u2019t final yet."
   ],
   "state_evidence": [
    "Renderings show vision for massive data center proposed in Utah, but permits could take years",
    "The plan for the campus proposed in Box Elder County isn\u2019t final yet."
   ],
   "capacity_gw_evidence": [
    "Renderings show vision for massive data center proposed in Utah, but permits could take years",
    "According to a Box Elder County [news release](https://www.boxeldercountyut.gov/m/newsflash/Home/Detail/82), one is intended to host a data center and an energy plant capable of generating 7.5 to 9 gigawatts of power \u2014 about double what the entire state consumes."
   ],
   "builder_evidence": [
    "Renderings show vision for massive data center proposed in Utah, but permits could take years",
    "However, O\u2019Leary Digital, the developer of the project, already has a vision of full glass and wooden facades and buildings forming perfect rectangles in front of Utah\u2019s iconic mountains."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Renderings show vision for massive data center proposed in Utah, but permits could take years",
    "Backers of a proposed massive data center are revealing their view of what it could look like, but the project generating intense public outcry in Utah has a long road ahead."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://abit.ee/en/artificial-intelligence/openai-data-centre-camellia-artificial-intelligence-georgia-energy-consumption-compute-infrastructur-en",
   "title": "OpenAI is building a 3.2GW, $20 billion AI hub \u2014 the promises sound great, but there's nothing to verify yet",
   "published_at": "2026-07-26T00:00:00",
   "project": "Project Camellia",
   "locality": "Savannah Gateway Industrial Hub",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "Georgia Power",
   "ai_customer": "OpenAI",
   "status": "planning stage",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI is building a 3.2GW, $20 billion AI hub \u2014 the promises sound great, but there's nothing to verify yet",
    "OpenAI has announced Project Camellia \u2014 yet another data centre, this time at the Savannah Gateway Industrial Hub in Georgia."
   ],
   "locality_evidence": [
    "# OpenAI is building a 3.2GW, $20 billion AI hub \u2014 the promises sound great, but there's nothing to verify yet",
    "OpenAI has announced Project Camellia \u2014 yet another data centre, this time at the Savannah Gateway Industrial Hub in Georgia."
   ],
   "state_evidence": [
    "# OpenAI is building a 3.2GW, $20 billion AI hub \u2014 the promises sound great, but there's nothing to verify yet",
    "OpenAI has announced Project Camellia \u2014 yet another data centre, this time at the Savannah Gateway Industrial Hub in Georgia."
   ],
   "capacity_gw_evidence": [
    "# OpenAI is building a 3.2GW, $20 billion AI hub \u2014 the promises sound great, but there's nothing to verify yet",
    "The stated capacity is up to 3.2GW of electricity, which utility Georgia Power has pledged to deliver in stages between 2028 and 2032."
   ],
   "builder_evidence": [
    "# OpenAI is building a 3.2GW, $20 billion AI hub \u2014 the promises sound great, but there's nothing to verify yet",
    "The stated capacity is up to 3.2GW of electricity, which utility Georgia Power has pledged to deliver in stages between 2028 and 2032."
   ],
   "ai_customer_evidence": [
    "# OpenAI is building a 3.2GW, $20 billion AI hub \u2014 the promises sound great, but there's nothing to verify yet",
    "OpenAI has announced Project Camellia \u2014 yet another data centre, this time at the Savannah Gateway Industrial Hub in Georgia."
   ],
   "status_evidence": [
    "# OpenAI is building a 3.2GW, $20 billion AI hub \u2014 the promises sound great, but there's nothing to verify yet",
    "Formally, Project Camellia remains in the planning stage: further progress depends on permits, coordination with the utility, construction timelines, and \u2014 importantly \u2014 whether the stated figures for electricity, water, and social investment ever actually get independently verified."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://compoundimpact.substack.com/p/where-the-grid-fails-first",
   "title": "Where the Grid Fails First",
   "published_at": "2026-04-02T16:28:29",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Company",
   "ai_customer": "Google",
   "status": "preliminary approval",
   "announcement_date": "2026-02-28",
   "project_evidence": [
    "# Where the Grid Fails First",
    "### Signals Brief #10 (2026.03.30) | First Principles Emerge for Data Centers",
    "Back on the U.S. mainland, another Google project became public.",
    "The developer was listed as Panattoni Development Company. The project name was \u201cProject Cannoli.\u201d"
   ],
   "locality_evidence": [
    "# Where the Grid Fails First",
    "### Signals Brief #10 (2026.03.30) | First Principles Emerge for Data Centers",
    "Back on the U.S. mainland, another Google project became public.",
    "On February 28, Van Buren Township\u2019s Planning Commission in Michigan granted preliminary approval for a 1-gigawatt data center \u2014 the largest proposed in the state\u2019s history."
   ],
   "state_evidence": [
    "# Where the Grid Fails First",
    "### Signals Brief #10 (2026.03.30) | First Principles Emerge for Data Centers",
    "Back on the U.S. mainland, another Google project became public.",
    "On February 28, Van Buren Township\u2019s Planning Commission in Michigan granted preliminary approval for a 1-gigawatt data center \u2014 the largest proposed in the state\u2019s history."
   ],
   "capacity_gw_evidence": [
    "# Where the Grid Fails First",
    "### Signals Brief #10 (2026.03.30) | First Principles Emerge for Data Centers",
    "Back on the U.S. mainland, another Google project became public.",
    "On February 28, Van Buren Township\u2019s Planning Commission in Michigan granted preliminary approval for a 1-gigawatt data center \u2014 the largest proposed in the state\u2019s history."
   ],
   "builder_evidence": [
    "# Where the Grid Fails First",
    "### Signals Brief #10 (2026.03.30) | First Principles Emerge for Data Centers",
    "Back on the U.S. mainland, another Google project became public.",
    "The developer was listed as Panattoni Development Company. The project name was \u201cProject Cannoli.\u201d"
   ],
   "ai_customer_evidence": [
    "# Where the Grid Fails First",
    "### Signals Brief #10 (2026.03.30) | First Principles Emerge for Data Centers",
    "Back on the U.S. mainland, another Google project became public.",
    "On March 17, Google confirmed it was behind Project Cannoli."
   ],
   "status_evidence": [
    "# Where the Grid Fails First",
    "### Signals Brief #10 (2026.03.30) | First Principles Emerge for Data Centers",
    "Back on the U.S. mainland, another Google project became public.",
    "On February 28, Van Buren Township\u2019s Planning Commission in Michigan granted preliminary approval for a 1-gigawatt data center \u2014 the largest proposed in the state\u2019s history."
   ],
   "announcement_date_evidence": [
    "# Where the Grid Fails First",
    "### Signals Brief #10 (2026.03.30) | First Principles Emerge for Data Centers",
    "Back on the U.S. mainland, another Google project became public.",
    "On February 28, Van Buren Township\u2019s Planning Commission in Michigan granted preliminary approval for a 1-gigawatt data center \u2014 the largest proposed in the state\u2019s history."
   ]
  },
  {
   "url": "https://baxtel.com/news/terawulf-purchases-kentucky-site-for-1gw-data-center-campus",
   "title": "TeraWulf Purchases Kentucky Site for 1GW Data Center Campus",
   "published_at": "2026-05-28T00:00:00",
   "project": "Muskie Data Campus",
   "locality": "Eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": "2026-05-28",
   "project_evidence": [
    "Purchased from Industrial Equity Partners, the Muskie Data Campus is projected to deliver more than 1GW of data center capacity over time.",
    "May 28, 2026 | Posted by Abdul-Rahman Oladimeji",
    "Crypto mining and AI infrastructure company TeraWulf is growing its presence with plans for a second facility in Kentucky."
   ],
   "locality_evidence": [
    "The company this week revealed it has acquired a hyperscale high-performance computing (HPC) development site in Eastern Kentucky.",
    "May 28, 2026 | Posted by Abdul-Rahman Oladimeji",
    "Crypto mining and AI infrastructure company TeraWulf is growing its presence with plans for a second facility in Kentucky."
   ],
   "state_evidence": [
    "Crypto mining and AI infrastructure company TeraWulf is growing its presence with plans for a second facility in Kentucky.",
    "May 28, 2026 | Posted by Abdul-Rahman Oladimeji"
   ],
   "capacity_gw_evidence": [
    "Purchased from Industrial Equity Partners, the Muskie Data Campus is projected to deliver more than 1GW of data center capacity over time.",
    "May 28, 2026 | Posted by Abdul-Rahman Oladimeji",
    "Crypto mining and AI infrastructure company TeraWulf is growing its presence with plans for a second facility in Kentucky."
   ],
   "builder_evidence": [
    "Crypto mining and AI infrastructure company TeraWulf is growing its presence with plans for a second facility in Kentucky.",
    "Purchased from Industrial Equity Partners, the Muskie Data Campus is projected to deliver more than 1GW of data center capacity over time.",
    "May 28, 2026 | Posted by Abdul-Rahman Oladimeji"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The company this week revealed it has acquired a hyperscale high-performance computing (HPC) development site in Eastern Kentucky.",
    "May 28, 2026 | Posted by Abdul-Rahman Oladimeji",
    "Crypto mining and AI infrastructure company TeraWulf is growing its presence with plans for a second facility in Kentucky."
   ],
   "announcement_date_evidence": [
    "May 28, 2026 | Posted by Abdul-Rahman Oladimeji",
    "Crypto mining and AI infrastructure company TeraWulf is growing its presence with plans for a second facility in Kentucky."
   ]
  },
  {
   "url": "https://thenextweb.com/news/hut-8-beacon-point-9-8-billion-ai-lease-texas",
   "title": "Hut 8 signs a 15-year, $9.8bn lease for the first phase of its Texas AI data centre",
   "published_at": "2026-05-06T12:26:05",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "commercialised the first phase",
   "announcement_date": null,
   "project_evidence": [
    "# Hut 8 signs a 15-year, $9.8bn lease for the first phase of its Texas AI data centre",
    "[On Tuesday, the company announced](https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html) that it has commercialised the first phase of its Beacon Point campus in Nueces County, Texas, through a 15-year lease covering 352 megawatts of IT capacity at a base-term contract value of $9.8bn."
   ],
   "locality_evidence": [
    "# Hut 8 signs a 15-year, $9.8bn lease for the first phase of its Texas AI data centre",
    "[On Tuesday, the company announced](https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html) that it has commercialised the first phase of its Beacon Point campus in Nueces County, Texas, through a 15-year lease covering 352 megawatts of IT capacity at a base-term contract value of $9.8bn."
   ],
   "state_evidence": [
    "# Hut 8 signs a 15-year, $9.8bn lease for the first phase of its Texas AI data centre",
    "[On Tuesday, the company announced](https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html) that it has commercialised the first phase of its Beacon Point campus in Nueces County, Texas, through a 15-year lease covering 352 megawatts of IT capacity at a base-term contract value of $9.8bn."
   ],
   "capacity_gw_evidence": [
    "# Hut 8 signs a 15-year, $9.8bn lease for the first phase of its Texas AI data centre",
    "[On Tuesday, the company announced](https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html) that it has commercialised the first phase of its Beacon Point campus in Nueces County, Texas, through a 15-year lease covering 352 megawatts of IT capacity at a base-term contract value of $9.8bn."
   ],
   "builder_evidence": [
    "# Hut 8 signs a 15-year, $9.8bn lease for the first phase of its Texas AI data centre",
    "*The Beacon Point lease, anchored by an unnamed investment-grade tenant, lifts Hut 8\u2019s contracted AI capacity to 597 MW and $16.8bn in base-term value. The Bitcoin-miner-to-AI-landlord pivot is now substantially complete.*",
    "[On Tuesday, the company announced](https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html) that it has commercialised the first phase of its Beacon Point campus in Nueces County, Texas, through a 15-year lease covering 352 megawatts of IT capacity at a base-term contract value of $9.8bn."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Hut 8 signs a 15-year, $9.8bn lease for the first phase of its Texas AI data centre",
    "[On Tuesday, the company announced](https://www.prnewswire.com/news-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw-it-lease-with-base-term-contract-value-of-9-8-billion-302763484.html) that it has commercialised the first phase of its Beacon Point campus in Nueces County, Texas, through a 15-year lease covering 352 megawatts of IT capacity at a base-term contract value of $9.8bn."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://theaiconsultingnetwork.com/blog/nvidia-iren-2-1b-5gw-partnership-cre-investors-2026",
   "title": "Nvidia's $2.1B IREN Investment and 5GW Partnership: What CRE Data Center Investors Need to Know",
   "published_at": "2026-05-07T04:00:18",
   "project": "Sweetwater Texas campus",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN Limited",
   "ai_customer": null,
   "status": null,
   "announcement_date": "2026-05-07",
   "project_evidence": [
    "Nvidia's $2.1B IREN Investment and 5GW Partnership: What CRE Data Center Investors Need to Know",
    "The partnership targets up to 5 gigawatts of Nvidia DSX-aligned infrastructure across IREN's pipeline, with Sweetwater Texas (2GW) flagged as flagship campus.",
    "Third, a $3.4 billion five-year managed GPU cloud services deal under which IREN provides Nvidia access to its hosted GPU infrastructure at Childress, Texas for Nvidia's own internal AI and research workloads.",
    "IREN's 2 gigawatt Sweetwater campus and 1.4 gigawatt Childress campus are both in Texas, joining Meta's $13 billion Sopaipilla campus in El Paso, Hut 8's $9.8 billion Beacon Point lease, and Fleet Data Centers' 230 megawatt Storey County development."
   ],
   "locality_evidence": [
    "Nvidia's $2.1B IREN Investment and 5GW Partnership: What CRE Data Center Investors Need to Know",
    "The partnership targets up to 5 gigawatts of Nvidia DSX-aligned infrastructure across IREN's pipeline, with Sweetwater Texas (2GW) flagged as flagship campus.",
    "IREN's 2 gigawatt Sweetwater campus and 1.4 gigawatt Childress campus are both in Texas, joining Meta's $13 billion Sopaipilla campus in El Paso, Hut 8's $9.8 billion Beacon Point lease, and Fleet Data Centers' 230 megawatt Storey County development."
   ],
   "state_evidence": [
    "Nvidia's $2.1B IREN Investment and 5GW Partnership: What CRE Data Center Investors Need to Know",
    "The partnership targets up to 5 gigawatts of Nvidia DSX-aligned infrastructure across IREN's pipeline, with Sweetwater Texas (2GW) flagged as flagship campus.",
    "IREN's 2 gigawatt Sweetwater campus and 1.4 gigawatt Childress campus are both in Texas, joining Meta's $13 billion Sopaipilla campus in El Paso, Hut 8's $9.8 billion Beacon Point lease, and Fleet Data Centers' 230 megawatt Storey County development."
   ],
   "capacity_gw_evidence": [
    "Nvidia's $2.1B IREN Investment and 5GW Partnership: What CRE Data Center Investors Need to Know",
    "The partnership targets up to 5 gigawatts of Nvidia DSX-aligned infrastructure across IREN's pipeline, with Sweetwater Texas (2GW) flagged as flagship campus.",
    "IREN's 2 gigawatt Sweetwater campus and 1.4 gigawatt Childress campus are both in Texas, joining Meta's $13 billion Sopaipilla campus in El Paso, Hut 8's $9.8 billion Beacon Point lease, and Fleet Data Centers' 230 megawatt Storey County development."
   ],
   "builder_evidence": [
    "Nvidia's $2.1B IREN Investment and 5GW Partnership: What CRE Data Center Investors Need to Know",
    "What is the Nvidia IREN partnership? The Nvidia IREN partnership is a May 7, 2026 strategic agreement under which Nvidia will invest up to $2.1 billion in IREN Limited (NASDAQ: IREN) via a five-year warrant for 30 million shares at $70, while the two companies plan to deploy up to 5 gigawatts of Nvidia DSX-aligned AI infrastructure across IREN's global data center pipeline.",
    "IREN's 2 gigawatt Sweetwater campus and 1.4 gigawatt Childress campus are both in Texas, joining Meta's $13 billion Sopaipilla campus in El Paso, Hut 8's $9.8 billion Beacon Point lease, and Fleet Data Centers' 230 megawatt Storey County development."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": [
    "Nvidia's $2.1B IREN Investment and 5GW Partnership: What CRE Data Center Investors Need to Know",
    "What is the Nvidia IREN partnership? The Nvidia IREN partnership is a May 7, 2026 strategic agreement under which Nvidia will invest up to $2.1 billion in IREN Limited (NASDAQ: IREN) via a five-year warrant for 30 million shares at $70, while the two companies plan to deploy up to 5 gigawatts of Nvidia DSX-aligned AI infrastructure across IREN's global data center pipeline."
   ]
  },
  {
   "url": "https://theaiconsultingnetwork.com/blog/nvidia-iren-2-1b-5gw-partnership-cre-investors-2026",
   "title": "Nvidia's $2.1B IREN Investment and 5GW Partnership: What CRE Data Center Investors Need to Know",
   "published_at": "2026-05-07T04:00:18",
   "project": "Childress campus",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "IREN Limited",
   "ai_customer": "Nvidia",
   "status": null,
   "announcement_date": "2026-05-07",
   "project_evidence": [
    "Nvidia's $2.1B IREN Investment and 5GW Partnership: What CRE Data Center Investors Need to Know",
    "A separate five-year, $3.4 billion managed GPU cloud services deal gives Nvidia capacity at IREN's Childress, Texas site for Nvidia's own internal AI workloads.",
    "IREN's 2 gigawatt Sweetwater campus and 1.4 gigawatt Childress campus are both in Texas, joining Meta's $13 billion Sopaipilla campus in El Paso, Hut 8's $9.8 billion Beacon Point lease, and Fleet Data Centers' 230 megawatt Storey County development."
   ],
   "locality_evidence": [
    "Nvidia's $2.1B IREN Investment and 5GW Partnership: What CRE Data Center Investors Need to Know",
    "A separate five-year, $3.4 billion managed GPU cloud services deal gives Nvidia capacity at IREN's Childress, Texas site for Nvidia's own internal AI workloads.",
    "IREN's 2 gigawatt Sweetwater campus and 1.4 gigawatt Childress campus are both in Texas, joining Meta's $13 billion Sopaipilla campus in El Paso, Hut 8's $9.8 billion Beacon Point lease, and Fleet Data Centers' 230 megawatt Storey County development."
   ],
   "state_evidence": [
    "Nvidia's $2.1B IREN Investment and 5GW Partnership: What CRE Data Center Investors Need to Know",
    "A separate five-year, $3.4 billion managed GPU cloud services deal gives Nvidia capacity at IREN's Childress, Texas site for Nvidia's own internal AI workloads.",
    "IREN's 2 gigawatt Sweetwater campus and 1.4 gigawatt Childress campus are both in Texas, joining Meta's $13 billion Sopaipilla campus in El Paso, Hut 8's $9.8 billion Beacon Point lease, and Fleet Data Centers' 230 megawatt Storey County development."
   ],
   "capacity_gw_evidence": [
    "Nvidia's $2.1B IREN Investment and 5GW Partnership: What CRE Data Center Investors Need to Know",
    "IREN's 2 gigawatt Sweetwater campus and 1.4 gigawatt Childress campus are both in Texas, joining Meta's $13 billion Sopaipilla campus in El Paso, Hut 8's $9.8 billion Beacon Point lease, and Fleet Data Centers' 230 megawatt Storey County development."
   ],
   "builder_evidence": [
    "Nvidia's $2.1B IREN Investment and 5GW Partnership: What CRE Data Center Investors Need to Know",
    "What is the Nvidia IREN partnership? The Nvidia IREN partnership is a May 7, 2026 strategic agreement under which Nvidia will invest up to $2.1 billion in IREN Limited (NASDAQ: IREN) via a five-year warrant for 30 million shares at $70, while the two companies plan to deploy up to 5 gigawatts of Nvidia DSX-aligned AI infrastructure across IREN's global data center pipeline.",
    "IREN's 2 gigawatt Sweetwater campus and 1.4 gigawatt Childress campus are both in Texas, joining Meta's $13 billion Sopaipilla campus in El Paso, Hut 8's $9.8 billion Beacon Point lease, and Fleet Data Centers' 230 megawatt Storey County development."
   ],
   "ai_customer_evidence": [
    "Nvidia's $2.1B IREN Investment and 5GW Partnership: What CRE Data Center Investors Need to Know",
    "A separate five-year, $3.4 billion managed GPU cloud services deal gives Nvidia capacity at IREN's Childress, Texas site for Nvidia's own internal AI workloads."
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "Nvidia's $2.1B IREN Investment and 5GW Partnership: What CRE Data Center Investors Need to Know",
    "What is the Nvidia IREN partnership? The Nvidia IREN partnership is a May 7, 2026 strategic agreement under which Nvidia will invest up to $2.1 billion in IREN Limited (NASDAQ: IREN) via a five-year warrant for 30 million shares at $70, while the two companies plan to deploy up to 5 gigawatts of Nvidia DSX-aligned AI infrastructure across IREN's global data center pipeline."
   ]
  },
  {
   "url": "https://theaiconsultingnetwork.com/blog/nvidia-iren-2-1b-5gw-partnership-cre-investors-2026",
   "title": "Nvidia's $2.1B IREN Investment and 5GW Partnership: What CRE Data Center Investors Need to Know",
   "published_at": "2026-05-07T04:00:18",
   "project": "Sopaipilla campus",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Nvidia's $2.1B IREN Investment and 5GW Partnership: What CRE Data Center Investors Need to Know",
    "IREN's 2 gigawatt Sweetwater campus and 1.4 gigawatt Childress campus are both in Texas, joining Meta's $13 billion Sopaipilla campus in El Paso, Hut 8's $9.8 billion Beacon Point lease, and Fleet Data Centers' 230 megawatt Storey County development."
   ],
   "locality_evidence": [
    "Nvidia's $2.1B IREN Investment and 5GW Partnership: What CRE Data Center Investors Need to Know",
    "IREN's 2 gigawatt Sweetwater campus and 1.4 gigawatt Childress campus are both in Texas, joining Meta's $13 billion Sopaipilla campus in El Paso, Hut 8's $9.8 billion Beacon Point lease, and Fleet Data Centers' 230 megawatt Storey County development."
   ],
   "state_evidence": [
    "Nvidia's $2.1B IREN Investment and 5GW Partnership: What CRE Data Center Investors Need to Know",
    "IREN's 2 gigawatt Sweetwater campus and 1.4 gigawatt Childress campus are both in Texas, joining Meta's $13 billion Sopaipilla campus in El Paso, Hut 8's $9.8 billion Beacon Point lease, and Fleet Data Centers' 230 megawatt Storey County development."
   ],
   "capacity_gw_evidence": [
    "Nvidia's $2.1B IREN Investment and 5GW Partnership: What CRE Data Center Investors Need to Know",
    "For more on the Texas concentration, see [Hut 8's $9.8B Beacon Point AI lease](/blog/hut-8-beacon-point-9-8b-ai-data-center-lease-cre-investors-2026) and [Meta's $13B El Paso Sopaipilla data center](/blog/meta-13b-el-paso-sopaipilla-1gw-data-center-cre-investors-2026)."
   ],
   "builder_evidence": [
    "Nvidia's $2.1B IREN Investment and 5GW Partnership: What CRE Data Center Investors Need to Know",
    "IREN's 2 gigawatt Sweetwater campus and 1.4 gigawatt Childress campus are both in Texas, joining Meta's $13 billion Sopaipilla campus in El Paso, Hut 8's $9.8 billion Beacon Point lease, and Fleet Data Centers' 230 megawatt Storey County development."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://smartsbusinesswire.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "*Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite*",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "About Creekstone Energy",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "*Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite*",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://innovationopenlab.com/news-biz/31947/ecl-announces-worlds-first-1-gigawatt-off-grid-hydrogen-powered-ai-factory-data-center.html",
   "title": "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
   "published_at": "2024-09-26T06:57:03",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "announced",
   "announcement_date": "2024-09-26",
   "project_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center"
   ],
   "locality_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions"
   ],
   "state_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions"
   ],
   "capacity_gw_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center"
   ],
   "builder_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center"
   ],
   "ai_customer_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center"
   ],
   "status_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center"
   ],
   "announcement_date_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "- ** 26-09-2024"
   ]
  },
  {
   "url": "https://bymachine.news/openai-ports-pike-ohio-investment",
   "title": "OpenAI Commits 8 Gigawatts to Pike County Ohio Data Center",
   "published_at": "2026-08-18T01:20:14",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "OpenAI has secured approximately 8 gigawatts-IT of capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, in partnership with SB Energy, NVIDIA, and the U.S. Department of Energy."
   ],
   "locality_evidence": [
    "OpenAI has secured approximately 8 gigawatts-IT of capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, in partnership with SB Energy, NVIDIA, and the U.S. Department of Energy."
   ],
   "state_evidence": [
    "OpenAI has secured approximately 8 gigawatts-IT of capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, in partnership with SB Energy, NVIDIA, and the U.S. Department of Energy."
   ],
   "capacity_gw_evidence": [
    "OpenAI has secured approximately 8 gigawatts-IT of capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, in partnership with SB Energy, NVIDIA, and the U.S. Department of Energy."
   ],
   "builder_evidence": [
    "OpenAI has secured approximately 8 gigawatts-IT of capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, in partnership with SB Energy, NVIDIA, and the U.S. Department of Energy.",
    "SB Energy will build and operate the facility under a 20-year lease to OpenAI."
   ],
   "ai_customer_evidence": [
    "OpenAI has secured approximately 8 gigawatts-IT of capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, in partnership with SB Energy, NVIDIA, and the U.S. Department of Energy."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://rcrwireless.com/20250925/ai-infrastructure/openai-stargate",
   "title": "OpenAI, Oracle, and SoftBank expand Stargate",
   "published_at": "2025-09-25T15:18:23",
   "project": "Stargate",
   "locality": "Milam County",
   "state": "Texas",
   "capacity_gw": 1.5,
   "builder": "SoftBank",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "## The five new locations were selected from more than 300 proposals across 30 states, according to OpenAI",
    "Two additional sites are being developed with SoftBank. One in Lordstown, Ohio, is already under construction and slated to open next year. The second, in Milam County, Texas, will be built with SB Energy, SoftBank\u2019s renewables arm, and designed for rapid deployment with up to 1.5 GW of capacity over 18 months."
   ],
   "locality_evidence": [
    "## The five new locations were selected from more than 300 proposals across 30 states, according to OpenAI",
    "Two additional sites are being developed with SoftBank. One in Lordstown, Ohio, is already under construction and slated to open next year. The second, in Milam County, Texas, will be built with SB Energy, SoftBank\u2019s renewables arm, and designed for rapid deployment with up to 1.5 GW of capacity over 18 months."
   ],
   "state_evidence": [
    "## The five new locations were selected from more than 300 proposals across 30 states, according to OpenAI",
    "Two additional sites are being developed with SoftBank. One in Lordstown, Ohio, is already under construction and slated to open next year. The second, in Milam County, Texas, will be built with SB Energy, SoftBank\u2019s renewables arm, and designed for rapid deployment with up to 1.5 GW of capacity over 18 months."
   ],
   "capacity_gw_evidence": [
    "## The five new locations were selected from more than 300 proposals across 30 states, according to OpenAI",
    "Two additional sites are being developed with SoftBank. One in Lordstown, Ohio, is already under construction and slated to open next year. The second, in Milam County, Texas, will be built with SB Energy, SoftBank\u2019s renewables arm, and designed for rapid deployment with up to 1.5 GW of capacity over 18 months."
   ],
   "builder_evidence": [
    "## The five new locations were selected from more than 300 proposals across 30 states, according to OpenAI",
    "Two additional sites are being developed with SoftBank. One in Lordstown, Ohio, is already under construction and slated to open next year. The second, in Milam County, Texas, will be built with SB Energy, SoftBank\u2019s renewables arm, and designed for rapid deployment with up to 1.5 GW of capacity over 18 months."
   ],
   "ai_customer_evidence": [
    "## The five new locations were selected from more than 300 proposals across 30 states, according to OpenAI",
    "OpenAI, Oracle, and SoftBank have announced five new U.S. data center sites under the Stargate initiative, the large-scale AI infrastructure program first launched in January.",
    "Two additional sites are being developed with SoftBank. One in Lordstown, Ohio, is already under construction and slated to open next year. The second, in Milam County, Texas, will be built with SB Energy, SoftBank\u2019s renewables arm, and designed for rapid deployment with up to 1.5 GW of capacity over 18 months."
   ],
   "status_evidence": [
    "## The five new locations were selected from more than 300 proposals across 30 states, according to OpenAI",
    "OpenAI, Oracle, and SoftBank have announced five new U.S. data center sites under the Stargate initiative, the large-scale AI infrastructure program first launched in January.",
    "Two additional sites are being developed with SoftBank. One in Lordstown, Ohio, is already under construction and slated to open next year. The second, in Milam County, Texas, will be built with SB Energy, SoftBank\u2019s renewables arm, and designed for rapid deployment with up to 1.5 GW of capacity over 18 months."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://siliconreport.com/meta-hyperion-louisiana-megacampus-profile-84de9440",
   "title": "Meta Hyperion: inside the Louisiana megacampus that tripled its own power plan",
   "published_at": "2026-07-03T07:52:34",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 7.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "under construction",
   "announcement_date": "2024-12-01",
   "project_evidence": [
    "# Meta Hyperion: inside the Louisiana megacampus that tripled its own power plan",
    "Meta's Hyperion data center in Richland Parish, Louisiana, has roughly tripled its power plan since it was announced in December 2024, and the campus is now one of the largest AI buildouts tracked on [/datacenters](/datacenters) by contracted power."
   ],
   "locality_evidence": [
    "# Meta Hyperion: inside the Louisiana megacampus that tripled its own power plan",
    "Meta's Richland Parish campus grew from a 2-gigawatt pledge into a 7-plus-gigawatt buildout backed by $29 billion in off-balance-sheet financing, with Entergy now permitting ten gas plants to feed it.",
    "Meta's Hyperion data center in Richland Parish, Louisiana, has roughly tripled its power plan since it was announced in December 2024, and the campus is now one of the largest AI buildouts tracked on [/datacenters](/datacenters) by contracted power."
   ],
   "state_evidence": [
    "# Meta Hyperion: inside the Louisiana megacampus that tripled its own power plan",
    "Meta's Richland Parish campus grew from a 2-gigawatt pledge into a 7-plus-gigawatt buildout backed by $29 billion in off-balance-sheet financing, with Entergy now permitting ten gas plants to feed it.",
    "Meta's Hyperion data center in Richland Parish, Louisiana, has roughly tripled its power plan since it was announced in December 2024, and the campus is now one of the largest AI buildouts tracked on [/datacenters](/datacenters) by contracted power."
   ],
   "capacity_gw_evidence": [
    "# Meta Hyperion: inside the Louisiana megacampus that tripled its own power plan",
    "Meta's Richland Parish campus grew from a 2-gigawatt pledge into a 7-plus-gigawatt buildout backed by $29 billion in off-balance-sheet financing, with Entergy now permitting ten gas plants to feed it.",
    "What started as a 2-gigawatt pledge to Entergy Louisiana regulators is, as of March 2026, a commitment to ten new gas-fired power plants and up to 1.5 gigawatts of solar \u2014 enough capacity, combined, to exceed 7 gigawatts."
   ],
   "builder_evidence": [
    "# Meta Hyperion: inside the Louisiana megacampus that tripled its own power plan",
    "Meta's Richland Parish campus grew from a 2-gigawatt pledge into a 7-plus-gigawatt buildout backed by $29 billion in off-balance-sheet financing, with Entergy now permitting ten gas plants to feed it.",
    "Meta's Hyperion data center in Richland Parish, Louisiana, has roughly tripled its power plan since it was announced in December 2024, and the campus is now one of the largest AI buildouts tracked on [/datacenters](/datacenters) by contracted power."
   ],
   "ai_customer_evidence": [
    "# Meta Hyperion: inside the Louisiana megacampus that tripled its own power plan",
    "Meta's Richland Parish campus grew from a 2-gigawatt pledge into a 7-plus-gigawatt buildout backed by $29 billion in off-balance-sheet financing, with Entergy now permitting ten gas plants to feed it.",
    "Meta's Hyperion data center in Richland Parish, Louisiana, has roughly tripled its power plan since it was announced in December 2024, and the campus is now one of the largest AI buildouts tracked on [/datacenters](/datacenters) by contracted power."
   ],
   "status_evidence": [
    "# Meta Hyperion: inside the Louisiana megacampus that tripled its own power plan",
    "Construction is phased through 2030, with an interim milestone of 1.5 gigawatts online by the end of 2027."
   ],
   "announcement_date_evidence": [
    "# Meta Hyperion: inside the Louisiana megacampus that tripled its own power plan",
    "Meta's Hyperion data center in Richland Parish, Louisiana, has roughly tripled its power plan since it was announced in December 2024, and the campus is now one of the largest AI buildouts tracked on [/datacenters](/datacenters) by contracted power."
   ]
  },
  {
   "url": "https://interconnectionqueue.org/project/aws-rainier-new-carlisle",
   "title": "Amazon AWS Rainier (Project Rainier) \u2014 Project signal",
   "published_at": null,
   "project": "Amazon AWS Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon Web Services",
   "ai_customer": "Anthropic",
   "status": "Under Construction",
   "announcement_date": "2024",
   "project_evidence": [
    "Exhibit 2 \u00b7 Project signal",
    "Amazon AWS Rainier (Project Rainier)"
   ],
   "locality_evidence": [
    "Exhibit 2 \u00b7 Project signal",
    "Nearest cityNew Carlisle"
   ],
   "state_evidence": [
    "Exhibit 2 \u00b7 Project signal",
    "StateIN"
   ],
   "capacity_gw_evidence": [
    "Exhibit 2 \u00b7 Project signal",
    "Estimated load2,200 MW"
   ],
   "builder_evidence": [
    "Exhibit 2 \u00b7 Project signal",
    "Developer / ownerAmazon Web Services; compute for Anthropic"
   ],
   "ai_customer_evidence": [
    "Exhibit 2 \u00b7 Project signal",
    "Developer / ownerAmazon Web Services; compute for Anthropic"
   ],
   "status_evidence": [
    "Exhibit 2 \u00b7 Project signal",
    "StatusUnder Construction"
   ],
   "announcement_date_evidence": [
    "Exhibit 2 \u00b7 Project signal",
    "Announced2024"
   ]
  },
  {
   "url": "https://techlinos.com/post/elon-musk-is-turning-colossus-data-center-into-a-2-gigawatt-ai-behemoth",
   "title": "Elon Musk Is Turning \u2018Colossus\u2019 Data Center Into a 2-Gigawatt AI Behemoth",
   "published_at": "2026-01-02T12:46:25",
   "project": "Colossus",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Elon Musk Is Turning \u2018Colossus\u2019 Data Center Into a 2-Gigawatt AI Behemoth",
    "Elon Musk is transforming xAI\u2019s Colossus campus in Memphis from a fast\u2011built AI supercomputer into what is effectively a 2\u2011gigawatt, three\u2011site \u201cAI power plant,\u201d positioning it as one of the most energy\u2011hungry data center complexes on the planet."
   ],
   "locality_evidence": [
    "# Elon Musk Is Turning \u2018Colossus\u2019 Data Center Into a 2-Gigawatt AI Behemoth",
    "Elon Musk is transforming xAI\u2019s Colossus campus in Memphis from a fast\u2011built AI supercomputer into what is effectively a 2\u2011gigawatt, three\u2011site \u201cAI power plant,\u201d positioning it as one of the most energy\u2011hungry data center complexes on the planet."
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "# Elon Musk Is Turning \u2018Colossus\u2019 Data Center Into a 2-Gigawatt AI Behemoth",
    "Elon Musk is transforming xAI\u2019s Colossus campus in Memphis from a fast\u2011built AI supercomputer into what is effectively a 2\u2011gigawatt, three\u2011site \u201cAI power plant,\u201d positioning it as one of the most energy\u2011hungry data center complexes on the planet."
   ],
   "builder_evidence": [
    "# Elon Musk Is Turning \u2018Colossus\u2019 Data Center Into a 2-Gigawatt AI Behemoth",
    "Elon Musk is transforming xAI\u2019s Colossus campus in Memphis from a fast\u2011built AI supercomputer into what is effectively a 2\u2011gigawatt, three\u2011site \u201cAI power plant,\u201d positioning it as one of the most energy\u2011hungry data center complexes on the planet."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Inside the Colossus Campus",
    "\u25cf Colossus 2: A second, larger facility under construction with a target power envelope near 1 GW and a GPU count reportedly exceeding 555,000 units on its own."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas - lancium",
   "published_at": "2026-07-15T10:17:35",
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": "",
   "status": "Announced",
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "locality_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "ai_customer_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "The data center will be purpose-built to support the advanced AI computational requirements of a leading hyperscale technology company."
   ],
   "status_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "announcement_date_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) \u2014 Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ]
  },
  {
   "url": "https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas - lancium",
   "published_at": "2026-07-15T10:17:35",
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "Expanding",
   "announcement_date": null,
   "project_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "It\u2019s a division of labor that has proven out at scale in Abilene, and Childress extends that playbook to a new market."
   ],
   "locality_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "It\u2019s a division of labor that has proven out at scale in Abilene, and Childress extends that playbook to a new market."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "The Childress development is the latest chapter in Crusoe\u2019s deep commitment to Texas."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://oilandgaspress.com/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand",
   "title": "Energy, Automobile, EV, Renewable News",
   "published_at": null,
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Under Construction",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "## 19 Aug Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "locality_evidence": [
    "## 19 Aug Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "DENVER\u2013(BUSINESS WIRE)\u2013Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "## 19 Aug Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "DENVER\u2013(BUSINESS WIRE)\u2013Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "## 19 Aug Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "DENVER\u2013(BUSINESS WIRE)\u2013Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "## 19 Aug Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "DENVER\u2013(BUSINESS WIRE)\u2013Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## 19 Aug Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": [
    "## 19 Aug Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand"
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news/fermi-secures-preliminary-approval-for-6gw-of-natural-gas-generation-at-up-to-11gw-campus-in-amarillo-texas",
   "title": "Fermi secures preliminary approval for 6GW of natural gas generation at up to 11GW campus in Amarillo, Texas",
   "published_at": "2026-05-14T16:21:39",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Fermi America, the developer behind the planned up to 11GW data center campus in Amarillo, Texas, has been granted preliminary approval for 6GW of clean natural gas-based power generation from the Texas Commission on Environmental Quality (TCEQ).",
    "Fermi\u2019s Project Matador is one of the most ambitious data center campuses planned anywhere in the world."
   ],
   "locality_evidence": [
    "Fermi America, the developer behind the planned up to 11GW data center campus in Amarillo, Texas, has been granted preliminary approval for 6GW of clean natural gas-based power generation from the Texas Commission on Environmental Quality (TCEQ).",
    "Fermi\u2019s Project Matador is one of the most ambitious data center campuses planned anywhere in the world."
   ],
   "state_evidence": [
    "Fermi America, the developer behind the planned up to 11GW data center campus in Amarillo, Texas, has been granted preliminary approval for 6GW of clean natural gas-based power generation from the Texas Commission on Environmental Quality (TCEQ).",
    "Fermi\u2019s Project Matador is one of the most ambitious data center campuses planned anywhere in the world."
   ],
   "capacity_gw_evidence": [
    "Fermi America, the developer behind the planned up to 11GW data center campus in Amarillo, Texas, has been granted preliminary approval for 6GW of clean natural gas-based power generation from the Texas Commission on Environmental Quality (TCEQ).",
    "Fermi\u2019s Project Matador is one of the most ambitious data center campuses planned anywhere in the world."
   ],
   "builder_evidence": [
    "Fermi America, the developer behind the planned up to 11GW data center campus in Amarillo, Texas, has been granted preliminary approval for 6GW of clean natural gas-based power generation from the Texas Commission on Environmental Quality (TCEQ).",
    "Fermi\u2019s Project Matador is one of the most ambitious data center campuses planned anywhere in the world."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Fermi America, the developer behind the planned up to 11GW data center campus in Amarillo, Texas, has been granted preliminary approval for 6GW of clean natural gas-based power generation from the Texas Commission on Environmental Quality (TCEQ).",
    "Fermi\u2019s Project Matador is one of the most ambitious data center campuses planned anywhere in the world."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://nsenergybusiness.com/news/homer-city-coal-plant-repurposed-data-centre-hub",
   "title": "Homer City coal plant to be repurposed as 4.5GW data centre hub",
   "published_at": "2025-04-03T06:07:00",
   "project": "Homer City Energy Campus",
   "locality": "Indiana County",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Kiewit Power Constructors",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "The Homer City Energy Campus is expected to deliver up to 4.5GW of power while reducing greenhouse gas emissions by 60\u201365% per megawatt hour compared to the former coal plant."
   ],
   "locality_evidence": [
    "Further, we are fully committed to maximising the unprecedented level of economic opportunity this project represents not just for Indiana County, but for all of Pennsylvania and the Mid-Atlantic region of the country."
   ],
   "state_evidence": [
    "Homer City Redevelopment (HCR) and Kiewit Power Constructors have announced plans to transform the former Homer City Generating Station in Pennsylvania into a natural gas-powered data centre campus."
   ],
   "capacity_gw_evidence": [
    "The Homer City Energy Campus is expected to deliver up to 4.5GW of power while reducing greenhouse gas emissions by 60\u201365% per megawatt hour compared to the former coal plant."
   ],
   "builder_evidence": [
    "Kiewit Power Constructors will oversee construction works."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Homer City Redevelopment (HCR) and Kiewit Power Constructors have announced plans to transform the former Homer City Generating Station in Pennsylvania into a natural gas-powered data centre campus."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://finanznachrichten.de/nachrichten-2026-03/67956866-nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy-to-compute-008.htm",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": null,
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "- *Nscale Acquires the Monarch Compute Campus - America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia - with plans to build one of the world's largest AI Factories."
   ],
   "locality_evidence": [
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts.",
    "- *Nscale Acquires the Monarch Compute Campus - America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*"
   ],
   "state_evidence": [
    "Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia - with plans to build one of the world's largest AI Factories.",
    "- *Nscale Acquires the Monarch Compute Campus - America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*"
   ],
   "capacity_gw_evidence": [
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031.",
    "- *Nscale Acquires the Monarch Compute Campus - America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*"
   ],
   "builder_evidence": [
    "Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia - with plans to build one of the world's largest AI Factories.",
    "- *Nscale Acquires the Monarch Compute Campus - America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031.",
    "- *Nscale Acquires the Monarch Compute Campus - America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*"
   ],
   "announcement_date_evidence": [
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia - with plans to build one of the world's largest AI Factories.",
    "- *Nscale Acquires the Monarch Compute Campus - America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*"
   ]
  },
  {
   "url": "https://cozzyenergysolutions.com/isone/data-centers-go-off-grid-powering-ai-in-a-changing-landscape",
   "title": "Data Centers Go Off-Grid: Powering AI in a Changing Landscape",
   "published_at": "2026-05-29T00:50:35",
   "project": "Data City",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Data Centers Go Off-Grid: Powering AI in a Changing Landscape",
    "Energy Abundance\u2019s \u2018Data City\u2019 near Laredo, Texas, exemplifies this trend, featuring a self-sufficient hub with data centers alongside wind, solar, battery storage, and gas turbines, targeting 300MW in its initial phase, slated for launch in 2026, with a potential total capacity of 5GW."
   ],
   "locality_evidence": [
    "Data Centers Go Off-Grid: Powering AI in a Changing Landscape",
    "Energy Abundance\u2019s \u2018Data City\u2019 near Laredo, Texas, exemplifies this trend, featuring a self-sufficient hub with data centers alongside wind, solar, battery storage, and gas turbines, targeting 300MW in its initial phase, slated for launch in 2026, with a potential total capacity of 5GW."
   ],
   "state_evidence": [
    "Data Centers Go Off-Grid: Powering AI in a Changing Landscape",
    "Energy Abundance\u2019s \u2018Data City\u2019 near Laredo, Texas, exemplifies this trend, featuring a self-sufficient hub with data centers alongside wind, solar, battery storage, and gas turbines, targeting 300MW in its initial phase, slated for launch in 2026, with a potential total capacity of 5GW."
   ],
   "capacity_gw_evidence": [
    "Data Centers Go Off-Grid: Powering AI in a Changing Landscape",
    "Energy Abundance\u2019s \u2018Data City\u2019 near Laredo, Texas, exemplifies this trend, featuring a self-sufficient hub with data centers alongside wind, solar, battery storage, and gas turbines, targeting 300MW in its initial phase, slated for launch in 2026, with a potential total capacity of 5GW."
   ],
   "builder_evidence": [
    "Data Centers Go Off-Grid: Powering AI in a Changing Landscape",
    "Energy Abundance\u2019s \u2018Data City\u2019 near Laredo, Texas, exemplifies this trend, featuring a self-sufficient hub with data centers alongside wind, solar, battery storage, and gas turbines, targeting 300MW in its initial phase, slated for launch in 2026, with a potential total capacity of 5GW."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Data Centers Go Off-Grid: Powering AI in a Changing Landscape",
    "Energy Abundance\u2019s \u2018Data City\u2019 near Laredo, Texas, exemplifies this trend, featuring a self-sufficient hub with data centers alongside wind, solar, battery storage, and gas turbines, targeting 300MW in its initial phase, slated for launch in 2026, with a potential total capacity of 5GW."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://enterprisedna.co/resources/news/openai-project-camellia-georgia-data-center-30-billion-2026",
   "title": "OpenAI's Project Camellia: $30B for AI Infrastructure",
   "published_at": "2026-07-24T00:00:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "OpenAI's Project Camellia: $30B for AI Infrastructure",
    "On July 22, OpenAI announced Project Camellia \u2014 a 3.2-gigawatt data center campus in Effingham County, Georgia that will cost more than $30 billion at full build-out."
   ],
   "locality_evidence": [
    "OpenAI's Project Camellia: $30B for AI Infrastructure",
    "On July 22, OpenAI announced Project Camellia \u2014 a 3.2-gigawatt data center campus in Effingham County, Georgia that will cost more than $30 billion at full build-out."
   ],
   "state_evidence": [
    "OpenAI's Project Camellia: $30B for AI Infrastructure",
    "On July 22, OpenAI announced Project Camellia \u2014 a 3.2-gigawatt data center campus in Effingham County, Georgia that will cost more than $30 billion at full build-out."
   ],
   "capacity_gw_evidence": [
    "OpenAI's Project Camellia: $30B for AI Infrastructure",
    "On July 22, OpenAI announced Project Camellia \u2014 a 3.2-gigawatt data center campus in Effingham County, Georgia that will cost more than $30 billion at full build-out."
   ],
   "builder_evidence": [
    "OpenAI's Project Camellia: $30B for AI Infrastructure",
    "It is the first data center OpenAI will design, build, and operate itself."
   ],
   "ai_customer_evidence": [
    "OpenAI's Project Camellia: $30B for AI Infrastructure",
    "On July 22, OpenAI announced Project Camellia \u2014 a 3.2-gigawatt data center campus in Effingham County, Georgia that will cost more than $30 billion at full build-out."
   ],
   "status_evidence": [
    "OpenAI's Project Camellia: $30B for AI Infrastructure",
    "On July 22, OpenAI announced Project Camellia \u2014 a 3.2-gigawatt data center campus in Effingham County, Georgia that will cost more than $30 billion at full build-out."
   ],
   "announcement_date_evidence": [
    "OpenAI's Project Camellia: $30B for AI Infrastructure",
    "On July 22, OpenAI announced Project Camellia \u2014 a 3.2-gigawatt data center campus in Effingham County, Georgia that will cost more than $30 billion at full build-out."
   ]
  },
  {
   "url": "https://nameplatereport.substack.com/p/project-cannoli-10-gw-of-contracted",
   "title": "Project Cannoli: 1.0 GW of contracted Google load",
   "published_at": "2026-07-09T13:19:11",
   "project": "Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Google",
   "ai_customer": "Google",
   "status": "permitting",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "# Project Cannoli: 1.0 GW of contracted Google load",
    "Cannoli sits in Van Buren Township, inside DTE Electric's service territory and the MISO footprint."
   ],
   "locality_evidence": [
    "In March, DTE Electric filed an 8-K with the SEC covering a power supply agreement with Google: 1.0 GW of data-center load in Van Buren Township, between Ann Arbor and Detroit, with roughly 1,600 MW of renewables and 480 MW of storage attached.",
    "# Project Cannoli: 1.0 GW of contracted Google load"
   ],
   "state_evidence": [
    "In March, DTE Electric filed an 8-K with the SEC covering a power supply agreement with Google: 1.0 GW of data-center load in Van Buren Township, between Ann Arbor and Detroit, with roughly 1,600 MW of renewables and 480 MW of storage attached.",
    "# Project Cannoli: 1.0 GW of contracted Google load"
   ],
   "capacity_gw_evidence": [
    "In March, DTE Electric filed an 8-K with the SEC covering a power supply agreement with Google: 1.0 GW of data-center load in Van Buren Township, between Ann Arbor and Detroit, with roughly 1,600 MW of renewables and 480 MW of storage attached.",
    "# Project Cannoli: 1.0 GW of contracted Google load"
   ],
   "builder_evidence": [
    "In March, DTE Electric filed an 8-K with the SEC covering a power supply agreement with Google: 1.0 GW of data-center load in Van Buren Township, between Ann Arbor and Detroit, with roughly 1,600 MW of renewables and 480 MW of storage attached.",
    "# Project Cannoli: 1.0 GW of contracted Google load"
   ],
   "ai_customer_evidence": [
    "In March, DTE Electric filed an 8-K with the SEC covering a power supply agreement with Google: 1.0 GW of data-center load in Van Buren Township, between Ann Arbor and Detroit, with roughly 1,600 MW of renewables and 480 MW of storage attached.",
    "# Project Cannoli: 1.0 GW of contracted Google load"
   ],
   "status_evidence": [
    "Permitting is the quieter watch item.",
    "The power agreement is approved; the project still sits at **permitting** because site and construction permits are the open item, along with MPSC treatment of the CCAA cost-recovery mechanism.",
    "# Project Cannoli: 1.0 GW of contracted Google load"
   ],
   "announcement_date_evidence": [
    "In March, DTE Electric filed an 8-K with the SEC covering a power supply agreement with Google: 1.0 GW of data-center load in Van Buren Township, between Ann Arbor and Detroit, with roughly 1,600 MW of renewables and 480 MW of storage attached.",
    "The power supply agreement and the Clean Capacity Acceleration Agreement are documented in a DTE Form 8-K filed 16 Mar 2026, and the power agreement reads approved.",
    "# Project Cannoli: 1.0 GW of contracted Google load"
   ]
  },
  {
   "url": "https://nameplatereport.substack.com/p/project-cannoli-10-gw-of-contracted",
   "title": "Project Cannoli: 1.0 GW of contracted Google load",
   "published_at": "2026-07-09T13:19:11",
   "project": "Stargate",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.383,
   "builder": null,
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "The state's *only* other gigawatt-scale data-center load we track \u2014 the Oracle / OpenAI \u201cStargate\u201d campus \u2014 is one county west in Saline Township, roughly 19 miles away.",
    "# Project Cannoli: 1.0 GW of contracted Google load"
   ],
   "locality_evidence": [
    "The state's *only* other gigawatt-scale data-center load we track \u2014 the Oracle / OpenAI \u201cStargate\u201d campus \u2014 is one county west in Saline Township, roughly 19 miles away.",
    "# Project Cannoli: 1.0 GW of contracted Google load"
   ],
   "state_evidence": [
    "The state's *only* other gigawatt-scale data-center load we track \u2014 the Oracle / OpenAI \u201cStargate\u201d campus \u2014 is one county west in Saline Township, roughly 19 miles away.",
    "# Project Cannoli: 1.0 GW of contracted Google load"
   ],
   "capacity_gw_evidence": [
    "It is bigger and it has the disclosed cost Cannoli lacks: $16.0 billion over 1,383 MW, about $11.6 million per megawatt, the only real $/MW in the state.",
    "# Project Cannoli: 1.0 GW of contracted Google load"
   ],
   "builder_evidence": null,
   "ai_customer_evidence": [
    "The state's *only* other gigawatt-scale data-center load we track \u2014 the Oracle / OpenAI \u201cStargate\u201d campus \u2014 is one county west in Saline Township, roughly 19 miles away.",
    "# Project Cannoli: 1.0 GW of contracted Google load"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://bitget.com/news/detail/12560605429310",
   "title": "TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
   "published_at": "2026-05-26T06:09:31",
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore.",
    "- The Muskie Data Campus in eastern Kentucky is expected to support more than 1 GW of data center capacity on a roughly 285-acre parcel inside a 1,000-acre industrial park."
   ],
   "locality_evidence": [
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore.",
    "- The Muskie Data Campus in eastern Kentucky is expected to support more than 1 GW of data center capacity on a roughly 285-acre parcel inside a 1,000-acre industrial park."
   ],
   "state_evidence": [
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore.",
    "- The Muskie Data Campus in eastern Kentucky is expected to support more than 1 GW of data center capacity on a roughly 285-acre parcel inside a 1,000-acre industrial park."
   ],
   "capacity_gw_evidence": [
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore.",
    "- The Muskie Data Campus in eastern Kentucky is expected to support more than 1 GW of data center capacity on a roughly 285-acre parcel inside a 1,000-acre industrial park."
   ],
   "builder_evidence": [
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore.",
    "- The Muskie Data Campus in eastern Kentucky is expected to support more than 1 GW of data center capacity on a roughly 285-acre parcel inside a 1,000-acre industrial park."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://bitget.com/news/detail/12560605429310",
   "title": "TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
   "published_at": "2026-05-26T06:09:31",
   "project": "Pecos, Texas mining site",
   "locality": "Pecos",
   "state": "Texas",
   "capacity_gw": 1.5,
   "builder": "Core Scientific",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "In another crypto.news [piece](https://crypto.news/core-scientific-shifts-bitcoin-mining-site-toward-1-5gw-ai-data-center-plan/), Core outlined plans to convert its Pecos, Texas mining site into a 1.5 GW AI campus, repurposing about 300 MW previously used for Bitcoin mining."
   ],
   "locality_evidence": [
    "In another crypto.news [piece](https://crypto.news/core-scientific-shifts-bitcoin-mining-site-toward-1-5gw-ai-data-center-plan/), Core outlined plans to convert its Pecos, Texas mining site into a 1.5 GW AI campus, repurposing about 300 MW previously used for Bitcoin mining."
   ],
   "state_evidence": [
    "In another crypto.news [piece](https://crypto.news/core-scientific-shifts-bitcoin-mining-site-toward-1-5gw-ai-data-center-plan/), Core outlined plans to convert its Pecos, Texas mining site into a 1.5 GW AI campus, repurposing about 300 MW previously used for Bitcoin mining."
   ],
   "capacity_gw_evidence": [
    "In another crypto.news [piece](https://crypto.news/core-scientific-shifts-bitcoin-mining-site-toward-1-5gw-ai-data-center-plan/), Core outlined plans to convert its Pecos, Texas mining site into a 1.5 GW AI campus, repurposing about 300 MW previously used for Bitcoin mining."
   ],
   "builder_evidence": [
    "In another crypto.news [piece](https://crypto.news/core-scientific-shifts-bitcoin-mining-site-toward-1-5gw-ai-data-center-plan/), Core outlined plans to convert its Pecos, Texas mining site into a 1.5 GW AI campus, repurposing about 300 MW previously used for Bitcoin mining."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://bnctimes.com/hut-8-iren-secure-major-ai-infrastructure-deals",
   "title": "Hut 8, IREN Secure Major AI Infrastructure Deals. - BNC Times",
   "published_at": "2026-07-20T21:52:45",
   "project": "Beacon Point",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "fully commercialized",
   "announcement_date": null,
   "project_evidence": [
    "Hut 8 fully commercialized its 1GW Beacon Point AI campus with a second $9.8B lease.",
    "Hut 8 Fully Commercializes Texas AI Campus"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "Hut 8 Fully Commercializes Texas AI Campus"
   ],
   "capacity_gw_evidence": [
    "Hut 8 fully commercialized its 1GW Beacon Point AI campus with a second $9.8B lease.",
    "Hut 8 Fully Commercializes Texas AI Campus"
   ],
   "builder_evidence": [
    "Hut 8 fully commercialized its 1GW Beacon Point AI campus with a second $9.8B lease.",
    "Hut 8 Fully Commercializes Texas AI Campus"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Hut 8 fully commercialized its 1GW Beacon Point AI campus with a second $9.8B lease.",
    "Hut 8 Fully Commercializes Texas AI Campus"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://inteliview.kr/en/topics/us-stocks/nvidia-iren-2-1-billion-investment-texas-2gw-datacenter-warrant-2026",
   "title": "NVIDIA Invests $1.44B in Bitcoin Miner-Turned-AI Firm IREN, Partners on 2GW Texas Data Center",
   "published_at": "2026-05-08T00:00:00",
   "project": null,
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": "",
   "status": null,
   "announcement_date": "2026-05-07",
   "project_evidence": null,
   "locality_evidence": [
    "NVIDIA Invests $1.44B in Bitcoin Miner-Turned-AI Firm IREN, Partners on 2GW Texas Data Center",
    "The jointly developed data center will be located in Sweetwater, Texas, at a capacity of 2 gigawatts \u2014 enough to power approximately 1.5 million homes."
   ],
   "state_evidence": [
    "NVIDIA Invests $1.44B in Bitcoin Miner-Turned-AI Firm IREN, Partners on 2GW Texas Data Center",
    "The jointly developed data center will be located in Sweetwater, Texas, at a capacity of 2 gigawatts \u2014 enough to power approximately 1.5 million homes."
   ],
   "capacity_gw_evidence": [
    "NVIDIA Invests $1.44B in Bitcoin Miner-Turned-AI Firm IREN, Partners on 2GW Texas Data Center",
    "The jointly developed data center will be located in Sweetwater, Texas, at a capacity of 2 gigawatts \u2014 enough to power approximately 1.5 million homes."
   ],
   "builder_evidence": [
    "NVIDIA Invests $1.44B in Bitcoin Miner-Turned-AI Firm IREN, Partners on 2GW Texas Data Center",
    "NVIDIA is investing up to $2.1B in IREN and co-developing a 2GW AI data center in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": [
    "On May 7, NVIDIA announced an investment of up to $2.1B in AI data center company [IREN](/stock/IREN)."
   ]
  },
  {
   "url": "https://coasttocoasttribune.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "About Creekstone Energy",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "About Creekstone Energy",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://baxtel.com/news/ecl-plans-to-construct-a-1gw-hydrogen-powered-ai-data-center-in-texas-with-lambda-as-its-inaugural-tenant",
   "title": "ECL plans to construct a 1GW hydrogen-powered AI data center in Texas, with Lambda as its inaugural tenant.",
   "published_at": "2024-09-25T00:00:00",
   "project": "TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "planned",
   "announcement_date": "2024-09-25",
   "project_evidence": [
    "Data center startup ECL claims that it will build a 1GW AI data center on a more than 600-acre site east of Houston, Texas, powered by hydrogen.",
    "The TerraSite-TX1 will initially have a capacity of 50MW, coming next summer, at a cost of around $450 million.",
    "Sep 25, 2024 | Posted by Abdul-Rahman Oladimeji"
   ],
   "locality_evidence": [
    "Data center startup ECL claims that it will build a 1GW AI data center on a more than 600-acre site east of Houston, Texas, powered by hydrogen.",
    "Sep 25, 2024 | Posted by Abdul-Rahman Oladimeji"
   ],
   "state_evidence": [
    "Data center startup ECL claims that it will build a 1GW AI data center on a more than 600-acre site east of Houston, Texas, powered by hydrogen.",
    "Sep 25, 2024 | Posted by Abdul-Rahman Oladimeji"
   ],
   "capacity_gw_evidence": [
    "Data center startup ECL claims that it will build a 1GW AI data center on a more than 600-acre site east of Houston, Texas, powered by hydrogen.",
    "Sep 25, 2024 | Posted by Abdul-Rahman Oladimeji"
   ],
   "builder_evidence": [
    "Data center startup ECL claims that it will build a 1GW AI data center on a more than 600-acre site east of Houston, Texas, powered by hydrogen.",
    "Sep 25, 2024 | Posted by Abdul-Rahman Oladimeji"
   ],
   "ai_customer_evidence": [
    "The TerraSite-TX1 will initially have a capacity of 50MW, coming next summer, at a cost of around $450 million.",
    "AI cloud provider Lambda will be the first customer, but is not taking the whole 50MW.",
    "Sep 25, 2024 | Posted by Abdul-Rahman Oladimeji"
   ],
   "status_evidence": [
    "Data center startup ECL claims that it will build a 1GW AI data center on a more than 600-acre site east of Houston, Texas, powered by hydrogen.",
    "Sep 25, 2024 | Posted by Abdul-Rahman Oladimeji"
   ],
   "announcement_date_evidence": [
    "Data center startup ECL claims that it will build a 1GW AI data center on a more than 600-acre site east of Houston, Texas, powered by hydrogen.",
    "Sep 25, 2024 | Posted by Abdul-Rahman Oladimeji"
   ]
  },
  {
   "url": "https://pureai.com/articles/2026/08/17/invests-1dot5-billion-in-sb-energy-to-back-massive-openai-ohio-data-center.aspx",
   "title": "Nvidia Invests 1.5 Billion in SB Energy to Back Massive OpenAI Ohio Data Center -- Pure AI",
   "published_at": "2026-08-17T00:00:00",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "Nvidia Invests 1.5 Billion in SB Energy to Back Massive OpenAI Ohio Data Center",
    "The agreement, announced Aug. 17 in a company [blog post](https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute), centers on SB Energy's PORTS-Pike Technology Campus in Pike County, where Nvidia will be the exclusive AI compute infrastructure provider."
   ],
   "locality_evidence": [
    "Nvidia Invests 1.5 Billion in SB Energy to Back Massive OpenAI Ohio Data Center",
    "The agreement, announced Aug. 17 in a company [blog post](https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute), centers on SB Energy's PORTS-Pike Technology Campus in Pike County, where Nvidia will be the exclusive AI compute infrastructure provider."
   ],
   "state_evidence": [
    "Nvidia Invests 1.5 Billion in SB Energy to Back Massive OpenAI Ohio Data Center",
    "Nvidia is investing $1.5 billion in SB Energy and providing credit support for a massive new AI data center campus in Ohio that will supply computing capacity to OpenAI."
   ],
   "capacity_gw_evidence": [
    "Nvidia Invests 1.5 Billion in SB Energy to Back Massive OpenAI Ohio Data Center",
    "The company also has an option on the remaining 3.75 IT-GW, while OpenAI is expected to be the customer for the full 8 IT-GW planned for the campus."
   ],
   "builder_evidence": [
    "Nvidia Invests 1.5 Billion in SB Energy to Back Massive OpenAI Ohio Data Center",
    "SB Energy will build, own and operate the data center under a 20-year lease to OpenAI."
   ],
   "ai_customer_evidence": [
    "Nvidia Invests 1.5 Billion in SB Energy to Back Massive OpenAI Ohio Data Center",
    "Nvidia is investing $1.5 billion in SB Energy and providing credit support for a massive new AI data center campus in Ohio that will supply computing capacity to OpenAI."
   ],
   "status_evidence": [
    "Nvidia Invests 1.5 Billion in SB Energy to Back Massive OpenAI Ohio Data Center",
    "The company also has an option on the remaining 3.75 IT-GW, while OpenAI is expected to be the customer for the full 8 IT-GW planned for the campus."
   ],
   "announcement_date_evidence": [
    "Nvidia Invests 1.5 Billion in SB Energy to Back Massive OpenAI Ohio Data Center",
    "The agreement, announced Aug. 17 in a company [blog post](https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute), centers on SB Energy's PORTS-Pike Technology Campus in Pike County, where Nvidia will be the exclusive AI compute infrastructure provider."
   ]
  },
  {
   "url": "https://bitget.com/news/detail/12560605689483",
   "title": "Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant",
   "published_at": "2026-08-17T05:56:15",
   "project": "PORTS-Pike Technology Park",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2025-08-17",
   "project_evidence": [
    "# Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant",
    "On August 17, **Nvidia announced a strategic partnership with SB Energy to provide credit support for the PORTS-Pike Technology Park in Ohio, transforming it into a hyperscale data center dedicated to Nvidia AI computing infrastructure, with OpenAI as the sole tenant."
   ],
   "locality_evidence": [
    "# Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant",
    "PORTS-Pike is located in Pike County, Ohio, adjacent to the decommissioned Portsmouth Gaseous Diffusion Plant site, spanning both private and federal land."
   ],
   "state_evidence": [
    "# Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant"
   ],
   "capacity_gw_evidence": [
    "# Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant",
    "The initial deployment capacity of the project is 4.25 IT-GW, with Nvidia having the option to expand by an additional 3.75 IT-GW, bringing the park\u2019s planned total capacity to 8 IT-GW."
   ],
   "builder_evidence": [
    "# Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant",
    "On August 17, **Nvidia announced a strategic partnership with SB Energy to provide credit support for the PORTS-Pike Technology Park in Ohio, transforming it into a hyperscale data center dedicated to Nvidia AI computing infrastructure, with OpenAI as the sole tenant."
   ],
   "ai_customer_evidence": [
    "# Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant",
    "On August 17, **Nvidia announced a strategic partnership with SB Energy to provide credit support for the PORTS-Pike Technology Park in Ohio, transforming it into a hyperscale data center dedicated to Nvidia AI computing infrastructure, with OpenAI as the sole tenant."
   ],
   "status_evidence": [
    "# Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant",
    "The initial deployment capacity of the project is 4.25 IT-GW, with Nvidia having the option to expand by an additional 3.75 IT-GW, bringing the park\u2019s planned total capacity to 8 IT-GW."
   ],
   "announcement_date_evidence": [
    "# Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant",
    "On August 17, **Nvidia announced a strategic partnership with SB Energy to provide credit support for the PORTS-Pike Technology Park in Ohio, transforming it into a hyperscale data center dedicated to Nvidia AI computing infrastructure, with OpenAI as the sole tenant."
   ]
  },
  {
   "url": "https://cryptopolitan.com/meta-announces-10b-indiana-data-center",
   "title": "Meta announces $10B Indiana data center while auditor flags $27B Louisiana deal - Cryptopolitan",
   "published_at": "2026-02-11T20:30:50",
   "project": "Lebanon campus",
   "locality": "Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "breaking ground",
   "announcement_date": "2026-02-00",
   "project_evidence": [
    "Meta announces $10B Indiana data center while auditor flags $27B Louisiana deal",
    "Meta announced Wednesday it will pour more than $10 billion into a new data center in Lebanon, Indiana, marking another huge bet on artificial intelligence infrastructure even as questions pile up about how the social media giant finances these projects.",
    "The Lebanon campus is Meta\u2019s second major tech project in Indiana."
   ],
   "locality_evidence": [
    "Meta announces $10B Indiana data center while auditor flags $27B Louisiana deal",
    "Meta announced Wednesday it will pour more than $10 billion into a new data center in Lebanon, Indiana, marking another huge bet on artificial intelligence infrastructure even as questions pile up about how the social media giant finances these projects."
   ],
   "state_evidence": [
    "Meta announces $10B Indiana data center while auditor flags $27B Louisiana deal",
    "Meta announced Wednesday it will pour more than $10 billion into a new data center in Lebanon, Indiana, marking another huge bet on artificial intelligence infrastructure even as questions pile up about how the social media giant finances these projects."
   ],
   "capacity_gw_evidence": [
    "Meta announces $10B Indiana data center while auditor flags $27B Louisiana deal",
    "The company broke ground on the site that will deliver one gigawatt of electricity to power AI systems and Meta\u2019s social networks."
   ],
   "builder_evidence": [
    "Meta announces $10B Indiana data center while auditor flags $27B Louisiana deal",
    "Meta announced Wednesday it will pour more than $10 billion into a new data center in Lebanon, Indiana, marking another huge bet on artificial intelligence infrastructure even as questions pile up about how the social media giant finances these projects."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Meta announces $10B Indiana data center while auditor flags $27B Louisiana deal",
    "The company broke ground on the site that will deliver one gigawatt of electricity to power AI systems and Meta\u2019s social networks."
   ],
   "announcement_date_evidence": [
    "Meta announces $10B Indiana data center while auditor flags $27B Louisiana deal",
    "Meta announced Wednesday it will pour more than $10 billion into a new data center in Lebanon, Indiana, marking another huge bet on artificial intelligence infrastructure even as questions pile up about how the social media giant finances these projects."
   ]
  },
  {
   "url": "https://datacenter.news/story/aws-s-11bn-indiana-data-centre-powers-anthropic-s-ai-growth",
   "title": "AWS's $11bn Indiana data centre powers Anthropic's AI growth",
   "published_at": "2025-11-03T07:16:00",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon Web Services",
   "ai_customer": "Anthropic",
   "status": "fully operational",
   "announcement_date": null,
   "project_evidence": [
    "# AWS's $11bn Indiana data centre powers Anthropic's AI growth",
    "Amazon Web Services' (AWS) $11 billion Project Rainier data centre campus near New Carlisle became fully operational in October 2025, marking what AWS has described as \"one of the most ambitious projects\" in its history."
   ],
   "locality_evidence": [
    "# AWS's $11bn Indiana data centre powers Anthropic's AI growth",
    "Amazon Web Services' (AWS) $11 billion Project Rainier data centre campus near New Carlisle became fully operational in October 2025, marking what AWS has described as \"one of the most ambitious projects\" in its history."
   ],
   "state_evidence": [
    "# AWS's $11bn Indiana data centre powers Anthropic's AI growth",
    "In rural Indiana, a once quiet stretch of farmland has been transformed into one of the largest artificial intelligence infrastructure projects ever undertaken."
   ],
   "capacity_gw_evidence": [
    "# AWS's $11bn Indiana data centre powers Anthropic's AI growth",
    "The site spans 1,200 acres and will ultimately draw 2.2 gigawatts of power - enough to serve about 1.6 million homes."
   ],
   "builder_evidence": [
    "# AWS's $11bn Indiana data centre powers Anthropic's AI growth",
    "Amazon Web Services' (AWS) $11 billion Project Rainier data centre campus near New Carlisle became fully operational in October 2025, marking what AWS has described as \"one of the most ambitious projects\" in its history."
   ],
   "ai_customer_evidence": [
    "# AWS's $11bn Indiana data centre powers Anthropic's AI growth",
    "Project Rainier's purpose extends beyond data storage: it was designed to serve Anthropic, the San Francisco-based AI firm founded by former OpenAI researchers Dario and Daniela Amodei."
   ],
   "status_evidence": [
    "# AWS's $11bn Indiana data centre powers Anthropic's AI growth",
    "Amazon Web Services' (AWS) $11 billion Project Rainier data centre campus near New Carlisle became fully operational in October 2025, marking what AWS has described as \"one of the most ambitious projects\" in its history."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacentermap.com/usa/mississippi/southaven/xai-macrohardrr",
   "title": "xAI MACROHARDRR Data Center in Southaven (2000 MW)",
   "published_at": null,
   "project": "MACROHARDRR",
   "locality": "Southaven",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI Corp",
   "ai_customer": null,
   "status": "Announced",
   "announcement_date": "2025-12-29",
   "project_evidence": [
    "Overview",
    "xAI Corp is developing the MACROHARDRR data center, located at 2400 Stateline Rd W in Southaven, Tennessee, within the Memphis market."
   ],
   "locality_evidence": [
    "Overview",
    "xAI Corp is developing the MACROHARDRR data center, located at 2400 Stateline Rd W in Southaven, Tennessee, within the Memphis market."
   ],
   "state_evidence": [
    "Overview",
    "xAI Corp is developing the MACROHARDRR data center, located at 2400 Stateline Rd W in Southaven, Tennessee, within the Memphis market."
   ],
   "capacity_gw_evidence": [
    "Overview",
    "This facility, acquired as an 810,000 sqft warehouse, is intended to bolster xAI's AI compute capacity, with potential to reach \"almost 2GW\"."
   ],
   "builder_evidence": [
    "Overview",
    "xAI Corp is developing the MACROHARDRR data center, located at 2400 Stateline Rd W in Southaven, Tennessee, within the Memphis market."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Dec 29, 2025 - Stage Change",
    "xAI announces third data center purchase, potentially reaching 2GW capacity",
    " - New Stage: Announced"
   ],
   "announcement_date_evidence": [
    "Dec 29, 2025 - Stage Change",
    "xAI announces third data center purchase, potentially reaching 2GW capacity"
   ]
  },
  {
   "url": "https://w.media/crusoe-and-lancium-plan-to-build-a-new-ai-data-center-in-childress-texas",
   "title": "Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
   "published_at": null,
   "project": "AI data center",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-07-16",
   "project_evidence": [
    "# Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
    "Crusoe, an AI factory company in partnership with Lancium, an energy technology and infrastructure company, is planning to develop a 1 GW AI data center campus in Childress, Texas."
   ],
   "locality_evidence": [
    "# Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
    "Crusoe, an AI factory company in partnership with Lancium, an energy technology and infrastructure company, is planning to develop a 1 GW AI data center campus in Childress, Texas."
   ],
   "state_evidence": [
    "# Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
    "Crusoe, an AI factory company in partnership with Lancium, an energy technology and infrastructure company, is planning to develop a 1 GW AI data center campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
    "Crusoe, an AI factory company in partnership with Lancium, an energy technology and infrastructure company, is planning to develop a 1 GW AI data center campus in Childress, Texas."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
    "Crusoe, an AI factory company in partnership with Lancium, an energy technology and infrastructure company, is planning to develop a 1 GW AI data center campus in Childress, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
    "Crusoe, an AI factory company in partnership with Lancium, an energy technology and infrastructure company, is planning to develop a 1 GW AI data center campus in Childress, Texas."
   ],
   "announcement_date_evidence": [
    "# Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
    "July 16, 2026 at 6:33 PM GMT+8"
   ]
  },
  {
   "url": "https://datacentre.solutions/news/70668/vantage-data-centers-announces-largest-25-billion-mega-campus-investment-in-texas",
   "title": "Vantage Data Centers announces largest $25 Billion mega-campus investment in Texas",
   "published_at": "2025-08-19T12:59:00",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Construction is already underway",
   "announcement_date": null,
   "project_evidence": [
    "# Vantage Data Centers announces largest $25 Billion mega-campus investment in Texas",
    "$25 billion will be channelled into the creation of a vast 1.4GW data centre campus named \"Frontier\" in Shackelford County, Texas."
   ],
   "locality_evidence": [
    "# Vantage Data Centers announces largest $25 Billion mega-campus investment in Texas",
    "Vantage Data Centers unveils a groundbreaking $25 billion investment in a mega-scale data centre campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "# Vantage Data Centers announces largest $25 Billion mega-campus investment in Texas",
    "Vantage Data Centers unveils a groundbreaking $25 billion investment in a mega-scale data centre campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "# Vantage Data Centers announces largest $25 Billion mega-campus investment in Texas",
    "$25 billion will be channelled into the creation of a vast 1.4GW data centre campus named \"Frontier\" in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "# Vantage Data Centers announces largest $25 Billion mega-campus investment in Texas",
    "Vantage Data Centers unveils a groundbreaking $25 billion investment in a mega-scale data centre campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Vantage Data Centers announces largest $25 Billion mega-campus investment in Texas",
    "Construction is already underway, with the initial building anticipated to be ready in the latter half of 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://lowvoltagenation.com/posts/vantage-frontier-texas-ai-data-center-low-voltage",
   "title": "Vantage Frontier Texas AI Data Center Low-Voltage Watch",
   "published_at": "2026-07-04T12:20:55",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Kiewit",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "Vantage Frontier Texas AI Data Center Low-Voltage Watch",
    "# Vantage Frontier Texas AI Data Center Low-Voltage Watch",
    "Vantage Data Centers' Frontier campus in Shackelford County, Texas is the kind of AI infrastructure project LVN Signal should track before the specialty contractor map is public."
   ],
   "locality_evidence": [
    "Vantage Data Centers' Frontier campus in Shackelford County, Texas is the kind of AI infrastructure project LVN Signal should track before the specialty contractor map is public.",
    "Vantage Frontier Texas AI Data Center Low-Voltage Watch",
    "# Vantage Frontier Texas AI Data Center Low-Voltage Watch"
   ],
   "state_evidence": [
    "Vantage Frontier Texas AI Data Center Low-Voltage Watch",
    "# Vantage Frontier Texas AI Data Center Low-Voltage Watch",
    "Vantage Data Centers' Frontier campus in Shackelford County, Texas is the kind of AI infrastructure project LVN Signal should track before the specialty contractor map is public."
   ],
   "capacity_gw_evidence": [
    "Vantage Frontier Texas AI Data Center Low-Voltage Watch",
    "# Vantage Frontier Texas AI Data Center Low-Voltage Watch",
    "The headline numbers are large: Vantage describes Frontier as a $25B-plus campus on 1,200 acres with 10 data centers, 3.7 million square feet, and 1.4 GW of critical IT load."
   ],
   "builder_evidence": [
    "Vantage Frontier Texas AI Data Center Low-Voltage Watch",
    "# Vantage Frontier Texas AI Data Center Low-Voltage Watch",
    "That supports a medium-confidence EPC/general-contractor signal, while TDLR remains the primary source for the confirmed design-firm role."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Vantage Frontier Texas AI Data Center Low-Voltage Watch",
    "# Vantage Frontier Texas AI Data Center Low-Voltage Watch",
    "Vantage's [Frontier release](https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/) says construction is already underway and says the project will employ more than 5,000 people across construction and operations."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://uk.advfn.com/stock-market/london/fermi-FRMI/share-news/Fermi-Inc-Initial-Draw-on-200m-Equipment-Facilit/97876737",
   "title": "Fermi Inc. Initial Draw on $200m Equipment Facility",
   "published_at": null,
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2026-02-20",
   "project_evidence": [
    "Fermi Inc. Initial Draw on $200m Equipment Facility",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "locality_evidence": [
    "Fermi Inc. Initial Draw on $200m Equipment Facility",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus.",
    "\"While everyone is debating big tech use of grid power, the backing of legitimate financial organizations like Keystone National Group affirms that Fermi America is building the actual solution here in Amarillo, Texas - private grid power for AI at scale.\""
   ],
   "state_evidence": [
    "Fermi Inc. Initial Draw on $200m Equipment Facility",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus.",
    "\"While everyone is debating big tech use of grid power, the backing of legitimate financial organizations like Keystone National Group affirms that Fermi America is building the actual solution here in Amarillo, Texas - private grid power for AI at scale.\""
   ],
   "capacity_gw_evidence": [
    "Fermi Inc. Initial Draw on $200m Equipment Facility",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Fermi America combines cutting-edge technology with a deep bench of proven world-class multi-disciplinary leaders with a combined 25 GW of experience, to create the world's largest, 11 GW next-gen private grid, helping ensure America's energy and AI dominance."
   ],
   "builder_evidence": [
    "Fermi Inc. Initial Draw on $200m Equipment Facility",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Fermi Inc. Initial Draw on $200m Equipment Facility",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus."
   ],
   "announcement_date_evidence": [
    "Fermi Inc. Initial Draw on $200m Equipment Facility",
    "### 20/02/2026 7:00am",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ]
  },
  {
   "url": "https://rcrtech.com/ai-infrastructure/first-steel-on-homer-city-energys-4-4-gw-campus",
   "title": "'First steel' on Homer City Energy's 4.4 GW campus",
   "published_at": "2026-04-07T16:29:31",
   "project": "Homer City Energy Campus",
   "locality": "Homer",
   "state": "Pennsylvania",
   "capacity_gw": 4.4,
   "builder": "GE Vernova",
   "ai_customer": null,
   "status": "Under development",
   "announcement_date": null,
   "project_evidence": [
    "In another example of how co-location and behind-the-meter strategies can transform otherwise obsolete facilities, Homer City Energy Campus in Homer, PA will transform a decommissioned coal power plant into 4.4 GW of power in the heart of PJM\u2019s Mid-Atlantic region.",
    "AI Infrastructure Top Stories"
   ],
   "locality_evidence": [
    "In another example of how co-location and behind-the-meter strategies can transform otherwise obsolete facilities, Homer City Energy Campus in Homer, PA will transform a decommissioned coal power plant into 4.4 GW of power in the heart of PJM\u2019s Mid-Atlantic region.",
    "AI Infrastructure Top Stories"
   ],
   "state_evidence": [
    "In another example of how co-location and behind-the-meter strategies can transform otherwise obsolete facilities, Homer City Energy Campus in Homer, PA will transform a decommissioned coal power plant into 4.4 GW of power in the heart of PJM\u2019s Mid-Atlantic region.",
    "AI Infrastructure Top Stories"
   ],
   "capacity_gw_evidence": [
    "In another example of how co-location and behind-the-meter strategies can transform otherwise obsolete facilities, Homer City Energy Campus in Homer, PA will transform a decommissioned coal power plant into 4.4 GW of power in the heart of PJM\u2019s Mid-Atlantic region.",
    "AI Infrastructure Top Stories"
   ],
   "builder_evidence": [
    "On a 3,200-acre campus, GE Vernova will build one of the largest, if not the largest, natural gas-powered data center campuses in the United States.",
    "AI Infrastructure Top Stories"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "At its core will be seven high-efficiency 7HA.02 hydrogen-enabled, gas-fired turbines, currently being built by Kiewit Power Constructors Co., which have reached the \u201cfirst steel\u201d threshold and are planning for first deliveries by later this year.",
    "AI Infrastructure Top Stories"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://lifestyle.luxedb.com/story/558344/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy-to-compute",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": "2026-03-16T22:30:28",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "# [Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute](https://lifestyle.luxedb.com/story/558344/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy-to-compute/)",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ],
   "locality_evidence": [
    "# [Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute](https://lifestyle.luxedb.com/story/558344/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy-to-compute/)",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "# [Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute](https://lifestyle.luxedb.com/story/558344/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy-to-compute/)",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "capacity_gw_evidence": [
    "# [Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute](https://lifestyle.luxedb.com/story/558344/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy-to-compute/)",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "builder_evidence": [
    "# [Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute](https://lifestyle.luxedb.com/story/558344/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy-to-compute/)",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# [Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute](https://lifestyle.luxedb.com/story/558344/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy-to-compute/)",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "announcement_date_evidence": [
    "# [Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute](https://lifestyle.luxedb.com/story/558344/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy-to-compute/)",
    "SAN JOSE, Calif., March 16, 2026"
   ]
  },
  {
   "url": "https://compute-atlas.com/facilities/stratos-box-elder-ut",
   "title": "Compute Atlas",
   "published_at": "2026-07-06T00:00:00",
   "project": "Stratos AI Data Center Campus",
   "locality": "Lucin",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O'Leary Digital",
   "ai_customer": null,
   "status": "Proposed",
   "announcement_date": "2026-04",
   "project_evidence": [
    "# Stratos AI Data Center Campus"
   ],
   "locality_evidence": [
    "Lucin, UT \u00b7 Box Elder County \u00b7 41.500\u00b0N 113.500\u00b0W",
    "# Stratos AI Data Center Campus"
   ],
   "state_evidence": [
    "# Stratos AI Data Center Campus",
    "Utah Senate President called for 75% footprint reduction; O'Leary agreed to cut acreage by 50% (remove ~20,000 acres)."
   ],
   "capacity_gw_evidence": [
    "Capacity9,000 MW planned",
    "# Stratos AI Data Center Campus"
   ],
   "builder_evidence": [
    "O'Leary Digital",
    "# Stratos AI Data Center Campus"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Proposed",
    "# Stratos AI Data Center Campus"
   ],
   "announcement_date_evidence": [
    "Announced2026-04",
    "# Stratos AI Data Center Campus"
   ]
  },
  {
   "url": "https://agenccy.ai/news/openai-project-camellia-georgia-3-2-gigawatts",
   "title": "OpenAI's $20B Project Camellia: 3.2 GW Georgia Campus",
   "published_at": "2026-07-23T12:30:34",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "Announced",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "# OpenAI Unveils Project Camellia: a $20 Billion, 3.2-Gigawatt Campus It Will Design Itself",
    "**OpenAI** announced **Project Camellia** on July 22 \u2014 a data center campus in Effingham County near Savannah, Georgia, that marks the first time the company will design and develop its own facility rather than lease capacity built by partners."
   ],
   "locality_evidence": [
    "# OpenAI Unveils Project Camellia: a $20 Billion, 3.2-Gigawatt Campus It Will Design Itself",
    "**OpenAI** announced **Project Camellia** on July 22 \u2014 a data center campus in Effingham County near Savannah, Georgia, that marks the first time the company will design and develop its own facility rather than lease capacity built by partners."
   ],
   "state_evidence": [
    "# OpenAI Unveils Project Camellia: a $20 Billion, 3.2-Gigawatt Campus It Will Design Itself",
    "The Georgia data center is OpenAI's first as its own designer and developer \u2014 announced the same day the company's projected infrastructure spending through 2030 reportedly climbed to $750 billion."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Unveils Project Camellia: a $20 Billion, 3.2-Gigawatt Campus It Will Design Itself",
    "Georgia Power will deliver up to **3.2 gigawatts** in phases between **2028 and 2032**, under an agreement local reporting puts at 25 years."
   ],
   "builder_evidence": [
    "# OpenAI Unveils Project Camellia: a $20 Billion, 3.2-Gigawatt Campus It Will Design Itself",
    "**OpenAI** announced **Project Camellia** on July 22 \u2014 a data center campus in Effingham County near Savannah, Georgia, that marks the first time the company will design and develop its own facility rather than lease capacity built by partners."
   ],
   "ai_customer_evidence": [
    "# OpenAI Unveils Project Camellia: a $20 Billion, 3.2-Gigawatt Campus It Will Design Itself",
    "**OpenAI** announced **Project Camellia** on July 22 \u2014 a data center campus in Effingham County near Savannah, Georgia, that marks the first time the company will design and develop its own facility rather than lease capacity built by partners."
   ],
   "status_evidence": [
    "# OpenAI Unveils Project Camellia: a $20 Billion, 3.2-Gigawatt Campus It Will Design Itself",
    "**OpenAI** announced **Project Camellia** on July 22 \u2014 a data center campus in Effingham County near Savannah, Georgia, that marks the first time the company will design and develop its own facility rather than lease capacity built by partners."
   ],
   "announcement_date_evidence": [
    "# OpenAI Unveils Project Camellia: a $20 Billion, 3.2-Gigawatt Campus It Will Design Itself",
    "**OpenAI** announced **Project Camellia** on July 22 \u2014 a data center campus in Effingham County near Savannah, Georgia, that marks the first time the company will design and develop its own facility rather than lease capacity built by partners."
   ]
  },
  {
   "url": "https://servercountry.org/data/projects/google-van-buren-township-data-center-campus-project-cannoli-mi",
   "title": "Google Van Buren Township Data Center Campus (Project Cannoli)",
   "published_at": null,
   "project": "Google Van Buren Township Data Center Campus (Project Cannoli)",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Google",
   "ai_customer": null,
   "status": "Planned",
   "announcement_date": "2026-03-18",
   "project_evidence": [
    "# Google Van Buren Township Data Center Campus (Project Cannoli)",
    "This record tracks Google Van Buren Township Data Center Campus (Project Cannoli) in Michigan."
   ],
   "locality_evidence": [
    "# Google Van Buren Township Data Center Campus (Project Cannoli)",
    "[ Michigan ](/data/states/michigan) \u2014 Van Buren Township, Wayne County"
   ],
   "state_evidence": [
    "# Google Van Buren Township Data Center Campus (Project Cannoli)",
    "[ Michigan ](/data/states/michigan) \u2014 Van Buren Township, Wayne County"
   ],
   "capacity_gw_evidence": [
    "1.0 GW",
    "# Google Van Buren Township Data Center Campus (Project Cannoli)",
    "Power Capacity"
   ],
   "builder_evidence": [
    "# Google Van Buren Township Data Center Campus (Project Cannoli)",
    "Google was publicly identified in March 2026 as the Fortune 50 end user behind Project Cannoli."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Planned",
    "# Google Van Buren Township Data Center Campus (Project Cannoli)"
   ],
   "announcement_date_evidence": [
    "# Google Van Buren Township Data Center Campus (Project Cannoli)",
    "Announced\n\n2026-03-18"
   ]
  },
  {
   "url": "https://mining.einnews.com/article/915189548?lcf=-9uuuS1RcYoZrhlmc6j2lA%3D%3D",
   "title": "TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
   "published_at": "2026-05-26T14:09:01",
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": null,
   "project_evidence": [
    "# TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
    "News",
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore.",
    "The Muskie Data Campus in eastern Kentucky is expected to support more than 1 GW of data center capacity on a roughly 285-acre parcel inside a 1,000-acre industrial park.",
    "TeraWulf disclosed Tuesday that it has acquired the Muskie Data Campus from Industrial Equity Partners, adding a hyperscale AI and HPC site in eastern Kentucky that the company says can support more than 1 GW of future data center capacity."
   ],
   "locality_evidence": [
    "# TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
    "News",
    "The Muskie Data Campus in eastern Kentucky is expected to support more than 1 GW of data center capacity on a roughly 285-acre parcel inside a 1,000-acre industrial park.",
    "TeraWulf disclosed Tuesday that it has acquired the Muskie Data Campus from Industrial Equity Partners, adding a hyperscale AI and HPC site in eastern Kentucky that the company says can support more than 1 GW of future data center capacity."
   ],
   "state_evidence": [
    "# TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
    "News",
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore.",
    "The Muskie Data Campus in eastern Kentucky is expected to support more than 1 GW of data center capacity on a roughly 285-acre parcel inside a 1,000-acre industrial park.",
    "TeraWulf disclosed Tuesday that it has acquired the Muskie Data Campus from Industrial Equity Partners, adding a hyperscale AI and HPC site in eastern Kentucky that the company says can support more than 1 GW of future data center capacity."
   ],
   "capacity_gw_evidence": [
    "# TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
    "News",
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore.",
    "The Muskie Data Campus in eastern Kentucky is expected to support more than 1 GW of data center capacity on a roughly 285-acre parcel inside a 1,000-acre industrial park.",
    "TeraWulf disclosed Tuesday that it has acquired the Muskie Data Campus from Industrial Equity Partners, adding a hyperscale AI and HPC site in eastern Kentucky that the company says can support more than 1 GW of future data center capacity."
   ],
   "builder_evidence": [
    "# TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
    "News",
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
    "News",
    "TeraWulf disclosed Tuesday that it has acquired the Muskie Data Campus from Industrial Equity Partners, adding a hyperscale AI and HPC site in eastern Kentucky that the company says can support more than 1 GW of future data center capacity."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mining.einnews.com/article/915189548?lcf=-9uuuS1RcYoZrhlmc6j2lA%3D%3D",
   "title": "TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
   "published_at": "2026-05-26T14:09:01",
   "project": "Pecos",
   "locality": "Pecos",
   "state": "Texas",
   "capacity_gw": 1.5,
   "builder": "Core",
   "ai_customer": null,
   "status": "plans",
   "announcement_date": null,
   "project_evidence": [
    "# TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
    "News",
    "In another crypto.news [piece](https://crypto.news/core-scientific-shifts-bitcoin-mining-site-toward-1-5gw-ai-data-center-plan/), Core outlined plans to convert its Pecos, Texas mining site into a 1.5 GW AI campus, repurposing about 300 MW previously used for Bitcoin mining."
   ],
   "locality_evidence": [
    "# TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
    "News",
    "In another crypto.news [piece](https://crypto.news/core-scientific-shifts-bitcoin-mining-site-toward-1-5gw-ai-data-center-plan/), Core outlined plans to convert its Pecos, Texas mining site into a 1.5 GW AI campus, repurposing about 300 MW previously used for Bitcoin mining."
   ],
   "state_evidence": [
    "# TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
    "News",
    "In another crypto.news [piece](https://crypto.news/core-scientific-shifts-bitcoin-mining-site-toward-1-5gw-ai-data-center-plan/), Core outlined plans to convert its Pecos, Texas mining site into a 1.5 GW AI campus, repurposing about 300 MW previously used for Bitcoin mining."
   ],
   "capacity_gw_evidence": [
    "# TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
    "News",
    "In another crypto.news [piece](https://crypto.news/core-scientific-shifts-bitcoin-mining-site-toward-1-5gw-ai-data-center-plan/), Core outlined plans to convert its Pecos, Texas mining site into a 1.5 GW AI campus, repurposing about 300 MW previously used for Bitcoin mining."
   ],
   "builder_evidence": [
    "# TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
    "News",
    "In another crypto.news [piece](https://crypto.news/core-scientific-shifts-bitcoin-mining-site-toward-1-5gw-ai-data-center-plan/), Core outlined plans to convert its Pecos, Texas mining site into a 1.5 GW AI campus, repurposing about 300 MW previously used for Bitcoin mining."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
    "News",
    "In another crypto.news [piece](https://crypto.news/core-scientific-shifts-bitcoin-mining-site-toward-1-5gw-ai-data-center-plan/), Core outlined plans to convert its Pecos, Texas mining site into a 1.5 GW AI campus, repurposing about 300 MW previously used for Bitcoin mining."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tracker.bepresearch.com/projects/iren-sweetwater",
   "title": "BEP AI Infrastructure Tracker",
   "published_at": null,
   "project": "IREN Sweetwater",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": "2025-03",
   "project_evidence": [
    "# IREN Sweetwater",
    "IREN Sweetwater \u00b7 BEP AI Infrastructure Tracker"
   ],
   "locality_evidence": [
    "LocationSweetwater, Texas (Nolan/Fisher County), United States",
    "IREN Sweetwater \u00b7 BEP AI Infrastructure Tracker"
   ],
   "state_evidence": [
    "LocationSweetwater, Texas (Nolan/Fisher County), United States",
    "IREN Sweetwater \u00b7 BEP AI Infrastructure Tracker"
   ],
   "capacity_gw_evidence": [
    "Under construction. 2 GW announced (critical it load); owned or developed by IREN.",
    "IREN Sweetwater \u00b7 BEP AI Infrastructure Tracker"
   ],
   "builder_evidence": [
    "Under construction. 2 GW announced (critical it load); owned or developed by IREN.",
    "IREN Sweetwater \u00b7 BEP AI Infrastructure Tracker"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Under constructionHyperscale campusLast verified 17 days agoNot scored",
    "IREN Sweetwater \u00b7 BEP AI Infrastructure Tracker"
   ],
   "announcement_date_evidence": [
    "1. AnnouncedMar 2025",
    "IREN Sweetwater \u00b7 BEP AI Infrastructure Tracker"
   ]
  },
  {
   "url": "https://worldreportmonitor.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "About Creekstone Energy",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "About Creekstone Energy",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://thetechcapital.com/ecl-unveils-1gw-ai-focused-data-centre-hub-in-texas",
   "title": "ECL unveils 1GW AI-focused data centre hub in Texas",
   "published_at": "2024-09-29T17:46:58",
   "project": "TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "ECL unveils 1GW AI-focused data centre hub in Texas",
    "TerraSite-TX1 is designed to support AI and cloud computing operations and at full build it will yield a cost of around US$8 billion.",
    "ECL, a company specializing in off-grid and sustainable data centres, has announced plans to construct a fully sustainable 1GW data centre facility, dubbed TerraSite-TX1, on a 600-acre site near Houston, Texas."
   ],
   "locality_evidence": [
    "ECL unveils 1GW AI-focused data centre hub in Texas",
    "ECL, a company specializing in off-grid and sustainable data centres, has announced plans to construct a fully sustainable 1GW data centre facility, dubbed TerraSite-TX1, on a 600-acre site near Houston, Texas."
   ],
   "state_evidence": [
    "ECL unveils 1GW AI-focused data centre hub in Texas",
    "ECL, a company specializing in off-grid and sustainable data centres, has announced plans to construct a fully sustainable 1GW data centre facility, dubbed TerraSite-TX1, on a 600-acre site near Houston, Texas."
   ],
   "capacity_gw_evidence": [
    "ECL unveils 1GW AI-focused data centre hub in Texas",
    "ECL, a company specializing in off-grid and sustainable data centres, has announced plans to construct a fully sustainable 1GW data centre facility, dubbed TerraSite-TX1, on a 600-acre site near Houston, Texas."
   ],
   "builder_evidence": [
    "ECL unveils 1GW AI-focused data centre hub in Texas",
    "ECL, a company specializing in off-grid and sustainable data centres, has announced plans to construct a fully sustainable 1GW data centre facility, dubbed TerraSite-TX1, on a 600-acre site near Houston, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "ECL unveils 1GW AI-focused data centre hub in Texas",
    "ECL, a company specializing in off-grid and sustainable data centres, has announced plans to construct a fully sustainable 1GW data centre facility, dubbed TerraSite-TX1, on a 600-acre site near Houston, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://newsobserver.com/news/business/article316739447.html",
   "title": "Morgan Stanley leads $15B bet on Anthropic's Texas campus",
   "published_at": "2026-08-02T00:07:00",
   "project": null,
   "locality": "Hubbard",
   "state": "Texas",
   "capacity_gw": 1.6,
   "builder": "Nexus Data Centers",
   "ai_customer": "Anthropic",
   "status": "closing in on $15 billion in financing",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "state_evidence": [
    "Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "capacity_gw_evidence": [
    "Morgan Stanley leads $15B bet on Anthropic's Texas campus",
    "The guarantees cover [four Anthropic data center leases](https://www.reuters.com/legal/litigation/banks-talks-lend-15-billion-anthropic-data-center-backed-by-google-wsj-reports-2026-07-30/) and the power purchase agreements tied to an on-site natural gas plant with 1.6 gigawatts of capacity."
   ],
   "builder_evidence": [
    "Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "ai_customer_evidence": [
    "Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "status_evidence": [
    "Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://easternherald.com/2026/08/17/nvidia-sb-energy-openai-ohio-ai-data-center-investment",
   "title": "Nvidia Invests $1.5 Billion in SB Energy for OpenAI Ohio Data Center, Rejects Circular Financing Label",
   "published_at": "2026-08-17T15:20:58",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "PORTSMOUTH, Ohio \u2014 Jensen Huang had a simple answer for everyone who wondered whether Nvidia was lending money to its biggest customer and calling it an investment.",
    "Nvidia confirmed Monday that it will invest $1.5 billion in SB Energy, a clean-energy developer majority-owned by SoftBank, under a deal that gives OpenAI exclusive rights to the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "locality_evidence": [
    "PORTSMOUTH, Ohio \u2014 Jensen Huang had a simple answer for everyone who wondered whether Nvidia was lending money to its biggest customer and calling it an investment.",
    "Nvidia confirmed Monday that it will invest $1.5 billion in SB Energy, a clean-energy developer majority-owned by SoftBank, under a deal that gives OpenAI exclusive rights to the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "state_evidence": [
    "PORTSMOUTH, Ohio \u2014 Jensen Huang had a simple answer for everyone who wondered whether Nvidia was lending money to its biggest customer and calling it an investment.",
    "Nvidia confirmed Monday that it will invest $1.5 billion in SB Energy, a clean-energy developer majority-owned by SoftBank, under a deal that gives OpenAI exclusive rights to the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "capacity_gw_evidence": [
    "PORTSMOUTH, Ohio \u2014 Jensen Huang had a simple answer for everyone who wondered whether Nvidia was lending money to its biggest customer and calling it an investment.",
    "The initial footprint covers 4.25 gigawatts of computing infrastructure \u2014 enough to house roughly 1.5 million Nvidia GPUs at full deployment \u2014 with an option to expand to 8 gigawatts."
   ],
   "builder_evidence": [
    "PORTSMOUTH, Ohio \u2014 Jensen Huang had a simple answer for everyone who wondered whether Nvidia was lending money to its biggest customer and calling it an investment.",
    "Nvidia confirmed Monday that it will invest $1.5 billion in SB Energy, a clean-energy developer majority-owned by SoftBank, under a deal that gives OpenAI exclusive rights to the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "ai_customer_evidence": [
    "PORTSMOUTH, Ohio \u2014 Jensen Huang had a simple answer for everyone who wondered whether Nvidia was lending money to its biggest customer and calling it an investment.",
    "Nvidia confirmed Monday that it will invest $1.5 billion in SB Energy, a clean-energy developer majority-owned by SoftBank, under a deal that gives OpenAI exclusive rights to the PORTS-Pike Technology Campus in Pike County, Ohio."
   ],
   "status_evidence": [
    "PORTSMOUTH, Ohio \u2014 Jensen Huang had a simple answer for everyone who wondered whether Nvidia was lending money to its biggest customer and calling it an investment.",
    "SB Energy, backed by SoftBank chairman Masayoshi Son, will build, own, and operate the site under a 20-year OpenAI lease."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://intuitionlabs.ai/articles/oracle-openai-300b-deal-analysis",
   "title": "Oracle-OpenAI $300B Deal Explained: 2026 Update",
   "published_at": "2025-11-30T09:18:53",
   "project": "Stargate data center campus",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe",
   "ai_customer": "OpenAI",
   "status": "live and operational",
   "announcement_date": null,
   "project_evidence": [
    "Oracle-OpenAI $300B Deal Explained: 2026 Update",
    "## Executive Summary",
    "The flagship Stargate data center in Abilene, Texas is now live and operational, with Oracle Cloud Infrastructure powering its 1.2 GW campus"
   ],
   "locality_evidence": [
    "Oracle-OpenAI $300B Deal Explained: 2026 Update",
    "## Executive Summary",
    "The flagship Stargate data center in Abilene, Texas is now live and operational, with Oracle Cloud Infrastructure powering its 1.2 GW campus"
   ],
   "state_evidence": [
    "Oracle-OpenAI $300B Deal Explained: 2026 Update",
    "## Executive Summary",
    "The flagship Stargate data center in Abilene, Texas is now live and operational, with Oracle Cloud Infrastructure powering its 1.2 GW campus"
   ],
   "capacity_gw_evidence": [
    "Oracle-OpenAI $300B Deal Explained: 2026 Update",
    "## Executive Summary",
    "The flagship Stargate data center in Abilene, Texas is now live and operational, with Oracle Cloud Infrastructure powering its 1.2 GW campus"
   ],
   "builder_evidence": [
    "Oracle-OpenAI $300B Deal Explained: 2026 Update",
    "## Progress and Implementation (to Dec 2025)",
    "**Abilene, Texas** \u2013 *Primary U.S. Site (Now Live)*: The first large Stargate facility is fully operational in Abilene, TX, running on Oracle Cloud Infrastructure. Crusoe announced the flagship campus as live in early 2026"
   ],
   "ai_customer_evidence": [
    "Oracle-OpenAI $300B Deal Explained: 2026 Update",
    "## Executive Summary",
    "The flagship Stargate data center in Abilene, Texas is now live and operational, with Oracle Cloud Infrastructure powering its 1.2 GW campus"
   ],
   "status_evidence": [
    "Oracle-OpenAI $300B Deal Explained: 2026 Update",
    "## Executive Summary",
    "The flagship Stargate data center in Abilene, Texas is now live and operational, with Oracle Cloud Infrastructure powering its 1.2 GW campus"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://intuitionlabs.ai/articles/oracle-openai-300b-deal-analysis",
   "title": "Oracle-OpenAI $300B Deal Explained: 2026 Update",
   "published_at": "2025-11-30T09:18:53",
   "project": "Milam County, Texas campus",
   "locality": "Milam County",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "SB Energy",
   "ai_customer": null,
   "status": "expected to enter service in 2026",
   "announcement_date": null,
   "project_evidence": [
    "Oracle-OpenAI $300B Deal Explained: 2026 Update",
    "## Progress and Implementation (to Dec 2025)",
    "The Milam County, Texas campus is being developed by SB Energy (a SoftBank Group company), providing a 1.2 GW powered infrastructure site with initial facilities expected to enter service in 2026."
   ],
   "locality_evidence": [
    "Oracle-OpenAI $300B Deal Explained: 2026 Update",
    "## Progress and Implementation (to Dec 2025)",
    "The Milam County, Texas campus is being developed by SB Energy (a SoftBank Group company), providing a 1.2 GW powered infrastructure site with initial facilities expected to enter service in 2026."
   ],
   "state_evidence": [
    "Oracle-OpenAI $300B Deal Explained: 2026 Update",
    "## Progress and Implementation (to Dec 2025)",
    "The Milam County, Texas campus is being developed by SB Energy (a SoftBank Group company), providing a 1.2 GW powered infrastructure site with initial facilities expected to enter service in 2026."
   ],
   "capacity_gw_evidence": [
    "Oracle-OpenAI $300B Deal Explained: 2026 Update",
    "## Progress and Implementation (to Dec 2025)",
    "The Milam County, Texas campus is being developed by SB Energy (a SoftBank Group company), providing a 1.2 GW powered infrastructure site with initial facilities expected to enter service in 2026."
   ],
   "builder_evidence": [
    "Oracle-OpenAI $300B Deal Explained: 2026 Update",
    "## Progress and Implementation (to Dec 2025)",
    "The Milam County, Texas campus is being developed by SB Energy (a SoftBank Group company), providing a 1.2 GW powered infrastructure site with initial facilities expected to enter service in 2026."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Oracle-OpenAI $300B Deal Explained: 2026 Update",
    "## Progress and Implementation (to Dec 2025)",
    "The Milam County, Texas campus is being developed by SB Energy (a SoftBank Group company), providing a 1.2 GW powered infrastructure site with initial facilities expected to enter service in 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aterio.io/blog/where-are-openai-s-five-new-hyperscale-campuses-being-built",
   "title": "Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
   "published_at": "2025-09-24T18:20:00",
   "project": "Vantage Shackelford Campus",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": "OpenAI",
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "## **Scope and Scale: What Each Campus Is Really Building**",
    "- **Vantage Shackelford Campus (Shackelford County, TX) - *Under Construction***"
   ],
   "locality_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "## **Scope and Scale: What Each Campus Is Really Building**",
    "- **Vantage Shackelford Campus (Shackelford County, TX) - *Under Construction***"
   ],
   "state_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "## **Scope and Scale: What Each Campus Is Really Building**",
    "- **Vantage Shackelford Campus (Shackelford County, TX) - *Under Construction***"
   ],
   "capacity_gw_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "## **Scope and Scale: What Each Campus Is Really Building**",
    "- **Vantage Shackelford Campus (Shackelford County, TX) - *Under Construction***",
    "  - Estimated 1,400 MW of power capacity"
   ],
   "builder_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "## **Scope and Scale: What Each Campus Is Really Building**",
    "- **Vantage Shackelford Campus (Shackelford County, TX) - *Under Construction***"
   ],
   "ai_customer_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "## **Scope and Scale: What Each Campus Is Really Building**",
    "- **Vantage Shackelford Campus (Shackelford County, TX) - *Under Construction***"
   ],
   "status_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "## **Scope and Scale: What Each Campus Is Really Building**",
    "- **Vantage Shackelford Campus (Shackelford County, TX) - *Under Construction***"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aterio.io/blog/where-are-openai-s-five-new-hyperscale-campuses-being-built",
   "title": "Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
   "published_at": "2025-09-24T18:20:00",
   "project": "Vantage Port Washington Campus",
   "locality": "Port Washington",
   "state": "Wisconsin",
   "capacity_gw": 1.3,
   "builder": "Vantage Data Centers",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "## **Scope and Scale: What Each Campus Is Really Building**",
    "- **Vantage Port Washington Campus**"
   ],
   "locality_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "### **Vantage Port Washington Campus (Midwest U.S.)**",
    "One of the five Stargate campuses is located in **Port Washington, Wisconsin** where **Vantage Data Centers** acquired the site from **Cloverleaf** in 2025."
   ],
   "state_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "### **Vantage Port Washington Campus (Midwest U.S.)**",
    "One of the five Stargate campuses is located in **Port Washington, Wisconsin** where **Vantage Data Centers** acquired the site from **Cloverleaf** in 2025."
   ],
   "capacity_gw_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "## **Scope and Scale: What Each Campus Is Really Building**",
    "- **Vantage Port Washington Campus**",
    "  - Estimated 1,300 MW of power capacity"
   ],
   "builder_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "### **Vantage Port Washington Campus (Midwest U.S.)**",
    "One of the five Stargate campuses is located in **Port Washington, Wisconsin** where **Vantage Data Centers** acquired the site from **Cloverleaf** in 2025."
   ],
   "ai_customer_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "## **Scope and Scale: What Each Campus Is Really Building**",
    "- **Vantage Port Washington Campus**"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://aterio.io/blog/where-are-openai-s-five-new-hyperscale-campuses-being-built",
   "title": "Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
   "published_at": "2025-09-24T18:20:00",
   "project": "Project Jupiter",
   "locality": "Dona Ana County",
   "state": "New Mexico",
   "capacity_gw": 1.0,
   "builder": "STACK Infrastructure",
   "ai_customer": "OpenAI",
   "status": "Announced",
   "announcement_date": "2025-08-25",
   "project_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "## **Scope and Scale: What Each Campus Is Really Building**",
    "- **Project Jupiter (Dona Ana County, NM)**"
   ],
   "locality_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "## **Scope and Scale: What Each Campus Is Really Building**",
    "- **Project Jupiter (Dona Ana County, NM)**"
   ],
   "state_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "## **Scope and Scale: What Each Campus Is Really Building**",
    "- **Project Jupiter (Dona Ana County, NM)**"
   ],
   "capacity_gw_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "## **Scope and Scale: What Each Campus Is Really Building**",
    "- **Project Jupiter (Dona Ana County, NM)**",
    "  - MW not yet disclosed, but projected >1 GW"
   ],
   "builder_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "### **Project Jupiter (New Mexico)**",
    "BorderPlex Digital Assets and STACK Infrastructure officially announced **Project Jupiter** on **August 25**, describing it as a \u201cnext-generation AI campus\u201d designed with responsible power and water usage principles."
   ],
   "ai_customer_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "### **Project Jupiter (New Mexico)**",
    "Though OpenAI was not named, the $25B scale, Oracle\u2019s involvement, and regional siting match Stargate project criteria."
   ],
   "status_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "### **Project Jupiter (New Mexico)**",
    "BorderPlex Digital Assets and STACK Infrastructure officially announced **Project Jupiter** on **August 25**, describing it as a \u201cnext-generation AI campus\u201d designed with responsible power and water usage principles."
   ],
   "announcement_date_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "### **Project Jupiter (New Mexico)**",
    "BorderPlex Digital Assets and STACK Infrastructure officially announced **Project Jupiter** on **August 25**, describing it as a \u201cnext-generation AI campus\u201d designed with responsible power and water usage principles."
   ]
  },
  {
   "url": "https://aterio.io/blog/where-are-openai-s-five-new-hyperscale-campuses-being-built",
   "title": "Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
   "published_at": "2025-09-24T18:20:00",
   "project": "Goodnight Campus",
   "locality": "Claude",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe",
   "ai_customer": null,
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "## **What Wasn\u2019t Mentioned?**",
    "While OpenAI\u2019s five Stargate campuses dominate the spotlight, it\u2019s notable that **Crusoe\u2019s $29B Goodnight Campus in Claude, Texas,** a project already under construction and widely viewed as **architecturally and strategically aligned with Stargate,** was not included in the announcement."
   ],
   "locality_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "## **What Wasn\u2019t Mentioned?**",
    "While OpenAI\u2019s five Stargate campuses dominate the spotlight, it\u2019s notable that **Crusoe\u2019s $29B Goodnight Campus in Claude, Texas,** a project already under construction and widely viewed as **architecturally and strategically aligned with Stargate,** was not included in the announcement."
   ],
   "state_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "## **What Wasn\u2019t Mentioned?**",
    "While OpenAI\u2019s five Stargate campuses dominate the spotlight, it\u2019s notable that **Crusoe\u2019s $29B Goodnight Campus in Claude, Texas,** a project already under construction and widely viewed as **architecturally and strategically aligned with Stargate,** was not included in the announcement."
   ],
   "capacity_gw_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "## **What Wasn\u2019t Mentioned?**",
    "As we reported earlier, the [Goodnight Campus](https://www.aterio.io/blog/crusoe-launches-usd29b-goodnight-campus-in-claude-mirroring-openai-s-stargate) is a **seven-building**, **1 GW** hyperscale deployment backed by Crusoe with sitework already confirmed via satellite as of September."
   ],
   "builder_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "## **What Wasn\u2019t Mentioned?**",
    "While OpenAI\u2019s five Stargate campuses dominate the spotlight, it\u2019s notable that **Crusoe\u2019s $29B Goodnight Campus in Claude, Texas,** a project already under construction and widely viewed as **architecturally and strategically aligned with Stargate,** was not included in the announcement."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Where Are OpenAI\u2019s Five New Hyperscale Campuses Being Built?",
    "## **What Wasn\u2019t Mentioned?**",
    "While OpenAI\u2019s five Stargate campuses dominate the spotlight, it\u2019s notable that **Crusoe\u2019s $29B Goodnight Campus in Claude, Texas,** a project already under construction and widely viewed as **architecturally and strategically aligned with Stargate,** was not included in the announcement."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://siliconreport.com/biggest-ai-data-centers-us-ranked-power-8becb4fb",
   "title": "The biggest AI data centers in the US, ranked by power capacity",
   "published_at": "2026-07-03T07:52:38",
   "project": "AWS Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "AWS",
   "ai_customer": "Anthropic",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "locality_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "state_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "capacity_gw_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "builder_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "Blackstone's QTS platform leads the field at 3 gigawatts of commissioned capacity, trailed by a cluster of 2-to-2.2GW campuses from AWS, OpenAI's Stargate venture, Microsoft, xAI, and Meta \u2014 nearly all running on-site gas turbines to skip multi-year grid interconnection queues."
   ],
   "ai_customer_evidence": [
    "AWS Project Rainier: the one built for a single customer",
    "Amazon spent roughly $11 billion building the 1,200-acre New Carlisle campus specifically to train [Anthropic's](/company/anthropic) Claude models, running it on grid power rather than on-site generation."
   ],
   "status_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://siliconreport.com/biggest-ai-data-centers-us-ranked-power-8becb4fb",
   "title": "The biggest AI data centers in the US, ranked by power capacity",
   "published_at": "2026-07-03T07:52:38",
   "project": "Stargate Do\u00f1a Ana County / Project Jupiter",
   "locality": "Santa Teresa",
   "state": "New Mexico",
   "capacity_gw": 2.2,
   "builder": "STACK Infrastructure",
   "ai_customer": "OpenAI",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "locality_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "state_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "capacity_gw_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "builder_evidence": [
    "Stargate Jupiter and the OpenAI buildout",
    "STACK Infrastructure, developing the site with BorderPlex Digital Assets, and OpenAI's Stargate partners have committed to as much as $165 billion in investment there over 30 years, with an initial $50 billion tranche over five years, according to [reporting in the Albuquerque Journal](https://www.abqjournal.com/business/doa-ana-countys-project-jupiter-joins-500-billion-stargate-initiative-led-by-openai-oracle/493927)."
   ],
   "ai_customer_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "Blackstone's QTS platform leads the field at 3 gigawatts of commissioned capacity, trailed by a cluster of 2-to-2.2GW campuses from AWS, OpenAI's Stargate venture, Microsoft, xAI, and Meta \u2014 nearly all running on-site gas turbines to skip multi-year grid interconnection queues."
   ],
   "status_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://siliconreport.com/biggest-ai-data-centers-us-ranked-power-8becb4fb",
   "title": "The biggest AI data centers in the US, ranked by power capacity",
   "published_at": "2026-07-03T07:52:38",
   "project": "Microsoft Pecos, Texas campus",
   "locality": "Pecos",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Microsoft",
   "ai_customer": "",
   "status": "announced",
   "announcement_date": "2026-06-22",
   "project_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "locality_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "state_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "capacity_gw_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "builder_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "Blackstone's QTS platform leads the field at 3 gigawatts of commissioned capacity, trailed by a cluster of 2-to-2.2GW campuses from AWS, OpenAI's Stargate venture, Microsoft, xAI, and Meta \u2014 nearly all running on-site gas turbines to skip multi-year grid interconnection queues."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "announcement_date_evidence": [
    "Microsoft Pecos and the gas-first playbook",
    "Microsoft announced its Pecos, Texas campus in June 2026 as one of the largest single capacity additions in company history \u2014 roughly 2 gigawatts, delivered over five to seven years and supporting more than 6,000 construction jobs at peak build."
   ]
  },
  {
   "url": "https://siliconreport.com/biggest-ai-data-centers-us-ranked-power-8becb4fb",
   "title": "The biggest AI data centers in the US, ranked by power capacity",
   "published_at": "2026-07-03T07:52:38",
   "project": "xAI Colossus 2",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "xAI",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "locality_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "state_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "capacity_gw_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "builder_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "Blackstone's QTS platform leads the field at 3 gigawatts of commissioned capacity, trailed by a cluster of 2-to-2.2GW campuses from AWS, OpenAI's Stargate venture, Microsoft, xAI, and Meta \u2014 nearly all running on-site gas turbines to skip multi-year grid interconnection queues."
   ],
   "ai_customer_evidence": [
    "xAI Colossus 2 and Meta Hyperion: parallel gas-power fights",
    "xAI's Colossus 2, in Southaven, Mississippi, is SiliconReport's facility tracker's largest capacity target for [xAI](/company/xai) at 2,000MW, though [SemiAnalysis's on-the-ground reporting](https://newsletter.semianalysis.com/p/xais-colossus-2-first-gigawatt-datacenter) put live capacity closer to 1.1 gigawatts as of its most recent assessment, with an expansion path toward 1.5-plus gigawatts by mid-2027 \u2014 the gap between announced target and installed capacity is typical at this scale, and worth tracking as sites mature from under-construction to operational."
   ],
   "status_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://siliconreport.com/biggest-ai-data-centers-us-ranked-power-8becb4fb",
   "title": "The biggest AI data centers in the US, ranked by power capacity",
   "published_at": "2026-07-03T07:52:38",
   "project": "Meta Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 2.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "locality_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "state_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "capacity_gw_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "builder_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "Blackstone's QTS platform leads the field at 3 gigawatts of commissioned capacity, trailed by a cluster of 2-to-2.2GW campuses from AWS, OpenAI's Stargate venture, Microsoft, xAI, and Meta \u2014 nearly all running on-site gas turbines to skip multi-year grid interconnection queues."
   ],
   "ai_customer_evidence": [
    "xAI Colossus 2 and Meta Hyperion: parallel gas-power fights",
    "Meta's Hyperion campus in Richland Parish, Louisiana faces a similar dynamic: Entergy Louisiana won regulatory approval to build gas-fired generation for the 2,000MW site, and has since expanded those plans to ten gas plants combining for 5.2 gigawatts of new capacity \u2014 far more generation than Hyperion itself needs, positioning Entergy to serve additional [Meta](/company/meta) buildouts or other large loads in the region, according to [Data Center Dynamics](https://www.datacenterdynamics.com/en/news/entergy-obtains-approval-to-construct-three-gas-facilities-to-serve-metas-2gw-data-center-in-louisiana/)."
   ],
   "status_evidence": [
    "The biggest AI data centers in the US, ranked by power capacity",
    "## The top six by capacity",
    "Ranked by megawatts of capacity, the field: **QTS Company-Wide Platform** (Blackstone-owned, operational, 3,000MW, unclear geographic concentration since QTS operates as a national platform); **[AWS Project Rainier](/datacenters/facility/aws-project-rainier)** in New Carlisle, Indiana (operational, 2,200MW, grid-powered); **[Stargate Do\u00f1a Ana County / Project Jupiter](/datacenters/facility/stargate-dona-ana-jupiter)** in Santa Teresa, New Mexico (under construction, 2,200MW, grid plus gas); **[Microsoft's Pecos, Texas campus](/datacenters/facility/microsoft-pecos)** (announced, 2,000MW); **[xAI Colossus 2](/datacenters/facility/xai-colossus-2)** in Southaven, Mississippi (under construction, targeting 2,000MW); and **[Meta Hyperion](/datacenters/facility/meta-hyperion)** in Richland Parish, Louisiana (under construction, 2,000MW, gas-powered)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://firmsuggest.com/blog/elon-musks-xai-secures-third-massive-data-center-facility-to-power-2-gigawatt-colossus-supercomputer-expansion",
   "title": "Elon Musk\u2019s xAI Secures Third Massive Data Center Facility to Power 2-Gigawatt \u2018Colossus\u2019 Supercomputer Expansion",
   "published_at": "2025-12-31T10:23:44",
   "project": "MACROHARDRR",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "Under acquisition and development",
   "announcement_date": null,
   "project_evidence": [
    "Elon Musk\u2019s xAI has officially acquired a third industrial facility to expand its unprecedented computing infrastructure.",
    "The newly purchased warehouse, an 810,000-square-foot site located in Southaven, Mississippi, sits directly adjacent to the company\u2019s existing Colossus 2 facility.",
    "Musk, known for his unconventional branding, has reportedly dubbed the new facility \"MACROHARDRR,\" a characteristic nod to industry rival and OpenAI benefactor Microsoft."
   ],
   "locality_evidence": [
    "Elon Musk\u2019s xAI has officially acquired a third industrial facility to expand its unprecedented computing infrastructure.",
    "The newly purchased warehouse, an 810,000-square-foot site located in Southaven, Mississippi, sits directly adjacent to the company\u2019s existing Colossus 2 facility."
   ],
   "state_evidence": [
    "Elon Musk\u2019s xAI has officially acquired a third industrial facility to expand its unprecedented computing infrastructure.",
    "The newly purchased warehouse, an 810,000-square-foot site located in Southaven, Mississippi, sits directly adjacent to the company\u2019s existing Colossus 2 facility."
   ],
   "capacity_gw_evidence": [
    "Elon Musk\u2019s xAI has officially acquired a third industrial facility to expand its unprecedented computing infrastructure.",
    "This strategic expansion is designed to propel xAI\u2019s total power capacity toward a staggering two gigawatts, a threshold that would provide enough electricity to power more than 750,000 American homes simultaneously."
   ],
   "builder_evidence": [
    "Elon Musk\u2019s xAI has officially acquired a third industrial facility to expand its unprecedented computing infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Elon Musk\u2019s xAI has officially acquired a third industrial facility to expand its unprecedented computing infrastructure.",
    "As the transition of the new Southaven warehouse into a high-tier data center is slated to begin in 2026, the tech industry is watching closely."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://globenewswire.com/news-release/2026/07/15/3327869/0/en/Crusoe-and-Lancium-Announce-1-0-Gigawatt-AI-Data-Center-Campus-in-Childress-Texas.html",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
   "published_at": "2026-07-15T14:00:00",
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": "",
   "status": "announced",
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "locality_evidence": [
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "state_evidence": [
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "builder_evidence": [
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "announcement_date_evidence": [
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ]
  },
  {
   "url": "https://globenewswire.com/news-release/2026/07/15/3327869/0/en/Crusoe-and-Lancium-Announce-1-0-Gigawatt-AI-Data-Center-Campus-in-Childress-Texas.html",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
   "published_at": "2026-07-15T14:00:00",
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe and Lancium",
   "ai_customer": "",
   "status": "expanding",
   "announcement_date": null,
   "project_evidence": [
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "locality_evidence": [
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "state_evidence": [
    "The Childress development is the latest chapter in Crusoe's deep commitment to Texas."
   ],
   "capacity_gw_evidence": [
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "builder_evidence": [
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://finance.yahoo.com/news/vantage-data-centers-unveils-plans-110000447.html",
   "title": "Vantage Data Centers Unveils Plans for \"Frontier,\" a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
   "published_at": "2025-08-19T11:00:00",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "Vantage Data Centers Unveils Plans for \"Frontier,\" a $25B Mega-campus in Texas to Meet Unprecedented AI Demand Campus boasts 1.4 gigawatts of capacity in the Lone Star state, a strategic, global AI hub",
    "The state-of-the-art campus, \"Frontier,\" will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "locality_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "Vantage Data Centers Unveils Plans for \"Frontier,\" a $25B Mega-campus in Texas to Meet Unprecedented AI Demand Campus boasts 1.4 gigawatts of capacity in the Lone Star state, a strategic, global AI hub",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "Vantage Data Centers Unveils Plans for \"Frontier,\" a $25B Mega-campus in Texas to Meet Unprecedented AI Demand Campus boasts 1.4 gigawatts of capacity in the Lone Star state, a strategic, global AI hub",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "Vantage Data Centers Unveils Plans for \"Frontier,\" a $25B Mega-campus in Texas to Meet Unprecedented AI Demand Campus boasts 1.4 gigawatts of capacity in the Lone Star state, a strategic, global AI hub",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": [
    "DENVER, August 19, 2025--(BUSINESS WIRE)--Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ]
  },
  {
   "url": "https://substack.com/redirect/29a6e4e3-a6be-4284-b289-7c2e4a337265?j=eyJ1IjoiM3djM2MxIn0.OGuf1Irm-qb700DahBb35RT9QTn8SiZLleBWozyCeUk",
   "title": "Fermi America inks reactor supply and design deals for up to 11GW data center campus in Amarillo, Texas",
   "published_at": "2026-05-21T21:27:53",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Fermi America has signed two more nuclear energy agreements to support the development of its planned giant data center campus in Amarillo, Texas.",
    "Fermi\u2019s Project Matador is one of the more ambitious data center projects to be announced to date."
   ],
   "locality_evidence": [
    "Fermi America has signed two more nuclear energy agreements to support the development of its planned giant data center campus in Amarillo, Texas.",
    "Fermi\u2019s Project Matador is one of the more ambitious data center projects to be announced to date."
   ],
   "state_evidence": [
    "Fermi America has signed two more nuclear energy agreements to support the development of its planned giant data center campus in Amarillo, Texas.",
    "Fermi\u2019s Project Matador is one of the more ambitious data center projects to be announced to date."
   ],
   "capacity_gw_evidence": [
    "Fermi America has signed two more nuclear energy agreements to support the development of its planned giant data center campus in Amarillo, Texas.",
    "Fermi\u2019s Project Matador is one of the more ambitious data center projects to be announced to date.",
    "If realized, the project will span 18 million sq ft (1.67 million sqm) and have a capacity of up to 11GW."
   ],
   "builder_evidence": [
    "Fermi America has signed two more nuclear energy agreements to support the development of its planned giant data center campus in Amarillo, Texas.",
    "Fermi\u2019s Project Matador is one of the more ambitious data center projects to be announced to date."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Fermi America has signed two more nuclear energy agreements to support the development of its planned giant data center campus in Amarillo, Texas.",
    "Fermi\u2019s Project Matador is one of the more ambitious data center projects to be announced to date."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://allusanewshub.com/2026/03/17/nscale-signs-1-35gw-microsoft-loi-for-a-west-virginia-ai-campus-built-around-nvidias-vera-rubin-gpus",
   "title": "Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus built around NVIDIA\u2019s Vera Rubin GPUs",
   "published_at": "2026-03-17T00:00:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 1.35,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "announced",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "### Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus built around NVIDIA\u2019s Vera Rubin GPUs",
    "The deployment will sit on a site Nscale has simultaneously acquired, the Monarch Compute Campus, a 2,250-acre plot in Mason County that Nscale describes as the first state-certified AI microgrid in the United States, with an on-site power potential scalable to over eight gigawatts."
   ],
   "locality_evidence": [
    "### Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus built around NVIDIA\u2019s Vera Rubin GPUs",
    "The deployment will sit on a site Nscale has simultaneously acquired, the Monarch Compute Campus, a 2,250-acre plot in Mason County that Nscale describes as the first state-certified AI microgrid in the United States, with an on-site power potential scalable to over eight gigawatts."
   ],
   "state_evidence": [
    "### Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus built around NVIDIA\u2019s Vera Rubin GPUs",
    "Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity at a new campus in Mason County, West Virginia, deploying NVIDIA\u2019s next-generation Vera Rubin NVL72 GPUs at what it describes as the first large-scale commercial rollout of the Vera Rubin DSX AI Factory reference architecture."
   ],
   "capacity_gw_evidence": [
    "### Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus built around NVIDIA\u2019s Vera Rubin GPUs",
    "Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity at a new campus in Mason County, West Virginia, deploying NVIDIA\u2019s next-generation Vera Rubin NVL72 GPUs at what it describes as the first large-scale commercial rollout of the Vera Rubin DSX AI Factory reference architecture."
   ],
   "builder_evidence": [
    "### Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus built around NVIDIA\u2019s Vera Rubin GPUs",
    "Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity at a new campus in Mason County, West Virginia, deploying NVIDIA\u2019s next-generation Vera Rubin NVL72 GPUs at what it describes as the first large-scale commercial rollout of the Vera Rubin DSX AI Factory reference architecture."
   ],
   "ai_customer_evidence": [
    "### Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus built around NVIDIA\u2019s Vera Rubin GPUs",
    "Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity at a new campus in Mason County, West Virginia, deploying NVIDIA\u2019s next-generation Vera Rubin NVL72 GPUs at what it describes as the first large-scale commercial rollout of the Vera Rubin DSX AI Factory reference architecture."
   ],
   "status_evidence": [
    "### Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus built around NVIDIA\u2019s Vera Rubin GPUs",
    "The deal, announced at [NVIDIA\u2019s GTC 2026 conference](https://thenextweb.com/news/nvidia-gtc-2026-opens-today) on 16 March, covers approximately 430,000 Vera Rubin GPUs and is structured as a long-term framework combining a multi-year compute services agreement with a long-term data centre lease."
   ],
   "announcement_date_evidence": [
    "### Nscale signs 1.35GW Microsoft LOI for a West Virginia AI campus built around NVIDIA\u2019s Vera Rubin GPUs",
    "The deal, announced at [NVIDIA\u2019s GTC 2026 conference](https://thenextweb.com/news/nvidia-gtc-2026-opens-today) on 16 March, covers approximately 430,000 Vera Rubin GPUs and is structured as a long-term framework combining a multi-year compute services agreement with a long-term data centre lease."
   ]
  },
  {
   "url": "https://servnetuk.com/news/ai-datacenter-west-texas-capacity-power-shortage-2026",
   "title": "West Texas AI Datacenter Boom: UK Capacity Risk 2026",
   "published_at": "2026-07-25T16:16:27",
   "project": "Cardinal Data Power",
   "locality": "West Texas",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Cardinal Data Power",
   "ai_customer": null,
   "status": "developing",
   "announcement_date": null,
   "project_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "Bitcoin treasury firm Empery Digital has put $20 million into Cardinal Data Power, backing a West Texas campus with a 750MW first phase and plans to scale beyond 5GW.",
    "| | Cardinal Data Power | Pacifico GW Ranch | OpenAI Stargate | Meta Hyperion |",
    "CDP, headquartered in Dallas and founded by the Lyda Hunt Allred and Barbara Crow Hunt families through their Cavallo Holdings and Stratford Bridge Holdings offices, is developing a behind-the-meter campus in West Texas."
   ],
   "locality_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "Bitcoin treasury firm Empery Digital has put $20 million into Cardinal Data Power, backing a West Texas campus with a 750MW first phase and plans to scale beyond 5GW.",
    "CDP, headquartered in Dallas and founded by the Lyda Hunt Allred and Barbara Crow Hunt families through their Cavallo Holdings and Stratford Bridge Holdings offices, is developing a behind-the-meter campus in West Texas."
   ],
   "state_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "Bitcoin treasury firm Empery Digital has put $20 million into Cardinal Data Power, backing a West Texas campus with a 750MW first phase and plans to scale beyond 5GW.",
    "CDP, headquartered in Dallas and founded by the Lyda Hunt Allred and Barbara Crow Hunt families through their Cavallo Holdings and Stratford Bridge Holdings offices, is developing a behind-the-meter campus in West Texas."
   ],
   "capacity_gw_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "Bitcoin treasury firm Empery Digital has put $20 million into Cardinal Data Power, backing a West Texas campus with a 750MW first phase and plans to scale beyond 5GW.",
    "| | Cardinal Data Power | Pacifico GW Ranch | OpenAI Stargate | Meta Hyperion |",
    "| Planned capacity | GW5 | GW5 | GW7 | GW5 |",
    "First power is expected in 2027, gross capacity could hit roughly 1GW by 2029, and the site is designed to expand beyond 5GW over time."
   ],
   "builder_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "Bitcoin treasury firm Empery Digital has put $20 million into Cardinal Data Power, backing a West Texas campus with a 750MW first phase and plans to scale beyond 5GW.",
    "| | Cardinal Data Power | Pacifico GW Ranch | OpenAI Stargate | Meta Hyperion |",
    "CDP, headquartered in Dallas and founded by the Lyda Hunt Allred and Barbara Crow Hunt families through their Cavallo Holdings and Stratford Bridge Holdings offices, is developing a behind-the-meter campus in West Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "CDP, headquartered in Dallas and founded by the Lyda Hunt Allred and Barbara Crow Hunt families through their Cavallo Holdings and Stratford Bridge Holdings offices, is developing a behind-the-meter campus in West Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://servnetuk.com/news/ai-datacenter-west-texas-capacity-power-shortage-2026",
   "title": "West Texas AI Datacenter Boom: UK Capacity Risk 2026",
   "published_at": "2026-07-25T16:16:27",
   "project": "GW Ranch",
   "locality": "West Texas",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Pacifico Energy",
   "ai_customer": null,
   "status": "securing permit",
   "announcement_date": null,
   "project_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "| | Cardinal Data Power | Pacifico GW Ranch | OpenAI Stargate | Meta Hyperion |",
    "| Planned capacity | GW5 | GW5 | GW7 | GW5 |",
    "Pacifico Energy has secured a 7.65GW air permit for its 5GW GW Ranch project, Chevron is building its first gas-fired plant specifically to power data centers there, and Circe Energy has ordered 2GW of natural gas generation capacity from Cummins for a 1,950-acre Permian site."
   ],
   "locality_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "Pacifico Energy has secured a 7.65GW air permit for its 5GW GW Ranch project, Chevron is building its first gas-fired plant specifically to power data centers there, and Circe Energy has ordered 2GW of natural gas generation capacity from Cummins for a 1,950-acre Permian site."
   ],
   "state_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "Pacifico Energy has secured a 7.65GW air permit for its 5GW GW Ranch project, Chevron is building its first gas-fired plant specifically to power data centers there, and Circe Energy has ordered 2GW of natural gas generation capacity from Cummins for a 1,950-acre Permian site."
   ],
   "capacity_gw_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "| | Cardinal Data Power | Pacifico GW Ranch | OpenAI Stargate | Meta Hyperion |",
    "| Planned capacity | GW5 | GW5 | GW7 | GW5 |",
    "Pacifico Energy has secured a 7.65GW air permit for its 5GW GW Ranch project, Chevron is building its first gas-fired plant specifically to power data centers there, and Circe Energy has ordered 2GW of natural gas generation capacity from Cummins for a 1,950-acre Permian site."
   ],
   "builder_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "Pacifico Energy has secured a 7.65GW air permit for its 5GW GW Ranch project, Chevron is building its first gas-fired plant specifically to power data centers there, and Circe Energy has ordered 2GW of natural gas generation capacity from Cummins for a 1,950-acre Permian site."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "Pacifico Energy has secured a 7.65GW air permit for its 5GW GW Ranch project, Chevron is building its first gas-fired plant specifically to power data centers there, and Circe Energy has ordered 2GW of natural gas generation capacity from Cummins for a 1,950-acre Permian site."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://servnetuk.com/news/ai-datacenter-west-texas-capacity-power-shortage-2026",
   "title": "West Texas AI Datacenter Boom: UK Capacity Risk 2026",
   "published_at": "2026-07-25T16:16:27",
   "project": "Stargate",
   "locality": null,
   "state": null,
   "capacity_gw": 7.0,
   "builder": null,
   "ai_customer": "OpenAI",
   "status": "expanding",
   "announcement_date": null,
   "project_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "| | Cardinal Data Power | Pacifico GW Ranch | OpenAI Stargate | Meta Hyperion |",
    "| Planned capacity | GW5 | GW5 | GW7 | GW5 |",
    "Layer on OpenAI's Stargate expansion, now tracking toward nearly 7GW of planned capacity and over $400 billion of investment, plus Meta's Hyperion plan growing to 5GW in Louisiana, and the picture is clear: 5GW-class AI campuses are no longer a hypothetical, they're a procurement queue."
   ],
   "locality_evidence": null,
   "state_evidence": null,
   "capacity_gw_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "| | Cardinal Data Power | Pacifico GW Ranch | OpenAI Stargate | Meta Hyperion |",
    "| Planned capacity | GW5 | GW5 | GW7 | GW5 |",
    "Layer on OpenAI's Stargate expansion, now tracking toward nearly 7GW of planned capacity and over $400 billion of investment, plus Meta's Hyperion plan growing to 5GW in Louisiana, and the picture is clear: 5GW-class AI campuses are no longer a hypothetical, they're a procurement queue."
   ],
   "builder_evidence": null,
   "ai_customer_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "Layer on OpenAI's Stargate expansion, now tracking toward nearly 7GW of planned capacity and over $400 billion of investment, plus Meta's Hyperion plan growing to 5GW in Louisiana, and the picture is clear: 5GW-class AI campuses are no longer a hypothetical, they're a procurement queue."
   ],
   "status_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "Layer on OpenAI's Stargate expansion, now tracking toward nearly 7GW of planned capacity and over $400 billion of investment, plus Meta's Hyperion plan growing to 5GW in Louisiana, and the picture is clear: 5GW-class AI campuses are no longer a hypothetical, they're a procurement queue."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://servnetuk.com/news/ai-datacenter-west-texas-capacity-power-shortage-2026",
   "title": "West Texas AI Datacenter Boom: UK Capacity Risk 2026",
   "published_at": "2026-07-25T16:16:27",
   "project": "Hyperion",
   "locality": null,
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "| | Cardinal Data Power | Pacifico GW Ranch | OpenAI Stargate | Meta Hyperion |",
    "| Planned capacity | GW5 | GW5 | GW7 | GW5 |",
    "Layer on OpenAI's Stargate expansion, now tracking toward nearly 7GW of planned capacity and over $400 billion of investment, plus Meta's Hyperion plan growing to 5GW in Louisiana, and the picture is clear: 5GW-class AI campuses are no longer a hypothetical, they're a procurement queue."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "Layer on OpenAI's Stargate expansion, now tracking toward nearly 7GW of planned capacity and over $400 billion of investment, plus Meta's Hyperion plan growing to 5GW in Louisiana, and the picture is clear: 5GW-class AI campuses are no longer a hypothetical, they're a procurement queue."
   ],
   "capacity_gw_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "| | Cardinal Data Power | Pacifico GW Ranch | OpenAI Stargate | Meta Hyperion |",
    "| Planned capacity | GW5 | GW5 | GW7 | GW5 |",
    "Layer on OpenAI's Stargate expansion, now tracking toward nearly 7GW of planned capacity and over $400 billion of investment, plus Meta's Hyperion plan growing to 5GW in Louisiana, and the picture is clear: 5GW-class AI campuses are no longer a hypothetical, they're a procurement queue."
   ],
   "builder_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "Layer on OpenAI's Stargate expansion, now tracking toward nearly 7GW of planned capacity and over $400 billion of investment, plus Meta's Hyperion plan growing to 5GW in Louisiana, and the picture is clear: 5GW-class AI campuses are no longer a hypothetical, they're a procurement queue."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "Layer on OpenAI's Stargate expansion, now tracking toward nearly 7GW of planned capacity and over $400 billion of investment, plus Meta's Hyperion plan growing to 5GW in Louisiana, and the picture is clear: 5GW-class AI campuses are no longer a hypothetical, they're a procurement queue."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://servnetuk.com/news/ai-datacenter-west-texas-capacity-power-shortage-2026",
   "title": "West Texas AI Datacenter Boom: UK Capacity Risk 2026",
   "published_at": "2026-07-25T16:16:27",
   "project": "Pecos campus",
   "locality": "Pecos",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Microsoft",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "Microsoft's 2GW Pecos campus carries a 20-year Chevron PPA for up to 2.67GW."
   ],
   "locality_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "Microsoft's 2GW Pecos campus carries a 20-year Chevron PPA for up to 2.67GW."
   ],
   "state_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "Microsoft plans 2GW data center campus in Pecos, Texas"
   ],
   "capacity_gw_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "Microsoft's 2GW Pecos campus carries a 20-year Chevron PPA for up to 2.67GW."
   ],
   "builder_evidence": [
    "# West Texas AI Datacenter Boom: UK Capacity Risk 2026",
    "Microsoft's 2GW Pecos campus carries a 20-year Chevron PPA for up to 2.67GW."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://ventureatlas.org/news/2026-07-24-openai-project-camellia-georgia-data-center",
   "title": "OpenAI unveils self-built 'Project Camellia' data center in Georgia",
   "published_at": "2026-07-24T00:00:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": "2026-07-24",
   "project_evidence": [
    "# OpenAI unveils self-built 'Project Camellia' data center in Georgia",
    "OpenAI announced Project Camellia, a 3.2-gigawatt data-center campus in Effingham County, Georgia, the first data center the company will design and build itself rather than lease."
   ],
   "locality_evidence": [
    "# OpenAI unveils self-built 'Project Camellia' data center in Georgia",
    "OpenAI announced Project Camellia, a 3.2-gigawatt data-center campus in Effingham County, Georgia, the first data center the company will design and build itself rather than lease."
   ],
   "state_evidence": [
    "# OpenAI unveils self-built 'Project Camellia' data center in Georgia",
    "OpenAI announced Project Camellia, a 3.2-gigawatt data-center campus in Effingham County, Georgia, the first data center the company will design and build itself rather than lease."
   ],
   "capacity_gw_evidence": [
    "# OpenAI unveils self-built 'Project Camellia' data center in Georgia",
    "OpenAI announced Project Camellia, a 3.2-gigawatt data-center campus in Effingham County, Georgia, the first data center the company will design and build itself rather than lease."
   ],
   "builder_evidence": [
    "# OpenAI unveils self-built 'Project Camellia' data center in Georgia",
    "OpenAI announced Project Camellia, a 3.2-gigawatt data-center campus in Effingham County, Georgia, the first data center the company will design and build itself rather than lease."
   ],
   "ai_customer_evidence": [
    "# OpenAI unveils self-built 'Project Camellia' data center in Georgia",
    "OpenAI announced Project Camellia, a 3.2-gigawatt data-center campus in Effingham County, Georgia, the first data center the company will design and build itself rather than lease."
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "Friday, July 24, 2026",
    "# OpenAI unveils self-built 'Project Camellia' data center in Georgia"
   ]
  },
  {
   "url": "https://finance.yahoo.com/news/google-reveals-behind-big-project-120218594.html",
   "title": "Google reveals it is behind big 'Project Cannoli' data center project",
   "published_at": "2026-03-17T12:02:18",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "locality_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "state_evidence": [
    "[ ![Detroit Free Press](https://s.yimg.com/lo/mysterio/api/A0E5D32B6628CC9BF9DC3B2339342F0AE2E2F71965C96836ED941D03CB7CC137/subgraphmysterio/resizefill_w341_h48;quality_100;format_webp/https:%2F%2Fd29szjachogqwa.cloudfront.net%2Fimages%2Fuser-uploaded%2Fdetroit-logo_4792.png) ](https://www.freep.com/)",
    "Google also said Tuesday that it is creating a $10 million Energy Impact Fund for local organizations to tap into with the aim of lowering monthly utility bills for Michiganders."
   ],
   "capacity_gw_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "builder_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "The data center would be developed for Google by Panattoni Development Co."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "announcement_date_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ]
  },
  {
   "url": "https://bitgetapp.com/news/detail/12560605429310",
   "title": "TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
   "published_at": "2026-05-26T06:09:31",
   "project": "Muskie Data Campus",
   "locality": null,
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore.",
    "The Muskie Data Campus in eastern Kentucky is expected to support more than 1 GW of data center capacity on a roughly 285-acre parcel inside a 1,000-acre industrial park."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore.",
    "The Muskie Data Campus in eastern Kentucky is expected to support more than 1 GW of data center capacity on a roughly 285-acre parcel inside a 1,000-acre industrial park."
   ],
   "capacity_gw_evidence": [
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore.",
    "The Muskie Data Campus in eastern Kentucky is expected to support more than 1 GW of data center capacity on a roughly 285-acre parcel inside a 1,000-acre industrial park."
   ],
   "builder_evidence": [
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore.",
    "TeraWulf disclosed Tuesday that it has acquired the Muskie Data Campus from Industrial Equity Partners, adding a hyperscale AI and HPC site in eastern Kentucky that the company says can support more than 1 GW of future data center capacity."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://bitgetapp.com/news/detail/12560605429310",
   "title": "TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
   "published_at": "2026-05-26T06:09:31",
   "project": "Pecos, Texas mining site",
   "locality": "Pecos",
   "state": "Texas",
   "capacity_gw": 1.5,
   "builder": "Core Scientific",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "In another crypto.news [piece](https://crypto.news/core-scientific-shifts-bitcoin-mining-site-toward-1-5gw-ai-data-center-plan/), Core outlined plans to convert its Pecos, Texas mining site into a 1.5 GW AI campus, repurposing about 300 MW previously used for Bitcoin mining."
   ],
   "locality_evidence": [
    "In another crypto.news [piece](https://crypto.news/core-scientific-shifts-bitcoin-mining-site-toward-1-5gw-ai-data-center-plan/), Core outlined plans to convert its Pecos, Texas mining site into a 1.5 GW AI campus, repurposing about 300 MW previously used for Bitcoin mining."
   ],
   "state_evidence": [
    "In another crypto.news [piece](https://crypto.news/core-scientific-shifts-bitcoin-mining-site-toward-1-5gw-ai-data-center-plan/), Core outlined plans to convert its Pecos, Texas mining site into a 1.5 GW AI campus, repurposing about 300 MW previously used for Bitcoin mining."
   ],
   "capacity_gw_evidence": [
    "In another crypto.news [piece](https://crypto.news/core-scientific-shifts-bitcoin-mining-site-toward-1-5gw-ai-data-center-plan/), Core outlined plans to convert its Pecos, Texas mining site into a 1.5 GW AI campus, repurposing about 300 MW previously used for Bitcoin mining."
   ],
   "builder_evidence": [
    "In one earlier [story](https://crypto.news/core-scientific-dumps-bitcoin-for-ai-data-centers/), Core Scientific sold $208.3 million worth of Bitcoin in the first quarter to fund its own AI data center buildout, with colocation revenue rising to $77.5 million while mining revenue fell to $30.1 million.",
    "In another crypto.news [piece](https://crypto.news/core-scientific-shifts-bitcoin-mining-site-toward-1-5gw-ai-data-center-plan/), Core outlined plans to convert its Pecos, Texas mining site into a 1.5 GW AI campus, repurposing about 300 MW previously used for Bitcoin mining."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://blockspace.media/insight/hut-8-secures-second-beacon-point-lease-2026",
   "title": "B. Riley keeps Hut 8 at Buy after second $9.8 billion Beacon Point lease - Blockspace",
   "published_at": "2026-07-20T14:05:19",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "fully commercialized",
   "announcement_date": "2026-07-20",
   "project_evidence": [
    "# B. Riley keeps Hut 8 at Buy after second $9.8 billion Beacon Point lease",
    "Hut 8 (NASDAQ: HUT) [signed](https://www.hut8.com/news-insights/press-releases/hut-8-fully-commercializes-1-gw-beacon-point-ai-data-center-campus-with-second-352-mw-it-lease) a second 15-year lease for 352 MW of IT capacity at its Beacon Point campus in Texas on Monday.",
    "Beacon Point now has 704 MW of contracted IT capacity under an interconnection agreement with AEP Texas that provides 1,000 MW of utility capacity."
   ],
   "locality_evidence": [
    "# B. Riley keeps Hut 8 at Buy after second $9.8 billion Beacon Point lease",
    "The triple-net lease is worth $9.8 billion over the base term and covers the second phase of the Nueces County AI data-center campus."
   ],
   "state_evidence": [
    "# B. Riley keeps Hut 8 at Buy after second $9.8 billion Beacon Point lease",
    "Hut 8 (NASDAQ: HUT) [signed](https://www.hut8.com/news-insights/press-releases/hut-8-fully-commercializes-1-gw-beacon-point-ai-data-center-campus-with-second-352-mw-it-lease) a second 15-year lease for 352 MW of IT capacity at its Beacon Point campus in Texas on Monday."
   ],
   "capacity_gw_evidence": [
    "# B. Riley keeps Hut 8 at Buy after second $9.8 billion Beacon Point lease",
    "Beacon Point now has 704 MW of contracted IT capacity under an interconnection agreement with AEP Texas that provides 1,000 MW of utility capacity."
   ],
   "builder_evidence": [
    "# B. Riley keeps Hut 8 at Buy after second $9.8 billion Beacon Point lease",
    "Hut 8 (NASDAQ: HUT) [signed](https://www.hut8.com/news-insights/press-releases/hut-8-fully-commercializes-1-gw-beacon-point-ai-data-center-campus-with-second-352-mw-it-lease) a second 15-year lease for 352 MW of IT capacity at its Beacon Point campus in Texas on Monday."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# B. Riley keeps Hut 8 at Buy after second $9.8 billion Beacon Point lease",
    "Hut 8 (NASDAQ: HUT) [signed](https://www.hut8.com/news-insights/press-releases/hut-8-fully-commercializes-1-gw-beacon-point-ai-data-center-campus-with-second-352-mw-it-lease) a second 15-year lease for 352 MW of IT capacity at its Beacon Point campus in Texas on Monday."
   ],
   "announcement_date_evidence": [
    "# B. Riley keeps Hut 8 at Buy after second $9.8 billion Beacon Point lease",
    "Jul 20, 2026"
   ]
  },
  {
   "url": "https://completeaitraining.com/news/iren-partners-with-nvidia-to-build-ai-data-center-campus-in",
   "title": "IREN partners with NVIDIA to build AI data center campus in Fisher County, Texas",
   "published_at": "2026-05-29T17:03:31",
   "project": "Sweetwater",
   "locality": "Fisher County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "IREN",
   "ai_customer": "",
   "status": "energized",
   "announcement_date": null,
   "project_evidence": [
    "## IREN builds AI-ready data center in West Texas with NVIDIA partnership",
    "IREN, a digital infrastructure company, is partnering with NVIDIA to design and build out its Sweetwater data center campus in Fisher County, Texas."
   ],
   "locality_evidence": [
    "## IREN builds AI-ready data center in West Texas with NVIDIA partnership",
    "IREN, a digital infrastructure company, is partnering with NVIDIA to design and build out its Sweetwater data center campus in Fisher County, Texas."
   ],
   "state_evidence": [
    "## IREN builds AI-ready data center in West Texas with NVIDIA partnership",
    "IREN, a digital infrastructure company, is partnering with NVIDIA to design and build out its Sweetwater data center campus in Fisher County, Texas."
   ],
   "capacity_gw_evidence": [
    "## IREN builds AI-ready data center in West Texas with NVIDIA partnership",
    "The company recently energized its 1.4 gigawatt Sweetwater One site, connecting the campus to the ERCOT power grid."
   ],
   "builder_evidence": [
    "## IREN builds AI-ready data center in West Texas with NVIDIA partnership",
    "IREN, a digital infrastructure company, is partnering with NVIDIA to design and build out its Sweetwater data center campus in Fisher County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## IREN builds AI-ready data center in West Texas with NVIDIA partnership",
    "The company recently energized its 1.4 gigawatt Sweetwater One site, connecting the campus to the ERCOT power grid."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://smallbusinessnewswatch.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "state_evidence": [
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "capacity_gw_evidence": [
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "builder_evidence": [
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://kttc.marketminute.com/article/bizwire-2024-9-25-ecl-announces-worlds-first-1-gigawatt-off-grid-hydrogen-powered-ai-factory-data-center",
   "title": "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
   "published_at": "2024-09-25T17:30:00",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "announced",
   "announcement_date": "2024-09-25",
   "project_evidence": [
    "*600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions*",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "locality_evidence": [
    "*600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions*",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "state_evidence": [
    "*600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions*",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "capacity_gw_evidence": [
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant.",
    "The initial 1GW phased development may be expanded to 2GW in the future, enabled by its modularity and based on customer demand."
   ],
   "builder_evidence": [
    "*600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions*",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "ai_customer_evidence": [
    "*600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions*",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "status_evidence": [
    "*600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions*",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "announcement_date_evidence": [
    "*600+ acres near Houston, Texas will give Lambda and other AI leaders the space and power needed for the next wave of innovation, with zero emissions*",
    "Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ]
  },
  {
   "url": "https://moomoo.com/news/post/74804688/nvidia-invests-1-5-billion-in-sb-energy-to-secure",
   "title": "NVIDIA invests $1.5 billion in SB Energy to secure 8GW of AI computing power, with OpenAI as the sole tenant",
   "published_at": "2026-08-17T13:48:50",
   "project": "PORTS-Pike",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "NVIDIA is expanding the boundaries of competition from GPUs and servers to the land, power, and construction of AI data centers.",
    "On August 17, NVIDIA announced a strategic partnership with SB Energy to provide credit guarantees for the PORTS-Pike technology park in Ohio, transforming it into a hyperscale data center dedicated exclusively to NVIDIA\u2019s AI computing infrastructure, with OpenAI as the sole tenant."
   ],
   "locality_evidence": [
    "NVIDIA is expanding the boundaries of competition from GPUs and servers to the land, power, and construction of AI data centers.",
    "PORTS-Pike is located in Pike County, Ohio, adjacent to the site of the decommissioned Portsmouth Gaseous Diffusion Plant."
   ],
   "state_evidence": [
    "NVIDIA is expanding the boundaries of competition from GPUs and servers to the land, power, and construction of AI data centers.",
    "The company has partnered with SB Energy to develop an 8GW hyperscale AI data center in Ohio, investing $1.5 billion to provide credit support for infrastructure financing, with OpenAI serving as the sole tenant."
   ],
   "capacity_gw_evidence": [
    "NVIDIA is expanding the boundaries of competition from GPUs and servers to the land, power, and construction of AI data centers.",
    "The company has partnered with SB Energy to develop an 8GW hyperscale AI data center in Ohio, investing $1.5 billion to provide credit support for infrastructure financing, with OpenAI serving as the sole tenant."
   ],
   "builder_evidence": [
    "NVIDIA is expanding the boundaries of competition from GPUs and servers to the land, power, and construction of AI data centers.",
    "The company has partnered with SB Energy to develop an 8GW hyperscale AI data center in Ohio, investing $1.5 billion to provide credit support for infrastructure financing, with OpenAI serving as the sole tenant."
   ],
   "ai_customer_evidence": [
    "NVIDIA is expanding the boundaries of competition from GPUs and servers to the land, power, and construction of AI data centers.",
    "The company has partnered with SB Energy to develop an 8GW hyperscale AI data center in Ohio, investing $1.5 billion to provide credit support for infrastructure financing, with OpenAI serving as the sole tenant."
   ],
   "status_evidence": [
    "NVIDIA is expanding the boundaries of competition from GPUs and servers to the land, power, and construction of AI data centers.",
    "On August 17, NVIDIA announced a strategic partnership with SB Energy to provide credit guarantees for the PORTS-Pike technology park in Ohio, transforming it into a hyperscale data center dedicated exclusively to NVIDIA\u2019s AI computing infrastructure, with OpenAI as the sole tenant."
   ],
   "announcement_date_evidence": [
    "NVIDIA is expanding the boundaries of competition from GPUs and servers to the land, power, and construction of AI data centers.",
    "On August 17, NVIDIA announced a strategic partnership with SB Energy to provide credit guarantees for the PORTS-Pike technology park in Ohio, transforming it into a hyperscale data center dedicated exclusively to NVIDIA\u2019s AI computing infrastructure, with OpenAI as the sole tenant."
   ]
  },
  {
   "url": "https://edgen.tech/news/post/blackrock-and-meta-form-14b-data-center-venture-in-texas",
   "title": "BlackRock and Meta form $14B data center venture in Texas",
   "published_at": "2026-07-28T09:41:43",
   "project": null,
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "BlackRock Inc. and Meta Platforms Inc.",
   "ai_customer": "Meta",
   "status": "under development",
   "announcement_date": "2026-07-28",
   "project_evidence": null,
   "locality_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas."
   ],
   "state_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas."
   ],
   "capacity_gw_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas."
   ],
   "builder_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "**BlackRock Inc. and Meta Platforms Inc. are jointly developing a $14 billion data center campus in El Paso, Texas, marking the latest hyperscale infrastructure deal as technology companies race to secure capacity for artificial intelligence workloads.**"
   ],
   "ai_customer_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas."
   ],
   "status_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas."
   ],
   "announcement_date_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "## Rachel Kim](https://www.edgen.tech/author/news/rachel-kim)\u00b7Jul 28 2026, 09:41"
   ]
  },
  {
   "url": "https://edgen.tech/news/post/blackrock-and-meta-form-14b-data-center-venture-in-texas",
   "title": "BlackRock and Meta form $14B data center venture in Texas",
   "published_at": "2026-07-28T09:41:43",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "expanded",
   "announcement_date": null,
   "project_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "The El Paso arrangement follows the same template Meta used for its Hyperion project in Richland Parish, Louisiana, where an 80/20 joint venture between a private-credit firm and Meta issued $27 billion in debt \u2014 the largest private-debt offering on record."
   ],
   "locality_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "The El Paso arrangement follows the same template Meta used for its Hyperion project in Richland Parish, Louisiana, where an 80/20 joint venture between a private-credit firm and Meta issued $27 billion in debt \u2014 the largest private-debt offering on record."
   ],
   "state_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "The El Paso arrangement follows the same template Meta used for its Hyperion project in Richland Parish, Louisiana, where an 80/20 joint venture between a private-credit firm and Meta issued $27 billion in debt \u2014 the largest private-debt offering on record."
   ],
   "capacity_gw_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "Meta has since expanded Hyperion to 5 gigawatts of compute capacity at an estimated cost exceeding $50 billion, with that expansion owned entirely by Meta rather than through a joint venture."
   ],
   "builder_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "The El Paso arrangement follows the same template Meta used for its Hyperion project in Richland Parish, Louisiana, where an 80/20 joint venture between a private-credit firm and Meta issued $27 billion in debt \u2014 the largest private-debt offering on record.",
    "Meta has since expanded Hyperion to 5 gigawatts of compute capacity at an estimated cost exceeding $50 billion, with that expansion owned entirely by Meta rather than through a joint venture."
   ],
   "ai_customer_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "The El Paso arrangement follows the same template Meta used for its Hyperion project in Richland Parish, Louisiana, where an 80/20 joint venture between a private-credit firm and Meta issued $27 billion in debt \u2014 the largest private-debt offering on record."
   ],
   "status_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "Meta has since expanded Hyperion to 5 gigawatts of compute capacity at an estimated cost exceeding $50 billion, with that expansion owned entirely by Meta rather than through a joint venture."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://anastasiintech.substack.com/p/inside-amazons-rainier-one-of-the",
   "title": "Inside Amazon\u2019s Rainier: One of the World\u2019s Largest AI Data Centers",
   "published_at": "2026-01-18T10:53:20",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.0,
   "builder": "Amazon",
   "ai_customer": "Anthropic",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "Inside Amazon\u2019s Rainier: One of the World\u2019s Largest AI Data Centers",
    "## The Rise of Project Rainier",
    "Today, it hosts Project Rainier, an eleven-billion-dollar AI supercluster."
   ],
   "locality_evidence": [
    "Inside Amazon\u2019s Rainier: One of the World\u2019s Largest AI Data Centers",
    "## The Rise of Project Rainier",
    "This is rural Indiana, a quiet town called New Carlisle with a population of only 1,900 people."
   ],
   "state_evidence": [
    "Inside Amazon\u2019s Rainier: One of the World\u2019s Largest AI Data Centers",
    "In 2024, rural Indiana farmland was quiet.",
    "## The Rise of Project Rainier",
    "Amazon didn\u2019t stumble into Indiana."
   ],
   "capacity_gw_evidence": [
    "Inside Amazon\u2019s Rainier: One of the World\u2019s Largest AI Data Centers",
    "Close to one million AI processors under one roof, pulling up to two gigawatts of power.",
    "## The Rise of Project Rainier",
    "Vast and affordable land, space to expand far beyond what exists today, and most importantly, direct access to a power grid that can deliver more than two gigawatts of power."
   ],
   "builder_evidence": [
    "Inside Amazon\u2019s Rainier: One of the World\u2019s Largest AI Data Centers",
    "## The Rise of Project Rainier",
    "Amazon didn\u2019t stumble into Indiana."
   ],
   "ai_customer_evidence": [
    "Inside Amazon\u2019s Rainier: One of the World\u2019s Largest AI Data Centers",
    "## Anchor Customer",
    "For Amazon, that anchor customer is Anthropic."
   ],
   "status_evidence": [
    "Inside Amazon\u2019s Rainier: One of the World\u2019s Largest AI Data Centers",
    "## The Rise of Project Rainier",
    "The project was announced just last year, and somehow it is already operational in under twelve months."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://techzine.eu/news/infrastructure/137578/xai-expands-colossus-megadata-center-to-2-gigawatts",
   "title": "xAI expands Colossus megadata center to 2 gigawatts",
   "published_at": "2025-12-31T08:36:38",
   "project": "Colossus",
   "locality": "Memphis",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "expanding",
   "announcement_date": null,
   "project_evidence": [
    "# xAI expands Colossus megadata center to 2 gigawatts",
    "Elon Musk\u2019s xAI is purchasing a third building for the Colossus data center complex in Memphis, Texas."
   ],
   "locality_evidence": [
    "# xAI expands Colossus megadata center to 2 gigawatts",
    "Elon Musk\u2019s xAI is purchasing a third building for the Colossus data center complex in Memphis, Texas."
   ],
   "state_evidence": [
    "# xAI expands Colossus megadata center to 2 gigawatts",
    "Elon Musk\u2019s xAI is purchasing a third building for the Colossus data center complex in Memphis, Texas."
   ],
   "capacity_gw_evidence": [
    "# xAI expands Colossus megadata center to 2 gigawatts",
    "The total capacity will grow to nearly 2 gigawatts."
   ],
   "builder_evidence": [
    "# xAI expands Colossus megadata center to 2 gigawatts",
    "Elon Musk\u2019s xAI is purchasing a third building for the Colossus data center complex in Memphis, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# xAI expands Colossus megadata center to 2 gigawatts",
    "Elon Musk\u2019s xAI is purchasing a third building for the Colossus data center complex in Memphis, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://intelligentdatacentres.com/2025/08/29/vantage-data-centers-unveils-plans-for-frontier-a-us25b-mega-campus-in-texas",
   "title": "Vantage Data Centers unveils plans for Frontier, a US$25B mega-campus in Texas",
   "published_at": "2025-08-29T00:00:00",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Construction is already under way",
   "announcement_date": null,
   "project_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, has announced its largest investment to date: more than US$25 billion to develop a 1.4GW data center mega-campus in Shackelford County, Texas.",
    "The state-of-the-art campus, named \u2018Frontier\u2019, is designed to advance AI innovation and will employ more than 5,000 people across construction and on-going operations.",
    "Vantage Data Centers unveils plans for Frontier, a US$25B mega-campus in Texas"
   ],
   "locality_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, has announced its largest investment to date: more than US$25 billion to develop a 1.4GW data center mega-campus in Shackelford County, Texas.",
    "Vantage Data Centers unveils plans for Frontier, a US$25B mega-campus in Texas"
   ],
   "state_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, has announced its largest investment to date: more than US$25 billion to develop a 1.4GW data center mega-campus in Shackelford County, Texas.",
    "Vantage Data Centers unveils plans for Frontier, a US$25B mega-campus in Texas"
   ],
   "capacity_gw_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, has announced its largest investment to date: more than US$25 billion to develop a 1.4GW data center mega-campus in Shackelford County, Texas.",
    "Vantage Data Centers unveils plans for Frontier, a US$25B mega-campus in Texas"
   ],
   "builder_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, has announced its largest investment to date: more than US$25 billion to develop a 1.4GW data center mega-campus in Shackelford County, Texas.",
    "Vantage Data Centers unveils plans for Frontier, a US$25B mega-campus in Texas"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction is already under way, with the first building scheduled for delivery in the second half of 2026.",
    "Vantage Data Centers unveils plans for Frontier, a US$25B mega-campus in Texas"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://miningstockeducation.com/2026/02/fermi-america-makes-initial-draw-on-200-million-equipment-facility-from-keystone-national-group-and-cape-commercial-finance-to-accelerate-the-delivery-of-the-first-2-3gw-of-project-matadors",
   "title": "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador\u2019s 11GW Private HyperGrid\u2122 Campus",
   "published_at": null,
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": null,
   "announcement_date": "2026-02-19",
   "project_evidence": [
    "# Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador\u2019s 11GW Private HyperGrid\u2122 Campus",
    "Project Matador"
   ],
   "locality_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ \u2014 [Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4623677-1&h=4044461773&u=https%3A%2F%2Ffermiamerica.com%2F&a=Fermi+Inc.+(d%2Fb%2Fa+Fermi+America)+(NASDAQ+%26+LSE%3A+FRMI)%2C+operating+as+Fermi+America%E2%84%A2), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "Amarillo"
   ],
   "state_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ \u2014 [Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4623677-1&h=4044461773&u=https%3A%2F%2Ffermiamerica.com%2F&a=Fermi+Inc.+(d%2Fb%2Fa+Fermi+America)+(NASDAQ+%26+LSE%3A+FRMI)%2C+operating+as+Fermi+America%E2%84%A2), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "Texas"
   ],
   "capacity_gw_evidence": [
    "# Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador\u2019s 11GW Private HyperGrid\u2122 Campus",
    "11"
   ],
   "builder_evidence": [
    "# Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador\u2019s 11GW Private HyperGrid\u2122 Campus",
    "Fermi America"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ \u2014 [Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4623677-1&h=4044461773&u=https%3A%2F%2Ffermiamerica.com%2F&a=Fermi+Inc.+(d%2Fb%2Fa+Fermi+America)+(NASDAQ+%26+LSE%3A+FRMI)%2C+operating+as+Fermi+America%E2%84%A2), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "2026-02-19"
   ]
  },
  {
   "url": "https://datacentersexposed.com/facilities/homer-city-energy-campus-pa-pg",
   "title": "Homer City Energy Campus \u2014 Indiana County County, PA",
   "published_at": null,
   "project": "Homer City Energy Campus",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Homer City Redevelopment",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "Under constructionAI / GPU compute",
    "# Homer City Energy Campus",
    "Homer City Energy Campus is a under construction data center in Indiana County County, PA, operated by Homer City Redevelopment."
   ],
   "locality_evidence": [
    "Under constructionAI / GPU compute",
    "# Homer City Energy Campus",
    "Homer City, Indiana County County, PA",
    "The nearest public school, **Homer-Center Jshs** in Homer City, is 0.7 mi from this site (383 students)."
   ],
   "state_evidence": [
    "Under constructionAI / GPU compute",
    "# Homer City Energy Campus",
    "Homer City, Indiana County County, PA",
    "Homer City Energy Campus is a under construction data center in Indiana County County, PA, operated by Homer City Redevelopment."
   ],
   "capacity_gw_evidence": [
    "Under constructionAI / GPU compute",
    "# Homer City Energy Campus",
    "Homer City Energy Campus is a under construction data center in Indiana County County, PA, operated by Homer City Redevelopment. DataCentersExposed has documented 4,500 MW of reported power capacity at this site."
   ],
   "builder_evidence": [
    "Under constructionAI / GPU compute",
    "# Homer City Energy Campus",
    "Homer City Energy Campus is a under construction data center in Indiana County County, PA, operated by Homer City Redevelopment."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Under constructionAI / GPU compute",
    "# Homer City Energy Campus",
    "Homer City Energy Campus is a under construction data center in Indiana County County, PA, operated by Homer City Redevelopment."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://siliconreport.com/nscale-acquires-american-intelligence-power-for-8gw-west-virginia-campus-5e84071e2c53bba2",
   "title": "Nscale Acquires American Intelligence & Power for 8GW West Virginia Campus",
   "published_at": "2026-03-16T22:37:45",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# Nscale Acquires American Intelligence & Power for 8GW West Virginia Campus",
    "Nscale has acquired American Intelligence & Power Corporation, an energy-to-compute developer created to own and operate the Monarch Compute Campus in West Virginia."
   ],
   "locality_evidence": [
    "# Nscale Acquires American Intelligence & Power for 8GW West Virginia Campus",
    "In a release, American Intelligence & Power described Monarch as a 2,250-acre, 8+ GW AI data center project in Mason County, West Virginia."
   ],
   "state_evidence": [
    "# Nscale Acquires American Intelligence & Power for 8GW West Virginia Campus",
    "Nscale has acquired American Intelligence & Power Corporation, an energy-to-compute developer created to own and operate the Monarch Compute Campus in West Virginia."
   ],
   "capacity_gw_evidence": [
    "# Nscale Acquires American Intelligence & Power for 8GW West Virginia Campus",
    "The deal gives Nscale control of a 2,250-acre site slated for up to 8GW of compute by 2031, a direct bet that dedicated power and microgrids will matter as much as GPUs in AI infrastructure."
   ],
   "builder_evidence": [
    "# Nscale Acquires American Intelligence & Power for 8GW West Virginia Campus",
    "Nscale has acquired American Intelligence & Power Corporation, an energy-to-compute developer created to own and operate the Monarch Compute Campus in West Virginia."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Nscale Acquires American Intelligence & Power for 8GW West Virginia Campus",
    "The deal gives Nscale control of a 2,250-acre site slated for up to 8GW of compute by 2031, a direct bet that dedicated power and microgrids will matter as much as GPUs in AI infrastructure."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://smb.demopolistimes.com/article/C-O-R-R-E-C-T-I-O-N-Energy-Abundance-Development-Corporation/67dcee79e68a6d77f58081d7",
   "title": "/C O R R E C T I O N -- Energy Abundance Development Corporation/",
   "published_at": null,
   "project": "Data City, Texas",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corporation",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2025-03-20",
   "project_evidence": [
    "# /C O R R E C T I O N -- Energy Abundance Development Corporation/",
    "Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "locality_evidence": [
    "# /C O R R E C T I O N -- Energy Abundance Development Corporation/",
    "Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "state_evidence": [
    "# /C O R R E C T I O N -- Energy Abundance Development Corporation/",
    "Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "capacity_gw_evidence": [
    "# /C O R R E C T I O N -- Energy Abundance Development Corporation/",
    "Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "builder_evidence": [
    "# /C O R R E C T I O N -- Energy Abundance Development Corporation/",
    "Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# /C O R R E C T I O N -- Energy Abundance Development Corporation/",
    "Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "announcement_date_evidence": [
    "# /C O R R E C T I O N -- Energy Abundance Development Corporation/",
    "Energy Abundance Announces Data City, Texas - The World's Largest Behind-the-Meter Data Center Hub Powered by 100% 24/7 Green Energy",
    "HOUSTON, March 20, 2025"
   ]
  },
  {
   "url": "https://shaam.blog/articles/openai-750-billion-infrastructure-spending-2030",
   "title": "OpenAI's $750 Billion Infrastructure Bet Through 2030: Visionary Land Grab or Spending Spree?",
   "published_at": "2026-07-29T18:27:35",
   "project": "Project Camellia",
   "locality": "Rincon",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "under development",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "Project Camellia is OpenAI's first ground-up, self-designed AI data center campus \u2014 a 1,400-acre site within the 2,600-acre Savannah Gateway Industrial Hub, in Rincon, Effingham County, Georgia."
   ],
   "locality_evidence": [
    "Project Camellia is OpenAI's first ground-up, self-designed AI data center campus \u2014 a 1,400-acre site within the 2,600-acre Savannah Gateway Industrial Hub, in Rincon, Effingham County, Georgia."
   ],
   "state_evidence": [
    "Project Camellia is OpenAI's first ground-up, self-designed AI data center campus \u2014 a 1,400-acre site within the 2,600-acre Savannah Gateway Industrial Hub, in Rincon, Effingham County, Georgia."
   ],
   "capacity_gw_evidence": [
    "OpenAI has contracted with **Georgia Power** for **3.2 gigawatts of electricity** delivered in phases between 2028 and 2032 under a 25-year agreement, and has committed at least **$20 billion** in the county to qualify for a local incentive package; at the full 3.2 GW build-out, total project costs will exceed **$30 billion**, per Katti."
   ],
   "builder_evidence": [
    "Project Camellia is OpenAI's first ground-up, self-designed AI data center campus \u2014 a 1,400-acre site within the 2,600-acre Savannah Gateway Industrial Hub, in Rincon, Effingham County, Georgia."
   ],
   "ai_customer_evidence": [
    "Project Camellia is OpenAI's first ground-up, self-designed AI data center campus \u2014 a 1,400-acre site within the 2,600-acre Savannah Gateway Industrial Hub, in Rincon, Effingham County, Georgia."
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "## How did OpenAI's spending target get to $750 billion?",
    "| Jul 22, 2026 | ~$750 billion | Revised upward after new cloud contracts and the Project Camellia self-build announcement | [WSJ via TechCrunch, Jul 22 2026](https://techcrunch.com/2026/07/22/openais-ai-spending-spree-has-ballooned-to-750b/) |",
    "| Provider | Commitment | What it covers | Source |"
   ]
  },
  {
   "url": "https://crypto.news/terawulfs-kentucky-ai-build-shows-miners-are-abandoning-pure-bitcoin-economics",
   "title": "TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
   "published_at": "2026-05-26T14:09:01",
   "project": "Muskie Data Campus",
   "locality": null,
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore.",
    "The Muskie Data Campus in eastern Kentucky is expected to support more than 1 GW of data center capacity on a roughly 285-acre parcel inside a 1,000-acre industrial park."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore.",
    "The Muskie Data Campus in eastern Kentucky is expected to support more than 1 GW of data center capacity on a roughly 285-acre parcel inside a 1,000-acre industrial park."
   ],
   "capacity_gw_evidence": [
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore.",
    "The Muskie Data Campus in eastern Kentucky is expected to support more than 1 GW of data center capacity on a roughly 285-acre parcel inside a 1,000-acre industrial park."
   ],
   "builder_evidence": [
    "TeraWulf has bought a Kentucky site designed for more than 1 gigawatt of AI and high-performance computing capacity, a move that makes the company\u2019s pivot away from pure Bitcoin mining impossible to ignore.",
    "The Muskie Data Campus in eastern Kentucky is expected to support more than 1 GW of data center capacity on a roughly 285-acre parcel inside a 1,000-acre industrial park."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://crypto.news/terawulfs-kentucky-ai-build-shows-miners-are-abandoning-pure-bitcoin-economics",
   "title": "TeraWulf\u2019s Kentucky AI build shows miners are abandoning pure Bitcoin economics",
   "published_at": "2026-05-26T14:09:01",
   "project": "Pecos, Texas mining site",
   "locality": "Pecos",
   "state": "Texas",
   "capacity_gw": 1.5,
   "builder": "Core Scientific",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "In another crypto.news [piece](https://crypto.news/core-scientific-shifts-bitcoin-mining-site-toward-1-5gw-ai-data-center-plan/), Core outlined plans to convert its Pecos, Texas mining site into a 1.5 GW AI campus, repurposing about 300 MW previously used for Bitcoin mining."
   ],
   "locality_evidence": [
    "In another crypto.news [piece](https://crypto.news/core-scientific-shifts-bitcoin-mining-site-toward-1-5gw-ai-data-center-plan/), Core outlined plans to convert its Pecos, Texas mining site into a 1.5 GW AI campus, repurposing about 300 MW previously used for Bitcoin mining."
   ],
   "state_evidence": [
    "In another crypto.news [piece](https://crypto.news/core-scientific-shifts-bitcoin-mining-site-toward-1-5gw-ai-data-center-plan/), Core outlined plans to convert its Pecos, Texas mining site into a 1.5 GW AI campus, repurposing about 300 MW previously used for Bitcoin mining."
   ],
   "capacity_gw_evidence": [
    "In another crypto.news [piece](https://crypto.news/core-scientific-shifts-bitcoin-mining-site-toward-1-5gw-ai-data-center-plan/), Core outlined plans to convert its Pecos, Texas mining site into a 1.5 GW AI campus, repurposing about 300 MW previously used for Bitcoin mining."
   ],
   "builder_evidence": [
    "In another crypto.news [piece](https://crypto.news/core-scientific-shifts-bitcoin-mining-site-toward-1-5gw-ai-data-center-plan/), Core outlined plans to convert its Pecos, Texas mining site into a 1.5 GW AI campus, repurposing about 300 MW previously used for Bitcoin mining."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://business-news-today.com/a-1-4gw-power-move-can-iren-limited-turn-sweetwater-1-into-an-ai-infrastructure-breakout",
   "title": "Can IREN Limited turn Sweetwater 1 into an AI",
   "published_at": "2026-05-02T01:14:43",
   "project": "Sweetwater 1",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN Limited",
   "ai_customer": null,
   "status": "energization",
   "announcement_date": null,
   "project_evidence": [
    "# A 1.4GW power move: Can IREN Limited turn Sweetwater 1 into an AI infrastructure breakout?",
    "IREN Limited (NASDAQ: IREN) has announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas, marking its connection to the ERCOT grid and a key milestone in the broader 2GW Sweetwater campus buildout."
   ],
   "locality_evidence": [
    "# A 1.4GW power move: Can IREN Limited turn Sweetwater 1 into an AI infrastructure breakout?",
    "IREN Limited (NASDAQ: IREN) has announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas, marking its connection to the ERCOT grid and a key milestone in the broader 2GW Sweetwater campus buildout."
   ],
   "state_evidence": [
    "# A 1.4GW power move: Can IREN Limited turn Sweetwater 1 into an AI infrastructure breakout?",
    "IREN Limited (NASDAQ: IREN) has announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas, marking its connection to the ERCOT grid and a key milestone in the broader 2GW Sweetwater campus buildout."
   ],
   "capacity_gw_evidence": [
    "# A 1.4GW power move: Can IREN Limited turn Sweetwater 1 into an AI infrastructure breakout?",
    "IREN Limited (NASDAQ: IREN) has announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas, marking its connection to the ERCOT grid and a key milestone in the broader 2GW Sweetwater campus buildout."
   ],
   "builder_evidence": [
    "# A 1.4GW power move: Can IREN Limited turn Sweetwater 1 into an AI infrastructure breakout?",
    "IREN Limited (NASDAQ: IREN) has announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas, marking its connection to the ERCOT grid and a key milestone in the broader 2GW Sweetwater campus buildout."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# A 1.4GW power move: Can IREN Limited turn Sweetwater 1 into an AI infrastructure breakout?",
    "IREN Limited (NASDAQ: IREN) has announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas, marking its connection to the ERCOT grid and a key milestone in the broader 2GW Sweetwater campus buildout."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://einnews.com/pr_news/915463239/enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": "2026-05-27T19:28:19",
   "project": "Creekstone Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "About Creekstone Energy",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://ciofirst.com/ecl-announces-worlds-first-1-gigawatt-off-grid-hydrogen-powered-ai-factory-data-center",
   "title": "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
   "published_at": "2024-09-26T12:40:35",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "locality_evidence": [
    "# ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "state_evidence": [
    "# ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "ECL Terrasite-TX1 comes at a critical time for the state of Texas, with The Electric Reliability Council of Texas (ERCOT) testifying on June 12 this year that the state\u2019s power grid needs will grow approximately 2X by 2030 due in part to the growth of data centers and AI."
   ],
   "capacity_gw_evidence": [
    "# ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "builder_evidence": [
    "# ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "ai_customer_evidence": [
    "# ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "status_evidence": [
    "# ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://odaily.news/en/post/5212541",
   "title": "\u9ec4\u4ec1\u52cb\u3001\u5965\u7279\u66fc\u3001\u5b59\u6b63\u4e49\u300c\u62b1\u56e2 20 \u5e74\u300d",
   "published_at": "2026-08-18T02:59:58",
   "project": "PORTS-Pike",
   "locality": null,
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "under construction",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# \u9ec4\u4ec1\u52cb\u3001\u5965\u7279\u66fc\u3001\u5b59\u6b63\u4e49\u300c\u62b1\u56e220\u5e74\u300d",
    "1. \u9879\u76ee\u4f4d\u4e8e\u4fc4\u4ea5\u4fc4\u5ddePORTS-Pike\u56ed\u533a\uff0c\u8ba1\u5212\u5efa\u8bbe10GW\u65b0\u80fd\u6e90\u53d1\u7535\u80fd\u529b\u548c\u7ea68GW AI\u5de5\u5382\u5bb9\u91cf\uff0c\u5206\u9636\u6bb5\u4e8e2028\u5e74\u9646\u7eed\u6295\u7528\u3002",
    "The data center project, developed jointly by OpenAI, SoftBank's SB Energy, and Nvidia, is located at the PORTS-Pike campus in Ohio, US."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# \u9ec4\u4ec1\u52cb\u3001\u5965\u7279\u66fc\u3001\u5b59\u6b63\u4e49\u300c\u62b1\u56e220\u5e74\u300d",
    "1. \u9879\u76ee\u4f4d\u4e8e\u4fc4\u4ea5\u4fc4\u5ddePORTS-Pike\u56ed\u533a\uff0c\u8ba1\u5212\u5efa\u8bbe10GW\u65b0\u80fd\u6e90\u53d1\u7535\u80fd\u529b\u548c\u7ea68GW AI\u5de5\u5382\u5bb9\u91cf\uff0c\u5206\u9636\u6bb5\u4e8e2028\u5e74\u9646\u7eed\u6295\u7528\u3002",
    "The data center project, developed jointly by OpenAI, SoftBank's SB Energy, and Nvidia, is located at the PORTS-Pike campus in Ohio, US."
   ],
   "capacity_gw_evidence": [
    "# \u9ec4\u4ec1\u52cb\u3001\u5965\u7279\u66fc\u3001\u5b59\u6b63\u4e49\u300c\u62b1\u56e220\u5e74\u300d",
    "1. \u9879\u76ee\u4f4d\u4e8e\u4fc4\u4ea5\u4fc4\u5ddePORTS-Pike\u56ed\u533a\uff0c\u8ba1\u5212\u5efa\u8bbe10GW\u65b0\u80fd\u6e90\u53d1\u7535\u80fd\u529b\u548c\u7ea68GW AI\u5de5\u5382\u5bb9\u91cf\uff0c\u5206\u9636\u6bb5\u4e8e2028\u5e74\u9646\u7eed\u6295\u7528\u3002",
    "The plan calls for at least 10GW of new renewable energy generation capacity.",
    "Once completed, the campus will exclusively deploy Nvidia computing infrastructure, ultimately yielding roughly 8GW of AI factory capacity."
   ],
   "builder_evidence": [
    "# \u9ec4\u4ec1\u52cb\u3001\u5965\u7279\u66fc\u3001\u5b59\u6b63\u4e49\u300c\u62b1\u56e220\u5e74\u300d",
    "On August 17, local time in the US, Nvidia, OpenAI, and SoftBank-backed SB Energy confirmed a partnership to build a large-scale data center in the United States.",
    "Under the arrangement, SB Energy will handle development and operations, OpenAI will be the tenant, and the data center will run entirely on Nvidia compute.",
    "The data center project, developed jointly by OpenAI, SoftBank's SB Energy, and Nvidia, is located at the PORTS-Pike campus in Ohio, US.",
    "SB Energy is responsible for constructing, owning, and operating the data center, while OpenAI will use the capacity as it is built and delivered."
   ],
   "ai_customer_evidence": [
    "# \u9ec4\u4ec1\u52cb\u3001\u5965\u7279\u66fc\u3001\u5b59\u6b63\u4e49\u300c\u62b1\u56e220\u5e74\u300d",
    "On August 17, local time in the US, Nvidia, OpenAI, and SoftBank-backed SB Energy confirmed a partnership to build a large-scale data center in the United States.",
    "Under the arrangement, SB Energy will handle development and operations, OpenAI will be the tenant, and the data center will run entirely on Nvidia compute.",
    "The data center project, developed jointly by OpenAI, SoftBank's SB Energy, and Nvidia, is located at the PORTS-Pike campus in Ohio, US.",
    "SB Energy is responsible for constructing, owning, and operating the data center, while OpenAI will use the capacity as it is built and delivered."
   ],
   "status_evidence": [
    "# \u9ec4\u4ec1\u52cb\u3001\u5965\u7279\u66fc\u3001\u5b59\u6b63\u4e49\u300c\u62b1\u56e220\u5e74\u300d",
    "The southern Ohio data center campus broke ground in March this year"
   ],
   "announcement_date_evidence": [
    "# \u9ec4\u4ec1\u52cb\u3001\u5965\u7279\u66fc\u3001\u5b59\u6b63\u4e49\u300c\u62b1\u56e220\u5e74\u300d",
    "On August 17, local time in the US, Nvidia, OpenAI, and SoftBank-backed SB Energy confirmed a partnership to build a large-scale data center in the United States."
   ]
  },
  {
   "url": "https://aitoolsrecap.com/Blog/meta-blackrock-14-billion-el-paso-ai-data-center-2026",
   "title": "Meta and BlackRock Announce $14B El Paso AI Data Center \u2014 BlackRock Takes 80%, 1GW Online 2028",
   "published_at": "2026-07-29T00:00:00",
   "project": "Meta \u00d7 BlackRock El Paso",
   "locality": "El Paso",
   "state": null,
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "Anthropic",
   "status": "Online: 2028",
   "announcement_date": "2026-07-28",
   "project_evidence": [
    "META \u00d7 BLACKROCK EL PASO \u2014 KEY FACTS (JULY 28, 2026)",
    "| Deal | Scale | Online |",
    "| Nvidia \u00d7 SK Group (July 25) | $500B+, 2GW Vera Rubin | 2027 |",
    "| Meta \u00d7 BlackRock El Paso (July 28) | $14B dev cost, 1GW | 2028 |"
   ],
   "locality_evidence": [
    "META \u00d7 BLACKROCK EL PASO \u2014 KEY FACTS (JULY 28, 2026)",
    "| Deal | Scale | Online |",
    "| Nvidia \u00d7 SK Group (July 25) | $500B+, 2GW Vera Rubin | 2027 |",
    "| Meta \u00d7 BlackRock El Paso (July 28) | $14B dev cost, 1GW | 2028 |"
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "META \u00d7 BLACKROCK EL PASO \u2014 KEY FACTS (JULY 28, 2026)",
    "\u25cf **Capacity:** 1 gigawatt \u2014 same scale as Nvidia-SK Group Vera Rubin factory (signed July 25)",
    "| Deal | Scale | Online |",
    "| Nvidia \u00d7 SK Group (July 25) | $500B+, 2GW Vera Rubin | 2027 |",
    "| Meta \u00d7 BlackRock El Paso (July 28) | $14B dev cost, 1GW | 2028 |"
   ],
   "builder_evidence": [
    "META \u00d7 BLACKROCK EL PASO \u2014 KEY FACTS (JULY 28, 2026)",
    "According to [Meta's official press release](https://www.prnewswire.com/news-releases/meta-announces-new-strategic-venture-with-blackrock-to-develop-data-center-in-el-paso-302836040.html), BlackRock-managed funds will own 80% of the El Paso joint venture while Meta retains 20% and enters into lease agreements for the entire campus with a four-year initial term."
   ],
   "ai_customer_evidence": [
    "META \u00d7 BLACKROCK EL PASO \u2014 KEY FACTS (JULY 28, 2026)",
    "\u25cf **Anthropic angle:** Reuters reports Meta in talks to lease compute to Anthropic \u2014 up to $10B over two years"
   ],
   "status_evidence": [
    "META \u00d7 BLACKROCK EL PASO \u2014 KEY FACTS (JULY 28, 2026)",
    "\u25cf **Online:** 2028",
    "| Deal | Scale | Online |",
    "| Nvidia \u00d7 SK Group (July 25) | $500B+, 2GW Vera Rubin | 2027 |",
    "| Meta \u00d7 BlackRock El Paso (July 28) | $14B dev cost, 1GW | 2028 |"
   ],
   "announcement_date_evidence": [
    "META \u00d7 BLACKROCK EL PASO \u2014 KEY FACTS (JULY 28, 2026)"
   ]
  },
  {
   "url": "https://gentic.news/ai-data-centers/case-studies/project-rainier-anthropic",
   "title": "Project Rainier \u2014 Anthropic's 2.2 GW Trainium Campus",
   "published_at": "2026-04-18T05:39:54",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "AWS",
   "ai_customer": "Anthropic",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Case Study \u00b7 AWS \u00d7 Anthropic",
    "# Project Rainier \u2014 Anthropic's 2.2 GW Trainium Campus",
    "Project Rainier's 500,000 Trainium2 chips, split across 7 buildings connected by AWS's Neuron fabric, deliver **5\u00d7 the compute Anthropic used to train any previous Claude model**(per AWS/Anthropic joint statements)."
   ],
   "locality_evidence": [
    "Case Study \u00b7 AWS \u00d7 Anthropic",
    "# Project Rainier \u2014 Anthropic's 2.2 GW Trainium Campus",
    "AWS spent $11B on 1,200 acres of former farmland in New Carlisle, Indiana to build Anthropic a supercomputer of ~500,000 Trainium2 chips, scaling to 1M+ and 2.2 GW."
   ],
   "state_evidence": [
    "Case Study \u00b7 AWS \u00d7 Anthropic",
    "# Project Rainier \u2014 Anthropic's 2.2 GW Trainium Campus",
    "AWS spent $11B on 1,200 acres of former farmland in New Carlisle, Indiana to build Anthropic a supercomputer of ~500,000 Trainium2 chips, scaling to 1M+ and 2.2 GW."
   ],
   "capacity_gw_evidence": [
    "Case Study \u00b7 AWS \u00d7 Anthropic",
    "# Project Rainier \u2014 Anthropic's 2.2 GW Trainium Campus",
    "AWS spent $11B on 1,200 acres of former farmland in New Carlisle, Indiana to build Anthropic a supercomputer of ~500,000 Trainium2 chips, scaling to 1M+ and 2.2 GW."
   ],
   "builder_evidence": [
    "Case Study \u00b7 AWS \u00d7 Anthropic",
    "# Project Rainier \u2014 Anthropic's 2.2 GW Trainium Campus",
    "AWS spent $11B on 1,200 acres of former farmland in New Carlisle, Indiana to build Anthropic a supercomputer of ~500,000 Trainium2 chips, scaling to 1M+ and 2.2 GW."
   ],
   "ai_customer_evidence": [
    "Case Study \u00b7 AWS \u00d7 Anthropic",
    "# Project Rainier \u2014 Anthropic's 2.2 GW Trainium Campus",
    "AWS spent $11B on 1,200 acres of former farmland in New Carlisle, Indiana to build Anthropic a supercomputer of ~500,000 Trainium2 chips, scaling to 1M+ and 2.2 GW."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "http://business.woonsocketcall.com/woonsocketcall/article/tokenring-2026-1-2-colossus-unbound-xais-memphis-expansion-targets-1-million-gpus-in-the-race-for-agi",
   "title": "Colossus Unbound: xAI\u00e2s Memphis Expansion Targets 1 Million GPUs in the Race for AGI",
   "published_at": "2026-01-02T19:48:24",
   "project": "Colossus",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "xAI",
   "status": "expanding",
   "announcement_date": "2026-01-02",
   "project_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "locality_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "state_evidence": [
    "As the \"Digital Delta\" takes shape across the Tennessee-Mississippi border, the project is redefining the physical and logistical requirements of the AGI era.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "capacity_gw_evidence": [
    "By targeting a power capacity of 2 gigawatts (GW)\u2014roughly enough to power nearly 2 million homes\u2014xAI is transitioning from a high-scale startup to a \"Gigafactory of Compute.\"",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "builder_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "ai_customer_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "status_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "announcement_date_evidence": [
    "As of January 2, 2026, the company has successfully scaled its initial 100,000-GPU cluster to over 200,000 units and is now aggressively pursuing a roadmap to reach 1 million GPUs by the end of the year.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ]
  },
  {
   "url": "https://energy.media/energy-deals/lancium-and-crusoe-announce-1-gw-texas-data-center",
   "title": "Lancium and Crusoe Announce 1 GW Texas Data Center - Energy.Media",
   "published_at": "2026-07-26T16:58:54",
   "project": null,
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Lancium and Crusoe",
   "ai_customer": "",
   "status": "planned",
   "announcement_date": "2026-07-26",
   "project_evidence": null,
   "locality_evidence": [
    "Lancium and Crusoe Announce 1 GW Texas Data Center",
    "Crusoe, a vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, have announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas, on a 270-acre site owned by Lancium."
   ],
   "state_evidence": [
    "Lancium and Crusoe Announce 1 GW Texas Data Center",
    "Crusoe, a vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, have announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas, on a 270-acre site owned by Lancium."
   ],
   "capacity_gw_evidence": [
    "Lancium and Crusoe Announce 1 GW Texas Data Center",
    "Crusoe, a vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, have announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas, on a 270-acre site owned by Lancium."
   ],
   "builder_evidence": [
    "Lancium and Crusoe Announce 1 GW Texas Data Center",
    "Crusoe, a vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, have announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas, on a 270-acre site owned by Lancium."
   ],
   "ai_customer_evidence": [
    "Lancium and Crusoe Announce 1 GW Texas Data Center",
    "The grid-connected campus, which will also feature behind-the-meter solar and energy storage, is being developed for a leading hyperscale technology company."
   ],
   "status_evidence": [
    "Lancium and Crusoe Announce 1 GW Texas Data Center",
    "Crusoe, a vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, have announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas, on a 270-acre site owned by Lancium."
   ],
   "announcement_date_evidence": [
    "Lancium and Crusoe Announce 1 GW Texas Data Center",
    "- July 26, 2026"
   ]
  },
  {
   "url": "https://newsbreak.com/the-associated-press-510077/4183064475298-vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand",
   "title": "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand - NewsBreak",
   "published_at": "2025-08-19T11:00:28",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026.",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "WebsiteNews from The Associated Press, the definitive source for independent journalism from every corner of the globe.2025-08-19Vantage Data Centers\u2019 Frontier campus in Texas boasts 1.4GW of capacity to meet AI demand.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "locality_evidence": [
    "WebsiteNews from The Associated Press, the definitive source for independent journalism from every corner of the globe.2025-08-19Vantage Data Centers\u2019 Frontier campus in Texas boasts 1.4GW of capacity to meet AI demand.",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "WebsiteNews from The Associated Press, the definitive source for independent journalism from every corner of the globe.2025-08-19Vantage Data Centers\u2019 Frontier campus in Texas boasts 1.4GW of capacity to meet AI demand.",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "WebsiteNews from The Associated Press, the definitive source for independent journalism from every corner of the globe.2025-08-19Vantage Data Centers\u2019 Frontier campus in Texas boasts 1.4GW of capacity to meet AI demand.",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "WebsiteNews from The Associated Press, the definitive source for independent journalism from every corner of the globe.2025-08-19Vantage Data Centers\u2019 Frontier campus in Texas boasts 1.4GW of capacity to meet AI demand.",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "WebsiteNews from The Associated Press, the definitive source for independent journalism from every corner of the globe.2025-08-19Vantage Data Centers\u2019 Frontier campus in Texas boasts 1.4GW of capacity to meet AI demand.",
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": [
    "WebsiteNews from The Associated Press, the definitive source for independent journalism from every corner of the globe.2025-08-19Vantage Data Centers\u2019 Frontier campus in Texas boasts 1.4GW of capacity to meet AI demand."
   ]
  },
  {
   "url": "http://idcnova.com/html/1/59/153/5290.html",
   "title": "**Nscale in Advanced Talks to Acquire Massive 8GW AI Data Center Campus in West Virginia**|Idcnova-Media|the gateway to China data center market",
   "published_at": null,
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Fidelis New Energy",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2023-01-01",
   "project_evidence": [
    "**Nscale in Advanced Talks to Acquire Massive 8GW AI Data Center Campus in West Virginia**",
    "The potential deal underscores the intense competition for large-scale, power-secure sites capable of supporting the next generation of artificial intelligence workloads, which require unprecedented amounts of energy and computing power.",
    "The Monarch Compute Campus is planned to eventually support up to 8 gigawatts of capacity, a colossal scale that highlights the industry's push towards mega-facilities."
   ],
   "locality_evidence": [
    "**Nscale in Advanced Talks to Acquire Massive 8GW AI Data Center Campus in West Virginia**",
    "The potential deal underscores the intense competition for large-scale, power-secure sites capable of supporting the next generation of artificial intelligence workloads, which require unprecedented amounts of energy and computing power.",
    "The site, located in Mason County, is one of the largest available parcels for AI data center development in the nation and has already cleared key regulatory hurdles."
   ],
   "state_evidence": [
    "**Nscale in Advanced Talks to Acquire Massive 8GW AI Data Center Campus in West Virginia**",
    "The potential deal underscores the intense competition for large-scale, power-secure sites capable of supporting the next generation of artificial intelligence workloads, which require unprecedented amounts of energy and computing power.",
    "In a move that could significantly reshape the landscape for AI infrastructure in the United States, UK-based neocloud provider Nscale is reportedly in advanced negotiations to acquire the massive Monarch Compute Campus in West Virginia."
   ],
   "capacity_gw_evidence": [
    "**Nscale in Advanced Talks to Acquire Massive 8GW AI Data Center Campus in West Virginia**",
    "The potential deal underscores the intense competition for large-scale, power-secure sites capable of supporting the next generation of artificial intelligence workloads, which require unprecedented amounts of energy and computing power.",
    "The Monarch Compute Campus is planned to eventually support up to 8 gigawatts of capacity, a colossal scale that highlights the industry's push towards mega-facilities."
   ],
   "builder_evidence": [
    "**Nscale in Advanced Talks to Acquire Massive 8GW AI Data Center Campus in West Virginia**",
    "The potential deal underscores the intense competition for large-scale, power-secure sites capable of supporting the next generation of artificial intelligence workloads, which require unprecedented amounts of energy and computing power.",
    "The property's development history traces back to 2023 when partner Fidelis New Energy first announced plans for a 1GW campus, later expanded into the current joint venture between Fidelis and 8090 Industries that formed AIP at the start of 2026."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "**Nscale in Advanced Talks to Acquire Massive 8GW AI Data Center Campus in West Virginia**",
    "The potential deal underscores the intense competition for large-scale, power-secure sites capable of supporting the next generation of artificial intelligence workloads, which require unprecedented amounts of energy and computing power.",
    "The Monarch Compute Campus is planned to eventually support up to 8 gigawatts of capacity, a colossal scale that highlights the industry's push towards mega-facilities."
   ],
   "announcement_date_evidence": [
    "**Nscale in Advanced Talks to Acquire Massive 8GW AI Data Center Campus in West Virginia**",
    "The potential deal underscores the intense competition for large-scale, power-secure sites capable of supporting the next generation of artificial intelligence workloads, which require unprecedented amounts of energy and computing power.",
    "The property's development history traces back to 2023 when partner Fidelis New Energy first announced plans for a 1GW campus, later expanded into the current joint venture between Fidelis and 8090 Industries that formed AIP at the start of 2026."
   ]
  },
  {
   "url": "https://aidailypost.com/news/openais-georgia-data-center-project-secures",
   "title": "OpenAI's Georgia Data Center Project Secures 3.2-Gigawatt Power Deal",
   "published_at": "2026-07-22T23:16:06",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "Georgia Power",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Editorial illustration for OpenAI's Georgia Data Center Project Secures 3.2-Gigawatt Power Deal",
    "# OpenAI Secures 3.2GW Power Deal for Georgia Data Center",
    "Georgia Power and [OpenAI](/topics/openai) have signed a deal to deliver 3.2 gigawatts of electricity through 2032, tied to a new data center project in Effingham County that OpenAI has named \"Project Camellia.\""
   ],
   "locality_evidence": [
    "Editorial illustration for OpenAI's Georgia Data Center Project Secures 3.2-Gigawatt Power Deal",
    "# OpenAI Secures 3.2GW Power Deal for Georgia Data Center",
    "Georgia Power and [OpenAI](/topics/openai) have signed a deal to deliver 3.2 gigawatts of electricity through 2032, tied to a new data center project in Effingham County that OpenAI has named \"Project Camellia.\""
   ],
   "state_evidence": [
    "Editorial illustration for OpenAI's Georgia Data Center Project Secures 3.2-Gigawatt Power Deal",
    "# OpenAI Secures 3.2GW Power Deal for Georgia Data Center",
    "Georgia Power and [OpenAI](/topics/openai) have signed a deal to deliver 3.2 gigawatts of electricity through 2032, tied to a new data center project in Effingham County that OpenAI has named \"Project Camellia.\""
   ],
   "capacity_gw_evidence": [
    "Editorial illustration for OpenAI's Georgia Data Center Project Secures 3.2-Gigawatt Power Deal",
    "# OpenAI Secures 3.2GW Power Deal for Georgia Data Center",
    "Georgia Power and [OpenAI](/topics/openai) have signed a deal to deliver 3.2 gigawatts of electricity through 2032, tied to a new data center project in Effingham County that OpenAI has named \"Project Camellia.\""
   ],
   "builder_evidence": [
    "Editorial illustration for OpenAI's Georgia Data Center Project Secures 3.2-Gigawatt Power Deal",
    "# OpenAI Secures 3.2GW Power Deal for Georgia Data Center",
    "Georgia Power and [OpenAI](/topics/openai) have signed a deal to deliver 3.2 gigawatts of electricity through 2032, tied to a new data center project in Effingham County that OpenAI has named \"Project Camellia.\""
   ],
   "ai_customer_evidence": [
    "Editorial illustration for OpenAI's Georgia Data Center Project Secures 3.2-Gigawatt Power Deal",
    "# OpenAI Secures 3.2GW Power Deal for Georgia Data Center",
    "Georgia Power and [OpenAI](/topics/openai) have signed a deal to deliver 3.2 gigawatts of electricity through 2032, tied to a new data center project in Effingham County that OpenAI has named \"Project Camellia.\""
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://cryptoworldheadline.com/bitcoin-information-right-this-moment-is-mining-dying-as-terawulf-abandons-miners",
   "title": "Bitcoin Information Right this moment: Is Mining Dying as TeraWulf Abandons Miners",
   "published_at": "2026-05-27T00:00:00",
   "project": "Muskie Information Campus",
   "locality": "EastPark Industrial Park",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "In Bitcoin information in the present day, TeraWulf simply made probably the most candid assertion about Bitcoin mining\u2019s future that any publicly traded miner has ever made with an actual property deal.",
    "The Maryland-based Bitcoin mining agency introduced Tuesday that it has acquired the Muskie Information Campus, a 285-acre web site inside japanese Kentucky\u2019s EastPark Industrial Park, and plans to construct greater than 1 gigawatt of AI knowledge middle capability there."
   ],
   "locality_evidence": [
    "In Bitcoin information in the present day, TeraWulf simply made probably the most candid assertion about Bitcoin mining\u2019s future that any publicly traded miner has ever made with an actual property deal.",
    "The Maryland-based Bitcoin mining agency introduced Tuesday that it has acquired the Muskie Information Campus, a 285-acre web site inside japanese Kentucky\u2019s EastPark Industrial Park, and plans to construct greater than 1 gigawatt of AI knowledge middle capability there."
   ],
   "state_evidence": [
    "In Bitcoin information in the present day, TeraWulf simply made probably the most candid assertion about Bitcoin mining\u2019s future that any publicly traded miner has ever made with an actual property deal.",
    "The Maryland-based Bitcoin mining agency introduced Tuesday that it has acquired the Muskie Information Campus, a 285-acre web site inside japanese Kentucky\u2019s EastPark Industrial Park, and plans to construct greater than 1 gigawatt of AI knowledge middle capability there."
   ],
   "capacity_gw_evidence": [
    "In Bitcoin information in the present day, TeraWulf simply made probably the most candid assertion about Bitcoin mining\u2019s future that any publicly traded miner has ever made with an actual property deal.",
    "The Maryland-based Bitcoin mining agency introduced Tuesday that it has acquired the Muskie Information Campus, a 285-acre web site inside japanese Kentucky\u2019s EastPark Industrial Park, and plans to construct greater than 1 gigawatt of AI knowledge middle capability there."
   ],
   "builder_evidence": [
    "In Bitcoin information in the present day, TeraWulf simply made probably the most candid assertion about Bitcoin mining\u2019s future that any publicly traded miner has ever made with an actual property deal.",
    "The Maryland-based Bitcoin mining agency introduced Tuesday that it has acquired the Muskie Information Campus, a 285-acre web site inside japanese Kentucky\u2019s EastPark Industrial Park, and plans to construct greater than 1 gigawatt of AI knowledge middle capability there."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "In Bitcoin information in the present day, TeraWulf simply made probably the most candid assertion about Bitcoin mining\u2019s future that any publicly traded miner has ever made with an actual property deal.",
    "The Maryland-based Bitcoin mining agency introduced Tuesday that it has acquired the Muskie Information Campus, a 285-acre web site inside japanese Kentucky\u2019s EastPark Industrial Park, and plans to construct greater than 1 gigawatt of AI knowledge middle capability there."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://dlvr.it/TTd1ft",
   "title": "Hut 8 signs 352MW lease with unnamed hyperscaler in Texas",
   "published_at": "2026-07-22T00:00:00",
   "project": "Beacon Point",
   "locality": "Corpus Christi",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "commercialized",
   "announcement_date": null,
   "project_evidence": [
    "The company this week announced the commercialization of the second phase of its Beacon Point data center campus in Nueces County, Texas, via a second 15-year, $9.8 billion lease for 352MW of IT capacity.",
    "Cryptomine and HPC data center developer Hut 8 has signed an extended lease with a hyperscale customer in Texas."
   ],
   "locality_evidence": [
    "The 525-acre campus is located near Corpus Christi.",
    "Cryptomine and HPC data center developer Hut 8 has signed an extended lease with a hyperscale customer in Texas."
   ],
   "state_evidence": [
    "The company this week announced the commercialization of the second phase of its Beacon Point data center campus in Nueces County, Texas, via a second 15-year, $9.8 billion lease for 352MW of IT capacity.",
    "Cryptomine and HPC data center developer Hut 8 has signed an extended lease with a hyperscale customer in Texas."
   ],
   "capacity_gw_evidence": [
    "This latest lease further commercializes Beacon Point\u2019s 1GW of utility capacity, secured under an interconnection agreement with AEP Texas for electric delivery service.",
    "Cryptomine and HPC data center developer Hut 8 has signed an extended lease with a hyperscale customer in Texas."
   ],
   "builder_evidence": [
    "Cryptomine and HPC data center developer Hut 8 has signed an extended lease with a hyperscale customer in Texas.",
    "The company this week announced the commercialization of the second phase of its Beacon Point data center campus in Nueces County, Texas, via a second 15-year, $9.8 billion lease for 352MW of IT capacity."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The company this week announced the commercialization of the second phase of its Beacon Point data center campus in Nueces County, Texas, via a second 15-year, $9.8 billion lease for 352MW of IT capacity.",
    "Cryptomine and HPC data center developer Hut 8 has signed an extended lease with a hyperscale customer in Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://techblog.comsoc.org/2026/05/10/nvidia-strategic-partnership-with-iren-targets-5g-watts-ai-infrastructure-buildout-2-1b-investment-option",
   "title": "Nvidia strategic partnership with IREN targets 5G Watts AI infrastructure buildout + $2.1B investment option",
   "published_at": "2026-05-10T23:36:12",
   "project": "Sweetwater campus",
   "locality": "Texas",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": "Nvidia",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# Nvidia strategic partnership with IREN targets 5G Watts AI infrastructure buildout + $2.1B investment option",
    "The roadmap centers on the **2GW Sweetwater campus** in Texas, positioned to be the flagship deployment of NVIDIA\u2019s **DSX factory architecture**."
   ],
   "locality_evidence": [
    "# Nvidia strategic partnership with IREN targets 5G Watts AI infrastructure buildout + $2.1B investment option",
    "The roadmap centers on the **2GW Sweetwater campus** in Texas, positioned to be the flagship deployment of NVIDIA\u2019s **DSX factory architecture**."
   ],
   "state_evidence": [
    "# Nvidia strategic partnership with IREN targets 5G Watts AI infrastructure buildout + $2.1B investment option",
    "The roadmap centers on the **2GW Sweetwater campus** in Texas, positioned to be the flagship deployment of NVIDIA\u2019s **DSX factory architecture**."
   ],
   "capacity_gw_evidence": [
    "# Nvidia strategic partnership with IREN targets 5G Watts AI infrastructure buildout + $2.1B investment option",
    "The roadmap centers on the **2GW Sweetwater campus** in Texas, positioned to be the flagship deployment of NVIDIA\u2019s **DSX factory architecture**."
   ],
   "builder_evidence": [
    "# Nvidia strategic partnership with IREN targets 5G Watts AI infrastructure buildout + $2.1B investment option",
    "**Nvidia** has [announced](https://nvidianews.nvidia.com/news/nvidia-and-iren-announce-strategic-partnership-to-accelerate-deployment-of-up-to-5-gigawatts-of-ai-infrastructure) a strategic partnership with cloud AI data center operator [**IREN [1.]**](https://iren.com/) to deploy up to **5G Watts (5GW) of AI infrastructure**, driven by a **$3.4 billion services contract** and a **$2.1****billion investment option** for Nvidia."
   ],
   "ai_customer_evidence": [
    "# Nvidia strategic partnership with IREN targets 5G Watts AI infrastructure buildout + $2.1B investment option",
    "**Nvidia** has [announced](https://nvidianews.nvidia.com/news/nvidia-and-iren-announce-strategic-partnership-to-accelerate-deployment-of-up-to-5-gigawatts-of-ai-infrastructure) a strategic partnership with cloud AI data center operator [**IREN [1.]**](https://iren.com/) to deploy up to **5G Watts (5GW) of AI infrastructure**, driven by a **$3.4 billion services contract** and a **$2.1****billion investment option** for Nvidia."
   ],
   "status_evidence": [
    "# Nvidia strategic partnership with IREN targets 5G Watts AI infrastructure buildout + $2.1B investment option",
    "**Nvidia** has [announced](https://nvidianews.nvidia.com/news/nvidia-and-iren-announce-strategic-partnership-to-accelerate-deployment-of-up-to-5-gigawatts-of-ai-infrastructure) a strategic partnership with cloud AI data center operator [**IREN [1.]**](https://iren.com/) to deploy up to **5G Watts (5GW) of AI infrastructure**, driven by a **$3.4 billion services contract** and a **$2.1****billion investment option** for Nvidia."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://einpresswire.com/article/915463239/enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": "2026-05-27T19:28:19",
   "project": "Creekstone Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "About Creekstone Energy",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "About Creekstone Energy",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://neiaap.com/article/ecl-announces-1gw-hydrogen-fuel-powered-off-grid-texas-ai-factory-data-center",
   "title": "ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
   "published_at": null,
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "### ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
    "Now, it intends to build a 1 GW facility powered by hydrogen fuel, the ECL TerraSite-TX1."
   ],
   "locality_evidence": [
    "### ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
    "The facility will be located on over 600 acres not too far from Houston, Texas"
   ],
   "state_evidence": [
    "### ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
    "The facility will be located on over 600 acres not too far from Houston, Texas"
   ],
   "capacity_gw_evidence": [
    "### ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
    "ECL, a data center-as-a-service pioneer, recently announced that it would be opening the first 1 gigawatt hydrogen fuel-powered off-grid AI Factory data center, a facility it intends to open in Texas near Houston."
   ],
   "builder_evidence": [
    "### ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
    "ECL, a data center-as-a-service pioneer, recently announced that it would be opening the first 1 gigawatt hydrogen fuel-powered off-grid AI Factory data center, a facility it intends to open in Texas near Houston."
   ],
   "ai_customer_evidence": [
    "### ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
    "The first tenant at the new H2-powered sustainable data center east of Houston will be Lambda."
   ],
   "status_evidence": [
    "### ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
    "Now, it intends to build a 1 GW facility powered by hydrogen fuel, the ECL TerraSite-TX1."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://bitget.com/asia/amp/news/detail/12560605689483",
   "title": "Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant",
   "published_at": "2026-08-17T13:56:15",
   "project": "PORTS-Pike Technology Park",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant",
    "On August 17, **Nvidia announced a strategic partnership with SB Energy to provide credit support for the PORTS-Pike Technology Park in Ohio, transforming it into a hyperscale data center dedicated to Nvidia AI computing infrastructure, with OpenAI as the sole tenant. At the same time, Nvidia is investing $1.5 billion in SB Energy.**"
   ],
   "locality_evidence": [
    "# Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant",
    "PORTS-Pike is located in Pike County, Ohio, adjacent to the decommissioned Portsmouth Gaseous Diffusion Plant site, spanning both private and federal land."
   ],
   "state_evidence": [
    "# Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant"
   ],
   "capacity_gw_evidence": [
    "# Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant",
    "**The initial deployment capacity of the project is 4.25 IT-GW, with Nvidia having the option to expand by an additional 3.75 IT-GW, bringing the park\u2019s planned total capacity to 8 IT-GW.**"
   ],
   "builder_evidence": [
    "# Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant"
   ],
   "ai_customer_evidence": [
    "# Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant"
   ],
   "status_evidence": [
    "# Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant",
    "On August 17, **Nvidia announced a strategic partnership with SB Energy to provide credit support for the PORTS-Pike Technology Park in Ohio, transforming it into a hyperscale data center dedicated to Nvidia AI computing infrastructure, with OpenAI as the sole tenant. At the same time, Nvidia is investing $1.5 billion in SB Energy.**"
   ],
   "announcement_date_evidence": [
    "# Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant",
    "On August 17, **Nvidia announced a strategic partnership with SB Energy to provide credit support for the PORTS-Pike Technology Park in Ohio, transforming it into a hyperscale data center dedicated to Nvidia AI computing infrastructure, with OpenAI as the sole tenant. At the same time, Nvidia is investing $1.5 billion in SB Energy.**"
   ]
  },
  {
   "url": "https://presenc.ai/research/stargate-project-status-2026",
   "title": "Stargate Project Status Report 2026",
   "published_at": "2026-05-22T00:00:00",
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": null,
   "ai_customer": null,
   "status": "4 of 8 buildings live; GPT-5.5 trained here",
   "announcement_date": null,
   "project_evidence": [
    "Stargate Site Map (May 2026)",
    "| Site | State or Country | Planned Capacity | Status |",
    "| Abilene | Texas, USA | 1.2 GW | 4 of 8 buildings live; GPT-5.5 trained here |"
   ],
   "locality_evidence": [
    "Stargate Site Map (May 2026)",
    "| Site | State or Country | Planned Capacity | Status |",
    "| Abilene | Texas, USA | 1.2 GW | 4 of 8 buildings live; GPT-5.5 trained here |"
   ],
   "state_evidence": [
    "Stargate Site Map (May 2026)",
    "| Site | State or Country | Planned Capacity | Status |",
    "| Abilene | Texas, USA | 1.2 GW | 4 of 8 buildings live; GPT-5.5 trained here |"
   ],
   "capacity_gw_evidence": [
    "Stargate Site Map (May 2026)",
    "| Site | State or Country | Planned Capacity | Status |",
    "| Abilene | Texas, USA | 1.2 GW | 4 of 8 buildings live; GPT-5.5 trained here |"
   ],
   "builder_evidence": null,
   "ai_customer_evidence": null,
   "status_evidence": [
    "Stargate Site Map (May 2026)",
    "| Site | State or Country | Planned Capacity | Status |",
    "| Abilene | Texas, USA | 1.2 GW | 4 of 8 buildings live; GPT-5.5 trained here |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://presenc.ai/research/stargate-project-status-2026",
   "title": "Stargate Project Status Report 2026",
   "published_at": "2026-05-22T00:00:00",
   "project": "Milam County",
   "locality": "Milam County",
   "state": "Texas",
   "capacity_gw": 1.1,
   "builder": "SB Energy",
   "ai_customer": null,
   "status": "Under construction with SB Energy",
   "announcement_date": null,
   "project_evidence": [
    "Stargate Site Map (May 2026)",
    "| Site | State or Country | Planned Capacity | Status |",
    "| Milam County | Texas, USA | 1.1 GW | Under construction with SB Energy |"
   ],
   "locality_evidence": [
    "Stargate Site Map (May 2026)",
    "| Site | State or Country | Planned Capacity | Status |",
    "| Milam County | Texas, USA | 1.1 GW | Under construction with SB Energy |"
   ],
   "state_evidence": [
    "Stargate Site Map (May 2026)",
    "| Site | State or Country | Planned Capacity | Status |",
    "| Milam County | Texas, USA | 1.1 GW | Under construction with SB Energy |"
   ],
   "capacity_gw_evidence": [
    "Stargate Site Map (May 2026)",
    "| Site | State or Country | Planned Capacity | Status |",
    "| Milam County | Texas, USA | 1.1 GW | Under construction with SB Energy |"
   ],
   "builder_evidence": [
    "Stargate Site Map (May 2026)",
    "| Site | State or Country | Planned Capacity | Status |",
    "| Milam County | Texas, USA | 1.1 GW | Under construction with SB Energy |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Stargate Site Map (May 2026)",
    "| Site | State or Country | Planned Capacity | Status |",
    "| Milam County | Texas, USA | 1.1 GW | Under construction with SB Energy |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://presenc.ai/research/stargate-project-status-2026",
   "title": "Stargate Project Status Report 2026",
   "published_at": "2026-05-22T00:00:00",
   "project": "Lordstown",
   "locality": "Lordstown",
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": null,
   "ai_customer": null,
   "status": "2027 target operational date",
   "announcement_date": null,
   "project_evidence": [
    "Stargate Site Map (May 2026)",
    "| Site | State or Country | Planned Capacity | Status |",
    "| Lordstown | Ohio, USA | ~1.0 GW | 2027 target operational date |"
   ],
   "locality_evidence": [
    "Stargate Site Map (May 2026)",
    "| Site | State or Country | Planned Capacity | Status |",
    "| Lordstown | Ohio, USA | ~1.0 GW | 2027 target operational date |"
   ],
   "state_evidence": [
    "Stargate Site Map (May 2026)",
    "| Site | State or Country | Planned Capacity | Status |",
    "| Lordstown | Ohio, USA | ~1.0 GW | 2027 target operational date |"
   ],
   "capacity_gw_evidence": [
    "Stargate Site Map (May 2026)",
    "| Site | State or Country | Planned Capacity | Status |",
    "| Lordstown | Ohio, USA | ~1.0 GW | 2027 target operational date |"
   ],
   "builder_evidence": null,
   "ai_customer_evidence": null,
   "status_evidence": [
    "Stargate Site Map (May 2026)",
    "| Site | State or Country | Planned Capacity | Status |",
    "| Lordstown | Ohio, USA | ~1.0 GW | 2027 target operational date |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatainsider.com/news/meta-commits-10-bn-to-1-gw-data-centre-in-indiana",
   "title": "Meta Commits $10 Bn to 1 GW Data Centre in Indiana",
   "published_at": "2026-02-12T13:58:08",
   "project": null,
   "locality": "Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "broken ground",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "Meta has broken ground on a 1 gigawatt (GW) data centre campus in Lebanon, Indiana, marking an investment of more than $10 billion in infrastructure and the surrounding community."
   ],
   "state_evidence": [
    "Meta has broken ground on a 1 gigawatt (GW) data centre campus in Lebanon, Indiana, marking an investment of more than $10 billion in infrastructure and the surrounding community."
   ],
   "capacity_gw_evidence": [
    "Meta has broken ground on a 1 gigawatt (GW) data centre campus in Lebanon, Indiana, marking an investment of more than $10 billion in infrastructure and the surrounding community."
   ],
   "builder_evidence": [
    "Meta has broken ground on a 1 gigawatt (GW) data centre campus in Lebanon, Indiana, marking an investment of more than $10 billion in infrastructure and the surrounding community."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Meta has broken ground on a 1 gigawatt (GW) data centre campus in Lebanon, Indiana, marking an investment of more than $10 billion in infrastructure and the surrounding community."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatainsider.com/news/meta-commits-10-bn-to-1-gw-data-centre-in-indiana",
   "title": "Meta Commits $10 Bn to 1 GW Data Centre in Indiana",
   "published_at": "2026-02-12T13:58:08",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "The company\u2019s broader US expansion includes the 5 GW Hyperion project in Richland Parish, Louisiana, with an initial 2 GW planned by 2030, and the 1 GW Prometheus supercluster in New Albany, Ohio, which is expected to come online in 2026."
   ],
   "locality_evidence": [
    "The company\u2019s broader US expansion includes the 5 GW Hyperion project in Richland Parish, Louisiana, with an initial 2 GW planned by 2030, and the 1 GW Prometheus supercluster in New Albany, Ohio, which is expected to come online in 2026."
   ],
   "state_evidence": [
    "The company\u2019s broader US expansion includes the 5 GW Hyperion project in Richland Parish, Louisiana, with an initial 2 GW planned by 2030, and the 1 GW Prometheus supercluster in New Albany, Ohio, which is expected to come online in 2026."
   ],
   "capacity_gw_evidence": [
    "The company\u2019s broader US expansion includes the 5 GW Hyperion project in Richland Parish, Louisiana, with an initial 2 GW planned by 2030, and the 1 GW Prometheus supercluster in New Albany, Ohio, which is expected to come online in 2026."
   ],
   "builder_evidence": [
    "Meta plans to invest up to $600 billion over the next three years (through 2028) in US AI data centres and related infrastructure, with 2026 capex potentially reaching $135 billion.",
    "The company\u2019s broader US expansion includes the 5 GW Hyperion project in Richland Parish, Louisiana, with an initial 2 GW planned by 2030, and the 1 GW Prometheus supercluster in New Albany, Ohio, which is expected to come online in 2026."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatainsider.com/news/meta-commits-10-bn-to-1-gw-data-centre-in-indiana",
   "title": "Meta Commits $10 Bn to 1 GW Data Centre in Indiana",
   "published_at": "2026-02-12T13:58:08",
   "project": "Prometheus",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "expected to come online in 2026",
   "announcement_date": null,
   "project_evidence": [
    "The company\u2019s broader US expansion includes the 5 GW Hyperion project in Richland Parish, Louisiana, with an initial 2 GW planned by 2030, and the 1 GW Prometheus supercluster in New Albany, Ohio, which is expected to come online in 2026."
   ],
   "locality_evidence": [
    "The company\u2019s broader US expansion includes the 5 GW Hyperion project in Richland Parish, Louisiana, with an initial 2 GW planned by 2030, and the 1 GW Prometheus supercluster in New Albany, Ohio, which is expected to come online in 2026."
   ],
   "state_evidence": [
    "The company\u2019s broader US expansion includes the 5 GW Hyperion project in Richland Parish, Louisiana, with an initial 2 GW planned by 2030, and the 1 GW Prometheus supercluster in New Albany, Ohio, which is expected to come online in 2026."
   ],
   "capacity_gw_evidence": [
    "The company\u2019s broader US expansion includes the 5 GW Hyperion project in Richland Parish, Louisiana, with an initial 2 GW planned by 2030, and the 1 GW Prometheus supercluster in New Albany, Ohio, which is expected to come online in 2026."
   ],
   "builder_evidence": [
    "Meta plans to invest up to $600 billion over the next three years (through 2028) in US AI data centres and related infrastructure, with 2026 capex potentially reaching $135 billion.",
    "The company\u2019s broader US expansion includes the 5 GW Hyperion project in Richland Parish, Louisiana, with an initial 2 GW planned by 2030, and the 1 GW Prometheus supercluster in New Albany, Ohio, which is expected to come online in 2026."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The company\u2019s broader US expansion includes the 5 GW Hyperion project in Richland Parish, Louisiana, with an initial 2 GW planned by 2030, and the 1 GW Prometheus supercluster in New Albany, Ohio, which is expected to come online in 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterindex.ai/projects/aws-project-rainier-ai-campus-indiana",
   "title": "AWS Project Rainier (New Carlisle, Indiana) \u2014 2.4 GW AI Data Center, New Carlisle, IN | Data Center Index",
   "published_at": null,
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.4,
   "builder": "Amazon Web Services",
   "ai_customer": "Anthropic",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# AWS Project Rainier (New Carlisle, Indiana)",
    "AWS Project Rainier (New Carlisle, Indiana) is a 2.4 GW AI data center project located in New Carlisle, IN, United States, currently operational.",
    "Amazon Web Services (AWS) is rapidly expanding its \"Project Rainier\" AI supercomputing campus in New Carlisle, Indiana, representing a total investment of $15 billion."
   ],
   "locality_evidence": [
    "# AWS Project Rainier (New Carlisle, Indiana)",
    "2.4 GW AI data center in New Carlisle, IN, United States \u2014 operational.",
    "AWS Project Rainier (New Carlisle, Indiana) is a 2.4 GW AI data center project located in New Carlisle, IN, United States, currently operational."
   ],
   "state_evidence": [
    "# AWS Project Rainier (New Carlisle, Indiana)",
    "2.4 GW AI data center in New Carlisle, IN, United States \u2014 operational.",
    "AWS Project Rainier (New Carlisle, Indiana) is a 2.4 GW AI data center project located in New Carlisle, IN, United States, currently operational."
   ],
   "capacity_gw_evidence": [
    "# AWS Project Rainier (New Carlisle, Indiana)",
    "2.4 GW AI data center in New Carlisle, IN, United States \u2014 operational.",
    "- Capacity: **2.4 GW**",
    "AWS Project Rainier (New Carlisle, Indiana) is a 2.4 GW AI data center project located in New Carlisle, IN, United States, currently operational."
   ],
   "builder_evidence": [
    "# AWS Project Rainier (New Carlisle, Indiana)",
    "- Developer: Amazon Web Services",
    "It is being built by Amazon Web Services."
   ],
   "ai_customer_evidence": [
    "# AWS Project Rainier (New Carlisle, Indiana)",
    "Amazon Web Services (AWS) is rapidly expanding its \"Project Rainier\" AI supercomputing campus in New Carlisle, Indiana, representing a total investment of $15 billion.",
    "The massive 2.4 GW campus is specifically optimized to serve partner Anthropic's AI training workloads."
   ],
   "status_evidence": [
    "# AWS Project Rainier (New Carlisle, Indiana)",
    "2.4 GW AI data center in New Carlisle, IN, United States \u2014 operational.",
    "- Status: operational",
    "AWS Project Rainier (New Carlisle, Indiana) is a 2.4 GW AI data center project located in New Carlisle, IN, United States, currently operational."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://investor.wedbush.com/wedbush/article/tokenring-2026-1-2-colossus-unbound-xais-memphis-expansion-targets-1-million-gpus-in-the-race-for-agi",
   "title": "Colossus Unbound: xAI\u00e2s Memphis Expansion Targets 1 Million GPUs in the Race for AGI",
   "published_at": "2026-01-02T19:48:24",
   "project": "Colossus",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "xAI",
   "status": "expanding",
   "announcement_date": "2026-01-02",
   "project_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "locality_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "state_evidence": [
    "As the \"Digital Delta\" takes shape across the Tennessee-Mississippi border, the project is redefining the physical and logistical requirements of the AGI era.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "capacity_gw_evidence": [
    "By targeting a power capacity of 2 gigawatts (GW)\u2014roughly enough to power nearly 2 million homes\u2014xAI is transitioning from a high-scale startup to a \"Gigafactory of Compute.\"",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "builder_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "ai_customer_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "status_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "announcement_date_evidence": [
    "As of January 2, 2026, the company has successfully scaled its initial 100,000-GPU cluster to over 200,000 units and is now aggressively pursuing a roadmap to reach 1 million GPUs by the end of the year.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ]
  },
  {
   "url": "https://constructionequipmentguide.com/crusoe-lancium-partner-on-data-center-campus/71847",
   "title": "Crusoe, Lancium Partner On Data Center Campus : CEG",
   "published_at": "2026-07-21T00:00:00",
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Lancium",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "Crusoe, a vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, announced on July 15, 2026, a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "locality_evidence": [
    "Crusoe, a vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, announced on July 15, 2026, a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "state_evidence": [
    "Crusoe, a vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, announced on July 15, 2026, a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "Crusoe, a vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, announced on July 15, 2026, a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "builder_evidence": [
    "Crusoe, a vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, announced on July 15, 2026, a 1.0 gigawatt (GW) AI data center campus in Childress, Texas.",
    "The grid-connected campus spans 270 acres owned by Lancium, which also will develop and manage the site's energy infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Crusoe, a vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, announced on July 15, 2026, a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "announcement_date_evidence": [
    "Crusoe, a vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, announced on July 15, 2026, a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ]
  },
  {
   "url": "https://constructionequipmentguide.com/crusoe-lancium-partner-on-data-center-campus/71847",
   "title": "Crusoe, Lancium Partner On Data Center Campus : CEG",
   "published_at": "2026-07-21T00:00:00",
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Lancium",
   "ai_customer": null,
   "status": "expanding",
   "announcement_date": null,
   "project_evidence": [
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year before expanding that campus to 1.2 GW."
   ],
   "locality_evidence": [
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year before expanding that campus to 1.2 GW."
   ],
   "state_evidence": [
    "The Childress development is the latest chapter in Crusoe's Texas history.",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year before expanding that campus to 1.2 GW."
   ],
   "capacity_gw_evidence": [
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year before expanding that campus to 1.2 GW."
   ],
   "builder_evidence": [
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year before expanding that campus to 1.2 GW."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year before expanding that campus to 1.2 GW."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://epoch.ai/data/ai-data-centers/directory/openai-stargate-shackelford",
   "title": "OpenAI Stargate Shackelford | AI Data Centers",
   "published_at": null,
   "project": "OpenAI Stargate Shackelford",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage",
   "ai_customer": "OpenAI",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Stargate Shackelford",
    "OpenAI Stargate Shackelford is an AI Data Center under construction, projected to host an estimated 3,623k H100-equivalent chips \u2014 supported by 1,400 MW \u2014 at a capital cost of $53.0 B."
   ],
   "locality_evidence": [
    "# OpenAI Stargate Shackelford",
    "Abilene, Texas, United States",
    "OpenAI Stargate Shackelford is an AI Data Center under construction, projected to host an estimated 3,623k H100-equivalent chips \u2014 supported by 1,400 MW \u2014 at a capital cost of $53.0 B."
   ],
   "state_evidence": [
    "# OpenAI Stargate Shackelford",
    "Abilene, Texas, United States",
    "OpenAI Stargate Shackelford is an AI Data Center under construction, projected to host an estimated 3,623k H100-equivalent chips \u2014 supported by 1,400 MW \u2014 at a capital cost of $53.0 B."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Stargate Shackelford",
    "OpenAI Stargate Shackelford is an AI Data Center under construction, projected to host an estimated 3,623k H100-equivalent chips \u2014 supported by 1,400 MW \u2014 at a capital cost of $53.0 B."
   ],
   "builder_evidence": [
    "# OpenAI Stargate Shackelford",
    "Just 20 km from the original Abilene site, Shackelford is the second U.S. Stargate location, developed by Vantage under the name \u201cFrontier.\u201d"
   ],
   "ai_customer_evidence": [
    "# OpenAI Stargate Shackelford",
    "OpenAI Stargate Shackelford is an AI Data Center under construction, projected to host an estimated 3,623k H100-equivalent chips \u2014 supported by 1,400 MW \u2014 at a capital cost of $53.0 B."
   ],
   "status_evidence": [
    "# OpenAI Stargate Shackelford",
    "OpenAI Stargate Shackelford is an AI Data Center under construction, projected to host an estimated 3,623k H100-equivalent chips \u2014 supported by 1,400 MW \u2014 at a capital cost of $53.0 B."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://finance.yahoo.com/news/fermi-america-makes-initial-draw-213700797.html",
   "title": "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
   "published_at": "2026-02-19T21:37:00",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "in development",
   "announcement_date": "2026-02-19",
   "project_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "# Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "locality_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ -- [Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://fermiamerica.com/), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "# Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "state_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ -- [Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://fermiamerica.com/), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "# Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "capacity_gw_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "# Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "builder_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "# Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The behind-the-meter Project Matador campus is expected to integrate the nation's biggest combined-cycle natural gas project, one of the largest clean, new nuclear power complexes in America, utility grid power, solar power, and battery energy storage, to support hyperscale AI and advanced computing.",
    "# Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "announcement_date_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ -- [Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://fermiamerica.com/), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "# Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ]
  },
  {
   "url": "https://bicmagazine.com/industry/natgas-lng/kiewit-to-build-countrys-largest-natural-gas-powered-ai-data-center-campus",
   "title": "Kiewit to build country\u2019s largest natural gas-powered AI data center campus",
   "published_at": null,
   "project": "Homer City Energy Campus",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Kiewit Power Constructors Co.",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Kiewit to build country\u2019s largest natural gas-powered AI data center campus",
    "GE Vernova will provide seven high efficiency 7HA.02 hydrogen-enabled, gas-fired turbines, with the first deliveries expected to begin in 2026.",
    "The Homer City Energy Campus will be built by Kiewit Power Constructors Co., one of the leading engineering, procurement and construction (EPC) contractors in the country."
   ],
   "locality_evidence": [
    "# Kiewit to build country\u2019s largest natural gas-powered AI data center campus",
    "Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) announced the future of the former Homer City Generating Station."
   ],
   "state_evidence": [
    "# Kiewit to build country\u2019s largest natural gas-powered AI data center campus",
    "Homer City, previously the largest coal-burning power plant in Pennsylvania, will be transformed into a more than 3,200-acre natural gas-powered data center campus, designed to meet the growing artificial intelligence (AI) and high-performance computing (HPC) needs of the innovative technology companies shaping America\u2019s digital future."
   ],
   "capacity_gw_evidence": [
    "# Kiewit to build country\u2019s largest natural gas-powered AI data center campus",
    "Delivery of up to 4.5 gigawatts (GW) of power to support AI-driven hyperscale data centers, while reducing greenhouse gas emissions by 60\u201365% per megawatt hour compared to the former coal plant."
   ],
   "builder_evidence": [
    "# Kiewit to build country\u2019s largest natural gas-powered AI data center campus",
    "The Homer City Energy Campus will be built by Kiewit Power Constructors Co., one of the leading engineering, procurement and construction (EPC) contractors in the country."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Kiewit to build country\u2019s largest natural gas-powered AI data center campus",
    "Construction of the site is expected to commence this year and is expected to begin producing power by 2027."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://technode.global/prnasia/nscale-and-microsoft-announce-collaboration-with-nvidia-and-caterpillar-to-deliver-1-35gw-of-nvidia-vera-rubin-nvl72-gpus-at-flagship-ai-factory-campus-in-west-virginia",
   "title": "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia - TNGlobal",
   "published_at": "2026-03-16T21:32:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "announced",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid"
   ],
   "locality_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "state_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "capacity_gw_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "builder_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "ai_customer_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA\u2019s next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ],
   "status_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA\u2019s next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ],
   "announcement_date_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "March 17, 2026",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA\u2019s next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ]
  },
  {
   "url": "https://keepingupwith.ai/articles/utahs-40000-acre-data-center-faces-environmental-hurdles-despite-fast-track-appr",
   "title": "Utah's 40,000-Acre Data Center Faces Environmental Hurdles Despite Fast-Track Approval",
   "published_at": "2026-05-21T21:01:50",
   "project": "Stratos Project",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "West GenCo",
   "ai_customer": null,
   "status": "Zoning approval secured; environmental and building permits pending",
   "announcement_date": "2026-03",
   "project_evidence": [
    "# Utah's 40,000-Acre Data Center Faces Environmental Hurdles Despite Fast-Track Approval",
    "Box Elder County commissioners approved the Stratos Project, a massive AI data center backed by Kevin O'Leary, but environmental permits and water sustainability remain unresolved.",
    "## Stratos Project Clears Local Approval, Skips State and Federal Environmental Review",
    "**Kevin O\u2019Leary\u2019s** Stratos Project secured zoning approval from Box Elder County commissioners in May 2026, clearing the path for one of the largest compute infrastructure buildouts in U.S. history."
   ],
   "locality_evidence": [
    "# Utah's 40,000-Acre Data Center Faces Environmental Hurdles Despite Fast-Track Approval",
    "Box Elder County commissioners approved the Stratos Project, a massive AI data center backed by Kevin O'Leary, but environmental permits and water sustainability remain unresolved.",
    "## Stratos Project Clears Local Approval, Skips State and Federal Environmental Review",
    "**Kevin O\u2019Leary\u2019s** Stratos Project secured zoning approval from Box Elder County commissioners in May 2026, clearing the path for one of the largest compute infrastructure buildouts in U.S. history."
   ],
   "state_evidence": [
    "# Utah's 40,000-Acre Data Center Faces Environmental Hurdles Despite Fast-Track Approval",
    "Box Elder County commissioners approved the Stratos Project, a massive AI data center backed by Kevin O'Leary, but environmental permits and water sustainability remain unresolved.",
    "## Stratos Project Clears Local Approval, Skips State and Federal Environmental Review",
    "According to The Verge AI, the facility will span 62 square miles across Utah\u2019s Hansel Valley, consume 9GW of continuous power\u2014nearly double the state\u2019s peak electricity demand in 2025\u2014and require a first-phase investment exceeding $4 billion."
   ],
   "capacity_gw_evidence": [
    "# Utah's 40,000-Acre Data Center Faces Environmental Hurdles Despite Fast-Track Approval",
    "Box Elder County commissioners approved the Stratos Project, a massive AI data center backed by Kevin O'Leary, but environmental permits and water sustainability remain unresolved.",
    "## Stratos Project Clears Local Approval, Skips State and Federal Environmental Review",
    "According to The Verge AI, the facility will span 62 square miles across Utah\u2019s Hansel Valley, consume 9GW of continuous power\u2014nearly double the state\u2019s peak electricity demand in 2025\u2014and require a first-phase investment exceeding $4 billion."
   ],
   "builder_evidence": [
    "# Utah's 40,000-Acre Data Center Faces Environmental Hurdles Despite Fast-Track Approval",
    "Box Elder County commissioners approved the Stratos Project, a massive AI data center backed by Kevin O'Leary, but environmental permits and water sustainability remain unresolved.",
    "## Accelerated Permitting Process Raises Questions About Environmental Rigor",
    "The partnership between O\u2019Leary\u2019s investment firm and real-estate developer **West GenCo** was announced publicly in March; county approval followed by May."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Utah's 40,000-Acre Data Center Faces Environmental Hurdles Despite Fast-Track Approval",
    "Box Elder County commissioners approved the Stratos Project, a massive AI data center backed by Kevin O'Leary, but environmental permits and water sustainability remain unresolved.",
    "## Stratos Project Clears Local Approval, Skips State and Federal Environmental Review",
    "**Kevin O\u2019Leary\u2019s** Stratos Project secured zoning approval from Box Elder County commissioners in May 2026, clearing the path for one of the largest compute infrastructure buildouts in U.S. history.",
    "Yet despite these unprecedented resource demands, the project has not secured environmental permits or binding commitments on water supply, leaving critical infrastructure questions unresolved."
   ],
   "announcement_date_evidence": [
    "# Utah's 40,000-Acre Data Center Faces Environmental Hurdles Despite Fast-Track Approval",
    "Box Elder County commissioners approved the Stratos Project, a massive AI data center backed by Kevin O'Leary, but environmental permits and water sustainability remain unresolved.",
    "## Accelerated Permitting Process Raises Questions About Environmental Rigor",
    "The partnership between O\u2019Leary\u2019s investment firm and real-estate developer **West GenCo** was announced publicly in March; county approval followed by May."
   ]
  },
  {
   "url": "https://aiimpactlab.net/impact/openai-effingham-3-2gw-community-commitments",
   "title": "A 3.2-gigawatt AI campus puts community promises to the test",
   "published_at": "2026-07-23T12:00:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "A 3.2-gigawatt AI campus puts community promises to the test",
    "OpenAI plans to contract for 3.2 gigawatts of electricity for Project Camellia, a data-center campus in Effingham County, Georgia, with power arriving in phases from 2028 through 2032."
   ],
   "locality_evidence": [
    "A 3.2-gigawatt AI campus puts community promises to the test",
    "OpenAI plans to contract for 3.2 gigawatts of electricity for Project Camellia, a data-center campus in Effingham County, Georgia, with power arriving in phases from 2028 through 2032."
   ],
   "state_evidence": [
    "A 3.2-gigawatt AI campus puts community promises to the test",
    "OpenAI plans to contract for 3.2 gigawatts of electricity for Project Camellia, a data-center campus in Effingham County, Georgia, with power arriving in phases from 2028 through 2032."
   ],
   "capacity_gw_evidence": [
    "A 3.2-gigawatt AI campus puts community promises to the test",
    "OpenAI plans to contract for 3.2 gigawatts of electricity for Project Camellia, a data-center campus in Effingham County, Georgia, with power arriving in phases from 2028 through 2032."
   ],
   "builder_evidence": [
    "A 3.2-gigawatt AI campus puts community promises to the test",
    "OpenAI plans to contract for 3.2 gigawatts of electricity for Project Camellia, a data-center campus in Effingham County, Georgia, with power arriving in phases from 2028 through 2032."
   ],
   "ai_customer_evidence": [
    "A 3.2-gigawatt AI campus puts community promises to the test",
    "OpenAI plans to contract for 3.2 gigawatts of electricity for Project Camellia, a data-center campus in Effingham County, Georgia, with power arriving in phases from 2028 through 2032."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/tags/project-cannoli",
   "title": "Project Cannoli - DCD",
   "published_at": "2026-05-21T20:54:34",
   "project": "Project Cannoli",
   "locality": "Detroit",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Google",
   "ai_customer": "Google",
   "status": "confirmed",
   "announcement_date": null,
   "project_evidence": [
    "# Project Cannoli",
    "# [Google confirms 1GW data center campus near Detroit, Michigan, partners with DTE Energy on 2.7GW power generation](/en/news/google-confirms-1gw-data-center-campus-near-detroit-michigan-partners-with-dte-energy-on-27gw-power-generation/)"
   ],
   "locality_evidence": [
    "# Project Cannoli",
    "# [Google confirms 1GW data center campus near Detroit, Michigan, partners with DTE Energy on 2.7GW power generation](/en/news/google-confirms-1gw-data-center-campus-near-detroit-michigan-partners-with-dte-energy-on-27gw-power-generation/)"
   ],
   "state_evidence": [
    "# Project Cannoli",
    "# [Google confirms 1GW data center campus near Detroit, Michigan, partners with DTE Energy on 2.7GW power generation](/en/news/google-confirms-1gw-data-center-campus-near-detroit-michigan-partners-with-dte-energy-on-27gw-power-generation/)"
   ],
   "capacity_gw_evidence": [
    "# Project Cannoli",
    "# [Google confirms 1GW data center campus near Detroit, Michigan, partners with DTE Energy on 2.7GW power generation](/en/news/google-confirms-1gw-data-center-campus-near-detroit-michigan-partners-with-dte-energy-on-27gw-power-generation/)"
   ],
   "builder_evidence": [
    "# Project Cannoli",
    "# [Google confirms 1GW data center campus near Detroit, Michigan, partners with DTE Energy on 2.7GW power generation](/en/news/google-confirms-1gw-data-center-campus-near-detroit-michigan-partners-with-dte-energy-on-27gw-power-generation/)"
   ],
   "ai_customer_evidence": [
    "# Project Cannoli",
    "# [Google confirms 1GW data center campus near Detroit, Michigan, partners with DTE Energy on 2.7GW power generation](/en/news/google-confirms-1gw-data-center-campus-near-detroit-michigan-partners-with-dte-energy-on-27gw-power-generation/)"
   ],
   "status_evidence": [
    "# Project Cannoli",
    "# [Google confirms 1GW data center campus near Detroit, Michigan, partners with DTE Energy on 2.7GW power generation](/en/news/google-confirms-1gw-data-center-campus-near-detroit-michigan-partners-with-dte-energy-on-27gw-power-generation/)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mexc.fm/news/1114567",
   "title": "TeraWulf surges 10% on 1GW Kentucky AI campus bet | MEXC News",
   "published_at": null,
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure. However, it is not about chips anymore. It is about power. The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity.",
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access."
   ],
   "locality_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure. However, it is not about chips anymore. It is about power. The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity."
   ],
   "state_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure. However, it is not about chips anymore. It is about power. The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity."
   ],
   "capacity_gw_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure. However, it is not about chips anymore. It is about power. The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity."
   ],
   "builder_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure. However, it is not about chips anymore. It is about power. The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity.",
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure. However, it is not about chips anymore. It is about power. The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://blockspace.media/short/hut-8-lands-19-6b-15-year-deal-to-fill-1-gw-beacon-point-site",
   "title": "Hut 8 lands $19.6B, 15-year deal to fill 1 GW Beacon Point site - Blockspace",
   "published_at": "2026-07-20T20:33:42",
   "project": "Beacon Point",
   "locality": null,
   "state": null,
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": null,
   "announcement_date": "2026-07-20",
   "project_evidence": [
    "Hut 8 lands $19.6B, 15-year deal to fill 1 GW Beacon Point site",
    "Hut 8 announced a second AI lease at its Beacon Point data center \u2014 a 352MW, 15-year triple-net agreement valued at $9.8 billion over the base term, carrying a 3% annual rent escalator, with the same unnamed tenant as phase one."
   ],
   "locality_evidence": null,
   "state_evidence": null,
   "capacity_gw_evidence": [
    "Hut 8 lands $19.6B, 15-year deal to fill 1 GW Beacon Point site",
    "The tenant will now occupy 704MW of critical IT load within the one-gigawatt Beacon Point campus (hosts cited both 704 and 740 MW figures during the segment)."
   ],
   "builder_evidence": [
    "Hut 8 lands $19.6B, 15-year deal to fill 1 GW Beacon Point site",
    "Hut 8 announced a second AI lease at its Beacon Point data center \u2014 a 352MW, 15-year triple-net agreement valued at $9.8 billion over the base term, carrying a 3% annual rent escalator, with the same unnamed tenant as phase one."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": [
    "Jul 20, 2026",
    "Hut 8 lands $19.6B, 15-year deal to fill 1 GW Beacon Point site"
   ]
  },
  {
   "url": "https://datacentercompass.com/datacenter/iren-sweetwater-1",
   "title": "IREN Sweetwater 1 AI Campus \u2014 1.4 GW Under Construction Data Center | Data Hunter",
   "published_at": null,
   "project": "IREN Sweetwater 1 AI Campus",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "IREN Limited",
   "ai_customer": null,
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "Under ConstructionIREN Limited",
    "# IREN Sweetwater 1 AI Campus"
   ],
   "locality_evidence": [
    "Under ConstructionIREN Limited",
    "# IREN Sweetwater 1 AI Campus",
    " Sweetwater, TX (Nolan County), Texas"
   ],
   "state_evidence": [
    "Under ConstructionIREN Limited",
    "# IREN Sweetwater 1 AI Campus",
    " Sweetwater, TX (Nolan County), Texas"
   ],
   "capacity_gw_evidence": [
    "Under ConstructionIREN Limited",
    "# IREN Sweetwater 1 AI Campus",
    "Capacity",
    "1.4 GW"
   ],
   "builder_evidence": [
    "Under ConstructionIREN Limited",
    "# IREN Sweetwater 1 AI Campus",
    "- IREN Limited"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Under ConstructionIREN Limited",
    "# IREN Sweetwater 1 AI Campus"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://theconsumernewsnetwork.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Creekstone Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "*Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite*",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "About Creekstone Energy",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "*Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite*",
    "About Creekstone Energy",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://hydrogenfuelnews.com/texas-ai-factory-data-center/8567340",
   "title": "ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
   "published_at": "2024-10-07T07:02:33",
   "project": "TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "planned",
   "announcement_date": "2024-10-07",
   "project_evidence": [
    "ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
    "# ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
    "Now, it intends to build a 1 GW facility powered by hydrogen fuel, the ECL TerraSite-TX1."
   ],
   "locality_evidence": [
    "ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
    "# ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
    "The facility will be located on over 600 acres not too far from Houston, Texas"
   ],
   "state_evidence": [
    "ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
    "# ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
    "The facility will be located on over 600 acres not too far from Houston, Texas"
   ],
   "capacity_gw_evidence": [
    "ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
    "# ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
    "ECL, a data center-as-a-service pioneer, recently announced that it would be opening the first 1 gigawatt hydrogen fuel-powered off-grid AI Factory [data center](https://www.hydrogenfuelnews.com/microsofts-green-data-centers/8567258/), a facility it intends to open in Texas near Houston."
   ],
   "builder_evidence": [
    "ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
    "# ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
    "ECL, a data center-as-a-service pioneer, recently announced that it would be opening the first 1 gigawatt hydrogen fuel-powered off-grid AI Factory [data center](https://www.hydrogenfuelnews.com/microsofts-green-data-centers/8567258/), a facility it intends to open in Texas near Houston."
   ],
   "ai_customer_evidence": [
    "ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
    "# ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
    "The first tenant at the new H2-powered sustainable data center east of Houston will be Lambda."
   ],
   "status_evidence": [
    "ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
    "# ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
    "Now, it intends to build a 1 GW facility powered by hydrogen fuel, the ECL TerraSite-TX1."
   ],
   "announcement_date_evidence": [
    "ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
    "# ECL Announces 1GW Hydrogen fuel powered off-grid Texas AI Factory data center",
    "October 7, 2024"
   ]
  },
  {
   "url": "https://bitgetapp.com/news/detail/12560605689483",
   "title": "Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant",
   "published_at": "2026-08-17T05:56:15",
   "project": "PORTS-Pike Technology Park",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "Planned",
   "announcement_date": "2025-08-17",
   "project_evidence": [
    "# Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant",
    "On August 17, **Nvidia announced a strategic partnership with SB Energy to provide credit support for the PORTS-Pike Technology Park in Ohio, transforming it into a hyperscale data center dedicated to Nvidia AI computing infrastructure, with OpenAI as the sole tenant. At the same time, Nvidia is investing $1.5 billion in SB Energy.**"
   ],
   "locality_evidence": [
    "# Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant",
    "PORTS-Pike is located in Pike County, Ohio, adjacent to the decommissioned Portsmouth Gaseous Diffusion Plant site, spanning both private and federal land."
   ],
   "state_evidence": [
    "# Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant",
    "On August 17, **Nvidia announced a strategic partnership with SB Energy to provide credit support for the PORTS-Pike Technology Park in Ohio, transforming it into a hyperscale data center dedicated to Nvidia AI computing infrastructure, with OpenAI as the sole tenant. At the same time, Nvidia is investing $1.5 billion in SB Energy.**"
   ],
   "capacity_gw_evidence": [
    "# Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant",
    "**The initial deployment capacity of the project is 4.25 IT-GW, with Nvidia having the option to expand by an additional 3.75 IT-GW, bringing the park\u2019s planned total capacity to 8 IT-GW.**"
   ],
   "builder_evidence": [
    "# Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant",
    "On August 17, **Nvidia announced a strategic partnership with SB Energy to provide credit support for the PORTS-Pike Technology Park in Ohio, transforming it into a hyperscale data center dedicated to Nvidia AI computing infrastructure, with OpenAI as the sole tenant. At the same time, Nvidia is investing $1.5 billion in SB Energy.**"
   ],
   "ai_customer_evidence": [
    "# Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant",
    "On August 17, **Nvidia announced a strategic partnership with SB Energy to provide credit support for the PORTS-Pike Technology Park in Ohio, transforming it into a hyperscale data center dedicated to Nvidia AI computing infrastructure, with OpenAI as the sole tenant. At the same time, Nvidia is investing $1.5 billion in SB Energy.**"
   ],
   "status_evidence": [
    "# Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant",
    "**The initial deployment capacity of the project is 4.25 IT-GW, with Nvidia having the option to expand by an additional 3.75 IT-GW, bringing the park\u2019s planned total capacity to 8 IT-GW.**"
   ],
   "announcement_date_evidence": [
    "# Nvidia invests $1.5 billion in SB Energy, securing 8GW of AI computing power, with OpenAI set to become the sole tenant",
    "On August 17, **Nvidia announced a strategic partnership with SB Energy to provide credit support for the PORTS-Pike Technology Park in Ohio, transforming it into a hyperscale data center dedicated to Nvidia AI computing infrastructure, with OpenAI as the sole tenant. At the same time, Nvidia is investing $1.5 billion in SB Energy.**"
   ]
  },
  {
   "url": "https://aidatacenterindex.com/ai-focus/training/feed",
   "title": "Training AI Data Center Feed",
   "published_at": null,
   "project": "Meta\u2013Oklo Advanced Nuclear AI Campus",
   "locality": "Ohio",
   "state": "Ohio",
   "capacity_gw": 1.2,
   "builder": "Oklo Inc.",
   "ai_customer": "Meta",
   "status": "Announced",
   "announcement_date": "2026-01-09",
   "project_evidence": [
    "Meta\u2013Oklo Advanced Nuclear AI Campus (Ohio)",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "locality_evidence": [
    "Meta\u2013Oklo Advanced Nuclear AI Campus (Ohio)",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "state_evidence": [
    "Meta\u2013Oklo Advanced Nuclear AI Campus (Ohio)",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "capacity_gw_evidence": [
    "On January 9, 2026, Meta announced a landmark agreement with Oklo Inc. (backed by Sam Altman) to develop an advanced nuclear technology campus in Ohio to provide up to 1.2 gigawatts (GW) of clean, baseload power starting as early as 2030.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "builder_evidence": [
    "On January 9, 2026, Meta announced a landmark agreement with Oklo Inc. (backed by Sam Altman) to develop an advanced nuclear technology campus in Ohio to provide up to 1.2 gigawatts (GW) of clean, baseload power starting as early as 2030.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "ai_customer_evidence": [
    "On January 9, 2026, Meta announced a landmark agreement with Oklo Inc. (backed by Sam Altman) to develop an advanced nuclear technology campus in Ohio to provide up to 1.2 gigawatts (GW) of clean, baseload power starting as early as 2030.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "status_evidence": [
    "2030",
    "Announced1.2 GW",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "announcement_date_evidence": [
    "On January 9, 2026, Meta announced a landmark agreement with Oklo Inc. (backed by Sam Altman) to develop an advanced nuclear technology campus in Ohio to provide up to 1.2 gigawatts (GW) of clean, baseload power starting as early as 2030.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ]
  },
  {
   "url": "https://aidatacenterindex.com/ai-focus/training/feed",
   "title": "Training AI Data Center Feed",
   "published_at": null,
   "project": "Meta Project Prometheus",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.5,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "Meta Project Prometheus (New Albany, Ohio)",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "locality_evidence": [
    "Meta Project Prometheus (New Albany, Ohio)",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "state_evidence": [
    "Meta Project Prometheus (New Albany, Ohio)",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "capacity_gw_evidence": [
    "Meta's \"Project Prometheus\" is a multi-gigawatt AI-optimized campus located in New Albany, Ohio.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "builder_evidence": [
    "Meta's \"Project Prometheus\" is a multi-gigawatt AI-optimized campus located in New Albany, Ohio.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "ai_customer_evidence": [
    "Meta's \"Project Prometheus\" is a multi-gigawatt AI-optimized campus located in New Albany, Ohio.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "status_evidence": [
    "Under Construction1.5 GW",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/ai-focus/training/feed",
   "title": "Training AI Data Center Feed",
   "published_at": null,
   "project": "Vantage Data Centers Texas Mega-Campus",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Announced",
   "announcement_date": "2025-08-01",
   "project_evidence": [
    "Vantage Data Centers Texas Mega-Campus (Shackelford County)",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "locality_evidence": [
    "Vantage Data Centers Texas Mega-Campus (Shackelford County)",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "state_evidence": [
    "Vantage Data Centers Texas Mega-Campus (Shackelford County)",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "capacity_gw_evidence": [
    "Vantage Data Centers announced a $25 billion investment in August 2025 to construct a 1.4 gigawatt (GW) hyperscale campus in Shackelford County, Texas.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "builder_evidence": [
    "Vantage Data Centers announced a $25 billion investment in August 2025 to construct a 1.4 gigawatt (GW) hyperscale campus in Shackelford County, Texas.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Announced1.4 GW",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "announcement_date_evidence": [
    "Vantage Data Centers announced a $25 billion investment in August 2025 to construct a 1.4 gigawatt (GW) hyperscale campus in Shackelford County, Texas.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ]
  },
  {
   "url": "https://aidatacenterindex.com/ai-focus/training/feed",
   "title": "Training AI Data Center Feed",
   "published_at": null,
   "project": "Meta Hyperion AI Data Center",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "Meta Hyperion AI Data Center (Louisiana)",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "locality_evidence": [
    "Meta is investing between $10 billion and $27 billion to develop \"Hyperion,\" a massive AI infrastructure project in Richland Parish, Louisiana.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "state_evidence": [
    "Meta Hyperion AI Data Center (Louisiana)",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "capacity_gw_evidence": [
    "Meta Hyperion AI Data Center (Louisiana)",
    "Under Construction5.0 GW",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "builder_evidence": [
    "Meta is investing between $10 billion and $27 billion to develop \"Hyperion,\" a massive AI infrastructure project in Richland Parish, Louisiana.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "ai_customer_evidence": [
    "Meta is investing between $10 billion and $27 billion to develop \"Hyperion,\" a massive AI infrastructure project in Richland Parish, Louisiana.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "status_evidence": [
    "Under Construction5.0 GW",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/ai-focus/training/feed",
   "title": "Training AI Data Center Feed",
   "published_at": null,
   "project": "Microsoft Project Fairwater",
   "locality": "Mount Pleasant",
   "state": "Wisconsin",
   "capacity_gw": 3.3,
   "builder": "Microsoft",
   "ai_customer": "Microsoft",
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "Microsoft Project Fairwater (Mount Pleasant, Wisconsin)",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "locality_evidence": [
    "Microsoft Project Fairwater (Mount Pleasant, Wisconsin)",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "state_evidence": [
    "Microsoft Project Fairwater (Mount Pleasant, Wisconsin)",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "capacity_gw_evidence": [
    "Microsoft Project Fairwater (Mount Pleasant, Wisconsin)",
    "Under Construction3.3 GW",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "builder_evidence": [
    "Microsoft's \"Project Fairwater\" in Mount Pleasant, Wisconsin, is designed to be the world's most powerful AI data center campus.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "ai_customer_evidence": [
    "Microsoft's \"Project Fairwater\" in Mount Pleasant, Wisconsin, is designed to be the world's most powerful AI data center campus.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "status_evidence": [
    "Under Construction3.3 GW",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/ai-focus/training/feed",
   "title": "Training AI Data Center Feed",
   "published_at": null,
   "project": "xAI Gigascale Data Center",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 1.5,
   "builder": "xAI",
   "ai_customer": "xAI",
   "status": "Operational",
   "announcement_date": null,
   "project_evidence": [
    "xAI Gigascale Data Center (Tennessee/Mississippi)",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "locality_evidence": [
    "xAI's Memphis Supercluster, nicknamed \"Colossus,\" is one of the most consequential AI infrastructure stories of 2024.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "state_evidence": [
    "xAI Gigascale Data Center (Tennessee/Mississippi)",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "capacity_gw_evidence": [
    "Operational1.5 GW",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "builder_evidence": [
    "xAI's Memphis Supercluster, nicknamed \"Colossus,\" is one of the most consequential AI infrastructure stories of 2024.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "ai_customer_evidence": [
    "xAI's Memphis Supercluster, nicknamed \"Colossus,\" is one of the most consequential AI infrastructure stories of 2024.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "status_evidence": [
    "Operational1.5 GW",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/ai-focus/training/feed",
   "title": "Training AI Data Center Feed",
   "published_at": null,
   "project": "OpenAI Stargate Data Center",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "Operational",
   "announcement_date": null,
   "project_evidence": [
    "OpenAI Stargate Data Center (Texas)",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "locality_evidence": [
    "OpenAI's Stargate campus in Abilene, Texas has been built at breakneck pace to meet surging compute demand.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "state_evidence": [
    "OpenAI Stargate Data Center (Texas)",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "capacity_gw_evidence": [
    "Operational1.2 GW",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "builder_evidence": [
    "OpenAI's Stargate campus in Abilene, Texas has been built at breakneck pace to meet surging compute demand.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "ai_customer_evidence": [
    "OpenAI's Stargate campus in Abilene, Texas has been built at breakneck pace to meet surging compute demand.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "status_evidence": [
    "Operational1.2 GW",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/ai-focus/training/feed",
   "title": "Training AI Data Center Feed",
   "published_at": null,
   "project": "Google Gemini Cluster",
   "locality": "Iowa and Nebraska",
   "state": "Iowa",
   "capacity_gw": 1.0,
   "builder": "Google",
   "ai_customer": "Google",
   "status": "Operational",
   "announcement_date": null,
   "project_evidence": [
    "Google Gemini Cluster (Iowa/Nebraska)",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "locality_evidence": [
    "Google has established a massive 1-gigawatt (GW) AI training cluster spanning its campuses in Iowa and Nebraska to serve as the primary engine for its Gemini models.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "state_evidence": [
    "Google Gemini Cluster (Iowa/Nebraska)",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "capacity_gw_evidence": [
    "Google has established a massive 1-gigawatt (GW) AI training cluster spanning its campuses in Iowa and Nebraska to serve as the primary engine for its Gemini models.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "builder_evidence": [
    "Google has established a massive 1-gigawatt (GW) AI training cluster spanning its campuses in Iowa and Nebraska to serve as the primary engine for its Gemini models.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "ai_customer_evidence": [
    "Google has established a massive 1-gigawatt (GW) AI training cluster spanning its campuses in Iowa and Nebraska to serve as the primary engine for its Gemini models.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "status_evidence": [
    "Operational1.0 GW",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/ai-focus/training/feed",
   "title": "Training AI Data Center Feed",
   "published_at": null,
   "project": "Stargate AI Supercomputer",
   "locality": null,
   "state": null,
   "capacity_gw": 5.0,
   "builder": "Microsoft and OpenAI",
   "ai_customer": "Microsoft and OpenAI",
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "Stargate AI Supercomputer",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "locality_evidence": null,
   "state_evidence": null,
   "capacity_gw_evidence": [
    "Under Construction5.0 GW",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "builder_evidence": [
    "\"Stargate\" is the codename for a multi-phased, five-year infrastructure plan by Microsoft and OpenAI to build the world\u2019s largest AI supercomputing clusters.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "ai_customer_evidence": [
    "\"Stargate\" is the codename for a multi-phased, five-year infrastructure plan by Microsoft and OpenAI to build the world\u2019s largest AI supercomputing clusters.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "status_evidence": [
    "Under Construction5.0 GW",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/ai-focus/training/feed",
   "title": "Training AI Data Center Feed",
   "published_at": null,
   "project": "Meta \u2014 El Paso AI Mega Campus",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "Meta \u2014 El Paso AI Mega Campus",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "locality_evidence": [
    "Meta\u2019s El Paso campus is a gigawatt-scale infrastructure project designed specifically for \"superintelligence\" workloads.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "state_evidence": [
    "Meta \u2014 El Paso AI Mega Campus\n\nPlanned1.0",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "capacity_gw_evidence": [
    "Planned1.0 GW",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "builder_evidence": [
    "Meta\u2019s El Paso campus is a gigawatt-scale infrastructure project designed specifically for \"superintelligence\" workloads.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "ai_customer_evidence": [
    "Meta\u2019s El Paso campus is a gigawatt-scale infrastructure project designed specifically for \"superintelligence\" workloads.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "status_evidence": [
    "Planned1.0 GW",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/ai-focus/training/feed",
   "title": "Training AI Data Center Feed",
   "published_at": null,
   "project": "Microsoft & OpenAI \u2014 Project Jupiter",
   "locality": "Santa Teresa",
   "state": "New Mexico",
   "capacity_gw": 1.0,
   "builder": "Microsoft and OpenAI",
   "ai_customer": "Microsoft and OpenAI",
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "Microsoft & OpenAI \u2014 Project Jupiter (New Mexico)",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "locality_evidence": [
    "\"Project Jupiter\" is a key site in the Microsoft-OpenAI \"Stargate\" infrastructure initiative, located in the Santa Teresa area of Do\u00f1a Ana County, New Mexico.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "state_evidence": [
    "Microsoft & OpenAI \u2014 Project Jupiter (New Mexico)",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "capacity_gw_evidence": [
    "The planned 1 GW campus is designed to support the next generation of AI supercom",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "builder_evidence": [
    "\"Project Jupiter\" is a key site in the Microsoft-OpenAI \"Stargate\" infrastructure initiative, located in the Santa Teresa area of Do\u00f1a Ana County, New Mexico.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "ai_customer_evidence": [
    "\"Project Jupiter\" is a key site in the Microsoft-OpenAI \"Stargate\" infrastructure initiative, located in the Santa Teresa area of Do\u00f1a Ana County, New Mexico.",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "status_evidence": [
    "Planned1.0 GW",
    "# Training AI Data Center Feed",
    "Chronological feed for Training using the best public timeline year available for each tracked facility."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://newnetworktimes.com/data-center/1170-crusoe-lancium-partner-to-expand-childress-campus-ai-data-center-with-1-gw-capacity",
   "title": "Crusoe, Lancium Partner to Expand Childress Campus AI Data Center with 1 GW Capacity",
   "published_at": null,
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "Crusoe and Lancium announced a 1.0 GW AI data center campus in Childress, Texas.",
    "Childress marks the second site where Crusoe and Lancium are executing this same partnership structure: Lancium acquires and owns the land, secures the power interconnect, and manages energy orchestration for the campus; while Crusoe designs, builds, and operates the AI data center itself."
   ],
   "locality_evidence": [
    "Crusoe and Lancium announced a 1.0 GW AI data center campus in Childress, Texas.",
    "Childress marks the second site where Crusoe and Lancium are executing this same partnership structure: Lancium acquires and owns the land, secures the power interconnect, and manages energy orchestration for the campus; while Crusoe designs, builds, and operates the AI data center itself."
   ],
   "state_evidence": [
    "Crusoe and Lancium announced a 1.0 GW AI data center campus in Childress, Texas.",
    "Childress marks the second site where Crusoe and Lancium are executing this same partnership structure: Lancium acquires and owns the land, secures the power interconnect, and manages energy orchestration for the campus; while Crusoe designs, builds, and operates the AI data center itself."
   ],
   "capacity_gw_evidence": [
    "Crusoe and Lancium announced a 1.0 GW AI data center campus in Childress, Texas.",
    "Childress marks the second site where Crusoe and Lancium are executing this same partnership structure: Lancium acquires and owns the land, secures the power interconnect, and manages energy orchestration for the campus; while Crusoe designs, builds, and operates the AI data center itself."
   ],
   "builder_evidence": [
    "Crusoe and Lancium announced a 1.0 GW AI data center campus in Childress, Texas.",
    "Childress marks the second site where Crusoe and Lancium are executing this same partnership structure: Lancium acquires and owns the land, secures the power interconnect, and manages energy orchestration for the campus; while Crusoe designs, builds, and operates the AI data center itself."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Crusoe and Lancium announced a 1.0 GW AI data center campus in Childress, Texas.",
    "Childress marks the second site where Crusoe and Lancium are executing this same partnership structure: Lancium acquires and owns the land, secures the power interconnect, and manages energy orchestration for the campus; while Crusoe designs, builds, and operates the AI data center itself."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://newnetworktimes.com/data-center/1170-crusoe-lancium-partner-to-expand-childress-campus-ai-data-center-with-1-gw-capacity",
   "title": "Crusoe, Lancium Partner to Expand Childress Campus AI Data Center with 1 GW Capacity",
   "published_at": null,
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "expanding",
   "announcement_date": null,
   "project_evidence": [
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "locality_evidence": [
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "state_evidence": [
    "The Childress development is the latest chapter in Crusoe's deep commitment to Texas.",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "capacity_gw_evidence": [
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "builder_evidence": [
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://interestingengineering.com/culture/oracle-to-back-gas-powered-data-center",
   "title": "Oracle to back massive 1.4-gigawatt data center in Texas with gas power: Report",
   "published_at": "2025-08-21T08:57:23",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "The campus, called Frontier, is [designed](https://www.bloomberg.com/news/articles/2025-08-20/oracle-cloud-powers-openai-nvidia-and-larry-ellison-s-riches) to handle ultra-high-density racks of 250 kilowatts or more.",
    "Today we unveil Frontier, a $25 billion, 1.4GW AI mega-campus in Shackelford County, Texas, Vantage\u2019s largest campus and investment to date."
   ],
   "locality_evidence": [
    "The West Texas site is in Shackelford County, near its existing Abilene data center.",
    "Today we unveil Frontier, a $25 billion, 1.4GW AI mega-campus in Shackelford County, Texas, Vantage\u2019s largest campus and investment to date."
   ],
   "state_evidence": [
    "The West Texas site is in Shackelford County, near its existing Abilene data center.",
    "Today we unveil Frontier, a $25 billion, 1.4GW AI mega-campus in Shackelford County, Texas, Vantage\u2019s largest campus and investment to date."
   ],
   "capacity_gw_evidence": [
    "Vantage Data Centers is [developi](https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/)ng the project and will have a capacity of 1.4 gigawatts, making it one of the largest data centers globally.",
    "Today we unveil Frontier, a $25 billion, 1.4GW AI mega-campus in Shackelford County, Texas, Vantage\u2019s largest campus and investment to date."
   ],
   "builder_evidence": [
    "Vantage Data Centers is [developi](https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/)ng the project and will have a capacity of 1.4 gigawatts, making it one of the largest data centers globally.",
    "Today we unveil Frontier, a $25 billion, 1.4GW AI mega-campus in Shackelford County, Texas, Vantage\u2019s largest campus and investment to date."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction is already underway, with the first building expected to be ready in the second half of 2026."
   ],
   "announcement_date_evidence": [
    "\u2014 Vantage Data Centers (@VantageDC) [August 19, 2025](https://twitter.com/VantageDC/status/1957761287846301944?ref_src=twsrc%5Etfw)"
   ]
  },
  {
   "url": "https://energytech.com/data-center-power/article/55328209/planned-hypergrid-ai-data-center-project-gains-first-approval-for-off-grid-gas-power",
   "title": "Planned Texas AI Data Center Project Gains First Approval for Off-Grid Gas Power",
   "published_at": "2025-11-05T01:20:00",
   "project": "HyperGrid",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "preliminarily approved",
   "announcement_date": null,
   "project_evidence": [
    "An off-grid data center power developer co-founded by former U.S. Energy Secretary Rick Perry took the first step toward clearing its first regulatory hurdle in Perry\u2019s home state of Texas."
   ],
   "locality_evidence": [
    "An off-grid data center power developer co-founded by former U.S. Energy Secretary Rick Perry took the first step toward clearing its first regulatory hurdle in Perry\u2019s home state of Texas."
   ],
   "state_evidence": [
    "An off-grid data center power developer co-founded by former U.S. Energy Secretary Rick Perry took the first step toward clearing its first regulatory hurdle in Perry\u2019s home state of Texas."
   ],
   "capacity_gw_evidence": [
    "An off-grid data center power developer co-founded by former U.S. Energy Secretary Rick Perry took the first step toward clearing its first regulatory hurdle in Perry\u2019s home state of Texas.",
    "Fermi America is promising to build as much as 11 GW of artificial intelligence and digital infrastructure capabilities within the Project Matador HyperGrid campus."
   ],
   "builder_evidence": [
    "An off-grid data center power developer co-founded by former U.S. Energy Secretary Rick Perry took the first step toward clearing its first regulatory hurdle in Perry\u2019s home state of Texas.",
    "Fermi America is promising to build as much as 11 GW of artificial intelligence and digital infrastructure capabilities within the Project Matador HyperGrid campus."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "An off-grid data center power developer co-founded by former U.S. Energy Secretary Rick Perry took the first step toward clearing its first regulatory hurdle in Perry\u2019s home state of Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://ien.com/artificial-intelligence/news/22937710/coalfired-power-plant-now-retired-to-become-massive-gaspowered-campus-for-ai-data-centers",
   "title": "Coal-Fired Power Plant, Now Retired, to Become Massive Gas-Powered Campus for AI, Data Centers",
   "published_at": "2025-04-03T13:25:49",
   "project": "Homer City Generating Station",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Homer City Development",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "locality_evidence": [
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "state_evidence": [
    "The owners of what was once Pennsylvania's biggest coal-fired power plant said Wednesday that they will turn it into a $10 billion natural gas-powered data center campus designed to capitalize on the fast-growing energy demands of Big Tech companies to power artificial intelligence and cloud computing applications."
   ],
   "capacity_gw_evidence": [
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "builder_evidence": [
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction is expected to begin this year and power could start flowing by 2027, the group said in a statement."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://newswire.ca/news-releases/nscale-and-microsoft-announce-collaboration-with-nvidia-and-caterpillar-to-deliver-1-35gw-of-nvidia-vera-rubin-nvl72-gpus-at-flagship-ai-factory-campus-in-west-virginia-835098659.html",
   "title": "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
   "published_at": "2026-03-16T21:20:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "under development",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "- *Nscale Acquires the Monarch Compute Campus -- America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid*"
   ],
   "locality_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "state_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "capacity_gw_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "builder_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "ai_customer_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "- *Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs*"
   ],
   "status_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "announcement_date_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Mar 16, 2026, 17:20 ET"
   ]
  },
  {
   "url": "https://datacenterknowledge.com/data-center-construction/galaxy-s-500-acre-texas-ai-campus-reflects-new-grid-model",
   "title": "Galaxy\u2019s 500-Acre Texas AI Campus Reflects New Grid Model",
   "published_at": "2026-07-28T16:31:23",
   "project": "Helios",
   "locality": "Dickens County",
   "state": "Texas",
   "capacity_gw": 1.6,
   "builder": "Galaxy Digital",
   "ai_customer": "CoreWeave",
   "status": "delivered roughly 200 MW of gross power",
   "announcement_date": null,
   "project_evidence": [
    "The project is Galaxy\u2019s second major Texas AI campus after its 1.6 GW [Helios development](/build-design/texas-may-have-accidentally-built-the-perfect-grid-for-ai) in Dickens County.",
    "Earlier this month, the company said its Helios campus had delivered roughly 200 MW of gross power, including 133 MW of critical IT load, under a long-term lease with CoreWeave."
   ],
   "locality_evidence": [
    "The project is Galaxy\u2019s second major Texas AI campus after its 1.6 GW [Helios development](/build-design/texas-may-have-accidentally-built-the-perfect-grid-for-ai) in Dickens County."
   ],
   "state_evidence": [
    "The project is Galaxy\u2019s second major Texas AI campus after its 1.6 GW [Helios development](/build-design/texas-may-have-accidentally-built-the-perfect-grid-for-ai) in Dickens County."
   ],
   "capacity_gw_evidence": [
    "The project is Galaxy\u2019s second major Texas AI campus after its 1.6 GW [Helios development](/build-design/texas-may-have-accidentally-built-the-perfect-grid-for-ai) in Dickens County."
   ],
   "builder_evidence": [
    "An aerial view of Galaxy Digital\u2019s Project Helios in West Texas, delivering approximately 200 MW to CoreWeave.Galaxy Digital",
    "The project is Galaxy\u2019s second major Texas AI campus after its 1.6 GW [Helios development](/build-design/texas-may-have-accidentally-built-the-perfect-grid-for-ai) in Dickens County."
   ],
   "ai_customer_evidence": [
    "An aerial view of Galaxy Digital\u2019s Project Helios in West Texas, delivering approximately 200 MW to CoreWeave.Galaxy Digital",
    "Earlier this month, the company said its Helios campus had delivered roughly 200 MW of gross power, including 133 MW of critical IT load, under a long-term lease with CoreWeave."
   ],
   "status_evidence": [
    "Earlier this month, the company said its Helios campus had delivered roughly 200 MW of gross power, including 133 MW of critical IT load, under a long-term lease with CoreWeave."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mexc.com/news/1075284",
   "title": "Kevin O\u2019Leary\u2019s Utah AI campus gets approved | MEXC News",
   "published_at": null,
   "project": "Stratos AI campus",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "Kevin O\u2019Leary Digital",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "locality_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "state_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "capacity_gw_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "The campus will generate up to 9 gigawatts at full buildout, more than twice Utah\u2019s current total electricity consumption, powered by an on-site natural gas pipeline.",
    "The campus, designated through Utah\u2019s Military Installation Development Authority, spans more than 40,000 acres and will reach 9 gigawatts of generation capacity at full buildout."
   ],
   "builder_evidence": [
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://letsdatascience.com/news/openai-plans-32-gigawatt-data-center-campus-in-georgia-09bc839f",
   "title": "OpenAI Plans 3.2-Gigawatt Data Center Campus in Georgia",
   "published_at": "2026-07-22T19:40:12",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "# OpenAI Plans 3.2-Gigawatt Data Center Campus in Georgia",
    "OpenAI announced Project Camellia on July 22, describing a planned data center campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia."
   ],
   "locality_evidence": [
    "# OpenAI Plans 3.2-Gigawatt Data Center Campus in Georgia",
    "OpenAI announced Project Camellia on July 22, describing a planned data center campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia."
   ],
   "state_evidence": [
    "# OpenAI Plans 3.2-Gigawatt Data Center Campus in Georgia",
    "OpenAI announced Project Camellia on July 22, describing a planned data center campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Plans 3.2-Gigawatt Data Center Campus in Georgia",
    "OpenAI announced Project Camellia on July 22, describing a planned data center campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia.",
    "The company says it is contracting with Georgia Power for 3.2 gigawatts of electricity to be delivered in phases from 2028 through 2032."
   ],
   "builder_evidence": [
    "# OpenAI Plans 3.2-Gigawatt Data Center Campus in Georgia",
    "OpenAI announced Project Camellia on July 22, describing a planned data center campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia."
   ],
   "ai_customer_evidence": [
    "# OpenAI Plans 3.2-Gigawatt Data Center Campus in Georgia",
    "OpenAI announced Project Camellia on July 22, describing a planned data center campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia."
   ],
   "status_evidence": [
    "# OpenAI Plans 3.2-Gigawatt Data Center Campus in Georgia",
    "OpenAI announced Project Camellia on July 22, describing a planned data center campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia."
   ],
   "announcement_date_evidence": [
    "# OpenAI Plans 3.2-Gigawatt Data Center Campus in Georgia",
    "OpenAI announced Project Camellia on July 22, describing a planned data center campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia."
   ]
  },
  {
   "url": "https://bitcoinethereumnews.com/finance/terawulf-surges-10-on-1gw-kentucky-ai-campus-et",
   "title": "TeraWulf surges 10% on 1GW Kentucky AI campus et",
   "published_at": "2026-05-27T00:27:29",
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "secured",
   "announcement_date": null,
   "project_evidence": [
    "# TeraWulf surges 10% on 1GW Kentucky AI campus et",
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access."
   ],
   "locality_evidence": [
    "# TeraWulf surges 10% on 1GW Kentucky AI campus et",
    "The company secured a 285-acre site in eastern Kentucky."
   ],
   "state_evidence": [
    "# TeraWulf surges 10% on 1GW Kentucky AI campus et",
    "The company secured a 285-acre site in eastern Kentucky."
   ],
   "capacity_gw_evidence": [
    "# TeraWulf surges 10% on 1GW Kentucky AI campus et",
    "It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity."
   ],
   "builder_evidence": [
    "# TeraWulf surges 10% on 1GW Kentucky AI campus et",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# TeraWulf surges 10% on 1GW Kentucky AI campus et",
    "The company secured a 285-acre site in eastern Kentucky."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://cryptopulse.news/bitcoin-miners-hut-8-and-iren-expand-into-ai-data-centers",
   "title": "Bitcoin Miners Hut 8 and IREN Expand Into AI Data Centers",
   "published_at": "2026-07-20T19:55:11",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": "",
   "status": "fully commercialized",
   "announcement_date": "2026-07-20",
   "project_evidence": [
    "# Bitcoin Miners Hut 8 and IREN Expand Into AI Data Centers",
    "## Hut 8 Fully Leases 1 GW Texas AI Campus"
   ],
   "locality_evidence": [
    "# Bitcoin Miners Hut 8 and IREN Expand Into AI Data Centers",
    "## Hut 8 Fully Leases 1 GW Texas AI Campus"
   ],
   "state_evidence": [
    "# Bitcoin Miners Hut 8 and IREN Expand Into AI Data Centers",
    "## Hut 8 Fully Leases 1 GW Texas AI Campus"
   ],
   "capacity_gw_evidence": [
    "# Bitcoin Miners Hut 8 and IREN Expand Into AI Data Centers",
    "## Hut 8 Fully Leases 1 GW Texas AI Campus"
   ],
   "builder_evidence": [
    "# Bitcoin Miners Hut 8 and IREN Expand Into AI Data Centers",
    "## Hut 8 Fully Leases 1 GW Texas AI Campus"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Bitcoin Miners Hut 8 and IREN Expand Into AI Data Centers",
    "## Hut 8 Fully Leases 1 GW Texas AI Campus"
   ],
   "announcement_date_evidence": [
    "# Bitcoin Miners Hut 8 and IREN Expand Into AI Data Centers",
    "July 20, 2026",
    "Bitcoin mining companies **Hut 8** and **IREN** are expanding their presence in the artificial intelligence sector after announcing **billions of dollars in new infrastructure agreements**, reinforcing an industry-wide shift toward high-performance computing and AI data center services."
   ]
  },
  {
   "url": "https://ca.investing.com/news/stock-market-news/iren-energizes-14gw-texas-data-center-site-93CH-4604628",
   "title": "IREN energizes 1.4GW Texas data center site",
   "published_at": "2026-05-01T20:22:16",
   "project": "Sweetwater",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "energized",
   "announcement_date": null,
   "project_evidence": [
    "TEXAS - announced today the energization of its 1.4GW Sweetwater 1 data center site in Texas, according to a press release statement.",
    "The energization connects the site\u2019s high-voltage substation to the ERCOT grid and represents a milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "TEXAS - announced today the energization of its 1.4GW Sweetwater 1 data center site in Texas, according to a press release statement."
   ],
   "capacity_gw_evidence": [
    "The energization connects the site\u2019s high-voltage substation to the ERCOT grid and represents a milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "builder_evidence": [
    "\"Delivering Sweetwater 1 substation energization on schedule reflects our disciplined execution, the strength of our supply chain relationships and the efficiency of our vertically integrated development model,\" said Daniel Roberts, Co-Founder and Co-CEO at IREN."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "TEXAS - announced today the energization of its 1.4GW Sweetwater 1 data center site in Texas, according to a press release statement."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://economicpolicytimes.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Creekstone Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "*Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite*",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "*Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite*",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://businesswire.com/news/home/20240925729563/en/ECL-Announces-Worlds-First-1-Gigawatt-Off-Grid-Hydrogen-Powered-AI-Factory-Data-Center",
   "title": "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
   "published_at": "2024-09-25T17:30:00",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "announced",
   "announcement_date": "2024-09-25",
   "project_evidence": [
    "MOUNTAIN VIEW, Calif.--([BUSINESS WIRE](https://www.businesswire.com))--Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "locality_evidence": [
    "MOUNTAIN VIEW, Calif.--([BUSINESS WIRE](https://www.businesswire.com))--Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "state_evidence": [
    "MOUNTAIN VIEW, Calif.--([BUSINESS WIRE](https://www.businesswire.com))--Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "capacity_gw_evidence": [
    "Designed specifically for the development and deployment of artificial intelligence (AI) technologies, the site will also provide space for tenants to deliver cutting-edge AI cloud and traditional cloud services to their customers.",
    "The initial 1GW phased development may be expanded to 2GW in the future, enabled by its modularity and based on customer demand."
   ],
   "builder_evidence": [
    "MOUNTAIN VIEW, Calif.--([BUSINESS WIRE](https://www.businesswire.com))--Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "ai_customer_evidence": [
    "MOUNTAIN VIEW, Calif.--([BUSINESS WIRE](https://www.businesswire.com))--Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "status_evidence": [
    "MOUNTAIN VIEW, Calif.--([BUSINESS WIRE](https://www.businesswire.com))--Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ],
   "announcement_date_evidence": [
    "MOUNTAIN VIEW, Calif.--([BUSINESS WIRE](https://www.businesswire.com))--Data Center-as-a-Service pioneer [ECL](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.ecldc.com&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=ECL&index=1&md5=bc5f3c1a1e3e704c3be7abd2ca4e0cc2), which [unveiled](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.businesswire.com%2Fnews%2Fhome%2F20240620107869%2Fen%2FECL-Unveils-World%25E2%2580%2599s-First-Off-Grid-Hydrogen-Powered-AI-Data-Center&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=unveiled&index=2&md5=abf1c642c4d72cc0eddb077b578a7d9a) the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with [Lambda](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Flambdalabs.com%2F&esheet=54126927&newsitemid=20240925729563&lan=en-US&anchor=Lambda&index=3&md5=53acf31c0605b2292c38a09c21a32e9a) as its first tenant."
   ]
  },
  {
   "url": "https://cnbc.com/2026/08/17/nvidia-financing-open-ai-data-center-ohio.html",
   "title": "Nvidia backing $105 billion in financing for OpenAI data center in Ohio",
   "published_at": "2026-08-17T14:10:16",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike City",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "Nvidia backing $105 billion in financing for OpenAI data center in Ohio",
    "SB Energy will build and manage the datacenter at the PORTS-Pike Technology Campus in Pike City, Ohio, through a 20-year lease to OpenAI.",
    "# Nvidia backing $105 billion in financing for OpenAI data center in Ohio"
   ],
   "locality_evidence": [
    "SB Energy will build and manage the datacenter at the PORTS-Pike Technology Campus in Pike City, Ohio, through a 20-year lease to OpenAI.",
    "# Nvidia backing $105 billion in financing for OpenAI data center in Ohio"
   ],
   "state_evidence": [
    "SB Energy will build and manage the datacenter at the PORTS-Pike Technology Campus in Pike City, Ohio, through a 20-year lease to OpenAI.",
    "# Nvidia backing $105 billion in financing for OpenAI data center in Ohio"
   ],
   "capacity_gw_evidence": [
    "The credit will support an initial 4.25 gigawatts of computing capacity with the option for an additional 3.75 gigawatts.",
    "# Nvidia backing $105 billion in financing for OpenAI data center in Ohio"
   ],
   "builder_evidence": [
    "SB Energy will build and manage the datacenter at the PORTS-Pike Technology Campus in Pike City, Ohio, through a 20-year lease to OpenAI.",
    "# Nvidia backing $105 billion in financing for OpenAI data center in Ohio"
   ],
   "ai_customer_evidence": [
    "SB Energy will build and manage the datacenter at the PORTS-Pike Technology Campus in Pike City, Ohio, through a 20-year lease to OpenAI.",
    "# Nvidia backing $105 billion in financing for OpenAI data center in Ohio"
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "# Nvidia backing $105 billion in financing for OpenAI data center in Ohio"
   ]
  },
  {
   "url": "https://agenccy.ai/news/meta-blackrock-el-paso-gigawatt-data-centre-venture",
   "title": "Meta and BlackRock Form $14B, 1GW El Paso Data Centre JV",
   "published_at": "2026-07-29T08:30:18",
   "project": "False",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta and BlackRock",
   "ai_customer": "Meta",
   "status": "under construction",
   "announcement_date": "2026-07-28",
   "project_evidence": null,
   "locality_evidence": [
    "# Meta Found Another Way to Build a Gigawatt Without Paying for It",
    "BlackRock's funds take 80% of a $14 billion campus in El Paso.",
    "Meta and BlackRock announced a joint venture on **28 July** to own the AI data centre campus already under construction in northeast **El Paso, Texas**: about **$14 billion** of total development cost and **1 gigawatt** of capacity, with the first of it expected online in **2028**."
   ],
   "state_evidence": [
    "# Meta Found Another Way to Build a Gigawatt Without Paying for It",
    "Meta and BlackRock announced a joint venture on **28 July** to own the AI data centre campus already under construction in northeast **El Paso, Texas**: about **$14 billion** of total development cost and **1 gigawatt** of capacity, with the first of it expected online in **2028**."
   ],
   "capacity_gw_evidence": [
    "# Meta Found Another Way to Build a Gigawatt Without Paying for It",
    "Meta and BlackRock announced a joint venture on **28 July** to own the AI data centre campus already under construction in northeast **El Paso, Texas**: about **$14 billion** of total development cost and **1 gigawatt** of capacity, with the first of it expected online in **2028**."
   ],
   "builder_evidence": [
    "# Meta Found Another Way to Build a Gigawatt Without Paying for It",
    "Meta and BlackRock announced a joint venture on **28 July** to own the AI data centre campus already under construction in northeast **El Paso, Texas**: about **$14 billion** of total development cost and **1 gigawatt** of capacity, with the first of it expected online in **2028**."
   ],
   "ai_customer_evidence": [
    "# Meta Found Another Way to Build a Gigawatt Without Paying for It",
    "BlackRock's funds take 80% of a $14 billion campus in El Paso. Meta contributes land, manages construction, is the only tenant, and guarantees residual value of up to about $13 billion."
   ],
   "status_evidence": [
    "# Meta Found Another Way to Build a Gigawatt Without Paying for It",
    "Meta and BlackRock announced a joint venture on **28 July** to own the AI data centre campus already under construction in northeast **El Paso, Texas**: about **$14 billion** of total development cost and **1 gigawatt** of capacity, with the first of it expected online in **2028**."
   ],
   "announcement_date_evidence": [
    "# Meta Found Another Way to Build a Gigawatt Without Paying for It",
    "Meta and BlackRock announced a joint venture on **28 July** to own the AI data centre campus already under construction in northeast **El Paso, Texas**: about **$14 billion** of total development cost and **1 gigawatt** of capacity, with the first of it expected online in **2028**."
   ]
  },
  {
   "url": "https://tracker.bepresearch.com/projects/project-rainier-new-carlisle",
   "title": "BEP AI Infrastructure Tracker",
   "published_at": null,
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon Web Services",
   "ai_customer": "Anthropic",
   "status": "Partially operational",
   "announcement_date": "2024-01-01",
   "project_evidence": [
    "Project Rainier \u00b7 BEP AI Infrastructure Tracker",
    "# Project Rainier",
    "AWS campus at New Carlisle, Indiana built for Anthropic training workloads on Trainium."
   ],
   "locality_evidence": [
    "AWS campus at New Carlisle, Indiana built for Anthropic training workloads on Trainium.",
    "Project Rainier \u00b7 BEP AI Infrastructure Tracker",
    "# Project Rainier"
   ],
   "state_evidence": [
    "AWS campus at New Carlisle, Indiana built for Anthropic training workloads on Trainium.",
    "Project Rainier \u00b7 BEP AI Infrastructure Tracker",
    "# Project Rainier"
   ],
   "capacity_gw_evidence": [
    "CNBC reports the full ~30-building site will draw more than 2.2 GW at completion.",
    "Project Rainier \u00b7 BEP AI Infrastructure Tracker",
    "# Project Rainier"
   ],
   "builder_evidence": [
    "Partially operational. 910 MW announced (critical it load); 1,045,000 accelerators (AWS Trainium2); expected Dec 2026; owned or developed by Amazon Web Services; tenant: Anthropic; power source: Grid.",
    "Project Rainier \u00b7 BEP AI Infrastructure Tracker",
    "# Project Rainier"
   ],
   "ai_customer_evidence": [
    "AWS campus at New Carlisle, Indiana built for Anthropic training workloads on Trainium.",
    "Project Rainier \u00b7 BEP AI Infrastructure Tracker",
    "# Project Rainier"
   ],
   "status_evidence": [
    "Partially operationalHyperscale campusLast verified 14 days ago60",
    "Project Rainier \u00b7 BEP AI Infrastructure Tracker",
    "# Project Rainier"
   ],
   "announcement_date_evidence": [
    "1. AnnouncedJan 2024",
    "Project Rainier \u00b7 BEP AI Infrastructure Tracker",
    "# Project Rainier"
   ]
  },
  {
   "url": "https://tracker.bepresearch.com/projects/project-rainier-new-carlisle",
   "title": "BEP AI Infrastructure Tracker",
   "published_at": null,
   "project": "Nebius Highridge",
   "locality": "Butler Township",
   "state": "Pennsylvania",
   "capacity_gw": 1.2,
   "builder": "Nebius Group",
   "ai_customer": null,
   "status": "Planning",
   "announcement_date": null,
   "project_evidence": [
    "- [Nebius Highridge](/projects/nebius-highridge-pennsylvania)",
    "## Related projects",
    "Nebius Group \u00b7 Butler Township, Pennsylvania, United States",
    "1.2 GWPlanning"
   ],
   "locality_evidence": [
    "- [Nebius Highridge](/projects/nebius-highridge-pennsylvania)",
    "## Related projects",
    "Nebius Group \u00b7 Butler Township, Pennsylvania, United States",
    "1.2 GWPlanning"
   ],
   "state_evidence": [
    "- [Nebius Highridge](/projects/nebius-highridge-pennsylvania)",
    "## Related projects",
    "Nebius Group \u00b7 Butler Township, Pennsylvania, United States",
    "1.2 GWPlanning"
   ],
   "capacity_gw_evidence": [
    "- [Nebius Highridge](/projects/nebius-highridge-pennsylvania)",
    "## Related projects",
    "Nebius Group \u00b7 Butler Township, Pennsylvania, United States",
    "1.2 GWPlanning"
   ],
   "builder_evidence": [
    "- [Nebius Highridge](/projects/nebius-highridge-pennsylvania)",
    "## Related projects",
    "Nebius Group \u00b7 Butler Township, Pennsylvania, United States",
    "1.2 GWPlanning"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "- [Nebius Highridge](/projects/nebius-highridge-pennsylvania)",
    "## Related projects",
    "Nebius Group \u00b7 Butler Township, Pennsylvania, United States",
    "1.2 GWPlanning"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tracker.bepresearch.com/projects/project-rainier-new-carlisle",
   "title": "BEP AI Infrastructure Tracker",
   "published_at": null,
   "project": "Meta Prometheus",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "Partially operational",
   "announcement_date": null,
   "project_evidence": [
    "- [Meta Prometheus](/projects/meta-prometheus-new-albany)",
    "## Related projects",
    "Meta \u00b7 New Albany, Ohio, United States",
    "1 GWPartially operational"
   ],
   "locality_evidence": [
    "- [Meta Prometheus](/projects/meta-prometheus-new-albany)",
    "## Related projects",
    "Meta \u00b7 New Albany, Ohio, United States",
    "1 GWPartially operational"
   ],
   "state_evidence": [
    "- [Meta Prometheus](/projects/meta-prometheus-new-albany)",
    "## Related projects",
    "Meta \u00b7 New Albany, Ohio, United States",
    "1 GWPartially operational"
   ],
   "capacity_gw_evidence": [
    "- [Meta Prometheus](/projects/meta-prometheus-new-albany)",
    "## Related projects",
    "Meta \u00b7 New Albany, Ohio, United States",
    "1 GWPartially operational"
   ],
   "builder_evidence": [
    "- [Meta Prometheus](/projects/meta-prometheus-new-albany)",
    "## Related projects",
    "Meta \u00b7 New Albany, Ohio, United States",
    "1 GWPartially operational"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "- [Meta Prometheus](/projects/meta-prometheus-new-albany)",
    "## Related projects",
    "Meta \u00b7 New Albany, Ohio, United States",
    "1 GWPartially operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tracker.bepresearch.com/projects/project-rainier-new-carlisle",
   "title": "BEP AI Infrastructure Tracker",
   "published_at": null,
   "project": "Stargate Michigan",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.4,
   "builder": "Related Digital",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "- [Stargate Michigan](/projects/stargate-michigan-saline-township)",
    "## Related projects",
    "Related Digital \u00b7 Saline Township, Michigan, United States",
    "1.4 GWUnder construction"
   ],
   "locality_evidence": [
    "- [Stargate Michigan](/projects/stargate-michigan-saline-township)",
    "## Related projects",
    "Related Digital \u00b7 Saline Township, Michigan, United States",
    "1.4 GWUnder construction"
   ],
   "state_evidence": [
    "- [Stargate Michigan](/projects/stargate-michigan-saline-township)",
    "## Related projects",
    "Related Digital \u00b7 Saline Township, Michigan, United States",
    "1.4 GWUnder construction"
   ],
   "capacity_gw_evidence": [
    "- [Stargate Michigan](/projects/stargate-michigan-saline-township)",
    "## Related projects",
    "Related Digital \u00b7 Saline Township, Michigan, United States",
    "1.4 GWUnder construction"
   ],
   "builder_evidence": [
    "- [Stargate Michigan](/projects/stargate-michigan-saline-township)",
    "## Related projects",
    "Related Digital \u00b7 Saline Township, Michigan, United States",
    "1.4 GWUnder construction"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "- [Stargate Michigan](/projects/stargate-michigan-saline-township)",
    "## Related projects",
    "Related Digital \u00b7 Saline Township, Michigan, United States",
    "1.4 GWUnder construction"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://money.mymotherlode.com/clarkebroadcasting.mymotherlode/article/tokenring-2026-1-2-colossus-unbound-xais-memphis-expansion-targets-1-million-gpus-in-the-race-for-agi",
   "title": "Colossus Unbound: xAI\u00e2s Memphis Expansion Targets 1 Million GPUs in the Race for AGI",
   "published_at": "2026-01-02T19:48:24",
   "project": "Colossus",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "expanding",
   "announcement_date": "2026-01-02",
   "project_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "As of January 2, 2026, the company has successfully scaled its initial 100,000-GPU cluster to over 200,000 units and is now aggressively pursuing a roadmap to reach 1 million GPUs by the end of the year."
   ],
   "locality_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "As of January 2, 2026, the company has successfully scaled its initial 100,000-GPU cluster to over 200,000 units and is now aggressively pursuing a roadmap to reach 1 million GPUs by the end of the year."
   ],
   "state_evidence": [
    "As the \"Digital Delta\" takes shape across the Tennessee-Mississippi border, the project is redefining the physical and logistical requirements of the AGI era.",
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "As of January 2, 2026, the company has successfully scaled its initial 100,000-GPU cluster to over 200,000 units and is now aggressively pursuing a roadmap to reach 1 million GPUs by the end of the year."
   ],
   "capacity_gw_evidence": [
    "By targeting a power capacity of 2 gigawatts (GW)\u2014roughly enough to power nearly 2 million homes\u2014xAI is transitioning from a high-scale startup to a \"Gigafactory of Compute.\"",
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "As of January 2, 2026, the company has successfully scaled its initial 100,000-GPU cluster to over 200,000 units and is now aggressively pursuing a roadmap to reach 1 million GPUs by the end of the year."
   ],
   "builder_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "As of January 2, 2026, the company has successfully scaled its initial 100,000-GPU cluster to over 200,000 units and is now aggressively pursuing a roadmap to reach 1 million GPUs by the end of the year."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "As of January 2, 2026, the company has successfully scaled its initial 100,000-GPU cluster to over 200,000 units and is now aggressively pursuing a roadmap to reach 1 million GPUs by the end of the year."
   ],
   "announcement_date_evidence": [
    "As of January 2, 2026, the company has successfully scaled its initial 100,000-GPU cluster to over 200,000 units and is now aggressively pursuing a roadmap to reach 1 million GPUs by the end of the year.",
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race."
   ]
  },
  {
   "url": "https://panhandleregionalnews.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
   "published_at": null,
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "July 15, 2026",
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "locality_evidence": [
    "July 15, 2026",
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe and Lancium announce a 270-acre, 1 GW AI data center in Childress, TX, with solar power and water-efficient cooling."
   ],
   "state_evidence": [
    "July 15, 2026",
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "July 15, 2026",
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "builder_evidence": [
    "July 15, 2026",
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "July 15, 2026",
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "Crusoe and Lancium announce a 270-acre, 1 GW AI data center in Childress, TX, with solar power and water-efficient cooling."
   ],
   "announcement_date_evidence": [
    "July 15, 2026",
    "# Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) -- Crusoe, the industry's first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ]
  },
  {
   "url": "https://panhandleregionalnews.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas",
   "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
   "published_at": null,
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "under construction / operating",
   "announcement_date": null,
   "project_evidence": [
    "July 15, 2026",
    "## Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene",
    "The Childress development is the latest chapter in Crusoe's deep commitment to Texas."
   ],
   "locality_evidence": [
    "July 15, 2026",
    "## Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "state_evidence": [
    "July 15, 2026",
    "## Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene",
    "The Childress development is the latest chapter in Crusoe's deep commitment to Texas."
   ],
   "capacity_gw_evidence": [
    "July 15, 2026",
    "## Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "builder_evidence": [
    "July 15, 2026",
    "## Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene",
    "Childress marks the second site where Crusoe and Lancium are executing this same partnership structure: Lancium acquires and owns the land, secures the power interconnect, and manages energy orchestration for the campus; while Crusoe designs, builds, and operates the AI data center itself."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "July 15, 2026",
    "## Childress Extends Crusoe and Lancium's Ongoing Partnership, Building on the Model Established in Abilene",
    "The company broke ground in Abilene in June 2024 on the Lancium-owned campus, energizing its first two buildings within one year \u2014 a remarkable feat of speed for a project of that scale \u2014 before expanding that campus to 1.2 GW."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand",
   "title": "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand - Vantage Data Centers",
   "published_at": null,
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Under Construction",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "# Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "locality_evidence": [
    "# Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations.",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "# Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations.",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "# Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations.",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "# Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations.",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations.",
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": [
    "# Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations.",
    "**DENVER (Aug. 19, 2025)** \u2013 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ]
  },
  {
   "url": "https://datacentersexposed.com/facilities/fermi-america-hypergrid-project-matador",
   "title": "Fermi America HyperGrid/ Project Matador \u2014 Carson County, TX",
   "published_at": null,
   "project": "Fermi America HyperGrid/ Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "Under construction",
    "# Fermi America HyperGrid/ Project Matador",
    "Fermi America HyperGrid/ Project Matador is a under construction data center in Carson County, TX, operated by Fermi America and Texas Tech."
   ],
   "locality_evidence": [
    "Under construction",
    "# Fermi America HyperGrid/ Project Matador",
    "Amarillo, Carson County, TX"
   ],
   "state_evidence": [
    "Under construction",
    "# Fermi America HyperGrid/ Project Matador",
    "Amarillo, Carson County, TX",
    "Fermi America HyperGrid/ Project Matador is a under construction data center in Carson County, TX, operated by Fermi America and Texas Tech."
   ],
   "capacity_gw_evidence": [
    "Under construction",
    "# Fermi America HyperGrid/ Project Matador",
    "Source: [Primary source](https://www.datacenterdynamics.com/en/news/fermi-america-acquires-600mw-of-gas-turbines-for-11gw-ai-mega-campus-in-amarillo-texas/)",
    "DataCentersExposed has documented 11,000 MW of reported power capacity at this site."
   ],
   "builder_evidence": [
    "Under construction",
    "# Fermi America HyperGrid/ Project Matador",
    "Fermi America HyperGrid/ Project Matador is a under construction data center in Carson County, TX, operated by Fermi America and Texas Tech."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Under construction",
    "# Fermi America HyperGrid/ Project Matador",
    "Fermi America HyperGrid/ Project Matador is a under construction data center in Carson County, TX, operated by Fermi America and Texas Tech."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://oilandgaspress.com/homer-city-redevelopment-and-kiewit-announce-countrys-largest-natural-gas-powered-data-center-campus-to-support-ai-and-hpc-demand",
   "title": "Energy, Automobile, EV, Renewable News",
   "published_at": null,
   "project": "Homer City Energy Campus",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Kiewit",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2025-04-02",
   "project_evidence": [
    "## 02 Apr Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "The Homer City Energy Campus will be built by Kiewit Power Constructors Co., one of the leading engineering, procurement and construction (EPC) contractors in the country."
   ],
   "locality_evidence": [
    "## 02 Apr Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "HOMER CITY, Pa.\u2013(BUSINESS WIRE)\u2013Today Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) announced the future of the former Homer City Generating Station."
   ],
   "state_evidence": [
    "## 02 Apr Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "*Projected Cost of Power Infrastructure and Data Centers Will Represent Largest Capital Investment in the History of Pennsylvania*"
   ],
   "capacity_gw_evidence": [
    "## 02 Apr Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "*Facility Will Generate Up to 4.5 GW of Energy Production Powered by Seven GE Vernova Turbines; First Turbine Deliveries Expected to Begin in 2026*"
   ],
   "builder_evidence": [
    "## 02 Apr Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "The Homer City Energy Campus will be built by Kiewit Power Constructors Co., one of the leading engineering, procurement and construction (EPC) contractors in the country."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## 02 Apr Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "HOMER CITY, Pa.\u2013(BUSINESS WIRE)\u2013Today Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) announced the future of the former Homer City Generating Station."
   ],
   "announcement_date_evidence": [
    "## 02 Apr Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand"
   ]
  },
  {
   "url": "https://newswire.ca/news-releases/nscale-acquires-american-intelligence-amp-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy-to-compute-814582521.html",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": "2026-03-16T21:18:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "Acquired",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "- *Nscale Acquires the Monarch Compute Campus -- America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*"
   ],
   "locality_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "capacity_gw_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "- *Nscale Acquires the Monarch Compute Campus -- America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*"
   ],
   "builder_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026 /CNW/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia -- with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026 /CNW/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia -- with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "announcement_date_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Mar 16, 2026, 17:18 ET"
   ]
  },
  {
   "url": "https://blackridgeresearch.com/blog/largest-biggest-upcoming-new-data-centers-in-texas-united-states",
   "title": "Texas Data Centers 2026: Top Upcoming Hyperscale Projects",
   "published_at": null,
   "project": "Advanced Energy and Intelligence Campus",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Texas University System & Fermi America",
   "ai_customer": null,
   "status": "Geo-technical work started in June 2025; the first 1 GW by the end of 2026",
   "announcement_date": null,
   "project_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 1 | Advanced Energy and Intelligence Campus | 11 GW | Near Amarillo, Texas Panhandle | Texas University System & Fermi America | Geo-technical work started in June 2025; the first 1 GW by the end of 2026 |"
   ],
   "locality_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 1 | Advanced Energy and Intelligence Campus | 11 GW | Near Amarillo, Texas Panhandle | Texas University System & Fermi America | Geo-technical work started in June 2025; the first 1 GW by the end of 2026 |"
   ],
   "state_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 1 | Advanced Energy and Intelligence Campus | 11 GW | Near Amarillo, Texas Panhandle | Texas University System & Fermi America | Geo-technical work started in June 2025; the first 1 GW by the end of 2026 |"
   ],
   "capacity_gw_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 1 | Advanced Energy and Intelligence Campus | 11 GW | Near Amarillo, Texas Panhandle | Texas University System & Fermi America | Geo-technical work started in June 2025; the first 1 GW by the end of 2026 |"
   ],
   "builder_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 1 | Advanced Energy and Intelligence Campus | 11 GW | Near Amarillo, Texas Panhandle | Texas University System & Fermi America | Geo-technical work started in June 2025; the first 1 GW by the end of 2026 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 1 | Advanced Energy and Intelligence Campus | 11 GW | Near Amarillo, Texas Panhandle | Texas University System & Fermi America | Geo-technical work started in June 2025; the first 1 GW by the end of 2026 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://blackridgeresearch.com/blog/largest-biggest-upcoming-new-data-centers-in-texas-united-states",
   "title": "Texas Data Centers 2026: Top Upcoming Hyperscale Projects",
   "published_at": null,
   "project": "Data City, Texas",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corporation",
   "ai_customer": null,
   "status": "First 300 MW + 1 M sq ft launching in 2026; full build phased",
   "announcement_date": null,
   "project_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 2 | Data City, Texas | 5 GW | Near Laredo, Texas | Energy Abundance Development Corporation | First 300 MW + 1 M sq ft launching in 2026; full build phased |"
   ],
   "locality_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 2 | Data City, Texas | 5 GW | Near Laredo, Texas | Energy Abundance Development Corporation | First 300 MW + 1 M sq ft launching in 2026; full build phased |"
   ],
   "state_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 2 | Data City, Texas | 5 GW | Near Laredo, Texas | Energy Abundance Development Corporation | First 300 MW + 1 M sq ft launching in 2026; full build phased |"
   ],
   "capacity_gw_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 2 | Data City, Texas | 5 GW | Near Laredo, Texas | Energy Abundance Development Corporation | First 300 MW + 1 M sq ft launching in 2026; full build phased |"
   ],
   "builder_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 2 | Data City, Texas | 5 GW | Near Laredo, Texas | Energy Abundance Development Corporation | First 300 MW + 1 M sq ft launching in 2026; full build phased |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 2 | Data City, Texas | 5 GW | Near Laredo, Texas | Energy Abundance Development Corporation | First 300 MW + 1 M sq ft launching in 2026; full build phased |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://blackridgeresearch.com/blog/largest-biggest-upcoming-new-data-centers-in-texas-united-states",
   "title": "Texas Data Centers 2026: Top Upcoming Hyperscale Projects",
   "published_at": null,
   "project": "OpenAI Stargate Campus",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 4.5,
   "builder": "OpenAI, Oracle, SoftBank (land owned by Lancium)",
   "ai_customer": "OpenAI",
   "status": "Under construction; phased build over 4 years",
   "announcement_date": null,
   "project_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 3 | OpenAI Stargate Campus | 4.5 GW | Abilene, Texas | OpenAI, Oracle, SoftBank (land owned by Lancium) | Under construction; phased build over 4 years |"
   ],
   "locality_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 3 | OpenAI Stargate Campus | 4.5 GW | Abilene, Texas | OpenAI, Oracle, SoftBank (land owned by Lancium) | Under construction; phased build over 4 years |"
   ],
   "state_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 3 | OpenAI Stargate Campus | 4.5 GW | Abilene, Texas | OpenAI, Oracle, SoftBank (land owned by Lancium) | Under construction; phased build over 4 years |"
   ],
   "capacity_gw_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 3 | OpenAI Stargate Campus | 4.5 GW | Abilene, Texas | OpenAI, Oracle, SoftBank (land owned by Lancium) | Under construction; phased build over 4 years |"
   ],
   "builder_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 3 | OpenAI Stargate Campus | 4.5 GW | Abilene, Texas | OpenAI, Oracle, SoftBank (land owned by Lancium) | Under construction; phased build over 4 years |"
   ],
   "ai_customer_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 3 | OpenAI Stargate Campus | 4.5 GW | Abilene, Texas | OpenAI, Oracle, SoftBank (land owned by Lancium) | Under construction; phased build over 4 years |"
   ],
   "status_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 3 | OpenAI Stargate Campus | 4.5 GW | Abilene, Texas | OpenAI, Oracle, SoftBank (land owned by Lancium) | Under construction; phased build over 4 years |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://blackridgeresearch.com/blog/largest-biggest-upcoming-new-data-centers-in-texas-united-states",
   "title": "Texas Data Centers 2026: Top Upcoming Hyperscale Projects",
   "published_at": null,
   "project": "Tract Caldwell County Park",
   "locality": "Caldwell County",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Tract",
   "ai_customer": null,
   "status": "Land acquisition completed in May 2025; 360 MW first phase operational in 2028",
   "announcement_date": null,
   "project_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 4 | Tract Caldwell County Park | 2 GW | Caldwell County, Texas | Tract | Land acquisition completed in May 2025; 360 MW first phase operational in 2028 |"
   ],
   "locality_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 4 | Tract Caldwell County Park | 2 GW | Caldwell County, Texas | Tract | Land acquisition completed in May 2025; 360 MW first phase operational in 2028 |"
   ],
   "state_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 4 | Tract Caldwell County Park | 2 GW | Caldwell County, Texas | Tract | Land acquisition completed in May 2025; 360 MW first phase operational in 2028 |"
   ],
   "capacity_gw_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 4 | Tract Caldwell County Park | 2 GW | Caldwell County, Texas | Tract | Land acquisition completed in May 2025; 360 MW first phase operational in 2028 |"
   ],
   "builder_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 4 | Tract Caldwell County Park | 2 GW | Caldwell County, Texas | Tract | Land acquisition completed in May 2025; 360 MW first phase operational in 2028 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 4 | Tract Caldwell County Park | 2 GW | Caldwell County, Texas | Tract | Land acquisition completed in May 2025; 360 MW first phase operational in 2028 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://blackridgeresearch.com/blog/largest-biggest-upcoming-new-data-centers-in-texas-united-states",
   "title": "Texas Data Centers 2026: Top Upcoming Hyperscale Projects",
   "published_at": null,
   "project": "Frontier (Vantage DC)",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Construction started; first building delivery- H2 2026",
   "announcement_date": null,
   "project_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 5 | Frontier (Vantage DC) | 1.4 GW | Shackelford County, Texas | Vantage Data Centers | Construction started; first building delivery- H2 2026 |"
   ],
   "locality_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 5 | Frontier (Vantage DC) | 1.4 GW | Shackelford County, Texas | Vantage Data Centers | Construction started; first building delivery- H2 2026 |"
   ],
   "state_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 5 | Frontier (Vantage DC) | 1.4 GW | Shackelford County, Texas | Vantage Data Centers | Construction started; first building delivery- H2 2026 |"
   ],
   "capacity_gw_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 5 | Frontier (Vantage DC) | 1.4 GW | Shackelford County, Texas | Vantage Data Centers | Construction started; first building delivery- H2 2026 |"
   ],
   "builder_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 5 | Frontier (Vantage DC) | 1.4 GW | Shackelford County, Texas | Vantage Data Centers | Construction started; first building delivery- H2 2026 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# List of Upcoming Data Centers in Texas 2026",
    "Top 7 Upcoming Data Centers in Texas 2025",
    "| **Rank** | **Project Name** | **Capacity** | **Location** | **Developer** | **Stage** |",
    "| 5 | Frontier (Vantage DC) | 1.4 GW | Shackelford County, Texas | Vantage Data Centers | Construction started; first building delivery- H2 2026 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://letsdatascience.com/news/openai-plans-30-billion-georgia-data-center-581fd2a9",
   "title": "OpenAI Plans 3.2-Gigawatt Data Center Campus in Georgia",
   "published_at": "2026-07-22T19:40:12",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "# OpenAI Plans 3.2-Gigawatt Data Center Campus in Georgia",
    "OpenAI announced Project Camellia on July 22, describing a planned data center campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia."
   ],
   "locality_evidence": [
    "# OpenAI Plans 3.2-Gigawatt Data Center Campus in Georgia",
    "OpenAI announced Project Camellia on July 22, describing a planned data center campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia."
   ],
   "state_evidence": [
    "# OpenAI Plans 3.2-Gigawatt Data Center Campus in Georgia",
    "OpenAI announced Project Camellia on July 22, describing a planned data center campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Plans 3.2-Gigawatt Data Center Campus in Georgia",
    "The company says it is contracting with Georgia Power for 3.2 gigawatts of electricity to be delivered in phases from 2028 through 2032."
   ],
   "builder_evidence": [
    "# OpenAI Plans 3.2-Gigawatt Data Center Campus in Georgia",
    "OpenAI announced Project Camellia on July 22, describing a planned data center campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia."
   ],
   "ai_customer_evidence": [
    "# OpenAI Plans 3.2-Gigawatt Data Center Campus in Georgia",
    "OpenAI announced Project Camellia on July 22, describing a planned data center campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia."
   ],
   "status_evidence": [
    "# OpenAI Plans 3.2-Gigawatt Data Center Campus in Georgia",
    "OpenAI announced Project Camellia on July 22, describing a planned data center campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia."
   ],
   "announcement_date_evidence": [
    "# OpenAI Plans 3.2-Gigawatt Data Center Campus in Georgia",
    "OpenAI announced Project Camellia on July 22, describing a planned data center campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia."
   ]
  },
  {
   "url": "https://the-leader.com/story/money/business/2026/03/17/google-reveals-project-cannoli-data-center/89185890007",
   "title": "Google reveals it is behind big 'Project Cannoli' data center project",
   "published_at": "2026-03-17T12:02:18",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": null,
   "status": "preliminary site plan approval",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "locality_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "state_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google also said Tuesday that it is creating a $10 million Energy Impact Fund for local organizations to tap into with the aim of lowering monthly utility bills for Michiganders."
   ],
   "capacity_gw_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "builder_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "The data center would be developed for Google by Panattoni Development Co."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "The township's Planning Commission voted 5-2 on Feb. 11 to give a preliminary site plan approval for the project."
   ],
   "announcement_date_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ]
  },
  {
   "url": "https://constructionreviewonline.com/muskie-data-campus-acquisition-sets-stage-for-1gw-ai-infrastructure-in-eastern-kentucky",
   "title": "Muskie Data Campus Acquisition Sets Stage for 1GW AI Infrastructure in Eastern Kentucky",
   "published_at": "2026-05-26T13:39:50",
   "project": "Muskie Data Campus",
   "locality": "Eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf Inc.",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Muskie Data Campus Acquisition Sets Stage for 1GW AI Infrastructure in Eastern Kentucky",
    "Known as the Muskie Data Campus, the project is poised to deliver over 1 gigawatt (GW) of AI-focused digital infrastructure capacity.",
    "**Project**: Muskie Data Campus"
   ],
   "locality_evidence": [
    "# Muskie Data Campus Acquisition Sets Stage for 1GW AI Infrastructure in Eastern Kentucky",
    "A landmark hyperscale AI and high-performance computing (HPC) development is moving forward in Eastern Kentucky with the acquisition of a key industrial site.",
    "**Location**: EastPark Industrial Park, Eastern Kentucky"
   ],
   "state_evidence": [
    "# Muskie Data Campus Acquisition Sets Stage for 1GW AI Infrastructure in Eastern Kentucky",
    "A landmark hyperscale AI and high-performance computing (HPC) development is moving forward in Eastern Kentucky with the acquisition of a key industrial site."
   ],
   "capacity_gw_evidence": [
    "# Muskie Data Campus Acquisition Sets Stage for 1GW AI Infrastructure in Eastern Kentucky",
    "Known as the Muskie Data Campus, the project is poised to deliver over 1 gigawatt (GW) of AI-focused digital infrastructure capacity.",
    "**Planned Capacity**: Over 1 gigawatt (GW) of AI and high-performance computing (HPC) infrastructure"
   ],
   "builder_evidence": [
    "# Muskie Data Campus Acquisition Sets Stage for 1GW AI Infrastructure in Eastern Kentucky",
    "[TeraWulf Inc.](https://investors.terawulf.com/), a leader in digital infrastructure development, acquired the Muskie site from Industrial Equity Partners, enabling a phased construction timeline that will bring the project online by 2030.",
    "**Developer**: TeraWulf Inc., focused on AI and HPC digital infrastructure projects"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Muskie Data Campus Acquisition Sets Stage for 1GW AI Infrastructure in Eastern Kentucky",
    "A landmark hyperscale AI and high-performance computing (HPC) development is moving forward in Eastern Kentucky with the acquisition of a key industrial site."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://bitbo.io/news/hut8-ai-landlord-pivot",
   "title": "Bitcoin Miner Hut 8 Becomes AI Landlord in $16.8B Pivot \u2013 Bitbo",
   "published_at": "2026-06-04T14:00:00",
   "project": "Beacon Point",
   "locality": "Corpus Christi",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-06",
   "project_evidence": [
    "Hut 8 signed a 15-year, $9.8B triple-net lease at its Beacon Point campus in Nueces County, Texas with an undisclosed investment-grade AI tenant.",
    "![Bitcoin Miner Hut 8 Becomes AI Landlord in $16.8B Pivot](https://bitbo.io/news/images/miners.jpg)",
    "### Key Takeaways"
   ],
   "locality_evidence": [
    "On May 6, 2026, Hut 8 announced a 15-year, $9.8 billion triple-net lease at its Beacon Point campus near Corpus Christi, Texas with a high-investment-grade tenant set to deploy infrastructure for AI training and inference at hyperscale.",
    "![Bitcoin Miner Hut 8 Becomes AI Landlord in $16.8B Pivot](https://bitbo.io/news/images/miners.jpg)",
    "### Key Takeaways"
   ],
   "state_evidence": [
    "Hut 8 signed a 15-year, $9.8B triple-net lease at its Beacon Point campus in Nueces County, Texas with an undisclosed investment-grade AI tenant.",
    "![Bitcoin Miner Hut 8 Becomes AI Landlord in $16.8B Pivot](https://bitbo.io/news/images/miners.jpg)",
    "### Key Takeaways"
   ],
   "capacity_gw_evidence": [
    "Beacon Point is planned as a 1,000 MW multi-tenant campus with a secured interconnection agreement with AEP Texas.",
    "![Bitcoin Miner Hut 8 Becomes AI Landlord in $16.8B Pivot](https://bitbo.io/news/images/miners.jpg)",
    "### Key Takeaways"
   ],
   "builder_evidence": [
    "Hut 8 signed a 15-year, $9.8B triple-net lease at its Beacon Point campus in Nueces County, Texas with an undisclosed investment-grade AI tenant.",
    "![Bitcoin Miner Hut 8 Becomes AI Landlord in $16.8B Pivot](https://bitbo.io/news/images/miners.jpg)",
    "### Key Takeaways"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Beacon Point is planned as a 1,000 MW multi-tenant campus with a secured interconnection agreement with AEP Texas.",
    "![Bitcoin Miner Hut 8 Becomes AI Landlord in $16.8B Pivot](https://bitbo.io/news/images/miners.jpg)",
    "### Key Takeaways"
   ],
   "announcement_date_evidence": [
    "On May 6, 2026, Hut 8 announced a 15-year, $9.8 billion triple-net lease at its Beacon Point campus near Corpus Christi, Texas with a high-investment-grade tenant set to deploy infrastructure for AI training and inference at hyperscale.",
    "![Bitcoin Miner Hut 8 Becomes AI Landlord in $16.8B Pivot](https://bitbo.io/news/images/miners.jpg)",
    "### Key Takeaways"
   ]
  },
  {
   "url": "https://thenextweb.com/news/nvidia-iren-2-1bn-warrant-5gw-sweetwater-ai-data-centers",
   "title": "NVIDIA takes $2.1bn warrant in IREN as part of 5GW AI data-centre deal",
   "published_at": "2026-05-08T10:23:00",
   "project": "Sweetwater",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": "Microsoft",
   "status": "planned capacity",
   "announcement_date": null,
   "project_evidence": [
    "# NVIDIA takes $2.1bn warrant in IREN as part of 5GW AI data-centre deal",
    "Operationally, the Sweetwater campus in Texas, currently sized at 2GW of planned capacity, comes first."
   ],
   "locality_evidence": [
    "# NVIDIA takes $2.1bn warrant in IREN as part of 5GW AI data-centre deal",
    "Operationally, the Sweetwater campus in Texas, currently sized at 2GW of planned capacity, comes first."
   ],
   "state_evidence": [
    "# NVIDIA takes $2.1bn warrant in IREN as part of 5GW AI data-centre deal",
    "Operationally, the Sweetwater campus in Texas, currently sized at 2GW of planned capacity, comes first."
   ],
   "capacity_gw_evidence": [
    "# NVIDIA takes $2.1bn warrant in IREN as part of 5GW AI data-centre deal",
    "Operationally, the Sweetwater campus in Texas, currently sized at 2GW of planned capacity, comes first."
   ],
   "builder_evidence": [
    "# NVIDIA takes $2.1bn warrant in IREN as part of 5GW AI data-centre deal",
    "Operationally, the Sweetwater campus in Texas, currently sized at 2GW of planned capacity, comes first."
   ],
   "ai_customer_evidence": [
    "# NVIDIA takes $2.1bn warrant in IREN as part of 5GW AI data-centre deal",
    "IREN signed a $9.7bn cloud agreement with Microsoft last year for capacity at the same site; the Nvidia tie-up extends the same playbook with the chipmaker as both partner and shareholder."
   ],
   "status_evidence": [
    "# NVIDIA takes $2.1bn warrant in IREN as part of 5GW AI data-centre deal",
    "Operationally, the Sweetwater campus in Texas, currently sized at 2GW of planned capacity, comes first."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://finance.yahoo.com/news/creekstone-energy-secures-largest-solar-110000344.html",
   "title": "Creekstone Energy Secures Largest Solar Lease in Utah\u2019s History and Receives Millard County Zoning Approval for Over 1 GW of Solar Development",
   "published_at": "2026-03-10T11:00:00",
   "project": "Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "master-planned",
   "announcement_date": "2026-03-10",
   "project_evidence": [
    "Creekstone Energy Secures Largest Solar Lease in Utah\u2019s History and Receives Millard County Zoning Approval for Over 1 GW of Solar Development",
    "Landmark agreement positions Creekstone\u2019s Delta Gigasite as one of the nation\u2019s largest co-located renewable energy and AI data center campuses",
    "Creekstone plans to develop more than 1 gigawatt (GW) of solar generating capacity over the next 18 months to support the growing power demands of its Delta Gigasite\u2014one of the largest AI hyperscale data center developments in the western United States."
   ],
   "locality_evidence": [
    "Creekstone Energy Secures Largest Solar Lease in Utah\u2019s History and Receives Millard County Zoning Approval for Over 1 GW of Solar Development",
    "**DELTA, Utah, March 10, 2026**--([BUSINESS WIRE](https://www.businesswire.com))--Creekstone Energy LLC (\"Creekstone\") today announced it has executed a long-term solar lease with the State of Utah\u2019s School and Institutional Trust Lands Administration (TLA) encompassing approximately 13,000 acres of state trust lands in Millard County.",
    "Creekstone\u2019s Delta Gigasite campus sits on more than 1,100 acres in central Utah\u2019s Millard County adjacent to the leased land and is master-planned for more than 10 gigawatts of total capacity."
   ],
   "state_evidence": [
    "Creekstone Energy Secures Largest Solar Lease in Utah\u2019s History and Receives Millard County Zoning Approval for Over 1 GW of Solar Development",
    "**DELTA, Utah, March 10, 2026**--([BUSINESS WIRE](https://www.businesswire.com))--Creekstone Energy LLC (\"Creekstone\") today announced it has executed a long-term solar lease with the State of Utah\u2019s School and Institutional Trust Lands Administration (TLA) encompassing approximately 13,000 acres of state trust lands in Millard County.",
    "Creekstone\u2019s Delta Gigasite campus sits on more than 1,100 acres in central Utah\u2019s Millard County adjacent to the leased land and is master-planned for more than 10 gigawatts of total capacity."
   ],
   "capacity_gw_evidence": [
    "Creekstone Energy Secures Largest Solar Lease in Utah\u2019s History and Receives Millard County Zoning Approval for Over 1 GW of Solar Development",
    "Creekstone\u2019s Delta Gigasite campus sits on more than 1,100 acres in central Utah\u2019s Millard County adjacent to the leased land and is master-planned for more than 10 gigawatts of total capacity."
   ],
   "builder_evidence": [
    "Creekstone Energy Secures Largest Solar Lease in Utah\u2019s History and Receives Millard County Zoning Approval for Over 1 GW of Solar Development",
    "**DELTA, Utah, March 10, 2026**--([BUSINESS WIRE](https://www.businesswire.com))--Creekstone Energy LLC (\"Creekstone\") today announced it has executed a long-term solar lease with the State of Utah\u2019s School and Institutional Trust Lands Administration (TLA) encompassing approximately 13,000 acres of state trust lands in Millard County."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Creekstone Energy Secures Largest Solar Lease in Utah\u2019s History and Receives Millard County Zoning Approval for Over 1 GW of Solar Development",
    "Creekstone\u2019s Delta Gigasite campus sits on more than 1,100 acres in central Utah\u2019s Millard County adjacent to the leased land and is master-planned for more than 10 gigawatts of total capacity."
   ],
   "announcement_date_evidence": [
    "Creekstone Energy Secures Largest Solar Lease in Utah\u2019s History and Receives Millard County Zoning Approval for Over 1 GW of Solar Development",
    "**DELTA, Utah, March 10, 2026**--([BUSINESS WIRE](https://www.businesswire.com))--Creekstone Energy LLC (\"Creekstone\") today announced it has executed a long-term solar lease with the State of Utah\u2019s School and Institutional Trust Lands Administration (TLA) encompassing approximately 13,000 acres of state trust lands in Millard County."
   ]
  },
  {
   "url": "https://hydrogen-central.com/ecl-announces-worlds-first-1-gigawatt-off-grid-hydrogen-powered-ai-factory-data-center",
   "title": "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
   "published_at": "2024-09-26T23:49:54",
   "project": "ECL Terrasite-TX1",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "ECL",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "ECL Terrasite-TX1 comes at a critical time for the state of Texas, with The Electric Reliability Council of Texas (ERCOT) testifying on June 12 this year that the state\u2019s power grid needs will grow approximately 2X by 2030 due in part to the growth of data centers and AI."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "ECL Terrasite-TX1 comes at a critical time for the state of Texas, with The Electric Reliability Council of Texas (ERCOT) testifying on June 12 this year that the state\u2019s power grid needs will grow approximately 2X by 2030 due in part to the growth of data centers and AI."
   ],
   "capacity_gw_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "The initial 1GW phased development may be expanded to 2GW in the future, enabled by its modularity and based on customer demand."
   ],
   "builder_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://coincentral.com/eagle-point-provides-1-3-billion-private-credit-loan-for-anthropic-linked-texas-data-center",
   "title": "Eagle Point Provides $1.3 Billion Private Credit Loan for Anthropic-Linked Texas Data Center",
   "published_at": "2026-08-19T14:05:04",
   "project": null,
   "locality": "Hubbard",
   "state": "Texas",
   "capacity_gw": 1.6,
   "builder": "Nexus Data Centers",
   "ai_customer": "Anthropic",
   "status": "under development",
   "announcement_date": "2026-07-30",
   "project_evidence": null,
   "locality_evidence": [
    "A consortium led by Morgan Stanley would finance a 1.6-gigawatt campus in Hubbard, Texas, complete with its own natural gas power plant.\u2026",
    "TLDR"
   ],
   "state_evidence": [
    "A consortium led by Morgan Stanley would finance a 1.6-gigawatt campus in Hubbard, Texas, complete with its own natural gas power plant.\u2026",
    "TLDR"
   ],
   "capacity_gw_evidence": [
    "A consortium led by Morgan Stanley would finance a 1.6-gigawatt campus in Hubbard, Texas, complete with its own natural gas power plant.\u2026",
    "TLDR"
   ],
   "builder_evidence": [
    "The loan is part of a larger $16 billion project-finance package for developer Nexus Data Centers",
    "TLDR"
   ],
   "ai_customer_evidence": [
    "Eagle Point Credit Management is providing a $1.3 billion private credit loan for a Texas AI data center tied to Anthropic",
    "TLDR"
   ],
   "status_evidence": [
    "A consortium led by Morgan Stanley would finance a 1.6-gigawatt campus in Hubbard, Texas, complete with its own natural gas power plant.\u2026",
    "TLDR"
   ],
   "announcement_date_evidence": [
    "\u2014 CryptoTweets (@CryptoTweets) [July 30, 2026](https://x.com/CryptoTweets/status/2082949457700630870?ref_src=twsrc%5Etfw)",
    "TLDR"
   ]
  },
  {
   "url": "https://peoplearegeek.com/articles/nvidia-105-billion-ports-pike-openai-ohio",
   "title": "Nvidia Guarantees $105B for OpenAI's Ohio AI Campus",
   "published_at": "2026-08-17T00:00:00",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "SysadminNews",
    "# Nvidia Guarantees $105B for OpenAI's Ohio AI Campus",
    "On August seventeenth, 2026, Nvidia said it will provide residual value guaranties capped at one hundred five billion dollars to secure land, power and shell capacity at SB Energy's PORTS-Pike Technology Campus in Pike County, Ohio, where OpenAI signs a twenty year lease."
   ],
   "locality_evidence": [
    "SysadminNews",
    "# Nvidia Guarantees $105B for OpenAI's Ohio AI Campus",
    "On August seventeenth, 2026, Nvidia said it will provide residual value guaranties capped at one hundred five billion dollars to secure land, power and shell capacity at SB Energy's PORTS-Pike Technology Campus in Pike County, Ohio, where OpenAI signs a twenty year lease."
   ],
   "state_evidence": [
    "SysadminNews",
    "# Nvidia Guarantees $105B for OpenAI's Ohio AI Campus",
    "On August seventeenth, 2026, Nvidia said it will provide residual value guaranties capped at one hundred five billion dollars to secure land, power and shell capacity at SB Energy's PORTS-Pike Technology Campus in Pike County, Ohio, where OpenAI signs a twenty year lease."
   ],
   "capacity_gw_evidence": [
    "SysadminNews",
    "# Nvidia Guarantees $105B for OpenAI's Ohio AI Campus",
    "Ten gigawatts of new generation yields eight gigawatts of usable AI factory capacity, and the first eight hundred megawatts is targeted for 2028."
   ],
   "builder_evidence": [
    "SysadminNews",
    "# Nvidia Guarantees $105B for OpenAI's Ohio AI Campus",
    "On August seventeenth, 2026, Nvidia said it will provide residual value guaranties capped at one hundred five billion dollars to secure land, power and shell capacity at SB Energy's PORTS-Pike Technology Campus in Pike County, Ohio, where OpenAI signs a twenty year lease."
   ],
   "ai_customer_evidence": [
    "SysadminNews",
    "# Nvidia Guarantees $105B for OpenAI's Ohio AI Campus",
    "On August seventeenth, 2026, Nvidia said it will provide residual value guaranties capped at one hundred five billion dollars to secure land, power and shell capacity at SB Energy's PORTS-Pike Technology Campus in Pike County, Ohio, where OpenAI signs a twenty year lease."
   ],
   "status_evidence": [
    "SysadminNews",
    "# Nvidia Guarantees $105B for OpenAI's Ohio AI Campus",
    "On August seventeenth, 2026, Nvidia said it will provide residual value guaranties capped at one hundred five billion dollars to secure land, power and shell capacity at SB Energy's PORTS-Pike Technology Campus in Pike County, Ohio, where OpenAI signs a twenty year lease."
   ],
   "announcement_date_evidence": [
    "SysadminNews",
    "# Nvidia Guarantees $105B for OpenAI's Ohio AI Campus",
    "On August seventeenth, 2026, Nvidia said it will provide residual value guaranties capped at one hundred five billion dollars to secure land, power and shell capacity at SB Energy's PORTS-Pike Technology Campus in Pike County, Ohio, where OpenAI signs a twenty year lease."
   ]
  },
  {
   "url": "https://fdrmt-zgph.maillist-manage.com/click/110c473dea1ae26e2/110c473dea1a9bcc0?trk=article-ssr-frontend-pulse_little-text-block",
   "title": "Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
   "published_at": null,
   "project": "Stargate",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 5.5,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "[The companies said ](https://openai.com/index/five-new-stargate-sites/)the flagship site in Abilene, Texas is operational and can deliver 5.5 gigawatts of capacity built on Oracle Cloud Infrastructure (OCI) and [Nvidia's stack](https://blogs.nvidia.com/blog/openai-nvidia/)."
   ],
   "locality_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "[The companies said ](https://openai.com/index/five-new-stargate-sites/)the flagship site in Abilene, Texas is operational and can deliver 5.5 gigawatts of capacity built on Oracle Cloud Infrastructure (OCI) and [Nvidia's stack](https://blogs.nvidia.com/blog/openai-nvidia/)."
   ],
   "state_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "[The companies said ](https://openai.com/index/five-new-stargate-sites/)the flagship site in Abilene, Texas is operational and can deliver 5.5 gigawatts of capacity built on Oracle Cloud Infrastructure (OCI) and [Nvidia's stack](https://blogs.nvidia.com/blog/openai-nvidia/)."
   ],
   "capacity_gw_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "[The companies said ](https://openai.com/index/five-new-stargate-sites/)the flagship site in Abilene, Texas is operational and can deliver 5.5 gigawatts of capacity built on Oracle Cloud Infrastructure (OCI) and [Nvidia's stack](https://blogs.nvidia.com/blog/openai-nvidia/)."
   ],
   "builder_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "[The companies said ](https://openai.com/index/five-new-stargate-sites/)the flagship site in Abilene, Texas is operational and can deliver 5.5 gigawatts of capacity built on Oracle Cloud Infrastructure (OCI) and [Nvidia's stack](https://blogs.nvidia.com/blog/openai-nvidia/)."
   ],
   "ai_customer_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "[The companies said ](https://openai.com/index/five-new-stargate-sites/)the flagship site in Abilene, Texas is operational and can deliver 5.5 gigawatts of capacity built on Oracle Cloud Infrastructure (OCI) and [Nvidia's stack](https://blogs.nvidia.com/blog/openai-nvidia/)."
   ],
   "status_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "[The companies said ](https://openai.com/index/five-new-stargate-sites/)the flagship site in Abilene, Texas is operational and can deliver 5.5 gigawatts of capacity built on Oracle Cloud Infrastructure (OCI) and [Nvidia's stack](https://blogs.nvidia.com/blog/openai-nvidia/)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://fdrmt-zgph.maillist-manage.com/click/110c473dea1ae26e2/110c473dea1a9bcc0?trk=article-ssr-frontend-pulse_little-text-block",
   "title": "Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
   "published_at": null,
   "project": "Stargate",
   "locality": "Lordstown",
   "state": "Ohio",
   "capacity_gw": 1.5,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "In addition to the flagship Stargate site in Abilene, two separate sites will be developed over the next 18 months."
   ],
   "locality_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "Stargate sites in Lordstown, Ohio and another in Milam County, Texas can scale to 1.5 gigawatts of capacity."
   ],
   "state_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "Stargate sites in Lordstown, Ohio and another in Milam County, Texas can scale to 1.5 gigawatts of capacity."
   ],
   "capacity_gw_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "Stargate sites in Lordstown, Ohio and another in Milam County, Texas can scale to 1.5 gigawatts of capacity."
   ],
   "builder_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "OpenAI, Oracle and Softbank have announced 5 new data centers under the Stargate project good for 7 gigawatts of capacity."
   ],
   "ai_customer_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "OpenAI, Oracle and Softbank have announced 5 new data centers under the Stargate project good for 7 gigawatts of capacity."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://fdrmt-zgph.maillist-manage.com/click/110c473dea1ae26e2/110c473dea1a9bcc0?trk=article-ssr-frontend-pulse_little-text-block",
   "title": "Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
   "published_at": null,
   "project": "Stargate",
   "locality": "Milam County",
   "state": "Texas",
   "capacity_gw": 1.5,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "In addition to the flagship Stargate site in Abilene, two separate sites will be developed over the next 18 months."
   ],
   "locality_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "Stargate sites in Lordstown, Ohio and another in Milam County, Texas can scale to 1.5 gigawatts of capacity."
   ],
   "state_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "Stargate sites in Lordstown, Ohio and another in Milam County, Texas can scale to 1.5 gigawatts of capacity."
   ],
   "capacity_gw_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "Stargate sites in Lordstown, Ohio and another in Milam County, Texas can scale to 1.5 gigawatts of capacity."
   ],
   "builder_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "OpenAI, Oracle and Softbank have announced 5 new data centers under the Stargate project good for 7 gigawatts of capacity."
   ],
   "ai_customer_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "OpenAI, Oracle and Softbank have announced 5 new data centers under the Stargate project good for 7 gigawatts of capacity."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://theoutpost.ai/news-story/meta-breaks-ground-on-10-billion-indiana-data-center-to-fuel-ai-ambitions-23727",
   "title": "Meta breaks ground on $10 billion Indiana data center to accelerate AI infrastructure buildout",
   "published_at": "2026-02-11T23:38:22",
   "project": "Lebanon",
   "locality": "Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2026-02-11",
   "project_evidence": [
    "Meta breaks ground on $10 billion Indiana data center to accelerate AI infrastructure buildout",
    "Meta Platforms Inc. said it will spend more than $10 billion to build a data center campus in Lebanon, Indiana, ranking it among the company's largest artificial intelligence infrastructure investments to date."
   ],
   "locality_evidence": [
    "Meta breaks ground on $10 billion Indiana data center to accelerate AI infrastructure buildout",
    "Meta Platforms Inc. said it will spend more than $10 billion to build a data center campus in Lebanon, Indiana, ranking it among the company's largest artificial intelligence infrastructure investments to date."
   ],
   "state_evidence": [
    "Meta breaks ground on $10 billion Indiana data center to accelerate AI infrastructure buildout",
    "Meta Platforms Inc. said it will spend more than $10 billion to build a data center campus in Lebanon, Indiana, ranking it among the company's largest artificial intelligence infrastructure investments to date."
   ],
   "capacity_gw_evidence": [
    "Meta breaks ground on $10 billion Indiana data center to accelerate AI infrastructure buildout",
    "Meta on Wednesday broke ground on the Lebanon site, which it expects to deliver one gigawatt of power to potentially support both its AI projects and core social media business."
   ],
   "builder_evidence": [
    "Meta breaks ground on $10 billion Indiana data center to accelerate AI infrastructure buildout",
    "Meta Platforms Inc. said it will spend more than $10 billion to build a data center campus in Lebanon, Indiana, ranking it among the company's largest artificial intelligence infrastructure investments to date."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Meta breaks ground on $10 billion Indiana data center to accelerate AI infrastructure buildout",
    "Meta on Wednesday broke ground on the Lebanon site, which it expects to deliver one gigawatt of power to potentially support both its AI projects and core social media business."
   ],
   "announcement_date_evidence": [
    "Meta breaks ground on $10 billion Indiana data center to accelerate AI infrastructure buildout",
    "Meta to Spend More Than $10 Billion on Indiana-Based Data Center",
    "Meta on Wednesday broke ground on the Lebanon site, which it expects to deliver one gigawatt of power to potentially support both its AI projects and core social media business."
   ]
  },
  {
   "url": "https://whatjobs.com/news/amazons-project-rainier-the-ai-data-center-that-changed-everything",
   "title": "Amazon's Project Rainier: The AI Data Center That Changed Everything | WhatJobs News",
   "published_at": "2025-12-09T14:00:00",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.0,
   "builder": "Amazon",
   "ai_customer": "Anthropic",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "## **The Tectonic Shift: Farmland to Data Centers**",
    "## **Project Rainier: The $11 Billion Bet**",
    "Today, it hosts **Project Rainier, an $11 billion AI supercluster**."
   ],
   "locality_evidence": [
    "## **The Tectonic Shift: Farmland to Data Centers**",
    "### From Farmland to Compute Fields",
    "This is rural Indiana\u2014a quiet town called New Carlisle with a population of 1,900 people."
   ],
   "state_evidence": [
    "## **The Tectonic Shift: Farmland to Data Centers**",
    "### From Farmland to Compute Fields",
    "This is rural Indiana\u2014a quiet town called New Carlisle with a population of 1,900 people."
   ],
   "capacity_gw_evidence": [
    "## **The Tectonic Shift: Farmland to Data Centers**",
    "Last December, it was just quiet farmland. Today, it hosts one of the largest AI data centers on Earth\u2014close to **1 million AI processors under one roof pulling up to 2 GW of power**."
   ],
   "builder_evidence": [
    "## **The Tectonic Shift: Farmland to Data Centers**",
    "### From Farmland to Compute Fields",
    "Amazon didn\u2019t just stumble into Indiana."
   ],
   "ai_customer_evidence": [
    "## **The Anchor Customer: Anthropic**",
    "### Why This Scale Makes Sense",
    "For Amazon, **this anchor customer is Anthropic**."
   ],
   "status_evidence": [
    "## **The Tectonic Shift: Farmland to Data Centers**",
    "### From Farmland to Compute Fields",
    "The project was announced last year and somehow it\u2019s already operational\u2014under 12 months."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://index.businessinsurance.com/businessinsurance/article/tokenring-2026-1-2-colossus-unbound-xais-memphis-expansion-targets-1-million-gpus-in-the-race-for-agi",
   "title": "Colossus Unbound: xAI\u00e2s Memphis Expansion Targets 1 Million GPUs in the Race for AGI",
   "published_at": "2026-01-02T19:48:24",
   "project": "Colossus",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "xAI",
   "status": "expanding",
   "announcement_date": "2026-01-02",
   "project_evidence": [
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)",
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race."
   ],
   "locality_evidence": [
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)",
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race."
   ],
   "state_evidence": [
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)",
    "As the \"Digital Delta\" takes shape across the Tennessee-Mississippi border, the project is redefining the physical and logistical requirements of the AGI era."
   ],
   "capacity_gw_evidence": [
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)",
    "By targeting a power capacity of 2 gigawatts (GW)\u2014roughly enough to power nearly 2 million homes\u2014xAI is transitioning from a high-scale startup to a \"Gigafactory of Compute.\""
   ],
   "builder_evidence": [
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)",
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race."
   ],
   "ai_customer_evidence": [
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)",
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race."
   ],
   "status_evidence": [
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)",
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race."
   ],
   "announcement_date_evidence": [
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)",
    "As of January 2, 2026, the company has successfully scaled its initial 100,000-GPU cluster to over 200,000 units and is now aggressively pursuing a roadmap to reach 1 million GPUs by the end of the year."
   ]
  },
  {
   "url": "https://linkedin.com/top-content/artificial-intelligence/ai-and-energy-transformation/crusoe-energy-s-shift-to-ai-datacenters",
   "title": "Crusoe Energy's Shift to AI Datacenters",
   "published_at": "2025-06-13T12:00:01",
   "project": "MegaCampus",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe and Lancium",
   "ai_customer": "Project Stargate",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "U.S. Energy Grid & AI Infrastructure | Independent Research & Investment Analysis | AI Grid Insider",
    "Last week Crusoe and Lancium said they had begun the second phase of construction at their MegaCampus in Abilene, Texas, which will support 1.2 gigawatts of power and is scheduled to be completed by mid-2026."
   ],
   "locality_evidence": [
    "U.S. Energy Grid & AI Infrastructure | Independent Research & Investment Analysis | AI Grid Insider",
    "Last week Crusoe and Lancium said they had begun the second phase of construction at their MegaCampus in Abilene, Texas, which will support 1.2 gigawatts of power and is scheduled to be completed by mid-2026."
   ],
   "state_evidence": [
    "U.S. Energy Grid & AI Infrastructure | Independent Research & Investment Analysis | AI Grid Insider",
    "Last week Crusoe and Lancium said they had begun the second phase of construction at their MegaCampus in Abilene, Texas, which will support 1.2 gigawatts of power and is scheduled to be completed by mid-2026."
   ],
   "capacity_gw_evidence": [
    "U.S. Energy Grid & AI Infrastructure | Independent Research & Investment Analysis | AI Grid Insider",
    "Last week Crusoe and Lancium said they had begun the second phase of construction at their MegaCampus in Abilene, Texas, which will support 1.2 gigawatts of power and is scheduled to be completed by mid-2026."
   ],
   "builder_evidence": [
    "U.S. Energy Grid & AI Infrastructure | Independent Research & Investment Analysis | AI Grid Insider",
    "Last week Crusoe and Lancium said they had begun the second phase of construction at their MegaCampus in Abilene, Texas, which will support 1.2 gigawatts of power and is scheduled to be completed by mid-2026."
   ],
   "ai_customer_evidence": [
    "U.S. Energy Grid & AI Infrastructure | Independent Research & Investment Analysis | AI Grid Insider",
    "The first phase of the campus, which Crusoe is building for Project Stargate, will span 980,000 SF and 200 megawatts, and will be energized \u201cin the first half of 2025.\u201d"
   ],
   "status_evidence": [
    "U.S. Energy Grid & AI Infrastructure | Independent Research & Investment Analysis | AI Grid Insider",
    "Last week Crusoe and Lancium said they had begun the second phase of construction at their MegaCampus in Abilene, Texas, which will support 1.2 gigawatts of power and is scheduled to be completed by mid-2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://linkedin.com/top-content/artificial-intelligence/ai-and-energy-transformation/crusoe-energy-s-shift-to-ai-datacenters",
   "title": "Crusoe Energy's Shift to AI Datacenters",
   "published_at": "2025-06-13T12:00:01",
   "project": "Project Jade",
   "locality": null,
   "state": "Wyoming",
   "capacity_gw": 10.0,
   "builder": "Crusoe",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "U.S. Energy Grid & AI Infrastructure | Independent Research & Investment Analysis | AI Grid Insider",
    "In Wyoming, Project Jade \u2014 2.7 GW scalable to 10 \u2014 was approved in January."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "U.S. Energy Grid & AI Infrastructure | Independent Research & Investment Analysis | AI Grid Insider",
    "In Wyoming, Project Jade \u2014 2.7 GW scalable to 10 \u2014 was approved in January."
   ],
   "capacity_gw_evidence": [
    "U.S. Energy Grid & AI Infrastructure | Independent Research & Investment Analysis | AI Grid Insider",
    "In Wyoming, Project Jade \u2014 2.7 GW scalable to 10 \u2014 was approved in January."
   ],
   "builder_evidence": [
    "U.S. Energy Grid & AI Infrastructure | Independent Research & Investment Analysis | AI Grid Insider",
    "Three states, three hyperscalers, three different deal structures.",
    "But one developer controlling the land, the buildings, the power plants, and the cloud software on top."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "U.S. Energy Grid & AI Infrastructure | Independent Research & Investment Analysis | AI Grid Insider",
    "In Wyoming, Project Jade \u2014 2.7 GW scalable to 10 \u2014 was approved in January."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://linkedin.com/top-content/artificial-intelligence/ai-and-energy-transformation/crusoe-energy-s-shift-to-ai-datacenters",
   "title": "Crusoe Energy's Shift to AI Datacenters",
   "published_at": "2025-06-13T12:00:01",
   "project": null,
   "locality": null,
   "state": "Wyoming",
   "capacity_gw": 10.0,
   "builder": "Crusoe and Tallgrass",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": null,
   "state_evidence": [
    "\ud83d\udea8 Crusoe & Tallgrass Unveil 1.8 GW AI Data Center in Wyoming\u26a1"
   ],
   "capacity_gw_evidence": [
    "\ud83d\udea8 Crusoe & Tallgrass Unveil 1.8 GW AI Data Center in Wyoming\u26a1"
   ],
   "builder_evidence": [
    "\ud83d\udea8 Crusoe & Tallgrass Unveil 1.8 GW AI Data Center in Wyoming\u26a1"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "\ud83d\udea8 Crusoe & Tallgrass Unveil 1.8 GW AI Data Center in Wyoming\u26a1"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://svcp.com/microsofts-ai-infrastructure-strategy-the-largest-industrial-buildout-in-the-companys-history",
   "title": "Microsoft\u2019s AI Infrastructure Strategy: The Largest Industrial Buildout in the Company\u2019s History",
   "published_at": "2026-07-06T21:12:19",
   "project": "Pecos",
   "locality": "Pecos",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Microsoft",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2026-06",
   "project_evidence": [
    "In June 2026 the company announced one of the largest single AI infrastructure projects in its history: a new datacenter campus in Pecos, Texas.",
    "The project is expected to add approximately **2 gigawatts of AI capacity** over the next five to seven years and will include dedicated energy infrastructure funded by Microsoft itself."
   ],
   "locality_evidence": [
    "In June 2026 the company announced one of the largest single AI infrastructure projects in its history: a new datacenter campus in Pecos, Texas."
   ],
   "state_evidence": [
    "In June 2026 the company announced one of the largest single AI infrastructure projects in its history: a new datacenter campus in Pecos, Texas."
   ],
   "capacity_gw_evidence": [
    "The project is expected to add approximately **2 gigawatts of AI capacity** over the next five to seven years and will include dedicated energy infrastructure funded by Microsoft itself."
   ],
   "builder_evidence": [
    "In June 2026 the company announced one of the largest single AI infrastructure projects in its history: a new datacenter campus in Pecos, Texas.",
    "The project is expected to add approximately **2 gigawatts of AI capacity** over the next five to seven years and will include dedicated energy infrastructure funded by Microsoft itself."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "In June 2026 the company announced one of the largest single AI infrastructure projects in its history: a new datacenter campus in Pecos, Texas."
   ],
   "announcement_date_evidence": [
    "In June 2026 the company announced one of the largest single AI infrastructure projects in its history: a new datacenter campus in Pecos, Texas."
   ]
  },
  {
   "url": "https://ceoinsightsasia.com/news/vantage-plots-14gw-data-center-campus-in-texas-nwid-13837.html",
   "title": "Vantage Plots 1.4GW Data Center Campus in Texas",
   "published_at": null,
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "underway",
   "announcement_date": null,
   "project_evidence": [
    "Supported by private equity firm Silver Lake and asset manager DigitalBridge, Vantage stated that the **1.4-gigawatt campus**, named \"Frontier,\" represents the largest development in its global portfolio.",
    "## Vantage Plots 1.4GW Data Center Campus in Texas"
   ],
   "locality_evidence": [
    "Vantage Plots 1.4GW Data Center Campus in Texas\n\n![Separator](https://www.ceoinsightsasia.com/images/line.png)\n\n![img](https://www.ceoinsightsasia.com/uploaded_images/embed_image/zxxnhDataCenter4.jpg)**Vantage Data Centers** announced that it plans to invest over **$25 billion to establish a data center campus** spanning 1,200 acres in **Shackelford County, Texas**, driven by the increasing demand for **artificial intelligence infrastructure** that is fueling large-scale projects.",
    "## Vantage Plots 1.4GW Data Center Campus in Texas"
   ],
   "state_evidence": [
    "Vantage Plots 1.4GW Data Center Campus in Texas\n\n![Separator](https://www.ceoinsightsasia.com/images/line.png)\n\n![img](https://www.ceoinsightsasia.com/uploaded_images/embed_image/zxxnhDataCenter4.jpg)**Vantage Data Centers** announced that it plans to invest over **$25 billion to establish a data center campus** spanning 1,200 acres in **Shackelford County, Texas**, driven by the increasing demand for **artificial intelligence infrastructure** that is fueling large-scale projects.",
    "## Vantage Plots 1.4GW Data Center Campus in Texas"
   ],
   "capacity_gw_evidence": [
    "Supported by private equity firm Silver Lake and asset manager DigitalBridge, Vantage stated that the **1.4-gigawatt campus**, named \"Frontier,\" represents the largest development in its global portfolio.",
    "## Vantage Plots 1.4GW Data Center Campus in Texas"
   ],
   "builder_evidence": [
    "**Vantage Data Centers** announced that it plans to invest over **$25 billion to establish a data center campus** spanning 1,200 acres in **Shackelford County, Texas**, driven by the increasing demand for **artificial intelligence infrastructure** that is fueling large-scale projects.",
    "## Vantage Plots 1.4GW Data Center Campus in Texas"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Vantage has announced that construction of the campus is underway, which will **feature 10 data centers** designed to accommodate ultra-high-density racks exceeding 250 kilowatts each.",
    "## Vantage Plots 1.4GW Data Center Campus in Texas"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://interconnectionqueue.org/project/fermi-matador-amarillo",
   "title": "Fermi America 'Project Matador' \u2014 Project signal",
   "published_at": null,
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "TX",
   "capacity_gw": 17.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "Delayed",
   "announcement_date": "2025-10",
   "project_evidence": [
    "Exhibit 2 \u00b7 Project signal",
    "# Fermi America 'Project Matador'"
   ],
   "locality_evidence": [
    "Exhibit 2 \u00b7 Project signal",
    "Nearest cityAmarillo"
   ],
   "state_evidence": [
    "Exhibit 2 \u00b7 Project signal",
    "StateTX"
   ],
   "capacity_gw_evidence": [
    "Exhibit 2 \u00b7 Project signal",
    "Public summaryPitched as potentially the largest data center in the world (formerly 'Advanced Energy and Intelligence Campus'). ~11,000 MW at full build, target later raised toward 17,000 MW; first ~1,000 MW targeted end of 2026 (as of 2026-04)."
   ],
   "builder_evidence": [
    "Exhibit 2 \u00b7 Project signal",
    "Developer / ownerFermi America"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Exhibit 2 \u00b7 Project signal",
    "Data Center \u00b7 Delayed",
    "StatusDelayed"
   ],
   "announcement_date_evidence": [
    "Exhibit 2 \u00b7 Project signal",
    "Announced2025-10"
   ]
  },
  {
   "url": "https://indianacountyceo.com/homer-city-redevelopment-and-kiewit-announce-countrys-largest-natural-gas-powered-data-center-campus-to-support-ai-and-hpc-demand",
   "title": "Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
   "published_at": "2025-04-02T16:54:41",
   "project": "Homer City Energy Campus",
   "locality": "Indiana County",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Kiewit",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2025-04-02",
   "project_evidence": [
    "# Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "The Homer City Energy Campus will be built by Kiewit Power Constructors Co., one of the leading engineering, procurement and construction (EPC) contractors in the country."
   ],
   "locality_evidence": [
    "# Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "Further, we are fully committed to maximizing the unprecedented level of economic opportunity this project represents not just for Indiana County, but for all of Pennsylvania and the Mid-Atlantic region of the country."
   ],
   "state_evidence": [
    "# Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "Homer City \u2013 previously the largest coal-burning power plant in Pennsylvania \u2013 will be transformed into a more than 3,200-acre natural gas-powered data center campus, designed to meet the growing artificial intelligence (AI) and high-performance computing (HPC) needs of the innovative technology companies shaping America\u2019s digital future."
   ],
   "capacity_gw_evidence": [
    "# Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "\u00b7 Delivery of up to 4.5 gigawatts (GW) of power to support AI-driven hyperscale data centers, while reducing greenhouse gas emissions by 60\u201365% per megawatt hour compared to the former coal plant."
   ],
   "builder_evidence": [
    "# Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "The Homer City Energy Campus will be built by Kiewit Power Constructors Co., one of the leading engineering, procurement and construction (EPC) contractors in the country."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "On April 2 Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) announced the future of the former Homer City Generating Station."
   ],
   "announcement_date_evidence": [
    "# Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "On April 2 Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) announced the future of the former Homer City Generating Station."
   ]
  },
  {
   "url": "https://ai-watch.jp/english/46501",
   "title": "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
   "published_at": "2026-03-16T21:54:06",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "acquired",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "locality_evidence": [
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "state_evidence": [
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "capacity_gw_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "builder_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "ai_customer_evidence": [
    "Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA\u2019s next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ],
   "status_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "announcement_date_evidence": [
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA\u2019s next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ]
  },
  {
   "url": "https://bitcoinethereumnews.com/tech/kevin-olearys-utah-ai-campus-gets-approved",
   "title": "Kevin O\u2019Leary\u2019s Utah AI campus gets approved",
   "published_at": "2026-05-07T00:05:54",
   "project": "Stratos",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "Kevin O\u2019Leary Digital",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "# Kevin O\u2019Leary\u2019s Utah AI campus gets approved",
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents."
   ],
   "locality_evidence": [
    "# Kevin O\u2019Leary\u2019s Utah AI campus gets approved",
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents."
   ],
   "state_evidence": [
    "# Kevin O\u2019Leary\u2019s Utah AI campus gets approved",
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents."
   ],
   "capacity_gw_evidence": [
    "# Kevin O\u2019Leary\u2019s Utah AI campus gets approved",
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents."
   ],
   "builder_evidence": [
    "# Kevin O\u2019Leary\u2019s Utah AI campus gets approved",
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Kevin O\u2019Leary\u2019s Utah AI campus gets approved",
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://poweredbywho.com/projects/project-camellia-openai-effingham-county",
   "title": "Project Camellia (OpenAI Effingham County Campus) Data Center, Georgia | PoweredByWho",
   "published_at": null,
   "project": "Project Camellia",
   "locality": "Rincon",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "Announced",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "PROJECT DOSSIER",
    "FILE #PROJECT-CAMELLIA-OPENAI-EFFINGHAM-COUNTY \u00b7 UPDATED 2026-07-23",
    "Project Camellia (OpenAI Effingham County Campus)",
    "project_announcedOpenAI announced 'Project Camellia,' a 3.2 GW privately funded AI data center campus in Effingham County GA (~30 min inland from Savannah)."
   ],
   "locality_evidence": [
    "PROJECT DOSSIER",
    "FILE #PROJECT-CAMELLIA-OPENAI-EFFINGHAM-COUNTY \u00b7 UPDATED 2026-07-23",
    "Rincon \u00b7 1400 acres",
    "project_announcedOpenAI announced 'Project Camellia,' a 3.2 GW privately funded AI data center campus in Effingham County GA (~30 min inland from Savannah)."
   ],
   "state_evidence": [
    "PROJECT DOSSIER",
    "FILE #PROJECT-CAMELLIA-OPENAI-EFFINGHAM-COUNTY \u00b7 UPDATED 2026-07-23",
    "Location\n\nRINCON\n\nEffingham County, GA",
    "project_announcedOpenAI announced 'Project Camellia,' a 3.2 GW privately funded AI data center campus in Effingham County GA (~30 min inland from Savannah)."
   ],
   "capacity_gw_evidence": [
    "PROJECT DOSSIER",
    "FILE #PROJECT-CAMELLIA-OPENAI-EFFINGHAM-COUNTY \u00b7 UPDATED 2026-07-23",
    "3200 MW \u00b7 ANNOUNCED",
    "project_announcedOpenAI announced 'Project Camellia,' a 3.2 GW privately funded AI data center campus in Effingham County GA (~30 min inland from Savannah)."
   ],
   "builder_evidence": [
    "PROJECT DOSSIER",
    "FILE #PROJECT-CAMELLIA-OPENAI-EFFINGHAM-COUNTY \u00b7 UPDATED 2026-07-23",
    "Operator\n\nOpenAI",
    "project_announcedOpenAI announced 'Project Camellia,' a 3.2 GW privately funded AI data center campus in Effingham County GA (~30 min inland from Savannah)."
   ],
   "ai_customer_evidence": [
    "PROJECT DOSSIER",
    "FILE #PROJECT-CAMELLIA-OPENAI-EFFINGHAM-COUNTY \u00b7 UPDATED 2026-07-23",
    "Operator\n\nOpenAI",
    "project_announcedOpenAI announced 'Project Camellia,' a 3.2 GW privately funded AI data center campus in Effingham County GA (~30 min inland from Savannah)."
   ],
   "status_evidence": [
    "PROJECT DOSSIER",
    "FILE #PROJECT-CAMELLIA-OPENAI-EFFINGHAM-COUNTY \u00b7 UPDATED 2026-07-23",
    "Status\n\nAnnounced",
    "project_announcedOpenAI announced 'Project Camellia,' a 3.2 GW privately funded AI data center campus in Effingham County GA (~30 min inland from Savannah)."
   ],
   "announcement_date_evidence": [
    "PROJECT DOSSIER",
    "FILE #PROJECT-CAMELLIA-OPENAI-EFFINGHAM-COUNTY \u00b7 UPDATED 2026-07-23",
    "2026-07-22",
    "project_announcedOpenAI announced 'Project Camellia,' a 3.2 GW privately funded AI data center campus in Effingham County GA (~30 min inland from Savannah)."
   ]
  },
  {
   "url": "https://bridgemi.com/michigan-environment-watch/google-inks-deal-with-dte-energy-for-another-southeast-michigan-data-center",
   "title": "Google inks deal with DTE Energy for another southeast Michigan data center",
   "published_at": "2026-03-17T14:57:54",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Pannatoni Development Co.",
   "ai_customer": "Google",
   "status": "proposed",
   "announcement_date": null,
   "project_evidence": [
    "Google inks deal with DTE Energy for another southeast Michigan data center",
    "Local officials in Van Buren Township, located between Detroit and Ann Arbor, have been deliberating for months over a California real estate company\u2019s bid to develop a data center dubbed Project Cannoli, but until now the planned end user remained a mystery."
   ],
   "locality_evidence": [
    "Google inks deal with DTE Energy for another southeast Michigan data center",
    "Local officials in Van Buren Township, located between Detroit and Ann Arbor, have been deliberating for months over a California real estate company\u2019s bid to develop a data center dubbed Project Cannoli, but until now the planned end user remained a mystery."
   ],
   "state_evidence": [
    "Google inks deal with DTE Energy for another southeast Michigan data center",
    "Google is considering a 1-gigawatt data center in Van Buren Township, near the Detroit airport"
   ],
   "capacity_gw_evidence": [
    "Google inks deal with DTE Energy for another southeast Michigan data center",
    "Google is considering a 1-gigawatt data center in Van Buren Township, near the Detroit airport",
    "The data center itself would be 1 gigawatt, DTE officials said."
   ],
   "builder_evidence": [
    "Google inks deal with DTE Energy for another southeast Michigan data center",
    "Plans submitted by the real estate developer, Pannatoni Development Co., call for three data center buildings occupying about 152 of the site\u2019s 280 acres."
   ],
   "ai_customer_evidence": [
    "Google inks deal with DTE Energy for another southeast Michigan data center",
    "Tech giant Google has revealed itself as the prospective end user of a proposed southeast Michigan data center, announcing Tuesday that it has struck a deal for DTE Energy to power a facility in the utility\u2019s territory."
   ],
   "status_evidence": [
    "Google inks deal with DTE Energy for another southeast Michigan data center",
    "Tech giant Google has revealed itself as the prospective end user of a proposed southeast Michigan data center, announcing Tuesday that it has struck a deal for DTE Energy to power a facility in the utility\u2019s territory."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://cryptobriefing.com/terawulf-muskie-data-campus-acquisition-2",
   "title": "TeraWulf expands development pipeline 36% with Muskie Data Campus acquisition",
   "published_at": "2026-05-26T16:23:08",
   "project": "Muskie Data Campus",
   "locality": "Eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "Acquired",
   "announcement_date": null,
   "project_evidence": [
    "The company closed its acquisition of the Muskie Data Campus on May 22, a sprawling site in Eastern Kentucky designed to host more than 1 GW of high-performance computing capacity."
   ],
   "locality_evidence": [
    "The company closed its acquisition of the Muskie Data Campus on May 22, a sprawling site in Eastern Kentucky designed to host more than 1 GW of high-performance computing capacity."
   ],
   "state_evidence": [
    "The company closed its acquisition of the Muskie Data Campus on May 22, a sprawling site in Eastern Kentucky designed to host more than 1 GW of high-performance computing capacity."
   ],
   "capacity_gw_evidence": [
    "The company closed its acquisition of the Muskie Data Campus on May 22, a sprawling site in Eastern Kentucky designed to host more than 1 GW of high-performance computing capacity."
   ],
   "builder_evidence": [
    "TeraWulf just made another big bet that its future lies in powering AI, not mining Bitcoin.",
    "The company closed its acquisition of the Muskie Data Campus on May 22, a sprawling site in Eastern Kentucky designed to host more than 1 GW of high-performance computing capacity."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The company closed its acquisition of the Muskie Data Campus on May 22, a sprawling site in Eastern Kentucky designed to host more than 1 GW of high-performance computing capacity."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://niueindustrybrief.com/article/909739213-iren-announces-successful-energization-of-sweetwater-1",
   "title": "IREN Announces Successful Energization of Sweetwater 1",
   "published_at": null,
   "project": "Sweetwater",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "energized",
   "announcement_date": "2026-05-01",
   "project_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas.",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "capacity_gw_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "builder_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "announcement_date_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ]
  },
  {
   "url": "https://intelligentcio.com/north-america/2024/09/26/ecl-announce-1gw-off-grid-hydrogen-powered-ai-factory-data-centre",
   "title": "ECL announce 1GW off-grid hydrogen-powered AI factory data centre",
   "published_at": "2024-09-26T14:21:29",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "ECL",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "ECL has announced it will build one of the first fully sustainable 1GW AI Factory data centres \u2013 ECL TerraSite-TX1 \u2013 on a 600+ acre site east of Houston.",
    "![ECL announce 1GW off-grid hydrogen-powered AI factory data centre](https://www.intelligentcio.com/north-america/wp-content/uploads/sites/45/2024/09/DSC_6249_Y-w.jpg)"
   ],
   "locality_evidence": [
    "600+ acres near Houston, Texas, will give AI leaders the space and power needed for the next wave of innovation with zero emissions",
    "ECL has announced it will build one of the first fully sustainable 1GW AI Factory data centres \u2013 ECL TerraSite-TX1 \u2013 on a 600+ acre site east of Houston.",
    "![ECL announce 1GW off-grid hydrogen-powered AI factory data centre](https://www.intelligentcio.com/north-america/wp-content/uploads/sites/45/2024/09/DSC_6249_Y-w.jpg)"
   ],
   "state_evidence": [
    "600+ acres near Houston, Texas, will give AI leaders the space and power needed for the next wave of innovation with zero emissions",
    "ECL has announced it will build one of the first fully sustainable 1GW AI Factory data centres \u2013 ECL TerraSite-TX1 \u2013 on a 600+ acre site east of Houston.",
    "![ECL announce 1GW off-grid hydrogen-powered AI factory data centre](https://www.intelligentcio.com/north-america/wp-content/uploads/sites/45/2024/09/DSC_6249_Y-w.jpg)"
   ],
   "capacity_gw_evidence": [
    "The initial 1GW phased development may be expanded to 2GW in the future, enabled by its modularity and based on customer demand.",
    "ECL has announced it will build one of the first fully sustainable 1GW AI Factory data centres \u2013 ECL TerraSite-TX1 \u2013 on a 600+ acre site east of Houston.",
    "![ECL announce 1GW off-grid hydrogen-powered AI factory data centre](https://www.intelligentcio.com/north-america/wp-content/uploads/sites/45/2024/09/DSC_6249_Y-w.jpg)"
   ],
   "builder_evidence": [
    "ECL has announced it will build one of the first fully sustainable 1GW AI Factory data centres \u2013 ECL TerraSite-TX1 \u2013 on a 600+ acre site east of Houston.",
    "![ECL announce 1GW off-grid hydrogen-powered AI factory data centre](https://www.intelligentcio.com/north-america/wp-content/uploads/sites/45/2024/09/DSC_6249_Y-w.jpg)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "ECL has announced it will build one of the first fully sustainable 1GW AI Factory data centres \u2013 ECL TerraSite-TX1 \u2013 on a 600+ acre site east of Houston.",
    "![ECL announce 1GW off-grid hydrogen-powered AI factory data centre](https://www.intelligentcio.com/north-america/wp-content/uploads/sites/45/2024/09/DSC_6249_Y-w.jpg)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mercedsunstar.com/news/business/article316739447.html",
   "title": "Morgan Stanley leads $15B bet on Anthropic's Texas campus",
   "published_at": "2026-08-02T00:07:00",
   "project": "Hubbard campus",
   "locality": "Hubbard",
   "state": "Texas",
   "capacity_gw": 1.6,
   "builder": "Nexus Data Centers",
   "ai_customer": "Anthropic",
   "status": "in advanced talks",
   "announcement_date": "2026-07-30",
   "project_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus",
    "The Hubbard campus lands at an awkward moment for that model."
   ],
   "locality_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "state_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "capacity_gw_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus",
    "The guarantees cover [four Anthropic data center leases](https://www.reuters.com/legal/litigation/banks-talks-lend-15-billion-anthropic-data-center-backed-by-google-wsj-reports-2026-07-30/) and the power purchase agreements tied to an on-site natural gas plant with 1.6 gigawatts of capacity."
   ],
   "builder_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "ai_customer_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "status_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "announcement_date_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ]
  },
  {
   "url": "https://thxnews.com/nvidia-secures-ohio-ai-data-center-for-openai",
   "title": "NVIDIA Secures Ohio AI Data Center for OpenAI",
   "published_at": "2026-08-17T17:31:00",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "In development / early civil work",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "Table of Contents",
    "NVIDIA announced on August 17 that it will secure infrastructure at SB Energy\u2019s PORTS-Pike Technology Campus in Pike County, Ohio, exclusively for NVIDIA AI compute, with OpenAI as the customer.",
    "The PORTS-Pike Technology Campus is being developed across private and federal land associated with the former Portsmouth Gaseous Diffusion Plant in Pike County."
   ],
   "locality_evidence": [
    "Table of Contents",
    "NVIDIA announced on August 17 that it will secure infrastructure at SB Energy\u2019s PORTS-Pike Technology Campus in Pike County, Ohio, exclusively for NVIDIA AI compute, with OpenAI as the customer.",
    "The PORTS-Pike Technology Campus is being developed across private and federal land associated with the former Portsmouth Gaseous Diffusion Plant in Pike County."
   ],
   "state_evidence": [
    "Table of Contents",
    "NVIDIA announced on August 17 that it will secure infrastructure at SB Energy\u2019s PORTS-Pike Technology Campus in Pike County, Ohio, exclusively for NVIDIA AI compute, with OpenAI as the customer."
   ],
   "capacity_gw_evidence": [
    "Table of Contents",
    "NVIDIA announced on August 17 that it will secure infrastructure at SB Energy\u2019s PORTS-Pike Technology Campus in Pike County, Ohio, exclusively for NVIDIA AI compute, with OpenAI as the customer.",
    "The project is designed for up to 8 IT-GW of AI factory capacity and is tied to major power, grid, employment and community investments in southern Ohio."
   ],
   "builder_evidence": [
    "Table of Contents",
    "NVIDIA announced on August 17 that it will secure infrastructure at SB Energy\u2019s PORTS-Pike Technology Campus in Pike County, Ohio, exclusively for NVIDIA AI compute, with OpenAI as the customer.",
    "Under the arrangement, NVIDIA will serve as the exclusive AI compute infrastructure provider, while SB Energy will build, own and operate the data center under a 20-year lease to OpenAI."
   ],
   "ai_customer_evidence": [
    "Table of Contents",
    "NVIDIA announced on August 17 that it will secure infrastructure at SB Energy\u2019s PORTS-Pike Technology Campus in Pike County, Ohio, exclusively for NVIDIA AI compute, with OpenAI as the customer.",
    "Under the arrangement, NVIDIA will serve as the exclusive AI compute infrastructure provider, while SB Energy will build, own and operate the data center under a 20-year lease to OpenAI."
   ],
   "status_evidence": [
    "PORTS-Pike Redevelops Former Ohio Nuclear Site",
    "The campus website says the first approximately 800-megawatt phase began early civil work ahead of full construction in 2026, with capacity expected to come online in phases beginning in 2028."
   ],
   "announcement_date_evidence": [
    "Table of Contents",
    "NVIDIA announced on August 17 that it will secure infrastructure at SB Energy\u2019s PORTS-Pike Technology Campus in Pike County, Ohio, exclusively for NVIDIA AI compute, with OpenAI as the customer."
   ]
  },
  {
   "url": "https://stargate.how",
   "title": "Stargate LLC - Project Tracker",
   "published_at": "2026-02-06T14:55:01",
   "project": "Stargate I",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "Partially operational",
   "announcement_date": "2025-01-21",
   "project_evidence": [
    "## Site status snapshot",
    "The flagship Stargate I campus is serving early OpenAI training and inference workloads while the remaining data halls are completed."
   ],
   "locality_evidence": [
    "## Site status snapshot",
    "### Abilene"
   ],
   "state_evidence": [
    "## Site status snapshot",
    "### Abilene",
    "Texas, United States"
   ],
   "capacity_gw_evidence": [
    "## Site status snapshot",
    "### Abilene",
    "1.2 GW OpenAI\u2013Oracle campus; this is total campus capacity, not capacity already online."
   ],
   "builder_evidence": [
    "## Site status snapshot",
    "### Abilene",
    "1.2 GW OpenAI\u2013Oracle campus; this is total campus capacity, not capacity already online.",
    "Partners",
    "OpenAIOracleCrusoe"
   ],
   "ai_customer_evidence": [
    "## Site status snapshot",
    "### Abilene",
    "OpenAI roleCompute customer running workloads on Oracle Cloud Infrastructure capacity."
   ],
   "status_evidence": [
    "## Site status snapshot",
    "### Abilene",
    "Partially operational"
   ],
   "announcement_date_evidence": [
    "## Site status snapshot",
    "### Abilene",
    "AnnouncedJanuary 21, 2025"
   ]
  },
  {
   "url": "https://stargate.how",
   "title": "Stargate LLC - Project Tracker",
   "published_at": "2026-02-06T14:55:01",
   "project": "Stargate platform",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "Contracted",
   "announcement_date": "2025-09-23",
   "project_evidence": [
    "## Site status snapshot",
    "### Shackelford County",
    "ScopeOpenAI Stargate platform"
   ],
   "locality_evidence": [
    "## Site status snapshot",
    "### Shackelford County"
   ],
   "state_evidence": [
    "## Site status snapshot",
    "### Shackelford County",
    "Texas, United States"
   ],
   "capacity_gw_evidence": [
    "## Site status snapshot",
    "### Shackelford County",
    "More than 1 GW across the overall campus; OpenAI\u2019s contracted share is not separately disclosed."
   ],
   "builder_evidence": [
    "## Site status snapshot",
    "### Shackelford County",
    "One of the additional Oracle-backed U.S. Stargate sites announced in September 2025, with data halls and power infrastructure in development."
   ],
   "ai_customer_evidence": [
    "## Site status snapshot",
    "### Shackelford County",
    "OpenAI roleFuture compute customer under OpenAI\u2019s capacity partnership with Oracle."
   ],
   "status_evidence": [
    "## Site status snapshot",
    "### Shackelford County",
    "Contracted"
   ],
   "announcement_date_evidence": [
    "## Site status snapshot",
    "### Shackelford County",
    "AnnouncedSeptember 23, 2025"
   ]
  },
  {
   "url": "https://stargate.how",
   "title": "Stargate LLC - Project Tracker",
   "published_at": "2026-02-06T14:55:01",
   "project": "Project Jupiter",
   "locality": "Do\u00f1a Ana County",
   "state": "New Mexico",
   "capacity_gw": 1.0,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "Under construction",
   "announcement_date": "2025-09-23",
   "project_evidence": [
    "## Site status snapshot",
    "### Do\u00f1a Ana County",
    "More than 1 GW across the Project Jupiter campus; the figure is not all currently powered OpenAI capacity."
   ],
   "locality_evidence": [
    "## Site status snapshot",
    "### Do\u00f1a Ana County"
   ],
   "state_evidence": [
    "## Site status snapshot",
    "### Do\u00f1a Ana County",
    "New Mexico, United States"
   ],
   "capacity_gw_evidence": [
    "## Site status snapshot",
    "### Do\u00f1a Ana County",
    "More than 1 GW across the Project Jupiter campus; the figure is not all currently powered OpenAI capacity."
   ],
   "builder_evidence": [
    "## Site status snapshot",
    "### Do\u00f1a Ana County",
    "Project Jupiter is an Oracle-backed Stargate campus developed with STACK and BorderPlex. Its revised energy architecture uses Bloom Energy fuel cells."
   ],
   "ai_customer_evidence": [
    "## Site status snapshot",
    "### Do\u00f1a Ana County",
    "OpenAI roleIntended end user of compute supplied through Oracle; OpenAI does not own the campus."
   ],
   "status_evidence": [
    "## Site status snapshot",
    "### Do\u00f1a Ana County",
    "Under construction"
   ],
   "announcement_date_evidence": [
    "## Site status snapshot",
    "### Do\u00f1a Ana County",
    "AnnouncedSeptember 23, 2025"
   ]
  },
  {
   "url": "https://temperature2.com/p/2026-07-28-meta-blackrock-el-paso-data-center-venture",
   "title": "Meta sells 80% of a $14B AI data center to BlackRock",
   "published_at": "2026-07-28T18:15:00",
   "project": "El Paso",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Meta sells 80% of a $14B AI data center to BlackRock",
    "Meta and BlackRock formed a venture for a 1GW El Paso data center, Meta's second off-balance-sheet AI infrastructure deal in nine months."
   ],
   "locality_evidence": [
    "# Meta sells 80% of a $14B AI data center to BlackRock",
    "Meta and BlackRock formed a venture for a 1GW El Paso data center, Meta's second off-balance-sheet AI infrastructure deal in nine months."
   ],
   "state_evidence": [
    "# Meta sells 80% of a $14B AI data center to BlackRock",
    "Meta and BlackRock announced a joint venture today to build a 1-gigawatt AI data center campus in El Paso, Texas, with BlackRock-managed funds taking an 80% stake in a project Meta values at roughly $14 billion."
   ],
   "capacity_gw_evidence": [
    "# Meta sells 80% of a $14B AI data center to BlackRock",
    "Meta and BlackRock formed a venture for a 1GW El Paso data center, Meta's second off-balance-sheet AI infrastructure deal in nine months."
   ],
   "builder_evidence": [
    "# Meta sells 80% of a $14B AI data center to BlackRock",
    "Meta and BlackRock announced a joint venture today to build a 1-gigawatt AI data center campus in El Paso, Texas, with BlackRock-managed funds taking an 80% stake in a project Meta values at roughly $14 billion."
   ],
   "ai_customer_evidence": [
    "# Meta sells 80% of a $14B AI data center to BlackRock",
    "Meta and BlackRock announced a joint venture today to build a 1-gigawatt AI data center campus in El Paso, Texas, with BlackRock-managed funds taking an 80% stake in a project Meta values at roughly $14 billion."
   ],
   "status_evidence": [
    "# Meta sells 80% of a $14B AI data center to BlackRock",
    "Meta and BlackRock announced a joint venture today to build a 1-gigawatt AI data center campus in El Paso, Texas, with BlackRock-managed funds taking an 80% stake in a project Meta values at roughly $14 billion."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://kdc.bussetech.com/sites/aws-new-carlisle",
   "title": "Project Rainier (New Carlisle campus) \u00b7 kdc",
   "published_at": null,
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon Web Services",
   "ai_customer": "Anthropic",
   "status": "operational",
   "announcement_date": "2024-09",
   "project_evidence": [
    "# Project Rainier (New Carlisle campus)",
    "Facts",
    "| Operator | Amazon Web Services *(hyperscaler)* |"
   ],
   "locality_evidence": [
    "# Project Rainier (New Carlisle campus)",
    "Facts",
    "| Location | New Carlisle, St. Joseph, IN |"
   ],
   "state_evidence": [
    "# Project Rainier (New Carlisle campus)",
    "Facts",
    "| Location | New Carlisle, St. Joseph, IN |",
    "CNBC (2025-10-29) independently confirms the $11bn opening and characterises it as the largest capital commitment in Indiana's history; corroborates the operational status resolved from datacenter.news and Amazon."
   ],
   "capacity_gw_evidence": [
    "# Project Rainier (New Carlisle campus)",
    "Facts",
    "| Capacity | 2200 MW (utility) |",
    "capacity_mw 2.2 GW described as ultimate power draw."
   ],
   "builder_evidence": [
    "# Project Rainier (New Carlisle campus)",
    "Facts",
    "| Operator | Amazon Web Services *(hyperscaler)* |",
    "Built by AWS for Anthropic (Claude) as sole customer."
   ],
   "ai_customer_evidence": [
    "# Project Rainier (New Carlisle campus)",
    "Built by AWS for Anthropic (Claude) as sole customer."
   ],
   "status_evidence": [
    "# Project Rainier (New Carlisle campus)",
    "**Status:** operational \u00b7 **Confidence:** high \u00b7 **Announced:** 2024-09 \u00b7 **Operational:** 2025-10"
   ],
   "announcement_date_evidence": [
    "# Project Rainier (New Carlisle campus)",
    "**Status:** operational \u00b7 **Confidence:** high \u00b7 **Announced:** 2024-09 \u00b7 **Operational:** 2025-10"
   ]
  },
  {
   "url": "https://panhandleregionalnews.com/2026/07/16/crusoe-and-lancium-plan-to-build-a-new-ai-data-center-in-childress-texas",
   "title": "Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
   "published_at": null,
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-07-16",
   "project_evidence": [
    "Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
    "Crusoe, an AI factory company in partnership with Lancium, an energy technology and infrastructure company, is planning to develop a 1 GW AI data center campus in Childress, Texas."
   ],
   "locality_evidence": [
    "Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
    "Crusoe, an AI factory company in partnership with Lancium, an energy technology and infrastructure company, is planning to develop a 1 GW AI data center campus in Childress, Texas."
   ],
   "state_evidence": [
    "Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
    "Crusoe, an AI factory company in partnership with Lancium, an energy technology and infrastructure company, is planning to develop a 1 GW AI data center campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "Crusoe, an AI factory company in partnership with Lancium, an energy technology and infrastructure company, is planning to develop a 1 GW AI data center campus in Childress, Texas."
   ],
   "builder_evidence": [
    "Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
    "Crusoe, an AI factory company in partnership with Lancium, an energy technology and infrastructure company, is planning to develop a 1 GW AI data center campus in Childress, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
    "Crusoe, an AI factory company in partnership with Lancium, an energy technology and infrastructure company, is planning to develop a 1 GW AI data center campus in Childress, Texas."
   ],
   "announcement_date_evidence": [
    "Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
    "July 16, 2026 at 6:33 PM GMT+8"
   ]
  },
  {
   "url": "https://panhandleregionalnews.com/2026/07/16/crusoe-and-lancium-plan-to-build-a-new-ai-data-center-in-childress-texas",
   "title": "Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
   "published_at": null,
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Lancium and Crusoe",
   "ai_customer": null,
   "status": "existing",
   "announcement_date": null,
   "project_evidence": [
    "The project builds on Lancium and Crusoe\u2019s existing data center developments in Texas, including the 1.2 GW campus in Abilene and a second 900 MW campus under construction on adjacent Lancium-owned property."
   ],
   "locality_evidence": [
    "The project builds on Lancium and Crusoe\u2019s existing data center developments in Texas, including the 1.2 GW campus in Abilene and a second 900 MW campus under construction on adjacent Lancium-owned property."
   ],
   "state_evidence": [
    "The project builds on Lancium and Crusoe\u2019s existing data center developments in Texas, including the 1.2 GW campus in Abilene and a second 900 MW campus under construction on adjacent Lancium-owned property."
   ],
   "capacity_gw_evidence": [
    "The project builds on Lancium and Crusoe\u2019s existing data center developments in Texas, including the 1.2 GW campus in Abilene and a second 900 MW campus under construction on adjacent Lancium-owned property."
   ],
   "builder_evidence": [
    "The project builds on Lancium and Crusoe\u2019s existing data center developments in Texas, including the 1.2 GW campus in Abilene and a second 900 MW campus under construction on adjacent Lancium-owned property."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The project builds on Lancium and Crusoe\u2019s existing data center developments in Texas, including the 1.2 GW campus in Abilene and a second 900 MW campus under construction on adjacent Lancium-owned property."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://digitalbridge.com/news/2025-08-19-vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand",
   "title": "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand |",
   "published_at": "2025-08-19T00:00:00",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "locality_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "state_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "capacity_gw_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "builder_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "For more information, visit [http://www.vantage-dc.com](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.vantage-dc.com%2F&esheet=54310031&newsitemid=20250819333311&lan=en-US&anchor=http%3A%2F%2Fwww.vantage-dc.com&index=1&md5=a4db755555ad59ccff4ee9532ac4d8df)."
   ]
  },
  {
   "url": "https://aibusiness.com/data/major-ai-data-center-planned-for-former-pennsylvania-coal-power-plant",
   "title": "Major AI Data Center Planned for Former Pennsylvania Coal Power Plant",
   "published_at": "2025-04-07T21:00:46",
   "project": "Homer City Energy Campus",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Kiewit Power Constructors Company",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "A rendering of the Homer City Energy Campus.",
    "Major AI Data Center Planned for Former Pennsylvania Coal Power Plant"
   ],
   "locality_evidence": [
    "The Homer City Generating Station, previously the biggest coal-burning power plant in Pennsylvania, will be transformed into a major natural gas-powered data center campus delivering up to 4.5 GW of power, developers have announced.",
    "Major AI Data Center Planned for Former Pennsylvania Coal Power Plant"
   ],
   "state_evidence": [
    "The Homer City Generating Station, previously the biggest coal-burning power plant in Pennsylvania, will be transformed into a major natural gas-powered data center campus delivering up to 4.5 GW of power, developers have announced.",
    "Major AI Data Center Planned for Former Pennsylvania Coal Power Plant"
   ],
   "capacity_gw_evidence": [
    "The Homer City redevelopment is expected to go online in 2027 and generate up to 4.5 GW of energy",
    "Major AI Data Center Planned for Former Pennsylvania Coal Power Plant"
   ],
   "builder_evidence": [
    "Homer City Redevelopment (HCR) and Kiewit Power Constructors Company have signed a $10 billion deal to turn Homer City into a 3,200-acre data center facility tailored for AI and high-performance computing (HPC).",
    "Major AI Data Center Planned for Former Pennsylvania Coal Power Plant"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The Homer City redevelopment is expected to go online in 2027 and generate up to 4.5 GW of energy",
    "Major AI Data Center Planned for Former Pennsylvania Coal Power Plant"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://kyodonewsprwire.jp/release/202603175753",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": "2026-03-17T02:19:36",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "Acquired",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "\u30fbNscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid"
   ],
   "locality_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "capacity_gw_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "\u30fbNscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid"
   ],
   "builder_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "\u30fbNscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "\u30fbNscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid"
   ],
   "announcement_date_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ]
  },
  {
   "url": "https://aioapex.com/en/news/openai-to-spend-over-30-billion-on-project-camellia-its-first-self-built-data-ce-mrxixc2h",
   "title": "OpenAI to spend over $30 billion on Project Camellia, its first self-built data center",
   "published_at": "2026-07-23T13:05:05",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "building",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "# OpenAI to spend over $30 billion on Project Camellia, its first self-built data center",
    "OpenAI announced on July 22 that it is building Project Camellia, a 3.2-gigawatt data center campus in Effingham County, Georgia, with a total project cost exceeding $30 billion."
   ],
   "locality_evidence": [
    "# OpenAI to spend over $30 billion on Project Camellia, its first self-built data center",
    "OpenAI announced on July 22 that it is building Project Camellia, a 3.2-gigawatt data center campus in Effingham County, Georgia, with a total project cost exceeding $30 billion."
   ],
   "state_evidence": [
    "# OpenAI to spend over $30 billion on Project Camellia, its first self-built data center",
    "OpenAI announced on July 22 that it is building Project Camellia, a 3.2-gigawatt data center campus in Effingham County, Georgia, with a total project cost exceeding $30 billion."
   ],
   "capacity_gw_evidence": [
    "# OpenAI to spend over $30 billion on Project Camellia, its first self-built data center",
    "OpenAI announced on July 22 that it is building Project Camellia, a 3.2-gigawatt data center campus in Effingham County, Georgia, with a total project cost exceeding $30 billion."
   ],
   "builder_evidence": [
    "# OpenAI to spend over $30 billion on Project Camellia, its first self-built data center",
    "OpenAI announced on July 22 that it is building Project Camellia, a 3.2-gigawatt data center campus in Effingham County, Georgia, with a total project cost exceeding $30 billion."
   ],
   "ai_customer_evidence": [
    "# OpenAI to spend over $30 billion on Project Camellia, its first self-built data center",
    "OpenAI announced on July 22 that it is building Project Camellia, a 3.2-gigawatt data center campus in Effingham County, Georgia, with a total project cost exceeding $30 billion."
   ],
   "status_evidence": [
    "# OpenAI to spend over $30 billion on Project Camellia, its first self-built data center",
    "OpenAI announced on July 22 that it is building Project Camellia, a 3.2-gigawatt data center campus in Effingham County, Georgia, with a total project cost exceeding $30 billion."
   ],
   "announcement_date_evidence": [
    "# OpenAI to spend over $30 billion on Project Camellia, its first self-built data center",
    "OpenAI announced on July 22 that it is building Project Camellia, a 3.2-gigawatt data center campus in Effingham County, Georgia, with a total project cost exceeding $30 billion."
   ]
  },
  {
   "url": "https://cleanview.co/data-centers/michigan/1913/project-cannoli",
   "title": "Project Cannoli \u2014 Wayne, Michigan",
   "published_at": null,
   "project": "Project Cannoli",
   "locality": "Wayne",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Google",
   "ai_customer": null,
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "Project Cannoli \u2014 Wayne, Michigan",
    "# Project Cannoli",
    "Project Cannoli is a planned data center located in Wayne, Michigan."
   ],
   "locality_evidence": [
    "Project Cannoli \u2014 Wayne, Michigan",
    "Project Cannoli is a planned data center located in Wayne, Michigan."
   ],
   "state_evidence": [
    "Project Cannoli \u2014 Wayne, Michigan",
    "Project Cannoli is a planned data center located in Wayne, Michigan.",
    "State\n\nMichigan"
   ],
   "capacity_gw_evidence": [
    "Project Cannoli is a planned data center located in Wayne, Michigan.",
    "It will have a capacity of 1,000 MW.",
    "Capacity\n\n1,000 MW"
   ],
   "builder_evidence": [
    "Being developed by Google",
    "Project Cannoli is a planned data center located in Wayne, Michigan.",
    "Developer\n\nGoogle"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Project Cannoli is a planned data center located in Wayne, Michigan.",
    "Status\n\nPlanned"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mexc.co/news/1114567",
   "title": "TeraWulf surges 10% on 1GW Kentucky AI campus bet | MEXC News",
   "published_at": null,
   "project": "Muskie Data Campus",
   "locality": null,
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure.",
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure.",
    "The company secured a 285-acre site in eastern Kentucky."
   ],
   "capacity_gw_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure.",
    "It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity."
   ],
   "builder_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure.",
    "The company secured a 285-acre site in eastern Kentucky."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure.",
    "It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity.",
    "The company plans to bring the first 500 MW online during the second half of 2028."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://electronicspressreleases.com/article/909739213-iren-announces-successful-energization-of-sweetwater-1",
   "title": "IREN Announces Successful Energization of Sweetwater 1",
   "published_at": null,
   "project": "Sweetwater",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN Limited",
   "ai_customer": null,
   "status": "Energized",
   "announcement_date": "2026-05-01",
   "project_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas.",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "capacity_gw_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "builder_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas.",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "announcement_date_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ]
  },
  {
   "url": "https://todayinenergy.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Creekstone Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah.",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah.",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://rtl.chrisadams.me.uk/2024/10/revisiting-h2-powered-datacentres",
   "title": "Revisiting H2-powered datacentres",
   "published_at": "2024-10-06T15:11:02",
   "project": "TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# Revisiting H2-powered datacentres",
    "The TerraSite-TX1 will initially have a capacity of 50MW, coming next summer, at a cost of around $450 million."
   ],
   "locality_evidence": [
    "# Revisiting H2-powered datacentres",
    "Data center startup ECL claims that it will build a 1GW AI data center on a more than 600-acre site east of Houston, Texas, powered by hydrogen."
   ],
   "state_evidence": [
    "# Revisiting H2-powered datacentres",
    "Data center startup ECL claims that it will build a 1GW AI data center on a more than 600-acre site east of Houston, Texas, powered by hydrogen."
   ],
   "capacity_gw_evidence": [
    "# Revisiting H2-powered datacentres",
    "Data center startup ECL claims that it will build a 1GW AI data center on a more than 600-acre site east of Houston, Texas, powered by hydrogen."
   ],
   "builder_evidence": [
    "# Revisiting H2-powered datacentres",
    "Data center startup ECL claims that it will build a 1GW AI data center on a more than 600-acre site east of Houston, Texas, powered by hydrogen."
   ],
   "ai_customer_evidence": [
    "# Revisiting H2-powered datacentres",
    "AI cloud provider Lambda will be the first customer, but is not taking the whole 50MW."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://theolympian.com/news/business/article316739447.html",
   "title": "Morgan Stanley leads $15B bet on Anthropic's Texas campus",
   "published_at": "2026-08-02T00:07:00",
   "project": "Hubbard campus",
   "locality": "Hubbard",
   "state": "Texas",
   "capacity_gw": 1.6,
   "builder": "Nexus Data Centers",
   "ai_customer": "Anthropic",
   "status": "closing in on $15 billion in financing",
   "announcement_date": "2026-08-01",
   "project_evidence": [
    "Morgan Stanley leads $15B bet on Anthropic's Texas campus",
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "locality_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "state_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "capacity_gw_evidence": [
    "The guarantees cover [four Anthropic data center leases](https://www.reuters.com/legal/litigation/banks-talks-lend-15-billion-anthropic-data-center-backed-by-google-wsj-reports-2026-07-30/) and the power purchase agreements tied to an on-site natural gas plant with 1.6 gigawatts of capacity.",
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "builder_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "ai_customer_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "status_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "announcement_date_evidence": [
    "This story was originally published August 1, 2026 at 5:07 PM.",
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ]
  },
  {
   "url": "https://dev.to/gentic_news/openai-leases-8gw-ohio-site-nvidia-backs-105b-k4b",
   "title": "OpenAI Leases 8GW Ohio Site; Nvidia Backs $105B",
   "published_at": "2026-08-17T16:26:20",
   "project": "PORTS-Pike",
   "locality": null,
   "state": "Ohio",
   "capacity_gw": 10.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "Leased",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Leases 8GW Ohio Site; Nvidia Backs $105B",
    "OpenAI has signed a 20-year lease with SoftBank subsidiary SB Energy for the \"PORTS-Pike\" campus in Ohio, securing around 8 gigawatts of IT capacity."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# OpenAI Leases 8GW Ohio Site; Nvidia Backs $105B",
    "OpenAI has signed a 20-year lease with SoftBank subsidiary SB Energy for the \"PORTS-Pike\" campus in Ohio, securing around 8 gigawatts of IT capacity."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Leases 8GW Ohio Site; Nvidia Backs $105B",
    "The Wall Street Journal puts the project's gross total at 10 gigawatts once cooling and infrastructure are factored in."
   ],
   "builder_evidence": [
    "# OpenAI Leases 8GW Ohio Site; Nvidia Backs $105B",
    "OpenAI has signed a 20-year lease with SoftBank subsidiary SB Energy for the \"PORTS-Pike\" campus in Ohio, securing around 8 gigawatts of IT capacity."
   ],
   "ai_customer_evidence": [
    "# OpenAI Leases 8GW Ohio Site; Nvidia Backs $105B",
    "OpenAI has signed a 20-year lease with SoftBank subsidiary SB Energy for the \"PORTS-Pike\" campus in Ohio, securing around 8 gigawatts of IT capacity."
   ],
   "status_evidence": [
    "# OpenAI Leases 8GW Ohio Site; Nvidia Backs $105B",
    "OpenAI has signed a 20-year lease with SoftBank subsidiary SB Energy for the \"PORTS-Pike\" campus in Ohio, securing around 8 gigawatts of IT capacity."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://edgen.beta.edgen.tech/news/post/blackrock-and-meta-form-14b-data-center-venture-in-texas",
   "title": "BlackRock and Meta form $14B data center venture in Texas",
   "published_at": "2026-07-28T09:41:43",
   "project": null,
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "BlackRock Inc. and Meta Platforms Inc.",
   "ai_customer": "Meta",
   "status": "under development",
   "announcement_date": "2026-07-28",
   "project_evidence": null,
   "locality_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "BlackRock Inc. and Meta Platforms Inc. are jointly developing a $14 billion data center campus in El Paso, Texas, marking the latest hyperscale infrastructure deal as technology companies race to secure capacity for artificial intelligence workloads."
   ],
   "state_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "BlackRock Inc. and Meta Platforms Inc. are jointly developing a $14 billion data center campus in El Paso, Texas, marking the latest hyperscale infrastructure deal as technology companies race to secure capacity for artificial intelligence workloads."
   ],
   "capacity_gw_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "- BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas."
   ],
   "builder_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "BlackRock Inc. and Meta Platforms Inc. are jointly developing a $14 billion data center campus in El Paso, Texas, marking the latest hyperscale infrastructure deal as technology companies race to secure capacity for artificial intelligence workloads."
   ],
   "ai_customer_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "BlackRock Inc. and Meta Platforms Inc. are jointly developing a $14 billion data center campus in El Paso, Texas, marking the latest hyperscale infrastructure deal as technology companies race to secure capacity for artificial intelligence workloads."
   ],
   "status_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "BlackRock Inc. and Meta Platforms Inc. are jointly developing a $14 billion data center campus in El Paso, Texas, marking the latest hyperscale infrastructure deal as technology companies race to secure capacity for artificial intelligence workloads."
   ],
   "announcement_date_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "[![Rachel Kim](https://static.edgen.tech/authors/rachel-kim.png?image_process=resize,w_32/quality,q_75/format,webp/sharpen,100)\n## Rachel Kim](https://edgen.beta.edgen.tech/author/news/rachel-kim)\u00b7Jul 28 2026, 09:41",
    "The venture, announced Tuesday, will build a 1-gigawatt campus \u2014 enough to power roughly 830,000 US homes \u2014 with initial capacity expected online in 2028."
   ]
  },
  {
   "url": "https://edgen.beta.edgen.tech/news/post/blackrock-and-meta-form-14b-data-center-venture-in-texas",
   "title": "BlackRock and Meta form $14B data center venture in Texas",
   "published_at": "2026-07-28T09:41:43",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "expanded",
   "announcement_date": null,
   "project_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "The deal mirrors Meta's Louisiana Hyperion project and comes alongside BlackRock's $40 billion Aligned Data Centers acquisition."
   ],
   "locality_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "The El Paso arrangement follows the same template Meta used for its Hyperion project in Richland Parish, Louisiana, where an 80/20 joint venture between a private-credit firm and Meta issued $27 billion in debt \u2014 the largest private-debt offering on record."
   ],
   "state_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "The El Paso arrangement follows the same template Meta used for its Hyperion project in Richland Parish, Louisiana, where an 80/20 joint venture between a private-credit firm and Meta issued $27 billion in debt \u2014 the largest private-debt offering on record."
   ],
   "capacity_gw_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "Meta has since expanded Hyperion to 5 gigawatts of compute capacity at an estimated cost exceeding $50 billion, with that expansion owned entirely by Meta rather than through a joint venture."
   ],
   "builder_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "Meta has since expanded Hyperion to 5 gigawatts of compute capacity at an estimated cost exceeding $50 billion, with that expansion owned entirely by Meta rather than through a joint venture."
   ],
   "ai_customer_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "The deal mirrors Meta's Louisiana Hyperion project and comes alongside BlackRock's $40 billion Aligned Data Centers acquisition."
   ],
   "status_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "Meta has since expanded Hyperion to 5 gigawatts of compute capacity at an estimated cost exceeding $50 billion, with that expansion owned entirely by Meta rather than through a joint venture."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/operators/anthropic/feed",
   "title": "Anthropic AI Data Center Feed",
   "published_at": null,
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.4,
   "builder": "Amazon Web Services",
   "ai_customer": null,
   "status": "Operational",
   "announcement_date": null,
   "project_evidence": [
    "Timeline Feed",
    "## Chronological Entries",
    "AWS Project Rainier (New Carlisle, Indiana)",
    "Amazon Web Services (AWS) is rapidly expanding its \"Project Rainier\" AI supercomputing campus in New Carlisle, Indiana, representing a total investment of $15 billion."
   ],
   "locality_evidence": [
    "Timeline Feed",
    "## Chronological Entries",
    "AWS Project Rainier (New Carlisle, Indiana)",
    "New Carlisle, New Carlisle, Indiana, United States"
   ],
   "state_evidence": [
    "Timeline Feed",
    "## Chronological Entries",
    "AWS Project Rainier (New Carlisle, Indiana)",
    "New Carlisle, New Carlisle, Indiana, United States"
   ],
   "capacity_gw_evidence": [
    "Timeline Feed",
    "## Chronological Entries",
    "Operational2.4 GW",
    "The massive 2.4 gigawatt (GW) campus is specifically optimized to serve"
   ],
   "builder_evidence": [
    "Timeline Feed",
    "## Chronological Entries",
    "AWS Project Rainier (New Carlisle, Indiana)",
    "Amazon Web Services (AWS) is rapidly expanding its \"Project Rainier\" AI supercomputing campus in New Carlisle, Indiana, representing a total investment of $15 billion."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Timeline Feed",
    "## Chronological Entries",
    "Operational2.4 GW"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://business.times-online.com/times-online/article/tokenring-2026-1-2-colossus-unbound-xais-memphis-expansion-targets-1-million-gpus-in-the-race-for-agi",
   "title": "Colossus Unbound: xAI\u00e2s Memphis Expansion Targets 1 Million GPUs in the Race for AGI",
   "published_at": "2026-01-02T19:48:24",
   "project": "Colossus",
   "locality": "Memphis and Southaven",
   "state": "Tennessee-Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "xAI",
   "status": "expanding",
   "announcement_date": "2026-01-02",
   "project_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "locality_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "state_evidence": [
    "As the \"Digital Delta\" takes shape across the Tennessee-Mississippi border, the project is redefining the physical and logistical requirements of the AGI era.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "capacity_gw_evidence": [
    "By targeting a power capacity of 2 gigawatts (GW)\u2014roughly enough to power nearly 2 million homes\u2014xAI is transitioning from a high-scale startup to a \"Gigafactory of Compute.\"",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "builder_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "ai_customer_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "status_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "announcement_date_evidence": [
    "As of January 2, 2026, the company has successfully scaled its initial 100,000-GPU cluster to over 200,000 units and is now aggressively pursuing a roadmap to reach 1 million GPUs by the end of the year.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ]
  },
  {
   "url": "https://caprockcourier.com/news/childress-texas-extends-crusoe-and-lanciums-ongoing-partnership-building-model-established",
   "title": "Childress, Texas, extends Crusoe and Lancium\u2019s ongoing partnership, building on model established in Abilene",
   "published_at": "2026-08-06T10:48:17",
   "project": null,
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "# Childress, Texas, extends Crusoe and Lancium\u2019s ongoing partnership, building on model established in Abilene",
    "**In a July 15 press release** shared via Globe Newswire, Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, recently announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "state_evidence": [
    "# Childress, Texas, extends Crusoe and Lancium\u2019s ongoing partnership, building on model established in Abilene",
    "**In a July 15 press release** shared via Globe Newswire, Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, recently announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "# Childress, Texas, extends Crusoe and Lancium\u2019s ongoing partnership, building on model established in Abilene",
    "**In a July 15 press release** shared via Globe Newswire, Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, recently announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "builder_evidence": [
    "# Childress, Texas, extends Crusoe and Lancium\u2019s ongoing partnership, building on model established in Abilene",
    "**In a July 15 press release** shared via Globe Newswire, Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, recently announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Childress, Texas, extends Crusoe and Lancium\u2019s ongoing partnership, building on model established in Abilene",
    "**In a July 15 press release** shared via Globe Newswire, Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, recently announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://app.dealroom.co/news/feed/crusoe-and-lancium-to-build-1gw-ai-data-centre-campus-in-texas",
   "title": "Dealroom.co | Crusoe and Lancium to build 1GW AI data centre campus in Texas",
   "published_at": null,
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2026-07",
   "project_evidence": [
    "# Crusoe and Lancium to build 1GW AI data centre campus in Texas",
    "Crusoe and Lancium announced a 1.0 gigawatt AI data centre campus in Childress, Texas."
   ],
   "locality_evidence": [
    "# Crusoe and Lancium to build 1GW AI data centre campus in Texas",
    "Crusoe and Lancium announced a 1.0 gigawatt AI data centre campus in Childress, Texas."
   ],
   "state_evidence": [
    "# Crusoe and Lancium to build 1GW AI data centre campus in Texas",
    "Crusoe and Lancium announced a 1.0 gigawatt AI data centre campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium to build 1GW AI data centre campus in Texas",
    "Crusoe and Lancium announced a 1.0 gigawatt AI data centre campus in Childress, Texas."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium to build 1GW AI data centre campus in Texas",
    "Crusoe and Lancium announced a 1.0 gigawatt AI data centre campus in Childress, Texas.",
    "The grid-connected facility will span 270 acres owned by Lancium, which will develop and manage the site's energy infrastructure, whilst Crusoe will design, build and operate the data centre."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Crusoe and Lancium to build 1GW AI data centre campus in Texas",
    "Crusoe and Lancium announced a 1.0 gigawatt AI data centre campus in Childress, Texas."
   ],
   "announcement_date_evidence": [
    "# Crusoe and Lancium to build 1GW AI data centre campus in Texas",
    "\u25cf Jul 2026"
   ]
  },
  {
   "url": "https://datacentremagazine.com/news/vantage-data-centers-hyperscale-campus-builder",
   "title": "Vantage Data Centers: Hyperscale Campus Builder",
   "published_at": "2025-10-31T09:36:43",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2025-08-01",
   "project_evidence": [
    "[In August 2025, Vantage announced its largest investment to date](https://datacentremagazine.com/news/inside-vantages-us-25bn-ai-data-centre-mega-campus-in-texas) of over US$25bn to develop a 1.4GW data centre campus in Shackelford County, Texas.",
    "The campus, named Frontier and situated on 1,200 acres, will be home to 10 data centres totalling 3.7M square feet and can accommodate ultra-high-density racks of 250kW and above."
   ],
   "locality_evidence": [
    "[In August 2025, Vantage announced its largest investment to date](https://datacentremagazine.com/news/inside-vantages-us-25bn-ai-data-centre-mega-campus-in-texas) of over US$25bn to develop a 1.4GW data centre campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "[In August 2025, Vantage announced its largest investment to date](https://datacentremagazine.com/news/inside-vantages-us-25bn-ai-data-centre-mega-campus-in-texas) of over US$25bn to develop a 1.4GW data centre campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "[In August 2025, Vantage announced its largest investment to date](https://datacentremagazine.com/news/inside-vantages-us-25bn-ai-data-centre-mega-campus-in-texas) of over US$25bn to develop a 1.4GW data centre campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "[In August 2025, Vantage announced its largest investment to date](https://datacentremagazine.com/news/inside-vantages-us-25bn-ai-data-centre-mega-campus-in-texas) of over US$25bn to develop a 1.4GW data centre campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": [
    "[In August 2025, Vantage announced its largest investment to date](https://datacentremagazine.com/news/inside-vantages-us-25bn-ai-data-centre-mega-campus-in-texas) of over US$25bn to develop a 1.4GW data centre campus in Shackelford County, Texas."
   ]
  },
  {
   "url": "https://stocktitan.net/news/FRMI/fermi-america-tells-texas-lawmakers-project-matador-will-push-the-z7wbkjm2tsxy.html",
   "title": "Fermi tells Texas lawmakers Project Matador cuts water use 80%",
   "published_at": "2026-06-24T12:30:00",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Fermi America Tells Texas Lawmakers Project Matador Will Push the Frontier of AI Compute While Setting a New Standard for Water Stewardship",
    "**Fermi America (NASDAQ: FRMI)** detailed its four\u2011pillar water strategy for **Project Matador**, an AI-focused HyperGrid campus in the Texas Panhandle, during testimony to Texas lawmakers.",
    "Campus capacity 11GW private energy campus Scale of planned energy campus supporting AI compute in Texas Panhandle"
   ],
   "locality_evidence": [
    "Water rate premium 2x standard municipal rate Rate Fermi agreed to pay the City of Amarillo for water",
    "In addition, Fermi America has agreed to pay the City of Amarillo twice the standard municipal water rate while building water infrastructure for the city at the company's own cost, helping fund and strengthen the city's water system rather than drawing it down.",
    "Fermi America Tells Texas Lawmakers Project Matador Will Push the Frontier of AI Compute While Setting a New Standard for Water Stewardship"
   ],
   "state_evidence": [
    "Fermi America Tells Texas Lawmakers Project Matador Will Push the Frontier of AI Compute While Setting a New Standard for Water Stewardship",
    "**Fermi America (NASDAQ: FRMI)** detailed its four\u2011pillar water strategy for **Project Matador**, an AI-focused HyperGrid campus in the Texas Panhandle, during testimony to Texas lawmakers.",
    "AUSTIN, Texas, June 24, 2026 /PRNewswire/ -- Fermi Inc. (NASDAQ: [FRMI](/overview/FRMI/)) (LSE: [FRMI](/overview/FRMI/)), operating as Fermi America\u2122 (\"Fermi\" or the \"Company\"), today underscored its commitment to responsible environmental stewardship as Chief Site Development Officer Charlie Hamilton testified before the Texas House Natural Resources Committee at an interim hearing examining data center water use and conservation."
   ],
   "capacity_gw_evidence": [
    "Fermi America Tells Texas Lawmakers Project Matador Will Push the Frontier of AI Compute While Setting a New Standard for Water Stewardship",
    "Campus capacity 11GW private energy campus Scale of planned energy campus supporting AI compute in Texas Panhandle"
   ],
   "builder_evidence": [
    "Fermi America Tells Texas Lawmakers Project Matador Will Push the Frontier of AI Compute While Setting a New Standard for Water Stewardship",
    "**Fermi America (NASDAQ: FRMI)** detailed its four\u2011pillar water strategy for **Project Matador**, an AI-focused HyperGrid campus in the Texas Panhandle, during testimony to Texas lawmakers."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Fermi America Tells Texas Lawmakers Project Matador Will Push the Frontier of AI Compute While Setting a New Standard for Water Stewardship",
    "Campus capacity 11GW private energy campus Scale of planned energy campus supporting AI compute in Texas Panhandle"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://designdevelopmenttoday.com/industries/energy/news/22937710/coalfired-power-plant-now-retired-to-become-massive-gaspowered-campus-for-ai-data-centers",
   "title": "Coal-Fired Power Plant, Now Retired, to Become Massive Gas-Powered Campus for AI, Data Centers",
   "published_at": "2025-04-03T13:25:49",
   "project": "Homer City Generating Station",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Homer City Development",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2025-03-26",
   "project_evidence": [
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "locality_evidence": [
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "state_evidence": [
    "The owners of what was once Pennsylvania's biggest coal-fired power plant said Wednesday that they will turn it into a $10 billion natural gas-powered data center campus designed to capitalize on the fast-growing energy demands of Big Tech companies to power artificial intelligence and cloud computing applications."
   ],
   "capacity_gw_evidence": [
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "builder_evidence": [
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "announcement_date_evidence": [
    "The owners of what was once Pennsylvania's biggest coal-fired power plant said Wednesday that they will turn it into a $10 billion natural gas-powered data center campus designed to capitalize on the fast-growing energy demands of Big Tech companies to power artificial intelligence and cloud computing applications."
   ]
  },
  {
   "url": "https://wboc.com/online_features/press_releases/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy/article_3e0fce9e-8115-545b-8ec3-1de1277ae5f6.html",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": "2026-03-16T21:18:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "locality_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "capacity_gw_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts.",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "builder_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories.",
    "AIPCorp's team brings nearly a decade of experience and continuity in AI infrastructure development and will support Nscale's development of the Monarch Compute Campus and Nscale's future global development and expansion operations."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "announcement_date_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026"
   ]
  },
  {
   "url": "https://readers.id/en/utah-approves-massive-ai-data-center",
   "title": "Utah Approves 9 Gigawatt AI Data Center Campus in Box Elder",
   "published_at": "2026-04-27T19:11:43",
   "project": "Stratos",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O'Leary Digital",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": "2026-04-24",
   "project_evidence": [
    "# Utah Approves 9 Gigawatt AI Data Center Campus in Box Elder",
    "The project, led by O'Leary Digital, aims to reach a 9 GW power capacity to support [artificial intelligence](https://www.readers.id/en/tag/artificial-intelligence) infrastructure.",
    "Known as Stratos or \"Wonder Valley,\" the campus will span 40,000 acres of private land and 1,200 acres of military and state-owned property."
   ],
   "locality_evidence": [
    "# Utah Approves 9 Gigawatt AI Data Center Campus in Box Elder",
    "The Military Installation Development Authority (MIDA) approved a development agreement on Friday, April 24, 2026, for a hyperscale data center campus in Box Elder County, Utah."
   ],
   "state_evidence": [
    "# Utah Approves 9 Gigawatt AI Data Center Campus in Box Elder",
    "The Military Installation Development Authority (MIDA) approved a development agreement on Friday, April 24, 2026, for a hyperscale data center campus in Box Elder County, Utah."
   ],
   "capacity_gw_evidence": [
    "# Utah Approves 9 Gigawatt AI Data Center Campus in Box Elder",
    "The project, led by O'Leary Digital, aims to reach a 9 GW power capacity to support [artificial intelligence](https://www.readers.id/en/tag/artificial-intelligence) infrastructure."
   ],
   "builder_evidence": [
    "# Utah Approves 9 Gigawatt AI Data Center Campus in Box Elder",
    "The project, led by O'Leary Digital, aims to reach a 9 GW power capacity to support [artificial intelligence](https://www.readers.id/en/tag/artificial-intelligence) infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Utah Approves 9 Gigawatt AI Data Center Campus in Box Elder",
    "The Military Installation Development Authority (MIDA) approved a development agreement on Friday, April 24, 2026, for a hyperscale data center campus in Box Elder County, Utah."
   ],
   "announcement_date_evidence": [
    "# Utah Approves 9 Gigawatt AI Data Center Campus in Box Elder",
    "The Military Installation Development Authority (MIDA) approved a development agreement on Friday, April 24, 2026, for a hyperscale data center campus in Box Elder County, Utah."
   ]
  },
  {
   "url": "https://thekalamazoopress.com/news/data-center-debate-grows-in-michigan-as-google-announces-project-cannoli-in-van-buren-township-officials-call-for-community-guardrails",
   "title": "Data Center Debate Grows in Michigan as Google Announces Project Cannoli in Van Buren Township, Officials Call for Community Guardrails",
   "published_at": "2026-04-01T21:07:37",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "DTE Energy",
   "ai_customer": "Google",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# Data Center Debate Grows in Michigan as Google Announces Project Cannoli in Van Buren Township, Officials Call for Community Guardrails",
    "The project, known as **Project Cannoli**, would require **1,000 megawatts** of electricity and is being developed in partnership with **DTE Energy**."
   ],
   "locality_evidence": [
    "# Data Center Debate Grows in Michigan as Google Announces Project Cannoli in Van Buren Township, Officials Call for Community Guardrails",
    "Google's Project Cannoli data center proposal in Van Buren Township highlights the growing debate over data centers in Michigan, with officials and community members calling for stronger protections for ratepayers and taxpayers amid competing visions of clean energy versus fossil fuel dependence."
   ],
   "state_evidence": [
    "# Data Center Debate Grows in Michigan as Google Announces Project Cannoli in Van Buren Township, Officials Call for Community Guardrails",
    "Google's Project Cannoli data center proposal in Van Buren Township highlights the growing debate over data centers in Michigan, with officials and community members calling for stronger protections for ratepayers and taxpayers amid competing visions of clean energy versus fossil fuel dependence."
   ],
   "capacity_gw_evidence": [
    "# Data Center Debate Grows in Michigan as Google Announces Project Cannoli in Van Buren Township, Officials Call for Community Guardrails",
    "The project, known as **Project Cannoli**, would require **1,000 megawatts** of electricity and is being developed in partnership with **DTE Energy**."
   ],
   "builder_evidence": [
    "# Data Center Debate Grows in Michigan as Google Announces Project Cannoli in Van Buren Township, Officials Call for Community Guardrails",
    "The project, known as **Project Cannoli**, would require **1,000 megawatts** of electricity and is being developed in partnership with **DTE Energy**."
   ],
   "ai_customer_evidence": [
    "# Data Center Debate Grows in Michigan as Google Announces Project Cannoli in Van Buren Township, Officials Call for Community Guardrails",
    "Google's Project Cannoli data center proposal in Van Buren Township highlights the growing debate over data centers in Michigan, with officials and community members calling for stronger protections for ratepayers and taxpayers amid competing visions of clean energy versus fossil fuel dependence."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://mexc.com/news/1114567",
   "title": "TeraWulf surges 10% on 1GW Kentucky AI campus bet | MEXC News",
   "published_at": null,
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure.",
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access."
   ],
   "locality_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure.",
    "The company secured a 285-acre site in eastern Kentucky."
   ],
   "state_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure.",
    "The company secured a 285-acre site in eastern Kentucky."
   ],
   "capacity_gw_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure.",
    "It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity."
   ],
   "builder_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure.",
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure.",
    "The company plans to bring the first 500 MW online during the second half of 2028."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://asiapacificnewsnetwork.com/article/909739213-iren-announces-successful-energization-of-sweetwater-1",
   "title": "IREN Announces Successful Energization of Sweetwater 1",
   "published_at": null,
   "project": "Sweetwater",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "energized",
   "announcement_date": "2026-05-01",
   "project_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas.",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "capacity_gw_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "builder_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "announcement_date_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ]
  },
  {
   "url": "https://montserratdailynews.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://dcnnmagazine.com/data-centres/ecl-announces-hydrogen-powered-ai-factory-data-centre",
   "title": "ECL announces hydrogen-powered AI factory data centre",
   "published_at": "2024-09-27T10:21:34",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# ECL announces hydrogen-powered AI factory data centre",
    "Data Centre-as-a-Service company, [ECL](https://www.ecldc.com/), has announced that it will build the first fully sustainable 1GW AI factory data centre \u2013 ECL TerraSite-TX1 \u2013 on a 600 acre site east of Houston, with Lambda as its first tenant."
   ],
   "locality_evidence": [
    "# ECL announces hydrogen-powered AI factory data centre",
    "Data Centre-as-a-Service company, [ECL](https://www.ecldc.com/), has announced that it will build the first fully sustainable 1GW AI factory data centre \u2013 ECL TerraSite-TX1 \u2013 on a 600 acre site east of Houston, with Lambda as its first tenant."
   ],
   "state_evidence": [
    "# ECL announces hydrogen-powered AI factory data centre",
    "ECL Terrasite-TX1 comes at a critical time for the state of Texas, with The Electric Reliability Council of Texas (ERCOT) testifying on 12 June this year that the state\u2019s power grid needs will grow approximately times two by 2030 due in part to the growth of data centres and AI."
   ],
   "capacity_gw_evidence": [
    "# ECL announces hydrogen-powered AI factory data centre",
    "The initial 1GW phased development may be expanded to 2GW in the future, enabled by its modularity and based on customer demand."
   ],
   "builder_evidence": [
    "# ECL announces hydrogen-powered AI factory data centre",
    "Data Centre-as-a-Service company, [ECL](https://www.ecldc.com/), has announced that it will build the first fully sustainable 1GW AI factory data centre \u2013 ECL TerraSite-TX1 \u2013 on a 600 acre site east of Houston, with Lambda as its first tenant."
   ],
   "ai_customer_evidence": [
    "# ECL announces hydrogen-powered AI factory data centre",
    "Data Centre-as-a-Service company, [ECL](https://www.ecldc.com/), has announced that it will build the first fully sustainable 1GW AI factory data centre \u2013 ECL TerraSite-TX1 \u2013 on a 600 acre site east of Houston, with Lambda as its first tenant."
   ],
   "status_evidence": [
    "# ECL announces hydrogen-powered AI factory data centre",
    "Data Centre-as-a-Service company, [ECL](https://www.ecldc.com/), has announced that it will build the first fully sustainable 1GW AI factory data centre \u2013 ECL TerraSite-TX1 \u2013 on a 600 acre site east of Houston, with Lambda as its first tenant."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://edgen.tech/tr/news/stock/blackrock-and-meta-form-14b-data-center-venture-in-texas",
   "title": "BlackRock and Meta form $14B data center venture in Texas",
   "published_at": "2026-07-28T09:41:43",
   "project": null,
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "BlackRock Inc. and Meta Platforms Inc.",
   "ai_customer": "Meta",
   "status": "developing",
   "announcement_date": "2026-07-28",
   "project_evidence": null,
   "locality_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas."
   ],
   "state_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas."
   ],
   "capacity_gw_evidence": [
    "BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas.",
    "The venture, announced Tuesday, will build a 1-gigawatt campus \u2014 enough to power roughly 830,000 US homes \u2014 with initial capacity expected online in 2028."
   ],
   "builder_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "BlackRock Inc. and Meta Platforms Inc. are jointly developing a $14 billion data center campus in El Paso, Texas, marking the latest hyperscale infrastructure deal as technology companies race to secure capacity for artificial intelligence workloads."
   ],
   "ai_customer_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "Meta will enter into lease agreements with the venture for the entire campus, with a four-year initial term and four options to extend, providing flexibility over a potential 20-year period."
   ],
   "status_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "BlackRock Inc. and Meta Platforms Inc. are jointly developing a $14 billion data center campus in El Paso, Texas, marking the latest hyperscale infrastructure deal as technology companies race to secure capacity for artificial intelligence workloads."
   ],
   "announcement_date_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "[![Rachel Kim](https://static.edgen.tech/authors/rachel-kim.png?image_process=resize,w_32/quality,q_75/format,webp/sharpen,100)\n## Rachel Kim](https://www.edgen.tech/tr/author/news/rachel-kim)\u00b7Jul 28 2026, 09:41"
   ]
  },
  {
   "url": "https://edgen.tech/tr/news/stock/blackrock-and-meta-form-14b-data-center-venture-in-texas",
   "title": "BlackRock and Meta form $14B data center venture in Texas",
   "published_at": "2026-07-28T09:41:43",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "expanded",
   "announcement_date": null,
   "project_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "The El Paso arrangement follows the same template Meta used for its Hyperion project in Richland Parish, Louisiana, where an 80/20 joint venture between a private-credit firm and Meta issued $27 billion in debt \u2014 the largest private-debt offering on record."
   ],
   "locality_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "The El Paso arrangement follows the same template Meta used for its Hyperion project in Richland Parish, Louisiana, where an 80/20 joint venture between a private-credit firm and Meta issued $27 billion in debt \u2014 the largest private-debt offering on record."
   ],
   "state_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "The El Paso arrangement follows the same template Meta used for its Hyperion project in Richland Parish, Louisiana, where an 80/20 joint venture between a private-credit firm and Meta issued $27 billion in debt \u2014 the largest private-debt offering on record."
   ],
   "capacity_gw_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "Meta has since expanded Hyperion to 5 gigawatts of compute capacity at an estimated cost exceeding $50 billion, with that expansion owned entirely by Meta rather than through a joint venture."
   ],
   "builder_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "The El Paso arrangement follows the same template Meta used for its Hyperion project in Richland Parish, Louisiana, where an 80/20 joint venture between a private-credit firm and Meta issued $27 billion in debt \u2014 the largest private-debt offering on record.",
    "Meta has since expanded Hyperion to 5 gigawatts of compute capacity at an estimated cost exceeding $50 billion, with that expansion owned entirely by Meta rather than through a joint venture."
   ],
   "ai_customer_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "The El Paso arrangement follows the same template Meta used for its Hyperion project in Richland Parish, Louisiana, where an 80/20 joint venture between a private-credit firm and Meta issued $27 billion in debt \u2014 the largest private-debt offering on record."
   ],
   "status_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "Meta has since expanded Hyperion to 5 gigawatts of compute capacity at an estimated cost exceeding $50 billion, with that expansion owned entirely by Meta rather than through a joint venture."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tracker.bepresearch.com/projects/crusoe-goodnight-armstrong-county",
   "title": "BEP AI Infrastructure Tracker",
   "published_at": null,
   "project": "Nebius Highridge",
   "locality": "Butler Township",
   "state": "Pennsylvania",
   "capacity_gw": 1.2,
   "builder": "Nebius Group",
   "ai_customer": null,
   "status": "Planning",
   "announcement_date": null,
   "project_evidence": [
    "Nebius Highridge",
    "## Related projects"
   ],
   "locality_evidence": [
    "Nebius Group \u00b7 Butler Township, Pennsylvania, United States",
    "## Related projects"
   ],
   "state_evidence": [
    "Nebius Group \u00b7 Butler Township, Pennsylvania, United States",
    "## Related projects"
   ],
   "capacity_gw_evidence": [
    "1.2 GWPlanning",
    "## Related projects"
   ],
   "builder_evidence": [
    "Nebius Group \u00b7 Butler Township, Pennsylvania, United States",
    "## Related projects"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "1.2 GWPlanning",
    "## Related projects"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tracker.bepresearch.com/projects/crusoe-goodnight-armstrong-county",
   "title": "BEP AI Infrastructure Tracker",
   "published_at": null,
   "project": "Meta Prometheus",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "Partially operational",
   "announcement_date": null,
   "project_evidence": [
    "Meta Prometheus",
    "## Related projects"
   ],
   "locality_evidence": [
    "Meta \u00b7 New Albany, Ohio, United States",
    "## Related projects"
   ],
   "state_evidence": [
    "Meta \u00b7 New Albany, Ohio, United States",
    "## Related projects"
   ],
   "capacity_gw_evidence": [
    "1 GWPartially operational",
    "## Related projects"
   ],
   "builder_evidence": [
    "Meta \u00b7 New Albany, Ohio, United States",
    "## Related projects"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "1 GWPartially operational",
    "## Related projects"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tracker.bepresearch.com/projects/crusoe-goodnight-armstrong-county",
   "title": "BEP AI Infrastructure Tracker",
   "published_at": null,
   "project": "Stargate Michigan",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.4,
   "builder": "Related Digital",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "Stargate Michigan",
    "## Related projects"
   ],
   "locality_evidence": [
    "Related Digital \u00b7 Saline Township, Michigan, United States",
    "## Related projects"
   ],
   "state_evidence": [
    "Related Digital \u00b7 Saline Township, Michigan, United States",
    "## Related projects"
   ],
   "capacity_gw_evidence": [
    "1.4 GWUnder construction",
    "## Related projects"
   ],
   "builder_evidence": [
    "Related Digital \u00b7 Saline Township, Michigan, United States",
    "## Related projects"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "1.4 GWUnder construction",
    "## Related projects"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://na.magazine.intelligentcio.com/intelligent-cio-north-america-issue-62/0483097001760001469/p31",
   "title": "Intelligent CIO North America Issue 62 | Page 31",
   "published_at": "2025-10-09T00:00:00",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Construction is already under way, with the first building scheduled for delivery in the second half of 2026.",
   "announcement_date": null,
   "project_evidence": [
    "INTELLIGENT TECHNOLOGY: DATA CENTERS",
    "Vantage Data Centers unveils plans for Frontier, a US $ 25B mega-campus in Texas",
    "The state-of-the-art campus, named\u2018 Frontier\u2019, is designed to advance AI innovation and will employ more than 5,000 people across construction and ongoing operations."
   ],
   "locality_evidence": [
    "INTELLIGENT TECHNOLOGY: DATA CENTERS",
    "Vantage Data Centers unveils plans for Frontier, a US $ 25B mega-campus in Texas",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, has announced its largest investment to date: more than US $ 25 billion to develop a 1.4GW data center mega-campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "INTELLIGENT TECHNOLOGY: DATA CENTERS",
    "Vantage Data Centers unveils plans for Frontier, a US $ 25B mega-campus in Texas",
    "Campus will deliver 1.4 gigawatts of capacity in the Lone Star State, establishing a global AI hub."
   ],
   "capacity_gw_evidence": [
    "INTELLIGENT TECHNOLOGY: DATA CENTERS",
    "Vantage Data Centers unveils plans for Frontier, a US $ 25B mega-campus in Texas",
    "Campus will deliver 1.4 gigawatts of capacity in the Lone Star State, establishing a global AI hub."
   ],
   "builder_evidence": [
    "INTELLIGENT TECHNOLOGY: DATA CENTERS",
    "Vantage Data Centers unveils plans for Frontier, a US $ 25B mega-campus in Texas",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, has announced its largest investment to date: more than US $ 25 billion to develop a 1.4GW data center mega-campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "INTELLIGENT TECHNOLOGY: DATA CENTERS",
    "Vantage Data Centers unveils plans for Frontier, a US $ 25B mega-campus in Texas",
    "Construction is already under way, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://fermiamerica.com/category/news",
   "title": "News Archives - FERMI AMERICA",
   "published_at": null,
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 17.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "permitting",
   "announcement_date": "2026-03-13",
   "project_evidence": [
    "World\u2019s Largest Private Grid, Fermi America\u2122 to File Additional 5GW Clean Air Permit for Project Matador with the Texas Commission on Environmental Quality (TCEQ) Upsizing Campus Projections to 17GW of Private Power"
   ],
   "locality_evidence": [
    "AMARILLO, Texas, March 13, 2026 /PRNewswire/ -- Fermi Inc. (d/b/a Fermi America)\u2026",
    "World\u2019s Largest Private Grid, Fermi America\u2122 to File Additional 5GW Clean Air Permit for Project Matador with the Texas Commission on Environmental Quality (TCEQ) Upsizing Campus Projections to 17GW of Private Power"
   ],
   "state_evidence": [
    "World\u2019s Largest Private Grid, Fermi America\u2122 to File Additional 5GW Clean Air Permit for Project Matador with the Texas Commission on Environmental Quality (TCEQ) Upsizing Campus Projections to 17GW of Private Power",
    "AMARILLO, Texas, March 13, 2026 /PRNewswire/ -- Fermi Inc. (d/b/a Fermi America)\u2026"
   ],
   "capacity_gw_evidence": [
    "World\u2019s Largest Private Grid, Fermi America\u2122 to File Additional 5GW Clean Air Permit for Project Matador with the Texas Commission on Environmental Quality (TCEQ) Upsizing Campus Projections to 17GW of Private Power"
   ],
   "builder_evidence": [
    "World\u2019s Largest Private Grid, Fermi America\u2122 to File Additional 5GW Clean Air Permit for Project Matador with the Texas Commission on Environmental Quality (TCEQ) Upsizing Campus Projections to 17GW of Private Power",
    "AMARILLO, Texas, March 13, 2026 /PRNewswire/ -- Fermi Inc. (d/b/a Fermi America)\u2026"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "World\u2019s Largest Private Grid, Fermi America\u2122 to File Additional 5GW Clean Air Permit for Project Matador with the Texas Commission on Environmental Quality (TCEQ) Upsizing Campus Projections to 17GW of Private Power"
   ],
   "announcement_date_evidence": [
    "AMARILLO, Texas, March 13, 2026 /PRNewswire/ -- Fermi Inc. (d/b/a Fermi America)\u2026",
    "World\u2019s Largest Private Grid, Fermi America\u2122 to File Additional 5GW Clean Air Permit for Project Matador with the Texas Commission on Environmental Quality (TCEQ) Upsizing Campus Projections to 17GW of Private Power"
   ]
  },
  {
   "url": "https://prnewswire.co.uk/news-releases/nscale-and-microsoft-announce-collaboration-with-nvidia-and-caterpillar-to-deliver-1-35gw-of-nvidia-vera-rubin-nvl72-gpus-at-flagship-ai-factory-campus-in-west-virginia-302715220.html",
   "title": "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
   "published_at": "2026-03-16T21:30:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "planned",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "locality_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "state_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "capacity_gw_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts.",
    "The expansion capabilities of this site \u2014 which has the potential for a total power draw of 8GW \u2014 will allow Nscale to develop power capacity rapidly while supporting one of the largest announced AI compute deployments in the market today."
   ],
   "builder_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "ai_customer_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ],
   "status_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "The planned infrastructure will operate under a long-term framework that includes an initial multi-year compute services term alongside a long-term data centre lease structure, reflecting the scale and strategic importance of the facility."
   ],
   "announcement_date_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "[**Nscale** ](/news/nscale/)\n16 Mar, 2026, 21:30 GMT",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ]
  },
  {
   "url": "https://montanalabs.ai/news/meta-s-5gw-louisiana-expansion-is-announced-through-teacher-bonuses-not-teraflops",
   "title": "Meta's 5GW Louisiana Expansion Is Announced Through Teacher Bonuses, Not Teraflops",
   "published_at": "2026-07-13T00:00:00",
   "project": null,
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "expanding",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "# Meta's 5GW Louisiana Expansion Is Announced Through Teacher Bonuses, Not Teraflops",
    "A $50 billion compute buildout in Richland Parish is presented almost entirely through community outcomes \u2014 here's what the source actually commits Meta to.",
    "The headline number in Meta's own text is straightforward: the Richland Parish, Louisiana data center is expanding to 5GW of compute capacity, part of an investment the company puts at more than $50 billion in the region."
   ],
   "state_evidence": [
    "# Meta's 5GW Louisiana Expansion Is Announced Through Teacher Bonuses, Not Teraflops",
    "The headline number in Meta's own text is straightforward: the Richland Parish, Louisiana data center is expanding to 5GW of compute capacity, part of an investment the company puts at more than $50 billion in the region."
   ],
   "capacity_gw_evidence": [
    "# Meta's 5GW Louisiana Expansion Is Announced Through Teacher Bonuses, Not Teraflops",
    "The headline number in Meta's own text is straightforward: the Richland Parish, Louisiana data center is expanding to 5GW of compute capacity, part of an investment the company puts at more than $50 billion in the region."
   ],
   "builder_evidence": [
    "# Meta's 5GW Louisiana Expansion Is Announced Through Teacher Bonuses, Not Teraflops",
    "The headline number in Meta's own text is straightforward: the Richland Parish, Louisiana data center is expanding to 5GW of compute capacity, part of an investment the company puts at more than $50 billion in the region."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Meta's 5GW Louisiana Expansion Is Announced Through Teacher Bonuses, Not Teraflops",
    "The headline number in Meta's own text is straightforward: the Richland Parish, Louisiana data center is expanding to 5GW of compute capacity, part of an investment the company puts at more than $50 billion in the region."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aichatdaily.com/ai-news/utah-approves-40-000-acre-stratos-data-center-despite",
   "title": "Utah approves 40,000-acre Stratos data center despite 4,000 public objections",
   "published_at": "2026-05-20T14:07:34",
   "project": "Stratos Project",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "West GenCo",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "# Utah approves 40,000-acre Stratos data center despite 4,000 public objections",
    "Box Elder County commissioners approved the 40,000-acre Stratos Project earlier this month, a data center backed by Shark Tank investor Kevin O'Leary that will consume 9GW of power \u2014 nearly double Utah's 2025 peak electricity demand."
   ],
   "locality_evidence": [
    "# Utah approves 40,000-acre Stratos data center despite 4,000 public objections",
    "Box Elder County commissioners approved the 40,000-acre Stratos Project earlier this month, a data center backed by Shark Tank investor Kevin O'Leary that will consume 9GW of power \u2014 nearly double Utah's 2025 peak electricity demand."
   ],
   "state_evidence": [
    "# Utah approves 40,000-acre Stratos data center despite 4,000 public objections",
    "Kevin O'Leary's 9GW AI campus could raise Utah carbon emissions 55% and nighttime temps by 12\u00b0F."
   ],
   "capacity_gw_evidence": [
    "# Utah approves 40,000-acre Stratos data center despite 4,000 public objections",
    "Kevin O'Leary's 9GW AI campus could raise Utah carbon emissions 55% and nighttime temps by 12\u00b0F."
   ],
   "builder_evidence": [
    "# Utah approves 40,000-acre Stratos data center despite 4,000 public objections",
    "By March, O'Leary's investment firm announced the partnership with real-estate developer West GenCo."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Utah approves 40,000-acre Stratos data center despite 4,000 public objections",
    "Box Elder County commissioners approved the 40,000-acre Stratos Project earlier this month, a data center backed by Shark Tank investor Kevin O'Leary that will consume 9GW of power \u2014 nearly double Utah's 2025 peak electricity demand."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://breachroad.com/en/blog/openai-project-camellia-data-center",
   "title": "OpenAI Project Camellia: a 3.2 GW data center in Georgia",
   "published_at": "2026-07-24T00:00:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "Georgia Power",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": "2026-07-24",
   "project_evidence": [
    "# OpenAI Project Camellia: a 3.2 GW data center in Georgia",
    "OpenAI announced Project Camellia \u2014 a 3.2 GW data center campus in Georgia costing over $30 billion.",
    "OpenAI has announced **Project Camellia** \u2014 a data-center campus in Georgia with **3.2 gigawatts** of capacity."
   ],
   "locality_evidence": [
    "- **Location:** 1,400 acres in Effingham County, Georgia.",
    "# OpenAI Project Camellia: a 3.2 GW data center in Georgia"
   ],
   "state_evidence": [
    "# OpenAI Project Camellia: a 3.2 GW data center in Georgia",
    "OpenAI announced Project Camellia \u2014 a 3.2 GW data center campus in Georgia costing over $30 billion.",
    "- **Location:** 1,400 acres in Effingham County, Georgia."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Project Camellia: a 3.2 GW data center in Georgia",
    "OpenAI announced Project Camellia \u2014 a 3.2 GW data center campus in Georgia costing over $30 billion.",
    "- **Capacity:** 3.2 gigawatts."
   ],
   "builder_evidence": [
    "- **Power partner:** Georgia Power.",
    "# OpenAI Project Camellia: a 3.2 GW data center in Georgia"
   ],
   "ai_customer_evidence": [
    "OpenAI announced Project Camellia \u2014 a 3.2 GW data center campus in Georgia costing over $30 billion.",
    "# OpenAI Project Camellia: a 3.2 GW data center in Georgia"
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "PUBLISHED24 July 2026",
    "# OpenAI Project Camellia: a 3.2 GW data center in Georgia"
   ]
  },
  {
   "url": "https://redding.com/story/money/business/2026/03/17/google-reveals-project-cannoli-data-center/89185890007",
   "title": "Google reveals it is behind big 'Project Cannoli' data center project",
   "published_at": "2026-03-17T12:02:18",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": "Google",
   "status": "planned",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "locality_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "state_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google also said Tuesday that it is creating a $10 million Energy Impact Fund for local organizations to tap into with the aim of lowering monthly utility bills for Michiganders."
   ],
   "capacity_gw_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "builder_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "The data center would be developed for Google by Panattoni Development Co."
   ],
   "ai_customer_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "status_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "announcement_date_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Updated March 17, 2026, 11:27 a.m. PT",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ]
  },
  {
   "url": "https://mexc.com/en-GB/news/1114567",
   "title": "TeraWulf surges 10% on 1GW Kentucky AI campus bet | MEXC News",
   "published_at": null,
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "**TeraWulf is making a much bigger bet on artificial intelligence infrastructure. However, it is not about chips anymore. It is about power. The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity.**",
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access."
   ],
   "locality_evidence": [
    "**TeraWulf is making a much bigger bet on artificial intelligence infrastructure. However, it is not about chips anymore. It is about power. The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity.**"
   ],
   "state_evidence": [
    "**TeraWulf is making a much bigger bet on artificial intelligence infrastructure. However, it is not about chips anymore. It is about power. The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity.**"
   ],
   "capacity_gw_evidence": [
    "**TeraWulf is making a much bigger bet on artificial intelligence infrastructure. However, it is not about chips anymore. It is about power. The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity.**"
   ],
   "builder_evidence": [
    "**TeraWulf is making a much bigger bet on artificial intelligence infrastructure. However, it is not about chips anymore. It is about power. The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity.**",
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://utahpolicy.com/news-release/75074-creekstone-energy-and-blusky-ai-announce-50-mw-infrastructure-agreement-at-utahs-delta-gigasite",
   "title": "Creekstone Energy and BluSky AI announce 50 MW infrastructure agreement at Utah\u2019s Delta Gigasite",
   "published_at": "2025-07-31T04:46:25",
   "project": "Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": "BluSky AI Inc.",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "The effort to build the world\u2019s largest data-center campus in Delta, Utah has taken another significant step forward.",
    "Creekstone Energy LLC, the developer behind Utah\u2019s largest AI-ready energy site, has signed an agreement with BluSky AI Inc. to provide land and up to 50 megawatts of power at its Delta Gigasite in Millard County."
   ],
   "locality_evidence": [
    "The effort to build the world\u2019s largest data-center campus in Delta, Utah has taken another significant step forward.",
    "Creekstone Energy LLC, the developer behind Utah\u2019s largest AI-ready energy site, has signed an agreement with BluSky AI Inc. to provide land and up to 50 megawatts of power at its Delta Gigasite in Millard County."
   ],
   "state_evidence": [
    "The effort to build the world\u2019s largest data-center campus in Delta, Utah has taken another significant step forward.",
    "Creekstone Energy LLC, the developer behind Utah\u2019s largest AI-ready energy site, has signed an agreement with BluSky AI Inc. to provide land and up to 50 megawatts of power at its Delta Gigasite in Millard County."
   ],
   "capacity_gw_evidence": [
    "It has access to more than 10 gigawatts of power potential\u2014drawing from geothermal, solar, wind, and natural gas\u2014and is located at a major power and fiber crossroads in the Western U.S."
   ],
   "builder_evidence": [
    "Creekstone Energy LLC, the developer behind Utah\u2019s largest AI-ready energy site, has signed an agreement with BluSky AI Inc. to provide land and up to 50 megawatts of power at its Delta Gigasite in Millard County."
   ],
   "ai_customer_evidence": [
    "Creekstone Energy LLC, the developer behind Utah\u2019s largest AI-ready energy site, has signed an agreement with BluSky AI Inc. to provide land and up to 50 megawatts of power at its Delta Gigasite in Millard County."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://inkl.com/news/ecl-builds-gigawatt-hydrogen-powered-data-center-to-keep-up-with-ai-s-insatiable-demand-for-power-and-it-s-already-planning-an-expansion",
   "title": "ECL builds gigawatt hydrogen-powered data center to keep up with AI\u2019s insatiable demand for power \u2014 and it's already planning an expansion",
   "published_at": "2024-10-04T15:49:00",
   "project": "TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "TechRadar",
    "ECL builds gigawatt hydrogen-powered data center to keep up with AI\u2019s insatiable demand for power \u2014 and it's already planning an expansion",
    "ECL has announced its development of TerraSite-TX1, the world\u2019s first 1GW off-grid, hydrogen-powered AI factory data center."
   ],
   "locality_evidence": [
    "TechRadar",
    "ECL builds gigawatt hydrogen-powered data center to keep up with AI\u2019s insatiable demand for power \u2014 and it's already planning an expansion",
    "Located on a 600-acre site near Houston, Texas, this facility is set to provide Lambda and other AI leaders with both space and power for future projects, while maintaining zero emissions."
   ],
   "state_evidence": [
    "TechRadar",
    "ECL builds gigawatt hydrogen-powered data center to keep up with AI\u2019s insatiable demand for power \u2014 and it's already planning an expansion",
    "Located on a 600-acre site near Houston, Texas, this facility is set to provide Lambda and other AI leaders with both space and power for future projects, while maintaining zero emissions."
   ],
   "capacity_gw_evidence": [
    "TechRadar",
    "ECL builds gigawatt hydrogen-powered data center to keep up with AI\u2019s insatiable demand for power \u2014 and it's already planning an expansion",
    "Up to 2GW",
    "When it's up and running, TerraSite-TX1 will receive hydrogen through three pipelines, minimizing the need for additional fuel transport, and its modular design will allow for future expansion up to 2GW."
   ],
   "builder_evidence": [
    "TechRadar",
    "ECL builds gigawatt hydrogen-powered data center to keep up with AI\u2019s insatiable demand for power \u2014 and it's already planning an expansion",
    "ECL has announced its development of TerraSite-TX1, the world\u2019s first 1GW off-grid, hydrogen-powered AI factory data center."
   ],
   "ai_customer_evidence": [
    "TechRadar",
    "ECL builds gigawatt hydrogen-powered data center to keep up with AI\u2019s insatiable demand for power \u2014 and it's already planning an expansion",
    "Located on a 600-acre site near Houston, Texas, this facility is set to provide Lambda and other AI leaders with both space and power for future projects, while maintaining zero emissions.",
    "Ken Patchett, Vice President of Data Center Infrastructure at Lambda, the facility\u2019s first tenant, said, \u201cThe data center technology committed to by ECL is truly transformative in the industry."
   ],
   "status_evidence": [
    "TechRadar",
    "ECL builds gigawatt hydrogen-powered data center to keep up with AI\u2019s insatiable demand for power \u2014 and it's already planning an expansion",
    "ECL has announced its development of TerraSite-TX1, the world\u2019s first 1GW off-grid, hydrogen-powered AI factory data center."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://gentic.news/article/openai-leases-8gw-ohio-site-nvidia",
   "title": "OpenAI Leases 8GW Ohio Site; Nvidia Backs $105B",
   "published_at": "2026-08-17T14:13:26",
   "project": "PORTS-Pike",
   "locality": null,
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Leases 8GW Ohio Site; Nvidia Backs $105B"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# OpenAI Leases 8GW Ohio Site; Nvidia Backs $105B"
   ],
   "capacity_gw_evidence": [
    "# OpenAI Leases 8GW Ohio Site; Nvidia Backs $105B"
   ],
   "builder_evidence": [
    "# OpenAI Leases 8GW Ohio Site; Nvidia Backs $105B"
   ],
   "ai_customer_evidence": [
    "# OpenAI Leases 8GW Ohio Site; Nvidia Backs $105B"
   ],
   "status_evidence": [
    "# OpenAI Leases 8GW Ohio Site; Nvidia Backs $105B",
    "Per the WSJ, Nvidia backs the residual value of the finished data centers in the first construction phase, which covers 4.25 gigawatts of IT capacity."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://edgen.tech/vi/news/stock/blackrock-and-meta-form-14b-data-center-venture-in-texas",
   "title": "BlackRock and Meta form $14B data center venture in Texas",
   "published_at": "2026-07-28T09:41:43",
   "project": null,
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "BlackRock Inc. and Meta Platforms Inc.",
   "ai_customer": "Meta",
   "status": "developing",
   "announcement_date": "2026-07-28",
   "project_evidence": null,
   "locality_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas."
   ],
   "state_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas."
   ],
   "capacity_gw_evidence": [
    "BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas.",
    "The venture, announced Tuesday, will build a 1-gigawatt campus \u2014 enough to power roughly 830,000 US homes \u2014 with initial capacity expected online in 2028."
   ],
   "builder_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "BlackRock Inc. and Meta Platforms Inc. are jointly developing a $14 billion data center campus in El Paso, Texas, marking the latest hyperscale infrastructure deal as technology companies race to secure capacity for artificial intelligence workloads."
   ],
   "ai_customer_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "Meta will enter into lease agreements with the venture for the entire campus, with a four-year initial term and four options to extend, providing flexibility over a potential 20-year period."
   ],
   "status_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas"
   ],
   "announcement_date_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "[![Rachel Kim](https://static.edgen.tech/authors/rachel-kim.png?image_process=resize,w_32/quality,q_75/format,webp/sharpen,100)\n## Rachel Kim](https://www.edgen.tech/vi/author/news/rachel-kim)\u00b7Jul 28 2026, 09:41"
   ]
  },
  {
   "url": "https://inkontrend.com/2026/05/19/5-facts-biggest-data-center-in-the-world",
   "title": "5 Shocking Facts About the Biggest Data Center in the World - Ink On Trend",
   "published_at": "2026-05-19T10:30:00",
   "project": "AWS Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon",
   "ai_customer": "Anthropic",
   "status": "Under construction",
   "announcement_date": "2024-09-01",
   "project_evidence": [
    "[AWS Project Rainier](https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster) in New Carlisle, Indiana, is one of the biggest data center in the world.",
    "## **Fact 1: The Biggest Data Center in the World Uses Enough Power to Run 1.6 Million Homes**"
   ],
   "locality_evidence": [
    "[AWS Project Rainier](https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster) in New Carlisle, Indiana, is one of the biggest data center in the world.",
    "## **Fact 1: The Biggest Data Center in the World Uses Enough Power to Run 1.6 Million Homes**"
   ],
   "state_evidence": [
    "[AWS Project Rainier](https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster) in New Carlisle, Indiana, is one of the biggest data center in the world.",
    "## **Fact 1: The Biggest Data Center in the World Uses Enough Power to Run 1.6 Million Homes**"
   ],
   "capacity_gw_evidence": [
    "At full capacity, it will use 2.2 gigawatts of electricity, which is enough to power over 1.6 million homes.",
    "[AWS Project Rainier](https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster) in New Carlisle, Indiana, is one of the biggest data center in the world.",
    "## **Fact 1: The Biggest Data Center in the World Uses Enough Power to Run 1.6 Million Homes**"
   ],
   "builder_evidence": [
    "Amazon spent $11 billion to build it on 1,200 acres of what used to be farmland.",
    "[AWS Project Rainier](https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster) in New Carlisle, Indiana, is one of the biggest data center in the world.",
    "## **Fact 1: The Biggest Data Center in the World Uses Enough Power to Run 1.6 Million Homes**"
   ],
   "ai_customer_evidence": [
    "The entire facility was built to train Anthropic\u2019s Claude AI models.",
    "[AWS Project Rainier](https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster) in New Carlisle, Indiana, is one of the biggest data center in the world.",
    "## **Fact 1: The Biggest Data Center in the World Uses Enough Power to Run 1.6 Million Homes**"
   ],
   "status_evidence": [
    "Construction started in September 2024, and the first buildings were live within seven months.",
    "[AWS Project Rainier](https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster) in New Carlisle, Indiana, is one of the biggest data center in the world.",
    "## **Fact 1: The Biggest Data Center in the World Uses Enough Power to Run 1.6 Million Homes**"
   ],
   "announcement_date_evidence": [
    "Construction started in September 2024, and the first buildings were live within seven months.",
    "[AWS Project Rainier](https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster) in New Carlisle, Indiana, is one of the biggest data center in the world.",
    "## **Fact 1: The Biggest Data Center in the World Uses Enough Power to Run 1.6 Million Homes**"
   ]
  },
  {
   "url": "https://avpress.marketminute.com/article/tokenring-2026-1-2-colossus-unbound-xais-memphis-expansion-targets-1-million-gpus-in-the-race-for-agi",
   "title": "Colossus Unbound: xAI\u2019s Memphis Expansion Targets 1 Million GPUs in the Race for AGI",
   "published_at": "2026-01-02T19:48:24",
   "project": "Colossus",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "expanding",
   "announcement_date": null,
   "project_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race."
   ],
   "locality_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race."
   ],
   "state_evidence": [
    "As the \"Digital Delta\" takes shape across the Tennessee-Mississippi border, the project is redefining the physical and logistical requirements of the AGI era."
   ],
   "capacity_gw_evidence": [
    "By targeting a power capacity of 2 gigawatts (GW)\u2014roughly enough to power nearly 2 million homes\u2014xAI is transitioning from a high-scale startup to a \"Gigafactory of Compute.\""
   ],
   "builder_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://capdex.com/news/crusoe-and-lancium-announce-1-gw-ai-data-center-campus-in",
   "title": "Crusoe and Lancium Announce 1-GW AI Data Center Campus in Childress, Texas",
   "published_at": "2026-07-16T14:30:09",
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "CHILDRESS, Texas \u2014 **[Crusoe](/firm/crusoe)** and **Lancium** announced Tuesday a 1.0 gigawatt AI data center campus in Childress, Texas, marking the second major site where the two companies are executing a shared development model that divides land ownership and energy management from data center design and operations.",
    "[Crusoe Newsroom: Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas (July 15, 2026)](https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas)"
   ],
   "locality_evidence": [
    "CHILDRESS, Texas \u2014 **[Crusoe](/firm/crusoe)** and **Lancium** announced Tuesday a 1.0 gigawatt AI data center campus in Childress, Texas, marking the second major site where the two companies are executing a shared development model that divides land ownership and energy management from data center design and operations.",
    "[Crusoe Newsroom: Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas (July 15, 2026)](https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas)"
   ],
   "state_evidence": [
    "CHILDRESS, Texas \u2014 **[Crusoe](/firm/crusoe)** and **Lancium** announced Tuesday a 1.0 gigawatt AI data center campus in Childress, Texas, marking the second major site where the two companies are executing a shared development model that divides land ownership and energy management from data center design and operations.",
    "[Crusoe Newsroom: Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas (July 15, 2026)](https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas)"
   ],
   "capacity_gw_evidence": [
    "CHILDRESS, Texas \u2014 **[Crusoe](/firm/crusoe)** and **Lancium** announced Tuesday a 1.0 gigawatt AI data center campus in Childress, Texas, marking the second major site where the two companies are executing a shared development model that divides land ownership and energy management from data center design and operations.",
    "[Crusoe Newsroom: Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas (July 15, 2026)](https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas)"
   ],
   "builder_evidence": [
    "CHILDRESS, Texas \u2014 **[Crusoe](/firm/crusoe)** and **Lancium** announced Tuesday a 1.0 gigawatt AI data center campus in Childress, Texas, marking the second major site where the two companies are executing a shared development model that divides land ownership and energy management from data center design and operations.",
    "[Crusoe Newsroom: Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas (July 15, 2026)](https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "CHILDRESS, Texas \u2014 **[Crusoe](/firm/crusoe)** and **Lancium** announced Tuesday a 1.0 gigawatt AI data center campus in Childress, Texas, marking the second major site where the two companies are executing a shared development model that divides land ownership and energy management from data center design and operations.",
    "[Crusoe Newsroom: Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas (July 15, 2026)](https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas)"
   ],
   "announcement_date_evidence": [
    "[Crusoe Newsroom: Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas (July 15, 2026)](https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas)"
   ]
  },
  {
   "url": "https://capdex.com/news/crusoe-and-lancium-announce-1-gw-ai-data-center-campus-in",
   "title": "Crusoe and Lancium Announce 1-GW AI Data Center Campus in Childress, Texas",
   "published_at": "2026-07-16T14:30:09",
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "operating",
   "announcement_date": null,
   "project_evidence": [
    "The Childress announcement follows the trajectory of the companies' collaboration in Abilene, where Crusoe broke ground in June 2024 on a Lancium-owned campus and energized its first two buildings within approximately one year.",
    "[Crusoe Newsroom: Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas (July 15, 2026)](https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas)"
   ],
   "locality_evidence": [
    "The Childress announcement follows the trajectory of the companies' collaboration in Abilene, where Crusoe broke ground in June 2024 on a Lancium-owned campus and energized its first two buildings within approximately one year.",
    "[Crusoe Newsroom: Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas (July 15, 2026)](https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas)"
   ],
   "state_evidence": [
    "CHILDRESS, Texas \u2014 **[Crusoe](/firm/crusoe)** and **Lancium** announced Tuesday a 1.0 gigawatt AI data center campus in Childress, Texas, marking the second major site where the two companies are executing a shared development model that divides land ownership and energy management from data center design and operations.",
    "[Crusoe Newsroom: Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas (July 15, 2026)](https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas)"
   ],
   "capacity_gw_evidence": [
    "That campus has since expanded to 1.2 GW.",
    "[Crusoe Newsroom: Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas (July 15, 2026)](https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas)"
   ],
   "builder_evidence": [
    "The Childress announcement follows the trajectory of the companies' collaboration in Abilene, where Crusoe broke ground in June 2024 on a Lancium-owned campus and energized its first two buildings within approximately one year.",
    "[Crusoe Newsroom: Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas (July 15, 2026)](https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The Childress announcement follows the trajectory of the companies' collaboration in Abilene, where Crusoe broke ground in June 2024 on a Lancium-owned campus and energized its first two buildings within approximately one year.",
    "[Crusoe Newsroom: Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas (July 15, 2026)](https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://cryptobriefing.com/microsoft-ai-data-center-stock-crypto-miners",
   "title": "Microsoft opens new AI data center amid stock struggles, and crypto miners are paying attention",
   "published_at": "2026-07-09T12:31:53",
   "project": "New 2 gigawatt datacenter campus",
   "locality": "Pecos",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Microsoft",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Just one day before the Fairwater completion announcement, Microsoft revealed plans for a new 2 gigawatt datacenter campus in Pecos, Texas, aimed at further expanding global capacity."
   ],
   "locality_evidence": [
    "Just one day before the Fairwater completion announcement, Microsoft revealed plans for a new 2 gigawatt datacenter campus in Pecos, Texas, aimed at further expanding global capacity."
   ],
   "state_evidence": [
    "Just one day before the Fairwater completion announcement, Microsoft revealed plans for a new 2 gigawatt datacenter campus in Pecos, Texas, aimed at further expanding global capacity."
   ],
   "capacity_gw_evidence": [
    "Just one day before the Fairwater completion announcement, Microsoft revealed plans for a new 2 gigawatt datacenter campus in Pecos, Texas, aimed at further expanding global capacity."
   ],
   "builder_evidence": [
    "Just one day before the Fairwater completion announcement, Microsoft revealed plans for a new 2 gigawatt datacenter campus in Pecos, Texas, aimed at further expanding global capacity."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Just one day before the Fairwater completion announcement, Microsoft revealed plans for a new 2 gigawatt datacenter campus in Pecos, Texas, aimed at further expanding global capacity."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://msp-channel.com/news/70668/vantage-data-centers-announces-largest-25-billion-mega-campus-investment-in-texas",
   "title": "Vantage Data Centers announces largest $25 Billion mega-campus investment in Texas",
   "published_at": "2025-08-19T13:20:59",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Construction is already underway",
   "announcement_date": null,
   "project_evidence": [
    "Vantage Data Centers announces largest $25 Billion mega-campus investment in Texas",
    "$25 billion will be channelled into the creation of a vast 1.4GW data centre campus named \"Frontier\" in Shackelford County, Texas."
   ],
   "locality_evidence": [
    "Vantage Data Centers announces largest $25 Billion mega-campus investment in Texas",
    "Vantage Data Centers unveils a groundbreaking $25 billion investment in a mega-scale data centre campus in Shackelford County, Texas.",
    "$25 billion will be channelled into the creation of a vast 1.4GW data centre campus named \"Frontier\" in Shackelford County, Texas."
   ],
   "state_evidence": [
    "Vantage Data Centers announces largest $25 Billion mega-campus investment in Texas",
    "Vantage Data Centers unveils a groundbreaking $25 billion investment in a mega-scale data centre campus in Shackelford County, Texas.",
    "$25 billion will be channelled into the creation of a vast 1.4GW data centre campus named \"Frontier\" in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "Vantage Data Centers announces largest $25 Billion mega-campus investment in Texas",
    "$25 billion will be channelled into the creation of a vast 1.4GW data centre campus named \"Frontier\" in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "Vantage Data Centers announces largest $25 Billion mega-campus investment in Texas",
    "Vantage Data Centers unveils a groundbreaking $25 billion investment in a mega-scale data centre campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Vantage Data Centers announces largest $25 Billion mega-campus investment in Texas",
    "Construction is already underway, with the initial building anticipated to be ready in the latter half of 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://uk.advfn.com/stock-market/london/fermi-FRMI/share-news/Fermi-Inc-Initial-Draw-on-200m-Equipment-Facility/97876737",
   "title": "Fermi Inc. Initial Draw on $200m Equipment Facility",
   "published_at": null,
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2026-02-20",
   "project_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Fermi Inc. Initial Draw on $200m Equipment Facility"
   ],
   "locality_evidence": [
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus.",
    "Fermi Inc. Initial Draw on $200m Equipment Facility",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "state_evidence": [
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus.",
    "Fermi Inc. Initial Draw on $200m Equipment Facility",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "capacity_gw_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Fermi Inc. Initial Draw on $200m Equipment Facility"
   ],
   "builder_evidence": [
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus.",
    "Fermi Inc. Initial Draw on $200m Equipment Facility",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus.",
    "Fermi Inc. Initial Draw on $200m Equipment Facility",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "announcement_date_evidence": [
    "20 February 2026",
    "Fermi Inc. Initial Draw on $200m Equipment Facility",
    "Fermi Inc."
   ]
  },
  {
   "url": "https://constructionreviewonline.com/former-homer-city-plant-to-become-a-10-billion-ai-data-center-campus",
   "title": "Former Homer City Plant to Become a $10 Billion AI Data Center Campus",
   "published_at": "2025-04-02T18:45:43",
   "project": "Homer City Energy Campus",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Kiewit Power Constructors Co.",
   "ai_customer": null,
   "status": "Site preparation and the start of above-ground construction",
   "announcement_date": null,
   "project_evidence": [
    "# Former Homer City Plant to Become a $10 Billion AI Data Center Campus",
    "Former Homer City Power Station is set to become US\u2019s largest natural gas-powered AI data center campus.",
    "In addition to the Homer City Energy Campus, another major development was [CoreWeave securing $4 billion in funding in July 2025](https://constructionreviewonline.com/turner-wohlsen-construction-selected-for-6-billion-coreweave-data-center-pennsylvania/) for its planned $6 billion AI data center campus in Lancaster, Pennsylvania, highlighting the state\u2019s growing role in digital and energy infrastructure."
   ],
   "locality_evidence": [
    "# Former Homer City Plant to Become a $10 Billion AI Data Center Campus",
    "The Pennsylvania Department of Environmental Protection issued an air quality plan approval on November 20, 2025, allowing Homer City Generation to begin site preparation for the natural gas power plant at the 3,200-acre campus."
   ],
   "state_evidence": [
    "# Former Homer City Plant to Become a $10 Billion AI Data Center Campus",
    "The Pennsylvania Department of Environmental Protection issued an air quality plan approval on November 20, 2025, allowing Homer City Generation to begin site preparation for the natural gas power plant at the 3,200-acre campus."
   ],
   "capacity_gw_evidence": [
    "# Former Homer City Plant to Become a $10 Billion AI Data Center Campus",
    "[Homer City Redevelopment (HCR)](https://www.homercityredevelopment.com/) and[ Kiewit Power Constructors Co.](https://www.kiewit.com/markets/power/) collaborated to construct this innovative project, which will have seven gas-fired turbines generating up to 4.5 gigawatts of electricity\u2014sufficient to power approximately 3 million households."
   ],
   "builder_evidence": [
    "# Former Homer City Plant to Become a $10 Billion AI Data Center Campus",
    "[Homer City Redevelopment (HCR)](https://www.homercityredevelopment.com/) and[ Kiewit Power Constructors Co.](https://www.kiewit.com/markets/power/) collaborated to construct this innovative project, which will have seven gas-fired turbines generating up to 4.5 gigawatts of electricity\u2014sufficient to power approximately 3 million households."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Former Homer City Plant to Become a $10 Billion AI Data Center Campus",
    "Current activity is focused on site preparation and the start of above-ground construction, with the first GE Vernova hydrogen-ready turbines expected to arrive later this year."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://laotiantimes.com/2026/03/17/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy-to-compute",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": "2026-03-16T21:34:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*"
   ],
   "locality_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "capacity_gw_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The West Virginia campus is the first state-certified utility grid purpose-built for AI workloads in the United States."
   ],
   "builder_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ],
   "announcement_date_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ]
  },
  {
   "url": "https://ai-buildout-tracker-five.vercel.app",
   "title": "US AI Infrastructure Buildout Tracker",
   "published_at": null,
   "project": "Meta Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "",
   "status": "Building",
   "announcement_date": null,
   "project_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Meta Hyperion, LA: $27B / 5GW \u2014 largest private investment in Louisiana history"
   ],
   "locality_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Meta Hyperion Year 1: $875M in local contracts; grants to 9 Richland Parish schools for STEM labs and VR instruction"
   ],
   "state_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Meta Hyperion, LA: $27B / 5GW \u2014 largest private investment in Louisiana history"
   ],
   "capacity_gw_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Meta Hyperion, LA: $27B / 5GW \u2014 largest private investment in Louisiana history"
   ],
   "builder_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Meta Hyperion, LA: $27B / 5GW \u2014 largest private investment in Louisiana history"
   ],
   "ai_customer_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Meta Hyperion, LA: $27B / 5GW \u2014 largest private investment in Louisiana history"
   ],
   "status_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "BUILDING\n\nMeta Hyperion\n\nMeta \u00b7 LA\n\n$27B5,000MW"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://ai-buildout-tracker-five.vercel.app",
   "title": "US AI Infrastructure Buildout Tracker",
   "published_at": null,
   "project": "xAI Southaven",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "",
   "status": "Building",
   "announcement_date": null,
   "project_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "xAI Southaven, MS: $20B / 2GW / 1M GPU target \u2014 largest xAI project ever announced"
   ],
   "locality_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "xAI Southaven, MS: $20B / 2GW / 1M GPU target \u2014 largest xAI project ever announced"
   ],
   "state_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "xAI Southaven, MS: $20B / 2GW / 1M GPU target \u2014 largest xAI project ever announced"
   ],
   "capacity_gw_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "xAI Southaven, MS: $20B / 2GW / 1M GPU target \u2014 largest xAI project ever announced"
   ],
   "builder_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "xAI Southaven, MS: $20B / 2GW / 1M GPU target \u2014 largest xAI project ever announced"
   ],
   "ai_customer_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "xAI Southaven, MS: $20B / 2GW / 1M GPU target \u2014 largest xAI project ever announced"
   ],
   "status_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "BUILDING\n\nxAI Southaven\n\nxAI \u00b7 MS\n\n$20B2,000MW"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://ai-buildout-tracker-five.vercel.app",
   "title": "US AI Infrastructure Buildout Tracker",
   "published_at": null,
   "project": "Stargate Michigan",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "OpenAI / Oracle",
   "ai_customer": "OpenAI",
   "status": "Building",
   "announcement_date": null,
   "project_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Stargate Michigan: $45B+ / 1GW / 2,500 union construction jobs / 450+ permanent \u2014 Saline Township, Washtenaw County"
   ],
   "locality_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Stargate Michigan: $45B+ / 1GW / 2,500 union construction jobs / 450+ permanent \u2014 Saline Township, Washtenaw County"
   ],
   "state_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Stargate Michigan: $45B+ / 1GW / 2,500 union construction jobs / 450+ permanent \u2014 Saline Township, Washtenaw County"
   ],
   "capacity_gw_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Stargate Michigan: $45B+ / 1GW / 2,500 union construction jobs / 450+ permanent \u2014 Saline Township, Washtenaw County"
   ],
   "builder_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "BUILDING\n\nStargate Michigan\n\nOpenAI/Oracle \u00b7 MI\n\n$45B+1,000MW"
   ],
   "ai_customer_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "BUILDING\n\nStargate Michigan\n\nOpenAI/Oracle \u00b7 MI\n\n$45B+1,000MW"
   ],
   "status_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "BUILDING\n\nStargate Michigan\n\nOpenAI/Oracle \u00b7 MI\n\n$45B+1,000MW"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://ai-buildout-tracker-five.vercel.app",
   "title": "US AI Infrastructure Buildout Tracker",
   "published_at": null,
   "project": "Stargate Lordstown",
   "locality": "Lordstown",
   "state": "Ohio",
   "capacity_gw": 1.5,
   "builder": "OpenAI / Oracle / SoftBank",
   "ai_customer": "OpenAI",
   "status": "Building",
   "announcement_date": null,
   "project_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Stargate Lordstown, OH: 600MW (\u21921.5GW) \u2014 former GM plant repurposed; SoftBank $3B; on track for 2026 operations"
   ],
   "locality_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Stargate Lordstown, OH: 600MW (\u21921.5GW) \u2014 former GM plant repurposed; SoftBank $3B; on track for 2026 operations"
   ],
   "state_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Stargate Lordstown, OH: 600MW (\u21921.5GW) \u2014 former GM plant repurposed; SoftBank $3B; on track for 2026 operations"
   ],
   "capacity_gw_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Stargate Lordstown, OH: 600MW (\u21921.5GW) \u2014 former GM plant repurposed; SoftBank $3B; on track for 2026 operations"
   ],
   "builder_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "BUILDING\n\nStargate Lordstown\n\nOpenAI/Oracle/SoftBank \u00b7 OH\n\n$3B600MW"
   ],
   "ai_customer_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "BUILDING\n\nStargate Lordstown\n\nOpenAI/Oracle/SoftBank \u00b7 OH\n\n$3B600MW"
   ],
   "status_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "BUILDING\n\nStargate Lordstown\n\nOpenAI/Oracle/SoftBank \u00b7 OH\n\n$3B600MW"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://ai-buildout-tracker-five.vercel.app",
   "title": "US AI Infrastructure Buildout Tracker",
   "published_at": null,
   "project": "Stargate Milam County",
   "locality": "Milam County",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "OpenAI / Oracle / SB Energy",
   "ai_customer": "OpenAI",
   "status": "Building",
   "announcement_date": null,
   "project_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Stargate Milam County, TX: 1.2GW / SB Energy \u2014 $1B phase 1 infra; 595 acres; first facilities entering service 2026"
   ],
   "locality_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Stargate Milam County, TX: 1.2GW / SB Energy \u2014 $1B phase 1 infra; 595 acres; first facilities entering service 2026"
   ],
   "state_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Stargate Milam County, TX: 1.2GW / SB Energy \u2014 $1B phase 1 infra; 595 acres; first facilities entering service 2026"
   ],
   "capacity_gw_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Stargate Milam County, TX: 1.2GW / SB Energy \u2014 $1B phase 1 infra; 595 acres; first facilities entering service 2026"
   ],
   "builder_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "BUILDING\n\nStargate Milam County\n\nOpenAI/Oracle/SB Energy \u00b7 TX\n\n$1B+1,200MW"
   ],
   "ai_customer_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "BUILDING\n\nStargate Milam County\n\nOpenAI/Oracle/SB Energy \u00b7 TX\n\n$1B+1,200MW"
   ],
   "status_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "BUILDING\n\nStargate Milam County\n\nOpenAI/Oracle/SB Energy \u00b7 TX\n\n$1B+1,200MW"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://ai-buildout-tracker-five.vercel.app",
   "title": "US AI Infrastructure Buildout Tracker",
   "published_at": null,
   "project": "Vantage Frontier",
   "locality": "",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage",
   "ai_customer": "",
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "PLANNED\n\nVantage Frontier TX\n\nVantage \u00b7 TX\n\n$25B1,400MW"
   ],
   "locality_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "PLANNED\n\nVantage Frontier TX\n\nVantage \u00b7 TX\n\n$25B1,400MW"
   ],
   "state_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "PLANNED\n\nVantage Frontier TX\n\nVantage \u00b7 TX\n\n$25B1,400MW"
   ],
   "capacity_gw_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "PLANNED\n\nVantage Frontier TX\n\nVantage \u00b7 TX\n\n$25B1,400MW"
   ],
   "builder_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "PLANNED\n\nVantage Frontier TX\n\nVantage \u00b7 TX\n\n$25B1,400MW"
   ],
   "ai_customer_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "PLANNED\n\nVantage Frontier TX\n\nVantage \u00b7 TX\n\n$25B1,400MW"
   ],
   "status_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "PLANNED\n\nVantage Frontier TX\n\nVantage \u00b7 TX\n\n$25B1,400MW"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://ai-buildout-tracker-five.vercel.app",
   "title": "US AI Infrastructure Buildout Tracker",
   "published_at": null,
   "project": "Creekstone Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 9.7,
   "builder": "Creekstone Energy",
   "ai_customer": "",
   "status": "Building",
   "announcement_date": null,
   "project_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Creekstone Delta Gigasite: $17B / 9,700 MW \u2014 Millard County, UT; nuclear + solar + gas hybrid; Utah Gov confirmed; construction underway"
   ],
   "locality_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Creekstone Delta Gigasite: $17B / 9,700 MW \u2014 Millard County, UT; nuclear + solar + gas hybrid; Utah Gov confirmed; construction underway"
   ],
   "state_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Creekstone Delta Gigasite: $17B / 9,700 MW \u2014 Millard County, UT; nuclear + solar + gas hybrid; Utah Gov confirmed; construction underway"
   ],
   "capacity_gw_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Creekstone Delta Gigasite: $17B / 9,700 MW \u2014 Millard County, UT; nuclear + solar + gas hybrid; Utah Gov confirmed; construction underway"
   ],
   "builder_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "BUILDING\n\nDelta Gigasite\n\nCreekstone Energy \u00b7 UT\n\n$17B9,700MW"
   ],
   "ai_customer_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "BUILDING\n\nDelta Gigasite\n\nCreekstone Energy \u00b7 UT\n\n$17B9,700MW"
   ],
   "status_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "BUILDING\n\nDelta Gigasite\n\nCreekstone Energy \u00b7 UT\n\n$17B9,700MW"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://ai-buildout-tracker-five.vercel.app",
   "title": "US AI Infrastructure Buildout Tracker",
   "published_at": null,
   "project": "Nscale Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale / Microsoft",
   "ai_customer": "Microsoft",
   "status": "Building",
   "announcement_date": null,
   "project_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Nscale Monarch Compute Campus: 8GW / Mason County WV \u2014 Microsoft signed 1.35GW LOI; NVIDIA Vera Rubin NVL72 GPUs; nation's first state-certified AI microgrid"
   ],
   "locality_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Nscale Monarch Compute Campus: 8GW / Mason County WV \u2014 Microsoft signed 1.35GW LOI; NVIDIA Vera Rubin NVL72 GPUs; nation's first state-certified AI microgrid"
   ],
   "state_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Nscale Monarch Compute Campus: 8GW / Mason County WV \u2014 Microsoft signed 1.35GW LOI; NVIDIA Vera Rubin NVL72 GPUs; nation's first state-certified AI microgrid"
   ],
   "capacity_gw_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Nscale Monarch Compute Campus: 8GW / Mason County WV \u2014 Microsoft signed 1.35GW LOI; NVIDIA Vera Rubin NVL72 GPUs; nation's first state-certified AI microgrid"
   ],
   "builder_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "BUILDING\n\nMonarch Compute Campus\n\nNscale / Microsoft \u00b7 WV\n\nTBD8,000MW"
   ],
   "ai_customer_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Nscale Monarch Compute Campus: 8GW / Mason County WV \u2014 Microsoft signed 1.35GW LOI; NVIDIA Vera Rubin NVL72 GPUs; nation's first state-certified AI microgrid"
   ],
   "status_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "BUILDING\n\nMonarch Compute Campus\n\nNscale / Microsoft \u00b7 WV\n\nTBD8,000MW"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://ai-buildout-tracker-five.vercel.app",
   "title": "US AI Infrastructure Buildout Tracker",
   "published_at": null,
   "project": "Nexus Hubbard Campus",
   "locality": "Hubbard",
   "state": "Texas",
   "capacity_gw": 7.2,
   "builder": "Nexus Data Centers",
   "ai_customer": "",
   "status": "Building",
   "announcement_date": null,
   "project_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Nexus Data Centers Hubbard, TX: $50M community partnership fund for Hill County \u2014 construction underway; 600MW Phase 1 / 7.2GW expansion potential"
   ],
   "locality_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Nexus Data Centers Hubbard, TX: $50M community partnership fund for Hill County \u2014 construction underway; 600MW Phase 1 / 7.2GW expansion potential"
   ],
   "state_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Nexus Data Centers Hubbard, TX: $50M community partnership fund for Hill County \u2014 construction underway; 600MW Phase 1 / 7.2GW expansion potential"
   ],
   "capacity_gw_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Nexus Data Centers Hubbard, TX: $50M community partnership fund for Hill County \u2014 construction underway; 600MW Phase 1 / 7.2GW expansion potential"
   ],
   "builder_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "BUILDING\n\nNexus Hubbard Campus\n\nNexus Data Centers \u00b7 TX\n\nTBD600MW"
   ],
   "ai_customer_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "BUILDING\n\nNexus Hubbard Campus\n\nNexus Data Centers \u00b7 TX\n\nTBD600MW"
   ],
   "status_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "BUILDING\n\nNexus Hubbard Campus\n\nNexus Data Centers \u00b7 TX\n\nTBD600MW"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://ai-buildout-tracker-five.vercel.app",
   "title": "US AI Infrastructure Buildout Tracker",
   "published_at": null,
   "project": "PORTS Tech Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 10.0,
   "builder": "SoftBank / AEP Ohio",
   "ai_customer": "",
   "status": "Building",
   "announcement_date": "2026-03-01",
   "project_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "SoftBank PORTS Campus, Pike County OH: 10GW / $500B potential \u2014 world's largest proposed AI data center; 35,000 construction jobs, 2,500 permanent; DOE public-private partnership; groundbreaking March 2026"
   ],
   "locality_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "SoftBank PORTS Campus, Pike County OH: 10GW / $500B potential \u2014 world's largest proposed AI data center; 35,000 construction jobs, 2,500 permanent; DOE public-private partnership; groundbreaking March 2026"
   ],
   "state_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "SoftBank PORTS Campus, Pike County OH: 10GW / $500B potential \u2014 world's largest proposed AI data center; 35,000 construction jobs, 2,500 permanent; DOE public-private partnership; groundbreaking March 2026"
   ],
   "capacity_gw_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "SoftBank PORTS Campus, Pike County OH: 10GW / $500B potential \u2014 world's largest proposed AI data center; 35,000 construction jobs, 2,500 permanent; DOE public-private partnership; groundbreaking March 2026"
   ],
   "builder_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "BUILDING\n\nPORTS Tech Campus\n\nSoftBank / AEP Ohio \u00b7 OH\n\n$33B+10,000MW"
   ],
   "ai_customer_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "BUILDING\n\nPORTS Tech Campus\n\nSoftBank / AEP Ohio \u00b7 OH\n\n$33B+10,000MW"
   ],
   "status_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "BUILDING\n\nPORTS Tech Campus\n\nSoftBank / AEP Ohio \u00b7 OH\n\n$33B+10,000MW"
   ],
   "announcement_date_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "SoftBank PORTS Campus, Pike County OH: 10GW / $500B potential \u2014 world's largest proposed AI data center; 35,000 construction jobs, 2,500 permanent; DOE public-private partnership; groundbreaking March 2026"
   ]
  },
  {
   "url": "https://ai-buildout-tracker-five.vercel.app",
   "title": "US AI Infrastructure Buildout Tracker",
   "published_at": null,
   "project": "Stargate Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "OpenAI / Oracle",
   "ai_customer": "OpenAI",
   "status": "Online",
   "announcement_date": null,
   "project_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "LIVE: Stargate Abilene \u2014 200MW operational, 1,000MW under construction in Abilene, TX"
   ],
   "locality_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "LIVE: Stargate Abilene \u2014 200MW operational, 1,000MW under construction in Abilene, TX"
   ],
   "state_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "LIVE: Stargate Abilene \u2014 200MW operational, 1,000MW under construction in Abilene, TX"
   ],
   "capacity_gw_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Stargate Abilene: 4 of 8 buildings operational, ~300MW live \u2014 full 1,200MW campus on track"
   ],
   "builder_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "ONLINE\n\nStargate Abilene\n\nOpenAI/Oracle \u00b7 TX\n\n$3.5B1,200MW"
   ],
   "ai_customer_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "ONLINE\n\nStargate Abilene\n\nOpenAI/Oracle \u00b7 TX\n\n$3.5B1,200MW"
   ],
   "status_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "ONLINE\n\nStargate Abilene\n\nOpenAI/Oracle \u00b7 TX\n\n$3.5B1,200MW"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://ai-buildout-tracker-five.vercel.app",
   "title": "US AI Infrastructure Buildout Tracker",
   "published_at": null,
   "project": "Loudoun Cluster",
   "locality": "Loudoun County",
   "state": "Virginia",
   "capacity_gw": 4.0,
   "builder": "Multi-tenant",
   "ai_customer": "",
   "status": "Online",
   "announcement_date": null,
   "project_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "ONLINE\n\nLoudoun Cluster\n\nMulti-tenant \u00b7 VA\n\nN/D4,000MW"
   ],
   "locality_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Loudoun County, VA: 38% of county general fund generated from 3% of its land (26:1 fiscal ratio)"
   ],
   "state_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "Loudoun County, VA: 38% of county general fund generated from 3% of its land (26:1 fiscal ratio)"
   ],
   "capacity_gw_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "ONLINE\n\nLoudoun Cluster\n\nMulti-tenant \u00b7 VA\n\nN/D4,000MW"
   ],
   "builder_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "ONLINE\n\nLoudoun Cluster\n\nMulti-tenant \u00b7 VA\n\nN/D4,000MW"
   ],
   "ai_customer_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "ONLINE\n\nLoudoun Cluster\n\nMulti-tenant \u00b7 VA\n\nN/D4,000MW"
   ],
   "status_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "ONLINE\n\nLoudoun Cluster\n\nMulti-tenant \u00b7 VA\n\nN/D4,000MW"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://ai-buildout-tracker-five.vercel.app",
   "title": "US AI Infrastructure Buildout Tracker",
   "published_at": null,
   "project": "MARA Long Ridge AI",
   "locality": "",
   "state": "",
   "capacity_gw": 1.0,
   "builder": "MARA / Starwood",
   "ai_customer": "",
   "status": "Announced",
   "announcement_date": null,
   "project_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "ANNOUNCED\n\nMARA Long Ridge AI (ex-BTC)\n\nMARA / Starwood \u00b7 Multi\n\n$1.5B+1,000MW"
   ],
   "locality_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "ANNOUNCED\n\nMARA Long Ridge AI (ex-BTC)\n\nMARA / Starwood \u00b7 Multi\n\n$1.5B+1,000MW"
   ],
   "state_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "ANNOUNCED\n\nMARA Long Ridge AI (ex-BTC)\n\nMARA / Starwood \u00b7 Multi\n\n$1.5B+1,000MW"
   ],
   "capacity_gw_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "ANNOUNCED\n\nMARA Long Ridge AI (ex-BTC)\n\nMARA / Starwood \u00b7 Multi\n\n$1.5B+1,000MW"
   ],
   "builder_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "ANNOUNCED\n\nMARA Long Ridge AI (ex-BTC)\n\nMARA / Starwood \u00b7 Multi\n\n$1.5B+1,000MW"
   ],
   "ai_customer_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "ANNOUNCED\n\nMARA Long Ridge AI (ex-BTC)\n\nMARA / Starwood \u00b7 Multi\n\n$1.5B+1,000MW"
   ],
   "status_evidence": [
    "Project Status Board",
    "Real-time status of major US AI data center projects by construction stage. Green = operational. Amber = under construction. Grey = planned or announced.",
    "ANNOUNCED\n\nMARA Long Ridge AI (ex-BTC)\n\nMARA / Starwood \u00b7 Multi\n\n$1.5B+1,000MW"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://pivotnews.ai/energy/edition/2026-05-21",
   "title": "Utah county approves 9GW Stratos AI data center on 40,000 acres",
   "published_at": "2026-05-21T00:00:00",
   "project": "Stratos",
   "locality": "Hansel Valley",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "Kevin O'Leary",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": "2026-05-21",
   "project_evidence": [
    "# Utah county approves 9GW Stratos AI data center on 40,000 acres",
    "## [Utah county approves 9GW Stratos AI data center on 40,000 acres](/energy/stratos-data-center-utah-backlash?utm_source=pivot_energy&utm_medium=email&utm_campaign=2026-05-21&utm_content=feature_1&pn_channel=newsletter)",
    "Box Elder County signed off on the Stratos Project, a 40,000-acre AI data center in Hansel Valley backed by Kevin O'Leary, with projected load of 9GW across the site."
   ],
   "locality_evidence": [
    "# Utah county approves 9GW Stratos AI data center on 40,000 acres",
    "## [Utah county approves 9GW Stratos AI data center on 40,000 acres](/energy/stratos-data-center-utah-backlash?utm_source=pivot_energy&utm_medium=email&utm_campaign=2026-05-21&utm_content=feature_1&pn_channel=newsletter)",
    "Box Elder County signed off on the Stratos Project, a 40,000-acre AI data center in Hansel Valley backed by Kevin O'Leary, with projected load of 9GW across the site."
   ],
   "state_evidence": [
    "# Utah county approves 9GW Stratos AI data center on 40,000 acres",
    "## [Utah county approves 9GW Stratos AI data center on 40,000 acres](/energy/stratos-data-center-utah-backlash?utm_source=pivot_energy&utm_medium=email&utm_campaign=2026-05-21&utm_content=feature_1&pn_channel=newsletter)",
    "Box Elder commissioners cleared a Manhattan-sized campus drawing nearly twice Utah's peak power demand from already strained water and grid resources.",
    "Box Elder County signed off on the Stratos Project, a 40,000-acre AI data center in Hansel Valley backed by Kevin O'Leary, with projected load of 9GW across the site."
   ],
   "capacity_gw_evidence": [
    "# Utah county approves 9GW Stratos AI data center on 40,000 acres",
    "## [Utah county approves 9GW Stratos AI data center on 40,000 acres](/energy/stratos-data-center-utah-backlash?utm_source=pivot_energy&utm_medium=email&utm_campaign=2026-05-21&utm_content=feature_1&pn_channel=newsletter)",
    "Box Elder County signed off on the Stratos Project, a 40,000-acre AI data center in Hansel Valley backed by Kevin O'Leary, with projected load of 9GW across the site."
   ],
   "builder_evidence": [
    "# Utah county approves 9GW Stratos AI data center on 40,000 acres",
    "## [Utah county approves 9GW Stratos AI data center on 40,000 acres](/energy/stratos-data-center-utah-backlash?utm_source=pivot_energy&utm_medium=email&utm_campaign=2026-05-21&utm_content=feature_1&pn_channel=newsletter)",
    "Box Elder County signed off on the Stratos Project, a 40,000-acre AI data center in Hansel Valley backed by Kevin O'Leary, with projected load of 9GW across the site."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Utah county approves 9GW Stratos AI data center on 40,000 acres",
    "## [Utah county approves 9GW Stratos AI data center on 40,000 acres](/energy/stratos-data-center-utah-backlash?utm_source=pivot_energy&utm_medium=email&utm_campaign=2026-05-21&utm_content=feature_1&pn_channel=newsletter)",
    "Box Elder County signed off on the Stratos Project, a 40,000-acre AI data center in Hansel Valley backed by Kevin O'Leary, with projected load of 9GW across the site."
   ],
   "announcement_date_evidence": [
    "May 21, 2026By Amara Diallo",
    "# Utah county approves 9GW Stratos AI data center on 40,000 acres",
    "## [Utah county approves 9GW Stratos AI data center on 40,000 acres](/energy/stratos-data-center-utah-backlash?utm_source=pivot_energy&utm_medium=email&utm_campaign=2026-05-21&utm_content=feature_1&pn_channel=newsletter)"
   ]
  },
  {
   "url": "https://tun.com/home/openai-project-camellia-georgia-students-get-free-codex-credits",
   "title": "OpenAI Project Camellia: Georgia Students Get Free Codex Credits",
   "published_at": "2026-07-23T11:22:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": null,
   "status": "developing",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "# OpenAI Project Camellia: Georgia Students Get Free Codex Credits",
    "OpenAI announced Project Camellia, a massive datacenter in Effingham County, Georgia, backed by 3.2 gigawatts of power.",
    "OpenAI announced on July 22, 2026, that it is developing Project Camellia, a large-scale datacenter campus in Effingham County, Georgia."
   ],
   "locality_evidence": [
    "# OpenAI Project Camellia: Georgia Students Get Free Codex Credits",
    "OpenAI announced Project Camellia, a massive datacenter in Effingham County, Georgia, backed by 3.2 gigawatts of power.",
    "OpenAI announced on July 22, 2026, that it is developing Project Camellia, a large-scale datacenter campus in Effingham County, Georgia."
   ],
   "state_evidence": [
    "# OpenAI Project Camellia: Georgia Students Get Free Codex Credits",
    "OpenAI announced Project Camellia, a massive datacenter in Effingham County, Georgia, backed by 3.2 gigawatts of power.",
    "OpenAI announced on July 22, 2026, that it is developing Project Camellia, a large-scale datacenter campus in Effingham County, Georgia."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Project Camellia: Georgia Students Get Free Codex Credits",
    "OpenAI announced Project Camellia, a massive datacenter in Effingham County, Georgia, backed by 3.2 gigawatts of power.",
    "The company has contracted with Georgia Power for 3.2 gigawatts of electricity \u2014 enough to rank among the largest single power agreements for an AI facility in the U.S. \u2014 with delivery phased between 2028 and 2032."
   ],
   "builder_evidence": [
    "# OpenAI Project Camellia: Georgia Students Get Free Codex Credits",
    "OpenAI announced Project Camellia, a massive datacenter in Effingham County, Georgia, backed by 3.2 gigawatts of power.",
    "OpenAI announced on July 22, 2026, that it is developing Project Camellia, a large-scale datacenter campus in Effingham County, Georgia."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# OpenAI Project Camellia: Georgia Students Get Free Codex Credits",
    "OpenAI announced on July 22, 2026, that it is developing Project Camellia, a large-scale datacenter campus in Effingham County, Georgia."
   ],
   "announcement_date_evidence": [
    "# OpenAI Project Camellia: Georgia Students Get Free Codex Credits",
    "OpenAI announced on July 22, 2026, that it is developing Project Camellia, a large-scale datacenter campus in Effingham County, Georgia."
   ]
  },
  {
   "url": "https://archynewsy.com/google-data-centers-2-7gw-clean-energy-plan-for-michigan-ai-expansion",
   "title": "Google Data Centers: 2.7GW Clean Energy Plan for Michigan & AI Expansion - Archynewsy",
   "published_at": "2026-03-17T21:24:07",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Google",
   "ai_customer": "Google",
   "status": "evaluating",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Google\u2019s $2.7 Billion Michigan Data Center Deal Signals Recent Era for Clean Energy and Grid Reliability",
    "## Project Cannoli and Site Evaluation",
    "The potential site for the data center is a 280-acre parcel in Van Buren Township, currently dubbed \u201cProject Cannoli.\u201d"
   ],
   "locality_evidence": [
    "# Google\u2019s $2.7 Billion Michigan Data Center Deal Signals Recent Era for Clean Energy and Grid Reliability",
    "## Partnership with DTE Energy",
    "Google will work with DTE to add 2.7 gigawatts (GW) of new energy resources to the grid, specifically targeting the area surrounding a potential data center location in Van Buren Township, west of Detroit Metropolitan Airport [[1]](https://www.bridgemi.com/michigan-environment-watch/google-inks-deal-with-dte-energy-for-another-southeast-michigan-data-center/). The proposed data center itself is expected to require 1",
    "## Project Cannoli and Site Evaluation",
    "The potential site for the data center is a 280-acre parcel in Van Buren Township, currently dubbed \u201cProject Cannoli.\u201d"
   ],
   "state_evidence": [
    "# Google\u2019s $2.7 Billion Michigan Data Center Deal Signals Recent Era for Clean Energy and Grid Reliability",
    "Google is forging ahead with plans to develop a new data center in Michigan, backed by a significant $2.7 billion investment in clean energy resources."
   ],
   "capacity_gw_evidence": [
    "# Google\u2019s $2.7 Billion Michigan Data Center Deal Signals Recent Era for Clean Energy and Grid Reliability",
    "## Partnership with DTE Energy",
    "The proposed data center itself is expected to require 1 GW of power."
   ],
   "builder_evidence": [
    "# Google\u2019s $2.7 Billion Michigan Data Center Deal Signals Recent Era for Clean Energy and Grid Reliability",
    "Google is forging ahead with plans to develop a new data center in Michigan, backed by a significant $2.7 billion investment in clean energy resources."
   ],
   "ai_customer_evidence": [
    "# Google\u2019s $2.7 Billion Michigan Data Center Deal Signals Recent Era for Clean Energy and Grid Reliability",
    "This initiative, announced on Tuesday, March 17, 2026, represents a strategic move to power its growing cloud services and AI operations although bolstering the state\u2019s grid reliability and advancing its clean energy transition."
   ],
   "status_evidence": [
    "# Google\u2019s $2.7 Billion Michigan Data Center Deal Signals Recent Era for Clean Energy and Grid Reliability",
    "## Project Cannoli and Site Evaluation",
    "Google is currently evaluating the site and will provide updates to the community as plans progress [[2]](https://www.bridgemi.com/michigan-environment-watch/google-inks-deal-with-dte-energy-for-another-southeast-michigan-data-center/), [ [3]](https://www.mlive.com/news/ann-arbor/2026/03/google-revealed-as-backer-for-data-center-project-west-of-detroit.html),"
   ],
   "announcement_date_evidence": [
    "# Google\u2019s $2.7 Billion Michigan Data Center Deal Signals Recent Era for Clean Energy and Grid Reliability",
    "This initiative, announced on Tuesday, March 17, 2026, represents a strategic move to power its growing cloud services and AI operations although bolstering the state\u2019s grid reliability and advancing its clean energy transition."
   ]
  },
  {
   "url": "https://gate.com/news/detail/terawulf-announces-a-1gw-ai-park-in-kentucky-shares-rise-10-21412624",
   "title": "TeraWulf announces a 1GW AI park in Kentucky, shares rise 10%",
   "published_at": "2026-05-27T02:30:31",
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-26",
   "project_evidence": [
    "TeraWulf announced on May 26 that it has acquired 285 acres of land in eastern Kentucky, naming it the \u201cMuskie Data Campus,\u201d with plans to build more than 1GW of artificial intelligence (AI) and high-performance computing (HPC) capacity."
   ],
   "locality_evidence": [
    "TeraWulf announced on May 26 that it has acquired 285 acres of land in eastern Kentucky, naming it the \u201cMuskie Data Campus,\u201d with plans to build more than 1GW of artificial intelligence (AI) and high-performance computing (HPC) capacity."
   ],
   "state_evidence": [
    "TeraWulf announced on May 26 that it has acquired 285 acres of land in eastern Kentucky, naming it the \u201cMuskie Data Campus,\u201d with plans to build more than 1GW of artificial intelligence (AI) and high-performance computing (HPC) capacity."
   ],
   "capacity_gw_evidence": [
    "TeraWulf announced on May 26 that it has acquired 285 acres of land in eastern Kentucky, naming it the \u201cMuskie Data Campus,\u201d with plans to build more than 1GW of artificial intelligence (AI) and high-performance computing (HPC) capacity.",
    "\u4f9d\u516c\u53f8\u516c\u544a\uff0cMuskie \u8cc7\u6599\u5712\u5340\u5c07\u5206\u5169\u671f\u5efa\u8a2d\uff1a\u9996\u6279 500 \u5146\u74e6\uff08MW\uff09\u8a08\u5283\u65bc 2028 \u5e74\u4e0b\u534a\u5e74\u5b8c\u6210\uff1b\u53e6\u5916 500 \u5146\u74e6\u8a08\u5283\u65bc 2030 \u5e74\u4e0b\u534a\u5e74\u5b8c\u6210\uff0c\u5169\u671f\u5408\u8a08\u9054 1GW\u3002"
   ],
   "builder_evidence": [
    "TeraWulf announced on May 26 that it has acquired 285 acres of land in eastern Kentucky, naming it the \u201cMuskie Data Campus,\u201d with plans to build more than 1GW of artificial intelligence (AI) and high-performance computing (HPC) capacity."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "TeraWulf announced on May 26 that it has acquired 285 acres of land in eastern Kentucky, naming it the \u201cMuskie Data Campus,\u201d with plans to build more than 1GW of artificial intelligence (AI) and high-performance computing (HPC) capacity.",
    "\u4f9d\u516c\u53f8\u516c\u544a\uff0cMuskie \u8cc7\u6599\u5712\u5340\u5c07\u5206\u5169\u671f\u5efa\u8a2d\uff1a\u9996\u6279 500 \u5146\u74e6\uff08MW\uff09\u8a08\u5283\u65bc 2028 \u5e74\u4e0b\u534a\u5e74\u5b8c\u6210\uff1b\u53e6\u5916 500 \u5146\u74e6\u8a08\u5283\u65bc 2030 \u5e74\u4e0b\u534a\u5e74\u5b8c\u6210\uff0c\u5169\u671f\u5408\u8a08\u9054 1GW\u3002"
   ],
   "announcement_date_evidence": [
    "TeraWulf announced on May 26 that it has acquired 285 acres of land in eastern Kentucky, naming it the \u201cMuskie Data Campus,\u201d with plans to build more than 1GW of artificial intelligence (AI) and high-performance computing (HPC) capacity."
   ]
  },
  {
   "url": "https://peoplearegeek.com/articles/hut-8-beacon-point-1gw-ai-datacenter",
   "title": "Hut 8 Fully Contracts Its 1 Gigawatt Beacon Point AI Campus",
   "published_at": "2026-07-21T00:00:00",
   "project": "Beacon Point",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "fully commercialized",
   "announcement_date": "2026-07-20",
   "project_evidence": [
    "NetworkNews",
    "# Hut 8 Fully Contracts Its 1 Gigawatt Beacon Point AI Campus",
    "Hut 8 signed a second lease at its Beacon Point campus in Texas on Monday, July 20, 2026, and the deal finishes what the first one started."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "NetworkNews",
    "# Hut 8 Fully Contracts Its 1 Gigawatt Beacon Point AI Campus",
    "Hut 8 signed a second lease at its Beacon Point campus in Texas on Monday, July 20, 2026, and the deal finishes what the first one started."
   ],
   "capacity_gw_evidence": [
    "NetworkNews",
    "# Hut 8 Fully Contracts Its 1 Gigawatt Beacon Point AI Campus",
    "The new 15-year agreement covers 352 megawatts of IT capacity with a base-term value of 9.8 billion dollars, and it fully commercializes the roughly 1 gigawatt site."
   ],
   "builder_evidence": [
    "NetworkNews",
    "# Hut 8 Fully Contracts Its 1 Gigawatt Beacon Point AI Campus",
    "Hut 8 signed a second lease at its Beacon Point campus in Texas on Monday, July 20, 2026, and the deal finishes what the first one started."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "NetworkNews",
    "# Hut 8 Fully Contracts Its 1 Gigawatt Beacon Point AI Campus",
    "The new 15-year agreement covers 352 megawatts of IT capacity with a base-term value of 9.8 billion dollars, and it fully commercializes the roughly 1 gigawatt site."
   ],
   "announcement_date_evidence": [
    "NetworkNews",
    "# Hut 8 Fully Contracts Its 1 Gigawatt Beacon Point AI Campus",
    "Hut 8 signed a second lease at its Beacon Point campus in Texas on Monday, July 20, 2026, and the deal finishes what the first one started."
   ]
  },
  {
   "url": "https://newsblaze.com.au/globenewswire_gnw_id-3043594_language_en",
   "title": "GlobeNewswire - NewsBlaze Australia",
   "published_at": "2021-03-19T13:26:36",
   "project": "Sweetwater",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "advancing",
   "announcement_date": "2025-03-17",
   "project_evidence": [
    "### IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "IREN Limited (NASDAQ: IREN) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "locality_evidence": [
    "### IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "IREN Limited (NASDAQ: IREN) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "state_evidence": [
    "### IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "IREN Limited (NASDAQ: IREN) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "capacity_gw_evidence": [
    "### IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "IREN Limited (NASDAQ: IREN) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "builder_evidence": [
    "### IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "IREN Limited (NASDAQ: IREN) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "### IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "IREN Limited (NASDAQ: IREN) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "announcement_date_evidence": [
    "### IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "2025-03-17T11:20:38Z"
   ]
  },
  {
   "url": "https://smbworldreport.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah.",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "capacity_gw_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://finanznachrichten.de/nachrichten-2024-09/63384378-the-hydrogen-stream-ecl-to-build-1-gw-hydrogen-ai-data-center-in-texas-451.htm",
   "title": "The Hydrogen Stream: ECL to build 1 GW hydrogen AI data center in Texas",
   "published_at": null,
   "project": "TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "Under development",
   "announcement_date": null,
   "project_evidence": [
    "ECL says it will build a 1 GW hydrogen-powered AI factory data center in Houston, Texas, with Lambda as its first tenant.",
    "\"The initial phase of TerraSite-TX1 will be delivered in the summer of 2025 at a cost of approximately $450 million, with 50 MW of data center capacity to be utilized by data center cloud and AI cloud operators,\" said the ..."
   ],
   "locality_evidence": [
    "ECL says it will build a 1 GW hydrogen-powered AI factory data center in Houston, Texas, with Lambda as its first tenant.",
    "ECL said it will build the \"first fully sustainable\" 1 GW AI factory data center on a site spanning more than 242. 81 hectares east of Houston, Texas, with Lambda as its first tenant."
   ],
   "state_evidence": [
    "ECL says it will build a 1 GW hydrogen-powered AI factory data center in Houston, Texas, with Lambda as its first tenant.",
    "ECL said it will build the \"first fully sustainable\" 1 GW AI factory data center on a site spanning more than 242. 81 hectares east of Houston, Texas, with Lambda as its first tenant."
   ],
   "capacity_gw_evidence": [
    "ECL says it will build a 1 GW hydrogen-powered AI factory data center in Houston, Texas, with Lambda as its first tenant.",
    "ECL said it will build the \"first fully sustainable\" 1 GW AI factory data center on a site spanning more than 242. 81 hectares east of Houston, Texas, with Lambda as its first tenant."
   ],
   "builder_evidence": [
    "ECL says it will build a 1 GW hydrogen-powered AI factory data center in Houston, Texas, with Lambda as its first tenant.",
    "ECL said it will build the \"first fully sustainable\" 1 GW AI factory data center on a site spanning more than 242. 81 hectares east of Houston, Texas, with Lambda as its first tenant."
   ],
   "ai_customer_evidence": [
    "ECL says it will build a 1 GW hydrogen-powered AI factory data center in Houston, Texas, with Lambda as its first tenant.",
    "ECL said it will build the \"first fully sustainable\" 1 GW AI factory data center on a site spanning more than 242. 81 hectares east of Houston, Texas, with Lambda as its first tenant."
   ],
   "status_evidence": [
    "ECL says it will build a 1 GW hydrogen-powered AI factory data center in Houston, Texas, with Lambda as its first tenant.",
    "The initial $450 million phase is scheduled for completion in summer 2025."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aimidday.com/openai-leases-8gw-ohio-campus-at-old-uranium-plant",
   "title": "OpenAI leases 8GW Ohio campus at old uranium plant",
   "published_at": "2026-08-19T00:52:50",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "signed",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI leases 8GW Ohio campus at old uranium plant",
    "OpenAI has signed a 20-year lease on SB Energy's PORTS-Pike Technology Campus in Pike County, Ohio \u2014 up to eight gigawatts of AI capacity on the decommissioned Portsmouth Gaseous Diffusion Plant, with Nvidia as the exclusive compute supplier."
   ],
   "locality_evidence": [
    "# OpenAI leases 8GW Ohio campus at old uranium plant",
    "OpenAI has signed a 20-year lease on SB Energy's PORTS-Pike Technology Campus in Pike County, Ohio \u2014 up to eight gigawatts of AI capacity on the decommissioned Portsmouth Gaseous Diffusion Plant, with Nvidia as the exclusive compute supplier."
   ],
   "state_evidence": [
    "# OpenAI leases 8GW Ohio campus at old uranium plant",
    "OpenAI has signed a 20-year lease on SB Energy's PORTS-Pike Technology Campus in Pike County, Ohio \u2014 up to eight gigawatts of AI capacity on the decommissioned Portsmouth Gaseous Diffusion Plant, with Nvidia as the exclusive compute supplier."
   ],
   "capacity_gw_evidence": [
    "# OpenAI leases 8GW Ohio campus at old uranium plant",
    "OpenAI has signed a 20-year lease on SB Energy's PORTS-Pike Technology Campus in Pike County, Ohio \u2014 up to eight gigawatts of AI capacity on the decommissioned Portsmouth Gaseous Diffusion Plant, with Nvidia as the exclusive compute supplier."
   ],
   "builder_evidence": [
    "# OpenAI leases 8GW Ohio campus at old uranium plant",
    "OpenAI has signed a 20-year lease on SB Energy's PORTS-Pike Technology Campus in Pike County, Ohio \u2014 up to eight gigawatts of AI capacity on the decommissioned Portsmouth Gaseous Diffusion Plant, with Nvidia as the exclusive compute supplier."
   ],
   "ai_customer_evidence": [
    "# OpenAI leases 8GW Ohio campus at old uranium plant",
    "OpenAI has signed a 20-year lease on SB Energy's PORTS-Pike Technology Campus in Pike County, Ohio \u2014 up to eight gigawatts of AI capacity on the decommissioned Portsmouth Gaseous Diffusion Plant, with Nvidia as the exclusive compute supplier."
   ],
   "status_evidence": [
    "# OpenAI leases 8GW Ohio campus at old uranium plant",
    "OpenAI has signed a 20-year lease on SB Energy's PORTS-Pike Technology Campus in Pike County, Ohio \u2014 up to eight gigawatts of AI capacity on the decommissioned Portsmouth Gaseous Diffusion Plant, with Nvidia as the exclusive compute supplier."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://edgen.tech/es/news/stock/blackrock-and-meta-form-14b-data-center-venture-in-texas",
   "title": "BlackRock and Meta form $14B data center venture in Texas",
   "published_at": "2026-07-28T09:41:43",
   "project": "False",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "BlackRock and Meta",
   "ai_customer": "Meta",
   "status": "under development",
   "announcement_date": "2026-07-28",
   "project_evidence": null,
   "locality_evidence": [
    "# BlackRock and Meta form $14B data center venture in Texas",
    "BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas."
   ],
   "state_evidence": [
    "# BlackRock and Meta form $14B data center venture in Texas",
    "BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas."
   ],
   "capacity_gw_evidence": [
    "# BlackRock and Meta form $14B data center venture in Texas",
    "BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas."
   ],
   "builder_evidence": [
    "# BlackRock and Meta form $14B data center venture in Texas",
    "BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas."
   ],
   "ai_customer_evidence": [
    "# BlackRock and Meta form $14B data center venture in Texas",
    "BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas."
   ],
   "status_evidence": [
    "# BlackRock and Meta form $14B data center venture in Texas",
    "BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas."
   ],
   "announcement_date_evidence": [
    "# BlackRock and Meta form $14B data center venture in Texas",
    "## Rachel Kim](https://www.edgen.tech/es/author/news/rachel-kim)\u00b7Jul 28 2026, 09:41"
   ]
  },
  {
   "url": "https://news.constructconnect.com/meta-expands-louisiana-data-center-to-5gw-lifts-richland-parish-investment-above-50-billion",
   "title": "Meta Expands Louisiana Data Center to 5GW, Lifts Richland Parish Investment Above $50 Billion",
   "published_at": "2026-07-13T19:58:53",
   "project": "Richland Parish campus",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "expanding",
   "announcement_date": "2026-07-13",
   "project_evidence": [
    "In a July 13, 2026, statement, Meta said it is expanding the [Richland Parish campus ](https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/)as part of its global infrastructure buildout and will provide 5 gigawatts of capacity for Hyperion, the company\u2019s largest AI computing campus."
   ],
   "locality_evidence": [
    "In a July 13, 2026, statement, Meta said it is expanding the [Richland Parish campus ](https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/)as part of its global infrastructure buildout and will provide 5 gigawatts of capacity for Hyperion, the company\u2019s largest AI computing campus."
   ],
   "state_evidence": [
    "Meta is expanding its Richland Parish, Louisiana, data center campus, shown in a rendering above, from a 2GW to a 5GW complex for Hyperion, its largest AI training cluster, pushing total investment past $50 billion."
   ],
   "capacity_gw_evidence": [
    "In a July 13, 2026, statement, Meta said it is expanding the [Richland Parish campus ](https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/)as part of its global infrastructure buildout and will provide 5 gigawatts of capacity for Hyperion, the company\u2019s largest AI computing campus."
   ],
   "builder_evidence": [
    "In a July 13, 2026, statement, Meta said it is expanding the [Richland Parish campus ](https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/)as part of its global infrastructure buildout and will provide 5 gigawatts of capacity for Hyperion, the company\u2019s largest AI computing campus."
   ],
   "ai_customer_evidence": [
    "In a July 13, 2026, statement, Meta said it is expanding the [Richland Parish campus ](https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/)as part of its global infrastructure buildout and will provide 5 gigawatts of capacity for Hyperion, the company\u2019s largest AI computing campus."
   ],
   "status_evidence": [
    "In a July 13, 2026, statement, Meta said it is expanding the [Richland Parish campus ](https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/)as part of its global infrastructure buildout and will provide 5 gigawatts of capacity for Hyperion, the company\u2019s largest AI computing campus."
   ],
   "announcement_date_evidence": [
    "In a July 13, 2026, statement, Meta said it is expanding the [Richland Parish campus ](https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/)as part of its global infrastructure buildout and will provide 5 gigawatts of capacity for Hyperion, the company\u2019s largest AI computing campus."
   ]
  },
  {
   "url": "https://winbuzzer.com/2025/10/29/amazon-opens11b-indiana-ai-data-center-with-custom-chips-for-anthropic-xcxwbn",
   "title": "Amazon Opens$11B Indiana AI Data Center with Custom Chips for Anthropic",
   "published_at": "2025-10-29T16:16:01",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon Web Services",
   "ai_customer": "Anthropic",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# Amazon Opens$11B Indiana AI Data Center with Custom Chips for Anthropic",
    "Amazon Web Services has launched Project Rainier, an $11B AI data center in Indiana, using its own Trainium chips to power partner Anthropic and challenge Nvidia.",
    "Against this backdrop, the scale of the Indiana campus is staggering."
   ],
   "locality_evidence": [
    "# Amazon Opens$11B Indiana AI Data Center with Custom Chips for Anthropic",
    "Just over a year ago, the 1,200-acre site in New Carlisle was active farmland.",
    "Against this backdrop, the scale of the Indiana campus is staggering."
   ],
   "state_evidence": [
    "# Amazon Opens$11B Indiana AI Data Center with Custom Chips for Anthropic",
    "Amazon Web Services has launched Project Rainier, an $11B AI data center in Indiana, using its own Trainium chips to power partner Anthropic and challenge Nvidia.",
    "Against this backdrop, the scale of the Indiana campus is staggering."
   ],
   "capacity_gw_evidence": [
    "# Amazon Opens$11B Indiana AI Data Center with Custom Chips for Anthropic",
    "When complete, it will span 30 buildings and draw over 2.2 gigawatts of electricity\u2014enough to power more than 1.6 million homes.",
    "Against this backdrop, the scale of the Indiana campus is staggering."
   ],
   "builder_evidence": [
    "# Amazon Opens$11B Indiana AI Data Center with Custom Chips for Anthropic",
    "Amazon Web Services has launched Project Rainier, an $11B AI data center in Indiana, using its own Trainium chips to power partner Anthropic and challenge Nvidia.",
    "Against this backdrop, the scale of the Indiana campus is staggering."
   ],
   "ai_customer_evidence": [
    "# Amazon Opens$11B Indiana AI Data Center with Custom Chips for Anthropic",
    "Amazon Web Services has launched Project Rainier, an $11B AI data center in Indiana, using its own Trainium chips to power partner Anthropic and challenge Nvidia.",
    "Against this backdrop, the scale of the Indiana campus is staggering."
   ],
   "status_evidence": [
    "# Amazon Opens$11B Indiana AI Data Center with Custom Chips for Anthropic",
    "Today, it hosts Project Rainier, one of the world\u2019s largest operational AI data centers.",
    "Against this backdrop, the scale of the Indiana campus is staggering."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tesery.com/fr-fr/blogs/news/elon-musk-s-xai-unveils-historic-20-billion-investment-in-mississippi-for-2gw-ai-data-center",
   "title": "Elon Musk\u2019s xAI Unveils Historic $20 Billion Investment in Mississippi for 2GW AI Data Center",
   "published_at": "2026-01-09T12:12:48",
   "project": "MACROHARDRR",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "",
   "status": "Operations from February 2026",
   "announcement_date": "2026-01-09",
   "project_evidence": [
    "Elon Musk\u2019s xAI Unveils Historic $20 Billion Investment in Mississippi for 2GW AI Data Center",
    "- **Project name:** \"MACROHARDRR\" \u2014 xAI's third massive data center in the greater Memphis area",
    "Elon Musk's xAI has announced a $20+ billion investment in a new 2-gigawatt AI data center campus in Southaven, Mississippi \u2014 the largest economic development project in the state's history.",
    "| **Project name** | \"MACROHARDRR\" \u2014 xAI's characteristic jab at Microsoft; third data center in the greater Memphis area |"
   ],
   "locality_evidence": [
    "Elon Musk\u2019s xAI Unveils Historic $20 Billion Investment in Mississippi for 2GW AI Data Center",
    "- **Location:** Southaven, Mississippi \u2014 just south of the Tennessee border; adjacent to Memphis xAI cluster",
    "Elon Musk's xAI has announced a $20+ billion investment in a new 2-gigawatt AI data center campus in Southaven, Mississippi \u2014 the largest economic development project in the state's history.",
    "| **Location** | Southaven, Mississippi \u2014 south of Tennessee border; retrofitted existing industrial facility |"
   ],
   "state_evidence": [
    "Elon Musk\u2019s xAI Unveils Historic $20 Billion Investment in Mississippi for 2GW AI Data Center",
    "- **Location:** Southaven, Mississippi \u2014 just south of the Tennessee border; adjacent to Memphis xAI cluster",
    "Elon Musk's xAI has announced a $20+ billion investment in a new 2-gigawatt AI data center campus in Southaven, Mississippi \u2014 the largest economic development project in the state's history.",
    "| **Location** | Southaven, Mississippi \u2014 south of Tennessee border; retrofitted existing industrial facility |"
   ],
   "capacity_gw_evidence": [
    "Elon Musk\u2019s xAI Unveils Historic $20 Billion Investment in Mississippi for 2GW AI Data Center",
    "- **Capacity:** **~2 gigawatts** \u2014 equivalent to two nuclear reactor units; powers ~1.5 million homes",
    "Elon Musk's xAI has announced a $20+ billion investment in a new 2-gigawatt AI data center campus in Southaven, Mississippi \u2014 the largest economic development project in the state's history.",
    "| **Planned capacity** | ~2 gigawatts \u2014 equivalent to two nuclear reactor units; ~1.5 million homes' worth of power dedicated to AI |"
   ],
   "builder_evidence": [
    "Elon Musk\u2019s xAI Unveils Historic $20 Billion Investment in Mississippi for 2GW AI Data Center",
    "- **Project name:** \"MACROHARDRR\" \u2014 xAI's third massive data center in the greater Memphis area",
    "Elon Musk's xAI has announced a $20+ billion investment in a new 2-gigawatt AI data center campus in Southaven, Mississippi \u2014 the largest economic development project in the state's history.",
    "| **Project name** | \"MACROHARDRR\" \u2014 xAI's characteristic jab at Microsoft; third data center in the greater Memphis area |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The Mid-South AI Corridor: Memphis + Southaven",
    "| Site | Role | Status |",
    "| **Southaven, Mississippi (MACROHARDRR)** | 2GW AI training supercomputer; pushes Colossus to most powerful AI system on Earth; next-generation LLM training | Operations from February 2026 |"
   ],
   "announcement_date_evidence": [
    "Elon Musk\u2019s xAI Unveils Historic $20 Billion Investment in Mississippi for 2GW AI Data Center",
    " par Rio sur Jan 09, 2026",
    "Elon Musk's xAI has announced a $20+ billion investment in a new 2-gigawatt AI data center campus in Southaven, Mississippi \u2014 the largest economic development project in the state's history."
   ]
  },
  {
   "url": "https://telecomreviewamericas.com/articles/wholesale-and-capacity/crusoe-and-lancium-power-up-1-gw-ai-mega-campus",
   "title": "Crusoe and Lancium Power Up 1-GW AI Mega Campus - Telecom Review Americas",
   "published_at": "2026-07-17T11:26:08",
   "project": null,
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "# Crusoe and Lancium Power Up 1-GW AI Mega Campus"
   ],
   "state_evidence": [
    "# Crusoe and Lancium Power Up 1-GW AI Mega Campus"
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium Power Up 1-GW AI Mega Campus"
   ],
   "builder_evidence": [
    "# Crusoe and Lancium Power Up 1-GW AI Mega Campus"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Crusoe and Lancium Power Up 1-GW AI Mega Campus",
    "Construction is expected to begin in Q3 2026, creating thousands of local construction jobs, more than 100 long-term positions, and a significant long-term economic investment for Childress County."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://recorderonline.marketminute.com/article/bizwire-2025-8-19-vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand",
   "title": "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
   "published_at": "2025-08-19T11:00:00",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "locality_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "state_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "capacity_gw_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "builder_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026.",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "announcement_date_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "This press release features multimedia. View the full release here: [https://www.businesswire.com/news/home/20250819333311/en/](https://www.businesswire.com/news/home/20250819333311/en/)"
   ]
  },
  {
   "url": "https://markets.ft.com/data/announce/detail?dockey=600-202602191637PR_NEWS_USPRX____DA91930-1",
   "title": "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus \u2013 Company Announcement",
   "published_at": "2026-02-19T21:37:00",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus"
   ],
   "locality_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ -- [Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4623677-1&h=4044461773&u=https%3A%2F%2Ffermiamerica.com%2F&a=Fermi+Inc.+(d%2Fb%2Fa+Fermi+America)+(NASDAQ+%26+LSE%3A+FRMI)%2C+operating+as+Fermi+America%E2%84%A2), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus"
   ],
   "state_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ -- [Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4623677-1&h=4044461773&u=https%3A%2F%2Ffermiamerica.com%2F&a=Fermi+Inc.+(d%2Fb%2Fa+Fermi+America)+(NASDAQ+%26+LSE%3A+FRMI)%2C+operating+as+Fermi+America%E2%84%A2), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus"
   ],
   "capacity_gw_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "This financing continues to build upon Fermi America's warehouse strategy enabling the aggregation of critical long-lead equipment in an inflationary and tightening supply environment and serves to further solidify Fermi America's power ramp, affirming the company's ability to deliver the first 2.3 of 11 gigawatts of long-duration, reliable power at scale."
   ],
   "builder_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mbtmag.com/artificial-intelligence/news/22937710/coalfired-power-plant-now-retired-to-become-massive-gaspowered-campus-for-ai-data-centers",
   "title": "Coal-Fired Power Plant, Now Retired, to Become Massive Gas-Powered Campus for AI, Data Centers",
   "published_at": "2025-04-03T13:25:49",
   "project": "Homer City Generating Station",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Homer City Development",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development.",
    "The owners of what was once Pennsylvania's biggest coal-fired power plant said Wednesday that they will turn it into a $10 billion natural gas-powered data center campus designed to capitalize on the fast-growing energy demands of Big Tech companies to power artificial intelligence and cloud computing applications."
   ],
   "locality_evidence": [
    "![The smokestacks of the former coal-fired Homer City Generating Station crumble in a planned demolition to make way for a new natural gas-fired power plant in Homer City, Pa., Saturday, March 22, 2025.](https://img.mbtmag.com/files/base/indm/multi/image/2025/04/AP25081444078926.67ee8c439c440.png?auto=format%2Ccompress&q=70&rect=0%2C84%2C1314%2C739&w=400)",
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "state_evidence": [
    "The owners of what was once Pennsylvania's biggest coal-fired power plant said Wednesday that they will turn it into a $10 billion natural gas-powered data center campus designed to capitalize on the fast-growing energy demands of Big Tech companies to power artificial intelligence and cloud computing applications."
   ],
   "capacity_gw_evidence": [
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "builder_evidence": [
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The owners of what was once Pennsylvania's biggest coal-fired power plant said Wednesday that they will turn it into a $10 billion natural gas-powered data center campus designed to capitalize on the fast-growing energy demands of Big Tech companies to power artificial intelligence and cloud computing applications."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://us.acrofan.com/detail.php?number=1007931",
   "title": "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campu",
   "published_at": "2026-03-16T20:32:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "Acquired",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u00e2\u20ac\u201d America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also [announced](https://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "locality_evidence": [
    "Nscale today also [announced](https://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "state_evidence": [
    "Nscale today also [announced](https://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "capacity_gw_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u00e2\u20ac\u201d America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also [announced](https://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "builder_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u00e2\u20ac\u201d America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ],
   "ai_customer_evidence": [
    "Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs",
    "Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ],
   "status_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u00e2\u20ac\u201d America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also [announced](https://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "announcement_date_evidence": [
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ]
  },
  {
   "url": "https://mexc.co/news/1075284",
   "title": "Kevin O\u2019Leary\u2019s Utah AI campus gets approved | MEXC News",
   "published_at": null,
   "project": "Stratos AI campus",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "Kevin O\u2019Leary Digital",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "locality_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "state_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "capacity_gw_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "The campus will generate up to 9 gigawatts at full buildout, more than twice Utah\u2019s current total electricity consumption, powered by an on-site natural gas pipeline.",
    "The campus, designated through Utah\u2019s Military Installation Development Authority, spans more than 40,000 acres and will reach 9 gigawatts of generation capacity at full buildout."
   ],
   "builder_evidence": [
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://data-central.co.uk/openais-3-2gw-campus-puts-power-first",
   "title": "OpenAI\u2019s 3.2GW campus puts power first",
   "published_at": "2026-07-27T13:58:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "proposed",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI\u2019s 3.2GW campus puts power first",
    "OpenAI\u2019s proposed Project Camellia campus in Georgia adds another multi-gigawatt marker to the AI infrastructure race.",
    "The project, known as Project Camellia, is expected to receive power in phases from 2028 to 2032."
   ],
   "locality_evidence": [
    "# OpenAI\u2019s 3.2GW campus puts power first",
    "- OpenAI is planning a proposed 3.2GW data centre campus in Effingham County, Georgia.",
    "[OpenAI](https://openai.com/) is planning a proposed 3.2GW data centre campus in Effingham County, Georgia, adding another multi-gigawatt project to the expanding AI infrastructure pipeline."
   ],
   "state_evidence": [
    "# OpenAI\u2019s 3.2GW campus puts power first",
    "- OpenAI is planning a proposed 3.2GW data centre campus in Effingham County, Georgia.",
    "[OpenAI](https://openai.com/) is planning a proposed 3.2GW data centre campus in Effingham County, Georgia, adding another multi-gigawatt project to the expanding AI infrastructure pipeline."
   ],
   "capacity_gw_evidence": [
    "# OpenAI\u2019s 3.2GW campus puts power first",
    "- OpenAI is planning a proposed 3.2GW data centre campus in Effingham County, Georgia.",
    "[OpenAI](https://openai.com/) is planning a proposed 3.2GW data centre campus in Effingham County, Georgia, adding another multi-gigawatt project to the expanding AI infrastructure pipeline.",
    "A 3.2GW data centre campus would be an industrial load of exceptional size."
   ],
   "builder_evidence": [
    "# OpenAI\u2019s 3.2GW campus puts power first",
    "OpenAI\u2019s proposed Project Camellia campus in Georgia adds another multi-gigawatt marker to the AI infrastructure race.",
    "- OpenAI is planning a proposed 3.2GW data centre campus in Effingham County, Georgia.",
    "[OpenAI](https://openai.com/) is planning a proposed 3.2GW data centre campus in Effingham County, Georgia, adding another multi-gigawatt project to the expanding AI infrastructure pipeline."
   ],
   "ai_customer_evidence": [
    "# OpenAI\u2019s 3.2GW campus puts power first",
    "OpenAI\u2019s proposed Project Camellia campus in Georgia adds another multi-gigawatt marker to the AI infrastructure race.",
    "- OpenAI is planning a proposed 3.2GW data centre campus in Effingham County, Georgia.",
    "[OpenAI](https://openai.com/) is planning a proposed 3.2GW data centre campus in Effingham County, Georgia, adding another multi-gigawatt project to the expanding AI infrastructure pipeline."
   ],
   "status_evidence": [
    "# OpenAI\u2019s 3.2GW campus puts power first",
    "OpenAI\u2019s proposed Project Camellia campus in Georgia adds another multi-gigawatt marker to the AI infrastructure race.",
    "- OpenAI is planning a proposed 3.2GW data centre campus in Effingham County, Georgia.",
    "[OpenAI](https://openai.com/) is planning a proposed 3.2GW data centre campus in Effingham County, Georgia, adding another multi-gigawatt project to the expanding AI infrastructure pipeline."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://newsherald.com/story/money/business/2026/03/17/google-reveals-project-cannoli-data-center/89185890007",
   "title": "Google reveals it is behind big 'Project Cannoli' data center project",
   "published_at": "2026-03-17T12:02:18",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "locality_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "state_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google also said Tuesday that it is creating a $10 million Energy Impact Fund for local organizations to tap into with the aim of lowering monthly utility bills for Michiganders."
   ],
   "capacity_gw_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "builder_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "The data center would be developed for Google by Panattoni Development Co."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "announcement_date_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ]
  },
  {
   "url": "https://cryptonews.net/news/mining/32922534",
   "title": "TeraWulf acquires hyperscale high-performance computing facility in Kentucky",
   "published_at": "2026-05-26T17:24:05",
   "project": "Muskie Data Campus",
   "locality": "Ashland and Grayson",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": "2026-05-26",
   "project_evidence": [
    "# TeraWulf acquires hyperscale high-performance computing facility in Kentucky",
    "The Nasdaq-listed company closed its acquisition of the Muskie Data Campus on May 22, a 285-acre site in eastern Kentucky\u2019s EastPark Industrial Park that it plans to develop into a hyperscale data center with more than 1 gigawatt of total capacity."
   ],
   "locality_evidence": [
    "# TeraWulf acquires hyperscale high-performance computing facility in Kentucky",
    "The company plans to develop capacity in two phases: 500 MW targeted for the second half of 2028, and another 500 MW expected by the end of 2030."
   ],
   "state_evidence": [
    "# TeraWulf acquires hyperscale high-performance computing facility in Kentucky",
    "The Nasdaq-listed company closed its acquisition of the Muskie Data Campus on May 22, a 285-acre site in eastern Kentucky\u2019s EastPark Industrial Park that it plans to develop into a hyperscale data center with more than 1 gigawatt of total capacity."
   ],
   "capacity_gw_evidence": [
    "# TeraWulf acquires hyperscale high-performance computing facility in Kentucky",
    "The Nasdaq-listed company closed its acquisition of the Muskie Data Campus on May 22, a 285-acre site in eastern Kentucky\u2019s EastPark Industrial Park that it plans to develop into a hyperscale data center with more than 1 gigawatt of total capacity."
   ],
   "builder_evidence": [
    "# TeraWulf acquires hyperscale high-performance computing facility in Kentucky",
    "The Nasdaq-listed company closed its acquisition of the Muskie Data Campus on May 22, a 285-acre site in eastern Kentucky\u2019s EastPark Industrial Park that it plans to develop into a hyperscale data center with more than 1 gigawatt of total capacity."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# TeraWulf acquires hyperscale high-performance computing facility in Kentucky",
    "The Nasdaq-listed company closed its acquisition of the Muskie Data Campus on May 22, a 285-acre site in eastern Kentucky\u2019s EastPark Industrial Park that it plans to develop into a hyperscale data center with more than 1 gigawatt of total capacity."
   ],
   "announcement_date_evidence": [
    "# TeraWulf acquires hyperscale high-performance computing facility in Kentucky",
    "Investors clearly liked what they saw. TeraWulf\u2019s stock climbed between 11% and 13% following the announcement on May 26."
   ]
  },
  {
   "url": "https://industrytimesfalklandislands.com/article/909739213-iren-announces-successful-energization-of-sweetwater-1",
   "title": "IREN Announces Successful Energization of Sweetwater 1",
   "published_at": null,
   "project": "Sweetwater",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "Under Development",
   "announcement_date": "2026-05-01",
   "project_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas.",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "locality_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas.",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "state_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "capacity_gw_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "builder_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "announcement_date_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ]
  },
  {
   "url": "https://natlawreview.com/press-releases/enchant-energy-offers-carbon-answer-americas-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "### Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "*Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite*",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "### Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "state_evidence": [
    "### Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "### Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "### Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "### Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "### Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "*** Press Release Date 05-27-2026*"
   ]
  },
  {
   "url": "https://datacentrereview.com/2024/09/ecl-to-build-hydrogen-powered-ai-data-centre-in-texas",
   "title": "ECL to build hydrogen-powered AI data centre in Texas - Data Centre Review",
   "published_at": "2024-09-27T09:30:09",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "**ECL has announced plans to build a fully sustainable 1 GW AI data centre in Houston, dubbed ECL TerraSite-TX1**"
   ],
   "locality_evidence": [
    "**ECL has announced plans to build a fully sustainable 1 GW AI data centre in Houston, dubbed ECL TerraSite-TX1**"
   ],
   "state_evidence": [
    "**ECL has announced plans to build a fully sustainable 1 GW AI data centre in Houston, dubbed ECL TerraSite-TX1**"
   ],
   "capacity_gw_evidence": [
    "The data centre has the potential to be expanded to 2 GW in the future, depending on customer demand."
   ],
   "builder_evidence": [
    "**ECL has announced plans to build a fully sustainable 1 GW AI data centre in Houston, dubbed ECL TerraSite-TX1**"
   ],
   "ai_customer_evidence": [
    "Lambda is set to be the first tenant at the facility, which will provide 50 MW of capacity in its first phase \u2013 scheduled for delivery in summer 2025."
   ],
   "status_evidence": [
    "**ECL has announced plans to build a fully sustainable 1 GW AI data centre in Houston, dubbed ECL TerraSite-TX1**"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://manilatimes.net/2026/08/17/tmt-newswire/globenewswire/nvidia-guarantees-sb-energys-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute/2406834",
   "title": "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
   "published_at": "2026-08-17T00:00:00",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 [(GLOBE NEWSWIRE)](https://www.globenewswire.com) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute.",
    "SB Energy\u2019s [PORTS-Pike Technology Campus](https://portscampus.com/) is reindustrializing the decommissioned Portsmouth Gaseous Diffusion Plant and the surrounding area, bringing a new generation of jobs to Appalachian Ohio, while creating an opportunity for the region to play an important role in the next era of American industry."
   ],
   "locality_evidence": [
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 [(GLOBE NEWSWIRE)](https://www.globenewswire.com) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute.",
    "\"This is going to be a huge site, with enough computing power to help millions of people use AI to do things we can only start to imagine today, from finding new medicines to starting businesses and solving hard problems,\u201d said Sam Altman, CEO of OpenAI."
   ],
   "state_evidence": [
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 [(GLOBE NEWSWIRE)](https://www.globenewswire.com) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute.",
    "PORTS-Pike campus project will create tens of thousands of Ohio jobs, pay for its power infrastructure, and invest hundreds of millions in the community anchored by an initial $80 million community benefits fund."
   ],
   "capacity_gw_evidence": [
    "- *OpenAI will be the customer for 8-IT GW*",
    "In support of the surrounding Ohio community, SB Energy and SoftBank will build at least 10 GW of new energy generation, which results in 8 IT-GW of AI factory capacity, and invest at least $4.2 billion in new regional grid infrastructure through an innovative partnership with AEP Ohio designed to protect ratepayers."
   ],
   "builder_evidence": [
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 [(GLOBE NEWSWIRE)](https://www.globenewswire.com) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute.",
    "SB Energy will build, own and operate the data center under a 20-year lease to OpenAI."
   ],
   "ai_customer_evidence": [
    "- *OpenAI will be the customer for 8-IT GW*",
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 [(GLOBE NEWSWIRE)](https://www.globenewswire.com) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "status_evidence": [
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 [(GLOBE NEWSWIRE)](https://www.globenewswire.com) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "announcement_date_evidence": [
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 [(GLOBE NEWSWIRE)](https://www.globenewswire.com) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ]
  },
  {
   "url": "https://edgen.tech/ja/news/stock/blackrock-and-meta-form-14b-data-center-venture-in-texas",
   "title": "BlackRock and Meta form $14B data center venture in Texas",
   "published_at": "2026-07-28T09:41:43",
   "project": null,
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "BlackRock and Meta",
   "ai_customer": "Meta",
   "status": "developing",
   "announcement_date": "2026-07-28",
   "project_evidence": null,
   "locality_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "# BlackRock and Meta form $14B data center venture in Texas",
    "- BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas.",
    "BlackRock Inc. and Meta Platforms Inc. are jointly developing a $14 billion data center campus in El Paso, Texas, marking the latest hyperscale infrastructure deal as technology companies race to secure capacity for artificial intelligence workloads."
   ],
   "state_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "# BlackRock and Meta form $14B data center venture in Texas",
    "- BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas.",
    "BlackRock Inc. and Meta Platforms Inc. are jointly developing a $14 billion data center campus in El Paso, Texas, marking the latest hyperscale infrastructure deal as technology companies race to secure capacity for artificial intelligence workloads."
   ],
   "capacity_gw_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "# BlackRock and Meta form $14B data center venture in Texas",
    "- BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas.",
    "The venture, announced Tuesday, will build a 1-gigawatt campus \u2014 enough to power roughly 830,000 US homes \u2014 with initial capacity expected online in 2028."
   ],
   "builder_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "# BlackRock and Meta form $14B data center venture in Texas",
    "- BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas.",
    "BlackRock Inc. and Meta Platforms Inc. are jointly developing a $14 billion data center campus in El Paso, Texas, marking the latest hyperscale infrastructure deal as technology companies race to secure capacity for artificial intelligence workloads."
   ],
   "ai_customer_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "# BlackRock and Meta form $14B data center venture in Texas",
    "- BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas.",
    "BlackRock Inc. and Meta Platforms Inc. are jointly developing a $14 billion data center campus in El Paso, Texas, marking the latest hyperscale infrastructure deal as technology companies race to secure capacity for artificial intelligence workloads."
   ],
   "status_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "# BlackRock and Meta form $14B data center venture in Texas",
    "- BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas.",
    "BlackRock Inc. and Meta Platforms Inc. are jointly developing a $14 billion data center campus in El Paso, Texas, marking the latest hyperscale infrastructure deal as technology companies race to secure capacity for artificial intelligence workloads."
   ],
   "announcement_date_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "# BlackRock and Meta form $14B data center venture in Texas",
    "## Rachel Kim](https://www.edgen.tech/ja/author/news/rachel-kim)\u00b7Jul 28 2026, 09:41"
   ]
  },
  {
   "url": "https://edgen.tech/ja/news/stock/blackrock-and-meta-form-14b-data-center-venture-in-texas",
   "title": "BlackRock and Meta form $14B data center venture in Texas",
   "published_at": "2026-07-28T09:41:43",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "private-credit firm and Meta",
   "ai_customer": "Meta",
   "status": "expanded",
   "announcement_date": null,
   "project_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "# BlackRock and Meta form $14B data center venture in Texas",
    "- The deal mirrors Meta's Louisiana Hyperion project and comes alongside BlackRock's $40 billion Aligned Data Centers acquisition.",
    "The El Paso arrangement follows the same template Meta used for its Hyperion project in Richland Parish, Louisiana, where an 80/20 joint venture between a private-credit firm and Meta issued $27 billion in debt \u2014 the largest private-debt offering on record."
   ],
   "locality_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "# BlackRock and Meta form $14B data center venture in Texas",
    "The El Paso arrangement follows the same template Meta used for its Hyperion project in Richland Parish, Louisiana, where an 80/20 joint venture between a private-credit firm and Meta issued $27 billion in debt \u2014 the largest private-debt offering on record."
   ],
   "state_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "# BlackRock and Meta form $14B data center venture in Texas",
    "- The deal mirrors Meta's Louisiana Hyperion project and comes alongside BlackRock's $40 billion Aligned Data Centers acquisition.",
    "The El Paso arrangement follows the same template Meta used for its Hyperion project in Richland Parish, Louisiana, where an 80/20 joint venture between a private-credit firm and Meta issued $27 billion in debt \u2014 the largest private-debt offering on record."
   ],
   "capacity_gw_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "# BlackRock and Meta form $14B data center venture in Texas",
    "Meta has since expanded Hyperion to 5 gigawatts of compute capacity at an estimated cost exceeding $50 billion, with that expansion owned entirely by Meta rather than through a joint venture."
   ],
   "builder_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "# BlackRock and Meta form $14B data center venture in Texas",
    "The El Paso arrangement follows the same template Meta used for its Hyperion project in Richland Parish, Louisiana, where an 80/20 joint venture between a private-credit firm and Meta issued $27 billion in debt \u2014 the largest private-debt offering on record."
   ],
   "ai_customer_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "# BlackRock and Meta form $14B data center venture in Texas",
    "- The deal mirrors Meta's Louisiana Hyperion project and comes alongside BlackRock's $40 billion Aligned Data Centers acquisition.",
    "The El Paso arrangement follows the same template Meta used for its Hyperion project in Richland Parish, Louisiana, where an 80/20 joint venture between a private-credit firm and Meta issued $27 billion in debt \u2014 the largest private-debt offering on record."
   ],
   "status_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "# BlackRock and Meta form $14B data center venture in Texas",
    "Meta has since expanded Hyperion to 5 gigawatts of compute capacity at an estimated cost exceeding $50 billion, with that expansion owned entirely by Meta rather than through a joint venture."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://markets.chroniclejournal.com/chroniclejournal/article/tokenring-2026-1-2-colossus-unbound-xais-memphis-expansion-targets-1-million-gpus-in-the-race-for-agi",
   "title": "Colossus Unbound: xAI\u00e2s Memphis Expansion Targets 1 Million GPUs in the Race for AGI",
   "published_at": "2026-01-02T19:48:24",
   "project": "Colossus",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "active expansion",
   "announcement_date": "2026-01-02",
   "project_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "locality_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "state_evidence": [
    "As the \"Digital Delta\" takes shape across the Tennessee-Mississippi border, the project is redefining the physical and logistical requirements of the AGI era.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "capacity_gw_evidence": [
    "By targeting a power capacity of 2 gigawatts (GW)\u2014roughly enough to power nearly 2 million homes\u2014xAI is transitioning from a high-scale startup to a \"Gigafactory of Compute.\"",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "builder_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "announcement_date_evidence": [
    "As of January 2, 2026, the company has successfully scaled its initial 100,000-GPU cluster to over 200,000 units and is now aggressively pursuing a roadmap to reach 1 million GPUs by the end of the year.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ]
  },
  {
   "url": "https://rotatingdata.com/deals/2026-07-crusoe-lancium-childress-1gw-campus",
   "title": "Crusoe and Lancium launch 1 GW Childress AI campus",
   "published_at": null,
   "project": "Childress AI campus",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": "unnamed leading hyperscale technology company",
   "status": "planned",
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "Data centers \u00b7 Evidence brief",
    "# Crusoe and Lancium launch 1 GW Childress AI campus",
    "Crusoe and Lancium announced the Childress campus on July 15, 2026."
   ],
   "locality_evidence": [
    "Data centers \u00b7 Evidence brief",
    "# Crusoe and Lancium launch 1 GW Childress AI campus",
    "Geography**Childress, Texas, United States**"
   ],
   "state_evidence": [
    "Data centers \u00b7 Evidence brief",
    "# Crusoe and Lancium launch 1 GW Childress AI campus",
    "Geography**Childress, Texas, United States**"
   ],
   "capacity_gw_evidence": [
    "Data centers \u00b7 Evidence brief",
    "# Crusoe and Lancium launch 1 GW Childress AI campus",
    "Disclosed scale**1.0 GW grid-connected AI data-center campus across 270 acres in Childress, Texas, designed for hundreds of thousands of advanced AI accelerators; construction is expected to begin in Q3 2026**"
   ],
   "builder_evidence": [
    "Data centers \u00b7 Evidence brief",
    "# Crusoe and Lancium launch 1 GW Childress AI campus",
    "Crusoe and Lancium announced the Childress campus on July 15, 2026."
   ],
   "ai_customer_evidence": [
    "Data centers \u00b7 Evidence brief",
    "# Crusoe and Lancium launch 1 GW Childress AI campus",
    "Crusoe + Lancium + unnamed leading hyperscale technology company"
   ],
   "status_evidence": [
    "Data centers \u00b7 Evidence brief",
    "# Crusoe and Lancium launch 1 GW Childress AI campus",
    "The grid-connected campus is planned for 1.0 GW at full scale across 270 acres owned by Lancium."
   ],
   "announcement_date_evidence": [
    "Data centers \u00b7 Evidence brief",
    "# Crusoe and Lancium launch 1 GW Childress AI campus",
    "Crusoe and Lancium announced the Childress campus on July 15, 2026."
   ]
  },
  {
   "url": "https://dcpulse.com/project/microsoft-project-aurora-wisconsin-13-billion-ai-expansion",
   "title": "Microsoft's $13B Project Aurora in Wisconsin",
   "published_at": null,
   "project": "Project Aurora",
   "locality": "Mount Pleasant",
   "state": "Wisconsin",
   "capacity_gw": 2.0,
   "builder": "Microsoft Corporation",
   "ai_customer": "OpenAI",
   "status": "Approved / Phase 1 Operation Start",
   "announcement_date": "2026-01-27",
   "project_evidence": [
    "# Project Aurora: $13B 15-Facility Microsoft AI Hub Wisconsin",
    "| Project Name | Project Aurora: $13B 15-Facility Microsoft AI Hub Wisconsin |"
   ],
   "locality_evidence": [
    "**Status:** Approved / Phase 1 Operation Start (March 2026) | **Location:** Wisconn Valley Science & Technology Park, Mount Pleasant",
    "| Location | Wisconn Valley Science & Technology Park, Mount Pleasant |"
   ],
   "state_evidence": [
    "# Project Aurora: $13B 15-Facility Microsoft AI Hub Wisconsin",
    "Unanimously approved on January 26, 2026, Project Aurora represents Microsoft\u2019s large-scale strategic response to the accelerating global shortage of AI compute capacity."
   ],
   "capacity_gw_evidence": [
    "| Total IT Load | ~1.5 GW to 2.0 GW (Expansion buildings only) |",
    "| Power Capacity | Estimated 1.5 GW - 2.0 GW for the 15-building expansion. |"
   ],
   "builder_evidence": [
    "Unanimously approved on January 26, 2026, Project Aurora represents Microsoft\u2019s large-scale strategic response to the accelerating global shortage of AI compute capacity.",
    "| Developer / Operator | [Microsoft Corporation](https://dcpulse.com/projects/companyprofiles/microsoft-corporation-data-center-projects) |"
   ],
   "ai_customer_evidence": [
    "Together, these campuses form a hyperscale AI infrastructure cluster designed to rapidly expand Microsoft\u2019s ability to deliver compute resources to key partners, including OpenAI, as well as enterprise cloud and AI customers."
   ],
   "status_evidence": [
    "**Status:** Approved / Phase 1 Operation Start (March 2026) | **Location:** Wisconn Valley Science & Technology Park, Mount Pleasant",
    "| Status | Approved / Phase 1 Operation Start (March 2026) |"
   ],
   "announcement_date_evidence": [
    "| Announcement | January 27, 2026 (Village Approval) |"
   ]
  },
  {
   "url": "https://constructionreviewonline.com/news/vantage-data-centers-unveils-25b-1-4gw-frontier-campus-in-texas-its-largest-project-to-date",
   "title": "Inside Frontier: Vantage Data Centers\u2019 $25B Hyperscale Campus in Texas",
   "published_at": "2025-08-19T14:12:00",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": "",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Inside Frontier: Vantage Data Centers\u2019 $25B Hyperscale Campus in Texas",
    "Project Name: Frontier"
   ],
   "locality_evidence": [
    "# Inside Frontier: Vantage Data Centers\u2019 $25B Hyperscale Campus in Texas",
    "Vantage Data Centers\u2019 Frontier Campus in Shackelford County, with 1.4 GW of capacity and 10 ultra-high-density buildings, highlights the state\u2019s ability to support multi-gigawatt AI workloads.",
    "Location: Shackelford County, Texas"
   ],
   "state_evidence": [
    "# Inside Frontier: Vantage Data Centers\u2019 $25B Hyperscale Campus in Texas",
    "Vantage Data Centers\u2019 Frontier Campus in Shackelford County, with 1.4 GW of capacity and 10 ultra-high-density buildings, highlights the state\u2019s ability to support multi-gigawatt AI workloads.",
    "Location: Shackelford County, Texas"
   ],
   "capacity_gw_evidence": [
    "# Inside Frontier: Vantage Data Centers\u2019 $25B Hyperscale Campus in Texas",
    "When completed in 2028 the datacenter will boast a total capacity of 1.4 Gigawatts (GW) though the first data center building is scheduled to enter service in the second half of 2026.",
    "Total Capacity: 1.4 gigawatts"
   ],
   "builder_evidence": [
    "# Inside Frontier: Vantage Data Centers\u2019 $25B Hyperscale Campus in Texas",
    "The Frontier Campus by [Vantage Data Centers](https://vantage-dc.com/) is one of the world\u2019s largest hyperscale projects, set to reshape Texas\u2019 position in the global data center market.",
    "Developer: Vantage Data Centers"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Inside Frontier: Vantage Data Centers\u2019 $25B Hyperscale Campus in Texas",
    "Unlike many announced megaprojects still on the drawing board, Frontier is already under construction, with initial capacity scheduled to come online in 2026.",
    "Project Status: Under construction"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://fermiamerica.com/author/fermiamerica",
   "title": "fermiamerica, Author at FERMI AMERICA",
   "published_at": null,
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 17.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": "2026-03-13",
   "project_evidence": [
    "World\u2019s Largest Private Grid, Fermi America\u2122 to File Additional 5GW Clean Air Permit for Project Matador with the Texas Commission on Environmental Quality (TCEQ) Upsizing Campus Projections to 17GW of Private Power"
   ],
   "locality_evidence": [
    "AMARILLO, Texas, March 13, 2026 /PRNewswire/ -- Fermi Inc. (d/b/a Fermi America)\u2026",
    "World\u2019s Largest Private Grid, Fermi America\u2122 to File Additional 5GW Clean Air Permit for Project Matador with the Texas Commission on Environmental Quality (TCEQ) Upsizing Campus Projections to 17GW of Private Power"
   ],
   "state_evidence": [
    "AMARILLO, Texas, March 13, 2026 /PRNewswire/ -- Fermi Inc. (d/b/a Fermi America)\u2026",
    "World\u2019s Largest Private Grid, Fermi America\u2122 to File Additional 5GW Clean Air Permit for Project Matador with the Texas Commission on Environmental Quality (TCEQ) Upsizing Campus Projections to 17GW of Private Power"
   ],
   "capacity_gw_evidence": [
    "World\u2019s Largest Private Grid, Fermi America\u2122 to File Additional 5GW Clean Air Permit for Project Matador with the Texas Commission on Environmental Quality (TCEQ) Upsizing Campus Projections to 17GW of Private Power"
   ],
   "builder_evidence": [
    "Fermi America Deepens Strategic Partnership with Hyundai E&C to Lead the Return of Large-Scale Nuclear Construction in the U.S. with Project Matador"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Fermi America\u2122 provides an exciting progress update on Project Matador, highlighting that construction is ahead\u2026",
    "Fermi America provides an update on operations on 2nd Cup"
   ],
   "announcement_date_evidence": [
    "AP News March 13, 2026 AMARILLO, Texas, March 13, 2026 /PRNewswire/ -- Fermi Inc. (d/b/a Fermi America)\u2026",
    "World\u2019s Largest Private Grid, Fermi America\u2122 to File Additional 5GW Clean Air Permit for Project Matador with the Texas Commission on Environmental Quality (TCEQ) Upsizing Campus Projections to 17GW of Private Power"
   ]
  },
  {
   "url": "https://prnewswire.co.uk/news-releases/nscale-acquires-american-intelligence--power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy-to-compute-302715213.html",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": "2026-03-16T21:21:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "locality_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "capacity_gw_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "builder_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "announcement_date_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "16 Mar, 2026, 21:21 GMT",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ]
  },
  {
   "url": "https://idcnova.com/news/Texas-to-become-hub-for-worlds-largest-green-powered-data-center-2331",
   "title": "Texas to become hub for world's largest green-powered data center",
   "published_at": "2025-03-25T12:53:13",
   "project": "Data City, Texas",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corp.",
   "ai_customer": null,
   "status": "planning",
   "announcement_date": null,
   "project_evidence": [
    "A Houston-based company is planning to construct a massive 50,000-acre data center hub near Laredo, Texas, dubbed \"Data City, Texas.\""
   ],
   "locality_evidence": [
    "A Houston-based company is planning to construct a massive 50,000-acre data center hub near Laredo, Texas, dubbed \"Data City, Texas.\""
   ],
   "state_evidence": [
    "A Houston-based company is planning to construct a massive 50,000-acre data center hub near Laredo, Texas, dubbed \"Data City, Texas.\""
   ],
   "capacity_gw_evidence": [
    "The project will be developed in multiple phases, starting with 300 megawatts of power and 1 million square feet of data center space in 2026, eventually expanding to 5 gigawatts of power and over 15 million square feet of leasable space."
   ],
   "builder_evidence": [
    "The facility is set to become \"the world\u2019s largest behind-the-meter data center,\" powered entirely by 100 percent green energy around the clock, according to Energy Abundance Development Corp."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "A Houston-based company is planning to construct a massive 50,000-acre data center hub near Laredo, Texas, dubbed \"Data City, Texas.\""
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://battlecreekenquirer.com/story/money/business/2026/03/17/google-reveals-project-cannoli-data-center/89185890007",
   "title": "Google reveals it is behind big 'Project Cannoli' data center project",
   "published_at": "2026-03-17T12:02:18",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": null,
   "status": "preliminary site plan approval",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "locality_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "state_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google also said Tuesday that it is creating a $10 million Energy Impact Fund for local organizations to tap into with the aim of lowering monthly utility bills for Michiganders."
   ],
   "capacity_gw_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "builder_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "The data center would be developed for Google by Panattoni Development Co."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "The township's Planning Commission voted 5-2 on Feb. 11 to give a preliminary site plan approval for the project."
   ],
   "announcement_date_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ]
  },
  {
   "url": "https://mexc.co/en-IN/news/1114567",
   "title": "TeraWulf surges 10% on 1GW Kentucky AI campus bet | MEXC News",
   "published_at": null,
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access.",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure.",
    "The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity."
   ],
   "locality_evidence": [
    "The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity.",
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access.",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure."
   ],
   "state_evidence": [
    "The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity.",
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access.",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure."
   ],
   "capacity_gw_evidence": [
    "The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity.",
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access.",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure."
   ],
   "builder_evidence": [
    "The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity.",
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access.",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The company plans to bring the first 500 MW online during the second half of 2028. Another 500 MW could be out by the second half of 2030.",
    "The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://asianewsguide.com/article/909739213-iren-announces-successful-energization-of-sweetwater-1",
   "title": "IREN Announces Successful Energization of Sweetwater 1",
   "published_at": null,
   "project": "Sweetwater",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN Limited",
   "ai_customer": null,
   "status": "energized",
   "announcement_date": "2026-05-01",
   "project_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "capacity_gw_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "builder_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "announcement_date_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ]
  },
  {
   "url": "https://economicnewsobserver.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Creekstone Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "*Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite*",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://pv-magazine.com/2024/09/27/the-hydrogen-stream-ecl-to-build-1-gw-hydrogen-ai-data-center-in-texas",
   "title": "The Hydrogen Stream: ECL to build 1 GW hydrogen AI data center in Texas",
   "published_at": "2024-09-27T01:14:36",
   "project": "TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# The Hydrogen Stream: ECL to build 1 GW hydrogen AI data center in Texas",
    "**ECL** said it will build the \u201cfirst fully sustainable\u201d 1 GW AI factory data center on a site spanning more than 242.81 hectares east of Houston, Texas, with Lambda as its first tenant.",
    "\u201cThe initial phase of TerraSite-TX1 will be delivered in the summer of 2025 at a cost of approximately $450 million, with 50 MW of data center capacity to be utilized by data center cloud and AI cloud operators,\u201d [said](https://www.businesswire.com/news/home/20240925729563/en/ECL-Announces-World%E2%80%99s-First-1-Gigawatt-Off-Grid-Hydrogen-Powered-AI-Factory-Data-Center) the data center-as-a-service company, noting that the data center will be hydrogen-powered."
   ],
   "locality_evidence": [
    "# The Hydrogen Stream: ECL to build 1 GW hydrogen AI data center in Texas",
    "**ECL** said it will build the \u201cfirst fully sustainable\u201d 1 GW AI factory data center on a site spanning more than 242.81 hectares east of Houston, Texas, with Lambda as its first tenant."
   ],
   "state_evidence": [
    "# The Hydrogen Stream: ECL to build 1 GW hydrogen AI data center in Texas",
    "**ECL** said it will build the \u201cfirst fully sustainable\u201d 1 GW AI factory data center on a site spanning more than 242.81 hectares east of Houston, Texas, with Lambda as its first tenant."
   ],
   "capacity_gw_evidence": [
    "# The Hydrogen Stream: ECL to build 1 GW hydrogen AI data center in Texas",
    "**ECL** said it will build the \u201cfirst fully sustainable\u201d 1 GW AI factory data center on a site spanning more than 242.81 hectares east of Houston, Texas, with Lambda as its first tenant."
   ],
   "builder_evidence": [
    "# The Hydrogen Stream: ECL to build 1 GW hydrogen AI data center in Texas",
    "**ECL** said it will build the \u201cfirst fully sustainable\u201d 1 GW AI factory data center on a site spanning more than 242.81 hectares east of Houston, Texas, with Lambda as its first tenant."
   ],
   "ai_customer_evidence": [
    "# The Hydrogen Stream: ECL to build 1 GW hydrogen AI data center in Texas",
    "**ECL** said it will build the \u201cfirst fully sustainable\u201d 1 GW AI factory data center on a site spanning more than 242.81 hectares east of Houston, Texas, with Lambda as its first tenant."
   ],
   "status_evidence": [
    "# The Hydrogen Stream: ECL to build 1 GW hydrogen AI data center in Texas",
    "**ECL** said it will build the \u201cfirst fully sustainable\u201d 1 GW AI factory data center on a site spanning more than 242.81 hectares east of Houston, Texas, with Lambda as its first tenant."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://particle.news/story/meta-unveils-plans-for-1gw-prometheus-and-5gw-hyperion-ai-superclusters",
   "title": "Meta Unveils Plans for 1GW Prometheus and 5GW Hyperion AI Superclusters",
   "published_at": "2025-07-17T00:24:12",
   "project": "Prometheus",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "goes online in 2026",
   "announcement_date": null,
   "project_evidence": [
    "## Overview",
    "- Prometheus, [Meta](/entity/meta/m/0hmyfsv?ref=cluster:6229227)\u2019s first supercluster, will deliver one gigawatt of capacity when it goes online in [New Albany](/entity/new-albany/m/0ywzj?ref=cluster:6229227), [Ohio](/entity/ohio/m/05kkh?ref=cluster:6229227), in 2026"
   ],
   "locality_evidence": [
    "## Overview",
    "- Prometheus, [Meta](/entity/meta/m/0hmyfsv?ref=cluster:6229227)\u2019s first supercluster, will deliver one gigawatt of capacity when it goes online in [New Albany](/entity/new-albany/m/0ywzj?ref=cluster:6229227), [Ohio](/entity/ohio/m/05kkh?ref=cluster:6229227), in 2026"
   ],
   "state_evidence": [
    "## Overview",
    "- Prometheus, [Meta](/entity/meta/m/0hmyfsv?ref=cluster:6229227)\u2019s first supercluster, will deliver one gigawatt of capacity when it goes online in [New Albany](/entity/new-albany/m/0ywzj?ref=cluster:6229227), [Ohio](/entity/ohio/m/05kkh?ref=cluster:6229227), in 2026"
   ],
   "capacity_gw_evidence": [
    "## Overview",
    "- Prometheus, [Meta](/entity/meta/m/0hmyfsv?ref=cluster:6229227)\u2019s first supercluster, will deliver one gigawatt of capacity when it goes online in [New Albany](/entity/new-albany/m/0ywzj?ref=cluster:6229227), [Ohio](/entity/ohio/m/05kkh?ref=cluster:6229227), in 2026"
   ],
   "builder_evidence": [
    "## Overview",
    "- Prometheus, [Meta](/entity/meta/m/0hmyfsv?ref=cluster:6229227)\u2019s first supercluster, will deliver one gigawatt of capacity when it goes online in [New Albany](/entity/new-albany/m/0ywzj?ref=cluster:6229227), [Ohio](/entity/ohio/m/05kkh?ref=cluster:6229227), in 2026"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Overview",
    "- Prometheus, [Meta](/entity/meta/m/0hmyfsv?ref=cluster:6229227)\u2019s first supercluster, will deliver one gigawatt of capacity when it goes online in [New Albany](/entity/new-albany/m/0ywzj?ref=cluster:6229227), [Ohio](/entity/ohio/m/05kkh?ref=cluster:6229227), in 2026"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://particle.news/story/meta-unveils-plans-for-1gw-prometheus-and-5gw-hyperion-ai-superclusters",
   "title": "Meta Unveils Plans for 1GW Prometheus and 5GW Hyperion AI Superclusters",
   "published_at": "2025-07-17T00:24:12",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "slated",
   "announcement_date": null,
   "project_evidence": [
    "## Overview",
    "- Hyperion, slated for [Richland Parish](/entity/richland-parish/m/0p498?ref=cluster:6229227), [Louisiana](/entity/louisiana/m/04ly1?ref=cluster:6229227), will scale up to five gigawatts over several years with additional \u201ctitan\u201d clusters planned"
   ],
   "locality_evidence": [
    "## Overview",
    "- Hyperion, slated for [Richland Parish](/entity/richland-parish/m/0p498?ref=cluster:6229227), [Louisiana](/entity/louisiana/m/04ly1?ref=cluster:6229227), will scale up to five gigawatts over several years with additional \u201ctitan\u201d clusters planned"
   ],
   "state_evidence": [
    "## Overview",
    "- Hyperion, slated for [Richland Parish](/entity/richland-parish/m/0p498?ref=cluster:6229227), [Louisiana](/entity/louisiana/m/04ly1?ref=cluster:6229227), will scale up to five gigawatts over several years with additional \u201ctitan\u201d clusters planned"
   ],
   "capacity_gw_evidence": [
    "## Overview",
    "- Hyperion, slated for [Richland Parish](/entity/richland-parish/m/0p498?ref=cluster:6229227), [Louisiana](/entity/louisiana/m/04ly1?ref=cluster:6229227), will scale up to five gigawatts over several years with additional \u201ctitan\u201d clusters planned"
   ],
   "builder_evidence": [
    "## Overview",
    "- [Meta](/entity/meta/m/0hmyfsv?ref=cluster:6229227) has pledged to invest hundreds of billions of dollars into compute infrastructure aimed at building [AI](/entity/artificial-intelligence/m/0mkz?ref=cluster:6229227) superintelligence",
    "- Hyperion, slated for [Richland Parish](/entity/richland-parish/m/0p498?ref=cluster:6229227), [Louisiana](/entity/louisiana/m/04ly1?ref=cluster:6229227), will scale up to five gigawatts over several years with additional \u201ctitan\u201d clusters planned"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Overview",
    "- Hyperion, slated for [Richland Parish](/entity/richland-parish/m/0p498?ref=cluster:6229227), [Louisiana](/entity/louisiana/m/04ly1?ref=cluster:6229227), will scale up to five gigawatts over several years with additional \u201ctitan\u201d clusters planned"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacentersexposed.com/facilities/anthropic-amazon-new-carlisle-epoch",
   "title": "Anthropic-Amazon New Carlisle \u2014 St. Joseph County, IN",
   "published_at": null,
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon",
   "ai_customer": "Anthropic",
   "status": "operating",
   "announcement_date": null,
   "project_evidence": [
    "hyperscaleAI / GPU compute",
    "# Anthropic-Amazon New Carlisle",
    "Project Rainier is Amazon's roughly 1,200-acre data-center campus in New Carlisle, Indiana, built for a single purpose: training and running Anthropic's Claude models."
   ],
   "locality_evidence": [
    "hyperscaleAI / GPU compute",
    "# Anthropic-Amazon New Carlisle",
    "Project Rainier is Amazon's roughly 1,200-acre data-center campus in New Carlisle, Indiana, built for a single purpose: training and running Anthropic's Claude models."
   ],
   "state_evidence": [
    "hyperscaleAI / GPU compute",
    "# Anthropic-Amazon New Carlisle",
    "Project Rainier is Amazon's roughly 1,200-acre data-center campus in New Carlisle, Indiana, built for a single purpose: training and running Anthropic's Claude models."
   ],
   "capacity_gw_evidence": [
    "hyperscaleAI / GPU compute",
    "# Anthropic-Amazon New Carlisle",
    "The full campus is designed for about 2.2 gigawatts, and Amazon has invested roughly $8 billion in Anthropic, which has committed to spending more than $100 billion on AWS."
   ],
   "builder_evidence": [
    "hyperscaleAI / GPU compute",
    "# Anthropic-Amazon New Carlisle",
    "Project Rainier is Amazon's roughly 1,200-acre data-center campus in New Carlisle, Indiana, built for a single purpose: training and running Anthropic's Claude models."
   ],
   "ai_customer_evidence": [
    "hyperscaleAI / GPU compute",
    "# Anthropic-Amazon New Carlisle",
    "Project Rainier is Amazon's roughly 1,200-acre data-center campus in New Carlisle, Indiana, built for a single purpose: training and running Anthropic's Claude models."
   ],
   "status_evidence": [
    "hyperscaleAI / GPU compute",
    "# Anthropic-Amazon New Carlisle",
    "Anthropic-Amazon New Carlisle is an operating data center in St. Joseph County, IN, operated by Amazon.com, Inc.."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://business.newportvermontdailyexpress.com/newportvermontdailyexpress/article/tokenring-2026-1-2-colossus-unbound-xais-memphis-expansion-targets-1-million-gpus-in-the-race-for-agi",
   "title": "Colossus Unbound: xAI\u00e2s Memphis Expansion Targets 1 Million GPUs in the Race for AGI",
   "published_at": "2026-01-02T19:48:24",
   "project": "Colossus",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "expanding",
   "announcement_date": "2026-01-02",
   "project_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race."
   ],
   "locality_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race."
   ],
   "state_evidence": [
    "As the \"Digital Delta\" takes shape across the Tennessee-Mississippi border, the project is redefining the physical and logistical requirements of the AGI era.",
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race."
   ],
   "capacity_gw_evidence": [
    "By targeting a power capacity of 2 gigawatts (GW)\u2014roughly enough to power nearly 2 million homes\u2014xAI is transitioning from a high-scale startup to a \"Gigafactory of Compute.\"",
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race."
   ],
   "builder_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race."
   ],
   "announcement_date_evidence": [
    "As of January 2, 2026, the company has successfully scaled its initial 100,000-GPU cluster to over 200,000 units and is now aggressively pursuing a roadmap to reach 1 million GPUs by the end of the year.",
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race."
   ]
  },
  {
   "url": "https://decisioninsights.ai/crusoe-and-lancium-plan-1.0-gw-ai-data-center-campus-in-childress-texas",
   "title": "Crusoe and Lancium plan 1.0 GW AI data center campus in Childress, Texas",
   "published_at": "2026-07-15T17:55:06",
   "project": null,
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-07-15",
   "project_evidence": null,
   "locality_evidence": [
    "# Crusoe and Lancium plan 1.0 GW AI data center campus in Childress, Texas",
    "Crusoe and Lancium said they will build a 1.0 gigawatt grid-connected [AI data center](https://decisioninsights.ai/term/ai-data-center/) campus in Childress, Texas."
   ],
   "state_evidence": [
    "# Crusoe and Lancium plan 1.0 GW AI data center campus in Childress, Texas",
    "Crusoe and Lancium said they will build a 1.0 gigawatt grid-connected [AI data center](https://decisioninsights.ai/term/ai-data-center/) campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium plan 1.0 GW AI data center campus in Childress, Texas",
    "Crusoe and Lancium said they will build a 1.0 gigawatt grid-connected [AI data center](https://decisioninsights.ai/term/ai-data-center/) campus in Childress, Texas."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium plan 1.0 GW AI data center campus in Childress, Texas",
    "Crusoe and Lancium said they will build a 1.0 gigawatt grid-connected [AI data center](https://decisioninsights.ai/term/ai-data-center/) campus in Childress, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Crusoe and Lancium plan 1.0 GW AI data center campus in Childress, Texas",
    "Crusoe and Lancium said they will build a 1.0 gigawatt grid-connected [AI data center](https://decisioninsights.ai/term/ai-data-center/) campus in Childress, Texas."
   ],
   "announcement_date_evidence": [
    "Provided by Globe Newswire on behalf of [Crusoe](https://decisioninsights.ai/directory/crusoe/). [Click to read original content](https://www.globenewswire.com/news-release/2026/07/15/3327869/0/en/Crusoe-and-Lancium-Announce-1-0-Gigawatt-AI-Data-Center-Campus-in-Childress-Texas.html)."
   ]
  },
  {
   "url": "https://flopper.io/datacenter/oracle-vantage-data-centers-frontier",
   "title": "Oracle Vantage Data Centers Frontier",
   "published_at": null,
   "project": "Vantage Data Centers Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "# Oracle Vantage Data Centers Frontier",
    "Oracle Vantage Data Centers Frontier"
   ],
   "locality_evidence": [
    "| Location | Shackelford County, Texas |",
    "# Oracle Vantage Data Centers Frontier",
    "## Specifications"
   ],
   "state_evidence": [
    "| Location | Shackelford County, Texas |",
    "# Oracle Vantage Data Centers Frontier",
    "## Specifications"
   ],
   "capacity_gw_evidence": [
    "1400.0 MW",
    "# Oracle Vantage Data Centers Frontier",
    "Power",
    "> \"1.4GW data center campus in Shackelford County, Texas\" \"The campus will be home to 10 data centers\""
   ],
   "builder_evidence": [
    "# Oracle Vantage Data Centers Frontier",
    "Oracle Vantage Data Centers Frontier",
    "- [View source](https://web.archive.org/web/20250825192457/https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Planned Likely",
    "# Oracle Vantage Data Centers Frontier"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://stocktitan.net/news/GEV/homer-city-redevelopment-and-kiewit-announce-country-s-largest-jewukgraqb4w.html",
   "title": "Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
   "published_at": "2025-04-02T11:00:00",
   "project": "Homer City Energy Campus",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Kiewit",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2025-04-02",
   "project_evidence": [
    "# Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "GE Vernova (NYSE: [GEV](/overview/GEV/)) will provide seven high efficiency 7HA.02 hydrogen-enabled, gas-fired turbines, with the first deliveries expected to begin in 2026.",
    "The Homer City Energy Campus will be built by Kiewit Power Constructors Co., one of the leading engineering, procurement and construction (EPC) contractors in the country."
   ],
   "locality_evidence": [
    "# Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "HOMER CITY, Pa.--(BUSINESS WIRE)-- Today Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) announced the future of the former Homer City Generating Station."
   ],
   "state_evidence": [
    "# Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "*Projected Cost of Power Infrastructure and Data Centers Will Represent Largest Capital Investment in the History of Pennsylvania*",
    "Homer City \u2013 previously the largest coal-burning power plant in Pennsylvania \u2013 will be transformed into a more than 3,200-acre natural gas-powered data center campus, designed to meet the growing artificial intelligence (AI) and high-performance computing (HPC) needs of the innovative technology companies shaping America\u2019s digital future."
   ],
   "capacity_gw_evidence": [
    "# Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "*Facility Will Generate Up to 4.5 GW of Energy Production Powered by Seven GE Vernova Turbines; First Turbine Deliveries Expected to Begin in 2026*",
    "- Delivery of up to 4.5 gigawatts (GW) of power to support AI-driven hyperscale data centers, while reducing greenhouse gas emissions by 60\u201365% per megawatt hour compared to the former coal plant."
   ],
   "builder_evidence": [
    "# Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "HOMER CITY, Pa.--(BUSINESS WIRE)-- Today Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) announced the future of the former Homer City Generating Station.",
    "The Homer City Energy Campus will be built by Kiewit Power Constructors Co., one of the leading engineering, procurement and construction (EPC) contractors in the country."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "HOMER CITY, Pa.--(BUSINESS WIRE)-- Today Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) announced the future of the former Homer City Generating Station."
   ],
   "announcement_date_evidence": [
    "# Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "HOMER CITY, Pa.--(BUSINESS WIRE)-- Today Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) announced the future of the former Homer City Generating Station."
   ]
  },
  {
   "url": "https://prnewswire.com/news-releases/nscale-acquires-american-intelligence--power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy-to-compute-302715207.html",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": "2026-03-16T21:18:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "locality_evidence": [
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "capacity_gw_evidence": [
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "The West Virginia campus is the first state-certified utility grid purpose-built for AI workloads in the United States. Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "builder_evidence": [
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "announcement_date_evidence": [
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ]
  },
  {
   "url": "https://inkl.com/news/openai-is-spending-30-billion-on-a-new-mega-3-2-gw-data-center-in-georgia-and-its-trying-really-hard-to-quell-local-opposition",
   "title": "OpenAI is spending $30 billion on a new mega 3.2 GW data center in Georgia \u2014 and it's trying really hard to quell local opposition",
   "published_at": "2026-07-23T15:05:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI is spending $30 billion on a new mega 3.2 GW data center in Georgia \u2014 and it's trying really hard to quell local opposition",
    "The site, named \u2018Project Camellia\u2019, will span 1,400 acres and is expected to be completed in phases between 2028 and 2032."
   ],
   "locality_evidence": [
    "# OpenAI is spending $30 billion on a new mega 3.2 GW data center in Georgia \u2014 and it's trying really hard to quell local opposition",
    "OpenAI is planning to build a new $30 billion AI data center campus in Effingham County, Georgia, that will deliver 3.2 gigawatts of compute once fully operational."
   ],
   "state_evidence": [
    "# OpenAI is spending $30 billion on a new mega 3.2 GW data center in Georgia \u2014 and it's trying really hard to quell local opposition",
    "OpenAI is planning to build a new $30 billion AI data center campus in Effingham County, Georgia, that will deliver 3.2 gigawatts of compute once fully operational."
   ],
   "capacity_gw_evidence": [
    "# OpenAI is spending $30 billion on a new mega 3.2 GW data center in Georgia \u2014 and it's trying really hard to quell local opposition",
    "OpenAI is planning to build a new $30 billion AI data center campus in Effingham County, Georgia, that will deliver 3.2 gigawatts of compute once fully operational."
   ],
   "builder_evidence": [
    "# OpenAI is spending $30 billion on a new mega 3.2 GW data center in Georgia \u2014 and it's trying really hard to quell local opposition",
    "OpenAI is planning to build a new $30 billion AI data center campus in Effingham County, Georgia, that will deliver 3.2 gigawatts of compute once fully operational."
   ],
   "ai_customer_evidence": [
    "# OpenAI is spending $30 billion on a new mega 3.2 GW data center in Georgia \u2014 and it's trying really hard to quell local opposition",
    "OpenAI is planning to build a new $30 billion AI data center campus in Effingham County, Georgia, that will deliver 3.2 gigawatts of compute once fully operational."
   ],
   "status_evidence": [
    "# OpenAI is spending $30 billion on a new mega 3.2 GW data center in Georgia \u2014 and it's trying really hard to quell local opposition",
    "OpenAI is planning to build a new $30 billion AI data center campus in Effingham County, Georgia, that will deliver 3.2 gigawatts of compute once fully operational."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://facebook.com/distillsocial/posts/dte-wants-state-regulators-to-sign-off-on-a-20-year-deal-to-power-googles-massiv/959890386563690",
   "title": "Distill Social",
   "published_at": null,
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "DTE",
   "ai_customer": "Google",
   "status": "evaluating",
   "announcement_date": null,
   "project_evidence": [
    "## Distill Social's Post",
    "DTE wants state regulators to sign off on a 20-year deal to power Google\u2019s massive \u201cProject Cannoli\u201d data center in Van Buren Township, a 1-gigawatt energy hog that would consume enough electricity to rival roughly 60% of Michigan homes."
   ],
   "locality_evidence": [
    "## Distill Social's Post",
    "DTE wants state regulators to sign off on a 20-year deal to power Google\u2019s massive \u201cProject Cannoli\u201d data center in Van Buren Township, a 1-gigawatt energy hog that would consume enough electricity to rival roughly 60% of Michigan homes."
   ],
   "state_evidence": [
    "## Distill Social's Post",
    "DTE wants state regulators to sign off on a 20-year deal to power Google\u2019s massive \u201cProject Cannoli\u201d data center in Van Buren Township, a 1-gigawatt energy hog that would consume enough electricity to rival roughly 60% of Michigan homes."
   ],
   "capacity_gw_evidence": [
    "## Distill Social's Post",
    "DTE wants state regulators to sign off on a 20-year deal to power Google\u2019s massive \u201cProject Cannoli\u201d data center in Van Buren Township, a 1-gigawatt energy hog that would consume enough electricity to rival roughly 60% of Michigan homes."
   ],
   "builder_evidence": [
    "## Distill Social's Post",
    "DTE wants state regulators to sign off on a 20-year deal to power Google\u2019s massive \u201cProject Cannoli\u201d data center in Van Buren Township, a 1-gigawatt energy hog that would consume enough electricity to rival roughly 60% of Michigan homes."
   ],
   "ai_customer_evidence": [
    "## Distill Social's Post",
    "DTE wants state regulators to sign off on a 20-year deal to power Google\u2019s massive \u201cProject Cannoli\u201d data center in Van Buren Township, a 1-gigawatt energy hog that would consume enough electricity to rival roughly 60% of Michigan homes."
   ],
   "status_evidence": [
    "## Distill Social's Post",
    "Google says it is still \u201cevaluating\u201d the site, but DTE\u2019s filing makes clear the township is the target, with service expected to begin in December 2027 and full load by December 2028."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://coincentral.com/terawulf-wulf-stock-jumps-13-on-kentucky-ai-data-center-expansion",
   "title": "TeraWulf (WULF) Stock Jumps 13% on Kentucky AI Data Center Expansion",
   "published_at": "2026-05-26T16:46:30",
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": null,
   "project_evidence": [
    "TeraWulf (WULF) surged 13% after announcing the Muskie Data Campus \u2014 a 1 gigawatt AI and HPC site in eastern Kentucky.",
    "TeraWulf (WULF) jumped 13% in early Tuesday trading after the company disclosed it had acquired the Muskie Data Campus in eastern Kentucky \u2014 a hyperscale site capable of supporting more than 1 gigawatt of AI and high-performance computing infrastructure over time."
   ],
   "locality_evidence": [
    "TeraWulf (WULF) surged 13% after announcing the Muskie Data Campus \u2014 a 1 gigawatt AI and HPC site in eastern Kentucky.",
    "TeraWulf (WULF) jumped 13% in early Tuesday trading after the company disclosed it had acquired the Muskie Data Campus in eastern Kentucky \u2014 a hyperscale site capable of supporting more than 1 gigawatt of AI and high-performance computing infrastructure over time."
   ],
   "state_evidence": [
    "TeraWulf (WULF) surged 13% after announcing the Muskie Data Campus \u2014 a 1 gigawatt AI and HPC site in eastern Kentucky.",
    "TeraWulf (WULF) jumped 13% in early Tuesday trading after the company disclosed it had acquired the Muskie Data Campus in eastern Kentucky \u2014 a hyperscale site capable of supporting more than 1 gigawatt of AI and high-performance computing infrastructure over time."
   ],
   "capacity_gw_evidence": [
    "TeraWulf (WULF) surged 13% after announcing the Muskie Data Campus \u2014 a 1 gigawatt AI and HPC site in eastern Kentucky.",
    "TeraWulf (WULF) jumped 13% in early Tuesday trading after the company disclosed it had acquired the Muskie Data Campus in eastern Kentucky \u2014 a hyperscale site capable of supporting more than 1 gigawatt of AI and high-performance computing infrastructure over time."
   ],
   "builder_evidence": [
    "TeraWulf (WULF) surged 13% after announcing the Muskie Data Campus \u2014 a 1 gigawatt AI and HPC site in eastern Kentucky.",
    "TeraWulf (WULF) jumped 13% in early Tuesday trading after the company disclosed it had acquired the Muskie Data Campus in eastern Kentucky \u2014 a hyperscale site capable of supporting more than 1 gigawatt of AI and high-performance computing infrastructure over time."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "TeraWulf (WULF) jumped 13% in early Tuesday trading after the company disclosed it had acquired the Muskie Data Campus in eastern Kentucky \u2014 a hyperscale site capable of supporting more than 1 gigawatt of AI and high-performance computing infrastructure over time."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://irisenergy.gcs-web.com/news-releases/news-release-details/iren-announces-successful-energization-sweetwater-1",
   "title": "IREN Announces Successful Energization of Sweetwater 1 | IREN",
   "published_at": null,
   "project": "Sweetwater",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN Limited",
   "ai_customer": null,
   "status": "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus.",
   "announcement_date": "2026-05-01",
   "project_evidence": [
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas.",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "capacity_gw_evidence": [
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "builder_evidence": [
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "announcement_date_evidence": [
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ]
  },
  {
   "url": "https://sustainableenergytimes.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "About Creekstone Energy",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "About Creekstone Energy",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://automationxai.com/ecl-announces-state-of-the-art-ai-data-centre-in-houston",
   "title": "ECL announces state-of-the-art AI data centre in Houston | Automation X",
   "published_at": "2024-09-27T12:47:38",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "This cutting-edge facility, designated the ECL TerraSite-TX1, is set to become a beacon of advanced technology and sustainable energy solutions.",
    "ECL unveils plans for a pioneering AI data centre in Houston, aiming for a sustainable future with a capacity of 1 gigawatt and an estimated investment of $8 billion."
   ],
   "locality_evidence": [
    "Houston, Texas \u2013 ECL, a prominent player in the sustainable technology sector, has revealed ambitious plans to construct a fully sustainable Artificial Intelligence (AI) data centre in Houston.",
    "ECL unveils plans for a pioneering AI data centre in Houston, aiming for a sustainable future with a capacity of 1 gigawatt and an estimated investment of $8 billion."
   ],
   "state_evidence": [
    "Houston, Texas \u2013 ECL, a prominent player in the sustainable technology sector, has revealed ambitious plans to construct a fully sustainable Artificial Intelligence (AI) data centre in Houston.",
    "ECL unveils plans for a pioneering AI data centre in Houston, aiming for a sustainable future with a capacity of 1 gigawatt and an estimated investment of $8 billion."
   ],
   "capacity_gw_evidence": [
    "Additionally, ECL has provided indications that the facility could potentially expand to 2 GW, contingent on future customer requirements.",
    "ECL unveils plans for a pioneering AI data centre in Houston, aiming for a sustainable future with a capacity of 1 gigawatt and an estimated investment of $8 billion."
   ],
   "builder_evidence": [
    "ECL, a prominent player in the sustainable technology sector, has revealed ambitious plans to construct a fully sustainable Artificial Intelligence (AI) data centre in Houston.",
    "ECL unveils plans for a pioneering AI data centre in Houston, aiming for a sustainable future with a capacity of 1 gigawatt and an estimated investment of $8 billion."
   ],
   "ai_customer_evidence": [
    "The first tenant scheduled to occupy the ground-breaking site is Lambda, an AI-focused company.",
    "ECL unveils plans for a pioneering AI data centre in Houston, aiming for a sustainable future with a capacity of 1 gigawatt and an estimated investment of $8 billion."
   ],
   "status_evidence": [
    "The complete data centre, with a planned capacity of 1 gigawatt (GW), is projected to demand an estimated investment of approximately $8 billion (\u00a35.98 billion).",
    "ECL unveils plans for a pioneering AI data centre in Houston, aiming for a sustainable future with a capacity of 1 gigawatt and an estimated investment of $8 billion."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://centredaily.com/news/business/article316739447.html",
   "title": "Morgan Stanley leads $15B bet on Anthropic's Texas campus",
   "published_at": "2026-08-02T00:07:00",
   "project": "Hubbard campus",
   "locality": "Hubbard",
   "state": "Texas",
   "capacity_gw": 1.6,
   "builder": "Nexus Data Centers",
   "ai_customer": "Anthropic",
   "status": "closing in on $15 billion in financing",
   "announcement_date": null,
   "project_evidence": [
    "Morgan Stanley leads $15B bet on Anthropic's Texas campus",
    "The Hubbard campus lands at an awkward moment for that model."
   ],
   "locality_evidence": null,
   "state_evidence": null,
   "capacity_gw_evidence": [
    "The guarantees cover [four Anthropic data center leases](https://www.reuters.com/legal/litigation/banks-talks-lend-15-billion-anthropic-data-center-backed-by-google-wsj-reports-2026-07-30/) and the power purchase agreements tied to an on-site natural gas plant with 1.6 gigawatts of capacity."
   ],
   "builder_evidence": null,
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://pondero.ai/news/2026-08-18-nvidia-sb-energy-ports-pike-105b",
   "title": "Nvidia guarantees $105 billion for OpenAI's Ohio campus and takes $1.5 billion stake in SB Energy",
   "published_at": "2026-08-18T00:00:00",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "Nvidia guarantees $105 billion for OpenAI's Ohio campus and takes $1.5 billion stake in SB Energy",
    "Nvidia on August 17 committed to back up to $105 billion in construction financing for the PORTS-Pike Technology Campus in Pike County, Ohio, and invested $1.5 billion in SB Energy, the SoftBank-backed developer building the facility, securing exclusive chip supply rights.",
    "The facility is the PORTS-Pike Technology Campus in Pike County, Ohio, which OpenAI will occupy on a 20-year lease."
   ],
   "locality_evidence": [
    "Nvidia guarantees $105 billion for OpenAI's Ohio campus and takes $1.5 billion stake in SB Energy",
    "Nvidia on August 17 committed to back up to $105 billion in construction financing for the PORTS-Pike Technology Campus in Pike County, Ohio, and invested $1.5 billion in SB Energy, the SoftBank-backed developer building the facility, securing exclusive chip supply rights.",
    "The facility is the PORTS-Pike Technology Campus in Pike County, Ohio, which OpenAI will occupy on a 20-year lease."
   ],
   "state_evidence": [
    "Nvidia guarantees $105 billion for OpenAI's Ohio campus and takes $1.5 billion stake in SB Energy",
    "Nvidia on August 17 committed to back up to $105 billion in construction financing for the PORTS-Pike Technology Campus in Pike County, Ohio, and invested $1.5 billion in SB Energy, the SoftBank-backed developer building the facility, securing exclusive chip supply rights.",
    "The facility is the PORTS-Pike Technology Campus in Pike County, Ohio, which OpenAI will occupy on a 20-year lease."
   ],
   "capacity_gw_evidence": [
    "Nvidia guarantees $105 billion for OpenAI's Ohio campus and takes $1.5 billion stake in SB Energy",
    "The campus will deliver an initial 4.25 gigawatts of IT capacity, with an option for 3.75 more gigawatts, reaching 8 gigawatts in total potential, per the Nvidia release."
   ],
   "builder_evidence": [
    "Nvidia guarantees $105 billion for OpenAI's Ohio campus and takes $1.5 billion stake in SB Energy",
    "Nvidia on August 17 committed to back up to $105 billion in construction financing for the PORTS-Pike Technology Campus in Pike County, Ohio, and invested $1.5 billion in SB Energy, the SoftBank-backed developer building the facility, securing exclusive chip supply rights.",
    "Alongside the guarantee, Nvidia took a $1.5 billion equity stake in SB Energy, the SoftBank-backed company building and operating the campus, and locked in exclusive rights to supply all compute at the site."
   ],
   "ai_customer_evidence": [
    "Nvidia guarantees $105 billion for OpenAI's Ohio campus and takes $1.5 billion stake in SB Energy",
    "Nvidia on August 17 committed to back up to $105 billion in construction financing for the PORTS-Pike Technology Campus in Pike County, Ohio, and invested $1.5 billion in SB Energy, the SoftBank-backed developer building the facility, securing exclusive chip supply rights.",
    "The facility is the PORTS-Pike Technology Campus in Pike County, Ohio, which OpenAI will occupy on a 20-year lease."
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "Nvidia guarantees $105 billion for OpenAI's Ohio campus and takes $1.5 billion stake in SB Energy",
    "Nvidia on August 17 committed to back up to $105 billion in construction financing for the PORTS-Pike Technology Campus in Pike County, Ohio, and invested $1.5 billion in SB Energy, the SoftBank-backed developer building the facility, securing exclusive chip supply rights."
   ]
  },
  {
   "url": "https://introl.com/blog/openai-stargate-500-billion-ai-infrastructure-2025",
   "title": "What $500 billion in AI infrastructure actually looks like: inside OpenAI's Stargate",
   "published_at": "2026-02-08T00:00:00",
   "project": "Abilene flagship",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "open",
   "announcement_date": "2025-01-21",
   "project_evidence": [
    "# What $500 billion in AI infrastructure actually looks like: inside OpenAI's Stargate",
    "Abilene flagship at 1.2GW with 400,000 GB200 GPUs planned.",
    "The flagship Abilene, Texas campus alone will draw 1.2 gigawatts once all eight AI factory halls come online, enough to power 750,000 homes."
   ],
   "locality_evidence": [
    "# What $500 billion in AI infrastructure actually looks like: inside OpenAI's Stargate",
    "Abilene flagship at 1.2GW with 400,000 GB200 GPUs planned.",
    "The flagship Abilene, Texas campus alone will draw 1.2 gigawatts once all eight AI factory halls come online, enough to power 750,000 homes."
   ],
   "state_evidence": [
    "# What $500 billion in AI infrastructure actually looks like: inside OpenAI's Stargate",
    "Abilene flagship at 1.2GW with 400,000 GB200 GPUs planned.",
    "The flagship Abilene, Texas campus alone will draw 1.2 gigawatts once all eight AI factory halls come online, enough to power 750,000 homes."
   ],
   "capacity_gw_evidence": [
    "# What $500 billion in AI infrastructure actually looks like: inside OpenAI's Stargate",
    "Abilene flagship at 1.2GW with 400,000 GB200 GPUs planned.",
    "The flagship Abilene, Texas campus alone will draw 1.2 gigawatts once all eight AI factory halls come online, enough to power 750,000 homes."
   ],
   "builder_evidence": [
    "# What $500 billion in AI infrastructure actually looks like: inside OpenAI's Stargate",
    "The flagship facility in Abilene, Texas, known internally as \"Project Ludicrous,\" began receiving NVIDIA GB200 server racks in mid-2025 and operates on Oracle Cloud Infrastructure."
   ],
   "ai_customer_evidence": [
    "# What $500 billion in AI infrastructure actually looks like: inside OpenAI's Stargate",
    "Abilene flagship at 1.2GW with 400,000 GB200 GPUs planned.",
    "The Stargate Project intends to invest $500 billion over four years building AI infrastructure for OpenAI across the United States."
   ],
   "status_evidence": [
    "# What $500 billion in AI infrastructure actually looks like: inside OpenAI's Stargate",
    "CNBC. \"OpenAI's first data center in $500 billion Stargate project is open in Texas.\" September 23, 2025. https://www.cnbc.com/2025/09/23/openai-first-data-center-in-500-billion-stargate-project-up-in-texas.html"
   ],
   "announcement_date_evidence": [
    "# What $500 billion in AI infrastructure actually looks like: inside OpenAI's Stargate",
    "President Donald Trump called it \"the largest AI infrastructure project in history\" when he stood alongside OpenAI CEO Sam Altman, SoftBank CEO Masayoshi Son, and Oracle Chairman Larry Ellison on January 21, 2025.\u00b9"
   ]
  },
  {
   "url": "https://linkedin.com/top-content/business-strategy/strategic-partnerships-in-tech-industry/utility-stocks-driven-by-data-center-partnerships",
   "title": "Utility Stocks Driven by Data Center Partnerships",
   "published_at": "2026-04-22T17:43:57",
   "project": "Hyperion",
   "locality": null,
   "state": "Louisiana",
   "capacity_gw": 7.4,
   "builder": "Entergy",
   "ai_customer": "Meta",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Utility Stocks Driven by Data Center Partnerships",
    "Explore top LinkedIn content from expert professionals.",
    "Plus Hyperion in Louisiana \u2014 $27B / 7.4GW through 10 gas-fired plants with Entergy."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "Utility Stocks Driven by Data Center Partnerships",
    "Explore top LinkedIn content from expert professionals.",
    "Plus Hyperion in Louisiana \u2014 $27B / 7.4GW through 10 gas-fired plants with Entergy."
   ],
   "capacity_gw_evidence": [
    "Utility Stocks Driven by Data Center Partnerships",
    "Explore top LinkedIn content from expert professionals.",
    "Plus Hyperion in Louisiana \u2014 $27B / 7.4GW through 10 gas-fired plants with Entergy."
   ],
   "builder_evidence": [
    "Utility Stocks Driven by Data Center Partnerships",
    "Explore top LinkedIn content from expert professionals.",
    "Plus Hyperion in Louisiana \u2014 $27B / 7.4GW through 10 gas-fired plants with Entergy."
   ],
   "ai_customer_evidence": [
    "Utility Stocks Driven by Data Center Partnerships",
    "Explore top LinkedIn content from expert professionals.",
    "Meta announced its 32nd data center in Tulsa yesterday ($1B+), and on the same day \u2014 a 1GW / 100GWh long-duration storage agreement with Noon Energy (which I covered in my previous post).",
    "Plus Hyperion in Louisiana \u2014 $27B / 7.4GW through 10 gas-fired plants with Entergy."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://dcpulse.com/project/xai-macrohardrr-20b-mississippi-2gw-ai-supercluster",
   "title": "xAI's $20B MACROHARDRR in Southaven",
   "published_at": null,
   "project": "xAI MACROHARDRR: $20B 2GW AI Supercluster Southaven MS",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "",
   "status": "Operational (Initial Phases)",
   "announcement_date": "2026-01-08",
   "project_evidence": [
    "# xAI MACROHARDRR: $20B 2GW AI Supercluster Southaven MS",
    "| Project Name | xAI MACROHARDRR: $20B 2GW AI Supercluster Southaven MS |"
   ],
   "locality_evidence": [
    "**Status:** Operational (Initial Phases) | **Location:** Southaven (DeSoto County)",
    "| Location | Southaven (DeSoto County) |",
    "| Header | Details |",
    "| City Name | Southaven |"
   ],
   "state_evidence": [
    "# xAI MACROHARDRR: $20B 2GW AI Supercluster Southaven MS",
    "The project was fast-tracked to go operational by February 2026, positioning it as a core node in what xAI calls the \"Digital Delta.\"",
    "| Header | Details |",
    "| Strategic Infrastructure Partner | Mississippi Development Authority (MDA) |"
   ],
   "capacity_gw_evidence": [
    "# xAI MACROHARDRR: $20B 2GW AI Supercluster Southaven MS",
    "The campus is engineered for unparalleled compute density, pushing xAI\u2019s total regional capacity to nearly 2 gigawatts.",
    "| Field | Value |",
    "| Project Name | xAI MACROHARDRR: $20B 2GW AI Supercluster Southaven MS |"
   ],
   "builder_evidence": [
    "# xAI MACROHARDRR: $20B 2GW AI Supercluster Southaven MS",
    "The project was fast-tracked to go operational by February 2026, positioning it as a core node in what xAI calls the \"Digital Delta.\"",
    "## Companies Involved",
    "| Header | Details |",
    "| Developer / Operator | [xai](https://dcpulse.com/projects/companyprofiles/xai-ai-company) |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "**Status:** Operational (Initial Phases) | **Location:** Southaven (DeSoto County)",
    "| Field | Value |",
    "| Status | Operational (Initial Phases) |"
   ],
   "announcement_date_evidence": [
    "## Milestones",
    "| Header | Details |",
    "| Announcement | January 8, 2026 |"
   ]
  },
  {
   "url": "https://idcnova.com/news/Crusoe-and-Lancium-Partner-to-Develop-1.4-GW-AI-Data-Center-Campus-in-Childress-Texas",
   "title": "Crusoe and Lancium Partner to Develop 1.4 GW AI Data Center Campus in Childress, Texas",
   "published_at": "2026-07-16T10:28:55",
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Crusoe and Lancium Partner to Develop 1.4 GW AI Data Center Campus in Childress, Texas",
    "Data center and AI cloud firm Crusoe has announced plans to develop a gigawatt-scale data center campus in Childress, Texas, in partnership with energy infrastructure developer Lancium."
   ],
   "locality_evidence": [
    "# Crusoe and Lancium Partner to Develop 1.4 GW AI Data Center Campus in Childress, Texas",
    "Data center and AI cloud firm Crusoe has announced plans to develop a gigawatt-scale data center campus in Childress, Texas, in partnership with energy infrastructure developer Lancium."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Partner to Develop 1.4 GW AI Data Center Campus in Childress, Texas",
    "Data center and AI cloud firm Crusoe has announced plans to develop a gigawatt-scale data center campus in Childress, Texas, in partnership with energy infrastructure developer Lancium."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium Partner to Develop 1.4 GW AI Data Center Campus in Childress, Texas"
   ],
   "builder_evidence": [
    "# Crusoe and Lancium Partner to Develop 1.4 GW AI Data Center Campus in Childress, Texas",
    "Data center and AI cloud firm Crusoe has announced plans to develop a gigawatt-scale data center campus in Childress, Texas, in partnership with energy infrastructure developer Lancium."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Data center and AI cloud firm Crusoe has announced plans to develop a gigawatt-scale data center campus in Childress, Texas, in partnership with energy infrastructure developer Lancium."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://substack.com/redirect/61ab2786-ec17-41e3-9781-0e77cd4dd5da?j=eyJ1IjoiM3djM2MxIn0.OGuf1Irm-qb700DahBb35RT9QTn8SiZLleBWozyCeUk",
   "title": "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand - Vantage Data Centers",
   "published_at": null,
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "# Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "locality_evidence": [
    "# Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "**DENVER (Aug. 19, 2025)** \u2013 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "# Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "**DENVER (Aug. 19, 2025)** \u2013 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "# Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "**DENVER (Aug. 19, 2025)** \u2013 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "# Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "**DENVER (Aug. 19, 2025)** \u2013 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": [
    "# Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "**DENVER (Aug. 19, 2025)** \u2013 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news/fermi-taps-hillcore-to-construct-26gw-gas-plant-for-up-to-11gw-project-matador-in-amarillo-texas",
   "title": "Fermi taps Hillcore to construct 2.6GW gas plant for up to 11GW Project Matador in Amarillo, Texas",
   "published_at": "2026-08-05T00:00:00",
   "project": "Project Matador",
   "locality": "Carson County",
   "state": "Texas",
   "capacity_gw": 17.0,
   "builder": "Fermi America",
   "ai_customer": "TensorWave",
   "status": "underway",
   "announcement_date": null,
   "project_evidence": [
    "Fermi America has inked a deal with Hillcore Energy Capital (Hillcore) to develop a 2.6GW natural gas-anchored power plant that will feed a planned up to 17GW data center and energy campus called Project Matador in Carson County, Texas.",
    "The company\u2019s Project Matador is [a massive 17GW data center and energy campus](https://www.datacenterdynamics.com/en/news/?tag=fermi-america) near Amarillo in Texas on land owned by the Texas Tech University system."
   ],
   "locality_evidence": [
    "Fermi America has inked a deal with Hillcore Energy Capital (Hillcore) to develop a 2.6GW natural gas-anchored power plant that will feed a planned up to 17GW data center and energy campus called Project Matador in Carson County, Texas."
   ],
   "state_evidence": [
    "Fermi America has inked a deal with Hillcore Energy Capital (Hillcore) to develop a 2.6GW natural gas-anchored power plant that will feed a planned up to 17GW data center and energy campus called Project Matador in Carson County, Texas."
   ],
   "capacity_gw_evidence": [
    "Fermi America has inked a deal with Hillcore Energy Capital (Hillcore) to develop a 2.6GW natural gas-anchored power plant that will feed a planned up to 17GW data center and energy campus called Project Matador in Carson County, Texas.",
    "The campus was initially announced with planned 11GW of capacity, but Fermi increased the figure to 17GW in March 2026."
   ],
   "builder_evidence": [
    "Fermi America has inked a deal with Hillcore Energy Capital (Hillcore) to develop a 2.6GW natural gas-anchored power plant that will feed a planned up to 17GW data center and energy campus called Project Matador in Carson County, Texas."
   ],
   "ai_customer_evidence": [
    "[Earlier this week](https://www.datacenterdynamics.com/en/news/fermi-signs-agreement-with-tensorwave-for-up-to-650mw-of-data-center-capacity-at-project-matador-site/), it signed a binding lease agreement with AI cloud provider TensorWave for up to 650MW of data center capacity at its Project Matador site in Texas."
   ],
   "status_evidence": [
    "This week, Fermi said Project Matador is \u201cwell underway,\u201d with approximately 6GW of the planned 17GW already permitted, and more than $1.5bn invested in the buildout to date, with first power targeted for 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://theregister.com/2025/04/02/pennsylvanias_largest_coal_plant",
   "title": "PA\u2019s largest coal plant to become 4.5GW gas-fired AI hub",
   "published_at": "2025-04-02T21:17:20",
   "project": "Homer City",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Homer City Redevelopment",
   "ai_customer": null,
   "status": "proposed",
   "announcement_date": null,
   "project_evidence": [
    "# Pennsylvania\u2019s once top coal power plant eyed for revival as 4.5GW gas-fired AI campus",
    "The Homer City datacenter complex is one of a growing number of large-scale power projects designed to address AI's exploding appetite for power."
   ],
   "locality_evidence": [
    "# Pennsylvania\u2019s once top coal power plant eyed for revival as 4.5GW gas-fired AI campus",
    "Building at the former Homer City Generating Station has its advantages."
   ],
   "state_evidence": [
    "# Pennsylvania\u2019s once top coal power plant eyed for revival as 4.5GW gas-fired AI campus",
    "Developers on Wednesday announced plans to bring up to 4.5 gigawatts of natural gas-fired power online by 2027 at the site of what was once Pennsylvania's largest coal plant, as part of a proposed datacenter campus running AI and high-performance computing workloads."
   ],
   "capacity_gw_evidence": [
    "# Pennsylvania\u2019s once top coal power plant eyed for revival as 4.5GW gas-fired AI campus",
    "Developers on Wednesday announced plans to bring up to 4.5 gigawatts of natural gas-fired power online by 2027 at the site of what was once Pennsylvania's largest coal plant, as part of a proposed datacenter campus running AI and high-performance computing workloads."
   ],
   "builder_evidence": [
    "# Pennsylvania\u2019s once top coal power plant eyed for revival as 4.5GW gas-fired AI campus",
    "Development of the 3,200-acre natural gas-powered datacenter campus is being led by Homer City Redevelopment (HCR) and is expected to exceed $10 billion for power infrastructure and site readiness alone, with additional billions anticipated for the datacenter development."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Pennsylvania\u2019s once top coal power plant eyed for revival as 4.5GW gas-fired AI campus",
    "Developers on Wednesday announced plans to bring up to 4.5 gigawatts of natural gas-fired power online by 2027 at the site of what was once Pennsylvania's largest coal plant, as part of a proposed datacenter campus running AI and high-performance computing workloads."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aap.com.au/aapreleases/cision20260316ae11323",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": null,
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*"
   ],
   "locality_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "capacity_gw_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "builder_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "announcement_date_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "merger, acquisition and takeover March 17, 2026",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ]
  },
  {
   "url": "https://adbytes.media/blog/core-scientific-converts-texas-bitcoin-mine-into-1-5gw-ai-data-center-campus",
   "title": "Core Scientific Converts Texas Bitcoin Mine into 1.5GW AI Data Center Campus - Let's Talk, Bitcoin",
   "published_at": "2026-04-28T12:01:48",
   "project": "Core Scientific Pecos project",
   "locality": "Pecos",
   "state": "Texas",
   "capacity_gw": 1.5,
   "builder": "Core Scientific",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "Core Scientific shifts Bitcoin mining site toward 1_5GW AI data center plan"
   ],
   "locality_evidence": [
    "Core Scientific shifts Bitcoin mining site toward 1_5GW AI data center plan",
    "[Core Scientific shifts Bitcoin mining site toward 1_5GW AI data center plan](https://crypto.news/?p=14458649) is converting a [Bitcoin mining](https://adbytes.media/blog/coreweave-stock-plummets-61-ai-bubble-fears-hit-crypto-and-tech-hard) site in Pecos, Texas into a 1.5GW AI data center campus, a blunt reminder that power, land, and grid access may be more valuable than hash rate alone."
   ],
   "state_evidence": [
    "Core Scientific shifts Bitcoin mining site toward 1_5GW AI data center plan",
    "[Core Scientific shifts Bitcoin mining site toward 1_5GW AI data center plan](https://crypto.news/?p=14458649) is converting a [Bitcoin mining](https://adbytes.media/blog/coreweave-stock-plummets-61-ai-bubble-fears-hit-crypto-and-tech-hard) site in Pecos, Texas into a 1.5GW AI data center campus, a blunt reminder that power, land, and grid access may be more valuable than hash rate alone."
   ],
   "capacity_gw_evidence": [
    "Core Scientific shifts Bitcoin mining site toward 1_5GW AI data center plan",
    "[Core Scientific shifts Bitcoin mining site toward 1_5GW AI data center plan](https://crypto.news/?p=14458649) is converting a [Bitcoin mining](https://adbytes.media/blog/coreweave-stock-plummets-61-ai-bubble-fears-hit-crypto-and-tech-hard) site in Pecos, Texas into a 1.5GW AI data center campus, a blunt reminder that power, land, and grid access may be more valuable than hash rate alone."
   ],
   "builder_evidence": [
    "Core Scientific shifts Bitcoin mining site toward 1_5GW AI data center plan"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Core Scientific shifts Bitcoin mining site toward 1_5GW AI data center plan",
    "The first data hall has already completed foundation work, vertical construction is beginning, and the company says early capacity should come online in 2027."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://petoskeynews.com/story/money/business/2026/03/17/google-reveals-project-cannoli-data-center/89185890007",
   "title": "Google reveals it is behind big 'Project Cannoli' data center project",
   "published_at": "2026-03-17T12:02:18",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "locality_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "state_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google also said Tuesday that it is creating a $10 million Energy Impact Fund for local organizations to tap into with the aim of lowering monthly utility bills for Michiganders."
   ],
   "capacity_gw_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "builder_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "The data center would be developed for Google by Panattoni Development Co."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "announcement_date_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Updated March 17, 2026, 2:27 p.m. ET",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ]
  },
  {
   "url": "https://becausebitcoin.com/post/terawulf-stock-bitcoin-miner-kentucky-muskie-campus-1gw-ai-capacity",
   "title": "TeraWulf Stock Jumps as Bitcoin Miner Secures Kentucky \u2018Muskie\u2019 Campus for 1+ GW of AI Capacity | Because Bitcoin",
   "published_at": null,
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "Bitcoin miners are evolving into power-first data infrastructure developers, and TeraWulf just made that pivot louder.",
    "The company purchased a large development site in eastern Kentucky to build the Muskie Data Campus\u2014positioning itself to deliver more than a gigawatt of AI and high\u2011performance computing capacity in a state hungry for new industrial investment."
   ],
   "locality_evidence": [
    "Bitcoin miners are evolving into power-first data infrastructure developers, and TeraWulf just made that pivot louder.",
    "The company purchased a large development site in eastern Kentucky to build the Muskie Data Campus\u2014positioning itself to deliver more than a gigawatt of AI and high\u2011performance computing capacity in a state hungry for new industrial investment."
   ],
   "state_evidence": [
    "Bitcoin miners are evolving into power-first data infrastructure developers, and TeraWulf just made that pivot louder.",
    "The company purchased a large development site in eastern Kentucky to build the Muskie Data Campus\u2014positioning itself to deliver more than a gigawatt of AI and high\u2011performance computing capacity in a state hungry for new industrial investment."
   ],
   "capacity_gw_evidence": [
    "Bitcoin miners are evolving into power-first data infrastructure developers, and TeraWulf just made that pivot louder.",
    "The company purchased a large development site in eastern Kentucky to build the Muskie Data Campus\u2014positioning itself to deliver more than a gigawatt of AI and high\u2011performance computing capacity in a state hungry for new industrial investment."
   ],
   "builder_evidence": [
    "Bitcoin miners are evolving into power-first data infrastructure developers, and TeraWulf just made that pivot louder.",
    "The company purchased a large development site in eastern Kentucky to build the Muskie Data Campus\u2014positioning itself to deliver more than a gigawatt of AI and high\u2011performance computing capacity in a state hungry for new industrial investment."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Bitcoin miners are evolving into power-first data infrastructure developers, and TeraWulf just made that pivot louder.",
    "The company purchased a large development site in eastern Kentucky to build the Muskie Data Campus\u2014positioning itself to deliver more than a gigawatt of AI and high\u2011performance computing capacity in a state hungry for new industrial investment."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://theenergymag.com/news/2026-05-06/hut-ai-beacon-point",
   "title": "Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion",
   "published_at": "2026-05-06T08:26:49",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion",
    "The Miami-based company said it signed a $9.8 billion triple-net lease for 352 megawatts of IT capacity at its Beacon Point campus in Nueces County, Texas."
   ],
   "locality_evidence": [
    "# Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion",
    "The Miami-based company said it signed a $9.8 billion triple-net lease for 352 megawatts of IT capacity at its Beacon Point campus in Nueces County, Texas."
   ],
   "state_evidence": [
    "# Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion",
    "The Miami-based company said it signed a $9.8 billion triple-net lease for 352 megawatts of IT capacity at its Beacon Point campus in Nueces County, Texas."
   ],
   "capacity_gw_evidence": [
    "# Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion",
    "Beacon Point is designed as a gigawatt-scale campus with 1,000 MW of utility capacity under interconnection agreement with AEP Texas."
   ],
   "builder_evidence": [
    "# Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion",
    "The Miami-based company said it signed a $9.8 billion triple-net lease for 352 megawatts of IT capacity at its Beacon Point campus in Nueces County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion",
    "Beacon Point is designed as a gigawatt-scale campus with 1,000 MW of utility capacity under interconnection agreement with AEP Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacentersexposed.com/facilities/sweetwater-1-and-2",
   "title": "Sweetwater 1 and 2 \u2014 Fisher County, TX",
   "published_at": null,
   "project": "Sweetwater 1 and 2",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN Limited",
   "ai_customer": null,
   "status": "Proposed",
   "announcement_date": null,
   "project_evidence": [
    "# Sweetwater 1 and 2",
    "Sweetwater 1 and 2 is a proposed data center in Fisher County, TX, operated by IREN Limited."
   ],
   "locality_evidence": [
    "# Sweetwater 1 and 2",
    "Sweetwater, Fisher County, TX",
    "Sweetwater 1 and 2 is a proposed data center in Fisher County, TX, operated by IREN Limited."
   ],
   "state_evidence": [
    "# Sweetwater 1 and 2",
    "Sweetwater, Fisher County, TX",
    "Sweetwater 1 and 2 is a proposed data center in Fisher County, TX, operated by IREN Limited."
   ],
   "capacity_gw_evidence": [
    "# Sweetwater 1 and 2",
    "DataCentersExposed has documented 2,000 MW of reported power capacity at this site."
   ],
   "builder_evidence": [
    "# Sweetwater 1 and 2",
    "Sweetwater 1 and 2 is a proposed data center in Fisher County, TX, operated by IREN Limited."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Proposed",
    "# Sweetwater 1 and 2",
    "Sweetwater 1 and 2 is a proposed data center in Fisher County, TX, operated by IREN Limited."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://finance.yahoo.com/news/world-largest-data-center-campus-173452204.html",
   "title": "World\u2019s largest data center campus could be coming to central Utah",
   "published_at": "2025-08-15T17:34:52",
   "project": "Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": "BluSky AI",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "World\u2019s largest data center campus could be coming to central Utah",
    "The first domino fell when Orem-based Fibernet MercuryDelta LLC in May filed a [request](https://millardcounty.gov/wp-content/uploads/2025/05/05282025-PC-Agenda.pdf) to rezone nearly 1,200 acres of property \u2014 located southeast of Delta \u2014 from agricultural land to heavy industrial land for its potential 20-million-square-foot data center campus called Delta Gigasite."
   ],
   "locality_evidence": [
    "World\u2019s largest data center campus could be coming to central Utah",
    "The first domino fell when Orem-based Fibernet MercuryDelta LLC in May filed a [request](https://millardcounty.gov/wp-content/uploads/2025/05/05282025-PC-Agenda.pdf) to rezone nearly 1,200 acres of property \u2014 located southeast of Delta \u2014 from agricultural land to heavy industrial land for its potential 20-million-square-foot data center campus called Delta Gigasite."
   ],
   "state_evidence": [
    "World\u2019s largest data center campus could be coming to central Utah",
    "The world's largest data center campus may be coming to Utah, with a pair of companies planning to construct artificial intelligence-ready hubs in Millard County."
   ],
   "capacity_gw_evidence": [
    "World\u2019s largest data center campus could be coming to central Utah",
    "A release from Creekstone Energy said that over the coming decade, the company plans to manage 10 gigawatts of capacity at the site from three primary sources, drawing 1.8 gigawatts from the Intermountain Power Project, 6 gigawatts from solar and 2 gigawatts from natural gas while also considering geothermal, wind and nuclear as potential future additions."
   ],
   "builder_evidence": [
    "World\u2019s largest data center campus could be coming to central Utah",
    "The effort to build what's being billed as the \"world's most powerful data center campus\" took another step forward in early August when Creekstone Energy LLC signed an agreement with Murray-based BluSky AI to provide the company 25 acres of land and up to 50 megawatts of energy for modular data centers on the campus."
   ],
   "ai_customer_evidence": [
    "World\u2019s largest data center campus could be coming to central Utah",
    "The effort to build what's being billed as the \"world's most powerful data center campus\" took another step forward in early August when Creekstone Energy LLC signed an agreement with Murray-based BluSky AI to provide the company 25 acres of land and up to 50 megawatts of energy for modular data centers on the campus."
   ],
   "status_evidence": [
    "World\u2019s largest data center campus could be coming to central Utah",
    "The first domino fell when Orem-based Fibernet MercuryDelta LLC in May filed a [request](https://millardcounty.gov/wp-content/uploads/2025/05/05282025-PC-Agenda.pdf) to rezone nearly 1,200 acres of property \u2014 located southeast of Delta \u2014 from agricultural land to heavy industrial land for its potential 20-million-square-foot data center campus called Delta Gigasite."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://power-to-x.de/en/ecl-builds-a-hydrogen-powered-data-center-with-1-GW-capacity",
   "title": "ECL builds a hydrogen-powered data center with 1 GW capacity",
   "published_at": "2024-10-01T09:26:32",
   "project": "TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Edge Cloud Link Inc.",
   "ai_customer": "Lambda Inc.",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "The project, called \"TerraSite-TX1,\" is being built east of Houston, Texas, on an area of \u200b\u200b600 hectares as a \"data center-as-a-service.\"",
    "**(Mountain View / USA) \u2013** California-based Edge Cloud Link Inc. (ECL) plans to build a hydrogen-powered data center with a capacity of one gigawatt."
   ],
   "locality_evidence": [
    "The project, called \"TerraSite-TX1,\" is being built east of Houston, Texas, on an area of \u200b\u200b600 hectares as a \"data center-as-a-service.\"",
    "**(Mountain View / USA) \u2013** California-based Edge Cloud Link Inc. (ECL) plans to build a hydrogen-powered data center with a capacity of one gigawatt."
   ],
   "state_evidence": [
    "The project, called \"TerraSite-TX1,\" is being built east of Houston, Texas, on an area of \u200b\u200b600 hectares as a \"data center-as-a-service.\"",
    "**(Mountain View / USA) \u2013** California-based Edge Cloud Link Inc. (ECL) plans to build a hydrogen-powered data center with a capacity of one gigawatt."
   ],
   "capacity_gw_evidence": [
    "The initially planned output of one gigawatt can be modularly expanded in 1 MW steps up to two gigawatts, depending on customer demand.",
    "**(Mountain View / USA) \u2013** California-based Edge Cloud Link Inc. (ECL) plans to build a hydrogen-powered data center with a capacity of one gigawatt."
   ],
   "builder_evidence": [
    "**(Mountain View / USA) \u2013** California-based Edge Cloud Link Inc. (ECL) plans to build a hydrogen-powered data center with a capacity of one gigawatt.",
    "The project, called \"TerraSite-TX1,\" is being built east of Houston, Texas, on an area of \u200b\u200b600 hectares as a \"data center-as-a-service.\""
   ],
   "ai_customer_evidence": [
    "According to the company, the first tenant is AI specialist Lambda Inc.",
    "**(Mountain View / USA) \u2013** California-based Edge Cloud Link Inc. (ECL) plans to build a hydrogen-powered data center with a capacity of one gigawatt."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://marketscreener.com/news/softbank-sb-energy-nvidia-and-openai-made-an-announcement-about-the-ports-pike-technology-campus-ce7859dcdb8ff32c",
   "title": "SoftBank : SB Energy, NVIDIA, and OpenAI made an announcement about the PORTS-Pike Technology Campus in Ohio. (External link)",
   "published_at": "2026-08-17T14:24:08",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# SoftBank : SB Energy, NVIDIA, and OpenAI made an announcement about the PORTS-Pike Technology Campus in Ohio. (External link)",
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "locality_evidence": [
    "# SoftBank : SB Energy, NVIDIA, and OpenAI made an announcement about the PORTS-Pike Technology Campus in Ohio. (External link)",
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "state_evidence": [
    "# SoftBank : SB Energy, NVIDIA, and OpenAI made an announcement about the PORTS-Pike Technology Campus in Ohio. (External link)",
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "capacity_gw_evidence": [
    "# SoftBank : SB Energy, NVIDIA, and OpenAI made an announcement about the PORTS-Pike Technology Campus in Ohio. (External link)",
    "- * OpenAI will be the customer for 8-IT GW*"
   ],
   "builder_evidence": [
    "# SoftBank : SB Energy, NVIDIA, and OpenAI made an announcement about the PORTS-Pike Technology Campus in Ohio. (External link)",
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "ai_customer_evidence": [
    "# SoftBank : SB Energy, NVIDIA, and OpenAI made an announcement about the PORTS-Pike Technology Campus in Ohio. (External link)",
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "status_evidence": [
    "# SoftBank : SB Energy, NVIDIA, and OpenAI made an announcement about the PORTS-Pike Technology Campus in Ohio. (External link)",
    "The planned capacity is expected to come online in phases beginning in 2028."
   ],
   "announcement_date_evidence": [
    "# SoftBank : SB Energy, NVIDIA, and OpenAI made an announcement about the PORTS-Pike Technology Campus in Ohio. (External link)",
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ]
  },
  {
   "url": "https://servercountry.org/data/entities/openai",
   "title": "OpenAI: Data Center Projects | Server Country",
   "published_at": null,
   "project": "OpenAI Stargate - Saline Township Campus",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.4,
   "builder": null,
   "ai_customer": null,
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "## Projects",
    "| Project | State | Investment | Power | Status |",
    "| [ OpenAI Stargate - Saline Township Campus ](/data/projects/openai-stargate-saline-township-campus) Saline Township | [ Michigan ](/data/states/michigan) | $16.0B | 1.4 GW | Under Construction |"
   ],
   "locality_evidence": [
    "## Projects",
    "| Project | State | Investment | Power | Status |",
    "| [ OpenAI Stargate - Saline Township Campus ](/data/projects/openai-stargate-saline-township-campus) Saline Township | [ Michigan ](/data/states/michigan) | $16.0B | 1.4 GW | Under Construction |"
   ],
   "state_evidence": [
    "## Projects",
    "| Project | State | Investment | Power | Status |",
    "| [ OpenAI Stargate - Saline Township Campus ](/data/projects/openai-stargate-saline-township-campus) Saline Township | [ Michigan ](/data/states/michigan) | $16.0B | 1.4 GW | Under Construction |"
   ],
   "capacity_gw_evidence": [
    "## Projects",
    "| Project | State | Investment | Power | Status |",
    "| [ OpenAI Stargate - Saline Township Campus ](/data/projects/openai-stargate-saline-township-campus) Saline Township | [ Michigan ](/data/states/michigan) | $16.0B | 1.4 GW | Under Construction |"
   ],
   "builder_evidence": null,
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Projects",
    "| Project | State | Investment | Power | Status |",
    "| [ OpenAI Stargate - Saline Township Campus ](/data/projects/openai-stargate-saline-township-campus) Saline Township | [ Michigan ](/data/states/michigan) | $16.0B | 1.4 GW | Under Construction |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://servercountry.org/data/entities/openai",
   "title": "OpenAI: Data Center Projects | Server Country",
   "published_at": null,
   "project": "Stargate Project - Abilene Campus (Oracle/Crusoe)",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Oracle/Crusoe",
   "ai_customer": null,
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "## Projects",
    "| Project | State | Investment | Power | Status |",
    "| [ Stargate Project - Abilene Campus (Oracle/Crusoe) ](/data/projects/stargate-project-abilene-campus-oraclecrusoe) Abilene | [ Texas ](/data/states/texas) | $15.0B | 1.2 GW | Under Construction |"
   ],
   "locality_evidence": [
    "## Projects",
    "| Project | State | Investment | Power | Status |",
    "| [ Stargate Project - Abilene Campus (Oracle/Crusoe) ](/data/projects/stargate-project-abilene-campus-oraclecrusoe) Abilene | [ Texas ](/data/states/texas) | $15.0B | 1.2 GW | Under Construction |"
   ],
   "state_evidence": [
    "## Projects",
    "| Project | State | Investment | Power | Status |",
    "| [ Stargate Project - Abilene Campus (Oracle/Crusoe) ](/data/projects/stargate-project-abilene-campus-oraclecrusoe) Abilene | [ Texas ](/data/states/texas) | $15.0B | 1.2 GW | Under Construction |"
   ],
   "capacity_gw_evidence": [
    "## Projects",
    "| Project | State | Investment | Power | Status |",
    "| [ Stargate Project - Abilene Campus (Oracle/Crusoe) ](/data/projects/stargate-project-abilene-campus-oraclecrusoe) Abilene | [ Texas ](/data/states/texas) | $15.0B | 1.2 GW | Under Construction |"
   ],
   "builder_evidence": [
    "## Projects",
    "| Project | State | Investment | Power | Status |",
    "| [ Stargate Project - Abilene Campus (Oracle/Crusoe) ](/data/projects/stargate-project-abilene-campus-oraclecrusoe) Abilene | [ Texas ](/data/states/texas) | $15.0B | 1.2 GW | Under Construction |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Projects",
    "| Project | State | Investment | Power | Status |",
    "| [ Stargate Project - Abilene Campus (Oracle/Crusoe) ](/data/projects/stargate-project-abilene-campus-oraclecrusoe) Abilene | [ Texas ](/data/states/texas) | $15.0B | 1.2 GW | Under Construction |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://servercountry.org/data/entities/openai",
   "title": "OpenAI: Data Center Projects | Server Country",
   "published_at": null,
   "project": "Stargate Project - Milam County Site",
   "locality": "Unknown",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": null,
   "ai_customer": null,
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "## Projects",
    "| Project | State | Investment | Power | Status |",
    "| [ Stargate Project - Milam County Site ](/data/projects/stargate-project-milam-county-site-tx) Unknown | [ Texas ](/data/states/texas) | $3.0B | 1.2 GW | Under Construction |"
   ],
   "locality_evidence": [
    "## Projects",
    "| Project | State | Investment | Power | Status |",
    "| [ Stargate Project - Milam County Site ](/data/projects/stargate-project-milam-county-site-tx) Unknown | [ Texas ](/data/states/texas) | $3.0B | 1.2 GW | Under Construction |"
   ],
   "state_evidence": [
    "## Projects",
    "| Project | State | Investment | Power | Status |",
    "| [ Stargate Project - Milam County Site ](/data/projects/stargate-project-milam-county-site-tx) Unknown | [ Texas ](/data/states/texas) | $3.0B | 1.2 GW | Under Construction |"
   ],
   "capacity_gw_evidence": [
    "## Projects",
    "| Project | State | Investment | Power | Status |",
    "| [ Stargate Project - Milam County Site ](/data/projects/stargate-project-milam-county-site-tx) Unknown | [ Texas ](/data/states/texas) | $3.0B | 1.2 GW | Under Construction |"
   ],
   "builder_evidence": null,
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Projects",
    "| Project | State | Investment | Power | Status |",
    "| [ Stargate Project - Milam County Site ](/data/projects/stargate-project-milam-county-site-tx) Unknown | [ Texas ](/data/states/texas) | $3.0B | 1.2 GW | Under Construction |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://edgen.tech/fr/news/stock/blackrock-and-meta-form-14b-data-center-venture-in-texas",
   "title": "BlackRock and Meta form $14B data center venture in Texas",
   "published_at": "2026-07-28T09:41:43",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "expanded",
   "announcement_date": null,
   "project_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "The deal mirrors Meta's Louisiana Hyperion project and comes alongside BlackRock's $40 billion Aligned Data Centers acquisition.",
    "The El Paso arrangement follows the same template Meta used for its Hyperion project in Richland Parish, Louisiana, where an 80/20 joint venture between a private-credit firm and Meta issued $27 billion in debt \u2014 the largest private-debt offering on record."
   ],
   "locality_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "The deal mirrors Meta's Louisiana Hyperion project and comes alongside BlackRock's $40 billion Aligned Data Centers acquisition.",
    "The El Paso arrangement follows the same template Meta used for its Hyperion project in Richland Parish, Louisiana, where an 80/20 joint venture between a private-credit firm and Meta issued $27 billion in debt \u2014 the largest private-debt offering on record."
   ],
   "state_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "The deal mirrors Meta's Louisiana Hyperion project and comes alongside BlackRock's $40 billion Aligned Data Centers acquisition.",
    "The El Paso arrangement follows the same template Meta used for its Hyperion project in Richland Parish, Louisiana, where an 80/20 joint venture between a private-credit firm and Meta issued $27 billion in debt \u2014 the largest private-debt offering on record."
   ],
   "capacity_gw_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "Meta has since expanded Hyperion to 5 gigawatts of compute capacity at an estimated cost exceeding $50 billion, with that expansion owned entirely by Meta rather than through a joint venture."
   ],
   "builder_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "The deal mirrors Meta's Louisiana Hyperion project and comes alongside BlackRock's $40 billion Aligned Data Centers acquisition.",
    "The El Paso arrangement follows the same template Meta used for its Hyperion project in Richland Parish, Louisiana, where an 80/20 joint venture between a private-credit firm and Meta issued $27 billion in debt \u2014 the largest private-debt offering on record.",
    "Meta has since expanded Hyperion to 5 gigawatts of compute capacity at an estimated cost exceeding $50 billion, with that expansion owned entirely by Meta rather than through a joint venture."
   ],
   "ai_customer_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "The deal mirrors Meta's Louisiana Hyperion project and comes alongside BlackRock's $40 billion Aligned Data Centers acquisition.",
    "The El Paso arrangement follows the same template Meta used for its Hyperion project in Richland Parish, Louisiana, where an 80/20 joint venture between a private-credit firm and Meta issued $27 billion in debt \u2014 the largest private-debt offering on record.",
    "Meta has since expanded Hyperion to 5 gigawatts of compute capacity at an estimated cost exceeding $50 billion, with that expansion owned entirely by Meta rather than through a joint venture."
   ],
   "status_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "Meta has since expanded Hyperion to 5 gigawatts of compute capacity at an estimated cost exceeding $50 billion, with that expansion owned entirely by Meta rather than through a joint venture."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://app.wlth.xyz/news/crusoe-and-lancium-plan-to-build-a-new-ai-data-center-in-childress-texas/cc140999-e1df-474e-86ac-6a6395311073",
   "title": "Crusoe and Lancium plan to build a new AI data center in Childress, Texas | WLTH",
   "published_at": "2026-07-16T10:37:07",
   "project": null,
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "Company Updates",
    "# Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
    "Crusoe, an AI factory company in partnership with Lancium, an energy technology and infrastructure company, is planning to develop a 1 GW AI data center campus in Childress, Texas."
   ],
   "state_evidence": [
    "Company Updates",
    "# Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
    "Crusoe, an AI factory company in partnership with Lancium, an energy technology and infrastructure company, is planning to develop a 1 GW AI data center campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "Company Updates",
    "# Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
    "Crusoe, an AI factory company in partnership with Lancium, an energy technology and infrastructure company, is planning to develop a 1 GW AI data center campus in Childress, Texas."
   ],
   "builder_evidence": [
    "Company Updates",
    "# Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
    "Crusoe, an AI factory company in partnership with Lancium, an energy technology and infrastructure company, is planning to develop a 1 GW AI data center campus in Childress, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Company Updates",
    "# Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
    "Crusoe, an AI factory company in partnership with Lancium, an energy technology and infrastructure company, is planning to develop a 1 GW AI data center campus in Childress, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://app.wlth.xyz/news/crusoe-and-lancium-plan-to-build-a-new-ai-data-center-in-childress-texas/cc140999-e1df-474e-86ac-6a6395311073",
   "title": "Crusoe and Lancium plan to build a new AI data center in Childress, Texas | WLTH",
   "published_at": "2026-07-16T10:37:07",
   "project": null,
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Lancium and Crusoe",
   "ai_customer": null,
   "status": "existing",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "Company Updates",
    "# Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
    "The project builds on Lancium and Crusoe's existing data center developments in Texas, including the 1.2 GW campus in Abilene and a second 900 MW campus under construction on adjacent Lancium-owned property."
   ],
   "state_evidence": [
    "Company Updates",
    "# Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
    "The project builds on Lancium and Crusoe's existing data center developments in Texas, including the 1.2 GW campus in Abilene and a second 900 MW campus under construction on adjacent Lancium-owned property."
   ],
   "capacity_gw_evidence": [
    "Company Updates",
    "# Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
    "The project builds on Lancium and Crusoe's existing data center developments in Texas, including the 1.2 GW campus in Abilene and a second 900 MW campus under construction on adjacent Lancium-owned property."
   ],
   "builder_evidence": [
    "Company Updates",
    "# Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
    "The project builds on Lancium and Crusoe's existing data center developments in Texas, including the 1.2 GW campus in Abilene and a second 900 MW campus under construction on adjacent Lancium-owned property."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Company Updates",
    "# Crusoe and Lancium plan to build a new AI data center in Childress, Texas",
    "The project builds on Lancium and Crusoe's existing data center developments in Texas, including the 1.2 GW campus in Abilene and a second 900 MW campus under construction on adjacent Lancium-owned property."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://newswire.telecomramblings.com/2025/08/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand",
   "title": "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
   "published_at": "2025-08-19T23:46:29",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Under Construction",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "Campus boasts 1.4 gigawatts of capacity in the Lone Star state, a strategic, global AI hub",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "locality_evidence": [
    "Campus boasts 1.4 gigawatts of capacity in the Lone Star state, a strategic, global AI hub",
    "**DENVER (Aug. 19, 2025)** \u2013 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "Campus boasts 1.4 gigawatts of capacity in the Lone Star state, a strategic, global AI hub",
    "**DENVER (Aug. 19, 2025)** \u2013 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "Campus boasts 1.4 gigawatts of capacity in the Lone Star state, a strategic, global AI hub",
    "**DENVER (Aug. 19, 2025)** \u2013 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "Campus boasts 1.4 gigawatts of capacity in the Lone Star state, a strategic, global AI hub",
    "**DENVER (Aug. 19, 2025)** \u2013 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Campus boasts 1.4 gigawatts of capacity in the Lone Star state, a strategic, global AI hub",
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": [
    "Campus boasts 1.4 gigawatts of capacity in the Lone Star state, a strategic, global AI hub",
    "**DENVER (Aug. 19, 2025)** \u2013 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news/former-texas-governor-and-us-energy-sec-plans-11gw-data-center-campus-outside-amarillo-texas",
   "title": "Former Texas governor and US energy sec plans 11GW data center campus outside Amarillo, Texas",
   "published_at": "2026-05-14T10:02:04",
   "project": "Advanced Energy and Intelligence Campus",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Located on approximately 5,800 acres, the Advanced Energy and Intelligence Campus will reportedly include \u201c18 million square feet (1.67 million sqm) of data centers and generate up to 11GW of IT capacity from natural gas, solar, wind, and clean nuclear energy.\u201d"
   ],
   "locality_evidence": [
    "This week, the Texas Tech University System (TTU System) announced a collaboration with recently founded energy and technology company Fermi America to develop a large AI and energy campus near Amarillo in the Texas Panhandle."
   ],
   "state_evidence": [
    "A massive multi-gigawatt behind-the-meter campus is being planned in Texas close to the US government\u2019s main nuclear weapons development facility by former Texas governor and energy secretary Rick Perry."
   ],
   "capacity_gw_evidence": [
    "Located on approximately 5,800 acres, the Advanced Energy and Intelligence Campus will reportedly include \u201c18 million square feet (1.67 million sqm) of data centers and generate up to 11GW of IT capacity from natural gas, solar, wind, and clean nuclear energy.\u201d"
   ],
   "builder_evidence": [
    "This week, the Texas Tech University System (TTU System) announced a collaboration with recently founded energy and technology company Fermi America to develop a large AI and energy campus near Amarillo in the Texas Panhandle."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "A massive multi-gigawatt behind-the-meter campus is being planned in Texas close to the US government\u2019s main nuclear weapons development facility by former Texas governor and energy secretary Rick Perry."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://patch.com/pennsylvania/pittsburgh/pa-get-huge-10b-ai-data-center-campus",
   "title": "Massive $10B AI, Data Center Campus Coming To PA",
   "published_at": "2025-04-03T13:21:15",
   "project": "Homer City Generating Station",
   "locality": "Indiana County",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Kiewit",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Business & Tech Massive $10B AI, Data Center Campus Coming To PA What was once Pennsylvania's largest coal-fired power plant will become an enormous natural gas-powered data center.",
    "The project was announced Wednesday by an investor group that includes Homer City Redevelopment and Kiewit, one of the country's largest construction and engineering firms.",
    "INDIANA COUNTY, PA \u2014 North America's largest natural gas-powered data center will be built in a $10 billion redevelopment of the former Homer City Generating Station that was demolished last month."
   ],
   "locality_evidence": [
    "Business & Tech Massive $10B AI, Data Center Campus Coming To PA What was once Pennsylvania's largest coal-fired power plant will become an enormous natural gas-powered data center.",
    "INDIANA COUNTY, PA \u2014 North America's largest natural gas-powered data center will be built in a $10 billion redevelopment of the former Homer City Generating Station that was demolished last month.",
    "Further, we are fully committed to maximizing the unprecedented level of economic opportunity this project represents not just for Indiana County, but for all of Pennsylvania and the Mid-Atlantic region of the country."
   ],
   "state_evidence": [
    "Business & Tech Massive $10B AI, Data Center Campus Coming To PA What was once Pennsylvania's largest coal-fired power plant will become an enormous natural gas-powered data center.",
    "INDIANA COUNTY, PA \u2014 North America's largest natural gas-powered data center will be built in a $10 billion redevelopment of the former Homer City Generating Station that was demolished last month.",
    "\u201cThis project will honor Homer City\u2019s place in the proud history of Pennsylvania energy generation, while accelerating the state and local community\u2019s ability to meet the needs of a rapidly shifting energy landscape,\" William Wexler, Homer City Redevelopment CEO, said in a release."
   ],
   "capacity_gw_evidence": [
    "Business & Tech Massive $10B AI, Data Center Campus Coming To PA What was once Pennsylvania's largest coal-fired power plant will become an enormous natural gas-powered data center.",
    "The former station, about 50 miles east of Pittsburgh, will have seven gas-fired turbines to power data centers with up to 4.5 gigawatts of electricity."
   ],
   "builder_evidence": [
    "Business & Tech Massive $10B AI, Data Center Campus Coming To PA What was once Pennsylvania's largest coal-fired power plant will become an enormous natural gas-powered data center.",
    "The project was announced Wednesday by an investor group that includes Homer City Redevelopment and Kiewit, one of the country's largest construction and engineering firms."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Business & Tech Massive $10B AI, Data Center Campus Coming To PA What was once Pennsylvania's largest coal-fired power plant will become an enormous natural gas-powered data center.",
    "Construction is expected to begin this year and power could begin flowing by 2027."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?tag=monarch-compute-campus",
   "title": "News Monarch Compute Campus - DCD",
   "published_at": "2026-05-21T02:59:30",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "acquires",
   "announcement_date": null,
   "project_evidence": [
    "# News - Monarch Compute Campus",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "[Nscale acquires 8GW Monarch Compute Campus, Microsoft signs on for 1.35GW of compute](/en/news/nscale-acquires-8gw-monarch-compute-campus-microsoft-signs-on-for-135gw-of-compute/)"
   ],
   "locality_evidence": [
    "# News - Monarch Compute Campus",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "[Caterpillar to supply 2GW of natural gas turbines for Monarch Compute Campus in Mason County, West Virginia](/en/news/caterpillar-to-supply-2gw-of-natural-gas-turbines-for-monarch-compute-campus-in-mason-county-west-virginia/)"
   ],
   "state_evidence": [
    "# News - Monarch Compute Campus",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "[Nscale in talks to acquire up to 8GW Monarch Compute Campus in West Virginia - report](/en/news/nscale-in-talks-to-acquire-8gw-monarch-compute-campus-in-west-virginia-report/)"
   ],
   "capacity_gw_evidence": [
    "# News - Monarch Compute Campus",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "[Nscale acquires 8GW Monarch Compute Campus, Microsoft signs on for 1.35GW of compute](/en/news/nscale-acquires-8gw-monarch-compute-campus-microsoft-signs-on-for-135gw-of-compute/)"
   ],
   "builder_evidence": [
    "# News - Monarch Compute Campus",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "[Nscale acquires 8GW Monarch Compute Campus, Microsoft signs on for 1.35GW of compute](/en/news/nscale-acquires-8gw-monarch-compute-campus-microsoft-signs-on-for-135gw-of-compute/)"
   ],
   "ai_customer_evidence": [
    "# News - Monarch Compute Campus",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "[Nscale acquires 8GW Monarch Compute Campus, Microsoft signs on for 1.35GW of compute](/en/news/nscale-acquires-8gw-monarch-compute-campus-microsoft-signs-on-for-135gw-of-compute/)"
   ],
   "status_evidence": [
    "# News - Monarch Compute Campus",
    "## The latest news from the AI, data center, telco, chip, and cloud sector",
    "[Nscale acquires 8GW Monarch Compute Campus, Microsoft signs on for 1.35GW of compute](/en/news/nscale-acquires-8gw-monarch-compute-campus-microsoft-signs-on-for-135gw-of-compute/)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://agent-wars.com/news/2025-04-28-utah-greenlights-9gw-ai-campus-using-over-twice-state-electricity",
   "title": "Utah greenlights 9GW AI campus using over twice state electricity",
   "published_at": "2025-04-28T20:24:41",
   "project": "Stratos",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O'Leary Digital",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "Utah just approved something absurd.",
    "Kevin O'Leary's O'Leary Digital got the green light from the state's Military Installation Development Authority (MIDA) to build \"Stratos,\" a 9-gigawatt hyperscale data center campus in Box Elder County."
   ],
   "locality_evidence": [
    "Utah just approved something absurd.",
    "Kevin O'Leary's O'Leary Digital got the green light from the state's Military Installation Development Authority (MIDA) to build \"Stratos,\" a 9-gigawatt hyperscale data center campus in Box Elder County."
   ],
   "state_evidence": [
    "Utah just approved something absurd.",
    "Kevin O'Leary's O'Leary Digital got the green light from the state's Military Installation Development Authority (MIDA) to build \"Stratos,\" a 9-gigawatt hyperscale data center campus in Box Elder County."
   ],
   "capacity_gw_evidence": [
    "Utah just approved something absurd.",
    "Kevin O'Leary's O'Leary Digital got the green light from the state's Military Installation Development Authority (MIDA) to build \"Stratos,\" a 9-gigawatt hyperscale data center campus in Box Elder County."
   ],
   "builder_evidence": [
    "Utah just approved something absurd.",
    "Kevin O'Leary's O'Leary Digital got the green light from the state's Military Installation Development Authority (MIDA) to build \"Stratos,\" a 9-gigawatt hyperscale data center campus in Box Elder County."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Utah just approved something absurd.",
    "Kevin O'Leary's O'Leary Digital got the green light from the state's Military Installation Development Authority (MIDA) to build \"Stratos,\" a 9-gigawatt hyperscale data center campus in Box Elder County."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://convergedigest.com/openai-plans-3-2-gw-ai-data-center-campus-in-georgia",
   "title": "OpenAI Plans 3.2 GW AI Data Center Campus in Georgia",
   "published_at": "2026-07-22T21:17:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "proposed",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Plans 3.2 GW AI Data Center Campus in Georgia",
    "OpenAI outlined plans for Project Camellia, a proposed AI infrastructure campus in Effingham County, Georgia, centered on a data center requiring up to 3.2 gigawatts (GW) of electrical capacity supplied by Georgia Power between 2028 and 2032."
   ],
   "locality_evidence": [
    "# OpenAI Plans 3.2 GW AI Data Center Campus in Georgia",
    "OpenAI outlined plans for Project Camellia, a proposed AI infrastructure campus in Effingham County, Georgia, centered on a data center requiring up to 3.2 gigawatts (GW) of electrical capacity supplied by Georgia Power between 2028 and 2032."
   ],
   "state_evidence": [
    "# OpenAI Plans 3.2 GW AI Data Center Campus in Georgia",
    "OpenAI outlined plans for Project Camellia, a proposed AI infrastructure campus in Effingham County, Georgia, centered on a data center requiring up to 3.2 gigawatts (GW) of electrical capacity supplied by Georgia Power between 2028 and 2032."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Plans 3.2 GW AI Data Center Campus in Georgia",
    "OpenAI outlined plans for Project Camellia, a proposed AI infrastructure campus in Effingham County, Georgia, centered on a data center requiring up to 3.2 gigawatts (GW) of electrical capacity supplied by Georgia Power between 2028 and 2032."
   ],
   "builder_evidence": [
    "# OpenAI Plans 3.2 GW AI Data Center Campus in Georgia",
    "OpenAI outlined plans for Project Camellia, a proposed AI infrastructure campus in Effingham County, Georgia, centered on a data center requiring up to 3.2 gigawatts (GW) of electrical capacity supplied by Georgia Power between 2028 and 2032."
   ],
   "ai_customer_evidence": [
    "# OpenAI Plans 3.2 GW AI Data Center Campus in Georgia",
    "OpenAI outlined plans for Project Camellia, a proposed AI infrastructure campus in Effingham County, Georgia, centered on a data center requiring up to 3.2 gigawatts (GW) of electrical capacity supplied by Georgia Power between 2028 and 2032."
   ],
   "status_evidence": [
    "# OpenAI Plans 3.2 GW AI Data Center Campus in Georgia",
    "OpenAI outlined plans for Project Camellia, a proposed AI infrastructure campus in Effingham County, Georgia, centered on a data center requiring up to 3.2 gigawatts (GW) of electrical capacity supplied by Georgia Power between 2028 and 2032."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://eu.freep.com/story/money/business/2026/03/17/google-reveals-project-cannoli-data-center/89185890007",
   "title": "Google reveals it is behind big 'Project Cannoli' data center project",
   "published_at": "2026-03-17T22:04:35",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": null,
   "status": "Preliminary site plan approval",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "locality_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "state_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google also said Tuesday that it is creating a $10 million Energy Impact Fund for local organizations to tap into with the aim of lowering monthly utility bills for Michiganders."
   ],
   "capacity_gw_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "builder_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "The data center would be developed for Google by Panattoni Development Co."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "The township's Planning Commission voted 5-2 on Feb. 11 to give a preliminary site plan approval for the project."
   ],
   "announcement_date_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Updated March 17, 2026, 2:27 p.m. ET",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ]
  },
  {
   "url": "https://cryptovideos.net/2026/05/26/terawulf-acquires-1-gw-kentucky-ai-data-center-site-shares-jump-11",
   "title": "TeraWulf Acquires 1 GW Kentucky AI Information Middle Website, Shares Leap 11%",
   "published_at": "2026-05-26T22:06:57",
   "project": "Muskie Information Campus",
   "locality": "northeastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "Underway",
   "announcement_date": "2026-08-25",
   "project_evidence": [
    "TeraWulf Inc. (Nasdaq: WULF) introduced Tuesday the acquisition of a hyperscale knowledge heart growth web site in jap Kentucky, a transfer that despatched shares climbing 14% at instances at the moment as buyers responded to the corporate\u2019s deepening push into synthetic intelligence and high-performance computing infrastructure.",
    "The brand new \u201cMuskie Information Campus,\u201d bought from Industrial Fairness Companions, sits throughout the 1,000-acre EastPark Industrial Park in northeastern Kentucky and encompasses roughly 285 acres of owned and managed land."
   ],
   "locality_evidence": [
    "TeraWulf Inc. (Nasdaq: WULF) introduced Tuesday the acquisition of a hyperscale knowledge heart growth web site in jap Kentucky, a transfer that despatched shares climbing 14% at instances at the moment as buyers responded to the corporate\u2019s deepening push into synthetic intelligence and high-performance computing infrastructure.",
    "The brand new \u201cMuskie Information Campus,\u201d bought from Industrial Fairness Companions, sits throughout the 1,000-acre EastPark Industrial Park in northeastern Kentucky and encompasses roughly 285 acres of owned and managed land."
   ],
   "state_evidence": [
    "TeraWulf Inc. (Nasdaq: WULF) introduced Tuesday the acquisition of a hyperscale knowledge heart growth web site in jap Kentucky, a transfer that despatched shares climbing 14% at instances at the moment as buyers responded to the corporate\u2019s deepening push into synthetic intelligence and high-performance computing infrastructure.",
    "The brand new \u201cMuskie Information Campus,\u201d bought from Industrial Fairness Companions, sits throughout the 1,000-acre EastPark Industrial Park in northeastern Kentucky and encompasses roughly 285 acres of owned and managed land."
   ],
   "capacity_gw_evidence": [
    "TeraWulf Inc. (Nasdaq: WULF) introduced Tuesday the acquisition of a hyperscale knowledge heart growth web site in jap Kentucky, a transfer that despatched shares climbing 14% at instances at the moment as buyers responded to the corporate\u2019s deepening push into synthetic intelligence and high-performance computing infrastructure.",
    "The location is predicted to help greater than 1 gigawatt of AI and HPC capability \u2014 sufficient to energy roughly 750,000 properties."
   ],
   "builder_evidence": [
    "TeraWulf Inc. (Nasdaq: WULF) introduced Tuesday the acquisition of a hyperscale knowledge heart growth web site in jap Kentucky, a transfer that despatched shares climbing 14% at instances at the moment as buyers responded to the corporate\u2019s deepening push into synthetic intelligence and high-performance computing infrastructure.",
    "The acquisition marks TeraWulf\u2019s second main digital infrastructure campus in Kentucky, becoming a member of its 480-megawatt Justified Information campus in Hancock County."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "TeraWulf Inc. (Nasdaq: WULF) introduced Tuesday the acquisition of a hyperscale knowledge heart growth web site in jap Kentucky, a transfer that despatched shares climbing 14% at instances at the moment as buyers responded to the corporate\u2019s deepening push into synthetic intelligence and high-performance computing infrastructure.",
    "The location is zoned for its meant use, with allowing underway."
   ],
   "announcement_date_evidence": [
    "TeraWulf Inc. (Nasdaq: WULF) introduced Tuesday the acquisition of a hyperscale knowledge heart growth web site in jap Kentucky, a transfer that despatched shares climbing 14% at instances at the moment as buyers responded to the corporate\u2019s deepening push into synthetic intelligence and high-performance computing infrastructure."
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news/hut-8-signs-352mw-lease-with-unnamed-hyperscaler-in-texas",
   "title": "Hut 8 signs 352MW lease with unnamed hyperscaler in Texas",
   "published_at": "2026-07-17T00:00:00",
   "project": "Beacon Point",
   "locality": "Corpus Christi",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "commercialized",
   "announcement_date": null,
   "project_evidence": [
    "Cryptomine and HPC data center developer Hut 8 has signed an extended lease with a hyperscale customer in Texas.",
    "The company this week announced the commercialization of the second phase of its Beacon Point data center campus in Nueces County, Texas, via a second 15-year, $9.8 billion lease for 352MW of IT capacity."
   ],
   "locality_evidence": [
    "Cryptomine and HPC data center developer Hut 8 has signed an extended lease with a hyperscale customer in Texas.",
    "The 525-acre campus is located near Corpus Christi."
   ],
   "state_evidence": [
    "Cryptomine and HPC data center developer Hut 8 has signed an extended lease with a hyperscale customer in Texas.",
    "The company this week announced the commercialization of the second phase of its Beacon Point data center campus in Nueces County, Texas, via a second 15-year, $9.8 billion lease for 352MW of IT capacity."
   ],
   "capacity_gw_evidence": [
    "Cryptomine and HPC data center developer Hut 8 has signed an extended lease with a hyperscale customer in Texas.",
    "This latest lease further commercializes Beacon Point\u2019s 1GW of utility capacity, secured under an interconnection agreement with AEP Texas for electric delivery service."
   ],
   "builder_evidence": [
    "Cryptomine and HPC data center developer Hut 8 has signed an extended lease with a hyperscale customer in Texas.",
    "This latest lease further commercializes Beacon Point\u2019s 1GW of utility capacity, secured under an interconnection agreement with AEP Texas for electric delivery service."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Cryptomine and HPC data center developer Hut 8 has signed an extended lease with a hyperscale customer in Texas.",
    "The company this week announced the commercialization of the second phase of its Beacon Point data center campus in Nueces County, Texas, via a second 15-year, $9.8 billion lease for 352MW of IT capacity."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://oneuniontimes.com/data-center-trends/irens-75mw-ai-data-center-1b-expansion-plan",
   "title": "IREN\u2019s 75MW AI Data Center &amp; $1B Expansion Plan",
   "published_at": "2025-03-13T11:09:55",
   "project": null,
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "developing",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "Did You Know? The 75MW AI data center built by IREN employs direct-to-chip liquid cooling technology since it exceeds air cooling efficiency by 3,000 times.",
    "The company continues its expansion by developing a 2GW data center facility in Sweetwater, Texas."
   ],
   "state_evidence": [
    "Did You Know? The 75MW AI data center built by IREN employs direct-to-chip liquid cooling technology since it exceeds air cooling efficiency by 3,000 times.",
    "The company continues its expansion by developing a 2GW data center facility in Sweetwater, Texas."
   ],
   "capacity_gw_evidence": [
    "Did You Know? The 75MW AI data center built by IREN employs direct-to-chip liquid cooling technology since it exceeds air cooling efficiency by 3,000 times.",
    "The company continues its expansion by developing a 2GW data center facility in Sweetwater, Texas."
   ],
   "builder_evidence": [
    "Did You Know? The 75MW AI data center built by IREN employs direct-to-chip liquid cooling technology since it exceeds air cooling efficiency by 3,000 times.",
    "The company continues its expansion by developing a 2GW data center facility in Sweetwater, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Did You Know? The 75MW AI data center built by IREN employs direct-to-chip liquid cooling technology since it exceeds air cooling efficiency by 3,000 times.",
    "The company continues its expansion by developing a 2GW data center facility in Sweetwater, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://globalbusinesswatch.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "locality_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "state_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "capacity_gw_evidence": [
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "builder_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://investorshangout.com/ecl-unveils-groundbreaking-1gw-offgrid-ai-factory-data-center-40699-",
   "title": "ECL Unveils Groundbreaking 1GW Off-Grid AI Factory Data Center",
   "published_at": "2024-09-25T17:43:57",
   "project": "ECL TerraSite-TX1",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "News",
    "ECL Unveils Groundbreaking 1GW Off-Grid AI Factory Data Center",
    "They've launched the ECL TerraSite-TX1, the world's first off-grid, sustainable 1 Gigawatt AI Factory data center."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "News",
    "ECL Unveils Groundbreaking 1GW Off-Grid AI Factory Data Center",
    "The introduction of ECL Terrasite-TX1 couldn\u2019t have come at a better moment\u2014Texas power demand is expected to double by 2030!"
   ],
   "capacity_gw_evidence": [
    "News",
    "ECL Unveils Groundbreaking 1GW Off-Grid AI Factory Data Center",
    "While they aim for an ambitious 1GW capacity right out of the gate, there\u2019s wiggle room to bump this up to a whopping 2GW if demand hits hard."
   ],
   "builder_evidence": [
    "News",
    "ECL Unveils Groundbreaking 1GW Off-Grid AI Factory Data Center",
    "Alright, listen up\u2014ECL just dropped a bombshell in the tech world."
   ],
   "ai_customer_evidence": [
    "News",
    "ECL Unveils Groundbreaking 1GW Off-Grid AI Factory Data Center",
    "Lambda's already onboard as the first tenant, which speaks volumes about the high stakes involved."
   ],
   "status_evidence": [
    "News",
    "ECL Unveils Groundbreaking 1GW Off-Grid AI Factory Data Center",
    "They've launched the ECL TerraSite-TX1, the world's first off-grid, sustainable 1 Gigawatt AI Factory data center."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://edgen.tech/news/post/google-backs-15-billion-anthropic-data-center-loan-in-texas",
   "title": "Google backs $15 billion Anthropic data center loan in Texas",
   "published_at": "2026-07-31T06:53:04",
   "project": "Hubbard",
   "locality": "Hubbard",
   "state": "Texas",
   "capacity_gw": 1.6,
   "builder": "Nexus Data Centers",
   "ai_customer": "Anthropic",
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "Google backs $15 billion Anthropic data center loan in Texas",
    "The deal, reported by the Wall Street Journal citing people familiar with the matter, involves a Morgan Stanley-led consortium lending to Nexus Data Centers for the Hubbard, Texas campus, which includes a 1.6-gigawatt natural-gas power plant."
   ],
   "locality_evidence": [
    "Google backs $15 billion Anthropic data center loan in Texas",
    "The deal, reported by the Wall Street Journal citing people familiar with the matter, involves a Morgan Stanley-led consortium lending to Nexus Data Centers for the Hubbard, Texas campus, which includes a 1.6-gigawatt natural-gas power plant."
   ],
   "state_evidence": [
    "Google backs $15 billion Anthropic data center loan in Texas",
    "The deal, reported by the Wall Street Journal citing people familiar with the matter, involves a Morgan Stanley-led consortium lending to Nexus Data Centers for the Hubbard, Texas campus, which includes a 1.6-gigawatt natural-gas power plant."
   ],
   "capacity_gw_evidence": [
    "Google backs $15 billion Anthropic data center loan in Texas",
    "The deal, reported by the Wall Street Journal citing people familiar with the matter, involves a Morgan Stanley-led consortium lending to Nexus Data Centers for the Hubbard, Texas campus, which includes a 1.6-gigawatt natural-gas power plant."
   ],
   "builder_evidence": [
    "Google backs $15 billion Anthropic data center loan in Texas",
    "The deal, reported by the Wall Street Journal citing people familiar with the matter, involves a Morgan Stanley-led consortium lending to Nexus Data Centers for the Hubbard, Texas campus, which includes a 1.6-gigawatt natural-gas power plant."
   ],
   "ai_customer_evidence": [
    "Google backs $15 billion Anthropic data center loan in Texas",
    "The deal, reported by the Wall Street Journal citing people familiar with the matter, involves a Morgan Stanley-led consortium lending to Nexus Data Centers for the Hubbard, Texas campus, which includes a 1.6-gigawatt natural-gas power plant."
   ],
   "status_evidence": [
    "Google backs $15 billion Anthropic data center loan in Texas",
    "Construction in Hubbard began in early 2025."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aistockwire.com/blog/nvidia-nvda-openai-ohio-ports-pike-guarantee-august-2026",
   "title": "Nvidia (NVDA) backs OpenAI's giant Ohio data center",
   "published_at": "2026-08-17T15:22:10",
   "project": "PORTS-Pike",
   "locality": "Piketon",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# Nvidia (NVDA) is now backing OpenAI's data-center lease in Ohio",
    "| PORTS-Pike, Ohio | Announced Aug. 17, 2026 |"
   ],
   "locality_evidence": [
    "# Nvidia (NVDA) is now backing OpenAI's data-center lease in Ohio",
    "It sits on the grounds of the former Portsmouth Gaseous Diffusion Plant, a Cold War uranium-enrichment site in Piketon, Pike County, Ohio."
   ],
   "state_evidence": [
    "# Nvidia (NVDA) is now backing OpenAI's data-center lease in Ohio",
    "- Nvidia (NVDA) said on Aug. 17 it will guarantee part of the cost of a giant AI data center in Pike County, Ohio."
   ],
   "capacity_gw_evidence": [
    "# Nvidia (NVDA) is now backing OpenAI's data-center lease in Ohio",
    "- The initial buildout is 4.25 gigawatts, with an option on another 3.75 gigawatts, for up to 8 gigawatts."
   ],
   "builder_evidence": [
    "# Nvidia (NVDA) is now backing OpenAI's data-center lease in Ohio",
    "- Nvidia (NVDA) said on Aug. 17 it will guarantee part of the cost of a giant AI data center in Pike County, Ohio. OpenAI will lease the site for 20 years and fill it with Nvidia chips, and SB Energy, an arm of SoftBank, will build and own it."
   ],
   "ai_customer_evidence": [
    "# Nvidia (NVDA) is now backing OpenAI's data-center lease in Ohio",
    "- Nvidia (NVDA) said on Aug. 17 it will guarantee part of the cost of a giant AI data center in Pike County, Ohio. OpenAI will lease the site for 20 years and fill it with Nvidia chips, and SB Energy, an arm of SoftBank, will build and own it."
   ],
   "status_evidence": [
    "# Nvidia (NVDA) is now backing OpenAI's data-center lease in Ohio",
    "| PORTS-Pike, Ohio | Announced Aug. 17, 2026 |"
   ],
   "announcement_date_evidence": [
    "# Nvidia (NVDA) is now backing OpenAI's data-center lease in Ohio",
    "| PORTS-Pike, Ohio | Announced Aug. 17, 2026 |"
   ]
  },
  {
   "url": "https://measuredai.substack.com/p/stargate-site-by-site-status",
   "title": "Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
   "published_at": "2026-03-31T11:00:06",
   "project": "Abilene, Texas",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe Energy",
   "ai_customer": "OpenAI",
   "status": "Phase 1 is operational; Phase 2 is under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Abilene, Texas \u2014 The Flagship",
    "The campus [comprises](https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts) eight data center buildings totaling approximately **4 million square feet and 1.2 GW of power capacity**."
   ],
   "locality_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Abilene, Texas \u2014 The Flagship",
    "The centerpiece was an already-in-progress campus in Abilene, Texas, being built by Crusoe Energy and leased by Oracle for OpenAI."
   ],
   "state_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Abilene, Texas \u2014 The Flagship",
    "The centerpiece was an already-in-progress campus in Abilene, Texas, being built by Crusoe Energy and leased by Oracle for OpenAI."
   ],
   "capacity_gw_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Abilene, Texas \u2014 The Flagship",
    "The campus [comprises](https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts) eight data center buildings totaling approximately **4 million square feet and 1.2 GW of power capacity**."
   ],
   "builder_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Abilene, Texas \u2014 The Flagship",
    "The centerpiece was an already-in-progress campus in Abilene, Texas, being built by Crusoe Energy and leased by Oracle for OpenAI."
   ],
   "ai_customer_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Abilene, Texas \u2014 The Flagship",
    "The centerpiece was an already-in-progress campus in Abilene, Texas, being built by Crusoe Energy and leased by Oracle for OpenAI."
   ],
   "status_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Abilene, Texas \u2014 The Flagship",
    "Phase 1 \u2014 two buildings delivering over 200 MW of critical IT capacity \u2014 became operational in **September 2025** after Oracle delivered the first racks of Nvidia GB200 chips that June. Phase 2, covering the remaining six buildings, began construction in March 2025 and is targeted for completion by **mid-2026**."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://measuredai.substack.com/p/stargate-site-by-site-status",
   "title": "Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
   "published_at": "2026-03-31T11:00:06",
   "project": "Milam County, Texas \u2014 \u201cOrion\u201d",
   "locality": "Milam County",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Milam County, Texas \u2014 \u201cOrion\u201d",
    "Milam County, located between Austin and Waco, is the first data center site [being developed](https://group.softbank/en/news/press/20250924) through SoftBank\u2019s energy subsidiary **SB Energy** rather than through Oracle."
   ],
   "locality_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Milam County, Texas \u2014 \u201cOrion\u201d",
    "Milam County, located between Austin and Waco, is the first data center site [being developed](https://group.softbank/en/news/press/20250924) through SoftBank\u2019s energy subsidiary **SB Energy** rather than through Oracle."
   ],
   "state_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Milam County, Texas \u2014 \u201cOrion\u201d",
    "Milam County, located between Austin and Waco, is the first data center site [being developed](https://group.softbank/en/news/press/20250924) through SoftBank\u2019s energy subsidiary **SB Energy** rather than through Oracle."
   ],
   "capacity_gw_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Milam County, Texas \u2014 \u201cOrion\u201d",
    "The campus targets **1.2 GW of power draw** under a different development model than Abilene."
   ],
   "builder_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Milam County, Texas \u2014 \u201cOrion\u201d",
    "Milam County, located between Austin and Waco, is the first data center site [being developed](https://group.softbank/en/news/press/20250924) through SoftBank\u2019s energy subsidiary **SB Energy** rather than through Oracle."
   ],
   "ai_customer_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Milam County, Texas \u2014 \u201cOrion\u201d",
    "OpenAI and SoftBank broke ground in **October 2025**, with each party [investing](https://www.prnewswire.com/news-releases/openai-and-softbank-group-partner-with-sb-energy-to-build-and-operate-next-generation-ai-data-centers-to-advance-stargate-302657541.html) $500 million in SB Energy for **$1 billion in total project equity**."
   ],
   "status_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Milam County, Texas \u2014 \u201cOrion\u201d",
    "- **Under construction (early-to-mid stage):** Milam County (broke ground Oct 2025), Shackelford County (broke ground Dec 2025)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://measuredai.substack.com/p/stargate-site-by-site-status",
   "title": "Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
   "published_at": "2026-03-31T11:00:06",
   "project": "Shackelford County, Texas \u2014 \u201cFrontier\u201d",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": "Oracle",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Shackelford County, Texas \u2014 \u201cFrontier\u201d",
    "Vantage Data Centers broke ground in **December 2025** on a [campus](https://www.businesswire.com/news/home/20250819333311/en/Vantage-Data-Centers-Unveils-Plans-for-Frontier-a-$25B-Mega-campus-in-Texas-to-Meet-Unprecedented-AI-Demand) it calls \u201cFrontier\u201d in Shackelford County, approximately 35 miles northeast of Abilene and 125 miles west of Fort Worth."
   ],
   "locality_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Shackelford County, Texas \u2014 \u201cFrontier\u201d",
    "Vantage Data Centers broke ground in **December 2025** on a [campus](https://www.businesswire.com/news/home/20250819333311/en/Vantage-Data-Centers-Unveils-Plans-for-Frontier-a-$25B-Mega-campus-in-Texas-to-Meet-Unprecedented-AI-Demand) it calls \u201cFrontier\u201d in Shackelford County, approximately 35 miles northeast of Abilene and 125 miles west of Fort Worth."
   ],
   "state_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Shackelford County, Texas \u2014 \u201cFrontier\u201d",
    "Vantage Data Centers broke ground in **December 2025** on a [campus](https://www.businesswire.com/news/home/20250819333311/en/Vantage-Data-Centers-Unveils-Plans-for-Frontier-a-$25B-Mega-campus-in-Texas-to-Meet-Unprecedented-AI-Demand) it calls \u201cFrontier\u201d in Shackelford County, approximately 35 miles northeast of Abilene and 125 miles west of Fort Worth."
   ],
   "capacity_gw_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Shackelford County, Texas \u2014 \u201cFrontier\u201d",
    "The site spans **1,200 acres** and is planned for 10 single-story data center buildings totaling **1.4 GW of IT capacity** and approximately 3.7 million square feet."
   ],
   "builder_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Shackelford County, Texas \u2014 \u201cFrontier\u201d",
    "Vantage Data Centers broke ground in **December 2025** on a [campus](https://www.businesswire.com/news/home/20250819333311/en/Vantage-Data-Centers-Unveils-Plans-for-Frontier-a-$25B-Mega-campus-in-Texas-to-Meet-Unprecedented-AI-Demand) it calls \u201cFrontier\u201d in Shackelford County, approximately 35 miles northeast of Abilene and 125 miles west of Fort Worth."
   ],
   "ai_customer_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Shackelford County, Texas \u2014 \u201cFrontier\u201d",
    "Each of the 10 buildings is registered with the Texas Comptroller as a Qualifying Large Data Center Project, with Oracle as the named occupant."
   ],
   "status_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Shackelford County, Texas \u2014 \u201cFrontier\u201d",
    "- **Under construction (early-to-mid stage):** Milam County (broke ground Oct 2025), Shackelford County (broke ground Dec 2025)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://measuredai.substack.com/p/stargate-site-by-site-status",
   "title": "Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
   "published_at": "2026-03-31T11:00:06",
   "project": "Port Washington, Wisconsin \u2014 \u201cLighthouse\u201d",
   "locality": "Port Washington",
   "state": "Wisconsin",
   "capacity_gw": 1.3,
   "builder": "Vantage Data Centers",
   "ai_customer": "OpenAI",
   "status": "Early construction",
   "announcement_date": null,
   "project_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Port Washington, Wisconsin \u2014 \u201cLighthouse\u201d",
    "Codenamed \u201cLighthouse,\u201d the Port Washington campus is being [developed](https://www.businesswire.com/news/home/20251022873578/en/OpenAI-Oracle-and-Vantage-Data-Centers-Announce-Stargate-Data-Center-Site-in-Wisconsin) by OpenAI, Oracle, and Vantage Data Centers on 672 acres sourced from Cloverleaf Infrastructure, at a total investment of more than **$15 billion**."
   ],
   "locality_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Port Washington, Wisconsin \u2014 \u201cLighthouse\u201d",
    "Codenamed \u201cLighthouse,\u201d the Port Washington campus is being [developed](https://www.businesswire.com/news/home/20251022873578/en/OpenAI-Oracle-and-Vantage-Data-Centers-Announce-Stargate-Data-Center-Site-in-Wisconsin) by OpenAI, Oracle, and Vantage Data Centers on 672 acres sourced from Cloverleaf Infrastructure, at a total investment of more than **$15 billion**."
   ],
   "state_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Port Washington, Wisconsin \u2014 \u201cLighthouse\u201d",
    "Codenamed \u201cLighthouse,\u201d the Port Washington campus is being [developed](https://www.businesswire.com/news/home/20251022873578/en/OpenAI-Oracle-and-Vantage-Data-Centers-Announce-Stargate-Data-Center-Site-in-Wisconsin) by OpenAI, Oracle, and Vantage Data Centers on 672 acres sourced from Cloverleaf Infrastructure, at a total investment of more than **$15 billion**."
   ],
   "capacity_gw_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Port Washington, Wisconsin \u2014 \u201cLighthouse\u201d",
    "The campus targets **902 MW of IT capacity** across four single-story data centers totaling 2.5 million square feet \u2014 requiring a total grid draw of **1.3 GW**."
   ],
   "builder_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Port Washington, Wisconsin \u2014 \u201cLighthouse\u201d",
    "Codenamed \u201cLighthouse,\u201d the Port Washington campus is being [developed](https://www.businesswire.com/news/home/20251022873578/en/OpenAI-Oracle-and-Vantage-Data-Centers-Announce-Stargate-Data-Center-Site-in-Wisconsin) by OpenAI, Oracle, and Vantage Data Centers on 672 acres sourced from Cloverleaf Infrastructure, at a total investment of more than **$15 billion**."
   ],
   "ai_customer_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Port Washington, Wisconsin \u2014 \u201cLighthouse\u201d",
    "Codenamed \u201cLighthouse,\u201d the Port Washington campus is being [developed](https://www.businesswire.com/news/home/20251022873578/en/OpenAI-Oracle-and-Vantage-Data-Centers-Announce-Stargate-Data-Center-Site-in-Wisconsin) by OpenAI, Oracle, and Vantage Data Centers on 672 acres sourced from Cloverleaf Infrastructure, at a total investment of more than **$15 billion**."
   ],
   "status_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Port Washington, Wisconsin \u2014 \u201cLighthouse\u201d",
    "- **Early construction:** Port Washington (first steel Mar 2026)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://measuredai.substack.com/p/stargate-site-by-site-status",
   "title": "Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
   "published_at": "2026-03-31T11:00:06",
   "project": "Saline Township, Michigan \u2014 \u201cThe Barn\u201d",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.38,
   "builder": "Related Digital",
   "ai_customer": "Oracle",
   "status": "Active construction, financing unresolved",
   "announcement_date": null,
   "project_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Saline Township, Michigan \u2014 \u201cThe Barn\u201d",
    "The Michigan project, internally called \u201cThe Barn,\u201d is a 250-acre [development](https://openai.com/index/expanding-stargate-to-michigan/) in Saline Township, approximately 45 miles west of Detroit."
   ],
   "locality_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Saline Township, Michigan \u2014 \u201cThe Barn\u201d",
    "The Michigan project, internally called \u201cThe Barn,\u201d is a 250-acre [development](https://openai.com/index/expanding-stargate-to-michigan/) in Saline Township, approximately 45 miles west of Detroit."
   ],
   "state_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Saline Township, Michigan \u2014 \u201cThe Barn\u201d",
    "The Michigan project, internally called \u201cThe Barn,\u201d is a 250-acre [development](https://openai.com/index/expanding-stargate-to-michigan/) in Saline Township, approximately 45 miles west of Detroit."
   ],
   "capacity_gw_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Saline Township, Michigan \u2014 \u201cThe Barn\u201d",
    "The campus is planned for **1.38 GW of contracted utility capacity** across three buildings of approximately 550,000 square feet each, at an estimated project cost of **$10 billion**."
   ],
   "builder_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Saline Township, Michigan \u2014 \u201cThe Barn\u201d",
    "Related Digital \u2014 a subsidiary of Related Companies \u2014 is the developer, partnering with OpenAI and Oracle, with Walbridge as general contractor."
   ],
   "ai_customer_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Saline Township, Michigan \u2014 \u201cThe Barn\u201d",
    "The contracting customer is an Oracle subsidiary."
   ],
   "status_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Saline Township, Michigan \u2014 \u201cThe Barn\u201d",
    "- **Active construction, financing unresolved:** Saline Township, MI (MPSC approved Dec 2025; Compute 1 pylons finished, ~60% gravel hauling complete, concrete batch plant expected operational early April)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://measuredai.substack.com/p/stargate-site-by-site-status",
   "title": "Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
   "published_at": "2026-03-31T11:00:06",
   "project": "Do\u00f1a Ana County, New Mexico \u2014 \u201cProject Jupiter\u201d",
   "locality": "Do\u00f1a Ana County",
   "state": "New Mexico",
   "capacity_gw": 4.5,
   "builder": "STACK Infrastructure",
   "ai_customer": "Oracle",
   "status": "Planning / pre-construction",
   "announcement_date": null,
   "project_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Do\u00f1a Ana County, New Mexico \u2014 \u201cProject Jupiter\u201d",
    "The New Mexico site, [located](https://www.oracle.com/news/announcement/blog/oracle-advances-american-ai-innovation-in-new-mexico-2026-01-23/) approximately 3.6 miles south of Santa Teresa near the US-Mexico border, is **the largest single Stargate campus by planned capacity** \u2014 **4.5 GW at full buildout** across two behind-the-fence microgrids."
   ],
   "locality_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Do\u00f1a Ana County, New Mexico \u2014 \u201cProject Jupiter\u201d",
    "The New Mexico site, [located](https://www.oracle.com/news/announcement/blog/oracle-advances-american-ai-innovation-in-new-mexico-2026-01-23/) approximately 3.6 miles south of Santa Teresa near the US-Mexico border, is **the largest single Stargate campus by planned capacity** \u2014 **4.5 GW at full buildout** across two behind-the-fence microgrids."
   ],
   "state_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Do\u00f1a Ana County, New Mexico \u2014 \u201cProject Jupiter\u201d",
    "The New Mexico site, [located](https://www.oracle.com/news/announcement/blog/oracle-advances-american-ai-innovation-in-new-mexico-2026-01-23/) approximately 3.6 miles south of Santa Teresa near the US-Mexico border, is **the largest single Stargate campus by planned capacity** \u2014 **4.5 GW at full buildout** across two behind-the-fence microgrids."
   ],
   "capacity_gw_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Do\u00f1a Ana County, New Mexico \u2014 \u201cProject Jupiter\u201d",
    "The New Mexico site, [located](https://www.oracle.com/news/announcement/blog/oracle-advances-american-ai-innovation-in-new-mexico-2026-01-23/) approximately 3.6 miles south of Santa Teresa near the US-Mexico border, is **the largest single Stargate campus by planned capacity** \u2014 **4.5 GW at full buildout** across two behind-the-fence microgrids."
   ],
   "builder_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Do\u00f1a Ana County, New Mexico \u2014 \u201cProject Jupiter\u201d",
    "It is being developed by STACK Infrastructure and BorderPlex Digital Assets for Oracle under the codename \u201cProject Jupiter\u201d."
   ],
   "ai_customer_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Do\u00f1a Ana County, New Mexico \u2014 \u201cProject Jupiter\u201d",
    "It is being developed by STACK Infrastructure and BorderPlex Digital Assets for Oracle under the codename \u201cProject Jupiter\u201d."
   ],
   "status_evidence": [
    "# Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch",
    "The table below [summarizes](https://openai.com/index/stargate-advances-with-partnership-with-oracle/) every [publicly confirmed](https://openai.com/index/five-new-stargate-sites/) US data center site affiliated with the Stargate program as of late March 2026.",
    "### Do\u00f1a Ana County, New Mexico \u2014 \u201cProject Jupiter\u201d",
    "- **Planning / pre-construction:** Do\u00f1a Ana County, NM (financing arranged; air quality permit decision deadline July 21, 2026; no construction start confirmed)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://measuredai.substack.com/p/meta-prometheus-google-ohio",
   "title": "Meta's Prometheus and Google's Central Ohio Cluster: An AI Data Center Primer",
   "published_at": "2026-05-20T16:17:28",
   "project": "New Albany campus and Prometheus AI cluster",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "more than 500 MW of AI compute is already installed",
   "announcement_date": null,
   "project_evidence": [
    "# Meta's Prometheus and Google's Central Ohio AI Cluster: Rivals Across the Road",
    "Two of the largest AI-capable data center footprints in the U.S. sit across Beech Road in New Albany \u2014 a primer on the campuses, accelerators, power, and grid behind 1 GW each by 2026.",
    "Meta\u2019s New Albany campus and Prometheus AI cluster cover **1,540+ acres** in Licking County and Google\u2019s four-campus Central Ohio cluster spans **1,100+ acres** across Licking, Franklin, and Fairfield counties.",
    "Meta\u2019s New Albany campus and Prometheus AI cluster will reach **1 gigawatt** spanning multiple data center buildings; **more than 500 MW of AI compute is already installed**."
   ],
   "locality_evidence": [
    "# Meta's Prometheus and Google's Central Ohio AI Cluster: Rivals Across the Road",
    "Two of the largest AI-capable data center footprints in the U.S. sit across Beech Road in New Albany \u2014 a primer on the campuses, accelerators, power, and grid behind 1 GW each by 2026.",
    "Meta and Google operate two of the largest AI-capable data center footprints in the United States in and around New Albany, Ohio."
   ],
   "state_evidence": [
    "# Meta's Prometheus and Google's Central Ohio AI Cluster: Rivals Across the Road",
    "Two of the largest AI-capable data center footprints in the U.S. sit across Beech Road in New Albany \u2014 a primer on the campuses, accelerators, power, and grid behind 1 GW each by 2026.",
    "Meta and Google operate two of the largest AI-capable data center footprints in the United States in and around New Albany, Ohio."
   ],
   "capacity_gw_evidence": [
    "# Meta's Prometheus and Google's Central Ohio AI Cluster: Rivals Across the Road",
    "Two of the largest AI-capable data center footprints in the U.S. sit across Beech Road in New Albany \u2014 a primer on the campuses, accelerators, power, and grid behind 1 GW each by 2026.",
    "Meta\u2019s New Albany campus and Prometheus AI cluster will reach **1 gigawatt** spanning multiple data center buildings; **more than 500 MW of AI compute is already installed**."
   ],
   "builder_evidence": [
    "# Meta's Prometheus and Google's Central Ohio AI Cluster: Rivals Across the Road",
    "Two of the largest AI-capable data center footprints in the U.S. sit across Beech Road in New Albany \u2014 a primer on the campuses, accelerators, power, and grid behind 1 GW each by 2026.",
    "Meta and Google operate two of the largest AI-capable data center footprints in the United States in and around New Albany, Ohio."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Meta \u2014 New Albany + Prometheus",
    "Meta\u2019s New Albany campus and Prometheus AI cluster will reach **1 gigawatt** spanning multiple data center buildings; **more than 500 MW of AI compute is already installed**."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://measuredai.substack.com/p/meta-prometheus-google-ohio",
   "title": "Meta's Prometheus and Google's Central Ohio Cluster: An AI Data Center Primer",
   "published_at": "2026-05-20T16:17:28",
   "project": "Central Ohio cluster",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "Google",
   "ai_customer": null,
   "status": "currently has approximately 1 GW of total compute capacity",
   "announcement_date": null,
   "project_evidence": [
    "# Meta's Prometheus and Google's Central Ohio AI Cluster: Rivals Across the Road",
    "Two of the largest AI-capable data center footprints in the U.S. sit across Beech Road in New Albany \u2014 a primer on the campuses, accelerators, power, and grid behind 1 GW each by 2026.",
    "Meta\u2019s New Albany campus and Prometheus AI cluster cover **1,540+ acres** in Licking County and Google\u2019s four-campus Central Ohio cluster spans **1,100+ acres** across Licking, Franklin, and Fairfield counties.",
    "Google\u2019s four-campus Central Ohio cluster currently has approximately **1 GW of total compute capacity**, with **~500+ MW dedicated to AI**, and is on a trajectory to **1 GW of AI compute by the end of 2026**."
   ],
   "locality_evidence": [
    "# Meta's Prometheus and Google's Central Ohio AI Cluster: Rivals Across the Road",
    "Two of the largest AI-capable data center footprints in the U.S. sit across Beech Road in New Albany \u2014 a primer on the campuses, accelerators, power, and grid behind 1 GW each by 2026.",
    "Meta and Google operate two of the largest AI-capable data center footprints in the United States in and around New Albany, Ohio."
   ],
   "state_evidence": [
    "# Meta's Prometheus and Google's Central Ohio AI Cluster: Rivals Across the Road",
    "Two of the largest AI-capable data center footprints in the U.S. sit across Beech Road in New Albany \u2014 a primer on the campuses, accelerators, power, and grid behind 1 GW each by 2026.",
    "Meta and Google operate two of the largest AI-capable data center footprints in the United States in and around New Albany, Ohio."
   ],
   "capacity_gw_evidence": [
    "# Meta's Prometheus and Google's Central Ohio AI Cluster: Rivals Across the Road",
    "Two of the largest AI-capable data center footprints in the U.S. sit across Beech Road in New Albany \u2014 a primer on the campuses, accelerators, power, and grid behind 1 GW each by 2026.",
    "Google\u2019s four-campus Central Ohio cluster currently has approximately **1 GW of total compute capacity**, with **~500+ MW dedicated to AI**, and is on a trajectory to **1 GW of AI compute by the end of 2026**."
   ],
   "builder_evidence": [
    "# Meta's Prometheus and Google's Central Ohio AI Cluster: Rivals Across the Road",
    "Two of the largest AI-capable data center footprints in the U.S. sit across Beech Road in New Albany \u2014 a primer on the campuses, accelerators, power, and grid behind 1 GW each by 2026.",
    "Meta and Google operate two of the largest AI-capable data center footprints in the United States in and around New Albany, Ohio."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Google \u2014 Central Ohio",
    "Google\u2019s four-campus Central Ohio cluster currently has approximately **1 GW of total compute capacity**, with **~500+ MW dedicated to AI**, and is on a trajectory to **1 GW of AI compute by the end of 2026**."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://business.wapakdailynews.com/wapakdailynews/article/tokenring-2026-1-2-colossus-unbound-xais-memphis-expansion-targets-1-million-gpus-in-the-race-for-agi",
   "title": "Colossus Unbound: xAI\u00e2s Memphis Expansion Targets 1 Million GPUs in the Race for AGI",
   "published_at": "2026-01-02T19:48:24",
   "project": "Colossus",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "",
   "status": "expanding",
   "announcement_date": "2026-01-02",
   "project_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "locality_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "state_evidence": [
    "As the \"Digital Delta\" takes shape across the Tennessee-Mississippi border, the project is redefining the physical and logistical requirements of the AGI era.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "capacity_gw_evidence": [
    "By targeting a power capacity of 2 gigawatts (GW)\u2014roughly enough to power nearly 2 million homes\u2014xAI is transitioning from a high-scale startup to a \"Gigafactory of Compute.\"",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "builder_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "announcement_date_evidence": [
    "As of January 2, 2026, the company has successfully scaled its initial 100,000-GPU cluster to over 200,000 units and is now aggressively pursuing a roadmap to reach 1 million GPUs by the end of the year.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ]
  },
  {
   "url": "https://energycapitalhtx.com/lancium-crusoe-west-texas-data-center",
   "title": "Lancium teams up with Crusoe on West Texas data center campus",
   "published_at": "2026-07-30T14:00:05",
   "project": "Childress County campus",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe Energy Systems",
   "ai_customer": null,
   "status": "expected to start construction in Q3 of this year",
   "announcement_date": "2026-07-15",
   "project_evidence": [
    "Construction on the 1-gigawatt Childress County campus, being built for an unidentified tech company, is expected to start in Q3 of this year."
   ],
   "locality_evidence": [
    "\u201cCrusoe has been a great partner to build alongside in Abilene, and we\u2019re glad to bring that same model \u2014 and the jobs and investment that come with it \u2014 to the community of Childress."
   ],
   "state_evidence": [
    "\u201cCrusoe has been a great partner to build alongside in Abilene, and we\u2019re glad to bring that same model \u2014 and the jobs and investment that come with it \u2014 to the community of Childress."
   ],
   "capacity_gw_evidence": [
    "Construction on the 1-gigawatt Childress County campus, being built for an unidentified tech company, is expected to start in Q3 of this year."
   ],
   "builder_evidence": [
    "The Woodlands-based [Lancium Technologies](https://lancium.com/), which designs, develops, and manages gigawatt-scale data center campuses, has teamed up with Denver-based data center builder and operator [Crusoe Energy Systems](https://www.crusoe.ai/) on a new grid-connected campus more than 100 miles east of Wichita Falls.",
    "Crusoe will design, build, and operate the campus."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction on the 1-gigawatt Childress County campus, being built for an unidentified tech company, is expected to start in Q3 of this year."
   ],
   "announcement_date_evidence": [
    "\u201cChildress is a natural next step in our partnership with Crusoe,\u201d Lancium CEO Michael McNamara said in [a news release](https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas/). \u201cCrusoe"
   ]
  },
  {
   "url": "https://linkedin.com/posts/oliverdennis1999_datacenters-aiinfrastructure-texasgrowth-activity-7364641685890342912-it47",
   "title": "Vantage Data Centers Launches $25B, 1.4GW \u201cFrontier\u201d Campus in Texas",
   "published_at": "2025-08-22T12:56:46",
   "project": "Frontier",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Construction underway",
   "announcement_date": null,
   "project_evidence": [
    "Vantage Data Centers Launches $25B, 1.4GW \u201cFrontier\u201d Campus in Texas Vantage is going big in Texas with its largest project ever a 1.4GW data center campus outside Abilene in Shackelford County."
   ],
   "locality_evidence": [
    "Vantage Data Centers Launches $25B, 1.4GW \u201cFrontier\u201d Campus in Texas Vantage is going big in Texas with its largest project ever a 1.4GW data center campus outside Abilene in Shackelford County."
   ],
   "state_evidence": [
    "Vantage Data Centers Launches $25B, 1.4GW \u201cFrontier\u201d Campus in Texas Vantage is going big in Texas with its largest project ever a 1.4GW data center campus outside Abilene in Shackelford County."
   ],
   "capacity_gw_evidence": [
    "Vantage Data Centers Launches $25B, 1.4GW \u201cFrontier\u201d Campus in Texas Vantage is going big in Texas with its largest project ever a 1.4GW data center campus outside Abilene in Shackelford County."
   ],
   "builder_evidence": [
    "Vantage Data Centers Launches $25B, 1.4GW \u201cFrontier\u201d Campus in Texas Vantage is going big in Texas with its largest project ever a 1.4GW data center campus outside Abilene in Shackelford County.",
    "\u201cTexas has become a critical and strategic market for AI providers."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "\u25aa\ufe0f Timeline: Construction underway, first building ready H2 2026"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://uk.advfn.com/stock-market/NASDAQ/FRMI/share-news/Fermi-America-Makes-Initial-Draw-on-200-Million-Equipment-Facility-from-Keysto/97875021",
   "title": "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
   "published_at": null,
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2026-02-19",
   "project_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus"
   ],
   "locality_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ -- Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122, in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "state_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ -- Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122, in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "capacity_gw_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "builder_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ -- Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122, in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "announcement_date_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ -- Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122, in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ]
  },
  {
   "url": "https://thebusinessjournal.com/coal-fired-power-plant-now-retired-to-become-massive-gas-powered-campus-for-ai-data-centers",
   "title": "Coal-fired power plant, now retired, to become massive gas-powered campus for AI, data centers",
   "published_at": "2025-04-02T21:08:22",
   "project": "Homer City Generating Station",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Homer City Development",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "locality_evidence": [
    "The project will be the largest capital investment ever in Pennsylvania, said state Senate Majority Leader Joe Pittman, R-Indiana, whose district is home to Homer City."
   ],
   "state_evidence": [
    "The owners of what was once Pennsylvania\u2019s biggest coal-fired power plant said Wednesday that they will turn it into a $10 billion natural gas-powered data center campus designed to capitalize on the [fast-growing energy demands](https://apnews.com/article/power-electricity-amazon-microsoft-power-plants-data-centers-grid-f4763f73bc112425e18f30618dff0039) of Big Tech companies to power artificial intelligence and cloud computing applications."
   ],
   "capacity_gw_evidence": [
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "builder_evidence": [
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The owners of what was once Pennsylvania\u2019s biggest coal-fired power plant said Wednesday that they will turn it into a $10 billion natural gas-powered data center campus designed to capitalize on the [fast-growing energy demands](https://apnews.com/article/power-electricity-amazon-microsoft-power-plants-data-centers-grid-f4763f73bc112425e18f30618dff0039) of Big Tech companies to power artificial intelligence and cloud computing applications."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://newsvidia.com/nscale-and-microsoft-announce-collaboration-with-nvidia-and-caterpillar-to-deliver-135gw-of-nvidia-vera-rubin-nvl72-gpus-at-flagship-ai-factory-campus-in-west-virginia",
   "title": "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1,35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia - Newsvidia",
   "published_at": "2026-03-22T01:13:55",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "announced",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1,35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid"
   ],
   "locality_evidence": [
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts.",
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1,35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia"
   ],
   "state_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1,35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "capacity_gw_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1,35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia"
   ],
   "builder_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1,35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "ai_customer_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1,35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs"
   ],
   "status_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1,35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ \u2014 Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA\u2019s next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ],
   "announcement_date_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1,35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ \u2014 Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA\u2019s next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ]
  },
  {
   "url": "https://faq.com.tw/en/ai-ml/2026-07-24-openai-project-camellia-30b-georgia-data-center-en",
   "title": "OpenAI to Build $30 Billion 'Project Camellia' Data Center in Georgia \u2014 Its First Self-Designed Campus",
   "published_at": "2026-07-24T00:00:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI to Build $30 Billion 'Project Camellia' Data Center in Georgia \u2014 Its First Self-Designed Campus",
    "Dubbed **Project Camellia**, the facility represents a qualitative shift in OpenAI\u2019s infrastructure posture."
   ],
   "locality_evidence": [
    "OpenAI announced plans to build a massive 3.2-gigawatt data center campus in Effingham County, Georgia, with an initial investment of at least $20 billion and a total cost likely exceeding $30 billion.",
    "## Scale and Location"
   ],
   "state_evidence": [
    "# OpenAI to Build $30 Billion 'Project Camellia' Data Center in Georgia \u2014 Its First Self-Designed Campus",
    "OpenAI announced plans to build a massive 3.2-gigawatt data center campus in Effingham County, Georgia, with an initial investment of at least $20 billion and a total cost likely exceeding $30 billion.",
    "## Scale and Location"
   ],
   "capacity_gw_evidence": [
    "OpenAI announced plans to build a massive 3.2-gigawatt data center campus in Effingham County, Georgia, with an initial investment of at least $20 billion and a total cost likely exceeding $30 billion.",
    "## Scale and Location"
   ],
   "builder_evidence": [
    "# OpenAI to Build $30 Billion 'Project Camellia' Data Center in Georgia \u2014 Its First Self-Designed Campus",
    "OpenAI announced plans to build a massive 3.2-gigawatt data center campus in Effingham County, Georgia, with an initial investment of at least $20 billion and a total cost likely exceeding $30 billion."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# OpenAI to Build $30 Billion 'Project Camellia' Data Center in Georgia \u2014 Its First Self-Designed Campus",
    "OpenAI announced plans to build a massive 3.2-gigawatt data center campus in Effingham County, Georgia, with an initial investment of at least $20 billion and a total cost likely exceeding $30 billion."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://oakridger.com/story/news/local/michigan/2026/03/17/google-weighs-joining-van-buren-township-data-center-project-dte-energy/89187228007",
   "title": "Google weighs joining Van Buren Township data center project",
   "published_at": "2026-03-17T12:02:32",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": "Google",
   "status": "seeking approval",
   "announcement_date": null,
   "project_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "The tech giant is evaluating whether it will get involved with [Project Cannoli, the hyperscale data center project advancing in the western Wayne County community](https://www.detroitnews.com/story/news/local/wayne-county/2026/03/06/nda-nondisclosure-agreement-confidentiality-clues-panattoni-anchor-designs-van-buren-data-center/89016021007/), a Google spokesperson said in an email."
   ],
   "locality_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project."
   ],
   "state_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday morning it plans to develop a large data center in DTE Energy Co.'s service territory."
   ],
   "capacity_gw_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "The Cannoli Project hyperscale data center in Van Buren Township will demand 1 gigawatt of power, DTE Energy Corporate Communications Director Jill Wilmot said in an email."
   ],
   "builder_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "The data center project is being pushed by California real estate development firm Panattoni Development Co."
   ],
   "ai_customer_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project."
   ],
   "status_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mexc.com/news/1114352",
   "title": "TeraWulf surges 10% on 1GW Kentucky AI campus et | MEXC News",
   "published_at": null,
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access.",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure."
   ],
   "locality_evidence": [
    "The company secured a 285-acre site in eastern Kentucky.",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure."
   ],
   "state_evidence": [
    "TeraWulf already operates another 480 MW facility in the state.",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure."
   ],
   "capacity_gw_evidence": [
    "It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity.",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure."
   ],
   "builder_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The company plans to bring the first 500 MW online during the second half of 2028.",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://fakta.co/iren-stock-texas-power-project",
   "title": "IREN Shares Surge as Texas AI Power Project Connects to Grid",
   "published_at": "2026-05-04T07:31:57",
   "project": "Sweetwater 1",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "IREN",
   "ai_customer": null,
   "status": "connected to the ERCOT grid",
   "announcement_date": "2026-05-04",
   "project_evidence": [
    "# IREN Shares Surge as Texas AI Power Project Connects to Grid",
    "[IREN](https://www.fakta.co/tag/iren) Limited shares jumped 11.91 percent on Monday, May 4, 2026, following the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "locality_evidence": [
    "# IREN Shares Surge as Texas AI Power Project Connects to Grid",
    "[IREN](https://www.fakta.co/tag/iren) Limited shares jumped 11.91 percent on Monday, May 4, 2026, following the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "state_evidence": [
    "# IREN Shares Surge as Texas AI Power Project Connects to Grid",
    "[IREN](https://www.fakta.co/tag/iren) Limited shares jumped 11.91 percent on Monday, May 4, 2026, following the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "capacity_gw_evidence": [
    "# IREN Shares Surge as Texas AI Power Project Connects to Grid",
    "[IREN](https://www.fakta.co/tag/iren) Limited shares jumped 11.91 percent on Monday, May 4, 2026, following the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "builder_evidence": [
    "# IREN Shares Surge as Texas AI Power Project Connects to Grid",
    "[IREN](https://www.fakta.co/tag/iren) Limited shares jumped 11.91 percent on Monday, May 4, 2026, following the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# IREN Shares Surge as Texas AI Power Project Connects to Grid",
    "The facility is now connected to the ERCOT grid, marking a significant milestone in the company's expansion toward a planned 2GW campus."
   ],
   "announcement_date_evidence": [
    "# IREN Shares Surge as Texas AI Power Project Connects to Grid",
    "[IREN](https://www.fakta.co/tag/iren) Limited shares jumped 11.91 percent on Monday, May 4, 2026, following the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ]
  },
  {
   "url": "https://entrepreneurshipreporter.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Creekstone Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "*Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite*",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "state_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "About Creekstone Energy",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "*Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite*",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://telecompaper.com/news/ecl-to-build-1-gw-hydrogen-powered-ai-data-centre-in-texas--1514296",
   "title": "ECL to build 1 GW hydrogen-powered AI data centre in Texas",
   "published_at": "2024-10-02T07:56:00",
   "project": "TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "ECL to build 1 GW hydrogen-powered AI data centre in Texas Data centre company ECL said it plans to build a hydrogen-powered 1 GW data centre on a 600+ acre site east of Houston, with AI company Lambda as its first tenant.",
    "The initial phase of TerraSite-TX1 will be delivered in the summer of 2025 at a cost of approximately USD 450 million, with 50 MW of data centre capacity to be utilised by data centre cloud and AI cloud operators."
   ],
   "locality_evidence": [
    "ECL to build 1 GW hydrogen-powered AI data centre in Texas Data centre company ECL said it plans to build a hydrogen-powered 1 GW data centre on a 600+ acre site east of Houston, with AI company Lambda as its first tenant."
   ],
   "state_evidence": [
    "ECL to build 1 GW hydrogen-powered AI data centre in Texas Data centre company ECL said it plans to build a hydrogen-powered 1 GW data centre on a 600+ acre site east of Houston, with AI company Lambda as its first tenant."
   ],
   "capacity_gw_evidence": [
    "ECL to build 1 GW hydrogen-powered AI data centre in Texas Data centre company ECL said it plans to build a hydrogen-powered 1 GW data centre on a 600+ acre site east of Houston, with AI company Lambda as its first tenant.",
    "The entire 1 GW site will be constructed at a cost of approximately USD 8 billion, with funding to be provided by ECL and unnamed fina"
   ],
   "builder_evidence": [
    "ECL to build 1 GW hydrogen-powered AI data centre in Texas Data centre company ECL said it plans to build a hydrogen-powered 1 GW data centre on a 600+ acre site east of Houston, with AI company Lambda as its first tenant.",
    "The entire 1 GW site will be constructed at a cost of approximately USD 8 billion, with funding to be provided by ECL and unnamed fina"
   ],
   "ai_customer_evidence": [
    "ECL to build 1 GW hydrogen-powered AI data centre in Texas Data centre company ECL said it plans to build a hydrogen-powered 1 GW data centre on a 600+ acre site east of Houston, with AI company Lambda as its first tenant."
   ],
   "status_evidence": [
    "ECL to build 1 GW hydrogen-powered AI data centre in Texas Data centre company ECL said it plans to build a hydrogen-powered 1 GW data centre on a 600+ acre site east of Houston, with AI company Lambda as its first tenant."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://idahostatesman.com/news/business/article316739447.html",
   "title": "Morgan Stanley leads $15B bet on Anthropic's Texas campus",
   "published_at": "2026-08-02T00:07:00",
   "project": "Nexus Data Centers project",
   "locality": "Hubbard",
   "state": "Texas",
   "capacity_gw": 1.6,
   "builder": "Nexus Data Centers",
   "ai_customer": "Anthropic",
   "status": "advanced talks",
   "announcement_date": "2026-07-30",
   "project_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus",
    "Nexus Data Centers is closing in on $15 billion in financing to build an [AI](https://www.thestreet.com/tag/artificial-intelligence) campus in Hubbard, Texas, which Anthropic will lease, with Morgan Stanley leading the bank group behind the deal, according to [CNBC](https://www.cnbc.com/2026/07/30/nexus-data-centers-in-advanced-talks-to-secure-15b-for-google-backed-anthropic-data-center.html).",
    "![Google is guaranteeing billions in Anthropic's lease obligations on a $15B Nexus Data Centers project, taking a 20% equity stake in return.](https://www.mcclatchy-wires.com/public/incoming/59s8dl/picture316739446/alternates/FREE_1200/a2b4f906-5a20-46cc-9828-0a8b4b8960c9)"
   ],
   "locality_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus",
    "Nexus Data Centers is closing in on $15 billion in financing to build an [AI](https://www.thestreet.com/tag/artificial-intelligence) campus in Hubbard, Texas, which Anthropic will lease, with Morgan Stanley leading the bank group behind the deal, according to [CNBC](https://www.cnbc.com/2026/07/30/nexus-data-centers-in-advanced-talks-to-secure-15b-for-google-backed-anthropic-data-center.html)."
   ],
   "state_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus",
    "Nexus Data Centers is closing in on $15 billion in financing to build an [AI](https://www.thestreet.com/tag/artificial-intelligence) campus in Hubbard, Texas, which Anthropic will lease, with Morgan Stanley leading the bank group behind the deal, according to [CNBC](https://www.cnbc.com/2026/07/30/nexus-data-centers-in-advanced-talks-to-secure-15b-for-google-backed-anthropic-data-center.html)."
   ],
   "capacity_gw_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus",
    "The guarantees cover [four Anthropic data center leases](https://www.reuters.com/legal/litigation/banks-talks-lend-15-billion-anthropic-data-center-backed-by-google-wsj-reports-2026-07-30/) and the power purchase agreements tied to an on-site natural gas plant with 1.6 gigawatts of capacity."
   ],
   "builder_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus",
    "Nexus Data Centers is closing in on $15 billion in financing to build an [AI](https://www.thestreet.com/tag/artificial-intelligence) campus in Hubbard, Texas, which Anthropic will lease, with Morgan Stanley leading the bank group behind the deal, according to [CNBC](https://www.cnbc.com/2026/07/30/nexus-data-centers-in-advanced-talks-to-secure-15b-for-google-backed-anthropic-data-center.html)."
   ],
   "ai_customer_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus",
    "Nexus Data Centers is closing in on $15 billion in financing to build an [AI](https://www.thestreet.com/tag/artificial-intelligence) campus in Hubbard, Texas, which Anthropic will lease, with Morgan Stanley leading the bank group behind the deal, according to [CNBC](https://www.cnbc.com/2026/07/30/nexus-data-centers-in-advanced-talks-to-secure-15b-for-google-backed-anthropic-data-center.html)."
   ],
   "status_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus",
    "Nexus Data Centers is closing in on $15 billion in financing to build an [AI](https://www.thestreet.com/tag/artificial-intelligence) campus in Hubbard, Texas, which Anthropic will lease, with Morgan Stanley leading the bank group behind the deal, according to [CNBC](https://www.cnbc.com/2026/07/30/nexus-data-centers-in-advanced-talks-to-secure-15b-for-google-backed-anthropic-data-center.html)."
   ],
   "announcement_date_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus",
    "Nexus Data Centers is closing in on $15 billion in financing to build an [AI](https://www.thestreet.com/tag/artificial-intelligence) campus in Hubbard, Texas, which Anthropic will lease, with Morgan Stanley leading the bank group behind the deal, according to [CNBC](https://www.cnbc.com/2026/07/30/nexus-data-centers-in-advanced-talks-to-secure-15b-for-google-backed-anthropic-data-center.html)."
   ]
  },
  {
   "url": "https://inblix.com/article/openai-s-ohio-data-center-lease-is-so-massive-nvidia-had-to-guarantee-it-b53dd2",
   "title": "OpenAI's 8GW Ohio Data Center Deal: Nvidia Backs $105B",
   "published_at": "2026-08-17T14:13:26",
   "project": "PORTS-Pike",
   "locality": null,
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# OpenAI's Ohio data center lease is so massive Nvidia had to guarantee it",
    "The site, called PORTS-Pike, sits partly on a former Department of Energy uranium enrichment facility and pulls power from a 9.2-gigawatt gas plant owned by the US government."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# OpenAI's Ohio data center lease is so massive Nvidia had to guarantee it",
    "OpenAI just signed the largest data center lease ever announced \u2014 a 20-year deal with SoftBank\u2019s SB Energy for an Ohio campus that will eventually deliver around 8 gigawatts of IT capacity."
   ],
   "capacity_gw_evidence": [
    "# OpenAI's Ohio data center lease is so massive Nvidia had to guarantee it",
    "OpenAI just signed the largest data center lease ever announced \u2014 a 20-year deal with SoftBank\u2019s SB Energy for an Ohio campus that will eventually deliver around 8 gigawatts of IT capacity."
   ],
   "builder_evidence": [
    "# OpenAI's Ohio data center lease is so massive Nvidia had to guarantee it",
    "OpenAI just signed the largest data center lease ever announced \u2014 a 20-year deal with SoftBank\u2019s SB Energy for an Ohio campus that will eventually deliver around 8 gigawatts of IT capacity."
   ],
   "ai_customer_evidence": [
    "# OpenAI's Ohio data center lease is so massive Nvidia had to guarantee it",
    "OpenAI just signed the largest data center lease ever announced \u2014 a 20-year deal with SoftBank\u2019s SB Energy for an Ohio campus that will eventually deliver around 8 gigawatts of IT capacity."
   ],
   "status_evidence": [
    "# OpenAI's Ohio data center lease is so massive Nvidia had to guarantee it",
    "OpenAI just signed the largest data center lease ever announced \u2014 a 20-year deal with SoftBank\u2019s SB Energy for an Ohio campus that will eventually deliver around 8 gigawatts of IT capacity."
   ],
   "announcement_date_evidence": [
    "# OpenAI's Ohio data center lease is so massive Nvidia had to guarantee it",
    "The Decoder \u00b7 Aug 17, 2026 \u00b7 2 min read \u00b7 [ Read original article \u2192 ](https://the-decoder.com/openai-signs-record-ohio-data-center-lease-with-nvidia-backing-up-to-105-billion/?ref=inblix)"
   ]
  },
  {
   "url": "https://newsbreak.com/news/4795773709049-meta-and-blackrock-form-a-14bn-venture-to-build-an-el-paso-ai-data-centre",
   "title": "Meta and BlackRock form a $14bn venture to build an El Paso AI data centre - NewsBreak",
   "published_at": "2026-07-28T13:28:47",
   "project": "El Paso",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "half-built",
   "announcement_date": null,
   "project_evidence": [
    "Meta has folded its half-built El Paso data centre into a joint venture with BlackRock, formalising a structure that keeps most of a $14bn project off its own books."
   ],
   "locality_evidence": [
    "Meta has folded its half-built El Paso data centre into a joint venture with BlackRock, formalising a structure that keeps most of a $14bn project off its own books."
   ],
   "state_evidence": [
    "Under the agreement, funds managed by BlackRock will own 80% of the Texas campus and Meta the remaining 20%, though Meta stays on as the site\u2019s construction manager, property manager, and sole tenant once the servers come online in 2028."
   ],
   "capacity_gw_evidence": [
    "The campus itself is designed to deliver a gigawatt of compute for Meta\u2019s AI systems and its core advertising business, with power expected in 2028, which would make it one of the larger single-site facilities the company has committed to outside Louisiana."
   ],
   "builder_evidence": [
    "Under the agreement, funds managed by BlackRock will own 80% of the Texas campus and Meta the remaining 20%, though Meta stays on as the site\u2019s construction manager, property manager, and sole tenant once the servers come online in 2028."
   ],
   "ai_customer_evidence": [
    "The campus itself is designed to deliver a gigawatt of compute for Meta\u2019s AI systems and its core advertising business, with power expected in 2028, which would make it one of the larger single-site facilities the company has committed to outside Louisiana."
   ],
   "status_evidence": [
    "Meta has folded its half-built El Paso data centre into a joint venture with BlackRock, formalising a structure that keeps most of a $14bn project off its own books."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aterio.io/blog/from-2023-to-2026-aws-accelerates-indiana-s-largest-data-center-build",
   "title": "From 2023 to 2026: AWS Accelerates Indiana\u2019s Largest Data Center Build",
   "published_at": "2025-06-16T16:29:00",
   "project": null,
   "locality": "St. Joseph County",
   "state": "Indiana",
   "capacity_gw": 2.25,
   "builder": "AWS",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2023",
   "project_evidence": null,
   "locality_evidence": [
    "# From 2023 to 2026: AWS Accelerates Indiana\u2019s Largest Data Center Build",
    "In 2023, [AWS](https://aws.amazon.com/trust-center/data-center/) announced plans for a $11 billion data center campus in **St. Joseph County, Indiana**\u2014originally pitched as a multi-phase development extending through 2030."
   ],
   "state_evidence": [
    "# From 2023 to 2026: AWS Accelerates Indiana\u2019s Largest Data Center Build",
    "In 2023, [AWS](https://aws.amazon.com/trust-center/data-center/) announced plans for a $11 billion data center campus in **St. Joseph County, Indiana**\u2014originally pitched as a multi-phase development extending through 2030."
   ],
   "capacity_gw_evidence": [
    "# From 2023 to 2026: AWS Accelerates Indiana\u2019s Largest Data Center Build",
    "A campus of this scale could ultimately deliver **2.25 GW of capacity**, enough to power 1.5 million homes."
   ],
   "builder_evidence": [
    "# From 2023 to 2026: AWS Accelerates Indiana\u2019s Largest Data Center Build",
    "In 2023, [AWS](https://aws.amazon.com/trust-center/data-center/) announced plans for a $11 billion data center campus in **St. Joseph County, Indiana**\u2014originally pitched as a multi-phase development extending through 2030."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# From 2023 to 2026: AWS Accelerates Indiana\u2019s Largest Data Center Build",
    "Aterio\u2019s latest analysis from **May 11, 2025**, confirms **all 16 planned buildings are already under construction**."
   ],
   "announcement_date_evidence": [
    "# From 2023 to 2026: AWS Accelerates Indiana\u2019s Largest Data Center Build",
    "In 2023, [AWS](https://aws.amazon.com/trust-center/data-center/) announced plans for a $11 billion data center campus in **St. Joseph County, Indiana**\u2014originally pitched as a multi-phase development extending through 2030."
   ]
  },
  {
   "url": "https://grokipedia.com/page/Colossus_(supercomputer",
   "title": "Colossus (supercomputer)",
   "published_at": "2026-03-28T00:34:30",
   "project": "Colossus",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "operational",
   "announcement_date": "2024-06-05",
   "project_evidence": [
    "Fact-checked by Grok 4 months ago",
    "# Colossus (supercomputer)",
    "Colossus is a supercomputer cluster built by [xAI](/page/xAI), [Elon Musk](/page/Elon_Musk)'s artificial intelligence company."
   ],
   "locality_evidence": [
    "Fact-checked by Grok 4 months ago",
    "# Colossus (supercomputer)",
    "The cluster is based in Memphis, Tennessee, with expansions in the greater Memphis area including a new data center in Southaven, Mississippi known as MACROHARDRR."
   ],
   "state_evidence": [
    "Fact-checked by Grok 4 months ago",
    "# Colossus (supercomputer)",
    "The cluster is based in Memphis, Tennessee, with expansions in the greater Memphis area including a new data center in Southaven, Mississippi known as MACROHARDRR."
   ],
   "capacity_gw_evidence": [
    "Fact-checked by Grok 4 months ago",
    "# Colossus (supercomputer)",
    "By February 2026, the cluster had been further expanded to approximately 555,000 NVIDIA GPUs of various types, achieving a power capacity of approximately 2 GW, with a roadmap to 1 million GPUs and beyond.[1]"
   ],
   "builder_evidence": [
    "Fact-checked by Grok 4 months ago",
    "# Colossus (supercomputer)",
    "Colossus is a supercomputer cluster built by [xAI](/page/xAI), [Elon Musk](/page/Elon_Musk)'s artificial intelligence company."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Fact-checked by Grok 4 months ago",
    "# Colossus (supercomputer)",
    "By February 2026, the cluster had been further expanded to approximately 555,000 NVIDIA GPUs of various types, achieving a power capacity of approximately 2 GW, with a roadmap to 1 million GPUs and beyond.[1]"
   ],
   "announcement_date_evidence": [
    "Fact-checked by Grok 4 months ago",
    "# Colossus (supercomputer)",
    "### Announcement and Planning",
    "[xAI](/page/xAI) publicly revealed plans for the Colossus supercomputer on June 5, 2024, designating [Memphis, Tennessee](/page/Memphis,_Tennessee), as its site due to the area's heavy industrial zoning that supports large-scale operations.[6][7]"
   ]
  },
  {
   "url": "https://lancium.com/category/latest-news",
   "title": "Latest News - lancium",
   "published_at": null,
   "project": null,
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": "",
   "status": "Announced",
   "announcement_date": "2026-07-15",
   "project_evidence": null,
   "locality_evidence": [
    "# Category: Latest News",
    "## [Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas](https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas/)",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) \u2014 Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "state_evidence": [
    "# Category: Latest News",
    "## [Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas](https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas/)",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) \u2014 Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "# Category: Latest News",
    "## [Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas](https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas/)",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) \u2014 Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "builder_evidence": [
    "# Category: Latest News",
    "## [Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas](https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas/)",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) \u2014 Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Category: Latest News",
    "## [Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas](https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas/)",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) \u2014 Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "announcement_date_evidence": [
    "# Category: Latest News",
    "## [Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas](https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas/)",
    "CHILDRESS, Texas, July 15, 2026 (GLOBE NEWSWIRE) \u2014 Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, today announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ]
  },
  {
   "url": "https://lancium.com/category/latest-news",
   "title": "Latest News - lancium",
   "published_at": null,
   "project": "Lancium Clean Campus",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Lancium",
   "ai_customer": "OpenAI",
   "status": "Announced",
   "announcement_date": "2025-10-16",
   "project_evidence": [
    "# Category: Latest News",
    "## [Lancium Secures $600 Million Debt Financing to Advance Clean Campus Development, Starting with 1.2 GW Abilene Site](https://lancium.com/2025/10/16/lancium-secures-600-million-debt-financing/)",
    "HOUSTON, Oct. 16, 2025 /PRNewswire/ \u2014 Lancium, a leading energy technology and infrastructure company, today announced the close of a $600 million debt financing package to advance its clean campus development strategy, beginning with the 1.2 GW Lancium Clean Campus in Abilene, Texas, the first site of the Stargate initiative, a multi-stakeholder AI infrastructure program backed by SoftBank, OpenAI, [\u2026]"
   ],
   "locality_evidence": [
    "# Category: Latest News",
    "## [Lancium Secures $600 Million Debt Financing to Advance Clean Campus Development, Starting with 1.2 GW Abilene Site](https://lancium.com/2025/10/16/lancium-secures-600-million-debt-financing/)",
    "HOUSTON, Oct. 16, 2025 /PRNewswire/ \u2014 Lancium, a leading energy technology and infrastructure company, today announced the close of a $600 million debt financing package to advance its clean campus development strategy, beginning with the 1.2 GW Lancium Clean Campus in Abilene, Texas, the first site of the Stargate initiative, a multi-stakeholder AI infrastructure program backed by SoftBank, OpenAI, [\u2026]"
   ],
   "state_evidence": [
    "# Category: Latest News",
    "## [Lancium Secures $600 Million Debt Financing to Advance Clean Campus Development, Starting with 1.2 GW Abilene Site](https://lancium.com/2025/10/16/lancium-secures-600-million-debt-financing/)",
    "HOUSTON, Oct. 16, 2025 /PRNewswire/ \u2014 Lancium, a leading energy technology and infrastructure company, today announced the close of a $600 million debt financing package to advance its clean campus development strategy, beginning with the 1.2 GW Lancium Clean Campus in Abilene, Texas, the first site of the Stargate initiative, a multi-stakeholder AI infrastructure program backed by SoftBank, OpenAI, [\u2026]"
   ],
   "capacity_gw_evidence": [
    "# Category: Latest News",
    "## [Lancium Secures $600 Million Debt Financing to Advance Clean Campus Development, Starting with 1.2 GW Abilene Site](https://lancium.com/2025/10/16/lancium-secures-600-million-debt-financing/)",
    "HOUSTON, Oct. 16, 2025 /PRNewswire/ \u2014 Lancium, a leading energy technology and infrastructure company, today announced the close of a $600 million debt financing package to advance its clean campus development strategy, beginning with the 1.2 GW Lancium Clean Campus in Abilene, Texas, the first site of the Stargate initiative, a multi-stakeholder AI infrastructure program backed by SoftBank, OpenAI, [\u2026]"
   ],
   "builder_evidence": [
    "# Category: Latest News",
    "## [Lancium Secures $600 Million Debt Financing to Advance Clean Campus Development, Starting with 1.2 GW Abilene Site](https://lancium.com/2025/10/16/lancium-secures-600-million-debt-financing/)",
    "HOUSTON, Oct. 16, 2025 /PRNewswire/ \u2014 Lancium, a leading energy technology and infrastructure company, today announced the close of a $600 million debt financing package to advance its clean campus development strategy, beginning with the 1.2 GW Lancium Clean Campus in Abilene, Texas, the first site of the Stargate initiative, a multi-stakeholder AI infrastructure program backed by SoftBank, OpenAI, [\u2026]"
   ],
   "ai_customer_evidence": [
    "# Category: Latest News",
    "## [Lancium Secures $600 Million Debt Financing to Advance Clean Campus Development, Starting with 1.2 GW Abilene Site](https://lancium.com/2025/10/16/lancium-secures-600-million-debt-financing/)",
    "HOUSTON, Oct. 16, 2025 /PRNewswire/ \u2014 Lancium, a leading energy technology and infrastructure company, today announced the close of a $600 million debt financing package to advance its clean campus development strategy, beginning with the 1.2 GW Lancium Clean Campus in Abilene, Texas, the first site of the Stargate initiative, a multi-stakeholder AI infrastructure program backed by SoftBank, OpenAI, [\u2026]"
   ],
   "status_evidence": [
    "# Category: Latest News",
    "## [Lancium Secures $600 Million Debt Financing to Advance Clean Campus Development, Starting with 1.2 GW Abilene Site](https://lancium.com/2025/10/16/lancium-secures-600-million-debt-financing/)",
    "HOUSTON, Oct. 16, 2025 /PRNewswire/ \u2014 Lancium, a leading energy technology and infrastructure company, today announced the close of a $600 million debt financing package to advance its clean campus development strategy, beginning with the 1.2 GW Lancium Clean Campus in Abilene, Texas, the first site of the Stargate initiative, a multi-stakeholder AI infrastructure program backed by SoftBank, OpenAI, [\u2026]"
   ],
   "announcement_date_evidence": [
    "# Category: Latest News",
    "## [Lancium Secures $600 Million Debt Financing to Advance Clean Campus Development, Starting with 1.2 GW Abilene Site](https://lancium.com/2025/10/16/lancium-secures-600-million-debt-financing/)",
    "HOUSTON, Oct. 16, 2025 /PRNewswire/ \u2014 Lancium, a leading energy technology and infrastructure company, today announced the close of a $600 million debt financing package to advance its clean campus development strategy, beginning with the 1.2 GW Lancium Clean Campus in Abilene, Texas, the first site of the Stargate initiative, a multi-stakeholder AI infrastructure program backed by SoftBank, OpenAI, [\u2026]"
   ]
  },
  {
   "url": "https://aidatacenterindex.com/datacenters/microsoft-project-fairwater-wisconsin.html",
   "title": "Microsoft Project Fairwater (Mount Pleasant, Wisconsin) \u2014 3.3 GW \u2014 Under Construction",
   "published_at": null,
   "project": "Microsoft Project Fairwater",
   "locality": "Mount Pleasant",
   "state": "Wisconsin",
   "capacity_gw": 3.3,
   "builder": "Microsoft",
   "ai_customer": "OpenAI",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "AI data center dossier",
    "# Microsoft Project Fairwater (Mount Pleasant, Wisconsin)",
    "Microsoft's \"Project Fairwater\" in Mount Pleasant, Wisconsin, is designed to be the world's most powerful AI data center campus."
   ],
   "locality_evidence": [
    "AI data center dossier",
    "# Microsoft Project Fairwater (Mount Pleasant, Wisconsin)",
    "Microsoft's \"Project Fairwater\" in Mount Pleasant, Wisconsin, is designed to be the world's most powerful AI data center campus."
   ],
   "state_evidence": [
    "AI data center dossier",
    "# Microsoft Project Fairwater (Mount Pleasant, Wisconsin)",
    "Microsoft's \"Project Fairwater\" in Mount Pleasant, Wisconsin, is designed to be the world's most powerful AI data center campus."
   ],
   "capacity_gw_evidence": [
    "AI data center dossier",
    "# Microsoft Project Fairwater (Mount Pleasant, Wisconsin)",
    "Known capacity\n\n3.3 GW",
    "Microsoft's \"Project Fairwater\" in Mount Pleasant, Wisconsin, is designed to be the world's most powerful AI data center campus. Spanning over 1,500 acres on the site originally intended for the Foxconn venture, the campus is projected to reach a peak electrical load of 3.3 gigawatts (GW) by late 2027\u2014exceeding the average power consumption of the city of Los Angeles."
   ],
   "builder_evidence": [
    "AI data center dossier",
    "# Microsoft Project Fairwater (Mount Pleasant, Wisconsin)",
    "Operator\n\nMicrosoft, NVIDIA",
    "Who operates Microsoft Project Fairwater (Mount Pleasant, Wisconsin)?Microsoft Project Fairwater (Mount Pleasant, Wisconsin) is operated by Microsoft and NVIDIA. Structured intelligence reports are available for Microsoft Operator Report and NVIDIA Operator Report and United States Country Report."
   ],
   "ai_customer_evidence": [
    "AI data center dossier",
    "# Microsoft Project Fairwater (Mount Pleasant, Wisconsin)",
    "Initial phases are set to go live in early 2026, serving as the flagship for training the largest AI models for OpenAI and Microsoft Copilot."
   ],
   "status_evidence": [
    "AI data center dossier",
    "# Microsoft Project Fairwater (Mount Pleasant, Wisconsin)",
    "What is the status of Microsoft Project Fairwater (Mount Pleasant, Wisconsin)?Microsoft Project Fairwater (Mount Pleasant, Wisconsin) is currently under construction. Known timeline milestones: Earliest market signal 2024."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://rcrwireless.com/20250820/ai-infrastructure/vantage-ai-texas",
   "title": "Vantage Data Centers plans $25B AI campus in Texas",
   "published_at": "2025-08-20T15:47:43",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "underway",
   "announcement_date": null,
   "project_evidence": [
    "The project, called Frontier, will span 1,200 acres and provide 1.4 gigawatts of capacity, making it the largest facility in Vantage\u2019s global portfolio.",
    "## Vantage noted that construction is already underway, with the first building expected to be operational in the second half of 2026"
   ],
   "locality_evidence": [
    "[Vantage Data Centers](https://vantage-dc.com/) plans to invest $25 billion in a hyperscale campus in Shackelford County, Texas, designed to meet growing demand for artificial intelligence (AI) infrastructure, the company said in a release.",
    "## Vantage noted that construction is already underway, with the first building expected to be operational in the second half of 2026"
   ],
   "state_evidence": [
    "[Vantage Data Centers](https://vantage-dc.com/) plans to invest $25 billion in a hyperscale campus in Shackelford County, Texas, designed to meet growing demand for artificial intelligence (AI) infrastructure, the company said in a release.",
    "## Vantage noted that construction is already underway, with the first building expected to be operational in the second half of 2026"
   ],
   "capacity_gw_evidence": [
    "**$25B AI mega-campus in Texas \u2013** Vantage will invest $25 billion in a 1.4 GW campus, its largest project to date, with operations starting in 2026.",
    "The project, called Frontier, will span 1,200 acres and provide 1.4 gigawatts of capacity, making it the largest facility in Vantage\u2019s global portfolio.",
    "## Vantage noted that construction is already underway, with the first building expected to be operational in the second half of 2026"
   ],
   "builder_evidence": [
    "[Vantage Data Centers](https://vantage-dc.com/) plans to invest $25 billion in a hyperscale campus in Shackelford County, Texas, designed to meet growing demand for artificial intelligence (AI) infrastructure, the company said in a release.",
    "## Vantage noted that construction is already underway, with the first building expected to be operational in the second half of 2026"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction is already underway, with the first building expected to be operational in the second half of 2026.",
    "## Vantage noted that construction is already underway, with the first building expected to be operational in the second half of 2026"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://industrialpcworld.com/fermis-11gw-texas-data-center-plan-gets-a-cooling-20251201",
   "title": "Fermi\u2019s 11GW Texas Data Center Plan Gets a Cooling Partner",
   "published_at": "2025-12-01T19:11:29",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Fermi\u2019s 11GW Texas Data Center Plan Gets a Cooling Partner",
    "The campus, dubbed Project Matador, is audaciously planned for up to 11GW of capacity and will be built on land owned by the Texas Tech University system."
   ],
   "locality_evidence": [
    "# Fermi\u2019s 11GW Texas Data Center Plan Gets a Cooling Partner",
    "According to DCD, Fermi America has signed a non-binding Memorandum of Understanding with power-cooling firm MVM EGI to develop cooling systems for its planned data center and energy campus in Amarillo, Texas."
   ],
   "state_evidence": [
    "# Fermi\u2019s 11GW Texas Data Center Plan Gets a Cooling Partner",
    "According to DCD, Fermi America has signed a non-binding Memorandum of Understanding with power-cooling firm MVM EGI to develop cooling systems for its planned data center and energy campus in Amarillo, Texas."
   ],
   "capacity_gw_evidence": [
    "# Fermi\u2019s 11GW Texas Data Center Plan Gets a Cooling Partner",
    "The campus, dubbed Project Matador, is audaciously planned for up to 11GW of capacity and will be built on land owned by the Texas Tech University system."
   ],
   "builder_evidence": [
    "# Fermi\u2019s 11GW Texas Data Center Plan Gets a Cooling Partner",
    "According to DCD, Fermi America has signed a non-binding Memorandum of Understanding with power-cooling firm MVM EGI to develop cooling systems for its planned data center and energy campus in Amarillo, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Fermi\u2019s 11GW Texas Data Center Plan Gets a Cooling Partner",
    "According to DCD, Fermi America has signed a non-binding Memorandum of Understanding with power-cooling firm MVM EGI to develop cooling systems for its planned data center and energy campus in Amarillo, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mescomputing.com/news-network/2026/openai-s-750-billion-bet-can-growth-outrun-the-losses-and-public-backlash",
   "title": "OpenAI's $750 Billion Bet: Can Growth Outrun The Losses And Public Backlash?",
   "published_at": "2026-07-25T01:37:23",
   "project": "Project Camellia",
   "locality": null,
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI's $750 Billion Bet: Can Growth Outrun The Losses And Public Backlash?",
    "At the same time **[OpenAI announced](https://projectcamellia.com/)** a $20 billion, 3.2GW data centre campus in Georgia known as Project Camellia."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# OpenAI's $750 Billion Bet: Can Growth Outrun The Losses And Public Backlash?",
    "At the same time **[OpenAI announced](https://projectcamellia.com/)** a $20 billion, 3.2GW data centre campus in Georgia known as Project Camellia."
   ],
   "capacity_gw_evidence": [
    "# OpenAI's $750 Billion Bet: Can Growth Outrun The Losses And Public Backlash?",
    "At the same time **[OpenAI announced](https://projectcamellia.com/)** a $20 billion, 3.2GW data centre campus in Georgia known as Project Camellia."
   ],
   "builder_evidence": [
    "# OpenAI's $750 Billion Bet: Can Growth Outrun The Losses And Public Backlash?",
    "At the same time **[OpenAI announced](https://projectcamellia.com/)** a $20 billion, 3.2GW data centre campus in Georgia known as Project Camellia."
   ],
   "ai_customer_evidence": [
    "# OpenAI's $750 Billion Bet: Can Growth Outrun The Losses And Public Backlash?",
    "At the same time **[OpenAI announced](https://projectcamellia.com/)** a $20 billion, 3.2GW data centre campus in Georgia known as Project Camellia."
   ],
   "status_evidence": [
    "# OpenAI's $750 Billion Bet: Can Growth Outrun The Losses And Public Backlash?",
    "At the same time **[OpenAI announced](https://projectcamellia.com/)** a $20 billion, 3.2GW data centre campus in Georgia known as Project Camellia."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://radio.wcmu.org/local-regional-news/2026-03-18/google-revealed-as-company-behind-hyperscale-data-center-project-cannoli",
   "title": "Google revealed as company behind hyperscale data center \"Project Cannoli\"",
   "published_at": "2026-03-18T00:55:41",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Google",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Google revealed as company behind hyperscale data center \"Project Cannoli\"",
    "The data center that\u2019s been [dubbed \u201cProject Cannoli\u201d](https://www.michiganpublic.org/transportation-infrastructure/2026-02-06/what-to-know-about-wayne-countys-proposed-data-center-project-cannoli) will require so much power, it\u2019s difficult to grasp."
   ],
   "locality_evidence": [
    "# Google revealed as company behind hyperscale data center \"Project Cannoli\"",
    "Some details about the data center proposed in Van Buren Township have been floating around for weeks."
   ],
   "state_evidence": [
    "# Google revealed as company behind hyperscale data center \"Project Cannoli\"",
    "A hyperscale data center planned for Western Wayne County now officially has a known backer: Google.",
    "That quantity is one gigawatt \u2014 as much as [DTE Energy\u2019s Fermi nuclear power plant produces](https://www.dteenergy.com/us/en/business/about-dte/fermi-2-power-plant/fermi-2-power-plant.html), or an average major city consumes."
   ],
   "capacity_gw_evidence": [
    "# Google revealed as company behind hyperscale data center \"Project Cannoli\"",
    "That quantity is one gigawatt \u2014 as much as [DTE Energy\u2019s Fermi nuclear power plant produces](https://www.dteenergy.com/us/en/business/about-dte/fermi-2-power-plant/fermi-2-power-plant.html), or an average major city consumes."
   ],
   "builder_evidence": [
    "# Google revealed as company behind hyperscale data center \"Project Cannoli\"",
    "A hyperscale data center planned for Western Wayne County now officially has a known backer: Google."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Google revealed as company behind hyperscale data center \"Project Cannoli\"",
    "A hyperscale data center planned for Western Wayne County now officially has a known backer: Google."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://briefly.co/anchor/Tech_industry/story/terawulf-expands-ai-strategy-with-1gw-data-campus-and-3b-backing",
   "title": "Terawulf Expands AI Strategy With 1GW Data Campus and $3B Backing",
   "published_at": null,
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "Terawulf",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": null,
   "project_evidence": [
    "Terawulf acquired the Muskie Data Campus in eastern Kentucky within the 1,000-acre Eastpark Industrial Park, adding about 285 acres of owned and controlled land.",
    "The Nasdaq-listed company said it acquired the Muskie Data Campus from Industrial Equity Partners."
   ],
   "locality_evidence": [
    "Terawulf acquired the Muskie Data Campus in eastern Kentucky within the 1,000-acre Eastpark Industrial Park, adding about 285 acres of owned and controlled land."
   ],
   "state_evidence": [
    "Terawulf acquired the Muskie Data Campus in eastern Kentucky within the 1,000-acre Eastpark Industrial Park, adding about 285 acres of owned and controlled land."
   ],
   "capacity_gw_evidence": [
    "The campus is expected to support more than 1 gigawatt of AI and high-performance computing capacity, roughly enough electricity for 750,000 homes."
   ],
   "builder_evidence": [
    "Terawulf acquired the Muskie Data Campus in eastern Kentucky within the 1,000-acre Eastpark Industrial Park, adding about 285 acres of owned and controlled land."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Terawulf acquired the Muskie Data Campus in eastern Kentucky within the 1,000-acre Eastpark Industrial Park, adding about 285 acres of owned and controlled land."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://techflowpost.com/en-US/newsletter/128914",
   "title": "Hut 8 and IREN Announce New Billion-Level AI Infrastructure Contract,\u2026",
   "published_at": "2026-07-20T14:19:34",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "fully commercialized",
   "announcement_date": "2026-07-20",
   "project_evidence": [
    "TechFlow news, July 20, according to The Block, Bitcoin mining companies Hut 8 (HUT) and IREN successively announced major AI infrastructure deals, with stock prices both rising more than 16% on the day.",
    "Hut 8 signed a second 15-year, $9.8 billion lease at the Beacon Point campus in Nueces County, Texas, fully commercializing the 1GW site."
   ],
   "locality_evidence": [
    "TechFlow news, July 20, according to The Block, Bitcoin mining companies Hut 8 (HUT) and IREN successively announced major AI infrastructure deals, with stock prices both rising more than 16% on the day.",
    "Hut 8 signed a second 15-year, $9.8 billion lease at the Beacon Point campus in Nueces County, Texas, fully commercializing the 1GW site."
   ],
   "state_evidence": [
    "TechFlow news, July 20, according to The Block, Bitcoin mining companies Hut 8 (HUT) and IREN successively announced major AI infrastructure deals, with stock prices both rising more than 16% on the day.",
    "Hut 8 signed a second 15-year, $9.8 billion lease at the Beacon Point campus in Nueces County, Texas, fully commercializing the 1GW site."
   ],
   "capacity_gw_evidence": [
    "TechFlow news, July 20, according to The Block, Bitcoin mining companies Hut 8 (HUT) and IREN successively announced major AI infrastructure deals, with stock prices both rising more than 16% on the day.",
    "Hut 8 signed a second 15-year, $9.8 billion lease at the Beacon Point campus in Nueces County, Texas, fully commercializing the 1GW site."
   ],
   "builder_evidence": [
    "TechFlow news, July 20, according to The Block, Bitcoin mining companies Hut 8 (HUT) and IREN successively announced major AI infrastructure deals, with stock prices both rising more than 16% on the day.",
    "Hut 8 signed a second 15-year, $9.8 billion lease at the Beacon Point campus in Nueces County, Texas, fully commercializing the 1GW site."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "TechFlow news, July 20, according to The Block, Bitcoin mining companies Hut 8 (HUT) and IREN successively announced major AI infrastructure deals, with stock prices both rising more than 16% on the day.",
    "Hut 8 signed a second 15-year, $9.8 billion lease at the Beacon Point campus in Nueces County, Texas, fully commercializing the 1GW site."
   ],
   "announcement_date_evidence": [
    "TechFlow news, July 20, according to The Block, Bitcoin mining companies Hut 8 (HUT) and IREN successively announced major AI infrastructure deals, with stock prices both rising more than 16% on the day."
   ]
  },
  {
   "url": "https://webcenters.netscape.compuserve.com/pf/story/0022/20260501/9711704.htm",
   "title": "IREN Announces Successful Energization of Sweetwater 1",
   "published_at": null,
   "project": "Sweetwater",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN Limited",
   "ai_customer": null,
   "status": "energized",
   "announcement_date": "2026-05-01",
   "project_evidence": [
    "## IREN Announces Successful Energization of Sweetwater 1",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "locality_evidence": [
    "## IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "state_evidence": [
    "## IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "capacity_gw_evidence": [
    "## IREN Announces Successful Energization of Sweetwater 1",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "builder_evidence": [
    "## IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "announcement_date_evidence": [
    "## IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ]
  },
  {
   "url": "https://latitudemedia.com/industry-news/creekstone-energy-raises-series-b-led-by-trident-ridge-to-advance-10-gigawatt-ai-data-center-campus-in-utah",
   "title": "Creekstone Energy raises series B led by Trident Ridge to advance 10-gigawatt AI data center campus in Utah | Latitude Media",
   "published_at": "2025-11-14T12:47:41",
   "project": "AI Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy",
   "ai_customer": null,
   "status": "early construction",
   "announcement_date": "2025-11-04",
   "project_evidence": [
    "PRESS RELEASE: [Creekstone Energy](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.creekstone.energy%2F&esheet=54352206&newsitemid=20251104790930&lan=en-US&anchor=Creekstone+Energy&index=1&md5=b050988022fb00cb1bd230ae3a8febfb), a leader in next-generation energy infrastructure for artificial intelligence (AI) computing, today announced it has closed its Series B funding to advance development of the AI Gigasite in Delta, Utah \u2014 a multi-gigawatt, hybrid-generation data center campus built to power the next era of AI and high-performance computing (HPC)."
   ],
   "locality_evidence": [
    "PRESS RELEASE: [Creekstone Energy](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.creekstone.energy%2F&esheet=54352206&newsitemid=20251104790930&lan=en-US&anchor=Creekstone+Energy&index=1&md5=b050988022fb00cb1bd230ae3a8febfb), a leader in next-generation energy infrastructure for artificial intelligence (AI) computing, today announced it has closed its Series B funding to advance development of the AI Gigasite in Delta, Utah \u2014 a multi-gigawatt, hybrid-generation data center campus built to power the next era of AI and high-performance computing (HPC)."
   ],
   "state_evidence": [
    "PRESS RELEASE: [Creekstone Energy](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.creekstone.energy%2F&esheet=54352206&newsitemid=20251104790930&lan=en-US&anchor=Creekstone+Energy&index=1&md5=b050988022fb00cb1bd230ae3a8febfb), a leader in next-generation energy infrastructure for artificial intelligence (AI) computing, today announced it has closed its Series B funding to advance development of the AI Gigasite in Delta, Utah \u2014 a multi-gigawatt, hybrid-generation data center campus built to power the next era of AI and high-performance computing (HPC)."
   ],
   "capacity_gw_evidence": [
    "PRESS RELEASE: [Creekstone Energy](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.creekstone.energy%2F&esheet=54352206&newsitemid=20251104790930&lan=en-US&anchor=Creekstone+Energy&index=1&md5=b050988022fb00cb1bd230ae3a8febfb), a leader in next-generation energy infrastructure for artificial intelligence (AI) computing, today announced it has closed its Series B funding to advance development of the AI Gigasite in Delta, Utah \u2014 a multi-gigawatt, hybrid-generation data center campus built to power the next era of AI and high-performance computing (HPC).",
    "Proceeds from the financing will accelerate permitting, engineering, and early construction of the 10-gigawatt Delta Gigasite, a project that strengthens Utah\u2019s role in U.S. energy and AI leadership."
   ],
   "builder_evidence": [
    "PRESS RELEASE: [Creekstone Energy](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.creekstone.energy%2F&esheet=54352206&newsitemid=20251104790930&lan=en-US&anchor=Creekstone+Energy&index=1&md5=b050988022fb00cb1bd230ae3a8febfb), a leader in next-generation energy infrastructure for artificial intelligence (AI) computing, today announced it has closed its Series B funding to advance development of the AI Gigasite in Delta, Utah \u2014 a multi-gigawatt, hybrid-generation data center campus built to power the next era of AI and high-performance computing (HPC)."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "PRESS RELEASE: [Creekstone Energy](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.creekstone.energy%2F&esheet=54352206&newsitemid=20251104790930&lan=en-US&anchor=Creekstone+Energy&index=1&md5=b050988022fb00cb1bd230ae3a8febfb), a leader in next-generation energy infrastructure for artificial intelligence (AI) computing, today announced it has closed its Series B funding to advance development of the AI Gigasite in Delta, Utah \u2014 a multi-gigawatt, hybrid-generation data center campus built to power the next era of AI and high-performance computing (HPC).",
    "Proceeds from the financing will accelerate permitting, engineering, and early construction of the 10-gigawatt Delta Gigasite, a project that strengthens Utah\u2019s role in U.S. energy and AI leadership."
   ],
   "announcement_date_evidence": [
    "PRESS RELEASE: [Creekstone Energy](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fwww.creekstone.energy%2F&esheet=54352206&newsitemid=20251104790930&lan=en-US&anchor=Creekstone+Energy&index=1&md5=b050988022fb00cb1bd230ae3a8febfb), a leader in next-generation energy infrastructure for artificial intelligence (AI) computing, today announced it has closed its Series B funding to advance development of the AI Gigasite in Delta, Utah \u2014 a multi-gigawatt, hybrid-generation data center campus built to power the next era of AI and high-performance computing (HPC).",
    "The round was led by **Trident Ridge**, with participation from [**Pelion Ventures**](https://cts.businesswire.com/ct/CT?id=smartlink&url=https%3A%2F%2Fpelionvp.com%2F&esheet=54352206&newsitemid=20251104790930&lan=en-US&anchor=Pelion+Ventures&index=2&md5=01abc85a7d89ceb250726d4d94525097), Utah\u2019s largest venture capital firm."
   ]
  },
  {
   "url": "https://pv-magazine-usa.com/2024/09/25/hydrogen-powered-data-center-planned-for-texas",
   "title": "Hydrogen-powered data center planned for Texas",
   "published_at": "2024-09-25T11:24:35",
   "project": "TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Hydrogen-powered data center planned for Texas",
    "ECL announced it is building its hydrogen-powered TerraSite-TX1 data center near Houston, Texas."
   ],
   "locality_evidence": [
    "# Hydrogen-powered data center planned for Texas",
    "ECL announced it is building its hydrogen-powered TerraSite-TX1 data center near Houston, Texas."
   ],
   "state_evidence": [
    "# Hydrogen-powered data center planned for Texas",
    "ECL announced it is building its hydrogen-powered TerraSite-TX1 data center near Houston, Texas."
   ],
   "capacity_gw_evidence": [
    "# Hydrogen-powered data center planned for Texas",
    "Current plans are for the facility to have a capacity of 1 GW of on-site, off-grid power supplied by hydrogen fuel cells and battery storage at a cost of $8 billion."
   ],
   "builder_evidence": [
    "# Hydrogen-powered data center planned for Texas",
    "California-based data center developer ECL is incorporating hydrogen fuel cells and battery storage into its projects to enable a completely self-contained generating capacity, even to the point of being grid free.",
    "ECL announced it is building its hydrogen-powered TerraSite-TX1 data center near Houston, Texas."
   ],
   "ai_customer_evidence": [
    "# Hydrogen-powered data center planned for Texas",
    "Along with announcing its new TerraSite-TX1 the company said it has signed AI cloud operator Lambda, which serves as a host for research and applications developer clients."
   ],
   "status_evidence": [
    "# Hydrogen-powered data center planned for Texas",
    "ECL announced it is building its hydrogen-powered TerraSite-TX1 data center near Houston, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://upi.com/amp/Top_News/US/2026/08/17/nvidia-openai-sb-energy-ports-pike-data-center-ohio/4201786985547",
   "title": "Nvidia to post $105 billion for OpenAI data center in Ohio",
   "published_at": "2026-08-17T00:00:00",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike City",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "slated to begin operating in 2028",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "The data center will be located at the PORTS-Pike Technology Campus in Pike City.",
    "Aug. 17 (UPI) -- Nvidia announced on Monday that it will finance an OpenAI data center in Ohio for up to $105 billion."
   ],
   "locality_evidence": [
    "The center is slated to begin operating in Pike City, Ohio, in 2028.",
    "Aug. 17 (UPI) -- Nvidia announced on Monday that it will finance an OpenAI data center in Ohio for up to $105 billion."
   ],
   "state_evidence": [
    "Nvidia announced on Monday that it will finance an OpenAI data center in Ohio for up to $105 billion.",
    "Aug. 17 (UPI) -- Nvidia announced on Monday that it will finance an OpenAI data center in Ohio for up to $105 billion."
   ],
   "capacity_gw_evidence": [
    "The credit from Nvidia will fund the [data center's first 4.25 gigawatts](https://blogs.nvidia.com/blog/securing-the-infrastructure-of-intelligence/) in computing capacity with an option to bring 3.75 gigawatts more online.",
    "Aug. 17 (UPI) -- Nvidia announced on Monday that it will finance an OpenAI data center in Ohio for up to $105 billion."
   ],
   "builder_evidence": [
    "It will be constructed and managed by SB Energy, a subsidiary of SoftBank Group.",
    "Aug. 17 (UPI) -- Nvidia announced on Monday that it will finance an OpenAI data center in Ohio for up to $105 billion."
   ],
   "ai_customer_evidence": [
    "Nvidia announced on Monday that it will finance an OpenAI data center in Ohio for up to $105 billion.",
    "Aug. 17 (UPI) -- Nvidia announced on Monday that it will finance an OpenAI data center in Ohio for up to $105 billion."
   ],
   "status_evidence": [
    "The center is slated to begin operating in Pike City, Ohio, in 2028.",
    "Aug. 17 (UPI) -- Nvidia announced on Monday that it will finance an OpenAI data center in Ohio for up to $105 billion."
   ],
   "announcement_date_evidence": [
    "Aug. 17 (UPI) -- Nvidia announced on Monday that it will finance an OpenAI data center in Ohio for up to $105 billion."
   ]
  },
  {
   "url": "https://groundy.com/articles/stargate-inside-openai-s-100b-plan-build-ai",
   "title": "Stargate: Inside OpenAI's $100B Plan to Build AI Infrastructure",
   "published_at": "2026-02-27T00:00:00",
   "project": "Frontier",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "Table of Contents",
    "## How Stargate Is Being Built: Sites, Silicon, and Scale",
    "The flagship site is in Abilene, Texas\u2014a 1,200-acre campus roughly 180 miles west of Dallas known as the Frontier campus."
   ],
   "locality_evidence": [
    "Table of Contents",
    "## How Stargate Is Being Built: Sites, Silicon, and Scale",
    "The flagship site is in Abilene, Texas\u2014a 1,200-acre campus roughly 180 miles west of Dallas known as the Frontier campus."
   ],
   "state_evidence": [
    "Table of Contents",
    "## How Stargate Is Being Built: Sites, Silicon, and Scale",
    "The flagship site is in Abilene, Texas\u2014a 1,200-acre campus roughly 180 miles west of Dallas known as the Frontier campus."
   ],
   "capacity_gw_evidence": [
    "Table of Contents",
    "## How Stargate Is Being Built: Sites, Silicon, and Scale",
    "At full build-out, the Abilene campus alone targets 1.4 gigawatts of capacity across 10 buildings totaling approximately 3.7 million square feet, with rack densities exceeding 250kW."
   ],
   "builder_evidence": [
    "Table of Contents",
    "## What Is the Stargate Project?",
    "Oracle serves as the primary cloud infrastructure provider, building and managing the data center campuses.",
    "## How Stargate Is Being Built: Sites, Silicon, and Scale",
    "As of late 2025, eight data center buildings are operational, making it what Oracle describes as \u201cthe world\u2019s largest AI supercluster.\u201d"
   ],
   "ai_customer_evidence": [
    "Table of Contents",
    "## How Stargate Is Being Built: Sites, Silicon, and Scale",
    "At full build-out, the Abilene campus alone targets 1.4 gigawatts of capacity across 10 buildings totaling approximately 3.7 million square feet, with rack densities exceeding 250kW."
   ],
   "status_evidence": [
    "Table of Contents",
    "## How Stargate Is Being Built: Sites, Silicon, and Scale",
    "As of late 2025, eight data center buildings are operational, making it what Oracle describes as \u201cthe world\u2019s largest AI supercluster.\u201d"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/operators/meta",
   "title": "Meta AI Data Centers (2026) \u2014 19 Facilities, 16.8 GW",
   "published_at": null,
   "project": "Meta Hyperion AI Data Center (Louisiana)",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta and Entergy Louisiana",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Hyperion AI Data Center (Louisiana)](/datacenters/meta-hyperion-ai-data-center-louisiana.html) | [Meta](/operators/meta/)[Entergy Louisiana](/operators/entergy-louisiana/) | [United States](/countries/united-states/) Richland Parish, Louisiana | 5,000 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 3 |"
   ],
   "locality_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Hyperion AI Data Center (Louisiana)](/datacenters/meta-hyperion-ai-data-center-louisiana.html) | [Meta](/operators/meta/)[Entergy Louisiana](/operators/entergy-louisiana/) | [United States](/countries/united-states/) Richland Parish, Louisiana | 5,000 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 3 |"
   ],
   "state_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Hyperion AI Data Center (Louisiana)](/datacenters/meta-hyperion-ai-data-center-louisiana.html) | [Meta](/operators/meta/)[Entergy Louisiana](/operators/entergy-louisiana/) | [United States](/countries/united-states/) Richland Parish, Louisiana | 5,000 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 3 |"
   ],
   "capacity_gw_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Hyperion AI Data Center (Louisiana)](/datacenters/meta-hyperion-ai-data-center-louisiana.html) | [Meta](/operators/meta/)[Entergy Louisiana](/operators/entergy-louisiana/) | [United States](/countries/united-states/) Richland Parish, Louisiana | 5,000 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 3 |"
   ],
   "builder_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Hyperion AI Data Center (Louisiana)](/datacenters/meta-hyperion-ai-data-center-louisiana.html) | [Meta](/operators/meta/)[Entergy Louisiana](/operators/entergy-louisiana/) | [United States](/countries/united-states/) Richland Parish, Louisiana | 5,000 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 3 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Hyperion AI Data Center (Louisiana)](/datacenters/meta-hyperion-ai-data-center-louisiana.html) | [Meta](/operators/meta/)[Entergy Louisiana](/operators/entergy-louisiana/) | [United States](/countries/united-states/) Richland Parish, Louisiana | 5,000 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 3 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/operators/meta",
   "title": "Meta AI Data Centers (2026) \u2014 19 Facilities, 16.8 GW",
   "published_at": null,
   "project": "Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)",
   "locality": null,
   "state": "Ohio and Pennsylvania",
   "capacity_gw": 2.1,
   "builder": "Meta and Vistra Corp",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)](/datacenters/meta-vistra-nuclear-uprate-agreement-oh-pa.html) | [Meta](/operators/meta/)[Vistra Corp](/operators/vistra-corp/) | [United States](/countries/united-states/) Ohio and Pennsylvania | 2,100 MW | [announced](/status/announced/) | [Nuclear](/energy/nuclear/) | [General Cloud](/ai-focus/general-cloud/) | | 2 |"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)](/datacenters/meta-vistra-nuclear-uprate-agreement-oh-pa.html) | [Meta](/operators/meta/)[Vistra Corp](/operators/vistra-corp/) | [United States](/countries/united-states/) Ohio and Pennsylvania | 2,100 MW | [announced](/status/announced/) | [Nuclear](/energy/nuclear/) | [General Cloud](/ai-focus/general-cloud/) | | 2 |"
   ],
   "capacity_gw_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)](/datacenters/meta-vistra-nuclear-uprate-agreement-oh-pa.html) | [Meta](/operators/meta/)[Vistra Corp](/operators/vistra-corp/) | [United States](/countries/united-states/) Ohio and Pennsylvania | 2,100 MW | [announced](/status/announced/) | [Nuclear](/energy/nuclear/) | [General Cloud](/ai-focus/general-cloud/) | | 2 |"
   ],
   "builder_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)](/datacenters/meta-vistra-nuclear-uprate-agreement-oh-pa.html) | [Meta](/operators/meta/)[Vistra Corp](/operators/vistra-corp/) | [United States](/countries/united-states/) Ohio and Pennsylvania | 2,100 MW | [announced](/status/announced/) | [Nuclear](/energy/nuclear/) | [General Cloud](/ai-focus/general-cloud/) | | 2 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)](/datacenters/meta-vistra-nuclear-uprate-agreement-oh-pa.html) | [Meta](/operators/meta/)[Vistra Corp](/operators/vistra-corp/) | [United States](/countries/united-states/) Ohio and Pennsylvania | 2,100 MW | [announced](/status/announced/) | [Nuclear](/energy/nuclear/) | [General Cloud](/ai-focus/general-cloud/) | | 2 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/operators/meta",
   "title": "Meta AI Data Centers (2026) \u2014 19 Facilities, 16.8 GW",
   "published_at": null,
   "project": "Meta Project Prometheus (New Albany, Ohio)",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.5,
   "builder": "Meta",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Project Prometheus (New Albany, Ohio)](/datacenters/meta-project-prometheus-ohio-ai-campus.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) New Albany, Ohio | 1,500 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "locality_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Project Prometheus (New Albany, Ohio)](/datacenters/meta-project-prometheus-ohio-ai-campus.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) New Albany, Ohio | 1,500 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "state_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Project Prometheus (New Albany, Ohio)](/datacenters/meta-project-prometheus-ohio-ai-campus.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) New Albany, Ohio | 1,500 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "capacity_gw_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Project Prometheus (New Albany, Ohio)](/datacenters/meta-project-prometheus-ohio-ai-campus.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) New Albany, Ohio | 1,500 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "builder_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Project Prometheus (New Albany, Ohio)](/datacenters/meta-project-prometheus-ohio-ai-campus.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) New Albany, Ohio | 1,500 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Project Prometheus (New Albany, Ohio)](/datacenters/meta-project-prometheus-ohio-ai-campus.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) New Albany, Ohio | 1,500 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/operators/meta",
   "title": "Meta AI Data Centers (2026) \u2014 19 Facilities, 16.8 GW",
   "published_at": null,
   "project": "Meta\u2013Oklo Advanced Nuclear AI Campus (Ohio)",
   "locality": null,
   "state": "Ohio",
   "capacity_gw": 1.2,
   "builder": "Meta and Oklo Inc.",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta\u2013Oklo Advanced Nuclear AI Campus (Ohio)](/datacenters/meta-oklo-nuclear-ai-campus-ohio.html) | [Meta](/operators/meta/)[Oklo Inc.](/operators/oklo-inc/) | [United States](/countries/united-states/) Ohio | 1,200 MW | [announced](/status/announced/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta\u2013Oklo Advanced Nuclear AI Campus (Ohio)](/datacenters/meta-oklo-nuclear-ai-campus-ohio.html) | [Meta](/operators/meta/)[Oklo Inc.](/operators/oklo-inc/) | [United States](/countries/united-states/) Ohio | 1,200 MW | [announced](/status/announced/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "capacity_gw_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta\u2013Oklo Advanced Nuclear AI Campus (Ohio)](/datacenters/meta-oklo-nuclear-ai-campus-ohio.html) | [Meta](/operators/meta/)[Oklo Inc.](/operators/oklo-inc/) | [United States](/countries/united-states/) Ohio | 1,200 MW | [announced](/status/announced/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "builder_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta\u2013Oklo Advanced Nuclear AI Campus (Ohio)](/datacenters/meta-oklo-nuclear-ai-campus-ohio.html) | [Meta](/operators/meta/)[Oklo Inc.](/operators/oklo-inc/) | [United States](/countries/united-states/) Ohio | 1,200 MW | [announced](/status/announced/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta\u2013Oklo Advanced Nuclear AI Campus (Ohio)](/datacenters/meta-oklo-nuclear-ai-campus-ohio.html) | [Meta](/operators/meta/)[Oklo Inc.](/operators/oklo-inc/) | [United States](/countries/united-states/) Ohio | 1,200 MW | [announced](/status/announced/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/operators/meta",
   "title": "Meta AI Data Centers (2026) \u2014 19 Facilities, 16.8 GW",
   "published_at": null,
   "project": "Meta \u2014 El Paso AI Mega Campus",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta \u2014 El Paso AI Mega Campus](/datacenters/meta-el-paso-ai-mega-campus-texas.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) Texas | 1,000 MW | [planned](/status/planned/) | [Renewable](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "locality_evidence": [
    "| [Meta \u2014 El Paso AI Mega Campus](/datacenters/meta-el-paso-ai-mega-campus-texas.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) Texas | 1,000 MW | [planned](/status/planned/) | [Renewable](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "state_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta \u2014 El Paso AI Mega Campus](/datacenters/meta-el-paso-ai-mega-campus-texas.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) Texas | 1,000 MW | [planned](/status/planned/) | [Renewable](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "capacity_gw_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta \u2014 El Paso AI Mega Campus](/datacenters/meta-el-paso-ai-mega-campus-texas.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) Texas | 1,000 MW | [planned](/status/planned/) | [Renewable](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "builder_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta \u2014 El Paso AI Mega Campus](/datacenters/meta-el-paso-ai-mega-campus-texas.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) Texas | 1,000 MW | [planned](/status/planned/) | [Renewable](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta \u2014 El Paso AI Mega Campus](/datacenters/meta-el-paso-ai-mega-campus-texas.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) Texas | 1,000 MW | [planned](/status/planned/) | [Renewable](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/operators/meta",
   "title": "Meta AI Data Centers (2026) \u2014 19 Facilities, 16.8 GW",
   "published_at": null,
   "project": "Meta Lebanon AI Data Center (Indiana)",
   "locality": "Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Lebanon AI Data Center (Indiana)](/datacenters/meta-lebanon-indiana-ai-campus.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) Lebanon, Indiana | 1,000 MW | [announced](/status/announced/) | [Other](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 1 |"
   ],
   "locality_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Lebanon AI Data Center (Indiana)](/datacenters/meta-lebanon-indiana-ai-campus.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) Lebanon, Indiana | 1,000 MW | [announced](/status/announced/) | [Other](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 1 |"
   ],
   "state_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Lebanon AI Data Center (Indiana)](/datacenters/meta-lebanon-indiana-ai-campus.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) Lebanon, Indiana | 1,000 MW | [announced](/status/announced/) | [Other](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 1 |"
   ],
   "capacity_gw_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Lebanon AI Data Center (Indiana)](/datacenters/meta-lebanon-indiana-ai-campus.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) Lebanon, Indiana | 1,000 MW | [announced](/status/announced/) | [Other](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 1 |"
   ],
   "builder_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Lebanon AI Data Center (Indiana)](/datacenters/meta-lebanon-indiana-ai-campus.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) Lebanon, Indiana | 1,000 MW | [announced](/status/announced/) | [Other](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 1 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Facilities",
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Lebanon AI Data Center (Indiana)](/datacenters/meta-lebanon-indiana-ai-campus.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) Lebanon, Indiana | 1,000 MW | [announced](/status/announced/) | [Other](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 1 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://rotatingdata.com/deals/2026-06-meta-crusoe-1-6gw-ai-capacity",
   "title": "Meta reportedly takes 1.6 GW of Crusoe AI capacity",
   "published_at": null,
   "project": null,
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe",
   "ai_customer": "Oracle",
   "status": null,
   "announcement_date": "2026-06-09",
   "project_evidence": null,
   "locality_evidence": [
    "Cloud capacity \u00b7 Evidence brief",
    "Crusoe said the 4.9 GW contracted footprint spans five U.S. AI data-center campuses, including its 1.2 GW Abilene campus for Oracle, a second 900 MW Abilene campus for Microsoft, two additional large-scale Texas campuses and a fifth Missouri campus."
   ],
   "state_evidence": [
    "Cloud capacity \u00b7 Evidence brief",
    "Crusoe said the 4.9 GW contracted footprint spans five U.S. AI data-center campuses, including its 1.2 GW Abilene campus for Oracle, a second 900 MW Abilene campus for Microsoft, two additional large-scale Texas campuses and a fifth Missouri campus."
   ],
   "capacity_gw_evidence": [
    "Cloud capacity \u00b7 Evidence brief",
    "Crusoe said the 4.9 GW contracted footprint spans five U.S. AI data-center campuses, including its 1.2 GW Abilene campus for Oracle, a second 900 MW Abilene campus for Microsoft, two additional large-scale Texas campuses and a fifth Missouri campus."
   ],
   "builder_evidence": [
    "Cloud capacity \u00b7 Evidence brief",
    "Crusoe said the 4.9 GW contracted footprint spans five U.S. AI data-center campuses, including its 1.2 GW Abilene campus for Oracle, a second 900 MW Abilene campus for Microsoft, two additional large-scale Texas campuses and a fifth Missouri campus."
   ],
   "ai_customer_evidence": [
    "Cloud capacity \u00b7 Evidence brief",
    "Crusoe said the 4.9 GW contracted footprint spans five U.S. AI data-center campuses, including its 1.2 GW Abilene campus for Oracle, a second 900 MW Abilene campus for Microsoft, two additional large-scale Texas campuses and a fifth Missouri campus."
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "Cloud capacity \u00b7 Evidence brief",
    "Crusoe announced on June 9, 2026 that it had contracted 4.9 GW of AI infrastructure across data-center projects and Crusoe Cloud.",
    "Crusoe said the 4.9 GW contracted footprint spans five U.S. AI data-center campuses, including its 1.2 GW Abilene campus for Oracle, a second 900 MW Abilene campus for Microsoft, two additional large-scale Texas campuses and a fifth Missouri campus."
   ]
  },
  {
   "url": "https://rotatingdata.com/deals/2026-06-meta-crusoe-1-6gw-ai-capacity",
   "title": "Meta reportedly takes 1.6 GW of Crusoe AI capacity",
   "published_at": null,
   "project": null,
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Lancium",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "Cloud capacity \u00b7 Evidence brief",
    "DCD noted Lancium lists a Childress project with a 1 GW ERCOT-approved interconnect."
   ],
   "state_evidence": [
    "Cloud capacity \u00b7 Evidence brief",
    "DCD noted Lancium lists a Childress project with a 1 GW ERCOT-approved interconnect."
   ],
   "capacity_gw_evidence": [
    "Cloud capacity \u00b7 Evidence brief",
    "DCD noted Lancium lists a Childress project with a 1 GW ERCOT-approved interconnect."
   ],
   "builder_evidence": [
    "Cloud capacity \u00b7 Evidence brief",
    "DCD noted Lancium lists a Childress project with a 1 GW ERCOT-approved interconnect."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://baytobaynews.com/stories/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet,246594",
   "title": "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
   "published_at": "2025-08-19T13:58:58",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "locality_evidence": [
    "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": [
    "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "Posted 8/19/25",
    "DENVER--(BUSINESS WIRE)--Aug 19, 2025--"
   ]
  },
  {
   "url": "https://poweredbywho.com/rankings/largest-data-centers-under-construction",
   "title": "The 25 Largest Data Centers Under Construction in the US",
   "published_at": null,
   "project": "Project Matador HyperGrid (Amarillo)",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "The 25 Largest Data Centers Under Construction in the US",
    "The largest under-construction data center in the United States is Fermi America Project Matador HyperGrid (Amarillo) in Amarillo, Texas \u2014 an 11,000 MW campus from Fermi America."
   ],
   "locality_evidence": [
    "The 25 Largest Data Centers Under Construction in the US",
    "The largest under-construction data center in the United States is Fermi America Project Matador HyperGrid (Amarillo) in Amarillo, Texas \u2014 an 11,000 MW campus from Fermi America."
   ],
   "state_evidence": [
    "The 25 Largest Data Centers Under Construction in the US",
    "The largest under-construction data center in the United States is Fermi America Project Matador HyperGrid (Amarillo) in Amarillo, Texas \u2014 an 11,000 MW campus from Fermi America."
   ],
   "capacity_gw_evidence": [
    "The 25 Largest Data Centers Under Construction in the US",
    "The largest under-construction data center in the United States is Fermi America Project Matador HyperGrid (Amarillo) in Amarillo, Texas \u2014 an 11,000 MW campus from Fermi America."
   ],
   "builder_evidence": [
    "The 25 Largest Data Centers Under Construction in the US",
    "The largest under-construction data center in the United States is Fermi America Project Matador HyperGrid (Amarillo) in Amarillo, Texas \u2014 an 11,000 MW campus from Fermi America."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The 25 Largest Data Centers Under Construction in the US",
    "The largest under-construction data center in the United States is Fermi America Project Matador HyperGrid (Amarillo) in Amarillo, Texas \u2014 an 11,000 MW campus from Fermi America."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://timesleader.com/news/1690919/former-coal-fired-power-plant-in-pennsylvania-to-become-massive-gas-powered-campus-for-ai-data-centers",
   "title": "Former coal-fired power plant in Pennsylvania to become massive gas-powered campus for AI, data centers",
   "published_at": "2025-04-02T19:17:00",
   "project": "Homer City Generating Station",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Homer City Development",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "HARRISBURG \u2014 The owners of what was once Pennsylvania\u2019s biggest coal-fired power plant said Wednesday that they will turn it into a $10 billion natural gas-powered data center campus designed to capitalize on the fast-growing energy demands of Big Tech companies to power artificial intelligence and cloud computing applications.",
    "The former Homer City Generating Station, about 50 miles east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "locality_evidence": [
    "The former Homer City Generating Station, about 50 miles east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "state_evidence": [
    "HARRISBURG \u2014 The owners of what was once Pennsylvania\u2019s biggest coal-fired power plant said Wednesday that they will turn it into a $10 billion natural gas-powered data center campus designed to capitalize on the fast-growing energy demands of Big Tech companies to power artificial intelligence and cloud computing applications."
   ],
   "capacity_gw_evidence": [
    "The former Homer City Generating Station, about 50 miles east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "builder_evidence": [
    "The former Homer City Generating Station, about 50 miles east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "HARRISBURG \u2014 The owners of what was once Pennsylvania\u2019s biggest coal-fired power plant said Wednesday that they will turn it into a $10 billion natural gas-powered data center campus designed to capitalize on the fast-growing energy demands of Big Tech companies to power artificial intelligence and cloud computing applications."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://kyodonewsprwire.jp/release/202603175752",
   "title": "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
   "published_at": "2026-03-17T01:49:45",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "announced",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid"
   ],
   "locality_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "state_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "capacity_gw_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "builder_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "ai_customer_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ],
   "status_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ],
   "announcement_date_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ]
  },
  {
   "url": "https://newsbreak.com/tom-s-hardware-512896/4615952937283-new-ai-data-center-in-utah-will-generate-and-consume-more-than-twice-the-amount-of-power-the-entire-state-uses-kevin-o-leary-s-9-gigawatt-utah-data-center-campus-approved",
   "title": "New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses \u2014 Kevin O'Leary's 9 Gigawatt Utah data center campus approved - NewsBreak",
   "published_at": "2026-04-27T14:58:17",
   "project": "Stratos",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O'Leary Digital",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": "2026-04-27",
   "project_evidence": [
    "Technology",
    "# New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses \u2014 Kevin O'Leary's 9 Gigawatt Utah data center campus approved",
    "The project, dubbed Stratos, is being developed by O'Leary Digital, the infrastructure arm of Shark Tank investor Kevin O'Leary, and would span 40,000 acres of private land plus 1,200 acres of military and state-owned property."
   ],
   "locality_evidence": [
    "Technology",
    "# New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses \u2014 Kevin O'Leary's 9 Gigawatt Utah data center campus approved"
   ],
   "state_evidence": [
    "Technology",
    "# New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses \u2014 Kevin O'Leary's 9 Gigawatt Utah data center campus approved"
   ],
   "capacity_gw_evidence": [
    "Technology",
    "# New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses \u2014 Kevin O'Leary's 9 Gigawatt Utah data center campus approved"
   ],
   "builder_evidence": [
    "Technology",
    "# New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses \u2014 Kevin O'Leary's 9 Gigawatt Utah data center campus approved",
    "The project, dubbed Stratos, is being developed by O'Leary Digital, the infrastructure arm of Shark Tank investor Kevin O'Leary, and would span 40,000 acres of private land plus 1,200 acres of military and state-owned property."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Technology",
    "# New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses \u2014 Kevin O'Leary's 9 Gigawatt Utah data center campus approved"
   ],
   "announcement_date_evidence": [
    "Technology",
    "# New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses \u2014 Kevin O'Leary's 9 Gigawatt Utah data center campus approved",
    "By Luke James,",
    "2026-04-27"
   ]
  },
  {
   "url": "https://hometownlife.com/story/money/business/2026/03/17/google-reveals-project-cannoli-data-center/89185890007",
   "title": "Google reveals it is behind big 'Project Cannoli' data center project",
   "published_at": "2026-03-17T12:02:18",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "locality_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "state_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google also said Tuesday that it is creating a $10 million Energy Impact Fund for local organizations to tap into with the aim of lowering monthly utility bills for Michiganders."
   ],
   "capacity_gw_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "builder_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "The data center would be developed for Google by Panattoni Development Co."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "announcement_date_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Updated March 17, 2026, 2:27 p.m. ET",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ]
  },
  {
   "url": "https://webpronews.com/terawulfs-kentucky-power-play-from-bitcoin-miner-to-ai-infrastructure-contender",
   "title": "TeraWulf\u2019s Kentucky Power Play: From Bitcoin Miner to AI Infrastructure Contender",
   "published_at": "2026-05-29T11:22:06",
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": "2026-05-29",
   "project_evidence": [
    "# TeraWulf\u2019s Kentucky Power Play: From Bitcoin Miner to AI Infrastructure Contender",
    "TeraWulf's acquisition of the 1+ GW Muskie Data Campus in eastern Kentucky accelerates its shift toward AI and HPC infrastructure."
   ],
   "locality_evidence": [
    "# TeraWulf\u2019s Kentucky Power Play: From Bitcoin Miner to AI Infrastructure Contender",
    "TeraWulf's acquisition of the 1+ GW Muskie Data Campus in eastern Kentucky accelerates its shift toward AI and HPC infrastructure."
   ],
   "state_evidence": [
    "# TeraWulf\u2019s Kentucky Power Play: From Bitcoin Miner to AI Infrastructure Contender",
    "TeraWulf's acquisition of the 1+ GW Muskie Data Campus in eastern Kentucky accelerates its shift toward AI and HPC infrastructure."
   ],
   "capacity_gw_evidence": [
    "# TeraWulf\u2019s Kentucky Power Play: From Bitcoin Miner to AI Infrastructure Contender",
    "TeraWulf's acquisition of the 1+ GW Muskie Data Campus in eastern Kentucky accelerates its shift toward AI and HPC infrastructure."
   ],
   "builder_evidence": [
    "# TeraWulf\u2019s Kentucky Power Play: From Bitcoin Miner to AI Infrastructure Contender",
    "TeraWulf's acquisition of the 1+ GW Muskie Data Campus in eastern Kentucky accelerates its shift toward AI and HPC infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# TeraWulf\u2019s Kentucky Power Play: From Bitcoin Miner to AI Infrastructure Contender",
    "TeraWulf's acquisition of the 1+ GW Muskie Data Campus in eastern Kentucky accelerates its shift toward AI and HPC infrastructure."
   ],
   "announcement_date_evidence": [
    "# TeraWulf\u2019s Kentucky Power Play: From Bitcoin Miner to AI Infrastructure Contender",
    "Friday, May 29, 2026"
   ]
  },
  {
   "url": "https://compute-atlas.com/facilities/iren-sweetwater-tx",
   "title": "Compute Atlas",
   "published_at": "2026-07-07T00:00:00",
   "project": "IREN Sweetwater Campus",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": "2025",
   "project_evidence": [
    "# IREN Sweetwater Campus",
    "Sweetwater, TX \u00b7 Nolan County County \u00b7 32.471\u00b0N 100.406\u00b0W"
   ],
   "locality_evidence": [
    "Sweetwater, TX \u00b7 Nolan County County \u00b7 32.471\u00b0N 100.406\u00b0W",
    "# IREN Sweetwater Campus",
    "LocationSweetwater, TX, Nolan County County"
   ],
   "state_evidence": [
    "Sweetwater, TX \u00b7 Nolan County County \u00b7 32.471\u00b0N 100.406\u00b0W",
    "# IREN Sweetwater Campus",
    "LocationSweetwater, TX, Nolan County County"
   ],
   "capacity_gw_evidence": [
    "# IREN Sweetwater Campus",
    "Capacity2,000 MW planned"
   ],
   "builder_evidence": [
    "# IREN Sweetwater Campus",
    "IREN (Iris Energy)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# IREN Sweetwater Campus",
    "Under construction"
   ],
   "announcement_date_evidence": [
    "# IREN Sweetwater Campus",
    "Announced2025"
   ]
  },
  {
   "url": "https://energy.einnews.com/pr_news/915463239/enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": "2026-05-27T19:28:19",
   "project": "Creekstone Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "*Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite*",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "About Creekstone Energy",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "About Creekstone Energy",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/tags/terrasite-tx1",
   "title": "TerraSite-TX1 - DCD",
   "published_at": "2026-05-14T03:20:23",
   "project": "TerraSite-TX1",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# TerraSite-TX1",
    "# [ECL says it will build a 1GW hydrogen-powered AI data center in Texas, with Lambda as its first tenant](/en/news/ecl-says-it-will-build-a-1gw-hydrogen-powered-ai-data-center-in-texas-with-lambda-as-its-first-tenant/)"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# [ECL says it will build a 1GW hydrogen-powered AI data center in Texas, with Lambda as its first tenant](/en/news/ecl-says-it-will-build-a-1gw-hydrogen-powered-ai-data-center-in-texas-with-lambda-as-its-first-tenant/)"
   ],
   "capacity_gw_evidence": [
    "# [ECL says it will build a 1GW hydrogen-powered AI data center in Texas, with Lambda as its first tenant](/en/news/ecl-says-it-will-build-a-1gw-hydrogen-powered-ai-data-center-in-texas-with-lambda-as-its-first-tenant/)"
   ],
   "builder_evidence": [
    "# [ECL says it will build a 1GW hydrogen-powered AI data center in Texas, with Lambda as its first tenant](/en/news/ecl-says-it-will-build-a-1gw-hydrogen-powered-ai-data-center-in-texas-with-lambda-as-its-first-tenant/)"
   ],
   "ai_customer_evidence": [
    "# [ECL says it will build a 1GW hydrogen-powered AI data center in Texas, with Lambda as its first tenant](/en/news/ecl-says-it-will-build-a-1gw-hydrogen-powered-ai-data-center-in-texas-with-lambda-as-its-first-tenant/)"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://techscurrent.com/2026/08/nvidia-openai-ohio-data-center-ports-pike",
   "title": "NVIDIA, OpenAI and SB Energy's Ohio AI Data Center Deal",
   "published_at": "2026-08-18T09:16:46",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# NVIDIA\u2019s Ohio Backstop Turns OpenAI\u2019s Data Center Demand Into Infrastructure Finance",
    "OpenAI has signed onto one of the largest AI infrastructure projects now planned in the United States, securing about 8 gigawatts of IT capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, with NVIDIA and SoftBank-backed SB Energy shaping the project around NVIDIA compute."
   ],
   "locality_evidence": [
    "# NVIDIA\u2019s Ohio Backstop Turns OpenAI\u2019s Data Center Demand Into Infrastructure Finance",
    "OpenAI has signed onto one of the largest AI infrastructure projects now planned in the United States, securing about 8 gigawatts of IT capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, with NVIDIA and SoftBank-backed SB Energy shaping the project around NVIDIA compute."
   ],
   "state_evidence": [
    "# NVIDIA\u2019s Ohio Backstop Turns OpenAI\u2019s Data Center Demand Into Infrastructure Finance",
    "OpenAI has signed onto one of the largest AI infrastructure projects now planned in the United States, securing about 8 gigawatts of IT capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, with NVIDIA and SoftBank-backed SB Energy shaping the project around NVIDIA compute."
   ],
   "capacity_gw_evidence": [
    "# NVIDIA\u2019s Ohio Backstop Turns OpenAI\u2019s Data Center Demand Into Infrastructure Finance",
    "OpenAI has signed onto one of the largest AI infrastructure projects now planned in the United States, securing about 8 gigawatts of IT capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, with NVIDIA and SoftBank-backed SB Energy shaping the project around NVIDIA compute."
   ],
   "builder_evidence": [
    "# NVIDIA\u2019s Ohio Backstop Turns OpenAI\u2019s Data Center Demand Into Infrastructure Finance",
    "OpenAI has signed onto one of the largest AI infrastructure projects now planned in the United States, securing about 8 gigawatts of IT capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, with NVIDIA and SoftBank-backed SB Energy shaping the project around NVIDIA compute."
   ],
   "ai_customer_evidence": [
    "# NVIDIA\u2019s Ohio Backstop Turns OpenAI\u2019s Data Center Demand Into Infrastructure Finance",
    "OpenAI has signed onto one of the largest AI infrastructure projects now planned in the United States, securing about 8 gigawatts of IT capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, with NVIDIA and SoftBank-backed SB Energy shaping the project around NVIDIA compute."
   ],
   "status_evidence": [
    "# NVIDIA\u2019s Ohio Backstop Turns OpenAI\u2019s Data Center Demand Into Infrastructure Finance",
    "OpenAI has signed onto one of the largest AI infrastructure projects now planned in the United States, securing about 8 gigawatts of IT capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, with NVIDIA and SoftBank-backed SB Energy shaping the project around NVIDIA compute."
   ],
   "announcement_date_evidence": [
    "# NVIDIA\u2019s Ohio Backstop Turns OpenAI\u2019s Data Center Demand Into Infrastructure Finance",
    "The August 17 announcement is not simply another large data center lease."
   ]
  },
  {
   "url": "https://socialday.live/features/metas-blackrock-data-center-deal-shows-who-really-pays-for-ai-and-what-that-mean",
   "title": "Meta's BlackRock Data Center Deal Shows Who Really Pays for AI (and What That Means for Marketers)",
   "published_at": "2026-07-28T10:28:28",
   "project": "El Paso",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "BlackRock",
   "ai_customer": "Meta",
   "status": "announced",
   "announcement_date": "2026-07-28",
   "project_evidence": [
    "Platforms",
    "Meta's BlackRock Data Center Deal Shows Who Really Pays for AI (and What That Means for Marketers)",
    "Meta and BlackRock announced a venture to develop and own a data center campus in El Paso, Texas on 28 July 2026."
   ],
   "locality_evidence": [
    "Platforms",
    "Meta's BlackRock Data Center Deal Shows Who Really Pays for AI (and What That Means for Marketers)",
    "Meta and BlackRock announced a venture to develop and own a data center campus in El Paso, Texas on 28 July 2026."
   ],
   "state_evidence": [
    "Platforms",
    "Meta's BlackRock Data Center Deal Shows Who Really Pays for AI (and What That Means for Marketers)",
    "Meta and BlackRock announced a venture to develop and own a data center campus in El Paso, Texas on 28 July 2026."
   ],
   "capacity_gw_evidence": [
    "Platforms",
    "Meta's BlackRock Data Center Deal Shows Who Really Pays for AI (and What That Means for Marketers)",
    "Total development costs are approximately $14 billion for buildings and long-lived power, cooling, and connectivity infrastructure, with the campus expected to reach roughly 1 gigawatt of capacity and come online in 2028, supporting more than 300 on-site jobs."
   ],
   "builder_evidence": [
    "Platforms",
    "Meta's BlackRock Data Center Deal Shows Who Really Pays for AI (and What That Means for Marketers)",
    "Meta and BlackRock announced a venture to develop and own a data center campus in El Paso, Texas on 28 July 2026."
   ],
   "ai_customer_evidence": [
    "Platforms",
    "Meta's BlackRock Data Center Deal Shows Who Really Pays for AI (and What That Means for Marketers)",
    "Meta and BlackRock announced a venture to develop and own a data center campus in El Paso, Texas on 28 July 2026."
   ],
   "status_evidence": [
    "Platforms",
    "Meta's BlackRock Data Center Deal Shows Who Really Pays for AI (and What That Means for Marketers)",
    "Meta and BlackRock announced a venture to develop and own a data center campus in El Paso, Texas on 28 July 2026."
   ],
   "announcement_date_evidence": [
    "Platforms",
    "Meta's BlackRock Data Center Deal Shows Who Really Pays for AI (and What That Means for Marketers)",
    "Meta and BlackRock announced a venture to develop and own a data center campus in El Paso, Texas on 28 July 2026."
   ]
  },
  {
   "url": "https://voi.id/en/teknologi/547806",
   "title": "Elon Musk's xAI Company Buys New Building for 2 GW AI Data Center",
   "published_at": null,
   "project": "Colossus",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "xAI",
   "status": "expanding",
   "announcement_date": "2025-12-31",
   "project_evidence": [
    "JAKARTA - Billionaire Elon Musk announced that his artificial intelligence (AI) company, xAI, plans to expand its data center in Memphis, and has purchased a third building in the area.",
    "Musk has built one data center in Memphis, called Colossus, and is currently building a second location nearby called Colossus 2."
   ],
   "locality_evidence": [
    "JAKARTA - Billionaire Elon Musk announced that his artificial intelligence (AI) company, xAI, plans to expand its data center in Memphis, and has purchased a third building in the area.",
    "Musk has built one data center in Memphis, called Colossus, and is currently building a second location nearby called Colossus 2."
   ],
   "state_evidence": [
    "JAKARTA - Billionaire Elon Musk announced that his artificial intelligence (AI) company, xAI, plans to expand its data center in Memphis, and has purchased a third building in the area."
   ],
   "capacity_gw_evidence": [
    "JAKARTA - Billionaire Elon Musk announced that his artificial intelligence (AI) company, xAI, plans to expand its data center in Memphis, and has purchased a third building in the area.",
    "In a statement on a post on X, Musk said the area would increase the company's artificial intelligence computing capacity to nearly 2 gigawatt."
   ],
   "builder_evidence": [
    "JAKARTA - Billionaire Elon Musk announced that his artificial intelligence (AI) company, xAI, plans to expand its data center in Memphis, and has purchased a third building in the area."
   ],
   "ai_customer_evidence": [
    "JAKARTA - Billionaire Elon Musk announced that his artificial intelligence (AI) company, xAI, plans to expand its data center in Memphis, and has purchased a third building in the area.",
    "In a statement on a post on X, Musk said the area would increase the company's artificial intelligence computing capacity to nearly 2 gigawatt."
   ],
   "status_evidence": [
    "JAKARTA - Billionaire Elon Musk announced that his artificial intelligence (AI) company, xAI, plans to expand its data center in Memphis, and has purchased a third building in the area."
   ],
   "announcement_date_evidence": [
    "JAKARTA - Billionaire Elon Musk announced that his artificial intelligence (AI) company, xAI, plans to expand its data center in Memphis, and has purchased a third building in the area.",
    "\"xAI has bought a third building called MACROHARDRR. It will increase the training computing power @xAI to almost 2 GW,\" Musk wrote on Wednesday, December 31."
   ]
  },
  {
   "url": "https://tmcnet.com/usubmit/-vantage-data-centers-unveils-plans-frontier-25b-mega-/2025/08/19/10240860.htm",
   "title": "Vantage Data Centers Unveils Plans for \"Frontier,\" a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
   "published_at": "2025-08-19T20:07:21",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Construction on the campus has already begun",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "## TMCnet News",
    "Vantage Data Centers Unveils Plans for \"Frontier,\" a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \"Frontier,\" will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "locality_evidence": [
    "## TMCnet News",
    "Vantage Data Centers Unveils Plans for \"Frontier,\" a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "## TMCnet News",
    "Vantage Data Centers Unveils Plans for \"Frontier,\" a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "## TMCnet News",
    "Vantage Data Centers Unveils Plans for \"Frontier,\" a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "## TMCnet News",
    "Vantage Data Centers Unveils Plans for \"Frontier,\" a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## TMCnet News",
    "Vantage Data Centers Unveils Plans for \"Frontier,\" a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": [
    "## TMCnet News",
    "Vantage Data Centers Unveils Plans for \"Frontier,\" a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "| | **[August 19, 2025]** | [![](//www.tmcnet.com/usubmit/images/Powered-by-Business-Wire-5.gif)](//www.businesswire.com/) | |---|---|"
   ]
  },
  {
   "url": "https://marketchameleon.com/PressReleases/i/2253523/FRMI/fermi-america-makes-initial-draw-on-200",
   "title": "FRMI Press Release: Fermi America Makes Initial Draw on $200 Mil...",
   "published_at": null,
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2026-02-19",
   "project_evidence": [
    "Fermi America Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid Campus"
   ],
   "locality_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ -- [Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4623677-1&h=4044461773&u=https%3A%2F%2Ffermiamerica.com%2F&a=Fermi+Inc.+(d%2Fb%2Fa+Fermi+America)+(NASDAQ+%26+LSE%3A+FRMI)%2C+operating+as+Fermi+America%E2%84%A2), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "Fermi America Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid Campus"
   ],
   "state_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ -- [Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4623677-1&h=4044461773&u=https%3A%2F%2Ffermiamerica.com%2F&a=Fermi+Inc.+(d%2Fb%2Fa+Fermi+America)+(NASDAQ+%26+LSE%3A+FRMI)%2C+operating+as+Fermi+America%E2%84%A2), in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "Fermi America Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid Campus"
   ],
   "capacity_gw_evidence": [
    "Fermi America Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid Campus"
   ],
   "builder_evidence": [
    "Fermi America Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid Campus"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Fermi America Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid Campus",
    "Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus"
   ],
   "announcement_date_evidence": [
    "PRNewswire 19-Feb-2026 4:37 PM",
    "Fermi America Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid Campus"
   ]
  },
  {
   "url": "https://soylentnews.org/article.pl?sid=25/05/06/032221",
   "title": "PA\u2019s Largest Coal Plant to Become 4.5GW Gas-Fired AI Hub",
   "published_at": null,
   "project": null,
   "locality": null,
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Homer City Redevelopment",
   "ai_customer": null,
   "status": "proposed",
   "announcement_date": "2025-04-02",
   "project_evidence": null,
   "locality_evidence": null,
   "state_evidence": [
    "[Seven gas turbines planned to juice datacenter demand by 2027](https://www.theregister.com/2025/04/02/pennsylvanias_largest_coal_plant/):",
    "Developers on Wednesday announced plans to bring up to 4.5 gigawatts of natural gas-fired power online by 2027 at the site of what was once Pennsylvania's largest coal plant, as part of a proposed datacenter campus running AI and high-performance computing workloads."
   ],
   "capacity_gw_evidence": [
    "[Seven gas turbines planned to juice datacenter demand by 2027](https://www.theregister.com/2025/04/02/pennsylvanias_largest_coal_plant/):",
    "Developers on Wednesday announced plans to bring up to 4.5 gigawatts of natural gas-fired power online by 2027 at the site of what was once Pennsylvania's largest coal plant, as part of a proposed datacenter campus running AI and high-performance computing workloads."
   ],
   "builder_evidence": [
    "[Seven gas turbines planned to juice datacenter demand by 2027](https://www.theregister.com/2025/04/02/pennsylvanias_largest_coal_plant/):",
    "Development of the 3,200-acre natural gas-powered datacenter campus is being led by Homer City Redevelopment (HCR) and is expected to exceed $10 billion for power infrastructure and site readiness alone, with additional billions anticipated for the datacenter development."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "[Seven gas turbines planned to juice datacenter demand by 2027](https://www.theregister.com/2025/04/02/pennsylvanias_largest_coal_plant/):",
    "Developers on Wednesday announced plans to bring up to 4.5 gigawatts of natural gas-fired power online by 2027 at the site of what was once Pennsylvania's largest coal plant, as part of a proposed datacenter campus running AI and high-performance computing workloads."
   ],
   "announcement_date_evidence": [
    "[Seven gas turbines planned to juice datacenter demand by 2027](https://www.theregister.com/2025/04/02/pennsylvanias_largest_coal_plant/):",
    "Developers on Wednesday announced plans to bring up to 4.5 gigawatts of natural gas-fired power online by 2027 at the site of what was once Pennsylvania's largest coal plant, as part of a proposed datacenter campus running AI and high-performance computing workloads."
   ]
  },
  {
   "url": "https://myvillager.com/online_features/press_releases/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy/article_60d1f5a1-fede-5620-8166-678fa97bac76.html",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": "2026-03-16T21:18:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "locality_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "capacity_gw_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "builder_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "announcement_date_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026"
   ]
  },
  {
   "url": "https://letstalkbitco.in/core-scientific-converts-texas-bitcoin-mine-into-1-5gw-ai-data-center-campus",
   "title": "Core Scientific Converts Texas Bitcoin Mine into 1.5GW AI Data Center Campus",
   "published_at": "2026-04-28T19:01:48",
   "project": "Pecos project",
   "locality": "Pecos",
   "state": "Texas",
   "capacity_gw": 1.5,
   "builder": "Core Scientific",
   "ai_customer": null,
   "status": "resurfacing / under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Core Scientific Converts Texas Bitcoin Mine into 1.5GW AI Data Center Campus",
    "Core Scientific\u2019s Pecos project is being reshaped into a massive AI data center campus with total gross power capacity projected to reach 1.5 gigawatts."
   ],
   "locality_evidence": [
    "# Core Scientific Converts Texas Bitcoin Mine into 1.5GW AI Data Center Campus",
    "[Core Scientific shifts Bitcoin mining site toward 1_5GW AI data center plan](https://crypto.news/?p=14458649) is converting a Bitcoin mining site in Pecos, Texas into a 1.5GW AI data center campus, a blunt reminder that power, land, and grid access may be more valuable than hash rate alone."
   ],
   "state_evidence": [
    "# Core Scientific Converts Texas Bitcoin Mine into 1.5GW AI Data Center Campus",
    "[Core Scientific shifts Bitcoin mining site toward 1_5GW AI data center plan](https://crypto.news/?p=14458649) is converting a Bitcoin mining site in Pecos, Texas into a 1.5GW AI data center campus, a blunt reminder that power, land, and grid access may be more valuable than hash rate alone."
   ],
   "capacity_gw_evidence": [
    "# Core Scientific Converts Texas Bitcoin Mine into 1.5GW AI Data Center Campus",
    "Core Scientific\u2019s Pecos project is being reshaped into a massive AI data center campus with total gross power capacity projected to reach 1.5 gigawatts."
   ],
   "builder_evidence": [
    "# Core Scientific Converts Texas Bitcoin Mine into 1.5GW AI Data Center Campus",
    "Core Scientific\u2019s Pecos project is being reshaped into a massive AI data center campus with total gross power capacity projected to reach 1.5 gigawatts."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Core Scientific Converts Texas Bitcoin Mine into 1.5GW AI Data Center Campus",
    "The first data hall has already completed foundation work, vertical construction is beginning, and the company says early capacity should come online in 2027."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://constructionreviewonline.com/worlds-largest-stratos-data-center-project-in-utah-scaled-back-as-oleary-provides-latest-insights",
   "title": "World\u2019s Largest Stratos Data Center Project in Utah Scaled Back as O\u2019Leary Provides Latest Insights",
   "published_at": "2026-06-06T09:41:44",
   "project": "Stratos Data Center Project",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "Kevin O\u2019Leary",
   "ai_customer": null,
   "status": "Project footprint significantly reduced following public and government concerns",
   "announcement_date": "2026-06-06",
   "project_evidence": [
    "# World\u2019s Largest Stratos Data Center Project in Utah Scaled Back as O\u2019Leary Provides Latest Insights",
    "- Project Name: Stratos Data Center Project"
   ],
   "locality_evidence": [
    "The world\u2019s largest Stratos data center project in Box Elder County, Utah is to scale back as O\u2019Leary provides latest insights.",
    "- Location: Box Elder County, Utah, USA"
   ],
   "state_evidence": [
    "The world\u2019s largest Stratos data center project in Box Elder County, Utah is to scale back as O\u2019Leary provides latest insights.",
    "- Location: Box Elder County, Utah, USA"
   ],
   "capacity_gw_evidence": [
    "In the proposal, the Stratos Project would have encompassed 40,000 acres with plans for a 9-gigawatt data center campus and on-site power generation at full buildout.",
    "- Original planned capacity: 9 GW data center campus"
   ],
   "builder_evidence": [
    "# World\u2019s Largest Stratos Data Center Project in Utah Scaled Back as O\u2019Leary Provides Latest Insights",
    "- Developer: Kevin O\u2019Leary"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "- Project footprint significantly reduced following public and government concerns"
   ],
   "announcement_date_evidence": [
    "Published on Jun 6, 2026",
    "# World\u2019s Largest Stratos Data Center Project in Utah Scaled Back as O\u2019Leary Provides Latest Insights"
   ]
  },
  {
   "url": "https://easternherald.com/2026/07/23/openai-project-camellia-georgia-power-grid-ai",
   "title": "OpenAI\u2019s $750 Billion AI Spending Spree Reshapes the Georgia Power Grid",
   "published_at": "2026-07-23T07:59:28",
   "project": "Project Camellia",
   "locality": "Savannah",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "SAVANNAH, Ga. \u2013 Effingham County officials approved a 50 percent property tax break for fifteen years to win the deal.",
    "What they secured in return was Project Camellia: a $20 billion data center campus that OpenAI plans to build on 1,400 acres northwest of Savannah, drawing at least 3.2 gigawatts of electricity from a Georgia Power grid that will require substantial reconstruction just to serve it."
   ],
   "locality_evidence": [
    "SAVANNAH, Ga. \u2013 Effingham County officials approved a 50 percent property tax break for fifteen years to win the deal.",
    "What they secured in return was Project Camellia: a $20 billion data center campus that OpenAI plans to build on 1,400 acres northwest of Savannah, drawing at least 3.2 gigawatts of electricity from a Georgia Power grid that will require substantial reconstruction just to serve it."
   ],
   "state_evidence": [
    "SAVANNAH, Ga. \u2013 Effingham County officials approved a 50 percent property tax break for fifteen years to win the deal.",
    "What they secured in return was Project Camellia: a $20 billion data center campus that OpenAI plans to build on 1,400 acres northwest of Savannah, drawing at least 3.2 gigawatts of electricity from a Georgia Power grid that will require substantial reconstruction just to serve it."
   ],
   "capacity_gw_evidence": [
    "SAVANNAH, Ga. \u2013 Effingham County officials approved a 50 percent property tax break for fifteen years to win the deal.",
    "What they secured in return was Project Camellia: a $20 billion data center campus that OpenAI plans to build on 1,400 acres northwest of Savannah, drawing at least 3.2 gigawatts of electricity from a Georgia Power grid that will require substantial reconstruction just to serve it."
   ],
   "builder_evidence": [
    "SAVANNAH, Ga. \u2013 Effingham County officials approved a 50 percent property tax break for fifteen years to win the deal.",
    "What they secured in return was Project Camellia: a $20 billion data center campus that OpenAI plans to build on 1,400 acres northwest of Savannah, drawing at least 3.2 gigawatts of electricity from a Georgia Power grid that will require substantial reconstruction just to serve it.",
    "To lead the physical construction, OpenAI hired Brett Mayo, whose previous assignment was overseeing the build-out of Colossus, the 100,000-chip data center that [Elon Musk](https://easternherald.com/person/elon-musk/)\u2019s xAI installed in a former Memphis factory in under a year."
   ],
   "ai_customer_evidence": [
    "SAVANNAH, Ga. \u2013 Effingham County officials approved a 50 percent property tax break for fifteen years to win the deal.",
    "What they secured in return was Project Camellia: a $20 billion data center campus that OpenAI plans to build on 1,400 acres northwest of Savannah, drawing at least 3.2 gigawatts of electricity from a Georgia Power grid that will require substantial reconstruction just to serve it."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://fosters.com/story/money/business/2026/03/17/google-reveals-project-cannoli-data-center/89185890007",
   "title": "Google reveals it is behind big 'Project Cannoli' data center project",
   "published_at": "2026-03-17T12:02:18",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "locality_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "state_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google also said Tuesday that it is creating a $10 million Energy Impact Fund for local organizations to tap into with the aim of lowering monthly utility bills for Michiganders."
   ],
   "capacity_gw_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "builder_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "The data center would be developed for Google by Panattoni Development Co."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "announcement_date_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Updated March 17, 2026, 2:27 p.m. ET",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ]
  },
  {
   "url": "https://dart-studio.com/news/how-a-bitcoin-miner-just-bet-big-on-kentucky-to-power-the-ai-boom-78724",
   "title": "How a Bitcoin Miner Just Bet Big on Kentucky to Power the AI Boom",
   "published_at": null,
   "project": "Muskie Data Campus",
   "locality": "EastPark Industrial Park",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "closed on a 285-acre greenfield site",
   "announcement_date": "2026-05-26",
   "project_evidence": [
    "How a Bitcoin Miner Just Bet Big on Kentucky to Power the AI Boom",
    "The location, called the Muskie Data Campus, sits within a 1,000-acre industrial zone and offers room to expand."
   ],
   "locality_evidence": [
    "How a Bitcoin Miner Just Bet Big on Kentucky to Power the AI Boom",
    "The firm closed on a 285-acre greenfield site in eastern Kentucky\u2019s EastPark Industrial Park on May 22, announcing the deal four days later."
   ],
   "state_evidence": [
    "How a Bitcoin Miner Just Bet Big on Kentucky to Power the AI Boom",
    "The firm closed on a 285-acre greenfield site in eastern Kentucky\u2019s EastPark Industrial Park on May 22, announcing the deal four days later."
   ],
   "capacity_gw_evidence": [
    "How a Bitcoin Miner Just Bet Big on Kentucky to Power the AI Boom",
    "Total gross power capacity could exceed one gigawatt, with roughly 800 megawatts of net deliverable power."
   ],
   "builder_evidence": [
    "How a Bitcoin Miner Just Bet Big on Kentucky to Power the AI Boom",
    "TeraWulf, a company better known for mining Bitcoin, has made a decisive move into the AI infrastructure game."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "How a Bitcoin Miner Just Bet Big on Kentucky to Power the AI Boom",
    "The firm closed on a 285-acre greenfield site in eastern Kentucky\u2019s EastPark Industrial Park on May 22, announcing the deal four days later."
   ],
   "announcement_date_evidence": [
    "Webpronews \u00b7 May 30, 2026",
    "How a Bitcoin Miner Just Bet Big on Kentucky to Power the AI Boom",
    "The firm closed on a 285-acre greenfield site in eastern Kentucky\u2019s EastPark Industrial Park on May 22, announcing the deal four days later."
   ]
  },
  {
   "url": "https://portal.sina.com.hk/finance/finance-globenewswire/globenewswire/2026/05/01/1746815/iren-announces-successful-energization-of-sweetwater-1",
   "title": "IREN Announces Successful Energization of Sweetwater 1 - \u65b0\u6d6a\u9999\u6e2f",
   "published_at": "2026-05-01T12:10:00",
   "project": "Sweetwater",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid",
   "announcement_date": "2026-05-01",
   "project_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 [(GLOBE NEWSWIRE)](https://www.globenewswire.com) \u2014 IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "capacity_gw_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "builder_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 [(GLOBE NEWSWIRE)](https://www.globenewswire.com) \u2014 IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "announcement_date_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 [(GLOBE NEWSWIRE)](https://www.globenewswire.com) \u2014 IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ]
  },
  {
   "url": "https://internationalnewsledger.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "locality_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "state_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "capacity_gw_evidence": [
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "builder_evidence": [
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://colocationscout.com/houston-data-center-space.html",
   "title": "Houston Data Center Space | Gulf Coast Colocation Guide",
   "published_at": "2026-08-04T00:00:00",
   "project": "TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Market profile",
    "## What has been announced in Houston",
    "Announcements are not filings. Nobody has to build what they announce, the figure is the one the developer chose to publish, and the date moves. They are here because megawatts are what a requirement is measured in, and because the size of what is coming changes who will take your call. Every figure below was read on the page it links to.",
    "| Capacity | Operator | Project | What was announced |",
    "| 1 GW | ECL | [TerraSite-TX1](https://www.datacenterfrontier.com/sustainability/article/55233745/ecl-debuts-1-gw-off-grid-hydrogen-powered-ai-factory-data-center-on-600-acres-near-houston) | 600 acres east of Houston, off-grid and hydrogen powered, first 50 MW phase at about $450m. Announced capacity at full build-out |"
   ],
   "locality_evidence": [
    "Market profile",
    "## What has been announced in Houston",
    "Announcements are not filings. Nobody has to build what they announce, the figure is the one the developer chose to publish, and the date moves. They are here because megawatts are what a requirement is measured in, and because the size of what is coming changes who will take your call. Every figure below was read on the page it links to.",
    "| Capacity | Operator | Project | What was announced |",
    "| 1 GW | ECL | [TerraSite-TX1](https://www.datacenterfrontier.com/sustainability/article/55233745/ecl-debuts-1-gw-off-grid-hydrogen-powered-ai-factory-data-center-on-600-acres-near-houston) | 600 acres east of Houston, off-grid and hydrogen powered, first 50 MW phase at about $450m. Announced capacity at full build-out |"
   ],
   "state_evidence": [
    "Market profile",
    "## What has been announced in Houston",
    "Announcements are not filings. Nobody has to build what they announce, the figure is the one the developer chose to publish, and the date moves. They are here because megawatts are what a requirement is measured in, and because the size of what is coming changes who will take your call. Every figure below was read on the page it links to.",
    "| Capacity | Operator | Project | What was announced |",
    "| 1 GW | ECL | [TerraSite-TX1](https://www.datacenterfrontier.com/sustainability/article/55233745/ecl-debuts-1-gw-off-grid-hydrogen-powered-ai-factory-data-center-on-600-acres-near-houston) | 600 acres east of Houston, off-grid and hydrogen powered, first 50 MW phase at about $450m. Announced capacity at full build-out |"
   ],
   "capacity_gw_evidence": [
    "Market profile",
    "## What has been announced in Houston",
    "Announcements are not filings. Nobody has to build what they announce, the figure is the one the developer chose to publish, and the date moves. They are here because megawatts are what a requirement is measured in, and because the size of what is coming changes who will take your call. Every figure below was read on the page it links to.",
    "| Capacity | Operator | Project | What was announced |",
    "| 1 GW | ECL | [TerraSite-TX1](https://www.datacenterfrontier.com/sustainability/article/55233745/ecl-debuts-1-gw-off-grid-hydrogen-powered-ai-factory-data-center-on-600-acres-near-houston) | 600 acres east of Houston, off-grid and hydrogen powered, first 50 MW phase at about $450m. Announced capacity at full build-out |"
   ],
   "builder_evidence": [
    "Market profile",
    "## What has been announced in Houston",
    "Announcements are not filings. Nobody has to build what they announce, the figure is the one the developer chose to publish, and the date moves. They are here because megawatts are what a requirement is measured in, and because the size of what is coming changes who will take your call. Every figure below was read on the page it links to.",
    "| Capacity | Operator | Project | What was announced |",
    "| 1 GW | ECL | [TerraSite-TX1](https://www.datacenterfrontier.com/sustainability/article/55233745/ecl-debuts-1-gw-off-grid-hydrogen-powered-ai-factory-data-center-on-600-acres-near-houston) | 600 acres east of Houston, off-grid and hydrogen powered, first 50 MW phase at about $450m. Announced capacity at full build-out |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://baxtel.com/news/nvidia-to-back-4-25gw-openai-data-center-in-ohio",
   "title": "Nvidia to Back 4.25GW OpenAI Data Center in Ohio",
   "published_at": "2026-08-17T00:00:00",
   "project": "Portsmouth Site",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 10.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# Nvidia to Back 4.25GW OpenAI Data Center in Ohio",
    "Nvidia has confirmed that it will financially support SoftBank\u2019s data center project at the Portsmouth Site in Pike County, Ohio."
   ],
   "locality_evidence": [
    "# Nvidia to Back 4.25GW OpenAI Data Center in Ohio",
    "Nvidia has confirmed that it will financially support SoftBank\u2019s data center project at the Portsmouth Site in Pike County, Ohio."
   ],
   "state_evidence": [
    "# Nvidia to Back 4.25GW OpenAI Data Center in Ohio",
    "Nvidia has confirmed that it will financially support SoftBank\u2019s data center project at the Portsmouth Site in Pike County, Ohio."
   ],
   "capacity_gw_evidence": [
    "# Nvidia to Back 4.25GW OpenAI Data Center in Ohio",
    "Led by SB Energy, the facility is expected to be fully leased to OpenAI and could eventually reach 10GW, potentially making it the world\u2019s largest data center."
   ],
   "builder_evidence": [
    "# Nvidia to Back 4.25GW OpenAI Data Center in Ohio",
    "Led by SB Energy, the facility is expected to be fully leased to OpenAI and could eventually reach 10GW, potentially making it the world\u2019s largest data center."
   ],
   "ai_customer_evidence": [
    "# Nvidia to Back 4.25GW OpenAI Data Center in Ohio",
    "Led by SB Energy, the facility is expected to be fully leased to OpenAI and could eventually reach 10GW, potentially making it the world\u2019s largest data center."
   ],
   "status_evidence": [
    "# Nvidia to Back 4.25GW OpenAI Data Center in Ohio",
    "Led by SB Energy, the facility is expected to be fully leased to OpenAI and could eventually reach 10GW, potentially making it the world\u2019s largest data center."
   ],
   "announcement_date_evidence": [
    "# Nvidia to Back 4.25GW OpenAI Data Center in Ohio",
    "Aug 17, 2026 Posted by Abdul-Rahman Oladimeji Published in NVIDIA"
   ]
  },
  {
   "url": "https://stargate.how/news/what-stargate-has-become-since-2025",
   "title": "What Stargate has become since 2025",
   "published_at": "2026-08-05T00:00:00",
   "project": null,
   "locality": "Milam County",
   "state": null,
   "capacity_gw": 1.2,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "SoftBank advanced a separate route through SB Energy, including a 1.2 GW OpenAI lease in Milam County.",
    "## From a single headline to a portfolio"
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "SoftBank advanced a separate route through SB Energy, including a 1.2 GW OpenAI lease in Milam County.",
    "## From a single headline to a portfolio"
   ],
   "builder_evidence": [
    "SoftBank advanced a separate route through SB Energy, including a 1.2 GW OpenAI lease in Milam County.",
    "## From a single headline to a portfolio"
   ],
   "ai_customer_evidence": [
    "SoftBank advanced a separate route through SB Energy, including a 1.2 GW OpenAI lease in Milam County.",
    "## From a single headline to a portfolio"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://edgen.tech/zh/news/stock/blackrock-and-meta-form-14b-data-center-venture-in-texas",
   "title": "BlackRock and Meta form $14B data center venture in Texas",
   "published_at": "2026-07-28T09:41:43",
   "project": "El Paso campus",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "BlackRock Inc. and Meta Platforms Inc.",
   "ai_customer": "Meta",
   "status": "under development",
   "announcement_date": "2026-07-28",
   "project_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "The El Paso campus represents an investment of more than $10 billion from Meta alone, supporting over 4,000 construction jobs at peak and 300 permanent operational roles."
   ],
   "locality_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "- BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas."
   ],
   "state_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "- BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas."
   ],
   "capacity_gw_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "- BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas."
   ],
   "builder_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "**BlackRock Inc. and Meta Platforms Inc. are jointly developing a $14 billion data center campus in El Paso, Texas, marking the latest hyperscale infrastructure deal as technology companies race to secure capacity for artificial intelligence workloads.**"
   ],
   "ai_customer_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "- BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas."
   ],
   "status_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "**BlackRock Inc. and Meta Platforms Inc. are jointly developing a $14 billion data center campus in El Paso, Texas, marking the latest hyperscale infrastructure deal as technology companies race to secure capacity for artificial intelligence workloads.**"
   ],
   "announcement_date_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "## Rachel Kim](https://www.edgen.tech/zh/author/news/rachel-kim)\u00b7Jul 28 2026, 09:41"
   ]
  },
  {
   "url": "https://blackridgeresearch.com/blog/latest-list-top-new-data-centers-in-indiana-united-states-us",
   "title": "List of Top Data Centers in Indiana, 2026",
   "published_at": null,
   "project": "Amazon Web Services (Project Rainier)",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon Web Services (AWS)",
   "ai_customer": "Anthropic",
   "status": "Operational",
   "announcement_date": null,
   "project_evidence": [
    "| **Project Name** | **Developer / Owner** | **Capacity** | **Location** | **Project Stage (as of 2026)** |",
    "| Amazon Web Services (Project Rainier) | Amazon Web Services (AWS) | 2.2 GW | New Carlisle, St. Joseph County, Indiana | Operational (since Oct 2025) |",
    "# List of Top 7 Data Centers in Indiana, United States 2026",
    "## List of Top 7 Largest Data Centers in Indiana, USA 2026"
   ],
   "locality_evidence": [
    "| **Project Name** | **Developer / Owner** | **Capacity** | **Location** | **Project Stage (as of 2026)** |",
    "| Amazon Web Services (Project Rainier) | Amazon Web Services (AWS) | 2.2 GW | New Carlisle, St. Joseph County, Indiana | Operational (since Oct 2025) |",
    "# List of Top 7 Data Centers in Indiana, United States 2026",
    "## List of Top 7 Largest Data Centers in Indiana, USA 2026"
   ],
   "state_evidence": [
    "| **Project Name** | **Developer / Owner** | **Capacity** | **Location** | **Project Stage (as of 2026)** |",
    "| Amazon Web Services (Project Rainier) | Amazon Web Services (AWS) | 2.2 GW | New Carlisle, St. Joseph County, Indiana | Operational (since Oct 2025) |",
    "# List of Top 7 Data Centers in Indiana, United States 2026",
    "## List of Top 7 Largest Data Centers in Indiana, USA 2026"
   ],
   "capacity_gw_evidence": [
    "| **Project Name** | **Developer / Owner** | **Capacity** | **Location** | **Project Stage (as of 2026)** |",
    "| Amazon Web Services (Project Rainier) | Amazon Web Services (AWS) | 2.2 GW | New Carlisle, St. Joseph County, Indiana | Operational (since Oct 2025) |",
    "# List of Top 7 Data Centers in Indiana, United States 2026",
    "## List of Top 7 Largest Data Centers in Indiana, USA 2026"
   ],
   "builder_evidence": [
    "| **Project Name** | **Developer / Owner** | **Capacity** | **Location** | **Project Stage (as of 2026)** |",
    "| Amazon Web Services (Project Rainier) | Amazon Web Services (AWS) | 2.2 GW | New Carlisle, St. Joseph County, Indiana | Operational (since Oct 2025) |",
    "# List of Top 7 Data Centers in Indiana, United States 2026",
    "## List of Top 7 Largest Data Centers in Indiana, USA 2026"
   ],
   "ai_customer_evidence": [
    "The Project Rainier is one of the world's largest AI compute clusters by AWS that will deliver nearly half a million Trainium 2 chips with Anthropic scaling to more than one million chips by the end of 2025.",
    "# List of Top 7 Data Centers in Indiana, United States 2026",
    "### Amazon Web Services (Rainier)"
   ],
   "status_evidence": [
    "| **Project Name** | **Developer / Owner** | **Capacity** | **Location** | **Project Stage (as of 2026)** |",
    "| Amazon Web Services (Project Rainier) | Amazon Web Services (AWS) | 2.2 GW | New Carlisle, St. Joseph County, Indiana | Operational (since Oct 2025) |",
    "# List of Top 7 Data Centers in Indiana, United States 2026",
    "## List of Top 7 Largest Data Centers in Indiana, USA 2026"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://markets.financialcontent.com/startribune/article/tokenring-2026-1-2-colossus-unbound-xais-memphis-expansion-targets-1-million-gpus-in-the-race-for-agi",
   "title": "Colossus Unbound: xAI\u00e2s Memphis Expansion Targets 1 Million GPUs in the Race for AGI",
   "published_at": "2026-01-02T19:48:24",
   "project": "Colossus",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "xAI",
   "status": "expanding",
   "announcement_date": "2026-01-02",
   "project_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "locality_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "state_evidence": [
    "As the \"Digital Delta\" takes shape across the Tennessee-Mississippi border, the project is redefining the physical and logistical requirements of the AGI era.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "capacity_gw_evidence": [
    "By targeting a power capacity of 2 gigawatts (GW)\u2014roughly enough to power nearly 2 million homes\u2014xAI is transitioning from a high-scale startup to a \"Gigafactory of Compute.\"",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "builder_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "ai_customer_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "status_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "announcement_date_evidence": [
    "As of January 2, 2026, the company has successfully scaled its initial 100,000-GPU cluster to over 200,000 units and is now aggressively pursuing a roadmap to reach 1 million GPUs by the end of the year.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ]
  },
  {
   "url": "https://datacentremagazine.com/news/crusoe-and-lanciums-strategy-for-1gw-ai-texas-campus",
   "title": "Crusoe and Lancium\u2019s Strategy for 1GW AI Texas Campus",
   "published_at": "2026-07-17T13:59:31",
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe",
   "ai_customer": null,
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "The project follows the same development model the two companies established in [Abilene, Texas](https://datacentremagazine.com/news/inside-microsoft-and-crusoes-new-ai-factory-campus-plans), where they have already delivered and expanded AI data centre capacity.",
    "The first two buildings at that campus were energised within a year before the development expanded to 1.2GW."
   ],
   "locality_evidence": [
    "The project follows the same development model the two companies established in [Abilene, Texas](https://datacentremagazine.com/news/inside-microsoft-and-crusoes-new-ai-factory-campus-plans), where they have already delivered and expanded AI data centre capacity."
   ],
   "state_evidence": [
    "The project follows the same development model the two companies established in [Abilene, Texas](https://datacentremagazine.com/news/inside-microsoft-and-crusoes-new-ai-factory-campus-plans), where they have already delivered and expanded AI data centre capacity.",
    "\u201cThis campus represents a major milestone in Crusoe's deep commitment to the state of Texas,\u201d says [Chase Lochmiller](https://datacentremagazine.com/executive/chase-lochmiller), Co-Founder and CEO of Crusoe."
   ],
   "capacity_gw_evidence": [
    "The first two buildings at that campus were energised within a year before the development expanded to 1.2GW."
   ],
   "builder_evidence": [
    "The project follows the same development model the two companies established in [Abilene, Texas](https://datacentremagazine.com/news/inside-microsoft-and-crusoes-new-ai-factory-campus-plans), where they have already delivered and expanded AI data centre capacity.",
    "The companies say the approach has already been proven through their work in Abilene, where Crusoe broke ground in June 2024."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The first two buildings at that campus were energised within a year before the development expanded to 1.2GW."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-wisconsin",
   "title": "Microsoft Fairwater Wisconsin | AI Data Centers",
   "published_at": null,
   "project": "Microsoft Fairwater Wisconsin",
   "locality": "Mount Pleasant",
   "state": "Wisconsin",
   "capacity_gw": 2.263,
   "builder": "Microsoft",
   "ai_customer": "OpenAI, Microsoft",
   "status": "Operational",
   "announcement_date": null,
   "project_evidence": [
    "# Microsoft Fairwater Wisconsin",
    "Microsoft Fairwater Wisconsin is an operational AI data center hosting an estimated 446k H100-equivalent chips, scaling toward a projected 4,528k H100-equivalent chips \u2014 supported by 369 MW of IT power, rising to 2,263 MW \u2014 at a capital cost of $14.0 B, rising to $85.7 B."
   ],
   "locality_evidence": [
    "Mount Pleasant, Wisconsin, United States",
    "# Microsoft Fairwater Wisconsin"
   ],
   "state_evidence": [
    "Mount Pleasant, Wisconsin, United States",
    "# Microsoft Fairwater Wisconsin"
   ],
   "capacity_gw_evidence": [
    "Microsoft Fairwater Wisconsin is an operational AI data center hosting an estimated 446k H100-equivalent chips, scaling toward a projected 4,528k H100-equivalent chips \u2014 supported by 369 MW of IT power, rising to 2,263 MW \u2014 at a capital cost of $14.0 B, rising to $85.7 B.",
    "# Microsoft Fairwater Wisconsin"
   ],
   "builder_evidence": [
    "OWNER Microsoft STATUS Operational USERS OpenAI, Microsoft PROJECT Microsoft AI WAN",
    "# Microsoft Fairwater Wisconsin"
   ],
   "ai_customer_evidence": [
    "OWNER Microsoft STATUS Operational USERS OpenAI, Microsoft PROJECT Microsoft AI WAN",
    "# Microsoft Fairwater Wisconsin"
   ],
   "status_evidence": [
    "OWNER Microsoft STATUS Operational USERS OpenAI, Microsoft PROJECT Microsoft AI WAN",
    "# Microsoft Fairwater Wisconsin"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://deepnewz.com/vc/vantage-unveils-25-billion-texas-campus-ai-data-center-spending-soars-3b71719a",
   "title": "Vantage Unveils $25 Billion Texas Campus as AI Data-Center Spending Soars",
   "published_at": "2025-08-19T16:10:09",
   "project": "Frontier Campus",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Vantage Data Centers to Invest $25 Billion in 1.4GW Frontier Campus in Shackelford County Texas; Oracle Builds $1B Gas-Powered AI Site",
    "Story Timeline"
   ],
   "locality_evidence": [
    "Vantage Data Centers to Invest $25 Billion in 1.4GW Frontier Campus in Shackelford County Texas; Oracle Builds $1B Gas-Powered AI Site",
    "Story Timeline"
   ],
   "state_evidence": [
    "Vantage Data Centers to Invest $25 Billion in 1.4GW Frontier Campus in Shackelford County Texas; Oracle Builds $1B Gas-Powered AI Site",
    "Story Timeline"
   ],
   "capacity_gw_evidence": [
    "Vantage Data Centers to Invest $25 Billion in 1.4GW Frontier Campus in Shackelford County Texas; Oracle Builds $1B Gas-Powered AI Site",
    "Story Timeline"
   ],
   "builder_evidence": [
    "Vantage Data Centers to Invest $25 Billion in 1.4GW Frontier Campus in Shackelford County Texas; Oracle Builds $1B Gas-Powered AI Site",
    "Story Timeline"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://substack.com/redirect/e208e1dc-d0f9-43cf-aa07-9e7557b8f4e9?j=eyJ1IjoiM3djM2MxIn0.OGuf1Irm-qb700DahBb35RT9QTn8SiZLleBWozyCeUk",
   "title": "Fermi secures natural gas pipeline connection for up to 11GW data center project in Amarillo, Texas",
   "published_at": "2026-05-21T22:30:01",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "developing",
   "announcement_date": null,
   "project_evidence": [
    "The company is currently developing \u201cProject Matador,\u201d in partnership with the Texas Tech University system, on whose land the data center will be sited.",
    "Fermi America has signed another energy supply agreement to power its proposed 11GW data center campus in Amarillo, Texas."
   ],
   "locality_evidence": [
    "Fermi America has signed another energy supply agreement to power its proposed 11GW data center campus in Amarillo, Texas.",
    "The company is currently developing \u201cProject Matador,\u201d in partnership with the Texas Tech University system, on whose land the data center will be sited."
   ],
   "state_evidence": [
    "Fermi America has signed another energy supply agreement to power its proposed 11GW data center campus in Amarillo, Texas.",
    "The company is currently developing \u201cProject Matador,\u201d in partnership with the Texas Tech University system, on whose land the data center will be sited."
   ],
   "capacity_gw_evidence": [
    "Fermi America has signed another energy supply agreement to power its proposed 11GW data center campus in Amarillo, Texas.",
    "The company is currently developing \u201cProject Matador,\u201d in partnership with the Texas Tech University system, on whose land the data center will be sited."
   ],
   "builder_evidence": [
    "Fermi America has signed another energy supply agreement to power its proposed 11GW data center campus in Amarillo, Texas.",
    "The company is currently developing \u201cProject Matador,\u201d in partnership with the Texas Tech University system, on whose land the data center will be sited."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The company is currently developing \u201cProject Matador,\u201d in partnership with the Texas Tech University system, on whose land the data center will be sited.",
    "Fermi America has signed another energy supply agreement to power its proposed 11GW data center campus in Amarillo, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://daily-tribune.com/online_features/press_releases/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy/article_c924c566-762d-5441-838a-bc3b71dacc48.html",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": "2026-03-16T21:18:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "under development / planned",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "locality_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "capacity_gw_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "builder_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "announcement_date_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ]
  },
  {
   "url": "https://constructionreviewonline.com/project-camellia-openai-plans-30-billion-3-2-gigawatt-data-center-near-savannah-georgia",
   "title": "Project Camellia: OpenAI Plans $30 Billion, 3.2-Gigawatt Data Center Near Savannah, Georgia",
   "published_at": "2026-07-22T15:18:47",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "# Project Camellia: OpenAI Plans $30 Billion, 3.2-Gigawatt Data Center Near Savannah, Georgia",
    "OpenAI Plans $30 Billion, 3.2-Gigawatt Data Center Near Savannah, Georgia\n\nPublished on Jul 22, 2026\n\n![](https://constructionreviewonline.com/wp-content/uploads/2026/07/HN1ZiKvbAAEnDIu.jpg)\n[OpenAI](https://openai.com/) plans to invest over $30 billion in a new 3.2-gigawatt data center complex, Project Camellia, in Effingham County near Savannah, Georgia, potentially making it one of the company\u2019s largest infrastructure projects to date.",
    "**Project Name**: Project Camellia"
   ],
   "locality_evidence": [
    "OpenAI Plans $30 Billion, 3.2-Gigawatt Data Center Near Savannah, Georgia\n\nPublished on Jul 22, 2026\n\n![](https://constructionreviewonline.com/wp-content/uploads/2026/07/HN1ZiKvbAAEnDIu.jpg)\n[OpenAI](https://openai.com/) plans to invest over $30 billion in a new 3.2-gigawatt data center complex, Project Camellia, in Effingham County near Savannah, Georgia, potentially making it one of the company\u2019s largest infrastructure projects to date.",
    "# Project Camellia: OpenAI Plans $30 Billion, 3.2-Gigawatt Data Center Near Savannah, Georgia",
    "**Location**: Savannah Gateway Industrial Hub, Rincon, Effingham County, Georgia"
   ],
   "state_evidence": [
    "OpenAI Plans $30 Billion, 3.2-Gigawatt Data Center Near Savannah, Georgia\n\nPublished on Jul 22, 2026\n\n![](https://constructionreviewonline.com/wp-content/uploads/2026/07/HN1ZiKvbAAEnDIu.jpg)\n[OpenAI](https://openai.com/) plans to invest over $30 billion in a new 3.2-gigawatt data center complex, Project Camellia, in Effingham County near Savannah, Georgia, potentially making it one of the company\u2019s largest infrastructure projects to date.",
    "# Project Camellia: OpenAI Plans $30 Billion, 3.2-Gigawatt Data Center Near Savannah, Georgia",
    "**Location**: Savannah Gateway Industrial Hub, Rincon, Effingham County, Georgia"
   ],
   "capacity_gw_evidence": [
    "# Project Camellia: OpenAI Plans $30 Billion, 3.2-Gigawatt Data Center Near Savannah, Georgia",
    "OpenAI Plans $30 Billion, 3.2-Gigawatt Data Center Near Savannah, Georgia\n\nPublished on Jul 22, 2026\n\n![](https://constructionreviewonline.com/wp-content/uploads/2026/07/HN1ZiKvbAAEnDIu.jpg)\n[OpenAI](https://openai.com/) plans to invest over $30 billion in a new 3.2-gigawatt data center complex, Project Camellia, in Effingham County near Savannah, Georgia, potentially making it one of the company\u2019s largest infrastructure projects to date.",
    "**Power Capacity**: 3.2 Gigawatts (3,200 MW)"
   ],
   "builder_evidence": [
    "# Project Camellia: OpenAI Plans $30 Billion, 3.2-Gigawatt Data Center Near Savannah, Georgia",
    "OpenAI Plans $30 Billion, 3.2-Gigawatt Data Center Near Savannah, Georgia\n\nPublished on Jul 22, 2026\n\n![](https://constructionreviewonline.com/wp-content/uploads/2026/07/HN1ZiKvbAAEnDIu.jpg)\n[OpenAI](https://openai.com/) plans to invest over $30 billion in a new 3.2-gigawatt data center complex, Project Camellia, in Effingham County near Savannah, Georgia, potentially making it one of the company\u2019s largest infrastructure projects to date.",
    "**Primary Developer**: OpenAI (First ground-up self-developed campus)"
   ],
   "ai_customer_evidence": [
    "# Project Camellia: OpenAI Plans $30 Billion, 3.2-Gigawatt Data Center Near Savannah, Georgia",
    "OpenAI Plans $30 Billion, 3.2-Gigawatt Data Center Near Savannah, Georgia\n\nPublished on Jul 22, 2026\n\n![](https://constructionreviewonline.com/wp-content/uploads/2026/07/HN1ZiKvbAAEnDIu.jpg)\n[OpenAI](https://openai.com/) plans to invest over $30 billion in a new 3.2-gigawatt data center complex, Project Camellia, in Effingham County near Savannah, Georgia, potentially making it one of the company\u2019s largest infrastructure projects to date.",
    "The ChatGPT maker contracted with Georgia Power to deliver the 3.2 GW of energy in phases between 2028 and 2032 under a 25-year agreement."
   ],
   "status_evidence": [
    "# Project Camellia: OpenAI Plans $30 Billion, 3.2-Gigawatt Data Center Near Savannah, Georgia",
    "OpenAI Plans $30 Billion, 3.2-Gigawatt Data Center Near Savannah, Georgia\n\nPublished on Jul 22, 2026\n\n![](https://constructionreviewonline.com/wp-content/uploads/2026/07/HN1ZiKvbAAEnDIu.jpg)\n[OpenAI](https://openai.com/) plans to invest over $30 billion in a new 3.2-gigawatt data center complex, Project Camellia, in Effingham County near Savannah, Georgia, potentially making it one of the company\u2019s largest infrastructure projects to date."
   ],
   "announcement_date_evidence": [
    "# Project Camellia: OpenAI Plans $30 Billion, 3.2-Gigawatt Data Center Near Savannah, Georgia",
    "Published on Jul 22, 2026"
   ]
  },
  {
   "url": "https://app.dealroom.co/news/feed/terawulf-stock-jumps-13-after-acquiring-1gw-ai-data-centre-site-in-kentucky",
   "title": "Dealroom.co | TeraWulf stock jumps 13% after acquiring 1GW AI data centre site in Kentucky",
   "published_at": null,
   "project": "Muskie Data Campus",
   "locality": "Eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": "Google",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# TeraWulf stock jumps 13% after acquiring 1GW AI data centre site in Kentucky",
    "TeraWulf shares jumped 8% to $24.86 after the Bitcoin miner-turned-AI infrastructure company announced the acquisition of the Muskie Data Campus, a hyperscale high-performance computing site in Eastern Kentucky."
   ],
   "locality_evidence": [
    "# TeraWulf stock jumps 13% after acquiring 1GW AI data centre site in Kentucky",
    "TeraWulf shares jumped 8% to $24.86 after the Bitcoin miner-turned-AI infrastructure company announced the acquisition of the Muskie Data Campus, a hyperscale high-performance computing site in Eastern Kentucky."
   ],
   "state_evidence": [
    "# TeraWulf stock jumps 13% after acquiring 1GW AI data centre site in Kentucky",
    "TeraWulf shares jumped 8% to $24.86 after the Bitcoin miner-turned-AI infrastructure company announced the acquisition of the Muskie Data Campus, a hyperscale high-performance computing site in Eastern Kentucky."
   ],
   "capacity_gw_evidence": [
    "# TeraWulf stock jumps 13% after acquiring 1GW AI data centre site in Kentucky",
    "The facility is expected to support over one gigawatt of data centre capacity, with initial 500 MW delivery targeted for late 2028."
   ],
   "builder_evidence": [
    "# TeraWulf stock jumps 13% after acquiring 1GW AI data centre site in Kentucky",
    "TeraWulf shares jumped 8% to $24.86 after the Bitcoin miner-turned-AI infrastructure company announced the acquisition of the Muskie Data Campus, a hyperscale high-performance computing site in Eastern Kentucky."
   ],
   "ai_customer_evidence": [
    "# TeraWulf stock jumps 13% after acquiring 1GW AI data centre site in Kentucky",
    "Google significantly backed the company in August 2025 with a $3.7 billion, 10-year AI hosting deal and took an 8% stake, later increased to 14%."
   ],
   "status_evidence": [
    "# TeraWulf stock jumps 13% after acquiring 1GW AI data centre site in Kentucky",
    "TeraWulf shares jumped 8% to $24.86 after the Bitcoin miner-turned-AI infrastructure company announced the acquisition of the Muskie Data Campus, a hyperscale high-performance computing site in Eastern Kentucky."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://investor.wedbush.com/wedbush/article/gnwcq-2025-3-17-iren-secures-275gw-for-data-centers-in-west-texas-with-new-600mw-grid-connection-agreement",
   "title": "IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
   "published_at": "2025-03-17T11:20:38",
   "project": "Sweetwater",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": "",
   "status": "advancing",
   "announcement_date": "2025-03-17",
   "project_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas.",
    "Sweetwater 2: Key Highlights"
   ],
   "locality_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas.",
    "Sweetwater 2: Key Highlights"
   ],
   "state_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas.",
    "Sweetwater 2: Key Highlights"
   ],
   "capacity_gw_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas.",
    "Sweetwater 2: Key Highlights"
   ],
   "builder_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas.",
    "Sweetwater 2: Key Highlights"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas.",
    "Sweetwater 2: Key Highlights"
   ],
   "announcement_date_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ]
  },
  {
   "url": "https://smbandme.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah.",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "Ray Conley, CEO of Creekstone, said, \"Creekstone designed the Delta Gigasite to be a net positive for Utah\u2014not just a facility that consumes resources, but one that contributes to the state's energy future.",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "capacity_gw_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://sustainabletechpartner.com/news/sustainable-technology-news-26-september-2025-ecl-iron-mountain-microsoft-wisetek-more",
   "title": "Sustainable Technology News 26 September 2025: ECL, Iron Mountain, Microsoft, Wisetek, More",
   "published_at": "2024-09-26T13:20:33",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "## A. Sustainable Technology, Talent, Partnerships and Green IT Alliances",
    "[ECL](http://www.ecldc.com) plans to build a \"fully sustainable\" 1GW AI Factory data center -- known as ECL TerraSite-TX1 -- on a 600+ acre site east of Houston."
   ],
   "locality_evidence": [
    "## A. Sustainable Technology, Talent, Partnerships and Green IT Alliances",
    "[ECL](http://www.ecldc.com) plans to build a \"fully sustainable\" 1GW AI Factory data center -- known as ECL TerraSite-TX1 -- on a 600+ acre site east of Houston."
   ],
   "state_evidence": [
    "## A. Sustainable Technology, Talent, Partnerships and Green IT Alliances",
    "[ECL](http://www.ecldc.com) plans to build a \"fully sustainable\" 1GW AI Factory data center -- known as ECL TerraSite-TX1 -- on a 600+ acre site east of Houston."
   ],
   "capacity_gw_evidence": [
    "## A. Sustainable Technology, Talent, Partnerships and Green IT Alliances",
    "[ECL](http://www.ecldc.com) plans to build a \"fully sustainable\" 1GW AI Factory data center -- known as ECL TerraSite-TX1 -- on a 600+ acre site east of Houston."
   ],
   "builder_evidence": [
    "## A. Sustainable Technology, Talent, Partnerships and Green IT Alliances",
    "[ECL](http://www.ecldc.com) plans to build a \"fully sustainable\" 1GW AI Factory data center -- known as ECL TerraSite-TX1 -- on a 600+ acre site east of Houston."
   ],
   "ai_customer_evidence": [
    "## A. Sustainable Technology, Talent, Partnerships and Green IT Alliances",
    "[ECL](http://www.ecldc.com) plans to build a \"fully sustainable\" 1GW AI Factory data center -- known as ECL TerraSite-TX1 -- on a 600+ acre site east of Houston.",
    "[Lambda](https://lambdalabs.com/) will be the first tenant."
   ],
   "status_evidence": [
    "## A. Sustainable Technology, Talent, Partnerships and Green IT Alliances",
    "[ECL](http://www.ecldc.com) plans to build a \"fully sustainable\" 1GW AI Factory data center -- known as ECL TerraSite-TX1 -- on a 600+ acre site east of Houston."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://edgen.tech/es/news/post/google-backs-15-billion-anthropic-data-center-loan-in-texas",
   "title": "Google backs $15 billion Anthropic data center loan in Texas",
   "published_at": "2026-07-31T06:53:04",
   "project": "Hubbard",
   "locality": "Hubbard",
   "state": "Texas",
   "capacity_gw": 1.6,
   "builder": "Nexus Data Centers",
   "ai_customer": "Anthropic",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "Google backs $15 billion Anthropic data center loan in Texas",
    "The deal, reported by the Wall Street Journal citing people familiar with the matter, involves a Morgan Stanley-led consortium lending to Nexus Data Centers for the Hubbard, Texas campus, which includes a 1.6-gigawatt natural-gas power plant."
   ],
   "locality_evidence": [
    "Google backs $15 billion Anthropic data center loan in Texas",
    "The deal, reported by the Wall Street Journal citing people familiar with the matter, involves a Morgan Stanley-led consortium lending to Nexus Data Centers for the Hubbard, Texas campus, which includes a 1.6-gigawatt natural-gas power plant."
   ],
   "state_evidence": [
    "Google backs $15 billion Anthropic data center loan in Texas",
    "The deal, reported by the Wall Street Journal citing people familiar with the matter, involves a Morgan Stanley-led consortium lending to Nexus Data Centers for the Hubbard, Texas campus, which includes a 1.6-gigawatt natural-gas power plant."
   ],
   "capacity_gw_evidence": [
    "Google backs $15 billion Anthropic data center loan in Texas",
    "The deal, reported by the Wall Street Journal citing people familiar with the matter, involves a Morgan Stanley-led consortium lending to Nexus Data Centers for the Hubbard, Texas campus, which includes a 1.6-gigawatt natural-gas power plant."
   ],
   "builder_evidence": [
    "Google backs $15 billion Anthropic data center loan in Texas",
    "The deal, reported by the Wall Street Journal citing people familiar with the matter, involves a Morgan Stanley-led consortium lending to Nexus Data Centers for the Hubbard, Texas campus, which includes a 1.6-gigawatt natural-gas power plant."
   ],
   "ai_customer_evidence": [
    "Google backs $15 billion Anthropic data center loan in Texas",
    "Morgan Stanley-led banks are in talks to lend $15 billion for an Anthropic data center campus in Texas, backed by Google guarantees."
   ],
   "status_evidence": [
    "Google backs $15 billion Anthropic data center loan in Texas",
    "Construction in Hubbard began in early 2025."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://primexbt.com/news/nvidia-backs-financing-for-openais-20-year-ohio-data-center-lease",
   "title": "Nvidia Backs Financing For OpenAI\u2019s 20-Year Ohio Data Center Lease",
   "published_at": "2026-08-17T15:08:22",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike City",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "SB Energy will build and manage the site at the PORTS-Pike Technology Campus in Pike City under a 20-year lease to OpenAI."
   ],
   "locality_evidence": [
    "SB Energy will build and manage the site at the PORTS-Pike Technology Campus in Pike City under a 20-year lease to OpenAI."
   ],
   "state_evidence": [
    "Nvidia will supply the credit and compute behind a new OpenAI data center in Ohio, backing an initial 4.25 gigawatts of capacity with an option for 3.75 gigawatts more."
   ],
   "capacity_gw_evidence": [
    "Nvidia will supply the credit and compute behind a new OpenAI data center in Ohio, backing an initial 4.25 gigawatts of capacity with an option for 3.75 gigawatts more.",
    "The credit backs an [initial 4.25 gigawatts of computing capacity, with the option for an additional 3.75 gigawatts](https://www.cnbc.com/2026/08/17/nvidia-financing-open-ai-data-center-ohio.html), and capacity is expected online in phases starting in 2028."
   ],
   "builder_evidence": [
    "SB Energy will build and run the site under a 20-year lease to OpenAI, with Nvidia's guarantee on the deal capped at $105 billion.",
    "SB Energy will build and manage the site at the PORTS-Pike Technology Campus in Pike City under a 20-year lease to OpenAI."
   ],
   "ai_customer_evidence": [
    "Nvidia will supply the credit and compute behind a new OpenAI data center in Ohio, backing an initial 4.25 gigawatts of capacity with an option for 3.75 gigawatts more.",
    "SB Energy will build and run the site under a 20-year lease to OpenAI, with Nvidia's guarantee on the deal capped at $105 billion."
   ],
   "status_evidence": [
    "Nvidia will supply the credit and compute behind a new OpenAI data center in Ohio, backing an initial 4.25 gigawatts of capacity with an option for 3.75 gigawatts more."
   ],
   "announcement_date_evidence": [
    "Nvidia [said Monday it will provide the credit and compute for a new OpenAI data center in Ohio](https://www.cnbc.com/2026/08/17/nvidia-financing-open-ai-data-center-ohio.html), extending its run of financing deals for the AI buildout."
   ]
  },
  {
   "url": "https://blockport.io/latest-news/meta-13b-financing-el-paso-data-center-expansion",
   "title": "Meta Secures $13B Financing for El Paso Data Center",
   "published_at": "2026-05-05T02:07:17",
   "project": "El Paso data center",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "expanding",
   "announcement_date": "2025-10-01",
   "project_evidence": [
    "# Meta Secures $13B Financing for El Paso Data Center",
    "Meta secured about $13 billion in mostly debt financing from Morgan Stanley and JPMorgan to expand its El Paso data center campus to roughly one gigawatt."
   ],
   "locality_evidence": [
    "# Meta Secures $13B Financing for El Paso Data Center",
    "Meta secured about $13 billion in mostly debt financing from Morgan Stanley and JPMorgan to expand its El Paso data center campus to roughly one gigawatt."
   ],
   "state_evidence": [
    "# Meta Secures $13B Financing for El Paso Data Center",
    "Meta secured about $13 billion in mostly debt financing from Morgan Stanley and JPMorgan to expand its El Paso data center campus to roughly one gigawatt."
   ],
   "capacity_gw_evidence": [
    "# Meta Secures $13B Financing for El Paso Data Center",
    "Meta secured about $13 billion in mostly debt financing from Morgan Stanley and JPMorgan to expand its El Paso data center campus to roughly one gigawatt."
   ],
   "builder_evidence": [
    "# Meta Secures $13B Financing for El Paso Data Center",
    "Meta secured about $13 billion in mostly debt financing from Morgan Stanley and JPMorgan to expand its El Paso data center campus to roughly one gigawatt."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Meta Secures $13B Financing for El Paso Data Center",
    "Meta secured about $13 billion in mostly debt financing from Morgan Stanley and JPMorgan to expand its El Paso data center campus to roughly one gigawatt."
   ],
   "announcement_date_evidence": [
    "# Meta Secures $13B Financing for El Paso Data Center",
    "The size of the deal is about eight times Meta\u2019s initial $1.5 billion commitment to the site announced in October 2025."
   ]
  },
  {
   "url": "https://indianacitizen.org/uncertain-future-new-carlisle-offer-lessons-to-other-communities-as-data-centers-arrive",
   "title": "UNCERTAIN FUTURE: New Carlisle offers lessons to other communities as data centers arrive",
   "published_at": "2026-07-16T01:45:41",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon Web Services",
   "ai_customer": null,
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "In 18 months, empty fields just outside the township started to take shape into Amazon Web Services\u2019 (AWS) Project Rainier, a 1,200-acre data center cluster used to train artificial intelligence models.",
    "This story about the impact of a massive data center building project in New Carlisle is the final installment in a three-part series by TheStatehouseFile.com."
   ],
   "locality_evidence": [
    "NEW CARLISLE, Indiana\u2014Back behind the walnuts and the rough bark of hickory trees, Riley Thompson and much of his extended family inhabit 120 acres of woods on the outskirts of New Carlisle.",
    "This story about the impact of a massive data center building project in New Carlisle is the final installment in a three-part series by TheStatehouseFile.com."
   ],
   "state_evidence": [
    "NEW CARLISLE, Indiana\u2014Back behind the walnuts and the rough bark of hickory trees, Riley Thompson and much of his extended family inhabit 120 acres of woods on the outskirts of New Carlisle.",
    "This story about the impact of a massive data center building project in New Carlisle is the final installment in a three-part series by TheStatehouseFile.com."
   ],
   "capacity_gw_evidence": [
    "When fully operational, Project Rainier expects to use up to 2.2 gigawatts of energy per year, enough to power 1 million homes.",
    "This story about the impact of a massive data center building project in New Carlisle is the final installment in a three-part series by TheStatehouseFile.com."
   ],
   "builder_evidence": [
    "In 18 months, empty fields just outside the township started to take shape into Amazon Web Services\u2019 (AWS) Project Rainier, a 1,200-acre data center cluster used to train artificial intelligence models.",
    "This story about the impact of a massive data center building project in New Carlisle is the final installment in a three-part series by TheStatehouseFile.com."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The old growth and chirping birds hide what is just around the corner\u2014one of the world\u2019s largest operational AI data centers.",
    "This story about the impact of a massive data center building project in New Carlisle is the final installment in a three-part series by TheStatehouseFile.com."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://techgarden.online/notes/texas-ai-super-build-2026",
   "title": "The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
   "published_at": null,
   "project": "Stargate Abilene (Crusoe/OpenAI/Oracle)",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe",
   "ai_customer": "OpenAI/Oracle",
   "status": "under construction or in advanced planning",
   "announcement_date": null,
   "project_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Stargate Abilene (Crusoe/OpenAI/Oracle) | Abilene | 1.2 GW | 8 | ~4 million | ~$32B |"
   ],
   "locality_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Stargate Abilene (Crusoe/OpenAI/Oracle) | Abilene | 1.2 GW | 8 | ~4 million | ~$32B |"
   ],
   "state_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Stargate Abilene (Crusoe/OpenAI/Oracle) | Abilene | 1.2 GW | 8 | ~4 million | ~$32B |"
   ],
   "capacity_gw_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Stargate Abilene (Crusoe/OpenAI/Oracle) | Abilene | 1.2 GW | 8 | ~4 million | ~$32B |"
   ],
   "builder_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Stargate Abilene (Crusoe/OpenAI/Oracle) | Abilene | 1.2 GW | 8 | ~4 million | ~$32B |"
   ],
   "ai_customer_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Stargate Abilene (Crusoe/OpenAI/Oracle) | Abilene | 1.2 GW | 8 | ~4 million | ~$32B |"
   ],
   "status_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Stargate Abilene (Crusoe/OpenAI/Oracle) | Abilene | 1.2 GW | 8 | ~4 million | ~$32B |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://techgarden.online/notes/texas-ai-super-build-2026",
   "title": "The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
   "published_at": null,
   "project": "Meta \"Project Seafox\"",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "",
   "status": "under construction or in advanced planning",
   "announcement_date": null,
   "project_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Meta \"Project Seafox\" | El Paso | 1.0 GW | 12 | 25.9 million | $10B |"
   ],
   "locality_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Meta \"Project Seafox\" | El Paso | 1.0 GW | 12 | 25.9 million | $10B |"
   ],
   "state_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Meta \"Project Seafox\" | El Paso | 1.0 GW | 12 | 25.9 million | $10B |"
   ],
   "capacity_gw_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Meta \"Project Seafox\" | El Paso | 1.0 GW | 12 | 25.9 million | $10B |"
   ],
   "builder_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Meta \"Project Seafox\" | El Paso | 1.0 GW | 12 | 25.9 million | $10B |"
   ],
   "ai_customer_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Meta \"Project Seafox\" | El Paso | 1.0 GW | 12 | 25.9 million | $10B |"
   ],
   "status_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Meta \"Project Seafox\" | El Paso | 1.0 GW | 12 | 25.9 million | $10B |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://techgarden.online/notes/texas-ai-super-build-2026",
   "title": "The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
   "published_at": null,
   "project": "Vantage \"Frontier\"",
   "locality": "Shackelford Co.",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage",
   "ai_customer": "",
   "status": "under construction or in advanced planning",
   "announcement_date": null,
   "project_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Vantage \"Frontier\" | Shackelford Co. | 1.4 GW | 10 | 3.7 million | $25B |"
   ],
   "locality_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Vantage \"Frontier\" | Shackelford Co. | 1.4 GW | 10 | 3.7 million | $25B |"
   ],
   "state_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Vantage \"Frontier\" | Shackelford Co. | 1.4 GW | 10 | 3.7 million | $25B |"
   ],
   "capacity_gw_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Vantage \"Frontier\" | Shackelford Co. | 1.4 GW | 10 | 3.7 million | $25B |"
   ],
   "builder_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Vantage \"Frontier\" | Shackelford Co. | 1.4 GW | 10 | 3.7 million | $25B |"
   ],
   "ai_customer_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Vantage \"Frontier\" | Shackelford Co. | 1.4 GW | 10 | 3.7 million | $25B |"
   ],
   "status_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Vantage \"Frontier\" | Shackelford Co. | 1.4 GW | 10 | 3.7 million | $25B |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://techgarden.online/notes/texas-ai-super-build-2026",
   "title": "The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
   "published_at": null,
   "project": "Microsoft/Chevron",
   "locality": "Pecos",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Microsoft/Chevron",
   "ai_customer": "Microsoft",
   "status": "under construction or in advanced planning",
   "announcement_date": null,
   "project_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Microsoft/Chevron | Pecos | 2.0 GW | TBD | TBD | Multi-billion |"
   ],
   "locality_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Microsoft/Chevron | Pecos | 2.0 GW | TBD | TBD | Multi-billion |"
   ],
   "state_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Microsoft/Chevron | Pecos | 2.0 GW | TBD | TBD | Multi-billion |"
   ],
   "capacity_gw_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Microsoft/Chevron | Pecos | 2.0 GW | TBD | TBD | Multi-billion |"
   ],
   "builder_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Microsoft/Chevron | Pecos | 2.0 GW | TBD | TBD | Multi-billion |"
   ],
   "ai_customer_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Microsoft/Chevron | Pecos | 2.0 GW | TBD | TBD | Multi-billion |"
   ],
   "status_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Microsoft/Chevron | Pecos | 2.0 GW | TBD | TBD | Multi-billion |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://techgarden.online/notes/texas-ai-super-build-2026",
   "title": "The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
   "published_at": null,
   "project": "Hut 8 \"Beacon Point\"",
   "locality": "Nueces Co.",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": "",
   "status": "under construction or in advanced planning",
   "announcement_date": null,
   "project_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Hut 8 \"Beacon Point\" | Nueces Co. | 1.0 GW | Multi-phase | TBD | $9.8B (Phase 1) |"
   ],
   "locality_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Hut 8 \"Beacon Point\" | Nueces Co. | 1.0 GW | Multi-phase | TBD | $9.8B (Phase 1) |"
   ],
   "state_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Hut 8 \"Beacon Point\" | Nueces Co. | 1.0 GW | Multi-phase | TBD | $9.8B (Phase 1) |"
   ],
   "capacity_gw_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Hut 8 \"Beacon Point\" | Nueces Co. | 1.0 GW | Multi-phase | TBD | $9.8B (Phase 1) |"
   ],
   "builder_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Hut 8 \"Beacon Point\" | Nueces Co. | 1.0 GW | Multi-phase | TBD | $9.8B (Phase 1) |"
   ],
   "ai_customer_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Hut 8 \"Beacon Point\" | Nueces Co. | 1.0 GW | Multi-phase | TBD | $9.8B (Phase 1) |"
   ],
   "status_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Hut 8 \"Beacon Point\" | Nueces Co. | 1.0 GW | Multi-phase | TBD | $9.8B (Phase 1) |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://techgarden.online/notes/texas-ai-super-build-2026",
   "title": "The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
   "published_at": null,
   "project": "Crusoe/Lancium",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe/Lancium",
   "ai_customer": "",
   "status": "under construction or in advanced planning",
   "announcement_date": null,
   "project_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Crusoe/Lancium | Childress | 1.0 GW | TBD | 270 acres | TBD |"
   ],
   "locality_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Crusoe/Lancium | Childress | 1.0 GW | TBD | 270 acres | TBD |"
   ],
   "state_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Crusoe/Lancium | Childress | 1.0 GW | TBD | 270 acres | TBD |"
   ],
   "capacity_gw_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Crusoe/Lancium | Childress | 1.0 GW | TBD | 270 acres | TBD |"
   ],
   "builder_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Crusoe/Lancium | Childress | 1.0 GW | TBD | 270 acres | TBD |"
   ],
   "ai_customer_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Crusoe/Lancium | Childress | 1.0 GW | TBD | 270 acres | TBD |"
   ],
   "status_evidence": [
    "# The Texas AI Super-Build: Data Centers, Terafab, and the Greatest Industrial Project in American History",
    "Across Texas, at least seven gigawatt-scale AI data center campuses are under construction or in advanced planning:",
    "| Project | Location | Capacity | Buildings | Square Footage | Investment |",
    "| Crusoe/Lancium | Childress | 1.0 GW | TBD | 270 acres | TBD |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://ainvest.com/news/vantage-data-centers-unveils-25b-texas-mega-campus-ai-demand-2508",
   "title": "Vantage Data Centers Unveils $25B Texas Mega-campus for AI Demand",
   "published_at": "2025-08-19T11:08:03",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Construction has begun",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "Tuesday, Aug 19, 2025 7:08 am ET1min read DBRG-- Vantage Data Centers is investing $25B in a 1.4GW data center campus in Texas, \"Frontier,\" to meet AI demand.",
    "Dubbed \"Frontier,\" this 1.4 gigawatt (GW) campus is designed to meet the unprecedented demand for artificial intelligence (AI) infrastructure."
   ],
   "locality_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, has announced a significant investment of over $25 billion for a mega-scale data center campus in Shackelford County, Texas.",
    "Tuesday, Aug 19, 2025 7:08 am ET1min read DBRG-- Vantage Data Centers is investing $25B in a 1.4GW data center campus in Texas, \"Frontier,\" to meet AI demand."
   ],
   "state_evidence": [
    "Tuesday, Aug 19, 2025 7:08 am ET1min read DBRG-- Vantage Data Centers is investing $25B in a 1.4GW data center campus in Texas, \"Frontier,\" to meet AI demand.",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, has announced a significant investment of over $25 billion for a mega-scale data center campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "Tuesday, Aug 19, 2025 7:08 am ET1min read DBRG-- Vantage Data Centers is investing $25B in a 1.4GW data center campus in Texas, \"Frontier,\" to meet AI demand.",
    "Dubbed \"Frontier,\" this 1.4 gigawatt (GW) campus is designed to meet the unprecedented demand for artificial intelligence (AI) infrastructure."
   ],
   "builder_evidence": [
    "Tuesday, Aug 19, 2025 7:08 am ET1min read DBRG-- Vantage Data Centers is investing $25B in a 1.4GW data center campus in Texas, \"Frontier,\" to meet AI demand.",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, has announced a significant investment of over $25 billion for a mega-scale data center campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction has begun, with the first building scheduled for delivery in 2026.",
    "Tuesday, Aug 19, 2025 7:08 am ET1min read DBRG-- Vantage Data Centers is investing $25B in a 1.4GW data center campus in Texas, \"Frontier,\" to meet AI demand."
   ],
   "announcement_date_evidence": [
    "Tuesday, Aug 19, 2025 7:08 am ET1min read DBRG-- Vantage Data Centers is investing $25B in a 1.4GW data center campus in Texas, \"Frontier,\" to meet AI demand."
   ]
  },
  {
   "url": "https://substack.com/redirect/d1a2f72f-8e5b-4901-94b2-9ca362d4b14f?j=eyJ1IjoiM3djM2MxIn0.OGuf1Irm-qb700DahBb35RT9QTn8SiZLleBWozyCeUk",
   "title": "Fermi secures preliminary approval for 6GW of natural gas generation at up to 11GW campus in Amarillo, Texas",
   "published_at": "2026-05-21T00:28:06",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Fermi\u2019s Project Matador is one of the most ambitious data center campuses planned anywhere in the world.",
    "Fermi America, the developer behind the planned up to 11GW data center campus in Amarillo, Texas, has been granted preliminary approval for 6GW of clean natural gas-based power generation from the Texas Commission on Environmental Quality (TCEQ)."
   ],
   "locality_evidence": [
    "Fermi America, the developer behind the planned up to 11GW data center campus in Amarillo, Texas, has been granted preliminary approval for 6GW of clean natural gas-based power generation from the Texas Commission on Environmental Quality (TCEQ)."
   ],
   "state_evidence": [
    "Fermi America, the developer behind the planned up to 11GW data center campus in Amarillo, Texas, has been granted preliminary approval for 6GW of clean natural gas-based power generation from the Texas Commission on Environmental Quality (TCEQ)."
   ],
   "capacity_gw_evidence": [
    "Fermi America, the developer behind the planned up to 11GW data center campus in Amarillo, Texas, has been granted preliminary approval for 6GW of clean natural gas-based power generation from the Texas Commission on Environmental Quality (TCEQ).",
    "If realized, the project will span 18 million sq ft (1.67 million sqm) and have a capacity of up to 11GW."
   ],
   "builder_evidence": [
    "Fermi America, the developer behind the planned up to 11GW data center campus in Amarillo, Texas, has been granted preliminary approval for 6GW of clean natural gas-based power generation from the Texas Commission on Environmental Quality (TCEQ)."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Fermi America, the developer behind the planned up to 11GW data center campus in Amarillo, Texas, has been granted preliminary approval for 6GW of clean natural gas-based power generation from the Texas Commission on Environmental Quality (TCEQ)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://finanznachrichten.de/nachrichten-2026-03/67956954-nscale-and-microsoft-announce-collaboration-with-nvidia-and-caterpillar-to-deliver-1-35gw-of-nvidia-vera-rubin-nvl72-gpus-at-flagship-ai-factory-campu-008.htm",
   "title": "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
   "published_at": null,
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "announced",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "Nscale Acquires the Monarch Compute Campus - America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design.",
    "Nscale today also announced the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "locality_evidence": [
    "Nscale Acquires the Monarch Compute Campus - America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also announced the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "state_evidence": [
    "Nscale Acquires the Monarch Compute Campus - America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design.",
    "Nscale today also announced the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "capacity_gw_evidence": [
    "Nscale Acquires the Monarch Compute Campus - America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also announced the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts.",
    "The expansion capabilities of this site - which has the potential for a total power draw of 8GW - will allow Nscale to develop power capacity rapidly while supporting one of the largest announced AI compute deployments in the market today."
   ],
   "builder_evidence": [
    "Nscale Acquires the Monarch Compute Campus - America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also announced the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts.",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "ai_customer_evidence": [
    "Nscale Acquires the Monarch Compute Campus - America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ],
   "status_evidence": [
    "Nscale Acquires the Monarch Compute Campus - America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also announced the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "announcement_date_evidence": [
    "Nscale Acquires the Monarch Compute Campus - America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ]
  },
  {
   "url": "https://printhereum.com/kevin-oleary-utah-ai-campus-gets-approved",
   "title": "Kevin O\u2019Leary launches Stratos to beat China",
   "published_at": null,
   "project": "Stratos",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "Kevin O\u2019Leary Digital",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "locality_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "state_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "capacity_gw_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "The campus will generate up to 9 gigawatts at full buildout, more than twice Utah\u2019s current total electricity consumption, powered by an on-site natural gas pipeline.",
    "The campus, designated through Utah\u2019s Military Installation Development Authority, spans more than 40,000 acres and will reach 9 gigawatts of generation capacity at full buildout."
   ],
   "builder_evidence": [
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://gangstaai.org/news/openai-30-billion-georgia-project-camellia-presence-enterprise-agents",
   "title": "OpenAI Just Committed $30 Billion to One Georgia Data Center \u2014 and Started Selling Agents by the Hour",
   "published_at": "2026-07-24T14:18:18",
   "project": "Project Camellia",
   "locality": null,
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "OpenAI Just Committed $30 Billion to One Georgia Data Center \u2014 and Started Selling Agents by the Hour",
    "The company announced **Project Camellia**, a plan to spend **more than $30 billion** building a single super data center in Georgia \u2014 3.2 gigawatts of power, enough to run a mid-sized city, phased in between 2028 and 2032."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "OpenAI Just Committed $30 Billion to One Georgia Data Center \u2014 and Started Selling Agents by the Hour",
    "The company announced **Project Camellia**, a plan to spend **more than $30 billion** building a single super data center in Georgia \u2014 3.2 gigawatts of power, enough to run a mid-sized city, phased in between 2028 and 2032."
   ],
   "capacity_gw_evidence": [
    "OpenAI Just Committed $30 Billion to One Georgia Data Center \u2014 and Started Selling Agents by the Hour",
    "The company announced **Project Camellia**, a plan to spend **more than $30 billion** building a single super data center in Georgia \u2014 3.2 gigawatts of power, enough to run a mid-sized city, phased in between 2028 and 2032."
   ],
   "builder_evidence": [
    "OpenAI Just Committed $30 Billion to One Georgia Data Center \u2014 and Started Selling Agents by the Hour",
    "The company announced **Project Camellia**, a plan to spend **more than $30 billion** building a single super data center in Georgia \u2014 3.2 gigawatts of power, enough to run a mid-sized city, phased in between 2028 and 2032."
   ],
   "ai_customer_evidence": [
    "OpenAI Just Committed $30 Billion to One Georgia Data Center \u2014 and Started Selling Agents by the Hour",
    "The company announced **Project Camellia**, a plan to spend **more than $30 billion** building a single super data center in Georgia \u2014 3.2 gigawatts of power, enough to run a mid-sized city, phased in between 2028 and 2032."
   ],
   "status_evidence": [
    "OpenAI Just Committed $30 Billion to One Georgia Data Center \u2014 and Started Selling Agents by the Hour",
    "The company announced **Project Camellia**, a plan to spend **more than $30 billion** building a single super data center in Georgia \u2014 3.2 gigawatts of power, enough to run a mid-sized city, phased in between 2028 and 2032."
   ],
   "announcement_date_evidence": [
    "OpenAI Just Committed $30 Billion to One Georgia Data Center \u2014 and Started Selling Agents by the Hour",
    "And on July 22, OpenAI told us plainly: it is afraid of becoming a commodity."
   ]
  },
  {
   "url": "https://heraldnews.com/story/money/business/2026/03/17/google-reveals-project-cannoli-data-center/89185890007",
   "title": "Google reveals it is behind big 'Project Cannoli' data center project",
   "published_at": "2026-03-17T12:02:18",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": null,
   "status": "preliminary site plan approval",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "locality_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "state_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google also said Tuesday that it is creating a $10 million Energy Impact Fund for local organizations to tap into with the aim of lowering monthly utility bills for Michiganders."
   ],
   "capacity_gw_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "builder_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "The data center would be developed for Google by Panattoni Development Co."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "The township's Planning Commission voted 5-2 on Feb. 11 to give a preliminary site plan approval for the project."
   ],
   "announcement_date_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Updated March 17, 2026, 2:27 p.m. ET",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ]
  },
  {
   "url": "https://gate.com/blog/bitcoin-mining-firms-ai-transition-electricity-assets-to-computing-infrastructure-restructuring-analysis",
   "title": "A Comprehensive Overview of Bitcoin Miners Pivoting to AI: Reshaping from Power Assets to Compute Infrastructure",
   "published_at": "2026-05-27T08:49:07",
   "project": "Muskie Data Park",
   "locality": null,
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-26",
   "project_evidence": [
    "## Three Industry Transformation Maps: TeraWulf, Core Scientific, IREN",
    "On May 26, 2026, TeraWulf announced the acquisition of a 285-acre site in eastern Kentucky, where it plans to build the \"Muskie Data Park\"\u2014an AI and HPC data center project with a total planned power capacity exceeding 1GW."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "## Three Industry Transformation Maps: TeraWulf, Core Scientific, IREN",
    "On May 26, 2026, TeraWulf announced the acquisition of a 285-acre site in eastern Kentucky, where it plans to build the \"Muskie Data Park\"\u2014an AI and HPC data center project with a total planned power capacity exceeding 1GW."
   ],
   "capacity_gw_evidence": [
    "## Three Industry Transformation Maps: TeraWulf, Core Scientific, IREN",
    "On May 26, 2026, TeraWulf announced the acquisition of a 285-acre site in eastern Kentucky, where it plans to build the \"Muskie Data Park\"\u2014an AI and HPC data center project with a total planned power capacity exceeding 1GW."
   ],
   "builder_evidence": [
    "## Three Industry Transformation Maps: TeraWulf, Core Scientific, IREN",
    "On May 26, 2026, TeraWulf announced the acquisition of a 285-acre site in eastern Kentucky, where it plans to build the \"Muskie Data Park\"\u2014an AI and HPC data center project with a total planned power capacity exceeding 1GW."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Three Industry Transformation Maps: TeraWulf, Core Scientific, IREN",
    "On May 26, 2026, TeraWulf announced the acquisition of a 285-acre site in eastern Kentucky, where it plans to build the \"Muskie Data Park\"\u2014an AI and HPC data center project with a total planned power capacity exceeding 1GW."
   ],
   "announcement_date_evidence": [
    "## Three Industry Transformation Maps: TeraWulf, Core Scientific, IREN",
    "On May 26, 2026, TeraWulf announced the acquisition of a 285-acre site in eastern Kentucky, where it plans to build the \"Muskie Data Park\"\u2014an AI and HPC data center project with a total planned power capacity exceeding 1GW."
   ]
  },
  {
   "url": "https://simplywall.st/stocks/us/software/nasdaq-hut/hut-8/news/why-hut-8-hut-is-up-203-after-fully-leasing-its-1gw-ai-data",
   "title": "Why Hut 8 (HUT) Is Up 20.3% After Fully Leasing Its 1\u2011GW AI Data Center Campus",
   "published_at": "2026-07-25T15:25:01",
   "project": "Beacon Point",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8 Corp.",
   "ai_customer": null,
   "status": "fully commercialized",
   "announcement_date": null,
   "project_evidence": [
    "# Why Hut 8 (HUT) Is Up 20.3% After Fully Leasing Its 1\u2011GW AI Data Center Campus",
    "- Hut 8 Corp. recently announced it has fully commercialized its one\u2011gigawatt Beacon Point data center campus in Texas by signing a second 15\u2011year triple-net lease for 352 MW of IT capacity with the same high\u2011investment\u2011grade tenant, bringing the campus\u2019s total contracted capacity to 704 MW and a base-term contract value of US$19.60 billion."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# Why Hut 8 (HUT) Is Up 20.3% After Fully Leasing Its 1\u2011GW AI Data Center Campus",
    "- Hut 8 Corp. recently announced it has fully commercialized its one\u2011gigawatt Beacon Point data center campus in Texas by signing a second 15\u2011year triple-net lease for 352 MW of IT capacity with the same high\u2011investment\u2011grade tenant, bringing the campus\u2019s total contracted capacity to 704 MW and a base-term contract value of US$19.60 billion."
   ],
   "capacity_gw_evidence": [
    "# Why Hut 8 (HUT) Is Up 20.3% After Fully Leasing Its 1\u2011GW AI Data Center Campus",
    "- Hut 8 Corp. recently announced it has fully commercialized its one\u2011gigawatt Beacon Point data center campus in Texas by signing a second 15\u2011year triple-net lease for 352 MW of IT capacity with the same high\u2011investment\u2011grade tenant, bringing the campus\u2019s total contracted capacity to 704 MW and a base-term contract value of US$19.60 billion."
   ],
   "builder_evidence": [
    "# Why Hut 8 (HUT) Is Up 20.3% After Fully Leasing Its 1\u2011GW AI Data Center Campus",
    "- Hut 8 Corp. recently announced it has fully commercialized its one\u2011gigawatt Beacon Point data center campus in Texas by signing a second 15\u2011year triple-net lease for 352 MW of IT capacity with the same high\u2011investment\u2011grade tenant, bringing the campus\u2019s total contracted capacity to 704 MW and a base-term contract value of US$19.60 billion."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Why Hut 8 (HUT) Is Up 20.3% After Fully Leasing Its 1\u2011GW AI Data Center Campus",
    "- Hut 8 Corp. recently announced it has fully commercialized its one\u2011gigawatt Beacon Point data center campus in Texas by signing a second 15\u2011year triple-net lease for 352 MW of IT capacity with the same high\u2011investment\u2011grade tenant, bringing the campus\u2019s total contracted capacity to 704 MW and a base-term contract value of US$19.60 billion."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://livenews.co.nz/2025/03/18/nz-au-iren-secures-2-75gw-for-data-centers-in-west-texas-with-new-600mw-grid-connection-agreement",
   "title": "NZ-AU: IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
   "published_at": "2025-03-18T00:00:00",
   "project": "Sweetwater",
   "locality": "West Texas",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "advancing",
   "announcement_date": "2025-03-17",
   "project_evidence": [
    "Post",
    "# NZ-AU: IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "locality_evidence": [
    "Post",
    "# NZ-AU: IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "state_evidence": [
    "Post",
    "# NZ-AU: IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "capacity_gw_evidence": [
    "Post",
    "# NZ-AU: IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "builder_evidence": [
    "Post",
    "# NZ-AU: IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Post",
    "# NZ-AU: IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "announcement_date_evidence": [
    "Post",
    "# NZ-AU: IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) \u2014 IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ]
  },
  {
   "url": "https://daily-tribune.com/online_features/press_releases/enchant-energy-offers-a-carbon-answer-to-americas-surging-ai-data-center-demand/article_113fcb65-d043-529c-9c63-8747f2d1682e.html",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": "2026-05-27T19:28:19",
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://power-to-x.com/ecl-builds-a-hydrogen-powered-data-center-with-1-GW-capacity",
   "title": "ECL builds a hydrogen-powered data center with 1 GW capacity",
   "published_at": "2024-10-01T09:26:32",
   "project": "TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Edge Cloud Link Inc.",
   "ai_customer": "Lambda Inc.",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "The project, called \"TerraSite-TX1,\" is being built east of Houston, Texas, on an area of \u200b\u200b600 hectares as a \"data center-as-a-service.\"",
    "**(Mountain View / USA) \u2013** California-based Edge Cloud Link Inc. (ECL) plans to build a hydrogen-powered data center with a capacity of one gigawatt."
   ],
   "locality_evidence": [
    "The project, called \"TerraSite-TX1,\" is being built east of Houston, Texas, on an area of \u200b\u200b600 hectares as a \"data center-as-a-service.\"",
    "**(Mountain View / USA) \u2013** California-based Edge Cloud Link Inc. (ECL) plans to build a hydrogen-powered data center with a capacity of one gigawatt."
   ],
   "state_evidence": [
    "The project, called \"TerraSite-TX1,\" is being built east of Houston, Texas, on an area of \u200b\u200b600 hectares as a \"data center-as-a-service.\"",
    "**(Mountain View / USA) \u2013** California-based Edge Cloud Link Inc. (ECL) plans to build a hydrogen-powered data center with a capacity of one gigawatt."
   ],
   "capacity_gw_evidence": [
    "The initially planned output of one gigawatt can be modularly expanded in 1 MW steps up to two gigawatts, depending on customer demand.",
    "**(Mountain View / USA) \u2013** California-based Edge Cloud Link Inc. (ECL) plans to build a hydrogen-powered data center with a capacity of one gigawatt."
   ],
   "builder_evidence": [
    "**(Mountain View / USA) \u2013** California-based Edge Cloud Link Inc. (ECL) plans to build a hydrogen-powered data center with a capacity of one gigawatt.",
    "The project, called \"TerraSite-TX1,\" is being built east of Houston, Texas, on an area of \u200b\u200b600 hectares as a \"data center-as-a-service.\""
   ],
   "ai_customer_evidence": [
    "According to the company, the first tenant is AI specialist Lambda Inc.",
    "**(Mountain View / USA) \u2013** California-based Edge Cloud Link Inc. (ECL) plans to build a hydrogen-powered data center with a capacity of one gigawatt."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://sacbee.com/news/business/article316739447.html",
   "title": "Morgan Stanley leads $15B bet on Anthropic's Texas campus",
   "published_at": "2026-08-02T00:07:00",
   "project": null,
   "locality": "Hubbard",
   "state": "Texas",
   "capacity_gw": 1.6,
   "builder": "Nexus Data Centers",
   "ai_customer": "Anthropic",
   "status": "advanced talks",
   "announcement_date": "2026-07-30",
   "project_evidence": null,
   "locality_evidence": [
    "Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "state_evidence": [
    "Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "capacity_gw_evidence": [
    "Morgan Stanley leads $15B bet on Anthropic's Texas campus",
    "The guarantees cover [four Anthropic data center leases](https://www.reuters.com/legal/litigation/banks-talks-lend-15-billion-anthropic-data-center-backed-by-google-wsj-reports-2026-07-30/) and the power purchase agreements tied to an on-site natural gas plant with 1.6 gigawatts of capacity."
   ],
   "builder_evidence": [
    "Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "ai_customer_evidence": [
    "Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "status_evidence": [
    "Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "announcement_date_evidence": [
    "Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ]
  },
  {
   "url": "https://agentsai.fyi/news/nvidia-105-billion-openai-ohio-data-center-2026-08-17",
   "title": "Nvidia Backs OpenAI's Ohio Data Center With Up to $105 Billion in Financing",
   "published_at": "2026-08-17T00:00:00",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "Nvidia Backs OpenAI's Ohio Data Center With Up to $105 Billion in Financing",
    "The campus, called PORTS-Pike Technology Campus, will be built and operated by SoftBank-backed SB Energy rather than Nvidia or OpenAI directly."
   ],
   "locality_evidence": [
    "Nvidia Backs OpenAI's Ohio Data Center With Up to $105 Billion in Financing",
    "Nvidia will guarantee up to $105 billion in credit for a new SB Energy-built data center in Pike County, Ohio, that OpenAI will lease exclusively, deepening the circular financing ties between the chipmaker and its largest AI customer."
   ],
   "state_evidence": [
    "Nvidia Backs OpenAI's Ohio Data Center With Up to $105 Billion in Financing",
    "Nvidia will guarantee up to $105 billion in credit for a new SB Energy-built data center in Pike County, Ohio, that OpenAI will lease exclusively, deepening the circular financing ties between the chipmaker and its largest AI customer."
   ],
   "capacity_gw_evidence": [
    "Nvidia Backs OpenAI's Ohio Data Center With Up to $105 Billion in Financing",
    "Nvidia's role is to guarantee financing covering land, power and shell construction for an initial 4.25 gigawatts of capacity, with an option to extend the guarantee to a further 3.75 gigawatts, bringing the site's planned total to 8 gigawatts."
   ],
   "builder_evidence": [
    "Nvidia Backs OpenAI's Ohio Data Center With Up to $105 Billion in Financing",
    "The campus, called PORTS-Pike Technology Campus, will be built and operated by SoftBank-backed SB Energy rather than Nvidia or OpenAI directly."
   ],
   "ai_customer_evidence": [
    "Nvidia Backs OpenAI's Ohio Data Center With Up to $105 Billion in Financing",
    "Nvidia will guarantee up to $105 billion in credit for a new SB Energy-built data center in Pike County, Ohio, that OpenAI will lease exclusively, deepening the circular financing ties between the chipmaker and its largest AI customer."
   ],
   "status_evidence": [
    "Nvidia Backs OpenAI's Ohio Data Center With Up to $105 Billion in Financing",
    "Nvidia's role is to guarantee financing covering land, power and shell construction for an initial 4.25 gigawatts of capacity, with an option to extend the guarantee to a further 3.75 gigawatts, bringing the site's planned total to 8 gigawatts."
   ],
   "announcement_date_evidence": [
    "Nvidia Backs OpenAI's Ohio Data Center With Up to $105 Billion in Financing",
    "AgentsAI NewsroomAugust 17, 20263 min read",
    "Nvidia said August 17 it will guarantee up to $105 billion in credit to support a new AI data center campus in Pike County, Ohio, that OpenAI has agreed to lease exclusively for 20 years \u2014 one of the largest single infrastructure financing commitments of the AI buildout so far."
   ]
  },
  {
   "url": "https://hpcwire.com/off-the-wire/nvidia-invests-1-5b-in-sb-energy-secures-ohio-ai-infrastructure-for-openai",
   "title": "HPCwire - Since 1987 \u2013 Covering the Fastest Computers in the World and the People Who Run Them",
   "published_at": "2026-08-17T18:11:52",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 4.25,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "## Off the Wire Press Releases **",
    "## NVIDIA Invests $1.5B in SB Energy, Secures Ohio AI Infrastructure for OpenAI",
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 \u2014 [NVIDIA](https://www.nvidia.com/) today announced that it has secured land, power and shell (LPS) capacity through a partnership with [SB Energy](http://www.sbenergy.com) at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "locality_evidence": [
    "## Off the Wire Press Releases **",
    "## NVIDIA Invests $1.5B in SB Energy, Secures Ohio AI Infrastructure for OpenAI",
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 \u2014 [NVIDIA](https://www.nvidia.com/) today announced that it has secured land, power and shell (LPS) capacity through a partnership with [SB Energy](http://www.sbenergy.com) at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "state_evidence": [
    "## Off the Wire Press Releases **",
    "## NVIDIA Invests $1.5B in SB Energy, Secures Ohio AI Infrastructure for OpenAI",
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 \u2014 [NVIDIA](https://www.nvidia.com/) today announced that it has secured land, power and shell (LPS) capacity through a partnership with [SB Energy](http://www.sbenergy.com) at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "capacity_gw_evidence": [
    "## Off the Wire Press Releases **",
    "## NVIDIA Invests $1.5B in SB Energy, Secures Ohio AI Infrastructure for OpenAI",
    "The initial deployment is designed to support 4.25 IT-GW of AI factory capacity."
   ],
   "builder_evidence": [
    "## Off the Wire Press Releases **",
    "## NVIDIA Invests $1.5B in SB Energy, Secures Ohio AI Infrastructure for OpenAI",
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 \u2014 [NVIDIA](https://www.nvidia.com/) today announced that it has secured land, power and shell (LPS) capacity through a partnership with [SB Energy](http://www.sbenergy.com) at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "ai_customer_evidence": [
    "## Off the Wire Press Releases **",
    "## NVIDIA Invests $1.5B in SB Energy, Secures Ohio AI Infrastructure for OpenAI",
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 \u2014 [NVIDIA](https://www.nvidia.com/) today announced that it has secured land, power and shell (LPS) capacity through a partnership with [SB Energy](http://www.sbenergy.com) at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "status_evidence": [
    "## Off the Wire Press Releases **",
    "**Campus to Bring New Jobs and Benefits to Ohio**",
    "The planned capacity is expected to come online in phases beginning in 2028."
   ],
   "announcement_date_evidence": [
    "## Off the Wire Press Releases **",
    "## NVIDIA Invests $1.5B in SB Energy, Secures Ohio AI Infrastructure for OpenAI",
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 \u2014 [NVIDIA](https://www.nvidia.com/) today announced that it has secured land, power and shell (LPS) capacity through a partnership with [SB Energy](http://www.sbenergy.com) at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ]
  },
  {
   "url": "https://datacenterknowledge.com/data-center-construction/meta-building-new-gigawatt-sized-data-center-in-texas",
   "title": "Meta Building New Gigawatt-Sized Data Center in Texas",
   "published_at": "2025-10-15T15:00:00",
   "project": null,
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta Platforms",
   "ai_customer": "",
   "status": "under construction",
   "announcement_date": "2025-10-XX",
   "project_evidence": null,
   "locality_evidence": [
    "The Instagram parent will spend more than $1.5 billion on the new facility, which is being built in El Paso, Texas, the company said in a [blog post](https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/) Wednesday.",
    "(Bloomberg) -- Meta Platforms is building a new gigawatt-sized data center in Texas to advance its AI efforts, the latest in a string of significant investments by the company as it looks to keep pace in the competitive AI industry."
   ],
   "state_evidence": [
    "The Instagram parent will spend more than $1.5 billion on the new facility, which is being built in El Paso, Texas, the company said in a [blog post](https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/) Wednesday.",
    "(Bloomberg) -- Meta Platforms is building a new gigawatt-sized data center in Texas to advance its AI efforts, the latest in a string of significant investments by the company as it looks to keep pace in the competitive AI industry."
   ],
   "capacity_gw_evidence": [
    "The data center will eventually have 1 gigawatt of capacity to power high-end computing chips for AI-related projects, according to the post.",
    "(Bloomberg) -- Meta Platforms is building a new gigawatt-sized data center in Texas to advance its AI efforts, the latest in a string of significant investments by the company as it looks to keep pace in the competitive AI industry."
   ],
   "builder_evidence": [
    "(Bloomberg) -- Meta Platforms is building a new gigawatt-sized data center in Texas to advance its AI efforts, the latest in a string of significant investments by the company as it looks to keep pace in the competitive AI industry.",
    "The Instagram parent will spend more than $1.5 billion on the new facility, which is being built in El Paso, Texas, the company said in a [blog post](https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/) Wednesday."
   ],
   "ai_customer_evidence": [
    "(Bloomberg) -- Meta Platforms is building a new gigawatt-sized data center in Texas to advance its AI efforts, the latest in a string of significant investments by the company as it looks to keep pace in the competitive AI industry.",
    "The Instagram parent will spend more than $1.5 billion on the new facility, which is being built in El Paso, Texas, the company said in a [blog post](https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/) Wednesday."
   ],
   "status_evidence": [
    "(Bloomberg) -- Meta Platforms is building a new gigawatt-sized data center in Texas to advance its AI efforts, the latest in a string of significant investments by the company as it looks to keep pace in the competitive AI industry.",
    "The Instagram parent will spend more than $1.5 billion on the new facility, which is being built in El Paso, Texas, the company said in a [blog post](https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/) Wednesday."
   ],
   "announcement_date_evidence": [
    "The Instagram parent will spend more than $1.5 billion on the new facility, which is being built in El Paso, Texas, the company said in a [blog post](https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/) Wednesday.",
    "2 Min Read"
   ]
  },
  {
   "url": "https://dcpulse.com/project/aws-project-white-river-northern-indiana-2-4-gigawatt-ai-expansion",
   "title": "AWS Project White River Indiana",
   "published_at": null,
   "project": "AWS Project White River",
   "locality": "Northwest Indiana",
   "state": "Indiana",
   "capacity_gw": 2.4,
   "builder": "Amazon Web Services",
   "ai_customer": "Amazon Web Services",
   "status": "Planned / Strategic Mobilization",
   "announcement_date": "2025-11-24",
   "project_evidence": [
    "# AWS Project White River: $15B 2.4GW NIPSCO AI Expansion",
    "Project White River represents one of the most ambitious data center expansions in the United States, positioning Amazon Web Services (AWS) at the center of a rapidly evolving energy and digital infrastructure landscape.",
    "| Project Name | AWS Project White River: $15B 2.4GW NIPSCO AI Expansion |"
   ],
   "locality_evidence": [
    "**Status:** Planned / Strategic Mobilization (March 2026) | **Location:** Northwest Indiana / NIPSCO Service Territory",
    "| Location | Northwest Indiana / NIPSCO Service Territory |"
   ],
   "state_evidence": [
    "# AWS Project White River: $15B 2.4GW NIPSCO AI Expansion",
    "Valued at approximately $15 billion, the project builds on AWS\u2019s earlier $11 billion New Carlisle development and significantly scales its footprint across Northern Indiana with an additional 2.4 gigawatts (GW) of capacity.",
    "| City Name | Indiana |"
   ],
   "capacity_gw_evidence": [
    "# AWS Project White River: $15B 2.4GW NIPSCO AI Expansion",
    "Valued at approximately $15 billion, the project builds on AWS\u2019s earlier $11 billion New Carlisle development and significantly scales its footprint across Northern Indiana with an additional 2.4 gigawatts (GW) of capacity.",
    "| Power Capacity | 2,400 MW (2.4 GW) |"
   ],
   "builder_evidence": [
    "Project White River represents one of the most ambitious data center expansions in the United States, positioning Amazon Web Services (AWS) at the center of a rapidly evolving energy and digital infrastructure landscape.",
    "## Companies Involved",
    "| Developer / Operator | [Amazon Web Services](https://dcpulse.com/projects/companyprofiles/amazon-web-services-data-center-projects) |"
   ],
   "ai_customer_evidence": [
    "Project White River represents one of the most ambitious data center expansions in the United States, positioning Amazon Web Services (AWS) at the center of a rapidly evolving energy and digital infrastructure landscape.",
    "| Total IT Load | 2.4 GW (Dedicated to AWS campuses) |"
   ],
   "status_evidence": [
    "**Status:** Planned / Strategic Mobilization (March 2026) | **Location:** Northwest Indiana / NIPSCO Service Territory",
    "| Status | Planned / Strategic Mobilization (March 2026) |"
   ],
   "announcement_date_evidence": [
    "## Milestones",
    "| Announcement | November 24, 2025 (Official Multi-Site Reveal) |"
   ]
  },
  {
   "url": "https://theledger.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "Where are xAI campuses located in Memphis and Southaven?",
   "published_at": "2026-01-15T11:02:44",
   "project": "Colossus 2",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 1.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "active construction still on site",
   "announcement_date": "2025-02-01",
   "project_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "locality_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The second Memphis campus in Whitehaven came into the picture in early 2025."
   ],
   "state_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "It has been a very [busy 18 months for Elon Musk's xAI](/story/money/business/development/2025/06/05/elon-musk-xai-supercomputer-grok-memphis-tn/83599473007/) since the company first announced plans for its Memphis data center in June 2024."
   ],
   "capacity_gw_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "builder_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "Elon Musk's xAI has acquired over 1,156 acres of land in the Memphis area for its data centers."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The Tulane Road site is an artificial intelligence data center, with active construction still on site."
   ],
   "announcement_date_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "In February 2025, CTC Property LLC purchased 186.13 acres for $79.9 million, according to the Shelby County Register of Deeds."
   ]
  },
  {
   "url": "https://theledger.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "Where are xAI campuses located in Memphis and Southaven?",
   "published_at": "2026-01-15T11:02:44",
   "project": "Macrohardrr",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2025-12-30",
   "project_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "locality_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "This is the third and most recent xAI campus."
   ],
   "state_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ],
   "capacity_gw_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "builder_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "Elon Musk's xAI has acquired over 1,156 acres of land in the Memphis area for its data centers."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "The former Duke Energy site has been under construction with gas turbines on site for powering xAI data centers."
   ],
   "announcement_date_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ]
  },
  {
   "url": "https://business.woonsocketcall.com/woonsocketcall/article/bizwire-2025-8-19-vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand",
   "title": "Vantage Data Centers Unveils Plans for \u00e2Frontier,\u00e2 a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
   "published_at": "2025-08-19T11:00:00",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Construction on the campus has already begun",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "locality_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "This press release features multimedia. View the full release here: [https://www.businesswire.com/news/home/20250819333311/en/](https://www.businesswire.com/news/home/20250819333311/en/)"
   ]
  },
  {
   "url": "https://smb.irontontribune.com/article/Nscale-Acquires-American-Intelligence-andamp-Power-Corporation-Creating-a-Full-Stack-AI-Hyperscaler-Integrated-from-Energy-to-Compute/69b874d93971457808b0a273",
   "title": "The Tribune",
   "published_at": "2016-01-29T15:28:58",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "Acquired",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "locality_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "capacity_gw_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The West Virginia campus is the first state-certified utility grid purpose-built for AI workloads in the United States. Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "builder_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "announcement_date_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026"
   ]
  },
  {
   "url": "https://rozeepk.com/kevin-olearys-utah-ai-campus-gets-approved",
   "title": "Kevin O'Leary's Utah AI campus gets approved - RozeePk",
   "published_at": "2026-05-07T00:11:06",
   "project": "Stratos AI campus",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "Kevin O\u2019Leary Digital",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Kevin O\u2019Leary\u2019s Utah AI campus gets approved"
   ],
   "locality_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Kevin O\u2019Leary\u2019s Utah AI campus gets approved"
   ],
   "state_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Kevin O\u2019Leary\u2019s Utah AI campus gets approved"
   ],
   "capacity_gw_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Kevin O\u2019Leary\u2019s Utah AI campus gets approved"
   ],
   "builder_evidence": [
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures.",
    "Kevin O\u2019Leary\u2019s Utah AI campus gets approved"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Kevin O\u2019Leary\u2019s Utah AI campus gets approved"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenters.economictimes.indiatimes.com/news/ai-compute-infrastructure/openai-plans-3-2-gw-self-built-data-center-campus-in-georgia/132618379",
   "title": "OpenAI Plans 3.2 GW Self-Built Data Center Campus in Georgia",
   "published_at": null,
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-07-25",
   "project_evidence": [
    "# OpenAI Plans 3.2 GW Self-Built Data Center Campus in Georgia",
    "This project, named [Project Camellia](/tag/project+camellia), represents a strategic move by the company to design and develop its compute infrastructure directly, rather than exclusively leasing capacity from third-party operators.The"
   ],
   "locality_evidence": [
    "# OpenAI Plans 3.2 GW Self-Built Data Center Campus in Georgia",
    "Artificial intelligence firm OpenAI has announced plans for a 3.2 gigawatt (GW) data center campus in Effingham County, Georgia, marking a strategic shift towards self-designed infrastructure."
   ],
   "state_evidence": [
    "# OpenAI Plans 3.2 GW Self-Built Data Center Campus in Georgia",
    "Artificial intelligence firm OpenAI has announced plans for a 3.2 gigawatt (GW) data center campus in Effingham County, Georgia, marking a strategic shift towards self-designed infrastructure."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Plans 3.2 GW Self-Built Data Center Campus in Georgia",
    "Artificial intelligence firm OpenAI has announced plans for a 3.2 gigawatt (GW) data center campus in Effingham County, Georgia, marking a strategic shift towards self-designed infrastructure."
   ],
   "builder_evidence": [
    "# OpenAI Plans 3.2 GW Self-Built Data Center Campus in Georgia"
   ],
   "ai_customer_evidence": [
    "# OpenAI Plans 3.2 GW Self-Built Data Center Campus in Georgia",
    "Artificial intelligence firm OpenAI has announced plans for a 3.2 gigawatt (GW) data center campus in Effingham County, Georgia, marking a strategic shift towards self-designed infrastructure."
   ],
   "status_evidence": [
    "# OpenAI Plans 3.2 GW Self-Built Data Center Campus in Georgia",
    "Artificial intelligence firm OpenAI has announced plans for a 3.2 gigawatt (GW) data center campus in Effingham County, Georgia, marking a strategic shift towards self-designed infrastructure."
   ],
   "announcement_date_evidence": [
    "# OpenAI Plans 3.2 GW Self-Built Data Center Campus in Georgia",
    "- Published On Jul 25, 2026 at 08:58 AM IST"
   ]
  },
  {
   "url": "https://broncoswire.usatoday.com/story/money/business/2026/03/17/google-reveals-project-cannoli-data-center/89185890007",
   "title": "Google reveals it is behind big 'Project Cannoli' data center project",
   "published_at": "2026-03-17T12:02:18",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": "",
   "status": "planned",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "BUSINESS",
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "locality_evidence": [
    "BUSINESS",
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "state_evidence": [
    "BUSINESS",
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google also said Tuesday that it is creating a $10 million Energy Impact Fund for local organizations to tap into with the aim of lowering monthly utility bills for Michiganders."
   ],
   "capacity_gw_evidence": [
    "BUSINESS",
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "builder_evidence": [
    "BUSINESS",
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "The data center would be developed for Google by Panattoni Development Co."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "BUSINESS",
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "announcement_date_evidence": [
    "BUSINESS",
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ]
  },
  {
   "url": "https://edgen.pre.edgen.tech/news/post/terawulf-buys-kentucky-site-for-1-gw-ai-data-center-campus",
   "title": "TeraWulf buys Kentucky site for 1-GW AI data center campus",
   "published_at": "2026-05-26T18:43:07",
   "project": "Muskie Data Campus",
   "locality": null,
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": "2026-05-26",
   "project_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus",
    "The 285-acre site within EastPark Industrial Park, dubbed the Muskie Data Campus, is already zoned for data center use."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus",
    "TeraWulf acquired a Kentucky site for a 1-GW AI data center campus",
    "TeraWulf Inc. acquired a Kentucky development site capable of supporting more than 1 gigawatt of data center capacity, as the Bitcoin miner pivots deeper into AI infrastructure where power availability has become the binding constraint."
   ],
   "capacity_gw_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus",
    "TeraWulf acquired a Kentucky site for a 1-GW AI data center campus",
    "TeraWulf Inc. acquired a Kentucky development site capable of supporting more than 1 gigawatt of data center capacity, as the Bitcoin miner pivots deeper into AI infrastructure where power availability has become the binding constraint."
   ],
   "builder_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus",
    "TeraWulf acquired a Kentucky site for a 1-GW AI data center campus",
    "TeraWulf Inc. acquired a Kentucky development site capable of supporting more than 1 gigawatt of data center capacity, as the Bitcoin miner pivots deeper into AI infrastructure where power availability has become the binding constraint."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus",
    "TeraWulf acquired a Kentucky site for a 1-GW AI data center campus",
    "TeraWulf Inc. acquired a Kentucky development site capable of supporting more than 1 gigawatt of data center capacity, as the Bitcoin miner pivots deeper into AI infrastructure where power availability has become the binding constraint."
   ],
   "announcement_date_evidence": [
    "[![Rachel Kim](https://static.edgen.tech/authors/rachel-kim.png?image_process=resize,w_32/quality,q_75/format,webp/sharpen,100)\n## Rachel Kim](https://edgen.pre.edgen.tech/author/news/rachel-kim)\u00b7May 26 2026, 18:43"
   ]
  },
  {
   "url": "https://backend.theenergymag.com/news/2026-05-06/hut-ai-beacon-point",
   "title": "Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion",
   "published_at": "2026-05-06T12:26:49",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion",
    "The Miami-based company said it signed a $9.8 billion triple-net lease for 352 megawatts of IT capacity at its Beacon Point campus in Nueces County, Texas."
   ],
   "locality_evidence": [
    "# Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion",
    "The Miami-based company said it signed a $9.8 billion triple-net lease for 352 megawatts of IT capacity at its Beacon Point campus in Nueces County, Texas."
   ],
   "state_evidence": [
    "# Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion",
    "The Miami-based company said it signed a $9.8 billion triple-net lease for 352 megawatts of IT capacity at its Beacon Point campus in Nueces County, Texas."
   ],
   "capacity_gw_evidence": [
    "# Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion",
    "Beacon Point is designed as a gigawatt-scale campus with 1,000 MW of utility capacity under interconnection agreement with AEP Texas."
   ],
   "builder_evidence": [
    "# Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion",
    "The Miami-based company said it signed a $9.8 billion triple-net lease for 352 megawatts of IT capacity at its Beacon Point campus in Nueces County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion",
    "Hut 8 said the first phase of the project \u2014 representing roughly 500 MW of utility capacity to support the 352 MW IT load \u2014 is expected to begin energization in the first quarter of 2027, with initial data hall delivery targeted for the third quarter of that year."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://readalchemist.com/articles/power-is-the-new-chip-nvidia-s-iren-deal-and-the-texas-takeo.html",
   "title": "Power Is the New Chip: Nvidia's IREN Deal and the Texas Takeover of AI Infrastructure",
   "published_at": "2026-06-16T00:00:00",
   "project": "Sweetwater",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": "Nvidia",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Power Is the New Chip: Nvidia's IREN Deal and the Texas Takeover of AI Infrastructure",
    "## The Nvidia-IREN Deal: What It Actually Is",
    "Nvidia has partnered with IREN to deploy up to 5 GW of AI infrastructure globally, positioning Texas's Sweetwater as a flagship site for its DSX AI factory architecture.",
    "Its portfolio includes a Childress, Texas campus at 750 MW, the Sweetwater project under construction at 2,000 MW, and a development site in Oklahoma at 1,600 MW, securing sites and contracts for more than 4.5 GW of power capacity in total."
   ],
   "locality_evidence": [
    "# Power Is the New Chip: Nvidia's IREN Deal and the Texas Takeover of AI Infrastructure",
    "## The Nvidia-IREN Deal: What It Actually Is",
    "Nvidia has partnered with IREN to deploy up to 5 GW of AI infrastructure globally, positioning Texas's Sweetwater as a flagship site for its DSX AI factory architecture."
   ],
   "state_evidence": [
    "# Power Is the New Chip: Nvidia's IREN Deal and the Texas Takeover of AI Infrastructure",
    "## The Nvidia-IREN Deal: What It Actually Is",
    "Nvidia has partnered with IREN to deploy up to 5 GW of AI infrastructure globally, positioning Texas's Sweetwater as a flagship site for its DSX AI factory architecture."
   ],
   "capacity_gw_evidence": [
    "# Power Is the New Chip: Nvidia's IREN Deal and the Texas Takeover of AI Infrastructure",
    "## The Nvidia-IREN Deal: What It Actually Is",
    "Its portfolio includes a Childress, Texas campus at 750 MW, the Sweetwater project under construction at 2,000 MW, and a development site in Oklahoma at 1,600 MW, securing sites and contracts for more than 4.5 GW of power capacity in total."
   ],
   "builder_evidence": [
    "# Power Is the New Chip: Nvidia's IREN Deal and the Texas Takeover of AI Infrastructure",
    "## The Nvidia-IREN Deal: What It Actually Is",
    "Nvidia has partnered with IREN to deploy up to 5 GW of AI infrastructure globally, positioning Texas's Sweetwater as a flagship site for its DSX AI factory architecture."
   ],
   "ai_customer_evidence": [
    "# Power Is the New Chip: Nvidia's IREN Deal and the Texas Takeover of AI Infrastructure",
    "## The Nvidia-IREN Deal: What It Actually Is",
    "Nvidia has partnered with IREN to deploy up to 5 GW of AI infrastructure globally, positioning Texas's Sweetwater as a flagship site for its DSX AI factory architecture."
   ],
   "status_evidence": [
    "# Power Is the New Chip: Nvidia's IREN Deal and the Texas Takeover of AI Infrastructure",
    "## The Nvidia-IREN Deal: What It Actually Is",
    "Its portfolio includes a Childress, Texas campus at 750 MW, the Sweetwater project under construction at 2,000 MW, and a development site in Oklahoma at 1,600 MW, securing sites and contracts for more than 4.5 GW of power capacity in total."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://todayinmarcom.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah.",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "capacity_gw_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://houstonarchitecture.com/topic/54446-terrasite-tx1-1-gw-data-center",
   "title": "TerraSite-TX1: 1 GW Data Center",
   "published_at": "2024-09-26T15:24:05",
   "project": null,
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "ECL has announced plans to build a 1 GW data center fueled by hydrogen on a 600 acre site east of Houston."
   ],
   "state_evidence": [
    "ECL has announced plans to build a 1 GW data center fueled by hydrogen on a 600 acre site east of Houston."
   ],
   "capacity_gw_evidence": [
    "ECL has announced plans to build a 1 GW data center fueled by hydrogen on a 600 acre site east of Houston."
   ],
   "builder_evidence": [
    "ECL has announced plans to build a 1 GW data center fueled by hydrogen on a 600 acre site east of Houston."
   ],
   "ai_customer_evidence": [
    "The first phase, 50 MW with a valuation of $450 million will open next year with Lambda as the first customer."
   ],
   "status_evidence": [
    "ECL has announced plans to build a 1 GW data center fueled by hydrogen on a 600 acre site east of Houston."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://kansas.com/news/business/article316739447.html",
   "title": "Morgan Stanley leads $15B bet on Anthropic's Texas campus",
   "published_at": "2026-08-02T00:07:00",
   "project": "Hubbard",
   "locality": "Hubbard",
   "state": "Texas",
   "capacity_gw": 1.6,
   "builder": "Nexus Data Centers",
   "ai_customer": "Anthropic",
   "status": "closing in on $15 billion in financing",
   "announcement_date": "2026-07-30",
   "project_evidence": [
    "Morgan Stanley leads $15B bet on Anthropic's Texas campus",
    "Broadcom is involved on the hardware side too. Anthropic plans to deploy tensor processing units co-designed by Google and Broadcom at the Hubbard site, with a separate vendor financing agreement covering the chip costs, CNBC reported."
   ],
   "locality_evidence": [
    "Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "state_evidence": [
    "Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "capacity_gw_evidence": [
    "Morgan Stanley leads $15B bet on Anthropic's Texas campus",
    "The guarantees cover [four Anthropic data center leases](https://www.reuters.com/legal/litigation/banks-talks-lend-15-billion-anthropic-data-center-backed-by-google-wsj-reports-2026-07-30/) and the power purchase agreements tied to an on-site natural gas plant with 1.6 gigawatts of capacity."
   ],
   "builder_evidence": [
    "Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "ai_customer_evidence": [
    "Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "status_evidence": [
    "Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "announcement_date_evidence": [
    "Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ]
  },
  {
   "url": "https://cnb.cx/4zvp2fx",
   "title": "Nvidia backing $105 billion in financing for OpenAI data center in Ohio",
   "published_at": "2026-08-17T14:10:16",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "Nvidia backing $105 billion in financing for OpenAI data center in Ohio",
    "SB Energy will build and manage the datacenter at the PORTS-Pike Technology Campus in Pike County, Ohio, through a 20-year lease to OpenAI."
   ],
   "locality_evidence": [
    "Nvidia backing $105 billion in financing for OpenAI data center in Ohio",
    "SB Energy will build and manage the datacenter at the PORTS-Pike Technology Campus in Pike County, Ohio, through a 20-year lease to OpenAI."
   ],
   "state_evidence": [
    "Nvidia backing $105 billion in financing for OpenAI data center in Ohio",
    "SB Energy will build and manage the datacenter at the PORTS-Pike Technology Campus in Pike County, Ohio, through a 20-year lease to OpenAI."
   ],
   "capacity_gw_evidence": [
    "Nvidia backing $105 billion in financing for OpenAI data center in Ohio",
    "The credit will support an initial 4.25 gigawatts of computing capacity with the option for an additional 3.75 gigawatts."
   ],
   "builder_evidence": [
    "Nvidia backing $105 billion in financing for OpenAI data center in Ohio",
    "SB Energy will build and manage the datacenter at the PORTS-Pike Technology Campus in Pike County, Ohio, through a 20-year lease to OpenAI."
   ],
   "ai_customer_evidence": [
    "Nvidia backing $105 billion in financing for OpenAI data center in Ohio",
    "SB Energy will build and manage the datacenter at the PORTS-Pike Technology Campus in Pike County, Ohio, through a 20-year lease to OpenAI."
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "Nvidia backing $105 billion in financing for OpenAI data center in Ohio"
   ]
  },
  {
   "url": "https://bricks-bytes.com/corporate/meta-blackrock-el-paso-data-center",
   "title": "BlackRock Now Owns 80% of Meta\u2019s $14 Billion AI Data Center. Here\u2019s Why It Matters - Bricks & Bytes",
   "published_at": "2026-07-31T07:04:31",
   "project": "El Paso",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta and BlackRock",
   "ai_customer": "Meta",
   "status": "under construction",
   "announcement_date": "2026-07-28",
   "project_evidence": [
    "Meta and BlackRock struck a roughly $14bn deal to build and own a 1-gigawatt data-center campus in El Paso, Texas.",
    "Meta and BlackRock announced a venture to develop and operate a data-center campus in El Paso, Texas, with total development costs of about $14bn."
   ],
   "locality_evidence": [
    "Meta and BlackRock struck a roughly $14bn deal to build and own a 1-gigawatt data-center campus in El Paso, Texas.",
    "Meta and BlackRock announced a venture to develop and operate a data-center campus in El Paso, Texas, with total development costs of about $14bn."
   ],
   "state_evidence": [
    "Meta and BlackRock struck a roughly $14bn deal to build and own a 1-gigawatt data-center campus in El Paso, Texas.",
    "Meta and BlackRock announced a venture to develop and operate a data-center campus in El Paso, Texas, with total development costs of about $14bn."
   ],
   "capacity_gw_evidence": [
    "Meta and BlackRock struck a roughly $14bn deal to build and own a 1-gigawatt data-center campus in El Paso, Texas.",
    "The campus is already under construction, designed to deliver 1 gigawatt of compute, with operations expected in 2028."
   ],
   "builder_evidence": [
    "Meta and BlackRock struck a roughly $14bn deal to build and own a 1-gigawatt data-center campus in El Paso, Texas.",
    "On Tuesday 28 July 2026, Meta and BlackRock announced a venture to develop and operate a data-center campus in El Paso, Texas, with total development costs of about $14bn."
   ],
   "ai_customer_evidence": [
    "Meta still runs the building and stays the only tenant, but it no longer owns most of it.",
    "Meta remains the sole occupant once it\u2019s finished, so nothing changes for the end user of the compute."
   ],
   "status_evidence": [
    "The campus is already under construction, designed to deliver 1 gigawatt of compute, with operations expected in 2028.",
    "Meta had already described El Paso as an investment of more than $10bn, one of 28 data centers it has in operation or under construction across the US."
   ],
   "announcement_date_evidence": [
    "On Tuesday 28 July 2026, Meta and BlackRock announced a venture to develop and operate a data-center campus in El Paso, Texas, with total development costs of about $14bn."
   ]
  },
  {
   "url": "https://vcstar.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "Where are xAI campuses located in Memphis and Southaven?",
   "published_at": "2026-01-15T11:02:44",
   "project": "Colossus 2",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 1.0,
   "builder": "xAI",
   "ai_customer": "xAI",
   "status": "active construction still on site",
   "announcement_date": "2025-03-01",
   "project_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "locality_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "builder_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "In March 2025, the Greater Memphis Chamber announced xAI's plans for a second campus and its purchase of a 1 million-square-foot building."
   ],
   "ai_customer_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "status_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The Tulane Road site is an artificial intelligence data center, with active construction still on site."
   ],
   "announcement_date_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "In March 2025, the Greater Memphis Chamber announced xAI's plans for a second campus and its purchase of a 1 million-square-foot building."
   ]
  },
  {
   "url": "https://vcstar.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "Where are xAI campuses located in Memphis and Southaven?",
   "published_at": "2026-01-15T11:02:44",
   "project": "Macrohardrr",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "xAI",
   "status": "under construction",
   "announcement_date": "2026-01-08",
   "project_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "locality_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "builder_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ],
   "ai_customer_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "status_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "The former Duke Energy site has been under construction with gas turbines on site for powering xAI data centers."
   ],
   "announcement_date_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ]
  },
  {
   "url": "https://en.wedoany.com/shortnews/404383.html",
   "title": "Crusoe and Lancium to Build 1GW Data Center in Childress, Texas",
   "published_at": null,
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Lancium",
   "ai_customer": "Meta",
   "status": "planned",
   "announcement_date": "2026-07-16",
   "project_evidence": [
    "Crusoe and Lancium to Build 1GW Data Center in Childress, Texas",
    "Childress is the second project for Crusoe and Lancium."
   ],
   "locality_evidence": [
    "Crusoe and Lancium to Build 1GW Data Center in Childress, Texas",
    "Childress is the second project for Crusoe and Lancium."
   ],
   "state_evidence": [
    "Crusoe and Lancium to Build 1GW Data Center in Childress, Texas",
    "Crusoe and Lancium plan to build a 1-gigawatt (GW) data center campus in Childress County, Texas, dedicated to artificial intelligence (AI) computing."
   ],
   "capacity_gw_evidence": [
    "Crusoe and Lancium to Build 1GW Data Center in Childress, Texas",
    "Crusoe and Lancium plan to build a 1-gigawatt (GW) data center campus in Childress County, Texas, dedicated to artificial intelligence (AI) computing."
   ],
   "builder_evidence": [
    "Crusoe and Lancium to Build 1GW Data Center in Childress, Texas",
    "The 270-acre campus is owned by Lancium, which will also develop and manage the site's energy infrastructure."
   ],
   "ai_customer_evidence": [
    "Crusoe and Lancium to Build 1GW Data Center in Childress, Texas",
    "According to previous reports, Meta is expected to lease capacity from Crusoe at this Childress campus."
   ],
   "status_evidence": [
    "Crusoe and Lancium to Build 1GW Data Center in Childress, Texas",
    "Crusoe and Lancium plan to build a 1-gigawatt (GW) data center campus in Childress County, Texas, dedicated to artificial intelligence (AI) computing."
   ],
   "announcement_date_evidence": [
    "Crusoe and Lancium to Build 1GW Data Center in Childress, Texas",
    "2026-07-16 10:28"
   ]
  },
  {
   "url": "https://vantage-dc.com/fr/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand",
   "title": "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand - Vantage Data Centers",
   "published_at": null,
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "# Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "locality_evidence": [
    "# Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "**DENVER (Aug. 19, 2025)** \u2013 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "# Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "**DENVER (Aug. 19, 2025)** \u2013 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "# Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "**DENVER (Aug. 19, 2025)** \u2013 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "# Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "**DENVER (Aug. 19, 2025)** \u2013 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": [
    "# Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "**DENVER (Aug. 19, 2025)** \u2013 Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ]
  },
  {
   "url": "https://amarillo.com/story/news/local/2026/08/11/fermi-project-matador-ai-campus-near-amarillo-gets-first-tenant-lease-agreement-tensor-wave/91029237007",
   "title": "Project Matador AI campus near Amarillo gets first announced tenant",
   "published_at": "2026-08-11T17:00:22",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 17.0,
   "builder": "Fermi America",
   "ai_customer": "TensorWave",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Fermi announces $6.5B lease agreement at Project Matador AI campus",
    "On Aug. 10, [Fermi America](/story/news/2026/04/20/fermi-america-makes-leadership-changes-plans-new-dallas-headquarters/89700478007/) announced a binding lease agreement with its first tenant, TensorWave, at the [Project Matador](/story/news/2025/06/27/fermi-america-and-texas-tech-university-unveil-plans-for-11-billion-hypergrid-ai-campus/84377449007/) site in Carson County."
   ],
   "locality_evidence": [
    "Amid other announced data center projects, concerns and controversies, progress is quietly continuing on a massive site in the Texas Panhandle near Amarillo.",
    "# Fermi announces $6.5B lease agreement at Project Matador AI campus"
   ],
   "state_evidence": [
    "Amid other announced data center projects, concerns and controversies, progress is quietly continuing on a massive site in the Texas Panhandle near Amarillo.",
    "# Fermi announces $6.5B lease agreement at Project Matador AI campus"
   ],
   "capacity_gw_evidence": [
    "Fermi said approximately 6 GW of the planned 17 GW are already permitted for the 7,570-acre campus being built in the Panhandle.",
    "# Fermi announces $6.5B lease agreement at Project Matador AI campus"
   ],
   "builder_evidence": [
    "On Aug. 10, [Fermi America](/story/news/2026/04/20/fermi-america-makes-leadership-changes-plans-new-dallas-headquarters/89700478007/) announced a binding lease agreement with its first tenant, TensorWave, at the [Project Matador](/story/news/2025/06/27/fermi-america-and-texas-tech-university-unveil-plans-for-11-billion-hypergrid-ai-campus/84377449007/) site in Carson County.",
    "# Fermi announces $6.5B lease agreement at Project Matador AI campus"
   ],
   "ai_customer_evidence": [
    "On Aug. 10, [Fermi America](/story/news/2026/04/20/fermi-america-makes-leadership-changes-plans-new-dallas-headquarters/89700478007/) announced a binding lease agreement with its first tenant, TensorWave, at the [Project Matador](/story/news/2025/06/27/fermi-america-and-texas-tech-university-unveil-plans-for-11-billion-hypergrid-ai-campus/84377449007/) site in Carson County.",
    "# Fermi announces $6.5B lease agreement at Project Matador AI campus"
   ],
   "status_evidence": [
    "Fermi said it continues to advance discussions with additional hyperscale, neo-cloud and enterprise compute counterparties for capacity at its massive AI data center campus and hypergrid under construction, along with development, construction, and financing partners.",
    "# Fermi announces $6.5B lease agreement at Project Matador AI campus"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://theenergydata.com/homer-city-kiewit-plan-largest-ai-data-center",
   "title": "Homer City & Kiewit Plan Largest U.S. AI Data Center",
   "published_at": "2025-04-03T06:10:49",
   "project": "Homer City Energy Campus",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Kiewit",
   "ai_customer": null,
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "# Homer City & Kiewit Plan Largest U.S. Gas-Powered AI Data Center",
    "Kiewit, one of the country\u2019s leading engineering, procurement, and construction (EPC) firms, has been tasked with developing the new Homer City Energy Campus."
   ],
   "locality_evidence": [
    "# Homer City & Kiewit Plan Largest U.S. Gas-Powered AI Data Center",
    "Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) have unveiled an ambitious plan to transform the former Homer City Generating Station, once Pennsylvania\u2019s largest coal-burning[** power plant**](https://theenergydata.com/type-one-energy-unveils-first-unified-fusion-po/), into a state-of-the-art, natural gas-powered data center campus."
   ],
   "state_evidence": [
    "# Homer City & Kiewit Plan Largest U.S. Gas-Powered AI Data Center",
    "Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) have unveiled an ambitious plan to transform the former Homer City Generating Station, once Pennsylvania\u2019s largest coal-burning[** power plant**](https://theenergydata.com/type-one-energy-unveils-first-unified-fusion-po/), into a state-of-the-art, natural gas-powered data center campus."
   ],
   "capacity_gw_evidence": [
    "# Homer City & Kiewit Plan Largest U.S. Gas-Powered AI Data Center",
    "- **Up to 4.5 gigawatts (GW) of power generation** to support hyperscale data centers, which are critical for AI and HPC operations."
   ],
   "builder_evidence": [
    "# Homer City & Kiewit Plan Largest U.S. Gas-Powered AI Data Center",
    "Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) have unveiled an ambitious plan to transform the former Homer City Generating Station, once Pennsylvania\u2019s largest coal-burning[** power plant**](https://theenergydata.com/type-one-energy-unveils-first-unified-fusion-po/), into a state-of-the-art, natural gas-powered data center campus."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Homer City & Kiewit Plan Largest U.S. Gas-Powered AI Data Center",
    "Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) have unveiled an ambitious plan to transform the former Homer City Generating Station, once Pennsylvania\u2019s largest coal-burning[** power plant**](https://theenergydata.com/type-one-energy-unveils-first-unified-fusion-po/), into a state-of-the-art, natural gas-powered data center campus."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://theindustrial.in/news/fd63c0a5ca/Nscale-and-Microsoft-Announce-Collaboration-with-NVIDIA-and-Caterpillar-to-Deliver-135GW-of-NVIDIA-Vera-Rubin-NVL72-GPUs-at-Flagship-AI-Factory-Campus-in-West-Virginia",
   "title": "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
   "published_at": null,
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "Acquired / in development",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid*",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "locality_evidence": [
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "state_evidence": [
    "SAN JOSE, Calif., March 16, 2026 -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design.",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "capacity_gw_evidence": [
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid*",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts.",
    "The expansion capabilities of this site \u2014 which has the potential for a total power draw of 8GW \u2014 will allow Nscale to develop power capacity rapidly while supporting one of the largest announced AI compute deployments in the market today."
   ],
   "builder_evidence": [
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid*",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "ai_customer_evidence": [
    "- *Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs*",
    "SAN JOSE, Calif., March 16, 2026 -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design.",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "status_evidence": [
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid*",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts.",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "announcement_date_evidence": [
    "SAN JOSE, Calif., March 16, 2026 -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ]
  },
  {
   "url": "https://invasion24.com/openai-project-camellia-effingham-georgia-data-center",
   "title": "OpenAI plans $20B data center campus in Georgia",
   "published_at": "2026-08-13T10:35:12",
   "project": "Project Camellia",
   "locality": "Rincon",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "Georgia Power",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "OpenAI plans a 20 billion dollar data center campus in rural Georgia",
    "The development, named Project Camellia, would rise at the Savannah Gateway Industrial Hub near Rincon, on a 2,600-acre site where the data center itself would occupy roughly 101 acres across four buildings."
   ],
   "locality_evidence": [
    "OpenAI plans a 20 billion dollar data center campus in rural Georgia",
    "The development, named Project Camellia, would rise at the Savannah Gateway Industrial Hub near Rincon, on a 2,600-acre site where the data center itself would occupy roughly 101 acres across four buildings."
   ],
   "state_evidence": [
    "OpenAI plans a 20 billion dollar data center campus in rural Georgia",
    "OpenAI unveiled plans on 22 July for a 20 billion dollar data center campus in Effingham County, Georgia, one of the largest privately funded computing projects tied to a single artificial intelligence company and a marker of how much physical infrastructure the technology now demands."
   ],
   "capacity_gw_evidence": [
    "OpenAI plans a 20 billion dollar data center campus in rural Georgia",
    "Georgia Power would supply the campus with 3.2 gigawatts of electricity, enough to run more than two million homes, delivered in phases between 2028 and 2032."
   ],
   "builder_evidence": [
    "OpenAI plans a 20 billion dollar data center campus in rural Georgia",
    "Georgia Power would supply the campus with 3.2 gigawatts of electricity, enough to run more than two million homes, delivered in phases between 2028 and 2032."
   ],
   "ai_customer_evidence": [
    "OpenAI plans a 20 billion dollar data center campus in rural Georgia",
    "OpenAI unveiled plans on 22 July for a 20 billion dollar data center campus in Effingham County, Georgia, one of the largest privately funded computing projects tied to a single artificial intelligence company and a marker of how much physical infrastructure the technology now demands."
   ],
   "status_evidence": [
    "OpenAI plans a 20 billion dollar data center campus in rural Georgia",
    "OpenAI unveiled plans on 22 July for a 20 billion dollar data center campus in Effingham County, Georgia, one of the largest privately funded computing projects tied to a single artificial intelligence company and a marker of how much physical infrastructure the technology now demands."
   ],
   "announcement_date_evidence": [
    "OpenAI plans a 20 billion dollar data center campus in rural Georgia",
    "OpenAI unveiled plans on 22 July for a 20 billion dollar data center campus in Effingham County, Georgia, one of the largest privately funded computing projects tied to a single artificial intelligence company and a marker of how much physical infrastructure the technology now demands."
   ]
  },
  {
   "url": "https://finance.yahoo.com/markets/crypto/articles/bitcoin-news-today-mining-dying-090938864.html",
   "title": "Bitcoin News Today: Is Mining Dying as TeraWulf Abandons Miners",
   "published_at": "2026-05-27T09:09:38",
   "project": "Muskie Data Campus",
   "locality": "EastPark Industrial Park",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "The Maryland-based Bitcoin mining firm announced Tuesday that it has acquired the Muskie Data Campus, a 285-acre site within eastern Kentucky\u2019s EastPark Industrial Park, and plans to build more than 1 gigawatt of AI data center capacity there.",
    "TeraWulf\u2019s acquisition of the Muskie Data Campus from Industrial Equity Partners provides a significant development pipeline, with 500 MW of AI data center capacity expected to come online in late 2028 and an additional 500 MW by 2030."
   ],
   "locality_evidence": [
    "The Maryland-based Bitcoin mining firm announced Tuesday that it has acquired the Muskie Data Campus, a 285-acre site within eastern Kentucky\u2019s EastPark Industrial Park, and plans to build more than 1 gigawatt of AI data center capacity there."
   ],
   "state_evidence": [
    "The Maryland-based Bitcoin mining firm announced Tuesday that it has acquired the Muskie Data Campus, a 285-acre site within eastern Kentucky\u2019s EastPark Industrial Park, and plans to build more than 1 gigawatt of AI data center capacity there."
   ],
   "capacity_gw_evidence": [
    "The Maryland-based Bitcoin mining firm announced Tuesday that it has acquired the Muskie Data Campus, a 285-acre site within eastern Kentucky\u2019s EastPark Industrial Park, and plans to build more than 1 gigawatt of AI data center capacity there."
   ],
   "builder_evidence": [
    "The Maryland-based Bitcoin mining firm announced Tuesday that it has acquired the Muskie Data Campus, a 285-acre site within eastern Kentucky\u2019s EastPark Industrial Park, and plans to build more than 1 gigawatt of AI data center capacity there."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The Maryland-based Bitcoin mining firm announced Tuesday that it has acquired the Muskie Data Campus, a 285-acre site within eastern Kentucky\u2019s EastPark Industrial Park, and plans to build more than 1 gigawatt of AI data center capacity there."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://iren.com/resources/video/introduction-to-sweetwater",
   "title": "Introduction to Sweetwater",
   "published_at": null,
   "project": "Sweetwater",
   "locality": null,
   "state": null,
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# Introduction to Sweetwater",
    "IREN's Sweetwater: 2GW flagship AI & compute hub Unmatched scale in emerging AI hub - 2GW of high-voltage power across more than 1,800 acres - Capacity for more than 700,000 liquid-cooled Blackwell GPUs"
   ],
   "locality_evidence": null,
   "state_evidence": null,
   "capacity_gw_evidence": [
    "# Introduction to Sweetwater",
    "IREN's Sweetwater: 2GW flagship AI & compute hub Unmatched scale in emerging AI hub - 2GW of high-voltage power across more than 1,800 acres - Capacity for more than 700,000 liquid-cooled Blackwell GPUs"
   ],
   "builder_evidence": [
    "# Introduction to Sweetwater",
    "IREN's Sweetwater: 2GW flagship AI & compute hub Unmatched scale in emerging AI hub - 2GW of high-voltage power across more than 1,800 acres - Capacity for more than 700,000 liquid-cooled Blackwell GPUs"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://energyindustrynewswatch.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Creekstone Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "About Creekstone Energy",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "About Creekstone Energy",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://haveanidea.substack.com/p/electric-feel",
   "title": "Electric Feel",
   "published_at": "2024-11-26T18:50:16",
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": null,
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda Labs",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# Electric Feel",
    "I put together a brief summary of a few of the gigawatt-scale projects I found:",
    "3. ECL (the data center startup, not the water treatment company) announced plans to build a 1GW \u201cAI factory\u201d at ECL TerraSite-TX1, a 600+ acre site near Houston."
   ],
   "locality_evidence": [
    "# Electric Feel",
    "I put together a brief summary of a few of the gigawatt-scale projects I found:",
    "3. ECL (the data center startup, not the water treatment company) announced plans to build a 1GW \u201cAI factory\u201d at ECL TerraSite-TX1, a 600+ acre site near Houston."
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "# Electric Feel",
    "I put together a brief summary of a few of the gigawatt-scale projects I found:",
    "3. ECL (the data center startup, not the water treatment company) announced plans to build a 1GW \u201cAI factory\u201d at ECL TerraSite-TX1, a 600+ acre site near Houston."
   ],
   "builder_evidence": [
    "# Electric Feel",
    "I put together a brief summary of a few of the gigawatt-scale projects I found:",
    "3. ECL (the data center startup, not the water treatment company) announced plans to build a 1GW \u201cAI factory\u201d at ECL TerraSite-TX1, a 600+ acre site near Houston."
   ],
   "ai_customer_evidence": [
    "# Electric Feel",
    "I put together a brief summary of a few of the gigawatt-scale projects I found:",
    "ECL plans to begin with a $450mn / 50 MW site to support Lambda Labs and then invest a modest ~$8bn to build the rest of the datacenter."
   ],
   "status_evidence": [
    "# Electric Feel",
    "I put together a brief summary of a few of the gigawatt-scale projects I found:",
    "3. ECL (the data center startup, not the water treatment company) announced plans to build a 1GW \u201cAI factory\u201d at ECL TerraSite-TX1, a 600+ acre site near Houston."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://sec.gov/Archives/edgar/data/1045810/000104581026000069/sbeoainvidia-portsrelease.htm",
   "title": "Document",
   "published_at": null,
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "Announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "SANTA CLARA and REDWOOD CITY, Calif. \u2013 August 17, 2026 \u2013 NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "locality_evidence": [
    "SANTA CLARA and REDWOOD CITY, Calif. \u2013 August 17, 2026 \u2013 NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "state_evidence": [
    "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "SANTA CLARA and REDWOOD CITY, Calif. \u2013 August 17, 2026 \u2013 NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "capacity_gw_evidence": [
    "\u2022NVIDIA to provide credit support on land, power, and shell buildout to secure initial 4.25 IT-GW, with an option to take the remaining 3.75 IT-GW",
    "\u2022OpenAI will be the customer for 8-IT GW"
   ],
   "builder_evidence": [
    "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "SB Energy will build, own and operate the data center under a 20-year lease to OpenAI."
   ],
   "ai_customer_evidence": [
    "\u2022OpenAI will be the customer for 8-IT GW",
    "OpenAI will be the customer."
   ],
   "status_evidence": [
    "SANTA CLARA and REDWOOD CITY, Calif. \u2013 August 17, 2026 \u2013 NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "announcement_date_evidence": [
    "SANTA CLARA and REDWOOD CITY, Calif. \u2013 August 17, 2026 \u2013 NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ]
  },
  {
   "url": "https://gurufocus.com/news/4090794/elon-musk-confirms-xai-third-data-center-targeting-nearly-2gw-ai-capacity",
   "title": "Elon Musk Confirms xAI Third Data Center, Targeting Nearly 2GW AI Capacity",
   "published_at": "2025-12-31T11:49:02",
   "project": "Colossus",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "xAI",
   "status": "under construction",
   "announcement_date": "2025-12-30",
   "project_evidence": [
    "# Elon Musk Confirms xAI Third Data Center, Targeting Nearly 2GW AI Capacity",
    "Elon Musk has [outlined](https://www.bloomberg.com/news/articles/2025-12-30/musk-s-xai-to-expand-colossus-data-center-information-reports?srnd=homepage-asia&embedded-checkout=true) plans for a further expansion of xAI's data center footprint around Memphis, after confirming the purchase of a third building that could lift the company's artificial intelligence training capacity to almost 2 gigawatts."
   ],
   "locality_evidence": [
    "# Elon Musk Confirms xAI Third Data Center, Targeting Nearly 2GW AI Capacity",
    "Earlier reporting by the Information, citing property records and a person familiar with the project, said the newly acquired building is located in Southaven, Mississippi, and directly adjoins the Colossus 2 site."
   ],
   "state_evidence": [
    "# Elon Musk Confirms xAI Third Data Center, Targeting Nearly 2GW AI Capacity",
    "Earlier reporting by the Information, citing property records and a person familiar with the project, said the newly acquired building is located in Southaven, Mississippi, and directly adjoins the Colossus 2 site."
   ],
   "capacity_gw_evidence": [
    "# Elon Musk Confirms xAI Third Data Center, Targeting Nearly 2GW AI Capacity",
    "Elon Musk has [outlined](https://www.bloomberg.com/news/articles/2025-12-30/musk-s-xai-to-expand-colossus-data-center-information-reports?srnd=homepage-asia&embedded-checkout=true) plans for a further expansion of xAI's data center footprint around Memphis, after confirming the purchase of a third building that could lift the company's artificial intelligence training capacity to almost 2 gigawatts."
   ],
   "builder_evidence": [
    "# Elon Musk Confirms xAI Third Data Center, Targeting Nearly 2GW AI Capacity",
    "Elon Musk has [outlined](https://www.bloomberg.com/news/articles/2025-12-30/musk-s-xai-to-expand-colossus-data-center-information-reports?srnd=homepage-asia&embedded-checkout=true) plans for a further expansion of xAI's data center footprint around Memphis, after confirming the purchase of a third building that could lift the company's artificial intelligence training capacity to almost 2 gigawatts."
   ],
   "ai_customer_evidence": [
    "# Elon Musk Confirms xAI Third Data Center, Targeting Nearly 2GW AI Capacity",
    "Elon Musk has [outlined](https://www.bloomberg.com/news/articles/2025-12-30/musk-s-xai-to-expand-colossus-data-center-information-reports?srnd=homepage-asia&embedded-checkout=true) plans for a further expansion of xAI's data center footprint around Memphis, after confirming the purchase of a third building that could lift the company's artificial intelligence training capacity to almost 2 gigawatts."
   ],
   "status_evidence": [
    "# Elon Musk Confirms xAI Third Data Center, Targeting Nearly 2GW AI Capacity",
    "In a post on X on Tuesday, Musk said the new site, called MACROHARDRR, will add to the existing Colossus complex, which already includes one completed data center and a second facility currently under construction nearby."
   ],
   "announcement_date_evidence": [
    "# Elon Musk Confirms xAI Third Data Center, Targeting Nearly 2GW AI Capacity",
    "Elon Musk has [outlined](https://www.bloomberg.com/news/articles/2025-12-30/musk-s-xai-to-expand-colossus-data-center-information-reports?srnd=homepage-asia&embedded-checkout=true) plans for a further expansion of xAI's data center footprint around Memphis, after confirming the purchase of a third building that could lift the company's artificial intelligence training capacity to almost 2 gigawatts."
   ]
  },
  {
   "url": "https://idcnova.com/news/Former-Texas-governor-and-US-energy-sec-plans-11GW-data-center-campus-outside-Amarillo-Texas-3103",
   "title": "Former Texas governor and US energy sec plans 11GW data center campus outside Amarillo, Texas",
   "published_at": "2025-06-30T18:54:13",
   "project": "Advanced Energy and Intelligence Campus",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Company partnering with Texas Tech University System for off-grid nuclear-solar-gas project",
    "Located on approximately 5,800 acres, the Advanced Energy and Intelligence Campus will reportedly include \u201c18 million square feet (1.67 million sqm) of data centers and generate up to 11GW of IT capacity from natural gas, solar, wind, and clean nuclear energy.\u201d"
   ],
   "locality_evidence": [
    "Company partnering with Texas Tech University System for off-grid nuclear-solar-gas project",
    "This week, the Texas Tech University System (TTU System) announced a collaboration with recently founded energy and technology company Fermi America to develop a large AI and energy campus near Amarillo in the Texas Panhandle."
   ],
   "state_evidence": [
    "Company partnering with Texas Tech University System for off-grid nuclear-solar-gas project",
    "A massive multi-gigawatt behind-the-meter campus is being planned in Texas close to the US government\u2019s main nuclear weapons development facility by former Texas governor and energy secretary Rick Perry."
   ],
   "capacity_gw_evidence": [
    "Company partnering with Texas Tech University System for off-grid nuclear-solar-gas project",
    "Located on approximately 5,800 acres, the Advanced Energy and Intelligence Campus will reportedly include \u201c18 million square feet (1.67 million sqm) of data centers and generate up to 11GW of IT capacity from natural gas, solar, wind, and clean nuclear energy.\u201d"
   ],
   "builder_evidence": [
    "Company partnering with Texas Tech University System for off-grid nuclear-solar-gas project",
    "This week, the Texas Tech University System (TTU System) announced a collaboration with recently founded energy and technology company Fermi America to develop a large AI and energy campus near Amarillo in the Texas Panhandle."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Company partnering with Texas Tech University System for off-grid nuclear-solar-gas project",
    "A massive multi-gigawatt behind-the-meter campus is being planned in Texas close to the US government\u2019s main nuclear weapons development facility by former Texas governor and energy secretary Rick Perry."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://m-en.yna.co.kr/view/RPR20260317001100353",
   "title": "[PRNewswire] Nscale Teams with Microsoft on AI Campus | Yonhap News Agency",
   "published_at": "2026-03-17T03:04:48",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "announced",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also announced [[http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation)] the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "locality_evidence": [
    "Nscale today also announced [[http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation)] the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "state_evidence": [
    "Nscale today also announced [[http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation)] the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "capacity_gw_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also announced [[http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation)] the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts.",
    "The expansion capabilities of this site \u2014 which has the potential for a total power draw of 8GW \u2014 will allow Nscale to develop power capacity rapidly while supporting one of the largest announced AI compute deployments in the market today."
   ],
   "builder_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "ai_customer_evidence": [
    "Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs",
    "SAN JOSE, Calif. March 17, 2026 /PRNewswire=YONHAP/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ],
   "status_evidence": [
    "Nscale today also announced [[http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation)] the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "announcement_date_evidence": [
    "SAN JOSE, Calif. March 17, 2026 /PRNewswire=YONHAP/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ]
  },
  {
   "url": "https://sultramedia.id/en/utah-approves-massive-ai-data-center",
   "title": "Utah Approves Massive 9 Gigawatt AI Data Center Campus",
   "published_at": "2026-04-27T19:10:17",
   "project": "Stratos",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O'Leary Digital",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": "2026-04-24",
   "project_evidence": [
    "# Utah Approves Massive 9 Gigawatt AI Data Center Campus",
    "The project, named Stratos, aims to generate up to 9 gigawatts of power on-site to support [artificial intelligence](https://www.sultramedia.id/en/tag/artificial-intelligence) infrastructure."
   ],
   "locality_evidence": [
    "# Utah Approves Massive 9 Gigawatt AI Data Center Campus",
    "The Military Installation Development Authority (MIDA) approved a development agreement on Friday, April 24, 2026, for a massive hyperscale data center campus in Box Elder County, Utah."
   ],
   "state_evidence": [
    "# Utah Approves Massive 9 Gigawatt AI Data Center Campus",
    "The Military Installation Development Authority (MIDA) approved a development agreement on Friday, April 24, 2026, for a massive hyperscale data center campus in Box Elder County, Utah."
   ],
   "capacity_gw_evidence": [
    "# Utah Approves Massive 9 Gigawatt AI Data Center Campus",
    "The project, named Stratos, aims to generate up to 9 gigawatts of power on-site to support [artificial intelligence](https://www.sultramedia.id/en/tag/artificial-intelligence) infrastructure."
   ],
   "builder_evidence": [
    "# Utah Approves Massive 9 Gigawatt AI Data Center Campus",
    "O'Leary Digital, led by investor Kevin O'Leary, will spearhead the project which is expected to consume more than double the entire state of Utah's current average electricity use."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Utah Approves Massive 9 Gigawatt AI Data Center Campus",
    "The Military Installation Development Authority (MIDA) approved a development agreement on Friday, April 24, 2026, for a massive hyperscale data center campus in Box Elder County, Utah."
   ],
   "announcement_date_evidence": [
    "# Utah Approves Massive 9 Gigawatt AI Data Center Campus",
    "The Military Installation Development Authority (MIDA) approved a development agreement on Friday, April 24, 2026, for a massive hyperscale data center campus in Box Elder County, Utah."
   ]
  },
  {
   "url": "https://computeforecast.com/articles-post/project-camellia-georgia-data-center-openai",
   "title": "Project Camellia: Inside OpenAI\u2019s $20B Georgia Data Center Bet - COMPUTE FORECAST",
   "published_at": "2026-08-11T07:13:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "in development",
   "announcement_date": "2025-07-22",
   "project_evidence": [
    "Project Camellia marks a meaningful change in how OpenAI approaches the physical layer behind its artificial intelligence ambitions."
   ],
   "locality_evidence": [
    "Announced July 22, the Effingham County project puts OpenAI in the lead on design and development while construction and operations arrangements remain under development."
   ],
   "state_evidence": [
    "The campus will sit inside the Savannah Gateway Industrial Hub in coastal Georgia, turning an industrial tract into a potential anchor for a new regional computing market."
   ],
   "capacity_gw_evidence": [
    "OpenAI describes the project as a long-term AI infrastructure development and says it will contract with Georgia Power for 3.2 gigawatts delivered in phases from 2028 through 2032."
   ],
   "builder_evidence": [
    "Project Camellia marks a meaningful change in how OpenAI approaches the physical layer behind its artificial intelligence ambitions.",
    "The company is expanding its infrastructure strategy by leading the design and development of a major campus while continuing to work with infrastructure partners elsewhere.",
    "Announced July 22, the Effingham County project puts OpenAI in the lead on design and development while construction and operations arrangements remain under development."
   ],
   "ai_customer_evidence": [
    "Project Camellia marks a meaningful change in how OpenAI approaches the physical layer behind its artificial intelligence ambitions.",
    "Announced July 22, the Effingham County project puts OpenAI in the lead on design and development while construction and operations arrangements remain under development."
   ],
   "status_evidence": [
    "Announced July 22, the Effingham County project puts OpenAI in the lead on design and development while construction and operations arrangements remain under development.",
    "OpenAI says it is still working through infrastructure, phasing, design, financing and its operating model, signaling that the announced scope should not be treated as a final construction package."
   ],
   "announcement_date_evidence": [
    "Announced July 22, the Effingham County project puts OpenAI in the lead on design and development while construction and operations arrangements remain under development."
   ]
  },
  {
   "url": "https://hattiesburgamerican.com/story/money/business/2026/03/17/google-reveals-project-cannoli-data-center/89185890007",
   "title": "Google reveals it is behind big 'Project Cannoli' data center project",
   "published_at": "2026-03-17T12:02:18",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": "Google",
   "status": "planned",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "BUSINESS",
    "Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "locality_evidence": [
    "BUSINESS",
    "Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "state_evidence": [
    "BUSINESS",
    "Google reveals it is behind big 'Project Cannoli' data center project",
    "Google also said Tuesday that it is creating a $10 million Energy Impact Fund for local organizations to tap into with the aim of lowering monthly utility bills for Michiganders."
   ],
   "capacity_gw_evidence": [
    "BUSINESS",
    "Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "builder_evidence": [
    "BUSINESS",
    "Google reveals it is behind big 'Project Cannoli' data center project",
    "The data center would be developed for Google by Panattoni Development Co."
   ],
   "ai_customer_evidence": [
    "BUSINESS",
    "Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "status_evidence": [
    "BUSINESS",
    "Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "announcement_date_evidence": [
    "BUSINESS",
    "Google reveals it is behind big 'Project Cannoli' data center project",
    "Updated March 17, 2026, 1:27 p.m. CT",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ]
  },
  {
   "url": "https://tradingkey.com/news/cryptocurrencies/261929637-cryptopolitan",
   "title": "TeraWulf surges 10% on 1GW Kentucky AI campus et",
   "published_at": "2026-05-27T00:15:14",
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# TeraWulf surges 10% on 1GW Kentucky AI campus et",
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access."
   ],
   "locality_evidence": [
    "# TeraWulf surges 10% on 1GW Kentucky AI campus et",
    "The company secured a 285-acre site in eastern Kentucky."
   ],
   "state_evidence": [
    "# TeraWulf surges 10% on 1GW Kentucky AI campus et",
    "The company secured a 285-acre site in eastern Kentucky."
   ],
   "capacity_gw_evidence": [
    "# TeraWulf surges 10% on 1GW Kentucky AI campus et",
    "It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity."
   ],
   "builder_evidence": [
    "# TeraWulf surges 10% on 1GW Kentucky AI campus et",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# TeraWulf surges 10% on 1GW Kentucky AI campus et",
    "The company secured a 285-acre site in eastern Kentucky."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://marketscreener.com/news/iren-announces-successful-energization-of-sweetwater-1-ce7f58d9de8dff26",
   "title": "IREN Announces Successful Energization of Sweetwater 1",
   "published_at": "2026-05-01T20:11:04",
   "project": "Sweetwater",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN Limited",
   "ai_customer": null,
   "status": "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid",
   "announcement_date": "2026-05-01",
   "project_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas.",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "capacity_gw_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "builder_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "announcement_date_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "Published on 05/01/2026 at 04:11 pm EDT"
   ]
  },
  {
   "url": "https://globalnewsscanner.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "*Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite*",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "About Creekstone Energy",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "*Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite*"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://digitalinfrastructure.substack.com/p/09292024-what-i-read-last-week",
   "title": "09/29/2024 What I Read Last Week",
   "published_at": "2024-09-30T04:45:17",
   "project": "TerraSite-TX1",
   "locality": "Texas",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "DigitalInfrastructure news: Iowa, Nuclear, Microsoft, Hydrogen, Blackstone",
    "Startup **ECL** says it will build a 1GW \ud83c\uddedhydrogen-powered AI data center in Texas with [Lambda](https://lambdalabs.com/) .",
    "The TerraSite-TX1 will initially have a capacity of 50MW, at a cost of around $450 million."
   ],
   "locality_evidence": [
    "DigitalInfrastructure news: Iowa, Nuclear, Microsoft, Hydrogen, Blackstone",
    "Startup **ECL** says it will build a 1GW \ud83c\uddedhydrogen-powered AI data center in Texas with [Lambda](https://lambdalabs.com/) ."
   ],
   "state_evidence": [
    "DigitalInfrastructure news: Iowa, Nuclear, Microsoft, Hydrogen, Blackstone",
    "Startup **ECL** says it will build a 1GW \ud83c\uddedhydrogen-powered AI data center in Texas with [Lambda](https://lambdalabs.com/) ."
   ],
   "capacity_gw_evidence": [
    "DigitalInfrastructure news: Iowa, Nuclear, Microsoft, Hydrogen, Blackstone",
    "Startup **ECL** says it will build a 1GW \ud83c\uddedhydrogen-powered AI data center in Texas with [Lambda](https://lambdalabs.com/) ."
   ],
   "builder_evidence": [
    "DigitalInfrastructure news: Iowa, Nuclear, Microsoft, Hydrogen, Blackstone",
    "Startup **ECL** says it will build a 1GW \ud83c\uddedhydrogen-powered AI data center in Texas with [Lambda](https://lambdalabs.com/) ."
   ],
   "ai_customer_evidence": [
    "DigitalInfrastructure news: Iowa, Nuclear, Microsoft, Hydrogen, Blackstone",
    "Startup **ECL** says it will build a 1GW \ud83c\uddedhydrogen-powered AI data center in Texas with [Lambda](https://lambdalabs.com/) ."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://aioapex.com/en/news/google-backstops-15-billion-loan-for-anthropics-16-gigawatt-texas-ai-campus-ms9wtchq",
   "title": "Google backstops $15 billion loan for Anthropic's 1.6-gigawatt Texas AI campus",
   "published_at": "2026-08-01T05:07:08",
   "project": "Hubbard, Texas",
   "locality": "Hubbard",
   "state": "Texas",
   "capacity_gw": 1.6,
   "builder": "Nexus Data Centers",
   "ai_customer": "Anthropic",
   "status": null,
   "announcement_date": "2026-07-30",
   "project_evidence": [
    "# Google backstops $15 billion loan for Anthropic's 1.6-gigawatt Texas AI campus",
    "Google has agreed to back a $15 billion debt financing package for Anthropic's largest infrastructure project to date: a sprawling AI data center campus in Hubbard, Texas, built and operated by Nexus Data Centers."
   ],
   "locality_evidence": [
    "# Google backstops $15 billion loan for Anthropic's 1.6-gigawatt Texas AI campus",
    "Google has agreed to back a $15 billion debt financing package for Anthropic's largest infrastructure project to date: a sprawling AI data center campus in Hubbard, Texas, built and operated by Nexus Data Centers."
   ],
   "state_evidence": [
    "# Google backstops $15 billion loan for Anthropic's 1.6-gigawatt Texas AI campus",
    "Google has agreed to back a $15 billion debt financing package for Anthropic's largest infrastructure project to date: a sprawling AI data center campus in Hubbard, Texas, built and operated by Nexus Data Centers."
   ],
   "capacity_gw_evidence": [
    "# Google backstops $15 billion loan for Anthropic's 1.6-gigawatt Texas AI campus",
    "Nexus plans to pair the data center campus with a dedicated natural-gas-fired power plant capable of producing 1.6 gigawatts of electricity \u2014 sidestepping the Texas grid capacity constraints that have made large-scale AI builds difficult at this scale."
   ],
   "builder_evidence": [
    "# Google backstops $15 billion loan for Anthropic's 1.6-gigawatt Texas AI campus",
    "Google has agreed to back a $15 billion debt financing package for Anthropic's largest infrastructure project to date: a sprawling AI data center campus in Hubbard, Texas, built and operated by Nexus Data Centers."
   ],
   "ai_customer_evidence": [
    "# Google backstops $15 billion loan for Anthropic's 1.6-gigawatt Texas AI campus",
    "Google has agreed to back a $15 billion debt financing package for Anthropic's largest infrastructure project to date: a sprawling AI data center campus in Hubbard, Texas, built and operated by Nexus Data Centers."
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "# Google backstops $15 billion loan for Anthropic's 1.6-gigawatt Texas AI campus",
    "As first reported by [The Wall Street Journal](https://www.wsj.com/), with additional detail from [CNBC](https://www.cnbc.com/2026/07/30/nexus-data-centers-in-advanced-talks-to-secure-15b-for-google-backed-anthropic-data-center.html)."
   ]
  },
  {
   "url": "https://aiinasia.com/news/nvidia-openai-ohio-guarantee-asia-supply-chain-news-deep-dive-2026-08-19",
   "title": "Nvidia Guaranteed an Ohio Campus and Asia Will Fill the Racks",
   "published_at": "2026-08-19T07:00:00",
   "project": "PORTS-Pike campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Nvidia is backing up to 105 billion dollars of rent and power on a SoftBank-built Ohio campus.",
    "AI Snapshot",
    "Nvidia will guarantee up to $105bn of lease and power obligations at SB Energy's PORTS-Pike campus in Ohio."
   ],
   "locality_evidence": [
    "Nvidia has agreed to stand behind up to 105 billion dollars of lease and power payments on a data centre campus in Pike County, Ohio.",
    "AI Snapshot"
   ],
   "state_evidence": [
    "Nvidia is backing up to 105 billion dollars of rent and power on a SoftBank-built Ohio campus.",
    "AI Snapshot"
   ],
   "capacity_gw_evidence": [
    "SB Energy and SoftBank say they will build at least 10 gigawatts of new generation to yield 8 gigawatts of IT capacity, and put at least 4.2 billion dollars into regional grid work with AEP Ohio.",
    "## What was actually signed"
   ],
   "builder_evidence": [
    "Nvidia is backing up to 105 billion dollars of rent and power on a SoftBank-built Ohio campus.",
    "AI Snapshot",
    "Nvidia will guarantee up to $105bn of lease and power obligations at SB Energy's PORTS-Pike campus in Ohio."
   ],
   "ai_customer_evidence": [
    "OpenAI leases for 20 years and Nvidia holds exclusivity on AI compute at the site.",
    "AI Snapshot",
    "The tenant is OpenAI, on a twenty year lease."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://panhandleregionalnews.com/2026/07/15/crusoe-to-develop-1-4gw-data-center-campus-in-childress-texas",
   "title": "Crusoe to develop 1.4GW data center campus in Childress, Texas",
   "published_at": "2026-07-14T00:00:00",
   "project": "Childress",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": "Meta",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Data center and AI cloud firm Crusoe is to develop a gigawatt-scale data center campus in Texas.",
    "Crusoe and Lancium this week announced plans for a 1GW AI data center campus in Childress, Childress County, Texas."
   ],
   "locality_evidence": [
    "Data center and AI cloud firm Crusoe is to develop a gigawatt-scale data center campus in Texas.",
    "Crusoe and Lancium this week announced plans for a 1GW AI data center campus in Childress, Childress County, Texas."
   ],
   "state_evidence": [
    "Data center and AI cloud firm Crusoe is to develop a gigawatt-scale data center campus in Texas.",
    "Crusoe and Lancium this week announced plans for a 1GW AI data center campus in Childress, Childress County, Texas."
   ],
   "capacity_gw_evidence": [
    "Data center and AI cloud firm Crusoe is to develop a gigawatt-scale data center campus in Texas.",
    "Crusoe and Lancium this week announced plans for a 1GW AI data center campus in Childress, Childress County, Texas."
   ],
   "builder_evidence": [
    "Data center and AI cloud firm Crusoe is to develop a gigawatt-scale data center campus in Texas.",
    "Crusoe and Lancium this week announced plans for a 1GW AI data center campus in Childress, Childress County, Texas."
   ],
   "ai_customer_evidence": [
    "Data center and AI cloud firm Crusoe is to develop a gigawatt-scale data center campus in Texas.",
    "Previous reports suggest Meta is set to [lease capacity in Childress](https://www.datacenterdynamics.com/en/news/meta-signs-16gw-capacity-agreement-with-crusoe-report/) from Crusoe."
   ],
   "status_evidence": [
    "Data center and AI cloud firm Crusoe is to develop a gigawatt-scale data center campus in Texas.",
    "Crusoe and Lancium this week announced plans for a 1GW AI data center campus in Childress, Childress County, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-wisconsin",
   "title": "Microsoft Fairwater Wisconsin | AI Data Centers",
   "published_at": null,
   "project": "Microsoft Fairwater Wisconsin",
   "locality": "Mount Pleasant",
   "state": "Wisconsin",
   "capacity_gw": 2.263,
   "builder": "Microsoft",
   "ai_customer": "OpenAI, Microsoft",
   "status": "Operational",
   "announcement_date": null,
   "project_evidence": [
    "# Microsoft Fairwater Wisconsin",
    "Microsoft Fairwater Wisconsin is an operational AI data center with AI chips owned by Microsoft and used by OpenAI (likely) and Microsoft (likely)."
   ],
   "locality_evidence": [
    "Mount Pleasant, Wisconsin, United States",
    "# Microsoft Fairwater Wisconsin"
   ],
   "state_evidence": [
    "Mount Pleasant, Wisconsin, United States",
    "# Microsoft Fairwater Wisconsin"
   ],
   "capacity_gw_evidence": [
    "In Q2 2028, we project it to rise to 4,528k H100-eq compute, 2,263 MW IT power and a cost of $85.7 B.",
    "# Microsoft Fairwater Wisconsin"
   ],
   "builder_evidence": [
    "OWNER Microsoft STATUS Operational USERS OpenAI, Microsoft PROJECT Microsoft AI WAN",
    "# Microsoft Fairwater Wisconsin"
   ],
   "ai_customer_evidence": [
    "Microsoft Fairwater Wisconsin is an operational AI data center with AI chips owned by Microsoft and used by OpenAI (likely) and Microsoft (likely).",
    "# Microsoft Fairwater Wisconsin"
   ],
   "status_evidence": [
    "Microsoft Fairwater Wisconsin is an operational AI data center with AI chips owned by Microsoft and used by OpenAI (likely) and Microsoft (likely).",
    "# Microsoft Fairwater Wisconsin"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://baytobaynews.com/cambridge/stories/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet,246594",
   "title": "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
   "published_at": "2025-08-19T15:39:27",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "locality_evidence": [
    "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": [
    "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "DENVER--(BUSINESS WIRE)--Aug 19, 2025--"
   ]
  },
  {
   "url": "https://engineering.com/nscale-to-deploy-1-35-gw-ai-compute-with-microsoft",
   "title": "Nscale to deploy 1.35 GW AI compute with Microsoft",
   "published_at": "2026-03-17T10:03:06",
   "project": "Monarch AI campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# Nscale to deploy 1.35 GW AI compute with Microsoft",
    "Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA\u2019s next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ],
   "locality_evidence": [
    "# Nscale to deploy 1.35 GW AI compute with Microsoft",
    "Nscale also announced the acquisition of American Intelligence & Power Corporation, sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "state_evidence": [
    "# Nscale to deploy 1.35 GW AI compute with Microsoft",
    "West Virginia campus will host NVIDIA Vera Rubin GPUs with scalable power up to 8 GW and phased rollout starting in 2027."
   ],
   "capacity_gw_evidence": [
    "# Nscale to deploy 1.35 GW AI compute with Microsoft",
    "West Virginia campus will host NVIDIA Vera Rubin GPUs with scalable power up to 8 GW and phased rollout starting in 2027.",
    "The expansion capabilities of this site \u2014 which has the potential for a total power draw of 8GW \u2014 will allow Nscale to develop power capacity rapidly while supporting one of the largest announced AI compute deployments in the market today."
   ],
   "builder_evidence": [
    "# Nscale to deploy 1.35 GW AI compute with Microsoft",
    "Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA\u2019s next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ],
   "ai_customer_evidence": [
    "# Nscale to deploy 1.35 GW AI compute with Microsoft",
    "Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA\u2019s next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "http://dlvr.it/TSPllF",
   "title": "Kevin O'Leary Data Center Approved in Box Elder, Utah",
   "published_at": "2026-05-06T08:06:26",
   "project": "Stratos Project",
   "locality": "Hansel Valley",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O'Leary Digital",
   "ai_customer": null,
   "status": "proposed",
   "announcement_date": "2026-05-04",
   "project_evidence": [
    "**The Box Elder County Commission voted on May 4 to authorize the Military Installation Development Authority (MIDA) to establish the Stratos Project Area in Hansel Valley**, approximately 60 square miles of privately held vacant land in unincorporated western Box Elder County.",
    "Developed through [O'Leary Digital](https://olearyventures.com/), the project is designed to become one of the largest data center and power generation campuses in the country."
   ],
   "locality_evidence": [
    "**The Box Elder County Commission voted on May 4 to authorize the Military Installation Development Authority (MIDA) to establish the Stratos Project Area in Hansel Valley**, approximately 60 square miles of privately held vacant land in unincorporated western Box Elder County."
   ],
   "state_evidence": [
    "At Phase 1, the commitment is 3 gigawatts; full buildout targets 9 GW in Utah as part of a broader 15 GW multi-site strategy."
   ],
   "capacity_gw_evidence": [
    "At Phase 1, the commitment is 3 gigawatts; full buildout targets 9 GW in Utah as part of a broader 15 GW multi-site strategy."
   ],
   "builder_evidence": [
    "Developed through [O'Leary Digital](https://olearyventures.com/), the project is designed to become one of the largest data center and power generation campuses in the country."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "**The Box Elder County Commission voted on May 4 to authorize the Military Installation Development Authority (MIDA) to establish the Stratos Project Area in Hansel Valley**, approximately 60 square miles of privately held vacant land in unincorporated western Box Elder County.",
    "### What the Stratos Project Actually Proposes for Power and Water"
   ],
   "announcement_date_evidence": [
    "**The Box Elder County Commission voted on May 4 to authorize the Military Installation Development Authority (MIDA) to establish the Stratos Project Area in Hansel Valley**, approximately 60 square miles of privately held vacant land in unincorporated western Box Elder County."
   ]
  },
  {
   "url": "https://wltreport.com/2026/07/26/openai-announces-which-state-company-intends-to-build-its-largest-ever-data-center",
   "title": "OpenAI Announces Which State Company Intends To Build Its Largest-Ever Data Center",
   "published_at": "2026-07-27T04:10:42",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "# OpenAI Announces Which State Company Intends To Build Its Largest-Ever Data Center",
    "OpenAI announced plans to build a 3.2-gigawatt, 1,400-acre data center in Effingham County, Georgia, marking the company\u2019s largest-ever data center campus.",
    "In addition to the billions in capital investment, the AI data center dubbed \u201cProject Camellia\u201d will bring 400 jobs, $80 million in community benefits and $71 million in coding classes for Georgia students, according a news release Wednesday from the Effingham County Board of Commissioners."
   ],
   "locality_evidence": [
    "# OpenAI Announces Which State Company Intends To Build Its Largest-Ever Data Center",
    "OpenAI announced plans to build a 3.2-gigawatt, 1,400-acre data center in Effingham County, Georgia, marking the company\u2019s largest-ever data center campus.",
    "OpenAI and Effingham County Industrial Development Authority reached a $20 billion dollar agreement to have a new data center humming away at Savannah Gateway Industrial Hub, about 30 minutes north of the city, as early as 2028."
   ],
   "state_evidence": [
    "# OpenAI Announces Which State Company Intends To Build Its Largest-Ever Data Center",
    "OpenAI announced plans to build a 3.2-gigawatt, 1,400-acre data center in Effingham County, Georgia, marking the company\u2019s largest-ever data center campus."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Announces Which State Company Intends To Build Its Largest-Ever Data Center",
    "OpenAI announced plans to build a 3.2-gigawatt, 1,400-acre data center in Effingham County, Georgia, marking the company\u2019s largest-ever data center campus.",
    "\u201cTo support the data center, we are contracting with Georgia Power Company for 3.2 gigawatts of power which will be delivered in phases between 2028 and 2032,\u201d OpenAI stated."
   ],
   "builder_evidence": [
    "# OpenAI Announces Which State Company Intends To Build Its Largest-Ever Data Center",
    "OpenAI announced plans to build a 3.2-gigawatt, 1,400-acre data center in Effingham County, Georgia, marking the company\u2019s largest-ever data center campus."
   ],
   "ai_customer_evidence": [
    "# OpenAI Announces Which State Company Intends To Build Its Largest-Ever Data Center",
    "OpenAI announced plans to build a 3.2-gigawatt, 1,400-acre data center in Effingham County, Georgia, marking the company\u2019s largest-ever data center campus."
   ],
   "status_evidence": [
    "# OpenAI Announces Which State Company Intends To Build Its Largest-Ever Data Center",
    "OpenAI announced plans to build a 3.2-gigawatt, 1,400-acre data center in Effingham County, Georgia, marking the company\u2019s largest-ever data center campus."
   ],
   "announcement_date_evidence": [
    "# OpenAI Announces Which State Company Intends To Build Its Largest-Ever Data Center",
    "> OpenAI plans to spend tens of billions of dollars on a massive new data center near Savannah [https://t.co/QxwpOECo0W](https://t.co/QxwpOECo0W)\n>\n> \u2014 Bloomberg (@business) [July 22, 2026](https://x.com/business/status/2079972272622739571?ref_src=twsrc%5Etfw)"
   ]
  },
  {
   "url": "https://sportsbookwire.usatoday.com/story/money/business/2026/03/17/google-reveals-project-cannoli-data-center/89185890007",
   "title": "Google reveals it is behind big 'Project Cannoli' data center project",
   "published_at": "2026-03-17T12:02:18",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "locality_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "state_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google also said Tuesday that it is creating a $10 million Energy Impact Fund for local organizations to tap into with the aim of lowering monthly utility bills for Michiganders."
   ],
   "capacity_gw_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "builder_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "The data center would be developed for Google by Panattoni Development Co."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "announcement_date_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ]
  },
  {
   "url": "https://edgen.dev.edgen.tech/news/post/terawulf-buys-kentucky-site-for-1-gw-ai-data-center-campus",
   "title": "TeraWulf buys Kentucky site for 1-GW AI data center campus",
   "published_at": "2026-05-26T18:43:07",
   "project": "Muskie Data Campus",
   "locality": "EastPark Industrial Park",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2026-05-26",
   "project_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus",
    "The 285-acre site within EastPark Industrial Park, dubbed the Muskie Data Campus, is already zoned for data center use."
   ],
   "locality_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus",
    "The 285-acre site within EastPark Industrial Park, dubbed the Muskie Data Campus, is already zoned for data center use."
   ],
   "state_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus",
    "TeraWulf acquired a Kentucky site for a 1-GW AI data center campus"
   ],
   "capacity_gw_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus"
   ],
   "builder_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus",
    "TeraWulf acquired a Kentucky site for a 1-GW AI data center campus"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus",
    "The first 500 megawatts are expected to come online in the second half of 2028, with an additional 500 MW targeted for 2030, the company said in a statement."
   ],
   "announcement_date_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus",
    "[![Rachel Kim](https://static.edgen.tech/authors/rachel-kim.png?image_process=resize,w_32/quality,q_75/format,webp/sharpen,100)\n## Rachel Kim](https://edgen.dev.edgen.tech/author/news/rachel-kim)\u00b7May 26 2026, 18:43"
   ]
  },
  {
   "url": "http://dlvr.it/TSx3Bp",
   "title": "Hut 8 prices $4.25bn note offering for 352MW Texas data center",
   "published_at": "2026-05-21T12:16:13",
   "project": "Beacon Point DC",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Cryptomine and AI data center operator Hut 8 has priced a $4.25 billion private offering that it hopes will fund a 352MW data center in Texas.",
    "Through its subsidiary Beacon Point DC LLC, Hut 8 said that it would price the notes with a 6.129 percent interest rate, due 2042."
   ],
   "locality_evidence": [
    "Cryptomine and AI data center operator Hut 8 has priced a $4.25 billion private offering that it hopes will fund a 352MW data center in Texas.",
    "The $4.5bn will fund the development and construction of the turnkey data center, which is set to feature six data halls, built on a 521-acre property in Nueces County, East Texas."
   ],
   "state_evidence": [
    "Cryptomine and AI data center operator Hut 8 has priced a $4.25 billion private offering that it hopes will fund a 352MW data center in Texas.",
    "The $4.5bn will fund the development and construction of the turnkey data center, which is set to feature six data halls, built on a 521-acre property in Nueces County, East Texas."
   ],
   "capacity_gw_evidence": [
    "Cryptomine and AI data center operator Hut 8 has priced a $4.25 billion private offering that it hopes will fund a 352MW data center in Texas.",
    "Hut 8 has a 1GW interconnection agreement at the site."
   ],
   "builder_evidence": [
    "Cryptomine and AI data center operator Hut 8 has priced a $4.25 billion private offering that it hopes will fund a 352MW data center in Texas.",
    "Through its subsidiary Beacon Point DC LLC, Hut 8 said that it would price the notes with a 6.129 percent interest rate, due 2042."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Cryptomine and AI data center operator Hut 8 has priced a $4.25 billion private offering that it hopes will fund a 352MW data center in Texas.",
    "The $4.5bn will fund the development and construction of the turnkey data center, which is set to feature six data halls, built on a 521-acre property in Nueces County, East Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://norfolkdailynews.com/online_features/press_releases/iren-announces-successful-energization-of-sweetwater-1/article_d76b1a46-6c61-5cd2-9349-9be4720a6db3.html",
   "title": "IREN Announces Successful Energization of Sweetwater 1",
   "published_at": "2026-05-01T20:10:47",
   "project": "Sweetwater",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "energization of its 1.4GW Sweetwater 1 data center site",
   "announcement_date": "2026-05-01",
   "project_evidence": [
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas.",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "capacity_gw_evidence": [
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "builder_evidence": [
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "announcement_date_evidence": [
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ]
  },
  {
   "url": "https://energyindustrytoday.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Creekstone Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "state_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "capacity_gw_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://substack.com/home/post/p-149592003",
   "title": "09/29/2024 What I Read Last Week",
   "published_at": "2024-09-30T04:45:17",
   "project": "TerraSite-TX1",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Startup ECL says it will build a 1GW \ud83c\uddedhydrogen-powered AI data center in Texas with Lambda .",
    "The TerraSite-TX1 will initially have a capacity of 50MW, at a cost of around $450 million.",
    "Weekly Edition of curated news about Digital InfrastructureImage created with DALL-E3"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "Startup ECL says it will build a 1GW \ud83c\uddedhydrogen-powered AI data center in Texas with Lambda .",
    "Weekly Edition of curated news about Digital InfrastructureImage created with DALL-E3"
   ],
   "capacity_gw_evidence": [
    "Startup ECL says it will build a 1GW \ud83c\uddedhydrogen-powered AI data center in Texas with Lambda .",
    "Weekly Edition of curated news about Digital InfrastructureImage created with DALL-E3"
   ],
   "builder_evidence": [
    "Startup ECL says it will build a 1GW \ud83c\uddedhydrogen-powered AI data center in Texas with Lambda .",
    "Weekly Edition of curated news about Digital InfrastructureImage created with DALL-E3"
   ],
   "ai_customer_evidence": [
    "Startup ECL says it will build a 1GW \ud83c\uddedhydrogen-powered AI data center in Texas with Lambda .",
    "AI cloud provider Lambda (AGI is here! (A) lot of (G)PUs (I)nterconnected) will be the first customer, but is not taking the whole 50MW.",
    "Weekly Edition of curated news about Digital InfrastructureImage created with DALL-E3"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://glonce.com/openai-signs-20-year-ohio-data-center-lease",
   "title": "OpenAI signs 20-year Ohio data center lease with Nvidia backing up to $105 billion",
   "published_at": "2026-08-18T06:00:00",
   "project": "PORTS-Pike",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 10.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI signs 20-year Ohio data center lease with Nvidia backing up to $105 billion",
    "OpenAI has signed a 20-year lease with SoftBank subsidiary SB Energy for the \"PORTS-Pike\" data center campus in Ohio, giving it around 8 gigawatts of IT capacity; the Wall Street Journal puts the project's gross total at 10 gigawatts once cooling and other infrastructure are counted."
   ],
   "locality_evidence": [
    "# OpenAI signs 20-year Ohio data center lease with Nvidia backing up to $105 billion",
    "OpenAI has signed a 20-year lease with SoftBank subsidiary SB Energy for the \"PORTS-Pike\" data center campus in Ohio, giving it around 8 gigawatts of IT capacity; the Wall Street Journal puts the project's gross total at 10 gigawatts once cooling and other infrastructure are counted."
   ],
   "state_evidence": [
    "# OpenAI signs 20-year Ohio data center lease with Nvidia backing up to $105 billion",
    "OpenAI has signed a 20-year lease with SoftBank subsidiary SB Energy for the \"PORTS-Pike\" data center campus in Ohio, giving it around 8 gigawatts of IT capacity; the Wall Street Journal puts the project's gross total at 10 gigawatts once cooling and other infrastructure are counted."
   ],
   "capacity_gw_evidence": [
    "# OpenAI signs 20-year Ohio data center lease with Nvidia backing up to $105 billion",
    "OpenAI has signed a 20-year lease with SoftBank subsidiary SB Energy for the \"PORTS-Pike\" data center campus in Ohio, giving it around 8 gigawatts of IT capacity; the Wall Street Journal puts the project's gross total at 10 gigawatts once cooling and other infrastructure are counted."
   ],
   "builder_evidence": [
    "# OpenAI signs 20-year Ohio data center lease with Nvidia backing up to $105 billion",
    "OpenAI has signed a 20-year lease with SoftBank subsidiary SB Energy for the \"PORTS-Pike\" data center campus in Ohio, giving it around 8 gigawatts of IT capacity; the Wall Street Journal puts the project's gross total at 10 gigawatts once cooling and other infrastructure are counted."
   ],
   "ai_customer_evidence": [
    "# OpenAI signs 20-year Ohio data center lease with Nvidia backing up to $105 billion",
    "OpenAI has signed a 20-year lease with SoftBank subsidiary SB Energy for the \"PORTS-Pike\" data center campus in Ohio, giving it around 8 gigawatts of IT capacity; the Wall Street Journal puts the project's gross total at 10 gigawatts once cooling and other infrastructure are counted."
   ],
   "status_evidence": [
    "# OpenAI signs 20-year Ohio data center lease with Nvidia backing up to $105 billion",
    "OpenAI has signed a 20-year lease with SoftBank subsidiary SB Energy for the \"PORTS-Pike\" data center campus in Ohio, giving it around 8 gigawatts of IT capacity; the Wall Street Journal puts the project's gross total at 10 gigawatts once cooling and other infrastructure are counted."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aiinfrastructuremap.com/investor/meta",
   "title": "Meta \u2014 AI infrastructure portfolio",
   "published_at": null,
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "construction",
   "announcement_date": null,
   "project_evidence": [
    "Hyperion in Richland Parish LA (eventually 5GW, $27B JV with Blue Owl) and Prometheus in Ohio (1GW, 2026 target) both lean on natural-gas combined-cycle generation rather than waiting for nuclear or PPAs from constrained grids.",
    "Investor portfolio",
    "Meta"
   ],
   "locality_evidence": [
    "Hyperion in Richland Parish LA (eventually 5GW, $27B JV with Blue Owl) and Prometheus in Ohio (1GW, 2026 target) both lean on natural-gas combined-cycle generation rather than waiting for nuclear or PPAs from constrained grids.",
    "Investor portfolio",
    "Meta"
   ],
   "state_evidence": [
    "Hyperion in Richland Parish LA (eventually 5GW, $27B JV with Blue Owl) and Prometheus in Ohio (1GW, 2026 target) both lean on natural-gas combined-cycle generation rather than waiting for nuclear or PPAs from constrained grids.",
    "Investor portfolio",
    "Meta"
   ],
   "capacity_gw_evidence": [
    "Hyperion in Richland Parish LA (eventually 5GW, $27B JV with Blue Owl) and Prometheus in Ohio (1GW, 2026 target) both lean on natural-gas combined-cycle generation rather than waiting for nuclear or PPAs from constrained grids.",
    "Investor portfolio",
    "Meta"
   ],
   "builder_evidence": [
    "Investor portfolio",
    "# Meta",
    "[Datacenter\nMeta\nMeta\n5GW long-term\n$27B total\nconstruction](/project/meta-la)"
   ],
   "ai_customer_evidence": [
    "Investor portfolio",
    "# Meta",
    "[Datacenter\nMeta\nMeta\n5GW long-term\n$27B total\nconstruction](/project/meta-la)"
   ],
   "status_evidence": [
    "Investor portfolio",
    "# Meta",
    "[Datacenter\nMeta\nMeta\n5GW long-term\n$27B total\nconstruction](/project/meta-la)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aiinfrastructuremap.com/investor/meta",
   "title": "Meta \u2014 AI infrastructure portfolio",
   "published_at": null,
   "project": "Prometheus",
   "locality": null,
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "construction",
   "announcement_date": null,
   "project_evidence": [
    "Hyperion in Richland Parish LA (eventually 5GW, $27B JV with Blue Owl) and Prometheus in Ohio (1GW, 2026 target) both lean on natural-gas combined-cycle generation rather than waiting for nuclear or PPAs from constrained grids.",
    "Investor portfolio",
    "Meta"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "Hyperion in Richland Parish LA (eventually 5GW, $27B JV with Blue Owl) and Prometheus in Ohio (1GW, 2026 target) both lean on natural-gas combined-cycle generation rather than waiting for nuclear or PPAs from constrained grids.",
    "Investor portfolio",
    "Meta"
   ],
   "capacity_gw_evidence": [
    "Hyperion in Richland Parish LA (eventually 5GW, $27B JV with Blue Owl) and Prometheus in Ohio (1GW, 2026 target) both lean on natural-gas combined-cycle generation rather than waiting for nuclear or PPAs from constrained grids.",
    "Investor portfolio",
    "Meta"
   ],
   "builder_evidence": [
    "Investor portfolio",
    "# Meta",
    "[Datacenter\nMeta\nMeta\n1GW\n$4B\nconstruction](/project/meta-oh)"
   ],
   "ai_customer_evidence": [
    "Investor portfolio",
    "# Meta",
    "[Datacenter\nMeta\nMeta\n1GW\n$4B\nconstruction](/project/meta-oh)"
   ],
   "status_evidence": [
    "Investor portfolio",
    "# Meta",
    "[Datacenter\nMeta\nMeta\n1GW\n$4B\nconstruction](/project/meta-oh)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://ldnews.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "Where are xAI campuses located in Memphis and Southaven?",
   "published_at": "2026-01-15T11:02:44",
   "project": "Colossus 2",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 1.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "active construction still on site",
   "announcement_date": "2025-02-01",
   "project_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "locality_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The second Memphis campus in Whitehaven came into the picture in early 2025."
   ],
   "state_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "It has been a very [busy 18 months for Elon Musk's xAI](/story/money/business/development/2025/06/05/elon-musk-xai-supercomputer-grok-memphis-tn/83599473007/) since the company first announced plans for its Memphis data center in June 2024."
   ],
   "capacity_gw_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "builder_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "In February 2025, CTC Property LLC purchased 186.13 acres for $79.9 million, according to the Shelby County Register of Deeds."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "Colossus 2 is a bit more straightforward than the Paul R. Lowry Road complex."
   ],
   "announcement_date_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "In February 2025, CTC Property LLC purchased 186.13 acres for $79.9 million, according to the Shelby County Register of Deeds."
   ]
  },
  {
   "url": "https://ldnews.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "Where are xAI campuses located in Memphis and Southaven?",
   "published_at": "2026-01-15T11:02:44",
   "project": "Macrohardrr",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "under construction with gas turbines on site for powering xAI data centers",
   "announcement_date": "2025-12-30",
   "project_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "locality_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "This is the third and most recent xAI campus."
   ],
   "state_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "In July 2025, MZX Tech LLC, an xAI affiliate, purchased the[ power plant and corresponding 114.49 acres of land surrounding the facility](/story/money/business/development/2025/07/18/xai-elon-musk-company-buys-southaven-mississippi-property-colossus-2-memphis-tn/85274193007/)."
   ],
   "capacity_gw_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "builder_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "In July 2025, MZX Tech LLC, an xAI affiliate, purchased the[ power plant and corresponding 114.49 acres of land surrounding the facility](/story/money/business/development/2025/07/18/xai-elon-musk-company-buys-southaven-mississippi-property-colossus-2-memphis-tn/85274193007/)."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "Aside from Musk's Dec. 30 post, no official plans or details for the third detail center have been released."
   ],
   "announcement_date_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ]
  },
  {
   "url": "https://tracker.bepresearch.com/projects/microsoft-fairwater-wisconsin",
   "title": "BEP AI Infrastructure Tracker",
   "published_at": null,
   "project": "Nebius Highridge",
   "locality": "Butler Township",
   "state": "Pennsylvania",
   "capacity_gw": 1.2,
   "builder": "Nebius Group",
   "ai_customer": null,
   "status": "Planning",
   "announcement_date": null,
   "project_evidence": [
    "## Related projects",
    "- [Nebius Highridge](/projects/nebius-highridge-pennsylvania)"
   ],
   "locality_evidence": [
    "## Related projects",
    "- [Nebius Highridge](/projects/nebius-highridge-pennsylvania)",
    "Nebius Group \u00b7 Butler Township, Pennsylvania, United States"
   ],
   "state_evidence": [
    "## Related projects",
    "- [Nebius Highridge](/projects/nebius-highridge-pennsylvania)",
    "Nebius Group \u00b7 Butler Township, Pennsylvania, United States"
   ],
   "capacity_gw_evidence": [
    "## Related projects",
    "- [Nebius Highridge](/projects/nebius-highridge-pennsylvania)",
    "1.2 GWPlanning"
   ],
   "builder_evidence": [
    "## Related projects",
    "- [Nebius Highridge](/projects/nebius-highridge-pennsylvania)",
    "Nebius Group \u00b7 Butler Township, Pennsylvania, United States"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Related projects",
    "- [Nebius Highridge](/projects/nebius-highridge-pennsylvania)",
    "1.2 GWPlanning"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tracker.bepresearch.com/projects/microsoft-fairwater-wisconsin",
   "title": "BEP AI Infrastructure Tracker",
   "published_at": null,
   "project": "Meta Prometheus",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "Partially operational",
   "announcement_date": null,
   "project_evidence": [
    "## Related projects",
    "- [Meta Prometheus](/projects/meta-prometheus-new-albany)"
   ],
   "locality_evidence": [
    "## Related projects",
    "- [Meta Prometheus](/projects/meta-prometheus-new-albany)",
    "Meta \u00b7 New Albany, Ohio, United States"
   ],
   "state_evidence": [
    "## Related projects",
    "- [Meta Prometheus](/projects/meta-prometheus-new-albany)",
    "Meta \u00b7 New Albany, Ohio, United States"
   ],
   "capacity_gw_evidence": [
    "## Related projects",
    "- [Meta Prometheus](/projects/meta-prometheus-new-albany)",
    "1 GWPartially operational"
   ],
   "builder_evidence": [
    "## Related projects",
    "- [Meta Prometheus](/projects/meta-prometheus-new-albany)",
    "Meta \u00b7 New Albany, Ohio, United States"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Related projects",
    "- [Meta Prometheus](/projects/meta-prometheus-new-albany)",
    "1 GWPartially operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tracker.bepresearch.com/projects/microsoft-fairwater-wisconsin",
   "title": "BEP AI Infrastructure Tracker",
   "published_at": null,
   "project": "Stargate Michigan",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.4,
   "builder": "Related Digital",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "## Related projects",
    "- [Stargate Michigan](/projects/stargate-michigan-saline-township)"
   ],
   "locality_evidence": [
    "## Related projects",
    "- [Stargate Michigan](/projects/stargate-michigan-saline-township)",
    "Related Digital \u00b7 Saline Township, Michigan, United States"
   ],
   "state_evidence": [
    "## Related projects",
    "- [Stargate Michigan](/projects/stargate-michigan-saline-township)",
    "Related Digital \u00b7 Saline Township, Michigan, United States"
   ],
   "capacity_gw_evidence": [
    "## Related projects",
    "- [Stargate Michigan](/projects/stargate-michigan-saline-township)",
    "1.4 GWUnder construction"
   ],
   "builder_evidence": [
    "## Related projects",
    "- [Stargate Michigan](/projects/stargate-michigan-saline-township)",
    "Related Digital \u00b7 Saline Township, Michigan, United States"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Related projects",
    "- [Stargate Michigan](/projects/stargate-michigan-saline-township)",
    "1.4 GWUnder construction"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://sunya.ai/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand",
   "title": "Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
   "published_at": null,
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Construction has commenced",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "#### Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "- Vantage Data Centers announced a $25 billion investment for a mega-scale data center campus named \"Frontier\" in Shackelford County, Texas."
   ],
   "locality_evidence": [
    "#### Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "- Vantage Data Centers announced a $25 billion investment for a mega-scale data center campus named \"Frontier\" in Shackelford County, Texas."
   ],
   "state_evidence": [
    "#### Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "- Vantage Data Centers announced a $25 billion investment for a mega-scale data center campus named \"Frontier\" in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "#### Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "- The Frontier campus will feature 1.4 gigawatts of capacity designed to support the growing demand for AI technologies."
   ],
   "builder_evidence": [
    "#### Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "- Vantage Data Centers announced a $25 billion investment for a mega-scale data center campus named \"Frontier\" in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "#### Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "- Construction has commenced, with the first building expected to be completed in the latter half of 2026."
   ],
   "announcement_date_evidence": [
    "#### Vantage Data Centers Unveils Plans for \u201cFrontier,\u201d a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
    "August 19, 2025"
   ]
  },
  {
   "url": "https://amarillo.com/story/news/2025/09/10/fermi-america-ipo-filing-outlines-11gw-amarillo-data-campus-plan/86074551007",
   "title": "Fermi America files for IPO to fund 11GW Amarillo data center campus",
   "published_at": "2025-09-10T16:30:16",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Fermi America files for IPO to fund 11GW Amarillo data center campus",
    "The 11-gigawatt project, known as Project Matador, is expected to span about 18 million square feet on land leased from Texas Tech University in Amarillo."
   ],
   "locality_evidence": [
    "# Fermi America files for IPO to fund 11GW Amarillo data center campus",
    "Fermi America, the company planning a massive energy and data center development in the Amarillo area, has filed paperwork with federal regulators for a proposed initial public offering.",
    "The 11-gigawatt project, known as Project Matador, is expected to span about 18 million square feet on land leased from Texas Tech University in Amarillo."
   ],
   "state_evidence": [
    "# Fermi America files for IPO to fund 11GW Amarillo data center campus",
    "The 11-gigawatt project, known as Project Matador, is expected to span about 18 million square feet on land leased from Texas Tech University in Amarillo."
   ],
   "capacity_gw_evidence": [
    "# Fermi America files for IPO to fund 11GW Amarillo data center campus",
    "The 11-gigawatt project, known as Project Matador, is expected to span about 18 million square feet on land leased from Texas Tech University in Amarillo."
   ],
   "builder_evidence": [
    "# Fermi America files for IPO to fund 11GW Amarillo data center campus",
    "Fermi America, the company planning a massive energy and data center development in the Amarillo area, has filed paperwork with federal regulators for a proposed initial public offering."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Fermi America files for IPO to fund 11GW Amarillo data center campus",
    "Fermi America, the company planning a massive energy and data center development in the Amarillo area, has filed paperwork with federal regulators for a proposed initial public offering."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://norfolkdailynews.com/online_features/press_releases/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy/article_81311550-a544-5ab0-9636-5ea0d3888358.html",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": "2026-03-16T21:18:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "Planned",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*"
   ],
   "locality_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "capacity_gw_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "builder_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories.",
    "AIPCorp's team brings nearly a decade of experience and continuity in AI infrastructure development and will support Nscale's development of the Monarch Compute Campus and Nscale's future global development and expansion operations."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "announcement_date_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026"
   ]
  },
  {
   "url": "https://introl.com/blog/galaxy-helios-1-6gw-ercot-approval-texas-data-center-2026",
   "title": "Galaxy's Helios Campus Hits 1.6GW: Inside Texas's Largest Single-Site Data Center Power Approval",
   "published_at": "2026-02-07T00:00:00",
   "project": "Helios",
   "locality": "Dickens County",
   "state": "Texas",
   "capacity_gw": 3.5,
   "builder": "Galaxy Digital",
   "ai_customer": "CoreWeave",
   "status": "Phase I construction",
   "announcement_date": null,
   "project_evidence": [
    "# Galaxy's Helios Campus Hits 1.6GW: Inside Texas's Largest Single-Site Data Center Power Approval",
    "Galaxy Digital just secured approval for the largest single-site allocation in that queue: 1.6 gigawatts at its Helios campus in West Texas, with CoreWeave committed to the entire capacity for AI training workloads."
   ],
   "locality_evidence": [
    "# Galaxy's Helios Campus Hits 1.6GW: Inside Texas's Largest Single-Site Data Center Power Approval",
    "The 160-acre campus sits in Dickens County, West Texas, offering several strategic benefits:"
   ],
   "state_evidence": [
    "# Galaxy's Helios Campus Hits 1.6GW: Inside Texas's Largest Single-Site Data Center Power Approval",
    "Galaxy Digital just secured approval for the largest single-site allocation in that queue: 1.6 gigawatts at its Helios campus in West Texas, with CoreWeave committed to the entire capacity for AI training workloads."
   ],
   "capacity_gw_evidence": [
    "# Galaxy's Helios Campus Hits 1.6GW: Inside Texas's Largest Single-Site Data Center Power Approval",
    "The campus, which began as a cryptocurrency mining operation acquired for $65 million in 2022, has transformed into what Galaxy calls \"one of the largest AI datacenter campuses in the world\"\u2014with potential to eventually support 3.5GW."
   ],
   "builder_evidence": [
    "# Galaxy's Helios Campus Hits 1.6GW: Inside Texas's Largest Single-Site Data Center Power Approval",
    "Galaxy Digital just secured approval for the largest single-site allocation in that queue: 1.6 gigawatts at its Helios campus in West Texas, with CoreWeave committed to the entire capacity for AI training workloads."
   ],
   "ai_customer_evidence": [
    "# Galaxy's Helios Campus Hits 1.6GW: Inside Texas's Largest Single-Site Data Center Power Approval",
    "Galaxy Digital just secured approval for the largest single-site allocation in that queue: 1.6 gigawatts at its Helios campus in West Texas, with CoreWeave committed to the entire capacity for AI training workloads."
   ],
   "status_evidence": [
    "Major Texas Data Center Developments:",
    "| Project | Developer | Capacity | Status |",
    "| Helios | Galaxy/CoreWeave | 1.6GW approved, 3.5GW potential | Phase I construction |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://computeforecast.com/news/openai-georgia-data-center-strategy",
   "title": "OpenAI Targets Multi-Billion-Dollar Georgia AI Campus While Redefining Data Center Development - COMPUTE FORECAST",
   "published_at": "2026-07-24T09:54:56",
   "project": "Project Camellia",
   "locality": "Savannah",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "The proposed development, internally known as Project Camellia, would become one of OpenAI\u2019s largest infrastructure assets once completed.",
    "[OpenAI](https://openai.com/) is preparing one of the largest artificial intelligence infrastructure projects ever proposed in the United States, pairing a planned investment exceeding $30 billion with an unusually aggressive community engagement strategy."
   ],
   "locality_evidence": [
    "The company intends to develop a 3.2-gigawatt data center campus in Effingham County near Savannah, Georgia, marking a significant shift in how hyperscale AI infrastructure is planned, financed, and presented to local communities.",
    "[OpenAI](https://openai.com/) is preparing one of the largest artificial intelligence infrastructure projects ever proposed in the United States, pairing a planned investment exceeding $30 billion with an unusually aggressive community engagement strategy."
   ],
   "state_evidence": [
    "The company intends to develop a 3.2-gigawatt data center campus in Effingham County near Savannah, Georgia, marking a significant shift in how hyperscale AI infrastructure is planned, financed, and presented to local communities.",
    "[OpenAI](https://openai.com/) is preparing one of the largest artificial intelligence infrastructure projects ever proposed in the United States, pairing a planned investment exceeding $30 billion with an unusually aggressive community engagement strategy."
   ],
   "capacity_gw_evidence": [
    "The company intends to develop a 3.2-gigawatt data center campus in Effingham County near Savannah, Georgia, marking a significant shift in how hyperscale AI infrastructure is planned, financed, and presented to local communities.",
    "[OpenAI](https://openai.com/) is preparing one of the largest artificial intelligence infrastructure projects ever proposed in the United States, pairing a planned investment exceeding $30 billion with an unusually aggressive community engagement strategy."
   ],
   "builder_evidence": [
    "The company intends to develop a 3.2-gigawatt data center campus in Effingham County near Savannah, Georgia, marking a significant shift in how hyperscale AI infrastructure is planned, financed, and presented to local communities.",
    "[OpenAI](https://openai.com/) is preparing one of the largest artificial intelligence infrastructure projects ever proposed in the United States, pairing a planned investment exceeding $30 billion with an unusually aggressive community engagement strategy."
   ],
   "ai_customer_evidence": [
    "The proposed development, internally known as Project Camellia, would become one of OpenAI\u2019s largest infrastructure assets once completed.",
    "[OpenAI](https://openai.com/) is preparing one of the largest artificial intelligence infrastructure projects ever proposed in the United States, pairing a planned investment exceeding $30 billion with an unusually aggressive community engagement strategy."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://sturgisjournal.com/story/money/business/2026/03/17/google-reveals-project-cannoli-data-center/89185890007",
   "title": "Google reveals it is behind big 'Project Cannoli' data center project",
   "published_at": "2026-03-17T12:02:18",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": null,
   "status": "Preliminary site plan approval",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "locality_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "state_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google also said Tuesday that it is creating a $10 million Energy Impact Fund for local organizations to tap into with the aim of lowering monthly utility bills for Michiganders."
   ],
   "capacity_gw_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "builder_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "The data center would be developed for Google by Panattoni Development Co."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "The township's Planning Commission voted 5-2 on Feb. 11 to give a preliminary site plan approval for the project."
   ],
   "announcement_date_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Updated March 17, 2026, 2:27 p.m. ET",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ]
  },
  {
   "url": "https://cdn2.benzinga.com/trading-ideas/movers/26/05/52781381/terawulf-stock-jumps-after-acquiring-1-gw-kentucky-ai-campus",
   "title": "(WULF) - TeraWulf Stock Jumps After Acquiring 1 GW Kentucky AI Campus",
   "published_at": "2026-05-26T14:52:43",
   "project": "Muskie Data Campus",
   "locality": null,
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf Inc.",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": "2026-05-26",
   "project_evidence": [
    "# TeraWulf Stock Jumps After Acquiring 1 GW Kentucky AI Campus",
    "TeraWulf said the newly acquired Muskie Data Campus is expected to support more than 1 gigawatt of data center capacity over time."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# TeraWulf Stock Jumps After Acquiring 1 GW Kentucky AI Campus",
    "TeraWulf said the newly acquired Muskie Data Campus is expected to support more than 1 gigawatt of data center capacity over time.",
    "TeraWulf said Kentucky Power, an AEP company, is constructing a 345 kV substation connected to the existing 765 kV transmission network to support the campus."
   ],
   "capacity_gw_evidence": [
    "# TeraWulf Stock Jumps After Acquiring 1 GW Kentucky AI Campus",
    "TeraWulf said the newly acquired Muskie Data Campus is expected to support more than 1 gigawatt of data center capacity over time."
   ],
   "builder_evidence": [
    "# TeraWulf Stock Jumps After Acquiring 1 GW Kentucky AI Campus",
    "**TeraWulf Inc.** [(NASDAQ:](https://www.benzinga.com/quote/WULF)[WULF](https://www.benzinga.com/quote/WULF)) shares are trading higher Tuesday after the company announced the acquisition of a hyperscale high-performing computing development site located[ in Eastern Kentucky](https://www.benzinga.com/node/52773191).",
    "TeraWulf said the newly acquired Muskie Data Campus is expected to support more than 1 gigawatt of data center capacity over time."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# TeraWulf Stock Jumps After Acquiring 1 GW Kentucky AI Campus",
    "**TeraWulf Inc.** [(NASDAQ:](https://www.benzinga.com/quote/WULF)[WULF](https://www.benzinga.com/quote/WULF)) shares are trading higher Tuesday after the company announced the acquisition of a hyperscale high-performing computing development site located[ in Eastern Kentucky](https://www.benzinga.com/node/52773191).",
    "TeraWulf said the newly acquired Muskie Data Campus is expected to support more than 1 gigawatt of data center capacity over time."
   ],
   "announcement_date_evidence": [
    "# TeraWulf Stock Jumps After Acquiring 1 GW Kentucky AI Campus",
    " May 26, 2026 10:52am"
   ]
  },
  {
   "url": "https://blockspace.media/insight/hut-8-q2-2026-earnings-ebitda-texas-audit?.tsrc=rss",
   "title": "KBW keeps 'Outperform' on HUT with $157 price target following Q2 Earnings - Blockspace",
   "published_at": "2026-08-04T14:05:04",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "under development",
   "announcement_date": null,
   "project_evidence": [
    "# KBW keeps \u2018Outperform\u2019 on HUT with $157 price target following Q2 Earnings",
    "## Beacon Point awaits ERCOT authorization",
    "Beacon Point is an AI data-center campus in Nueces County, Texas with 1GW of utility capacity."
   ],
   "locality_evidence": [
    "# KBW keeps \u2018Outperform\u2019 on HUT with $157 price target following Q2 Earnings",
    "## Beacon Point awaits ERCOT authorization",
    "Beacon Point is an AI data-center campus in Nueces County, Texas with 1GW of utility capacity."
   ],
   "state_evidence": [
    "# KBW keeps \u2018Outperform\u2019 on HUT with $157 price target following Q2 Earnings",
    "## Beacon Point awaits ERCOT authorization",
    "Beacon Point is an AI data-center campus in Nueces County, Texas with 1GW of utility capacity."
   ],
   "capacity_gw_evidence": [
    "# KBW keeps \u2018Outperform\u2019 on HUT with $157 price target following Q2 Earnings",
    "## Beacon Point awaits ERCOT authorization",
    "Beacon Point is an AI data-center campus in Nueces County, Texas with 1GW of utility capacity."
   ],
   "builder_evidence": [
    "# KBW keeps \u2018Outperform\u2019 on HUT with $157 price target following Q2 Earnings",
    "## Beacon Point awaits ERCOT authorization",
    "Hut 8 [said in July](https://www.prnewswire.com/news-releases/hut-8-fully-commercializes-1-gw-beacon-point-ai-data-center-campus-with-second-352-mw-it-lease-bringing-campus-level-base-term-contract-value-to-19-6-billion-302829514.html) that two 15-year leases with the same high-investment-grade tenant cover 704MW of IT capacity and carry $19.6 billion in combined base-term contract value."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# KBW keeps \u2018Outperform\u2019 on HUT with $157 price target following Q2 Earnings",
    "## Beacon Point awaits ERCOT authorization",
    "Hut 8 said on July 20 that site preparation was underway, long-lead critical equipment had been procured and initial energization remained scheduled for the first quarter of 2027."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://powergenerationjournal.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Creekstone Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "state_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "About Creekstone Energy",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "About Creekstone Energy",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://hwcompass.cc/article/nvidia-backs-openai-s-8gw-ohio-data-center-c4c8a1fd",
   "title": "NVIDIA Backs OpenAI's 8GW Ohio Data Center",
   "published_at": "2026-08-17T22:38:50",
   "project": "PORTS-Pike Technology Campus",
   "locality": null,
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "NVIDIA has finalized a financial guarantee for OpenAI's new data center at the PORTS-Pike Technology Campus in Ohio."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "NVIDIA has finalized a financial guarantee for OpenAI's new data center at the PORTS-Pike Technology Campus in Ohio."
   ],
   "capacity_gw_evidence": [
    "The agreement covers land, power, and shell costs for an initial 4.25 IT-gigawatts, with an option to expand to the full 8-gigawatt capacity."
   ],
   "builder_evidence": [
    "SB Energy will build, own, and operate the facility under a 20-year lease to OpenAI."
   ],
   "ai_customer_evidence": [
    "NVIDIA has finalized a financial guarantee for OpenAI's new data center at the PORTS-Pike Technology Campus in Ohio."
   ],
   "status_evidence": [
    "Capacity is scheduled to begin coming online in phases starting in 2028."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://linkedin.com/posts/sjanardhan_at-meta-were-on-a-mission-to-build-the-activity-7351287430366363649-2hzx",
   "title": "\ud83d\ude80 At Meta, we're on a mission to build the world's largest AI compute infrastructure, paving the way for the future of personal superintelligence.",
   "published_at": null,
   "project": "Hyperion",
   "locality": null,
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "forthcoming",
   "announcement_date": null,
   "project_evidence": [
    "Hyperion is our forthcoming mega-campus in Louisiana, and slated to bring 2GW+ fully online by 2030 \u2013 and as Mark mentioned, has the ability to scale up to 5GW over several years.",
    "[ Santosh Janardhan ](https://www.linkedin.com/in/sjanardhan?trk=public_post_feed-actor-name)"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "Hyperion is our forthcoming mega-campus in Louisiana, and slated to bring 2GW+ fully online by 2030 \u2013 and as Mark mentioned, has the ability to scale up to 5GW over several years.",
    "[ Santosh Janardhan ](https://www.linkedin.com/in/sjanardhan?trk=public_post_feed-actor-name)"
   ],
   "capacity_gw_evidence": [
    "Hyperion is our forthcoming mega-campus in Louisiana, and slated to bring 2GW+ fully online by 2030 \u2013 and as Mark mentioned, has the ability to scale up to 5GW over several years.",
    "[ Santosh Janardhan ](https://www.linkedin.com/in/sjanardhan?trk=public_post_feed-actor-name)"
   ],
   "builder_evidence": [
    "\ud83d\ude80 At Meta, we're on a mission to build the world's largest AI compute infrastructure, paving the way for the future of personal superintelligence.",
    "Hyperion is our forthcoming mega-campus in Louisiana, and slated to bring 2GW+ fully online by 2030 \u2013 and as Mark mentioned, has the ability to scale up to 5GW over several years.",
    "[ Santosh Janardhan ](https://www.linkedin.com/in/sjanardhan?trk=public_post_feed-actor-name)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Hyperion is our forthcoming mega-campus in Louisiana, and slated to bring 2GW+ fully online by 2030 \u2013 and as Mark mentioned, has the ability to scale up to 5GW over several years.",
    "[ Santosh Janardhan ](https://www.linkedin.com/in/sjanardhan?trk=public_post_feed-actor-name)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://linkedin.com/posts/sjanardhan_at-meta-were-on-a-mission-to-build-the-activity-7351287430366363649-2hzx",
   "title": "\ud83d\ude80 At Meta, we're on a mission to build the world's largest AI compute infrastructure, paving the way for the future of personal superintelligence.",
   "published_at": null,
   "project": null,
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "breaking ground",
   "announcement_date": "2025-10-15",
   "project_evidence": null,
   "locality_evidence": [
    "We're breaking ground on [Meta](https://www.linkedin.com/company/meta?trk=public_post-text)'s newest data center in El Paso.",
    "[ Rob Sherman ](https://www.linkedin.com/in/rsherman?trk=public_post_feed-actor-name)"
   ],
   "state_evidence": [
    "Wow this is cool! [Meta](https://www.linkedin.com/company/meta?trk=public_post-text) just announced a $1.5B investment into a new AI-focused data centre in El Paso, Texas.",
    "[ Connor Kentner ](https://ca.linkedin.com/in/connor-kentner-598049186?trk=public_post_feed-actor-name)"
   ],
   "capacity_gw_evidence": [
    "This data center can scale to 1GW, representing the kind of massive compute capacity needed for developing superintelligence and advancing AI research.",
    "[ Rob Sherman ](https://www.linkedin.com/in/rsherman?trk=public_post_feed-actor-name)"
   ],
   "builder_evidence": [
    "We're breaking ground on [Meta](https://www.linkedin.com/company/meta?trk=public_post-text)'s newest data center in El Paso.",
    "[ Rob Sherman ](https://www.linkedin.com/in/rsherman?trk=public_post_feed-actor-name)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "We're breaking ground on [Meta](https://www.linkedin.com/company/meta?trk=public_post-text)'s newest data center in El Paso.",
    "[ Rob Sherman ](https://www.linkedin.com/in/rsherman?trk=public_post_feed-actor-name)"
   ],
   "announcement_date_evidence": [
    "[\n Meta commits $1.5 billion for AI data center in Texas reuters.com\n\n](https://www.linkedin.com/redir/redirect?url=https%3A%2F%2Fwww%2Ereuters%2Ecom%2Fbusiness%2Fmeta-commits-15-billion-ai-data-center-texas-2025-10-15%2F&urlhash=Kb2l&trk=public_post_feed-article-content)",
    "[ Connor Kentner ](https://ca.linkedin.com/in/connor-kentner-598049186?trk=public_post_feed-actor-name)"
   ]
  },
  {
   "url": "https://economictimes.indiatimes.com/tech/artificial-intelligence/at-amazons-biggest-data-center-everything-is-supersized-for-ai/articleshow/122055517.cms",
   "title": "At Amazon's biggest data centre, everything is supersized for AI",
   "published_at": "2025-06-24T20:29:21",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon",
   "ai_customer": "Anthropic",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# At Amazon's biggest data centre, everything is supersized for AI",
    "The complex\u2014so large that it can be viewed completely only from high in the sky\u2014is the first in a new generation of data centres being built by Amazon, and part of what the company calls [Project Rainier](https://economictimes.indiatimes.com/topic/project-rainier), after the mountain that looms near its Seattle headquarters."
   ],
   "locality_evidence": [
    "# At Amazon's biggest data centre, everything is supersized for AI",
    "A year ago, a 1,200-acre stretch of farmland outside New Carlisle, Indiana, was an empty cornfield."
   ],
   "state_evidence": [
    "# At Amazon's biggest data centre, everything is supersized for AI",
    "Amazon constructs huge AI data centers in Indiana."
   ],
   "capacity_gw_evidence": [
    "# At Amazon's biggest data centre, everything is supersized for AI",
    "The facility will consume 2.2 gigawatts of electricity\u2014enough to power 1 million homes."
   ],
   "builder_evidence": [
    "# At Amazon's biggest data centre, everything is supersized for AI",
    "Amazon constructs huge AI data centers in Indiana."
   ],
   "ai_customer_evidence": [
    "# At Amazon's biggest data centre, everything is supersized for AI",
    "These centers will power AI startup Anthropic."
   ],
   "status_evidence": [
    "# At Amazon's biggest data centre, everything is supersized for AI",
    "Now, seven [Amazon data centres](https://economictimes.indiatimes.com/topic/amazon-data-centres) rise up from the rich soil, each larger than a football stadium."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://measuredai.substack.com/p/microsoft-fairwater-atlanta-data-center",
   "title": "Microsoft's Fairwater Atlanta: A Grid-Only Gigawatt AI Data Center",
   "published_at": "2026-06-02T11:00:28",
   "project": "QTS Fayetteville Main Campus",
   "locality": "Fayetteville",
   "state": "Georgia",
   "capacity_gw": 1.5,
   "builder": "QTS Data Centers",
   "ai_customer": "Microsoft",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# Microsoft's Fairwater Atlanta: A Grid-Only Gigawatt AI Data Center",
    "## QTS Fayetteville Data Center Campus: What\u2019s Being Built by QTS",
    "Microsoft\u2019s Fairwater Atlanta data centers sit within a **615-acre** QTS-owned Main Campus site at 1435 Highway 54 West in Fayetteville, Fayette County, Georgia \u2014 about 30 minutes south of Hartsfield-Jackson Atlanta International Airport."
   ],
   "locality_evidence": [
    "# Microsoft's Fairwater Atlanta: A Grid-Only Gigawatt AI Data Center",
    "## QTS Fayetteville Data Center Campus: What\u2019s Being Built by QTS",
    "Microsoft\u2019s Fairwater Atlanta data centers sit within a **615-acre** QTS-owned Main Campus site at 1435 Highway 54 West in Fayetteville, Fayette County, Georgia \u2014 about 30 minutes south of Hartsfield-Jackson Atlanta International Airport."
   ],
   "state_evidence": [
    "# Microsoft's Fairwater Atlanta: A Grid-Only Gigawatt AI Data Center",
    "## QTS Fayetteville Data Center Campus: What\u2019s Being Built by QTS",
    "Microsoft\u2019s Fairwater Atlanta data centers sit within a **615-acre** QTS-owned Main Campus site at 1435 Highway 54 West in Fayetteville, Fayette County, Georgia \u2014 about 30 minutes south of Hartsfield-Jackson Atlanta International Airport."
   ],
   "capacity_gw_evidence": [
    "# Microsoft's Fairwater Atlanta: A Grid-Only Gigawatt AI Data Center",
    "## The Grid: Supply, Transmission, and Renewables",
    "Georgia Power, via its [2025 IRP testimony](https://psc.ga.gov/search/facts-docket/?docketId=56002), repeatedly framed this single large anticipated data center load on its system at **\u201cjust under 1,500 megawatts.\u201d**"
   ],
   "builder_evidence": [
    "# Microsoft's Fairwater Atlanta: A Grid-Only Gigawatt AI Data Center",
    "## QTS Fayetteville Data Center Campus: What\u2019s Being Built by QTS",
    "Blackstone-owned QTS Data Centers acquired the original 615-acre parcel in August 2022 for **$153.8 million**, and subsequently, in 2024 and 2025, assembled three adjoining parcels totaling an additional 313 acres south of Sandy Creek Road with frontage on Veterans Parkway."
   ],
   "ai_customer_evidence": [
    "# Microsoft's Fairwater Atlanta: A Grid-Only Gigawatt AI Data Center",
    "## Microsoft\u2019s Fairwater Atlanta Campus: What\u2019s Being Leased from QTS",
    "[Microsoft is the tenant](https://measuredai.substack.com/p/microsoft-monarch-data-center) of multiple Fairwater-designed buildings at QTS\u2019 Fayetteville data center campus (most notably DC-1 and DC-2 as Fairwater 2; DC-9 and DC-10 as Fairwater 1)."
   ],
   "status_evidence": [
    "# Microsoft's Fairwater Atlanta: A Grid-Only Gigawatt AI Data Center",
    "## Microsoft\u2019s Fairwater Atlanta Campus: What\u2019s Being Leased from QTS",
    "The Microsoft Fairwater Atlanta campus has been in operation since **October 2025**."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://interconnectionqueue.org/project/vantage-frontier-shackelford",
   "title": "Vantage 'Frontier' Campus \u2014 Project signal",
   "published_at": null,
   "project": "Vantage 'Frontier' Campus",
   "locality": "Albany / Abilene",
   "state": "TX",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": "OpenAI",
   "status": "Under Construction",
   "announcement_date": "2025-08",
   "project_evidence": [
    "Exhibit 2 \u00b7 Project signal",
    "# Vantage 'Frontier' Campus"
   ],
   "locality_evidence": [
    "Exhibit 2 \u00b7 Project signal",
    "Nearest cityAlbany / Abilene"
   ],
   "state_evidence": [
    "Exhibit 2 \u00b7 Project signal",
    "StateTX"
   ],
   "capacity_gw_evidence": [
    "Exhibit 2 \u00b7 Project signal",
    "Estimated load1,400 MW"
   ],
   "builder_evidence": [
    "Exhibit 2 \u00b7 Project signal",
    "Developer / ownerVantage Data Centers (DigitalBridge / Silver Lake backed); tied to OpenAI/Stargate"
   ],
   "ai_customer_evidence": [
    "Exhibit 2 \u00b7 Project signal",
    "Developer / ownerVantage Data Centers (DigitalBridge / Silver Lake backed); tied to OpenAI/Stargate"
   ],
   "status_evidence": [
    "Exhibit 2 \u00b7 Project signal",
    "StatusUnder Construction"
   ],
   "announcement_date_evidence": [
    "Exhibit 2 \u00b7 Project signal",
    "Announced2025-08"
   ]
  },
  {
   "url": "https://web.amarillo-chamber.org/external/wcpages/referral.aspx?ProfileID=34223&ReferralType=SNLI&URL=https://www.linkedin.com/company/fermi-america",
   "title": "Fermi America | LinkedIn",
   "published_at": "2026-05-17T14:42:56",
   "project": "HyperGrid",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 17.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "## About us",
    "Our flagship HyperGrid\u2122 campus in Amarillo, Texas is expected to become the world\u2019s largest energy-driven AI complex, integrating nuclear, natural gas, utility, solar, and battery power."
   ],
   "locality_evidence": [
    "## About us",
    "Our flagship HyperGrid\u2122 campus in Amarillo, Texas is expected to become the world\u2019s largest energy-driven AI complex, integrating nuclear, natural gas, utility, solar, and battery power."
   ],
   "state_evidence": [
    "## About us",
    "Our flagship HyperGrid\u2122 campus in Amarillo, Texas is expected to become the world\u2019s largest energy-driven AI complex, integrating nuclear, natural gas, utility, solar, and battery power."
   ],
   "capacity_gw_evidence": [
    "## About us",
    "With 17 gigawatts of capacity and 18 million sq ft of AI infrastructure, Fermi America is positioned to secure global leadership in energy and artificial intelligence."
   ],
   "builder_evidence": [
    "## About us",
    "Fermi America is pioneering the development of next-generation electric grids that deliver highly redundant power at gigawatt scale, required to create next-generation artificial intelligence."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://portal.sina.com.hk/finance/finance-prnewswire/prnasia/2026/03/17/1614973/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy-to-compute",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute - \u65b0\u6d6a\u9999\u6e2f",
   "published_at": "2026-03-16T21:34:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*"
   ],
   "locality_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "capacity_gw_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "builder_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "announcement_date_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ]
  },
  {
   "url": "https://blackridgeresearch.com/blog/latest-list-new-upcoming-data-center-construction-project-developments-world",
   "title": "New Data Center Projects August 2026: Global Developments",
   "published_at": null,
   "project": "Lancium Clean Campus",
   "locality": "Hall County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "QTS",
   "ai_customer": null,
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Lancium Clean Campus (up to 11 buildings, 1 GW) | QTS | ~USD 10 Billion | Hall County (near Turkey), Texas | Planned |",
    "### Lancium Clean Campus"
   ],
   "locality_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Lancium Clean Campus (up to 11 buildings, 1 GW) | QTS | ~USD 10 Billion | Hall County (near Turkey), Texas | Planned |",
    "### Lancium Clean Campus",
    "QTS has announced plans to invest approximately USD 10 billion to develop up to 11 data center buildings at Lancium's Clean Campus in Hall County, Texas."
   ],
   "state_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Lancium Clean Campus (up to 11 buildings, 1 GW) | QTS | ~USD 10 Billion | Hall County (near Turkey), Texas | Planned |",
    "### Lancium Clean Campus",
    "QTS has announced plans to invest approximately USD 10 billion to develop up to 11 data center buildings at Lancium's Clean Campus in Hall County, Texas."
   ],
   "capacity_gw_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Lancium Clean Campus (up to 11 buildings, 1 GW) | QTS | ~USD 10 Billion | Hall County (near Turkey), Texas | Planned |",
    "### Lancium Clean Campus",
    "The campus spans around 465 acres and is supported by a 1 GW grid connection, with Lancium also providing on-site solar and battery energy storage."
   ],
   "builder_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Lancium Clean Campus (up to 11 buildings, 1 GW) | QTS | ~USD 10 Billion | Hall County (near Turkey), Texas | Planned |",
    "### Lancium Clean Campus",
    "QTS has announced plans to invest approximately USD 10 billion to develop up to 11 data center buildings at Lancium's Clean Campus in Hall County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Lancium Clean Campus (up to 11 buildings, 1 GW) | QTS | ~USD 10 Billion | Hall County (near Turkey), Texas | Planned |",
    "### Lancium Clean Campus"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://blackridgeresearch.com/blog/latest-list-new-upcoming-data-center-construction-project-developments-world",
   "title": "New Data Center Projects August 2026: Global Developments",
   "published_at": null,
   "project": "Hyperion Campus",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "Expansion announced",
   "announcement_date": null,
   "project_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Hyperion Campus Expansion (2 GW \u2192 5 GW, +1,400 acres) | Meta | USD 150 Million secured (multi-billion-dollar buildout) | Richland Parish, Louisiana | Expansion announced |",
    "### Hyperion Campus Expansion",
    "Meta has expanded plans for its Hyperion data center campus in Richland Parish, Louisiana, increasing its planned capacity from 2 GW to 5 GW."
   ],
   "locality_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Hyperion Campus Expansion (2 GW \u2192 5 GW, +1,400 acres) | Meta | USD 150 Million secured (multi-billion-dollar buildout) | Richland Parish, Louisiana | Expansion announced |",
    "### Hyperion Campus Expansion",
    "Meta has expanded plans for its Hyperion data center campus in Richland Parish, Louisiana, increasing its planned capacity from 2 GW to 5 GW."
   ],
   "state_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Hyperion Campus Expansion (2 GW \u2192 5 GW, +1,400 acres) | Meta | USD 150 Million secured (multi-billion-dollar buildout) | Richland Parish, Louisiana | Expansion announced |",
    "### Hyperion Campus Expansion",
    "Meta has expanded plans for its Hyperion data center campus in Richland Parish, Louisiana, increasing its planned capacity from 2 GW to 5 GW."
   ],
   "capacity_gw_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Hyperion Campus Expansion (2 GW \u2192 5 GW, +1,400 acres) | Meta | USD 150 Million secured (multi-billion-dollar buildout) | Richland Parish, Louisiana | Expansion announced |",
    "### Hyperion Campus Expansion",
    "Meta has expanded plans for its Hyperion data center campus in Richland Parish, Louisiana, increasing its planned capacity from 2 GW to 5 GW."
   ],
   "builder_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Hyperion Campus Expansion (2 GW \u2192 5 GW, +1,400 acres) | Meta | USD 150 Million secured (multi-billion-dollar buildout) | Richland Parish, Louisiana | Expansion announced |",
    "### Hyperion Campus Expansion",
    "Meta has expanded plans for its Hyperion data center campus in Richland Parish, Louisiana, increasing its planned capacity from 2 GW to 5 GW."
   ],
   "ai_customer_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Hyperion Campus Expansion (2 GW \u2192 5 GW, +1,400 acres) | Meta | USD 150 Million secured (multi-billion-dollar buildout) | Richland Parish, Louisiana | Expansion announced |",
    "### Hyperion Campus Expansion",
    "Meta has expanded plans for its Hyperion data center campus in Richland Parish, Louisiana, increasing its planned capacity from 2 GW to 5 GW."
   ],
   "status_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Hyperion Campus Expansion (2 GW \u2192 5 GW, +1,400 acres) | Meta | USD 150 Million secured (multi-billion-dollar buildout) | Richland Parish, Louisiana | Expansion announced |",
    "### Hyperion Campus Expansion"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://blackridgeresearch.com/blog/latest-list-new-upcoming-data-center-construction-project-developments-world",
   "title": "New Data Center Projects August 2026: Global Developments",
   "published_at": null,
   "project": "Matagorda County Campus",
   "locality": "Matagorda County",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Mara",
   "ai_customer": null,
   "status": "Land acquired",
   "announcement_date": null,
   "project_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Matagorda County Campus (1,200+ acres, up to 2 GW) | Mara | Not disclosed | Matagorda County, Texas | Land acquired |",
    "### Matagorda County Campus"
   ],
   "locality_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Matagorda County Campus (1,200+ acres, up to 2 GW) | Mara | Not disclosed | Matagorda County, Texas | Land acquired |",
    "### Matagorda County Campus",
    "MARA Holdings has acquired a 1,200-acre site in Matagorda County, Texas, to develop a large-scale AI, high-performance computing (HPC), and Bitcoin mining campus."
   ],
   "state_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Matagorda County Campus (1,200+ acres, up to 2 GW) | Mara | Not disclosed | Matagorda County, Texas | Land acquired |",
    "### Matagorda County Campus",
    "MARA Holdings has acquired a 1,200-acre site in Matagorda County, Texas, to develop a large-scale AI, high-performance computing (HPC), and Bitcoin mining campus."
   ],
   "capacity_gw_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Matagorda County Campus (1,200+ acres, up to 2 GW) | Mara | Not disclosed | Matagorda County, Texas | Land acquired |",
    "### Matagorda County Campus",
    "The site is expected to support up to 2 GW of power capacity, making it one of the company's largest planned infrastructure developments."
   ],
   "builder_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Matagorda County Campus (1,200+ acres, up to 2 GW) | Mara | Not disclosed | Matagorda County, Texas | Land acquired |",
    "### Matagorda County Campus",
    "MARA Holdings has acquired a 1,200-acre site in Matagorda County, Texas, to develop a large-scale AI, high-performance computing (HPC), and Bitcoin mining campus."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Matagorda County Campus (1,200+ acres, up to 2 GW) | Mara | Not disclosed | Matagorda County, Texas | Land acquired |",
    "### Matagorda County Campus"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://blackridgeresearch.com/blog/latest-list-new-upcoming-data-center-construction-project-developments-world",
   "title": "New Data Center Projects August 2026: Global Developments",
   "published_at": null,
   "project": "Kansas City Hyperscale Land",
   "locality": "Kansas City Metro",
   "state": "Kansas",
   "capacity_gw": 2.0,
   "builder": "Digital Realty",
   "ai_customer": null,
   "status": "Land acquired",
   "announcement_date": null,
   "project_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Kansas City Hyperscale Land (1,440 acres, up to 2 GW) | Digital Realty | Not disclosed | Kansas City Metro | Land acquired |",
    "### Digital Realty Hyperscale Campus \u2013 Kansas"
   ],
   "locality_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Kansas City Hyperscale Land (1,440 acres, up to 2 GW) | Digital Realty | Not disclosed | Kansas City Metro | Land acquired |",
    "### Digital Realty Hyperscale Campus \u2013 Kansas",
    "Digital Realty has acquired a 1,440-acre site in De Soto, Kansas, for USD 474 million to develop a new hyperscale data center campus, marking its entry into the Kansas City market."
   ],
   "state_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Kansas City Hyperscale Land (1,440 acres, up to 2 GW) | Digital Realty | Not disclosed | Kansas City Metro | Land acquired |",
    "### Digital Realty Hyperscale Campus \u2013 Kansas",
    "Digital Realty has acquired a 1,440-acre site in De Soto, Kansas, for USD 474 million to develop a new hyperscale data center campus, marking its entry into the Kansas City market."
   ],
   "capacity_gw_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Kansas City Hyperscale Land (1,440 acres, up to 2 GW) | Digital Realty | Not disclosed | Kansas City Metro | Land acquired |",
    "### Digital Realty Hyperscale Campus \u2013 Kansas",
    "The campus is backed by a 600 MW power agreement with Evergy, with the potential to scale up to 2 GW, supporting future expansion."
   ],
   "builder_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Kansas City Hyperscale Land (1,440 acres, up to 2 GW) | Digital Realty | Not disclosed | Kansas City Metro | Land acquired |",
    "### Digital Realty Hyperscale Campus \u2013 Kansas",
    "Digital Realty has acquired a 1,440-acre site in De Soto, Kansas, for USD 474 million to develop a new hyperscale data center campus, marking its entry into the Kansas City market."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Kansas City Hyperscale Land (1,440 acres, up to 2 GW) | Digital Realty | Not disclosed | Kansas City Metro | Land acquired |",
    "### Digital Realty Hyperscale Campus \u2013 Kansas"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://blackridgeresearch.com/blog/latest-list-new-upcoming-data-center-construction-project-developments-world",
   "title": "New Data Center Projects August 2026: Global Developments",
   "published_at": null,
   "project": "Project Kilby AI Data Center Power Campus",
   "locality": "Pecos",
   "state": "Texas",
   "capacity_gw": 2.67,
   "builder": "Microsoft + Chevron",
   "ai_customer": "Microsoft",
   "status": "Power agreement signed",
   "announcement_date": null,
   "project_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Project Kilby AI Data Center Power Campus (20-year power deal) | Microsoft + Chevron | Not disclosed | Near Pecos, Texas | Power agreement signed |",
    "### Project Kilby AI Data Center Power Campus \u2013 Reeves County, Texas"
   ],
   "locality_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Project Kilby AI Data Center Power Campus (20-year power deal) | Microsoft + Chevron | Not disclosed | Near Pecos, Texas | Power agreement signed |",
    "### Project Kilby AI Data Center Power Campus \u2013 Reeves County, Texas",
    "Chevron and Microsoft have signed a 20-year power purchase agreement to develop Project Kilby, a dedicated energy facility supporting a new AI data center campus in Reeves County, Texas."
   ],
   "state_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Project Kilby AI Data Center Power Campus (20-year power deal) | Microsoft + Chevron | Not disclosed | Near Pecos, Texas | Power agreement signed |",
    "### Project Kilby AI Data Center Power Campus \u2013 Reeves County, Texas",
    "Chevron and Microsoft have signed a 20-year power purchase agreement to develop Project Kilby, a dedicated energy facility supporting a new AI data center campus in Reeves County, Texas."
   ],
   "capacity_gw_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Project Kilby AI Data Center Power Campus (20-year power deal) | Microsoft + Chevron | Not disclosed | Near Pecos, Texas | Power agreement signed |",
    "### Project Kilby AI Data Center Power Campus \u2013 Reeves County, Texas",
    "Built on more than 2,000 acres, the project will provide up to 2.67 GW of natural gas-fired power directly to Microsoft's data center through a behind-the-meter configuration, avoiding reliance on the public grid."
   ],
   "builder_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Project Kilby AI Data Center Power Campus (20-year power deal) | Microsoft + Chevron | Not disclosed | Near Pecos, Texas | Power agreement signed |",
    "### Project Kilby AI Data Center Power Campus \u2013 Reeves County, Texas",
    "Chevron and Microsoft have signed a 20-year power purchase agreement to develop Project Kilby, a dedicated energy facility supporting a new AI data center campus in Reeves County, Texas."
   ],
   "ai_customer_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Project Kilby AI Data Center Power Campus (20-year power deal) | Microsoft + Chevron | Not disclosed | Near Pecos, Texas | Power agreement signed |",
    "### Project Kilby AI Data Center Power Campus \u2013 Reeves County, Texas",
    "Built on more than 2,000 acres, the project will provide up to 2.67 GW of natural gas-fired power directly to Microsoft's data center through a behind-the-meter configuration, avoiding reliance on the public grid."
   ],
   "status_evidence": [
    "North America Data Center Developments",
    "| Project / Site | Developer | Investment (USD) | Location | Status |",
    "| Project Kilby AI Data Center Power Campus (20-year power deal) | Microsoft + Chevron | Not disclosed | Near Pecos, Texas | Power agreement signed |",
    "### Project Kilby AI Data Center Power Campus \u2013 Reeves County, Texas"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://letsdatascience.com/news/oleary-digital-builds-9-gw-utah-ai-data-center-campus-8050e513",
   "title": "O'Leary Digital Builds 9 GW Utah AI Data Center Campus",
   "published_at": "2026-04-27T14:58:17",
   "project": "Stratos",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O'Leary Digital",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "O'Leary Digital Builds 9 GW Utah AI Data Center Campus",
    "Tom's Hardware reports that the Military Installation Development Authority (MIDA) approved a development agreement for a hyperscale data center campus named **Stratos**, developed by **O'Leary Digital**, in Box Elder County, Utah."
   ],
   "locality_evidence": [
    "O'Leary Digital Builds 9 GW Utah AI Data Center Campus",
    "Tom's Hardware reports that the Military Installation Development Authority (MIDA) approved a development agreement for a hyperscale data center campus named **Stratos**, developed by **O'Leary Digital**, in Box Elder County, Utah."
   ],
   "state_evidence": [
    "O'Leary Digital Builds 9 GW Utah AI Data Center Campus",
    "Tom's Hardware reports that the Military Installation Development Authority (MIDA) approved a development agreement for a hyperscale data center campus named **Stratos**, developed by **O'Leary Digital**, in Box Elder County, Utah."
   ],
   "capacity_gw_evidence": [
    "O'Leary Digital Builds 9 GW Utah AI Data Center Campus",
    "The article states the site would span **40,000 acres** of private land plus **1,200 acres** of military and state-owned property and could reach **9 GW** of power consumption at full buildout, versus Utah's current average electricity use of roughly **4 GW**, per Tom's Hardware."
   ],
   "builder_evidence": [
    "O'Leary Digital Builds 9 GW Utah AI Data Center Campus",
    "Tom's Hardware reports that the Military Installation Development Authority (MIDA) approved a development agreement for a hyperscale data center campus named **Stratos**, developed by **O'Leary Digital**, in Box Elder County, Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "O'Leary Digital Builds 9 GW Utah AI Data Center Campus",
    "Tom's Hardware reports that the Military Installation Development Authority (MIDA) approved a development agreement for a hyperscale data center campus named **Stratos**, developed by **O'Leary Digital**, in Box Elder County, Utah."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://the-ledger.net/events/openai-project-camellia",
   "title": "OpenAI Announces Project Camellia, Its First Company-Led Data-Center Development \u2014 The Ledger",
   "published_at": "2026-07-06T00:00:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "development stage",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "# OpenAI Announces Project Camellia, Its First Company-Led Data-Center Development",
    "On July 22, 2026, OpenAI announced Project Camellia, a planned data-center campus in Effingham County, Georgia, that it described as its first infrastructure project whose design and development it would lead directly."
   ],
   "locality_evidence": [
    "# OpenAI Announces Project Camellia, Its First Company-Led Data-Center Development",
    "On July 22, 2026, OpenAI announced Project Camellia, a planned data-center campus in Effingham County, Georgia, that it described as its first infrastructure project whose design and development it would lead directly."
   ],
   "state_evidence": [
    "# OpenAI Announces Project Camellia, Its First Company-Led Data-Center Development",
    "On July 22, 2026, OpenAI announced Project Camellia, a planned data-center campus in Effingham County, Georgia, that it described as its first infrastructure project whose design and development it would lead directly."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Announces Project Camellia, Its First Company-Led Data-Center Development",
    "The four-building campus would occupy approximately 1,400 acres, include a commitment of at least $20 billion in capital investment, and receive up to 3.2 gigawatts of electricity from Georgia Power in phases between 2028 and 2032."
   ],
   "builder_evidence": [
    "# OpenAI Announces Project Camellia, Its First Company-Led Data-Center Development",
    "On July 22, 2026, OpenAI announced Project Camellia, a planned data-center campus in Effingham County, Georgia, that it described as its first infrastructure project whose design and development it would lead directly."
   ],
   "ai_customer_evidence": [
    "# OpenAI Announces Project Camellia, Its First Company-Led Data-Center Development",
    "On July 22, 2026, OpenAI announced Project Camellia, a planned data-center campus in Effingham County, Georgia, that it described as its first infrastructure project whose design and development it would lead directly."
   ],
   "status_evidence": [
    "# OpenAI Announces Project Camellia, Its First Company-Led Data-Center Development",
    "The project remained at the development stage."
   ],
   "announcement_date_evidence": [
    "# OpenAI Announces Project Camellia, Its First Company-Led Data-Center Development",
    "A ledger entry in the industry archive, dated 2026-07-22.",
    "On July 22, 2026, OpenAI announced Project Camellia, a planned data-center campus in Effingham County, Georgia, that it described as its first infrastructure project whose design and development it would lead directly."
   ]
  },
  {
   "url": "https://thelistwire.usatoday.com/story/news/local/michigan/2026/03/17/google-weighs-joining-van-buren-township-data-center-project-dte-energy/89187228007",
   "title": "Google weighs joining Van Buren Township data center project",
   "published_at": "2026-03-17T12:02:32",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": "Google",
   "status": "evaluating",
   "announcement_date": "2026-03-06",
   "project_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "The tech giant is evaluating whether it will get involved with [Project Cannoli, the hyperscale data center project advancing in the western Wayne County community](https://www.detroitnews.com/story/news/local/wayne-county/2026/03/06/nda-nondisclosure-agreement-confidentiality-clues-panattoni-anchor-designs-van-buren-data-center/89016021007/), a Google spokesperson said in an email."
   ],
   "locality_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project."
   ],
   "state_evidence": [
    "Google promises to run Michigan data center on clean power",
    "Michigan has become a hub for data center development since [state lawmakers approved a tax incentive for data centers](https://www.detroitnews.com/story/business/2025/11/22/michigan-economic-development-corporation-data-center-tax-break-law/87229348007/) in 2024."
   ],
   "capacity_gw_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "The Cannoli Project hyperscale data center in Van Buren Township will demand 1 gigawatt of power, DTE Energy Corporate Communications Director Jill Wilmot said in an email."
   ],
   "builder_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "The data center project is being pushed by California real estate development firm Panattoni Development Co."
   ],
   "ai_customer_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project."
   ],
   "status_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "The tech giant is evaluating whether it will get involved with [Project Cannoli, the hyperscale data center project advancing in the western Wayne County community](https://www.detroitnews.com/story/news/local/wayne-county/2026/03/06/nda-nondisclosure-agreement-confidentiality-clues-panattoni-anchor-designs-van-buren-data-center/89016021007/), a Google spokesperson said in an email."
   ],
   "announcement_date_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "The tech giant is evaluating whether it will get involved with [Project Cannoli, the hyperscale data center project advancing in the western Wayne County community](https://www.detroitnews.com/story/news/local/wayne-county/2026/03/06/nda-nondisclosure-agreement-confidentiality-clues-panattoni-anchor-designs-van-buren-data-center/89016021007/), a Google spokesperson said in an email."
   ]
  },
  {
   "url": "https://cdn1.benzinga.com/trading-ideas/movers/26/05/52781381/terawulf-stock-jumps-after-acquiring-1-gw-kentucky-ai-campus",
   "title": "(WULF) - TeraWulf Stock Jumps After Acquiring 1 GW Kentucky AI Campus",
   "published_at": "2026-05-26T14:52:43",
   "project": "Muskie Data Campus",
   "locality": "Eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf Inc.",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": "2026-05-26",
   "project_evidence": [
    "# TeraWulf Stock Jumps After Acquiring 1 GW Kentucky AI Campus",
    "TeraWulf said the newly acquired Muskie Data Campus is expected to support more than 1 gigawatt of data center capacity over time."
   ],
   "locality_evidence": [
    "# TeraWulf Stock Jumps After Acquiring 1 GW Kentucky AI Campus",
    "**TeraWulf Inc.** [(NASDAQ:](https://www.benzinga.com/quote/WULF)[WULF](https://www.benzinga.com/quote/WULF)) shares are trading higher Tuesday after the company announced the acquisition of a hyperscale high-performing computing development site located[ in Eastern Kentucky](https://www.benzinga.com/node/52773191).\n\n- TeraWulf shares are powering higher. [What\u2019s fueling WULF momentum?](https://www.benzinga.com/quote/WULF)\n\n## **TeraWulf Expands Kentucky"
   ],
   "state_evidence": [
    "# TeraWulf Stock Jumps After Acquiring 1 GW Kentucky AI Campus",
    "TeraWulf said the newly acquired Muskie Data Campus is expected to support more than 1 gigawatt of data center capacity over time."
   ],
   "capacity_gw_evidence": [
    "# TeraWulf Stock Jumps After Acquiring 1 GW Kentucky AI Campus",
    "TeraWulf said the newly acquired Muskie Data Campus is expected to support more than 1 gigawatt of data center capacity over time."
   ],
   "builder_evidence": [
    "# TeraWulf Stock Jumps After Acquiring 1 GW Kentucky AI Campus",
    "**TeraWulf Inc.** [(NASDAQ:](https://www.benzinga.com/quote/WULF)[WULF](https://www.benzinga.com/quote/WULF)) shares are trading higher Tuesday after the company announced the acquisition of a hyperscale high-performing computing development site located[ in Eastern Kentucky](https://www.benzinga.com/node/52773191).\n\n- TeraWulf shares are powering higher. [What\u2019s fueling WULF momentum?](https://www.benzinga.com/quote/WULF)\n\n## **TeraWulf Expands Kentucky",
    "TeraWulf said the newly acquired Muskie Data Campus is expected to support more than 1 gigawatt of data center capacity over time."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# TeraWulf Stock Jumps After Acquiring 1 GW Kentucky AI Campus",
    "**TeraWulf Inc.** [(NASDAQ:](https://www.benzinga.com/quote/WULF)[WULF](https://www.benzinga.com/quote/WULF)) shares are trading higher Tuesday after the company announced the acquisition of a hyperscale high-performing computing development site located[ in Eastern Kentucky](https://www.benzinga.com/node/52773191).\n\n- TeraWulf shares are powering higher. [What\u2019s fueling WULF momentum?](https://www.benzinga.com/quote/WULF)\n\n## **TeraWulf Expands Kentucky",
    "TeraWulf said the newly acquired Muskie Data Campus is expected to support more than 1 gigawatt of data center capacity over time."
   ],
   "announcement_date_evidence": [
    "# TeraWulf Stock Jumps After Acquiring 1 GW Kentucky AI Campus",
    "May 26, 2026 10:52am",
    "TeraWulf said the newly acquired Muskie Data Campus is expected to support more than 1 gigawatt of data center capacity over time."
   ]
  },
  {
   "url": "https://gurufocus.com/news/8967143/hut-8-mining-secures-98-billion-lease-to-expand-ai-data-center-capacity",
   "title": "Hut 8 Mining Secures $9.8 Billion Lease to Expand AI Data Center Capacity",
   "published_at": "2026-07-20T15:14:20",
   "project": "Beacon Point",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8 Mining",
   "ai_customer": null,
   "status": "Site preparation is currently underway",
   "announcement_date": null,
   "project_evidence": [
    "# Hut 8 Mining Secures $9.8 Billion Lease to Expand AI Data Center Capacity",
    "This deal allows the existing high-investment-grade tenant to double its contracted footprint to 704 MW, fully utilizing the campus's 1,000 MW of secured utility capacity."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# Hut 8 Mining Secures $9.8 Billion Lease to Expand AI Data Center Capacity",
    "Hut 8 Mining [ HUT ](/stock/HUT/summary) is experiencing a significant surge in trading after finalizing a second 15-year, $9.8 billion triple-net lease for 352 MW of IT capacity at its Beacon Point AI data center campus in Texas."
   ],
   "capacity_gw_evidence": [
    "# Hut 8 Mining Secures $9.8 Billion Lease to Expand AI Data Center Capacity",
    "This deal allows the existing high-investment-grade tenant to double its contracted footprint to 704 MW, fully utilizing the campus's 1,000 MW of secured utility capacity."
   ],
   "builder_evidence": [
    "# Hut 8 Mining Secures $9.8 Billion Lease to Expand AI Data Center Capacity",
    "Hut 8 Mining [ HUT ](/stock/HUT/summary) is experiencing a significant surge in trading after finalizing a second 15-year, $9.8 billion triple-net lease for 352 MW of IT capacity at its Beacon Point AI data center campus in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Hut 8 Mining Secures $9.8 Billion Lease to Expand AI Data Center Capacity",
    "- **Development Timeline:** No additional utility capacity is needed for Phase 2. Site preparation is currently underway, and essential equipment has been procured."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://business.woonsocketcall.com/woonsocketcall/article/gnwcq-2026-5-1-iren-announces-successful-energization-of-sweetwater-1",
   "title": "IREN Announces Successful Energization of Sweetwater 1",
   "published_at": "2026-05-01T20:10:47",
   "project": "Sweetwater",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid",
   "announcement_date": "2026-05-01",
   "project_evidence": [
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited ([NASDAQ: IREN](http://business.woonsocketcall.com/woonsocketcall/quote?Symbol=NQ%3AIREN)) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas.",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited ([NASDAQ: IREN](http://business.woonsocketcall.com/woonsocketcall/quote?Symbol=NQ%3AIREN)) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "capacity_gw_evidence": [
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "builder_evidence": [
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited ([NASDAQ: IREN](http://business.woonsocketcall.com/woonsocketcall/quote?Symbol=NQ%3AIREN)) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "announcement_date_evidence": [
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited ([NASDAQ: IREN](http://business.woonsocketcall.com/woonsocketcall/quote?Symbol=NQ%3AIREN)) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ]
  },
  {
   "url": "https://worldadvertisingreport.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "About Creekstone Energy",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "About Creekstone Energy",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://siteselection.com/top-deals-may-2025",
   "title": "TOP DEALS \u2013 Site Selection Magazine",
   "published_at": null,
   "project": "TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "ECL\u2019s planned $8 billion data center in Houston, Texas, is a groundbreaking project known as TerraSite-TX1, designed to be the world\u2019s first fully sustainable, hydrogen-powered, off-grid AI data center with a capacity of 1 gigawatt (GW)."
   ],
   "locality_evidence": [
    "ECL\u2019s planned $8 billion data center in Houston, Texas, is a groundbreaking project known as TerraSite-TX1, designed to be the world\u2019s first fully sustainable, hydrogen-powered, off-grid AI data center with a capacity of 1 gigawatt (GW)."
   ],
   "state_evidence": [
    "ECL\u2019s planned $8 billion data center in Houston, Texas, is a groundbreaking project known as TerraSite-TX1, designed to be the world\u2019s first fully sustainable, hydrogen-powered, off-grid AI data center with a capacity of 1 gigawatt (GW)."
   ],
   "capacity_gw_evidence": [
    "ECL\u2019s planned $8 billion data center in Houston, Texas, is a groundbreaking project known as TerraSite-TX1, designed to be the world\u2019s first fully sustainable, hydrogen-powered, off-grid AI data center with a capacity of 1 gigawatt (GW)."
   ],
   "builder_evidence": [
    "ECL\u2019s planned $8 billion data center in Houston, Texas, is a groundbreaking project known as TerraSite-TX1, designed to be the world\u2019s first fully sustainable, hydrogen-powered, off-grid AI data center with a capacity of 1 gigawatt (GW)."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "ECL\u2019s planned $8 billion data center in Houston, Texas, is a groundbreaking project known as TerraSite-TX1, designed to be the world\u2019s first fully sustainable, hydrogen-powered, off-grid AI data center with a capacity of 1 gigawatt (GW)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://openai.com/zh-Hans-CN/index/openai-joins-ports-pike-project",
   "title": "OpenAI \u52a0\u5165 PORTS-Pike \u9879\u76ee",
   "published_at": "2026-08-19T19:00:00",
   "project": "PORTS-Pike",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# OpenAI \u52a0\u5165 PORTS-Pike \u9879\u76ee",
    "OpenAI \u52a0\u5165 PORTS-Pike \u9879\u76ee",
    "OpenAI \u5df2\u8fbe\u6210\u534f\u8bae\uff0c\u5c06\u4e0e SB Energy\u3001NVIDIA \u548c\u7f8e\u56fd\u80fd\u6e90\u90e8\u5408\u4f5c\uff0c\u5728\u4fc4\u4ea5\u4fc4\u5dde\u6d3e\u514b\u53bf\u7684 PORTS-Pike \u79d1\u6280\u56ed\u533a\u83b7\u5f97\u7ea6 8 \u5409\u74e6\u7684 IT \u5bb9\u91cf\u3002"
   ],
   "locality_evidence": [
    "OpenAI \u52a0\u5165 PORTS-Pike \u9879\u76ee",
    "OpenAI \u5df2\u8fbe\u6210\u534f\u8bae\uff0c\u5c06\u4e0e SB Energy\u3001NVIDIA \u548c\u7f8e\u56fd\u80fd\u6e90\u90e8\u5408\u4f5c\uff0c\u5728\u4fc4\u4ea5\u4fc4\u5dde\u6d3e\u514b\u53bf\u7684 PORTS-Pike \u79d1\u6280\u56ed\u533a\u83b7\u5f97\u7ea6 8 \u5409\u74e6\u7684 IT \u5bb9\u91cf\u3002"
   ],
   "state_evidence": [
    "OpenAI \u52a0\u5165 PORTS-Pike \u9879\u76ee",
    "OpenAI \u5df2\u8fbe\u6210\u534f\u8bae\uff0c\u5c06\u4e0e SB Energy\u3001NVIDIA \u548c\u7f8e\u56fd\u80fd\u6e90\u90e8\u5408\u4f5c\uff0c\u5728\u4fc4\u4ea5\u4fc4\u5dde\u6d3e\u514b\u53bf\u7684 PORTS-Pike \u79d1\u6280\u56ed\u533a\u83b7\u5f97\u7ea6 8 \u5409\u74e6\u7684 IT \u5bb9\u91cf\u3002"
   ],
   "capacity_gw_evidence": [
    "OpenAI \u52a0\u5165 PORTS-Pike \u9879\u76ee",
    "OpenAI \u5df2\u8fbe\u6210\u534f\u8bae\uff0c\u5c06\u4e0e SB Energy\u3001NVIDIA \u548c\u7f8e\u56fd\u80fd\u6e90\u90e8\u5408\u4f5c\uff0c\u5728\u4fc4\u4ea5\u4fc4\u5dde\u6d3e\u514b\u53bf\u7684 PORTS-Pike \u79d1\u6280\u56ed\u533a\u83b7\u5f97\u7ea6 8 \u5409\u74e6\u7684 IT \u5bb9\u91cf\u3002"
   ],
   "builder_evidence": [
    "OpenAI \u52a0\u5165 PORTS-Pike \u9879\u76ee",
    "OpenAI \u5df2\u8fbe\u6210\u534f\u8bae\uff0c\u5c06\u4e0e SB Energy\u3001NVIDIA \u548c\u7f8e\u56fd\u80fd\u6e90\u90e8\u5408\u4f5c\uff0c\u5728\u4fc4\u4ea5\u4fc4\u5dde\u6d3e\u514b\u53bf\u7684 PORTS-Pike \u79d1\u6280\u56ed\u533a\u83b7\u5f97\u7ea6 8 \u5409\u74e6\u7684 IT \u5bb9\u91cf\u3002",
    "SB Energy \u5c06\u5efa\u8bbe\u3001\u62e5\u6709\u5e76\u8fd0\u8425\u8be5\u6570\u636e\u4e2d\u5fc3\uff0c\u6839\u636e\u4e0e OpenAI \u7b7e\u8ba2\u7684 20 \u5e74\u79df\u7ea6\u9010\u6b65\u4ea4\u4ed8\u5bb9\u91cf\u3002"
   ],
   "ai_customer_evidence": [
    "OpenAI \u52a0\u5165 PORTS-Pike \u9879\u76ee",
    "OpenAI \u5df2\u8fbe\u6210\u534f\u8bae\uff0c\u5c06\u4e0e SB Energy\u3001NVIDIA \u548c\u7f8e\u56fd\u80fd\u6e90\u90e8\u5408\u4f5c\uff0c\u5728\u4fc4\u4ea5\u4fc4\u5dde\u6d3e\u514b\u53bf\u7684 PORTS-Pike \u79d1\u6280\u56ed\u533a\u83b7\u5f97\u7ea6 8 \u5409\u74e6\u7684 IT \u5bb9\u91cf\u3002",
    "OpenAI \u5c06\u4f5c\u4e3a\u5ba2\u6237\u4f7f\u7528\u8be5\u573a\u5730\u7684\u5bb9\u91cf\uff1b\u8be5\u573a\u5730\u5c06\u4e13\u95e8\u6258\u7ba1 NVIDIA AI \u8ba1\u7b97\u57fa\u7840\u8bbe\u65bd\u3002"
   ],
   "status_evidence": [
    "OpenAI \u52a0\u5165 PORTS-Pike \u9879\u76ee",
    "OpenAI \u5df2\u8fbe\u6210\u534f\u8bae\uff0c\u5c06\u4e0e SB Energy\u3001NVIDIA \u548c\u7f8e\u56fd\u80fd\u6e90\u90e8\u5408\u4f5c\uff0c\u5728\u4fc4\u4ea5\u4fc4\u5dde\u6d3e\u514b\u53bf\u7684 PORTS-Pike \u79d1\u6280\u56ed\u533a\u83b7\u5f97\u7ea6 8 \u5409\u74e6\u7684 IT \u5bb9\u91cf\u3002"
   ],
   "announcement_date_evidence": [
    "OpenAI \u52a0\u5165 PORTS-Pike \u9879\u76ee",
    "2026\u5e748\u670817\u65e5",
    "OpenAI \u5df2\u8fbe\u6210\u534f\u8bae\uff0c\u5c06\u4e0e SB Energy\u3001NVIDIA \u548c\u7f8e\u56fd\u80fd\u6e90\u90e8\u5408\u4f5c\uff0c\u5728\u4fc4\u4ea5\u4fc4\u5dde\u6d3e\u514b\u53bf\u7684 PORTS-Pike \u79d1\u6280\u56ed\u533a\u83b7\u5f97\u7ea6 8 \u5409\u74e6\u7684 IT \u5bb9\u91cf\u3002"
   ]
  },
  {
   "url": "https://cryptorank.io/news/feed/c89fb-meta-announces-10b-indiana-data-center",
   "title": "Meta announces $10B Indiana data center while auditor flags $27B Louisiana deal",
   "published_at": "2026-02-11T20:30:50",
   "project": "Lebanon campus",
   "locality": "Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "building",
   "announcement_date": "2026-02-11",
   "project_evidence": [
    "Meta announces $10B Indiana data center while auditor flags $27B Louisiana deal",
    "The Lebanon campus is Meta\u2019s second major tech project in Indiana.",
    "Meta announced Wednesday it will pour more than $10 billion into a new data center in Lebanon, Indiana, marking another huge bet on artificial intelligence infrastructure even as questions pile up about how the social media giant finances these projects."
   ],
   "locality_evidence": [
    "Meta announces $10B Indiana data center while auditor flags $27B Louisiana deal",
    "Meta announced Wednesday it will pour more than $10 billion into a new data center in Lebanon, Indiana, marking another huge bet on artificial intelligence infrastructure even as questions pile up about how the social media giant finances these projects."
   ],
   "state_evidence": [
    "Meta announces $10B Indiana data center while auditor flags $27B Louisiana deal",
    "Meta announced Wednesday it will pour more than $10 billion into a new data center in Lebanon, Indiana, marking another huge bet on artificial intelligence infrastructure even as questions pile up about how the social media giant finances these projects."
   ],
   "capacity_gw_evidence": [
    "Meta announces $10B Indiana data center while auditor flags $27B Louisiana deal",
    "The company broke ground on the site that will deliver one gigawatt of electricity to power AI systems and Meta\u2019s social networks."
   ],
   "builder_evidence": [
    "Meta announces $10B Indiana data center while auditor flags $27B Louisiana deal",
    "Meta announced Wednesday it will pour more than $10 billion into a new data center in Lebanon, Indiana, marking another huge bet on artificial intelligence infrastructure even as questions pile up about how the social media giant finances these projects."
   ],
   "ai_customer_evidence": [
    "Meta announces $10B Indiana data center while auditor flags $27B Louisiana deal",
    "The company broke ground on the site that will deliver one gigawatt of electricity to power AI systems and Meta\u2019s social networks."
   ],
   "status_evidence": [
    "Meta announces $10B Indiana data center while auditor flags $27B Louisiana deal",
    "The company broke ground on the site that will deliver one gigawatt of electricity to power AI systems and Meta\u2019s social networks."
   ],
   "announcement_date_evidence": [
    "Meta announces $10B Indiana data center while auditor flags $27B Louisiana deal",
    "Feb 11, 2026",
    "Meta announced Wednesday it will pour more than $10 billion into a new data center in Lebanon, Indiana, marking another huge bet on artificial intelligence infrastructure even as questions pile up about how the social media giant finances these projects."
   ]
  },
  {
   "url": "https://local.newsbreak.com/wilderness-marksman-359720901/4683970865697-amazon-to-build-11bn-ai-data-campus-in-indiana-that-will-use-electricity-of-1-million-homes-and-300m-gallons-of-water-a-year",
   "title": "Amazon to build $11bn AI data campus in Indiana that will use electricity of 1 million homes and 300m gallons of water a year - NewsBreak",
   "published_at": "2026-06-01T15:00:00",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# Amazon to build $11bn AI data campus in Indiana that will use electricity of 1 million homes and 300m gallons of water a year",
    "Amazon has committed $11 billion to build a sprawling data center campus there, known as Project Rainier."
   ],
   "locality_evidence": [
    "# Amazon to build $11bn AI data campus in Indiana that will use electricity of 1 million homes and 300m gallons of water a year",
    "You step back from the quiet fields near New Carlisle, Indiana, and see farmland giving way to something much larger."
   ],
   "state_evidence": [
    "# Amazon to build $11bn AI data campus in Indiana that will use electricity of 1 million homes and 300m gallons of water a year",
    "Amazon has committed $11 billion to build a sprawling data center campus there, known as Project Rainier."
   ],
   "capacity_gw_evidence": [
    "# Amazon to build $11bn AI data campus in Indiana that will use electricity of 1 million homes and 300m gallons of water a year",
    "Power needs for this campus reach about 2.2 gigawatts once fully built out."
   ],
   "builder_evidence": [
    "# Amazon to build $11bn AI data campus in Indiana that will use electricity of 1 million homes and 300m gallons of water a year",
    "Amazon has committed $11 billion to build a sprawling data center campus there, known as Project Rainier."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://thenews-messenger.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Colossus 2",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 1.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "active construction still on site",
   "announcement_date": "2025-03-01",
   "project_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "locality_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "state_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "In February 2025, CTC Property LLC purchased 186.13 acres for $79.9 million, according to the Shelby County Register of Deeds."
   ],
   "capacity_gw_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "builder_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "In February 2025, CTC Property LLC purchased 186.13 acres for $79.9 million, according to the Shelby County Register of Deeds."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "Colossus 2 is a bit more straightforward than the Paul R. Lowry Road complex.",
    "The Tulane Road site is an artificial intelligence data center, with active construction still on site."
   ],
   "announcement_date_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "In March 2025, the Greater Memphis Chamber announced xAI's plans for a second campus and its purchase of a 1 million-square-foot building."
   ]
  },
  {
   "url": "https://thenews-messenger.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Macrohardrr",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2025-12-30",
   "project_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "locality_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "state_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "In July 2025, MZX Tech LLC, an xAI affiliate, purchased the[ power plant and corresponding 114.49 acres of land surrounding the facility](/story/money/business/development/2025/07/18/xai-elon-musk-company-buys-southaven-mississippi-property-colossus-2-memphis-tn/85274193007/)."
   ],
   "capacity_gw_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "builder_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "In July 2025, MZX Tech LLC, an xAI affiliate, purchased the[ power plant and corresponding 114.49 acres of land surrounding the facility](/story/money/business/development/2025/07/18/xai-elon-musk-company-buys-southaven-mississippi-property-colossus-2-memphis-tn/85274193007/)."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "Aside from Musk's Dec. 30 post, no official plans or details for the third detail center have been released.",
    "The former Duke Energy site has been under construction with gas turbines on site for powering xAI data centers."
   ],
   "announcement_date_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ]
  },
  {
   "url": "http://business.theeveningleader.com/theeveningleader/article/bizwire-2025-8-19-vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand",
   "title": "Vantage Data Centers Unveils Plans for \u00e2Frontier,\u00e2 a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
   "published_at": "2025-08-19T11:00:00",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Under Construction",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "locality_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ]
  },
  {
   "url": "https://substack.com/redirect/a02761e6-f0ad-4497-aa37-e04b5da31b5c?j=eyJ1IjoiM3djM2MxIn0.OGuf1Irm-qb700DahBb35RT9QTn8SiZLleBWozyCeUk",
   "title": "Former Texas governor and US energy sec plans 11GW data center campus outside Amarillo, Texas",
   "published_at": "2026-05-21T09:13:57",
   "project": "Advanced Energy and Intelligence Campus",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Located on approximately 5,800 acres, the Advanced Energy and Intelligence Campus will reportedly include \u201c18 million square feet (1.67 million sqm) of data centers and generate up to 11GW of IT capacity from natural gas, solar, wind, and clean nuclear energy.\u201d"
   ],
   "locality_evidence": [
    "This week, the Texas Tech University System (TTU System) announced a collaboration with recently founded energy and technology company Fermi America to develop a large AI and energy campus near Amarillo in the Texas Panhandle."
   ],
   "state_evidence": [
    "A massive multi-gigawatt behind-the-meter campus is being planned in Texas close to the US government\u2019s main nuclear weapons development facility by former Texas governor and energy secretary Rick Perry."
   ],
   "capacity_gw_evidence": [
    "Located on approximately 5,800 acres, the Advanced Energy and Intelligence Campus will reportedly include \u201c18 million square feet (1.67 million sqm) of data centers and generate up to 11GW of IT capacity from natural gas, solar, wind, and clean nuclear energy.\u201d"
   ],
   "builder_evidence": [
    "This week, the Texas Tech University System (TTU System) announced a collaboration with recently founded energy and technology company Fermi America to develop a large AI and energy campus near Amarillo in the Texas Panhandle."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "A massive multi-gigawatt behind-the-meter campus is being planned in Texas close to the US government\u2019s main nuclear weapons development facility by former Texas governor and energy secretary Rick Perry."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://sparkaistrategy.com/powering-the-future-of-cre-ai-data-center-boom-ignites-new-opportunities-in-commercial-real-estate",
   "title": "Powering the Future of CRE: AI Data Center Boom Ignites New Opportunities in Commercial Real Estate",
   "published_at": "2025-05-02T12:57:47",
   "project": "Homer City Energy Campus",
   "locality": null,
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Homer City Redevelopment, Kiewit Power Constructors, GE Vernova",
   "ai_customer": null,
   "status": "proposed",
   "announcement_date": "2025-04-02",
   "project_evidence": [
    "Powering the Future of CRE: AI Data Center Boom Ignites New Opportunities in Commercial Real Estate",
    "A compelling case in point is the ambitious redevelopment of the former Homer City Generating Station in Pennsylvania.",
    "This $10+ billion project, transforming a 3,200-acre coal plant into the **Homer City Energy Campus**, a massive natural gas-powered data center hub, signals a paradigm shift with significant implications for CRE professionals."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "Powering the Future of CRE: AI Data Center Boom Ignites New Opportunities in Commercial Real Estate",
    "A compelling case in point is the ambitious redevelopment of the former Homer City Generating Station in Pennsylvania."
   ],
   "capacity_gw_evidence": [
    "Powering the Future of CRE: AI Data Center Boom Ignites New Opportunities in Commercial Real Estate",
    "The Homer City Energy Campus, poised to become the largest gas-powered plant in the U.S. with a staggering **4.5 GW power capacity**, is a direct response to the exponential energy demands of AI and high-performance computing (HPC)."
   ],
   "builder_evidence": [
    "Powering the Future of CRE: AI Data Center Boom Ignites New Opportunities in Commercial Real Estate",
    "The partnerships driving the Homer City project \u2013 Homer City Redevelopment (HCR), Kiewit Power Constructors, and GE Vernova \u2013 showcase the multidisciplinary nature of these developments."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Powering the Future of CRE: AI Data Center Boom Ignites New Opportunities in Commercial Real Estate",
    "This Proposed Gas Plant to Power a Data Center Campus Is Massive"
   ],
   "announcement_date_evidence": [
    "Powering the Future of CRE: AI Data Center Boom Ignites New Opportunities in Commercial Real Estate",
    "Homer City to become gas-powered data center campus"
   ]
  },
  {
   "url": "https://prnewswire.com/news-releases/nscale-and-microsoft-announce-collaboration-with-nvidia-and-caterpillar-to-deliver-1-35gw-of-nvidia-vera-rubin-nvl72-gpus-at-flagship-ai-factory-campus-in-west-virginia-302715210.html",
   "title": "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
   "published_at": "2026-03-16T21:20:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "announced",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "locality_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "state_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "capacity_gw_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts.",
    "The expansion capabilities of this site \u2014 which has the potential for a total power draw of 8GW \u2014 will allow Nscale to develop power capacity rapidly while supporting one of the largest announced AI compute deployments in the market today."
   ],
   "builder_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts.",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "ai_customer_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ],
   "status_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Mar 16, 2026, 17:20 ET",
    "Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ],
   "announcement_date_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Mar 16, 2026, 17:20 ET",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ]
  },
  {
   "url": "https://ecoportal.net/en/largest-mobilization-ever-america/4858",
   "title": "Largest mobilization ever planned in America \u2014 21st century oil appears in this state",
   "published_at": "2025-04-03T17:50:00",
   "project": "Data City, Texas",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corp.",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "This ambitious proposal, called \u201cData City, Texas,\u201d intends to build the world\u2019s largest green-powered data centre hub close to Laredo.",
    "[A large mobilization planned in an American state](https://www.ecoportal.net/en/mit-researchers-nuclear-fusion-america/3797/) has the potential to completely transform the state\u2019s technological and economic landscape."
   ],
   "locality_evidence": [
    "This ambitious proposal, called \u201cData City, Texas,\u201d intends to build the world\u2019s largest green-powered data centre hub close to Laredo.",
    "[A large mobilization planned in an American state](https://www.ecoportal.net/en/mit-researchers-nuclear-fusion-america/3797/) has the potential to completely transform the state\u2019s technological and economic landscape."
   ],
   "state_evidence": [
    "This ambitious proposal, called \u201cData City, Texas,\u201d intends to build the world\u2019s largest green-powered data centre hub close to Laredo.",
    "[A large mobilization planned in an American state](https://www.ecoportal.net/en/mit-researchers-nuclear-fusion-america/3797/) has the potential to completely transform the state\u2019s technological and economic landscape."
   ],
   "capacity_gw_evidence": [
    "It is anticipated that the development will reach a staggering 5 gigawatts (GW) of power.",
    "[A large mobilization planned in an American state](https://www.ecoportal.net/en/mit-researchers-nuclear-fusion-america/3797/) has the potential to completely transform the state\u2019s technological and economic landscape."
   ],
   "builder_evidence": [
    "The project, led by Energy Abundance Development Corp. (previously Green Hydrogen International Corp.), **aims to put Texas at the forefront of the digital era** by using renewable energy sources to power a sizable data centre complex.",
    "[A large mobilization planned in an American state](https://www.ecoportal.net/en/mit-researchers-nuclear-fusion-america/3797/) has the potential to completely transform the state\u2019s technological and economic landscape."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "This ambitious proposal, called \u201cData City, Texas,\u201d intends to build the world\u2019s largest green-powered data centre hub close to Laredo.",
    "[A large mobilization planned in an American state](https://www.ecoportal.net/en/mit-researchers-nuclear-fusion-america/3797/) has the potential to completely transform the state\u2019s technological and economic landscape."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://landgate.com/news/energy-sourcing-lessons-from-utah-s-stratos-project",
   "title": "Energy Sourcing Lessons from Utah's Stratos Project",
   "published_at": "2026-06-01T21:35:34",
   "project": "The Stratos Project",
   "locality": "Hansel Valley",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "Kevin O'Leary",
   "ai_customer": null,
   "status": "proposed",
   "announcement_date": null,
   "project_evidence": [
    "# Energy Sourcing Lessons from Utah's Stratos Project"
   ],
   "locality_evidence": [
    "# Energy Sourcing Lessons from Utah's Stratos Project"
   ],
   "state_evidence": [
    "# Energy Sourcing Lessons from Utah's Stratos Project"
   ],
   "capacity_gw_evidence": [
    "# Energy Sourcing Lessons from Utah's Stratos Project",
    "The Box Elder County Commission approved an interlocal agreement for the project in early May 2026, clearing an early hurdle for what backers have described as a phased buildout that could eventually reach 9 gigawatts of capacity."
   ],
   "builder_evidence": [
    "# Energy Sourcing Lessons from Utah's Stratos Project"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Energy Sourcing Lessons from Utah's Stratos Project"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://baxtel.com/data-center/openai-project-camellia",
   "title": "OpenAI: Project Camellia",
   "published_at": null,
   "project": "Portsmouth Site",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 10.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "proposed",
   "announcement_date": "2026-06-10",
   "project_evidence": [
    "OpenAI in Early Talks for 10GW Data Center Lease in Ohio",
    "OpenAI is in advanced talks to lease a proposed 10GW data center in Ohio being developed by SB Energy on US Department of Energy land at the Portsmouth Site in Pike County."
   ],
   "locality_evidence": [
    "OpenAI in Early Talks for 10GW Data Center Lease in Ohio",
    "OpenAI is in advanced talks to lease a proposed 10GW data center in Ohio being developed by SB Energy on US Department of Energy land at the Portsmouth Site in Pike County."
   ],
   "state_evidence": [
    "OpenAI in Early Talks for 10GW Data Center Lease in Ohio",
    "OpenAI is in advanced talks to lease a proposed 10GW data center in Ohio being developed by SB Energy on US Department of Energy land at the Portsmouth Site in Pike County."
   ],
   "capacity_gw_evidence": [
    "OpenAI in Early Talks for 10GW Data Center Lease in Ohio",
    "OpenAI is in advanced talks to lease a proposed 10GW data center in Ohio being developed by SB Energy on US Department of Energy land at the Portsmouth Site in Pike County."
   ],
   "builder_evidence": [
    "OpenAI in Early Talks for 10GW Data Center Lease in Ohio",
    "OpenAI is in advanced talks to lease a proposed 10GW data center in Ohio being developed by SB Energy on US Department of Energy land at the Portsmouth Site in Pike County."
   ],
   "ai_customer_evidence": [
    "OpenAI in Early Talks for 10GW Data Center Lease in Ohio",
    "OpenAI is in advanced talks to lease a proposed 10GW data center in Ohio being developed by SB Energy on US Department of Energy land at the Portsmouth Site in Pike County."
   ],
   "status_evidence": [
    "OpenAI in Early Talks for 10GW Data Center Lease in Ohio",
    "OpenAI is in advanced talks to lease a proposed 10GW data center in Ohio being developed by SB Energy on US Department of Energy land at the Portsmouth Site in Pike County."
   ],
   "announcement_date_evidence": [
    "OpenAI in Early Talks for 10GW Data Center Lease in Ohio",
    "June 10, 2026 OpenAI",
    "OpenAI is in advanced talks to lease a proposed 10GW data center in Ohio being developed by SB Energy on US Department of Energy land at the Portsmouth Site in Pike County."
   ]
  },
  {
   "url": "https://mmajunkie.usatoday.com/story/money/business/2026/03/17/google-reveals-project-cannoli-data-center/89185890007",
   "title": "Google reveals it is behind big 'Project Cannoli' data center project",
   "published_at": "2026-03-17T12:02:18",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "locality_evidence": [
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "state_evidence": [
    "Google also said Tuesday that it is creating a $10 million Energy Impact Fund for local organizations to tap into with the aim of lowering monthly utility bills for Michiganders."
   ],
   "capacity_gw_evidence": [
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "builder_evidence": [
    "The data center would be developed for Google by Panattoni Development Co."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "announcement_date_evidence": [
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ]
  },
  {
   "url": "https://mexc.co/en-PH/news/1114567",
   "title": "TeraWulf surges 10% on 1GW Kentucky AI campus bet | MEXC News",
   "published_at": null,
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access.",
    "**TeraWulf is making a much bigger bet on artificial intelligence infrastructure. However, it is not about chips anymore. It is about power. The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity.**"
   ],
   "locality_evidence": [
    "The company secured a 285-acre site in eastern Kentucky.",
    "**TeraWulf is making a much bigger bet on artificial intelligence infrastructure. However, it is not about chips anymore. It is about power. The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity.**"
   ],
   "state_evidence": [
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access.",
    "**TeraWulf is making a much bigger bet on artificial intelligence infrastructure. However, it is not about chips anymore. It is about power. The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity.**"
   ],
   "capacity_gw_evidence": [
    "It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity.",
    "**TeraWulf is making a much bigger bet on artificial intelligence infrastructure. However, it is not about chips anymore. It is about power. The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity.**"
   ],
   "builder_evidence": [
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access.",
    "**TeraWulf is making a much bigger bet on artificial intelligence infrastructure. However, it is not about chips anymore. It is about power. The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity.**"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://dev.ceo.ca/@GlobeNewswire/iren-announces-successful-energization-of-sweetwater",
   "title": "IREN Announces Successful Energization of Sweetwater 1, by @GlobeNewswire",
   "published_at": null,
   "project": "Sweetwater",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "energized",
   "announcement_date": "2026-05-01",
   "project_evidence": [
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas.",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "capacity_gw_evidence": [
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "builder_evidence": [
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas.",
    "**About IREN**",
    "IREN is a vertically integrated AI Cloud provider, delivering large-scale data centers and GPU clusters for AI training and inference."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "announcement_date_evidence": [
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ]
  },
  {
   "url": "https://worldpostreporter.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://mlq.ai/data-centers/usa/texas/houston",
   "title": "AI infrastructure intelligence",
   "published_at": null,
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Data Centers in Houston",
    "All data centers in Houston (46)",
    "| Name | Operator | Power (MW) | Sq Ft | Tier | Status |",
    "| [ECL TerraSite-TX1](/data-centers/usa/texas/houston/usa-texas-houston-ecl-terrasite-tx1/) | ECL | 1000.0 | \u2014 | \u2014 | planned |"
   ],
   "locality_evidence": [
    "# Data Centers in Houston",
    " 46 tracked data centers in Houston, Texas representing 1.5 GW across 23 operators.",
    "All data centers in Houston (46)",
    "| Name | Operator | Power (MW) | Sq Ft | Tier | Status |",
    "| [ECL TerraSite-TX1](/data-centers/usa/texas/houston/usa-texas-houston-ecl-terrasite-tx1/) | ECL | 1000.0 | \u2014 | \u2014 | planned |"
   ],
   "state_evidence": [
    "# Data Centers in Houston",
    " 46 tracked data centers in Houston, Texas representing 1.5 GW across 23 operators.",
    "All data centers in Houston (46)",
    "| Name | Operator | Power (MW) | Sq Ft | Tier | Status |",
    "| [ECL TerraSite-TX1](/data-centers/usa/texas/houston/usa-texas-houston-ecl-terrasite-tx1/) | ECL | 1000.0 | \u2014 | \u2014 | planned |"
   ],
   "capacity_gw_evidence": [
    "# Data Centers in Houston",
    "All data centers in Houston (46)",
    "| Name | Operator | Power (MW) | Sq Ft | Tier | Status |",
    "| [ECL TerraSite-TX1](/data-centers/usa/texas/houston/usa-texas-houston-ecl-terrasite-tx1/) | ECL | 1000.0 | \u2014 | \u2014 | planned |"
   ],
   "builder_evidence": [
    "# Data Centers in Houston",
    "All data centers in Houston (46)",
    "| Name | Operator | Power (MW) | Sq Ft | Tier | Status |",
    "| [ECL TerraSite-TX1](/data-centers/usa/texas/houston/usa-texas-houston-ecl-terrasite-tx1/) | ECL | 1000.0 | \u2014 | \u2014 | planned |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Data Centers in Houston",
    "All data centers in Houston (46)",
    "| Name | Operator | Power (MW) | Sq Ft | Tier | Status |",
    "| [ECL TerraSite-TX1](/data-centers/usa/texas/houston/usa-texas-houston-ecl-terrasite-tx1/) | ECL | 1000.0 | \u2014 | \u2014 | planned |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://lobbyistsforcitizens.com/2026/08/17/nvidia-guarantees-sb-energys-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute",
   "title": "NVIDIA Guarantees SB Energy\u2019s PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
   "published_at": "2026-08-17T00:00:00",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Portsmouth",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "NVIDIA Guarantees SB Energy\u2019s PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "locality_evidence": [
    "The proposed Portsmouth, Ohio mega data center is to be built on federal land, so Ohioans have no say in this matter.",
    "NVIDIA Guarantees SB Energy\u2019s PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute"
   ],
   "state_evidence": [
    "Ohio has over 200 operational data centers.",
    "NVIDIA Guarantees SB Energy\u2019s PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute"
   ],
   "capacity_gw_evidence": [
    "In support of the surrounding Ohio community, SB Energy and SoftBank will build at least 10 GW of new energy generation, which results in 8 IT-GW of AI factory capacity, and invest at least $4.2 billion in new regional grid infrastructure through an innovative partnership with AEP Ohio designed to protect ratepayers.",
    "NVIDIA Guarantees SB Energy\u2019s PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute"
   ],
   "builder_evidence": [
    "NVIDIA Guarantees SB Energy\u2019s PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "SB Energy will build, own and operate the data center under a 20-year lease to OpenAI."
   ],
   "ai_customer_evidence": [
    "NVIDIA Guarantees SB Energy\u2019s PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "OpenAI will be the customer for 8-IT GW"
   ],
   "status_evidence": [
    "NVIDIA Guarantees SB Energy\u2019s PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "The planned capacity is expected to come online in phases beginning in 2028."
   ],
   "announcement_date_evidence": [
    "NVIDIA Guarantees SB Energy\u2019s PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "Press Release: August 17, 2026"
   ]
  },
  {
   "url": "https://constellationr.com/insights/news/stargate-ramps-openai-oracle-softbank-outline-5-new-data-centers",
   "title": "Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
   "published_at": null,
   "project": "Stargate",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 5.5,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "[The companies said ](https://openai.com/index/five-new-stargate-sites/)the flagship site in Abilene, Texas is operational and can deliver 5.5 gigawatts of capacity built on Oracle Cloud Infrastructure (OCI) and [Nvidia's stack](https://blogs.nvidia.com/blog/openai-nvidia/)."
   ],
   "locality_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "[The companies said ](https://openai.com/index/five-new-stargate-sites/)the flagship site in Abilene, Texas is operational and can deliver 5.5 gigawatts of capacity built on Oracle Cloud Infrastructure (OCI) and [Nvidia's stack](https://blogs.nvidia.com/blog/openai-nvidia/)."
   ],
   "state_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "[The companies said ](https://openai.com/index/five-new-stargate-sites/)the flagship site in Abilene, Texas is operational and can deliver 5.5 gigawatts of capacity built on Oracle Cloud Infrastructure (OCI) and [Nvidia's stack](https://blogs.nvidia.com/blog/openai-nvidia/)."
   ],
   "capacity_gw_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "[The companies said ](https://openai.com/index/five-new-stargate-sites/)the flagship site in Abilene, Texas is operational and can deliver 5.5 gigawatts of capacity built on Oracle Cloud Infrastructure (OCI) and [Nvidia's stack](https://blogs.nvidia.com/blog/openai-nvidia/)."
   ],
   "builder_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "[The companies said ](https://openai.com/index/five-new-stargate-sites/)the flagship site in Abilene, Texas is operational and can deliver 5.5 gigawatts of capacity built on Oracle Cloud Infrastructure (OCI) and [Nvidia's stack](https://blogs.nvidia.com/blog/openai-nvidia/)."
   ],
   "ai_customer_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "[The companies said ](https://openai.com/index/five-new-stargate-sites/)the flagship site in Abilene, Texas is operational and can deliver 5.5 gigawatts of capacity built on Oracle Cloud Infrastructure (OCI) and [Nvidia's stack](https://blogs.nvidia.com/blog/openai-nvidia/)."
   ],
   "status_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "[The companies said ](https://openai.com/index/five-new-stargate-sites/)the flagship site in Abilene, Texas is operational and can deliver 5.5 gigawatts of capacity built on Oracle Cloud Infrastructure (OCI) and [Nvidia's stack](https://blogs.nvidia.com/blog/openai-nvidia/)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://constellationr.com/insights/news/stargate-ramps-openai-oracle-softbank-outline-5-new-data-centers",
   "title": "Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
   "published_at": null,
   "project": "Stargate",
   "locality": "Lordstown",
   "state": "Ohio",
   "capacity_gw": 1.5,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "In addition to the flagship Stargate site in Abilene, two separate sites will be developed over the next 18 months."
   ],
   "locality_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "Stargate sites in Lordstown, Ohio and another in Milam County, Texas can scale to 1.5 gigawatts of capacity."
   ],
   "state_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "Stargate sites in Lordstown, Ohio and another in Milam County, Texas can scale to 1.5 gigawatts of capacity."
   ],
   "capacity_gw_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "Stargate sites in Lordstown, Ohio and another in Milam County, Texas can scale to 1.5 gigawatts of capacity."
   ],
   "builder_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "OpenAI, Oracle and Softbank have announced 5 new data centers under the Stargate project good for 7 gigawatts of capacity."
   ],
   "ai_customer_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "OpenAI, Oracle and Softbank have announced 5 new data centers under the Stargate project good for 7 gigawatts of capacity."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://constellationr.com/insights/news/stargate-ramps-openai-oracle-softbank-outline-5-new-data-centers",
   "title": "Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
   "published_at": null,
   "project": "Stargate",
   "locality": "Milam County",
   "state": "Texas",
   "capacity_gw": 1.5,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "In addition to the flagship Stargate site in Abilene, two separate sites will be developed over the next 18 months."
   ],
   "locality_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "Stargate sites in Lordstown, Ohio and another in Milam County, Texas can scale to 1.5 gigawatts of capacity."
   ],
   "state_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "Stargate sites in Lordstown, Ohio and another in Milam County, Texas can scale to 1.5 gigawatts of capacity."
   ],
   "capacity_gw_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "Stargate sites in Lordstown, Ohio and another in Milam County, Texas can scale to 1.5 gigawatts of capacity."
   ],
   "builder_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "OpenAI, Oracle and Softbank have announced 5 new data centers under the Stargate project good for 7 gigawatts of capacity."
   ],
   "ai_customer_evidence": [
    "# Stargate ramps as OpenAI, Oracle, Softbank outline 5 new data centers",
    "OpenAI, Oracle and Softbank have announced 5 new data centers under the Stargate project good for 7 gigawatts of capacity."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://btcc.com/en-US/square/Global%20Cryptocurrency/1073101",
   "title": "Meta Invests $1.5 Billion in Texas Data Center to Bolster AI Infrastructure",
   "published_at": null,
   "project": null,
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "slated for completion by 2028",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "# Meta Invests $1.5 Billion in Texas Data Center to Bolster AI Infrastructure",
    "Meta Platforms (META) is committing over $1.5 billion to construct a new data center in El Paso, Texas, as part of its aggressive expansion into artificial intelligence."
   ],
   "state_evidence": [
    "# Meta Invests $1.5 Billion in Texas Data Center to Bolster AI Infrastructure",
    "Meta Platforms (META) is committing over $1.5 billion to construct a new data center in El Paso, Texas, as part of its aggressive expansion into artificial intelligence."
   ],
   "capacity_gw_evidence": [
    "# Meta Invests $1.5 Billion in Texas Data Center to Bolster AI Infrastructure",
    "The facility, slated for completion by 2028, will feature 1 gigawatt of power to support high-performance AI chips."
   ],
   "builder_evidence": [
    "# Meta Invests $1.5 Billion in Texas Data Center to Bolster AI Infrastructure",
    "Meta Platforms (META) is committing over $1.5 billion to construct a new data center in El Paso, Texas, as part of its aggressive expansion into artificial intelligence."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Meta Invests $1.5 Billion in Texas Data Center to Bolster AI Infrastructure",
    "The facility, slated for completion by 2028, will feature 1 gigawatt of power to support high-performance AI chips."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://particle.news/story/musks-xai-buys-third-building-to-push-colossus-toward-2-gw-of-ai-training-power",
   "title": "Musk\u2019s xAI Buys Third Building to Push Colossus Toward 2 GW of AI Training Power",
   "published_at": "2026-01-01T13:23:17",
   "project": "MACROHARDRR",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "## Overview",
    "- Elon [Musk](/entity/elon-musk/m/03nzf1?ref=cluster:11500379) said [xAI](/entity/xai/g/11v5pdm3kg?ref=cluster:11500379) purchased a third building, named MACROHARDRR, to expand its AI training capacity to nearly two gigawatts."
   ],
   "locality_evidence": [
    "## Overview",
    "- Reporting based on property records places the site outside Memphis, with several outlets identifying [Southaven](/entity/southaven/m/0xggj?ref=cluster:11500379), [Mississippi](/entity/mississippi/m/04tgp?ref=cluster:11500379), as the location."
   ],
   "state_evidence": [
    "## Overview",
    "- Reporting based on property records places the site outside Memphis, with several outlets identifying [Southaven](/entity/southaven/m/0xggj?ref=cluster:11500379), [Mississippi](/entity/mississippi/m/04tgp?ref=cluster:11500379), as the location."
   ],
   "capacity_gw_evidence": [
    "## Overview",
    "- Elon [Musk](/entity/elon-musk/m/03nzf1?ref=cluster:11500379) said [xAI](/entity/xai/g/11v5pdm3kg?ref=cluster:11500379) purchased a third building, named MACROHARDRR, to expand its AI training capacity to nearly two gigawatts."
   ],
   "builder_evidence": [
    "## Overview",
    "- Elon [Musk](/entity/elon-musk/m/03nzf1?ref=cluster:11500379) said [xAI](/entity/xai/g/11v5pdm3kg?ref=cluster:11500379) purchased a third building, named MACROHARDRR, to expand its AI training capacity to nearly two gigawatts."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## Overview"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://kdc.bussetech.com/sites/matador-carson",
   "title": "Fermi America Project Matador (Amarillo Campus) \u00b7 kdc",
   "published_at": null,
   "project": "Fermi America Project Matador (Amarillo Campus)",
   "locality": "Carson",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2026-07-07",
   "project_evidence": [
    "# Fermi America Project Matador (Amarillo Campus)",
    "Facts",
    "## Facts"
   ],
   "locality_evidence": [
    "| Location | Carson, TX |",
    "Facts",
    "## Facts"
   ],
   "state_evidence": [
    "| Location | Carson, TX |",
    "Facts",
    "## Facts"
   ],
   "capacity_gw_evidence": [
    "| Capacity | 11000 MW |",
    "Facts",
    "## Facts"
   ],
   "builder_evidence": [
    "Operator Fermi America needs an operators.yml entry (omitted here) \u2014 company led by a former Texas governor and US Energy Secretary.",
    "Facts",
    "## Facts"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "**Status:** announced \u00b7 **Confidence:** medium",
    "Facts",
    "## Facts"
   ],
   "announcement_date_evidence": [
    "| First recorded | 2026-07-07 |",
    "Facts",
    "## Facts"
   ]
  },
  {
   "url": "https://pennlive.com/business/2026/06/it-will-devour-the-future.html?gift=1dc8b21c-8eda-4982-845c-30f196de48a6",
   "title": "\u2018It will devour the future\u2019",
   "published_at": "2026-06-25T19:25:43",
   "project": "Homer City",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 1.333,
   "builder": "Homer City Redevelopment LLC",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": "2025-04",
   "project_evidence": [
    "Business",
    "# \u2018It will devour the future\u2019",
    "Massive data center is swallowing a tiny Pa. coal town",
    "INDIANA, Pa. \u2014 Giant plumes of water vapor venting from the cooling towers of Homer City\u2019s coal-fired electric generation plant served as a local landmark and a weathervane for decades."
   ],
   "locality_evidence": [
    "Business",
    "# \u2018It will devour the future\u2019",
    "Massive data center is swallowing a tiny Pa. coal town",
    "INDIANA, Pa. \u2014 Giant plumes of water vapor venting from the cooling towers of Homer City\u2019s coal-fired electric generation plant served as a local landmark and a weathervane for decades.",
    "After decades of waiting in vain for something to rise from coal\u2019s ashes, tiny Homer City was handed an unlikely second act."
   ],
   "state_evidence": [
    "Business",
    "# \u2018It will devour the future\u2019",
    "Massive data center is swallowing a tiny Pa. coal town",
    "Pennsylvania \u2014 like much of the country \u2014 was turning away from coal."
   ],
   "capacity_gw_evidence": [
    "Business",
    "# \u2018It will devour the future\u2019",
    "Massive data center is swallowing a tiny Pa. coal town",
    "When complete, the facility is projected to generate 4.4 gigawatts \u2014 more than four Three Mile Island\u2013scale plants.",
    "Roughly a third of that energy would feed the data center campus."
   ],
   "builder_evidence": [
    "Business",
    "# \u2018It will devour the future\u2019",
    "Massive data center is swallowing a tiny Pa. coal town",
    "Knighthead is financing the effort, while a pair of corporate entities are executing the project.",
    "Homer City Generation LLC is overseeing the power plant, and Homer City Redevelopment LLC is largely responsible for developing the data center campus."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Business",
    "# \u2018It will devour the future\u2019",
    "Massive data center is swallowing a tiny Pa. coal town",
    "Work is well underway."
   ],
   "announcement_date_evidence": [
    "Business",
    "# \u2018It will devour the future\u2019",
    "Massive data center is swallowing a tiny Pa. coal town",
    "Since the project\u2019s announcement in April 2025, the district\u2019s sense of doom has lifted."
   ]
  },
  {
   "url": "https://aap.com.au/aapreleases/cision20260316ae11294",
   "title": "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
   "published_at": null,
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "announced",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "locality_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "state_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "capacity_gw_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "The expansion capabilities of this site \u2014 which has the potential for a total power draw of 8GW \u2014 will allow Nscale to develop power capacity rapidly while supporting one of the largest announced AI compute deployments in the market today."
   ],
   "builder_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts.",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "ai_customer_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ],
   "status_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "March 17, 2026",
    "Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs"
   ],
   "announcement_date_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "March 17, 2026"
   ]
  },
  {
   "url": "https://stratos.fiftheast.com/developers.html",
   "title": "Who's behind it? The Stratos Project",
   "published_at": null,
   "project": "Stratos Project",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O'Leary Digital",
   "ai_customer": null,
   "status": "pre-construction",
   "announcement_date": "2026-04-24",
   "project_evidence": [
    "Public-record research",
    "Two private partners are asking Box Elder County to consent to the Stratos Project."
   ],
   "locality_evidence": [
    "Public-record research",
    "Two private partners are asking Box Elder County to consent to the Stratos Project."
   ],
   "state_evidence": [
    "Public-record research",
    "O'Leary has framed the campus on Fox News and AOL coverage as a strategic-AI counterweight to China and uses the brand \"Wonder Valley Utah,\" echoing the name of his proposed Alberta facility."
   ],
   "capacity_gw_evidence": [
    "Public-record research",
    "None of these matches Stratos's stated **3 GW Phase 1 / 7.5 to 9 GW full / ~40,000 acres**."
   ],
   "builder_evidence": [
    "Public-record research",
    "**O'Leary Digital**, the developer, would build the data-center campus."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Public-record research",
    "- **Wonder Valley Utah / Stratos**: public announcement **April 24, 2026**; pre-construction; Box Elder County consent vote **tabled twice** as of April 27, 2026."
   ],
   "announcement_date_evidence": [
    "Public-record research",
    "- **Wonder Valley Utah / Stratos**: public announcement **April 24, 2026**; pre-construction; Box Elder County consent vote **tabled twice** as of April 27, 2026."
   ]
  },
  {
   "url": "https://computing.co.uk/news-analysis/2026/can-openai-growth-outrun-losses-and-public-backlash",
   "title": "OpenAI's $750bn bet: Can growth outrun the losses and public backlash?",
   "published_at": "2026-07-23T11:32:40",
   "project": "Project Camellia",
   "locality": null,
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI's $750bn bet: Can growth outrun the losses and public backlash?",
    "## OpenAI is spending more money than it planned, and virtually nobody wants its datacentres in their backyards",
    "At the same time [OpenAI announced](https://projectcamellia.com/) a $20 billion, 3.2GW data centre campus in Georgia known as Project Camellia."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# OpenAI's $750bn bet: Can growth outrun the losses and public backlash?",
    "## OpenAI is spending more money than it planned, and virtually nobody wants its datacentres in their backyards",
    "At the same time [OpenAI announced](https://projectcamellia.com/) a $20 billion, 3.2GW data centre campus in Georgia known as Project Camellia."
   ],
   "capacity_gw_evidence": [
    "# OpenAI's $750bn bet: Can growth outrun the losses and public backlash?",
    "## OpenAI is spending more money than it planned, and virtually nobody wants its datacentres in their backyards",
    "At the same time [OpenAI announced](https://projectcamellia.com/) a $20 billion, 3.2GW data centre campus in Georgia known as Project Camellia."
   ],
   "builder_evidence": [
    "# OpenAI's $750bn bet: Can growth outrun the losses and public backlash?",
    "## OpenAI is spending more money than it planned, and virtually nobody wants its datacentres in their backyards",
    "At the same time [OpenAI announced](https://projectcamellia.com/) a $20 billion, 3.2GW data centre campus in Georgia known as Project Camellia."
   ],
   "ai_customer_evidence": [
    "# OpenAI's $750bn bet: Can growth outrun the losses and public backlash?",
    "## OpenAI is spending more money than it planned, and virtually nobody wants its datacentres in their backyards",
    "At the same time [OpenAI announced](https://projectcamellia.com/) a $20 billion, 3.2GW data centre campus in Georgia known as Project Camellia."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://eu.thetimesherald.com/story/money/business/2026/03/17/google-reveals-project-cannoli-data-center/89185890007",
   "title": "Google reveals it is behind big 'Project Cannoli' data center project",
   "published_at": "2026-03-17T12:02:18",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "locality_evidence": [
    "Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "state_evidence": [
    "Google reveals it is behind big 'Project Cannoli' data center project",
    "Google also said Tuesday that it is creating a $10 million Energy Impact Fund for local organizations to tap into with the aim of lowering monthly utility bills for Michiganders."
   ],
   "capacity_gw_evidence": [
    "Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "builder_evidence": [
    "Google reveals it is behind big 'Project Cannoli' data center project",
    "The data center would be developed for Google by Panattoni Development Co."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "announcement_date_evidence": [
    "Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ]
  },
  {
   "url": "https://mexc.com/news/1113949",
   "title": "TeraWulf (WULF) Stock Jumps 13% on Kentucky AI Data Center Expansion | MEXC News",
   "published_at": null,
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "Site work has already begun",
   "announcement_date": null,
   "project_evidence": [
    "### TLDR",
    "TeraWulf (WULF) surged 13% after announcing the Muskie Data Campus \u2014 a 1 gigawatt AI and HPC site in eastern Kentucky.",
    "TeraWulf (WULF) jumped 13% in early Tuesday trading after the company disclosed it had acquired the Muskie Data Campus in eastern Kentucky \u2014 a hyperscale site capable of supporting more than 1 gigawatt of AI and high-performance computing infrastructure over time."
   ],
   "locality_evidence": [
    "### TLDR",
    "TeraWulf (WULF) surged 13% after announcing the Muskie Data Campus \u2014 a 1 gigawatt AI and HPC site in eastern Kentucky.",
    "TeraWulf (WULF) jumped 13% in early Tuesday trading after the company disclosed it had acquired the Muskie Data Campus in eastern Kentucky \u2014 a hyperscale site capable of supporting more than 1 gigawatt of AI and high-performance computing infrastructure over time."
   ],
   "state_evidence": [
    "### TLDR",
    "TeraWulf (WULF) surged 13% after announcing the Muskie Data Campus \u2014 a 1 gigawatt AI and HPC site in eastern Kentucky.",
    "TeraWulf (WULF) jumped 13% in early Tuesday trading after the company disclosed it had acquired the Muskie Data Campus in eastern Kentucky \u2014 a hyperscale site capable of supporting more than 1 gigawatt of AI and high-performance computing infrastructure over time."
   ],
   "capacity_gw_evidence": [
    "### TLDR",
    "TeraWulf (WULF) surged 13% after announcing the Muskie Data Campus \u2014 a 1 gigawatt AI and HPC site in eastern Kentucky.",
    "TeraWulf (WULF) jumped 13% in early Tuesday trading after the company disclosed it had acquired the Muskie Data Campus in eastern Kentucky \u2014 a hyperscale site capable of supporting more than 1 gigawatt of AI and high-performance computing infrastructure over time."
   ],
   "builder_evidence": [
    "### TLDR",
    "TeraWulf (WULF) surged 13% after announcing the Muskie Data Campus \u2014 a 1 gigawatt AI and HPC site in eastern Kentucky.",
    "TeraWulf (WULF) jumped 13% in early Tuesday trading after the company disclosed it had acquired the Muskie Data Campus in eastern Kentucky \u2014 a hyperscale site capable of supporting more than 1 gigawatt of AI and high-performance computing infrastructure over time."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "### TLDR",
    "The property sits on roughly 285 acres within a 1,000-acre industrial park called EastPark. Site work has already begun, and much of the zoning and permitting is reportedly in place."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://bitcoinethereumnews.com/bitcoin/hut-8-surges-30-after-landing-second-ai-data-center-lease-worth-9-8-billion-bitcoin-news",
   "title": "Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion \u2013 Bitcoin News",
   "published_at": "2026-05-07T09:36:17",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "under development",
   "announcement_date": null,
   "project_evidence": [
    "# Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion \u2013 Bitcoin News",
    "The Miami-based company said it signed a $9.8 billion triple-net lease for 352 megawatts of IT capacity at its Beacon Point campus in Nueces County, Texas."
   ],
   "locality_evidence": [
    "# Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion \u2013 Bitcoin News",
    "The Miami-based company said it signed a $9.8 billion triple-net lease for 352 megawatts of IT capacity at its Beacon Point campus in Nueces County, Texas."
   ],
   "state_evidence": [
    "# Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion \u2013 Bitcoin News",
    "The Miami-based company said it signed a $9.8 billion triple-net lease for 352 megawatts of IT capacity at its Beacon Point campus in Nueces County, Texas."
   ],
   "capacity_gw_evidence": [
    "# Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion \u2013 Bitcoin News",
    "Beacon Point is designed as a gigawatt-scale campus with 1,000 MW of utility capacity under interconnection agreement with AEP Texas."
   ],
   "builder_evidence": [
    "# Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion \u2013 Bitcoin News",
    "The Miami-based company said it signed a $9.8 billion triple-net lease for 352 megawatts of IT capacity at its Beacon Point campus in Nueces County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion \u2013 Bitcoin News",
    "Hut 8 said the first phase of the project \u2014 representing roughly 500 MW of utility capacity to support the 352 MW IT load \u2014 is expected to begin energization in the first quarter of 2027, with initial data hall delivery targeted for the third quarter of that year."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://note.com/trex_ai/n/n22ef573b1278?hl=en",
   "title": "05/09-2\uff5c5GW\uff0b$21\u5104\u51fa\u8cc7\u6a29\uff0b$34\u5104\u767a\u6ce8\u3002NVIDIA\u304cIREN\u3067\u4f9b\u7d66\u00d7\u8cfc\u5165\u00d7\u51fa\u8cc7\u306e\u4e09\u5f79\uff5cTrex IT NEWS",
   "published_at": "2026-05-09T02:30:00",
   "project": "Sweetwater",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": "NVIDIA",
   "status": "announced",
   "announcement_date": "2026-05-07",
   "project_evidence": [
    "05/09-2 | 5GW + $2.1B Investment Rights + $3.4B Order. NVIDIA Plays Triple Role of Supplier, Buyer, and Investor in IREN | Trex IT NEWS",
    "The flagship site for deployment is the 2GW Sweetwater campus (Texas), with the announcement coming immediately after IREN brought the 1.4GW Sweetwater 1 substation online on May 1."
   ],
   "locality_evidence": [
    "05/09-2 | 5GW + $2.1B Investment Rights + $3.4B Order. NVIDIA Plays Triple Role of Supplier, Buyer, and Investor in IREN | Trex IT NEWS",
    "The flagship site for deployment is the 2GW Sweetwater campus (Texas), with the announcement coming immediately after IREN brought the 1.4GW Sweetwater 1 substation online on May 1."
   ],
   "state_evidence": [
    "05/09-2 | 5GW + $2.1B Investment Rights + $3.4B Order. NVIDIA Plays Triple Role of Supplier, Buyer, and Investor in IREN | Trex IT NEWS",
    "The flagship site for deployment is the 2GW Sweetwater campus (Texas), with the announcement coming immediately after IREN brought the 1.4GW Sweetwater 1 substation online on May 1."
   ],
   "capacity_gw_evidence": [
    "05/09-2 | 5GW + $2.1B Investment Rights + $3.4B Order. NVIDIA Plays Triple Role of Supplier, Buyer, and Investor in IREN | Trex IT NEWS",
    "The flagship site for deployment is the 2GW Sweetwater campus (Texas), with the announcement coming immediately after IREN brought the 1.4GW Sweetwater 1 substation online on May 1."
   ],
   "builder_evidence": [
    "05/09-2 | 5GW + $2.1B Investment Rights + $3.4B Order. NVIDIA Plays Triple Role of Supplier, Buyer, and Investor in IREN | Trex IT NEWS",
    "The flagship site for deployment is the 2GW Sweetwater campus (Texas), with the announcement coming immediately after IREN brought the 1.4GW Sweetwater 1 substation online on May 1."
   ],
   "ai_customer_evidence": [
    "05/09-2 | 5GW + $2.1B Investment Rights + $3.4B Order. NVIDIA Plays Triple Role of Supplier, Buyer, and Investor in IREN | Trex IT NEWS",
    "On May 7, 2026, NVIDIA announced a strategic partnership with data center operator IREN Limited (NASDAQ: IREN, headquartered in Australia)."
   ],
   "status_evidence": [
    "05/09-2 | 5GW + $2.1B Investment Rights + $3.4B Order. NVIDIA Plays Triple Role of Supplier, Buyer, and Investor in IREN | Trex IT NEWS",
    "The flagship site for deployment is the 2GW Sweetwater campus (Texas), with the announcement coming immediately after IREN brought the 1.4GW Sweetwater 1 substation online on May 1."
   ],
   "announcement_date_evidence": [
    "05/09-2 | 5GW + $2.1B Investment Rights + $3.4B Order. NVIDIA Plays Triple Role of Supplier, Buyer, and Investor in IREN | Trex IT NEWS",
    "On May 7, 2026, NVIDIA announced a strategic partnership with data center operator IREN Limited (NASDAQ: IREN, headquartered in Australia)."
   ]
  },
  {
   "url": "https://americanewsobserver.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Creekstone Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "state_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://datacentre.solutions/videos/4701/hydrogen-powered-ai-factory-data-centre-lifts-off-in-houston",
   "title": "Hydrogen-powered AI factory data centre lifts off in Houston",
   "published_at": "2024-10-25T04:16:07",
   "project": "ECL TerraSite",
   "locality": null,
   "state": null,
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Yuval Bachar, co-founder and CEO of ECL, the data centre-as-a-service pioneer which unveiled a world first off-grid, sustainable, modular, built-to-suit data centre earlier this year, explains the thinking behind the company\u2019s decision to build what it says will be the first fully sustainable 1GW AI Factory \u2013 ECL TerraSite on a 600+ acre site in the New Orleans to Houston corridor."
   ],
   "locality_evidence": null,
   "state_evidence": null,
   "capacity_gw_evidence": [
    "Yuval Bachar, co-founder and CEO of ECL, the data centre-as-a-service pioneer which unveiled a world first off-grid, sustainable, modular, built-to-suit data centre earlier this year, explains the thinking behind the company\u2019s decision to build what it says will be the first fully sustainable 1GW AI Factory \u2013 ECL TerraSite on a 600+ acre site in the New Orleans to Houston corridor."
   ],
   "builder_evidence": [
    "Yuval Bachar, co-founder and CEO of ECL, the data centre-as-a-service pioneer which unveiled a world first off-grid, sustainable, modular, built-to-suit data centre earlier this year, explains the thinking behind the company\u2019s decision to build what it says will be the first fully sustainable 1GW AI Factory \u2013 ECL TerraSite on a 600+ acre site in the New Orleans to Houston corridor."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://blockchainnews.azurewebsites.net/news/openai-ports-pike-project-ohio",
   "title": "OpenAI Backs PORTS-Pike Project, $160M Investment in Ohio",
   "published_at": null,
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# OpenAI Backs PORTS-Pike Project, $160M Investment in Ohio",
    "OpenAI has announced its participation in the PORTS-Pike Technology Campus project in Pike County, Ohio, marking a significant step in the development of AI infrastructure in the United States."
   ],
   "locality_evidence": [
    "# OpenAI Backs PORTS-Pike Project, $160M Investment in Ohio",
    "OpenAI has announced its participation in the PORTS-Pike Technology Campus project in Pike County, Ohio, marking a significant step in the development of AI infrastructure in the United States."
   ],
   "state_evidence": [
    "# OpenAI Backs PORTS-Pike Project, $160M Investment in Ohio",
    "OpenAI has announced its participation in the PORTS-Pike Technology Campus project in Pike County, Ohio, marking a significant step in the development of AI infrastructure in the United States."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Backs PORTS-Pike Project, $160M Investment in Ohio",
    "OpenAI has secured approximately 8 gigawatts of IT capacity at the site, aligning with its long-term frontier-training needs for advanced AI systems."
   ],
   "builder_evidence": [
    "# OpenAI Backs PORTS-Pike Project, $160M Investment in Ohio",
    "The initiative, a collaboration with SB Energy, NVIDIA, and the U.S. Department of Energy (DOE), is projected to create 37,500 jobs and includes a $160 million investment in community development."
   ],
   "ai_customer_evidence": [
    "# OpenAI Backs PORTS-Pike Project, $160M Investment in Ohio",
    "OpenAI has announced its participation in the PORTS-Pike Technology Campus project in Pike County, Ohio, marking a significant step in the development of AI infrastructure in the United States."
   ],
   "status_evidence": [
    "# OpenAI Backs PORTS-Pike Project, $160M Investment in Ohio",
    "OpenAI has announced its participation in the PORTS-Pike Technology Campus project in Pike County, Ohio, marking a significant step in the development of AI infrastructure in the United States."
   ],
   "announcement_date_evidence": [
    "# OpenAI Backs PORTS-Pike Project, $160M Investment in Ohio",
    "[Zach Anderson](/Profile/Zach-Anderson) Aug 17, 2026 14:22"
   ]
  },
  {
   "url": "https://qz.com/meta-blackrock-el-paso-data-center-joint-venture-072826?.tsrc=rss",
   "title": "Meta and BlackRock are forming a $14 billion joint venture to build a Texas AI data center",
   "published_at": "2026-07-28T13:35:18",
   "project": "Data center campus in El Paso",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta and BlackRock",
   "ai_customer": "Meta",
   "status": "currently being built",
   "announcement_date": "2026-07-28",
   "project_evidence": [
    "# Meta and BlackRock are forming a $14 billion joint venture to build a Texas AI data center"
   ],
   "locality_evidence": [
    "# Meta and BlackRock are forming a $14 billion joint venture to build a Texas AI data center"
   ],
   "state_evidence": [
    "# Meta and BlackRock are forming a $14 billion joint venture to build a Texas AI data center"
   ],
   "capacity_gw_evidence": [
    "# Meta and BlackRock are forming a $14 billion joint venture to build a Texas AI data center",
    "The facility, which is currently being built, will deliver 1 gigawatt of compute capacity when finished."
   ],
   "builder_evidence": [
    "# Meta and BlackRock are forming a $14 billion joint venture to build a Texas AI data center"
   ],
   "ai_customer_evidence": [
    "# Meta and BlackRock are forming a $14 billion joint venture to build a Texas AI data center",
    "The facility, which is currently being built, will deliver 1 gigawatt of compute capacity when finished. Meta will be the sole occupant upon completion, which is expected in 2028."
   ],
   "status_evidence": [
    "# Meta and BlackRock are forming a $14 billion joint venture to build a Texas AI data center",
    "The facility, which is currently being built, will deliver 1 gigawatt of compute capacity when finished."
   ],
   "announcement_date_evidence": [
    "# Meta and BlackRock are forming a $14 billion joint venture to build a Texas AI data center",
    "[By Cris Tolomia](/author/cristolomia)\u00b72 min read\u00b7Updated July 28, 2026"
   ]
  },
  {
   "url": "https://newsbreak.com/wilderness-marksman-359720901/4683970865697-amazon-to-build-11bn-ai-data-campus-in-indiana-that-will-use-electricity-of-1-million-homes-and-300m-gallons-of-water-a-year",
   "title": "Amazon to build $11bn AI data campus in Indiana that will use electricity of 1 million homes and 300m gallons of water a year - NewsBreak",
   "published_at": "2026-06-01T15:00:00",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Indiana",
    "Amazon to build $11bn AI data campus in Indiana that will use electricity of 1 million homes and 300m gallons of water a year",
    "Amazon has committed $11 billion to build a sprawling data center campus there, known as Project Rainier."
   ],
   "locality_evidence": [
    "Indiana",
    "Amazon to build $11bn AI data campus in Indiana that will use electricity of 1 million homes and 300m gallons of water a year",
    "You step back from the quiet fields near New Carlisle, Indiana, and see farmland giving way to something much larger."
   ],
   "state_evidence": [
    "Indiana",
    "Amazon to build $11bn AI data campus in Indiana that will use electricity of 1 million homes and 300m gallons of water a year",
    "You step back from the quiet fields near New Carlisle, Indiana, and see farmland giving way to something much larger."
   ],
   "capacity_gw_evidence": [
    "Indiana",
    "Amazon to build $11bn AI data campus in Indiana that will use electricity of 1 million homes and 300m gallons of water a year",
    "Power needs for this campus reach about 2.2 gigawatts once fully built out."
   ],
   "builder_evidence": [
    "Indiana",
    "Amazon to build $11bn AI data campus in Indiana that will use electricity of 1 million homes and 300m gallons of water a year",
    "Amazon has committed $11 billion to build a sprawling data center campus there, known as Project Rainier."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Indiana",
    "Amazon to build $11bn AI data campus in Indiana that will use electricity of 1 million homes and 300m gallons of water a year",
    "Amazon has committed $11 billion to build a sprawling data center campus there, known as Project Rainier."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://markets.financialcontent.com/statesmanexaminer/article/tokenring-2026-1-2-colossus-unbound-xais-memphis-expansion-targets-1-million-gpus-in-the-race-for-agi",
   "title": "Colossus Unbound: xAI\u00e2s Memphis Expansion Targets 1 Million GPUs in the Race for AGI",
   "published_at": "2026-01-02T19:48:24",
   "project": "Colossus",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "",
   "status": "expanding",
   "announcement_date": null,
   "project_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "locality_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "state_evidence": [
    "As the \"Digital Delta\" takes shape across the Tennessee-Mississippi border, the project is redefining the physical and logistical requirements of the AGI era.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "capacity_gw_evidence": [
    "By targeting a power capacity of 2 gigawatts (GW)\u2014roughly enough to power nearly 2 million homes\u2014xAI is transitioning from a high-scale startup to a \"Gigafactory of Compute.\"",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "builder_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://poweredbywho.com/projects/microsoft-fairwater-campus-former-foxconn-5eafd55b",
   "title": "Microsoft Fairwater Campus (Former Foxconn) Data Center, Wisconsin | PoweredByWho",
   "published_at": null,
   "project": "Microsoft Fairwater Campus (Former Foxconn)",
   "locality": "Mount Pleasant",
   "state": "Wisconsin",
   "capacity_gw": 2.0,
   "builder": "Microsoft",
   "ai_customer": "",
   "status": "Operational",
   "announcement_date": "2024-05",
   "project_evidence": [
    "FILE #MICROSOFT-FAIRWATER-CAMPUS-FORMER-FOXCONN-5EAFD55B \u00b7 UPDATED 2026-07-08",
    "# Microsoft Fairwater Campus (Former Foxconn)"
   ],
   "locality_evidence": [
    "FILE #MICROSOFT-FAIRWATER-CAMPUS-FORMER-FOXCONN-5EAFD55B \u00b7 UPDATED 2026-07-08",
    "Mount Pleasant \u00b7 315 acres",
    "Location\n\nMOUNT PLEASANT\n\nRacine County, WI"
   ],
   "state_evidence": [
    "FILE #MICROSOFT-FAIRWATER-CAMPUS-FORMER-FOXCONN-5EAFD55B \u00b7 UPDATED 2026-07-08",
    "Location\n\nMOUNT PLEASANT\n\nRacine County, WI",
    "2026-06-23\n\npress_coverageMicrosoft announced the first Fairwater datacenter facility in Mount Pleasant is complete and fully operational."
   ],
   "capacity_gw_evidence": [
    "FILE #MICROSOFT-FAIRWATER-CAMPUS-FORMER-FOXCONN-5EAFD55B \u00b7 UPDATED 2026-07-08",
    "2000 MW \u00b7 OPERATIONAL",
    "Capacity\n\n2000 MW"
   ],
   "builder_evidence": [
    "FILE #MICROSOFT-FAIRWATER-CAMPUS-FORMER-FOXCONN-5EAFD55B \u00b7 UPDATED 2026-07-08",
    "Operator\n\nMicrosoft"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "FILE #MICROSOFT-FAIRWATER-CAMPUS-FORMER-FOXCONN-5EAFD55B \u00b7 UPDATED 2026-07-08",
    "2000 MW \u00b7 OPERATIONAL",
    "Status\n\nOperational\n\nAs of 2026-07-08"
   ],
   "announcement_date_evidence": [
    "FILE #MICROSOFT-FAIRWATER-CAMPUS-FORMER-FOXCONN-5EAFD55B \u00b7 UPDATED 2026-07-08",
    "2026-06-23\n\npress_coverageMicrosoft announced the first Fairwater datacenter facility in Mount Pleasant is complete and fully operational. Equipment was brought online and startup activities ran in April 2026; full completion declared June 23, 2026 - built ahead of schedule (announced May 2024, ~10,000 construction workers over two years)."
   ]
  },
  {
   "url": "https://fermiamerica.com/former-texas-governor-and-us-energy-sec-plans-11gw-data-center-campus-outside-amarillo-texas",
   "title": "Former Texas governor and US energy sec plans 11GW data center campus outside Amarillo, Texas - FERMI AMERICA",
   "published_at": "2025-06-28T06:01:32",
   "project": "Advanced Energy and Intelligence Campus",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Located on approximately 5,800 acres, the Advanced Energy and Intelligence Campus will reportedly include \u201c18 million square feet (1.67 million sqm) of data centers and generate up to 11GW of IT capacity from natural gas, solar, wind, and clean nuclear energy.\u201d"
   ],
   "locality_evidence": [
    "This week, the Texas Tech University System (TTU System) announced a collaboration with recently founded energy and technology company Fermi America to develop a large AI and energy campus near Amarillo in the Texas Panhandle."
   ],
   "state_evidence": [
    "A massive multi-gigawatt behind-the-meter campus is being planned in Texas close to the US government\u2019s main nuclear weapons development facility by former Texas governor and energy secretary Rick Perry."
   ],
   "capacity_gw_evidence": [
    "Located on approximately 5,800 acres, the Advanced Energy and Intelligence Campus will reportedly include \u201c18 million square feet (1.67 million sqm) of data centers and generate up to 11GW of IT capacity from natural gas, solar, wind, and clean nuclear energy.\u201d"
   ],
   "builder_evidence": [
    "This week, the Texas Tech University System (TTU System) announced a collaboration with recently founded energy and technology company Fermi America to develop a large AI and energy campus near Amarillo in the Texas Panhandle."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "A massive multi-gigawatt behind-the-meter campus is being planned in Texas close to the US government\u2019s main nuclear weapons development facility by former Texas governor and energy secretary Rick Perry."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://manilatimes.net/2026/03/17/tmt-newswire/pr-newswire/nscale-and-microsoft-announce-collaboration-with-nvidia-and-caterpillar-to-deliver-135gw-of-nvidia-vera-rubin-nvl72-gpus-at-flagship-ai-factory-campus-in-west-virginia/2301273",
   "title": "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
   "published_at": "2026-03-17T23:40:59",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "announced",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design.",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "locality_evidence": [
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "state_evidence": [
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design.",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "capacity_gw_evidence": [
    "- *Nscale Acquires the Monarch Compute Campus - America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid*",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts.",
    "The expansion capabilities of this site - which has the potential for a total power draw of 8GW - will allow Nscale to develop power capacity rapidly while supporting one of the largest announced AI compute deployments in the market today."
   ],
   "builder_evidence": [
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design.",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "ai_customer_evidence": [
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design.",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "status_evidence": [
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "announcement_date_evidence": [
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ]
  },
  {
   "url": "https://texasedequity.blogspot.com/2026/07/draining-ogallala-aquifer-for-ai.html",
   "title": "Draining the Ogallala Aquifer for AI? Project Matador and the myth of limitless growth, by Angela Valenzuela, Ph.D. & Luke Metzger, Exec. Dir., Environment Texas Research & Policy Center",
   "published_at": null,
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 17.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "Project Matador, a massive artificial-intelligence and energy campus under construction near Amarillo, raises urgent questions about water, natural gas, public land, corporate accountability, and the proper role of a public university in facilitating private development.",
    "A 17-gigawatt AI campus in the Texas Panhandle is staking its future on water the region doesn't have to spare.",
    "A massive artificial-intelligence (AI) infrastructure project is rising approximately 12 miles northeast of Amarillo."
   ],
   "locality_evidence": [
    "Project Matador, a massive artificial-intelligence and energy campus under construction near Amarillo, raises urgent questions about water, natural gas, public land, corporate accountability, and the proper role of a public university in facilitating private development.",
    "A 17-gigawatt AI campus in the Texas Panhandle is staking its future on water the region doesn't have to spare.",
    "A massive artificial-intelligence (AI) infrastructure project is rising approximately 12 miles northeast of Amarillo."
   ],
   "state_evidence": [
    "Project Matador, a massive artificial-intelligence and energy campus under construction near Amarillo, raises urgent questions about water, natural gas, public land, corporate accountability, and the proper role of a public university in facilitating private development.",
    "A 17-gigawatt AI campus in the Texas Panhandle is staking its future on water the region doesn't have to spare.",
    "A massive artificial-intelligence (AI) infrastructure project is rising approximately 12 miles northeast of Amarillo."
   ],
   "capacity_gw_evidence": [
    "Project Matador, a massive artificial-intelligence and energy campus under construction near Amarillo, raises urgent questions about water, natural gas, public land, corporate accountability, and the proper role of a public university in facilitating private development.",
    "A 17-gigawatt AI campus in the Texas Panhandle is staking its future on water the region doesn't have to spare.",
    "Now the [company says](https://fermiamerica.com/) it will produce 17 gigawatts across 7,570 acres, with natural gas, solar energy, battery storage, and four proposed nuclear reactors providing the power."
   ],
   "builder_evidence": [
    "Project Matador, a massive artificial-intelligence and energy campus under construction near Amarillo, raises urgent questions about water, natural gas, public land, corporate accountability, and the proper role of a public university in facilitating private development.",
    "A 17-gigawatt AI campus in the Texas Panhandle is staking its future on water the region doesn't have to spare.",
    "Known as Project Matador, the development is being built by Fermi America through a partnership with the Texas Tech University System and promoted as the largest private energy and artificial-intelligence campus in the world."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Project Matador, a massive artificial-intelligence and energy campus under construction near Amarillo, raises urgent questions about water, natural gas, public land, corporate accountability, and the proper role of a public university in facilitating private development.",
    "A 17-gigawatt AI campus in the Texas Panhandle is staking its future on water the region doesn't have to spare.",
    "A massive artificial-intelligence (AI) infrastructure project is rising approximately 12 miles northeast of Amarillo."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://brendonbeebe.substack.com/p/mr-wonderfuls-megaproject-where-the",
   "title": "Mr. Wonderful\u2019s Megaproject: Where the Stratos Data Center Really Stands After Utah\u2019s New \u201cData Center Framework\u201d",
   "published_at": "2026-05-31T01:38:11",
   "project": "Stratos Project",
   "locality": "Hansel Valley",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O'Leary Digital",
   "ai_customer": null,
   "status": "Cleared land-use gates, has not secured a single binding environmental permit or any water rights",
   "announcement_date": null,
   "project_evidence": [
    "# Mr. Wonderful\u2019s Megaproject: Where the Stratos Data Center Really Stands After Utah\u2019s New \u201cData Center Framework\u201d",
    "- **Where it stands (late May 2026):** The Stratos Project \u2014 a ~40,000-acre, up-to-9-gigawatt AI data center and gas-power campus backed by Kevin O\u2019Leary\u2019s O\u2019Leary Digital and Utah\u2019s Military Installation Development Authority (MIDA) in Box Elder County\u2019s Hansel Valley \u2014 has cleared its *land-use* gates (MIDA board approval April 24; unanimous Box Elder County Commission approval May 4) but **has not secured a single binding environmental permit or any water rights.**"
   ],
   "locality_evidence": [
    "# Mr. Wonderful\u2019s Megaproject: Where the Stratos Data Center Really Stands After Utah\u2019s New \u201cData Center Framework\u201d",
    "- **Where it stands (late May 2026):** The Stratos Project \u2014 a ~40,000-acre, up-to-9-gigawatt AI data center and gas-power campus backed by Kevin O\u2019Leary\u2019s O\u2019Leary Digital and Utah\u2019s Military Installation Development Authority (MIDA) in Box Elder County\u2019s Hansel Valley \u2014 has cleared its *land-use* gates (MIDA board approval April 24; unanimous Box Elder County Commission approval May 4) but **has not secured a single binding environmental permit or any water rights.**"
   ],
   "state_evidence": [
    "# Mr. Wonderful\u2019s Megaproject: Where the Stratos Data Center Really Stands After Utah\u2019s New \u201cData Center Framework\u201d",
    "- **Where it stands (late May 2026):** The Stratos Project \u2014 a ~40,000-acre, up-to-9-gigawatt AI data center and gas-power campus backed by Kevin O\u2019Leary\u2019s O\u2019Leary Digital and Utah\u2019s Military Installation Development Authority (MIDA) in Box Elder County\u2019s Hansel Valley \u2014 has cleared its *land-use* gates (MIDA board approval April 24; unanimous Box Elder County Commission approval May 4) but **has not secured a single binding environmental permit or any water rights.**"
   ],
   "capacity_gw_evidence": [
    "# Mr. Wonderful\u2019s Megaproject: Where the Stratos Data Center Really Stands After Utah\u2019s New \u201cData Center Framework\u201d",
    "- **Where it stands (late May 2026):** The Stratos Project \u2014 a ~40,000-acre, up-to-9-gigawatt AI data center and gas-power campus backed by Kevin O\u2019Leary\u2019s O\u2019Leary Digital and Utah\u2019s Military Installation Development Authority (MIDA) in Box Elder County\u2019s Hansel Valley \u2014 has cleared its *land-use* gates (MIDA board approval April 24; unanimous Box Elder County Commission approval May 4) but **has not secured a single binding environmental permit or any water rights.**"
   ],
   "builder_evidence": [
    "# Mr. Wonderful\u2019s Megaproject: Where the Stratos Data Center Really Stands After Utah\u2019s New \u201cData Center Framework\u201d",
    "- **Where it stands (late May 2026):** The Stratos Project \u2014 a ~40,000-acre, up-to-9-gigawatt AI data center and gas-power campus backed by Kevin O\u2019Leary\u2019s O\u2019Leary Digital and Utah\u2019s Military Installation Development Authority (MIDA) in Box Elder County\u2019s Hansel Valley \u2014 has cleared its *land-use* gates (MIDA board approval April 24; unanimous Box Elder County Commission approval May 4) but **has not secured a single binding environmental permit or any water rights.**"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Mr. Wonderful\u2019s Megaproject: Where the Stratos Data Center Really Stands After Utah\u2019s New \u201cData Center Framework\u201d",
    "- **Where it stands (late May 2026):** The Stratos Project \u2014 a ~40,000-acre, up-to-9-gigawatt AI data center and gas-power campus backed by Kevin O\u2019Leary\u2019s O\u2019Leary Digital and Utah\u2019s Military Installation Development Authority (MIDA) in Box Elder County\u2019s Hansel Valley \u2014 has cleared its *land-use* gates (MIDA board approval April 24; unanimous Box Elder County Commission approval May 4) but **has not secured a single binding environmental permit or any water rights.**"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://awesomeagents.ai/news/openai-750b-compute-camellia",
   "title": "OpenAI's $750B Plan Has It Building Its Own Data Centers",
   "published_at": "2026-07-22T18:02:28",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI's $750B Plan Has It Building Its Own Data Centers",
    "Project Camellia"
   ],
   "locality_evidence": [
    "# OpenAI's $750B Plan Has It Building Its Own Data Centers",
    "- Project Camellia is a 1,400-acre, $20 billion campus in Effingham County, Georgia, drawing at least 3.2 gigawatts from Georgia Power, mostly produced by new natural gas plants",
    "Effingham County"
   ],
   "state_evidence": [
    "# OpenAI's $750B Plan Has It Building Its Own Data Centers",
    "- Project Camellia is a 1,400-acre, $20 billion campus in Effingham County, Georgia, drawing at least 3.2 gigawatts from Georgia Power, mostly produced by new natural gas plants",
    "Georgia"
   ],
   "capacity_gw_evidence": [
    "# OpenAI's $750B Plan Has It Building Its Own Data Centers",
    "- Project Camellia is a 1,400-acre, $20 billion campus in Effingham County, Georgia, drawing at least 3.2 gigawatts from Georgia Power, mostly produced by new natural gas plants",
    "Georgia Power will supply at least 3.2 gigawatts, generated mostly by new natural gas capacity with grid batteries and solar, with generating capacity coming online in stages between 2028 and 2032."
   ],
   "builder_evidence": [
    "# OpenAI's $750B Plan Has It Building Its Own Data Centers",
    "OpenAI is the principal designer and builder, not a tenant leasing racks inside someone else's shell."
   ],
   "ai_customer_evidence": [
    "# OpenAI's $750B Plan Has It Building Its Own Data Centers",
    "OpenAI is the principal designer and builder, not a tenant leasing racks inside someone else's shell."
   ],
   "status_evidence": [
    "# OpenAI's $750B Plan Has It Building Its Own Data Centers",
    "OpenAI raised its infrastructure spending target to $750 billion through 2030 and is building its first self-owned data center campus in Georgia, even as its flagship Stargate project stalls.",
    "Running that construction is Brett Mayo, hired away from xAI, where he oversaw the Colossus supercomputer buildout in Memphis."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://vbtmi.gov/Document_Center/Department/Municipal%20Services/Project%20Cannoli-%20Utility%20Infrastructure%20Planning%20Commission%20Meeting_051326%20FINAL.pdf?t=202605261120120",
   "title": "REVISED/RESUBMIT_Project Cannoli- Utility Infrastructure Planning Commission Meeting",
   "published_at": "2026-05-13T18:48:42",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": null,
   "capacity_gw": 1.0,
   "builder": "Panattoni",
   "ai_customer": null,
   "status": "preliminary site plan approval",
   "announcement_date": null,
   "project_evidence": [
    "PROJECT CANNOLI",
    "In February, Project Cannoli received preliminary site plan approval for a 1GW data center campus in Van\n\nBuren Township."
   ],
   "locality_evidence": [
    "INTRODUCTION",
    "In February, Project Cannoli received preliminary site plan approval for a 1GW data center campus in Van\n\nBuren Township."
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "INTRODUCTION",
    "In February, Project Cannoli received preliminary site plan approval for a 1GW data center campus in Van\n\nBuren Township."
   ],
   "builder_evidence": [
    "INTRODUCTION",
    "Panattoni is presenting as the developer for the entire property who will coordinate the construction of the\n\ncampus development with the utility infrastructure including the power conditioning units which are being\n\nrequired by DTE and ITC."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "INTRODUCTION",
    "In February, Project Cannoli received preliminary site plan approval for a 1GW data center campus in Van\n\nBuren Township."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mexc.co/en-NG/news/1114567",
   "title": "TeraWulf surges 10% on 1GW Kentucky AI campus bet | MEXC News",
   "published_at": null,
   "project": "Muskie Data Campus",
   "locality": null,
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": "",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access.",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure. However, it is not about chips anymore. It is about power. The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access.",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure. However, it is not about chips anymore. It is about power. The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity."
   ],
   "capacity_gw_evidence": [
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access.",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure. However, it is not about chips anymore. It is about power. The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity."
   ],
   "builder_evidence": [
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access.",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure. However, it is not about chips anymore. It is about power. The company secured a 285-acre site in eastern Kentucky. It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://simplywall.st/stocks/us/software/nasdaq-hut/hut-8/news/how-investors-may-respond-to-hut-8-hut-securing-us196-billio",
   "title": "How Investors May Respond To Hut 8 (HUT) Securing US$19.6 Billion In Long-Term AI Lease Deals",
   "published_at": "2026-08-02T06:21:48",
   "project": "Beacon Point",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "commercialized",
   "announcement_date": null,
   "project_evidence": [
    "# How Investors May Respond To Hut 8 (HUT) Securing US$19.6 Billion In Long-Term AI Lease Deals",
    "- Hut 8 Corp. recently announced it had commercialized the second phase of its Beacon Point AI data center campus in Texas via a second 15-year triple-net lease for 352 MW of IT capacity with the same high-investment-grade tenant, fully contracting the site\u2019s 1,000 MW utility allocation."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# How Investors May Respond To Hut 8 (HUT) Securing US$19.6 Billion In Long-Term AI Lease Deals",
    "- Hut 8 Corp. recently announced it had commercialized the second phase of its Beacon Point AI data center campus in Texas via a second 15-year triple-net lease for 352 MW of IT capacity with the same high-investment-grade tenant, fully contracting the site\u2019s 1,000 MW utility allocation."
   ],
   "capacity_gw_evidence": [
    "# How Investors May Respond To Hut 8 (HUT) Securing US$19.6 Billion In Long-Term AI Lease Deals",
    "- Hut 8 Corp. recently announced it had commercialized the second phase of its Beacon Point AI data center campus in Texas via a second 15-year triple-net lease for 352 MW of IT capacity with the same high-investment-grade tenant, fully contracting the site\u2019s 1,000 MW utility allocation."
   ],
   "builder_evidence": [
    "# How Investors May Respond To Hut 8 (HUT) Securing US$19.6 Billion In Long-Term AI Lease Deals",
    "- Hut 8 Corp. recently announced it had commercialized the second phase of its Beacon Point AI data center campus in Texas via a second 15-year triple-net lease for 352 MW of IT capacity with the same high-investment-grade tenant, fully contracting the site\u2019s 1,000 MW utility allocation."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# How Investors May Respond To Hut 8 (HUT) Securing US$19.6 Billion In Long-Term AI Lease Deals",
    "- Hut 8 Corp. recently announced it had commercialized the second phase of its Beacon Point AI data center campus in Texas via a second 15-year triple-net lease for 352 MW of IT capacity with the same high-investment-grade tenant, fully contracting the site\u2019s 1,000 MW utility allocation."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://dailyguardian.ca/iren-secures-2-75gw-for-data-centers-in-west-texas-with-new-600mw-grid-connection-agreement",
   "title": "IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement | Daily Guardian",
   "published_at": "2025-03-17T11:27:59",
   "project": "Sweetwater",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN Limited",
   "ai_customer": null,
   "status": "Advancing",
   "announcement_date": "2025-03-17",
   "project_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) \u2014 IREN Limited (NASDAQ: IREN) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "locality_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) \u2014 IREN Limited (NASDAQ: IREN) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "state_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) \u2014 IREN Limited (NASDAQ: IREN) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "capacity_gw_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) \u2014 IREN Limited (NASDAQ: IREN) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "builder_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) \u2014 IREN Limited (NASDAQ: IREN) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) \u2014 IREN Limited (NASDAQ: IREN) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "announcement_date_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) \u2014 IREN Limited (NASDAQ: IREN) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ]
  },
  {
   "url": "https://energypressreleases.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://digitalisationworld.com/videos/4701/hydrogen-powered-ai-factory-data-centre-lifts-off-in-houston",
   "title": "Hydrogen-powered AI factory data centre lifts off in Houston",
   "published_at": "2024-10-25T04:16:07",
   "project": "ECL TerraSite",
   "locality": "Houston",
   "state": null,
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# Hydrogen-powered AI factory data centre lifts off in Houston",
    "Yuval Bachar, co-founder and CEO of ECL, the data centre-as-a-service pioneer which unveiled a world first off-grid, sustainable, modular, built-to-suit data centre earlier this year, explains the thinking behind the company\u2019s decision to build what it says will be the first fully sustainable 1GW AI Factory \u2013 ECL TerraSite on a 600+ acre site in the New Orleans to Houston corridor."
   ],
   "locality_evidence": [
    "# Hydrogen-powered AI factory data centre lifts off in Houston",
    "Yuval Bachar, co-founder and CEO of ECL, the data centre-as-a-service pioneer which unveiled a world first off-grid, sustainable, modular, built-to-suit data centre earlier this year, explains the thinking behind the company\u2019s decision to build what it says will be the first fully sustainable 1GW AI Factory \u2013 ECL TerraSite on a 600+ acre site in the New Orleans to Houston corridor."
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "# Hydrogen-powered AI factory data centre lifts off in Houston",
    "Yuval Bachar, co-founder and CEO of ECL, the data centre-as-a-service pioneer which unveiled a world first off-grid, sustainable, modular, built-to-suit data centre earlier this year, explains the thinking behind the company\u2019s decision to build what it says will be the first fully sustainable 1GW AI Factory \u2013 ECL TerraSite on a 600+ acre site in the New Orleans to Houston corridor."
   ],
   "builder_evidence": [
    "# Hydrogen-powered AI factory data centre lifts off in Houston",
    "Yuval Bachar, co-founder and CEO of ECL, the data centre-as-a-service pioneer which unveiled a world first off-grid, sustainable, modular, built-to-suit data centre earlier this year, explains the thinking behind the company\u2019s decision to build what it says will be the first fully sustainable 1GW AI Factory \u2013 ECL TerraSite on a 600+ acre site in the New Orleans to Houston corridor."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://chaingridnews.com/2026/07/30/google-backs-15b-anthropic-data-center-in-texas",
   "title": "Google backs $15B Anthropic data center in Texas",
   "published_at": "2026-07-30T21:15:38",
   "project": "Hubbard, Texas, data-center campus",
   "locality": "Hubbard",
   "state": "Texas",
   "capacity_gw": 1.6,
   "builder": "Nexus Data Centers",
   "ai_customer": "Anthropic",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Google backs $15B Anthropic data center in Texas",
    "- Nexus is in advanced talks to **raise $15 billion** for its Hubbard, Texas, data-center campus.",
    "A group of banks led by Morgan Stanley is discussing a financing package for Nexus Data Centers\u2019 planned campus in Hubbard, Texas, according to a Wall Street Journal report cited by [Reuters](https://www.reuters.com/legal/litigation/banks-talks-lend-15-billion-anthropic-data-center-backed-by-google-wsj-reports-2026-07-30/)."
   ],
   "locality_evidence": [
    "# Google backs $15B Anthropic data center in Texas",
    "- Nexus is in advanced talks to **raise $15 billion** for its Hubbard, Texas, data-center campus.",
    "A group of banks led by Morgan Stanley is discussing a financing package for Nexus Data Centers\u2019 planned campus in Hubbard, Texas, according to a Wall Street Journal report cited by [Reuters](https://www.reuters.com/legal/litigation/banks-talks-lend-15-billion-anthropic-data-center-backed-by-google-wsj-reports-2026-07-30/)."
   ],
   "state_evidence": [
    "# Google backs $15B Anthropic data center in Texas",
    "- Nexus is in advanced talks to **raise $15 billion** for its Hubbard, Texas, data-center campus.",
    "A group of banks led by Morgan Stanley is discussing a financing package for Nexus Data Centers\u2019 planned campus in Hubbard, Texas, according to a Wall Street Journal report cited by [Reuters](https://www.reuters.com/legal/litigation/banks-talks-lend-15-billion-anthropic-data-center-backed-by-google-wsj-reports-2026-07-30/)."
   ],
   "capacity_gw_evidence": [
    "# Google backs $15B Anthropic data center in Texas",
    "- The campus includes an on-site natural-gas plant capable of **generating 1.6 gigawatts**.",
    "Nexus plans to pair the data-center campus with a natural-gas-fired power plant capable of producing 1.6 GW of electricity."
   ],
   "builder_evidence": [
    "# Google backs $15B Anthropic data center in Texas",
    "A group of banks led by Morgan Stanley is discussing a financing package for Nexus Data Centers\u2019 planned campus in Hubbard, Texas, according to a Wall Street Journal report cited by [Reuters](https://www.reuters.com/legal/litigation/banks-talks-lend-15-billion-anthropic-data-center-backed-by-google-wsj-reports-2026-07-30/)."
   ],
   "ai_customer_evidence": [
    "# Google backs $15B Anthropic data center in Texas",
    "Google is reportedly backing a proposed $15 billion financing package for an Anthropic-linked data center in Texas, extending an AI infrastructure boom that has also lifted Bitcoin miners expanding into high-performance computing.",
    "- Google would guarantee parts of Anthropic\u2019s leases and receive an **estimated 20% project stake**."
   ],
   "status_evidence": [
    "# Google backs $15B Anthropic data center in Texas",
    "A group of banks led by Morgan Stanley is discussing a financing package for Nexus Data Centers\u2019 planned campus in Hubbard, Texas, according to a Wall Street Journal report cited by [Reuters](https://www.reuters.com/legal/litigation/banks-talks-lend-15-billion-anthropic-data-center-backed-by-google-wsj-reports-2026-07-30/)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://blockchain.news/news/openai-ports-pike-project-ohio",
   "title": "OpenAI Backs PORTS-Pike Project, $160M Investment in Ohio",
   "published_at": null,
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# OpenAI Backs PORTS-Pike Project, $160M Investment in Ohio",
    "OpenAI has announced its participation in the PORTS-Pike Technology Campus project in Pike County, Ohio, marking a significant step in the development of AI infrastructure in the United States."
   ],
   "locality_evidence": [
    "# OpenAI Backs PORTS-Pike Project, $160M Investment in Ohio",
    "OpenAI has announced its participation in the PORTS-Pike Technology Campus project in Pike County, Ohio, marking a significant step in the development of AI infrastructure in the United States."
   ],
   "state_evidence": [
    "# OpenAI Backs PORTS-Pike Project, $160M Investment in Ohio",
    "OpenAI has announced its participation in the PORTS-Pike Technology Campus project in Pike County, Ohio, marking a significant step in the development of AI infrastructure in the United States."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Backs PORTS-Pike Project, $160M Investment in Ohio",
    "OpenAI has secured approximately 8 gigawatts of IT capacity at the site, aligning with its long-term frontier-training needs for advanced AI systems."
   ],
   "builder_evidence": [
    "# OpenAI Backs PORTS-Pike Project, $160M Investment in Ohio",
    "The initiative, a collaboration with SB Energy, NVIDIA, and the U.S. Department of Energy (DOE), is projected to create 37,500 jobs and includes a $160 million investment in community development."
   ],
   "ai_customer_evidence": [
    "# OpenAI Backs PORTS-Pike Project, $160M Investment in Ohio",
    "OpenAI has announced its participation in the PORTS-Pike Technology Campus project in Pike County, Ohio, marking a significant step in the development of AI infrastructure in the United States."
   ],
   "status_evidence": [
    "# OpenAI Backs PORTS-Pike Project, $160M Investment in Ohio",
    "OpenAI has announced its participation in the PORTS-Pike Technology Campus project in Pike County, Ohio, marking a significant step in the development of AI infrastructure in the United States."
   ],
   "announcement_date_evidence": [
    "# OpenAI Backs PORTS-Pike Project, $160M Investment in Ohio",
    "[Zach Anderson](/Profile/Zach-Anderson) Aug 17, 2026 14:22"
   ]
  },
  {
   "url": "https://geektak.com/blog/meta-hyperion-engineering-5-gigawatt-ai-training",
   "title": "Meta Hyperion: Engineering a 5-Gigawatt AI Training Facility",
   "published_at": "2026-02-26T18:08:08",
   "project": "Meta Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Meta Hyperion: Engineering a 5-Gigawatt AI Training Facility",
    "Meta\u2019s Hyperion data center, currently under construction in northern Louisiana, represents the most extreme manifestation of this shift\u2014a single facility designed to concentrate nearly five gigawatts of power consumption and approximately two million GPUs under one administrative domain."
   ],
   "locality_evidence": [
    "# Meta Hyperion: Engineering a 5-Gigawatt AI Training Facility",
    "Meta selected Richland Parish in northern Louisiana based on three factors unavailable in most developed regions: available flat land exceeding five miles by one mile, immediate access to water resources, and regulatory velocity including fast-tracked permitting and equipment tax waivers that accelerate construction timelines by months."
   ],
   "state_evidence": [
    "# Meta Hyperion: Engineering a 5-Gigawatt AI Training Facility",
    "Meta\u2019s Hyperion data center, currently under construction in northern Louisiana, represents the most extreme manifestation of this shift\u2014a single facility designed to concentrate nearly five gigawatts of power consumption and approximately two million GPUs under one administrative domain.",
    "Meta selected Richland Parish in northern Louisiana based on three factors unavailable in most developed regions: available flat land exceeding five miles by one mile, immediate access to water resources, and regulatory velocity including fast-tracked permitting and equipment tax waivers that accelerate construction timelines by months."
   ],
   "capacity_gw_evidence": [
    "# Meta Hyperion: Engineering a 5-Gigawatt AI Training Facility",
    "Meta\u2019s Hyperion data center, currently under construction in northern Louisiana, represents the most extreme manifestation of this shift\u2014a single facility designed to concentrate nearly five gigawatts of power consumption and approximately two million GPUs under one administrative domain."
   ],
   "builder_evidence": [
    "# Meta Hyperion: Engineering a 5-Gigawatt AI Training Facility",
    "Meta\u2019s Hyperion data center, currently under construction in northern Louisiana, represents the most extreme manifestation of this shift\u2014a single facility designed to concentrate nearly five gigawatts of power consumption and approximately two million GPUs under one administrative domain."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Meta Hyperion: Engineering a 5-Gigawatt AI Training Facility",
    "Meta\u2019s Hyperion data center, currently under construction in northern Louisiana, represents the most extreme manifestation of this shift\u2014a single facility designed to concentrate nearly five gigawatts of power consumption and approximately two million GPUs under one administrative domain."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://europesays.com/people/175615",
   "title": "xAI announces fourth data center; turbines to be removed from Southaven site - People",
   "published_at": "2026-08-02T17:14:53",
   "project": null,
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 1.2,
   "builder": "SpaceXAI",
   "ai_customer": null,
   "status": "preparing to remove",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "MEMPHIS, Tenn. (WMC) \u2013 Elon Musk confirmed on X that xAI is building a fourth data center near its existing Memphis-area facilities, while SpaceXAI prepares to remove dozens of turbines from its Southaven site and replace them with a permanent power plant.",
    "SpaceXAI prepares to remove dozens of turbines from its Southaven site and replace them with a permanent power plant."
   ],
   "state_evidence": [
    "The Mississippi Department of Environmental Quality has outlined rules xAI must follow going forward:"
   ],
   "capacity_gw_evidence": [
    "SpaceXAI is preparing [to remove all 69 turbines](https://www.actionnews5.com/2026/07/31/spacexai-announces-removal-temporary-turbines-southaven-data-center/) from its Stanton Road site in Southaven and replace them with a permanent 1.2-gigawatt power plant with 41 turbines.",
    "SpaceXAI prepares to remove dozens of turbines from its Southaven site and replace them with a permanent power plant."
   ],
   "builder_evidence": [
    "MEMPHIS, Tenn. (WMC) \u2013 Elon Musk confirmed on X that xAI is building a fourth data center near its existing Memphis-area facilities, while SpaceXAI prepares to remove dozens of turbines from its Southaven site and replace them with a permanent power plant.",
    "SpaceXAI prepares to remove dozens of turbines from its Southaven site and replace them with a permanent power plant."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "MEMPHIS, Tenn. (WMC) \u2013 Elon Musk confirmed on X that xAI is building a fourth data center near its existing Memphis-area facilities, while SpaceXAI prepares to remove dozens of turbines from its Southaven site and replace them with a permanent power plant.",
    "SpaceXAI prepares to remove dozens of turbines from its Southaven site and replace them with a permanent power plant."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://ground.news/article/childress-texas-extends-crusoe-and-lanciums-ongoing-partnership-building-on-model-established-in-abilene",
   "title": "Childress, Texas, extends Crusoe and Lancium\u2019s ongoing partnership, building on model established in Abilene",
   "published_at": "2026-08-06T10:46:11",
   "project": null,
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "In a July 15 press release shared via Globe Newswire, Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, recently announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "state_evidence": [
    "In a July 15 press release shared via Globe Newswire, Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, recently announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "In a July 15 press release shared via Globe Newswire, Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, recently announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "builder_evidence": [
    "In a July 15 press release shared via Globe Newswire, Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, recently announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "In a July 15 press release shared via Globe Newswire, Crusoe, the industry\u2019s first vertically integrated AI infrastructure provider, and Lancium, an energy technology and infrastructure company, recently announced a 1.0 gigawatt (GW) AI data center campus in Childress, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news/jpmorgan-and-mufg-close-to-securing-22bn-financing-for-vantages-texas-data-center-project",
   "title": "JPMorgan and MUFG close to securing $22bn financing for Vantage's Texas data center project",
   "published_at": "2026-08-05T00:00:00",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Construction on the campus has already begun",
   "announcement_date": null,
   "project_evidence": [
    "The DigitalBridge and Silver Lake-backed company [this week announced plans](https://www.datacenterdynamics.com/en/news/vantage-plots-14gw-data-center-campus-in-texas/) for the 1.4GW Frontier campus in Shackelford County, set to be home to 10 data centers totaling 3.7 million sq ft (343,741 sqm)."
   ],
   "locality_evidence": [
    "The DigitalBridge and Silver Lake-backed company [this week announced plans](https://www.datacenterdynamics.com/en/news/vantage-plots-14gw-data-center-campus-in-texas/) for the 1.4GW Frontier campus in Shackelford County, set to be home to 10 data centers totaling 3.7 million sq ft (343,741 sqm)."
   ],
   "state_evidence": [
    "JPMorgan and Mitsubishi UFJ Financial Group (MUFG) are leading the debt financing for Vantage's planned $25 billion Texas data center campus.",
    "The DigitalBridge and Silver Lake-backed company [this week announced plans](https://www.datacenterdynamics.com/en/news/vantage-plots-14gw-data-center-campus-in-texas/) for the 1.4GW Frontier campus in Shackelford County, set to be home to 10 data centers totaling 3.7 million sq ft (343,741 sqm)."
   ],
   "capacity_gw_evidence": [
    "The DigitalBridge and Silver Lake-backed company [this week announced plans](https://www.datacenterdynamics.com/en/news/vantage-plots-14gw-data-center-campus-in-texas/) for the 1.4GW Frontier campus in Shackelford County, set to be home to 10 data centers totaling 3.7 million sq ft (343,741 sqm)."
   ],
   "builder_evidence": [
    "JPMorgan and Mitsubishi UFJ Financial Group (MUFG) are leading the debt financing for Vantage's planned $25 billion Texas data center campus.",
    "Frontier will be Vantage Data Centers' largest campus, with the company's North America president, Dana Adams, noting that it \"marks a watershed moment for Vantage as we deliver on our promise to meet the unprecedented requirements of our customers.\""
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://linkedin.com/company/fermi-america",
   "title": "Fermi America | LinkedIn",
   "published_at": "2026-05-17T14:42:56",
   "project": "HyperGrid",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 17.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "expected",
   "announcement_date": null,
   "project_evidence": [
    "## About us",
    "Our flagship HyperGrid\u2122 campus in Amarillo, Texas is expected to become the world\u2019s largest energy-driven AI complex, integrating nuclear, natural gas, utility, solar, and battery power."
   ],
   "locality_evidence": [
    "## About us",
    "Our flagship HyperGrid\u2122 campus in Amarillo, Texas is expected to become the world\u2019s largest energy-driven AI complex, integrating nuclear, natural gas, utility, solar, and battery power."
   ],
   "state_evidence": [
    "## About us",
    "Our flagship HyperGrid\u2122 campus in Amarillo, Texas is expected to become the world\u2019s largest energy-driven AI complex, integrating nuclear, natural gas, utility, solar, and battery power."
   ],
   "capacity_gw_evidence": [
    "## About us",
    "With 17 gigawatts of capacity and 18 million sq ft of AI infrastructure, Fermi America is positioned to secure global leadership in energy and artificial intelligence."
   ],
   "builder_evidence": [
    "## About us",
    "Fermi America is pioneering the development of next-generation electric grids that deliver highly redundant power at gigawatt scale, required to create next-generation artificial intelligence.",
    "Our flagship HyperGrid\u2122 campus in Amarillo, Texas is expected to become the world\u2019s largest energy-driven AI complex, integrating nuclear, natural gas, utility, solar, and battery power."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## About us",
    "Our flagship HyperGrid\u2122 campus in Amarillo, Texas is expected to become the world\u2019s largest energy-driven AI complex, integrating nuclear, natural gas, utility, solar, and battery power."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://digitalmore.co/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy-to-compute",
   "title": "Nscale Acquires American Intelligence &amp; Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute | Digital More",
   "published_at": "2026-03-16T22:39:30",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "",
   "status": "Acquired / Planned",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ],
   "locality_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories.",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "capacity_gw_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The West Virginia campus is the first state-certified utility grid purpose-built for AI workloads in the United States. Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "builder_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ],
   "announcement_date_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world\u2019s largest AI Factories."
   ]
  },
  {
   "url": "https://energynews.biz/data-city-a-colossal-hydrogen-powered-vision-in-texas",
   "title": "Data City, A Colossal Hydrogen-Powered Vision in Texas - Energy News",
   "published_at": "2025-04-07T06:32:09",
   "project": "Data City",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corp",
   "ai_customer": null,
   "status": "In development",
   "announcement_date": null,
   "project_evidence": [
    "Coined \u201cData City,\u201d this project is aimed at harnessing green energy to power a colossal data center, potentially shifting paradigms in sustainable energy solutions.",
    "Join Our Newsletter"
   ],
   "locality_evidence": [
    "In an ambitious move, the Energy Abundance Development Corp is developing what will be the largest hydrogen project globally on a 50,000-acre site near Laredo, Texas.",
    "Join Our Newsletter"
   ],
   "state_evidence": [
    "In an ambitious move, the Energy Abundance Development Corp is developing what will be the largest hydrogen project globally on a 50,000-acre site near Laredo, Texas.",
    "Join Our Newsletter"
   ],
   "capacity_gw_evidence": [
    "Starting with an initial 300 megawatts and scaling to a capacity of 5 gigawatts, the project is poised to redefine how data centers can efficiently and sustainably operate.",
    "Join Our Newsletter"
   ],
   "builder_evidence": [
    "In an ambitious move, the Energy Abundance Development Corp is developing what will be the largest hydrogen project globally on a 50,000-acre site near Laredo, Texas.",
    "Join Our Newsletter"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "In an ambitious move, the Energy Abundance Development Corp is developing what will be the largest hydrogen project globally on a 50,000-acre site near Laredo, Texas.",
    "Join Our Newsletter"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://newscord.org/article/box-elder-county-approves-stratos-project-data-center-despite-water-energy-envir--Story_20260513_Irresponsiblebacklas55da5909",
   "title": "Box Elder County Approves Stratos Project Data Center Despite Water, Energy, Environmental Disputes",
   "published_at": "2026-05-12T15:44:26",
   "project": "Stratos Project",
   "locality": "Hansel Valley",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "Kevin O\u2019Leary",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "Box Elder County commissioners unanimously approved the 40,000-acre Stratos Project data center in Hansel Valley.",
    "### Stratos gets county approval"
   ],
   "locality_evidence": [
    "Box Elder County commissioners unanimously approved the 40,000-acre Stratos Project data center in Hansel Valley.",
    "### Stratos gets county approval"
   ],
   "state_evidence": [
    "In a separate account of the same approval, the Guardian said the Stratos footprint would cover more than 40,000 acres over three sites in Box Elder county in north-western Utah and that the facility will require about 9GW of power.",
    "### Stratos gets county approval"
   ],
   "capacity_gw_evidence": [
    "The project is described as requiring 9 gigawatts of energy to help power artificial intelligence, cloud computing and national security, with power expected to be generated onsite and an initial phase-one permit granting a center covering fewer than 2,000 acres.",
    "### Stratos gets county approval"
   ],
   "builder_evidence": [
    "Supporters say the center will use a closed-loop system for cooling to preserve water, while the project\u2019s developers, including \u201cShark Tank\u201d investor Kevin O\u2019Leary, have put $20 million into the project and expect it to cost investors more than $100 billion by the time it is finished.",
    "### Stratos gets county approval"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Box Elder County commissioners unanimously approved the 40,000-acre Stratos Project data center in Hansel Valley.",
    "### Stratos gets county approval"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://100percentfedup.com/openai-announces-which-state-company-intends-build-its",
   "title": "OpenAI Announces Which State Company Intends To Build Its Largest-Ever Data Center",
   "published_at": "2026-07-27T03:55:06",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "In addition to the billions in capital investment, the AI data center dubbed \u201cProject Camellia\u201d will bring 400 jobs, $80 million in community benefits and $71 million in coding classes for Georgia students, according a news release Wednesday from the Effingham County Board of Commissioners."
   ],
   "locality_evidence": [
    "OpenAI announced plans to build a 3.2-gigawatt, 1,400-acre data center in Effingham County, Georgia, marking the company\u2019s largest-ever data center campus."
   ],
   "state_evidence": [
    "OpenAI announced plans to build a 3.2-gigawatt, 1,400-acre data center in Effingham County, Georgia, marking the company\u2019s largest-ever data center campus."
   ],
   "capacity_gw_evidence": [
    "OpenAI announced plans to build a 3.2-gigawatt, 1,400-acre data center in Effingham County, Georgia, marking the company\u2019s largest-ever data center campus."
   ],
   "builder_evidence": [
    "OpenAI announced plans to build a 3.2-gigawatt, 1,400-acre data center in Effingham County, Georgia, marking the company\u2019s largest-ever data center campus."
   ],
   "ai_customer_evidence": [
    "OpenAI announced plans to build a 3.2-gigawatt, 1,400-acre data center in Effingham County, Georgia, marking the company\u2019s largest-ever data center campus."
   ],
   "status_evidence": [
    "OpenAI announced plans to build a 3.2-gigawatt, 1,400-acre data center in Effingham County, Georgia, marking the company\u2019s largest-ever data center campus."
   ],
   "announcement_date_evidence": [
    "OpenAI plans to spend tens of billions of dollars on a massive new data center near Savannah [https://t.co/QxwpOECo0W](https://t.co/QxwpOECo0W)",
    "\u2014 Bloomberg (@business) [July 22, 2026](https://x.com/business/status/2079972272622739571?ref_src=twsrc%5Etfw)"
   ]
  },
  {
   "url": "https://datacentersexposed.com/facilities/panattoni-project-cannoli",
   "title": "Panattoni Project Cannoli \u2014 Wayne County, MI",
   "published_at": null,
   "project": "Panattoni Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni",
   "ai_customer": "Google LLC",
   "status": "Proposed",
   "announcement_date": null,
   "project_evidence": [
    "# Panattoni Project Cannoli",
    "Panattoni Project Cannoli is a proposed data center in Wayne County, MI, operated by Google LLC and ultimately owned by Alphabet Inc.. DataCentersExposed has documented 1,000 MW of reported power capacity and a 800,000 sq ft footprint at this site."
   ],
   "locality_evidence": [
    "Van Buren Township, Wayne County, MI",
    "# Panattoni Project Cannoli",
    "Panattoni Project Cannoli in Van Buren Township, MI is contested. Petition: https://www.change.org/p/stop-the-massive-data-center-in-van-buren-township-michigan Track what's being decided, when, and how to weigh in."
   ],
   "state_evidence": [
    "Van Buren Township, Wayne County, MI",
    "# Panattoni Project Cannoli",
    "Panattoni Project Cannoli is a proposed data center in Wayne County, MI, operated by Google LLC and ultimately owned by Alphabet Inc.. DataCentersExposed has documented 1,000 MW of reported power capacity and a 800,000 sq ft footprint at this site."
   ],
   "capacity_gw_evidence": [
    "# Panattoni Project Cannoli",
    "Panattoni Project Cannoli is a proposed data center in Wayne County, MI, operated by Google LLC and ultimately owned by Alphabet Inc.. DataCentersExposed has documented 1,000 MW of reported power capacity and a 800,000 sq ft footprint at this site."
   ],
   "builder_evidence": [
    "# Panattoni Project Cannoli",
    "Panattoni Project Cannoli is a proposed data center in Wayne County, MI, operated by Google LLC and ultimately owned by Alphabet Inc.. DataCentersExposed has documented 1,000 MW of reported power capacity and a 800,000 sq ft footprint at this site."
   ],
   "ai_customer_evidence": [
    "# Panattoni Project Cannoli",
    "Panattoni Project Cannoli is a proposed data center in Wayne County, MI, operated by Google LLC and ultimately owned by Alphabet Inc.. DataCentersExposed has documented 1,000 MW of reported power capacity and a 800,000 sq ft footprint at this site."
   ],
   "status_evidence": [
    "Proposed",
    "# Panattoni Project Cannoli",
    "Panattoni Project Cannoli is a proposed data center in Wayne County, MI, operated by Google LLC and ultimately owned by Alphabet Inc.. DataCentersExposed has documented 1,000 MW of reported power capacity and a 800,000 sq ft footprint at this site."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mexc.fm/news/1114352",
   "title": "TeraWulf surges 10% on 1GW Kentucky AI campus et | MEXC News",
   "published_at": null,
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access.",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure."
   ],
   "locality_evidence": [
    "The company secured a 285-acre site in eastern Kentucky.",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure."
   ],
   "state_evidence": [
    "The company secured a 285-acre site in eastern Kentucky.",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure."
   ],
   "capacity_gw_evidence": [
    "It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity.",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure."
   ],
   "builder_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure.",
    "The company secured a 285-acre site in eastern Kentucky."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity.",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mainstreamcryptonews.com/hut-8-surges-30-after-landing-second-ai-data-center-lease-worth-9-8-billion-bitcoin-news",
   "title": "Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion \u2013 Bitcoin News",
   "published_at": "2026-05-07T09:33:39",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-06",
   "project_evidence": [
    "Beacon Point is designed as a gigawatt-scale campus with 1,000 MW of utility capacity under interconnection agreement with AEP Texas.",
    "The Miami-based company said it signed a $9.8 billion triple-net lease for 352 megawatts of IT capacity at its Beacon Point campus in Nueces County, Texas."
   ],
   "locality_evidence": [
    "The Miami-based company said it signed a $9.8 billion triple-net lease for 352 megawatts of IT capacity at its Beacon Point campus in Nueces County, Texas."
   ],
   "state_evidence": [
    "The Miami-based company said it signed a $9.8 billion triple-net lease for 352 megawatts of IT capacity at its Beacon Point campus in Nueces County, Texas."
   ],
   "capacity_gw_evidence": [
    "Beacon Point is designed as a gigawatt-scale campus with 1,000 MW of utility capacity under interconnection agreement with AEP Texas."
   ],
   "builder_evidence": [
    "The Miami-based company said it signed a $9.8 billion triple-net lease for 352 megawatts of IT capacity at its Beacon Point campus in Nueces County, Texas.",
    "The deal marks Hut 8\u2019s second major AI data center commercialization after its previously announced River Bend project with AI cloud company Fluidstack."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Hut 8 said the first phase of the project \u2014 representing roughly 500 MW of utility capacity to support the 352 MW IT load \u2014 is expected to begin energization in the first quarter of 2027, with initial data hall delivery targeted for the third quarter of that year."
   ],
   "announcement_date_evidence": [
    "The original article can be viewed [here](https://theenergymag.com/news/2026-05-06/hut-ai-beacon-point)."
   ]
  },
  {
   "url": "https://iren.com/resources/video",
   "title": "Videos | IREN",
   "published_at": null,
   "project": "Sweetwater",
   "locality": null,
   "state": null,
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "IREN's Sweetwater: 2GW flagship AI & compute hub Unmatched scale in emerging AI hub - 2GW of high-voltage power across more than 1,800 acres - Capacity for more than 700,000 liquid-cooled Blackwell GPUs",
    "Introduction to Sweetwater"
   ],
   "locality_evidence": null,
   "state_evidence": null,
   "capacity_gw_evidence": [
    "IREN's Sweetwater: 2GW flagship AI & compute hub Unmatched scale in emerging AI hub - 2GW of high-voltage power across more than 1,800 acres - Capacity for more than 700,000 liquid-cooled Blackwell GPUs",
    "Introduction to Sweetwater"
   ],
   "builder_evidence": [
    "IREN's Sweetwater: 2GW flagship AI & compute hub Unmatched scale in emerging AI hub - 2GW of high-voltage power across more than 1,800 acres - Capacity for more than 700,000 liquid-cooled Blackwell GPUs",
    "Introduction to Sweetwater"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://theworldnewswire.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Creekstone Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "About Creekstone Energy",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://power-to-x.com/tag/ecl",
   "title": "Power-to-X",
   "published_at": null,
   "project": "TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Edge Cloud Link Inc.",
   "ai_customer": null,
   "status": "plans to build",
   "announcement_date": "2024-10-01",
   "project_evidence": [
    "ECL builds a hydrogen-powered data center with 1 GW capacity",
    "The project, called \"TerraSite-TX1\", is being built east of Houston, Texas, on an area..."
   ],
   "locality_evidence": [
    "ECL builds a hydrogen-powered data center with 1 GW capacity",
    "The project, called \"TerraSite-TX1\", is being built east of Houston, Texas, on an area..."
   ],
   "state_evidence": [
    "ECL builds a hydrogen-powered data center with 1 GW capacity",
    "The project, called \"TerraSite-TX1\", is being built east of Houston, Texas, on an area..."
   ],
   "capacity_gw_evidence": [
    "ECL builds a hydrogen-powered data center with 1 GW capacity",
    "California-based Edge Cloud Link Inc. (ECL) plans to build a hydrogen-powered data center with a capacity of one gigawatt."
   ],
   "builder_evidence": [
    "ECL builds a hydrogen-powered data center with 1 GW capacity",
    "California-based Edge Cloud Link Inc. (ECL) plans to build a hydrogen-powered data center with a capacity of one gigawatt."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "ECL builds a hydrogen-powered data center with 1 GW capacity",
    "California-based Edge Cloud Link Inc. (ECL) plans to build a hydrogen-powered data center with a capacity of one gigawatt."
   ],
   "announcement_date_evidence": [
    "ECL builds a hydrogen-powered data center with 1 GW capacity",
    "of | October 1, 2024 | [Research & Technology](https://power-to-x.com/category/technology/)"
   ]
  },
  {
   "url": "https://oilprice.com/Company-News/Nvidia-Backs-8-GW-Ohio-AI-Campus-for-OpenAI-With-15-Billion-Investment.html",
   "title": "Nvidia Backs 8-GW Ohio AI Campus for OpenAI With $1.5 Billion Investment",
   "published_at": "2026-08-18T01:30:00",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Nvidia Backs 8-GW Ohio AI Campus for OpenAI With $1.5 Billion Investment",
    "The chipmaker [said](https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute) it has partnered with SB Energy to secure land, power and data center shell capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, where OpenAI will be the customer under a 20-year lease."
   ],
   "locality_evidence": [
    "# Nvidia Backs 8-GW Ohio AI Campus for OpenAI With $1.5 Billion Investment",
    "The chipmaker [said](https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute) it has partnered with SB Energy to secure land, power and data center shell capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, where OpenAI will be the customer under a 20-year lease."
   ],
   "state_evidence": [
    "# Nvidia Backs 8-GW Ohio AI Campus for OpenAI With $1.5 Billion Investment",
    "The chipmaker [said](https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute) it has partnered with SB Energy to secure land, power and data center shell capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, where OpenAI will be the customer under a 20-year lease."
   ],
   "capacity_gw_evidence": [
    "# Nvidia Backs 8-GW Ohio AI Campus for OpenAI With $1.5 Billion Investment",
    "The first phase is designed to provide 4.25 gigawatts of IT capacity, with Nvidia holding an option covering another 3.75 GW. At full buildout, the project would provide 8 GW of AI computing capacity."
   ],
   "builder_evidence": [
    "# Nvidia Backs 8-GW Ohio AI Campus for OpenAI With $1.5 Billion Investment",
    "The chipmaker [said](https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute) it has partnered with SB Energy to secure land, power and data center shell capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, where OpenAI will be the customer under a 20-year lease.",
    "SB Energy, which is backed by Japan's SoftBank Group and OpenAI, will build, own and operate the data center infrastructure."
   ],
   "ai_customer_evidence": [
    "# Nvidia Backs 8-GW Ohio AI Campus for OpenAI With $1.5 Billion Investment",
    "The chipmaker [said](https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute) it has partnered with SB Energy to secure land, power and data center shell capacity at the PORTS-Pike Technology Campus in Pike County, Ohio, where OpenAI will be the customer under a 20-year lease."
   ],
   "status_evidence": [
    "# Nvidia Backs 8-GW Ohio AI Campus for OpenAI With $1.5 Billion Investment",
    "The planned scale of the development highlights the increasingly close relationship between AI infrastructure and the energy sector."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://barchart.com/story/news/3885308/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute",
   "title": "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
   "published_at": "2026-08-17T12:33:22",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "**News Summary:**",
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "locality_evidence": [
    "**News Summary:**",
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "state_evidence": [
    "**News Summary:**",
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "capacity_gw_evidence": [
    "**News Summary:**",
    "- *OpenAI will be the customer for 8-IT GW*"
   ],
   "builder_evidence": [
    "**News Summary:**",
    "SB Energy will build, own and operate the data center under a 20-year lease to OpenAI."
   ],
   "ai_customer_evidence": [
    "**News Summary:**",
    "- *OpenAI will be the customer for 8-IT GW*"
   ],
   "status_evidence": [
    "**News Summary:**",
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 (GLOBE NEWSWIRE) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "announcement_date_evidence": [
    "**News Summary:**",
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 (GLOBE NEWSWIRE) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ]
  },
  {
   "url": "https://siliconreport.com/datacenters/company/meta",
   "title": "SiliconReport",
   "published_at": null,
   "project": "Meta New Albany",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "Under_construction",
   "announcement_date": null,
   "project_evidence": [
    "# Meta Data Centers",
    "Verified Meta facilities and project records in the Silicon Report data-center tracker.",
    "7. [## Meta\nNew Albany \u00b7 OH\nOperatorMeta\nStatusUnder_construction\nCapacity1,000 MW\nPowerNuclear](/datacenters/facility/meta-new-albany)"
   ],
   "locality_evidence": [
    "# Meta Data Centers",
    "Verified Meta facilities and project records in the Silicon Report data-center tracker.",
    "7. [## Meta\nNew Albany \u00b7 OH\nOperatorMeta\nStatusUnder_construction\nCapacity1,000 MW\nPowerNuclear](/datacenters/facility/meta-new-albany)"
   ],
   "state_evidence": [
    "# Meta Data Centers",
    "Verified Meta facilities and project records in the Silicon Report data-center tracker.",
    "7. [## Meta\nNew Albany \u00b7 OH\nOperatorMeta\nStatusUnder_construction\nCapacity1,000 MW\nPowerNuclear](/datacenters/facility/meta-new-albany)"
   ],
   "capacity_gw_evidence": [
    "# Meta Data Centers",
    "Verified Meta facilities and project records in the Silicon Report data-center tracker.",
    "7. [## Meta\nNew Albany \u00b7 OH\nOperatorMeta\nStatusUnder_construction\nCapacity1,000 MW\nPowerNuclear](/datacenters/facility/meta-new-albany)"
   ],
   "builder_evidence": [
    "# Meta Data Centers",
    "Verified Meta facilities and project records in the Silicon Report data-center tracker.",
    "7. [## Meta\nNew Albany \u00b7 OH\nOperatorMeta\nStatusUnder_construction\nCapacity1,000 MW\nPowerNuclear](/datacenters/facility/meta-new-albany)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Meta Data Centers",
    "Verified Meta facilities and project records in the Silicon Report data-center tracker.",
    "7. [## Meta\nNew Albany \u00b7 OH\nOperatorMeta\nStatusUnder_construction\nCapacity1,000 MW\nPowerNuclear](/datacenters/facility/meta-new-albany)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://siliconreport.com/datacenters/company/meta",
   "title": "SiliconReport",
   "published_at": null,
   "project": "Meta El Paso",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "Under_construction",
   "announcement_date": null,
   "project_evidence": [
    "# Meta Data Centers",
    "Verified Meta facilities and project records in the Silicon Report data-center tracker.",
    "8. [## Meta\nEl Paso \u00b7 TX\nOperatorMeta\nStatusUnder_construction\nCapacity1,000 MW](/datacenters/facility/meta-el-paso)"
   ],
   "locality_evidence": [
    "# Meta Data Centers",
    "Verified Meta facilities and project records in the Silicon Report data-center tracker.",
    "8. [## Meta\nEl Paso \u00b7 TX\nOperatorMeta\nStatusUnder_construction\nCapacity1,000 MW](/datacenters/facility/meta-el-paso)"
   ],
   "state_evidence": [
    "# Meta Data Centers",
    "Verified Meta facilities and project records in the Silicon Report data-center tracker.",
    "8. [## Meta\nEl Paso \u00b7 TX\nOperatorMeta\nStatusUnder_construction\nCapacity1,000 MW](/datacenters/facility/meta-el-paso)"
   ],
   "capacity_gw_evidence": [
    "# Meta Data Centers",
    "Verified Meta facilities and project records in the Silicon Report data-center tracker.",
    "8. [## Meta\nEl Paso \u00b7 TX\nOperatorMeta\nStatusUnder_construction\nCapacity1,000 MW](/datacenters/facility/meta-el-paso)"
   ],
   "builder_evidence": [
    "# Meta Data Centers",
    "Verified Meta facilities and project records in the Silicon Report data-center tracker.",
    "8. [## Meta\nEl Paso \u00b7 TX\nOperatorMeta\nStatusUnder_construction\nCapacity1,000 MW](/datacenters/facility/meta-el-paso)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Meta Data Centers",
    "Verified Meta facilities and project records in the Silicon Report data-center tracker.",
    "8. [## Meta\nEl Paso \u00b7 TX\nOperatorMeta\nStatusUnder_construction\nCapacity1,000 MW](/datacenters/facility/meta-el-paso)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://siliconreport.com/datacenters/company/meta",
   "title": "SiliconReport",
   "published_at": null,
   "project": "Meta Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 2.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "Under_construction",
   "announcement_date": null,
   "project_evidence": [
    "# Meta Data Centers",
    "Verified Meta facilities and project records in the Silicon Report data-center tracker.",
    "12. [## Meta Hyperion\nMeta \u00b7 Richland Parish \u00b7 LA\nOperatorMeta\nStatusUnder_construction\nCapacity2,000 MW\nOperational capacityNot reported\nUnder construction2,000 MW\nAnnouncedNot reported\nPowerGas\nLast updated2026-07-03](/datacenters/facility/meta-hyperion)"
   ],
   "locality_evidence": [
    "# Meta Data Centers",
    "Verified Meta facilities and project records in the Silicon Report data-center tracker.",
    "12. [## Meta Hyperion\nMeta \u00b7 Richland Parish \u00b7 LA\nOperatorMeta\nStatusUnder_construction\nCapacity2,000 MW\nOperational capacityNot reported\nUnder construction2,000 MW\nAnnouncedNot reported\nPowerGas\nLast updated2026-07-03](/datacenters/facility/meta-hyperion)"
   ],
   "state_evidence": [
    "# Meta Data Centers",
    "Verified Meta facilities and project records in the Silicon Report data-center tracker.",
    "12. [## Meta Hyperion\nMeta \u00b7 Richland Parish \u00b7 LA\nOperatorMeta\nStatusUnder_construction\nCapacity2,000 MW\nOperational capacityNot reported\nUnder construction2,000 MW\nAnnouncedNot reported\nPowerGas\nLast updated2026-07-03](/datacenters/facility/meta-hyperion)"
   ],
   "capacity_gw_evidence": [
    "# Meta Data Centers",
    "Verified Meta facilities and project records in the Silicon Report data-center tracker.",
    "12. [## Meta Hyperion\nMeta \u00b7 Richland Parish \u00b7 LA\nOperatorMeta\nStatusUnder_construction\nCapacity2,000 MW\nOperational capacityNot reported\nUnder construction2,000 MW\nAnnouncedNot reported\nPowerGas\nLast updated2026-07-03](/datacenters/facility/meta-hyperion)"
   ],
   "builder_evidence": [
    "# Meta Data Centers",
    "Verified Meta facilities and project records in the Silicon Report data-center tracker.",
    "12. [## Meta Hyperion\nMeta \u00b7 Richland Parish \u00b7 LA\nOperatorMeta\nStatusUnder_construction\nCapacity2,000 MW\nOperational capacityNot reported\nUnder construction2,000 MW\nAnnouncedNot reported\nPowerGas\nLast updated2026-07-03](/datacenters/facility/meta-hyperion)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Meta Data Centers",
    "Verified Meta facilities and project records in the Silicon Report data-center tracker.",
    "12. [## Meta Hyperion\nMeta \u00b7 Richland Parish \u00b7 LA\nOperatorMeta\nStatusUnder_construction\nCapacity2,000 MW\nOperational capacityNot reported\nUnder construction2,000 MW\nAnnouncedNot reported\nPowerGas\nLast updated2026-07-03](/datacenters/facility/meta-hyperion)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://siliconreport.com/datacenters/company/meta",
   "title": "SiliconReport",
   "published_at": null,
   "project": "Meta Lebanon, Indiana Campus",
   "locality": "Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "Under_construction",
   "announcement_date": null,
   "project_evidence": [
    "# Meta Data Centers",
    "Verified Meta facilities and project records in the Silicon Report data-center tracker.",
    "13. [## Meta Lebanon, Indiana Campus\nMeta \u00b7 Lebanon \u00b7 IN\nOperatorMeta\nStatusUnder_construction\nCapacity1,000 MW\nOperational capacityNot reported\nUnder construction1,000 MW\nAnnouncedNot reported\nPowerGrid\nLast updated2026-07-03](/datacenters/facility/meta-lebanon-indiana)"
   ],
   "locality_evidence": [
    "# Meta Data Centers",
    "Verified Meta facilities and project records in the Silicon Report data-center tracker.",
    "13. [## Meta Lebanon, Indiana Campus\nMeta \u00b7 Lebanon \u00b7 IN\nOperatorMeta\nStatusUnder_construction\nCapacity1,000 MW\nOperational capacityNot reported\nUnder construction1,000 MW\nAnnouncedNot reported\nPowerGrid\nLast updated2026-07-03](/datacenters/facility/meta-lebanon-indiana)"
   ],
   "state_evidence": [
    "# Meta Data Centers",
    "Verified Meta facilities and project records in the Silicon Report data-center tracker.",
    "13. [## Meta Lebanon, Indiana Campus\nMeta \u00b7 Lebanon \u00b7 IN\nOperatorMeta\nStatusUnder_construction\nCapacity1,000 MW\nOperational capacityNot reported\nUnder construction1,000 MW\nAnnouncedNot reported\nPowerGrid\nLast updated2026-07-03](/datacenters/facility/meta-lebanon-indiana)"
   ],
   "capacity_gw_evidence": [
    "# Meta Data Centers",
    "Verified Meta facilities and project records in the Silicon Report data-center tracker.",
    "13. [## Meta Lebanon, Indiana Campus\nMeta \u00b7 Lebanon \u00b7 IN\nOperatorMeta\nStatusUnder_construction\nCapacity1,000 MW\nOperational capacityNot reported\nUnder construction1,000 MW\nAnnouncedNot reported\nPowerGrid\nLast updated2026-07-03](/datacenters/facility/meta-lebanon-indiana)"
   ],
   "builder_evidence": [
    "# Meta Data Centers",
    "Verified Meta facilities and project records in the Silicon Report data-center tracker.",
    "13. [## Meta Lebanon, Indiana Campus\nMeta \u00b7 Lebanon \u00b7 IN\nOperatorMeta\nStatusUnder_construction\nCapacity1,000 MW\nOperational capacityNot reported\nUnder construction1,000 MW\nAnnouncedNot reported\nPowerGrid\nLast updated2026-07-03](/datacenters/facility/meta-lebanon-indiana)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Meta Data Centers",
    "Verified Meta facilities and project records in the Silicon Report data-center tracker.",
    "13. [## Meta Lebanon, Indiana Campus\nMeta \u00b7 Lebanon \u00b7 IN\nOperatorMeta\nStatusUnder_construction\nCapacity1,000 MW\nOperational capacityNot reported\nUnder construction1,000 MW\nAnnouncedNot reported\nPowerGrid\nLast updated2026-07-03](/datacenters/facility/meta-lebanon-indiana)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://markets.financialcontent.com/pennwell.laserfocusworld/article/tokenring-2026-1-2-colossus-unbound-xais-memphis-expansion-targets-1-million-gpus-in-the-race-for-agi",
   "title": "About Us",
   "published_at": "2019-05-14T21:48:59",
   "project": "Colossus",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "xAI",
   "status": "expanding",
   "announcement_date": "2026-01-02",
   "project_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "locality_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "state_evidence": [
    "As the \"Digital Delta\" takes shape across the Tennessee-Mississippi border, the project is redefining the physical and logistical requirements of the AGI era.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "capacity_gw_evidence": [
    "By targeting a power capacity of 2 gigawatts (GW)\u2014roughly enough to power nearly 2 million homes\u2014xAI is transitioning from a high-scale startup to a \"Gigafactory of Compute.\"",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "builder_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "ai_customer_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "status_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "announcement_date_evidence": [
    "As of January 2, 2026, the company has successfully scaled its initial 100,000-GPU cluster to over 200,000 units and is now aggressively pursuing a roadmap to reach 1 million GPUs by the end of the year.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ]
  },
  {
   "url": "https://pboilandgasmagazine.com/ai-data-centers-rig-counts-and-no-complaints",
   "title": "AI, Data Centers, Rig Counts, and No Complaints",
   "published_at": "2025-10-23T13:00:19",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage",
   "ai_customer": null,
   "status": "expected to open in the second half of next year",
   "announcement_date": null,
   "project_evidence": [
    "# AI, Data Centers, Rig Counts, and No Complaints",
    "The project, named Frontier, will use liquid cooling and utilize a closed-loop chiller system, which requires minimal water for cooling."
   ],
   "locality_evidence": [
    "# AI, Data Centers, Rig Counts, and No Complaints",
    "The company will develop a 1.4GW data center campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "# AI, Data Centers, Rig Counts, and No Complaints",
    "The company will develop a 1.4GW data center campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "# AI, Data Centers, Rig Counts, and No Complaints",
    "The company will develop a 1.4GW data center campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "# AI, Data Centers, Rig Counts, and No Complaints",
    "Vantage is building a complex that will be home to 10 data centers, spanning 3.7 million square feet across 85 acres of buildings."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# AI, Data Centers, Rig Counts, and No Complaints",
    "It is expected to open in the second half of next year."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://uk.advfn.com/stock-market/london/fermi-FRMI/share-news/Fermi-America-Makes-Initial-Draw-on-200-Million-Equipment-Facility-from-Keysto/97875022",
   "title": "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus",
   "published_at": null,
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2026-02-19",
   "project_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "locality_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ -- Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122, in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "state_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ -- Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122, in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "capacity_gw_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "builder_evidence": [
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "![Construction crews install power infrastructure at Fermi America's Project Matador site in Amarillo, Texas, on Feb 13th, 2026, as work advances on the nation's largest private HyperGrid campus](https://mma.prnewswire.com/media/2917079/Fermi_America_Keystone_Financing.jpg)",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ],
   "announcement_date_evidence": [
    "AMARILLO, Texas, Feb. 19, 2026 /PRNewswire/ -- Fermi Inc. (d/b/a Fermi America) (NASDAQ & LSE: FRMI), operating as Fermi America\u2122, in partnership with the Texas Tech University System (TTU System), announced today that it has secured over $100 million in committed equipment financing from a private debt fund managed by Keystone National Group, part of a larger $200 million facility arranged by Cape Commercial Finance, which is expected to be drawn on during 2026.",
    "Fermi America\u2122 Makes Initial Draw on $200 Million Equipment Facility from Keystone National Group and Cape Commercial Finance to Accelerate the Delivery of the First 2.3GW of Project Matador's 11GW Private HyperGrid\u2122 Campus"
   ]
  },
  {
   "url": "https://powersystems.technology/news-pst/homer-city-redevelopment-and-kiewit-to-build-country-s-largest-natural-gas-powered-data-center-campus-power-systems-technology-news.html",
   "title": "Homer City Redevelopment and Kiewit to Build Country\u2019s Largest Natural Gas-Powered Data Center Campus",
   "published_at": "2025-04-03T12:23:44",
   "project": "Homer City Energy Campus",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Kiewit Power Constructors Co.",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "Homer City Redevelopment and Kiewit to Build Country\u2019s Largest Natural Gas-Powered Data Center Campus News PST Image source: techxplore.com",
    "The Homer City Energy Campus is expected to create over 10,000 direct on-site construction jobs and approximately 1,000 permanent high-paying positions in technology, operations, and energy infrastructure."
   ],
   "locality_evidence": [
    "Homer City Redevelopment and Kiewit to Build Country\u2019s Largest Natural Gas-Powered Data Center Campus News PST Image source: techxplore.com",
    "Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) have announced a transformative project that will turn the site of the former Homer City Generating Station in Pennsylvania into the largest natural gas-powered data center campus in the United States."
   ],
   "state_evidence": [
    "Homer City Redevelopment and Kiewit to Build Country\u2019s Largest Natural Gas-Powered Data Center Campus News PST Image source: techxplore.com",
    "Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) have announced a transformative project that will turn the site of the former Homer City Generating Station in Pennsylvania into the largest natural gas-powered data center campus in the United States."
   ],
   "capacity_gw_evidence": [
    "Homer City Redevelopment and Kiewit to Build Country\u2019s Largest Natural Gas-Powered Data Center Campus News PST Image source: techxplore.com",
    "The project will deliver up to 4.5 GW of power to support hyperscale data centers, with seven GE Vernova turbines providing the necessary energy."
   ],
   "builder_evidence": [
    "Homer City Redevelopment and Kiewit to Build Country\u2019s Largest Natural Gas-Powered Data Center Campus News PST Image source: techxplore.com",
    "Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) have announced a transformative project that will turn the site of the former Homer City Generating Station in Pennsylvania into the largest natural gas-powered data center campus in the United States."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Homer City Redevelopment and Kiewit to Build Country\u2019s Largest Natural Gas-Powered Data Center Campus News PST Image source: techxplore.com",
    "Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) have announced a transformative project that will turn the site of the former Homer City Generating Station in Pennsylvania into the largest natural gas-powered data center campus in the United States."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://laotiantimes.com/2026/03/17/nscale-and-microsoft-announce-collaboration-with-nvidia-and-caterpillar-to-deliver-1-35gw-of-nvidia-vera-rubin-nvl72-gpus-at-flagship-ai-factory-campus-in-west-virginia",
   "title": "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
   "published_at": "2026-03-16T21:32:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "Under construction",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid*"
   ],
   "locality_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "state_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "capacity_gw_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "builder_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "ai_customer_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "- *Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs*"
   ],
   "status_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "announcement_date_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ \u2014 Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA\u2019s next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ]
  },
  {
   "url": "https://computelaw.blog/power/texas-retail-power-puct-rules-ai-data-centers",
   "title": "Texas retail power and PUCT rules for AI data centers",
   "published_at": "2026-05-23T00:00:00",
   "project": "Crusoe Abilene Campus",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe Energy Systems",
   "ai_customer": "OpenAI",
   "status": "Operational / Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "The on-the-ground reality, what is actually being built",
    "- **Crusoe Abilene Campus (Stargate), Taylor County.** Phase 1 delivered 200 plus MW and was operational by September 2025, hosting OpenAI workloads. Phase 2 adds six buildings for a total 1.2 GW by end of 2026. A new adjacent 900 MW Microsoft campus brings the total Abilene footprint to roughly 2.1 GW. [Crusoe press release](https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live), [Crusoe press release](https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts), [Crusoe press release](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure)"
   ],
   "locality_evidence": [
    "The on-the-ground reality, what is actually being built",
    "- **Crusoe Abilene Campus (Stargate), Taylor County.** Phase 1 delivered 200 plus MW and was operational by September 2025, hosting OpenAI workloads. Phase 2 adds six buildings for a total 1.2 GW by end of 2026. A new adjacent 900 MW Microsoft campus brings the total Abilene footprint to roughly 2.1 GW. [Crusoe press release](https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live), [Crusoe press release](https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts), [Crusoe press release](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure)"
   ],
   "state_evidence": [
    "The on-the-ground reality, what is actually being built",
    "- **Crusoe Abilene Campus (Stargate), Taylor County.** Phase 1 delivered 200 plus MW and was operational by September 2025, hosting OpenAI workloads. Phase 2 adds six buildings for a total 1.2 GW by end of 2026. A new adjacent 900 MW Microsoft campus brings the total Abilene footprint to roughly 2.1 GW. [Crusoe press release](https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live), [Crusoe press release](https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts), [Crusoe press release](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure)"
   ],
   "capacity_gw_evidence": [
    "The on-the-ground reality, what is actually being built",
    "- **Crusoe Abilene Campus (Stargate), Taylor County.** Phase 1 delivered 200 plus MW and was operational by September 2025, hosting OpenAI workloads. Phase 2 adds six buildings for a total 1.2 GW by end of 2026. A new adjacent 900 MW Microsoft campus brings the total Abilene footprint to roughly 2.1 GW. [Crusoe press release](https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live), [Crusoe press release](https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts), [Crusoe press release](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure)"
   ],
   "builder_evidence": [
    "The on-the-ground reality, what is actually being built",
    "- **Crusoe Abilene Campus (Stargate), Taylor County.** Phase 1 delivered 200 plus MW and was operational by September 2025, hosting OpenAI workloads. Phase 2 adds six buildings for a total 1.2 GW by end of 2026. A new adjacent 900 MW Microsoft campus brings the total Abilene footprint to roughly 2.1 GW. [Crusoe press release](https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live), [Crusoe press release](https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts), [Crusoe press release](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure)"
   ],
   "ai_customer_evidence": [
    "The on-the-ground reality, what is actually being built",
    "- **Crusoe Abilene Campus (Stargate), Taylor County.** Phase 1 delivered 200 plus MW and was operational by September 2025, hosting OpenAI workloads. Phase 2 adds six buildings for a total 1.2 GW by end of 2026. A new adjacent 900 MW Microsoft campus brings the total Abilene footprint to roughly 2.1 GW. [Crusoe press release](https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live), [Crusoe press release](https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts), [Crusoe press release](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure)"
   ],
   "status_evidence": [
    "The on-the-ground reality, what is actually being built",
    "- **Crusoe Abilene Campus (Stargate), Taylor County.** Phase 1 delivered 200 plus MW and was operational by September 2025, hosting OpenAI workloads. Phase 2 adds six buildings for a total 1.2 GW by end of 2026. A new adjacent 900 MW Microsoft campus brings the total Abilene footprint to roughly 2.1 GW. [Crusoe press release](https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live), [Crusoe press release](https://www.crusoe.ai/resources/newsroom/crusoe-expands-ai-data-center-campus-in-abilene-to-1-2-gigawatts), [Crusoe press release](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://computelaw.blog/power/texas-retail-power-puct-rules-ai-data-centers",
   "title": "Texas retail power and PUCT rules for AI data centers",
   "published_at": "2026-05-23T00:00:00",
   "project": "Meta El Paso Campus",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "The on-the-ground reality, what is actually being built",
    "- **Meta El Paso Campus, El Paso County.** Broke ground October 2025, initially $1.5 billion. By March 2026, Meta increased its commitment to $10 billion and a 1 GW target by 2028 using liquid cooling. [Texas Land Agent](https://thetexaslandagent.com/texas-data-center-pipeline)"
   ],
   "locality_evidence": [
    "The on-the-ground reality, what is actually being built",
    "- **Meta El Paso Campus, El Paso County.** Broke ground October 2025, initially $1.5 billion. By March 2026, Meta increased its commitment to $10 billion and a 1 GW target by 2028 using liquid cooling. [Texas Land Agent](https://thetexaslandagent.com/texas-data-center-pipeline)"
   ],
   "state_evidence": [
    "The on-the-ground reality, what is actually being built",
    "- **Meta El Paso Campus, El Paso County.** Broke ground October 2025, initially $1.5 billion. By March 2026, Meta increased its commitment to $10 billion and a 1 GW target by 2028 using liquid cooling. [Texas Land Agent](https://thetexaslandagent.com/texas-data-center-pipeline)"
   ],
   "capacity_gw_evidence": [
    "The on-the-ground reality, what is actually being built",
    "- **Meta El Paso Campus, El Paso County.** Broke ground October 2025, initially $1.5 billion. By March 2026, Meta increased its commitment to $10 billion and a 1 GW target by 2028 using liquid cooling. [Texas Land Agent](https://thetexaslandagent.com/texas-data-center-pipeline)"
   ],
   "builder_evidence": [
    "The on-the-ground reality, what is actually being built",
    "- **Meta El Paso Campus, El Paso County.** Broke ground October 2025, initially $1.5 billion. By March 2026, Meta increased its commitment to $10 billion and a 1 GW target by 2028 using liquid cooling. [Texas Land Agent](https://thetexaslandagent.com/texas-data-center-pipeline)"
   ],
   "ai_customer_evidence": [
    "The on-the-ground reality, what is actually being built",
    "- **Meta El Paso Campus, El Paso County.** Broke ground October 2025, initially $1.5 billion. By March 2026, Meta increased its commitment to $10 billion and a 1 GW target by 2028 using liquid cooling. [Texas Land Agent](https://thetexaslandagent.com/texas-data-center-pipeline)"
   ],
   "status_evidence": [
    "The on-the-ground reality, what is actually being built",
    "- **Meta El Paso Campus, El Paso County.** Broke ground October 2025, initially $1.5 billion. By March 2026, Meta increased its commitment to $10 billion and a 1 GW target by 2028 using liquid cooling. [Texas Land Agent](https://thetexaslandagent.com/texas-data-center-pipeline)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mexc.fm/news/1075284",
   "title": "Kevin O\u2019Leary\u2019s Utah AI campus gets approved | MEXC News",
   "published_at": null,
   "project": "Stratos AI campus",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "Kevin O\u2019Leary Digital",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "locality_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "state_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "capacity_gw_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "The campus will generate up to 9 gigawatts at full buildout, more than twice Utah\u2019s current total electricity consumption, powered by an on-site natural gas pipeline.",
    "The campus, designated through Utah\u2019s Military Installation Development Authority, spans more than 40,000 acres and will reach 9 gigawatts of generation capacity at full buildout."
   ],
   "builder_evidence": [
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://peoplearegeek.com/articles/openai-project-camellia-georgia-datacenter",
   "title": "OpenAI's Project Camellia: a 3.2 GW Data Center in Georgia",
   "published_at": "2026-07-23T00:00:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "SysadminNews",
    "OpenAI's Project Camellia: a 3.2 GW Data Center in Georgia",
    "On July 22, 2026, OpenAI put a name and a location on one of its next large data centers: Project Camellia, a roughly 3.2 gigawatt campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia, with a reported capital investment of around 20 billion dollars."
   ],
   "locality_evidence": [
    "SysadminNews",
    "OpenAI's Project Camellia: a 3.2 GW Data Center in Georgia",
    "On July 22, 2026, OpenAI put a name and a location on one of its next large data centers: Project Camellia, a roughly 3.2 gigawatt campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia, with a reported capital investment of around 20 billion dollars."
   ],
   "state_evidence": [
    "SysadminNews",
    "OpenAI's Project Camellia: a 3.2 GW Data Center in Georgia",
    "On July 22, 2026, OpenAI put a name and a location on one of its next large data centers: Project Camellia, a roughly 3.2 gigawatt campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia, with a reported capital investment of around 20 billion dollars."
   ],
   "capacity_gw_evidence": [
    "SysadminNews",
    "OpenAI's Project Camellia: a 3.2 GW Data Center in Georgia",
    "On July 22, 2026, OpenAI put a name and a location on one of its next large data centers: Project Camellia, a roughly 3.2 gigawatt campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia, with a reported capital investment of around 20 billion dollars."
   ],
   "builder_evidence": [
    "SysadminNews",
    "OpenAI's Project Camellia: a 3.2 GW Data Center in Georgia",
    "On July 22, 2026, OpenAI put a name and a location on one of its next large data centers: Project Camellia, a roughly 3.2 gigawatt campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia, with a reported capital investment of around 20 billion dollars."
   ],
   "ai_customer_evidence": [
    "SysadminNews",
    "OpenAI's Project Camellia: a 3.2 GW Data Center in Georgia",
    "On July 22, 2026, OpenAI put a name and a location on one of its next large data centers: Project Camellia, a roughly 3.2 gigawatt campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia, with a reported capital investment of around 20 billion dollars."
   ],
   "status_evidence": [
    "SysadminNews",
    "OpenAI's Project Camellia: a 3.2 GW Data Center in Georgia",
    "On July 22, 2026, OpenAI put a name and a location on one of its next large data centers: Project Camellia, a roughly 3.2 gigawatt campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia, with a reported capital investment of around 20 billion dollars."
   ],
   "announcement_date_evidence": [
    "SysadminNews",
    "OpenAI's Project Camellia: a 3.2 GW Data Center in Georgia",
    "On July 22, 2026, OpenAI put a name and a location on one of its next large data centers: Project Camellia, a roughly 3.2 gigawatt campus at the Savannah Gateway Industrial Hub in Effingham County, Georgia, with a reported capital investment of around 20 billion dollars."
   ]
  },
  {
   "url": "https://edgen.tech/news/post/terawulf-buys-kentucky-site-for-1-gw-ai-data-center-campus",
   "title": "TeraWulf buys Kentucky site for 1-GW AI data center campus",
   "published_at": "2026-05-26T18:43:07",
   "project": "Muskie Data Campus",
   "locality": "EastPark Industrial Park",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "permitting activities are already underway",
   "announcement_date": "2026-05-26",
   "project_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus",
    "The 285-acre site within EastPark Industrial Park, dubbed the Muskie Data Campus, is already zoned for data center use."
   ],
   "locality_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus",
    "The 285-acre site within EastPark Industrial Park, dubbed the Muskie Data Campus, is already zoned for data center use."
   ],
   "state_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus",
    "TeraWulf Inc. acquired a Kentucky development site capable of supporting more than 1 gigawatt of data center capacity, as the Bitcoin miner pivots deeper into AI infrastructure where power availability has become the binding constraint."
   ],
   "capacity_gw_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus",
    "TeraWulf Inc. acquired a Kentucky development site capable of supporting more than 1 gigawatt of data center capacity, as the Bitcoin miner pivots deeper into AI infrastructure where power availability has become the binding constraint."
   ],
   "builder_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus",
    "TeraWulf Inc. acquired a Kentucky development site capable of supporting more than 1 gigawatt of data center capacity, as the Bitcoin miner pivots deeper into AI infrastructure where power availability has become the binding constraint."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus",
    "TeraWulf said limited site work is required before construction can begin, and permitting activities are already underway."
   ],
   "announcement_date_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus",
    "[![Rachel Kim](https://static.edgen.tech/authors/rachel-kim.png?image_process=resize,w_32/quality,q_75/format,webp/sharpen,100)\n\n## Rachel Kim\n\n](https://www.edgen.tech/author/news/rachel-kim)\u00b7May 26 2026, 18:43"
   ]
  },
  {
   "url": "https://finance.yahoo.com/markets/stocks/articles/hut-8-closes-4-25-131008059.html",
   "title": "Hut 8 closes $4.25 billion bond for Beacon Point AI data center in Texas",
   "published_at": "2026-06-10T13:10:08",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "under development",
   "announcement_date": null,
   "project_evidence": [
    "Hut 8 closes $4.25 billion bond for Beacon Point AI data center in Texas",
    "The proceeds will fund development of a 352-megawatt AI data center on a 521-acre site in Nueces County, Texas."
   ],
   "locality_evidence": [
    "Hut 8 closes $4.25 billion bond for Beacon Point AI data center in Texas",
    "The proceeds will fund development of a 352-megawatt AI data center on a 521-acre site in Nueces County, Texas."
   ],
   "state_evidence": [
    "Hut 8 closes $4.25 billion bond for Beacon Point AI data center in Texas",
    "The proceeds will fund development of a 352-megawatt AI data center on a 521-acre site in Nueces County, Texas."
   ],
   "capacity_gw_evidence": [
    "Hut 8 closes $4.25 billion bond for Beacon Point AI data center in Texas",
    "Hut 8 has executed an interconnection agreement for 1,000 MW of utility capacity at Beacon Point, with initial energization expected in Q1 2027 and initial data hall delivery in Q3 2027."
   ],
   "builder_evidence": [
    "Hut 8 closes $4.25 billion bond for Beacon Point AI data center in Texas",
    "Hut 8 has executed an interconnection agreement for 1,000 MW of utility capacity at Beacon Point, with initial energization expected in Q1 2027 and initial data hall delivery in Q3 2027."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Hut 8 closes $4.25 billion bond for Beacon Point AI data center in Texas",
    "The proceeds will fund development of a 352-megawatt AI data center on a 521-acre site in Nueces County, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news?tag=sweetwater",
   "title": "News Sweetwater - DCD",
   "published_at": "2026-05-21T07:24:23",
   "project": "Sweetwater",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Iren",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# News - Sweetwater",
    "# [Iren energizes first phase of 2GW Sweetwater data center campus in Texas](/en/news/iren-energizes-first-phase-of-2gw-sweetwater-data-center-campus-in-texas/)"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# News - Sweetwater",
    "# [Iren energizes first phase of 2GW Sweetwater data center campus in Texas](/en/news/iren-energizes-first-phase-of-2gw-sweetwater-data-center-campus-in-texas/)"
   ],
   "capacity_gw_evidence": [
    "# News - Sweetwater",
    "# [Iren energizes first phase of 2GW Sweetwater data center campus in Texas](/en/news/iren-energizes-first-phase-of-2gw-sweetwater-data-center-campus-in-texas/)"
   ],
   "builder_evidence": [
    "# News - Sweetwater",
    "# [Iren energizes first phase of 2GW Sweetwater data center campus in Texas](/en/news/iren-energizes-first-phase-of-2gw-sweetwater-data-center-campus-in-texas/)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://wattshappeningtoday.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Creekstone Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "*Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite*",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://h2-view.com/story/ecl-secures-site-for-1gw-hydrogen-powered-data-centre/2114888.article",
   "title": "ECL secures site for 1GW hydrogen-powered data centre",
   "published_at": "2024-09-26T08:00:25",
   "project": "TerraSite1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": null,
   "status": "secured site",
   "announcement_date": null,
   "project_evidence": [
    "# ECL secures site for 1GW hydrogen-powered data centre",
    "ECL has secured a 600-acre site in Texas to deliver a 1GW off-grid, hydrogen-powered artificial intelligence (AI) factory, dubbed TerraSite1."
   ],
   "locality_evidence": [
    "# ECL secures site for 1GW hydrogen-powered data centre",
    "Located near Houston, the factory will develop, manufacture and deploy AI technologies."
   ],
   "state_evidence": [
    "# ECL secures site for 1GW hydrogen-powered data centre",
    "ECL has secured a 600-acre site in Texas to deliver a 1GW off-grid, hydrogen-powered artificial intelligence (AI) factory, dubbed TerraSite1."
   ],
   "capacity_gw_evidence": [
    "# ECL secures site for 1GW hydrogen-powered data centre",
    "ECL has secured a 600-acre site in Texas to deliver a 1GW off-grid, hydrogen-powered artificial intelligence (AI) factory, dubbed TerraSite1."
   ],
   "builder_evidence": [
    "# ECL secures site for 1GW hydrogen-powered data centre",
    "ECL has secured a 600-acre site in Texas to deliver a 1GW off-grid, hydrogen-powered artificial intelligence (AI) factory, dubbed TerraSite1."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# ECL secures site for 1GW hydrogen-powered data centre",
    "ECL has secured a 600-acre site in Texas to deliver a 1GW off-grid, hydrogen-powered artificial intelligence (AI) factory, dubbed TerraSite1."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://cryptodunia.in/google-backs-15b-anthropic-knowledge-heart-in-texas",
   "title": "Google backs $15B Anthropic knowledge heart in Texas - Crypto Dunia",
   "published_at": "2026-07-30T20:50:00",
   "project": "Nexus Information Facilities\u2019 deliberate campus",
   "locality": "Hubbard",
   "state": "Texas",
   "capacity_gw": 1.6,
   "builder": "Nexus Information Facilities",
   "ai_customer": "Anthropic",
   "status": "deliberate",
   "announcement_date": null,
   "project_evidence": [
    "# Google backs $15B Anthropic knowledge heart in Texas",
    "A gaggle of banks led by Morgan Stanley is discussing a financing bundle for Nexus Information Facilities\u2019 deliberate campus in Hubbard, Texas, in response to a Wall Avenue Journal report cited by Reuters."
   ],
   "locality_evidence": [
    "# Google backs $15B Anthropic knowledge heart in Texas",
    "A gaggle of banks led by Morgan Stanley is discussing a financing bundle for Nexus Information Facilities\u2019 deliberate campus in Hubbard, Texas, in response to a Wall Avenue Journal report cited by Reuters."
   ],
   "state_evidence": [
    "# Google backs $15B Anthropic knowledge heart in Texas",
    "A gaggle of banks led by Morgan Stanley is discussing a financing bundle for Nexus Information Facilities\u2019 deliberate campus in Hubbard, Texas, in response to a Wall Avenue Journal report cited by Reuters."
   ],
   "capacity_gw_evidence": [
    "# Google backs $15B Anthropic knowledge heart in Texas",
    "## Texas campus features a 1.6 GW energy plant",
    "Nexus plans to pair the data-center campus with a natural-gas-fired energy plant able to producing 1.6 GW of electrical energy."
   ],
   "builder_evidence": [
    "# Google backs $15B Anthropic knowledge heart in Texas",
    "A gaggle of banks led by Morgan Stanley is discussing a financing bundle for Nexus Information Facilities\u2019 deliberate campus in Hubbard, Texas, in response to a Wall Avenue Journal report cited by Reuters."
   ],
   "ai_customer_evidence": [
    "# Google backs $15B Anthropic knowledge heart in Texas",
    "Google is reportedly backing a proposed $15 billion financing bundle for an Anthropic-linked knowledge heart in Texas, extending an AI infrastructure growth that has additionally lifted Bitcoin miners increasing into high-performance computing."
   ],
   "status_evidence": [
    "# Google backs $15B Anthropic knowledge heart in Texas",
    "A gaggle of banks led by Morgan Stanley is discussing a financing bundle for Nexus Information Facilities\u2019 deliberate campus in Hubbard, Texas, in response to a Wall Avenue Journal report cited by Reuters."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://bluewaterhealthyliving.com/news/national-news/ohio/openai-commits-to-massive-buildout-of-pike-county-data-center-campus",
   "title": "OpenAI commits to massive buildout of Pike County data center campus.",
   "published_at": "2026-08-17T13:05:11",
   "project": "Pike County data center campus",
   "locality": "Portsmouth",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "broke ground earlier this year",
   "announcement_date": "2025-08-17",
   "project_evidence": [
    "Partnering with the Japanese-owed SB Energy, California-based Nvidia and U.S. Department of Energy, OpenAI, the U.S. artificial intelligence company, has pledged to create 35,000 construction jobs in a six-year buildout of the Pike County data center campus that broke ground earlier this year.",
    "OpenAI commits to massive buildout of Pike County data center campus."
   ],
   "locality_evidence": [
    "When officials from SB Energy and the Trump administration visited in March, they touted the former Portsmouth Gaseous Diffusion Plant as having helped win the Cold War and revive industrialization by enriching uranium used for defense, and now having \u201canother opportunity to play a leading role in the next era of American industrialization.\u201d",
    "OpenAI commits to massive buildout of Pike County data center campus."
   ],
   "state_evidence": [
    "The company appeared to react to ongoing pushback to data center expansion in Ohio by emphasizing the long-term benefits of its operations, especially to residents who have become increasingly skeptical.",
    "\u201cWe will also invest $40 million in a community grant fund supporting priorities identified by local residents\u2014building on SB Energy\u2019s previously announced $40 million commitment,\u201d the company said. \u201cSeparately, we are providing $84 million in Codex credits through ChatGPT, giving every Ohio college student access to the technology.\u201d",
    "OpenAI commits to massive buildout of Pike County data center campus."
   ],
   "capacity_gw_evidence": [
    "The San Francisco-based company has agreed to secure approximately 8 gigawatts of information technology electrical power at the PORTS-Pike Technology Campus about 70 miles south of Columbus.",
    "OpenAI commits to massive buildout of Pike County data center campus."
   ],
   "builder_evidence": [
    "SB Energy will build, own, and operate the data center under a 20-year lease to OpenAI and deliver operational capacity over time.",
    "OpenAI commits to massive buildout of Pike County data center campus."
   ],
   "ai_customer_evidence": [
    "SB Energy will build, own, and operate the data center under a 20-year lease to OpenAI and deliver operational capacity over time.",
    "OpenAI commits to massive buildout of Pike County data center campus."
   ],
   "status_evidence": [
    "Partnering with the Japanese-owed SB Energy, California-based Nvidia and U.S. Department of Energy, OpenAI, the U.S. artificial intelligence company, has pledged to create 35,000 construction jobs in a six-year buildout of the Pike County data center campus that broke ground earlier this year.",
    "OpenAI commits to massive buildout of Pike County data center campus."
   ],
   "announcement_date_evidence": [
    "The company did not address its overall investment in a news release issued Aug. 17.",
    "OpenAI commits to massive buildout of Pike County data center campus."
   ]
  },
  {
   "url": "https://chatforest.com/builders-log/meta-hyperion-50-billion-5-gigawatt-louisiana-ai-infrastructure-builder-guide",
   "title": "Meta's Hyperion: $50 Billion, 5 Gigawatts, 3,200 Acres \u2014 The Scale of AI Infrastructure in 2026",
   "published_at": "2026-07-12T15:00:00",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "",
   "status": "expanding",
   "announcement_date": "2026-07-13",
   "project_evidence": [
    "# Meta's Hyperion: $50 Billion, 5 Gigawatts, 3,200 Acres \u2014 The Scale of AI Infrastructure in 2026",
    "**Name:** Hyperion"
   ],
   "locality_evidence": [
    "Meta [announced on July 13, 2026](https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html) that it is expanding its Hyperion data center in Richland Parish, Louisiana to **5 gigawatts** of compute capacity at a total investment of [**$50 billion**](https://about.fb.com/news/2026/07/teachers-local-businesses-win-as-meta-expands-louisiana-data-center/) \u2014 a five-fold increase from the original $10 billion commitment.",
    "**Site:** [Richland Parish, northeast Louisiana](https://datacenters.atmeta.com/richland-parish-data-center/)"
   ],
   "state_evidence": [
    "Meta [announced on July 13, 2026](https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html) that it is expanding its Hyperion data center in Richland Parish, Louisiana to **5 gigawatts** of compute capacity at a total investment of [**$50 billion**](https://about.fb.com/news/2026/07/teachers-local-businesses-win-as-meta-expands-louisiana-data-center/) \u2014 a five-fold increase from the original $10 billion commitment.",
    "**Site:** [Richland Parish, northeast Louisiana](https://datacenters.atmeta.com/richland-parish-data-center/)"
   ],
   "capacity_gw_evidence": [
    "# Meta's Hyperion: $50 Billion, 5 Gigawatts, 3,200 Acres \u2014 The Scale of AI Infrastructure in 2026",
    "Meta [announced on July 13, 2026](https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html) that it is expanding its Hyperion data center in Richland Parish, Louisiana to **5 gigawatts** of compute capacity at a total investment of [**$50 billion**](https://about.fb.com/news/2026/07/teachers-local-businesses-win-as-meta-expands-louisiana-data-center/) \u2014 a five-fold increase from the original $10 billion commitment."
   ],
   "builder_evidence": [
    "# Meta's Hyperion: $50 Billion, 5 Gigawatts, 3,200 Acres \u2014 The Scale of AI Infrastructure in 2026",
    "Meta [announced on July 13, 2026](https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html) that it is expanding its Hyperion data center in Richland Parish, Louisiana to **5 gigawatts** of compute capacity at a total investment of [**$50 billion**](https://about.fb.com/news/2026/07/teachers-local-businesses-win-as-meta-expands-louisiana-data-center/) \u2014 a five-fold increase from the original $10 billion commitment."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Meta's Hyperion: $50 Billion, 5 Gigawatts, 3,200 Acres \u2014 The Scale of AI Infrastructure in 2026",
    "Meta [announced on July 13, 2026](https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html) that it is expanding its Hyperion data center in Richland Parish, Louisiana to **5 gigawatts** of compute capacity at a total investment of [**$50 billion**](https://about.fb.com/news/2026/07/teachers-local-businesses-win-as-meta-expands-louisiana-data-center/) \u2014 a five-fold increase from the original $10 billion commitment."
   ],
   "announcement_date_evidence": [
    "# Meta's Hyperion: $50 Billion, 5 Gigawatts, 3,200 Acres \u2014 The Scale of AI Infrastructure in 2026",
    "Meta [announced on July 13, 2026](https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html) that it is expanding its Hyperion data center in Richland Parish, Louisiana to **5 gigawatts** of compute capacity at a total investment of [**$50 billion**](https://about.fb.com/news/2026/07/teachers-local-businesses-win-as-meta-expands-louisiana-data-center/) \u2014 a five-fold increase from the original $10 billion commitment."
   ]
  },
  {
   "url": "https://computing.co.uk/news-network/2026/agi-the-eye-of-the-needle-is-physics",
   "title": "AGI: The eye of the needle is physics",
   "published_at": "2026-08-07T09:30:35",
   "project": "Hyperion",
   "locality": null,
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "planning",
   "announcement_date": null,
   "project_evidence": [
    "Meta is planning major projects such as the 5-gigawatt \"Hyperion\" campus in Louisiana, as part of a multi-year infrastructure initiative in the multi-digit billion range.",
    "# AGI: The eye of the needle is physics"
   ],
   "locality_evidence": null,
   "state_evidence": [
    "Meta is planning major projects such as the 5-gigawatt \"Hyperion\" campus in Louisiana, as part of a multi-year infrastructure initiative in the multi-digit billion range.",
    "# AGI: The eye of the needle is physics"
   ],
   "capacity_gw_evidence": [
    "Meta is planning major projects such as the 5-gigawatt \"Hyperion\" campus in Louisiana, as part of a multi-year infrastructure initiative in the multi-digit billion range.",
    "# AGI: The eye of the needle is physics"
   ],
   "builder_evidence": [
    "Meta is planning major projects such as the 5-gigawatt \"Hyperion\" campus in Louisiana, as part of a multi-year infrastructure initiative in the multi-digit billion range.",
    "# AGI: The eye of the needle is physics"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Meta is planning major projects such as the 5-gigawatt \"Hyperion\" campus in Louisiana, as part of a multi-year infrastructure initiative in the multi-digit billion range.",
    "# AGI: The eye of the needle is physics"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://markets.financialcontent.com/worldnow/article/tokenring-2026-1-2-colossus-unbound-xais-memphis-expansion-targets-1-million-gpus-in-the-race-for-agi",
   "title": "Colossus Unbound: xAI\u00e2s Memphis Expansion Targets 1 Million GPUs in the Race for AGI",
   "published_at": "2026-01-02T19:48:24",
   "project": "Colossus",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "expanding",
   "announcement_date": "2026-01-02",
   "project_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race."
   ],
   "locality_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race."
   ],
   "state_evidence": [
    "As the \"Digital Delta\" takes shape across the Tennessee-Mississippi border, the project is redefining the physical and logistical requirements of the AGI era."
   ],
   "capacity_gw_evidence": [
    "By targeting a power capacity of 2 gigawatts (GW)\u2014roughly enough to power nearly 2 million homes\u2014xAI is transitioning from a high-scale startup to a \"Gigafactory of Compute.\""
   ],
   "builder_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race."
   ],
   "announcement_date_evidence": [
    "As of January 2, 2026, the company has successfully scaled its initial 100,000-GPU cluster to over 200,000 units and is now aggressively pursuing a roadmap to reach 1 million GPUs by the end of the year."
   ]
  },
  {
   "url": "https://dev.to/gentic_news/crusoe-lancium-build-1gw-texas-ai-campus-sidestepping-grid-197p",
   "title": "Crusoe, Lancium Build 1GW Texas AI Campus, Sidestepping Grid",
   "published_at": "2026-07-16T21:38:13",
   "project": "Childress campus",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# Crusoe, Lancium Build 1GW Texas AI Campus, Sidestepping Grid",
    "Crusoe and Lancium announced a 1.0 gigawatt AI data center campus in Childress, Texas.",
    "The Childress campus is expected to reach full capacity by 2030."
   ],
   "locality_evidence": [
    "# Crusoe, Lancium Build 1GW Texas AI Campus, Sidestepping Grid",
    "Crusoe and Lancium announced a 1.0 gigawatt AI data center campus in Childress, Texas."
   ],
   "state_evidence": [
    "# Crusoe, Lancium Build 1GW Texas AI Campus, Sidestepping Grid",
    "Crusoe and Lancium announced a 1.0 gigawatt AI data center campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "# Crusoe, Lancium Build 1GW Texas AI Campus, Sidestepping Grid",
    "Crusoe and Lancium announced a 1.0 gigawatt AI data center campus in Childress, Texas."
   ],
   "builder_evidence": [
    "# Crusoe, Lancium Build 1GW Texas AI Campus, Sidestepping Grid",
    "Crusoe and Lancium announced a 1.0 gigawatt AI data center campus in Childress, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Crusoe, Lancium Build 1GW Texas AI Campus, Sidestepping Grid",
    "Crusoe and Lancium announced a 1.0 gigawatt AI data center campus in Childress, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://poweredbywho.com/projects/5eafd55b-b32e-49b7-bf99-32da9e44d76a",
   "title": "Microsoft Fairwater Campus (Former Foxconn) Data Center, Wisconsin | PoweredByWho",
   "published_at": null,
   "project": "Microsoft Fairwater Campus (Former Foxconn)",
   "locality": "Mount Pleasant",
   "state": "Wisconsin",
   "capacity_gw": 2.0,
   "builder": "Microsoft",
   "ai_customer": null,
   "status": "Operational",
   "announcement_date": "2024-05",
   "project_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "FILE #MICROSOFT-FAIRWATER-CAMPUS-FORMER-FOXCONN-5EAFD55B \u00b7 UPDATED 2026-07-08",
    "# Microsoft Fairwater Campus (Former Foxconn)"
   ],
   "locality_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "FILE #MICROSOFT-FAIRWATER-CAMPUS-FORMER-FOXCONN-5EAFD55B \u00b7 UPDATED 2026-07-08",
    "Mount Pleasant \u00b7 315 acres",
    "Location",
    "MOUNT PLEASANT"
   ],
   "state_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "FILE #MICROSOFT-FAIRWATER-CAMPUS-FORMER-FOXCONN-5EAFD55B \u00b7 UPDATED 2026-07-08",
    "Racine County, WI"
   ],
   "capacity_gw_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "FILE #MICROSOFT-FAIRWATER-CAMPUS-FORMER-FOXCONN-5EAFD55B \u00b7 UPDATED 2026-07-08",
    "2000 MW \u00b7 OPERATIONAL",
    "Capacity",
    "2000 MW"
   ],
   "builder_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "FILE #MICROSOFT-FAIRWATER-CAMPUS-FORMER-FOXCONN-5EAFD55B \u00b7 UPDATED 2026-07-08",
    "Operator",
    "Microsoft"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "FILE #MICROSOFT-FAIRWATER-CAMPUS-FORMER-FOXCONN-5EAFD55B \u00b7 UPDATED 2026-07-08",
    "2000 MW \u00b7 OPERATIONAL",
    "Status",
    "Operational"
   ],
   "announcement_date_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "FILE #MICROSOFT-FAIRWATER-CAMPUS-FORMER-FOXCONN-5EAFD55B \u00b7 UPDATED 2026-07-08",
    "A second, immediately adjacent facility is under construction (foundation work, steel erection, underground utilities) and is scheduled for completion in 2028.[SOURCE \u2197](https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/)"
   ]
  },
  {
   "url": "https://business.times-online.com/times-online/article/bizwire-2025-8-19-vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand",
   "title": "Vantage Data Centers Unveils Plans for \u00e2Frontier,\u00e2 a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
   "published_at": "2025-08-19T11:00:00",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Construction on the campus has already begun",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "locality_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "state_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "capacity_gw_evidence": [
    "*Campus boasts 1.4 gigawatts of capacity in the Lone Star state, a strategic, global AI hub*",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "This press release features multimedia. View the full release here: [https://www.businesswire.com/news/home/20250819333311/en/](https://www.businesswire.com/news/home/20250819333311/en/)"
   ]
  },
  {
   "url": "https://amarillotribune.org/2025/10/08/digging-into-fermis-filings-carson-county-roads-and-company-leadership",
   "title": "Digging into Fermi\u2019s filings \u2013 Carson County roads and company leadership",
   "published_at": "2025-10-08T20:45:12",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America, LLC",
   "ai_customer": null,
   "status": "Phase 0",
   "announcement_date": null,
   "project_evidence": [
    "# Digging into Fermi\u2019s filings \u2013 Carson County roads and company leadership",
    "The Amarillo Tribune has been reading through various filings submitted by Fermi America, LLC, the company behind [Project Matador](https://amarillotribune.org/2025/07/30/what-weve-learned-about-fermi-americas-donald-j-trump-advanced-energy-and-intelligence-campus-from-their-nuclear-regulatory-commission-application/), which is bringing the President Donald J. Trump Advanced Energy and Intelligence Campus to the Amarillo area."
   ],
   "locality_evidence": [
    "# Digging into Fermi\u2019s filings \u2013 Carson County roads and company leadership",
    "The Amarillo Tribune has been reading through various filings submitted by Fermi America, LLC, the company behind [Project Matador](https://amarillotribune.org/2025/07/30/what-weve-learned-about-fermi-americas-donald-j-trump-advanced-energy-and-intelligence-campus-from-their-nuclear-regulatory-commission-application/), which is bringing the President Donald J. Trump Advanced Energy and Intelligence Campus to the Amarillo area."
   ],
   "state_evidence": [
    "# Digging into Fermi\u2019s filings \u2013 Carson County roads and company leadership",
    "The Amarillo Tribune has been reading through various filings submitted by Fermi America, LLC, the company behind [Project Matador](https://amarillotribune.org/2025/07/30/what-weve-learned-about-fermi-americas-donald-j-trump-advanced-energy-and-intelligence-campus-from-their-nuclear-regulatory-commission-application/), which is bringing the President Donald J. Trump Advanced Energy and Intelligence Campus to the Amarillo area."
   ],
   "capacity_gw_evidence": [
    "# Digging into Fermi\u2019s filings \u2013 Carson County roads and company leadership",
    "The campus\u2019s site is 5,236 acres, and Fermi\u2019s mission is to deliver up to 11 gigawatts of power, with 1.1 GW projected to be online by 2026."
   ],
   "builder_evidence": [
    "# Digging into Fermi\u2019s filings \u2013 Carson County roads and company leadership",
    "The Amarillo Tribune has been reading through various filings submitted by Fermi America, LLC, the company behind [Project Matador](https://amarillotribune.org/2025/07/30/what-weve-learned-about-fermi-americas-donald-j-trump-advanced-energy-and-intelligence-campus-from-their-nuclear-regulatory-commission-application/), which is bringing the President Donald J. Trump Advanced Energy and Intelligence Campus to the Amarillo area."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Digging into Fermi\u2019s filings \u2013 Carson County roads and company leadership",
    "Project Matador is in Phase 0, according to Fermi\u2019s prospectus, which we\u2019ll dive a bit deeper into later."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://breitbart.com/news/coal-fired-power-plant-now-retired-to-become-massive-gas-powered-campus-for-ai-data-centers",
   "title": "Coal-fired power plant, now retired, to become massive gas-powered campus for AI, data centers",
   "published_at": "2025-04-02T14:31:54",
   "project": "Homer City Generating Station",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Homer City Development",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2026-06-03",
   "project_evidence": [
    "What was once Pennsylvania\u2019s biggest coal-fired power plant is being turned into a $10 billion natural gas-powered data center campus designed to capitalize on Big Tech\u2019s fast-growing energy demands",
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "locality_evidence": [
    "What was once Pennsylvania\u2019s biggest coal-fired power plant is being turned into a $10 billion natural gas-powered data center campus designed to capitalize on Big Tech\u2019s fast-growing energy demands",
    "The project also would be the largest capital investment ever in Pennsylvania, said state Senate Majority Leader Joe Pittman, R-Indiana, whose district is home to Homer City."
   ],
   "state_evidence": [
    "What was once Pennsylvania\u2019s biggest coal-fired power plant is being turned into a $10 billion natural gas-powered data center campus designed to capitalize on Big Tech\u2019s fast-growing energy demands",
    "The project also would be the largest capital investment ever in Pennsylvania, said state Senate Majority Leader Joe Pittman, R-Indiana, whose district is home to Homer City."
   ],
   "capacity_gw_evidence": [
    "What was once Pennsylvania\u2019s biggest coal-fired power plant is being turned into a $10 billion natural gas-powered data center campus designed to capitalize on Big Tech\u2019s fast-growing energy demands",
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "builder_evidence": [
    "What was once Pennsylvania\u2019s biggest coal-fired power plant is being turned into a $10 billion natural gas-powered data center campus designed to capitalize on Big Tech\u2019s fast-growing energy demands",
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "What was once Pennsylvania\u2019s biggest coal-fired power plant is being turned into a $10 billion natural gas-powered data center campus designed to capitalize on Big Tech\u2019s fast-growing energy demands",
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "announcement_date_evidence": [
    "What was once Pennsylvania\u2019s biggest coal-fired power plant is being turned into a $10 billion natural gas-powered data center campus designed to capitalize on Big Tech\u2019s fast-growing energy demands",
    "HARRISBURG, Pa. (AP) \u2014 The owners of what was once Pennsylvania\u2019s biggest coal-fired power plant said Wednesday that they will turn it into a $10 billion natural gas-powered data center campus designed to capitalize on the [fast-growing energy demands](https://apnews.com/article/power-electricity-amazon-microsoft-power-plants-data-centers-grid-f4763f73bc112425e18f30618dff0039) of Big Tech companies to power artificial intelligence and cloud computing applications."
   ]
  },
  {
   "url": "https://en.prnasia.com/releases/global/nscale-and-microsoft-announce-collaboration-with-nvidia-and-caterpillar-to-deliver-1-35gw-of-nvidia-vera-rubin-nvl72-gpus-at-flagship-ai-factory-campus-in-west-virginia-525469.shtml",
   "title": "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
   "published_at": null,
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "under development",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid"
   ],
   "locality_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "state_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "capacity_gw_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "builder_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "ai_customer_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs"
   ],
   "status_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "announcement_date_evidence": [
    "# Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ]
  },
  {
   "url": "https://emergingtechbrew.com/stories/2025/04/07/data-city-texas-renewable-energy",
   "title": "Data City, Texas, aims to power acres of data centers via renewable energy",
   "published_at": "2025-04-07T14:04:58",
   "project": "Data City",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance",
   "ai_customer": null,
   "status": "building",
   "announcement_date": null,
   "project_evidence": [
    "The project will be called Data City, Texas, and be stationed outside Laredo, a city near the US-Mexico border.",
    "Energy Abundance recently announced it\u2019s building 50,000 acres of data center infrastructure to be powered entirely by renewable energy."
   ],
   "locality_evidence": [
    "The project will be called Data City, Texas, and be stationed outside Laredo, a city near the US-Mexico border.",
    "Energy Abundance recently announced it\u2019s building 50,000 acres of data center infrastructure to be powered entirely by renewable energy."
   ],
   "state_evidence": [
    "The project will be called Data City, Texas, and be stationed outside Laredo, a city near the US-Mexico border.",
    "Energy Abundance recently announced it\u2019s building 50,000 acres of data center infrastructure to be powered entirely by renewable energy."
   ],
   "capacity_gw_evidence": [
    "After that, Energy Abundance said in a press release that Data City will grow to offer 5GW of power that will become available to lessees \u201cas demand accelerates.\u201d",
    "Energy Abundance recently announced it\u2019s building 50,000 acres of data center infrastructure to be powered entirely by renewable energy."
   ],
   "builder_evidence": [
    "Energy Abundance recently announced it\u2019s building 50,000 acres of data center infrastructure to be powered entirely by renewable energy."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Energy Abundance recently announced it\u2019s building 50,000 acres of data center infrastructure to be powered entirely by renewable energy."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://finance.biggo.com/news/f7e57ee3-497a-4fe9-9796-05a4a19b7c71",
   "title": "OpenAI Inks Landmark 25-Year Power Deal, Commits $20 Billion to Georgia Data Center",
   "published_at": "2026-07-22T18:26:46",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Inks Landmark 25-Year Power Deal, Commits $20 Billion to Georgia Data Center",
    "OpenAI has committed $20 billion to build its first self-designed data center campus, Project Camellia, in Effingham County, Georgia, with total costs potentially exceeding $30 billion.",
    "The project, dubbed \"Project Camellia,\" marks the ChatGPT maker's first venture as a principal designer and builder of its own computing infrastructure, moving beyond leasing capacity from cloud providers."
   ],
   "locality_evidence": [
    "# OpenAI Inks Landmark 25-Year Power Deal, Commits $20 Billion to Georgia Data Center",
    "OpenAI has committed $20 billion to build its first self-designed data center campus, Project Camellia, in Effingham County, Georgia, with total costs potentially exceeding $30 billion.",
    "OpenAI has signed a 25-year power supply agreement with a subsidiary of Southern Co. (SO), anchoring a massive $20 billion data center campus in Effingham County, Georgia."
   ],
   "state_evidence": [
    "# OpenAI Inks Landmark 25-Year Power Deal, Commits $20 Billion to Georgia Data Center",
    "OpenAI has committed $20 billion to build its first self-designed data center campus, Project Camellia, in Effingham County, Georgia, with total costs potentially exceeding $30 billion.",
    "OpenAI has signed a 25-year power supply agreement with a subsidiary of Southern Co. (SO), anchoring a massive $20 billion data center campus in Effingham County, Georgia."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Inks Landmark 25-Year Power Deal, Commits $20 Billion to Georgia Data Center",
    "Under a 25-year power deal with Georgia Power, a unit of Southern Co., the facility will receive 3.2 gigawatts of electricity phased in between 2028 and 2032.",
    "The facility, located within the Savannah Gateway Industrial Hub roughly 45 minutes outside of Savannah, will draw an immense 3.2 gigawatts of power from Georgia Power."
   ],
   "builder_evidence": [
    "# OpenAI Inks Landmark 25-Year Power Deal, Commits $20 Billion to Georgia Data Center",
    "OpenAI has committed $20 billion to build its first self-designed data center campus, Project Camellia, in Effingham County, Georgia, with total costs potentially exceeding $30 billion.",
    "The project, dubbed \"Project Camellia,\" marks the ChatGPT maker's first venture as a principal designer and builder of its own computing infrastructure, moving beyond leasing capacity from cloud providers."
   ],
   "ai_customer_evidence": [
    "# OpenAI Inks Landmark 25-Year Power Deal, Commits $20 Billion to Georgia Data Center",
    "OpenAI has committed $20 billion to build its first self-designed data center campus, Project Camellia, in Effingham County, Georgia, with total costs potentially exceeding $30 billion."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://golfweek.usatoday.com/story/news/local/michigan/2026/03/17/google-weighs-joining-van-buren-township-data-center-project-dte-energy/89187228007",
   "title": "Google weighs joining Van Buren Township data center project",
   "published_at": "2026-03-17T12:02:32",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": "Google",
   "status": "seeking approval",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "MICHIGAN",
    "# Google weighs joining Van Buren Township data center project",
    "The tech giant is evaluating whether it will get involved with [Project Cannoli, the hyperscale data center project advancing in the western Wayne County community](/story/news/local/wayne-county/2026/03/06/nda-nondisclosure-agreement-confidentiality-clues-panattoni-anchor-designs-van-buren-data-center/89016021007/), a Google spokesperson said in an email."
   ],
   "locality_evidence": [
    "MICHIGAN",
    "# Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project."
   ],
   "state_evidence": [
    "MICHIGAN",
    "# Google weighs joining Van Buren Township data center project"
   ],
   "capacity_gw_evidence": [
    "MICHIGAN",
    "# Google weighs joining Van Buren Township data center project",
    "The Cannoli Project hyperscale data center in Van Buren Township will demand 1 gigawatt of power, DTE Energy Corporate Communications Director Jill Wilmot said in an email."
   ],
   "builder_evidence": [
    "MICHIGAN",
    "# Google weighs joining Van Buren Township data center project",
    "The data center project is being pushed by California real estate development firm Panattoni Development Co."
   ],
   "ai_customer_evidence": [
    "MICHIGAN",
    "# Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project."
   ],
   "status_evidence": [
    "MICHIGAN",
    "# Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project."
   ],
   "announcement_date_evidence": [
    "MICHIGAN",
    "# Google weighs joining Van Buren Township data center project",
    "Updated March 17, 2026, 3:27 p.m. ET"
   ]
  },
  {
   "url": "https://mexc.co/news/1114352",
   "title": "TeraWulf surges 10% on 1GW Kentucky AI campus et | MEXC News",
   "published_at": null,
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access.",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure."
   ],
   "locality_evidence": [
    "The company secured a 285-acre site in eastern Kentucky.",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure."
   ],
   "state_evidence": [
    "The company secured a 285-acre site in eastern Kentucky.",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure."
   ],
   "capacity_gw_evidence": [
    "It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity.",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure."
   ],
   "builder_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure.",
    "The company secured a 285-acre site in eastern Kentucky."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity.",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://markets.ft.com/data/announce/detail?dockey=1330-9395507en-5LGC3ULKTRJ1ANFICTMC3H2KPE",
   "title": "IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement \u2013 Company Announcement",
   "published_at": "2025-03-17T10:20:38",
   "project": "Sweetwater",
   "locality": "West Texas",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "advancing",
   "announcement_date": "2025-03-17",
   "project_evidence": [
    "IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "locality_evidence": [
    "IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "state_evidence": [
    "IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "capacity_gw_evidence": [
    "IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "builder_evidence": [
    "IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "announcement_date_evidence": [
    "IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ]
  },
  {
   "url": "https://utahbusiness.com/press-releases/2025/08/01/creekstone-energy-blusky-ai-50-mw-infrastructure-utah-delta-gigasite",
   "title": "Creekstone and BluSky AI announce agreement at Delta Gigasite",
   "published_at": "2025-08-01T16:15:48",
   "project": "Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "under development",
   "announcement_date": null,
   "project_evidence": [
    "DELTA, Utah \u2014 The effort to build the world\u2019s largest data-center campus in Delta, Utah has taken another significant step forward.",
    "Creekstone Energy LLC, the developer behind Utah\u2019s largest AI-ready energy site, has signed an agreement with BluSky AI Inc. to provide land and up to 50 megawatts of power at its Delta Gigasite in Millard County.",
    "It has access to more than 10 gigawatts of power potential\u2014drawing from geothermal, solar, wind, and natural gas\u2014and is located at a major power and fiber crossroads in the Western U.S."
   ],
   "locality_evidence": [
    "DELTA, Utah \u2014 The effort to build the world\u2019s largest data-center campus in Delta, Utah has taken another significant step forward.",
    "Creekstone Energy LLC, the developer behind Utah\u2019s largest AI-ready energy site, has signed an agreement with BluSky AI Inc. to provide land and up to 50 megawatts of power at its Delta Gigasite in Millard County."
   ],
   "state_evidence": [
    "DELTA, Utah \u2014 The effort to build the world\u2019s largest data-center campus in Delta, Utah has taken another significant step forward.",
    "Creekstone Energy LLC, the developer behind Utah\u2019s largest AI-ready energy site, has signed an agreement with BluSky AI Inc. to provide land and up to 50 megawatts of power at its Delta Gigasite in Millard County."
   ],
   "capacity_gw_evidence": [
    "It has access to more than 10 gigawatts of power potential\u2014drawing from geothermal, solar, wind, and natural gas\u2014and is located at a major power and fiber crossroads in the Western U.S."
   ],
   "builder_evidence": [
    "Creekstone Energy LLC, the developer behind Utah\u2019s largest AI-ready energy site, has signed an agreement with BluSky AI Inc. to provide land and up to 50 megawatts of power at its Delta Gigasite in Millard County.",
    "Creekstone Energy LLC is an energy and infrastructure development firm focused on aggregating unprecedented power capacity in a single location to fuel the next era of artificial intelligence."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "DELTA, Utah \u2014 The effort to build the world\u2019s largest data-center campus in Delta, Utah has taken another significant step forward.",
    "Creekstone Energy LLC, the developer behind Utah\u2019s largest AI-ready energy site, has signed an agreement with BluSky AI Inc. to provide land and up to 50 megawatts of power at its Delta Gigasite in Millard County."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://gh2forclimate.org/author/ghc1",
   "title": "ghc1, Author at GHC",
   "published_at": null,
   "project": "TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2024-09-24",
   "project_evidence": [
    "Texas to Host $8 Billion Off-Grid Hydrogen-Powered Data Center",
    "Last week, California-based data center developer ECL announced that its off-grid hydrogen-powered 1GW artificial intelligence (AI) data center, TerraSite-TX1, will be developed and built in Houston, Texas."
   ],
   "locality_evidence": [
    "Texas to Host $8 Billion Off-Grid Hydrogen-Powered Data Center",
    "Last week, California-based data center developer ECL announced that its off-grid hydrogen-powered 1GW artificial intelligence (AI) data center, TerraSite-TX1, will be developed and built in Houston, Texas."
   ],
   "state_evidence": [
    "Texas to Host $8 Billion Off-Grid Hydrogen-Powered Data Center",
    "Last week, California-based data center developer ECL announced that its off-grid hydrogen-powered 1GW artificial intelligence (AI) data center, TerraSite-TX1, will be developed and built in Houston, Texas."
   ],
   "capacity_gw_evidence": [
    "Texas to Host $8 Billion Off-Grid Hydrogen-Powered Data Center",
    "Last week, California-based data center developer ECL announced that its off-grid hydrogen-powered 1GW artificial intelligence (AI) data center, TerraSite-TX1, will be developed and built in Houston, Texas."
   ],
   "builder_evidence": [
    "Texas to Host $8 Billion Off-Grid Hydrogen-Powered Data Center",
    "Last week, California-based data center developer ECL announced that its off-grid hydrogen-powered 1GW artificial intelligence (AI) data center, TerraSite-TX1, will be developed and built in Houston, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Texas to Host $8 Billion Off-Grid Hydrogen-Powered Data Center",
    "Last week, California-based data center developer ECL announced that its off-grid hydrogen-powered 1GW artificial intelligence (AI) data center, TerraSite-TX1, will be developed and built in Houston, Texas."
   ],
   "announcement_date_evidence": [
    "Texas to Host $8 Billion Off-Grid Hydrogen-Powered Data Center",
    "by | Oct 1, 2024 | [Article](https://gh2forclimate.org/category/article/)",
    "Last week, California-based data center developer ECL announced that its off-grid hydrogen-powered 1GW artificial intelligence (AI) data center, TerraSite-TX1, will be developed and built in Houston, Texas."
   ]
  },
  {
   "url": "https://aiweekly.co/alerts/nexus-lines-up-15b-bridge-loan-for-anthropics-texas-ai-campus",
   "title": "Nexus lines up ~$15B bridge loan for Anthropic's Texas AI campus",
   "published_at": "2026-07-30T18:32:32",
   "project": "Hubbard, Texas AI campus",
   "locality": "Hubbard",
   "state": "Texas",
   "capacity_gw": 7.7,
   "builder": "Nexus Data Centers",
   "ai_customer": "Anthropic",
   "status": "in talks",
   "announcement_date": null,
   "project_evidence": [
    "# Nexus lines up ~$15B bridge loan for Anthropic's Texas AI campus",
    "- A group of banks is in talks to lend roughly $15 billion to Nexus Data Centers to build the Hubbard, Texas AI campus leased to Anthropic."
   ],
   "locality_evidence": [
    "# Nexus lines up ~$15B bridge loan for Anthropic's Texas AI campus",
    "- A group of banks is in talks to lend roughly $15 billion to Nexus Data Centers to build the Hubbard, Texas AI campus leased to Anthropic."
   ],
   "state_evidence": [
    "# Nexus lines up ~$15B bridge loan for Anthropic's Texas AI campus",
    "- A group of banks is in talks to lend roughly $15 billion to Nexus Data Centers to build the Hubbard, Texas AI campus leased to Anthropic."
   ],
   "capacity_gw_evidence": [
    "# Nexus lines up ~$15B bridge loan for Anthropic's Texas AI campus",
    "The first phase alone is expected to cost more than $5 billion and provide about 500 megawatts, with the campus eventually scaling toward a targeted 7.7 gigawatts across a 2,900-acre site sitting near a major gas pipeline so it can be powered by gas turbines owned by Nexus."
   ],
   "builder_evidence": [
    "# Nexus lines up ~$15B bridge loan for Anthropic's Texas AI campus",
    "- A group of banks is in talks to lend roughly $15 billion to Nexus Data Centers to build the Hubbard, Texas AI campus leased to Anthropic."
   ],
   "ai_customer_evidence": [
    "# Nexus lines up ~$15B bridge loan for Anthropic's Texas AI campus",
    "- A group of banks is in talks to lend roughly $15 billion to Nexus Data Centers to build the Hubbard, Texas AI campus leased to Anthropic."
   ],
   "status_evidence": [
    "# Nexus lines up ~$15B bridge loan for Anthropic's Texas AI campus",
    "- A group of banks is in talks to lend roughly $15 billion to Nexus Data Centers to build the Hubbard, Texas AI campus leased to Anthropic."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://nasileak.com/business/nvidia-105-billion-openai-ohio-data-center-financing",
   "title": "Nvidia to Back OpenAI's Ohio Mega Data Center With Up to US$105 Billion in Financing",
   "published_at": null,
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": "2026-08-19",
   "project_evidence": [
    "# Nvidia to Back OpenAI's Ohio Mega Data Center With Up to US$105 Billion in Financing",
    "The facility, known as the PORTS-Pike Technology Campus and located in Pike County, Ohio, will be built and operated by SB Energy, a developer backed by SoftBank."
   ],
   "locality_evidence": [
    "# Nvidia to Back OpenAI's Ohio Mega Data Center With Up to US$105 Billion in Financing",
    "The facility, known as the PORTS-Pike Technology Campus and located in Pike County, Ohio, will be built and operated by SB Energy, a developer backed by SoftBank."
   ],
   "state_evidence": [
    "# Nvidia to Back OpenAI's Ohio Mega Data Center With Up to US$105 Billion in Financing",
    "The facility, known as the PORTS-Pike Technology Campus and located in Pike County, Ohio, will be built and operated by SB Energy, a developer backed by SoftBank."
   ],
   "capacity_gw_evidence": [
    "# Nvidia to Back OpenAI's Ohio Mega Data Center With Up to US$105 Billion in Financing",
    "The guarantee will underwrite an initial 4.25 gigawatts of computing capacity, with an option to scale up by a further 3.75 gigawatts, bringing total planned capacity to roughly 8 gigawatts."
   ],
   "builder_evidence": [
    "# Nvidia to Back OpenAI's Ohio Mega Data Center With Up to US$105 Billion in Financing",
    "The facility, known as the PORTS-Pike Technology Campus and located in Pike County, Ohio, will be built and operated by SB Energy, a developer backed by SoftBank."
   ],
   "ai_customer_evidence": [
    "# Nvidia to Back OpenAI's Ohio Mega Data Center With Up to US$105 Billion in Financing",
    "Chipmaker Nvidia has committed to underwrite as much as US$105 billion in financing for a sprawling new artificial intelligence data centre that OpenAI will lease in Ohio, according to a regulatory filing made public on Monday."
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "Aug 19, 2026",
    "# Nvidia to Back OpenAI's Ohio Mega Data Center With Up to US$105 Billion in Financing"
   ]
  },
  {
   "url": "https://bitcoinethereumnews.com/finance/meta-taps-morgan-stanley-jpmorgan-for-13b-texas-data-center-financing",
   "title": "Meta taps Morgan Stanley, JPMorgan for $13B Texas data center financing",
   "published_at": "2026-05-05T01:34:12",
   "project": "El Paso",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "in financing",
   "announcement_date": "2025-10-01",
   "project_evidence": [
    "# Meta taps Morgan Stanley, JPMorgan for $13B Texas data center financing",
    "Meta is working with Morgan Stanley and JPMorgan on roughly $13 billion in financing for its El Paso data center campus, per a May 4 report."
   ],
   "locality_evidence": [
    "# Meta taps Morgan Stanley, JPMorgan for $13B Texas data center financing",
    "Meta is working with Morgan Stanley and JPMorgan on roughly $13 billion in financing for its El Paso data center campus, per a May 4 report."
   ],
   "state_evidence": [
    "# Meta taps Morgan Stanley, JPMorgan for $13B Texas data center financing",
    "Meta is working with Morgan Stanley and JPMorgan on roughly $13 billion in financing for its El Paso data center campus, per a May 4 report."
   ],
   "capacity_gw_evidence": [
    "# Meta taps Morgan Stanley, JPMorgan for $13B Texas data center financing",
    "The financing now under discussion is roughly eight times that, scaling the campus to about one gigawatt of capacity."
   ],
   "builder_evidence": [
    "# Meta taps Morgan Stanley, JPMorgan for $13B Texas data center financing",
    "Meta is working with Morgan Stanley and JPMorgan on roughly $13 billion in financing for its El Paso data center campus, per a May 4 report."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Meta taps Morgan Stanley, JPMorgan for $13B Texas data center financing",
    "Meta is working with Morgan Stanley and JPMorgan on roughly $13 billion in financing for its El Paso data center campus, per a May 4 report."
   ],
   "announcement_date_evidence": [
    "# Meta taps Morgan Stanley, JPMorgan for $13B Texas data center financing",
    "Meta\u2019s original commitment to El Paso, announced in October 2025, was $1.5 billion."
   ]
  },
  {
   "url": "https://thespectrum.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Colossus 2",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 1.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": null,
   "announcement_date": "2025-05-01",
   "project_evidence": [
    "## Colossus 2 | Tulane Road, Memphis",
    "The second Memphis campus in Whitehaven came into the picture in early 2025.",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses"
   ],
   "locality_evidence": [
    "## Colossus 2 | Tulane Road, Memphis",
    "The second Memphis campus in Whitehaven came into the picture in early 2025.",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses"
   ],
   "state_evidence": [
    "In March 2025, the Greater Memphis Chamber announced xAI's plans for a second campus and its purchase of a 1 million-square-foot building.",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses"
   ],
   "capacity_gw_evidence": [
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses"
   ],
   "builder_evidence": [
    "In March 2025, the Greater Memphis Chamber announced xAI's plans for a second campus and its purchase of a 1 million-square-foot building.",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": [
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses"
   ]
  },
  {
   "url": "https://thespectrum.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Macrohardrr",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": null,
   "announcement_date": "2025-12-30",
   "project_evidence": [
    "## Marcrohardrr | Southaven",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road.",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses"
   ],
   "locality_evidence": [
    "## Marcrohardrr | Southaven",
    "This is the third and most recent xAI campus.",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses"
   ],
   "state_evidence": [
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road.",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses"
   ],
   "capacity_gw_evidence": [
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity.",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses"
   ],
   "builder_evidence": [
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road.",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": [
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity.",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses"
   ]
  },
  {
   "url": "https://tracker.bepresearch.com/companies/microsoft",
   "title": "BEP AI Infrastructure Tracker",
   "published_at": null,
   "project": "Microsoft Pecos",
   "locality": "Pecos",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Microsoft",
   "ai_customer": null,
   "status": "Announced",
   "announcement_date": null,
   "project_evidence": [
    "# Microsoft",
    "## Projects owned",
    "- [Microsoft Pecos](/projects/microsoft-pecos)"
   ],
   "locality_evidence": [
    "# Microsoft",
    "## Projects owned",
    "- [Microsoft Pecos](/projects/microsoft-pecos)",
    "Microsoft \u00b7 Pecos, Texas, United States"
   ],
   "state_evidence": [
    "# Microsoft",
    "## Projects owned",
    "- [Microsoft Pecos](/projects/microsoft-pecos)",
    "Microsoft \u00b7 Pecos, Texas, United States"
   ],
   "capacity_gw_evidence": [
    "# Microsoft",
    "## Projects owned",
    "- [Microsoft Pecos](/projects/microsoft-pecos)",
    "2 GWAnnounced"
   ],
   "builder_evidence": [
    "# Microsoft",
    "## Projects owned",
    "- [Microsoft Pecos](/projects/microsoft-pecos)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Microsoft",
    "## Projects owned",
    "- [Microsoft Pecos](/projects/microsoft-pecos)",
    "2 GWAnnounced"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://markets.financialcontent.com/talkmarkets/article/bizwire-2025-8-19-vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand",
   "title": "Vantage Data Centers Unveils Plans for \u00e2Frontier,\u00e2 a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
   "published_at": "2025-08-19T11:00:00",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Under Construction",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "locality_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "View the full release here: https://www.businesswire.com/news/home/20250819333311/en/"
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news/fermi-america-files-for-ipo-amid-plans-for-11gw-data-center-campus-in-texas",
   "title": "Fermi America files for IPO amid plans for 11GW data center campus in Texas",
   "published_at": "2026-05-07T14:19:23",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "The company behind a gargantuan 11GW planned energy and data center campus in Amarillo, Texas, has filed for an initial public offering (IPO).",
    "Fermi is developing \u201cProject Matador,\u201d a planned 11GW hyperscale data center complex expected to span 18 million sq ft (1.67 million sqm)."
   ],
   "locality_evidence": [
    "The company behind a gargantuan 11GW planned energy and data center campus in Amarillo, Texas, has filed for an initial public offering (IPO)."
   ],
   "state_evidence": [
    "The company behind a gargantuan 11GW planned energy and data center campus in Amarillo, Texas, has filed for an initial public offering (IPO)."
   ],
   "capacity_gw_evidence": [
    "The company behind a gargantuan 11GW planned energy and data center campus in Amarillo, Texas, has filed for an initial public offering (IPO).",
    "Fermi is developing \u201cProject Matador,\u201d a planned 11GW hyperscale data center complex expected to span 18 million sq ft (1.67 million sqm)."
   ],
   "builder_evidence": [
    "Fermi America, a company co-founded by former US Energy Secretary Rick Perry, filed a Registration Statement on Form S-11 with the U.S. Securities and Exchange Commission related to the proposed IPO on Monday (8 September).",
    "Fermi is developing \u201cProject Matador,\u201d a planned 11GW hyperscale data center complex expected to span 18 million sq ft (1.67 million sqm)."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The company behind a gargantuan 11GW planned energy and data center campus in Amarillo, Texas, has filed for an initial public offering (IPO).",
    "Fermi is developing \u201cProject Matador,\u201d a planned 11GW hyperscale data center complex expected to span 18 million sq ft (1.67 million sqm)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://news.taiwannet.com.tw/news/198609/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy-to.html",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute - Global Business News - \u53f0\u7063\u7522\u7d93\u65b0\u805e\u7db2 - Taiwan Business News",
   "published_at": null,
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# **Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute**",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*"
   ],
   "locality_evidence": [
    "# **Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute**",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "# **Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute**",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "capacity_gw_evidence": [
    "# **Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute**",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*"
   ],
   "builder_evidence": [
    "# **Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute**",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# **Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute**",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "announcement_date_evidence": [
    "# **Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute**",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ]
  },
  {
   "url": "https://tedmag.com/openai-plans-3-2-gw-project-camellia-data-center-in-georgia",
   "title": "OpenAI Plans 3.2-GW Project Camellia Data Center in Georgia",
   "published_at": "2026-07-24T15:55:44",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Plans 3.2-GW Project Camellia Data Center in Georgia",
    "OpenAI Plans 3.2-GW Project Camellia Data Center in Georgia\n\n#####\n\n![](https://tedmag.com/wp-content/uploads/2026/07/OpenAI-Blossom_white_350x_do-not-crop-300x300.jpg)OpenAI [announced](https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/) Project Camellia, a long-term data center campus in Effingham County, Georgia."
   ],
   "locality_evidence": [
    "# OpenAI Plans 3.2-GW Project Camellia Data Center in Georgia",
    "OpenAI Plans 3.2-GW Project Camellia Data Center in Georgia\n\n#####\n\n![](https://tedmag.com/wp-content/uploads/2026/07/OpenAI-Blossom_white_350x_do-not-crop-300x300.jpg)OpenAI [announced](https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/) Project Camellia, a long-term data center campus in Effingham County, Georgia."
   ],
   "state_evidence": [
    "# OpenAI Plans 3.2-GW Project Camellia Data Center in Georgia",
    "OpenAI Plans 3.2-GW Project Camellia Data Center in Georgia\n\n#####\n\n![](https://tedmag.com/wp-content/uploads/2026/07/OpenAI-Blossom_white_350x_do-not-crop-300x300.jpg)OpenAI [announced](https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/) Project Camellia, a long-term data center campus in Effingham County, Georgia."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Plans 3.2-GW Project Camellia Data Center in Georgia",
    "Project Camellia is a long-term data center project that OpenAI is designing and developing in Effingham County, Georgia."
   ],
   "builder_evidence": [
    "# OpenAI Plans 3.2-GW Project Camellia Data Center in Georgia",
    "Project Camellia is a long-term data center project that OpenAI is designing and developing in Effingham County, Georgia."
   ],
   "ai_customer_evidence": [
    "# OpenAI Plans 3.2-GW Project Camellia Data Center in Georgia",
    "Project Camellia is a long-term data center project that OpenAI is designing and developing in Effingham County, Georgia."
   ],
   "status_evidence": [
    "# OpenAI Plans 3.2-GW Project Camellia Data Center in Georgia",
    "OpenAI Plans 3.2-GW Project Camellia Data Center in Georgia\n\n#####\n\n![](https://tedmag.com/wp-content/uploads/2026/07/OpenAI-Blossom_white_350x_do-not-crop-300x300.jpg)OpenAI [announced](https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/) Project Camellia, a long-term data center campus in Effingham County, Georgia."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://metrowestdailynews.com/story/news/local/michigan/2026/03/17/google-weighs-joining-van-buren-township-data-center-project-dte-energy/89187228007",
   "title": "Google weighs joining Van Buren Township data center project",
   "published_at": "2026-03-17T12:02:32",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": "Google",
   "status": "seeking approval",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "Google weighs joining Van Buren Township data center project",
    "The tech giant is evaluating whether it will get involved with [Project Cannoli, the hyperscale data center project advancing in the western Wayne County community](/story/news/local/wayne-county/2026/03/06/nda-nondisclosure-agreement-confidentiality-clues-panattoni-anchor-designs-van-buren-data-center/89016021007/), a Google spokesperson said in an email."
   ],
   "locality_evidence": [
    "Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project.",
    "The tech giant is evaluating whether it will get involved with [Project Cannoli, the hyperscale data center project advancing in the western Wayne County community](/story/news/local/wayne-county/2026/03/06/nda-nondisclosure-agreement-confidentiality-clues-panattoni-anchor-designs-van-buren-data-center/89016021007/), a Google spokesperson said in an email."
   ],
   "state_evidence": [
    "MICHIGAN",
    "Google weighs joining Van Buren Township data center project"
   ],
   "capacity_gw_evidence": [
    "Google weighs joining Van Buren Township data center project",
    "The Cannoli Project hyperscale data center in Van Buren Township will demand 1 gigawatt of power, DTE Energy Corporate Communications Director Jill Wilmot said in an email."
   ],
   "builder_evidence": [
    "Google weighs joining Van Buren Township data center project",
    "The data center project is being pushed by California real estate development firm Panattoni Development Co."
   ],
   "ai_customer_evidence": [
    "Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project."
   ],
   "status_evidence": [
    "Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project."
   ],
   "announcement_date_evidence": [
    "Google weighs joining Van Buren Township data center project",
    "Updated March 17, 2026, 3:27 p.m. ET"
   ]
  },
  {
   "url": "http://dlvr.it/TSlrwL",
   "title": "TeraWulf acquires site in Kentucky for 1GW data center campus",
   "published_at": "2026-05-21T09:14:17",
   "project": "Muskie Data Campus",
   "locality": "Eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Cryptominer and AI data center firm TeraWulf is expanding its footprint with a second planned site in Kentucky.",
    "Acquired from Industrial Equity Partners, the Muskie Data Campus is expected to support more than 1GW of data center capacity over time."
   ],
   "locality_evidence": [
    "Cryptominer and AI data center firm TeraWulf is expanding its footprint with a second planned site in Kentucky.",
    "The Nasdaq-listed firm this week announced the acquisition of a hyperscale high-performance computing development site located in Eastern Kentucky.",
    "Acquired from Industrial Equity Partners, the Muskie Data Campus is expected to support more than 1GW of data center capacity over time."
   ],
   "state_evidence": [
    "Cryptominer and AI data center firm TeraWulf is expanding its footprint with a second planned site in Kentucky.",
    "The Nasdaq-listed firm this week announced the acquisition of a hyperscale high-performance computing development site located in Eastern Kentucky.",
    "Acquired from Industrial Equity Partners, the Muskie Data Campus is expected to support more than 1GW of data center capacity over time."
   ],
   "capacity_gw_evidence": [
    "Cryptominer and AI data center firm TeraWulf is expanding its footprint with a second planned site in Kentucky.",
    "Acquired from Industrial Equity Partners, the Muskie Data Campus is expected to support more than 1GW of data center capacity over time."
   ],
   "builder_evidence": [
    "Cryptominer and AI data center firm TeraWulf is expanding its footprint with a second planned site in Kentucky.",
    "Acquired from Industrial Equity Partners, the Muskie Data Campus is expected to support more than 1GW of data center capacity over time."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Cryptominer and AI data center firm TeraWulf is expanding its footprint with a second planned site in Kentucky.",
    "Acquired from Industrial Equity Partners, the Muskie Data Campus is expected to support more than 1GW of data center capacity over time."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://cointelegraph.com/news/hut-8-commits-16m-louisiana-water-infra-tied-ai-data-center-campus",
   "title": "Hut 8 Commits $16M to Louisiana AI Data Center Infrastructure",
   "published_at": null,
   "project": "Beacon Point",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "commercialized first phase",
   "announcement_date": null,
   "project_evidence": [
    "# Hut 8 to fund Louisiana water system expansion tied to AI campus",
    "The company followed that agreement in May with another 15-year lease tied to 352 MW of capacity at its Beacon Point campus in Texas in a [deal](https://www.hut8.com/news-insights/press-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw) it said is valued at $9.8 billion.",
    "Hut 8 added that the two campuses represent a combined $16.8 billion in contracted lease revenue tied to 597 MW of AI data center capacity."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# Hut 8 to fund Louisiana water system expansion tied to AI campus",
    "The company followed that agreement in May with another 15-year lease tied to 352 MW of capacity at its Beacon Point campus in Texas in a [deal](https://www.hut8.com/news-insights/press-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw) it said is valued at $9.8 billion."
   ],
   "capacity_gw_evidence": [
    "# Hut 8 to fund Louisiana water system expansion tied to AI campus"
   ],
   "builder_evidence": [
    "# Hut 8 to fund Louisiana water system expansion tied to AI campus",
    "The company followed that agreement in May with another 15-year lease tied to 352 MW of capacity at its Beacon Point campus in Texas in a [deal](https://www.hut8.com/news-insights/press-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw) it said is valued at $9.8 billion."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Hut 8 to fund Louisiana water system expansion tied to AI campus"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://worldenergynewsonline.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "About Creekstone Energy",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "About Creekstone Energy",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news/lambda-installs-gb200-nvl72-rack-at-hydrogen-powered-data-center",
   "title": "Lambda installs GB200 NVL72 rack at hydrogen-powered data center",
   "published_at": "2026-05-14T13:17:24",
   "project": "TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "EdgeCloudLink",
   "ai_customer": "Lambda",
   "status": "upcoming",
   "announcement_date": null,
   "project_evidence": [
    "GPU cloud provider Lambda has deployed an Nvidia GB200 NVL72 rack system at EdgeCloudLink's (ECL) data center in Mountain View, California.",
    "Lambda is also set to be the anchor tenant at ECL's upcoming 1GW TerraSite-TX1 data center campus in Houston, Texas, which will also be powered by hydrogen."
   ],
   "locality_evidence": [
    "GPU cloud provider Lambda has deployed an Nvidia GB200 NVL72 rack system at EdgeCloudLink's (ECL) data center in Mountain View, California.",
    "Lambda is also set to be the anchor tenant at ECL's upcoming 1GW TerraSite-TX1 data center campus in Houston, Texas, which will also be powered by hydrogen."
   ],
   "state_evidence": [
    "GPU cloud provider Lambda has deployed an Nvidia GB200 NVL72 rack system at EdgeCloudLink's (ECL) data center in Mountain View, California.",
    "Lambda is also set to be the anchor tenant at ECL's upcoming 1GW TerraSite-TX1 data center campus in Houston, Texas, which will also be powered by hydrogen."
   ],
   "capacity_gw_evidence": [
    "GPU cloud provider Lambda has deployed an Nvidia GB200 NVL72 rack system at EdgeCloudLink's (ECL) data center in Mountain View, California.",
    "Lambda is also set to be the anchor tenant at ECL's upcoming 1GW TerraSite-TX1 data center campus in Houston, Texas, which will also be powered by hydrogen."
   ],
   "builder_evidence": [
    "GPU cloud provider Lambda has deployed an Nvidia GB200 NVL72 rack system at EdgeCloudLink's (ECL) data center in Mountain View, California.",
    "Lambda is also set to be the anchor tenant at ECL's upcoming 1GW TerraSite-TX1 data center campus in Houston, Texas, which will also be powered by hydrogen."
   ],
   "ai_customer_evidence": [
    "GPU cloud provider Lambda has deployed an Nvidia GB200 NVL72 rack system at EdgeCloudLink's (ECL) data center in Mountain View, California.",
    "Lambda is also set to be the anchor tenant at ECL's upcoming 1GW TerraSite-TX1 data center campus in Houston, Texas, which will also be powered by hydrogen."
   ],
   "status_evidence": [
    "GPU cloud provider Lambda has deployed an Nvidia GB200 NVL72 rack system at EdgeCloudLink's (ECL) data center in Mountain View, California.",
    "Lambda is also set to be the anchor tenant at ECL's upcoming 1GW TerraSite-TX1 data center campus in Houston, Texas, which will also be powered by hydrogen."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://compute-atlas.com/facilities/nexus-hubbard-campus-hill-county-tx",
   "title": "Compute Atlas",
   "published_at": "2026-07-18T00:00:00",
   "project": "Nexus Hubbard Data Center & Power Campus",
   "locality": "Hubbard",
   "state": "Texas",
   "capacity_gw": 7.7,
   "builder": "Nexus Data Centers",
   "ai_customer": null,
   "status": "Proposed",
   "announcement_date": null,
   "project_evidence": [
    "# Nexus Hubbard Data Center & Power Campus",
    "Hubbard, TX \u00b7 Hill County \u00b7 31.824\u00b0N 96.776\u00b0W"
   ],
   "locality_evidence": [
    "LocationHubbard, TX, Hill County",
    "Hubbard, TX \u00b7 Hill County \u00b7 31.824\u00b0N 96.776\u00b0W"
   ],
   "state_evidence": [
    "LocationHubbard, TX, Hill County",
    "Hubbard, TX \u00b7 Hill County \u00b7 31.824\u00b0N 96.776\u00b0W",
    "Texas Commission on Environmental QualityRetrieved:"
   ],
   "capacity_gw_evidence": [
    "Publicly stated full-buildout target ~7.7 GW.",
    "Hubbard, TX \u00b7 Hill County \u00b7 31.824\u00b0N 96.776\u00b0W",
    "# Nexus Hubbard Data Center & Power Campus"
   ],
   "builder_evidence": [
    "Nexus Data Centers",
    "Hubbard, TX \u00b7 Hill County \u00b7 31.824\u00b0N 96.776\u00b0W",
    "# Nexus Hubbard Data Center & Power Campus"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Proposed",
    "Hubbard, TX \u00b7 Hill County \u00b7 31.824\u00b0N 96.776\u00b0W",
    "# Nexus Hubbard Data Center & Power Campus"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://corewire.news/meta-hyperion-louisiana-5gw",
   "title": "Meta lifts Hyperion price tag to $50 billion, up from $27 billion - Corewire",
   "published_at": "2026-07-14T11:32:34",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "under development",
   "announcement_date": "2026-07-13",
   "project_evidence": [
    "Meta now puts its 5GW Hyperion campus in Louisiana above $50 billion, nearly double the $27 billion financing figure from last October, with full capacity not expected until around 2032."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "Meta now puts its 5GW Hyperion campus in Louisiana above $50 billion, nearly double the $27 billion financing figure from last October, with full capacity not expected until around 2032."
   ],
   "capacity_gw_evidence": [
    "Meta now puts its 5GW Hyperion campus in Louisiana above $50 billion, nearly double the $27 billion financing figure from last October, with full capacity not expected until around 2032."
   ],
   "builder_evidence": [
    "Meta now puts its 5GW Hyperion campus in Louisiana above $50 billion, nearly double the $27 billion financing figure from last October, with full capacity not expected until around 2032."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Meta now puts its 5GW Hyperion campus in Louisiana above $50 billion, nearly double the $27 billion financing figure from last October, with full capacity not expected until around 2032."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://powertracker.io/site/project-rainier",
   "title": "Project Rainier (AWS/Anthropic) - powertracker",
   "published_at": "2026-05-18T00:00:00",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "AWS/Anthropic",
   "ai_customer": "AWS/Anthropic",
   "status": "Operational (2025)",
   "announcement_date": null,
   "project_evidence": [
    "AI data centers in US grid context.",
    "# Project Rainier"
   ],
   "locality_evidence": [
    "AI data centers in US grid context.",
    "AWS/Anthropic \u00b7 New Carlisle, Indiana"
   ],
   "state_evidence": [
    "AI data centers in US grid context.",
    "AWS/Anthropic \u00b7 New Carlisle, Indiana"
   ],
   "capacity_gw_evidence": [
    "AI data centers in US grid context.",
    "2.2 GW Announced load"
   ],
   "builder_evidence": [
    "AI data centers in US grid context.",
    "AWS/Anthropic \u00b7 New Carlisle, Indiana"
   ],
   "ai_customer_evidence": [
    "AI data centers in US grid context.",
    "AWS/Anthropic \u00b7 New Carlisle, Indiana"
   ],
   "status_evidence": [
    "AI data centers in US grid context.",
    "Status",
    "Operational (2025)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://stargazette.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Colossus 2",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 1.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2025-05-01",
   "project_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "locality_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The second Memphis campus in Whitehaven came into the picture in early 2025."
   ],
   "state_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "It has been a very [busy 18 months for Elon Musk's xAI](/story/money/business/development/2025/06/05/elon-musk-xai-supercomputer-grok-memphis-tn/83599473007/) since the company first announced plans for its Memphis data center in June 2024.",
    "## Colossus 2 | Tulane Road, Memphis"
   ],
   "capacity_gw_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "builder_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "In March 2025, the Greater Memphis Chamber announced xAI's plans for a second campus and its purchase of a 1 million-square-foot building."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "Colossus 2 is a bit more straightforward than the Paul R. Lowry Road complex."
   ],
   "announcement_date_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ]
  },
  {
   "url": "https://stargazette.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Macrohardrr",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2025-12-30",
   "project_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "locality_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "This is the third and most recent xAI campus."
   ],
   "state_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "In July 2025, MZX Tech LLC, an xAI affiliate, purchased the[ power plant and corresponding 114.49 acres of land surrounding the facility](/story/money/business/development/2025/07/18/xai-elon-musk-company-buys-southaven-mississippi-property-colossus-2-memphis-tn/85274193007/)."
   ],
   "capacity_gw_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "builder_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "The former Duke Energy site has been under construction with gas turbines on site for powering xAI data centers."
   ],
   "announcement_date_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ]
  },
  {
   "url": "https://baxtel.com/data-center/crusoe-abilene-campus",
   "title": "Crusoe: Abilene Campus Data Center",
   "published_at": null,
   "project": "Abilene Campus",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe",
   "ai_customer": "Oracle",
   "status": "Construction",
   "announcement_date": null,
   "project_evidence": [
    "# Crusoe: Abilene Campus",
    "Crusoe is developing an AI campus at the Lancium Clean Campus in Abilene, Texas, planned for 1.2 GW, and in May 2025 it secured $11.6 billion in debt and equity to expand the site from two to eight buildings."
   ],
   "locality_evidence": [
    "# Crusoe: Abilene Campus",
    "Crusoe is developing an AI campus at the Lancium Clean Campus in Abilene, Texas, planned for 1.2 GW, and in May 2025 it secured $11.6 billion in debt and equity to expand the site from two to eight buildings."
   ],
   "state_evidence": [
    "# Crusoe: Abilene Campus",
    "Crusoe is developing an AI campus at the Lancium Clean Campus in Abilene, Texas, planned for 1.2 GW, and in May 2025 it secured $11.6 billion in debt and equity to expand the site from two to eight buildings."
   ],
   "capacity_gw_evidence": [
    "# Crusoe: Abilene Campus",
    "Crusoe is developing an AI campus at the Lancium Clean Campus in Abilene, Texas, planned for 1.2 GW, and in May 2025 it secured $11.6 billion in debt and equity to expand the site from two to eight buildings."
   ],
   "builder_evidence": [
    "# Crusoe: Abilene Campus",
    "Crusoe is developing an AI campus at the Lancium Clean Campus in Abilene, Texas, planned for 1.2 GW, and in May 2025 it secured $11.6 billion in debt and equity to expand the site from two to eight buildings."
   ],
   "ai_customer_evidence": [
    "# Crusoe: Abilene Campus",
    "For this project, it is reported that Crusoe\u2019s direct customer is Oracle and that OpenAI is Oracle\u2019s customer; the Abilene campus is tied to OpenAI\u2019s Stargate program;"
   ],
   "status_evidence": [
    "# Crusoe: Abilene Campus",
    "## Crusoe: Abilene Campus Power Growth Over Time",
    " Construction",
    "- In March 2025 began construction on the second phase of the Abilene, Texas campus to bring total planned capacity to 1.2 GW."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://baxtel.com/data-center/crusoe-abilene-campus",
   "title": "Crusoe: Abilene Campus Data Center",
   "published_at": null,
   "project": "Project Jade",
   "locality": "Cheyenne",
   "state": "Wyoming",
   "capacity_gw": 1.8,
   "builder": "Crusoe",
   "ai_customer": null,
   "status": "In Doubt",
   "announcement_date": "2025-07-01",
   "project_evidence": [
    "[ Read Crusoe Temporarily Stops 1.8GW Data Center Build in Wyoming ]",
    "### Crusoe Temporarily Stops 1.8GW Data Center Build in Wyoming",
    "Crusoe has paused development of Project Jade, a planned 1.8GW data center campus in Cheyenne, Wyoming that was announced last year and designed to potentially scale up to 10GW."
   ],
   "locality_evidence": [
    "[ Read Crusoe Temporarily Stops 1.8GW Data Center Build in Wyoming ]",
    "### Crusoe Temporarily Stops 1.8GW Data Center Build in Wyoming",
    "Crusoe has paused development of Project Jade, a planned 1.8GW data center campus in Cheyenne, Wyoming that was announced last year and designed to potentially scale up to 10GW."
   ],
   "state_evidence": [
    "[ Read Crusoe Temporarily Stops 1.8GW Data Center Build in Wyoming ]",
    "### Crusoe Temporarily Stops 1.8GW Data Center Build in Wyoming",
    "Crusoe has paused development of Project Jade, a planned 1.8GW data center campus in Cheyenne, Wyoming that was announced last year and designed to potentially scale up to 10GW."
   ],
   "capacity_gw_evidence": [
    "[ Read Crusoe Temporarily Stops 1.8GW Data Center Build in Wyoming ]",
    "### Crusoe Temporarily Stops 1.8GW Data Center Build in Wyoming",
    "Crusoe has paused development of Project Jade, a planned 1.8GW data center campus in Cheyenne, Wyoming that was announced last year and designed to potentially scale up to 10GW."
   ],
   "builder_evidence": [
    "[ Read Crusoe Temporarily Stops 1.8GW Data Center Build in Wyoming ]",
    "### Crusoe Temporarily Stops 1.8GW Data Center Build in Wyoming",
    "Crusoe has paused development of Project Jade, a planned 1.8GW data center campus in Cheyenne, Wyoming that was announced last year and designed to potentially scale up to 10GW."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "[ Read Crusoe Temporarily Stops 1.8GW Data Center Build in Wyoming ]",
    "### Crusoe Temporarily Stops 1.8GW Data Center Build in Wyoming",
    "Crusoe has paused development of Project Jade, a planned 1.8GW data center campus in Cheyenne, Wyoming that was announced last year and designed to potentially scale up to 10GW."
   ],
   "announcement_date_evidence": [
    "[ Read Crusoe Temporarily Stops 1.8GW Data Center Build in Wyoming ]",
    "### Crusoe Temporarily Stops 1.8GW Data Center Build in Wyoming",
    "- In July 2025 announced a 1.8 GW AI data center campus with Tallgrass near Cheyenne, Wyoming."
   ]
  },
  {
   "url": "https://mind2markets.com/us-data-center-energy-news-trend-december-2025",
   "title": "US Data Center Energy News Trend December 2025 Best Insights",
   "published_at": "2026-01-21T09:56:08",
   "project": "Vantage \u201cFrontier\u201d campus",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": "Oracle & OpenAI",
   "status": "broken ground",
   "announcement_date": "2025-12-15",
   "project_evidence": [
    "# Data center energy news trends \u2013 December 2025",
    "| **Project / Company****** | **Location****** | **Capacity & Scale****** | **Energy / Power Angle****** | **Source****** |",
    "| Vantage \u201cFrontier\u201d campus | Shackelford County, Texas (US) | 1.4GW across 10 single\u2011story facilities, ~3.7m sq ft, >US$25bn investment | Mega\u2011campus scale implies very large incremental grid demand and long\u2011term power procurement linked to Oracle & OpenAI\u2019s Stargate expansion | Vantage breaks ground on Texas gigawatt data center campus for OpenAI (DCD, 15 Dec 2025)Monthly-North-America-Market-Intelligence-Report-_-December-2025.pdf\u200b |"
   ],
   "locality_evidence": [
    "# Data center energy news trends \u2013 December 2025",
    "| **Project / Company****** | **Location****** | **Capacity & Scale****** | **Energy / Power Angle****** | **Source****** |",
    "| Vantage \u201cFrontier\u201d campus | Shackelford County, Texas (US) | 1.4GW across 10 single\u2011story facilities, ~3.7m sq ft, >US$25bn investment | Mega\u2011campus scale implies very large incremental grid demand and long\u2011term power procurement linked to Oracle & OpenAI\u2019s Stargate expansion | Vantage breaks ground on Texas gigawatt data center campus for OpenAI (DCD, 15 Dec 2025)Monthly-North-America-Market-Intelligence-Report-_-December-2025.pdf\u200b |"
   ],
   "state_evidence": [
    "# Data center energy news trends \u2013 December 2025",
    "| **Project / Company****** | **Location****** | **Capacity & Scale****** | **Energy / Power Angle****** | **Source****** |",
    "| Vantage \u201cFrontier\u201d campus | Shackelford County, Texas (US) | 1.4GW across 10 single\u2011story facilities, ~3.7m sq ft, >US$25bn investment | Mega\u2011campus scale implies very large incremental grid demand and long\u2011term power procurement linked to Oracle & OpenAI\u2019s Stargate expansion | Vantage breaks ground on Texas gigawatt data center campus for OpenAI (DCD, 15 Dec 2025)Monthly-North-America-Market-Intelligence-Report-_-December-2025.pdf\u200b |"
   ],
   "capacity_gw_evidence": [
    "# Data center energy news trends \u2013 December 2025",
    "| **Project / Company****** | **Location****** | **Capacity & Scale****** | **Energy / Power Angle****** | **Source****** |",
    "| Vantage \u201cFrontier\u201d campus | Shackelford County, Texas (US) | 1.4GW across 10 single\u2011story facilities, ~3.7m sq ft, >US$25bn investment | Mega\u2011campus scale implies very large incremental grid demand and long\u2011term power procurement linked to Oracle & OpenAI\u2019s Stargate expansion | Vantage breaks ground on Texas gigawatt data center campus for OpenAI (DCD, 15 Dec 2025)Monthly-North-America-Market-Intelligence-Report-_-December-2025.pdf\u200b |"
   ],
   "builder_evidence": [
    "# Data center energy news trends \u2013 December 2025",
    "**Vantage** **\u201cFrontier****\u201d gigawatt campus (Texas)**",
    "Vantage Data Centers has broken ground on a 1.4GW \u201cFrontier\u201d hyperscale campus in Shackelford County, Texas, tied to Oracle and OpenAI\u2019s Stargate expansion."
   ],
   "ai_customer_evidence": [
    "# Data center energy news trends \u2013 December 2025",
    "| **Project / Company****** | **Location****** | **Capacity & Scale****** | **Energy / Power Angle****** | **Source****** |",
    "| Vantage \u201cFrontier\u201d campus | Shackelford County, Texas (US) | 1.4GW across 10 single\u2011story facilities, ~3.7m sq ft, >US$25bn investment | Mega\u2011campus scale implies very large incremental grid demand and long\u2011term power procurement linked to Oracle & OpenAI\u2019s Stargate expansion | Vantage breaks ground on Texas gigawatt data center campus for OpenAI (DCD, 15 Dec 2025)Monthly-North-America-Market-Intelligence-Report-_-December-2025.pdf\u200b |"
   ],
   "status_evidence": [
    "# Data center energy news trends \u2013 December 2025",
    "**Vantage** **\u201cFrontier****\u201d gigawatt campus (Texas)**",
    "Vantage Data Centers has broken ground on a 1.4GW \u201cFrontier\u201d hyperscale campus in Shackelford County, Texas, tied to Oracle and OpenAI\u2019s Stargate expansion."
   ],
   "announcement_date_evidence": [
    "# Data center energy news trends \u2013 December 2025",
    "| **Project / Company****** | **Location****** | **Capacity & Scale****** | **Energy / Power Angle****** | **Source****** |",
    "| Vantage \u201cFrontier\u201d campus | Shackelford County, Texas (US) | 1.4GW across 10 single\u2011story facilities, ~3.7m sq ft, >US$25bn investment | Mega\u2011campus scale implies very large incremental grid demand and long\u2011term power procurement linked to Oracle & OpenAI\u2019s Stargate expansion | Vantage breaks ground on Texas gigawatt data center campus for OpenAI (DCD, 15 Dec 2025)Monthly-North-America-Market-Intelligence-Report-_-December-2025.pdf\u200b |"
   ]
  },
  {
   "url": "https://mind2markets.com/us-data-center-energy-news-trend-december-2025",
   "title": "US Data Center Energy News Trend December 2025 Best Insights",
   "published_at": "2026-01-21T09:56:08",
   "project": "Panattoni Detroit\u2011area campus",
   "locality": "Detroit",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni",
   "ai_customer": null,
   "status": "targeting",
   "announcement_date": null,
   "project_evidence": [
    "# Data center energy news trends \u2013 December 2025",
    "**\u200bPanattoni****\u2019s 1GW Detroit****\u2011area campus**",
    "Panattoni is targeting a 1GW hyperscale data center campus on a 282\u2011acre site near I\u201194 and Haggerty Road outside Detroit, Michigan."
   ],
   "locality_evidence": [
    "# Data center energy news trends \u2013 December 2025",
    "**\u200bPanattoni****\u2019s 1GW Detroit****\u2011area campus**",
    "Panattoni is targeting a 1GW hyperscale data center campus on a 282\u2011acre site near I\u201194 and Haggerty Road outside Detroit, Michigan."
   ],
   "state_evidence": [
    "# Data center energy news trends \u2013 December 2025",
    "**\u200bPanattoni****\u2019s 1GW Detroit****\u2011area campus**",
    "Panattoni is targeting a 1GW hyperscale data center campus on a 282\u2011acre site near I\u201194 and Haggerty Road outside Detroit, Michigan."
   ],
   "capacity_gw_evidence": [
    "# Data center energy news trends \u2013 December 2025",
    "**\u200bPanattoni****\u2019s 1GW Detroit****\u2011area campus**",
    "Panattoni is targeting a 1GW hyperscale data center campus on a 282\u2011acre site near I\u201194 and Haggerty Road outside Detroit, Michigan."
   ],
   "builder_evidence": [
    "# Data center energy news trends \u2013 December 2025",
    "**\u200bPanattoni****\u2019s 1GW Detroit****\u2011area campus**",
    "Panattoni is targeting a 1GW hyperscale data center campus on a 282\u2011acre site near I\u201194 and Haggerty Road outside Detroit, Michigan."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Data center energy news trends \u2013 December 2025",
    "**\u200bPanattoni****\u2019s 1GW Detroit****\u2011area campus**",
    "Panattoni is targeting a 1GW hyperscale data center campus on a 282\u2011acre site near I\u201194 and Haggerty Road outside Detroit, Michigan."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://courthousenews.com/coal-fired-power-plant-now-retired-to-become-massive-gas-powered-campus-for-ai-data-centers",
   "title": "Coal-fired power plant, now retired, to become massive gas-powered campus for AI, data centers",
   "published_at": "2025-04-02T14:10:09",
   "project": "Homer City Generating Station",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Homer City Development",
   "ai_customer": null,
   "status": "Proposed",
   "announcement_date": "2026-08-26",
   "project_evidence": [
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "locality_evidence": [
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development.",
    "The project also would be the largest capital investment ever in Pennsylvania, said state Senate Majority Leader Joe Pittman, R-Indiana, whose district is home to Homer City."
   ],
   "state_evidence": [
    "HARRISBURG, Pa. (AP) \u2014 The owners of what was once Pennsylvania\u2019s biggest coal-fired power plant said Wednesday that they will turn it into a $10 billion natural gas-powered data center campus designed to capitalize on the [fast-growing energy demands](https://apnews.com/article/power-electricity-amazon-microsoft-power-plants-data-centers-grid-f4763f73bc112425e18f30618dff0039) of Big Tech companies to power artificial intelligence and cloud computing applications.",
    "The project also would be the largest capital investment ever in Pennsylvania, said state Senate Majority Leader Joe Pittman, R-Indiana, whose district is home to Homer City."
   ],
   "capacity_gw_evidence": [
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "builder_evidence": [
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The turbines ordered for the proposed plant, meanwhile, can run on a hydrogen blend.",
    "Construction is expected to begin this year and power could start flowing by 2027, the group said in a statement."
   ],
   "announcement_date_evidence": [
    "HARRISBURG, Pa. (AP) \u2014 The owners of what was once Pennsylvania\u2019s biggest coal-fired power plant said Wednesday that they will turn it into a $10 billion natural gas-powered data center campus designed to capitalize on the [fast-growing energy demands](https://apnews.com/article/power-electricity-amazon-microsoft-power-plants-data-centers-grid-f4763f73bc112425e18f30618dff0039) of Big Tech companies to power artificial intelligence and cloud computing applications."
   ]
  },
  {
   "url": "https://ad-hoc-news.de/boerse/news/unternehmensnachrichten/nscale-united-states-of-america-california/68828558",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated fr",
   "published_at": "2026-03-18T22:21:58",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "Acquired",
   "announcement_date": "2026-03-18",
   "project_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgridto build one of the world's largest AI Factories."
   ],
   "locality_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "capacity_gw_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The West Virginia campus is the first state-certified utility grid purpose-built for AI workloads in the United States."
   ],
   "builder_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgridto build one of the world's largest AI Factories."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgridto build one of the world's largest AI Factories."
   ],
   "announcement_date_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Ver\u00f6ffentlicht: 18.03.2026 um 23:21 Uhr, prnewswire.co.uk"
   ]
  },
  {
   "url": "https://thejobwalk.com/p/thejobwalk-e-86",
   "title": "TheJobWalk E.86",
   "published_at": "2026-07-30T16:00:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "## **Georgia Power to Supply 3.2GW for OpenAI's Project Camellia Campus**",
    "OpenAI has struck a [25-year power agreement](https://www.prnewswire.com/news-releases/georgia-power-to-serve-openai-project-in-effingham-county-302832224.html?utm_campaign=openai-s-3-200-mw-effingham-county-project-lands-georgia-power-as-utility-partner&utm_medium=referral&utm_source=thejobwalk.com) with Georgia Power to supply 3.2 GW of contracted capacity for a new data center campus in Effingham County, Georgia, known as [Project Camellia](https://projectcamellia.com/)."
   ],
   "locality_evidence": [
    "## **Georgia Power to Supply 3.2GW for OpenAI's Project Camellia Campus**",
    "OpenAI has struck a [25-year power agreement](https://www.prnewswire.com/news-releases/georgia-power-to-serve-openai-project-in-effingham-county-302832224.html?utm_campaign=openai-s-3-200-mw-effingham-county-project-lands-georgia-power-as-utility-partner&utm_medium=referral&utm_source=thejobwalk.com) with Georgia Power to supply 3.2 GW of contracted capacity for a new data center campus in Effingham County, Georgia, known as [Project Camellia](https://projectcamellia.com/)."
   ],
   "state_evidence": [
    "## **Georgia Power to Supply 3.2GW for OpenAI's Project Camellia Campus**",
    "OpenAI has struck a [25-year power agreement](https://www.prnewswire.com/news-releases/georgia-power-to-serve-openai-project-in-effingham-county-302832224.html?utm_campaign=openai-s-3-200-mw-effingham-county-project-lands-georgia-power-as-utility-partner&utm_medium=referral&utm_source=thejobwalk.com) with Georgia Power to supply 3.2 GW of contracted capacity for a new data center campus in Effingham County, Georgia, known as [Project Camellia](https://projectcamellia.com/)."
   ],
   "capacity_gw_evidence": [
    "## **Georgia Power to Supply 3.2GW for OpenAI's Project Camellia Campus**",
    "OpenAI has struck a [25-year power agreement](https://www.prnewswire.com/news-releases/georgia-power-to-serve-openai-project-in-effingham-county-302832224.html?utm_campaign=openai-s-3-200-mw-effingham-county-project-lands-georgia-power-as-utility-partner&utm_medium=referral&utm_source=thejobwalk.com) with Georgia Power to supply 3.2 GW of contracted capacity for a new data center campus in Effingham County, Georgia, known as [Project Camellia](https://projectcamellia.com/)."
   ],
   "builder_evidence": [
    "## **Georgia Power to Supply 3.2GW for OpenAI's Project Camellia Campus**",
    "OpenAI has struck a [25-year power agreement](https://www.prnewswire.com/news-releases/georgia-power-to-serve-openai-project-in-effingham-county-302832224.html?utm_campaign=openai-s-3-200-mw-effingham-county-project-lands-georgia-power-as-utility-partner&utm_medium=referral&utm_source=thejobwalk.com) with Georgia Power to supply 3.2 GW of contracted capacity for a new data center campus in Effingham County, Georgia, known as [Project Camellia](https://projectcamellia.com/)."
   ],
   "ai_customer_evidence": [
    "## **Georgia Power to Supply 3.2GW for OpenAI's Project Camellia Campus**",
    "OpenAI has struck a [25-year power agreement](https://www.prnewswire.com/news-releases/georgia-power-to-serve-openai-project-in-effingham-county-302832224.html?utm_campaign=openai-s-3-200-mw-effingham-county-project-lands-georgia-power-as-utility-partner&utm_medium=referral&utm_source=thejobwalk.com) with Georgia Power to supply 3.2 GW of contracted capacity for a new data center campus in Effingham County, Georgia, known as [Project Camellia](https://projectcamellia.com/)."
   ],
   "status_evidence": [
    "## **Georgia Power to Supply 3.2GW for OpenAI's Project Camellia Campus**",
    "The project is currently in the announced stage."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://thejobwalk.com/p/thejobwalk-e-86",
   "title": "TheJobWalk E.86",
   "published_at": "2026-07-30T16:00:00",
   "project": "Columbia County Data Center",
   "locality": "Augusta",
   "state": "Georgia",
   "capacity_gw": null,
   "builder": "Google",
   "ai_customer": "Google",
   "status": null,
   "announcement_date": "2026-07-23",
   "project_evidence": [
    "## **Georgia Lands a 23-Building Google Data Giant**** \u26a1**",
    "Google has been confirmed as the sole end-user and operator of the new Columbia County Data Center, a 1,900-acre, 23-building complex totaling 8 million square feet northwest of Augusta, Georgia."
   ],
   "locality_evidence": [
    "## **Georgia Lands a 23-Building Google Data Giant**** \u26a1**",
    "Google has been confirmed as the sole end-user and operator of the new Columbia County Data Center, a 1,900-acre, 23-building complex totaling 8 million square feet northwest of Augusta, Georgia."
   ],
   "state_evidence": [
    "## **Georgia Lands a 23-Building Google Data Giant**** \u26a1**",
    "Google has been confirmed as the sole end-user and operator of the new Columbia County Data Center, a 1,900-acre, 23-building complex totaling 8 million square feet northwest of Augusta, Georgia."
   ],
   "capacity_gw_evidence": null,
   "builder_evidence": [
    "## **Georgia Lands a 23-Building Google Data Giant**** \u26a1**",
    "Google has been confirmed as the sole end-user and operator of the new Columbia County Data Center, a 1,900-acre, 23-building complex totaling 8 million square feet northwest of Augusta, Georgia."
   ],
   "ai_customer_evidence": [
    "## **Georgia Lands a 23-Building Google Data Giant**** \u26a1**",
    "Google has been confirmed as the sole end-user and operator of the new Columbia County Data Center, a 1,900-acre, 23-building complex totaling 8 million square feet northwest of Augusta, Georgia."
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "## **Georgia Lands a 23-Building Google Data Giant**** \u26a1**",
    "Announced July 23 by county leaders alongside President Trump's Ratepayer Protection Pledge, the project includes Google's commitment to cover all energy costs."
   ]
  },
  {
   "url": "https://thejobwalk.com/p/thejobwalk-e-86",
   "title": "TheJobWalk E.86",
   "published_at": "2026-07-30T16:00:00",
   "project": null,
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hensel Phelps & JE Dunn",
   "ai_customer": "Meta",
   "status": null,
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "## **Meta and BlackRock Go Big in El Paso** \ud83d\udcb0",
    "Meta and BlackRock have formed a joint venture to develop a 1GW data center campus in El Paso, Texas, with total development costs of roughly $14 billion."
   ],
   "state_evidence": [
    "## **Meta and BlackRock Go Big in El Paso** \ud83d\udcb0",
    "Meta and BlackRock have formed a joint venture to develop a 1GW data center campus in El Paso, Texas, with total development costs of roughly $14 billion."
   ],
   "capacity_gw_evidence": [
    "## **Meta and BlackRock Go Big in El Paso** \ud83d\udcb0",
    "Meta and BlackRock have formed a joint venture to develop a 1GW data center campus in El Paso, Texas, with total development costs of roughly $14 billion."
   ],
   "builder_evidence": [
    "## **Meta and BlackRock Go Big in El Paso** \ud83d\udcb0",
    "**Contractors:** Hensel Phelps & JE Dunn"
   ],
   "ai_customer_evidence": [
    "## **Meta and BlackRock Go Big in El Paso** \ud83d\udcb0",
    "Meta and BlackRock have formed a joint venture to develop a 1GW data center campus in El Paso, Texas, with total development costs of roughly $14 billion."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://hoopshype.com/story/news/local/michigan/2026/03/17/google-weighs-joining-van-buren-township-data-center-project-dte-energy/89187228007",
   "title": "Google weighs joining Van Buren Township data center project",
   "published_at": "2026-03-17T12:02:32",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": "Google",
   "status": "seeking approval",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "The tech giant is evaluating whether it will get involved with [Project Cannoli, the hyperscale data center project advancing in the western Wayne County community](/story/news/local/wayne-county/2026/03/06/nda-nondisclosure-agreement-confidentiality-clues-panattoni-anchor-designs-van-buren-data-center/89016021007/), a Google spokesperson said in an email."
   ],
   "locality_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project."
   ],
   "state_evidence": [
    "MICHIGAN",
    "# Google weighs joining Van Buren Township data center project"
   ],
   "capacity_gw_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "The Cannoli Project hyperscale data center in Van Buren Township will demand 1 gigawatt of power, DTE Energy Corporate Communications Director Jill Wilmot said in an email."
   ],
   "builder_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "The data center project is being pushed by California real estate development firm Panattoni Development Co."
   ],
   "ai_customer_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project."
   ],
   "status_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project."
   ],
   "announcement_date_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "Updated March 17, 2026, 3:27 p.m. ET"
   ]
  },
  {
   "url": "https://blockspace.media/insight/terawulf-acquires-kentucky-ai-hpc-campus-2026",
   "title": "TeraWulf jumps 11% as data center firm announces 1 GW Kentucky campus - Blockspace",
   "published_at": "2026-05-26T13:34:05",
   "project": "Muskie Data Campus",
   "locality": "Eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf Inc.",
   "ai_customer": null,
   "status": "Acquired",
   "announcement_date": "2026-05-26",
   "project_evidence": [
    "TeraWulf jumps 11% as data center firm announces 1 GW Kentucky campus",
    "The company is calling the site the \u201cMuskie Data Campus\u201d and expects the first 500 MW to begin ramping in the second half of 2028, with an additional 500 MW targeted for the second half of 2030."
   ],
   "locality_evidence": [
    "TeraWulf Inc. (NASDAQ: WULF) announced on May 26 that it acquired a hyperscale high-performance computing development site in Eastern Kentucky capable of supporting more than 1 gigawatt of data center capacity.",
    "TeraWulf jumps 11% as data center firm announces 1 GW Kentucky campus"
   ],
   "state_evidence": [
    "TeraWulf jumps 11% as data center firm announces 1 GW Kentucky campus",
    "TeraWulf Inc. (NASDAQ: WULF) announced on May 26 that it acquired a hyperscale high-performance computing development site in Eastern Kentucky capable of supporting more than 1 gigawatt of data center capacity."
   ],
   "capacity_gw_evidence": [
    "TeraWulf jumps 11% as data center firm announces 1 GW Kentucky campus",
    "TeraWulf Inc. (NASDAQ: WULF) announced on May 26 that it acquired a hyperscale high-performance computing development site in Eastern Kentucky capable of supporting more than 1 gigawatt of data center capacity."
   ],
   "builder_evidence": [
    "TeraWulf jumps 11% as data center firm announces 1 GW Kentucky campus",
    "TeraWulf Inc. (NASDAQ: WULF) announced on May 26 that it acquired a hyperscale high-performance computing development site in Eastern Kentucky capable of supporting more than 1 gigawatt of data center capacity."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "TeraWulf jumps 11% as data center firm announces 1 GW Kentucky campus",
    "TeraWulf Inc. (NASDAQ: WULF) announced on May 26 that it acquired a hyperscale high-performance computing development site in Eastern Kentucky capable of supporting more than 1 gigawatt of data center capacity."
   ],
   "announcement_date_evidence": [
    "May 26, 2026",
    "TeraWulf jumps 11% as data center firm announces 1 GW Kentucky campus",
    "TeraWulf Inc. (NASDAQ: WULF) announced on May 26 that it acquired a hyperscale high-performance computing development site in Eastern Kentucky capable of supporting more than 1 gigawatt of data center capacity."
   ]
  },
  {
   "url": "https://investing.com/news/stock-market-news/hut-8-stock-surges-37-on-98-billion-ai-data-center-lease-93CH-4662864",
   "title": "Hut 8 stock surges 37% on $9.8 billion AI data center lease",
   "published_at": "2026-05-06T11:34:38",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "under development",
   "announcement_date": null,
   "project_evidence": [
    "Investing.com -- shares rose 37% Wednesday after the company announced a 15-year, $9.8 billion lease for 352 MW of IT capacity at its Beacon Point AI data center campus in Nueces County, Texas.",
    "Beacon Point represents the second AI data center campus commercialized under Hut 8\u2019s power-first, greenfield development model following River Bend."
   ],
   "locality_evidence": [
    "Investing.com -- shares rose 37% Wednesday after the company announced a 15-year, $9.8 billion lease for 352 MW of IT capacity at its Beacon Point AI data center campus in Nueces County, Texas."
   ],
   "state_evidence": [
    "Investing.com -- shares rose 37% Wednesday after the company announced a 15-year, $9.8 billion lease for 352 MW of IT capacity at its Beacon Point AI data center campus in Nueces County, Texas."
   ],
   "capacity_gw_evidence": [
    "The company has executed an interconnection agreement for 1,000 MW of utility capacity with American Electric Power (NASDAQ:AEP), with initial energization expected in the first quarter of 2027."
   ],
   "builder_evidence": [
    "Investing.com -- shares rose 37% Wednesday after the company announced a 15-year, $9.8 billion lease for 352 MW of IT capacity at its Beacon Point AI data center campus in Nueces County, Texas.",
    "The triple-net lease with a high-investment-grade tenant brings Hut 8\u2019s total contracted AI data center capacity to 597 MW with aggregate base-term contract value of approximately $16.8 billion.",
    "Beacon Point represents the second AI data center campus commercialized under Hut 8\u2019s power-first, greenfield development model following River Bend.",
    "Hut 8 is developing the campus through partnerships with Jacobs (NYSE:J) as EPCM lead and Vertiv Holdings Co (NYSE:VRT) supporting critical digital infrastructure systems."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Investing.com -- shares rose 37% Wednesday after the company announced a 15-year, $9.8 billion lease for 352 MW of IT capacity at its Beacon Point AI data center campus in Nueces County, Texas.",
    "Beacon Point represents the second AI data center campus commercialized under Hut 8\u2019s power-first, greenfield development model following River Bend."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://nasdaq.com/press-release/iren-announces-successful-energization-sweetwater-1-2026-05-01",
   "title": "IREN Announces Successful Energization of Sweetwater 1 | Nasdaq",
   "published_at": "2026-05-01T18:50:26",
   "project": "Sweetwater 1",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "IREN",
   "ai_customer": null,
   "status": "energized",
   "announcement_date": "2026-05-01",
   "project_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "capacity_gw_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "builder_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "announcement_date_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ]
  },
  {
   "url": "https://globalenergyindustrytoday.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy signs letter of intent with Creekstone Energy LLC to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Ray Conley, CEO of Creekstone, said, \"Creekstone designed the Delta Gigasite to be a net positive for Utah\u2014not just a facility that consumes resources, but one that contributes to the state's energy future."
   ],
   "capacity_gw_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://investorshub.advfn.com/boards/read_msg.aspx?message_id=175083973",
   "title": "Hydrogen-powered data center coming southeast Texas",
   "published_at": "2024-09-14T11:50:13",
   "project": "ECL Terrasite",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2024-09-25",
   "project_evidence": [
    "Hydrogen-powered data center coming southeast Texas Seth Kovar | Source: CW39 | Posted 09/13/2024 https://dash3.gridmonitor.com/news/articles/?id=10502 HOUSTON (KIAH) The ECL company calls it a world\u2019s first.",
    "The officially named ECL Terrasite project, described as the first fully sustainable 1GW AI Factory data center, is set to have a formal announcement from ECL on September 25."
   ],
   "locality_evidence": [
    "Hydrogen-powered data center coming southeast Texas Seth Kovar | Source: CW39 | Posted 09/13/2024 https://dash3.gridmonitor.com/news/articles/?id=10502 HOUSTON (KIAH) The ECL company calls it a world\u2019s first.",
    "It\u2019s building a data center near Houston that\u2019s powered by hydrogen."
   ],
   "state_evidence": [
    "Hydrogen-powered data center coming southeast Texas Seth Kovar | Source: CW39 | Posted 09/13/2024 https://dash3.gridmonitor.com/news/articles/?id=10502 HOUSTON (KIAH) The ECL company calls it a world\u2019s first.",
    "Hydrogen-powered data center coming southeast Texas"
   ],
   "capacity_gw_evidence": [
    "Hydrogen-powered data center coming southeast Texas Seth Kovar | Source: CW39 | Posted 09/13/2024 https://dash3.gridmonitor.com/news/articles/?id=10502 HOUSTON (KIAH) The ECL company calls it a world\u2019s first.",
    "The officially named ECL Terrasite project, described as the first fully sustainable 1GW AI Factory data center, is set to have a formal announcement from ECL on September 25."
   ],
   "builder_evidence": [
    "Hydrogen-powered data center coming southeast Texas Seth Kovar | Source: CW39 | Posted 09/13/2024 https://dash3.gridmonitor.com/news/articles/?id=10502 HOUSTON (KIAH) The ECL company calls it a world\u2019s first.",
    "The ECL company is constructing a groundbreaking data center near Houston that will be powered by hydrogen, marking a world-first in sustainable technological infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Hydrogen-powered data center coming southeast Texas Seth Kovar | Source: CW39 | Posted 09/13/2024 https://dash3.gridmonitor.com/news/articles/?id=10502 HOUSTON (KIAH) The ECL company calls it a world\u2019s first.",
    "The ECL company is constructing a groundbreaking data center near Houston that will be powered by hydrogen, marking a world-first in sustainable technological infrastructure."
   ],
   "announcement_date_evidence": [
    "Hydrogen-powered data center coming southeast Texas Seth Kovar | Source: CW39 | Posted 09/13/2024 https://dash3.gridmonitor.com/news/articles/?id=10502 HOUSTON (KIAH) The ECL company calls it a world\u2019s first.",
    "The officially named ECL Terrasite project, described as the first fully sustainable 1GW AI Factory data center, is set to have a formal announcement from ECL on September 25."
   ]
  },
  {
   "url": "https://chatai.com/posts/nvidia-and-openai-back-massive-8-gw-ai-data-center-project-in-ohio",
   "title": "Nvidia and OpenAI Back Massive 8-GW AI Data Center Project in Ohio",
   "published_at": "2026-08-17T17:15:18",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# Nvidia and OpenAI Back Massive 8-GW AI Data Center Project in Ohio",
    "Nvidia announced that it has secured land, power and data center shell capacity at SB Energy\u2019s PORTS-Pike Technology Campus in Pike County, Ohio, where OpenAI will use up to 8 IT-GW of AI computing capacity."
   ],
   "locality_evidence": [
    "# Nvidia and OpenAI Back Massive 8-GW AI Data Center Project in Ohio",
    "Nvidia announced that it has secured land, power and data center shell capacity at SB Energy\u2019s PORTS-Pike Technology Campus in Pike County, Ohio, where OpenAI will use up to 8 IT-GW of AI computing capacity."
   ],
   "state_evidence": [
    "# Nvidia and OpenAI Back Massive 8-GW AI Data Center Project in Ohio",
    "Nvidia announced that it has secured land, power and data center shell capacity at SB Energy\u2019s PORTS-Pike Technology Campus in Pike County, Ohio, where OpenAI will use up to 8 IT-GW of AI computing capacity."
   ],
   "capacity_gw_evidence": [
    "# Nvidia and OpenAI Back Massive 8-GW AI Data Center Project in Ohio",
    "Nvidia announced that it has secured land, power and data center shell capacity at SB Energy\u2019s PORTS-Pike Technology Campus in Pike County, Ohio, where OpenAI will use up to 8 IT-GW of AI computing capacity."
   ],
   "builder_evidence": [
    "# Nvidia and OpenAI Back Massive 8-GW AI Data Center Project in Ohio",
    "Nvidia announced that it has secured land, power and data center shell capacity at SB Energy\u2019s PORTS-Pike Technology Campus in Pike County, Ohio, where OpenAI will use up to 8 IT-GW of AI computing capacity.",
    "Nvidia will serve as the campus\u2019s exclusive AI compute infrastructure provider, while SB Energy will build, own and operate the data center under a 20-year lease with OpenAI."
   ],
   "ai_customer_evidence": [
    "# Nvidia and OpenAI Back Massive 8-GW AI Data Center Project in Ohio",
    "Nvidia announced that it has secured land, power and data center shell capacity at SB Energy\u2019s PORTS-Pike Technology Campus in Pike County, Ohio, where OpenAI will use up to 8 IT-GW of AI computing capacity.",
    "Nvidia will serve as the campus\u2019s exclusive AI compute infrastructure provider, while SB Energy will build, own and operate the data center under a 20-year lease with OpenAI."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://inforcapital.com/news/openai-stargates-milam-texas-freebird-data-center-to-span-548950-sq-ft-in-first-phase",
   "title": "OpenAI, SoftBank Fuel AI Infrastructure with Texas Data Hub",
   "published_at": "2026-04-23T00:13:28",
   "project": "Freebird",
   "locality": "Milam County",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "A significant expansion of artificial intelligence computing power is underway in Texas, with **OpenAI** and **SoftBank** driving the development of a massive data center campus dubbed 'Freebird' in Milam County.",
    "## Analysis"
   ],
   "locality_evidence": [
    "A significant expansion of artificial intelligence computing power is underway in Texas, with **OpenAI** and **SoftBank** driving the development of a massive data center campus dubbed 'Freebird' in Milam County.",
    "## Analysis"
   ],
   "state_evidence": [
    "A significant expansion of artificial intelligence computing power is underway in Texas, with **OpenAI** and **SoftBank** driving the development of a massive data center campus dubbed 'Freebird' in Milam County.",
    "## Analysis"
   ],
   "capacity_gw_evidence": [
    "The Milam County site is engineered to support approximately **1.2 gigawatts** of processing capacity.",
    "## Analysis"
   ],
   "builder_evidence": [
    "**SB Energy** is tasked with the construction and operational management of the Milam County facility, ensuring the seamless integration of power generation and computing infrastructure.",
    "## Analysis"
   ],
   "ai_customer_evidence": [
    "A significant expansion of artificial intelligence computing power is underway in Texas, with **OpenAI** and **SoftBank** driving the development of a massive data center campus dubbed 'Freebird' in Milam County.",
    "## Analysis"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://edgen.tech/ko/news/stock/blackrock-and-meta-form-14b-data-center-venture-in-texas",
   "title": "BlackRock and Meta form $14B data center venture in Texas",
   "published_at": "2026-07-28T09:41:43",
   "project": "El Paso campus",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "BlackRock Inc. and Meta Platforms Inc.",
   "ai_customer": "Meta",
   "status": "under development",
   "announcement_date": "2026-07-28",
   "project_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "# BlackRock and Meta form $14B data center venture in Texas",
    "The El Paso campus represents an investment of more than $10 billion from Meta alone, supporting over 4,000 construction jobs at peak and 300 permanent operational roles."
   ],
   "locality_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "# BlackRock and Meta form $14B data center venture in Texas",
    "- BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas."
   ],
   "state_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "# BlackRock and Meta form $14B data center venture in Texas",
    "- BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas."
   ],
   "capacity_gw_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "# BlackRock and Meta form $14B data center venture in Texas",
    "- BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas."
   ],
   "builder_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "# BlackRock and Meta form $14B data center venture in Texas",
    "**BlackRock Inc. and Meta Platforms Inc. are jointly developing a $14 billion data center campus in El Paso, Texas, marking the latest hyperscale infrastructure deal as technology companies race to secure capacity for artificial intelligence workloads.**"
   ],
   "ai_customer_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "# BlackRock and Meta form $14B data center venture in Texas",
    "Meta will enter into lease agreements with the venture for the entire campus, with a four-year initial term and four options to extend, providing flexibility over a potential 20-year period."
   ],
   "status_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "# BlackRock and Meta form $14B data center venture in Texas",
    "- BlackRock and Meta are jointly developing a $14 billion, 1-gigawatt data center campus in El Paso, Texas."
   ],
   "announcement_date_evidence": [
    "BlackRock and Meta form $14B data center venture in Texas",
    "# BlackRock and Meta form $14B data center venture in Texas",
    "[![Rachel Kim](https://static.edgen.tech/authors/rachel-kim.png?image_process=resize,w_32/quality,q_75/format,webp/sharpen,100)\n## Rachel Kim](https://www.edgen.tech/ko/author/news/rachel-kim)\u00b7Jul 28 2026, 09:41"
   ]
  },
  {
   "url": "https://sonsofthunderwelding.com/industries/data-centers",
   "title": "The 2026 Data Center Construction Boom \u2014 Where Welding Fits",
   "published_at": null,
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "AWS",
   "ai_customer": null,
   "status": "targeting ~1 GW online",
   "announcement_date": null,
   "project_evidence": [
    "# Inside the 2026 Data Center Boom",
    "## Why Northwest Indiana is ground zero",
    "AWS's \"Project Rainier\" in New Carlisle is an ~$11B campus targeting ~1 GW online; a November 2025 AWS commitment adds ~$15B in new Northwest Indiana campuses, and Meta broke ground on a ~$10B Indiana data center in early 2026."
   ],
   "locality_evidence": [
    "# Inside the 2026 Data Center Boom",
    "## Why Northwest Indiana is ground zero",
    "AWS's \"Project Rainier\" in New Carlisle is an ~$11B campus targeting ~1 GW online; a November 2025 AWS commitment adds ~$15B in new Northwest Indiana campuses, and Meta broke ground on a ~$10B Indiana data center in early 2026."
   ],
   "state_evidence": [
    "# Inside the 2026 Data Center Boom",
    "## Why Northwest Indiana is ground zero",
    "AWS's \"Project Rainier\" in New Carlisle is an ~$11B campus targeting ~1 GW online; a November 2025 AWS commitment adds ~$15B in new Northwest Indiana campuses, and Meta broke ground on a ~$10B Indiana data center in early 2026."
   ],
   "capacity_gw_evidence": [
    "# Inside the 2026 Data Center Boom",
    "## Why Northwest Indiana is ground zero",
    "AWS's \"Project Rainier\" in New Carlisle is an ~$11B campus targeting ~1 GW online; a November 2025 AWS commitment adds ~$15B in new Northwest Indiana campuses, and Meta broke ground on a ~$10B Indiana data center in early 2026."
   ],
   "builder_evidence": [
    "# Inside the 2026 Data Center Boom",
    "## Why Northwest Indiana is ground zero",
    "AWS's \"Project Rainier\" in New Carlisle is an ~$11B campus targeting ~1 GW online; a November 2025 AWS commitment adds ~$15B in new Northwest Indiana campuses, and Meta broke ground on a ~$10B Indiana data center in early 2026."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Inside the 2026 Data Center Boom",
    "## Why Northwest Indiana is ground zero",
    "AWS's \"Project Rainier\" in New Carlisle is an ~$11B campus targeting ~1 GW online; a November 2025 AWS commitment adds ~$15B in new Northwest Indiana campuses, and Meta broke ground on a ~$10B Indiana data center in early 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mtshastanews.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Colossus 2",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 1.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "Active construction still on site",
   "announcement_date": "2025-03-01",
   "project_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "The company is developing three primary campuses: Colossus, Colossus 2 and Macrohardrr.",
    "## Colossus 2 | Tulane Road, Memphis"
   ],
   "locality_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "The company is developing three primary campuses: Colossus, Colossus 2 and Macrohardrr.",
    "## Colossus 2 | Tulane Road, Memphis"
   ],
   "state_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "It has been a very [busy 18 months for Elon Musk's xAI](https://www.commercialappeal.com/story/money/business/development/2025/06/05/elon-musk-xai-supercomputer-grok-memphis-tn/83599473007/) since the company first announced plans for its Memphis data center in June 2024.",
    "## Colossus 2 | Tulane Road, Memphis"
   ],
   "capacity_gw_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "The company is developing three primary campuses: Colossus, Colossus 2 and Macrohardrr.",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](https://www.commercialappeal.com/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "builder_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Elon Musk's xAI has acquired over 1,156 acres of land in the Memphis area for its data centers.",
    "## Colossus 2 | Tulane Road, Memphis"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "Colossus 2 is a bit more straightforward than the Paul R. Lowry Road complex.",
    "The Tulane Road site is an artificial intelligence data center, with active construction still on site."
   ],
   "announcement_date_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "In March 2025, the Greater Memphis Chamber announced xAI's plans for a second campus and its purchase of a 1 million-square-foot building."
   ]
  },
  {
   "url": "https://mtshastanews.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Macrohardrr",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": "2026-01-08",
   "project_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "The company is developing three primary campuses: Colossus, Colossus 2 and Macrohardrr.",
    "## Marcrohardrr | Southaven"
   ],
   "locality_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "The company is developing three primary campuses: Colossus, Colossus 2 and Macrohardrr.",
    "## Marcrohardrr | Southaven",
    "This is the third and most recent xAI campus."
   ],
   "state_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "In July 2025, MZX Tech LLC, an xAI affiliate, purchased the[ power plant and corresponding 114.49 acres of land surrounding the facility](https://www.commercialappeal.com/story/money/business/development/2025/07/18/xai-elon-musk-company-buys-southaven-mississippi-property-colossus-2-memphis-tn/85274193007/)."
   ],
   "capacity_gw_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "builder_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Elon Musk's xAI has acquired over 1,156 acres of land in the Memphis area for its data centers.",
    "## Marcrohardrr | Southaven"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "The former Duke Energy site has been under construction with gas turbines on site for powering xAI data centers."
   ],
   "announcement_date_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](https://www.commercialappeal.com/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ]
  },
  {
   "url": "https://panhandleregionalnews.com/category/childress",
   "title": "Childress \u2013 Panhandle Regional News",
   "published_at": "2026-07-16T10:52:25",
   "project": null,
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-07-16",
   "project_evidence": null,
   "locality_evidence": [
    "# Category: Childress",
    "Crusoe, an AI factory company in partnership with Lancium, an energy technology and infrastructure company, is planning to develop a 1 GW AI data center campus in Childress, Texas."
   ],
   "state_evidence": [
    "# Category: Childress",
    "Crusoe, an AI factory company in partnership with Lancium, an energy technology and infrastructure company, is planning to develop a 1 GW AI data center campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "# Category: Childress",
    "Crusoe, an AI factory company in partnership with Lancium, an energy technology and infrastructure company, is planning to develop a 1 GW AI data center campus in Childress, Texas."
   ],
   "builder_evidence": [
    "# Category: Childress",
    "Crusoe, an AI factory company in partnership with Lancium, an energy technology and infrastructure company, is planning to develop a 1 GW AI data center campus in Childress, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Category: Childress",
    "Crusoe, an AI factory company in partnership with Lancium, an energy technology and infrastructure company, is planning to develop a 1 GW AI data center campus in Childress, Texas."
   ],
   "announcement_date_evidence": [
    "# Category: Childress",
    "## [Crusoe and Lancium plan to build a new AI data center in Childress, Texas](https://panhandleregionalnews.com/2026/07/16/crusoe-and-lancium-plan-to-build-a-new-ai-data-center-in-childress-texas/)"
   ]
  },
  {
   "url": "https://ainvest.com/news/digitalbridge-backed-vantage-data-centers-launches-25-billion-texas-frontier-campus-2508",
   "title": "DigitalBridge-Backed Vantage Data Centers Launches $25 Billion Texas Frontier Campus",
   "published_at": "2025-08-19T11:09:02",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Construction has already begun, with the first building scheduled for delivery in the second half of 2026",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "DigitalBridge-backed Vantage Data Centers is launching a $25 billion, 1.4GW hyperscale data center campus in Shackelford County, Texas, as part of its largest project to date.",
    "The new campus, named Frontier, is set to be a cornerstone in the rapidly growing Texas AI hub, supporting global hyperscale customers and bringing significant economic benefits to the region [1]."
   ],
   "locality_evidence": [
    "DigitalBridge-backed Vantage Data Centers is launching a $25 billion, 1.4GW hyperscale data center campus in Shackelford County, Texas, as part of its largest project to date."
   ],
   "state_evidence": [
    "DigitalBridge-backed Vantage Data Centers is launching a $25 billion, 1.4GW hyperscale data center campus in Shackelford County, Texas, as part of its largest project to date."
   ],
   "capacity_gw_evidence": [
    "DigitalBridge-backed Vantage Data Centers is launching a $25 billion, 1.4GW hyperscale data center campus in Shackelford County, Texas, as part of its largest project to date."
   ],
   "builder_evidence": [
    "DigitalBridge-backed Vantage Data Centers is launching a $25 billion, 1.4GW hyperscale data center campus in Shackelford County, Texas, as part of its largest project to date."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction has already begun, with the first building scheduled for delivery in the second half of 2026 [1]."
   ],
   "announcement_date_evidence": [
    "Tuesday, Aug 19, 2025 7:09 am ET1min read DBRG--"
   ]
  },
  {
   "url": "https://lubbockonline.com/story/news/local/2026/08/11/fermi-project-matador-ai-campus-near-amarillo-gets-first-tenant-lease-agreement-tensor-wave/91029237007",
   "title": "Project Matador AI campus near Amarillo gets first announced tenant",
   "published_at": "2026-08-11T17:00:22",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 17.0,
   "builder": "Fermi America",
   "ai_customer": "TensorWave",
   "status": "under construction",
   "announcement_date": "2025-06-27",
   "project_evidence": [
    "# Fermi announces $6.5B lease agreement at Project Matador AI campus",
    "On Aug. 10, [Fermi America](https://www.amarillo.com/story/news/2026/04/20/fermi-america-makes-leadership-changes-plans-new-dallas-headquarters/89700478007/) announced a binding lease agreement with its first tenant, TensorWave, at the [Project Matador](https://www.amarillo.com/story/news/2025/06/27/fermi-america-and-texas-tech-university-unveil-plans-for-11-billion-hypergrid-ai-campus/84377449007/) site in Carson County."
   ],
   "locality_evidence": [
    "Amid other announced data center projects, concerns and controversies, progress is quietly continuing on a massive site in the Texas Panhandle near Amarillo."
   ],
   "state_evidence": [
    "Amid other announced data center projects, concerns and controversies, progress is quietly continuing on a massive site in the Texas Panhandle near Amarillo.",
    "The Texas Tech University System-Fermi partnership is delivering on the bold vision behind Project Matador"
   ],
   "capacity_gw_evidence": [
    "# Fermi announces $6.5B lease agreement at Project Matador AI campus",
    "Fermi said approximately 6 GW of the planned 17 GW are already permitted for the 7,570-acre campus being built in the Panhandle."
   ],
   "builder_evidence": [
    "# Fermi announces $6.5B lease agreement at Project Matador AI campus",
    "On Aug. 10, [Fermi America](https://www.amarillo.com/story/news/2026/04/20/fermi-america-makes-leadership-changes-plans-new-dallas-headquarters/89700478007/) announced a binding lease agreement with its first tenant, TensorWave, at the [Project Matador](https://www.amarillo.com/story/news/2025/06/27/fermi-america-and-texas-tech-university-unveil-plans-for-11-billion-hypergrid-ai-campus/84377449007/) site in Carson County."
   ],
   "ai_customer_evidence": [
    "# Fermi announces $6.5B lease agreement at Project Matador AI campus",
    "On Aug. 10, [Fermi America](https://www.amarillo.com/story/news/2026/04/20/fermi-america-makes-leadership-changes-plans-new-dallas-headquarters/89700478007/) announced a binding lease agreement with its first tenant, TensorWave, at the [Project Matador](https://www.amarillo.com/story/news/2025/06/27/fermi-america-and-texas-tech-university-unveil-plans-for-11-billion-hypergrid-ai-campus/84377449007/) site in Carson County."
   ],
   "status_evidence": [
    "# Fermi announces $6.5B lease agreement at Project Matador AI campus",
    "Fermi said it continues to advance discussions with additional hyperscale, neo-cloud and enterprise compute counterparties for capacity at its massive AI data center campus and hypergrid under construction, along with development, construction, and financing partners."
   ],
   "announcement_date_evidence": [
    "# Fermi announces $6.5B lease agreement at Project Matador AI campus",
    "On Aug. 10, [Fermi America](https://www.amarillo.com/story/news/2026/04/20/fermi-america-makes-leadership-changes-plans-new-dallas-headquarters/89700478007/) announced a binding lease agreement with its first tenant, TensorWave, at the [Project Matador](https://www.amarillo.com/story/news/2025/06/27/fermi-america-and-texas-tech-university-unveil-plans-for-11-billion-hypergrid-ai-campus/84377449007/) site in Carson County."
   ]
  },
  {
   "url": "https://prnewswire.com/news-releases/nscale-and-microsoft-announce-collaboration-with-nvidia-and-caterpillar-to-deliver-1-35gw-of-nvidia-vera-rubin-nvl72-gpus-at-flagship-ai-factory-campus-in-west-virginia-302715220.html",
   "title": "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
   "published_at": "2026-03-16T21:30:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "announced",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid*",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ],
   "locality_evidence": [
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "state_evidence": [
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "capacity_gw_evidence": [
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid*"
   ],
   "builder_evidence": [
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "ai_customer_evidence": [
    "- *Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs*"
   ],
   "status_evidence": [
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ],
   "announcement_date_evidence": [
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA's next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ]
  },
  {
   "url": "https://byteseu.com/1996453",
   "title": "Kevin O&#039;Leary Data Center Approved in Box Elder, Utah - Bytes Europe",
   "published_at": "2026-05-06T19:04:28",
   "project": "Stratos Project Area",
   "locality": "Hansel Valley",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O\u2019Leary Digital",
   "ai_customer": null,
   "status": "cleared its first regulatory hurdle",
   "announcement_date": null,
   "project_evidence": [
    "A 40,000-acre hyperscale data center and power generation campus cleared its first regulatory hurdle in northern Utah this week.",
    "**The Box Elder County Commission voted on May 4 to authorize the Military Installation Development Authority (MIDA) to establish the Stratos Project Area in Hansel Valley**, approximately 60 square miles of privately held vacant land in unincorporated western Box Elder County."
   ],
   "locality_evidence": [
    "A 40,000-acre hyperscale data center and power generation campus cleared its first regulatory hurdle in northern Utah this week.",
    "**The Box Elder County Commission voted on May 4 to authorize the Military Installation Development Authority (MIDA) to establish the Stratos Project Area in Hansel Valley**, approximately 60 square miles of privately held vacant land in unincorporated western Box Elder County."
   ],
   "state_evidence": [
    "A 40,000-acre hyperscale data center and power generation campus cleared its first regulatory hurdle in northern Utah this week.",
    "At Phase 1, the commitment is 3 gigawatts; full buildout targets 9 GW in Utah as part of a broader 15 GW multi-site strategy."
   ],
   "capacity_gw_evidence": [
    "A 40,000-acre hyperscale data center and power generation campus cleared its first regulatory hurdle in northern Utah this week.",
    "At Phase 1, the commitment is 3 gigawatts; full buildout targets 9 GW in Utah as part of a broader 15 GW multi-site strategy."
   ],
   "builder_evidence": [
    "A 40,000-acre hyperscale data center and power generation campus cleared its first regulatory hurdle in northern Utah this week.",
    "Developed through [O\u2019Leary Digital](https://olearyventures.com/), the project is designed to become one of the largest data center and power generation campuses in the country."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "A 40,000-acre hyperscale data center and power generation campus cleared its first regulatory hurdle in northern Utah this week."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://newsbreak.com/news/4789454299083-openai-plans-3-2-gw-project-camellia-data-center-in-georgia",
   "title": "OpenAI Plans 3.2-GW Project Camellia Data Center in Georgia - NewsBreak",
   "published_at": "2026-07-24T15:55:44",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "designing and developing",
   "announcement_date": null,
   "project_evidence": [
    "OpenAI announced Project Camellia, a long-term data center campus in Effingham County, Georgia.",
    "Project Camellia is a long-term data center project that OpenAI is designing and developing in Effingham County, Georgia."
   ],
   "locality_evidence": [
    "OpenAI announced Project Camellia, a long-term data center campus in Effingham County, Georgia.",
    "Project Camellia is a long-term data center project that OpenAI is designing and developing in Effingham County, Georgia."
   ],
   "state_evidence": [
    "OpenAI announced Project Camellia, a long-term data center campus in Effingham County, Georgia.",
    "Project Camellia is a long-term data center project that OpenAI is designing and developing in Effingham County, Georgia."
   ],
   "capacity_gw_evidence": [
    "To support the data center, we are contracting with Georgia Power Company for 3.2 gigawatts of power which will be delivered in phases between 2028 and 2032."
   ],
   "builder_evidence": [
    "OpenAI announced Project Camellia, a long-term data center campus in Effingham County, Georgia.",
    "Project Camellia is a long-term data center project that OpenAI is designing and developing in Effingham County, Georgia."
   ],
   "ai_customer_evidence": [
    "OpenAI announced Project Camellia, a long-term data center campus in Effingham County, Georgia.",
    "Project Camellia is a long-term data center project that OpenAI is designing and developing in Effingham County, Georgia."
   ],
   "status_evidence": [
    "Project Camellia is a long-term data center project that OpenAI is designing and developing in Effingham County, Georgia."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://hoopshype.com/story/money/business/2026/03/17/google-reveals-project-cannoli-data-center/89185890007",
   "title": "Google reveals it is behind big 'Project Cannoli' data center project",
   "published_at": "2026-03-17T12:02:18",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "locality_evidence": [
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\"",
    "Google reveals it is behind big 'Project Cannoli' data center project"
   ],
   "state_evidence": [
    "Google also said Tuesday that it is creating a $10 million Energy Impact Fund for local organizations to tap into with the aim of lowering monthly utility bills for Michiganders.",
    "Google reveals it is behind big 'Project Cannoli' data center project"
   ],
   "capacity_gw_evidence": [
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to.",
    "Google reveals it is behind big 'Project Cannoli' data center project"
   ],
   "builder_evidence": [
    "The data center would be developed for Google by Panattoni Development Co.",
    "Google reveals it is behind big 'Project Cannoli' data center project"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to.",
    "Google reveals it is behind big 'Project Cannoli' data center project"
   ],
   "announcement_date_evidence": [
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to.",
    "Google reveals it is behind big 'Project Cannoli' data center project"
   ]
  },
  {
   "url": "https://cryptodunia.in/terawulf-acquires-1-gw-kentucky-ai-data-center-site-shares-jump-11",
   "title": "TeraWulf Acquires 1 GW Kentucky AI Data Center Site, Shares Jump 11% - Crypto Dunia",
   "published_at": "2026-05-26T20:21:00",
   "project": "Muskie Data Campus",
   "locality": "northeastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# TeraWulf Acquires 1 GW Kentucky AI Data Center Site, Shares Jump 11%",
    "The brand new \u201cMuskie Data Campus,\u201d bought from Industrial Fairness Companions, sits inside the 1,000-acre EastPark Industrial Park in northeastern Kentucky and encompasses roughly 285 acres of owned and managed land."
   ],
   "locality_evidence": [
    "# TeraWulf Acquires 1 GW Kentucky AI Data Center Site, Shares Jump 11%",
    "The brand new \u201cMuskie Data Campus,\u201d bought from Industrial Fairness Companions, sits inside the 1,000-acre EastPark Industrial Park in northeastern Kentucky and encompasses roughly 285 acres of owned and managed land."
   ],
   "state_evidence": [
    "# TeraWulf Acquires 1 GW Kentucky AI Data Center Site, Shares Jump 11%",
    "TeraWulf Inc. (Nasdaq: WULF) introduced Tuesday the acquisition of a hyperscale information heart improvement web site in jap Kentucky, a transfer that despatched shares climbing 14% at instances at the moment as traders responded to the corporate\u2019s deepening push into synthetic intelligence and high-performance computing infrastructure.",
    "The brand new \u201cMuskie Data Campus,\u201d bought from Industrial Fairness Companions, sits inside the 1,000-acre EastPark Industrial Park in northeastern Kentucky and encompasses roughly 285 acres of owned and managed land."
   ],
   "capacity_gw_evidence": [
    "# TeraWulf Acquires 1 GW Kentucky AI Data Center Site, Shares Jump 11%",
    "The positioning is predicted to assist greater than 1 gigawatt of AI and HPC capability \u2014 sufficient to energy roughly 750,000 properties."
   ],
   "builder_evidence": [
    "# TeraWulf Acquires 1 GW Kentucky AI Data Center Site, Shares Jump 11%",
    "TeraWulf Inc. (Nasdaq: WULF) introduced Tuesday the acquisition of a hyperscale information heart improvement web site in jap Kentucky, a transfer that despatched shares climbing 14% at instances at the moment as traders responded to the corporate\u2019s deepening push into synthetic intelligence and high-performance computing infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# TeraWulf Acquires 1 GW Kentucky AI Data Center Site, Shares Jump 11%",
    "TeraWulf Inc. (Nasdaq: WULF) introduced Tuesday the acquisition of a hyperscale information heart improvement web site in jap Kentucky, a transfer that despatched shares climbing 14% at instances at the moment as traders responded to the corporate\u2019s deepening push into synthetic intelligence and high-performance computing infrastructure."
   ],
   "announcement_date_evidence": [
    "# TeraWulf Acquires 1 GW Kentucky AI Data Center Site, Shares Jump 11%",
    "By / May 27, 2026 / 3 minutes of reading",
    "TeraWulf Inc. (Nasdaq: WULF) introduced Tuesday the acquisition of a hyperscale information heart improvement web site in jap Kentucky, a transfer that despatched shares climbing 14% at instances at the moment as traders responded to the corporate\u2019s deepening push into synthetic intelligence and high-performance computing infrastructure."
   ]
  },
  {
   "url": "https://usdatacenterprojects.com/texas/jacobs-wins-sole-source-epcm-contract-for-hut-8-beacon-point-ai-data-center-campus",
   "title": "Jacobs Wins Sole-Source EPCM Contract for Hut 8's Beacon Point AI Data Center Campus",
   "published_at": "2026-05-14T09:37:38",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Jacobs",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Jacobs (a global professional services company) has been awarded a sole-source engineering, procurement, and construction management contract by Hut 8 (data center company)to deliver the company's second AI data center campus in the United States, a multi-phase development in Nueces County, Texas, designed to support one gigawatt of total capacity.",
    "The Beacon Point award represents a follow-on scope to Jacobs' previously announced EPCM role at Hut 8's River Bend campus in Louisiana."
   ],
   "locality_evidence": [
    "Jacobs (a global professional services company) has been awarded a sole-source engineering, procurement, and construction management contract by Hut 8 (data center company)to deliver the company's second AI data center campus in the United States, a multi-phase development in Nueces County, Texas, designed to support one gigawatt of total capacity."
   ],
   "state_evidence": [
    "Jacobs (a global professional services company) has been awarded a sole-source engineering, procurement, and construction management contract by Hut 8 (data center company)to deliver the company's second AI data center campus in the United States, a multi-phase development in Nueces County, Texas, designed to support one gigawatt of total capacity."
   ],
   "capacity_gw_evidence": [
    "Jacobs (a global professional services company) has been awarded a sole-source engineering, procurement, and construction management contract by Hut 8 (data center company)to deliver the company's second AI data center campus in the United States, a multi-phase development in Nueces County, Texas, designed to support one gigawatt of total capacity."
   ],
   "builder_evidence": [
    "Jacobs (a global professional services company) has been awarded a sole-source engineering, procurement, and construction management contract by Hut 8 (data center company)to deliver the company's second AI data center campus in the United States, a multi-phase development in Nueces County, Texas, designed to support one gigawatt of total capacity."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Jacobs is advancing design, integrated procurement, and construction management to support phased delivery of the Beacon Point campus.",
    "Initial energization and commissioning are targeted for 2027."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://business.woonsocketcall.com/woonsocketcall/article/gnwcq-2025-3-17-iren-secures-275gw-for-data-centers-in-west-texas-with-new-600mw-grid-connection-agreement",
   "title": "IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
   "published_at": "2025-03-17T11:20:38",
   "project": "Sweetwater",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "advancing",
   "announcement_date": "2025-03-17",
   "project_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas.",
    "Sweetwater 2: Key Highlights"
   ],
   "locality_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas.",
    "Sweetwater 2: Key Highlights"
   ],
   "state_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas.",
    "Sweetwater 2: Key Highlights"
   ],
   "capacity_gw_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas.",
    "Sweetwater 2: Key Highlights"
   ],
   "builder_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas.",
    "Sweetwater 2: Key Highlights"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas.",
    "Sweetwater 2: Key Highlights"
   ],
   "announcement_date_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas.",
    "Sweetwater 2: Key Highlights"
   ]
  },
  {
   "url": "https://weeklyvoice.com/enchant-energy-offers-a-carbon-answer-to-americas-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America\u2019s Surging AI Data Center Demand",
   "published_at": "2026-05-27T20:36:33",
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "locality_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "state_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "capacity_gw_evidence": [
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "announcement_date_evidence": [
    "DELTA, UT, UNITED STATES, May 27, 2026 /[EINPresswire.com](https://www.einpresswire.com/)/ \u2014 Enchant Energy Offers a Carbon Answer to America's Surging AI [Data Center](https://enchantenergy.com/enchant-energy-in-brief/) Demand"
   ]
  },
  {
   "url": "https://power-to-x.com/tag/edge-cloud-link",
   "title": "Power-to-X",
   "published_at": null,
   "project": "TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Edge Cloud Link Inc.",
   "ai_customer": null,
   "status": "plans to build",
   "announcement_date": "2024-10-01",
   "project_evidence": [
    "## [ECL builds a hydrogen-powered data center with 1 GW capacity](https://power-to-x.com/ecl-builds-a-hydrogen-powered-data-center-with-1-GW-capacity/)",
    "The project, called \"TerraSite-TX1\", is being built east of Houston, Texas, on an area..."
   ],
   "locality_evidence": [
    "## [ECL builds a hydrogen-powered data center with 1 GW capacity](https://power-to-x.com/ecl-builds-a-hydrogen-powered-data-center-with-1-GW-capacity/)",
    "The project, called \"TerraSite-TX1\", is being built east of Houston, Texas, on an area..."
   ],
   "state_evidence": [
    "## [ECL builds a hydrogen-powered data center with 1 GW capacity](https://power-to-x.com/ecl-builds-a-hydrogen-powered-data-center-with-1-GW-capacity/)",
    "The project, called \"TerraSite-TX1\", is being built east of Houston, Texas, on an area..."
   ],
   "capacity_gw_evidence": [
    "## [ECL builds a hydrogen-powered data center with 1 GW capacity](https://power-to-x.com/ecl-builds-a-hydrogen-powered-data-center-with-1-GW-capacity/)",
    "(Mountain View / USA) \u2013 California-based Edge Cloud Link Inc. (ECL) plans to build a hydrogen-powered data center with a capacity of one gigawatt."
   ],
   "builder_evidence": [
    "## [ECL builds a hydrogen-powered data center with 1 GW capacity](https://power-to-x.com/ecl-builds-a-hydrogen-powered-data-center-with-1-GW-capacity/)",
    "(Mountain View / USA) \u2013 California-based Edge Cloud Link Inc. (ECL) plans to build a hydrogen-powered data center with a capacity of one gigawatt."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "## [ECL builds a hydrogen-powered data center with 1 GW capacity](https://power-to-x.com/ecl-builds-a-hydrogen-powered-data-center-with-1-GW-capacity/)",
    "(Mountain View / USA) \u2013 California-based Edge Cloud Link Inc. (ECL) plans to build a hydrogen-powered data center with a capacity of one gigawatt."
   ],
   "announcement_date_evidence": [
    "## [ECL builds a hydrogen-powered data center with 1 GW capacity](https://power-to-x.com/ecl-builds-a-hydrogen-powered-data-center-with-1-GW-capacity/)",
    "By | October 1, 2024 | [Research & Technology](https://power-to-x.com/category/technology/)"
   ]
  },
  {
   "url": "https://investor.nvidia.com/news/press-release-details/2026/NVIDIA-Guarantees-SB-Energys-PORTS-Pike-Technology-Campus-in-Ohio-to-Exclusively-Host-NVIDIA-AI-Compute",
   "title": "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
   "published_at": null,
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "SB Energy\u2019s [PORTS-Pike Technology Campus](https://portscampus.com/) is reindustrializing the decommissioned Portsmouth Gaseous Diffusion Plant and the surrounding area, bringing a new generation of jobs to Appalachian Ohio, while creating an opportunity for the region to play an important role in the next era of American industry.",
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 (GLOBE NEWSWIRE) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "locality_evidence": [
    "SB Energy\u2019s [PORTS-Pike Technology Campus](https://portscampus.com/) is reindustrializing the decommissioned Portsmouth Gaseous Diffusion Plant and the surrounding area, bringing a new generation of jobs to Appalachian Ohio, while creating an opportunity for the region to play an important role in the next era of American industry.",
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 (GLOBE NEWSWIRE) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "state_evidence": [
    "SB Energy\u2019s [PORTS-Pike Technology Campus](https://portscampus.com/) is reindustrializing the decommissioned Portsmouth Gaseous Diffusion Plant and the surrounding area, bringing a new generation of jobs to Appalachian Ohio, while creating an opportunity for the region to play an important role in the next era of American industry.",
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 (GLOBE NEWSWIRE) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "capacity_gw_evidence": [
    "In support of the surrounding Ohio community, SB Energy and SoftBank will build at least 10 GW of new energy generation, which results in 8 IT-GW of AI factory capacity, and invest at least $4.2 billion in new regional grid infrastructure through an innovative partnership with AEP Ohio designed to protect ratepayers.",
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 (GLOBE NEWSWIRE) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "builder_evidence": [
    "SB Energy will build, own and operate the data center under a 20-year lease to OpenAI.",
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 (GLOBE NEWSWIRE) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "ai_customer_evidence": [
    "OpenAI will be the customer for 8-IT GW",
    "OpenAI will be the customer.",
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 (GLOBE NEWSWIRE) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "status_evidence": [
    "The planned capacity is expected to come online in phases beginning in 2028.",
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 (GLOBE NEWSWIRE) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "announcement_date_evidence": [
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 (GLOBE NEWSWIRE) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ]
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "Meta Hyperion AI Data Center (Louisiana)",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta, Entergy Louisiana",
   "ai_customer": "",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Hyperion AI Data Center (Louisiana)](/datacenters/meta-hyperion-ai-data-center-louisiana.html) | [Meta](/operators/meta/)[Entergy Louisiana](/operators/entergy-louisiana/) | [United States](/countries/united-states/) Richland Parish, Louisiana | 5,000 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 3 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Hyperion AI Data Center (Louisiana)](/datacenters/meta-hyperion-ai-data-center-louisiana.html) | [Meta](/operators/meta/)[Entergy Louisiana](/operators/entergy-louisiana/) | [United States](/countries/united-states/) Richland Parish, Louisiana | 5,000 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 3 |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Hyperion AI Data Center (Louisiana)](/datacenters/meta-hyperion-ai-data-center-louisiana.html) | [Meta](/operators/meta/)[Entergy Louisiana](/operators/entergy-louisiana/) | [United States](/countries/united-states/) Richland Parish, Louisiana | 5,000 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 3 |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Hyperion AI Data Center (Louisiana)](/datacenters/meta-hyperion-ai-data-center-louisiana.html) | [Meta](/operators/meta/)[Entergy Louisiana](/operators/entergy-louisiana/) | [United States](/countries/united-states/) Richland Parish, Louisiana | 5,000 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 3 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Hyperion AI Data Center (Louisiana)](/datacenters/meta-hyperion-ai-data-center-louisiana.html) | [Meta](/operators/meta/)[Entergy Louisiana](/operators/entergy-louisiana/) | [United States](/countries/united-states/) Richland Parish, Louisiana | 5,000 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 3 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Hyperion AI Data Center (Louisiana)](/datacenters/meta-hyperion-ai-data-center-louisiana.html) | [Meta](/operators/meta/)[Entergy Louisiana](/operators/entergy-louisiana/) | [United States](/countries/united-states/) Richland Parish, Louisiana | 5,000 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 3 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "Stargate AI Supercomputer",
   "locality": "Global / United States",
   "state": null,
   "capacity_gw": 5.0,
   "builder": "Microsoft, OpenAI, SoftBank, Oracle",
   "ai_customer": "",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Stargate AI Supercomputer](/datacenters/stargate-ai-supercomputer.html) | [Microsoft](/operators/microsoft/)[OpenAI](/operators/openai/)[SoftBank](/operators/softbank/)[Oracle](/operators/oracle/) | [United States](/countries/united-states/) Global / United States | 5,000 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 3 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Stargate AI Supercomputer](/datacenters/stargate-ai-supercomputer.html) | [Microsoft](/operators/microsoft/)[OpenAI](/operators/openai/)[SoftBank](/operators/softbank/)[Oracle](/operators/oracle/) | [United States](/countries/united-states/) Global / United States | 5,000 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 3 |"
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Stargate AI Supercomputer](/datacenters/stargate-ai-supercomputer.html) | [Microsoft](/operators/microsoft/)[OpenAI](/operators/openai/)[SoftBank](/operators/softbank/)[Oracle](/operators/oracle/) | [United States](/countries/united-states/) Global / United States | 5,000 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 3 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Stargate AI Supercomputer](/datacenters/stargate-ai-supercomputer.html) | [Microsoft](/operators/microsoft/)[OpenAI](/operators/openai/)[SoftBank](/operators/softbank/)[Oracle](/operators/oracle/) | [United States](/countries/united-states/) Global / United States | 5,000 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 3 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Stargate AI Supercomputer](/datacenters/stargate-ai-supercomputer.html) | [Microsoft](/operators/microsoft/)[OpenAI](/operators/openai/)[SoftBank](/operators/softbank/)[Oracle](/operators/oracle/) | [United States](/countries/united-states/) Global / United States | 5,000 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 3 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "Microsoft Project Fairwater (Mount Pleasant, Wisconsin)",
   "locality": "Mount Pleasant",
   "state": "Wisconsin",
   "capacity_gw": 3.3,
   "builder": "Microsoft, NVIDIA",
   "ai_customer": "",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft Project Fairwater (Mount Pleasant, Wisconsin)](/datacenters/microsoft-project-fairwater-wisconsin.html) | [Microsoft](/operators/microsoft/)[NVIDIA](/operators/nvidia/) | [United States](/countries/united-states/) Mount Pleasant, Wisconsin | 3,300 MW | [under construction](/status/under-construction/) | [Other](/energy/renewable/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft Project Fairwater (Mount Pleasant, Wisconsin)](/datacenters/microsoft-project-fairwater-wisconsin.html) | [Microsoft](/operators/microsoft/)[NVIDIA](/operators/nvidia/) | [United States](/countries/united-states/) Mount Pleasant, Wisconsin | 3,300 MW | [under construction](/status/under-construction/) | [Other](/energy/renewable/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft Project Fairwater (Mount Pleasant, Wisconsin)](/datacenters/microsoft-project-fairwater-wisconsin.html) | [Microsoft](/operators/microsoft/)[NVIDIA](/operators/nvidia/) | [United States](/countries/united-states/) Mount Pleasant, Wisconsin | 3,300 MW | [under construction](/status/under-construction/) | [Other](/energy/renewable/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft Project Fairwater (Mount Pleasant, Wisconsin)](/datacenters/microsoft-project-fairwater-wisconsin.html) | [Microsoft](/operators/microsoft/)[NVIDIA](/operators/nvidia/) | [United States](/countries/united-states/) Mount Pleasant, Wisconsin | 3,300 MW | [under construction](/status/under-construction/) | [Other](/energy/renewable/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft Project Fairwater (Mount Pleasant, Wisconsin)](/datacenters/microsoft-project-fairwater-wisconsin.html) | [Microsoft](/operators/microsoft/)[NVIDIA](/operators/nvidia/) | [United States](/countries/united-states/) Mount Pleasant, Wisconsin | 3,300 MW | [under construction](/status/under-construction/) | [Other](/energy/renewable/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft Project Fairwater (Mount Pleasant, Wisconsin)](/datacenters/microsoft-project-fairwater-wisconsin.html) | [Microsoft](/operators/microsoft/)[NVIDIA](/operators/nvidia/) | [United States](/countries/united-states/) Mount Pleasant, Wisconsin | 3,300 MW | [under construction](/status/under-construction/) | [Other](/energy/renewable/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "Google Nebraska Mega-Campus (Project Tenaska)",
   "locality": "Lincoln/Omaha Region",
   "state": "Nebraska",
   "capacity_gw": 2.7,
   "builder": "Google, Tenaska, Tallgrass Energy",
   "ai_customer": "",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Google Nebraska Mega-Campus (Project Tenaska)](/datacenters/google-nebraska-mega-campus-private-gas-power.html) | [Google](/operators/google/)[Tenaska](/operators/tenaska/)[Tallgrass Energy](/operators/tallgrass-energy/) | [United States](/countries/united-states/) Lincoln/Omaha Region, Nebraska | 2,700 MW | [planned](/status/planned/) | [Gas](/energy/fossil/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Google Nebraska Mega-Campus (Project Tenaska)](/datacenters/google-nebraska-mega-campus-private-gas-power.html) | [Google](/operators/google/)[Tenaska](/operators/tenaska/)[Tallgrass Energy](/operators/tallgrass-energy/) | [United States](/countries/united-states/) Lincoln/Omaha Region, Nebraska | 2,700 MW | [planned](/status/planned/) | [Gas](/energy/fossil/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Google Nebraska Mega-Campus (Project Tenaska)](/datacenters/google-nebraska-mega-campus-private-gas-power.html) | [Google](/operators/google/)[Tenaska](/operators/tenaska/)[Tallgrass Energy](/operators/tallgrass-energy/) | [United States](/countries/united-states/) Lincoln/Omaha Region, Nebraska | 2,700 MW | [planned](/status/planned/) | [Gas](/energy/fossil/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Google Nebraska Mega-Campus (Project Tenaska)](/datacenters/google-nebraska-mega-campus-private-gas-power.html) | [Google](/operators/google/)[Tenaska](/operators/tenaska/)[Tallgrass Energy](/operators/tallgrass-energy/) | [United States](/countries/united-states/) Lincoln/Omaha Region, Nebraska | 2,700 MW | [planned](/status/planned/) | [Gas](/energy/fossil/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Google Nebraska Mega-Campus (Project Tenaska)](/datacenters/google-nebraska-mega-campus-private-gas-power.html) | [Google](/operators/google/)[Tenaska](/operators/tenaska/)[Tallgrass Energy](/operators/tallgrass-energy/) | [United States](/countries/united-states/) Lincoln/Omaha Region, Nebraska | 2,700 MW | [planned](/status/planned/) | [Gas](/energy/fossil/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Google Nebraska Mega-Campus (Project Tenaska)](/datacenters/google-nebraska-mega-campus-private-gas-power.html) | [Google](/operators/google/)[Tenaska](/operators/tenaska/)[Tallgrass Energy](/operators/tallgrass-energy/) | [United States](/countries/united-states/) Lincoln/Omaha Region, Nebraska | 2,700 MW | [planned](/status/planned/) | [Gas](/energy/fossil/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "AWS Project Rainier (New Carlisle, Indiana)",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.4,
   "builder": "Amazon Web Services, Anthropic",
   "ai_customer": "Anthropic",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS Project Rainier (New Carlisle, Indiana)](/datacenters/aws-project-rainier-ai-campus-indiana.html) | [Amazon Web Services](/operators/amazon-web-services/)[Anthropic](/operators/anthropic/) | [United States](/countries/united-states/) New Carlisle, Indiana | 2,400 MW | [operational](/status/operational/) | [Other](/energy/unknown/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS Project Rainier (New Carlisle, Indiana)](/datacenters/aws-project-rainier-ai-campus-indiana.html) | [Amazon Web Services](/operators/amazon-web-services/)[Anthropic](/operators/anthropic/) | [United States](/countries/united-states/) New Carlisle, Indiana | 2,400 MW | [operational](/status/operational/) | [Other](/energy/unknown/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS Project Rainier (New Carlisle, Indiana)](/datacenters/aws-project-rainier-ai-campus-indiana.html) | [Amazon Web Services](/operators/amazon-web-services/)[Anthropic](/operators/anthropic/) | [United States](/countries/united-states/) New Carlisle, Indiana | 2,400 MW | [operational](/status/operational/) | [Other](/energy/unknown/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS Project Rainier (New Carlisle, Indiana)](/datacenters/aws-project-rainier-ai-campus-indiana.html) | [Amazon Web Services](/operators/amazon-web-services/)[Anthropic](/operators/anthropic/) | [United States](/countries/united-states/) New Carlisle, Indiana | 2,400 MW | [operational](/status/operational/) | [Other](/energy/unknown/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS Project Rainier (New Carlisle, Indiana)](/datacenters/aws-project-rainier-ai-campus-indiana.html) | [Amazon Web Services](/operators/amazon-web-services/)[Anthropic](/operators/anthropic/) | [United States](/countries/united-states/) New Carlisle, Indiana | 2,400 MW | [operational](/status/operational/) | [Other](/energy/unknown/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "ai_customer_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS Project Rainier (New Carlisle, Indiana)](/datacenters/aws-project-rainier-ai-campus-indiana.html) | [Amazon Web Services](/operators/amazon-web-services/)[Anthropic](/operators/anthropic/) | [United States](/countries/united-states/) New Carlisle, Indiana | 2,400 MW | [operational](/status/operational/) | [Other](/energy/unknown/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS Project Rainier (New Carlisle, Indiana)](/datacenters/aws-project-rainier-ai-campus-indiana.html) | [Amazon Web Services](/operators/amazon-web-services/)[Anthropic](/operators/anthropic/) | [United States](/countries/united-states/) New Carlisle, Indiana | 2,400 MW | [operational](/status/operational/) | [Other](/energy/unknown/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "Diablo Canyon AI Integration Project",
   "locality": "Western United States",
   "state": null,
   "capacity_gw": 2.256,
   "builder": "Pacific Gas and Electric Company (PG&E), Atomic Canyon",
   "ai_customer": "",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Diablo Canyon AI Integration Project](/datacenters/diablo-canyon-ai-integration-project.html) | [Pacific Gas and Electric Company (PG&E)](/operators/pacific-gas-and-electric-company-pg-and-e/)[Atomic Canyon](/operators/atomic-canyon/) | [United States](/countries/united-states/) Western United States | 2,256 MW | [operational](/status/operational/) | [Nuclear](/energy/nuclear/) | Unknown | | 2 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Diablo Canyon AI Integration Project](/datacenters/diablo-canyon-ai-integration-project.html) | [Pacific Gas and Electric Company (PG&E)](/operators/pacific-gas-and-electric-company-pg-and-e/)[Atomic Canyon](/operators/atomic-canyon/) | [United States](/countries/united-states/) Western United States | 2,256 MW | [operational](/status/operational/) | [Nuclear](/energy/nuclear/) | Unknown | | 2 |"
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Diablo Canyon AI Integration Project](/datacenters/diablo-canyon-ai-integration-project.html) | [Pacific Gas and Electric Company (PG&E)](/operators/pacific-gas-and-electric-company-pg-and-e/)[Atomic Canyon](/operators/atomic-canyon/) | [United States](/countries/united-states/) Western United States | 2,256 MW | [operational](/status/operational/) | [Nuclear](/energy/nuclear/) | Unknown | | 2 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Diablo Canyon AI Integration Project](/datacenters/diablo-canyon-ai-integration-project.html) | [Pacific Gas and Electric Company (PG&E)](/operators/pacific-gas-and-electric-company-pg-and-e/)[Atomic Canyon](/operators/atomic-canyon/) | [United States](/countries/united-states/) Western United States | 2,256 MW | [operational](/status/operational/) | [Nuclear](/energy/nuclear/) | Unknown | | 2 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Diablo Canyon AI Integration Project](/datacenters/diablo-canyon-ai-integration-project.html) | [Pacific Gas and Electric Company (PG&E)](/operators/pacific-gas-and-electric-company-pg-and-e/)[Atomic Canyon](/operators/atomic-canyon/) | [United States](/countries/united-states/) Western United States | 2,256 MW | [operational](/status/operational/) | [Nuclear](/energy/nuclear/) | Unknown | | 2 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)",
   "locality": "Ohio and Pennsylvania",
   "state": null,
   "capacity_gw": 2.1,
   "builder": "Meta, Vistra Corp",
   "ai_customer": "",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)](/datacenters/meta-vistra-nuclear-uprate-agreement-oh-pa.html) | [Meta](/operators/meta/)[Vistra Corp](/operators/vistra-corp/) | [United States](/countries/united-states/) Ohio and Pennsylvania | 2,100 MW | [announced](/status/announced/) | [Nuclear](/energy/nuclear/) | [General Cloud](/ai-focus/general-cloud/) | | 2 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)](/datacenters/meta-vistra-nuclear-uprate-agreement-oh-pa.html) | [Meta](/operators/meta/)[Vistra Corp](/operators/vistra-corp/) | [United States](/countries/united-states/) Ohio and Pennsylvania | 2,100 MW | [announced](/status/announced/) | [Nuclear](/energy/nuclear/) | [General Cloud](/ai-focus/general-cloud/) | | 2 |"
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)](/datacenters/meta-vistra-nuclear-uprate-agreement-oh-pa.html) | [Meta](/operators/meta/)[Vistra Corp](/operators/vistra-corp/) | [United States](/countries/united-states/) Ohio and Pennsylvania | 2,100 MW | [announced](/status/announced/) | [Nuclear](/energy/nuclear/) | [General Cloud](/ai-focus/general-cloud/) | | 2 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)](/datacenters/meta-vistra-nuclear-uprate-agreement-oh-pa.html) | [Meta](/operators/meta/)[Vistra Corp](/operators/vistra-corp/) | [United States](/countries/united-states/) Ohio and Pennsylvania | 2,100 MW | [announced](/status/announced/) | [Nuclear](/energy/nuclear/) | [General Cloud](/ai-focus/general-cloud/) | | 2 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta\u2013Vistra Nuclear Uprate Agreement (OH/PA)](/datacenters/meta-vistra-nuclear-uprate-agreement-oh-pa.html) | [Meta](/operators/meta/)[Vistra Corp](/operators/vistra-corp/) | [United States](/countries/united-states/) Ohio and Pennsylvania | 2,100 MW | [announced](/status/announced/) | [Nuclear](/energy/nuclear/) | [General Cloud](/ai-focus/general-cloud/) | | 2 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "Digital Realty \u2014 Project Bunkhouse",
   "locality": "Georgia",
   "state": "Georgia",
   "capacity_gw": 1.83,
   "builder": "Digital Realty",
   "ai_customer": "",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Digital Realty \u2014 Project Bunkhouse](/datacenters/digital-realty-project-bunkhouse-georgia.html) | [Digital Realty](/operators/digital-realty/) | [United States](/countries/united-states/) Georgia | 1,830 MW | [planned](/status/planned/) | [Other](/energy/unknown/) | Unknown | | 1 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Digital Realty \u2014 Project Bunkhouse](/datacenters/digital-realty-project-bunkhouse-georgia.html) | [Digital Realty](/operators/digital-realty/) | [United States](/countries/united-states/) Georgia | 1,830 MW | [planned](/status/planned/) | [Other](/energy/unknown/) | Unknown | | 1 |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Digital Realty \u2014 Project Bunkhouse](/datacenters/digital-realty-project-bunkhouse-georgia.html) | [Digital Realty](/operators/digital-realty/) | [United States](/countries/united-states/) Georgia | 1,830 MW | [planned](/status/planned/) | [Other](/energy/unknown/) | Unknown | | 1 |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Digital Realty \u2014 Project Bunkhouse](/datacenters/digital-realty-project-bunkhouse-georgia.html) | [Digital Realty](/operators/digital-realty/) | [United States](/countries/united-states/) Georgia | 1,830 MW | [planned](/status/planned/) | [Other](/energy/unknown/) | Unknown | | 1 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Digital Realty \u2014 Project Bunkhouse](/datacenters/digital-realty-project-bunkhouse-georgia.html) | [Digital Realty](/operators/digital-realty/) | [United States](/countries/united-states/) Georgia | 1,830 MW | [planned](/status/planned/) | [Other](/energy/unknown/) | Unknown | | 1 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Digital Realty \u2014 Project Bunkhouse](/datacenters/digital-realty-project-bunkhouse-georgia.html) | [Digital Realty](/operators/digital-realty/) | [United States](/countries/united-states/) Georgia | 1,830 MW | [planned](/status/planned/) | [Other](/energy/unknown/) | Unknown | | 1 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "AWS AI Innovation Campuses (Salem and Falls Townships, PA)",
   "locality": "Salem and Falls Townships",
   "state": "Pennsylvania",
   "capacity_gw": 1.8,
   "builder": "Amazon Web Services",
   "ai_customer": "",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS AI Innovation Campuses (Salem and Falls Townships, PA)](/datacenters/aws-ai-innovation-campuses-pennsylvania.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Salem and Falls Townships, Pennsylvania | 1,800 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Mixed](/ai-focus/mixed/) | | 1 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS AI Innovation Campuses (Salem and Falls Townships, PA)](/datacenters/aws-ai-innovation-campuses-pennsylvania.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Salem and Falls Townships, Pennsylvania | 1,800 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Mixed](/ai-focus/mixed/) | | 1 |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS AI Innovation Campuses (Salem and Falls Townships, PA)](/datacenters/aws-ai-innovation-campuses-pennsylvania.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Salem and Falls Townships, Pennsylvania | 1,800 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Mixed](/ai-focus/mixed/) | | 1 |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS AI Innovation Campuses (Salem and Falls Townships, PA)](/datacenters/aws-ai-innovation-campuses-pennsylvania.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Salem and Falls Townships, Pennsylvania | 1,800 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Mixed](/ai-focus/mixed/) | | 1 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS AI Innovation Campuses (Salem and Falls Townships, PA)](/datacenters/aws-ai-innovation-campuses-pennsylvania.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Salem and Falls Townships, Pennsylvania | 1,800 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Mixed](/ai-focus/mixed/) | | 1 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS AI Innovation Campuses (Salem and Falls Townships, PA)](/datacenters/aws-ai-innovation-campuses-pennsylvania.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Salem and Falls Townships, Pennsylvania | 1,800 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Mixed](/ai-focus/mixed/) | | 1 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "Amazon Web Services \u2014 Northern Virginia Hyperscale Campus",
   "locality": "Northern Virginia",
   "state": "Virginia",
   "capacity_gw": 1.5,
   "builder": "Amazon Web Services",
   "ai_customer": "",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Amazon Web Services \u2014 Northern Virginia Hyperscale Campus](/datacenters/amazon-ec2-virginia-hyperscale-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Northern Virginia | 1,500 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Amazon Web Services \u2014 Northern Virginia Hyperscale Campus](/datacenters/amazon-ec2-virginia-hyperscale-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Northern Virginia | 1,500 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Amazon Web Services \u2014 Northern Virginia Hyperscale Campus](/datacenters/amazon-ec2-virginia-hyperscale-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Northern Virginia | 1,500 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Amazon Web Services \u2014 Northern Virginia Hyperscale Campus](/datacenters/amazon-ec2-virginia-hyperscale-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Northern Virginia | 1,500 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Amazon Web Services \u2014 Northern Virginia Hyperscale Campus](/datacenters/amazon-ec2-virginia-hyperscale-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Northern Virginia | 1,500 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Amazon Web Services \u2014 Northern Virginia Hyperscale Campus](/datacenters/amazon-ec2-virginia-hyperscale-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Northern Virginia | 1,500 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "ExxonMobil's 1.5GW Data Center Power Plant Initiative",
   "locality": "Southern United States",
   "state": null,
   "capacity_gw": 1.5,
   "builder": "ExxonMobil",
   "ai_customer": "",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [ExxonMobil's 1.5GW Data Center Power Plant Initiative](/datacenters/exxonmobil-1-5gw-data-center-power-plant-initiative.html) | [ExxonMobil](/operators/exxonmobil/) | [United States](/countries/united-states/) Southern United States | 1,500 MW | [planned](/status/planned/) | [Gas](/energy/fossil/) | [General Cloud](/ai-focus/general-cloud/) | | 2 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [ExxonMobil's 1.5GW Data Center Power Plant Initiative](/datacenters/exxonmobil-1-5gw-data-center-power-plant-initiative.html) | [ExxonMobil](/operators/exxonmobil/) | [United States](/countries/united-states/) Southern United States | 1,500 MW | [planned](/status/planned/) | [Gas](/energy/fossil/) | [General Cloud](/ai-focus/general-cloud/) | | 2 |"
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [ExxonMobil's 1.5GW Data Center Power Plant Initiative](/datacenters/exxonmobil-1-5gw-data-center-power-plant-initiative.html) | [ExxonMobil](/operators/exxonmobil/) | [United States](/countries/united-states/) Southern United States | 1,500 MW | [planned](/status/planned/) | [Gas](/energy/fossil/) | [General Cloud](/ai-focus/general-cloud/) | | 2 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [ExxonMobil's 1.5GW Data Center Power Plant Initiative](/datacenters/exxonmobil-1-5gw-data-center-power-plant-initiative.html) | [ExxonMobil](/operators/exxonmobil/) | [United States](/countries/united-states/) Southern United States | 1,500 MW | [planned](/status/planned/) | [Gas](/energy/fossil/) | [General Cloud](/ai-focus/general-cloud/) | | 2 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [ExxonMobil's 1.5GW Data Center Power Plant Initiative](/datacenters/exxonmobil-1-5gw-data-center-power-plant-initiative.html) | [ExxonMobil](/operators/exxonmobil/) | [United States](/countries/united-states/) Southern United States | 1,500 MW | [planned](/status/planned/) | [Gas](/energy/fossil/) | [General Cloud](/ai-focus/general-cloud/) | | 2 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "Meta Project Prometheus (New Albany, Ohio)",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.5,
   "builder": "Meta",
   "ai_customer": "",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Project Prometheus (New Albany, Ohio)](/datacenters/meta-project-prometheus-ohio-ai-campus.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) New Albany, Ohio | 1,500 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Project Prometheus (New Albany, Ohio)](/datacenters/meta-project-prometheus-ohio-ai-campus.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) New Albany, Ohio | 1,500 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Project Prometheus (New Albany, Ohio)](/datacenters/meta-project-prometheus-ohio-ai-campus.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) New Albany, Ohio | 1,500 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Project Prometheus (New Albany, Ohio)](/datacenters/meta-project-prometheus-ohio-ai-campus.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) New Albany, Ohio | 1,500 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Project Prometheus (New Albany, Ohio)](/datacenters/meta-project-prometheus-ohio-ai-campus.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) New Albany, Ohio | 1,500 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Project Prometheus (New Albany, Ohio)](/datacenters/meta-project-prometheus-ohio-ai-campus.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) New Albany, Ohio | 1,500 MW | [under construction](/status/under-construction/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "xAI Gigascale Data Center (Tennessee/Mississippi)",
   "locality": "Eastern Tennessee / Northern Mississippi",
   "state": null,
   "capacity_gw": 1.5,
   "builder": "xAI",
   "ai_customer": "",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [xAI Gigascale Data Center (Tennessee/Mississippi)](/datacenters/xai-gigascale-data-center-tennessee-mississippi.html) | [xAI](/operators/xai/) | [United States](/countries/united-states/) Eastern Tennessee / Northern Mississippi | 1,500 MW | [operational](/status/operational/) | [Gas](/energy/fossil/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [xAI Gigascale Data Center (Tennessee/Mississippi)](/datacenters/xai-gigascale-data-center-tennessee-mississippi.html) | [xAI](/operators/xai/) | [United States](/countries/united-states/) Eastern Tennessee / Northern Mississippi | 1,500 MW | [operational](/status/operational/) | [Gas](/energy/fossil/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [xAI Gigascale Data Center (Tennessee/Mississippi)](/datacenters/xai-gigascale-data-center-tennessee-mississippi.html) | [xAI](/operators/xai/) | [United States](/countries/united-states/) Eastern Tennessee / Northern Mississippi | 1,500 MW | [operational](/status/operational/) | [Gas](/energy/fossil/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [xAI Gigascale Data Center (Tennessee/Mississippi)](/datacenters/xai-gigascale-data-center-tennessee-mississippi.html) | [xAI](/operators/xai/) | [United States](/countries/united-states/) Eastern Tennessee / Northern Mississippi | 1,500 MW | [operational](/status/operational/) | [Gas](/energy/fossil/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [xAI Gigascale Data Center (Tennessee/Mississippi)](/datacenters/xai-gigascale-data-center-tennessee-mississippi.html) | [xAI](/operators/xai/) | [United States](/countries/united-states/) Eastern Tennessee / Northern Mississippi | 1,500 MW | [operational](/status/operational/) | [Gas](/energy/fossil/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "Vantage Data Centers Texas Mega-Campus (Shackelford County)",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": "",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Vantage Data Centers Texas Mega-Campus (Shackelford County)](/datacenters/vantage-texas-mega-campus-shackelford.html) | [Vantage Data Centers](/operators/vantage-data-centers/) | [United States](/countries/united-states/) Shackelford County, Texas | 1,400 MW | [announced](/status/announced/) | [Other](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Vantage Data Centers Texas Mega-Campus (Shackelford County)](/datacenters/vantage-texas-mega-campus-shackelford.html) | [Vantage Data Centers](/operators/vantage-data-centers/) | [United States](/countries/united-states/) Shackelford County, Texas | 1,400 MW | [announced](/status/announced/) | [Other](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Vantage Data Centers Texas Mega-Campus (Shackelford County)](/datacenters/vantage-texas-mega-campus-shackelford.html) | [Vantage Data Centers](/operators/vantage-data-centers/) | [United States](/countries/united-states/) Shackelford County, Texas | 1,400 MW | [announced](/status/announced/) | [Other](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Vantage Data Centers Texas Mega-Campus (Shackelford County)](/datacenters/vantage-texas-mega-campus-shackelford.html) | [Vantage Data Centers](/operators/vantage-data-centers/) | [United States](/countries/united-states/) Shackelford County, Texas | 1,400 MW | [announced](/status/announced/) | [Other](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Vantage Data Centers Texas Mega-Campus (Shackelford County)](/datacenters/vantage-texas-mega-campus-shackelford.html) | [Vantage Data Centers](/operators/vantage-data-centers/) | [United States](/countries/united-states/) Shackelford County, Texas | 1,400 MW | [announced](/status/announced/) | [Other](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Vantage Data Centers Texas Mega-Campus (Shackelford County)](/datacenters/vantage-texas-mega-campus-shackelford.html) | [Vantage Data Centers](/operators/vantage-data-centers/) | [United States](/countries/united-states/) Shackelford County, Texas | 1,400 MW | [announced](/status/announced/) | [Other](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)",
   "locality": "Madison County",
   "state": null,
   "capacity_gw": 1.3,
   "builder": "Amazon Web Services",
   "ai_customer": "",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)](/datacenters/aws-mississippi-ai-data-center.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Madison County | 1,300 MW | [under construction](/status/under-construction/) | [Renewable](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)](/datacenters/aws-mississippi-ai-data-center.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Madison County | 1,300 MW | [under construction](/status/under-construction/) | [Renewable](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)](/datacenters/aws-mississippi-ai-data-center.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Madison County | 1,300 MW | [under construction](/status/under-construction/) | [Renewable](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)](/datacenters/aws-mississippi-ai-data-center.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Madison County | 1,300 MW | [under construction](/status/under-construction/) | [Renewable](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS \u2014 Mississippi AI Data Center (Ridgeland/Madison)](/datacenters/aws-mississippi-ai-data-center.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Madison County | 1,300 MW | [under construction](/status/under-construction/) | [Renewable](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 2 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "AWS US Government AI Supercomputing Expansion",
   "locality": "Virginia / Oregon / Ohio",
   "state": null,
   "capacity_gw": 1.3,
   "builder": "Amazon Web Services",
   "ai_customer": "",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS US Government AI Supercomputing Expansion](/datacenters/aws-us-government-ai-supercomputing-expansion.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Virginia / Oregon / Ohio | 1,300 MW | [announced](/status/announced/) | [Renewable](/energy/renewable/) | [Sovereign AI](/ai-focus/sovereign-ai/) | | 2 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS US Government AI Supercomputing Expansion](/datacenters/aws-us-government-ai-supercomputing-expansion.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Virginia / Oregon / Ohio | 1,300 MW | [announced](/status/announced/) | [Renewable](/energy/renewable/) | [Sovereign AI](/ai-focus/sovereign-ai/) | | 2 |"
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS US Government AI Supercomputing Expansion](/datacenters/aws-us-government-ai-supercomputing-expansion.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Virginia / Oregon / Ohio | 1,300 MW | [announced](/status/announced/) | [Renewable](/energy/renewable/) | [Sovereign AI](/ai-focus/sovereign-ai/) | | 2 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS US Government AI Supercomputing Expansion](/datacenters/aws-us-government-ai-supercomputing-expansion.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Virginia / Oregon / Ohio | 1,300 MW | [announced](/status/announced/) | [Renewable](/energy/renewable/) | [Sovereign AI](/ai-focus/sovereign-ai/) | | 2 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS US Government AI Supercomputing Expansion](/datacenters/aws-us-government-ai-supercomputing-expansion.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Virginia / Oregon / Ohio | 1,300 MW | [announced](/status/announced/) | [Renewable](/energy/renewable/) | [Sovereign AI](/ai-focus/sovereign-ai/) | | 2 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "Microsoft \u2014 Port Washington AI Campus (Stargate Phase 1)",
   "locality": "Wisconsin",
   "state": "Wisconsin",
   "capacity_gw": 1.3,
   "builder": "Microsoft",
   "ai_customer": "",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft \u2014 Port Washington AI Campus (Stargate Phase 1)](/datacenters/microsoft-port-washington-wisconsin-stargate.html) | [Microsoft](/operators/microsoft/) | [United States](/countries/united-states/) Wisconsin | 1,300 MW | [planned](/status/planned/) | [Other](/energy/unknown/) | [HPC / Supercomputing](/ai-focus/hpc/) | | 1 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft \u2014 Port Washington AI Campus (Stargate Phase 1)](/datacenters/microsoft-port-washington-wisconsin-stargate.html) | [Microsoft](/operators/microsoft/) | [United States](/countries/united-states/) Wisconsin | 1,300 MW | [planned](/status/planned/) | [Other](/energy/unknown/) | [HPC / Supercomputing](/ai-focus/hpc/) | | 1 |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft \u2014 Port Washington AI Campus (Stargate Phase 1)](/datacenters/microsoft-port-washington-wisconsin-stargate.html) | [Microsoft](/operators/microsoft/) | [United States](/countries/united-states/) Wisconsin | 1,300 MW | [planned](/status/planned/) | [Other](/energy/unknown/) | [HPC / Supercomputing](/ai-focus/hpc/) | | 1 |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft \u2014 Port Washington AI Campus (Stargate Phase 1)](/datacenters/microsoft-port-washington-wisconsin-stargate.html) | [Microsoft](/operators/microsoft/) | [United States](/countries/united-states/) Wisconsin | 1,300 MW | [planned](/status/planned/) | [Other](/energy/unknown/) | [HPC / Supercomputing](/ai-focus/hpc/) | | 1 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft \u2014 Port Washington AI Campus (Stargate Phase 1)](/datacenters/microsoft-port-washington-wisconsin-stargate.html) | [Microsoft](/operators/microsoft/) | [United States](/countries/united-states/) Wisconsin | 1,300 MW | [planned](/status/planned/) | [Other](/energy/unknown/) | [HPC / Supercomputing](/ai-focus/hpc/) | | 1 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft \u2014 Port Washington AI Campus (Stargate Phase 1)](/datacenters/microsoft-port-washington-wisconsin-stargate.html) | [Microsoft](/operators/microsoft/) | [United States](/countries/united-states/) Wisconsin | 1,300 MW | [planned](/status/planned/) | [Other](/energy/unknown/) | [HPC / Supercomputing](/ai-focus/hpc/) | | 1 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "Google \u2014 Fort Wayne AI Campus",
   "locality": "Indiana",
   "state": "Indiana",
   "capacity_gw": 1.2,
   "builder": "Google",
   "ai_customer": "",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Google \u2014 Fort Wayne AI Campus](/datacenters/google-fort-wayne-indiana-ai-campus.html) | [Google](/operators/google/) | [United States](/countries/united-states/) Indiana | 1,200 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | Unknown | | 1 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Google \u2014 Fort Wayne AI Campus](/datacenters/google-fort-wayne-indiana-ai-campus.html) | [Google](/operators/google/) | [United States](/countries/united-states/) Indiana | 1,200 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | Unknown | | 1 |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Google \u2014 Fort Wayne AI Campus](/datacenters/google-fort-wayne-indiana-ai-campus.html) | [Google](/operators/google/) | [United States](/countries/united-states/) Indiana | 1,200 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | Unknown | | 1 |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Google \u2014 Fort Wayne AI Campus](/datacenters/google-fort-wayne-indiana-ai-campus.html) | [Google](/operators/google/) | [United States](/countries/united-states/) Indiana | 1,200 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | Unknown | | 1 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Google \u2014 Fort Wayne AI Campus](/datacenters/google-fort-wayne-indiana-ai-campus.html) | [Google](/operators/google/) | [United States](/countries/united-states/) Indiana | 1,200 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | Unknown | | 1 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Google \u2014 Fort Wayne AI Campus](/datacenters/google-fort-wayne-indiana-ai-campus.html) | [Google](/operators/google/) | [United States](/countries/united-states/) Indiana | 1,200 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | Unknown | | 1 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "Meta\u2013Oklo Advanced Nuclear AI Campus (Ohio)",
   "locality": "Ohio",
   "state": "Ohio",
   "capacity_gw": 1.2,
   "builder": "Meta, Oklo Inc.",
   "ai_customer": "",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta\u2013Oklo Advanced Nuclear AI Campus (Ohio)](/datacenters/meta-oklo-nuclear-ai-campus-ohio.html) | [Meta](/operators/meta/)[Oklo Inc.](/operators/oklo-inc/) | [United States](/countries/united-states/) Ohio | 1,200 MW | [announced](/status/announced/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta\u2013Oklo Advanced Nuclear AI Campus (Ohio)](/datacenters/meta-oklo-nuclear-ai-campus-ohio.html) | [Meta](/operators/meta/)[Oklo Inc.](/operators/oklo-inc/) | [United States](/countries/united-states/) Ohio | 1,200 MW | [announced](/status/announced/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta\u2013Oklo Advanced Nuclear AI Campus (Ohio)](/datacenters/meta-oklo-nuclear-ai-campus-ohio.html) | [Meta](/operators/meta/)[Oklo Inc.](/operators/oklo-inc/) | [United States](/countries/united-states/) Ohio | 1,200 MW | [announced](/status/announced/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta\u2013Oklo Advanced Nuclear AI Campus (Ohio)](/datacenters/meta-oklo-nuclear-ai-campus-ohio.html) | [Meta](/operators/meta/)[Oklo Inc.](/operators/oklo-inc/) | [United States](/countries/united-states/) Ohio | 1,200 MW | [announced](/status/announced/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta\u2013Oklo Advanced Nuclear AI Campus (Ohio)](/datacenters/meta-oklo-nuclear-ai-campus-ohio.html) | [Meta](/operators/meta/)[Oklo Inc.](/operators/oklo-inc/) | [United States](/countries/united-states/) Ohio | 1,200 MW | [announced](/status/announced/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta\u2013Oklo Advanced Nuclear AI Campus (Ohio)](/datacenters/meta-oklo-nuclear-ai-campus-ohio.html) | [Meta](/operators/meta/)[Oklo Inc.](/operators/oklo-inc/) | [United States](/countries/united-states/) Ohio | 1,200 MW | [announced](/status/announced/) | [Nuclear](/energy/nuclear/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "OpenAI Stargate Data Center (Texas)",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "OpenAI, Crusoe Energy, Blue Owl Capital",
   "ai_customer": "",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [OpenAI Stargate Data Center (Texas)](/datacenters/openai-stargate-data-center-texas.html) | [OpenAI](/operators/openai/)[Crusoe Energy](/operators/crusoe-energy/)[Blue Owl Capital](/operators/blue-owl-capital/) | [United States](/countries/united-states/) Abilene, Texas | 1,200 MW | [operational](/status/operational/) | [Other](/energy/unknown/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [OpenAI Stargate Data Center (Texas)](/datacenters/openai-stargate-data-center-texas.html) | [OpenAI](/operators/openai/)[Crusoe Energy](/operators/crusoe-energy/)[Blue Owl Capital](/operators/blue-owl-capital/) | [United States](/countries/united-states/) Abilene, Texas | 1,200 MW | [operational](/status/operational/) | [Other](/energy/unknown/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [OpenAI Stargate Data Center (Texas)](/datacenters/openai-stargate-data-center-texas.html) | [OpenAI](/operators/openai/)[Crusoe Energy](/operators/crusoe-energy/)[Blue Owl Capital](/operators/blue-owl-capital/) | [United States](/countries/united-states/) Abilene, Texas | 1,200 MW | [operational](/status/operational/) | [Other](/energy/unknown/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [OpenAI Stargate Data Center (Texas)](/datacenters/openai-stargate-data-center-texas.html) | [OpenAI](/operators/openai/)[Crusoe Energy](/operators/crusoe-energy/)[Blue Owl Capital](/operators/blue-owl-capital/) | [United States](/countries/united-states/) Abilene, Texas | 1,200 MW | [operational](/status/operational/) | [Other](/energy/unknown/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [OpenAI Stargate Data Center (Texas)](/datacenters/openai-stargate-data-center-texas.html) | [OpenAI](/operators/openai/)[Crusoe Energy](/operators/crusoe-energy/)[Blue Owl Capital](/operators/blue-owl-capital/) | [United States](/countries/united-states/) Abilene, Texas | 1,200 MW | [operational](/status/operational/) | [Other](/energy/unknown/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [OpenAI Stargate Data Center (Texas)](/datacenters/openai-stargate-data-center-texas.html) | [OpenAI](/operators/openai/)[Crusoe Energy](/operators/crusoe-energy/)[Blue Owl Capital](/operators/blue-owl-capital/) | [United States](/countries/united-states/) Abilene, Texas | 1,200 MW | [operational](/status/operational/) | [Other](/energy/unknown/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "Vistra's Comanche Peak Nuclear Data Center Campus",
   "locality": "Southwestern United States",
   "state": null,
   "capacity_gw": 1.2,
   "builder": "Vistra Corp, Amazon Web Services",
   "ai_customer": "",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Vistra's Comanche Peak Nuclear Data Center Campus](/datacenters/vistra-comanche-peak-nuclear-power-plant-expansion.html) | [Vistra Corp](/operators/vistra-corp/)[Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Southwestern United States | 1,200 MW | [planned](/status/planned/) | [Nuclear](/energy/nuclear/) | [General Cloud](/ai-focus/general-cloud/) | | 3 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Vistra's Comanche Peak Nuclear Data Center Campus](/datacenters/vistra-comanche-peak-nuclear-power-plant-expansion.html) | [Vistra Corp](/operators/vistra-corp/)[Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Southwestern United States | 1,200 MW | [planned](/status/planned/) | [Nuclear](/energy/nuclear/) | [General Cloud](/ai-focus/general-cloud/) | | 3 |"
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Vistra's Comanche Peak Nuclear Data Center Campus](/datacenters/vistra-comanche-peak-nuclear-power-plant-expansion.html) | [Vistra Corp](/operators/vistra-corp/)[Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Southwestern United States | 1,200 MW | [planned](/status/planned/) | [Nuclear](/energy/nuclear/) | [General Cloud](/ai-focus/general-cloud/) | | 3 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Vistra's Comanche Peak Nuclear Data Center Campus](/datacenters/vistra-comanche-peak-nuclear-power-plant-expansion.html) | [Vistra Corp](/operators/vistra-corp/)[Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Southwestern United States | 1,200 MW | [planned](/status/planned/) | [Nuclear](/energy/nuclear/) | [General Cloud](/ai-focus/general-cloud/) | | 3 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Vistra's Comanche Peak Nuclear Data Center Campus](/datacenters/vistra-comanche-peak-nuclear-power-plant-expansion.html) | [Vistra Corp](/operators/vistra-corp/)[Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) Southwestern United States | 1,200 MW | [planned](/status/planned/) | [Nuclear](/energy/nuclear/) | [General Cloud](/ai-focus/general-cloud/) | | 3 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "AWS \u2014 Richmond County AI Innovation Campus",
   "locality": "North Carolina",
   "state": "North Carolina",
   "capacity_gw": 1.0,
   "builder": "Amazon Web Services",
   "ai_customer": "",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS \u2014 Richmond County AI Innovation Campus](/datacenters/aws-richmond-county-north-carolina-ai-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) North Carolina | 1,000 MW | [under construction](/status/under-construction/) | [Other](/energy/unknown/) | [General Cloud](/ai-focus/general-cloud/) | | 1 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS \u2014 Richmond County AI Innovation Campus](/datacenters/aws-richmond-county-north-carolina-ai-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) North Carolina | 1,000 MW | [under construction](/status/under-construction/) | [Other](/energy/unknown/) | [General Cloud](/ai-focus/general-cloud/) | | 1 |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS \u2014 Richmond County AI Innovation Campus](/datacenters/aws-richmond-county-north-carolina-ai-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) North Carolina | 1,000 MW | [under construction](/status/under-construction/) | [Other](/energy/unknown/) | [General Cloud](/ai-focus/general-cloud/) | | 1 |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS \u2014 Richmond County AI Innovation Campus](/datacenters/aws-richmond-county-north-carolina-ai-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) North Carolina | 1,000 MW | [under construction](/status/under-construction/) | [Other](/energy/unknown/) | [General Cloud](/ai-focus/general-cloud/) | | 1 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS \u2014 Richmond County AI Innovation Campus](/datacenters/aws-richmond-county-north-carolina-ai-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) North Carolina | 1,000 MW | [under construction](/status/under-construction/) | [Other](/energy/unknown/) | [General Cloud](/ai-focus/general-cloud/) | | 1 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [AWS \u2014 Richmond County AI Innovation Campus](/datacenters/aws-richmond-county-north-carolina-ai-campus.html) | [Amazon Web Services](/operators/amazon-web-services/) | [United States](/countries/united-states/) North Carolina | 1,000 MW | [under construction](/status/under-construction/) | [Other](/energy/unknown/) | [General Cloud](/ai-focus/general-cloud/) | | 1 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "Google Gemini Cluster (Iowa/Nebraska)",
   "locality": "Midwest (Iowa\u2013Nebraska cluster)",
   "state": null,
   "capacity_gw": 1.0,
   "builder": "Google",
   "ai_customer": "",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Google Gemini Cluster (Iowa/Nebraska)](/datacenters/google-gemini-cluster-iowa-nebraska.html) | [Google](/operators/google/) | [United States](/countries/united-states/) Midwest (Iowa\u2013Nebraska cluster) | 1,000 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Google Gemini Cluster (Iowa/Nebraska)](/datacenters/google-gemini-cluster-iowa-nebraska.html) | [Google](/operators/google/) | [United States](/countries/united-states/) Midwest (Iowa\u2013Nebraska cluster) | 1,000 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Google Gemini Cluster (Iowa/Nebraska)](/datacenters/google-gemini-cluster-iowa-nebraska.html) | [Google](/operators/google/) | [United States](/countries/united-states/) Midwest (Iowa\u2013Nebraska cluster) | 1,000 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Google Gemini Cluster (Iowa/Nebraska)](/datacenters/google-gemini-cluster-iowa-nebraska.html) | [Google](/operators/google/) | [United States](/countries/united-states/) Midwest (Iowa\u2013Nebraska cluster) | 1,000 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Google Gemini Cluster (Iowa/Nebraska)](/datacenters/google-gemini-cluster-iowa-nebraska.html) | [Google](/operators/google/) | [United States](/countries/united-states/) Midwest (Iowa\u2013Nebraska cluster) | 1,000 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | [Training](/ai-focus/training/) | | 2 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "Meta \u2014 El Paso AI Mega Campus",
   "locality": "Texas",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta \u2014 El Paso AI Mega Campus](/datacenters/meta-el-paso-ai-mega-campus-texas.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) Texas | 1,000 MW | [planned](/status/planned/) | [Renewable](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta \u2014 El Paso AI Mega Campus](/datacenters/meta-el-paso-ai-mega-campus-texas.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) Texas | 1,000 MW | [planned](/status/planned/) | [Renewable](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta \u2014 El Paso AI Mega Campus](/datacenters/meta-el-paso-ai-mega-campus-texas.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) Texas | 1,000 MW | [planned](/status/planned/) | [Renewable](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta \u2014 El Paso AI Mega Campus](/datacenters/meta-el-paso-ai-mega-campus-texas.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) Texas | 1,000 MW | [planned](/status/planned/) | [Renewable](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta \u2014 El Paso AI Mega Campus](/datacenters/meta-el-paso-ai-mega-campus-texas.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) Texas | 1,000 MW | [planned](/status/planned/) | [Renewable](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta \u2014 El Paso AI Mega Campus](/datacenters/meta-el-paso-ai-mega-campus-texas.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) Texas | 1,000 MW | [planned](/status/planned/) | [Renewable](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "Meta Lebanon AI Data Center (Indiana)",
   "locality": "Lebanon",
   "state": "Indiana",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Lebanon AI Data Center (Indiana)](/datacenters/meta-lebanon-indiana-ai-campus.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) Lebanon, Indiana | 1,000 MW | [announced](/status/announced/) | [Other](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 1 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Lebanon AI Data Center (Indiana)](/datacenters/meta-lebanon-indiana-ai-campus.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) Lebanon, Indiana | 1,000 MW | [announced](/status/announced/) | [Other](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 1 |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Lebanon AI Data Center (Indiana)](/datacenters/meta-lebanon-indiana-ai-campus.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) Lebanon, Indiana | 1,000 MW | [announced](/status/announced/) | [Other](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 1 |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Lebanon AI Data Center (Indiana)](/datacenters/meta-lebanon-indiana-ai-campus.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) Lebanon, Indiana | 1,000 MW | [announced](/status/announced/) | [Other](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 1 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Lebanon AI Data Center (Indiana)](/datacenters/meta-lebanon-indiana-ai-campus.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) Lebanon, Indiana | 1,000 MW | [announced](/status/announced/) | [Other](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 1 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Meta Lebanon AI Data Center (Indiana)](/datacenters/meta-lebanon-indiana-ai-campus.html) | [Meta](/operators/meta/) | [United States](/countries/united-states/) Lebanon, Indiana | 1,000 MW | [announced](/status/announced/) | [Other](/energy/renewable/) | [Mixed](/ai-focus/mixed/) | | 1 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "Microsoft Azure Northern Virginia AI Data Centers",
   "locality": "Northern Virginia (Loudoun, Prince William counties)",
   "state": "Virginia",
   "capacity_gw": 1.0,
   "builder": "Microsoft",
   "ai_customer": "",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft Azure Northern Virginia AI Data Centers](/datacenters/microsoft-northern-virginia-ai-data-centers.html) | [Microsoft](/operators/microsoft/) | [United States](/countries/united-states/) Northern Virginia (Loudoun, Prince William counties) | 1,000 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | [Inference](/ai-focus/inference/) | | 2 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft Azure Northern Virginia AI Data Centers](/datacenters/microsoft-northern-virginia-ai-data-centers.html) | [Microsoft](/operators/microsoft/) | [United States](/countries/united-states/) Northern Virginia (Loudoun, Prince William counties) | 1,000 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | [Inference](/ai-focus/inference/) | | 2 |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft Azure Northern Virginia AI Data Centers](/datacenters/microsoft-northern-virginia-ai-data-centers.html) | [Microsoft](/operators/microsoft/) | [United States](/countries/united-states/) Northern Virginia (Loudoun, Prince William counties) | 1,000 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | [Inference](/ai-focus/inference/) | | 2 |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft Azure Northern Virginia AI Data Centers](/datacenters/microsoft-northern-virginia-ai-data-centers.html) | [Microsoft](/operators/microsoft/) | [United States](/countries/united-states/) Northern Virginia (Loudoun, Prince William counties) | 1,000 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | [Inference](/ai-focus/inference/) | | 2 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft Azure Northern Virginia AI Data Centers](/datacenters/microsoft-northern-virginia-ai-data-centers.html) | [Microsoft](/operators/microsoft/) | [United States](/countries/united-states/) Northern Virginia (Loudoun, Prince William counties) | 1,000 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | [Inference](/ai-focus/inference/) | | 2 |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft Azure Northern Virginia AI Data Centers](/datacenters/microsoft-northern-virginia-ai-data-centers.html) | [Microsoft](/operators/microsoft/) | [United States](/countries/united-states/) Northern Virginia (Loudoun, Prince William counties) | 1,000 MW | [operational](/status/operational/) | [Renewable](/energy/renewable/) | [Inference](/ai-focus/inference/) | | 2 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aidatacenterindex.com/regions/north-america",
   "title": "AI Data Centers in North America (2026) \u2014 96 Facilities, 85.3 GW",
   "published_at": null,
   "project": "Microsoft & OpenAI \u2014 Project Jupiter (New Mexico)",
   "locality": "New Mexico",
   "state": "New Mexico",
   "capacity_gw": 1.0,
   "builder": "Microsoft",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft & OpenAI \u2014 Project Jupiter (New Mexico)](/datacenters/microsoft-openai-stargate-new-mexico.html) | [Microsoft](/operators/microsoft/) | [United States](/countries/united-states/) New Mexico | 1,000 MW | [planned](/status/planned/) | [Renewable](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft & OpenAI \u2014 Project Jupiter (New Mexico)](/datacenters/microsoft-openai-stargate-new-mexico.html) | [Microsoft](/operators/microsoft/) | [United States](/countries/united-states/) New Mexico | 1,000 MW | [planned](/status/planned/) | [Renewable](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft & OpenAI \u2014 Project Jupiter (New Mexico)](/datacenters/microsoft-openai-stargate-new-mexico.html) | [Microsoft](/operators/microsoft/) | [United States](/countries/united-states/) New Mexico | 1,000 MW | [planned](/status/planned/) | [Renewable](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft & OpenAI \u2014 Project Jupiter (New Mexico)](/datacenters/microsoft-openai-stargate-new-mexico.html) | [Microsoft](/operators/microsoft/) | [United States](/countries/united-states/) New Mexico | 1,000 MW | [planned](/status/planned/) | [Renewable](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft & OpenAI \u2014 Project Jupiter (New Mexico)](/datacenters/microsoft-openai-stargate-new-mexico.html) | [Microsoft](/operators/microsoft/) | [United States](/countries/united-states/) New Mexico | 1,000 MW | [planned](/status/planned/) | [Renewable](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "ai_customer_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft & OpenAI \u2014 Project Jupiter (New Mexico)](/datacenters/microsoft-openai-stargate-new-mexico.html) | [Microsoft](/operators/microsoft/) | [United States](/countries/united-states/) New Mexico | 1,000 MW | [planned](/status/planned/) | [Renewable](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "status_evidence": [
    "| Facility | Operator | Location | Capacity \u2193 | Status | Energy | Workload | Readiness | Sources |",
    "| [Microsoft & OpenAI \u2014 Project Jupiter (New Mexico)](/datacenters/microsoft-openai-stargate-new-mexico.html) | [Microsoft](/operators/microsoft/) | [United States](/countries/united-states/) New Mexico | 1,000 MW | [planned](/status/planned/) | [Renewable](/energy/renewable/) | [Training](/ai-focus/training/) | | 1 |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://newsleader.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Colossus 2",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 1.0,
   "builder": "xAI",
   "ai_customer": "",
   "status": "active construction still on site",
   "announcement_date": "2025-05-01",
   "project_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "locality_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The second Memphis campus in Whitehaven came into the picture in early 2025."
   ],
   "state_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "In February 2025, CTC Property LLC purchased 186.13 acres for $79.9 million, according to the Shelby County Register of Deeds."
   ],
   "capacity_gw_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "builder_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "- Elon Musk's xAI has acquired over 1,156 acres of land in the Memphis area for its data centers.",
    "In March 2025, the Greater Memphis Chamber announced xAI's plans for a second campus and its purchase of a 1 million-square-foot building."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The Tulane Road site is an artificial intelligence data center, with active construction still on site."
   ],
   "announcement_date_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ]
  },
  {
   "url": "https://newsleader.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Macrohardrr",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "",
   "status": "under construction with gas turbines on site for powering xAI data centers",
   "announcement_date": "2026-01-08",
   "project_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ],
   "locality_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "This is the third and most recent xAI campus."
   ],
   "state_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ],
   "capacity_gw_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "builder_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "- Elon Musk's xAI has acquired over 1,156 acres of land in the Memphis area for its data centers.",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "The former Duke Energy site has been under construction with gas turbines on site for powering xAI data centers."
   ],
   "announcement_date_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ]
  },
  {
   "url": "https://themiddlemarket.com/latest-news/vantage-data-centers-unveils-25b-frontier-campus-in-texas",
   "title": "Vantage Data Centers Unveils $25B Frontier Campus in Texas",
   "published_at": "2025-08-19T16:21:12",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Construction has begun",
   "announcement_date": null,
   "project_evidence": [
    "**Vantage Data Centers** announced its largest-ever investment\u2014over $25 billion\u2014to build a 1.4GW, 1,200-acre mega-scale data center campus in Shackelford County, Texas, named \u201cFrontier.\u201d"
   ],
   "locality_evidence": [
    "**Vantage Data Centers** announced its largest-ever investment\u2014over $25 billion\u2014to build a 1.4GW, 1,200-acre mega-scale data center campus in Shackelford County, Texas, named \u201cFrontier.\u201d"
   ],
   "state_evidence": [
    "**Vantage Data Centers** announced its largest-ever investment\u2014over $25 billion\u2014to build a 1.4GW, 1,200-acre mega-scale data center campus in Shackelford County, Texas, named \u201cFrontier.\u201d"
   ],
   "capacity_gw_evidence": [
    "**Vantage Data Centers** announced its largest-ever investment\u2014over $25 billion\u2014to build a 1.4GW, 1,200-acre mega-scale data center campus in Shackelford County, Texas, named \u201cFrontier.\u201d"
   ],
   "builder_evidence": [
    "**Vantage Data Centers** announced its largest-ever investment\u2014over $25 billion\u2014to build a 1.4GW, 1,200-acre mega-scale data center campus in Shackelford County, Texas, named \u201cFrontier.\u201d"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction has begun, with the first building expected in the second half of 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://wnep.com/article/news/coal-fired-power-plant-become-gas-powered-campus-ai-data-centers/521-1166194e-cf04-4596-921b-702f0bbe2dd0",
   "title": "Coal-fired power plant, now retired, to become a massive gas-powered campus for AI, data centers",
   "published_at": "2025-04-02T14:24:33",
   "project": "Homer City Generating Station",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Homer City Development",
   "ai_customer": "",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "Coal-fired power plant, now retired, to become a massive gas-powered campus for AI, data centers",
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "locality_evidence": [
    "Coal-fired power plant, now retired, to become a massive gas-powered campus for AI, data centers",
    "The owners of the former Homer City Generating Station, about an hour east of Pittsburgh, said Wednesday that they're installing seven gas-fired turbines."
   ],
   "state_evidence": [
    "Coal-fired power plant, now retired, to become a massive gas-powered campus for AI, data centers",
    "HARRISBURG, Pa. \u2014 The owners of what was once Pennsylvania's biggest coal-fired power plant said Wednesday that they will turn it into a $10 billion natural gas-powered data center campus designed to capitalize on the [fast-growing energy demands](https://apnews.com/article/power-electricity-amazon-microsoft-power-plants-data-centers-grid-f4763f73bc112425e18f30618dff0039) of Big Tech companies to power artificial intelligence and cloud computing applications."
   ],
   "capacity_gw_evidence": [
    "Coal-fired power plant, now retired, to become a massive gas-powered campus for AI, data centers",
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "builder_evidence": [
    "Coal-fired power plant, now retired, to become a massive gas-powered campus for AI, data centers",
    "The former Homer City Generating Station, about 50 miles (80 kilometers) east of Pittsburgh, will host seven gas-fired turbines to power data centers on site with up to 4.5 gigawatts of electricity, according to the owners, an investor group named Homer City Development."
   ],
   "ai_customer_evidence": [
    "Coal-fired power plant, now retired, to become a massive gas-powered campus for AI, data centers",
    "HARRISBURG, Pa. \u2014 The owners of what was once Pennsylvania's biggest coal-fired power plant said Wednesday that they will turn it into a $10 billion natural gas-powered data center campus designed to capitalize on the [fast-growing energy demands](https://apnews.com/article/power-electricity-amazon-microsoft-power-plants-data-centers-grid-f4763f73bc112425e18f30618dff0039) of Big Tech companies to power artificial intelligence and cloud computing applications."
   ],
   "status_evidence": [
    "Coal-fired power plant, now retired, to become a massive gas-powered campus for AI, data centers",
    "HARRISBURG, Pa. \u2014 The owners of what was once Pennsylvania's biggest coal-fired power plant said Wednesday that they will turn it into a $10 billion natural gas-powered data center campus designed to capitalize on the [fast-growing energy demands](https://apnews.com/article/power-electricity-amazon-microsoft-power-plants-data-centers-grid-f4763f73bc112425e18f30618dff0039) of Big Tech companies to power artificial intelligence and cloud computing applications."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://wfmz.com/online_features/press_releases/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy/article_69e8c713-9ea9-59e3-b33b-85c202b11884.html",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": "2026-03-16T21:18:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "Acquired",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "locality_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "capacity_gw_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "builder_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "announcement_date_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026"
   ]
  },
  {
   "url": "https://h2-tech.com/news/2025/03-2025/energy-abundance-announces-behind-the-meter-data-center-hub-powered-by-100-24-7-green-energy",
   "title": "Energy Abundance announces behind-the-meter data center hub",
   "published_at": null,
   "project": "Data City",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corporation",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# News",
    "# Energy Abundance announces behind-the-meter data center hub, powered by 100%, 24/7 green energy",
    "Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5-GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "locality_evidence": [
    "# News",
    "# Energy Abundance announces behind-the-meter data center hub, powered by 100%, 24/7 green energy",
    "Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5-GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "state_evidence": [
    "# News",
    "# Energy Abundance announces behind-the-meter data center hub, powered by 100%, 24/7 green energy",
    "Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5-GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "capacity_gw_evidence": [
    "# News",
    "# Energy Abundance announces behind-the-meter data center hub, powered by 100%, 24/7 green energy",
    "Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5-GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "builder_evidence": [
    "# News",
    "# Energy Abundance announces behind-the-meter data center hub, powered by 100%, 24/7 green energy",
    "Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5-GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# News",
    "# Energy Abundance announces behind-the-meter data center hub, powered by 100%, 24/7 green energy",
    "Energy Abundance Development Corporation has unveiled plans for Data City, Texas\u2014a 5-GW behind-the-meter data center hub to be built on 50,000 acres near the city of Laredo, powered by 100% 24/7 green energy."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://ratetoday.online/kevin-olearys-ai-campus-in-utah-has-been-approved",
   "title": "Kevin O'Leary's AI Campus in Utah has been approved - ratetoday",
   "published_at": "2026-05-07T01:46:06",
   "project": "Stratos AI Campus",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O'Leary Ventures",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "# Kevin O\u2019Leary\u2019s AI Campus in Utah has been approved",
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public outcry from hundreds of local residents."
   ],
   "locality_evidence": [
    "# Kevin O\u2019Leary\u2019s AI Campus in Utah has been approved",
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public outcry from hundreds of local residents."
   ],
   "state_evidence": [
    "# Kevin O\u2019Leary\u2019s AI Campus in Utah has been approved",
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public outcry from hundreds of local residents."
   ],
   "capacity_gw_evidence": [
    "# Kevin O\u2019Leary\u2019s AI Campus in Utah has been approved",
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public outcry from hundreds of local residents."
   ],
   "builder_evidence": [
    "# Kevin O\u2019Leary\u2019s AI Campus in Utah has been approved",
    "Utah\u2019s Box Elder County commissioners voted unanimously on May 4 to approve the Stratos AI Campus powered by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Kevin O\u2019Leary\u2019s AI Campus in Utah has been approved",
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public outcry from hundreds of local residents."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://w.media/openai-plans-to-build-its-own-3-2-gw-data-center-campus-in-georgia",
   "title": "OpenAI plans to build its own 3.2 GW data center campus in Georgia",
   "published_at": null,
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "Artificial intelligence research and deployment company OpenAI has announced plans for a 3.2 GW data center campus in Effingham County, Georgia, in a project the company is designing and developing itself rather than leasing capacity from a third-party operator.",
    "The project, which OpenAI calls [Project Camellia](https://projectcamellia.com/), comprises four buildings across 1,400 acres and is scheduled to open in phases from 2028."
   ],
   "locality_evidence": [
    "Artificial intelligence research and deployment company OpenAI has announced plans for a 3.2 GW data center campus in Effingham County, Georgia, in a project the company is designing and developing itself rather than leasing capacity from a third-party operator."
   ],
   "state_evidence": [
    "Artificial intelligence research and deployment company OpenAI has announced plans for a 3.2 GW data center campus in Effingham County, Georgia, in a project the company is designing and developing itself rather than leasing capacity from a third-party operator."
   ],
   "capacity_gw_evidence": [
    "Artificial intelligence research and deployment company OpenAI has announced plans for a 3.2 GW data center campus in Effingham County, Georgia, in a project the company is designing and developing itself rather than leasing capacity from a third-party operator."
   ],
   "builder_evidence": [
    "Artificial intelligence research and deployment company OpenAI has announced plans for a 3.2 GW data center campus in Effingham County, Georgia, in a project the company is designing and developing itself rather than leasing capacity from a third-party operator."
   ],
   "ai_customer_evidence": [
    "Artificial intelligence research and deployment company OpenAI has announced plans for a 3.2 GW data center campus in Effingham County, Georgia, in a project the company is designing and developing itself rather than leasing capacity from a third-party operator."
   ],
   "status_evidence": [
    "Artificial intelligence research and deployment company OpenAI has announced plans for a 3.2 GW data center campus in Effingham County, Georgia, in a project the company is designing and developing itself rather than leasing capacity from a third-party operator."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://w.media/openai-plans-to-build-its-own-3-2-gw-data-center-campus-in-georgia",
   "title": "OpenAI plans to build its own 3.2 GW data center campus in Georgia",
   "published_at": null,
   "project": "Stargate",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Its flagship Stargate site in Abilene, Texas, was developed and built by Crusoe and is leased and operated by Oracle, with power capacity targeted to reach 1.2 GW over the project\u2019s lifetime."
   ],
   "locality_evidence": [
    "Its flagship Stargate site in Abilene, Texas, was developed and built by Crusoe and is leased and operated by Oracle, with power capacity targeted to reach 1.2 GW over the project\u2019s lifetime."
   ],
   "state_evidence": [
    "Its flagship Stargate site in Abilene, Texas, was developed and built by Crusoe and is leased and operated by Oracle, with power capacity targeted to reach 1.2 GW over the project\u2019s lifetime."
   ],
   "capacity_gw_evidence": [
    "Its flagship Stargate site in Abilene, Texas, was developed and built by Crusoe and is leased and operated by Oracle, with power capacity targeted to reach 1.2 GW over the project\u2019s lifetime."
   ],
   "builder_evidence": [
    "Its flagship Stargate site in Abilene, Texas, was developed and built by Crusoe and is leased and operated by Oracle, with power capacity targeted to reach 1.2 GW over the project\u2019s lifetime."
   ],
   "ai_customer_evidence": [
    "Project Camellia sits within OpenAI\u2019s broader [Stargate program](https://w.media/stargate-announces-five-new-ai-data-center-sites-in-the-us/).",
    "Its flagship Stargate site in Abilene, Texas, was developed and built by Crusoe and is leased and operated by Oracle, with power capacity targeted to reach 1.2 GW over the project\u2019s lifetime."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://poweredbywho.com/projects/project-cannoli-van-buren-township-data-center-fffea3af",
   "title": "Project Cannoli - Van Buren Township Data Center, Michigan | PoweredByWho",
   "published_at": null,
   "project": "Project Cannoli - Van Buren Township Data Center",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Google / Panattoni Data Center Group",
   "ai_customer": null,
   "status": "Permit Approved",
   "announcement_date": null,
   "project_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "# Project Cannoli - Van Buren Township Data Center"
   ],
   "locality_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "Van Buren Township \u00b7 site",
    "VAN BUREN TOWNSHIP"
   ],
   "state_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "Wayne County, MI"
   ],
   "capacity_gw_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "1000 MW \u00b7 PERMIT APPROVED",
    "Capacity",
    "1000 MW"
   ],
   "builder_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "Developer \u00b7 Google / Panattoni Data Center Group"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "POWEREDBYWHO",
    "\u00b7 PROJECT DOSSIER",
    "1000 MW \u00b7 PERMIT APPROVED",
    "Status",
    "Permit Approved"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mexc.in/news/1114352",
   "title": "TeraWulf surges 10% on 1GW Kentucky AI campus et | MEXC News",
   "published_at": null,
   "project": "Muskie Data Campus",
   "locality": "eastern",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure.",
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access."
   ],
   "locality_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure.",
    "The company secured a 285-acre site in eastern Kentucky."
   ],
   "state_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure.",
    "The company secured a 285-acre site in eastern Kentucky."
   ],
   "capacity_gw_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure.",
    "It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity."
   ],
   "builder_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure.",
    "It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://cayenneindustrytimes.com/article/909739213-iren-announces-successful-energization-of-sweetwater-1",
   "title": "IREN Announces Successful Energization of Sweetwater 1",
   "published_at": null,
   "project": "Sweetwater",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN Limited",
   "ai_customer": null,
   "status": "Energized",
   "announcement_date": "2026-05-01",
   "project_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "capacity_gw_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "builder_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "announcement_date_evidence": [
    "# IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ]
  },
  {
   "url": "https://stateoftheunionnews.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "locality_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "state_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "capacity_gw_evidence": [
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "builder_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://aicerts.ai/news/infrastructure-scale-500mw-data-centers-reshape-power",
   "title": "Infrastructure Scale: 500MW Data Centers Reshape Power - AI CERTs News",
   "published_at": "2025-12-05T12:57:37",
   "project": "T5 Grayslake",
   "locality": "Grayslake",
   "state": null,
   "capacity_gw": 1.2,
   "builder": "T5",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Infrastructure Scale: 500MW Data Centers Reshape Power",
    "Global Gigawatt Campus Surge",
    "- T5 Grayslake: 1.2GW plan, Chicago metropolitan area."
   ],
   "locality_evidence": [
    "Infrastructure Scale: 500MW Data Centers Reshape Power",
    "Global Gigawatt Campus Surge",
    "- T5 Grayslake: 1.2GW plan, Chicago metropolitan area."
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "Infrastructure Scale: 500MW Data Centers Reshape Power",
    "Global Gigawatt Campus Surge",
    "- T5 Grayslake: 1.2GW plan, Chicago metropolitan area."
   ],
   "builder_evidence": [
    "Infrastructure Scale: 500MW Data Centers Reshape Power",
    "Global Gigawatt Campus Surge",
    "- T5 Grayslake: 1.2GW plan, Chicago metropolitan area."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://bluewaterhealthyliving.com/news/national-news/ohio/openai-commits-to-massive-buildout-of-pike-county-data-center-campus-2",
   "title": "OpenAI commits to massive buildout of Pike County data center campus",
   "published_at": "2026-08-17T22:28:39",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "broke ground earlier this year",
   "announcement_date": "2025-08-17",
   "project_evidence": [
    "Partnering with the Japanese-owed SB Energy, California-based Nvidia and U.S. Department of Energy, OpenAI, the artificial intelligence company, has pledged to create 35,000 construction jobs in a six-year buildout of the Pike County data center campus that broke ground earlier this year.",
    "The San Francisco-based company has agreed to secure approximately 8 gigawatts of information technology electrical power at the PORTS-Pike Technology Campus about 70 miles south of Columbus."
   ],
   "locality_evidence": [
    "Partnering with the Japanese-owed SB Energy, California-based Nvidia and U.S. Department of Energy, OpenAI, the artificial intelligence company, has pledged to create 35,000 construction jobs in a six-year buildout of the Pike County data center campus that broke ground earlier this year.",
    "The San Francisco-based company has agreed to secure approximately 8 gigawatts of information technology electrical power at the PORTS-Pike Technology Campus about 70 miles south of Columbus."
   ],
   "state_evidence": [
    "The company appeared to react to ongoing pushback to data center expansion in Ohio by emphasizing the long-term benefits of its operations, especially to residents who have become increasingly skeptical.",
    "\u201cWe will also invest $40 million in a community grant fund supporting priorities identified by local residents\u2014building on SB Energy\u2019s previously announced $40 million commitment,\u201d the company said. \u201cSeparately, we are providing $84 million in Codex credits through ChatGPT, giving every Ohio college student access to the technology.\u201d",
    "Open AI, in its news release, pledged \u201cto be a catalyst for jobs, business growth and investment across southern Ohio\u2014 and to help make this a place where young people can build careers, raise families, and choose to stay.\u201d"
   ],
   "capacity_gw_evidence": [
    "The San Francisco-based company has agreed to secure approximately 8 gigawatts of information technology electrical power at the PORTS-Pike Technology Campus about 70 miles south of Columbus."
   ],
   "builder_evidence": [
    "Partnering with the Japanese-owed SB Energy, California-based Nvidia and U.S. Department of Energy, OpenAI, the artificial intelligence company, has pledged to create 35,000 construction jobs in a six-year buildout of the Pike County data center campus that broke ground earlier this year.",
    "SB Energy will build, own, and operate the data center under a 20-year lease to OpenAI and deliver operational capacity over time."
   ],
   "ai_customer_evidence": [
    "Partnering with the Japanese-owed SB Energy, California-based Nvidia and U.S. Department of Energy, OpenAI, the artificial intelligence company, has pledged to create 35,000 construction jobs in a six-year buildout of the Pike County data center campus that broke ground earlier this year.",
    "SB Energy will build, own, and operate the data center under a 20-year lease to OpenAI and deliver operational capacity over time."
   ],
   "status_evidence": [
    "Partnering with the Japanese-owed SB Energy, California-based Nvidia and U.S. Department of Energy, OpenAI, the artificial intelligence company, has pledged to create 35,000 construction jobs in a six-year buildout of the Pike County data center campus that broke ground earlier this year."
   ],
   "announcement_date_evidence": [
    "The company did not address its overall investment in a news release Aug. 17."
   ]
  },
  {
   "url": "https://aiweekly.co/alerts/meta-msl-builds-five-titan-clusters-muse-spark-ties-opus-46",
   "title": "Meta MSL Builds Five Titan Clusters; Muse Spark Ties Opus 4.6",
   "published_at": "2026-07-10T06:27:08",
   "project": "Prometheus",
   "locality": "Ohio",
   "state": "Ohio",
   "capacity_gw": 3.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "in flight",
   "announcement_date": null,
   "project_evidence": [
    "# Meta MSL Builds Five Titan Clusters; Muse Spark Ties Opus 4.6",
    "On compute, the piece describes five gigawatt-scale 'Titan' campuses in flight.",
    "Prometheus in Ohio has grown from roughly 1GW to over 3GW, Hyperion in Louisiana is 1.5GW under construction, an Iowa lease covers another 1GW, and two more 1GW-plus campuses are going up in El Paso and Indiana."
   ],
   "locality_evidence": [
    "# Meta MSL Builds Five Titan Clusters; Muse Spark Ties Opus 4.6",
    "On compute, the piece describes five gigawatt-scale 'Titan' campuses in flight.",
    "Prometheus in Ohio has grown from roughly 1GW to over 3GW, Hyperion in Louisiana is 1.5GW under construction, an Iowa lease covers another 1GW, and two more 1GW-plus campuses are going up in El Paso and Indiana."
   ],
   "state_evidence": [
    "# Meta MSL Builds Five Titan Clusters; Muse Spark Ties Opus 4.6",
    "On compute, the piece describes five gigawatt-scale 'Titan' campuses in flight.",
    "Prometheus in Ohio has grown from roughly 1GW to over 3GW, Hyperion in Louisiana is 1.5GW under construction, an Iowa lease covers another 1GW, and two more 1GW-plus campuses are going up in El Paso and Indiana."
   ],
   "capacity_gw_evidence": [
    "# Meta MSL Builds Five Titan Clusters; Muse Spark Ties Opus 4.6",
    "On compute, the piece describes five gigawatt-scale 'Titan' campuses in flight.",
    "Prometheus in Ohio has grown from roughly 1GW to over 3GW, Hyperion in Louisiana is 1.5GW under construction, an Iowa lease covers another 1GW, and two more 1GW-plus campuses are going up in El Paso and Indiana."
   ],
   "builder_evidence": [
    "# Meta MSL Builds Five Titan Clusters; Muse Spark Ties Opus 4.6",
    "Meta reportedly has five gigawatt-scale 'Titan' campuses in flight, led by Prometheus in Ohio at over 3GW and Hyperion in Louisiana at 1.5GW."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Meta MSL Builds Five Titan Clusters; Muse Spark Ties Opus 4.6",
    "Meta reportedly has five gigawatt-scale 'Titan' campuses in flight, led by Prometheus in Ohio at over 3GW and Hyperion in Louisiana at 1.5GW."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://aiweekly.co/alerts/meta-msl-builds-five-titan-clusters-muse-spark-ties-opus-46",
   "title": "Meta MSL Builds Five Titan Clusters; Muse Spark Ties Opus 4.6",
   "published_at": "2026-07-10T06:27:08",
   "project": "Hyperion",
   "locality": "Louisiana",
   "state": "Louisiana",
   "capacity_gw": 1.5,
   "builder": "Meta",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Meta MSL Builds Five Titan Clusters; Muse Spark Ties Opus 4.6",
    "Meta reportedly has five gigawatt-scale 'Titan' campuses in flight, led by Prometheus in Ohio at over 3GW and Hyperion in Louisiana at 1.5GW."
   ],
   "locality_evidence": [
    "# Meta MSL Builds Five Titan Clusters; Muse Spark Ties Opus 4.6",
    "Meta reportedly has five gigawatt-scale 'Titan' campuses in flight, led by Prometheus in Ohio at over 3GW and Hyperion in Louisiana at 1.5GW."
   ],
   "state_evidence": [
    "# Meta MSL Builds Five Titan Clusters; Muse Spark Ties Opus 4.6",
    "Meta reportedly has five gigawatt-scale 'Titan' campuses in flight, led by Prometheus in Ohio at over 3GW and Hyperion in Louisiana at 1.5GW."
   ],
   "capacity_gw_evidence": [
    "# Meta MSL Builds Five Titan Clusters; Muse Spark Ties Opus 4.6",
    "Meta reportedly has five gigawatt-scale 'Titan' campuses in flight, led by Prometheus in Ohio at over 3GW and Hyperion in Louisiana at 1.5GW."
   ],
   "builder_evidence": [
    "# Meta MSL Builds Five Titan Clusters; Muse Spark Ties Opus 4.6",
    "Meta reportedly has five gigawatt-scale 'Titan' campuses in flight, led by Prometheus in Ohio at over 3GW and Hyperion in Louisiana at 1.5GW."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Meta MSL Builds Five Titan Clusters; Muse Spark Ties Opus 4.6",
    "Prometheus in Ohio has grown from roughly 1GW to over 3GW, Hyperion in Louisiana is 1.5GW under construction, an Iowa lease covers another 1GW, and two more 1GW-plus campuses are going up in El Paso and Indiana."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://gentic.news/ai-data-centers/case-studies",
   "title": "gentic.news \u2014 AI News Intelligence Platform",
   "published_at": null,
   "project": "Colossus 1 & 2",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "xAI",
   "status": "Power250 MW live \u2192 2 GW target by end-2026",
   "announcement_date": null,
   "project_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Colossus 1 & 2 \u2014 xAI's Memphis Gigawatt Campus"
   ],
   "locality_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Colossus 1 & 2 \u2014 xAI's Memphis Gigawatt Campus",
    "Memphis, Tennessee / Southaven, Mississippi"
   ],
   "state_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Colossus 1 & 2 \u2014 xAI's Memphis Gigawatt Campus",
    "Memphis, Tennessee / Southaven, Mississippi"
   ],
   "capacity_gw_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Colossus 1 & 2 \u2014 xAI's Memphis Gigawatt Campus",
    "Power250 MW live \u2192 2 GW target by end-2026"
   ],
   "builder_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Colossus 1 & 2 \u2014 xAI's Memphis Gigawatt Campus",
    "\ud83c\udfedxAI"
   ],
   "ai_customer_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Colossus 1 & 2 \u2014 xAI's Memphis Gigawatt Campus"
   ],
   "status_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Colossus 1 & 2 \u2014 xAI's Memphis Gigawatt Campus",
    "Power250 MW live \u2192 2 GW target by end-2026"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://gentic.news/ai-data-centers/case-studies",
   "title": "gentic.news \u2014 AI News Intelligence Platform",
   "published_at": null,
   "project": "Stargate Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe",
   "ai_customer": "OpenAI",
   "status": "First 2 buildings September 2025",
   "announcement_date": null,
   "project_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Stargate Abilene \u2014 OpenAI \u00d7 Oracle \u00d7 SoftBank's Flagship"
   ],
   "locality_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Stargate Abilene \u2014 OpenAI \u00d7 Oracle \u00d7 SoftBank's Flagship",
    "Abilene, Texas (Lancium Clean Campus)"
   ],
   "state_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Stargate Abilene \u2014 OpenAI \u00d7 Oracle \u00d7 SoftBank's Flagship",
    "Abilene, Texas (Lancium Clean Campus)"
   ],
   "capacity_gw_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Stargate Abilene \u2014 OpenAI \u00d7 Oracle \u00d7 SoftBank's Flagship",
    "Power1.2 GW (capped March 2026)"
   ],
   "builder_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Stargate Abilene \u2014 OpenAI \u00d7 Oracle \u00d7 SoftBank's Flagship",
    "\ud83d\ude80Oracle (for OpenAI) \u00b7 Crusoe-built \u00b7 Blue Owl-financed"
   ],
   "ai_customer_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Stargate Abilene \u2014 OpenAI \u00d7 Oracle \u00d7 SoftBank's Flagship"
   ],
   "status_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Stargate Abilene \u2014 OpenAI \u00d7 Oracle \u00d7 SoftBank's Flagship",
    "MilestoneFirst 2 buildings September 2025"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://gentic.news/ai-data-centers/case-studies",
   "title": "gentic.news \u2014 AI News Intelligence Platform",
   "published_at": null,
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "AWS",
   "ai_customer": "Anthropic",
   "status": "October 2025 (7 months from groundbreaking)",
   "announcement_date": null,
   "project_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Project Rainier \u2014 Anthropic's 2.2 GW Trainium Campus"
   ],
   "locality_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Project Rainier \u2014 Anthropic's 2.2 GW Trainium Campus",
    "New Carlisle, Indiana (1,200 acres, near Lake Michigan)"
   ],
   "state_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Project Rainier \u2014 Anthropic's 2.2 GW Trainium Campus",
    "New Carlisle, Indiana (1,200 acres, near Lake Michigan)"
   ],
   "capacity_gw_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Project Rainier \u2014 Anthropic's 2.2 GW Trainium Campus",
    "PowerCurrent 7 buildings \u2192 30 planned \u00b7 2.2 GW ultimate"
   ],
   "builder_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Project Rainier \u2014 Anthropic's 2.2 GW Trainium Campus",
    "\ud83c\udfd4\ufe0fAWS (built for Anthropic)"
   ],
   "ai_customer_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Project Rainier \u2014 Anthropic's 2.2 GW Trainium Campus"
   ],
   "status_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Project Rainier \u2014 Anthropic's 2.2 GW Trainium Campus",
    "MilestoneOctober 2025 (7 months from groundbreaking)"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://gentic.news/ai-data-centers/case-studies",
   "title": "gentic.news \u2014 AI News Intelligence Platform",
   "published_at": null,
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "Under construction \u00b7 operational target 2030",
   "announcement_date": null,
   "project_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Hyperion \u2014 Meta's 5 GW Louisiana Campus"
   ],
   "locality_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Hyperion \u2014 Meta's 5 GW Louisiana Campus",
    "Richland Parish, Louisiana (2,250 acres)"
   ],
   "state_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Hyperion \u2014 Meta's 5 GW Louisiana Campus",
    "Richland Parish, Louisiana (2,250 acres)"
   ],
   "capacity_gw_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Hyperion \u2014 Meta's 5 GW Louisiana Campus",
    "Power2 GW initial \u2192 scaling to 5 GW"
   ],
   "builder_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Hyperion \u2014 Meta's 5 GW Louisiana Campus",
    "\ud83c\udf0aMeta (majority-sold to Blue Owl, Dec 2024)"
   ],
   "ai_customer_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Hyperion \u2014 Meta's 5 GW Louisiana Campus"
   ],
   "status_evidence": [
    "Four of the most consequential AI campuses on Earth \u2014 each one an expensive bet on a different philosophy of power, silicon, and geography.",
    "Hyperion \u2014 Meta's 5 GW Louisiana Campus",
    "MilestoneUnder construction \u00b7 operational target 2030"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://markets.financialcontent.com/wral/article/tokenring-2026-1-2-colossus-unbound-xais-memphis-expansion-targets-1-million-gpus-in-the-race-for-agi",
   "title": "Colossus Unbound: xAI\u00e2s Memphis Expansion Targets 1 Million GPUs in the Race for AGI",
   "published_at": "2026-01-02T19:48:24",
   "project": "Colossus",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "xAI",
   "status": "expanding",
   "announcement_date": "2026-01-02",
   "project_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "locality_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "state_evidence": [
    "As the \"Digital Delta\" takes shape across the Tennessee-Mississippi border, the project is redefining the physical and logistical requirements of the AGI era.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "capacity_gw_evidence": [
    "By targeting a power capacity of 2 gigawatts (GW)\u2014roughly enough to power nearly 2 million homes\u2014xAI is transitioning from a high-scale startup to a \"Gigafactory of Compute.\"",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "builder_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "ai_customer_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "status_evidence": [
    "In a move that has sent shockwaves through the technology sector, xAI has announced a massive expansion of its \"Colossus\" supercomputer cluster, solidifying the Memphis and Southaven region as the epicenter of the global artificial intelligence arms race.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ],
   "announcement_date_evidence": [
    "As of January 2, 2026, the company has successfully scaled its initial 100,000-GPU cluster to over 200,000 units and is now aggressively pursuing a roadmap to reach 1 million GPUs by the end of the year.",
    "![Photo for article](https://news.tokenring.ai/wp-content/uploads/2026/01/ea538615-b334-462e-9840-b0227d84b140-1024x683.png)"
   ]
  },
  {
   "url": "https://capdex.com/firm/crusoe",
   "title": "Crusoe - Commercial Real Estate Firm Profile",
   "published_at": "2026-07-16T14:30:09",
   "project": "Crusoe and Lancium Announce 1-GW AI Data Center Campus in Childress, Texas",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "Announced",
   "announcement_date": "2026-07-01",
   "project_evidence": [
    "Latest: \u201cCrusoe and Lancium Announce 1-GW AI Data Center Campus in Childress, Texas\u201d \u00b7 July 2026 \u00b7 [Read the coverage \u2192](/news/crusoe-and-lancium-announce-1-gw-ai-data-center-campus-in)"
   ],
   "locality_evidence": [
    "Latest: \u201cCrusoe and Lancium Announce 1-GW AI Data Center Campus in Childress, Texas\u201d \u00b7 July 2026 \u00b7 [Read the coverage \u2192](/news/crusoe-and-lancium-announce-1-gw-ai-data-center-campus-in)"
   ],
   "state_evidence": [
    "Latest: \u201cCrusoe and Lancium Announce 1-GW AI Data Center Campus in Childress, Texas\u201d \u00b7 July 2026 \u00b7 [Read the coverage \u2192](/news/crusoe-and-lancium-announce-1-gw-ai-data-center-campus-in)"
   ],
   "capacity_gw_evidence": [
    "Latest: \u201cCrusoe and Lancium Announce 1-GW AI Data Center Campus in Childress, Texas\u201d \u00b7 July 2026 \u00b7 [Read the coverage \u2192](/news/crusoe-and-lancium-announce-1-gw-ai-data-center-campus-in)"
   ],
   "builder_evidence": [
    "Latest: \u201cCrusoe and Lancium Announce 1-GW AI Data Center Campus in Childress, Texas\u201d \u00b7 July 2026 \u00b7 [Read the coverage \u2192](/news/crusoe-and-lancium-announce-1-gw-ai-data-center-campus-in)"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Latest: \u201cCrusoe and Lancium Announce 1-GW AI Data Center Campus in Childress, Texas\u201d \u00b7 July 2026 \u00b7 [Read the coverage \u2192](/news/crusoe-and-lancium-announce-1-gw-ai-data-center-campus-in)"
   ],
   "announcement_date_evidence": [
    "Latest: \u201cCrusoe and Lancium Announce 1-GW AI Data Center Campus in Childress, Texas\u201d \u00b7 July 2026 \u00b7 [Read the coverage \u2192](/news/crusoe-and-lancium-announce-1-gw-ai-data-center-campus-in)"
   ]
  },
  {
   "url": "https://securityonline.info/microsoft-to-build-the-worlds-most-powerful-ai-data-center-in-wisconsin",
   "title": "Microsoft to Build the \u201cWorld\u2019s Most Powerful AI Data Center\u201d in Wisconsin",
   "published_at": "2025-09-22T00:00:43",
   "project": "False",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": null,
   "state_evidence": [
    "Cloud provider Vantage also announced in late August a $25 billion investment in Texas to build a 1.4-gigawatt AI data center, while Google disclosed plans in July to establish a 1-gigawatt facility in Andhra Pradesh, India."
   ],
   "capacity_gw_evidence": [
    "Cloud provider Vantage also announced in late August a $25 billion investment in Texas to build a 1.4-gigawatt AI data center, while Google disclosed plans in July to establish a 1-gigawatt facility in Andhra Pradesh, India."
   ],
   "builder_evidence": [
    "Cloud provider Vantage also announced in late August a $25 billion investment in Texas to build a 1.4-gigawatt AI data center, while Google disclosed plans in July to establish a 1-gigawatt facility in Andhra Pradesh, India."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Cloud provider Vantage also announced in late August a $25 billion investment in Texas to build a 1.4-gigawatt AI data center, while Google disclosed plans in July to establish a 1-gigawatt facility in Andhra Pradesh, India."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://markets.financialcontent.com/fatpitch.valueinvestingnews/article/bizwire-2025-8-19-vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand",
   "title": "Vantage Data Centers Unveils Plans for \u00e2Frontier,\u00e2 a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
   "published_at": "2025-08-19T11:00:00",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Construction on the campus has already begun",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "locality_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026."
   ],
   "announcement_date_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "This press release features multimedia. View the full release here: [https://www.businesswire.com/news/home/20250819333311/en/](https://www.businesswire.com/news/home/20250819333311/en/)"
   ]
  },
  {
   "url": "http://idcnova.com/html/1/59/153/3103.html",
   "title": "Former Texas governor and US energy sec plans 11GW data center campus outside Amarillo, Texas|Idcnova-Media|the gateway to China data center market",
   "published_at": null,
   "project": "Advanced Energy and Intelligence Campus",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Company partnering with Texas Tech University System for off-grid nuclear-solar-gas project",
    "Located on approximately 5,800 acres, the Advanced Energy and Intelligence Campus will reportedly include \u201c18 million square feet (1.67 million sqm) of data centers and generate up to 11GW of IT capacity from natural gas, solar, wind, and clean nuclear energy.\u201d"
   ],
   "locality_evidence": [
    "Company partnering with Texas Tech University System for off-grid nuclear-solar-gas project",
    "This week, the Texas Tech University System (TTU System) announced a collaboration with recently founded energy and technology company Fermi America to develop a large AI and energy campus near Amarillo in the Texas Panhandle."
   ],
   "state_evidence": [
    "Company partnering with Texas Tech University System for off-grid nuclear-solar-gas project",
    "This week, the Texas Tech University System (TTU System) announced a collaboration with recently founded energy and technology company Fermi America to develop a large AI and energy campus near Amarillo in the Texas Panhandle."
   ],
   "capacity_gw_evidence": [
    "Company partnering with Texas Tech University System for off-grid nuclear-solar-gas project",
    "Located on approximately 5,800 acres, the Advanced Energy and Intelligence Campus will reportedly include \u201c18 million square feet (1.67 million sqm) of data centers and generate up to 11GW of IT capacity from natural gas, solar, wind, and clean nuclear energy.\u201d"
   ],
   "builder_evidence": [
    "Company partnering with Texas Tech University System for off-grid nuclear-solar-gas project",
    "This week, the Texas Tech University System (TTU System) announced a collaboration with recently founded energy and technology company Fermi America to develop a large AI and energy campus near Amarillo in the Texas Panhandle."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Company partnering with Texas Tech University System for off-grid nuclear-solar-gas project",
    "A massive multi-gigawatt behind-the-meter campus is being planned in Texas close to the US government\u2019s main nuclear weapons development facility by former Texas governor and energy secretary Rick Perry."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://indianagazette.com/news/local/hcr-plans-10-billion-gas-powered-data-center-campus-employing-thousands/article_f9048f67-e5c5-4100-a3e4-85457f1327c5.html",
   "title": "HCR plans $10 billion gas-powered data center campus, employing thousands",
   "published_at": "2025-04-03T04:35:00",
   "project": "Homer City Energy Campus",
   "locality": "Center Township",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Kiewit Power Constructors Company",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Featured",
    "# HCR plans $10 billion gas-powered data center campus, employing thousands"
   ],
   "locality_evidence": [
    "Featured",
    "# HCR plans $10 billion gas-powered data center campus, employing thousands",
    "The former Homer City Generating Station, once the largest coal-burning power plant in Pennsylvania, is being converted into a natural gas-powered data center campus, covering more than 3,200 acres in Center Township, that will begin operations in 2027."
   ],
   "state_evidence": [
    "Featured",
    "# HCR plans $10 billion gas-powered data center campus, employing thousands",
    "The former Homer City Generating Station, once the largest coal-burning power plant in Pennsylvania, is being converted into a natural gas-powered data center campus, covering more than 3,200 acres in Center Township, that will begin operations in 2027."
   ],
   "capacity_gw_evidence": [
    "Featured",
    "# HCR plans $10 billion gas-powered data center campus, employing thousands"
   ],
   "builder_evidence": [
    "Featured",
    "# HCR plans $10 billion gas-powered data center campus, employing thousands"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Featured",
    "# HCR plans $10 billion gas-powered data center campus, employing thousands"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://wvtrades.org/general/monarch-compute-campus-west-virginia",
   "title": "WV Building Trades Sign MOU for Monarch Compute Campus Data Center",
   "published_at": "2026-06-22T19:50:13",
   "project": "Monarch Compute Campus",
   "locality": "Point Pleasant",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Earlier this month, the **[West Virginia Building and Construction Trades Council](https://www.wvtrades.org/)** and the **Tri-State Building & Construction Trades Council (TSBCTC)** signed a **Memorandum of Understanding (MOU)** with **[Nscale](https://www.nscale.com/ai-infrastructure/west-virginia)** to build the **[Monarch Compute Campus](https://www.nscale.com/ai-infrastructure/west-virginia)** data center and a power-generating facility in **Point Pleasant, West Virginia**."
   ],
   "locality_evidence": [
    "Earlier this month, the **[West Virginia Building and Construction Trades Council](https://www.wvtrades.org/)** and the **Tri-State Building & Construction Trades Council (TSBCTC)** signed a **Memorandum of Understanding (MOU)** with **[Nscale](https://www.nscale.com/ai-infrastructure/west-virginia)** to build the **[Monarch Compute Campus](https://www.nscale.com/ai-infrastructure/west-virginia)** data center and a power-generating facility in **Point Pleasant, West Virginia**."
   ],
   "state_evidence": [
    "Earlier this month, the **[West Virginia Building and Construction Trades Council](https://www.wvtrades.org/)** and the **Tri-State Building & Construction Trades Council (TSBCTC)** signed a **Memorandum of Understanding (MOU)** with **[Nscale](https://www.nscale.com/ai-infrastructure/west-virginia)** to build the **[Monarch Compute Campus](https://www.nscale.com/ai-infrastructure/west-virginia)** data center and a power-generating facility in **Point Pleasant, West Virginia**."
   ],
   "capacity_gw_evidence": [
    "The project is designed to expand to **8 gigawatts (8,000 MW)** by 2031, making it one of the largest AI-focused data center developments in North America."
   ],
   "builder_evidence": [
    "Earlier this month, the **[West Virginia Building and Construction Trades Council](https://www.wvtrades.org/)** and the **Tri-State Building & Construction Trades Council (TSBCTC)** signed a **Memorandum of Understanding (MOU)** with **[Nscale](https://www.nscale.com/ai-infrastructure/west-virginia)** to build the **[Monarch Compute Campus](https://www.nscale.com/ai-infrastructure/west-virginia)** data center and a power-generating facility in **Point Pleasant, West Virginia**."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "With more than **$20 billion in planned capital investment**, Monarch is expected to become one of the most significant AI infrastructure projects in U.S. history."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://nftaiverse.online/kevin-olearys-utah-ai-campus-gets-approved",
   "title": "Kevin O'Leary's Utah AI campus gets approved",
   "published_at": "2026-05-07T02:58:40",
   "project": "Stratos AI campus",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "Kevin O\u2019Leary Digital",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": "2026-05-04",
   "project_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "locality_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "state_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "capacity_gw_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "The campus will generate up to 9 gigawatts at full buildout, more than twice Utah\u2019s current total electricity consumption, powered by an on-site natural gas pipeline.",
    "The campus, designated through Utah\u2019s Military Installation Development Authority, spans more than 40,000 acres and will reach 9 gigawatts of generation capacity at full buildout."
   ],
   "builder_evidence": [
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ],
   "announcement_date_evidence": [
    "Box Elder County commissioners approved Kevin O\u2019Leary\u2019s 9GW Stratos AI campus in Utah on May 4, amid loud public protests from hundreds of local residents.",
    "Box Elder County commissioners in Utah voted unanimously on May 4 to approve the Stratos AI campus backed by Kevin O\u2019Leary Digital, the infrastructure arm of O\u2019Leary Ventures."
   ]
  },
  {
   "url": "https://datacenterfrontier.com/hyperscale/article/55393445/land-and-expand-the-gigawatt-credibility-test",
   "title": "Land and Expand: The Gigawatt Credibility Test",
   "published_at": "2026-08-06T00:00:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "early in development",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "OpenAI, on July 22 disclosed [Project Camellia,](https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/) a long-term data center development in Effingham County, Georgia.",
    "OpenAI Goes Direct in Georgia"
   ],
   "locality_evidence": [
    "OpenAI, on July 22 disclosed [Project Camellia,](https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/) a long-term data center development in Effingham County, Georgia.",
    "OpenAI Goes Direct in Georgia"
   ],
   "state_evidence": [
    "OpenAI, on July 22 disclosed [Project Camellia,](https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/) a long-term data center development in Effingham County, Georgia.",
    "OpenAI Goes Direct in Georgia"
   ],
   "capacity_gw_evidence": [
    "OpenAI said it is designing and developing the campus itself and has contracted with Georgia Power for 3.2 gigawatts of electricity, to be delivered in phases from 2028 through 2032.",
    "OpenAI Goes Direct in Georgia"
   ],
   "builder_evidence": [
    "OpenAI said it is designing and developing the campus itself and has contracted with Georgia Power for 3.2 gigawatts of electricity, to be delivered in phases from 2028 through 2032.",
    "OpenAI Goes Direct in Georgia"
   ],
   "ai_customer_evidence": [
    "OpenAI, on July 22 disclosed [Project Camellia,](https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/) a long-term data center development in Effingham County, Georgia.",
    "OpenAI Goes Direct in Georgia"
   ],
   "status_evidence": [
    "The project remains early in development, with infrastructure, phasing, financing and operating details still to be completed.",
    "OpenAI Goes Direct in Georgia"
   ],
   "announcement_date_evidence": [
    "OpenAI, on July 22 disclosed [Project Camellia,](https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/) a long-term data center development in Effingham County, Georgia.",
    "OpenAI Goes Direct in Georgia"
   ]
  },
  {
   "url": "https://datacenterfrontier.com/hyperscale/article/55393445/land-and-expand-the-gigawatt-credibility-test",
   "title": "Land and Expand: The Gigawatt Credibility Test",
   "published_at": "2026-08-06T00:00:00",
   "project": "Pecos campus",
   "locality": "Pecos",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "Microsoft",
   "ai_customer": "Microsoft",
   "status": "unveiling",
   "announcement_date": "2026-06-22",
   "project_evidence": [
    "Microsoft delivered another [defining announcement on June 22,](https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/) unveiling a new data center campus in Pecos, Texas, that would add approximately 2 gigawatts to its global capacity.",
    "Microsoft Pairs 2 Gigawatts of Capacity With Dedicated West Texas Power"
   ],
   "locality_evidence": [
    "Microsoft delivered another [defining announcement on June 22,](https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/) unveiling a new data center campus in Pecos, Texas, that would add approximately 2 gigawatts to its global capacity.",
    "Microsoft Pairs 2 Gigawatts of Capacity With Dedicated West Texas Power"
   ],
   "state_evidence": [
    "Microsoft delivered another [defining announcement on June 22,](https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/) unveiling a new data center campus in Pecos, Texas, that would add approximately 2 gigawatts to its global capacity.",
    "Microsoft Pairs 2 Gigawatts of Capacity With Dedicated West Texas Power"
   ],
   "capacity_gw_evidence": [
    "Microsoft delivered another [defining announcement on June 22,](https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/) unveiling a new data center campus in Pecos, Texas, that would add approximately 2 gigawatts to its global capacity.",
    "Microsoft Pairs 2 Gigawatts of Capacity With Dedicated West Texas Power"
   ],
   "builder_evidence": [
    "Microsoft delivered another [defining announcement on June 22,](https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/) unveiling a new data center campus in Pecos, Texas, that would add approximately 2 gigawatts to its global capacity.",
    "Microsoft Pairs 2 Gigawatts of Capacity With Dedicated West Texas Power"
   ],
   "ai_customer_evidence": [
    "Microsoft delivered another [defining announcement on June 22,](https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/) unveiling a new data center campus in Pecos, Texas, that would add approximately 2 gigawatts to its global capacity.",
    "Microsoft Pairs 2 Gigawatts of Capacity With Dedicated West Texas Power"
   ],
   "status_evidence": [
    "Microsoft delivered another [defining announcement on June 22,](https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/) unveiling a new data center campus in Pecos, Texas, that would add approximately 2 gigawatts to its global capacity.",
    "Microsoft Pairs 2 Gigawatts of Capacity With Dedicated West Texas Power"
   ],
   "announcement_date_evidence": [
    "Microsoft delivered another [defining announcement on June 22,](https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/) unveiling a new data center campus in Pecos, Texas, that would add approximately 2 gigawatts to its global capacity.",
    "Microsoft Pairs 2 Gigawatts of Capacity With Dedicated West Texas Power"
   ]
  },
  {
   "url": "https://datacenterfrontier.com/hyperscale/article/55393445/land-and-expand-the-gigawatt-credibility-test",
   "title": "Land and Expand: The Gigawatt Credibility Test",
   "published_at": "2026-08-06T00:00:00",
   "project": "Beacon Point AI data center campus",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "fully commercialized",
   "announcement_date": null,
   "project_evidence": [
    "Three days before OpenAI\u2019s Georgia announcement, Hut 8 reported that it had fully commercialized its [1-gigawatt Beacon Point AI data center campus in Nueces County, Texas](https://www.hut8.com/news-insights/press-releases/hut-8-fully-commercializes-1-gw-beacon-point-ai-data-center-campus-with-second-352-mw-it-lease).",
    "Hut 8 Turns a Texas Campus Into a Contracted Infrastructure Asset"
   ],
   "locality_evidence": [
    "Three days before OpenAI\u2019s Georgia announcement, Hut 8 reported that it had fully commercialized its [1-gigawatt Beacon Point AI data center campus in Nueces County, Texas](https://www.hut8.com/news-insights/press-releases/hut-8-fully-commercializes-1-gw-beacon-point-ai-data-center-campus-with-second-352-mw-it-lease).",
    "Hut 8 Turns a Texas Campus Into a Contracted Infrastructure Asset"
   ],
   "state_evidence": [
    "Three days before OpenAI\u2019s Georgia announcement, Hut 8 reported that it had fully commercialized its [1-gigawatt Beacon Point AI data center campus in Nueces County, Texas](https://www.hut8.com/news-insights/press-releases/hut-8-fully-commercializes-1-gw-beacon-point-ai-data-center-campus-with-second-352-mw-it-lease).",
    "Hut 8 Turns a Texas Campus Into a Contracted Infrastructure Asset"
   ],
   "capacity_gw_evidence": [
    "Three days before OpenAI\u2019s Georgia announcement, Hut 8 reported that it had fully commercialized its [1-gigawatt Beacon Point AI data center campus in Nueces County, Texas](https://www.hut8.com/news-insights/press-releases/hut-8-fully-commercializes-1-gw-beacon-point-ai-data-center-campus-with-second-352-mw-it-lease).",
    "Hut 8 Turns a Texas Campus Into a Contracted Infrastructure Asset"
   ],
   "builder_evidence": [
    "Three days before OpenAI\u2019s Georgia announcement, Hut 8 reported that it had fully commercialized its [1-gigawatt Beacon Point AI data center campus in Nueces County, Texas](https://www.hut8.com/news-insights/press-releases/hut-8-fully-commercializes-1-gw-beacon-point-ai-data-center-campus-with-second-352-mw-it-lease).",
    "Hut 8 Turns a Texas Campus Into a Contracted Infrastructure Asset"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Three days before OpenAI\u2019s Georgia announcement, Hut 8 reported that it had fully commercialized its [1-gigawatt Beacon Point AI data center campus in Nueces County, Texas](https://www.hut8.com/news-insights/press-releases/hut-8-fully-commercializes-1-gw-beacon-point-ai-data-center-campus-with-second-352-mw-it-lease).",
    "Hut 8 Turns a Texas Campus Into a Contracted Infrastructure Asset"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterfrontier.com/hyperscale/article/55393445/land-and-expand-the-gigawatt-credibility-test",
   "title": "Land and Expand: The Gigawatt Credibility Test",
   "published_at": "2026-08-06T00:00:00",
   "project": "Astra Enterprise Park",
   "locality": "De Soto",
   "state": "Kansas",
   "capacity_gw": 2.0,
   "builder": "Digital Realty",
   "ai_customer": null,
   "status": "acquisition",
   "announcement_date": "2026-06-22",
   "project_evidence": [
    "[Digital Realty\u2019s June 22 acquisition](https://investor.digitalrealty.com/news-releases/news-release-details/digital-realty-announces-transactions-drive-continued-platform) of roughly 1,440 acres at Astra Enterprise Park in De Soto, Kansas, marked another major expansion beyond the traditional primary markets.",
    "Kansas City Emerges as a Multi-Gigawatt Market"
   ],
   "locality_evidence": [
    "[Digital Realty\u2019s June 22 acquisition](https://investor.digitalrealty.com/news-releases/news-release-details/digital-realty-announces-transactions-drive-continued-platform) of roughly 1,440 acres at Astra Enterprise Park in De Soto, Kansas, marked another major expansion beyond the traditional primary markets.",
    "Kansas City Emerges as a Multi-Gigawatt Market"
   ],
   "state_evidence": [
    "[Digital Realty\u2019s June 22 acquisition](https://investor.digitalrealty.com/news-releases/news-release-details/digital-realty-announces-transactions-drive-continued-platform) of roughly 1,440 acres at Astra Enterprise Park in De Soto, Kansas, marked another major expansion beyond the traditional primary markets.",
    "Kansas City Emerges as a Multi-Gigawatt Market"
   ],
   "capacity_gw_evidence": [
    "Digital Realty acquired the site for approximately $475 million in cash and common units in its operating partnership and entered into a utility agreement that could provide 600 megawatts by early 2028, rising to 2 gigawatts at full delivery.",
    "Kansas City Emerges as a Multi-Gigawatt Market"
   ],
   "builder_evidence": [
    "[Digital Realty\u2019s June 22 acquisition](https://investor.digitalrealty.com/news-releases/news-release-details/digital-realty-announces-transactions-drive-continued-platform) of roughly 1,440 acres at Astra Enterprise Park in De Soto, Kansas, marked another major expansion beyond the traditional primary markets.",
    "Kansas City Emerges as a Multi-Gigawatt Market"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "[Digital Realty\u2019s June 22 acquisition](https://investor.digitalrealty.com/news-releases/news-release-details/digital-realty-announces-transactions-drive-continued-platform) of roughly 1,440 acres at Astra Enterprise Park in De Soto, Kansas, marked another major expansion beyond the traditional primary markets.",
    "Kansas City Emerges as a Multi-Gigawatt Market"
   ],
   "announcement_date_evidence": [
    "[Digital Realty\u2019s June 22 acquisition](https://investor.digitalrealty.com/news-releases/news-release-details/digital-realty-announces-transactions-drive-continued-platform) of roughly 1,440 acres at Astra Enterprise Park in De Soto, Kansas, marked another major expansion beyond the traditional primary markets.",
    "Kansas City Emerges as a Multi-Gigawatt Market"
   ]
  },
  {
   "url": "https://jconline.com/story/news/local/michigan/2026/03/17/google-weighs-joining-van-buren-township-data-center-project-dte-energy/89187228007",
   "title": "Google weighs joining Van Buren Township data center project",
   "published_at": "2026-03-17T12:02:32",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": "Google",
   "status": "seeking approval",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "Google weighs joining Van Buren Township data center project",
    "The tech giant is evaluating whether it will get involved with [Project Cannoli, the hyperscale data center project advancing in the western Wayne County community](/story/news/local/wayne-county/2026/03/06/nda-nondisclosure-agreement-confidentiality-clues-panattoni-anchor-designs-van-buren-data-center/89016021007/), a Google spokesperson said in an email."
   ],
   "locality_evidence": [
    "Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project."
   ],
   "state_evidence": [
    "MICHIGAN",
    "Google weighs joining Van Buren Township data center project"
   ],
   "capacity_gw_evidence": [
    "MICHIGAN",
    "Google weighs joining Van Buren Township data center project",
    "The Cannoli Project hyperscale data center in Van Buren Township will demand 1 gigawatt of power, DTE Energy Corporate Communications Director Jill Wilmot said in an email."
   ],
   "builder_evidence": [
    "MICHIGAN",
    "Google weighs joining Van Buren Township data center project",
    "The data center project is being pushed by California real estate development firm Panattoni Development Co."
   ],
   "ai_customer_evidence": [
    "MICHIGAN",
    "Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project."
   ],
   "status_evidence": [
    "MICHIGAN",
    "Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project."
   ],
   "announcement_date_evidence": [
    "MICHIGAN",
    "Google weighs joining Van Buren Township data center project",
    "Updated March 17, 2026, 3:27 p.m. ET"
   ]
  },
  {
   "url": "https://mitrade.com/insights/news/live-news/article-3-1755249-20260527",
   "title": "TeraWulf surges 10% on 1GW Kentucky AI campus et",
   "published_at": "2026-05-27T00:15:14",
   "project": "Muskie Data Campus",
   "locality": "eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# TeraWulf surges 10% on 1GW Kentucky AI campus et",
    "The new site, called the Muskie Data Campus, places TeraWulf among a growing list of firms racing to lock down massive electricity access."
   ],
   "locality_evidence": [
    "# TeraWulf surges 10% on 1GW Kentucky AI campus et",
    "The company secured a 285-acre site in eastern Kentucky."
   ],
   "state_evidence": [
    "# TeraWulf surges 10% on 1GW Kentucky AI campus et",
    "The company secured a 285-acre site in eastern Kentucky."
   ],
   "capacity_gw_evidence": [
    "# TeraWulf surges 10% on 1GW Kentucky AI campus et",
    "It is expected to support more than 1 gigawatt (GW) of AI and high-performance computing capacity."
   ],
   "builder_evidence": [
    "# TeraWulf surges 10% on 1GW Kentucky AI campus et",
    "TeraWulf is making a much bigger bet on artificial intelligence infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# TeraWulf surges 10% on 1GW Kentucky AI campus et",
    "The company secured a 285-acre site in eastern Kentucky."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://chat.orbiton.app/iren/about",
   "title": "About IREN Limited (NASDAQ:IREN)",
   "published_at": null,
   "project": "Oklahoma Data Center Campus",
   "locality": "Oklahoma",
   "state": "Oklahoma",
   "capacity_gw": 1.6,
   "builder": "IREN",
   "ai_customer": null,
   "status": "IN DEVELOPMENT",
   "announcement_date": null,
   "project_evidence": [
    "# IREN Limited",
    "Projects[\"### Oklahoma OK, USA\\nThis new data center campus is strategically located in Oklahoma, an emerging AI infrastructure hub, with 1,600MW of power secured across 2,000 acres and high-bandwidth, low-latency interconnectivity.\\nAI Cloud\\n- [Reserve your cluster](https://iren.com/contact-sales)\\n- [Explore options](https://iren.com/solutions/gpu-cloud/ai-cloud)\\n## Oklahoma Data Center Campus\\nThis grid-connected site boasts <6ms latency to network hubs, and with power scheduled to ramp up from 2028, it's an attractive solution for large-scale AI infrastructure.\\n## Oklahoma\\nOK, USA\\n2028 Substation Energization\\nIN DEVELOPMENT\\nPower Capacity1,600MW\\nLand2,000Acres\",",
    "## Oklahoma Data Center Campus"
   ],
   "locality_evidence": [
    "# IREN Limited",
    "Projects[\"### Oklahoma OK, USA\\nThis new data center campus is strategically located in Oklahoma, an emerging AI infrastructure hub, with 1,600MW of power secured across 2,000 acres and high-bandwidth, low-latency interconnectivity.\\nAI Cloud\\n- [Reserve your cluster](https://iren.com/contact-sales)\\n- [Explore options](https://iren.com/solutions/gpu-cloud/ai-cloud)\\n## Oklahoma Data Center Campus\\nThis grid-connected site boasts <6ms latency to network hubs, and with power scheduled to ramp up from 2028, it's an attractive solution for large-scale AI infrastructure.\\n## Oklahoma\\nOK, USA\\n2028 Substation Energization\\nIN DEVELOPMENT\\nPower Capacity1,600MW\\nLand2,000Acres\",",
    "### Oklahoma OK, USA"
   ],
   "state_evidence": [
    "# IREN Limited",
    "Projects[\"### Oklahoma OK, USA\\nThis new data center campus is strategically located in Oklahoma, an emerging AI infrastructure hub, with 1,600MW of power secured across 2,000 acres and high-bandwidth, low-latency interconnectivity.\\nAI Cloud\\n- [Reserve your cluster](https://iren.com/contact-sales)\\n- [Explore options](https://iren.com/solutions/gpu-cloud/ai-cloud)\\n## Oklahoma Data Center Campus\\nThis grid-connected site boasts <6ms latency to network hubs, and with power scheduled to ramp up from 2028, it's an attractive solution for large-scale AI infrastructure.\\n## Oklahoma\\nOK, USA\\n2028 Substation Energization\\nIN DEVELOPMENT\\nPower Capacity1,600MW\\nLand2,000Acres\",",
    "This new data center campus is strategically located in Oklahoma, an emerging AI infrastructure hub, with 1,600MW of power secured across 2,000 acres and high-bandwidth, low-latency interconnectivity."
   ],
   "capacity_gw_evidence": [
    "# IREN Limited",
    "Projects[\"### Oklahoma OK, USA\\nThis new data center campus is strategically located in Oklahoma, an emerging AI infrastructure hub, with 1,600MW of power secured across 2,000 acres and high-bandwidth, low-latency interconnectivity.\\nAI Cloud\\n- [Reserve your cluster](https://iren.com/contact-sales)\\n- [Explore options](https://iren.com/solutions/gpu-cloud/ai-cloud)\\n## Oklahoma Data Center Campus\\nThis grid-connected site boasts <6ms latency to network hubs, and with power scheduled to ramp up from 2028, it's an attractive solution for large-scale AI infrastructure.\\n## Oklahoma\\nOK, USA\\n2028 Substation Energization\\nIN DEVELOPMENT\\nPower Capacity1,600MW\\nLand2,000Acres\",",
    "This new data center campus is strategically located in Oklahoma, an emerging AI infrastructure hub, with 1,600MW of power secured across 2,000 acres and high-bandwidth, low-latency interconnectivity."
   ],
   "builder_evidence": [
    "# IREN Limited",
    "Projects[\"### Oklahoma OK, USA\\nThis new data center campus is strategically located in Oklahoma, an emerging AI infrastructure hub, with 1,600MW of power secured across 2,000 acres and high-bandwidth, low-latency interconnectivity.\\nAI Cloud\\n- [Reserve your cluster](https://iren.com/contact-sales)\\n- [Explore options](https://iren.com/solutions/gpu-cloud/ai-cloud)\\n## Oklahoma Data Center Campus\\nThis grid-connected site boasts <6ms latency to network hubs, and with power scheduled to ramp up from 2028, it's an attractive solution for large-scale AI infrastructure.\\n## Oklahoma\\nOK, USA\\n2028 Substation Energization\\nIN DEVELOPMENT\\nPower Capacity1,600MW\\nLand2,000Acres\","
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# IREN Limited",
    "Projects[\"### Oklahoma OK, USA\\nThis new data center campus is strategically located in Oklahoma, an emerging AI infrastructure hub, with 1,600MW of power secured across 2,000 acres and high-bandwidth, low-latency interconnectivity.\\nAI Cloud\\n- [Reserve your cluster](https://iren.com/contact-sales)\\n- [Explore options](https://iren.com/solutions/gpu-cloud/ai-cloud)\\n## Oklahoma Data Center Campus\\nThis grid-connected site boasts <6ms latency to network hubs, and with power scheduled to ramp up from 2028, it's an attractive solution for large-scale AI infrastructure.\\n## Oklahoma\\nOK, USA\\n2028 Substation Energization\\nIN DEVELOPMENT\\nPower Capacity1,600MW\\nLand2,000Acres\","
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://chat.orbiton.app/iren/about",
   "title": "About IREN Limited (NASDAQ:IREN)",
   "published_at": null,
   "project": "Sweetwater Hub",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "UNDER CONSTRUCTION",
   "announcement_date": null,
   "project_evidence": [
    "# IREN Limited",
    "Projects[\"### Oklahoma OK, USA\\nThis new data center campus is strategically located in Oklahoma, an emerging AI infrastructure hub, with 1,600MW of power secured across 2,000 acres and high-bandwidth, low-latency interconnectivity.\\nAI Cloud\\n- [Reserve your cluster](https://iren.com/contact-sales)\\n- [Explore options](https://iren.com/solutions/gpu-cloud/ai-cloud)\\n## Oklahoma Data Center Campus\\nThis grid-connected site boasts <6ms latency to network hubs, and with power scheduled to ramp up from 2028, it's an attractive solution for large-scale AI infrastructure.\\n## Oklahoma\\nOK, USA\\n2028 Substation Energization\\nIN DEVELOPMENT\\nPower Capacity1,600MW\\nLand2,000Acres\",\"### Sweetwater TX, USA\\nIREN\u2019s 2GW Sweetwater Hub is strategically located in West Texas across two sites: Sweetwater 1 and Sweetwater 2. Spanning 2,200 acres, together the two sites are capable of supporting over 700,000 state-of-the-art liquid-cooled GPUs.\\nAI Cloud\\n- [Reserve your cluster](https://iren.com/contact-sales)\\n- [Explore options](https://iren.com/solutions/gpu-cloud/ai-cloud)\\n## Sweetwater Data Centers\\nWith direct connection to the ERCOT grid, both Sweetwater 1 and Sweetwater 2 feature multiple fiber paths, delivering <10ms latency to the nearest hyperscaler regions. Procurement and site works are underway to support the energization of the 1,400MW bulk substation (345kV/138kV) as well as primary substations (138kV/34.5kV) at Sweetwater 1.\\nSWEETWATER TX, USA\\nAir + Liquid Cooling\\n## Sweetwater 1\\n2026 Substation Energization\\nUNDER CONSTRUCTION\\nPower Capacity1,400MW\\nLand1,700Acres\\nSWEETWATER TX, USA\\nAir + Liquid Cooling\\n## Sweetwater 2\\n2027 Substation Energization\\nUNDER CONSTRUCTION\\nPower Capacity600MW\\nLand500Acres\",\"###"
   ],
   "locality_evidence": [
    "# IREN Limited",
    "Projects[\"### Oklahoma OK, USA\\nThis new data center campus is strategically located in Oklahoma, an emerging AI infrastructure hub, with 1,600MW of power secured across 2,000 acres and high-bandwidth, low-latency interconnectivity.\\nAI Cloud\\n- [Reserve your cluster](https://iren.com/contact-sales)\\n- [Explore options](https://iren.com/solutions/gpu-cloud/ai-cloud)\\n## Oklahoma Data Center Campus\\nThis grid-connected site boasts <6ms latency to network hubs, and with power scheduled to ramp up from 2028, it's an attractive solution for large-scale AI infrastructure.\\n## Oklahoma\\nOK, USA\\n2028 Substation Energization\\nIN DEVELOPMENT\\nPower Capacity1,600MW\\nLand2,000Acres\",\"### Sweetwater TX, USA\\nIREN\u2019s 2GW Sweetwater Hub is strategically located in West Texas across two sites: Sweetwater 1 and Sweetwater 2. Spanning 2,200 acres, together the two sites are capable of supporting over 700,000 state-of-the-art liquid-cooled GPUs.\\nAI Cloud\\n- [Reserve your cluster](https://iren.com/contact-sales)\\n- [Explore options](https://iren.com/solutions/gpu-cloud/ai-cloud)\\n## Sweetwater Data Centers\\nWith direct connection to the ERCOT grid, both Sweetwater 1 and Sweetwater 2 feature multiple fiber paths, delivering <10ms latency to the nearest hyperscaler regions. Procurement and site works are underway to support the energization of the 1,400MW bulk substation (345kV/138kV) as well as primary substations (138kV/34.5kV) at Sweetwater 1.\\nSWEETWATER TX, USA\\nAir + Liquid Cooling\\n## Sweetwater 1\\n2026 Substation Energization\\nUNDER CONSTRUCTION\\nPower Capacity1,400MW\\nLand1,700Acres\\nSWEETWATER TX, USA\\nAir + Liquid Cooling\\n## Sweetwater 2\\n2027 Substation Energization\\nUNDER CONSTRUCTION\\nPower Capacity600MW\\nLand500Acres\",\"###"
   ],
   "state_evidence": [
    "# IREN Limited",
    "Projects[\"### Oklahoma OK, USA\\nThis new data center campus is strategically located in Oklahoma, an emerging AI infrastructure hub, with 1,600MW of power secured across 2,000 acres and high-bandwidth, low-latency interconnectivity.\\nAI Cloud\\n- [Reserve your cluster](https://iren.com/contact-sales)\\n- [Explore options](https://iren.com/solutions/gpu-cloud/ai-cloud)\\n## Oklahoma Data Center Campus\\nThis grid-connected site boasts <6ms latency to network hubs, and with power scheduled to ramp up from 2028, it's an attractive solution for large-scale AI infrastructure.\\n## Oklahoma\\nOK, USA\\n2028 Substation Energization\\nIN DEVELOPMENT\\nPower Capacity1,600MW\\nLand2,000Acres\",\"### Sweetwater TX, USA\\nIREN\u2019s 2GW Sweetwater Hub is strategically located in West Texas across two sites: Sweetwater 1 and Sweetwater 2. Spanning 2,200 acres, together the two sites are capable of supporting over 700,000 state-of-the-art liquid-cooled GPUs.\\nAI Cloud\\n- [Reserve your cluster](https://iren.com/contact-sales)\\n- [Explore options](https://iren.com/solutions/gpu-cloud/ai-cloud)\\n## Sweetwater Data Centers\\nWith direct connection to the ERCOT grid, both Sweetwater 1 and Sweetwater 2 feature multiple fiber paths, delivering <10ms latency to the nearest hyperscaler regions. Procurement and site works are underway to support the energization of the 1,400MW bulk substation (345kV/138kV) as well as primary substations (138kV/34.5kV) at Sweetwater 1.\\nSWEETWATER TX, USA\\nAir + Liquid Cooling\\n## Sweetwater 1\\n2026 Substation Energization\\nUNDER CONSTRUCTION\\nPower Capacity1,400MW\\nLand1,700Acres\\nSWEETWATER TX, USA\\nAir + Liquid Cooling\\n## Sweetwater 2\\n2027 Substation Energization\\nUNDER CONSTRUCTION\\nPower Capacity600MW\\nLand500Acres\",\"###"
   ],
   "capacity_gw_evidence": [
    "# IREN Limited",
    "Projects[\"### Oklahoma OK, USA\\nThis new data center campus is strategically located in Oklahoma, an emerging AI infrastructure hub, with 1,600MW of power secured across 2,000 acres and high-bandwidth, low-latency interconnectivity.\\nAI Cloud\\n- [Reserve your cluster](https://iren.com/contact-sales)\\n- [Explore options](https://iren.com/solutions/gpu-cloud/ai-cloud)\\n## Oklahoma Data Center Campus\\nThis grid-connected site boasts <6ms latency to network hubs, and with power scheduled to ramp up from 2028, it's an attractive solution for large-scale AI infrastructure.\\n## Oklahoma\\nOK, USA\\n2028 Substation Energization\\nIN DEVELOPMENT\\nPower Capacity1,600MW\\nLand2,000Acres\",\"### Sweetwater TX, USA\\nIREN\u2019s 2GW Sweetwater Hub is strategically located in West Texas across two sites: Sweetwater 1 and Sweetwater 2. Spanning 2,200 acres, together the two sites are capable of supporting over 700,000 state-of-the-art liquid-cooled GPUs.\\nAI Cloud\\n- [Reserve your cluster](https://iren.com/contact-sales)\\n- [Explore options](https://iren.com/solutions/gpu-cloud/ai-cloud)\\n## Sweetwater Data Centers\\nWith direct connection to the ERCOT grid, both Sweetwater 1 and Sweetwater 2 feature multiple fiber paths, delivering <10ms latency to the nearest hyperscaler regions. Procurement and site works are underway to support the energization of the 1,400MW bulk substation (345kV/138kV) as well as primary substations (138kV/34.5kV) at Sweetwater 1.\\nSWEETWATER TX, USA\\nAir + Liquid Cooling\\n## Sweetwater 1\\n2026 Substation Energization\\nUNDER CONSTRUCTION\\nPower Capacity1,400MW\\nLand1,700Acres\\nSWEETWATER TX, USA\\nAir + Liquid Cooling\\n## Sweetwater 2\\n2027 Substation Energization\\nUNDER CONSTRUCTION\\nPower Capacity600MW\\nLand500Acres\",\"###"
   ],
   "builder_evidence": [
    "# IREN Limited",
    "Projects[\"### Oklahoma OK, USA\\nThis new data center campus is strategically located in Oklahoma, an emerging AI infrastructure hub, with 1,600MW of power secured across 2,000 acres and high-bandwidth, low-latency interconnectivity.\\nAI Cloud\\n- [Reserve your cluster](https://iren.com/contact-sales)\\n- [Explore options](https://iren.com/solutions/gpu-cloud/ai-cloud)\\n## Oklahoma Data Center Campus\\nThis grid-connected site boasts <6ms latency to network hubs, and with power scheduled to ramp up from 2028, it's an attractive solution for large-scale AI infrastructure.\\n## Oklahoma\\nOK, USA\\n2028 Substation Energization\\nIN DEVELOPMENT\\nPower Capacity1,600MW\\nLand2,000Acres\",\"### Sweetwater TX, USA\\nIREN\u2019s 2GW Sweetwater Hub is strategically located in West Texas across two sites: Sweetwater 1 and Sweetwater 2. Spanning 2,200 acres, together the two sites are capable of supporting over 700,000 state-of-the-art liquid-cooled GPUs.\\nAI Cloud\\n- [Reserve your cluster](https://iren.com/contact-sales)\\n- [Explore options](https://iren.com/solutions/gpu-cloud/ai-cloud)\\n## Sweetwater Data Centers\\nWith direct connection to the ERCOT grid, both Sweetwater 1 and Sweetwater 2 feature multiple fiber paths, delivering <10ms latency to the nearest hyperscaler regions. Procurement and site works are underway to support the energization of the 1,400MW bulk substation (345kV/138kV) as well as primary substations (138kV/34.5kV) at Sweetwater 1.\\nSWEETWATER TX, USA\\nAir + Liquid Cooling\\n## Sweetwater 1\\n2026 Substation Energization\\nUNDER CONSTRUCTION\\nPower Capacity1,400MW\\nLand1,700Acres\\nSWEETWATER TX, USA\\nAir + Liquid Cooling\\n## Sweetwater 2\\n2027 Substation Energization\\nUNDER CONSTRUCTION\\nPower Capacity600MW\\nLand500Acres\",\"###"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# IREN Limited",
    "Projects[\"### Oklahoma OK, USA\\nThis new data center campus is strategically located in Oklahoma, an emerging AI infrastructure hub, with 1,600MW of power secured across 2,000 acres and high-bandwidth, low-latency interconnectivity.\\nAI Cloud\\n- [Reserve your cluster](https://iren.com/contact-sales)\\n- [Explore options](https://iren.com/solutions/gpu-cloud/ai-cloud)\\n## Oklahoma Data Center Campus\\nThis grid-connected site boasts <6ms latency to network hubs, and with power scheduled to ramp up from 2028, it's an attractive solution for large-scale AI infrastructure.\\n## Oklahoma\\nOK, USA\\n2028 Substation Energization\\nIN DEVELOPMENT\\nPower Capacity1,600MW\\nLand2,000Acres\",\"### Sweetwater TX, USA\\nIREN\u2019s 2GW Sweetwater Hub is strategically located in West Texas across two sites: Sweetwater 1 and Sweetwater 2. Spanning 2,200 acres, together the two sites are capable of supporting over 700,000 state-of-the-art liquid-cooled GPUs.\\nAI Cloud\\n- [Reserve your cluster](https://iren.com/contact-sales)\\n- [Explore options](https://iren.com/solutions/gpu-cloud/ai-cloud)\\n## Sweetwater Data Centers\\nWith direct connection to the ERCOT grid, both Sweetwater 1 and Sweetwater 2 feature multiple fiber paths, delivering <10ms latency to the nearest hyperscaler regions. Procurement and site works are underway to support the energization of the 1,400MW bulk substation (345kV/138kV) as well as primary substations (138kV/34.5kV) at Sweetwater 1.\\nSWEETWATER TX, USA\\nAir + Liquid Cooling\\n## Sweetwater 1\\n2026 Substation Energization\\nUNDER CONSTRUCTION\\nPower Capacity1,400MW\\nLand1,700Acres\\nSWEETWATER TX, USA\\nAir + Liquid Cooling\\n## Sweetwater 2\\n2027 Substation Energization\\nUNDER CONSTRUCTION\\nPower Capacity600MW\\nLand500Acres\",\"###"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://businesswire.com/news/home/20260310800142/en/Creekstone-Energy-Secures-Largest-Solar-Lease-in-Utahs-History-and-Receives-Millard-County-Zoning-Approval-for-Over-1-GW-of-Solar-Development",
   "title": "Creekstone Energy Secures Largest Solar Lease in Utah\u2019s History and Receives Millard County Zoning Approval for Over 1 GW of Solar Development",
   "published_at": "2026-03-10T11:00:00",
   "project": "Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy",
   "ai_customer": null,
   "status": "master-planned",
   "announcement_date": null,
   "project_evidence": [
    "Creekstone plans to develop more than 1 gigawatt (GW) of solar generating capacity over the next 18 months to support the growing power demands of its Delta Gigasite\u2014one of the largest AI hyperscale data center developments in the western United States.",
    "Creekstone\u2019s Delta Gigasite campus sits on more than 1,100 acres in central Utah\u2019s Millard County adjacent to the leased land and is master-planned for more than 10 gigawatts of total capacity."
   ],
   "locality_evidence": [
    "DELTA, Utah--([BUSINESS WIRE](https://www.businesswire.com))--Creekstone Energy LLC (\u201cCreekstone\u201d) today announced it has executed a long-term solar lease with the State of Utah\u2019s School and Institutional Trust Lands Administration (TLA) encompassing approximately 13,000 acres of state trust lands in Millard County.",
    "Creekstone\u2019s Delta Gigasite campus sits on more than 1,100 acres in central Utah\u2019s Millard County adjacent to the leased land and is master-planned for more than 10 gigawatts of total capacity."
   ],
   "state_evidence": [
    "DELTA, Utah--([BUSINESS WIRE](https://www.businesswire.com))--Creekstone Energy LLC (\u201cCreekstone\u201d) today announced it has executed a long-term solar lease with the State of Utah\u2019s School and Institutional Trust Lands Administration (TLA) encompassing approximately 13,000 acres of state trust lands in Millard County.",
    "Creekstone\u2019s Delta Gigasite campus sits on more than 1,100 acres in central Utah\u2019s Millard County adjacent to the leased land and is master-planned for more than 10 gigawatts of total capacity."
   ],
   "capacity_gw_evidence": [
    "Creekstone\u2019s Delta Gigasite campus sits on more than 1,100 acres in central Utah\u2019s Millard County adjacent to the leased land and is master-planned for more than 10 gigawatts of total capacity."
   ],
   "builder_evidence": [
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Creekstone\u2019s Delta Gigasite campus sits on more than 1,100 acres in central Utah\u2019s Millard County adjacent to the leased land and is master-planned for more than 10 gigawatts of total capacity."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://modbee.com/news/business/article316739447.html",
   "title": "Morgan Stanley leads $15B bet on Anthropic's Texas campus",
   "published_at": "2026-08-02T00:07:00",
   "project": "Hubbard campus",
   "locality": "Hubbard",
   "state": "Texas",
   "capacity_gw": 1.6,
   "builder": "Nexus Data Centers",
   "ai_customer": "Anthropic",
   "status": "closing in on $15 billion in financing",
   "announcement_date": null,
   "project_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus",
    "The Hubbard campus lands at an awkward moment for that model."
   ],
   "locality_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "state_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "capacity_gw_evidence": [
    "The guarantees cover [four Anthropic data center leases](https://www.reuters.com/legal/litigation/banks-talks-lend-15-billion-anthropic-data-center-backed-by-google-wsj-reports-2026-07-30/) and the power purchase agreements tied to an on-site natural gas plant with 1.6 gigawatts of capacity.",
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "builder_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "ai_customer_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "status_evidence": [
    "# Morgan Stanley leads $15B bet on Anthropic's Texas campus"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://cincinnati.com/story/news/2026/08/17/openai-nvidia-back-massive-data-center-campus-in-ohio/91347647007",
   "title": "OpenAI, Nvidia back massive data center campus in Ohio",
   "published_at": "2026-08-18T02:28:31",
   "project": "Pike County data center campus",
   "locality": "Piketon",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "broke ground earlier this year",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# OpenAI commits to massive buildout of Pike County data center campus",
    "OpenAI, the artificial intelligence company, has pledged to create 35,000 construction jobs in a six-year buildout of the Pike County data center campus that broke ground earlier this year."
   ],
   "locality_evidence": [
    "OpenAI commits to massive buildout of Pike County data center campus",
    "When officials from SB Energy and the Trump administration visited in March, they [touted the former Portsmouth Gaseous Diffusion Plant as having helped win the Cold War and revive industrialization by enriching uranium used for defense](/videos/business/energy-resource/2026/04/03/energy-officials-announce-massive-gas-plant-in-piketon/89292220007/) and now having \"another opportunity to play a leading role in the next era of American industrialization.\""
   ],
   "state_evidence": [
    "OpenAI commits to massive buildout of Pike County data center campus",
    "The company appeared to react to ongoing pushback to data center expansion in Ohio by emphasizing the long-term benefits of its operations, especially to residents who have become increasingly skeptical."
   ],
   "capacity_gw_evidence": [
    "OpenAI commits to massive buildout of Pike County data center campus",
    "The San Francisco-based company has agreed to secure approximately 8 gigawatts of information technology electrical power at the PORTS-Pike Technology Campus about 70 miles south of Columbus."
   ],
   "builder_evidence": [
    "OpenAI commits to massive buildout of Pike County data center campus",
    "SB Energy will build, own, and operate the data center under a 20-year lease to OpenAI and deliver operational capacity over time."
   ],
   "ai_customer_evidence": [
    "OpenAI commits to massive buildout of Pike County data center campus",
    "OpenAI will be the customer and will utilize capacity at the site, which will exclusively host NVIDIA AI compute infrastructure, according to the release."
   ],
   "status_evidence": [
    "OpenAI commits to massive buildout of Pike County data center campus",
    "OpenAI, the artificial intelligence company, has pledged to create 35,000 construction jobs in a six-year buildout of the Pike County data center campus that broke ground earlier this year."
   ],
   "announcement_date_evidence": [
    "OpenAI commits to massive buildout of Pike County data center campus",
    "Aug. 17, 2026, 10:28 p.m. ET",
    "The company did not address its overall investment in a news release Aug. 17."
   ]
  },
  {
   "url": "https://shaam.blog/articles/meta-hyperion-50-billion-data-center-louisiana",
   "title": "The $50 Billion War: Meta\u2019s Hyperion and the New Physics of AI Dominance",
   "published_at": "2026-07-14T13:03:54",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "",
   "status": "Under Construction",
   "announcement_date": "2025-10-01",
   "project_evidence": [
    "Why is Meta spending $50 billion on one data center?",
    "**Last verified:** 2026-07-14 \u00b7 **Project:** Hyperion (Richland Parish, LA) \u00b7 **Investment:** >$50B \u00b7 **Target:** 5GW by 2032 *Pricing and infrastructure scales change rapidly\u2014all data is based on July 2026 filings and official statements.*"
   ],
   "locality_evidence": [
    "Why is Meta spending $50 billion on one data center?",
    "**Last verified:** 2026-07-14 \u00b7 **Project:** Hyperion (Richland Parish, LA) \u00b7 **Investment:** >$50B \u00b7 **Target:** 5GW by 2032 *Pricing and infrastructure scales change rapidly\u2014all data is based on July 2026 filings and official statements.*"
   ],
   "state_evidence": [
    "Why did Meta choose Louisiana for its largest AI project?",
    "**Last verified:** 2026-07-14 \u00b7 **Project:** Hyperion (Richland Parish, LA) \u00b7 **Investment:** >$50B \u00b7 **Target:** 5GW by 2032 *Pricing and infrastructure scales change rapidly\u2014all data is based on July 2026 filings and official statements.*"
   ],
   "capacity_gw_evidence": [
    "How much power does the Hyperion facility actually use?",
    "The updated plan scales the facility to a monstrous **5 gigawatts (GW)** of capacity.",
    "**Last verified:** 2026-07-14 \u00b7 **Project:** Hyperion (Richland Parish, LA) \u00b7 **Investment:** >$50B \u00b7 **Target:** 5GW by 2032 *Pricing and infrastructure scales change rapidly\u2014all data is based on July 2026 filings and official statements.*"
   ],
   "builder_evidence": [
    "Why is Meta spending $50 billion on one data center?",
    "Meta\u2019s original $10 billion estimate for Hyperion grew to $27 billion in late 2025 through a joint venture with [Blue Owl Capital](https://investor.atmeta.com/investor-news/press-release-details/2025/Meta-Announces-Joint-Venture-with-Funds-Managed-by-Blue-Owl-Capital-to-Develop-Hyperion-Data-Center/default.aspx), and has now exploded past $50 billion."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Over $1.6 billion in direct contracts have already been awarded to local Louisiana businesses since construction began in December 2024.",
    "Why is Meta spending $50 billion on one data center?"
   ],
   "announcement_date_evidence": [
    "Why is Meta spending $50 billion on one data center?",
    "**2025-10-01:** (Historical Reference) Meta originally announced a $27B joint venture for Hyperion."
   ]
  },
  {
   "url": "https://therepublic.com/2026/07/17/data-center-of-attention-what-can-other-communities-learn-from-new-carlisle",
   "title": "Data center of attention: What can other communities learn from New Carlisle?",
   "published_at": "2026-07-17T13:51:03",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon Web Services",
   "ai_customer": null,
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "Data center of attention: What can other communities learn from New Carlisle?",
    "In 18 months, empty fields just outside the township started to take shape into Amazon Web Services\u2019 (AWS) Project Rainier, a 1,200-acre data center cluster used to train artificial intelligence models."
   ],
   "locality_evidence": [
    "Data center of attention: What can other communities learn from New Carlisle?",
    "NEW CARLISLE \u2014Back behind the walnuts and the rough bark of hickory trees, Riley Thompson and much of his extended family inhabit 120 acres of woods on the outskirts of New Carlisle."
   ],
   "state_evidence": [
    "Data center of attention: What can other communities learn from New Carlisle?",
    "The project adds to the 123 data centers in Indiana, according to datacentermap.com."
   ],
   "capacity_gw_evidence": [
    "Data center of attention: What can other communities learn from New Carlisle?",
    "When fully operational, Project Rainier expects to use up to 2.2 gigawatts of energy per year, enough to power 1 million homes."
   ],
   "builder_evidence": [
    "Data center of attention: What can other communities learn from New Carlisle?",
    "In 18 months, empty fields just outside the township started to take shape into Amazon Web Services\u2019 (AWS) Project Rainier, a 1,200-acre data center cluster used to train artificial intelligence models."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Data center of attention: What can other communities learn from New Carlisle?",
    "The old growth and chirping birds hide what is just around the corner \u2014 one of the world\u2019s largest operational AI data centers."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://visaliatimesdelta.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Colossus 2",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 1.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "active construction",
   "announcement_date": "2025-03-01",
   "project_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "locality_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis"
   ],
   "state_evidence": null,
   "capacity_gw_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "builder_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "In March 2025, the Greater Memphis Chamber announced xAI's plans for a second campus and its purchase of a 1 million-square-foot building."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The Tulane Road site is an artificial intelligence data center, with active construction still on site."
   ],
   "announcement_date_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "In March 2025, the Greater Memphis Chamber announced xAI's plans for a second campus and its purchase of a 1 million-square-foot building."
   ]
  },
  {
   "url": "https://visaliatimesdelta.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Macrohardrr",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2026-01-08",
   "project_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ],
   "locality_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven"
   ],
   "state_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ],
   "capacity_gw_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "builder_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "The former Duke Energy site has been under construction with gas turbines on site for powering xAI data centers."
   ],
   "announcement_date_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ]
  },
  {
   "url": "https://markets.financialcontent.com/wral/article/bizwire-2025-8-19-vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand",
   "title": "Vantage Data Centers Unveils Plans for \u00e2Frontier,\u00e2 a $25B Mega-campus in Texas to Meet Unprecedented AI Demand",
   "published_at": "2025-08-19T11:00:00",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2025-08-19",
   "project_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "locality_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "state_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "capacity_gw_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "builder_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "The state-of-the-art campus, \u201cFrontier,\u201d will lead to advancements in AI and employ more than 5,000 individuals across construction and ongoing operations."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Construction on the campus has already begun, with the first building scheduled for delivery in the second half of 2026.",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas."
   ],
   "announcement_date_evidence": [
    "Vantage Data Centers, a leading global provider of hyperscale data centers, today announced its largest investment to date of over $25 billion to develop a mega-scale 1.4GW data center campus in Shackelford County, Texas.",
    "View source version on businesswire.com: [https://www.businesswire.com/news/home/20250819333311/en/](https://www.businesswire.com/news/home/20250819333311/en/)"
   ]
  },
  {
   "url": "https://finviz.com/news/322520/fermi-america-secures-final-6gw-clean-air-permit-from-the-texas-commission-on-environmental-quality-tceq-for-worlds-largest-11-gw-private-power-grid",
   "title": "Fermi America Secures Final 6GW Clean Air Permit from the Texas Commission on Environmental Quality (TCEQ) for World's Largest 11 GW Private Power Grid",
   "published_at": null,
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "Final Air Permit Secured",
   "announcement_date": "2026-02-25",
   "project_evidence": [
    "[Fermi Inc. (d/b/a Fermi America) NASDAQ & LSE: FRMI)](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4627643-1&h=4175278444&u=https%3A%2F%2Ffermiamerica.com%2F&a=Fermi+Inc.+(d%2Fb%2Fa+Fermi+America)+NASDAQ+%26+LSE%3A+FRMI)), operating as Fermi America\u2122 in partnership with the Texas Tech University System (TTU System), today announced that the Texas Commission on Environmental Quality (TCEQ) has granted final approval of the nation's second largest Clean Air Permit for 6 gigawatts (GW) of clean natural gas-based power generation at its landmark 11 GW Project Matador campus.",
    "# Fermi America Secures Final 6GW Clean Air Permit from the Texas Commission on Environmental Quality (TCEQ) for World's Largest 11 GW Private Power Grid"
   ],
   "locality_evidence": [
    "AMARILLO, Texas, Feb. 25, 2026 /PRNewswire/ -- [Fermi Inc. (d/b/a Fermi America) NASDAQ & LSE: FRMI)](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4627643-1&h=4175278444&u=https%3A%2F%2Ffermiamerica.com%2F&a=Fermi+Inc.+(d%2Fb%2Fa+Fermi+America)+NASDAQ+%26+LSE%3A+FRMI)), operating as Fermi America\u2122 in partnership with the Texas Tech University System (TTU System), today announced that the Texas Commission on Environmental Quality (TCEQ) has granted final approval of the nation's second largest Clean Air Permit for 6 gigawatts (GW) of clean natural gas-based power generation at its landmark 11 GW Project Matador campus.",
    "# Fermi America Secures Final 6GW Clean Air Permit from the Texas Commission on Environmental Quality (TCEQ) for World's Largest 11 GW Private Power Grid"
   ],
   "state_evidence": [
    "AMARILLO, Texas, Feb. 25, 2026 /PRNewswire/ -- [Fermi Inc. (d/b/a Fermi America) NASDAQ & LSE: FRMI)](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4627643-1&h=4175278444&u=https%3A%2F%2Ffermiamerica.com%2F&a=Fermi+Inc.+(d%2Fb%2Fa+Fermi+America)+NASDAQ+%26+LSE%3A+FRMI)), operating as Fermi America\u2122 in partnership with the Texas Tech University System (TTU System), today announced that the Texas Commission on Environmental Quality (TCEQ) has granted final approval of the nation's second largest Clean Air Permit for 6 gigawatts (GW) of clean natural gas-based power generation at its landmark 11 GW Project Matador campus.",
    "# Fermi America Secures Final 6GW Clean Air Permit from the Texas Commission on Environmental Quality (TCEQ) for World's Largest 11 GW Private Power Grid"
   ],
   "capacity_gw_evidence": [
    "[Fermi Inc. (d/b/a Fermi America) NASDAQ & LSE: FRMI)](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4627643-1&h=4175278444&u=https%3A%2F%2Ffermiamerica.com%2F&a=Fermi+Inc.+(d%2Fb%2Fa+Fermi+America)+NASDAQ+%26+LSE%3A+FRMI)), operating as Fermi America\u2122 in partnership with the Texas Tech University System (TTU System), today announced that the Texas Commission on Environmental Quality (TCEQ) has granted final approval of the nation's second largest Clean Air Permit for 6 gigawatts (GW) of clean natural gas-based power generation at its landmark 11 GW Project Matador campus.",
    "# Fermi America Secures Final 6GW Clean Air Permit from the Texas Commission on Environmental Quality (TCEQ) for World's Largest 11 GW Private Power Grid"
   ],
   "builder_evidence": [
    "[Fermi Inc. (d/b/a Fermi America) NASDAQ & LSE: FRMI)](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4627643-1&h=4175278444&u=https%3A%2F%2Ffermiamerica.com%2F&a=Fermi+Inc.+(d%2Fb%2Fa+Fermi+America)+NASDAQ+%26+LSE%3A+FRMI)), operating as Fermi America\u2122 in partnership with the Texas Tech University System (TTU System), today announced that the Texas Commission on Environmental Quality (TCEQ) has granted final approval of the nation's second largest Clean Air Permit for 6 gigawatts (GW) of clean natural gas-based power generation at its landmark 11 GW Project Matador campus.",
    "# Fermi America Secures Final 6GW Clean Air Permit from the Texas Commission on Environmental Quality (TCEQ) for World's Largest 11 GW Private Power Grid"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "[Fermi Inc. (d/b/a Fermi America) NASDAQ & LSE: FRMI)](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4627643-1&h=4175278444&u=https%3A%2F%2Ffermiamerica.com%2F&a=Fermi+Inc.+(d%2Fb%2Fa+Fermi+America)+NASDAQ+%26+LSE%3A+FRMI)), operating as Fermi America\u2122 in partnership with the Texas Tech University System (TTU System), today announced that the Texas Commission on Environmental Quality (TCEQ) has granted final approval of the nation's second largest Clean Air Permit for 6 gigawatts (GW) of clean natural gas-based power generation at its landmark 11 GW Project Matador campus.",
    "# Fermi America Secures Final 6GW Clean Air Permit from the Texas Commission on Environmental Quality (TCEQ) for World's Largest 11 GW Private Power Grid"
   ],
   "announcement_date_evidence": [
    "AMARILLO, Texas, Feb. 25, 2026 /PRNewswire/ -- [Fermi Inc. (d/b/a Fermi America) NASDAQ & LSE: FRMI)](https://edge.prnewswire.com/c/link/?t=0&l=en&o=4627643-1&h=4175278444&u=https%3A%2F%2Ffermiamerica.com%2F&a=Fermi+Inc.+(d%2Fb%2Fa+Fermi+America)+NASDAQ+%26+LSE%3A+FRMI)), operating as Fermi America\u2122 in partnership with the Texas Tech University System (TTU System), today announced that the Texas Commission on Environmental Quality (TCEQ) has granted final approval of the nation's second largest Clean Air Permit for 6 gigawatts (GW) of clean natural gas-based power generation at its landmark 11 GW Project Matador campus.",
    "# Fermi America Secures Final 6GW Clean Air Permit from the Texas Commission on Environmental Quality (TCEQ) for World's Largest 11 GW Private Power Grid"
   ]
  },
  {
   "url": "http://enold.prnasia.com/releases/apac/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy-to-compute-525468.shtml",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": null,
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "locality_evidence": [
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "capacity_gw_evidence": [
    "The West Virginia campus is the first state-certified utility grid purpose-built for AI workloads in the United States.",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "builder_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "announcement_date_evidence": [
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ]
  },
  {
   "url": "https://particle.news/story/core-scientific-to-convert-texas-mining-site-into-15gw-ai-data-center-campus",
   "title": "Core Scientific to Convert Texas Mining Site Into 1.5GW AI Data Center Campus",
   "published_at": "2026-04-28T10:15:50",
   "project": "Pecos",
   "locality": "Pecos",
   "state": "Texas",
   "capacity_gw": 1.5,
   "builder": "Core Scientific",
   "ai_customer": "",
   "status": "The first data hall finished its foundation and early capacity is expected in 2027.",
   "announcement_date": null,
   "project_evidence": [
    "# [Core Scientific](/entity/core-scientific-inc/g/11h1y5_j9s?ref=cluster:15382196) to Convert [Texas](/entity/texas/m/07b_l?ref=cluster:15382196) Mining Site Into 1.5GW [AI](/entity/artificial-intelligence/m/0mkz?ref=cluster:15382196) Data Center Campus",
    "- [Core Scientific](/entity/core-scientific-inc/g/11h1y5_j9s?ref=cluster:15382196), which detailed the [Pecos](/entity/pecos/m/01081j?ref=cluster:15382196) plan Monday, said the first data hall finished its foundation and early capacity is expected in 2027.",
    "- More than 200 acres of land have been secured to support the build-out of the [Pecos](/entity/pecos/m/01081j?ref=cluster:15382196) campus."
   ],
   "locality_evidence": [
    "# [Core Scientific](/entity/core-scientific-inc/g/11h1y5_j9s?ref=cluster:15382196) to Convert [Texas](/entity/texas/m/07b_l?ref=cluster:15382196) Mining Site Into 1.5GW [AI](/entity/artificial-intelligence/m/0mkz?ref=cluster:15382196) Data Center Campus",
    "- [Core Scientific](/entity/core-scientific-inc/g/11h1y5_j9s?ref=cluster:15382196), which detailed the [Pecos](/entity/pecos/m/01081j?ref=cluster:15382196) plan Monday, said the first data hall finished its foundation and early capacity is expected in 2027.",
    "- More than 200 acres of land have been secured to support the build-out of the [Pecos](/entity/pecos/m/01081j?ref=cluster:15382196) campus."
   ],
   "state_evidence": [
    "# [Core Scientific](/entity/core-scientific-inc/g/11h1y5_j9s?ref=cluster:15382196) to Convert [Texas](/entity/texas/m/07b_l?ref=cluster:15382196) Mining Site Into 1.5GW [AI](/entity/artificial-intelligence/m/0mkz?ref=cluster:15382196) Data Center Campus"
   ],
   "capacity_gw_evidence": [
    "# [Core Scientific](/entity/core-scientific-inc/g/11h1y5_j9s?ref=cluster:15382196) to Convert [Texas](/entity/texas/m/07b_l?ref=cluster:15382196) Mining Site Into 1.5GW [AI](/entity/artificial-intelligence/m/0mkz?ref=cluster:15382196) Data Center Campus",
    "- The project targets about 1.5 gigawatts of total power with roughly 1 gigawatt offered for lease to AI customers."
   ],
   "builder_evidence": [
    "# [Core Scientific](/entity/core-scientific-inc/g/11h1y5_j9s?ref=cluster:15382196) to Convert [Texas](/entity/texas/m/07b_l?ref=cluster:15382196) Mining Site Into 1.5GW [AI](/entity/artificial-intelligence/m/0mkz?ref=cluster:15382196) Data Center Campus",
    "- [Core Scientific](/entity/core-scientific-inc/g/11h1y5_j9s?ref=cluster:15382196), which detailed the [Pecos](/entity/pecos/m/01081j?ref=cluster:15382196) plan Monday, said the first data hall finished its foundation and early capacity is expected in 2027."
   ],
   "ai_customer_evidence": [
    "# [Core Scientific](/entity/core-scientific-inc/g/11h1y5_j9s?ref=cluster:15382196) to Convert [Texas](/entity/texas/m/07b_l?ref=cluster:15382196) Mining Site Into 1.5GW [AI](/entity/artificial-intelligence/m/0mkz?ref=cluster:15382196) Data Center Campus",
    "- The project targets about 1.5 gigawatts of total power with roughly 1 gigawatt offered for lease to AI customers."
   ],
   "status_evidence": [
    "# [Core Scientific](/entity/core-scientific-inc/g/11h1y5_j9s?ref=cluster:15382196) to Convert [Texas](/entity/texas/m/07b_l?ref=cluster:15382196) Mining Site Into 1.5GW [AI](/entity/artificial-intelligence/m/0mkz?ref=cluster:15382196) Data Center Campus",
    "- [Core Scientific](/entity/core-scientific-inc/g/11h1y5_j9s?ref=cluster:15382196), which detailed the [Pecos](/entity/pecos/m/01081j?ref=cluster:15382196) plan Monday, said the first data hall finished its foundation and early capacity is expected in 2027."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://rtowww.com/131627-county-commission-approves-huge-utah-data-center-project",
   "title": "County Commission Approves Huge Utah Data Center Project",
   "published_at": "2026-05-06T00:05:37",
   "project": "Stratos",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O'Leary Digital",
   "ai_customer": null,
   "status": "Approved",
   "announcement_date": null,
   "project_evidence": [
    "County Commission Approves Huge Utah Data Center Project",
    "The Box Elder County Commission voted May 4 to approve two resolutions that clear the way for the Stratos project, a 40,000-acre development focused on large-scale energy generation and advanced data infrastructure."
   ],
   "locality_evidence": [
    "County Commission Approves Huge Utah Data Center Project",
    "Box Elder County, Utah | Billings Brett, U.S. Fish and Wildlife Service",
    "The Box Elder County Commission voted May 4 to approve two resolutions that clear the way for the Stratos project, a 40,000-acre development focused on large-scale energy generation and advanced data infrastructure."
   ],
   "state_evidence": [
    "County Commission Approves Huge Utah Data Center Project",
    "Box Elder County, Utah | Billings Brett, U.S. Fish and Wildlife Service",
    "A county commission has approved an up-to-9-GW data center in northwestern Utah, a project that proponents say will generate its own power and help accomplish national defense objectives."
   ],
   "capacity_gw_evidence": [
    "County Commission Approves Huge Utah Data Center Project",
    "A county commission has approved an up-to-9-GW data center in northwestern Utah, a project that proponents say will generate its own power and help accomplish national defense objectives.",
    "The project is expected to include 3 GW of generation in its first phase, with up to 9 GW total generation when all phases are complete."
   ],
   "builder_evidence": [
    "County Commission Approves Huge Utah Data Center Project",
    "O\u2019Leary Digital is developing the project in partnership with West GenCo."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "County Commission Approves Huge Utah Data Center Project",
    "A county commission has approved an up-to-9-GW data center in northwestern Utah, a project that proponents say will generate its own power and help accomplish national defense objectives.",
    "The Box Elder County Commission voted May 4 to approve two resolutions that clear the way for the Stratos project, a 40,000-acre development focused on large-scale energy generation and advanced data infrastructure."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://finance.yahoo.com/technology/ai/articles/openai-plans-20-billion-data-172855976.html",
   "title": "OpenAI plans $20 billion data center campus near Savannah, Georgia",
   "published_at": "2026-07-22T17:28:55",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "# OpenAI plans $20 billion data center campus near Savannah, Georgia",
    "The facility, named Project Camellia, is located within the Savannah Gateway Industrial Hub, about 45 minutes outside of Savannah, and would be the first data center that OpenAI is designing and building itself."
   ],
   "locality_evidence": [
    "# OpenAI plans $20 billion data center campus near Savannah, Georgia",
    "OpenAI [announced plans Wednesday](https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/) to build a data center campus in Effingham County, Georgia, committing $20 billion to the project in order to qualify for a local incentive package."
   ],
   "state_evidence": [
    "# OpenAI plans $20 billion data center campus near Savannah, Georgia",
    "OpenAI [announced plans Wednesday](https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/) to build a data center campus in Effingham County, Georgia, committing $20 billion to the project in order to qualify for a local incentive package."
   ],
   "capacity_gw_evidence": [
    "# OpenAI plans $20 billion data center campus near Savannah, Georgia",
    "The company has contracted with Georgia Power to receive 3.2 gigawatts of power, with delivery expected in phases between 2028 and 2032."
   ],
   "builder_evidence": [
    "# OpenAI plans $20 billion data center campus near Savannah, Georgia",
    "OpenAI [announced plans Wednesday](https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/) to build a data center campus in Effingham County, Georgia, committing $20 billion to the project in order to qualify for a local incentive package.",
    "The facility, named Project Camellia, is located within the Savannah Gateway Industrial Hub, about 45 minutes outside of Savannah, and would be the first data center that OpenAI is designing and building itself."
   ],
   "ai_customer_evidence": [
    "# OpenAI plans $20 billion data center campus near Savannah, Georgia",
    "OpenAI [announced plans Wednesday](https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/) to build a data center campus in Effingham County, Georgia, committing $20 billion to the project in order to qualify for a local incentive package."
   ],
   "status_evidence": [
    "# OpenAI plans $20 billion data center campus near Savannah, Georgia",
    "OpenAI [announced plans Wednesday](https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/) to build a data center campus in Effingham County, Georgia, committing $20 billion to the project in order to qualify for a local incentive package."
   ],
   "announcement_date_evidence": [
    "# OpenAI plans $20 billion data center campus near Savannah, Georgia",
    "OpenAI [announced plans Wednesday](https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/) to build a data center campus in Effingham County, Georgia, committing $20 billion to the project in order to qualify for a local incentive package."
   ]
  },
  {
   "url": "https://seacoastonline.com/story/money/business/2026/03/17/google-reveals-project-cannoli-data-center/89185890007",
   "title": "Google reveals it is behind big 'Project Cannoli' data center project",
   "published_at": "2026-03-17T12:02:18",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "locality_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "state_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google also said Tuesday that it is creating a $10 million Energy Impact Fund for local organizations to tap into with the aim of lowering monthly utility bills for Michiganders."
   ],
   "capacity_gw_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "builder_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "The data center would be developed for Google by Panattoni Development Co."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "announcement_date_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ]
  },
  {
   "url": "https://99bitcoins.com/news/bitcoin-btc/bitcoin-news-today-terawulf-abandons-btc-mining-ai-kentucky",
   "title": "Bitcoin News Today: Is Mining Dying as TeraWulf Abandons Miners",
   "published_at": "2026-05-27T09:09:38",
   "project": "Muskie Data Campus",
   "locality": "EastPark Industrial Park",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "The Maryland-based Bitcoin mining firm announced Tuesday that it has acquired the Muskie Data Campus, a 285-acre site within eastern Kentucky\u2019s EastPark Industrial Park, and plans to build more than 1 gigawatt of AI data center capacity there.",
    "TeraWulf\u2019s acquisition of the Muskie Data Campus from Industrial Equity Partners provides a significant development pipeline, with 500 MW of AI data center capacity expected to come online in late 2028 and an additional 500 MW by 2030."
   ],
   "locality_evidence": [
    "The Maryland-based Bitcoin mining firm announced Tuesday that it has acquired the Muskie Data Campus, a 285-acre site within eastern Kentucky\u2019s EastPark Industrial Park, and plans to build more than 1 gigawatt of AI data center capacity there."
   ],
   "state_evidence": [
    "The Maryland-based Bitcoin mining firm announced Tuesday that it has acquired the Muskie Data Campus, a 285-acre site within eastern Kentucky\u2019s EastPark Industrial Park, and plans to build more than 1 gigawatt of AI data center capacity there."
   ],
   "capacity_gw_evidence": [
    "The Maryland-based Bitcoin mining firm announced Tuesday that it has acquired the Muskie Data Campus, a 285-acre site within eastern Kentucky\u2019s EastPark Industrial Park, and plans to build more than 1 gigawatt of AI data center capacity there.",
    "[$WULF](https://twitter.com/search?q=%24WULF&src=ctag&ref_src=twsrc%5Etfw) acquired the 1+ GW Muskie Data Campus in Eastern Kentucky, expanding its AI/HPC infrastructure pipeline."
   ],
   "builder_evidence": [
    "The Maryland-based Bitcoin mining firm announced Tuesday that it has acquired the Muskie Data Campus, a 285-acre site within eastern Kentucky\u2019s EastPark Industrial Park, and plans to build more than 1 gigawatt of AI data center capacity there.",
    "TeraWulf\u2019s acquisition of the Muskie Data Campus from Industrial Equity Partners provides a significant development pipeline, with 500 MW of AI data center capacity expected to come online in late 2028 and an additional 500 MW by 2030."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The Maryland-based Bitcoin mining firm announced Tuesday that it has acquired the Muskie Data Campus, a 285-acre site within eastern Kentucky\u2019s EastPark Industrial Park, and plans to build more than 1 gigawatt of AI data center capacity there."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://sahmcapital.com/news/content/hut-8-stock-rises-after-signing-second-lease-that-fully-commercializes-beacon-point-campus-2026-07-20",
   "title": "Hut 8 Stock Rises After Signing Second Lease That Fully Commercializes Beacon Point Campus",
   "published_at": "2026-07-20T11:35:44",
   "project": "Beacon Point Campus",
   "locality": null,
   "state": null,
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "fully commercialized",
   "announcement_date": null,
   "project_evidence": [
    "Hut 8 Stock Rises After Signing Second Lease That Fully Commercializes Beacon Point Campus",
    "**Hut 8 Corp**. (NASDAQ:HUT) shares are trading higher Monday after the company announced it has fully commercialized its 1-gigawatt Beacon Point AI data center campus through a second 352-megawatt IT lease, bringing the campus-level base-term contract value to $19.6 billion."
   ],
   "locality_evidence": null,
   "state_evidence": null,
   "capacity_gw_evidence": [
    "Hut 8 Stock Rises After Signing Second Lease That Fully Commercializes Beacon Point Campus",
    "**Hut 8 Corp**. (NASDAQ:HUT) shares are trading higher Monday after the company announced it has fully commercialized its 1-gigawatt Beacon Point AI data center campus through a second 352-megawatt IT lease, bringing the campus-level base-term contract value to $19.6 billion."
   ],
   "builder_evidence": [
    "Hut 8 Stock Rises After Signing Second Lease That Fully Commercializes Beacon Point Campus",
    "**Hut 8 Corp**. (NASDAQ:HUT) shares are trading higher Monday after the company announced it has fully commercialized its 1-gigawatt Beacon Point AI data center campus through a second 352-megawatt IT lease, bringing the campus-level base-term contract value to $19.6 billion."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Hut 8 Stock Rises After Signing Second Lease That Fully Commercializes Beacon Point Campus",
    "**Hut 8 Corp**. (NASDAQ:HUT) shares are trading higher Monday after the company announced it has fully commercialized its 1-gigawatt Beacon Point AI data center campus through a second 352-megawatt IT lease, bringing the campus-level base-term contract value to $19.6 billion."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://ts2.tech/en/iren-stock-jumps-after-sweetwater-power-milestone-puts-its-ai-data-center-bet-back-in-focus",
   "title": "IREN Stock Jumps After Sweetwater Power Milestone Puts Its AI Data Center Bet Back In Focus",
   "published_at": "2026-05-05T11:31:03",
   "project": "Sweetwater 1",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "energized",
   "announcement_date": null,
   "project_evidence": [
    "NEW YORK, May 5, 2026, 07:11 (EDT)",
    "IREN shares jumped on Monday after the company flipped the switch on its 1.4-gigawatt Sweetwater 1 data center in Texas, pushing a major chunk of its AI infrastructure project from the construction phase to the grid."
   ],
   "locality_evidence": [
    "NEW YORK, May 5, 2026, 07:11 (EDT)",
    "Right now, Sweetwater has become the market\u2019s evidence that IREN can deliver."
   ],
   "state_evidence": [
    "NEW YORK, May 5, 2026, 07:11 (EDT)",
    "IREN shares jumped on Monday after the company flipped the switch on its 1.4-gigawatt Sweetwater 1 data center in Texas, pushing a major chunk of its AI infrastructure project from the construction phase to the grid."
   ],
   "capacity_gw_evidence": [
    "NEW YORK, May 5, 2026, 07:11 (EDT)",
    "Sweetwater 1 is part of IREN\u2019s larger 2-gigawatt campus in the area."
   ],
   "builder_evidence": [
    "NEW YORK, May 5, 2026, 07:11 (EDT)",
    "IREN shares jumped on Monday after the company flipped the switch on its 1.4-gigawatt Sweetwater 1 data center in Texas, pushing a major chunk of its AI infrastructure project from the construction phase to the grid."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "NEW YORK, May 5, 2026, 07:11 (EDT)",
    "IREN shares jumped on Monday after the company flipped the switch on its 1.4-gigawatt Sweetwater 1 data center in Texas, pushing a major chunk of its AI infrastructure project from the construction phase to the grid."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://kslnewsradio.com/business-economy/worlds-largest-data-center-utah/2237867",
   "title": "World's largest data center campus could be coming to central Utah - KSLNewsRadio",
   "published_at": "2025-08-15T15:00:40",
   "project": "Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2025-05-28",
   "project_evidence": [
    "# World\u2019s largest data center campus could be coming to central Utah",
    "The first domino fell when Orem-based Fibernet MercuryDelta LLC in May filed a [request](https://millardcounty.gov/wp-content/uploads/2025/05/05282025-PC-Agenda.pdf) to rezone nearly 1,200 acres of property \u2014 located southeast of Delta \u2014 from agricultural land to heavy industrial land for its potential 20-million-square-foot data center campus called Delta Gigasite."
   ],
   "locality_evidence": [
    "# World\u2019s largest data center campus could be coming to central Utah",
    "DELTA \u2014 The world\u2019s largest data center campus may be coming to Utah, with a pair of companies planning to construct artificial intelligence-ready hubs in Millard County."
   ],
   "state_evidence": [
    "# World\u2019s largest data center campus could be coming to central Utah",
    "DELTA \u2014 The world\u2019s largest data center campus may be coming to Utah, with a pair of companies planning to construct artificial intelligence-ready hubs in Millard County."
   ],
   "capacity_gw_evidence": [
    "# World\u2019s largest data center campus could be coming to central Utah",
    "A release from Creekstone Energy said that over the coming decade, the company plans to manage 10 gigawatts of capacity at the site from three primary sources, drawing 1.8 gigawatts from the Intermountain Power Project, 6 gigawatts from solar and 2 gigawatts from natural gas while also considering geothermal, wind and nuclear as potential future additions."
   ],
   "builder_evidence": [
    "# World\u2019s largest data center campus could be coming to central Utah",
    "A release from Creekstone Energy said that over the coming decade, the company plans to manage 10 gigawatts of capacity at the site from three primary sources, drawing 1.8 gigawatts from the Intermountain Power Project, 6 gigawatts from solar and 2 gigawatts from natural gas while also considering geothermal, wind and nuclear as potential future additions."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# World\u2019s largest data center campus could be coming to central Utah",
    "The first domino fell when Orem-based Fibernet MercuryDelta LLC in May filed a [request](https://millardcounty.gov/wp-content/uploads/2025/05/05282025-PC-Agenda.pdf) to rezone nearly 1,200 acres of property \u2014 located southeast of Delta \u2014 from agricultural land to heavy industrial land for its potential 20-million-square-foot data center campus called Delta Gigasite."
   ],
   "announcement_date_evidence": [
    "# World\u2019s largest data center campus could be coming to central Utah",
    "The first domino fell when Orem-based Fibernet MercuryDelta LLC in May filed a [request](https://millardcounty.gov/wp-content/uploads/2025/05/05282025-PC-Agenda.pdf) to rezone nearly 1,200 acres of property \u2014 located southeast of Delta \u2014 from agricultural land to heavy industrial land for its potential 20-million-square-foot data center campus called Delta Gigasite."
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news/lambda-brings-nvidia-gb300-nvl72-systems-online-at-hydrogen-powered-ecl-data-center",
   "title": "Lambda brings Nvidia GB300 NVL72 systems online at hydrogen-powered ECL data center",
   "published_at": "2026-05-14T11:25:12",
   "project": "TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "EdgeCloudLink",
   "ai_customer": "Lambda",
   "status": "upcoming",
   "announcement_date": null,
   "project_evidence": [
    "Lambda is also set to be the anchor tenant at ECL's upcoming 1GW TerraSite-TX1 data center campus in Houston, Texas, which will also be powered by hydrogen."
   ],
   "locality_evidence": [
    "Lambda is also set to be the anchor tenant at ECL's upcoming 1GW TerraSite-TX1 data center campus in Houston, Texas, which will also be powered by hydrogen."
   ],
   "state_evidence": [
    "Lambda is also set to be the anchor tenant at ECL's upcoming 1GW TerraSite-TX1 data center campus in Houston, Texas, which will also be powered by hydrogen."
   ],
   "capacity_gw_evidence": [
    "Lambda is also set to be the anchor tenant at ECL's upcoming 1GW TerraSite-TX1 data center campus in Houston, Texas, which will also be powered by hydrogen."
   ],
   "builder_evidence": [
    "Lambda is also set to be the anchor tenant at ECL's upcoming 1GW TerraSite-TX1 data center campus in Houston, Texas, which will also be powered by hydrogen."
   ],
   "ai_customer_evidence": [
    "Lambda is also set to be the anchor tenant at ECL's upcoming 1GW TerraSite-TX1 data center campus in Houston, Texas, which will also be powered by hydrogen."
   ],
   "status_evidence": [
    "Lambda is also set to be the anchor tenant at ECL's upcoming 1GW TerraSite-TX1 data center campus in Houston, Texas, which will also be powered by hydrogen."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://ai-blogs.org/news/2026-06-15-stargate-five-new-sites-7gw-capacity-expansion-pm.html",
   "title": "Stargate's five-new-site expansion brings planned capacity to nearly 7GW \u2014 $400B+ invested as Michigan, Wisconsin, Wyoming, Pennsylvania, Texas sites enter construction",
   "published_at": "2026-06-15T12:00:00",
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "live",
   "announcement_date": null,
   "project_evidence": [
    "# Stargate's five-new-site expansion brings planned capacity to nearly 7GW \u2014 $400B+ invested as Michigan, Wisconsin, Wyoming, Pennsylvania, Texas sites enter construction",
    "The flagship Abilene campus is live at 1.2GW of OCI as the operational beachhead."
   ],
   "locality_evidence": [
    "# Stargate's five-new-site expansion brings planned capacity to nearly 7GW \u2014 $400B+ invested as Michigan, Wisconsin, Wyoming, Pennsylvania, Texas sites enter construction",
    "The flagship Abilene campus is live at 1.2GW of OCI as the operational beachhead."
   ],
   "state_evidence": [
    "# Stargate's five-new-site expansion brings planned capacity to nearly 7GW \u2014 $400B+ invested as Michigan, Wisconsin, Wyoming, Pennsylvania, Texas sites enter construction",
    "The substantive piece is the multi-state capacity geography. Concentrating 7GW of AI compute capacity in a single Texas-anchored footprint creates concentration risk (grid, water, political); spreading across Michigan / Wisconsin / Wyoming / Pennsylvania / Texas distributes that risk and creates regional-political constituencies for the AI-compute build-out across multiple states simultaneously.",
    "The flagship Abilene campus is live at 1.2GW of OCI as the operational beachhead."
   ],
   "capacity_gw_evidence": [
    "# Stargate's five-new-site expansion brings planned capacity to nearly 7GW \u2014 $400B+ invested as Michigan, Wisconsin, Wyoming, Pennsylvania, Texas sites enter construction",
    "The flagship Abilene campus is live at 1.2GW of OCI as the operational beachhead."
   ],
   "builder_evidence": [
    "# Stargate's five-new-site expansion brings planned capacity to nearly 7GW \u2014 $400B+ invested as Michigan, Wisconsin, Wyoming, Pennsylvania, Texas sites enter construction",
    "The flagship Abilene campus is live at 1.2GW of OCI as the operational beachhead."
   ],
   "ai_customer_evidence": [
    "# Stargate's five-new-site expansion brings planned capacity to nearly 7GW \u2014 $400B+ invested as Michigan, Wisconsin, Wyoming, Pennsylvania, Texas sites enter construction",
    "OpenAI, Oracle, and SoftBank's Stargate program expanded with five new datacenter sites in mid-2026 \u2014 Michigan, Wisconsin, Wyoming, Pennsylvania, and additional Texas locations.",
    "The flagship Abilene campus is live at 1.2GW of OCI as the operational beachhead."
   ],
   "status_evidence": [
    "# Stargate's five-new-site expansion brings planned capacity to nearly 7GW \u2014 $400B+ invested as Michigan, Wisconsin, Wyoming, Pennsylvania, Texas sites enter construction",
    "The flagship Abilene campus is live at 1.2GW of OCI as the operational beachhead."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://blockrora.com/technology/meta-ai-data-centers-gigawatt-hyperion-prometheus",
   "title": "Meta\u2019s Gigawatt AI Gamble: Powering the Race to AGI",
   "published_at": "2025-07-16T06:47:10",
   "project": "Hyperion",
   "locality": null,
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "In a bold move to dominate the next frontier of artificial intelligence, Zuckerberg has [unveiled](https://www.facebook.com/share/v/16dgjkYHQh/) Meta\u2019s plans to build some of the largest AI data centers the world has ever seen.",
    "Hyperion and Prometheus: Meta\u2019s AI Powerhouses",
    "At the core of this empire are two titan-scale clusters:",
    "**Hyperion** \u2013 *Louisiana\u2019s Giant*",
    "Hyperion is Meta\u2019s flagship AI data center currently under construction in **Louisiana**."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "In a bold move to dominate the next frontier of artificial intelligence, Zuckerberg has [unveiled](https://www.facebook.com/share/v/16dgjkYHQh/) Meta\u2019s plans to build some of the largest AI data centers the world has ever seen.",
    "Hyperion and Prometheus: Meta\u2019s AI Powerhouses",
    "At the core of this empire are two titan-scale clusters:",
    "**Hyperion** \u2013 *Louisiana\u2019s Giant*",
    "Hyperion is Meta\u2019s flagship AI data center currently under construction in **Louisiana**."
   ],
   "capacity_gw_evidence": [
    "In a bold move to dominate the next frontier of artificial intelligence, Zuckerberg has [unveiled](https://www.facebook.com/share/v/16dgjkYHQh/) Meta\u2019s plans to build some of the largest AI data centers the world has ever seen.",
    "Hyperion and Prometheus: Meta\u2019s AI Powerhouses",
    "At the core of this empire are two titan-scale clusters:",
    "**Hyperion** \u2013 *Louisiana\u2019s Giant*",
    "Designed to deliver **5 gigawatts (GW)** of computational power at full capacity, it will surpass that of most data centers globally."
   ],
   "builder_evidence": [
    "In a bold move to dominate the next frontier of artificial intelligence, Zuckerberg has [unveiled](https://www.facebook.com/share/v/16dgjkYHQh/) Meta\u2019s plans to build some of the largest AI data centers the world has ever seen.",
    "Hyperion and Prometheus: Meta\u2019s AI Powerhouses",
    "At the core of this empire are two titan-scale clusters:",
    "**Hyperion** \u2013 *Louisiana\u2019s Giant*",
    "Hyperion is Meta\u2019s flagship AI data center currently under construction in **Louisiana**."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "In a bold move to dominate the next frontier of artificial intelligence, Zuckerberg has [unveiled](https://www.facebook.com/share/v/16dgjkYHQh/) Meta\u2019s plans to build some of the largest AI data centers the world has ever seen.",
    "Hyperion and Prometheus: Meta\u2019s AI Powerhouses",
    "At the core of this empire are two titan-scale clusters:",
    "**Hyperion** \u2013 *Louisiana\u2019s Giant*",
    "Hyperion is Meta\u2019s flagship AI data center currently under construction in **Louisiana**."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://blockrora.com/technology/meta-ai-data-centers-gigawatt-hyperion-prometheus",
   "title": "Meta\u2019s Gigawatt AI Gamble: Powering the Race to AGI",
   "published_at": "2025-07-16T06:47:10",
   "project": "Prometheus",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "",
   "status": "Scheduled for launch",
   "announcement_date": null,
   "project_evidence": [
    "In a bold move to dominate the next frontier of artificial intelligence, Zuckerberg has [unveiled](https://www.facebook.com/share/v/16dgjkYHQh/) Meta\u2019s plans to build some of the largest AI data centers the world has ever seen.",
    "Hyperion and Prometheus: Meta\u2019s AI Powerhouses",
    "At the core of this empire are two titan-scale clusters:",
    "**Prometheus** \u2013 *Ohio\u2019s 1GW Supercluster*",
    "Scheduled for launch in **2026** in **New Albany, Ohio**, Prometheus will add another **1 GW** to Meta\u2019s computing arsenal."
   ],
   "locality_evidence": [
    "In a bold move to dominate the next frontier of artificial intelligence, Zuckerberg has [unveiled](https://www.facebook.com/share/v/16dgjkYHQh/) Meta\u2019s plans to build some of the largest AI data centers the world has ever seen.",
    "Hyperion and Prometheus: Meta\u2019s AI Powerhouses",
    "At the core of this empire are two titan-scale clusters:",
    "**Prometheus** \u2013 *Ohio\u2019s 1GW Supercluster*",
    "Scheduled for launch in **2026** in **New Albany, Ohio**, Prometheus will add another **1 GW** to Meta\u2019s computing arsenal."
   ],
   "state_evidence": [
    "In a bold move to dominate the next frontier of artificial intelligence, Zuckerberg has [unveiled](https://www.facebook.com/share/v/16dgjkYHQh/) Meta\u2019s plans to build some of the largest AI data centers the world has ever seen.",
    "Hyperion and Prometheus: Meta\u2019s AI Powerhouses",
    "At the core of this empire are two titan-scale clusters:",
    "**Prometheus** \u2013 *Ohio\u2019s 1GW Supercluster*",
    "Scheduled for launch in **2026** in **New Albany, Ohio**, Prometheus will add another **1 GW** to Meta\u2019s computing arsenal."
   ],
   "capacity_gw_evidence": [
    "In a bold move to dominate the next frontier of artificial intelligence, Zuckerberg has [unveiled](https://www.facebook.com/share/v/16dgjkYHQh/) Meta\u2019s plans to build some of the largest AI data centers the world has ever seen.",
    "Hyperion and Prometheus: Meta\u2019s AI Powerhouses",
    "At the core of this empire are two titan-scale clusters:",
    "**Prometheus** \u2013 *Ohio\u2019s 1GW Supercluster*",
    "Scheduled for launch in **2026** in **New Albany, Ohio**, Prometheus will add another **1 GW** to Meta\u2019s computing arsenal."
   ],
   "builder_evidence": [
    "In a bold move to dominate the next frontier of artificial intelligence, Zuckerberg has [unveiled](https://www.facebook.com/share/v/16dgjkYHQh/) Meta\u2019s plans to build some of the largest AI data centers the world has ever seen.",
    "Hyperion and Prometheus: Meta\u2019s AI Powerhouses",
    "At the core of this empire are two titan-scale clusters:",
    "**Prometheus** \u2013 *Ohio\u2019s 1GW Supercluster*",
    "Scheduled for launch in **2026** in **New Albany, Ohio**, Prometheus will add another **1 GW** to Meta\u2019s computing arsenal."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "In a bold move to dominate the next frontier of artificial intelligence, Zuckerberg has [unveiled](https://www.facebook.com/share/v/16dgjkYHQh/) Meta\u2019s plans to build some of the largest AI data centers the world has ever seen.",
    "Hyperion and Prometheus: Meta\u2019s AI Powerhouses",
    "At the core of this empire are two titan-scale clusters:",
    "**Prometheus** \u2013 *Ohio\u2019s 1GW Supercluster*",
    "Scheduled for launch in **2026** in **New Albany, Ohio**, Prometheus will add another **1 GW** to Meta\u2019s computing arsenal."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://cssm.etimg.com/tech/artificial-intelligence/at-amazons-biggest-data-center-everything-is-supersized-for-ai/articleshow/122055517.cms",
   "title": "At Amazon's biggest data centre, everything is supersized for AI",
   "published_at": "2025-06-24T19:55:00",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon",
   "ai_customer": "Anthropic",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# At Amazon's biggest data centre, everything is supersized for AI"
   ],
   "locality_evidence": [
    "# At Amazon's biggest data centre, everything is supersized for AI",
    "A year ago, a 1,200-acre stretch of farmland outside New Carlisle, Indiana, was an empty cornfield."
   ],
   "state_evidence": [
    "# At Amazon's biggest data centre, everything is supersized for AI",
    "A year ago, a 1,200-acre stretch of farmland outside New Carlisle, Indiana, was an empty cornfield."
   ],
   "capacity_gw_evidence": [
    "# At Amazon's biggest data centre, everything is supersized for AI",
    "The facility will consume 2.2 gigawatts of electricity\u2014enough to power 1 million homes."
   ],
   "builder_evidence": [
    "# At Amazon's biggest data centre, everything is supersized for AI",
    "A year ago, a 1,200-acre stretch of farmland outside New Carlisle, Indiana, was an empty cornfield.",
    "Now, seven [Amazon data centres](/topic/Amazon-data-centres) rise up from the rich soil, each larger than a football stadium."
   ],
   "ai_customer_evidence": [
    "# At Amazon's biggest data centre, everything is supersized for AI",
    "And it was built with a single customer in mind: AI startup Anthropic, which aims to create an AI system that matches the human brain."
   ],
   "status_evidence": [
    "# At Amazon's biggest data centre, everything is supersized for AI",
    "A year ago, a 1,200-acre stretch of farmland outside New Carlisle, Indiana, was an empty cornfield.",
    "Now, seven [Amazon data centres](/topic/Amazon-data-centres) rise up from the rich soil, each larger than a football stadium."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://sctimes.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Colossus 2",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 1.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "active construction still on site",
   "announcement_date": "2025-02-01",
   "project_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The second Memphis campus in Whitehaven came into the picture in early 2025."
   ],
   "locality_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The second Memphis campus in Whitehaven came into the picture in early 2025."
   ],
   "state_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "It has been a very [busy 18 months for Elon Musk's xAI](/story/money/business/development/2025/06/05/elon-musk-xai-supercomputer-grok-memphis-tn/83599473007/) since the company first announced plans for its Memphis data center in June 2024."
   ],
   "capacity_gw_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "builder_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "In March 2025, the Greater Memphis Chamber announced xAI's plans for a second campus and its purchase of a 1 million-square-foot building."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The Tulane Road site is an artificial intelligence data center, with active construction still on site."
   ],
   "announcement_date_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "In February 2025, CTC Property LLC purchased 186.13 acres for $79.9 million, according to the Shelby County Register of Deeds."
   ]
  },
  {
   "url": "https://blog.amch.ltd/articles/crusoe-and-lancium-are-building-a-1-gw-campus-in-texas",
   "title": "Crusoe and Lancium are building a 1 GW campus in Texas",
   "published_at": "2026-07-31T07:38:00",
   "project": null,
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-07-15",
   "project_evidence": null,
   "locality_evidence": [
    "Crusoe and Lancium are building a 1 GW campus in Texas",
    "On July 15, Crusoe and Lancium announced an AI data-center campus in Childress, Texas."
   ],
   "state_evidence": [
    "Crusoe and Lancium are building a 1 GW campus in Texas",
    "On July 15, Crusoe and Lancium announced an AI data-center campus in Childress, Texas."
   ],
   "capacity_gw_evidence": [
    "Crusoe and Lancium are building a 1 GW campus in Texas",
    "On July 15, Crusoe and Lancium announced an AI data-center campus in Childress, Texas.",
    "The 270-acre site belongs to Lancium, and the grid-connected capacity will reach 1 GW."
   ],
   "builder_evidence": [
    "Crusoe and Lancium are building a 1 GW campus in Texas",
    "On July 15, Crusoe and Lancium announced an AI data-center campus in Childress, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Crusoe and Lancium are building a 1 GW campus in Texas",
    "On July 15, Crusoe and Lancium announced an AI data-center campus in Childress, Texas.",
    "Construction in Childress is scheduled to start in Q3 2026."
   ],
   "announcement_date_evidence": [
    "Crusoe and Lancium are building a 1 GW campus in Texas",
    "On July 15, Crusoe and Lancium announced an AI data-center campus in Childress, Texas."
   ]
  },
  {
   "url": "https://ainvest.com/news/texas-data-centre-aims-power-ai-1-4gw-sets-benchmark-25bn-investment-2508",
   "title": "Texas Data Centre Aims to Power AI with 1.4GW, Sets New Benchmark for $25bn Investment",
   "published_at": "2025-08-22T07:02:43",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2025-08-18",
   "project_evidence": [
    "Friday, Aug 22, 2025 3:02 am ET2min read DBRG-- Vantage Data Centers and DigitalBridge Group are investing $25bn in a 1.4GW data centre mega-campus in Texas to address AI infrastructure challenges.",
    "The Frontier campus will occupy 1,200 acres, deliver 3.7 million sq ft of data centre space, and create 5,000 jobs."
   ],
   "locality_evidence": [
    "Friday, Aug 22, 2025 3:02 am ET2min read DBRG-- Vantage Data Centers and DigitalBridge Group are investing $25bn in a 1.4GW data centre mega-campus in Texas to address AI infrastructure challenges.",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, and DigitalBridge Group, Inc. (NYSE: DBRG) have announced a significant investment of $25 billion in a 1.4GW data center mega-campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "Friday, Aug 22, 2025 3:02 am ET2min read DBRG-- Vantage Data Centers and DigitalBridge Group are investing $25bn in a 1.4GW data centre mega-campus in Texas to address AI infrastructure challenges.",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, and DigitalBridge Group, Inc. (NYSE: DBRG) have announced a significant investment of $25 billion in a 1.4GW data center mega-campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "Friday, Aug 22, 2025 3:02 am ET2min read DBRG-- Vantage Data Centers and DigitalBridge Group are investing $25bn in a 1.4GW data centre mega-campus in Texas to address AI infrastructure challenges.",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, and DigitalBridge Group, Inc. (NYSE: DBRG) have announced a significant investment of $25 billion in a 1.4GW data center mega-campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "Friday, Aug 22, 2025 3:02 am ET2min read DBRG-- Vantage Data Centers and DigitalBridge Group are investing $25bn in a 1.4GW data centre mega-campus in Texas to address AI infrastructure challenges.",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, and DigitalBridge Group, Inc. (NYSE: DBRG) have announced a significant investment of $25 billion in a 1.4GW data center mega-campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Friday, Aug 22, 2025 3:02 am ET2min read DBRG-- Vantage Data Centers and DigitalBridge Group are investing $25bn in a 1.4GW data centre mega-campus in Texas to address AI infrastructure challenges.",
    "Vantage Data Centers, a leading global provider of hyperscale data centers, and DigitalBridge Group, Inc. (NYSE: DBRG) have announced a significant investment of $25 billion in a 1.4GW data center mega-campus in Shackelford County, Texas."
   ],
   "announcement_date_evidence": [
    "References: [1] https://www.morningstar.com/news/business-wire/20250818389101/digitalbridge-backed-portfolio-company-vantage-data-centers-launches-25-billion-texas-frontier-mega-campus"
   ]
  },
  {
   "url": "https://convergedigest.com/fermi-america-secures-up-to-200mw-for-11gw-project-matador",
   "title": "Fermi America Secures Up to 200MW for 11GW Project Matador",
   "published_at": "2025-12-06T18:37:35",
   "project": "Project Matador Campus",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Fermi America signed a definitive Electric Service Agreement with Xcel Energy subsidiary Southwestern Public Service Company to supply up to 200MW of power to its 11GW Project Matador Campus in Amarillo, Texas.",
    "Fermi America & Project Matador \u2014 Key Facts"
   ],
   "locality_evidence": [
    "Fermi America signed a definitive Electric Service Agreement with Xcel Energy subsidiary Southwestern Public Service Company to supply up to 200MW of power to its 11GW Project Matador Campus in Amarillo, Texas.",
    "Fermi America & Project Matador \u2014 Key Facts"
   ],
   "state_evidence": [
    "Fermi America signed a definitive Electric Service Agreement with Xcel Energy subsidiary Southwestern Public Service Company to supply up to 200MW of power to its 11GW Project Matador Campus in Amarillo, Texas.",
    "Fermi America & Project Matador \u2014 Key Facts"
   ],
   "capacity_gw_evidence": [
    "Fermi America signed a definitive Electric Service Agreement with Xcel Energy subsidiary Southwestern Public Service Company to supply up to 200MW of power to its 11GW Project Matador Campus in Amarillo, Texas.",
    "Fermi America & Project Matador \u2014 Key Facts"
   ],
   "builder_evidence": [
    "Fermi America signed a definitive Electric Service Agreement with Xcel Energy subsidiary Southwestern Public Service Company to supply up to 200MW of power to its 11GW Project Matador Campus in Amarillo, Texas.",
    "Fermi America & Project Matador \u2014 Key Facts"
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://finance.yahoo.com/news/nscale-acquires-american-intelligence-power-213400820.html",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": "2026-03-16T21:34:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "locality_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "capacity_gw_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts.",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "builder_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "announcement_date_evidence": [
    "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid",
    "SAN JOSE, Calif., March 17, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ]
  },
  {
   "url": "https://finance.yahoo.com/sectors/technology/articles/ai-data-center-utah-generate-145817949.html",
   "title": "New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses \u2014 Kevin O'Leary's 9 Gigawatt Utah data center campus approved",
   "published_at": "2026-04-27T14:58:17",
   "project": "Stratos",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O'Leary Digital",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses \u2014 Kevin O'Leary's 9 Gigawatt Utah data center campus approved",
    "The project, dubbed Stratos, is being developed by O'Leary Digital, the infrastructure arm of Shark Tank investor Kevin O'Leary, and would span 40,000 acres of private land plus 1,200 acres of military and state-owned property."
   ],
   "locality_evidence": [
    "New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses \u2014 Kevin O'Leary's 9 Gigawatt Utah data center campus approved"
   ],
   "state_evidence": [
    "New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses \u2014 Kevin O'Leary's 9 Gigawatt Utah data center campus approved"
   ],
   "capacity_gw_evidence": [
    "New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses \u2014 Kevin O'Leary's 9 Gigawatt Utah data center campus approved"
   ],
   "builder_evidence": [
    "The project, dubbed Stratos, is being developed by O'Leary Digital, the infrastructure arm of Shark Tank investor Kevin O'Leary, and would span 40,000 acres of private land plus 1,200 acres of military and state-owned property.",
    "New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses \u2014 Kevin O'Leary's 9 Gigawatt Utah data center campus approved"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses \u2014 Kevin O'Leary's 9 Gigawatt Utah data center campus approved"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://commercialsearch.com/news/openai-unveils-plan-for-20b-data-center-project",
   "title": "OpenAI Unveils $20B Data Center Plan",
   "published_at": "2026-07-24T13:18:26",
   "project": "Project Camellia",
   "locality": "Rincon",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Unveils $20B Data Center Plan",
    "### Project Camellia will be the first ground-up campus developed by the company in house.",
    "Dubbed \u201cProject Camellia,\u201d the development will be the first ground-up, in-house data center campus designed and developed by OpenAI."
   ],
   "locality_evidence": [
    "# OpenAI Unveils $20B Data Center Plan",
    "### Project Camellia will be the first ground-up campus developed by the company in house.",
    "In one of the coastal Georgia\u2019s largest-ever private investments, OpenAI will build a $20 billion, 3.2 gigawatt data center campus at the Savannah Gateway Industrial Hub in Rincon, Ga."
   ],
   "state_evidence": [
    "# OpenAI Unveils $20B Data Center Plan",
    "### Project Camellia will be the first ground-up campus developed by the company in house.",
    "In one of the coastal Georgia\u2019s largest-ever private investments, OpenAI will build a $20 billion, 3.2 gigawatt data center campus at the Savannah Gateway Industrial Hub in Rincon, Ga."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Unveils $20B Data Center Plan",
    "### Project Camellia will be the first ground-up campus developed by the company in house.",
    "In one of the coastal Georgia\u2019s largest-ever private investments, OpenAI will build a $20 billion, 3.2 gigawatt data center campus at the Savannah Gateway Industrial Hub in Rincon, Ga."
   ],
   "builder_evidence": [
    "# OpenAI Unveils $20B Data Center Plan",
    "### Project Camellia will be the first ground-up campus developed by the company in house.",
    "In one of the coastal Georgia\u2019s largest-ever private investments, OpenAI will build a $20 billion, 3.2 gigawatt data center campus at the Savannah Gateway Industrial Hub in Rincon, Ga."
   ],
   "ai_customer_evidence": [
    "# OpenAI Unveils $20B Data Center Plan",
    "### Project Camellia will be the first ground-up campus developed by the company in house.",
    "In one of the coastal Georgia\u2019s largest-ever private investments, OpenAI will build a $20 billion, 3.2 gigawatt data center campus at the Savannah Gateway Industrial Hub in Rincon, Ga."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://planetdetroit.org/2026/06/google-data-center-wetlands",
   "title": "Google data center in Van Buren Township would destroy 13 acres of wetlands",
   "published_at": "2026-06-17T18:53:18",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co",
   "ai_customer": "Google",
   "status": "proposed",
   "announcement_date": null,
   "project_evidence": [
    "# Google data center in Van Buren Township would destroy 13 acres of wetlands",
    "The 1-gigawatt \u201cProject Cannoli\u201d [data center](https://planetdetroit.org/issues/data-centers/) is planned for 282 acres at the intersection of Haggerty Road and I-94."
   ],
   "locality_evidence": [
    "# Google data center in Van Buren Township would destroy 13 acres of wetlands",
    "Google's proposed 1-gigawatt data center in Van Buren Township would permanently destroy 13.55 acres of wetlands."
   ],
   "state_evidence": [
    "# Google data center in Van Buren Township would destroy 13 acres of wetlands",
    "Michigan regulators are reviewing a wetland permit for [Google\u2019s planned data center](https://planetdetroit.org/2026/03/google-dte-data-center-van-buren/) in Van Buren Township, which would destroy 13.55 acres of [wetlands](https://planetdetroit.org/deep-dive/wetlands-in-metro-detroit/) in a county that has already lost 90% of them to development."
   ],
   "capacity_gw_evidence": [
    "# Google data center in Van Buren Township would destroy 13 acres of wetlands",
    "Google's proposed 1-gigawatt data center in Van Buren Township would permanently destroy 13.55 acres of wetlands."
   ],
   "builder_evidence": [
    "# Google data center in Van Buren Township would destroy 13 acres of wetlands",
    "The developer, Panattoni Development Co, proposed purchasing 20.6 acres of wetland mitigation bank credits in its project [application](https://www.documentcloud.org/documents/28269261-hqh-q48n-1818y-v7-1-1/)."
   ],
   "ai_customer_evidence": [
    "# Google data center in Van Buren Township would destroy 13 acres of wetlands",
    "Google's proposed 1-gigawatt data center in Van Buren Township would permanently destroy 13.55 acres of wetlands."
   ],
   "status_evidence": [
    "# Google data center in Van Buren Township would destroy 13 acres of wetlands",
    "Google's proposed 1-gigawatt data center in Van Buren Township would permanently destroy 13.55 acres of wetlands."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://lanereport.com/187971/2026/06/terawulf-acquires-site-in-greenup-for-1-gw-data-center-campus",
   "title": "TeraWulf acquires site in Greenup for 1+ GW data center campus - The Lane Report | Kentucky Business & Economic News",
   "published_at": "2026-06-01T17:13:42",
   "project": "Muskie Data Campus",
   "locality": "Ashland and Grayson",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "Acquired and in development",
   "announcement_date": null,
   "project_evidence": [
    "**EASTON, Md. \u2014** Digital infrastructure owner operator TeraWulf Inc. has acquired a computing development site in a 1,000-acre multiuse business park near Ashland and Grayson, Kentucky, that it expects to grow into a gigawatt data center operation.",
    "Acquisition from Industrial Equity Partners (IEP) of what it has dubbed the Muskie Data Campus expands Easton, Maryland-based TeraWulf\u2019s portfolio of large-scale, energy-advantaged digital infrastructure campuses and advances the company\u2019s strategy of developing shovel-ready AI and HPC sites with long-term power availability, robust transmission infrastructure, and strong community alignment."
   ],
   "locality_evidence": [
    "**EASTON, Md. \u2014** Digital infrastructure owner operator TeraWulf Inc. has acquired a computing development site in a 1,000-acre multiuse business park near Ashland and Grayson, Kentucky, that it expects to grow into a gigawatt data center operation.",
    "Acquisition from Industrial Equity Partners (IEP) of what it has dubbed the Muskie Data Campus expands Easton, Maryland-based TeraWulf\u2019s portfolio of large-scale, energy-advantaged digital infrastructure campuses and advances the company\u2019s strategy of developing shovel-ready AI and HPC sites with long-term power availability, robust transmission infrastructure, and strong community alignment."
   ],
   "state_evidence": [
    "**EASTON, Md. \u2014** Digital infrastructure owner operator TeraWulf Inc. has acquired a computing development site in a 1,000-acre multiuse business park near Ashland and Grayson, Kentucky, that it expects to grow into a gigawatt data center operation.",
    "Acquisition from Industrial Equity Partners (IEP) of what it has dubbed the Muskie Data Campus expands Easton, Maryland-based TeraWulf\u2019s portfolio of large-scale, energy-advantaged digital infrastructure campuses and advances the company\u2019s strategy of developing shovel-ready AI and HPC sites with long-term power availability, robust transmission infrastructure, and strong community alignment."
   ],
   "capacity_gw_evidence": [
    "The Muskie Data Campus is expected to support more than 1 gigawatt of data center capacity over time.",
    "Acquisition from Industrial Equity Partners (IEP) of what it has dubbed the Muskie Data Campus expands Easton, Maryland-based TeraWulf\u2019s portfolio of large-scale, energy-advantaged digital infrastructure campuses and advances the company\u2019s strategy of developing shovel-ready AI and HPC sites with long-term power availability, robust transmission infrastructure, and strong community alignment."
   ],
   "builder_evidence": [
    "**EASTON, Md. \u2014** Digital infrastructure owner operator TeraWulf Inc. has acquired a computing development site in a 1,000-acre multiuse business park near Ashland and Grayson, Kentucky, that it expects to grow into a gigawatt data center operation.",
    "Acquisition from Industrial Equity Partners (IEP) of what it has dubbed the Muskie Data Campus expands Easton, Maryland-based TeraWulf\u2019s portfolio of large-scale, energy-advantaged digital infrastructure campuses and advances the company\u2019s strategy of developing shovel-ready AI and HPC sites with long-term power availability, robust transmission infrastructure, and strong community alignment."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "**EASTON, Md. \u2014** Digital infrastructure owner operator TeraWulf Inc. has acquired a computing development site in a 1,000-acre multiuse business park near Ashland and Grayson, Kentucky, that it expects to grow into a gigawatt data center operation.",
    "Acquisition from Industrial Equity Partners (IEP) of what it has dubbed the Muskie Data Campus expands Easton, Maryland-based TeraWulf\u2019s portfolio of large-scale, energy-advantaged digital infrastructure campuses and advances the company\u2019s strategy of developing shovel-ready AI and HPC sites with long-term power availability, robust transmission infrastructure, and strong community alignment."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://convergedigest.com/nvidia-and-iren-partner-on-5gw-global-ai-factory-buildout",
   "title": "NVIDIA and IREN Partner on 5GW Global AI Factory Buildout",
   "published_at": "2026-05-08T00:43:36",
   "project": "Sweetwater",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": "NVIDIA",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "Beyond the initial deployment, the companies said future infrastructure expansion will focus heavily on IREN\u2019s 2GW Sweetwater campus in Texas, which is expected to become a flagship deployment for NVIDIA\u2019s DSX architecture.",
    "- Sweetwater, Texas campus positioned as a flagship DSX deployment site"
   ],
   "locality_evidence": [
    "Beyond the initial deployment, the companies said future infrastructure expansion will focus heavily on IREN\u2019s 2GW Sweetwater campus in Texas, which is expected to become a flagship deployment for NVIDIA\u2019s DSX architecture.",
    "- Sweetwater, Texas campus positioned as a flagship DSX deployment site"
   ],
   "state_evidence": [
    "Beyond the initial deployment, the companies said future infrastructure expansion will focus heavily on IREN\u2019s 2GW Sweetwater campus in Texas, which is expected to become a flagship deployment for NVIDIA\u2019s DSX architecture.",
    "- Sweetwater, Texas campus positioned as a flagship DSX deployment site"
   ],
   "capacity_gw_evidence": [
    "Beyond the initial deployment, the companies said future infrastructure expansion will focus heavily on IREN\u2019s 2GW Sweetwater campus in Texas, which is expected to become a flagship deployment for NVIDIA\u2019s DSX architecture."
   ],
   "builder_evidence": [
    "Beyond the initial deployment, the companies said future infrastructure expansion will focus heavily on IREN\u2019s 2GW Sweetwater campus in Texas, which is expected to become a flagship deployment for NVIDIA\u2019s DSX architecture."
   ],
   "ai_customer_evidence": [
    "Beyond the initial deployment, the companies said future infrastructure expansion will focus heavily on IREN\u2019s 2GW Sweetwater campus in Texas, which is expected to become a flagship deployment for NVIDIA\u2019s DSX architecture."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://growingbusinessesinthenews.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "About Creekstone Energy",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "About Creekstone Energy",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://markets.businessinsider.com/news/stocks/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute-1036465396",
   "title": "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
   "published_at": "2026-08-17T14:33:22",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 (GLOBE NEWSWIRE) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "locality_evidence": [
    "# NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 (GLOBE NEWSWIRE) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "state_evidence": [
    "# NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 (GLOBE NEWSWIRE) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "capacity_gw_evidence": [
    "# NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "- *OpenAI will be the customer for 8-IT GW*",
    "In support of the surrounding Ohio community, SB Energy and SoftBank will build at least 10 GW of new energy generation, which results in 8 IT-GW of AI factory capacity, and invest at least $4.2 billion in new regional grid infrastructure through an innovative partnership with AEP Ohio designed to protect ratepayers."
   ],
   "builder_evidence": [
    "# NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 (GLOBE NEWSWIRE) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute.",
    "SB Energy will build, own and operate the data center under a 20-year lease to OpenAI."
   ],
   "ai_customer_evidence": [
    "# NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "- *OpenAI will be the customer for 8-IT GW*",
    "OpenAI will be the customer."
   ],
   "status_evidence": [
    "# NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "The planned capacity is expected to come online in phases beginning in 2028."
   ],
   "announcement_date_evidence": [
    "# NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 (GLOBE NEWSWIRE) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ]
  },
  {
   "url": "https://frnt.com/story/45051/meta-and-blackrock-launch-14-billion-joint-venture-for-texas-ai-data-center",
   "title": "Meta and BlackRock Launch $14 Billion Joint Venture for Texas AI Data Center",
   "published_at": "2026-07-21T16:52:58",
   "project": null,
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta Platforms and BlackRock",
   "ai_customer": "Meta",
   "status": "under development",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "Meta Platforms and BlackRock have entered into a $14 billion joint venture to develop a massive artificial intelligence data center in El Paso, Texas [1][2] ."
   ],
   "state_evidence": [
    "Meta Platforms and BlackRock have entered into a $14 billion joint venture to develop a massive artificial intelligence data center in El Paso, Texas [1][2] ."
   ],
   "capacity_gw_evidence": [
    "The project is designed to deliver 1 gigawatt of compute capacity upon its expected completion in 2028 [2] ."
   ],
   "builder_evidence": [
    "Meta Platforms and BlackRock have entered into a $14 billion joint venture to develop a massive artificial intelligence data center in El Paso, Texas [1][2] ."
   ],
   "ai_customer_evidence": [
    "Despite the minority ownership, Meta will serve as the sole occupant of the campus, entering into a lease agreement that includes an initial four-year term and four extension options, potentially spanning two decades [2] ."
   ],
   "status_evidence": [
    "Meta Platforms and BlackRock have entered into a $14 billion joint venture to develop a massive artificial intelligence data center in El Paso, Texas [1][2] ."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://coloradoan.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Colossus 2",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 1.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "active construction still on site",
   "announcement_date": "2025-03-01",
   "project_evidence": [
    "## Colossus 2 | Tulane Road, Memphis",
    "The second Memphis campus in Whitehaven came into the picture in early 2025.",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses"
   ],
   "locality_evidence": [
    "## Colossus 2 | Tulane Road, Memphis",
    "The second Memphis campus in Whitehaven came into the picture in early 2025.",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses"
   ],
   "state_evidence": [
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "It has been a very [busy 18 months for Elon Musk's xAI](/story/money/business/development/2025/06/05/elon-musk-xai-supercomputer-grok-memphis-tn/83599473007/) since the company first announced plans for its Memphis data center in June 2024."
   ],
   "capacity_gw_evidence": [
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses"
   ],
   "builder_evidence": [
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "In March 2025, the Greater Memphis Chamber announced xAI's plans for a second campus and its purchase of a 1 million-square-foot building."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Colossus 2 is a bit more straightforward than the Paul R. Lowry Road complex.",
    "The Tulane Road site is an artificial intelligence data center, with active construction still on site.",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses"
   ],
   "announcement_date_evidence": [
    "In March 2025, the Greater Memphis Chamber announced xAI's plans for a second campus and its purchase of a 1 million-square-foot building.",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses"
   ]
  },
  {
   "url": "https://coloradoan.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Macrohardrr",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "under construction with gas turbines on site",
   "announcement_date": "2025-12-30",
   "project_evidence": [
    "## Marcrohardrr | Southaven",
    "This is the third and most recent xAI campus.",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses"
   ],
   "locality_evidence": [
    "## Marcrohardrr | Southaven",
    "This is the third and most recent xAI campus.",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses"
   ],
   "state_evidence": [
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "In July 2025, MZX Tech LLC, an xAI affiliate, purchased the[ power plant and corresponding 114.49 acres of land surrounding the facility](/story/money/business/development/2025/07/18/xai-elon-musk-company-buys-southaven-mississippi-property-colossus-2-memphis-tn/85274193007/)."
   ],
   "capacity_gw_evidence": [
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity.",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses"
   ],
   "builder_evidence": [
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The former Duke Energy site has been under construction with gas turbines on site for powering xAI data centers.",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses"
   ],
   "announcement_date_evidence": [
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity.",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses"
   ]
  },
  {
   "url": "https://hostingjournalist.com/news/crusoe-and-lancium-scale-texas-ai-infrastructure-toward-1gw",
   "title": "Crusoe and Lancium Scale Texas AI Infrastructure Toward 1GW+",
   "published_at": "2026-07-19T03:17:19",
   "project": null,
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "# Crusoe and Lancium Scale Texas AI Infrastructure Toward 1GW+",
    "Crusoe and Lancium Scale Texas AI Infrastructure Toward 1GW+\n\n![Crusoe and Lancium Scale Texas AI Infrastructure Toward 1GW+](/uploads/news-pictures/2057-zutphen-blog-post-image-20260719145046.webp)\n\n**Crusoe and** [**Lancium**](https://hostingjournalist.com/news/2-4-billion-data-center-campus-to-be-developed-in-texas)** plan to build a 1 gigawatt AI data center campus in Childress, Texas, extending a partnership already underway in Abilene as hyperscale computing demand accelerates."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Scale Texas AI Infrastructure Toward 1GW+",
    "Crusoe and Lancium Scale Texas AI Infrastructure Toward 1GW+\n\n![Crusoe and Lancium Scale Texas AI Infrastructure Toward 1GW+](/uploads/news-pictures/2057-zutphen-blog-post-image-20260719145046.webp)\n\n**Crusoe and** [**Lancium**](https://hostingjournalist.com/news/2-4-billion-data-center-campus-to-be-developed-in-texas)** plan to build a 1 gigawatt AI data center campus in Childress, Texas, extending a partnership already underway in Abilene as hyperscale computing demand accelerates."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium Scale Texas AI Infrastructure Toward 1GW+",
    "Crusoe and Lancium Scale Texas AI Infrastructure Toward 1GW+\n\n![Crusoe and Lancium Scale Texas AI Infrastructure Toward 1GW+](/uploads/news-pictures/2057-zutphen-blog-post-image-20260719145046.webp)\n\n**Crusoe and** [**Lancium**](https://hostingjournalist.com/news/2-4-billion-data-center-campus-to-be-developed-in-texas)** plan to build a 1 gigawatt AI data center campus in Childress, Texas, extending a partnership already underway in Abilene as hyperscale computing demand accelerates."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium Scale Texas AI Infrastructure Toward 1GW+",
    "Crusoe and Lancium Scale Texas AI Infrastructure Toward 1GW+\n\n![Crusoe and Lancium Scale Texas AI Infrastructure Toward 1GW+](/uploads/news-pictures/2057-zutphen-blog-post-image-20260719145046.webp)\n\n**Crusoe and** [**Lancium**](https://hostingjournalist.com/news/2-4-billion-data-center-campus-to-be-developed-in-texas)** plan to build a 1 gigawatt AI data center campus in Childress, Texas, extending a partnership already underway in Abilene as hyperscale computing demand accelerates."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Crusoe and Lancium Scale Texas AI Infrastructure Toward 1GW+",
    "Crusoe and Lancium Scale Texas AI Infrastructure Toward 1GW+\n\n![Crusoe and Lancium Scale Texas AI Infrastructure Toward 1GW+](/uploads/news-pictures/2057-zutphen-blog-post-image-20260719145046.webp)\n\n**Crusoe and** [**Lancium**](https://hostingjournalist.com/news/2-4-billion-data-center-campus-to-be-developed-in-texas)** plan to build a 1 gigawatt AI data center campus in Childress, Texas, extending a partnership already underway in Abilene as hyperscale computing demand accelerates."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://hostingjournalist.com/news/crusoe-and-lancium-scale-texas-ai-infrastructure-toward-1gw",
   "title": "Crusoe and Lancium Scale Texas AI Infrastructure Toward 1GW+",
   "published_at": "2026-07-19T03:17:19",
   "project": null,
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe",
   "ai_customer": null,
   "status": "expanded",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "# Crusoe and Lancium Scale Texas AI Infrastructure Toward 1GW+",
    "Crusoe says it energized its first two buildings there within roughly a year before expanding the original campus to 1.2 gigawatts."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Scale Texas AI Infrastructure Toward 1GW+",
    "Crusoe and Lancium Scale Texas AI Infrastructure Toward 1GW+\n\n![Crusoe and Lancium Scale Texas AI Infrastructure Toward 1GW+](/uploads/news-pictures/2057-zutphen-blog-post-image-20260719145046.webp)\n\n**Crusoe and** [**Lancium**](https://hostingjournalist.com/news/2-4-billion-data-center-campus-to-be-developed-in-texas)** plan to build a 1 gigawatt AI data center campus in Childress, Texas, extending a partnership already underway in Abilene as hyperscale computing demand accelerates."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium Scale Texas AI Infrastructure Toward 1GW+",
    "Crusoe says it energized its first two buildings there within roughly a year before expanding the original campus to 1.2 gigawatts."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium Scale Texas AI Infrastructure Toward 1GW+",
    "Crusoe says it energized its first two buildings there within roughly a year before expanding the original campus to 1.2 gigawatts."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Crusoe and Lancium Scale Texas AI Infrastructure Toward 1GW+",
    "Crusoe says it energized its first two buildings there within roughly a year before expanding the original campus to 1.2 gigawatts."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://thetexasdispatch.com/shackelford-county-data-center-frontier-stargate",
   "title": "Vantage\u2019s Stargate Campus in Shackelford County Nears Its First Power-On",
   "published_at": "2026-06-30T20:30:00",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": "OpenAI and Oracle",
   "status": "nears its first power-on",
   "announcement_date": null,
   "project_evidence": [
    "Vantage Data Centers\u2019 \u201cFrontier\u201d campus in Shackelford County, developed as part of the Stargate initiative led by OpenAI and Oracle, is on a schedule that would bring its first facility online in the second half of 2026, according to the company and to reporting by Data Center Dynamics.",
    "# Vantage\u2019s Stargate Campus in Shackelford County Nears Its First Power-On"
   ],
   "locality_evidence": [
    "Vantage Data Centers\u2019 \u201cFrontier\u201d campus in Shackelford County, developed as part of the Stargate initiative led by OpenAI and Oracle, is on a schedule that would bring its first facility online in the second half of 2026, according to the company and to reporting by Data Center Dynamics.",
    "# Vantage\u2019s Stargate Campus in Shackelford County Nears Its First Power-On"
   ],
   "state_evidence": [
    "One of the largest single data-center projects yet planned in Texas is approaching an operational milestone in a rural county west of Fort Worth.",
    "# Vantage\u2019s Stargate Campus in Shackelford County Nears Its First Power-On"
   ],
   "capacity_gw_evidence": [
    "# Vantage\u2019s Stargate Campus in Shackelford County Nears Its First Power-On"
   ],
   "builder_evidence": [
    "Vantage Data Centers\u2019 \u201cFrontier\u201d campus in Shackelford County, developed as part of the Stargate initiative led by OpenAI and Oracle, is on a schedule that would bring its first facility online in the second half of 2026, according to the company and to reporting by Data Center Dynamics.",
    "# Vantage\u2019s Stargate Campus in Shackelford County Nears Its First Power-On"
   ],
   "ai_customer_evidence": [
    "Vantage Data Centers\u2019 \u201cFrontier\u201d campus in Shackelford County, developed as part of the Stargate initiative led by OpenAI and Oracle, is on a schedule that would bring its first facility online in the second half of 2026, according to the company and to reporting by Data Center Dynamics.",
    "# Vantage\u2019s Stargate Campus in Shackelford County Nears Its First Power-On"
   ],
   "status_evidence": [
    "Vantage\u2019s Stargate Campus in Shackelford County Nears Its First Power-On",
    "# Vantage\u2019s Stargate Campus in Shackelford County Nears Its First Power-On"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/news/fermi-america-acquires-600mw-of-gas-turbines-for-11gw-ai-mega-campus-in-amarillo-texas",
   "title": "Fermi America acquires 600MW of gas turbines for 11GW AI mega campus in Amarillo, Texas",
   "published_at": "2026-05-07T12:17:30",
   "project": "HyperGrid",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Fermi America has acquired more than 600MW of natural gas generation for its planned HyperGrid AI campus in Amarillo, Texas.",
    "The HyperGrid campus is set to integrate several different energy sources to power it, including \u201cthe largest nuclear power complex in America, the nation\u2019s biggest combined-cycle natural gas project, utility grid power, solar power, and battery energy storage to deliver next-generation artificial intelligence,\u201d according to the company."
   ],
   "locality_evidence": [
    "Fermi America has acquired more than 600MW of natural gas generation for its planned HyperGrid AI campus in Amarillo, Texas."
   ],
   "state_evidence": [
    "Fermi America has acquired more than 600MW of natural gas generation for its planned HyperGrid AI campus in Amarillo, Texas."
   ],
   "capacity_gw_evidence": [
    "The campus is being developed in partnership with the Texas Tech University System. It will span 5,769 acres and, at full buildout, will have the potential to deliver up to 11GW of power."
   ],
   "builder_evidence": [
    "Fermi America has acquired more than 600MW of natural gas generation for its planned HyperGrid AI campus in Amarillo, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Fermi America has acquired more than 600MW of natural gas generation for its planned HyperGrid AI campus in Amarillo, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://silicon.co.uk/press-release/homer-city-redevelopment-and-kiewit-announce-countrys-largest-natural-gas-powered-data-center-campus-to-support-ai-and-hpc-demand",
   "title": "Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
   "published_at": "2025-04-02T10:00:00",
   "project": "Homer City Energy Campus",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Kiewit Power Constructors Co.",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2025-04-02",
   "project_evidence": [
    "# Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "The Homer City Energy Campus will be built by Kiewit Power Constructors Co., one of the leading engineering, procurement and construction (EPC) contractors in the country."
   ],
   "locality_evidence": [
    "# Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "Today Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) announced the future of the former Homer City Generating Station."
   ],
   "state_evidence": [
    "# Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "Homer City \u2013 previously the largest coal-burning power plant in Pennsylvania \u2013 will be transformed into a more than 3,200-acre natural gas-powered data center campus, designed to meet the growing artificial intelligence (AI) and high-performance computing (HPC) needs of the innovative technology companies shaping America\u2019s digital future."
   ],
   "capacity_gw_evidence": [
    "# Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "- Delivery of up to 4.5 gigawatts (GW) of power to support AI-driven hyperscale data centers, while reducing greenhouse gas emissions by 60\u201365% per megawatt hour compared to the former coal plant."
   ],
   "builder_evidence": [
    "# Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "The Homer City Energy Campus will be built by Kiewit Power Constructors Co., one of the leading engineering, procurement and construction (EPC) contractors in the country."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "Today Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) announced the future of the former Homer City Generating Station."
   ],
   "announcement_date_evidence": [
    "# Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
    "View source version on businesswire.com: [https://www.businesswire.com/news/home/20250402452555/en/](https://www.businesswire.com/news/home/20250402452555/en/)"
   ]
  },
  {
   "url": "https://aithority.com/machine-learning/nscale-and-microsoft-announce-collaboration-with-nvidia-and-caterpillar-to-deliver-1-35gw-of-nvidia-vera-rubin-nvl72-gpus-at-flagship-ai-factory-campus-in-west-virginia",
   "title": "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
   "published_at": "2026-03-17T08:41:30",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "Acquired / Under Development",
   "announcement_date": null,
   "project_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also announced the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "locality_evidence": [
    "Nscale today also announced the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "state_evidence": [
    "Nscale today also announced the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "capacity_gw_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also announced the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "builder_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "ai_customer_evidence": [
    "Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs",
    "[Nscale](https://www.nscale.com/) has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA\u2019s next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ],
   "status_evidence": [
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also announced the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://stratoswatch.org",
   "title": "Stratos Watch",
   "published_at": null,
   "project": "The Stratos Project",
   "locality": "Hansel Valley",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O'Leary Digital",
   "ai_customer": "Apple, Amazon, Google, Meta & Microsoft",
   "status": "Approved",
   "announcement_date": "2026-04-22",
   "project_evidence": [
    "## The Box Elder\nData Center",
    "## A hyperscale datacenter and supporting infrastructure.\n\n\"The Stratos Project\"",
    "Targeted clients: Apple, Amazon, Google, Meta & Microsoft[3]"
   ],
   "locality_evidence": [
    "## The Box Elder\nData Center",
    "No public analysis of alternative sites has been presented. Kevin O'Leary and developers have been explicit that Hansel Valley was chosen specifically because the Ruby Pipeline runs through it[26] \u2014 the location decision was driven by fossil fuel access, not environmental suitability."
   ],
   "state_evidence": [
    "## The Box Elder\nData Center",
    "Does Utah truly need a hyperscale datacenter backed by the Military Installation Development Authority (MIDA)?"
   ],
   "capacity_gw_evidence": [
    "## The Box Elder\nData Center",
    "Required Gas for **9.0** GW: **1.54** Bcf/day",
    "We need to produce 9.0 GW, which is 9 000 000 000 W of electrical power."
   ],
   "builder_evidence": [
    "## The Box Elder\nData Center",
    "**Even the developers can't agree on how big this project is.** The MIDA press release announcing approval lists the project's capacity as \"up to approximately 7.5 gigawatts,\"[8] while the CEO of O'Leary Digital described it in official communications as \"7.5 gigawatts to 9 gigawatts.\"[32]"
   ],
   "ai_customer_evidence": [
    "## The Box Elder\nData Center",
    "Targeted clients: Apple, Amazon, Google, Meta & Microsoft[3]"
   ],
   "status_evidence": [
    "## The Box Elder\nData Center",
    "April 24, 2026\n\n### MIDA board formally approves the Stratos Project Area\n\nThe Military Installation Development Authority unanimously approves the creation of the Stratos Project Area in Box Elder County[1]."
   ],
   "announcement_date_evidence": [
    "## The Box Elder\nData Center",
    "April 22, 2026\n\n### First Public Mention at Box Elder County Commission\n\nMIDA and O'Leary Digital present the Stratos proposal to county commissioners for the **first time publicly** in a special session[0]."
   ]
  },
  {
   "url": "https://topclanker.com/blog/2026-07-23-openai-project-camellia-effingham-county-georgia",
   "title": "OpenAI's Project Camellia Puts a $20B, 3.2 GW Data Center Three Hours From My House",
   "published_at": "2026-07-23T00:00:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "# OpenAI's Project Camellia Puts a $20B, 3.2 GW Data Center Three Hours From My House",
    "OpenAI announced Project Camellia on Tuesday: a **$20 billion**, 1,400-acre data center campus in Effingham County, Georgia, with a **25-year, 3.2 gigawatt** power contract from Georgia Power \u2014 phased in from 2028 through 2032, with a public open house in Rincon tonight from 6 to 8 PM ([OpenAI announcement, 2026-07-22](https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/); [Georgia Public Broadcasting, 2026-07-22](https://www.gpb.org/news/2026/07/22/openai-plans-build-20b-data-center-campus-in-effingham-county-it-could-be-georgias))."
   ],
   "locality_evidence": [
    "# OpenAI's Project Camellia Puts a $20B, 3.2 GW Data Center Three Hours From My House",
    "OpenAI announced a $20 billion, 1,400-acre, 3.2 GW data center campus in Effingham County, Georgia on Tuesday, with a 25-year Georgia Power contract, 400-1,000 long-term jobs, $80M in community benefits, and an open house TONIGHT (July 23, 6-8 PM) in Rincon."
   ],
   "state_evidence": [
    "# OpenAI's Project Camellia Puts a $20B, 3.2 GW Data Center Three Hours From My House",
    "OpenAI announced a $20 billion, 1,400-acre, 3.2 GW data center campus in Effingham County, Georgia on Tuesday, with a 25-year Georgia Power contract, 400-1,000 long-term jobs, $80M in community benefits, and an open house TONIGHT (July 23, 6-8 PM) in Rincon."
   ],
   "capacity_gw_evidence": [
    "# OpenAI's Project Camellia Puts a $20B, 3.2 GW Data Center Three Hours From My House",
    "OpenAI announced a $20 billion, 1,400-acre, 3.2 GW data center campus in Effingham County, Georgia on Tuesday, with a 25-year Georgia Power contract, 400-1,000 long-term jobs, $80M in community benefits, and an open house TONIGHT (July 23, 6-8 PM) in Rincon."
   ],
   "builder_evidence": [
    "# OpenAI's Project Camellia Puts a $20B, 3.2 GW Data Center Three Hours From My House",
    "OpenAI announced a $20 billion, 1,400-acre, 3.2 GW data center campus in Effingham County, Georgia on Tuesday, with a 25-year Georgia Power contract, 400-1,000 long-term jobs, $80M in community benefits, and an open house TONIGHT (July 23, 6-8 PM) in Rincon."
   ],
   "ai_customer_evidence": [
    "# OpenAI's Project Camellia Puts a $20B, 3.2 GW Data Center Three Hours From My House",
    "OpenAI announced a $20 billion, 1,400-acre, 3.2 GW data center campus in Effingham County, Georgia on Tuesday, with a 25-year Georgia Power contract, 400-1,000 long-term jobs, $80M in community benefits, and an open house TONIGHT (July 23, 6-8 PM) in Rincon."
   ],
   "status_evidence": [
    "# OpenAI's Project Camellia Puts a $20B, 3.2 GW Data Center Three Hours From My House",
    "OpenAI announced a $20 billion, 1,400-acre, 3.2 GW data center campus in Effingham County, Georgia on Tuesday, with a 25-year Georgia Power contract, 400-1,000 long-term jobs, $80M in community benefits, and an open house TONIGHT (July 23, 6-8 PM) in Rincon."
   ],
   "announcement_date_evidence": [
    "# OpenAI's Project Camellia Puts a $20B, 3.2 GW Data Center Three Hours From My House",
    "*July 23, 2026*",
    "OpenAI announced Project Camellia on Tuesday: a **$20 billion**, 1,400-acre data center campus in Effingham County, Georgia, with a **25-year, 3.2 gigawatt** power contract from Georgia Power \u2014 phased in from 2028 through 2032, with a public open house in Rincon tonight from 6 to 8 PM ([OpenAI announcement, 2026-07-22](https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/); [Georgia Public Broadcasting, 2026-07-22](https://www.gpb.org/news/2026/07/22/openai-plans-build-20b-data-center-campus-in-effingham-county-it-could-be-georgias))."
   ]
  },
  {
   "url": "https://baxtel.com/data-center/terawulf-muskie-cb-3",
   "title": "TeraWulf: Muskie CB-3",
   "published_at": null,
   "project": "Muskie Data Campus",
   "locality": "Eastern Kentucky",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": "",
   "status": "Planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "### TeraWulf Buys Site in Kentucky for 1GW Data Center Campus",
    "The Nasdaq-listed cryptomining and AI infrastructure firm announced it has acquired the Muskie Data Campus in Eastern Kentucky from Industrial Equity Partners...."
   ],
   "locality_evidence": [
    "### TeraWulf Buys Site in Kentucky for 1GW Data Center Campus",
    "The Nasdaq-listed cryptomining and AI infrastructure firm announced it has acquired the Muskie Data Campus in Eastern Kentucky from Industrial Equity Partners...."
   ],
   "state_evidence": [
    "### TeraWulf Buys Site in Kentucky for 1GW Data Center Campus",
    "The Nasdaq-listed cryptomining and AI infrastructure firm announced it has acquired the Muskie Data Campus in Eastern Kentucky from Industrial Equity Partners...."
   ],
   "capacity_gw_evidence": [
    "### TeraWulf Buys Site in Kentucky for 1GW Data Center Campus",
    "The Nasdaq-listed cryptomining and AI infrastructure firm announced it has acquired the Muskie Data Campus in Eastern Kentucky from Industrial Equity Partners...."
   ],
   "builder_evidence": [
    "### TeraWulf Buys Site in Kentucky for 1GW Data Center Campus",
    "The Nasdaq-listed cryptomining and AI infrastructure firm announced it has acquired the Muskie Data Campus in Eastern Kentucky from Industrial Equity Partners...."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "### TeraWulf Buys Site in Kentucky for 1GW Data Center Campus",
    "TeraWulf is expanding its presence in Kentucky with the acquisition of a second planned site for hyperscale high-performance computing."
   ],
   "announcement_date_evidence": [
    "### TeraWulf Buys Site in Kentucky for 1GW Data Center Campus",
    "May 27, 2026 Terawulf"
   ]
  },
  {
   "url": "https://crowdfundjunction.com/blog/hut-8-surges-30-after-landing-second-ai-data-center-lease-worth-9-8-billion-bitcoin-news",
   "title": "Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion \u2013 Bitcoin News - Crowd Fund Junction Blog",
   "published_at": "2026-05-07T09:49:23",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2026-05-06",
   "project_evidence": [
    "Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion \u2013 Bitcoin News",
    "The Miami-based company said it signed a $9.8 billion triple-net lease for 352 megawatts of IT capacity at its Beacon Point campus in Nueces County, Texas."
   ],
   "locality_evidence": [
    "Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion \u2013 Bitcoin News",
    "The Miami-based company said it signed a $9.8 billion triple-net lease for 352 megawatts of IT capacity at its Beacon Point campus in Nueces County, Texas."
   ],
   "state_evidence": [
    "Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion \u2013 Bitcoin News",
    "The Miami-based company said it signed a $9.8 billion triple-net lease for 352 megawatts of IT capacity at its Beacon Point campus in Nueces County, Texas."
   ],
   "capacity_gw_evidence": [
    "Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion \u2013 Bitcoin News",
    "Beacon Point is designed as a gigawatt-scale campus with 1,000 MW of utility capacity under interconnection agreement with AEP Texas."
   ],
   "builder_evidence": [
    "Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion \u2013 Bitcoin News",
    "The Miami-based company said it signed a $9.8 billion triple-net lease for 352 megawatts of IT capacity at its Beacon Point campus in Nueces County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion \u2013 Bitcoin News",
    "Beacon Point is designed as a gigawatt-scale campus with 1,000 MW of utility capacity under interconnection agreement with AEP Texas."
   ],
   "announcement_date_evidence": [
    "Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion \u2013 Bitcoin News",
    "The original article can be viewed [here](https://theenergymag.com/news/2026-05-06/hut-ai-beacon-point)."
   ]
  },
  {
   "url": "https://greenstocknews.com/news/nasdaq/iren/iren-announces-successful-energization-of-sweetwater-1",
   "title": "IREN Announces Successful Energization of Sweetwater 1",
   "published_at": "2026-05-01T20:13:07",
   "project": "Sweetwater 1",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "IREN Limited",
   "ai_customer": null,
   "status": "energized",
   "announcement_date": "2026-05-01",
   "project_evidence": [
    "IREN Announces Successful Energization of Sweetwater 1",
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- **IREN Limited** (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "locality_evidence": [
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- **IREN Limited** (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas.",
    "Energization marks the connection of the site\u2019s high-voltage substation to the ERCOT grid, representing a key milestone in the development of the broader 2GW Sweetwater campus."
   ],
   "state_evidence": [
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- **IREN Limited** (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "capacity_gw_evidence": [
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- **IREN Limited** (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "builder_evidence": [
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- **IREN Limited** (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- **IREN Limited** (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ],
   "announcement_date_evidence": [
    "NEW YORK, May 01, 2026 (GLOBE NEWSWIRE) -- **IREN Limited** (NASDAQ: IREN) (\u201cIREN\u201d) today announced the successful energization of its 1.4GW Sweetwater 1 data center site in Texas."
   ]
  },
  {
   "url": "https://decarbonfuse.com/posts/enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "decarbonfuse",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "*Enchant Energy signs letter of intent with* [***Creekstone Energy LLC***](https://www.creekstone.energy/) *to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite*",
    "Enchant Energy Corporation (\"Enchant\") **entered into a letter of intent** with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "state_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation (\"Enchant\") **entered into a letter of intent** with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "capacity_gw_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "*Enchant Energy signs letter of intent with* [***Creekstone Energy LLC***](https://www.creekstone.energy/) *to develop a carbon capture and utilization solution for the Creekstone Delta Gigasite*",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation (\"Enchant\") **entered into a letter of intent** with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://kttc.marketminute.com/article/publisher/ECL",
   "title": "Articles from ECL",
   "published_at": null,
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "Lambda",
   "status": "announced",
   "announcement_date": "2024-09-25",
   "project_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "locality_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "state_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "capacity_gw_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "builder_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "ai_customer_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "status_evidence": [
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ],
   "announcement_date_evidence": [
    "[ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center](/article/bizwire-2024-9-25-ecl-announces-worlds-first-1-gigawatt-off-grid-hydrogen-powered-ai-factory-data-center)",
    "ECL Announces World\u2019s First 1 Gigawatt Off-Grid, Hydrogen-Powered AI Factory Data Center",
    "Data Center-as-a-Service pioneer ECL, which unveiled the world\u2019s first off-grid, sustainable, modular, built-to-suit data center on June 20, 2024, today announced that it will build the first fully sustainable 1GW AI Factory data center \u2013 ECL TerraSite-TX1 on a 600+ acre site east of Houston, with Lambda as its first tenant."
   ]
  },
  {
   "url": "https://globenewswire.com/news-release/2026/08/17/3346111/0/en/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute.html",
   "title": "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
   "published_at": "2026-08-17T12:33:22",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "locality_evidence": [
    "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "state_evidence": [
    "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "capacity_gw_evidence": [
    "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "- *OpenAI will be the customer for 8-IT GW*"
   ],
   "builder_evidence": [
    "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "ai_customer_evidence": [
    "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "- *OpenAI will be the customer for 8-IT GW*"
   ],
   "status_evidence": [
    "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 (GLOBE NEWSWIRE) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ],
   "announcement_date_evidence": [
    "NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute",
    "SANTA CLARA, Calif. and REDWOOD CITY, Calif., Aug. 17, 2026 (GLOBE NEWSWIRE) -- NVIDIA announced that it has secured land, power and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, to host NVIDIA compute."
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news/softbanks-sb-energy-to-build-and-operate-openais-12gw-stargate-data-center-in-milam-county-texas",
   "title": "SoftBank's SB Energy to build and operate OpenAI's 1.2GW Stargate data center in Milam County, Texas",
   "published_at": "2026-08-05T00:00:00",
   "project": "Stargate",
   "locality": "Milam County",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "SoftBank subsidiary SB Energy has partnered with OpenAI to build and operate the previously announced 1.2 GW Stargate data center in Milam County, Texas."
   ],
   "locality_evidence": [
    "SoftBank subsidiary SB Energy has partnered with OpenAI to build and operate the previously announced 1.2 GW Stargate data center in Milam County, Texas."
   ],
   "state_evidence": [
    "SoftBank subsidiary SB Energy has partnered with OpenAI to build and operate the previously announced 1.2 GW Stargate data center in Milam County, Texas."
   ],
   "capacity_gw_evidence": [
    "SoftBank subsidiary SB Energy has partnered with OpenAI to build and operate the previously announced 1.2 GW Stargate data center in Milam County, Texas."
   ],
   "builder_evidence": [
    "SoftBank subsidiary SB Energy has partnered with OpenAI to build and operate the previously announced 1.2 GW Stargate data center in Milam County, Texas."
   ],
   "ai_customer_evidence": [
    "SoftBank subsidiary SB Energy has partnered with OpenAI to build and operate the previously announced 1.2 GW Stargate data center in Milam County, Texas."
   ],
   "status_evidence": [
    "SoftBank subsidiary SB Energy has partnered with OpenAI to build and operate the previously announced 1.2 GW Stargate data center in Milam County, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://agenticbrew.ai/news/7d8be472-dd7f-4c5a-b3f0-b6f68efe4953/meta-blackrock-14b-el-paso-ai-data-center-deal",
   "title": "Meta-BlackRock $14B El Paso AI Data Center Deal",
   "published_at": "2026-07-28T17:36:56",
   "project": null,
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "expected online in 2028",
   "announcement_date": "2026-07-28",
   "project_evidence": null,
   "locality_evidence": [
    "Meta and BlackRock announced a joint venture on July 28, 2026 to develop and own a 1-gigawatt AI data center campus in El Paso, Texas, with total development costs of approximately $14 billion."
   ],
   "state_evidence": [
    "Meta and BlackRock announced a joint venture on July 28, 2026 to develop and own a 1-gigawatt AI data center campus in El Paso, Texas, with total development costs of approximately $14 billion."
   ],
   "capacity_gw_evidence": [
    "Meta and BlackRock announced a joint venture on July 28, 2026 to develop and own a 1-gigawatt AI data center campus in El Paso, Texas, with total development costs of approximately $14 billion."
   ],
   "builder_evidence": [
    "Meta and BlackRock announced a joint venture on July 28, 2026 to develop and own a 1-gigawatt AI data center campus in El Paso, Texas, with total development costs of approximately $14 billion.",
    "Meta will act as construction manager, property manager, and sole tenant of the facility, expected online in 2028, under a lease with a 4-year initial term plus four 4-year extension options and a roughly $13 billion residual value guarantee that declines over time."
   ],
   "ai_customer_evidence": [
    "Meta will act as construction manager, property manager, and sole tenant of the facility, expected online in 2028, under a lease with a 4-year initial term plus four 4-year extension options and a roughly $13 billion residual value guarantee that declines over time."
   ],
   "status_evidence": [
    "Meta will act as construction manager, property manager, and sole tenant of the facility, expected online in 2028, under a lease with a 4-year initial term plus four 4-year extension options and a roughly $13 billion residual value guarantee that declines over time."
   ],
   "announcement_date_evidence": [
    "Meta and BlackRock announced a joint venture on July 28, 2026 to develop and own a 1-gigawatt AI data center campus in El Paso, Texas, with total development costs of approximately $14 billion."
   ]
  },
  {
   "url": "https://vendordeep.com/analysis/meta-hyperion-5gw-50b-the-10b-to-50b-ai-data-center-behemoth-strategy.html",
   "title": "Meta Hyperion 5GW + $50B: The $10B to $50B AI Data Center Behemoth Strategy",
   "published_at": "2026-07-14T00:00:00",
   "project": "Hyperion",
   "locality": "Richland Parish",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2026-07-13",
   "project_evidence": [
    "Meta Hyperion 5GW + $50B: The $10B to $50B AI Data Center Behemoth Strategy",
    "On July 13, 2026, Meta officially announced the five-fold expansion of its Hyperion AI data center campus in Richland Parish, Louisiana, from the original $27B to $50B+, with power capacity rising from 2GW to 5GW, campus area expanding from 1,000 acres to 3,200 acres, construction jobs increasing from 5,000 to 7,500, and long-term operational positions rising from 500 to 1,000."
   ],
   "locality_evidence": [
    "Meta Hyperion 5GW + $50B: The $10B to $50B AI Data Center Behemoth Strategy",
    "On July 13, 2026, Meta officially announced the five-fold expansion of its Hyperion AI data center campus in Richland Parish, Louisiana, from the original $27B to $50B+, with power capacity rising from 2GW to 5GW, campus area expanding from 1,000 acres to 3,200 acres, construction jobs increasing from 5,000 to 7,500, and long-term operational positions rising from 500 to 1,000."
   ],
   "state_evidence": [
    "Meta Hyperion 5GW + $50B: The $10B to $50B AI Data Center Behemoth Strategy",
    "On July 13, 2026, Meta officially announced the five-fold expansion of its Hyperion AI data center campus in Richland Parish, Louisiana, from the original $27B to $50B+, with power capacity rising from 2GW to 5GW, campus area expanding from 1,000 acres to 3,200 acres, construction jobs increasing from 5,000 to 7,500, and long-term operational positions rising from 500 to 1,000."
   ],
   "capacity_gw_evidence": [
    "Meta Hyperion 5GW + $50B: The $10B to $50B AI Data Center Behemoth Strategy",
    "On July 13, 2026, Meta officially announced the five-fold expansion of its Hyperion AI data center campus in Richland Parish, Louisiana, from the original $27B to $50B+, with power capacity rising from 2GW to 5GW, campus area expanding from 1,000 acres to 3,200 acres, construction jobs increasing from 5,000 to 7,500, and long-term operational positions rising from 500 to 1,000."
   ],
   "builder_evidence": [
    "Meta Hyperion 5GW + $50B: The $10B to $50B AI Data Center Behemoth Strategy",
    "On July 13, 2026, Meta officially announced the five-fold expansion of its Hyperion AI data center campus in Richland Parish, Louisiana, from the original $27B to $50B+, with power capacity rising from 2GW to 5GW, campus area expanding from 1,000 acres to 3,200 acres, construction jobs increasing from 5,000 to 7,500, and long-term operational positions rising from 500 to 1,000."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Meta Hyperion 5GW + $50B: The $10B to $50B AI Data Center Behemoth Strategy",
    "On July 13, 2026, Meta officially announced the five-fold expansion of its Hyperion AI data center campus in Richland Parish, Louisiana, from the original $27B to $50B+, with power capacity rising from 2GW to 5GW, campus area expanding from 1,000 acres to 3,200 acres, construction jobs increasing from 5,000 to 7,500, and long-term operational positions rising from 500 to 1,000."
   ],
   "announcement_date_evidence": [
    "Meta Hyperion 5GW + $50B: The $10B to $50B AI Data Center Behemoth Strategy",
    "On July 13, 2026, Meta officially announced the five-fold expansion of its Hyperion AI data center campus in Richland Parish, Louisiana, from the original $27B to $50B+, with power capacity rising from 2GW to 5GW, campus area expanding from 1,000 acres to 3,200 acres, construction jobs increasing from 5,000 to 7,500, and long-term operational positions rising from 500 to 1,000."
   ]
  },
  {
   "url": "https://ithacajournal.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Colossus 2",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 1.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "active construction still on site",
   "announcement_date": "2025-03-01",
   "project_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "locality_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "The second Memphis campus in Whitehaven came into the picture in early 2025."
   ],
   "state_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "It has been a very [busy 18 months for Elon Musk's xAI](/story/money/business/development/2025/06/05/elon-musk-xai-supercomputer-grok-memphis-tn/83599473007/) since the company first announced plans for its Memphis data center in June 2024.",
    "## Colossus 2 | Tulane Road, Memphis"
   ],
   "capacity_gw_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "builder_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "- Elon Musk's xAI has acquired over 1,156 acres of land in the Memphis area for its data centers.",
    "## Colossus 2 | Tulane Road, Memphis",
    "In March 2025, the Greater Memphis Chamber announced xAI's plans for a second campus and its purchase of a 1 million-square-foot building."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "Colossus 2 is a bit more straightforward than the Paul R. Lowry Road complex. The Tulane Road site is an artificial intelligence data center, with active construction still on site."
   ],
   "announcement_date_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "In March 2025, the Greater Memphis Chamber announced xAI's plans for a second campus and its purchase of a 1 million-square-foot building."
   ]
  },
  {
   "url": "https://ithacajournal.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Macrohardrr",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2026-01-08",
   "project_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ],
   "locality_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "This is the third and most recent xAI campus."
   ],
   "state_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ],
   "capacity_gw_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "builder_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "- Elon Musk's xAI has acquired over 1,156 acres of land in the Memphis area for its data centers.",
    "## Marcrohardrr | Southaven",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "The former Duke Energy site has been under construction with gas turbines on site for powering xAI data centers."
   ],
   "announcement_date_evidence": [
    "DEVELOPMENT",
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ]
  },
  {
   "url": "https://stocktitan.net/news/DBRG/digital-bridge-backed-portfolio-company-vantage-data-centers-pjcr8lcq66tl.html",
   "title": "DigitalBridge-Backed Portfolio Company Vantage Data Centers Launches $25 Billion Texas \u201cFrontier\u201d Mega-Campus",
   "published_at": "2025-08-19T11:06:00",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": null,
   "announcement_date": "2025-08-18",
   "project_evidence": [
    "# DigitalBridge-Backed Portfolio Company Vantage Data Centers Launches $25 Billion Texas \u201cFrontier\u201d Mega-Campus",
    "BOCA RATON, Fla.--(BUSINESS WIRE)-- DigitalBridge Group, Inc. (NYSE: [DBRG](/overview/DBRG/)), a leading global alternative asset manager dedicated to investing in digital infrastructure, today announced its portfolio company Vantage Data Centers\u2019 largest project to date: Frontier, a $25 billion, 1.4GW hyperscale data center campus in Shackelford County, Texas."
   ],
   "locality_evidence": [
    "# DigitalBridge-Backed Portfolio Company Vantage Data Centers Launches $25 Billion Texas \u201cFrontier\u201d Mega-Campus",
    "BOCA RATON, Fla.--(BUSINESS WIRE)-- DigitalBridge Group, Inc. (NYSE: [DBRG](/overview/DBRG/)), a leading global alternative asset manager dedicated to investing in digital infrastructure, today announced its portfolio company Vantage Data Centers\u2019 largest project to date: Frontier, a $25 billion, 1.4GW hyperscale data center campus in Shackelford County, Texas."
   ],
   "state_evidence": [
    "# DigitalBridge-Backed Portfolio Company Vantage Data Centers Launches $25 Billion Texas \u201cFrontier\u201d Mega-Campus",
    "BOCA RATON, Fla.--(BUSINESS WIRE)-- DigitalBridge Group, Inc. (NYSE: [DBRG](/overview/DBRG/)), a leading global alternative asset manager dedicated to investing in digital infrastructure, today announced its portfolio company Vantage Data Centers\u2019 largest project to date: Frontier, a $25 billion, 1.4GW hyperscale data center campus in Shackelford County, Texas."
   ],
   "capacity_gw_evidence": [
    "# DigitalBridge-Backed Portfolio Company Vantage Data Centers Launches $25 Billion Texas \u201cFrontier\u201d Mega-Campus",
    "BOCA RATON, Fla.--(BUSINESS WIRE)-- DigitalBridge Group, Inc. (NYSE: [DBRG](/overview/DBRG/)), a leading global alternative asset manager dedicated to investing in digital infrastructure, today announced its portfolio company Vantage Data Centers\u2019 largest project to date: Frontier, a $25 billion, 1.4GW hyperscale data center campus in Shackelford County, Texas."
   ],
   "builder_evidence": [
    "# DigitalBridge-Backed Portfolio Company Vantage Data Centers Launches $25 Billion Texas \u201cFrontier\u201d Mega-Campus",
    "BOCA RATON, Fla.--(BUSINESS WIRE)-- DigitalBridge Group, Inc. (NYSE: [DBRG](/overview/DBRG/)), a leading global alternative asset manager dedicated to investing in digital infrastructure, today announced its portfolio company Vantage Data Centers\u2019 largest project to date: Frontier, a $25 billion, 1.4GW hyperscale data center campus in Shackelford County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": [
    "# DigitalBridge-Backed Portfolio Company Vantage Data Centers Launches $25 Billion Texas \u201cFrontier\u201d Mega-Campus",
    "BOCA RATON, Fla.--(BUSINESS WIRE)-- DigitalBridge Group, Inc. (NYSE: [DBRG](/overview/DBRG/)), a leading global alternative asset manager dedicated to investing in digital infrastructure, today announced its portfolio company Vantage Data Centers\u2019 largest project to date: Frontier, a $25 billion, 1.4GW hyperscale data center campus in Shackelford County, Texas."
   ]
  },
  {
   "url": "https://datacenterdynamics.com/en/news/us-law-firm-to-investigate-fermi-america-over-potential-violations-of-federal-law",
   "title": "US law firm to investigate Fermi America over potential violations of federal law",
   "published_at": "2026-05-14T01:14:27",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 11.0,
   "builder": "Fermi America",
   "ai_customer": null,
   "status": "planning",
   "announcement_date": null,
   "project_evidence": [
    "Fermi, a company co-founded by former Texas governor and energy secretary Rick Perry, is planning to [develop a massive 11GW data center and energy campus](https://www.datacenterdynamics.com/en/news/?tag=fermi-america) near Amarillo in Texas on land owned by the Texas Tech University system.",
    "If realized, Project Matador will span 18 million sq ft (1.67 million sqm) and would utilize a combination of on-site energy sources, including natural gas, solar, wind energy, and nuclear energy."
   ],
   "locality_evidence": [
    "Fermi, a company co-founded by former Texas governor and energy secretary Rick Perry, is planning to [develop a massive 11GW data center and energy campus](https://www.datacenterdynamics.com/en/news/?tag=fermi-america) near Amarillo in Texas on land owned by the Texas Tech University system.",
    "US law firm Robbins Geller Rudman & Dowd is investigating Fermi America, the developer of the up to 11GW mega data center campus in Amarillo, Texas."
   ],
   "state_evidence": [
    "Fermi, a company co-founded by former Texas governor and energy secretary Rick Perry, is planning to [develop a massive 11GW data center and energy campus](https://www.datacenterdynamics.com/en/news/?tag=fermi-america) near Amarillo in Texas on land owned by the Texas Tech University system.",
    "US law firm Robbins Geller Rudman & Dowd is investigating Fermi America, the developer of the up to 11GW mega data center campus in Amarillo, Texas."
   ],
   "capacity_gw_evidence": [
    "Fermi, a company co-founded by former Texas governor and energy secretary Rick Perry, is planning to [develop a massive 11GW data center and energy campus](https://www.datacenterdynamics.com/en/news/?tag=fermi-america) near Amarillo in Texas on land owned by the Texas Tech University system.",
    "US law firm Robbins Geller Rudman & Dowd is investigating Fermi America, the developer of the up to 11GW mega data center campus in Amarillo, Texas."
   ],
   "builder_evidence": [
    "Fermi, a company co-founded by former Texas governor and energy secretary Rick Perry, is planning to [develop a massive 11GW data center and energy campus](https://www.datacenterdynamics.com/en/news/?tag=fermi-america) near Amarillo in Texas on land owned by the Texas Tech University system.",
    "US law firm Robbins Geller Rudman & Dowd is investigating Fermi America, the developer of the up to 11GW mega data center campus in Amarillo, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Fermi, a company co-founded by former Texas governor and energy secretary Rick Perry, is planning to [develop a massive 11GW data center and energy campus](https://www.datacenterdynamics.com/en/news/?tag=fermi-america) near Amarillo in Texas on land owned by the Texas Tech University system."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://businesswire.com/news/home/20250402452555/en/Homer-City-Redevelopment-and-Kiewit-Announce-Countrys-Largest-Natural-Gas-Powered-Data-Center-Campus-to-Support-AI-and-HPC-Demand",
   "title": "Homer City Redevelopment and Kiewit Announce Country\u2019s Largest Natural Gas-Powered Data Center Campus to Support AI and HPC Demand",
   "published_at": "2025-04-02T11:00:00",
   "project": "Homer City Energy Campus",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Kiewit Power Constructors Co.",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2025-04-02",
   "project_evidence": [
    "Today Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) announced the future of the former Homer City Generating Station.",
    "The Homer City Energy Campus will be built by Kiewit Power Constructors Co., one of the leading engineering, procurement and construction (EPC) contractors in the country."
   ],
   "locality_evidence": [
    "HOMER CITY, Pa.--([BUSINESS WIRE](https://www.businesswire.com))--Today Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) announced the future of the former Homer City Generating Station."
   ],
   "state_evidence": [
    "Homer City \u2013 previously the largest coal-burning power plant in Pennsylvania \u2013 will be transformed into a more than 3,200-acre natural gas-powered data center campus, designed to meet the growing artificial intelligence (AI) and high-performance computing (HPC) needs of the innovative technology companies shaping America\u2019s digital future."
   ],
   "capacity_gw_evidence": [
    "Delivery of up to 4.5 gigawatts (GW) of power to support AI-driven hyperscale data centers, while reducing greenhouse gas emissions by 60\u201365% per megawatt hour compared to the former coal plant."
   ],
   "builder_evidence": [
    "The Homer City Energy Campus will be built by Kiewit Power Constructors Co., one of the leading engineering, procurement and construction (EPC) contractors in the country."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Today Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) announced the future of the former Homer City Generating Station."
   ],
   "announcement_date_evidence": [
    "These renderings are available here: [www.homercityredevelopment.com](https://cts.businesswire.com/ct/CT?id=smartlink&url=http%3A%2F%2Fwww.homercityredevelopment.com&esheet=54232269&newsitemid=20250402452555&lan=en-US&anchor=www.homercityredevelopment.com&index=2&md5=4a9df244b8488f085d8b0b710715066a)."
   ]
  },
  {
   "url": "https://lifestyle.timesla.com/story/586433/nscale-and-microsoft-announce-collaboration-with-nvidia-and-caterpillar-to-deliver-1-35gw-of-nvidia-vera-rubin-nvl72-gpus-at-flagship-ai-factory-campus-in-west-virginia",
   "title": "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
   "published_at": "2026-03-16T21:46:34",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "announced",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid"
   ],
   "locality_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "state_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "capacity_gw_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Acquires the Monarch Compute Campus \u2014 America\u2019s First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid",
    "Nscale today also [announced](http://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation) the acquisition of American Intelligence & Power Corporation (\u201cAIPCorp\u201d), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States\u2019 first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "builder_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Under the collaboration with Microsoft, Nscale will construct and operate advanced AI data center infrastructure to host this large-scale GPU deployment based on the latest generation NVIDIA Vera Rubin NVL72 GPUs and future technologies."
   ],
   "ai_customer_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs"
   ],
   "status_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ \u2014 Nscale has signed a letter of intent with Microsoft to provide 1.35 gigawatts of AI compute capacity, setting up the West Virginia Monarch AI campus as a global flagship deployment of NVIDIA\u2019s next-generation Vera Rubin GPUs as Vera Rubin NVL72 systems engineered with the NVIDIA Vera Rubin DSX AI Factory reference design."
   ],
   "announcement_date_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "SAN JOSE, Calif., March 16, 2026"
   ]
  },
  {
   "url": "http://idcnova.com/html/1/59/153/2331.html",
   "title": "Texas to become hub for world's largest green-powered data center|Idcnova-Media|the gateway to China data center market",
   "published_at": null,
   "project": "Data City, Texas",
   "locality": "Laredo",
   "state": "Texas",
   "capacity_gw": 5.0,
   "builder": "Energy Abundance Development Corp.",
   "ai_customer": "",
   "status": "planning",
   "announcement_date": null,
   "project_evidence": [
    "A Houston-based company is planning to construct a massive 50,000-acre data center hub near Laredo, Texas, dubbed \"Data City, Texas.\""
   ],
   "locality_evidence": [
    "A Houston-based company is planning to construct a massive 50,000-acre data center hub near Laredo, Texas, dubbed \"Data City, Texas.\""
   ],
   "state_evidence": [
    "A Houston-based company is planning to construct a massive 50,000-acre data center hub near Laredo, Texas, dubbed \"Data City, Texas.\""
   ],
   "capacity_gw_evidence": [
    "The project will be developed in multiple phases, starting with 300 megawatts of power and 1 million square feet of data center space in 2026, eventually expanding to 5 gigawatts of power and over 15 million square feet of leasable space."
   ],
   "builder_evidence": [
    "The facility is set to become \"the world\u2019s largest behind-the-meter data center,\" powered entirely by 100 percent green energy around the clock, according to Energy Abundance Development Corp."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "A Houston-based company is planning to construct a massive 50,000-acre data center hub near Laredo, Texas, dubbed \"Data City, Texas.\""
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://hngn.com/articles/272276/20260722/openai-plans-20-billion-georgia-data-center-its-first-self-built-campus.htm",
   "title": "OpenAI Plans $20 Billion Georgia Data Center, Its First Self-Built Campus",
   "published_at": "2026-07-22T21:06:05",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# OpenAI Plans $20 Billion Georgia Data Center, Its First Self-Built Campus",
    "OpenAI announced plans Wednesday to build a $20 billion data center campus, dubbed Project Camellia, in Effingham County, Georgia, near Savannah \u2014 the company's first data center it will design and build itself, with total project costs potentially exceeding $30 billion at full scale."
   ],
   "locality_evidence": [
    "# OpenAI Plans $20 Billion Georgia Data Center, Its First Self-Built Campus",
    "OpenAI announced plans Wednesday to build a $20 billion data center campus, dubbed Project Camellia, in Effingham County, Georgia, near Savannah \u2014 the company's first data center it will design and build itself, with total project costs potentially exceeding $30 billion at full scale."
   ],
   "state_evidence": [
    "# OpenAI Plans $20 Billion Georgia Data Center, Its First Self-Built Campus",
    "OpenAI announced plans Wednesday to build a $20 billion data center campus, dubbed Project Camellia, in Effingham County, Georgia, near Savannah \u2014 the company's first data center it will design and build itself, with total project costs potentially exceeding $30 billion at full scale."
   ],
   "capacity_gw_evidence": [
    "# OpenAI Plans $20 Billion Georgia Data Center, Its First Self-Built Campus",
    "#### The project will bring 3.2 gigawatts of power and 400 long-term jobs, with OpenAI pledging $80 million for local community priorities."
   ],
   "builder_evidence": [
    "# OpenAI Plans $20 Billion Georgia Data Center, Its First Self-Built Campus",
    "OpenAI announced plans Wednesday to build a $20 billion data center campus, dubbed Project Camellia, in Effingham County, Georgia, near Savannah \u2014 the company's first data center it will design and build itself, with total project costs potentially exceeding $30 billion at full scale."
   ],
   "ai_customer_evidence": [
    "# OpenAI Plans $20 Billion Georgia Data Center, Its First Self-Built Campus",
    "OpenAI announced plans Wednesday to build a $20 billion data center campus, dubbed Project Camellia, in Effingham County, Georgia, near Savannah \u2014 the company's first data center it will design and build itself, with total project costs potentially exceeding $30 billion at full scale."
   ],
   "status_evidence": [
    "# OpenAI Plans $20 Billion Georgia Data Center, Its First Self-Built Campus",
    "OpenAI announced plans Wednesday to build a $20 billion data center campus, dubbed Project Camellia, in Effingham County, Georgia, near Savannah \u2014 the company's first data center it will design and build itself, with total project costs potentially exceeding $30 billion at full scale."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "http://idcnova.com/html/1/59/153/4634.html",
   "title": "Panattoni looks to develop 1GW data center campus outside Detroit, Michigan|Idcnova-Media|the gateway to China data center market",
   "published_at": null,
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni",
   "ai_customer": null,
   "status": "proposed",
   "announcement_date": "2025-12-18",
   "project_evidence": [
    "**Panattoni Proposes 1-Gigawatt Data Center Campus Near Detroit Amid Industry Expansion and Local Scrutiny**",
    "According to local press reports and site plans reviewed by outlets including MLive and WEMU, the project, internally dubbed \"Project Cannoli,\" targets a 282-acre parcel of land north of Interstate 94 and east of Haggerty Road."
   ],
   "locality_evidence": [
    "**Panattoni Proposes 1-Gigawatt Data Center Campus Near Detroit Amid Industry Expansion and Local Scrutiny**",
    "Logistics real estate giant Panattoni has unveiled plans to develop a massive data center campus with a potential capacity of up to 1 gigawatt (GW) in Van Buren Township, Michigan, on the western outskirts of Detroit."
   ],
   "state_evidence": [
    "**Panattoni Proposes 1-Gigawatt Data Center Campus Near Detroit Amid Industry Expansion and Local Scrutiny**",
    "Logistics real estate giant Panattoni has unveiled plans to develop a massive data center campus with a potential capacity of up to 1 gigawatt (GW) in Van Buren Township, Michigan, on the western outskirts of Detroit."
   ],
   "capacity_gw_evidence": [
    "**Panattoni Proposes 1-Gigawatt Data Center Campus Near Detroit Amid Industry Expansion and Local Scrutiny**",
    "Logistics real estate giant Panattoni has unveiled plans to develop a massive data center campus with a potential capacity of up to 1 gigawatt (GW) in Van Buren Township, Michigan, on the western outskirts of Detroit."
   ],
   "builder_evidence": [
    "**Panattoni Proposes 1-Gigawatt Data Center Campus Near Detroit Amid Industry Expansion and Local Scrutiny**",
    "Logistics real estate giant Panattoni has unveiled plans to develop a massive data center campus with a potential capacity of up to 1 gigawatt (GW) in Van Buren Township, Michigan, on the western outskirts of Detroit."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "**Panattoni Proposes 1-Gigawatt Data Center Campus Near Detroit Amid Industry Expansion and Local Scrutiny**",
    "Logistics real estate giant Panattoni has unveiled plans to develop a massive data center campus with a potential capacity of up to 1 gigawatt (GW) in Van Buren Township, Michigan, on the western outskirts of Detroit."
   ],
   "announcement_date_evidence": [
    "**Panattoni Proposes 1-Gigawatt Data Center Campus Near Detroit Amid Industry Expansion and Local Scrutiny**",
    "December 18, 2025"
   ]
  },
  {
   "url": "https://kalkine.ca/news/stocks/iren-secures-275gw-for-data-centers-in-west-texas-with-new-600mw-grid-connection-agreement",
   "title": "IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
   "published_at": "2025-03-17T11:20:00",
   "project": "Sweetwater",
   "locality": "West Texas",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN Limited",
   "ai_customer": null,
   "status": "advancing",
   "announcement_date": "2025-03-17",
   "project_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas.",
    "2GW Sweetwater hub: Direct fiber loop being designed to link Sweetwater 1 & 2"
   ],
   "locality_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas.",
    "While many talk about MW pipelines, our 2.75GW in West Texas is fully contracted, minimizing development risk and ensuring real, deliverable capacity."
   ],
   "state_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas.",
    "While many talk about MW pipelines, our 2.75GW in West Texas is fully contracted, minimizing development risk and ensuring real, deliverable capacity."
   ],
   "capacity_gw_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "builder_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "announcement_date_evidence": [
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: IREN) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ]
  },
  {
   "url": "https://themarcomjournal.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "locality_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "state_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "capacity_gw_evidence": [
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "builder_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah.",
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "announcement_date_evidence": [
    "# Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://sdxcentral.com/news/lambda-installs-gb200-nvl72-rack-at-hydrogen-powered-data-center",
   "title": "Lambda installs GB200 NVL72 rack at hydrogen-powered data center",
   "published_at": "2025-10-30T14:55:53",
   "project": "TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "EdgeCloudLink",
   "ai_customer": "Lambda",
   "status": "upcoming",
   "announcement_date": null,
   "project_evidence": [
    "GPU cloud provider Lambda has deployed an Nvidia GB200 NVL72 rack system at EdgeCloudLink's (ECL) data center in Mountain View, California.",
    "Lambda is also set to be the anchor tenant at ECL's upcoming 1GW TerraSite-TX1 data center campus in Houston, Texas, which will also be powered by hydrogen."
   ],
   "locality_evidence": [
    "GPU cloud provider Lambda has deployed an Nvidia GB200 NVL72 rack system at EdgeCloudLink's (ECL) data center in Mountain View, California.",
    "Lambda is also set to be the anchor tenant at ECL's upcoming 1GW TerraSite-TX1 data center campus in Houston, Texas, which will also be powered by hydrogen."
   ],
   "state_evidence": [
    "GPU cloud provider Lambda has deployed an Nvidia GB200 NVL72 rack system at EdgeCloudLink's (ECL) data center in Mountain View, California.",
    "Lambda is also set to be the anchor tenant at ECL's upcoming 1GW TerraSite-TX1 data center campus in Houston, Texas, which will also be powered by hydrogen."
   ],
   "capacity_gw_evidence": [
    "GPU cloud provider Lambda has deployed an Nvidia GB200 NVL72 rack system at EdgeCloudLink's (ECL) data center in Mountain View, California.",
    "Lambda is also set to be the anchor tenant at ECL's upcoming 1GW TerraSite-TX1 data center campus in Houston, Texas, which will also be powered by hydrogen."
   ],
   "builder_evidence": [
    "GPU cloud provider Lambda has deployed an Nvidia GB200 NVL72 rack system at EdgeCloudLink's (ECL) data center in Mountain View, California.",
    "Lambda is also set to be the anchor tenant at ECL's upcoming 1GW TerraSite-TX1 data center campus in Houston, Texas, which will also be powered by hydrogen."
   ],
   "ai_customer_evidence": [
    "GPU cloud provider Lambda has deployed an Nvidia GB200 NVL72 rack system at EdgeCloudLink's (ECL) data center in Mountain View, California.",
    "Lambda is also set to be the anchor tenant at ECL's upcoming 1GW TerraSite-TX1 data center campus in Houston, Texas, which will also be powered by hydrogen."
   ],
   "status_evidence": [
    "GPU cloud provider Lambda has deployed an Nvidia GB200 NVL72 rack system at EdgeCloudLink's (ECL) data center in Mountain View, California.",
    "Lambda is also set to be the anchor tenant at ECL's upcoming 1GW TerraSite-TX1 data center campus in Houston, Texas, which will also be powered by hydrogen."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://streamlinefeed.co.ke/news/morgan-stanley-consortium-plans-15b-bond-market-tap-to-refinance-texas-data-centre",
   "title": "Morgan Stanley Consortium Plans $15B Bond Market Tap to Refinance Texas Data Centre",
   "published_at": "2026-08-05T04:06:03",
   "project": "Hubbard, Texas project",
   "locality": "Hubbard",
   "state": "Texas",
   "capacity_gw": 1.6,
   "builder": "Nexus Data Centers",
   "ai_customer": "Anthropic",
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "Business",
    "Morgan Stanley Consortium Plans $15B Bond Market Tap to Refinance Texas Data Centre",
    "The Hubbard, Texas project, spearheaded by the Texas-based developer Nexus Data Centers, represents one of the most ambitious AI infrastructure undertakings in North America to date."
   ],
   "locality_evidence": [
    "Business",
    "Morgan Stanley Consortium Plans $15B Bond Market Tap to Refinance Texas Data Centre",
    "A powerful banking consortium led by Morgan Stanley is currently preparing to tap the bond market to refinance a staggering $15 billion in debt initially committed to a sprawling 2,000-acre data center campus under construction in Hubbard, Texas."
   ],
   "state_evidence": [
    "Business",
    "Morgan Stanley Consortium Plans $15B Bond Market Tap to Refinance Texas Data Centre",
    "A powerful banking consortium led by Morgan Stanley is currently preparing to tap the bond market to refinance a staggering $15 billion in debt initially committed to a sprawling 2,000-acre data center campus under construction in Hubbard, Texas."
   ],
   "capacity_gw_evidence": [
    "Business",
    "Morgan Stanley Consortium Plans $15B Bond Market Tap to Refinance Texas Data Centre",
    "The capital is designated to fund not only the colossal server halls but also an essential on-site natural-gas-fired power plant capable of generating an unprecedented 1.6 gigawatts of electricity."
   ],
   "builder_evidence": [
    "Business",
    "Morgan Stanley Consortium Plans $15B Bond Market Tap to Refinance Texas Data Centre",
    "The Hubbard, Texas project, spearheaded by the Texas-based developer Nexus Data Centers, represents one of the most ambitious AI infrastructure undertakings in North America to date."
   ],
   "ai_customer_evidence": [
    "Business",
    "Morgan Stanley Consortium Plans $15B Bond Market Tap to Refinance Texas Data Centre",
    "Morgan Stanley leads a banking consortium in a $15 billion move to refinance debt for an Anthropic AI data center in Texas via the bond market, shifting construction risks to investors."
   ],
   "status_evidence": [
    "Business",
    "Morgan Stanley Consortium Plans $15B Bond Market Tap to Refinance Texas Data Centre",
    "A powerful banking consortium led by Morgan Stanley is currently preparing to tap the bond market to refinance a staggering $15 billion in debt initially committed to a sprawling 2,000-acre data center campus under construction in Hubbard, Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://futurumgroup.com/insights/nvidias-credit-support-buys-exclusivity-at-openais-ohio-data-center",
   "title": "NVIDIA's Credit Support Buys Exclusivity at OpenAI's Ohio Data Center - Futurum",
   "published_at": "2026-08-20T15:20:52",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "announced",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "Analyst(s): Brendan Burke",
    "Publication Date: August 20, 2026",
    "NVIDIA will provide credit support for the land, power, and shell buildout at SB Energy\u2019s PORTS-Pike Technology Campus in Ohio, where OpenAI will lease 8 IT-GW of AI factory capacity for 20 years."
   ],
   "locality_evidence": [
    "Analyst(s): Brendan Burke",
    "Publication Date: August 20, 2026",
    "The August 17 announcement: NVIDIA secured land, power, and shell (LPS) capacity at SB Energy\u2019s PORTS-Pike Technology Campus in Pike County, Ohio, which will exclusively host NVIDIA AI compute, with OpenAI as the customer for 8 IT-GW under a 20-year lease."
   ],
   "state_evidence": [
    "Analyst(s): Brendan Burke",
    "Publication Date: August 20, 2026",
    "NVIDIA will provide credit support for the land, power, and shell buildout at SB Energy\u2019s PORTS-Pike Technology Campus in Ohio, where OpenAI will lease 8 IT-GW of AI factory capacity for 20 years."
   ],
   "capacity_gw_evidence": [
    "Analyst(s): Brendan Burke",
    "Publication Date: August 20, 2026",
    "NVIDIA will provide credit support for the land, power, and shell buildout at SB Energy\u2019s PORTS-Pike Technology Campus in Ohio, where OpenAI will lease 8 IT-GW of AI factory capacity for 20 years."
   ],
   "builder_evidence": [
    "Analyst(s): Brendan Burke",
    "Publication Date: August 20, 2026",
    "NVIDIA will provide credit support for the land, power, and shell buildout at SB Energy\u2019s PORTS-Pike Technology Campus in Ohio, where OpenAI will lease 8 IT-GW of AI factory capacity for 20 years."
   ],
   "ai_customer_evidence": [
    "Analyst(s): Brendan Burke",
    "Publication Date: August 20, 2026",
    "NVIDIA will provide credit support for the land, power, and shell buildout at SB Energy\u2019s PORTS-Pike Technology Campus in Ohio, where OpenAI will lease 8 IT-GW of AI factory capacity for 20 years."
   ],
   "status_evidence": [
    "Analyst(s): Brendan Burke",
    "Publication Date: August 20, 2026",
    "**The News:** NVIDIA announced on August 17 that it has secured land, power, and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, which will exclusively host NVIDIA AI compute."
   ],
   "announcement_date_evidence": [
    "Analyst(s): Brendan Burke",
    "Publication Date: August 20, 2026",
    "**The News:** NVIDIA announced on August 17 that it has secured land, power, and shell (LPS) capacity through a partnership with SB Energy at the PORTS-Pike Technology Campus in Pike County, Ohio, which will exclusively host NVIDIA AI compute."
   ]
  },
  {
   "url": "https://epoch.ai/data/ai-data-centers/directory/meta-hyperion",
   "title": "Meta Hyperion | AI Data Centers",
   "published_at": null,
   "project": "Meta Hyperion",
   "locality": "Holly Ridge",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Meta Hyperion",
    "Meta Hyperion is an AI data center under construction with AI chips owned and used by Meta."
   ],
   "locality_evidence": [
    "Holly Ridge, Louisiana, United States",
    "# Meta Hyperion"
   ],
   "state_evidence": [
    "Holly Ridge, Louisiana, United States",
    "# Meta Hyperion"
   ],
   "capacity_gw_evidence": [
    "Meta [claims](https://engineering.fb.com/2025/09/29/data-infrastructure/metas-infrastructure-evolution-and-the-advent-of-ai/) that \"The Hyperion cluster will have a 5-gigawatt capacity once complete\", but so far there is no concrete evidence for this happening at the Holly Ridge site alone.",
    "# Meta Hyperion"
   ],
   "builder_evidence": [
    "Meta Hyperion is an AI data center under construction with AI chips owned and used by Meta.",
    "# Meta Hyperion"
   ],
   "ai_customer_evidence": [
    "Meta Hyperion is an AI data center under construction with AI chips owned and used by Meta.",
    "# Meta Hyperion"
   ],
   "status_evidence": [
    "OWNER Meta STATUS Under construction USER Meta PROJECT Hyperion",
    "# Meta Hyperion"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://postcrescent.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Colossus 2",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 1.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "active construction still on site",
   "announcement_date": "2025-03-01",
   "project_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "locality_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "state_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "In March 2025, the Greater Memphis Chamber announced xAI's plans for a second campus and its purchase of a 1 million-square-foot building."
   ],
   "capacity_gw_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "builder_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "In March 2025, the Greater Memphis Chamber announced xAI's plans for a second campus and its purchase of a 1 million-square-foot building."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "The Tulane Road site is an artificial intelligence data center, with active construction still on site."
   ],
   "announcement_date_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "In March 2025, the Greater Memphis Chamber announced xAI's plans for a second campus and its purchase of a 1 million-square-foot building."
   ]
  },
  {
   "url": "https://postcrescent.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Macrohardrr",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "under construction with gas turbines on site for powering xAI data centers",
   "announcement_date": "2026-01-08",
   "project_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "locality_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ],
   "state_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ],
   "capacity_gw_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "builder_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "The former Duke Energy site has been under construction with gas turbines on site for powering xAI data centers."
   ],
   "announcement_date_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ]
  },
  {
   "url": "https://telecompaper.com/news/crusoe-and-lancium-announce-1-gw-ai-data-centre-campus-in-texas--1577202",
   "title": "Crusoe and Lancium announce 1 GW AI data centre campus in Texas",
   "published_at": "2026-07-16T07:09:00",
   "project": null,
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": "",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "## Crusoe and Lancium announce 1 GW AI data centre campus in Texas",
    "Crusoe and Lancium have announced plans to develop a 1 GW AI data centre campus in Childress, Texas, extending the partnership model the companies have previously deployed in Abilene."
   ],
   "state_evidence": [
    "## Crusoe and Lancium announce 1 GW AI data centre campus in Texas",
    "Crusoe and Lancium have announced plans to develop a 1 GW AI data centre campus in Childress, Texas, extending the partnership model the companies have previously deployed in Abilene."
   ],
   "capacity_gw_evidence": [
    "## Crusoe and Lancium announce 1 GW AI data centre campus in Texas",
    "Crusoe and Lancium have announced plans to develop a 1 GW AI data centre campus in Childress, Texas, extending the partnership model the companies have previously deployed in Abilene."
   ],
   "builder_evidence": [
    "## Crusoe and Lancium announce 1 GW AI data centre campus in Texas",
    "Crusoe and Lancium have announced plans to develop a 1 GW AI data centre campus in Childress, Texas, extending the partnership model the companies have previously deployed in Abilene."
   ],
   "ai_customer_evidence": [
    "## Crusoe and Lancium announce 1 GW AI data centre campus in Texas",
    "The grid-connected campus will occupy a 270-acre site owned by Lancium and is intended to support the AI computing requirements of an unnamed hyperscale technology company."
   ],
   "status_evidence": [
    "## Crusoe and Lancium announce 1 GW AI data centre campus in Texas",
    "Crusoe and Lancium have announced plans to develop a 1 GW AI data centre campus in Childress, Texas, extending the partnership model the companies have previously deployed in Abilene."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://michaelbommarito.com/wiki/datacenters/projects/mega/vantage-data-centers-frontier-campus",
   "title": "vantage data centers - frontier campus | mike bommarito",
   "published_at": "2025-12-30T00:00:00",
   "project": "Frontier",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": null,
   "status": "Under Construction",
   "announcement_date": "2025-01-01",
   "project_evidence": [
    "# vantage data centers - frontier campus",
    "Vantage Data Centers Unveils Plans for \u2018Frontier,\u2019 a $25B Mega-campus in Texas"
   ],
   "locality_evidence": [
    "# vantage data centers - frontier campus",
    "| Location | Unknown, Shackelford County, Texas |"
   ],
   "state_evidence": [
    "# vantage data centers - frontier campus",
    "[datacenters](/wiki/tag/datacenters)[mega-projects](/wiki/tag/mega-projects)[texas](/wiki/tag/texas)[hyperscale](/wiki/tag/hyperscale)[ai-ml](/wiki/tag/ai-ml)",
    "| Location | Unknown, Shackelford County, Texas |"
   ],
   "capacity_gw_evidence": [
    "# vantage data centers - frontier campus",
    "| Power Capacity | 1.4 GW |",
    "The facility requires **1.4 GW** of power capacity:",
    "| Total Power Capacity | 1.4 GW |"
   ],
   "builder_evidence": [
    "# vantage data centers - frontier campus",
    "Largest single investment by Vantage to date; mega-scale campus",
    "| Sponsors | Vantage Data Centers |",
    "| Operators | Vantage Data Centers |"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# vantage data centers - frontier campus",
    "| Status | Under Construction |"
   ],
   "announcement_date_evidence": [
    "# vantage data centers - frontier campus",
    "published: December 30, 2025\u2022",
    "| Announced | 2025 |",
    "1. **Vantage Data Centers Unveils Plans for \u2018Frontier,\u2019 a $25B Mega-campus in Texas** - Vantage Data Centers - [https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/](https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/)"
   ]
  },
  {
   "url": "https://tomorrowsworldtoday.com/artificial-intelligence/retired-coal-fired-power-plant-turning-into-massive-ai-hub",
   "title": "Retired Coal-Fired Power Plant Turning into Massive AI Hub",
   "published_at": "2025-04-05T10:00:17",
   "project": "Homer City Generating Station",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Homer City Development",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": null,
   "project_evidence": [
    "# Retired Coal-Fired Power Plant Turning into Massive AI Hub",
    "Once one of Pennsylvania\u2019s largest coal-fired power plants, the former Homer City Generating Station announced that it will become a data center campus for tech companies to power artificial intelligence and cloud computing applications."
   ],
   "locality_evidence": [
    "# Retired Coal-Fired Power Plant Turning into Massive AI Hub",
    "The new AI data centers will be located in Homer City, just over 50 miles from Pittsburgh, Pennsylvania."
   ],
   "state_evidence": [
    "# Retired Coal-Fired Power Plant Turning into Massive AI Hub",
    "The new AI data centers will be located in Homer City, just over 50 miles from Pittsburgh, Pennsylvania."
   ],
   "capacity_gw_evidence": [
    "# Retired Coal-Fired Power Plant Turning into Massive AI Hub",
    "### AI Power Center",
    "The owners, an investor group named Homer City Development, said the former plant will have seven gas-fired turbines to power the data centers with up to 4.5 gigawatts of electricity, enough electricity to power about 3 million homes."
   ],
   "builder_evidence": [
    "# Retired Coal-Fired Power Plant Turning into Massive AI Hub",
    "### AI Power Center",
    "The owners, an investor group named Homer City Development, said the former plant will have seven gas-fired turbines to power the data centers with up to 4.5 gigawatts of electricity, enough electricity to power about 3 million homes."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Retired Coal-Fired Power Plant Turning into Massive AI Hub",
    "Once one of Pennsylvania\u2019s largest coal-fired power plants, the former Homer City Generating Station announced that it will become a data center campus for tech companies to power artificial intelligence and cloud computing applications."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://webdisclosure.fr/press-release/nscale-etr-nscale-and-microsoft-announce-collaboration-with-nvidia-and-caterpillar-to-deliver-135gw-of-nvidia-vera-rubin-nvl72-gpus-at-flagship-ai-factory-campus-in-west-virginia-OQFu35FQLCm",
   "title": "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
   "published_at": "2026-03-16T22:35:22",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "announced",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a potential of up to 8GW+ of onsite powered microgrid"
   ],
   "locality_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](https://eqs-cockpit.com/cgi-bin/fncls.ssp?fn=redirect&url=ac37feef177105b501dc6e5cbeae8a8e&application_id=2292294&site_id=symex~~~af100301-a623-4c64-8f3d-90fc88eca9e6&application_name=news) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "state_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](https://eqs-cockpit.com/cgi-bin/fncls.ssp?fn=redirect&url=ac37feef177105b501dc6e5cbeae8a8e&application_id=2292294&site_id=symex~~~af100301-a623-4c64-8f3d-90fc88eca9e6&application_name=news) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "capacity_gw_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](https://eqs-cockpit.com/cgi-bin/fncls.ssp?fn=redirect&url=ac37feef177105b501dc6e5cbeae8a8e&application_id=2292294&site_id=symex~~~af100301-a623-4c64-8f3d-90fc88eca9e6&application_name=news) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "builder_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale today also [announced](https://eqs-cockpit.com/cgi-bin/fncls.ssp?fn=redirect&url=ac37feef177105b501dc6e5cbeae8a8e&application_id=2292294&site_id=symex~~~af100301-a623-4c64-8f3d-90fc88eca9e6&application_name=news) the acquisition of American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, which includes the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over eight gigawatts."
   ],
   "ai_customer_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "Nscale Signs Letter of Intent with Microsoft for up to 1.35GW of AI Compute using NVIDIA Vera Rubin NVL72 GPUs"
   ],
   "status_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia"
   ],
   "announcement_date_evidence": [
    "Nscale and Microsoft Announce Collaboration with NVIDIA and Caterpillar to Deliver 1.35GW of NVIDIA Vera Rubin NVL72 GPUs at Flagship AI Factory Campus in West Virginia",
    "16.03.2026 / 22:35 CET/CEST"
   ]
  },
  {
   "url": "https://fox40.com/business/press-releases/ein-presswire/819207832/texas-5000-acre-ai-data-center-site-fast-tracks-500-mw-behind-meter-power",
   "title": "Texas 5,000 Acre AI Data Center Site Fast Tracks 500 MW Behind-Meter Power",
   "published_at": "2025-06-16T14:44:56",
   "project": "Stargate",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Oracle",
   "ai_customer": "OpenAI",
   "status": "In development",
   "announcement_date": null,
   "project_evidence": [
    "STARGATE PROJECT",
    "The Stargate hyperscale initiative, jointly backed by OpenAI, SoftBank, and Oracle, has unveiled a $500 billion U.S. AI-infrastructure program that will roll out 20 state-of-the-art data-center campuses nationwide, starting with a 1.2-gigawatt, GPU-dense hub in Abilene, West Texas."
   ],
   "locality_evidence": [
    "STARGATE PROJECT",
    "The Stargate hyperscale initiative, jointly backed by OpenAI, SoftBank, and Oracle, has unveiled a $500 billion U.S. AI-infrastructure program that will roll out 20 state-of-the-art data-center campuses nationwide, starting with a 1.2-gigawatt, GPU-dense hub in Abilene, West Texas."
   ],
   "state_evidence": [
    "STARGATE PROJECT",
    "The Stargate hyperscale initiative, jointly backed by OpenAI, SoftBank, and Oracle, has unveiled a $500 billion U.S. AI-infrastructure program that will roll out 20 state-of-the-art data-center campuses nationwide, starting with a 1.2-gigawatt, GPU-dense hub in Abilene, West Texas."
   ],
   "capacity_gw_evidence": [
    "STARGATE PROJECT",
    "The Stargate hyperscale initiative, jointly backed by OpenAI, SoftBank, and Oracle, has unveiled a $500 billion U.S. AI-infrastructure program that will roll out 20 state-of-the-art data-center campuses nationwide, starting with a 1.2-gigawatt, GPU-dense hub in Abilene, West Texas."
   ],
   "builder_evidence": [
    "STARGATE PROJECT",
    "The Stargate hyperscale initiative, jointly backed by OpenAI, SoftBank, and Oracle, has unveiled a $500 billion U.S. AI-infrastructure program that will roll out 20 state-of-the-art data-center campuses nationwide, starting with a 1.2-gigawatt, GPU-dense hub in Abilene, West Texas.",
    "To anchor this flagship site, Oracle has committed an additional $40 billion to purchase 400,000 NVIDIA GB200 Grace Blackwell GPUs, ensuring world-class accelerated-computing capacity for large-language-model training and inference."
   ],
   "ai_customer_evidence": [
    "STARGATE PROJECT",
    "The Stargate hyperscale initiative, jointly backed by OpenAI, SoftBank, and Oracle, has unveiled a $500 billion U.S. AI-infrastructure program that will roll out 20 state-of-the-art data-center campuses nationwide, starting with a 1.2-gigawatt, GPU-dense hub in Abilene, West Texas."
   ],
   "status_evidence": [
    "STARGATE PROJECT",
    "The Stargate hyperscale initiative, jointly backed by OpenAI, SoftBank, and Oracle, has unveiled a $500 billion U.S. AI-infrastructure program that will roll out 20 state-of-the-art data-center campuses nationwide, starting with a 1.2-gigawatt, GPU-dense hub in Abilene, West Texas."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://inkl.com/news/new-ai-data-center-in-utah-will-generate-and-consume-more-than-twice-the-amount-of-power-the-entire-state-uses-kevin-o-leary-s-9-gigawatt-utah-data-center-campus-approved",
   "title": "New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses \u2014 Kevin O'Leary's 9 Gigawatt Utah data center campus approved",
   "published_at": "2026-04-27T14:58:17",
   "project": "Stratos",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "O'Leary Digital",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": null,
   "project_evidence": [
    "New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses \u2014 Kevin O'Leary's 9 Gigawatt Utah data center campus approved",
    "The project, dubbed Stratos, is being developed by O'Leary Digital, the infrastructure arm of Shark Tank investor Kevin O'Leary, and would span 40,000 acres of private land plus 1,200 acres of military and state-owned property."
   ],
   "locality_evidence": [
    "New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses \u2014 Kevin O'Leary's 9 Gigawatt Utah data center campus approved"
   ],
   "state_evidence": [
    "New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses \u2014 Kevin O'Leary's 9 Gigawatt Utah data center campus approved"
   ],
   "capacity_gw_evidence": [
    "New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses \u2014 Kevin O'Leary's 9 Gigawatt Utah data center campus approved"
   ],
   "builder_evidence": [
    "New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses \u2014 Kevin O'Leary's 9 Gigawatt Utah data center campus approved",
    "The project, dubbed Stratos, is being developed by O'Leary Digital, the infrastructure arm of Shark Tank investor Kevin O'Leary, and would span 40,000 acres of private land plus 1,200 acres of military and state-owned property."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "New AI data center in Utah will generate and consume more than twice the amount of power the entire state uses \u2014 Kevin O'Leary's 9 Gigawatt Utah data center campus approved"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://cybercorsairs.com/750b-openais-data-center-gamble-grows",
   "title": "OpenAI's $750B Camellia: Georgia's AI Data Center Power Play",
   "published_at": null,
   "project": "Project Camellia",
   "locality": "Savannah",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": "2026-07-23",
   "project_evidence": [
    "# $750B: OpenAI\u2019s data center gamble grows",
    "#### \ud83c\udfd7\ufe0f First stop: Georgia",
    "The opening move is Project Camellia, a $20 billion data center campus northwest of Savannah."
   ],
   "locality_evidence": [
    "# $750B: OpenAI\u2019s data center gamble grows",
    "#### \ud83c\udfd7\ufe0f First stop: Georgia",
    "The opening move is Project Camellia, a $20 billion data center campus northwest of Savannah."
   ],
   "state_evidence": [
    "# $750B: OpenAI\u2019s data center gamble grows",
    "#### \ud83c\udfd7\ufe0f First stop: Georgia",
    "The opening move is Project Camellia, a $20 billion data center campus northwest of Savannah."
   ],
   "capacity_gw_evidence": [
    "# $750B: OpenAI\u2019s data center gamble grows",
    "#### \ud83c\udfd7\ufe0f First stop: Georgia",
    "TechCrunch AI reports the development will span 1,400 acres and pull at least 3.2 gigawatts of power from Georgia Power, the regional utility."
   ],
   "builder_evidence": [
    "# $750B: OpenAI\u2019s data center gamble grows",
    "#### \ud83c\udfd7\ufe0f First stop: Georgia",
    "The opening move is Project Camellia, a $20 billion data center campus northwest of Savannah."
   ],
   "ai_customer_evidence": [
    "# $750B: OpenAI\u2019s data center gamble grows",
    "#### \ud83c\udfd7\ufe0f First stop: Georgia",
    "The opening move is Project Camellia, a $20 billion data center campus northwest of Savannah."
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "# $750B: OpenAI\u2019s data center gamble grows",
    "By / July 23, 2026"
   ]
  },
  {
   "url": "https://rocketswire.usatoday.com/story/news/local/michigan/2026/03/17/google-weighs-joining-van-buren-township-data-center-project-dte-energy/89187228007",
   "title": "Google weighs joining Van Buren Township data center project",
   "published_at": "2026-03-17T12:02:32",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": "Google",
   "status": "Seeking approval",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "MICHIGAN",
    "Google weighs joining Van Buren Township data center project",
    "The tech giant is evaluating whether it will get involved with [Project Cannoli, the hyperscale data center project advancing in the western Wayne County community](/story/news/local/wayne-county/2026/03/06/nda-nondisclosure-agreement-confidentiality-clues-panattoni-anchor-designs-van-buren-data-center/89016021007/), a Google spokesperson said in an email."
   ],
   "locality_evidence": [
    "MICHIGAN",
    "Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project."
   ],
   "state_evidence": [
    "MICHIGAN",
    "Google weighs joining Van Buren Township data center project"
   ],
   "capacity_gw_evidence": [
    "MICHIGAN",
    "Google weighs joining Van Buren Township data center project",
    "The Cannoli Project hyperscale data center in Van Buren Township will demand 1 gigawatt of power, DTE Energy Corporate Communications Director Jill Wilmot said in an email."
   ],
   "builder_evidence": [
    "MICHIGAN",
    "Google weighs joining Van Buren Township data center project",
    "The data center project is being pushed by California real estate development firm Panattoni Development Co."
   ],
   "ai_customer_evidence": [
    "MICHIGAN",
    "Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project."
   ],
   "status_evidence": [
    "MICHIGAN",
    "Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project."
   ],
   "announcement_date_evidence": [
    "MICHIGAN",
    "Google weighs joining Van Buren Township data center project",
    "Updated March 17, 2026, 2:27 p.m. CT"
   ]
  },
  {
   "url": "https://eritvnews.com/terawulf-acquires-1-gw-kentucky-ai-data-center-site-shares-jump-11",
   "title": "TeraWulf Acquires 1 GW Kentucky AI Data Center Site, Shares Jump 11%",
   "published_at": "2026-05-26T22:00:06",
   "project": "Muskie Data Campus",
   "locality": "EastPark Industrial Park",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf Inc.",
   "ai_customer": null,
   "status": "development",
   "announcement_date": null,
   "project_evidence": [
    "# TeraWulf Acquires 1 GW Kentucky AI Data Center Site, Shares Jump 11%",
    "TeraWulf Acquires 1 GW Kentucky AI Data Center Site, Shares Jump 11%",
    "The new \u201cMuskie Data Campus,\u201d purchased from Industrial Equity Partners, sits within the 1,000-acre EastPark Industrial Park in northeastern Kentucky and encompasses roughly 285 acres of owned and controlled land."
   ],
   "locality_evidence": [
    "# TeraWulf Acquires 1 GW Kentucky AI Data Center Site, Shares Jump 11%",
    "TeraWulf Acquires 1 GW Kentucky AI Data Center Site, Shares Jump 11%",
    "The new \u201cMuskie Data Campus,\u201d purchased from Industrial Equity Partners, sits within the 1,000-acre EastPark Industrial Park in northeastern Kentucky and encompasses roughly 285 acres of owned and controlled land."
   ],
   "state_evidence": [
    "# TeraWulf Acquires 1 GW Kentucky AI Data Center Site, Shares Jump 11%",
    "TeraWulf Acquires 1 GW Kentucky AI Data Center Site, Shares Jump 11%",
    "The new \u201cMuskie Data Campus,\u201d purchased from Industrial Equity Partners, sits within the 1,000-acre EastPark Industrial Park in northeastern Kentucky and encompasses roughly 285 acres of owned and controlled land."
   ],
   "capacity_gw_evidence": [
    "# TeraWulf Acquires 1 GW Kentucky AI Data Center Site, Shares Jump 11%",
    "TeraWulf Acquires 1 GW Kentucky AI Data Center Site, Shares Jump 11%",
    "The site is expected to support more than 1 gigawatt of AI and HPC capacity \u2014 enough to power approximately 750,000 homes."
   ],
   "builder_evidence": [
    "# TeraWulf Acquires 1 GW Kentucky AI Data Center Site, Shares Jump 11%",
    "TeraWulf Acquires 1 GW Kentucky AI Data Center Site, Shares Jump 11%",
    "TeraWulf Inc. (Nasdaq: WULF) announced Tuesday the acquisition of a hyperscale data center development site in eastern Kentucky, a move that sent shares climbing 14% at times today as investors responded to the company\u2019s deepening push into artificial intelligence and high-performance computing infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# TeraWulf Acquires 1 GW Kentucky AI Data Center Site, Shares Jump 11%",
    "TeraWulf Acquires 1 GW Kentucky AI Data Center Site, Shares Jump 11%",
    "TeraWulf Inc. (Nasdaq: WULF) announced Tuesday the acquisition of a hyperscale data center development site in eastern Kentucky, a move that sent shares climbing 14% at times today as investors responded to the company\u2019s deepening push into artificial intelligence and high-performance computing infrastructure."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://blockspace.media/insight/hut-8-secures-4-25-billion-ai-data-center-bond",
   "title": "Hut 8 closes $4.25 billion bond for Beacon Point AI data center in Texas - Blockspace",
   "published_at": "2026-06-10T13:10:08",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "under development",
   "announcement_date": null,
   "project_evidence": [
    "Hut 8 closes $4.25 billion bond for Beacon Point AI data center in Texas",
    "Hut 8 (NASDAQ: HUT) [closed](https://www.hut8.com/news-insights/press-releases/hut-8-closes-usd4-25-billion-of-investment-grade-senior-secured-notes-for-beacon-point-data) a $4.25 billion offering of 6.129% senior secured notes due 2042 on Tuesday through its wholly owned subsidiary, Beacon Point DC LLC."
   ],
   "locality_evidence": [
    "The proceeds will fund development of a 352-megawatt AI data center on a 521-acre site in Nueces County, Texas.",
    "Hut 8 closes $4.25 billion bond for Beacon Point AI data center in Texas"
   ],
   "state_evidence": [
    "The proceeds will fund development of a 352-megawatt AI data center on a 521-acre site in Nueces County, Texas.",
    "Hut 8 closes $4.25 billion bond for Beacon Point AI data center in Texas"
   ],
   "capacity_gw_evidence": [
    "Hut 8 has executed an interconnection agreement for 1,000 MW of utility capacity at Beacon Point, with initial energization expected in Q1 2027 and initial data hall delivery in Q3 2027.",
    "Hut 8 closes $4.25 billion bond for Beacon Point AI data center in Texas"
   ],
   "builder_evidence": [
    "Hut 8 closes $4.25 billion bond for Beacon Point AI data center in Texas",
    "Hut 8 (NASDAQ: HUT) [closed](https://www.hut8.com/news-insights/press-releases/hut-8-closes-usd4-25-billion-of-investment-grade-senior-secured-notes-for-beacon-point-data) a $4.25 billion offering of 6.129% senior secured notes due 2042 on Tuesday through its wholly owned subsidiary, Beacon Point DC LLC."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "The proceeds will fund development of a 352-megawatt AI data center on a 521-acre site in Nueces County, Texas.",
    "Hut 8 closes $4.25 billion bond for Beacon Point AI data center in Texas"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://chaobro.com/en/posts/iren-1-4gw-datacenter-ai-infra-2026",
   "title": "IREN 1.4GW Data Center Online: The AI Infrastructure Race Behind 150K GPUs and Microsoft $9.7B Contract - ChaoBro",
   "published_at": "2026-05-03T13:00:00",
   "project": "Sweetwater 1",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "IREN",
   "ai_customer": "Microsoft",
   "status": "online",
   "announcement_date": "2026-05-01",
   "project_evidence": [
    "# IREN 1.4GW Data Center Online: The AI Infrastructure Race Behind 150K GPUs and Microsoft $9.7B Contract",
    "IREN (formerly Iris Energy) announced on May 1, 2026, that its **Sweetwater 1 site in Texas has officially powered up its 1.4GW electrical system**."
   ],
   "locality_evidence": [
    "# IREN 1.4GW Data Center Online: The AI Infrastructure Race Behind 150K GPUs and Microsoft $9.7B Contract",
    "IREN (formerly Iris Energy) announced on May 1, 2026, that its **Sweetwater 1 site in Texas has officially powered up its 1.4GW electrical system**."
   ],
   "state_evidence": [
    "# IREN 1.4GW Data Center Online: The AI Infrastructure Race Behind 150K GPUs and Microsoft $9.7B Contract",
    "IREN (formerly Iris Energy) announced on May 1, 2026, that its **Sweetwater 1 site in Texas has officially powered up its 1.4GW electrical system**."
   ],
   "capacity_gw_evidence": [
    "# IREN 1.4GW Data Center Online: The AI Infrastructure Race Behind 150K GPUs and Microsoft $9.7B Contract",
    "IREN (formerly Iris Energy) announced on May 1, 2026, that its **Sweetwater 1 site in Texas has officially powered up its 1.4GW electrical system**."
   ],
   "builder_evidence": [
    "# IREN 1.4GW Data Center Online: The AI Infrastructure Race Behind 150K GPUs and Microsoft $9.7B Contract",
    "IREN (formerly Iris Energy) announced on May 1, 2026, that its **Sweetwater 1 site in Texas has officially powered up its 1.4GW electrical system**."
   ],
   "ai_customer_evidence": [
    "# IREN 1.4GW Data Center Online: The AI Infrastructure Race Behind 150K GPUs and Microsoft $9.7B Contract",
    "IREN (formerly Iris Energy) announced on May 1, 2026, that its **Sweetwater 1 site in Texas has officially powered up its 1.4GW electrical system**.",
    "**2026**: Sweetwater 1 powered up, Microsoft $9.7B contract finalized"
   ],
   "status_evidence": [
    "# IREN 1.4GW Data Center Online: The AI Infrastructure Race Behind 150K GPUs and Microsoft $9.7B Contract",
    "IREN (formerly Iris Energy) announced on May 1, 2026, that its **Sweetwater 1 site in Texas has officially powered up its 1.4GW electrical system**."
   ],
   "announcement_date_evidence": [
    "# IREN 1.4GW Data Center Online: The AI Infrastructure Race Behind 150K GPUs and Microsoft $9.7B Contract",
    "IREN (formerly Iris Energy) announced on May 1, 2026, that its **Sweetwater 1 site in Texas has officially powered up its 1.4GW electrical system**."
   ]
  },
  {
   "url": "https://innovationandentrepreneursnews.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Creekstone Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ],
   "state_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://thecircuitry.to/article/nvidia-locks-in-initial-425-it-gw-at-ohio-ai-campus-backed-by-sb-energy-msx8c5ww",
   "title": "NVIDIA Locks in Initial 4.25 IT-GW at Ohio AI Campus Backed by SB Energy",
   "published_at": "2026-08-17T12:49:50",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "NVIDIA Locks in Initial 4.25 IT-GW at Ohio AI Campus Backed by SB Energy",
    "NVIDIA has partnered with SB Energy to secure an initial 4.25 IT-GW of AI capacity at the PORTS-Pike campus in Ohio, with OpenAI as the customer for the full 8 IT-GW site under a 20-year lease."
   ],
   "locality_evidence": [
    "NVIDIA Locks in Initial 4.25 IT-GW at Ohio AI Campus Backed by SB Energy"
   ],
   "state_evidence": [
    "NVIDIA Locks in Initial 4.25 IT-GW at Ohio AI Campus Backed by SB Energy",
    "NVIDIA has partnered with SB Energy to secure an initial 4.25 IT-GW of AI capacity at the PORTS-Pike campus in Ohio, with OpenAI as the customer for the full 8 IT-GW site under a 20-year lease."
   ],
   "capacity_gw_evidence": [
    "NVIDIA Locks in Initial 4.25 IT-GW at Ohio AI Campus Backed by SB Energy",
    "NVIDIA has partnered with SB Energy to secure an initial 4.25 IT-GW of AI capacity at the PORTS-Pike campus in Ohio, with OpenAI as the customer for the full 8 IT-GW site under a 20-year lease."
   ],
   "builder_evidence": [
    "NVIDIA Locks in Initial 4.25 IT-GW at Ohio AI Campus Backed by SB Energy",
    "NVIDIA has partnered with SB Energy to secure an initial 4.25 IT-GW of AI capacity at the PORTS-Pike campus in Ohio, with OpenAI as the customer for the full 8 IT-GW site under a 20-year lease."
   ],
   "ai_customer_evidence": [
    "NVIDIA Locks in Initial 4.25 IT-GW at Ohio AI Campus Backed by SB Energy",
    "NVIDIA has partnered with SB Energy to secure an initial 4.25 IT-GW of AI capacity at the PORTS-Pike campus in Ohio, with OpenAI as the customer for the full 8 IT-GW site under a 20-year lease."
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://rcrtech.com/ai-infrastructure-news/openai-stargate-wisconsin",
   "title": "OpenAI and partners announce Stargate Wisconsin",
   "published_at": "2025-10-24T16:16:29",
   "project": "Lighthouse",
   "locality": "Port Washington",
   "state": "Wisconsin",
   "capacity_gw": 1.0,
   "builder": "Vantage Data Centers",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "In a release, Vantage Data Centers said the $15 billion-plus development, known as Lighthouse, will include four hyperscale facilities providing nearly one gigawatt of AI computing capacity.",
    "## The new hub announced by OpenAI, Oracle, and Vantage Data Centers, will include four hyperscale facilities"
   ],
   "locality_evidence": [
    "## The new hub announced by OpenAI, Oracle, and Vantage Data Centers, will include four hyperscale facilities"
   ],
   "state_evidence": [
    "## The new hub announced by OpenAI, Oracle, and Vantage Data Centers, will include four hyperscale facilities"
   ],
   "capacity_gw_evidence": [
    "**$15B+ AI data hub for Wisconsin \u2013** OpenAI, Oracle, and Vantage will build data center campus near Milwaukee with nearly 1GW of computing capacity, boosting regional jobs and investment.",
    "In a release, Vantage Data Centers said the $15 billion-plus development, known as Lighthouse, will include four hyperscale facilities providing nearly one gigawatt of AI computing capacity.",
    "## The new hub announced by OpenAI, Oracle, and Vantage Data Centers, will include four hyperscale facilities"
   ],
   "builder_evidence": [
    "## The new hub announced by OpenAI, Oracle, and Vantage Data Centers, will include four hyperscale facilities"
   ],
   "ai_customer_evidence": [
    "## The new hub announced by OpenAI, Oracle, and Vantage Data Centers, will include four hyperscale facilities"
   ],
   "status_evidence": [
    "## The new hub announced by OpenAI, Oracle, and Vantage Data Centers, will include four hyperscale facilities"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://lcsun-news.com/story/money/business/2026/07/28/meta-selling-80-percent-ownership-in-14-billion-dollar-el-paso-data-center-to-blackrock/91078901007",
   "title": "Meta selling 80% ownership in $14B El Paso data center to BlackRock",
   "published_at": "2026-07-28T18:03:14",
   "project": "El Paso",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta Platforms",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2026-07-28",
   "project_evidence": [
    "BUSINESS",
    "Meta selling 80% ownership in $14B El Paso data center to BlackRock",
    "Meta Platforms is selling an 80% ownership stake in its huge El Paso data center, now under construction, to funds managed by BlackRock, an investment firm."
   ],
   "locality_evidence": [
    "BUSINESS",
    "Meta selling 80% ownership in $14B El Paso data center to BlackRock",
    "Meta Platforms is selling an 80% ownership stake in its huge El Paso data center, now under construction, to funds managed by BlackRock, an investment firm."
   ],
   "state_evidence": [
    "BUSINESS",
    "Meta selling 80% ownership in $14B El Paso data center to BlackRock",
    "Meta Platforms is selling an 80% ownership stake in its huge El Paso data center, now under construction, to funds managed by BlackRock, an investment firm.",
    "Meta, which operates Facebook, Instagram, and WhatsApp, will lease the data center campus on 1,000 acres in far Northeast El Paso from BlackRock with an initial four-year term**,** the companies announced Tuesday."
   ],
   "capacity_gw_evidence": [
    "BUSINESS",
    "Meta selling 80% ownership in $14B El Paso data center to BlackRock",
    "The deal is aimed at financing the $14 billion development costs of the El Paso campus, including buildings, power (it will need 1 gigawatt of electricity), cooling systems and other infrastructure."
   ],
   "builder_evidence": [
    "BUSINESS",
    "Meta selling 80% ownership in $14B El Paso data center to BlackRock",
    "Meta Platforms is selling an 80% ownership stake in its huge El Paso data center, now under construction, to funds managed by BlackRock, an investment firm."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "BUSINESS",
    "Meta selling 80% ownership in $14B El Paso data center to BlackRock",
    "Meta Platforms is selling an 80% ownership stake in its huge El Paso data center, now under construction, to funds managed by BlackRock, an investment firm."
   ],
   "announcement_date_evidence": [
    "BUSINESS",
    "Meta selling 80% ownership in $14B El Paso data center to BlackRock",
    "July 28, 2026Updated July 30, 2026, 3:50 p.m. MT"
   ]
  },
  {
   "url": "https://silicon.co.uk/cloud/ai/amazon-rainier-anthropic-ai-627280/amp",
   "title": "Amazon Brings \u2018Rainier\u2019 Data Centre Project Online",
   "published_at": "2025-10-30T09:00:25",
   "project": "Project Rainier",
   "locality": "Indiana",
   "state": "Indiana",
   "capacity_gw": 2.2,
   "builder": "Amazon",
   "ai_customer": "Anthropic",
   "status": "operational",
   "announcement_date": null,
   "project_evidence": [
    "Amazon said it has brought online the initial phase of its Project Rainier artificial intelligence data centre cluster, beginning with a campus in Indiana and planned to link together across multiple locations."
   ],
   "locality_evidence": [
    "Amazon said it has brought online the initial phase of its Project Rainier artificial intelligence data centre cluster, beginning with a campus in Indiana and planned to link together across multiple locations.",
    "The Indiana site currently consists of seven operational buildings, with two more campuses underway that is eventually planned to include 30 buildings and draw more than 2.2 gigawatts of electricity, Amazon said."
   ],
   "state_evidence": [
    "Amazon said it has brought online the initial phase of its Project Rainier artificial intelligence data centre cluster, beginning with a campus in Indiana and planned to link together across multiple locations.",
    "The Indiana site currently consists of seven operational buildings, with two more campuses underway that is eventually planned to include 30 buildings and draw more than 2.2 gigawatts of electricity, Amazon said."
   ],
   "capacity_gw_evidence": [
    "The Indiana site currently consists of seven operational buildings, with two more campuses underway that is eventually planned to include 30 buildings and draw more than 2.2 gigawatts of electricity, Amazon said."
   ],
   "builder_evidence": [
    "Amazon said it has brought online the initial phase of its Project Rainier artificial intelligence data centre cluster, beginning with a campus in Indiana and planned to link together across multiple locations.",
    "The Indiana site currently consists of seven operational buildings, with two more campuses underway that is eventually planned to include 30 buildings and draw more than 2.2 gigawatts of electricity, Amazon said."
   ],
   "ai_customer_evidence": [
    "The Rainier project was launched exclusively to train and run Claude AI models from start-up Anthropic, in which Amazon is [a major investor](https://www.silicon.co.uk/e-innovation/amazon-anthropic-investment-590439/amp)."
   ],
   "status_evidence": [
    "Amazon said it has brought online the initial phase of its Project Rainier artificial intelligence data centre cluster, beginning with a campus in Indiana and planned to link together across multiple locations.",
    "The Indiana site currently consists of seven operational buildings, with two more campuses underway that is eventually planned to include 30 buildings and draw more than 2.2 gigawatts of electricity, Amazon said."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://eveningsun.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Colossus 2",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 1.0,
   "builder": "xAI",
   "ai_customer": "",
   "status": "under construction",
   "announcement_date": "2025-02-01",
   "project_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "locality_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The second Memphis campus in Whitehaven came into the picture in early 2025."
   ],
   "state_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "It has been a very [busy 18 months for Elon Musk's xAI](/story/money/business/development/2025/06/05/elon-musk-xai-supercomputer-grok-memphis-tn/83599473007/) since the company first announced plans for its Memphis data center in June 2024."
   ],
   "capacity_gw_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "builder_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "Elon Musk's xAI has acquired over 1,156 acres of land in the Memphis area for its data centers."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The Tulane Road site is an artificial intelligence data center, with active construction still on site."
   ],
   "announcement_date_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "In February 2025, CTC Property LLC purchased 186.13 acres for $79.9 million, according to the Shelby County Register of Deeds."
   ]
  },
  {
   "url": "https://eveningsun.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Macrohardrr",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": "",
   "status": "under construction",
   "announcement_date": "2025-12-30",
   "project_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "locality_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "This is the third and most recent xAI campus."
   ],
   "state_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "In July 2025, MZX Tech LLC, an xAI affiliate, purchased the[ power plant and corresponding 114.49 acres of land surrounding the facility](/story/money/business/development/2025/07/18/xai-elon-musk-company-buys-southaven-mississippi-property-colossus-2-memphis-tn/85274193007/)."
   ],
   "capacity_gw_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "builder_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "Elon Musk's xAI has acquired over 1,156 acres of land in the Memphis area for its data centers."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "The former Duke Energy site has been under construction with gas turbines on site for powering xAI data centers."
   ],
   "announcement_date_evidence": [
    "DEVELOPMENT",
    "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ]
  },
  {
   "url": "https://datacentersexposed.com/facilities/goodnight-campus",
   "title": "Goodnight Campus \u2014 Armstrong County, TX",
   "published_at": null,
   "project": "Goodnight Campus",
   "locality": "Claude",
   "state": "Texas",
   "capacity_gw": 1.03,
   "builder": "Crusoe",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "Under constructionAI / GPU compute",
    "# Goodnight Campus",
    "Goodnight Campus is a under construction data center in Armstrong County, TX, operated by Crusoe."
   ],
   "locality_evidence": [
    "Under constructionAI / GPU compute",
    "# Goodnight Campus",
    "Claude, Armstrong County, TX",
    "Goodnight Campus is a under construction data center in Armstrong County, TX, operated by Crusoe."
   ],
   "state_evidence": [
    "Under constructionAI / GPU compute",
    "# Goodnight Campus",
    "Claude, Armstrong County, TX",
    "Goodnight Campus is a under construction data center in Armstrong County, TX, operated by Crusoe."
   ],
   "capacity_gw_evidence": [
    "Under constructionAI / GPU compute",
    "# Goodnight Campus",
    "DataCentersExposed has documented 1,030 MW of reported power capacity at this site."
   ],
   "builder_evidence": [
    "Under constructionAI / GPU compute",
    "# Goodnight Campus",
    "Goodnight Campus is a under construction data center in Armstrong County, TX, operated by Crusoe."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Under constructionAI / GPU compute",
    "# Goodnight Campus",
    "Goodnight Campus is a under construction data center in Armstrong County, TX, operated by Crusoe."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacentersexposed.com/facilities/frontier-stargate-shackelford-county-tx-pg",
   "title": "Frontier (Stargate Shackelford County) \u2014 Shackelford County County, TX",
   "published_at": null,
   "project": "Frontier (Stargate Shackelford County)",
   "locality": "Albany",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers Holdings, LLC",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "# Frontier (Stargate Shackelford County)",
    "Under constructionAI / GPU compute",
    "Frontier (Stargate Shackelford County) is a under construction data center in Shackelford County County, TX, operated by Vantage Data Centers Holdings, LLC."
   ],
   "locality_evidence": [
    "Albany, Shackelford County County, TX",
    "Under constructionAI / GPU compute"
   ],
   "state_evidence": [
    "Albany, Shackelford County County, TX",
    "Frontier (Stargate Shackelford County) is a under construction data center in Shackelford County County, TX, operated by Vantage Data Centers Holdings, LLC.",
    "Under constructionAI / GPU compute"
   ],
   "capacity_gw_evidence": [
    "DataCentersExposed has documented 1,400 MW of reported power capacity at this site.",
    "Under constructionAI / GPU compute"
   ],
   "builder_evidence": [
    "Frontier (Stargate Shackelford County) is a under construction data center in Shackelford County County, TX, operated by Vantage Data Centers Holdings, LLC.",
    "Under constructionAI / GPU compute"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Frontier (Stargate Shackelford County) is a under construction data center in Shackelford County County, TX, operated by Vantage Data Centers Holdings, LLC.",
    "Under constructionAI / GPU compute"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://irecruit.co/insights/fermi-signs-650mw-data-center-lease-tensorwave-project-matador",
   "title": "Fermi signs 650MW data center lease with TensorWave at Project Matador",
   "published_at": "2026-08-12T14:33:57",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 17.0,
   "builder": "Fermi America",
   "ai_customer": "TensorWave",
   "status": "underway",
   "announcement_date": null,
   "project_evidence": [
    "# Fermi signs 650MW data center lease with TensorWave at Project Matador",
    "Project Matador is a 17GW data center and energy campus near Amarillo in Texas on land owned by the [Texas Tech University](https://www.texastech.edu/) system."
   ],
   "locality_evidence": [
    "# Fermi signs 650MW data center lease with TensorWave at Project Matador",
    "Project Matador is a 17GW data center and energy campus near Amarillo in Texas on land owned by the [Texas Tech University](https://www.texastech.edu/) system."
   ],
   "state_evidence": [
    "# Fermi signs 650MW data center lease with TensorWave at Project Matador",
    "Project Matador is a 17GW data center and energy campus near Amarillo in Texas on land owned by the [Texas Tech University](https://www.texastech.edu/) system."
   ],
   "capacity_gw_evidence": [
    "# Fermi signs 650MW data center lease with TensorWave at Project Matador",
    "Project Matador is a 17GW data center and energy campus near Amarillo in Texas on land owned by the [Texas Tech University](https://www.texastech.edu/) system.",
    "The campus was first announced with planned 11GW of capacity, before Fermi increased that figure to 17GW in March 2026."
   ],
   "builder_evidence": [
    "# Fermi signs 650MW data center lease with TensorWave at Project Matador",
    "Fermi signs 650MW data center lease with TensorWave at Project Matador\n\n![](https://cdn.prod.website-files.com/plugins/Basic/assets/placeholder.60f9b1840c.svg)\nBy:\n\n[Fermi America](https://fermiamerica.com/) has signed a binding lease agreement with [TensorWave](https://tensorwave.com/) for up to 650MW of data center capacity at its Project Matador site in Texas, giving the company its first announced binding customer agreement for the large-scale campus."
   ],
   "ai_customer_evidence": [
    "# Fermi signs 650MW data center lease with TensorWave at Project Matador",
    "Fermi signs 650MW data center lease with TensorWave at Project Matador\n\n![](https://cdn.prod.website-files.com/plugins/Basic/assets/placeholder.60f9b1840c.svg)\nBy:\n\n[Fermi America](https://fermiamerica.com/) has signed a binding lease agreement with [TensorWave](https://tensorwave.com/) for up to 650MW of data center capacity at its Project Matador site in Texas, giving the company its first announced binding customer agreement for the large-scale campus."
   ],
   "status_evidence": [
    "# Fermi signs 650MW data center lease with TensorWave at Project Matador",
    "This week, Fermi said Project Matador is \"well underway\", with approximately 6GW of the planned 17GW already permitted and more than $1.5bn invested in the buildout to date."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://powersystems.technology/homer-city-redevelopment-and-kiewit-to-build-country-s-largest-natural-gas-powered-data-center-campus-power-systems-technology-news",
   "title": "Homer City Redevelopment, Kiewit Power Constructors, GE Vernova, data center, natural gas, AI, HPC, power infrastructure, Marcellus Shale, Pennsylvania, energy investment",
   "published_at": "2025-04-03T12:23:42",
   "project": "Homer City Energy Campus",
   "locality": "Indiana County",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Homer City Redevelopment and Kiewit Power Constructors Co.",
   "ai_customer": null,
   "status": "Announced",
   "announcement_date": null,
   "project_evidence": [
    "Homer City Redevelopment and Kiewit to Build Country\u2019s Largest Natural Gas-Powered Data Center Campus Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) have announced a transformative project that will turn the site of the former Homer City Generating Station in Pennsylvania into the largest natural gas-powered data center campus in the United States.",
    "The Homer City Energy Campus is expected to create over 10,000 direct on-site construction jobs and approximately 1,000 permanent high-paying positions in technology, operations, and energy infrastructure."
   ],
   "locality_evidence": [
    "Homer City Redevelopment and Kiewit to Build Country\u2019s Largest Natural Gas-Powered Data Center Campus Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) have announced a transformative project that will turn the site of the former Homer City Generating Station in Pennsylvania into the largest natural gas-powered data center campus in the United States.",
    "Further, we are fully committed to maximizing the unprecedented level of economic opportunity this project represents not just for Indiana County, but for all of Pennsylvania and the Mid-Atlantic region of the country."
   ],
   "state_evidence": [
    "Homer City Redevelopment and Kiewit to Build Country\u2019s Largest Natural Gas-Powered Data Center Campus Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) have announced a transformative project that will turn the site of the former Homer City Generating Station in Pennsylvania into the largest natural gas-powered data center campus in the United States.",
    "William Wexler, President and CEO of Homer City Redevelopment (HCR), stated, \"This project will honor Homer City's place in the proud history of Pennsylvania energy generation, while accelerating the state and local community's ability to meet the needs of a rapidly shifting energy landscape."
   ],
   "capacity_gw_evidence": [
    "Homer City Redevelopment and Kiewit to Build Country\u2019s Largest Natural Gas-Powered Data Center Campus Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) have announced a transformative project that will turn the site of the former Homer City Generating Station in Pennsylvania into the largest natural gas-powered data center campus in the United States.",
    "The project will deliver up to 4.5 GW of power to support hyperscale data centers, with seven GE Vernova turbines providing the necessary energy."
   ],
   "builder_evidence": [
    "Homer City Redevelopment and Kiewit to Build Country\u2019s Largest Natural Gas-Powered Data Center Campus Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) have announced a transformative project that will turn the site of the former Homer City Generating Station in Pennsylvania into the largest natural gas-powered data center campus in the United States."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Homer City Redevelopment and Kiewit to Build Country\u2019s Largest Natural Gas-Powered Data Center Campus Homer City Redevelopment (HCR) and Kiewit Power Constructors Co. (Kiewit) have announced a transformative project that will turn the site of the former Homer City Generating Station in Pennsylvania into the largest natural gas-powered data center campus in the United States."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mgn.com/news/nscale-microsoft-partner-ai-compute-west-virginia",
   "title": "Maritime Global Network",
   "published_at": null,
   "project": "Monarch Compute Campus",
   "locality": null,
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": "Microsoft",
   "status": "acquired",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "technology",
    "Nscale and Microsoft Partner to Deliver AI Compute Power at West Virginia Campus",
    "According to the announcement, Nscale has acquired the Monarch Compute Campus, which is described as 'America's First State-Certified AI Microgrid' with a potential of up to 8GW+ of onsite powered microgrid."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "technology",
    "Nscale and Microsoft Partner to Deliver AI Compute Power at West Virginia Campus",
    "Nscale announces a strategic collaboration with Microsoft, NVIDIA, and Caterpillar to establish a flagship AI factory campus in West Virginia with up to 1.35GW of NVIDIA Vera Rubin GPUs."
   ],
   "capacity_gw_evidence": [
    "technology",
    "Nscale and Microsoft Partner to Deliver AI Compute Power at West Virginia Campus",
    "According to the announcement, Nscale has acquired the Monarch Compute Campus, which is described as 'America's First State-Certified AI Microgrid' with a potential of up to 8GW+ of onsite powered microgrid."
   ],
   "builder_evidence": [
    "technology",
    "Nscale and Microsoft Partner to Deliver AI Compute Power at West Virginia Campus",
    "According to the announcement, Nscale has acquired the Monarch Compute Campus, which is described as 'America's First State-Certified AI Microgrid' with a potential of up to 8GW+ of onsite powered microgrid."
   ],
   "ai_customer_evidence": [
    "technology",
    "Nscale and Microsoft Partner to Deliver AI Compute Power at West Virginia Campus",
    "Nscale has signed a letter of intent with Microsoft for up to 1.35GW of AI compute using NVIDIA's Vera Rubin NVL72 GPUs at this campus."
   ],
   "status_evidence": [
    "technology",
    "Nscale and Microsoft Partner to Deliver AI Compute Power at West Virginia Campus",
    "According to the announcement, Nscale has acquired the Monarch Compute Campus, which is described as 'America's First State-Certified AI Microgrid' with a potential of up to 8GW+ of onsite powered microgrid."
   ],
   "announcement_date_evidence": [
    "technology",
    "Nscale and Microsoft Partner to Deliver AI Compute Power at West Virginia Campus",
    "By MGN Editorial\u2022March 17, 2026 at 01:14 PM"
   ]
  },
  {
   "url": "https://techradar.com/pro/openai-is-spending-usd30-billion-on-a-new-mega-3-2-gw-data-center-in-georgia-and-its-trying-really-hard-to-quell-local-opposition",
   "title": "OpenAI is spending $30 billion on a new mega 3.2 GW data center in Georgia \u2014 and it's trying really hard to quell local opposition",
   "published_at": "2026-07-23T15:05:00",
   "project": "Project Camellia",
   "locality": "Effingham County",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "OpenAI is planning to build a new $30 billion AI data center campus in Effingham County, Georgia, that will deliver 3.2 gigawatts of compute once fully operational.",
    "The site, named \u2018Project Camellia\u2019, will span 1,400 acres and is expected to be completed in phases between 2028 and 2032."
   ],
   "locality_evidence": [
    "OpenAI is planning to build a new $30 billion AI data center campus in Effingham County, Georgia, that will deliver 3.2 gigawatts of compute once fully operational."
   ],
   "state_evidence": [
    "OpenAI is planning to build a new $30 billion AI data center campus in Effingham County, Georgia, that will deliver 3.2 gigawatts of compute once fully operational."
   ],
   "capacity_gw_evidence": [
    "OpenAI is planning to build a new $30 billion AI data center campus in Effingham County, Georgia, that will deliver 3.2 gigawatts of compute once fully operational."
   ],
   "builder_evidence": [
    "OpenAI is planning to build a new $30 billion AI data center campus in Effingham County, Georgia, that will deliver 3.2 gigawatts of compute once fully operational."
   ],
   "ai_customer_evidence": [
    "OpenAI is planning to build a new $30 billion AI data center campus in Effingham County, Georgia, that will deliver 3.2 gigawatts of compute once fully operational."
   ],
   "status_evidence": [
    "OpenAI is planning to build a new $30 billion AI data center campus in Effingham County, Georgia, that will deliver 3.2 gigawatts of compute once fully operational."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://monroenews.com/story/money/business/2026/03/17/google-reveals-project-cannoli-data-center/89185890007",
   "title": "Google reveals it is behind big 'Project Cannoli' data center project",
   "published_at": "2026-03-17T12:02:18",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "locality_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Tech giant Google would be the operator of a large data center slated for Wayne County's Van Buren Township that until now has only been known by the code name \"Project Cannoli.\""
   ],
   "state_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google also said Tuesday that it is creating a $10 million Energy Impact Fund for local organizations to tap into with the aim of lowering monthly utility bills for Michiganders."
   ],
   "capacity_gw_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "builder_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "The data center would be developed for Google by Panattoni Development Co."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ],
   "announcement_date_evidence": [
    "# Google reveals it is behind big 'Project Cannoli' data center project",
    "Updated March 17, 2026, 2:27 p.m. ET",
    "Google announced on Tuesday, March 17, that it is the company behind the planned 1-gigawatt data center, ending months of secrecy and speculation as to which tech firm the project belongs to."
   ]
  },
  {
   "url": "https://tracker.bepresearch.com/projects/terawulf-justified-anthropic-lease",
   "title": "BEP AI Infrastructure Tracker",
   "published_at": null,
   "project": "Nebius Highridge",
   "locality": "Butler Township",
   "state": "Pennsylvania",
   "capacity_gw": 1.2,
   "builder": "Nebius Group",
   "ai_customer": null,
   "status": "Planning",
   "announcement_date": null,
   "project_evidence": [
    "Related projects",
    "- [Nebius Highridge](/projects/nebius-highridge-pennsylvania)",
    "Nebius Group \u00b7 Butler Township, Pennsylvania, United States",
    "1.2 GWPlanning"
   ],
   "locality_evidence": [
    "Related projects",
    "- [Nebius Highridge](/projects/nebius-highridge-pennsylvania)",
    "Nebius Group \u00b7 Butler Township, Pennsylvania, United States",
    "1.2 GWPlanning"
   ],
   "state_evidence": [
    "Related projects",
    "- [Nebius Highridge](/projects/nebius-highridge-pennsylvania)",
    "Nebius Group \u00b7 Butler Township, Pennsylvania, United States",
    "1.2 GWPlanning"
   ],
   "capacity_gw_evidence": [
    "Related projects",
    "- [Nebius Highridge](/projects/nebius-highridge-pennsylvania)",
    "Nebius Group \u00b7 Butler Township, Pennsylvania, United States",
    "1.2 GWPlanning"
   ],
   "builder_evidence": [
    "Related projects",
    "- [Nebius Highridge](/projects/nebius-highridge-pennsylvania)",
    "Nebius Group \u00b7 Butler Township, Pennsylvania, United States",
    "1.2 GWPlanning"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Related projects",
    "- [Nebius Highridge](/projects/nebius-highridge-pennsylvania)",
    "Nebius Group \u00b7 Butler Township, Pennsylvania, United States",
    "1.2 GWPlanning"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tracker.bepresearch.com/projects/terawulf-justified-anthropic-lease",
   "title": "BEP AI Infrastructure Tracker",
   "published_at": null,
   "project": "Meta Prometheus",
   "locality": "New Albany",
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "Partially operational",
   "announcement_date": null,
   "project_evidence": [
    "Related projects",
    "- [Meta Prometheus](/projects/meta-prometheus-new-albany)",
    "Meta \u00b7 New Albany, Ohio, United States",
    "1 GWPartially operational"
   ],
   "locality_evidence": [
    "Related projects",
    "- [Meta Prometheus](/projects/meta-prometheus-new-albany)",
    "Meta \u00b7 New Albany, Ohio, United States",
    "1 GWPartially operational"
   ],
   "state_evidence": [
    "Related projects",
    "- [Meta Prometheus](/projects/meta-prometheus-new-albany)",
    "Meta \u00b7 New Albany, Ohio, United States",
    "1 GWPartially operational"
   ],
   "capacity_gw_evidence": [
    "Related projects",
    "- [Meta Prometheus](/projects/meta-prometheus-new-albany)",
    "Meta \u00b7 New Albany, Ohio, United States",
    "1 GWPartially operational"
   ],
   "builder_evidence": [
    "Related projects",
    "- [Meta Prometheus](/projects/meta-prometheus-new-albany)",
    "Meta \u00b7 New Albany, Ohio, United States",
    "1 GWPartially operational"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Related projects",
    "- [Meta Prometheus](/projects/meta-prometheus-new-albany)",
    "Meta \u00b7 New Albany, Ohio, United States",
    "1 GWPartially operational"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://tracker.bepresearch.com/projects/terawulf-justified-anthropic-lease",
   "title": "BEP AI Infrastructure Tracker",
   "published_at": null,
   "project": "Stargate Michigan",
   "locality": "Saline Township",
   "state": "Michigan",
   "capacity_gw": 1.4,
   "builder": "Related Digital",
   "ai_customer": null,
   "status": "Under construction",
   "announcement_date": null,
   "project_evidence": [
    "Related projects",
    "- [Stargate Michigan](/projects/stargate-michigan-saline-township)",
    "Related Digital \u00b7 Saline Township, Michigan, United States",
    "1.4 GWUnder construction"
   ],
   "locality_evidence": [
    "Related projects",
    "- [Stargate Michigan](/projects/stargate-michigan-saline-township)",
    "Related Digital \u00b7 Saline Township, Michigan, United States",
    "1.4 GWUnder construction"
   ],
   "state_evidence": [
    "Related projects",
    "- [Stargate Michigan](/projects/stargate-michigan-saline-township)",
    "Related Digital \u00b7 Saline Township, Michigan, United States",
    "1.4 GWUnder construction"
   ],
   "capacity_gw_evidence": [
    "Related projects",
    "- [Stargate Michigan](/projects/stargate-michigan-saline-township)",
    "Related Digital \u00b7 Saline Township, Michigan, United States",
    "1.4 GWUnder construction"
   ],
   "builder_evidence": [
    "Related projects",
    "- [Stargate Michigan](/projects/stargate-michigan-saline-township)",
    "Related Digital \u00b7 Saline Township, Michigan, United States",
    "1.4 GWUnder construction"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Related projects",
    "- [Stargate Michigan](/projects/stargate-michigan-saline-township)",
    "Related Digital \u00b7 Saline Township, Michigan, United States",
    "1.4 GWUnder construction"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://thecatalystonline.com/investment-funding/hut-8-reinforces-its-leadership-in-ai-infrastructure",
   "title": "Hut 8 Reinforces Its Leadership in AI Infrastructure",
   "published_at": "2026-07-21T13:15:42",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "commercialized",
   "announcement_date": null,
   "project_evidence": [
    "# Hut 8 Reinforces Its Leadership in AI Infrastructure",
    "Hut 8 fully commercialized its 1GW Beacon Point AI data center campus with a $9.8 billion lease, expanding hyperscale AI infrastructure.",
    "[Hut 8 Corp.](https://www.hut8.com/), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive technologies, today announced the commercialization of the second phase of its one-gigawatt Beacon Point data center campus in Nueces County, Texas through a second 15-year, $9.8 billion lease (the \u201cAgreement\u201d) for 352 megawatts (MW) of IT capacity (the \u201cTransaction\u201d)."
   ],
   "locality_evidence": [
    "# Hut 8 Reinforces Its Leadership in AI Infrastructure",
    "Hut 8 fully commercialized its 1GW Beacon Point AI data center campus with a $9.8 billion lease, expanding hyperscale AI infrastructure.",
    "[Hut 8 Corp.](https://www.hut8.com/), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive technologies, today announced the commercialization of the second phase of its one-gigawatt Beacon Point data center campus in Nueces County, Texas through a second 15-year, $9.8 billion lease (the \u201cAgreement\u201d) for 352 megawatts (MW) of IT capacity (the \u201cTransaction\u201d)."
   ],
   "state_evidence": [
    "# Hut 8 Reinforces Its Leadership in AI Infrastructure",
    "Hut 8 fully commercialized its 1GW Beacon Point AI data center campus with a $9.8 billion lease, expanding hyperscale AI infrastructure.",
    "[Hut 8 Corp.](https://www.hut8.com/), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive technologies, today announced the commercialization of the second phase of its one-gigawatt Beacon Point data center campus in Nueces County, Texas through a second 15-year, $9.8 billion lease (the \u201cAgreement\u201d) for 352 megawatts (MW) of IT capacity (the \u201cTransaction\u201d)."
   ],
   "capacity_gw_evidence": [
    "# Hut 8 Reinforces Its Leadership in AI Infrastructure",
    "Hut 8 fully commercialized its 1GW Beacon Point AI data center campus with a $9.8 billion lease, expanding hyperscale AI infrastructure.",
    "[Hut 8 Corp.](https://www.hut8.com/), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive technologies, today announced the commercialization of the second phase of its one-gigawatt Beacon Point data center campus in Nueces County, Texas through a second 15-year, $9.8 billion lease (the \u201cAgreement\u201d) for 352 megawatts (MW) of IT capacity (the \u201cTransaction\u201d)."
   ],
   "builder_evidence": [
    "# Hut 8 Reinforces Its Leadership in AI Infrastructure",
    "Hut 8 fully commercialized its 1GW Beacon Point AI data center campus with a $9.8 billion lease, expanding hyperscale AI infrastructure.",
    "[Hut 8 Corp.](https://www.hut8.com/), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive technologies, today announced the commercialization of the second phase of its one-gigawatt Beacon Point data center campus in Nueces County, Texas through a second 15-year, $9.8 billion lease (the \u201cAgreement\u201d) for 352 megawatts (MW) of IT capacity (the \u201cTransaction\u201d)."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Hut 8 Reinforces Its Leadership in AI Infrastructure",
    "Hut 8 fully commercialized its 1GW Beacon Point AI data center campus with a $9.8 billion lease, expanding hyperscale AI infrastructure.",
    "[Hut 8 Corp.](https://www.hut8.com/), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive technologies, today announced the commercialization of the second phase of its one-gigawatt Beacon Point data center campus in Nueces County, Texas through a second 15-year, $9.8 billion lease (the \u201cAgreement\u201d) for 352 megawatts (MW) of IT capacity (the \u201cTransaction\u201d)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://techblog.comsoc.org/tag/iren",
   "title": "IREN \u2013 IEEE ComSoc Technology Blog",
   "published_at": "2026-05-11T00:05:39",
   "project": "Sweetwater campus",
   "locality": null,
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": "Nvidia",
   "status": null,
   "announcement_date": "2026-05-10",
   "project_evidence": [
    "# IREN",
    "The roadmap centers on the **2GW Sweetwater campus** in Texas, positioned to be the flagship deployment of NVIDIA\u2019s **DSX factory architecture**.",
    "Future deployments are expected to focus on IREN\u2019s 2-gigawatt Sweetwater campus in Texas, which the companies expect to serve as a flagship deployment for Nvidia\u2019s DSX architecture."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "# IREN",
    "The roadmap centers on the **2GW Sweetwater campus** in Texas, positioned to be the flagship deployment of NVIDIA\u2019s **DSX factory architecture**.",
    "Future deployments are expected to focus on IREN\u2019s 2-gigawatt Sweetwater campus in Texas, which the companies expect to serve as a flagship deployment for Nvidia\u2019s DSX architecture."
   ],
   "capacity_gw_evidence": [
    "# IREN",
    "The roadmap centers on the **2GW Sweetwater campus** in Texas, positioned to be the flagship deployment of NVIDIA\u2019s **DSX factory architecture**.",
    "Future deployments are expected to focus on IREN\u2019s 2-gigawatt Sweetwater campus in Texas, which the companies expect to serve as a flagship deployment for Nvidia\u2019s DSX architecture."
   ],
   "builder_evidence": [
    "# IREN",
    "The roadmap centers on the **2GW Sweetwater campus** in Texas, positioned to be the flagship deployment of NVIDIA\u2019s **DSX factory architecture**.",
    "Future deployments are expected to focus on IREN\u2019s 2-gigawatt Sweetwater campus in Texas, which the companies expect to serve as a flagship deployment for Nvidia\u2019s DSX architecture."
   ],
   "ai_customer_evidence": [
    "# IREN",
    "The roadmap centers on the **2GW Sweetwater campus** in Texas, positioned to be the flagship deployment of NVIDIA\u2019s **DSX factory architecture**.",
    "Future deployments are expected to focus on IREN\u2019s 2-gigawatt Sweetwater campus in Texas, which the companies expect to serve as a flagship deployment for Nvidia\u2019s DSX architecture."
   ],
   "status_evidence": null,
   "announcement_date_evidence": [
    "# IREN",
    "## [Nvidia strategic partnership with IREN targets 5G Watts AI infrastructure buildout + $2.1B investment option](https://techblog.comsoc.org/2026/05/10/nvidia-strategic-partnership-with-iren-targets-5g-watts-ai-infrastructure-buildout-2-1b-investment-option/)",
    "Posted on"
   ]
  },
  {
   "url": "https://globaladvertisingnews.com/article/915463239-enchant-energy-offers-a-carbon-answer-to-america-s-surging-ai-data-center-demand",
   "title": "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
   "published_at": null,
   "project": "Creekstone Delta Gigasite",
   "locality": "Millard County",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy LLC",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-27",
   "project_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "locality_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "state_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "capacity_gw_evidence": [
    "About Creekstone Energy",
    "Creekstone is developing the Delta Gigasite, a master-planned hyperscale data center campus in Millard County, Utah, designed to deliver more than 10 gigawatts of total IT load capacity across multiple phases."
   ],
   "builder_evidence": [
    "About Creekstone Energy",
    "Creekstone Energy LLC is a vertically integrated energy and data center infrastructure company headquartered in Utah."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand",
    "Enchant Energy Corporation ([www.enchantenergy.com](http://www.enchantenergy.com)) (\"Enchant\") entered into a letter of intent with Creekstone Energy LLC (\"Creekstone\") to develop a [carbon capture](https://enchantenergy.com/enchant-energy-in-brief/) and utilization solution for the Creekstone Delta Gigasite, a planned hyperscale data center campus in Millard County, Utah."
   ],
   "announcement_date_evidence": [
    "Enchant Energy Offers a Carbon Answer to America's Surging AI Data Center Demand"
   ]
  },
  {
   "url": "https://cleanview.co/data-centers/caiso/2260/nexus-hubbard---expansion",
   "title": "Nexus Hubbard - Expansion \u2014 Hill, Texas",
   "published_at": null,
   "project": "Nexus Hubbard - Expansion",
   "locality": "Hubbard",
   "state": "Texas",
   "capacity_gw": 7.2,
   "builder": "Nexus Data Centers",
   "ai_customer": null,
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "# Nexus Hubbard - Expansion",
    "Nexus Hubbard - Expansion \u2014 Hill, Texas",
    "Nexus Hubbard - Expansion is a planned data center located in Hill, Texas."
   ],
   "locality_evidence": [
    "# Nexus Hubbard - Expansion",
    "Nexus Hubbard - Expansion \u2014 Hill, Texas",
    "Nexus Hubbard - Expansion is a planned data center located in Hill, Texas."
   ],
   "state_evidence": [
    "Nexus Hubbard - Expansion \u2014 Hill, Texas",
    "Nexus Hubbard - Expansion is a planned data center located in Hill, Texas.",
    "State\n\nTexas"
   ],
   "capacity_gw_evidence": [
    "Nexus Hubbard - Expansion is a planned data center located in Hill, Texas.",
    "It will have a capacity of 7,200 MW.",
    "Capacity\n\n7,200 MW"
   ],
   "builder_evidence": [
    "Being developed by Nexus Data Centers",
    "Nexus Hubbard - Expansion is a planned data center located in Hill, Texas.",
    "Developer\n\nNexus Data Centers"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Nexus Hubbard - Expansion is a planned data center located in Hill, Texas.",
    "Status\n\nPlanned"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://thequantumdispatch.com/articles/nvidia-sb-energy-ports-pike-ohio-campus",
   "title": "Nvidia Invests $1.5B in SB Energy's Ohio AI Campus",
   "published_at": "2026-08-17T20:48:26",
   "project": "PORTS-Pike",
   "locality": "Cincinnati",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-08-17",
   "project_evidence": [
    "# Nvidia Invests $1.5B in SB Energy's Ohio AI Campus",
    "Nvidia is putting $1.5B into SB Energy and backing up to $105B in credit to make the 4.25GW PORTS-Pike campus in Ohio an Nvidia-only compute site.",
    "- The PORTS-Pike campus near Cincinnati starts at 4.25 gigawatts with a path to 8 gigawatts"
   ],
   "locality_evidence": [
    "# Nvidia Invests $1.5B in SB Energy's Ohio AI Campus",
    "- The PORTS-Pike campus near Cincinnati starts at 4.25 gigawatts with a path to 8 gigawatts"
   ],
   "state_evidence": [
    "# Nvidia Invests $1.5B in SB Energy's Ohio AI Campus",
    "Nvidia is putting $1.5B into SB Energy and backing up to $105B in credit to make the 4.25GW PORTS-Pike campus in Ohio an Nvidia-only compute site."
   ],
   "capacity_gw_evidence": [
    "# Nvidia Invests $1.5B in SB Energy's Ohio AI Campus",
    "- The PORTS-Pike campus near Cincinnati starts at 4.25 gigawatts with a path to 8 gigawatts",
    "Because the units have quietly changed. AI data centers used to be discussed in megawatts and square footage; now the meaningful figure is gigawatts, and PORTS-Pike starts at 4.25 with an expansion path to 8."
   ],
   "builder_evidence": [
    "# Nvidia Invests $1.5B in SB Energy's Ohio AI Campus",
    "Nvidia is putting $1.5B into SB Energy and backing up to $105B in credit to make the 4.25GW PORTS-Pike campus in Ohio an Nvidia-only compute site.",
    "- Nvidia will be the sole supplier of compute infrastructure at the site, which SB Energy will build, own, and operate under a 20-year lease to OpenAI"
   ],
   "ai_customer_evidence": [
    "# Nvidia Invests $1.5B in SB Energy's Ohio AI Campus",
    "- Nvidia will be the sole supplier of compute infrastructure at the site, which SB Energy will build, own, and operate under a 20-year lease to OpenAI",
    "SB Energy will build, own, and operate it, with OpenAI signed to a 20-year lease \u2014 the kind of term that makes project finance work and that turns a speculative buildout into a bankable asset."
   ],
   "status_evidence": [
    "# Nvidia Invests $1.5B in SB Energy's Ohio AI Campus",
    "Nvidia announced on August 17, 2026 that it will invest $1.5 billion in SB Energy, the SoftBank-backed developer building an enormous data center campus in southern Ohio, and guarantee the site as an exclusive home for its own compute."
   ],
   "announcement_date_evidence": [
    "# Nvidia Invests $1.5B in SB Energy's Ohio AI Campus",
    "Nvidia announced on August 17, 2026 that it will invest $1.5 billion in SB Energy, the SoftBank-backed developer building an enormous data center campus in southern Ohio, and guarantee the site as an exclusive home for its own compute."
   ]
  },
  {
   "url": "https://securityonline.info/meta-to-invest-1-5-billion-in-massive-1-gigawatt-texas-data-center-for-next-gen-ai-infrastructure",
   "title": "Meta to Invest $1.5 Billion in Massive 1-Gigawatt Texas Data Center for Next-Gen AI Infrastructure",
   "published_at": "2025-10-17T00:00:07",
   "project": "El Paso",
   "locality": "El Paso",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "Meta has [announced](https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/) plans to invest over $1.5 billion in the construction of a massive 1-gigawatt data center in El Paso, Texas, marking a significant step in the company\u2019s ongoing expansion of its artificial intelligence infrastructure."
   ],
   "locality_evidence": [
    "Meta has [announced](https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/) plans to invest over $1.5 billion in the construction of a massive 1-gigawatt data center in El Paso, Texas, marking a significant step in the company\u2019s ongoing expansion of its artificial intelligence infrastructure."
   ],
   "state_evidence": [
    "Meta has [announced](https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/) plans to invest over $1.5 billion in the construction of a massive 1-gigawatt data center in El Paso, Texas, marking a significant step in the company\u2019s ongoing expansion of its artificial intelligence infrastructure."
   ],
   "capacity_gw_evidence": [
    "Meta has [announced](https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/) plans to invest over $1.5 billion in the construction of a massive 1-gigawatt data center in El Paso, Texas, marking a significant step in the company\u2019s ongoing expansion of its artificial intelligence infrastructure."
   ],
   "builder_evidence": [
    "Meta has [announced](https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/) plans to invest over $1.5 billion in the construction of a massive 1-gigawatt data center in El Paso, Texas, marking a significant step in the company\u2019s ongoing expansion of its artificial intelligence infrastructure."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Meta has [announced](https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/) plans to invest over $1.5 billion in the construction of a massive 1-gigawatt data center in El Paso, Texas, marking a significant step in the company\u2019s ongoing expansion of its artificial intelligence infrastructure."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://securityonline.info/meta-to-invest-1-5-billion-in-massive-1-gigawatt-texas-data-center-for-next-gen-ai-infrastructure",
   "title": "Meta to Invest $1.5 Billion in Massive 1-Gigawatt Texas Data Center for Next-Gen AI Infrastructure",
   "published_at": "2025-10-17T00:00:07",
   "project": "Prometheus",
   "locality": null,
   "state": "Ohio",
   "capacity_gw": 1.0,
   "builder": "Meta",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": null,
   "project_evidence": [
    "In addition, Meta is building another gigawatt-scale facility in Ohio, known as \u201cPrometheus,\u201d further signaling its intent to dramatically extend its global AI infrastructure footprint."
   ],
   "locality_evidence": null,
   "state_evidence": [
    "In addition, Meta is building another gigawatt-scale facility in Ohio, known as \u201cPrometheus,\u201d further signaling its intent to dramatically extend its global AI infrastructure footprint."
   ],
   "capacity_gw_evidence": [
    "In addition, Meta is building another gigawatt-scale facility in Ohio, known as \u201cPrometheus,\u201d further signaling its intent to dramatically extend its global AI infrastructure footprint."
   ],
   "builder_evidence": [
    "In addition, Meta is building another gigawatt-scale facility in Ohio, known as \u201cPrometheus,\u201d further signaling its intent to dramatically extend its global AI infrastructure footprint."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "In addition, Meta is building another gigawatt-scale facility in Ohio, known as \u201cPrometheus,\u201d further signaling its intent to dramatically extend its global AI infrastructure footprint."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://pjstar.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Colossus 2",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 1.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "active construction still on site",
   "announcement_date": "2025-05-01",
   "project_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "locality_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The second Memphis campus in Whitehaven came into the picture in early 2025."
   ],
   "state_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The second Memphis campus in Whitehaven came into the picture in early 2025."
   ],
   "capacity_gw_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "builder_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "In March 2025, the Greater Memphis Chamber announced xAI's plans for a second campus and its purchase of a 1 million-square-foot building."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The Tulane Road site is an artificial intelligence data center, with active construction still on site."
   ],
   "announcement_date_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ]
  },
  {
   "url": "https://pjstar.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Macrohardrr",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2025-12-30",
   "project_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "locality_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "This is the third and most recent xAI campus."
   ],
   "state_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ],
   "capacity_gw_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "builder_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Jan. 8, xAI and Mississippi officials[ formally announced plans for the Marcohardrr data center](/story/money/business/development/2026/01/08/xai-in-southaven-ms-macrohardrr-data-center/88065622007/) at 2400 Stateline Road."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "The former Duke Energy site has been under construction with gas turbines on site for powering xAI data centers."
   ],
   "announcement_date_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ]
  },
  {
   "url": "https://briefglance.com/companies/crusoe-energy-systems-llc/pulses/58391",
   "title": "Crusoe and Lancium Expand Texas AI Data Center Footprint with 1GW Childress Campus",
   "published_at": "2026-07-15T14:00:00",
   "project": "Childress Campus",
   "locality": "Childress",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "Announced",
   "announcement_date": null,
   "project_evidence": [
    "# Crusoe and Lancium Expand Texas AI Data Center Footprint with 1GW Childress Campus",
    "- Crusoe and Lancium announce a 1.0 gigawatt AI data center campus in Childress, Texas, spanning 270 acres."
   ],
   "locality_evidence": [
    "# Crusoe and Lancium Expand Texas AI Data Center Footprint with 1GW Childress Campus",
    "- Crusoe and Lancium announce a 1.0 gigawatt AI data center campus in Childress, Texas, spanning 270 acres."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Expand Texas AI Data Center Footprint with 1GW Childress Campus",
    "- Crusoe and Lancium announce a 1.0 gigawatt AI data center campus in Childress, Texas, spanning 270 acres."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium Expand Texas AI Data Center Footprint with 1GW Childress Campus",
    "- Crusoe and Lancium announce a 1.0 gigawatt AI data center campus in Childress, Texas, spanning 270 acres."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium Expand Texas AI Data Center Footprint with 1GW Childress Campus",
    "- Crusoe and Lancium announce a 1.0 gigawatt AI data center campus in Childress, Texas, spanning 270 acres."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Crusoe and Lancium Expand Texas AI Data Center Footprint with 1GW Childress Campus",
    "- Crusoe and Lancium announce a 1.0 gigawatt AI data center campus in Childress, Texas, spanning 270 acres."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://briefglance.com/companies/crusoe-energy-systems-llc/pulses/58391",
   "title": "Crusoe and Lancium Expand Texas AI Data Center Footprint with 1GW Childress Campus",
   "published_at": "2026-07-15T14:00:00",
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe and Lancium",
   "ai_customer": null,
   "status": "Deployed",
   "announcement_date": null,
   "project_evidence": [
    "# Crusoe and Lancium Expand Texas AI Data Center Footprint with 1GW Childress Campus",
    "- Second site using same partnership model successfully deployed in Abilene (1.2GW campus)."
   ],
   "locality_evidence": [
    "# Crusoe and Lancium Expand Texas AI Data Center Footprint with 1GW Childress Campus",
    "- Second site using same partnership model successfully deployed in Abilene (1.2GW campus)."
   ],
   "state_evidence": [
    "# Crusoe and Lancium Expand Texas AI Data Center Footprint with 1GW Childress Campus",
    "- Crusoe and Lancium announce a 1.0 gigawatt AI data center campus in Childress, Texas, spanning 270 acres.",
    "- Second site using same partnership model successfully deployed in Abilene (1.2GW campus)."
   ],
   "capacity_gw_evidence": [
    "# Crusoe and Lancium Expand Texas AI Data Center Footprint with 1GW Childress Campus",
    "- Second site using same partnership model successfully deployed in Abilene (1.2GW campus)."
   ],
   "builder_evidence": [
    "# Crusoe and Lancium Expand Texas AI Data Center Footprint with 1GW Childress Campus",
    "- Second site using same partnership model successfully deployed in Abilene (1.2GW campus)."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Crusoe and Lancium Expand Texas AI Data Center Footprint with 1GW Childress Campus",
    "- Second site using same partnership model successfully deployed in Abilene (1.2GW campus)."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://en.mashdigi.com/microsoft-invests-another-7-billion-to-build-what-it-claims-will-be-the-worlds-most-powerful-ai-data-center-in-wisconsin",
   "title": "Microsoft to invest another $70 billion to build what it claims to be the \"world's most powerful\" AI data center in Wisconsin - mashdigi - Technology, New Products, Interesting News, Trends",
   "published_at": "2025-09-19T04:18:26",
   "project": null,
   "locality": "Dallas",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage",
   "ai_customer": null,
   "status": "announced",
   "announcement_date": "2025-08-31",
   "project_evidence": null,
   "locality_evidence": [
    "Cloud service provider Vantage also announced at the end of August that it would invest $25 billion to build a 1.4-gigawatt AI data center in Texas."
   ],
   "state_evidence": [
    "Cloud service provider Vantage also announced at the end of August that it would invest $25 billion to build a 1.4-gigawatt AI data center in Texas."
   ],
   "capacity_gw_evidence": [
    "Cloud service provider Vantage also announced at the end of August that it would invest $25 billion to build a 1.4-gigawatt AI data center in Texas."
   ],
   "builder_evidence": [
    "Cloud service provider Vantage also announced at the end of August that it would invest $25 billion to build a 1.4-gigawatt AI data center in Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Cloud service provider Vantage also announced at the end of August that it would invest $25 billion to build a 1.4-gigawatt AI data center in Texas."
   ],
   "announcement_date_evidence": [
    "Cloud service provider Vantage also announced at the end of August that it would invest $25 billion to build a 1.4-gigawatt AI data center in Texas."
   ]
  },
  {
   "url": "https://poweredbywho.com/projects/vantage-frontier-shackelford-county-stargate-0a6eaeba",
   "title": "Vantage Frontier Shackelford County (Stargate) Data Center, Texas | PoweredByWho",
   "published_at": null,
   "project": "Vantage Frontier Shackelford County (Stargate)",
   "locality": "Albany",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage Data Centers",
   "ai_customer": "Oracle",
   "status": "Under Construction",
   "announcement_date": null,
   "project_evidence": [
    "FILE #VANTAGE-FRONTIER-SHACKELFORD-COUNTY-STARGATE-0A6EAEBA \u00b7 UPDATED 2026-06-12",
    "# Vantage Frontier Shackelford County (Stargate)"
   ],
   "locality_evidence": [
    "Albany \u00b7 site",
    "Location\n\nALBANY"
   ],
   "state_evidence": [
    "Shackelford County, TX"
   ],
   "capacity_gw_evidence": [
    "1400 MW \u00b7 UNDER CONSTRUCTION",
    "Capacity\n\n1400 MW"
   ],
   "builder_evidence": [
    "Developer \u00b7 Vantage Data Centers / Oracle"
   ],
   "ai_customer_evidence": [
    "Operator\n\nOracle"
   ],
   "status_evidence": [
    "1400 MW \u00b7 UNDER CONSTRUCTION",
    "Status\n\nUnder Construction"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://flash.stocksentinel.ai/research/FRMI",
   "title": "Fermi Inc. (FRMI) Stock Research Report",
   "published_at": "2026-04-20T19:37:05",
   "project": "Project Matador",
   "locality": "Amarillo",
   "state": "Texas",
   "capacity_gw": 17.0,
   "builder": "Fermi Inc.",
   "ai_customer": null,
   "status": "under development",
   "announcement_date": null,
   "project_evidence": [
    "Fermi Inc. (FRMI) Investment Analysis: Navigating the Intersection of Gigawatt-Scale Energy and Generative AI Infrastructure",
    "## 1. **Executive Summary**",
    "Founded in January 2025 and headquartered in Amarillo, Texas, the company is developing Project Matador, a multi-gigawatt energy and data center campus that integrates private power generation with high-performance computing (HPC) facilities.[2, 3, 4]"
   ],
   "locality_evidence": [
    "Fermi Inc. (FRMI) Investment Analysis: Navigating the Intersection of Gigawatt-Scale Energy and Generative AI Infrastructure",
    "## 1. **Executive Summary**",
    "Founded in January 2025 and headquartered in Amarillo, Texas, the company is developing Project Matador, a multi-gigawatt energy and data center campus that integrates private power generation with high-performance computing (HPC) facilities.[2, 3, 4]"
   ],
   "state_evidence": [
    "Fermi Inc. (FRMI) Investment Analysis: Navigating the Intersection of Gigawatt-Scale Energy and Generative AI Infrastructure",
    "## 1. **Executive Summary**",
    "Founded in January 2025 and headquartered in Amarillo, Texas, the company is developing Project Matador, a multi-gigawatt energy and data center campus that integrates private power generation with high-performance computing (HPC) facilities.[2, 3, 4]"
   ],
   "capacity_gw_evidence": [
    "Fermi Inc. (FRMI) Investment Analysis: Navigating the Intersection of Gigawatt-Scale Energy and Generative AI Infrastructure",
    "### TAM / Market Opportunity Analysis",
    "Project Matador\u2019s 11 GW capacity (potentially expanding to 17 GW) positions Fermi to capture a significant share of the North American wholesale data center market.[11, 20, 21]"
   ],
   "builder_evidence": [
    "Fermi Inc. (FRMI) Investment Analysis: Navigating the Intersection of Gigawatt-Scale Energy and Generative AI Infrastructure",
    "## 1. **Executive Summary**",
    "Fermi Inc., operating commercially as Fermi America, is a development-stage infrastructure enterprise purpose-built to resolve the primary bottleneck of the generative artificial intelligence era: the availability of high-density, gigawatt-scale power.[1, 2, 3]"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Fermi Inc. (FRMI) Investment Analysis: Navigating the Intersection of Gigawatt-Scale Energy and Generative AI Infrastructure",
    "## 1. **Executive Summary**",
    "Founded in January 2025 and headquartered in Amarillo, Texas, the company is developing Project Matador, a multi-gigawatt energy and data center campus that integrates private power generation with high-performance computing (HPC) facilities.[2, 3, 4]"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterdynamics.com/en/tags/homer-city",
   "title": "Homer City - DCD",
   "published_at": "2026-08-05T00:00:00",
   "project": "Homer City",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Kiewit",
   "ai_customer": "AWS",
   "status": null,
   "announcement_date": null,
   "project_evidence": [
    "# Homer City",
    "# [AWS eyes potential data center development at 4.5GW natural gas plant in Pennsylvania](/en/news/aws-eyes-potential-data-center-development-at-45gw-natural-gas-plant-in-pennsylvania/)"
   ],
   "locality_evidence": [
    "# Homer City",
    "# [Campaigners call on regulator to block 4.5GW gas powered AI data center in Homer City, Pennsylvania](/en/news/campaigners-call-on-regulator-to-block-45gw-gas-powered-ai-data-center-in-homer-city-pennsylvania/)"
   ],
   "state_evidence": [
    "# Homer City",
    "# [AWS eyes potential data center development at 4.5GW natural gas plant in Pennsylvania](/en/news/aws-eyes-potential-data-center-development-at-45gw-natural-gas-plant-in-pennsylvania/)"
   ],
   "capacity_gw_evidence": [
    "# Homer City",
    "# [AWS eyes potential data center development at 4.5GW natural gas plant in Pennsylvania](/en/news/aws-eyes-potential-data-center-development-at-45gw-natural-gas-plant-in-pennsylvania/)"
   ],
   "builder_evidence": [
    "# Homer City",
    "# [Homer City and Kiewit unveil plans for 4.5GW natural gas powered AI data center in Pennsylvania](/en/news/homer-city-and-kiewit-unveil-plans-for-45gw-natural-gas-powered-ai-data-center-in-pennsylvania/)"
   ],
   "ai_customer_evidence": [
    "# Homer City",
    "# [AWS eyes potential data center development at 4.5GW natural gas plant in Pennsylvania](/en/news/aws-eyes-potential-data-center-development-at-45gw-natural-gas-plant-in-pennsylvania/)"
   ],
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://wchstv.com/news/local/ai-infrastructure-company-acquiring-monarch-compute-campus-in-mason-county-wva",
   "title": "AI infrastructure company acquiring Monarch Compute Campus in Mason County, W.Va.",
   "published_at": "2026-03-16T22:17:48",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# AI infrastructure company acquiring Monarch Compute Campus in Mason County, W.Va.",
    "Nscale has moved to acquire American Intelligence & Power Corporation which includes the Monarch Computer Campus in Mason County, according to[ a news release from the company](https://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation)."
   ],
   "locality_evidence": [
    "# AI infrastructure company acquiring Monarch Compute Campus in Mason County, W.Va.",
    "Nscale has moved to acquire American Intelligence & Power Corporation which includes the Monarch Computer Campus in Mason County, according to[ a news release from the company](https://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation)."
   ],
   "state_evidence": [
    "# AI infrastructure company acquiring Monarch Compute Campus in Mason County, W.Va."
   ],
   "capacity_gw_evidence": [
    "# AI infrastructure company acquiring Monarch Compute Campus in Mason County, W.Va.",
    "Officials expect the initial power capacity of 2 gigawatts to be online by early 2028 while [an expansion to 8 gigawatts](https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) is planned for 2031."
   ],
   "builder_evidence": [
    "# AI infrastructure company acquiring Monarch Compute Campus in Mason County, W.Va.",
    "Nscale has moved to acquire American Intelligence & Power Corporation which includes the Monarch Computer Campus in Mason County, according to[ a news release from the company](https://www.nscale.com/press-releases/nscale-acquires-american-intelligence-power-corporation)."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# AI infrastructure company acquiring Monarch Compute Campus in Mason County, W.Va.",
    "Officials expect the initial power capacity of 2 gigawatts to be online by early 2028 while [an expansion to 8 gigawatts](https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) is planned for 2031."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://louisianai.com/data-centers/meta-hyperion",
   "title": "Meta Hyperion Data Center: Status, Power, Water",
   "published_at": "2026-08-14T19:27:09",
   "project": "Meta Hyperion AI Data Center",
   "locality": "Rayville",
   "state": "Louisiana",
   "capacity_gw": 5.0,
   "builder": "Meta",
   "ai_customer": "Meta",
   "status": "Under construction",
   "announcement_date": "2026-07-13",
   "project_evidence": [
    "Tracker / Richland Parish / Meta",
    "# Meta Hyperion AI Data Center.",
    "Meta Hyperion is the under-construction Richland Parish AI campus behind the Hyperion, Project Sucre, and Meta Richland Parish aliases."
   ],
   "locality_evidence": [
    "What is Meta Hyperion Richland Parish?",
    "Meta Hyperion Richland Parish is the same campus as Meta Hyperion data center Louisiana: an under-construction Meta AI data center near Rayville in Richland Parish, Louisiana, served by Entergy Louisiana and tracked through LPSC data-center dockets."
   ],
   "state_evidence": [
    "Tracker / Richland Parish / Meta",
    "Meta''s largest data center to date: a long-dated AI-optimized campus on roughly four million square feet across thousands of acres in northeast Louisiana, publicly framed around multi-billion-dollar capital intensity and multi-gigawatt-scale compute targets."
   ],
   "capacity_gw_evidence": [
    "What is Meta Hyperion 5GW Louisiana?",
    "Meta Hyperion 5GW Louisiana refers to the confirmed 5 GW build-out of Meta's Richland Parish campus, announced July 13, 2026, with roughly 2 GW expected by 2030 and the full campus around 2032."
   ],
   "builder_evidence": [
    "Tracker / Richland Parish / Meta",
    "Operator",
    "Meta"
   ],
   "ai_customer_evidence": [
    "Tracker / Richland Parish / Meta",
    "# Meta Hyperion AI Data Center.",
    "Meta''s largest data center to date: a long-dated AI-optimized campus on roughly four million square feet across thousands of acres in northeast Louisiana, publicly framed around multi-billion-dollar capital intensity and multi-gigawatt-scale compute targets."
   ],
   "status_evidence": [
    "Under construction \u2014 major expansion underwayPhase II reviewConf \u00b7 BCurrent",
    "Tracker / Richland Parish / Meta",
    "Meta Hyperion is the under-construction Richland Parish AI campus behind the Hyperion, Project Sucre, and Meta Richland Parish aliases."
   ],
   "announcement_date_evidence": [
    "Tracker / Richland Parish / Meta",
    "Meta Hyperion is the under-construction Richland Parish AI campus behind the Hyperion, Project Sucre, and Meta Richland Parish aliases.",
    "The first checks are status, LPSC power dockets, water records, source-backed scale, and the confirmed 5 GW / $50B+ build-out announced July 13, 2026."
   ]
  },
  {
   "url": "https://mgrid.org/2026/05/04/box-elder-county-approves-9-gw-wonder-valley-data-center-in-utah-hansel-valley-after-4000-water-rights-protests",
   "title": "Box Elder County Approves 9 GW Wonder Valley Data Center",
   "published_at": "2026-05-04T13:00:00",
   "project": "Stratos Project",
   "locality": "Hansel Valley",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "West GenCo and O\u2019Leary Digital Limited",
   "ai_customer": null,
   "status": "Planned",
   "announcement_date": "2026-05-04",
   "project_evidence": [
    "# Box Elder County Approves 9 GW Wonder Valley Data Center",
    "Box Elder County commissioners unanimously approved plans on May 4, 2026, for the 9 gigawatt (GW) Stratos Project, a 40,000-acre artificial intelligence data center campus in Hansel Valley, Utah, representing the largest single AI data center campus to receive local approval in the United States to date."
   ],
   "locality_evidence": [
    "# Box Elder County Approves 9 GW Wonder Valley Data Center",
    "Box Elder County commissioners unanimously approved plans on May 4, 2026, for the 9 gigawatt (GW) Stratos Project, a 40,000-acre artificial intelligence data center campus in Hansel Valley, Utah, representing the largest single AI data center campus to receive local approval in the United States to date."
   ],
   "state_evidence": [
    "# Box Elder County Approves 9 GW Wonder Valley Data Center",
    "Box Elder County commissioners unanimously approved plans on May 4, 2026, for the 9 gigawatt (GW) Stratos Project, a 40,000-acre artificial intelligence data center campus in Hansel Valley, Utah, representing the largest single AI data center campus to receive local approval in the United States to date."
   ],
   "capacity_gw_evidence": [
    "# Box Elder County Approves 9 GW Wonder Valley Data Center",
    "Box Elder County commissioners unanimously approved plans on May 4, 2026, for the 9 gigawatt (GW) Stratos Project, a 40,000-acre artificial intelligence data center campus in Hansel Valley, Utah, representing the largest single AI data center campus to receive local approval in the United States to date."
   ],
   "builder_evidence": [
    "# Box Elder County Approves 9 GW Wonder Valley Data Center",
    "The project, marketed as \u201cWonder Valley,\u201d is a joint venture between West GenCo and O\u2019Leary Digital Limited, the technology vehicle of investor Kevin O\u2019Leary, alongside the Utah Military Installation Development Authority (MIDA)."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Box Elder County Approves 9 GW Wonder Valley Data Center",
    "StagePlanned"
   ],
   "announcement_date_evidence": [
    "# Box Elder County Approves 9 GW Wonder Valley Data Center",
    "Box Elder County commissioners unanimously approved plans on May 4, 2026, for the 9 gigawatt (GW) Stratos Project, a 40,000-acre artificial intelligence data center campus in Hansel Valley, Utah, representing the largest single AI data center campus to receive local approval in the United States to date."
   ]
  },
  {
   "url": "http://dlvr.it/TTglnW",
   "title": "OpenAI is building a $20 billion AI data center campus near Savannah, Georgia",
   "published_at": "2026-07-22T17:28:55",
   "project": "Project Camellia",
   "locality": "Savannah",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "OpenAI is building a $20 billion AI data center campus near Savannah, Georgia",
    "The project, called Project Camellia, will draw 3.2 gigawatts of power from Georgia Power in phases between 2028 and 2032"
   ],
   "locality_evidence": [
    "OpenAI plans $20 billion data center campus near Savannah, Georgia",
    "OpenAI is building a $20 billion AI data center campus near Savannah, Georgia"
   ],
   "state_evidence": [
    "OpenAI plans $20 billion data center campus near Savannah, Georgia",
    "OpenAI is building a $20 billion AI data center campus near Savannah, Georgia"
   ],
   "capacity_gw_evidence": [
    "OpenAI is building a $20 billion AI data center campus near Savannah, Georgia",
    "The project, called Project Camellia, will draw 3.2 gigawatts of power from Georgia Power in phases between 2028 and 2032"
   ],
   "builder_evidence": [
    "OpenAI is building a $20 billion AI data center campus near Savannah, Georgia"
   ],
   "ai_customer_evidence": [
    "OpenAI is building a $20 billion AI data center campus near Savannah, Georgia"
   ],
   "status_evidence": [
    "OpenAI plans $20 billion data center campus near Savannah, Georgia",
    "OpenAI is building a $20 billion AI data center campus near Savannah, Georgia"
   ],
   "announcement_date_evidence": [
    "OpenAI is building a $20 billion AI data center campus near Savannah, Georgia",
    "[By Cris Tolomia](/author/cristolomia)\u00b73 min read\u00b7Updated July 22, 2026"
   ]
  },
  {
   "url": "https://themidwesterner.news/2026/03/google-behind-proposed-280-acre-data-center-in-van-buren-twp",
   "title": "Google behind proposed 280-acre data center in Van Buren Twp.",
   "published_at": "2026-03-19T00:37:07",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development",
   "ai_customer": "Google",
   "status": "approved",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "The 1-gigawatt data center is part of \u201cProject Cannoli\u201d that\u2019s being developed by Panattoni Development at the 280-acre site [approved](https://www.themidwesterner.news/2026/02/van-buren-twp-planners-approve-280-acre-data-center-site-plan-despite-community-opposition/) by the township\u2019s planning commission last month."
   ],
   "locality_evidence": [
    "Tech giant Google announced its plans this week for a massive data center in Van Buren Township that residents have been concerned about for months."
   ],
   "state_evidence": [
    "Today, following Google\u2019s announcement of its data center plans in Wayne County\u2019s Van Buren Township, Michigan Attorney General Dana Nessel issued the following statement."
   ],
   "capacity_gw_evidence": [
    "The 1-gigawatt data center is part of \u201cProject Cannoli\u201d that\u2019s being developed by Panattoni Development at the 280-acre site [approved](https://www.themidwesterner.news/2026/02/van-buren-twp-planners-approve-280-acre-data-center-site-plan-despite-community-opposition/) by the township\u2019s planning commission last month."
   ],
   "builder_evidence": [
    "The 1-gigawatt data center is part of \u201cProject Cannoli\u201d that\u2019s being developed by Panattoni Development at the 280-acre site [approved](https://www.themidwesterner.news/2026/02/van-buren-twp-planners-approve-280-acre-data-center-site-plan-despite-community-opposition/) by the township\u2019s planning commission last month."
   ],
   "ai_customer_evidence": [
    "Tech giant Google announced its plans this week for a massive data center in Van Buren Township that residents have been concerned about for months."
   ],
   "status_evidence": [
    "The 1-gigawatt data center is part of \u201cProject Cannoli\u201d that\u2019s being developed by Panattoni Development at the 280-acre site [approved](https://www.themidwesterner.news/2026/02/van-buren-twp-planners-approve-280-acre-data-center-site-plan-despite-community-opposition/) by the township\u2019s planning commission last month."
   ],
   "announcement_date_evidence": [
    "Today, following Google\u2019s announcement of its data center plans in Wayne County\u2019s Van Buren Township, Michigan Attorney General Dana Nessel issued the following statement. Read more at [https://t.co/9ywLGuLWS8](https://t.co/9ywLGuLWS8)[pic.twitter.com/KkGM5QEBNL](https://t.co/KkGM5QEBNL)",
    "\u2014 Michigan Attorney General Dana Nessel (@MIAttyGen) [March 17, 2026](https://twitter.com/MIAttyGen/status/2033977166036079051?ref_src=twsrc%5Etfw)"
   ]
  },
  {
   "url": "https://edgen.beta.edgen.tech/news/post/terawulf-buys-kentucky-site-for-1-gw-ai-data-center-campus",
   "title": "TeraWulf buys Kentucky site for 1-GW AI data center campus",
   "published_at": "2026-05-26T18:43:07",
   "project": "Muskie Data Campus",
   "locality": "EastPark Industrial Park",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "acquired",
   "announcement_date": "2026-05-26",
   "project_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus",
    "The 285-acre site within EastPark Industrial Park, dubbed the Muskie Data Campus, is already zoned for data center use."
   ],
   "locality_evidence": [
    "The 285-acre site within EastPark Industrial Park, dubbed the Muskie Data Campus, is already zoned for data center use.",
    "TeraWulf buys Kentucky site for 1-GW AI data center campus"
   ],
   "state_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus",
    "TeraWulf Inc. acquired a Kentucky development site capable of supporting more than 1 gigawatt of data center capacity, as the Bitcoin miner pivots deeper into AI infrastructure where power availability has become the binding constraint."
   ],
   "capacity_gw_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus",
    "TeraWulf Inc. acquired a Kentucky development site capable of supporting more than 1 gigawatt of data center capacity, as the Bitcoin miner pivots deeper into AI infrastructure where power availability has become the binding constraint."
   ],
   "builder_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus",
    "TeraWulf Inc. acquired a Kentucky development site capable of supporting more than 1 gigawatt of data center capacity, as the Bitcoin miner pivots deeper into AI infrastructure where power availability has become the binding constraint."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus",
    "TeraWulf Inc. acquired a Kentucky development site capable of supporting more than 1 gigawatt of data center capacity, as the Bitcoin miner pivots deeper into AI infrastructure where power availability has become the binding constraint."
   ],
   "announcement_date_evidence": [
    "TeraWulf buys Kentucky site for 1-GW AI data center campus",
    "[![Rachel Kim](https://static.edgen.tech/authors/rachel-kim.png?image_process=resize,w_32/quality,q_75/format,webp/sharpen,100)\n## Rachel Kim](https://edgen.beta.edgen.tech/author/news/rachel-kim)\u00b7May 26 2026, 18:43"
   ]
  },
  {
   "url": "https://cryptoxplosive.com/hut-8-surges-30-after-landing-second-ai-data-center-lease-worth-9-8-billion-bitcoin-news",
   "title": "Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion \u2013 Bitcoin News",
   "published_at": "2026-05-14T23:40:07",
   "project": "Beacon Point",
   "locality": "Nueces County",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "Hut 8",
   "ai_customer": null,
   "status": "underway",
   "announcement_date": null,
   "project_evidence": [
    "Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion \u2013 Bitcoin News",
    "The Miami-based company said it signed a $9.8 billion triple-net lease for 352 megawatts of IT capacity at its Beacon Point campus in Nueces County, Texas."
   ],
   "locality_evidence": [
    "Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion \u2013 Bitcoin News",
    "The Miami-based company said it signed a $9.8 billion triple-net lease for 352 megawatts of IT capacity at its Beacon Point campus in Nueces County, Texas."
   ],
   "state_evidence": [
    "Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion \u2013 Bitcoin News",
    "The Miami-based company said it signed a $9.8 billion triple-net lease for 352 megawatts of IT capacity at its Beacon Point campus in Nueces County, Texas."
   ],
   "capacity_gw_evidence": [
    "Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion \u2013 Bitcoin News",
    "Beacon Point is designed as a gigawatt-scale campus with 1,000 MW of utility capacity under interconnection agreement with AEP Texas."
   ],
   "builder_evidence": [
    "Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion \u2013 Bitcoin News",
    "The Miami-based company said it signed a $9.8 billion triple-net lease for 352 megawatts of IT capacity at its Beacon Point campus in Nueces County, Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion \u2013 Bitcoin News",
    "The latest deal further reinforces a broader shift underway among bitcoin miners and power-focused infrastructure operators, which are increasingly repositioning large power campuses toward AI and hyperscale computing as demand for high-density GPU infrastructure accelerates."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://centralcharts.com/en/3038784-iris-energy-ltd/news/5040757-iren-secures-2-75gw-for-data-centers-in-west-texas-with-new-600mw-grid-connection-agreement",
   "title": "IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
   "published_at": null,
   "project": "Sweetwater",
   "locality": "Sweetwater",
   "state": "Texas",
   "capacity_gw": 2.0,
   "builder": "IREN",
   "ai_customer": null,
   "status": "advancing",
   "announcement_date": "2025-03-17",
   "project_evidence": [
    "# IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "locality_evidence": [
    "# IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "state_evidence": [
    "# IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "capacity_gw_evidence": [
    "# IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "builder_evidence": [
    "# IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ],
   "announcement_date_evidence": [
    "# IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement",
    "SYDNEY, March 17, 2025 (GLOBE NEWSWIRE) -- IREN Limited (NASDAQ: [IREN](https://www.globenewswire.com/Tracker?data=PRPUZFCSCOzbIHzRcyvCkI5Tdp4WSU64zV2LbdZkY6EuqelgYXy5kX5urXOZewW4)) (together with its subsidiaries, \u201cIREN\u201d), today announced the signing of a 600MW grid connection agreement for Sweetwater 2, advancing its 2GW Sweetwater data center hub in West Texas."
   ]
  },
  {
   "url": "https://datacenters.com/providers/creekstone-energy-llc",
   "title": "Creekstone Energy AI Data Center Power Infrastructure",
   "published_at": null,
   "project": "Delta Gigasite",
   "locality": "Delta",
   "state": "Utah",
   "capacity_gw": 10.0,
   "builder": "Creekstone Energy",
   "ai_customer": null,
   "status": "in development",
   "announcement_date": null,
   "project_evidence": [
    "Its flagship project is the **Delta Gigasite** near **Delta, Utah**, a large-scale AI infrastructure campus in Millard County.",
    "\u2022 **Delta Gigasite \u2014 Delta / Millard County, Utah:** flagship AI data center and energy infrastructure campus."
   ],
   "locality_evidence": [
    "Its flagship project is the **Delta Gigasite** near **Delta, Utah**, a large-scale AI infrastructure campus in Millard County.",
    "\u2022 **Delta Gigasite \u2014 Delta / Millard County, Utah:** flagship AI data center and energy infrastructure campus."
   ],
   "state_evidence": [
    "Its flagship project is the **Delta Gigasite** near **Delta, Utah**, a large-scale AI infrastructure campus in Millard County.",
    "\u2022 **Delta Gigasite \u2014 Delta / Millard County, Utah:** flagship AI data center and energy infrastructure campus."
   ],
   "capacity_gw_evidence": [
    "Its official site lists **more than 10 GW in development**, **100% behind-the-meter power**, **six energy sources**, and planned rack densities above **60 kW per rack**.",
    "\u2022 Planned for **more than 10 GW** of total power capacity."
   ],
   "builder_evidence": [
    "**Creekstone Energy** is a Utah-based **AI data center power infrastructure and hyperscale campus developer**focused on purpose-built data centers with integrated behind-the-meter generation."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Its official site lists **more than 10 GW in development**, **100% behind-the-meter power**, **six energy sources**, and planned rack densities above **60 kW per rack**."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mlq.ai/data-centers?status=planned",
   "title": "Frontier tech research, news & data",
   "published_at": null,
   "project": "Tract Caldwell Valley Technology Park",
   "locality": "Uhland",
   "state": "Texas",
   "capacity_gw": 4.0,
   "builder": "Tract",
   "ai_customer": "",
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Tract Caldwell Valley Technology Park | [Tract](/data-centers/operators/tract/) | Uhland, Texas \u00b7 USA | 4000 | \u2014 | Yes | Planned |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Tract Caldwell Valley Technology Park | [Tract](/data-centers/operators/tract/) | Uhland, Texas \u00b7 USA | 4000 | \u2014 | Yes | Planned |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Tract Caldwell Valley Technology Park | [Tract](/data-centers/operators/tract/) | Uhland, Texas \u00b7 USA | 4000 | \u2014 | Yes | Planned |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Tract Caldwell Valley Technology Park | [Tract](/data-centers/operators/tract/) | Uhland, Texas \u00b7 USA | 4000 | \u2014 | Yes | Planned |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Tract Caldwell Valley Technology Park | [Tract](/data-centers/operators/tract/) | Uhland, Texas \u00b7 USA | 4000 | \u2014 | Yes | Planned |"
   ],
   "ai_customer_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Tract Caldwell Valley Technology Park | [Tract](/data-centers/operators/tract/) | Uhland, Texas \u00b7 USA | 4000 | \u2014 | Yes | Planned |"
   ],
   "status_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Tract Caldwell Valley Technology Park | [Tract](/data-centers/operators/tract/) | Uhland, Texas \u00b7 USA | 4000 | \u2014 | Yes | Planned |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mlq.ai/data-centers?status=planned",
   "title": "Frontier tech research, news & data",
   "published_at": null,
   "project": "Project Jupiter",
   "locality": "Santa Teresa area",
   "state": "New Mexico",
   "capacity_gw": 2.45,
   "builder": "Oracle Cloud Infrastructure / BorderPlex Digital Assets",
   "ai_customer": "",
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Project Jupiter | [Oracle Cloud Infrastructure / BorderPlex Digital Assets](/data-centers/operators/oracle-cloud-infrastructure-borderplex-digital-assets/) | Santa Teresa area, New Mexico \u00b7 USA | 2450 | AI | Yes | Planned |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Project Jupiter | [Oracle Cloud Infrastructure / BorderPlex Digital Assets](/data-centers/operators/oracle-cloud-infrastructure-borderplex-digital-assets/) | Santa Teresa area, New Mexico \u00b7 USA | 2450 | AI | Yes | Planned |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Project Jupiter | [Oracle Cloud Infrastructure / BorderPlex Digital Assets](/data-centers/operators/oracle-cloud-infrastructure-borderplex-digital-assets/) | Santa Teresa area, New Mexico \u00b7 USA | 2450 | AI | Yes | Planned |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Project Jupiter | [Oracle Cloud Infrastructure / BorderPlex Digital Assets](/data-centers/operators/oracle-cloud-infrastructure-borderplex-digital-assets/) | Santa Teresa area, New Mexico \u00b7 USA | 2450 | AI | Yes | Planned |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Project Jupiter | [Oracle Cloud Infrastructure / BorderPlex Digital Assets](/data-centers/operators/oracle-cloud-infrastructure-borderplex-digital-assets/) | Santa Teresa area, New Mexico \u00b7 USA | 2450 | AI | Yes | Planned |"
   ],
   "ai_customer_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Project Jupiter | [Oracle Cloud Infrastructure / BorderPlex Digital Assets](/data-centers/operators/oracle-cloud-infrastructure-borderplex-digital-assets/) | Santa Teresa area, New Mexico \u00b7 USA | 2450 | AI | Yes | Planned |"
   ],
   "status_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Project Jupiter | [Oracle Cloud Infrastructure / BorderPlex Digital Assets](/data-centers/operators/oracle-cloud-infrastructure-borderplex-digital-assets/) | Santa Teresa area, New Mexico \u00b7 USA | 2450 | AI | Yes | Planned |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mlq.ai/data-centers?status=planned",
   "title": "Frontier tech research, news & data",
   "published_at": null,
   "project": "Hanover Technology Park",
   "locality": "Hanover",
   "state": "Virginia",
   "capacity_gw": 2.4,
   "builder": "Tract",
   "ai_customer": "",
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Hanover Technology Park | [Tract](/data-centers/operators/tract/) | Hanover, Virginia \u00b7 USA | 2400 | \u2014 | Yes | Planned |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Hanover Technology Park | [Tract](/data-centers/operators/tract/) | Hanover, Virginia \u00b7 USA | 2400 | \u2014 | Yes | Planned |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Hanover Technology Park | [Tract](/data-centers/operators/tract/) | Hanover, Virginia \u00b7 USA | 2400 | \u2014 | Yes | Planned |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Hanover Technology Park | [Tract](/data-centers/operators/tract/) | Hanover, Virginia \u00b7 USA | 2400 | \u2014 | Yes | Planned |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Hanover Technology Park | [Tract](/data-centers/operators/tract/) | Hanover, Virginia \u00b7 USA | 2400 | \u2014 | Yes | Planned |"
   ],
   "ai_customer_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Hanover Technology Park | [Tract](/data-centers/operators/tract/) | Hanover, Virginia \u00b7 USA | 2400 | \u2014 | Yes | Planned |"
   ],
   "status_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Hanover Technology Park | [Tract](/data-centers/operators/tract/) | Hanover, Virginia \u00b7 USA | 2400 | \u2014 | Yes | Planned |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mlq.ai/data-centers?status=planned",
   "title": "Frontier tech research, news & data",
   "published_at": null,
   "project": "PowerHouse Joliet",
   "locality": "Joliet",
   "state": "Illinois",
   "capacity_gw": 1.8,
   "builder": "PowerHouse Data Centers",
   "ai_customer": "",
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| PowerHouse Joliet | [PowerHouse Data Centers](/data-centers/operators/powerhouse-data-centers/) | Joliet, Illinois \u00b7 USA | 1800 | AI | Yes | Planned |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| PowerHouse Joliet | [PowerHouse Data Centers](/data-centers/operators/powerhouse-data-centers/) | Joliet, Illinois \u00b7 USA | 1800 | AI | Yes | Planned |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| PowerHouse Joliet | [PowerHouse Data Centers](/data-centers/operators/powerhouse-data-centers/) | Joliet, Illinois \u00b7 USA | 1800 | AI | Yes | Planned |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| PowerHouse Joliet | [PowerHouse Data Centers](/data-centers/operators/powerhouse-data-centers/) | Joliet, Illinois \u00b7 USA | 1800 | AI | Yes | Planned |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| PowerHouse Joliet | [PowerHouse Data Centers](/data-centers/operators/powerhouse-data-centers/) | Joliet, Illinois \u00b7 USA | 1800 | AI | Yes | Planned |"
   ],
   "ai_customer_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| PowerHouse Joliet | [PowerHouse Data Centers](/data-centers/operators/powerhouse-data-centers/) | Joliet, Illinois \u00b7 USA | 1800 | AI | Yes | Planned |"
   ],
   "status_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| PowerHouse Joliet | [PowerHouse Data Centers](/data-centers/operators/powerhouse-data-centers/) | Joliet, Illinois \u00b7 USA | 1800 | AI | Yes | Planned |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mlq.ai/data-centers?status=planned",
   "title": "Frontier tech research, news & data",
   "published_at": null,
   "project": "Project Jade Cheyenne AI Factory",
   "locality": "Cheyenne",
   "state": "Wyoming",
   "capacity_gw": 1.8,
   "builder": "Undisclosed large-load customer / Tallgrass / Black Hills Energy",
   "ai_customer": "",
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Project Jade Cheyenne AI Factory | [Undisclosed large-load customer / Tallgrass / Black Hills Energy](/data-centers/operators/undisclosed-large-load-customer-tallgrass-black-hills-energy/) | Cheyenne, Wyoming \u00b7 USA | 1800 | AI | Yes | Planned |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Project Jade Cheyenne AI Factory | [Undisclosed large-load customer / Tallgrass / Black Hills Energy](/data-centers/operators/undisclosed-large-load-customer-tallgrass-black-hills-energy/) | Cheyenne, Wyoming \u00b7 USA | 1800 | AI | Yes | Planned |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Project Jade Cheyenne AI Factory | [Undisclosed large-load customer / Tallgrass / Black Hills Energy](/data-centers/operators/undisclosed-large-load-customer-tallgrass-black-hills-energy/) | Cheyenne, Wyoming \u00b7 USA | 1800 | AI | Yes | Planned |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Project Jade Cheyenne AI Factory | [Undisclosed large-load customer / Tallgrass / Black Hills Energy](/data-centers/operators/undisclosed-large-load-customer-tallgrass-black-hills-energy/) | Cheyenne, Wyoming \u00b7 USA | 1800 | AI | Yes | Planned |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Project Jade Cheyenne AI Factory | [Undisclosed large-load customer / Tallgrass / Black Hills Energy](/data-centers/operators/undisclosed-large-load-customer-tallgrass-black-hills-energy/) | Cheyenne, Wyoming \u00b7 USA | 1800 | AI | Yes | Planned |"
   ],
   "ai_customer_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Project Jade Cheyenne AI Factory | [Undisclosed large-load customer / Tallgrass / Black Hills Energy](/data-centers/operators/undisclosed-large-load-customer-tallgrass-black-hills-energy/) | Cheyenne, Wyoming \u00b7 USA | 1800 | AI | Yes | Planned |"
   ],
   "status_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Project Jade Cheyenne AI Factory | [Undisclosed large-load customer / Tallgrass / Black Hills Energy](/data-centers/operators/undisclosed-large-load-customer-tallgrass-black-hills-energy/) | Cheyenne, Wyoming \u00b7 USA | 1800 | AI | Yes | Planned |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mlq.ai/data-centers?status=planned",
   "title": "Frontier tech research, news & data",
   "published_at": null,
   "project": "Tract Buckeye Technology Park",
   "locality": "Buckeye",
   "state": "Arizona",
   "capacity_gw": 1.8,
   "builder": "Tract",
   "ai_customer": "",
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Tract Buckeye Technology Park | [Tract](/data-centers/operators/tract/) | Buckeye, Arizona \u00b7 USA | 1800 | \u2014 | Yes | Planned |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Tract Buckeye Technology Park | [Tract](/data-centers/operators/tract/) | Buckeye, Arizona \u00b7 USA | 1800 | \u2014 | Yes | Planned |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Tract Buckeye Technology Park | [Tract](/data-centers/operators/tract/) | Buckeye, Arizona \u00b7 USA | 1800 | \u2014 | Yes | Planned |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Tract Buckeye Technology Park | [Tract](/data-centers/operators/tract/) | Buckeye, Arizona \u00b7 USA | 1800 | \u2014 | Yes | Planned |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Tract Buckeye Technology Park | [Tract](/data-centers/operators/tract/) | Buckeye, Arizona \u00b7 USA | 1800 | \u2014 | Yes | Planned |"
   ],
   "ai_customer_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Tract Buckeye Technology Park | [Tract](/data-centers/operators/tract/) | Buckeye, Arizona \u00b7 USA | 1800 | \u2014 | Yes | Planned |"
   ],
   "status_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Tract Buckeye Technology Park | [Tract](/data-centers/operators/tract/) | Buckeye, Arizona \u00b7 USA | 1800 | \u2014 | Yes | Planned |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mlq.ai/data-centers?status=planned",
   "title": "Frontier tech research, news & data",
   "published_at": null,
   "project": "Hedgehog Rice Power and Data Campus",
   "locality": "Rice",
   "state": "Texas",
   "capacity_gw": 1.5,
   "builder": "Hedgehog USA",
   "ai_customer": "",
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Hedgehog Rice Power and Data Campus | [Hedgehog USA](/data-centers/operators/hedgehog-usa/) | Rice, Texas \u00b7 USA | 1500 | AI | Yes | Planned |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Hedgehog Rice Power and Data Campus | [Hedgehog USA](/data-centers/operators/hedgehog-usa/) | Rice, Texas \u00b7 USA | 1500 | AI | Yes | Planned |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Hedgehog Rice Power and Data Campus | [Hedgehog USA](/data-centers/operators/hedgehog-usa/) | Rice, Texas \u00b7 USA | 1500 | AI | Yes | Planned |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Hedgehog Rice Power and Data Campus | [Hedgehog USA](/data-centers/operators/hedgehog-usa/) | Rice, Texas \u00b7 USA | 1500 | AI | Yes | Planned |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Hedgehog Rice Power and Data Campus | [Hedgehog USA](/data-centers/operators/hedgehog-usa/) | Rice, Texas \u00b7 USA | 1500 | AI | Yes | Planned |"
   ],
   "ai_customer_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Hedgehog Rice Power and Data Campus | [Hedgehog USA](/data-centers/operators/hedgehog-usa/) | Rice, Texas \u00b7 USA | 1500 | AI | Yes | Planned |"
   ],
   "status_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| Hedgehog Rice Power and Data Campus | [Hedgehog USA](/data-centers/operators/hedgehog-usa/) | Rice, Texas \u00b7 USA | 1500 | AI | Yes | Planned |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mlq.ai/data-centers?status=planned",
   "title": "Frontier tech research, news & data",
   "published_at": null,
   "project": "EdgeCore Louisa County",
   "locality": "Louisa County",
   "state": "Virginia",
   "capacity_gw": 1.1,
   "builder": "EdgeCore",
   "ai_customer": "",
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| EdgeCore Louisa County | [EdgeCore](/data-centers/operators/edgecore/) | Louisa County, Virginia \u00b7 USA | 1100 | AI | Yes | Planned |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| EdgeCore Louisa County | [EdgeCore](/data-centers/operators/edgecore/) | Louisa County, Virginia \u00b7 USA | 1100 | AI | Yes | Planned |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| EdgeCore Louisa County | [EdgeCore](/data-centers/operators/edgecore/) | Louisa County, Virginia \u00b7 USA | 1100 | AI | Yes | Planned |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| EdgeCore Louisa County | [EdgeCore](/data-centers/operators/edgecore/) | Louisa County, Virginia \u00b7 USA | 1100 | AI | Yes | Planned |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| EdgeCore Louisa County | [EdgeCore](/data-centers/operators/edgecore/) | Louisa County, Virginia \u00b7 USA | 1100 | AI | Yes | Planned |"
   ],
   "ai_customer_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| EdgeCore Louisa County | [EdgeCore](/data-centers/operators/edgecore/) | Louisa County, Virginia \u00b7 USA | 1100 | AI | Yes | Planned |"
   ],
   "status_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| EdgeCore Louisa County | [EdgeCore](/data-centers/operators/edgecore/) | Louisa County, Virginia \u00b7 USA | 1100 | AI | Yes | Planned |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mlq.ai/data-centers?status=planned",
   "title": "Frontier tech research, news & data",
   "published_at": null,
   "project": "COPT Van Meter Data Center Shell Campus",
   "locality": "Van Meter",
   "state": "Iowa",
   "capacity_gw": 1.0,
   "builder": "COPT Defense Properties",
   "ai_customer": "",
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| COPT Van Meter Data Center Shell Campus | [COPT Defense Properties](/data-centers/operators/copt-defense-properties/) | Van Meter, Iowa \u00b7 USA | 1000 | AI | \u2014 | Planned |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| COPT Van Meter Data Center Shell Campus | [COPT Defense Properties](/data-centers/operators/copt-defense-properties/) | Van Meter, Iowa \u00b7 USA | 1000 | AI | \u2014 | Planned |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| COPT Van Meter Data Center Shell Campus | [COPT Defense Properties](/data-centers/operators/copt-defense-properties/) | Van Meter, Iowa \u00b7 USA | 1000 | AI | \u2014 | Planned |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| COPT Van Meter Data Center Shell Campus | [COPT Defense Properties](/data-centers/operators/copt-defense-properties/) | Van Meter, Iowa \u00b7 USA | 1000 | AI | \u2014 | Planned |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| COPT Van Meter Data Center Shell Campus | [COPT Defense Properties](/data-centers/operators/copt-defense-properties/) | Van Meter, Iowa \u00b7 USA | 1000 | AI | \u2014 | Planned |"
   ],
   "ai_customer_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| COPT Van Meter Data Center Shell Campus | [COPT Defense Properties](/data-centers/operators/copt-defense-properties/) | Van Meter, Iowa \u00b7 USA | 1000 | AI | \u2014 | Planned |"
   ],
   "status_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| COPT Van Meter Data Center Shell Campus | [COPT Defense Properties](/data-centers/operators/copt-defense-properties/) | Van Meter, Iowa \u00b7 USA | 1000 | AI | \u2014 | Planned |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://mlq.ai/data-centers?status=planned",
   "title": "Frontier tech research, news & data",
   "published_at": null,
   "project": "ECL TerraSite-TX1",
   "locality": "Houston",
   "state": "Texas",
   "capacity_gw": 1.0,
   "builder": "ECL",
   "ai_customer": "",
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| ECL TerraSite-TX1 | [ECL](/data-centers/operators/ecl/) | Houston, Texas \u00b7 USA | 1000 | AI | \u2014 | Planned |"
   ],
   "locality_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| ECL TerraSite-TX1 | [ECL](/data-centers/operators/ecl/) | Houston, Texas \u00b7 USA | 1000 | AI | \u2014 | Planned |"
   ],
   "state_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| ECL TerraSite-TX1 | [ECL](/data-centers/operators/ecl/) | Houston, Texas \u00b7 USA | 1000 | AI | \u2014 | Planned |"
   ],
   "capacity_gw_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| ECL TerraSite-TX1 | [ECL](/data-centers/operators/ecl/) | Houston, Texas \u00b7 USA | 1000 | AI | \u2014 | Planned |"
   ],
   "builder_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| ECL TerraSite-TX1 | [ECL](/data-centers/operators/ecl/) | Houston, Texas \u00b7 USA | 1000 | AI | \u2014 | Planned |"
   ],
   "ai_customer_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| ECL TerraSite-TX1 | [ECL](/data-centers/operators/ecl/) | Houston, Texas \u00b7 USA | 1000 | AI | \u2014 | Planned |"
   ],
   "status_evidence": [
    "| Facility | Operator | Location | Power (MW) | AI | Filings | Status |",
    "| ECL TerraSite-TX1 | [ECL](/data-centers/operators/ecl/) | Houston, Texas \u00b7 USA | 1000 | AI | \u2014 | Planned |"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://cleanview.co/data-centers/nyiso/2260/nexus-hubbard---expansion",
   "title": "Nexus Hubbard - Expansion \u2014 Hill, Texas",
   "published_at": null,
   "project": "Nexus Hubbard - Expansion",
   "locality": "Hill",
   "state": "Texas",
   "capacity_gw": 7.2,
   "builder": "Nexus Data Centers",
   "ai_customer": null,
   "status": "Planned",
   "announcement_date": null,
   "project_evidence": [
    "Nexus Hubbard - Expansion \u2014 Hill, Texas",
    "# Nexus Hubbard - Expansion",
    "Nexus Hubbard - Expansion is a planned data center located in Hill, Texas."
   ],
   "locality_evidence": [
    "Nexus Hubbard - Expansion \u2014 Hill, Texas",
    "Nexus Hubbard - Expansion is a planned data center located in Hill, Texas.",
    "County\n\nHill"
   ],
   "state_evidence": [
    "Nexus Hubbard - Expansion \u2014 Hill, Texas",
    "Nexus Hubbard - Expansion is a planned data center located in Hill, Texas.",
    "State\n\nTexas"
   ],
   "capacity_gw_evidence": [
    "Nexus Hubbard - Expansion \u2014 Hill, Texas",
    "Nexus Hubbard - Expansion is a planned data center located in Hill, Texas.",
    "It will have a capacity of 7,200 MW.",
    "Capacity\n\n7,200 MW"
   ],
   "builder_evidence": [
    "Nexus Hubbard - Expansion \u2014 Hill, Texas",
    "Being developed by Nexus Data Centers",
    "Nexus Hubbard - Expansion is a planned data center located in Hill, Texas.",
    "Developer\n\nNexus Data Centers"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Nexus Hubbard - Expansion \u2014 Hill, Texas",
    "Nexus Hubbard - Expansion is a planned data center located in Hill, Texas.",
    "Status\n\nPlanned"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://thenewsink.com/nvidias-openai-data-centre-bet",
   "title": "Nvidia OpenAI Data Center: 7 Critical Reasons $105B Bet Matters - The News Ink\u2122 | World News | Sports | Technology | Business",
   "published_at": "2026-08-17T18:13:41",
   "project": "PORTS-Pike Technology Campus",
   "locality": "Pike County",
   "state": "Ohio",
   "capacity_gw": 8.0,
   "builder": "SB Energy",
   "ai_customer": "OpenAI",
   "status": "planned",
   "announcement_date": null,
   "project_evidence": [
    "# Nvidia\u2019s $105 Billion OpenAI Bet: Why the Massive Ohio AI Data Center Deal Matters",
    "Nvidia has agreed to provide up to $105 billion in guarantees connected to OpenAI\u2019s long-term lease at the PORTS-Pike Technology Campus in Pike County, Ohio, while also investing $1.5 billion in developer SB Energy.",
    "| Location | PORTS-Pike Technology Campus, Pike County, Ohio |"
   ],
   "locality_evidence": [
    "# Nvidia\u2019s $105 Billion OpenAI Bet: Why the Massive Ohio AI Data Center Deal Matters",
    "Nvidia has agreed to provide up to $105 billion in guarantees connected to OpenAI\u2019s long-term lease at the PORTS-Pike Technology Campus in Pike County, Ohio, while also investing $1.5 billion in developer SB Energy.",
    "| Location | PORTS-Pike Technology Campus, Pike County, Ohio |"
   ],
   "state_evidence": [
    "# Nvidia\u2019s $105 Billion OpenAI Bet: Why the Massive Ohio AI Data Center Deal Matters",
    "Nvidia has agreed to provide up to $105 billion in guarantees connected to OpenAI\u2019s long-term lease at the PORTS-Pike Technology Campus in Pike County, Ohio, while also investing $1.5 billion in developer SB Energy.",
    "| Location | PORTS-Pike Technology Campus, Pike County, Ohio |"
   ],
   "capacity_gw_evidence": [
    "# Nvidia\u2019s $105 Billion OpenAI Bet: Why the Massive Ohio AI Data Center Deal Matters",
    "The project is designed to provide OpenAI with roughly 8 gigawatts of IT capacity over time.",
    "| OpenAI capacity | Approximately 8 IT-GW |"
   ],
   "builder_evidence": [
    "# Nvidia\u2019s $105 Billion OpenAI Bet: Why the Massive Ohio AI Data Center Deal Matters",
    "Nvidia has agreed to provide up to $105 billion in guarantees connected to OpenAI\u2019s long-term lease at the PORTS-Pike Technology Campus in Pike County, Ohio, while also investing $1.5 billion in developer SB Energy.",
    "The Nvidia OpenAI data center is being developed by [SB Energy](https://sbenergy.com/nvidia-ai-compute-ports-pike-ohio/), which will build, own and operate the facility."
   ],
   "ai_customer_evidence": [
    "# Nvidia\u2019s $105 Billion OpenAI Bet: Why the Massive Ohio AI Data Center Deal Matters",
    "Nvidia has agreed to provide up to $105 billion in guarantees connected to OpenAI\u2019s long-term lease at the PORTS-Pike Technology Campus in Pike County, Ohio, while also investing $1.5 billion in developer SB Energy.",
    "The project is designed to provide OpenAI with roughly 8 gigawatts of IT capacity over time.",
    "Nvidia will be the exclusive AI compute infrastructure provider for the initial deployment, while OpenAI will use the capacity as the customer."
   ],
   "status_evidence": [
    "# Nvidia\u2019s $105 Billion OpenAI Bet: Why the Massive Ohio AI Data Center Deal Matters",
    "The project is designed to provide OpenAI with roughly 8 gigawatts of IT capacity over time.",
    "OpenAI says capacity will arrive in phases beginning in **2028**, while its projected six-year construction period extends through 2032."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://intuitionlabs.ai/pdfs/oracle-openai-s-300b-deal-ai-infrastructure-analysis.pdf",
   "title": "Oracle & OpenAI's $300B Deal: AI Infrastructure Analysis",
   "published_at": "2025-11-26T13:57:00",
   "project": "Abilene",
   "locality": "Abilene",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "Crusoe",
   "ai_customer": "OpenAI",
   "status": "fully operational",
   "announcement_date": null,
   "project_evidence": [
    "Progress and Implementation (to Dec 2025)",
    "Abilene, Texas \u2013 Primary U.S. Site (Now Live): The first large Stargate facility is fully operational in Abilene, TX, running on Oracle Cloud\n\nInfrastructure."
   ],
   "locality_evidence": [
    "Progress and Implementation (to Dec 2025)",
    "Abilene, Texas \u2013 Primary U.S. Site (Now Live): The first large Stargate facility is fully operational in Abilene, TX, running on Oracle Cloud\n\nInfrastructure."
   ],
   "state_evidence": [
    "Progress and Implementation (to Dec 2025)",
    "Abilene, Texas \u2013 Primary U.S. Site (Now Live): The first large Stargate facility is fully operational in Abilene, TX, running on Oracle Cloud\n\nInfrastructure."
   ],
   "capacity_gw_evidence": [
    "Progress and Implementation (to Dec 2025)",
    "The campus spans approximately 4 million square feet with a total power capacity of\n\n1.2 GW, with full campus completion expected by mid-2026."
   ],
   "builder_evidence": [
    "Progress and Implementation (to Dec 2025)",
    "For example, Oracle and Crusoe\n\nare expanding an Abilene, Texas campus (initially 2 buildings) to eventually 8 buildings ([39] www.reuters.com)."
   ],
   "ai_customer_evidence": [
    "Progress and Implementation (to Dec 2025)",
    "For example, Oracle and Crusoe\n\nare expanding an Abilene, Texas campus (initially 2 buildings) to eventually 8 buildings ([39] www.reuters.com)."
   ],
   "status_evidence": [
    "Progress and Implementation (to Dec 2025)",
    "Abilene, Texas \u2013 Primary U.S. Site (Now Live): The first large Stargate facility is fully operational in Abilene, TX, running on Oracle Cloud\n\nInfrastructure."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://intuitionlabs.ai/pdfs/oracle-openai-s-300b-deal-ai-infrastructure-analysis.pdf",
   "title": "Oracle & OpenAI's $300B Deal: AI Infrastructure Analysis",
   "published_at": "2025-11-26T13:57:00",
   "project": "Milam County campus",
   "locality": "Milam County",
   "state": "Texas",
   "capacity_gw": 1.2,
   "builder": "SB Energy",
   "ai_customer": null,
   "status": "developing",
   "announcement_date": null,
   "project_evidence": [
    "Progress and Implementation (to Dec 2025)",
    "The Milam\n\nCounty, Texas campus is being developed by SB Energy (a SoftBank Group company), providing a 1.2 GW powered infrastructure site\n\nwith initial facilities expected to enter service in 2026."
   ],
   "locality_evidence": [
    "Progress and Implementation (to Dec 2025)",
    "The Milam\n\nCounty, Texas campus is being developed by SB Energy (a SoftBank Group company), providing a 1.2 GW powered infrastructure site\n\nwith initial facilities expected to enter service in 2026."
   ],
   "state_evidence": [
    "Progress and Implementation (to Dec 2025)",
    "The Milam\n\nCounty, Texas campus is being developed by SB Energy (a SoftBank Group company), providing a 1.2 GW powered infrastructure site\n\nwith initial facilities expected to enter service in 2026."
   ],
   "capacity_gw_evidence": [
    "Progress and Implementation (to Dec 2025)",
    "The Milam\n\nCounty, Texas campus is being developed by SB Energy (a SoftBank Group company), providing a 1.2 GW powered infrastructure site\n\nwith initial facilities expected to enter service in 2026."
   ],
   "builder_evidence": [
    "Progress and Implementation (to Dec 2025)",
    "The Milam\n\nCounty, Texas campus is being developed by SB Energy (a SoftBank Group company), providing a 1.2 GW powered infrastructure site\n\nwith initial facilities expected to enter service in 2026."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Progress and Implementation (to Dec 2025)",
    "The Milam\n\nCounty, Texas campus is being developed by SB Energy (a SoftBank Group company), providing a 1.2 GW powered infrastructure site\n\nwith initial facilities expected to enter service in 2026."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterlocations.com/aws/usa",
   "title": "AWS Data Center in USA | Colocation, Cloud & AI Data Centers",
   "published_at": "2026-08-04T04:05:19",
   "project": "Project Rainier",
   "locality": "New Carlisle",
   "state": "Indiana",
   "capacity_gw": null,
   "builder": "AWS",
   "ai_customer": "Anthropic",
   "status": "fully operational",
   "announcement_date": null,
   "project_evidence": [
    "AWS Data Centers in USA",
    "## AWS AI Data Centers in USA",
    "- [New Carlisle, USA](/aws/new-carlisle/) Project Rainier AI DATA CENTER PENDING REVIEW"
   ],
   "locality_evidence": [
    "AWS Data Centers in USA",
    "## AWS AI Data Centers in USA",
    "- [New Carlisle, USA](/aws/new-carlisle/) Project Rainier AI DATA CENTER PENDING REVIEW"
   ],
   "state_evidence": [
    "AWS Data Centers in USA",
    "- [Indiana](/aws/usa/indiana/) ([New Carlisle](/aws/new-carlisle/))",
    "## AWS AI Data Centers in USA",
    "Project Rainier is a roughly $11 billion, 1,200-acre AI supercomputing campus that went fully operational in October 2025, running nearly 500,000 AWS Trainium2 chips dedicated to training Anthropic's Claude models."
   ],
   "capacity_gw_evidence": null,
   "builder_evidence": [
    "AWS Data Centers in USA",
    "AWS currently has confirmed facilities in 6 cities within USA.",
    "## AWS AI Data Centers in USA",
    "Project Rainier is a roughly $11 billion, 1,200-acre AI supercomputing campus that went fully operational in October 2025, running nearly 500,000 AWS Trainium2 chips dedicated to training Anthropic's Claude models."
   ],
   "ai_customer_evidence": [
    "AWS Data Centers in USA",
    "## AWS AI Data Centers in USA",
    "Project Rainier is a roughly $11 billion, 1,200-acre AI supercomputing campus that went fully operational in October 2025, running nearly 500,000 AWS Trainium2 chips dedicated to training Anthropic's Claude models."
   ],
   "status_evidence": [
    "AWS Data Centers in USA",
    "## AWS AI Data Centers in USA",
    "Project Rainier is a roughly $11 billion, 1,200-acre AI supercomputing campus that went fully operational in October 2025, running nearly 500,000 AWS Trainium2 chips dedicated to training Anthropic's Claude models."
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://datacenterlocations.com/aws/usa",
   "title": "AWS Data Center in USA | Colocation, Cloud & AI Data Centers",
   "published_at": "2026-08-04T04:05:19",
   "project": "Project Rainier",
   "locality": "Canton",
   "state": "Mississippi",
   "capacity_gw": 1.0,
   "builder": "AWS",
   "ai_customer": null,
   "status": "pending review",
   "announcement_date": null,
   "project_evidence": [
    "AWS Data Centers in USA",
    "## AWS AI Data Centers in USA",
    "- [Canton, USA](/aws/canton/) Project Rainier (Mississippi campus) AI DATA CENTER PENDING REVIEW"
   ],
   "locality_evidence": [
    "AWS Data Centers in USA",
    "## AWS AI Data Centers in USA",
    "- [Canton, USA](/aws/canton/) Project Rainier (Mississippi campus) AI DATA CENTER PENDING REVIEW"
   ],
   "state_evidence": [
    "AWS Data Centers in USA",
    "- [Mississippi](/aws/usa/mississippi/) ([Canton](/aws/canton/))",
    "## AWS AI Data Centers in USA",
    "- [Canton, USA](/aws/canton/) Project Rainier (Mississippi campus) AI DATA CENTER PENDING REVIEW"
   ],
   "capacity_gw_evidence": [
    "AWS Data Centers in USA",
    "## AWS AI Data Centers in USA",
    "This companion Project Rainier campus in Madison County already exceeded 350 MW of Trainium2-based AI IT capacity as of late 2025, with plans to scale past 1 GW."
   ],
   "builder_evidence": [
    "AWS Data Centers in USA",
    "AWS currently has confirmed facilities in 6 cities within USA.",
    "## AWS AI Data Centers in USA",
    "- [Canton, USA](/aws/canton/) Project Rainier (Mississippi campus) AI DATA CENTER PENDING REVIEW"
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "AWS Data Centers in USA",
    "## AWS AI Data Centers in USA",
    "- [Canton, USA](/aws/canton/) Project Rainier (Mississippi campus) AI DATA CENTER PENDING REVIEW"
   ],
   "announcement_date_evidence": null
  },
  {
   "url": "https://thegardnernews.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Colossus 2",
   "locality": "Memphis",
   "state": "Tennessee",
   "capacity_gw": 1.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "active construction still on site",
   "announcement_date": "2025-03-01",
   "project_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "locality_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "state_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)",
    "It has been a very [busy 18 months for Elon Musk's xAI](/story/money/business/development/2025/06/05/elon-musk-xai-supercomputer-grok-memphis-tn/83599473007/) since the company first announced plans for its Memphis data center in June 2024."
   ],
   "capacity_gw_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)"
   ],
   "builder_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "The site is expected to require more than a gigawatt of electricity, and in May 2025, Musk called it [the \"first gigawatt AI training supercluster.\"](/story/money/business/development/2025/07/15/elon-musk-xai-in-memphis-colossus-2/85215548007/)",
    "- Elon Musk's xAI has acquired over 1,156 acres of land in the Memphis area for its data centers."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "Colossus 2 is a bit more straightforward than the Paul R. Lowry Road complex.",
    "The Tulane Road site is an artificial intelligence data center, with active construction still on site."
   ],
   "announcement_date_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Colossus 2 | Tulane Road, Memphis",
    "In March 2025, the Greater Memphis Chamber announced xAI's plans for a second campus and its purchase of a 1 million-square-foot building."
   ]
  },
  {
   "url": "https://thegardnernews.com/story/money/business/development/2026/01/15/xai-elon-musk-campuses-memphis-southaven/88066070007",
   "title": "How big is xAI's presence in Memphis area? A guide to its 3 campuses",
   "published_at": "2026-01-15T11:02:44",
   "project": "Macrohardrr",
   "locality": "Southaven",
   "state": "Mississippi",
   "capacity_gw": 2.0,
   "builder": "xAI",
   "ai_customer": null,
   "status": "under construction",
   "announcement_date": "2025-12-30",
   "project_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "locality_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "state_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity.",
    "In July 2025, MZX Tech LLC, an xAI affiliate, purchased the[ power plant and corresponding 114.49 acres of land surrounding the facility](/story/money/business/development/2025/07/18/xai-elon-musk-company-buys-southaven-mississippi-property-colossus-2-memphis-tn/85274193007/)."
   ],
   "capacity_gw_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ],
   "builder_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity.",
    "- Elon Musk's xAI has acquired over 1,156 acres of land in the Memphis area for its data centers."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "Aside from Musk's Dec. 30 post, no official plans or details for the third detail center have been released.",
    "The former Duke Energy site has been under construction with gas turbines on site for powering xAI data centers."
   ],
   "announcement_date_evidence": [
    "# How big is xAI's presence in Memphis area? A guide to its 3 campuses",
    "Here is a look at the three primary xAI campuses in the Mid-South.",
    "## Marcrohardrr | Southaven",
    "On Dec. 30, Musk, via a post on X, confirmed the purchase of a third building called \"MACROHARDRR\" and plans to bring xAI's training compute up to 2 gigawatts of electricity."
   ]
  },
  {
   "url": "https://vantage-dc.com/wp-content/uploads/2025/08/VDC_DataSheet_Frontier.pdf",
   "title": "VDC_DataSheet_Frontier_EN",
   "published_at": "2025-08-19T00:35:25",
   "project": "False",
   "locality": "Shackelford County",
   "state": "Texas",
   "capacity_gw": 1.4,
   "builder": "Vantage",
   "ai_customer": null,
   "status": null,
   "announcement_date": null,
   "project_evidence": null,
   "locality_evidence": [
    "WWW.VANTAGE-DC.COM",
    "SHACKELFORD COUNTY, TEXAS DATA CENTER CAMPUS OVERVIEW",
    "\u2022  1,200-acre campus",
    "SHACKELFORD COUNTY, TEXAS DATA CENTER CAMPUS OVERVIEW "
   ],
   "state_evidence": [
    "WWW.VANTAGE-DC.COM",
    "SHACKELFORD COUNTY, TEXAS DATA CENTER CAMPUS OVERVIEW",
    "\u2022  1,200-acre campus",
    "A Mega-Campus in the Lone Star State to Meet Unprecedented AI Demand ",
    "SHACKELFORD COUNTY, TEXAS DATA CENTER CAMPUS OVERVIEW "
   ],
   "capacity_gw_evidence": [
    "WWW.VANTAGE-DC.COM",
    "SHACKELFORD COUNTY, TEXAS DATA CENTER CAMPUS OVERVIEW",
    "\u2022  1.4GW of critical IT load",
    "SHACKELFORD COUNTY, TEXAS DATA CENTER CAMPUS OVERVIEW "
   ],
   "builder_evidence": [
    "WWW.VANTAGE-DC.COM",
    "SHACKELFORD COUNTY, TEXAS DATA CENTER CAMPUS OVERVIEW",
    "\u2022  1,200-acre campus",
    "SHACKELFORD COUNTY, TEXAS DATA CENTER CAMPUS OVERVIEW "
   ],
   "ai_customer_evidence": null,
   "status_evidence": null,
   "announcement_date_evidence": null
  },
  {
   "url": "https://aiclasslab.com/powering-the-future-of-cre-ai-data-center-boom-ignites-new-opportunities-in-commercial-real-estate",
   "title": "Powering the Future of CRE: AI Data Center Boom Ignites New Opportunities in Commercial Real Estate",
   "published_at": "2025-05-02T12:57:47",
   "project": "Homer City Energy Campus",
   "locality": "Homer City",
   "state": "Pennsylvania",
   "capacity_gw": 4.5,
   "builder": "Homer City Redevelopment (HCR), Kiewit Power Constructors, and GE Vernova",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2025-04-02",
   "project_evidence": [
    "Powering the Future of CRE: AI Data Center Boom Ignites New Opportunities in Commercial Real Estate",
    "This $10+ billion project, transforming a 3,200-acre coal plant into the **Homer City Energy Campus**, a massive natural gas-powered data center hub, signals a paradigm shift with significant implications for CRE professionals."
   ],
   "locality_evidence": [
    "Powering the Future of CRE: AI Data Center Boom Ignites New Opportunities in Commercial Real Estate",
    "A compelling case in point is the ambitious redevelopment of the former Homer City Generating Station in Pennsylvania."
   ],
   "state_evidence": [
    "Powering the Future of CRE: AI Data Center Boom Ignites New Opportunities in Commercial Real Estate",
    "A compelling case in point is the ambitious redevelopment of the former Homer City Generating Station in Pennsylvania."
   ],
   "capacity_gw_evidence": [
    "Powering the Future of CRE: AI Data Center Boom Ignites New Opportunities in Commercial Real Estate",
    "The Homer City Energy Campus, poised to become the largest gas-powered plant in the U.S. with a staggering **4.5 GW power capacity**, is a direct response to the exponential energy demands of AI and high-performance computing (HPC)."
   ],
   "builder_evidence": [
    "Powering the Future of CRE: AI Data Center Boom Ignites New Opportunities in Commercial Real Estate",
    "The partnerships driving the Homer City project \u2013 Homer City Redevelopment (HCR), Kiewit Power Constructors, and GE Vernova \u2013 showcase the multidisciplinary nature of these developments."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "Powering the Future of CRE: AI Data Center Boom Ignites New Opportunities in Commercial Real Estate",
    "5. [GE Vernova to Supply Turbines for Homer City](https://www.reuters.com/business/energy/ge-vernova-supply-turbines-by-2026-planned-natgas-power-plant-pennsylvania-2025-04-02/)"
   ],
   "announcement_date_evidence": [
    "Powering the Future of CRE: AI Data Center Boom Ignites New Opportunities in Commercial Real Estate",
    "3. [Homer City to become gas-powered data center campus](https://www.axios.com/local/pittsburgh/2025/04/02/homer-city-coal-plant-ai-gas-conversion)"
   ]
  },
  {
   "url": "https://wfxg.com/online_features/press_releases/nscale-acquires-american-intelligence-power-corporation-creating-a-full-stack-ai-hyperscaler-integrated-from-energy/article_5c4e8cca-3fb3-581b-acfa-98dbba342b7a.html",
   "title": "Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
   "published_at": "2026-03-16T21:18:00",
   "project": "Monarch Compute Campus",
   "locality": "Mason County",
   "state": "West Virginia",
   "capacity_gw": 8.0,
   "builder": "Nscale",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-03-16",
   "project_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "locality_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "state_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "capacity_gw_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "- *Nscale Acquires the Monarch Compute Campus \u2014 America's First State-Certified AI Microgrid with a Potential of up to 8GW+ of Onsite Powered Microgrid*",
    "The acquisition secures the Monarch Compute Campus, a site with up to 2,250 acres in Mason County, West Virginia, and the United States' first state-certified AI microgrid with a power runway scalable to over 8 gigawatts."
   ],
   "builder_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026 /PRNewswire/ -- Nscale has signed an agreement to acquire American Intelligence & Power Corporation (\"AIPCorp\"), sponsored by Fidelis New Energy and 8090 Industries, including the Monarch Compute Campus in West Virginia \u2014 with [plans](http://www.nscale.com/press-releases/nscale-west-virginia-ai-factory) to build one of the world's largest AI Factories."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "Initial power capacity of 2 gigawatts is expected to be online by the first half of 2028 with an expansion to approximately 8 gigawatts planned for 2031."
   ],
   "announcement_date_evidence": [
    "# Nscale Acquires American Intelligence & Power Corporation, Creating a Full Stack AI Hyperscaler, Integrated from Energy to Compute",
    "SAN JOSE, Calif., March 16, 2026"
   ]
  },
  {
   "url": "https://joelmeister.substack.com/p/40000-acres-nine-gigawatts-one-question",
   "title": "40,000 Acres. Nine Gigawatts. One Question.",
   "published_at": "2026-04-28T02:47:55",
   "project": "Stratos",
   "locality": "Box Elder County",
   "state": "Utah",
   "capacity_gw": 9.0,
   "builder": "Kevin O\u2019Leary\u2019s development entity",
   "ai_customer": null,
   "status": "approved",
   "announcement_date": "2026-04",
   "project_evidence": [
    "# **Executive Summary**",
    "In April 2026, the Military Installation Development Authority (MIDA) approved a development framework for the Stratos project in Box Elder County, Utah, authorizing Kevin O\u2019Leary\u2019s development entity to build a nine-gigawatt hyperscale data center campus on 40,000 acres of rural land."
   ],
   "locality_evidence": [
    "# **Executive Summary**",
    "In April 2026, the Military Installation Development Authority (MIDA) approved a development framework for the Stratos project in Box Elder County, Utah, authorizing Kevin O\u2019Leary\u2019s development entity to build a nine-gigawatt hyperscale data center campus on 40,000 acres of rural land."
   ],
   "state_evidence": [
    "# **Executive Summary**",
    "In April 2026, the Military Installation Development Authority (MIDA) approved a development framework for the Stratos project in Box Elder County, Utah, authorizing Kevin O\u2019Leary\u2019s development entity to build a nine-gigawatt hyperscale data center campus on 40,000 acres of rural land."
   ],
   "capacity_gw_evidence": [
    "# **Executive Summary**",
    "In April 2026, the Military Installation Development Authority (MIDA) approved a development framework for the Stratos project in Box Elder County, Utah, authorizing Kevin O\u2019Leary\u2019s development entity to build a nine-gigawatt hyperscale data center campus on 40,000 acres of rural land."
   ],
   "builder_evidence": [
    "# **Executive Summary**",
    "In April 2026, the Military Installation Development Authority (MIDA) approved a development framework for the Stratos project in Box Elder County, Utah, authorizing Kevin O\u2019Leary\u2019s development entity to build a nine-gigawatt hyperscale data center campus on 40,000 acres of rural land."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# **Executive Summary**",
    "In April 2026, the Military Installation Development Authority (MIDA) approved a development framework for the Stratos project in Box Elder County, Utah, authorizing Kevin O\u2019Leary\u2019s development entity to build a nine-gigawatt hyperscale data center campus on 40,000 acres of rural land."
   ],
   "announcement_date_evidence": [
    "# **Executive Summary**",
    "In April 2026, the Military Installation Development Authority (MIDA) approved a development framework for the Stratos project in Box Elder County, Utah, authorizing Kevin O\u2019Leary\u2019s development entity to build a nine-gigawatt hyperscale data center campus on 40,000 acres of rural land."
   ]
  },
  {
   "url": "https://qz.com/openai-data-center-georgia-savannah-project-camellia-072226",
   "title": "OpenAI is building a $20 billion AI data center campus near Savannah, Georgia",
   "published_at": "2026-07-22T17:28:55",
   "project": "Project Camellia",
   "locality": "Savannah",
   "state": "Georgia",
   "capacity_gw": 3.2,
   "builder": "OpenAI",
   "ai_customer": "OpenAI",
   "status": "Under development",
   "announcement_date": "2026-07-22",
   "project_evidence": [
    "# OpenAI is building a $20 billion AI data center campus near Savannah, Georgia",
    "The project, called Project Camellia, will draw 3.2 gigawatts of power from Georgia Power in phases between 2028 and 2032",
    "The facility, named Project Camellia, is located within the Savannah Gateway Industrial Hub, about 45 minutes outside of Savannah, and would be the first data center that OpenAI is designing and building itself."
   ],
   "locality_evidence": [
    "# OpenAI is building a $20 billion AI data center campus near Savannah, Georgia",
    "The facility, named Project Camellia, is located within the Savannah Gateway Industrial Hub, about 45 minutes outside of Savannah, and would be the first data center that OpenAI is designing and building itself."
   ],
   "state_evidence": [
    "# OpenAI is building a $20 billion AI data center campus near Savannah, Georgia",
    "OpenAI [announced plans Wednesday](https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/) to build a data center campus in Effingham County, Georgia, committing $20 billion to the project in order to qualify for a local incentive package."
   ],
   "capacity_gw_evidence": [
    "The project, called Project Camellia, will draw 3.2 gigawatts of power from Georgia Power in phases between 2028 and 2032",
    "The company has contracted with Georgia Power to receive 3.2 gigawatts of power, with delivery expected in phases between 2028 and 2032."
   ],
   "builder_evidence": [
    "# OpenAI is building a $20 billion AI data center campus near Savannah, Georgia",
    "The facility, named Project Camellia, is located within the Savannah Gateway Industrial Hub, about 45 minutes outside of Savannah, and would be the first data center that OpenAI is designing and building itself."
   ],
   "ai_customer_evidence": [
    "# OpenAI is building a $20 billion AI data center campus near Savannah, Georgia",
    "OpenAI [announced plans Wednesday](https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/) to build a data center campus in Effingham County, Georgia, committing $20 billion to the project in order to qualify for a local incentive package."
   ],
   "status_evidence": [
    "# OpenAI is building a $20 billion AI data center campus near Savannah, Georgia",
    "OpenAI [announced plans Wednesday](https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/) to build a data center campus in Effingham County, Georgia, committing $20 billion to the project in order to qualify for a local incentive package."
   ],
   "announcement_date_evidence": [
    "[By Cris Tolomia](/author/cristolomia)\u00b73 min read\u00b7Updated July 22, 2026",
    "OpenAI [announced plans Wednesday](https://openai.com/index/building-ai-infrastructure-with-the-effingham-county-community/) to build a data center campus in Effingham County, Georgia, committing $20 billion to the project in order to qualify for a local incentive package."
   ]
  },
  {
   "url": "https://palmbeachdailynews.com/story/news/local/michigan/2026/03/17/google-weighs-joining-van-buren-township-data-center-project-dte-energy/89187228007",
   "title": "Google weighs joining Van Buren Township data center project",
   "published_at": "2026-03-17T12:02:32",
   "project": "Project Cannoli",
   "locality": "Van Buren Township",
   "state": "Michigan",
   "capacity_gw": 1.0,
   "builder": "Panattoni Development Co.",
   "ai_customer": "Google",
   "status": "seeking approval",
   "announcement_date": "2026-03-17",
   "project_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "The tech giant is evaluating whether it will get involved with [Project Cannoli, the hyperscale data center project advancing in the western Wayne County community](/story/news/local/wayne-county/2026/03/06/nda-nondisclosure-agreement-confidentiality-clues-panattoni-anchor-designs-van-buren-data-center/89016021007/), a Google spokesperson said in an email."
   ],
   "locality_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project."
   ],
   "state_evidence": [
    "MICHIGAN",
    "# Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project."
   ],
   "capacity_gw_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "The Cannoli Project hyperscale data center in Van Buren Township will demand 1 gigawatt of power, DTE Energy Corporate Communications Director Jill Wilmot said in an email."
   ],
   "builder_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "The data center project is being pushed by California real estate development firm Panattoni Development Co."
   ],
   "ai_customer_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project."
   ],
   "status_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project."
   ],
   "announcement_date_evidence": [
    "# Google weighs joining Van Buren Township data center project",
    "Updated March 17, 2026, 3:27 p.m. ET",
    "Google announced Tuesday it is working with the developer of the hyperscale data center seeking approval in Van Buren Township and may sign on to the project."
   ]
  },
  {
   "url": "https://ai.blab.com/2026-06-28-terawulf-expands-ai-infrastructure-with-kentucky-acquisition-bank-of-america-issues-buy-rating",
   "title": "TeraWulf Expands AI Infrastructure with Kentucky Acquisition, Bank of America Issues Buy Rating",
   "published_at": "2026-06-28T00:00:00",
   "project": "Muskie Data Campus",
   "locality": "Grayson",
   "state": "Kentucky",
   "capacity_gw": 1.0,
   "builder": "TeraWulf",
   "ai_customer": null,
   "status": "planned",
   "announcement_date": "2026-05-26",
   "project_evidence": [
    "# TeraWulf Expands AI Infrastructure with Kentucky Acquisition, Bank of America Issues Buy Rating",
    "On May 26, TeraWulf Inc. (NASDAQ:WULF) announced the purchase of the Muskie Data Campus, a development site in Kentucky that will expand the company\u2019s hyperscale digital infrastructure portfolio for high\u2011performance computing (HPC) and artificial intelligence (AI) workloads."
   ],
   "locality_evidence": [
    "# TeraWulf Expands AI Infrastructure with Kentucky Acquisition, Bank of America Issues Buy Rating",
    "The site, located in the EastPark Industrial Park in Grayson, Kentucky, was acquired from Industrial Equity Partners."
   ],
   "state_evidence": [
    "# TeraWulf Expands AI Infrastructure with Kentucky Acquisition, Bank of America Issues Buy Rating",
    "On May 26, TeraWulf Inc. (NASDAQ:WULF) announced the purchase of the Muskie Data Campus, a development site in Kentucky that will expand the company\u2019s hyperscale digital infrastructure portfolio for high\u2011performance computing (HPC) and artificial intelligence (AI) workloads.",
    "The site, located in the EastPark Industrial Park in Grayson, Kentucky, was acquired from Industrial Equity Partners."
   ],
   "capacity_gw_evidence": [
    "# TeraWulf Expands AI Infrastructure with Kentucky Acquisition, Bank of America Issues Buy Rating",
    "The company projects that the campus will provide more than 1 GW of digital infrastructure capacity, with 500 MW of power expected to become available in the second half of 2028 and the remaining capacity scheduled for the second half of 2030."
   ],
   "builder_evidence": [
    "# TeraWulf Expands AI Infrastructure with Kentucky Acquisition, Bank of America Issues Buy Rating",
    "On May 26, TeraWulf Inc. (NASDAQ:WULF) announced the purchase of the Muskie Data Campus, a development site in Kentucky that will expand the company\u2019s hyperscale digital infrastructure portfolio for high\u2011performance computing (HPC) and artificial intelligence (AI) workloads.",
    "The acquisition is part of TeraWulf\u2019s strategy to build power\u2011advantaged campuses that can support large\u2011scale AI and HPC operations."
   ],
   "ai_customer_evidence": null,
   "status_evidence": [
    "# TeraWulf Expands AI Infrastructure with Kentucky Acquisition, Bank of America Issues Buy Rating",
    "The company projects that the campus will provide more than 1 GW of digital infrastructure capacity, with 500 MW of power expected to become available in the second half of 2028 and the remaining capacity scheduled for the second half of 2030."
   ],
   "announcement_date_evidence": [
    "# TeraWulf Expands AI Infrastructure with Kentucky Acquisition, Bank of America Issues Buy Rating",
    "On May 26, TeraWulf Inc. (NASDAQ:WULF) announced the purchase of the Muskie Data Campus, a development site in Kentucky that will expand the company\u2019s hyperscale digital infrastructure portfolio for high\u2011performance computing (HPC) and artificial intelligence (AI) workloads."
   ]
  }
 ],
 "notes": [
  "Merged 21 queries (4200 total) \u2192 4086 unique results",
  "Search result set: r869691ab5fb (4086 rows), reference it as FROM r869691ab5fb in follow-up queries",
  "Semantic operators ran on only the first 2000 of 4086 input rows; the rest are absent from this result. Narrow the input with exact filters or process it in batches.",
  "WARNING: semantic extraction failed on 4 of 2000 rows \u2014 extracted values are null on those rows. First error: timed_out after 90.0s"
 ]
}